PEKERJAAN PENYELESAIAN
4.1 Pembersihan Lokasi Kerja m¹ 2,583.50 2,595.00 1,100.00 2,841,850.00 2,854,500.00
4.2 Pembuangan Sisa Tanah dan Lain-lain Dari Lokasi Kerja
- Untuk DN. 100 - 400 > 50 m¹ 2,583.50 2,595.00 4,900.00 12,659,150.00 12,715,500.00
4.3 Pembuatan Gambar Pelaksanaan (As Built Drawing) ls 1.00 1.00 2,050,000.00 2,050,000.00 2,050,000.00
SUB TOTAL- IV 17,551,000.00 17,620,000.00
Jumlah 1,093,986,648.60 1,201,458,120.40
Dibulatkan 1,093,986,000.00 1,201,458,000.00
PPN 109,398,600.00 120,145,800.00
Total 1,203,384,600.00 1,321,603,800.00
Terbilang : Satu Milyar Tiga Ratus Dua Puluh Satu Juta Enam Ratus Tiga Ribu Delapan Ratus Rupiah
Bobot pekerjaan 1,321,603,800.00 X 100% = 100% Padang, Februari 2022
1,321,603,800.00 ###
Disetujui Oleh :
Direktur Bidang Teknik
Pekerjaan : Optimalisasi IPA Guo Kuranji No. Kontrak Addendum : 07/S.PERJ-PK/2021 - AMD. I
Lokasi : IPA Guo Kuranji -Kota Padang Tgl. Kontrak Addendum : 18 Januari 2022
Jangka Waktu Pekerjaan : 150 (Seratus Lima Puluh) hari kalender Bulan Ke : III (Tiga)
Pelaksana : PT. VANESA CITRA NUSANTARA Tanggal : 17 Januari 2022
Nomor Kontrak : 07/S.PERJ.PK/2021 s/d Tanggal : 13 Februari 2022
Tanggal : 23 November 2021
ADDENDUM Ke-1 Rencana Pelaksanaan Minggu ke …
BOBOT
NO. URAIAN 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
VOLUME SATUAN
% Bulan 1 Bulan 2 Bulan 3 Bulan 4 Bulan 5 Bulan 6 Bulan 7
I. Pekerjaan Persiapan
1.1 Papan nama proyek 1.00 Bh 0.04 0.04 100%
1.2 Pengukuran dan Pemasangan Bowplank 14.40 M1 0.08 0.04 0.04
1.3 Mobilisasi dan Demobilisasi Kegiatan 1.00 ls 1.13 0.07 0.07 0.14 0.07 0.07 0.42 0.28
1.4 Dokumentasi, Pelaporan, Shop Drawing, Asbuilt Drawing 1.00 Paket 1.41 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05
1.5 Penyedian alat bantu pekerjaan 1.00 ls 1.13 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08
Sub Total - I
II. Rehabilitasi IPA
A Pengadaan besi baja dan fasilitas treatment
1 Pembongkaran, Penyediaan alat bantu Hoisting, dll - ls
2 Pembongkaran Tambahan Bangunan Bekas Flokulator 49.88 M3 2.92 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.10 0.10 0.10 0.10 0.10 0.10
3 Pengadaan baja
1. Koagulator 2,430.36 Kg 2.60 0.52 0.52 0.52 0.52 0.26 0.26
2. Flokulator 14,878.89 Kg 15.90 1.06 1.06 1.06 1.06 1.06 1.06 1.06 1.06 1.06 1.06 1.06 1.06 1.06 1.06 1.06
3. Sedimentasi 4,305.53 Kg 4.60 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46
4. Support dan Stiffener (UNF 100 dan UNF 50) 4,061.51 Kg 4.34 0.87 0.87 0.87 0.87 0.43 0.22 0.22
4 Fasilitas Treatment
Tube Settler PVC ; panjang = 1,20 m T= 1 mm 28.83 M2 10.74 1.07 1.07 1.07 1.07 1.07 1.07 1.07 1.07 1.07 1.07
5 Pembongkaran pipa bypass ke Filter 1.00 Ls 0.11 0.04 0.04 0.04
6 Pemasangan pipa bypass ke Filter 1.00 Ls 0.28 0.09 0.09 0.09
Total -A
B Pengadaan Perpipaan dan Accessories Pipa
Koagulator 90%
1 Wall pipe Dia. 300 mm 3.00 Bh 0.55 0.55
2 Pipa GIP dia. 300 mm 4.00 M1 0.36 0.36
3 Bend GIP dia. 300 mm x 90 2.00 Bh 0.22 0.11 0.11
