7 Absen Tenaga Kerja - Oke
7 Absen Tenaga Kerja - Oke
Pekerjaan : Renovasi Lahan Parkir Motor Club House Township Tanah Putih
Lokasi : Tanjung Enim
Tahun : 2023
Hari Ke - TOTAL
NO NAMA PEKERJA STATUS ABSEN UPAH HARIAN JUMLAH UPAH PARAF
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 Eko Prabowo Tukang 1 1 1 1 1 1 1 1 1 1 1 1 1 1 14 170,000 2,380,000
2 Agusman H Tukang 1 1 1 1 1 1 1 1 1 1 1 1 1 1 14 170,000 2,380,000
3 Gibran Ibrahim Pekerja 1 1 1 1 1 1 1 1 1 1 1 1 1 1 14 140,000 1,960,000
4 Hendriyanto Pekerja 1 1 1 1 1 1 1 1 1 1 1 1 1 1 14 140,000 1,960,000
5 Ahmadi Pekerja 1 1 1 1 1 1 1 1 1 1 1 1 1 1 14 140,000 1,960,000
6 Radika Pekerja 1 1 1 1 1 1 1 1 1 1 1 1 1 1 14 140,000 1,960,000
7 Amir Wani Pekerja 1 1 1 1 1 1 1 1 1 1 1 1 1 1 14 140,000 1,960,000
TOTAL 14,560,000
- Izin Kerja
- Sakit
Eko Prabowo
Pekerjaan : Renovasi Lahan Parkir Motor Club House Township Tanah Putih
Lokasi : Tanjung Enim
Tahun : 2023
Hari Ke - TOTAL
NO NAMA PEKERJA STATUS ABSEN UPAH HARIAN JUMLAH UPAH PARAF
15 16 17 18 19 20 21
1 Eko Prabowo Tukang 1 1 1 1 1 1 1 7 170,000 1,190,000
2 Agusman H Tukang 1 1 1 1 1 1 1 7 170,000 1,190,000
3 Gibran Ibrahim Pekerja 1 1 1 1 1 1 1 7 140,000 980,000
4 Hendriyanto Pekerja 1 1 1 1 1 1 1 7 140,000 980,000
5 Ahmadi Pekerja 1 1 1 1 1 1 1 7 140,000 980,000
6 Radika Pekerja 1 1 1 1 1 1 1 7 140,000 980,000
7 Amir Wani Pekerja 1 1 1 1 1 1 1 7 140,000 980,000
TOTAL 7,280,000
- Izin Kerja
- Sakit
Eko Prabowo
21,840,000
Harga Satuan Volume Satuan Jumlah
Tenaga 21,840,000.00 1.00 Ls 21,840,000.00
Kayu 5x5x400 cm Kelas II 2,651,000.00 1.00 m3 2,651,000.00
Kayu 2x25x400 cm Kelas II 2,651,000.00 1.00 m3 2,651,000.00
Pasir 187,000.00 40.00 m3 7,480,000.00
Semen Baturaja 68,000.00 120.00 Zak 8,160,000.00
Batu Andesit Uk 30x60 cm 297,000.00 130.00 m2 38,610,000.00
Koral Sikat 187,500.00 13.00 m2 2,437,500.00
Propan Stonkote 147,000.00 130.00 Kg 19,110,000.00
Thinner 65,000.00 130.00 L 8,450,000.00
Total 111,389,500.00
Deal 111,387,650.00
Selisih (1,850.00)