4 Butterfly valve dia. 300 mm 2.00 Bh 1.53 1.53
5 Loose Flange dia. 300 mm 6.00 Bh 0.23 0.23
Flokulator
1 Wall pipe Dia. 600 mm 2.00 Bh 1.06 0.53 0.53
2 Wall pipe Dia. 300 mm 2.00 Bh 0.37 0.19 0.19
3 Pipa GIP dia. 600 mm 5.00 M1 1.62 0.81 0.81
4 Pipa GIP dia. 300 mm 7.00 M1 0.63 0.32 0.32
5 Pipa GIP dia. 100 mm 12.00 M1 0.19 0.19
6 Bend GIP dia. 300 mm x 90 2.00 Bh 0.22 0.22
7 Bend GIP dia. 100 mm x 90 8.00 Bh 0.08 0.08
8 Tee GIP dia. 100 mm 4.00 Bh 0.04 0.04
9 Butterfly valve dia. 100 mm 4.00 Bh 0.72 0.72
10 Loose Flange dia. 600 mm 4.00 Bh 0.46 0.46
11 Loose Flange dia. 100 mm 8.00 Bh 0.06 0.06
Sedimentasi
1 Pipa GIP dia. 200 mm 6.00 M1 0.26 0.07 0.07 0.07 0.07
2 Bend GIP dia. 200 mm x 90 4.00 M1 0.16 0.16
3 Butterfly valve dia. 200 mm 2.00 Bh 0.69 0.35 0.35
4 Loose Flange dia. 200 mm 4.00 Bh 0.07 0.07 80%
Total - B
C Pekerjaan Pemasangan baja & Fasilitas Treatment
1 Pekerjaan baja
1. Sandblasting 718.96 M2 4.75 1.19 1.19 0.59 0.59 0.59 0.59
2. Memasang Dan Merakit Baja 25,676.29 Kg 3.20 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21
3. Pekerjaan pabrikasi, tekukan, potongan dan pelubangan 10,093.25 Kg 1.69 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12
4. Pengelasan 25,676.29 Kg 3.84 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35
2 Fasilitas Treatment
Tube Settler PVC ; panjang = 1,20 m T= 1 mm 28.83 M2 0.54 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06
3 Pengecatan
1. Bagian dalam : primer, under dan finish coat 2 lapis 363.25 M2 1.22 0.20 0.20 0.20 0.20 0.20 0.20
2. Bagian luar : primer, under dan finish coat 2 lapis 381.15 M2 1.28 0.21 0.21 0.21 0.21 0.21 0.21
3. Mengikis & Pengecatan kembali dinding bangunan 290.68 M2 0.73 0.18 0.18 0.18 0.18
filter dan sedimentasi
Total - C
ADDENDUM Ke-1 Rencana Pelaksanaan Minggu ke …
BOBOT
NO. URAIAN 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
VOLUME SATUAN
% Bulan 1 Bulan 2 Bulan 3 Bulan 4 Bulan 5 Bulan 6 Bulan 7
D Pemasangan Perpipaan dan Accessories Pipa
Koagulator
1 Wall pipe Dia. 300 mm 3.00 Bh 0.05 0.05
2 Pipa GIP dia. 300 mm 4.00 M1 0.02 0.02
3 Bend GIP dia. 300 mm x 90 2.00 Bh 0.01 0.01
4 Butterfly valve dia. 300 mm 2.00 Bh 0.04 0.04 70%
5 Loose Flange dia. 300 mm 6.00 Bh 0.02 0.02
Flokulator
1 Wall pipe Dia. 600 mm 2.00 M1 0.11 0.11
2 Wall pipe Dia. 300 mm 2.00 M1 0.04 0.04
3 Pipa GIP dia. 600 mm 5.00 Bh 0.06 0.06
4 Pipa GIP dia. 300 mm 7.00 Bh 0.04 0.04
5 Pipa GIP dia. 100 mm 12.00 Bh 0.03 0.03
6 Bend GIP dia. 300 mm x 90 2.00 Bh 0.01 0.01
7 Bend GIP dia. 100 mm x 90 8.00 Bh 0.03 0.03
8 Tee GIP dia. 100 mm 4.00 Bh 0.01 0.01
9 Butterfly valve dia. 100 mm 4.00 Bh 0.07 0.07
10 Loose Flange dia. 600 mm 4.00 Bh 0.02 0.02
11 Loose Flange dia. 100 mm 8.00 Bh 0.01 0.01
Sedimentasi
1 Pipa GIP dia. 200 mm 6.00 Bh 0.03 0.03
2 Bend GIP dia. 200 mm x 90 4.00 M1 0.02 0.02
3 Butterfly valve dia. 200 mm 2.00 Bh 0.04 0.04
4 Loose Flange dia. 200 mm 4.00 Bh 0.01 0.01
Total - D
Sub Total - II
III Pekerjaan Tanah, Pondasi & Dinding
3.1 Galian Tanah 15.12 M3 0.07 0.07 60%
3.2 Pembuangan Tanah 11.73 M3 0.03 0.03
3.3 Urugan sirtu dipadatkan - M3
3.4 Lantai kerja Beton 1 : 3 : 5 2.24 M3 0.11 0.03 0.03 0.03 0.03
3.5 Pondasi Plat setempat Beton Bertulang K. 225 2.45 M3 0.78 0.20 0.20 0.20 0.20
3.6 Plat Lantai Inlet Sedimentasi Beton bertulang K. 250 11.53 M3 3.66 0.73 0.73 0.73 0.73 0.73
3.7 Plat Dinding Inlet Sedimentasi Beton bertulang K. 250 4.46 M3 1.37 0.17 0.17 0.17 0.17 0.17 0.17 0.09 0.09 0.09 0.09
3.8 Penambahan Plat Dinding Filter Eksisting K. 250 4.32 M3 1.32 0.17 0.17 0.17 0.17 0.17 0.17 0.08 0.08 0.08 0.08
3.9 Waterstop (plat besi min. 1 mm) - M3
3.10 Hooper Lumpur Sedimentasi (pasangan batu kali) 10.74 M3 0.54 0.14 0.14 0.14 0.14
3.11 Plesteran dan acian Tbl. 20 mm 30.20 M2 0.25 0.06 0.06 0.06 0.06
3.12 Plat Lantai Saluran Inlet Filter - M3
3.13 Plat Lantai Saluran Inlet Filter (Plat Baja)
Pengadaan Besi Baja 1,108.98 Kg 1.19 0.20 0.20 0.20 0.20 0.20 0.20
Pemasangan :
1. Sandblasting 39.79 M2 0.26 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
2. Memasang Dan Merakit Baja 1,108.98 Kg 0.14 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
3. Pekerjaan pabrikasi, tekukan, potongan dan pelubangan 986.75 Kg 0.16 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
4. Pengelasan 1,108.98 M1 0.17 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
3.14 Leveling Beton di Sedimentasi dan Filter (Beton) 0.34 M3 0.02 0.01 0.01
3.15 Pas. Batu bata Saluran Drainase 38.18 M2 0.32 0.11 0.11 0.11
3.16 Plesteran dan acian Tbl. 15 mm 38.18 M2 0.32 0.11 0.11 0.11 50%
3.17 Pondasi Tapak 70 x 70 x 25 Kedalaman 1 m (Beton K225) untuk Perkuatan 0.94 M3 0.30 0.10 0.10 0.10
Sedimentasi dan Filter 5 Titik
100.09
Rencana Progres (Add) 0.39 0.35 0.38 0.76 0.76 1.90 2.07 2.47 3.14 6.33 4.42 3.66 4.16 3.82 5.41 5.07 6.08 2.75 12.36 6.05 3.90 3.20 3.60 3.40 2.64 4.18 2.86 2.65 1.31
Kumulatif Rencana Progres (Add) 0.39 0.74 1.12 1.88 2.64 4.54 6.61 9.08 12.22 18.55 22.97 26.63 30.79 34.61 40.02 45.09 51.17 53.92 66.28 72.33 76.23 79.43 83.03 86.43 89.07 93.25 96.11 98.76 100.07
Realisasi Progres (Add) 0.077 0.962 2.986 1.273 1.098 0.445 0.900 1.860 1.24 3.94 1.78 3.05
Kumulatif Realisasi Progres (Add) 0.08 1.04 4.03 5.30 6.40 6.85 7.75 7.69 8.93 12.87 14.65 17.70
Deviasi Terhadap Rencana Progres (Add) - 0.31 0.30 2.91 3.42 3.76 2.31 1.14 - 1.39 - 3.29 - 5.68 - 8.32 - 8.93
Kurva Rencana Progress Add
Kurva Realisasi Progress Add
Padang, 13 Februari 2022
WAKTU PELAKSANAAN
NOVEMBER DESEMBER JANUARI FEBRUARI
BOBOT MGG MGG MGG MGG MGG MGG MGG MGG MGG MGG MGG MGG MGG MGG
No. URAIAN PEKERJAAN VOLUME SAT PEKERJAAN KETERANGAN
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14
18-Nov 22-Nov 29-Nov 6-Dec 13-Dec 20-Dec 27-Dec 3-Jan 10-Jan 17-Jan 24-Jan 31-Jan 7-Feb 14-Feb
(%) 21-Nov 28-Nov 5-Dec 12-Dec 19-Dec 26-Dec 2-Jan 9-Jan 16-Jan 23-Jan 30-Jan 6-Feb 13-Feb 15-Feb
I. PEKERJAAN PERSIAPAN RENCANA
1.1 Pengukuran dan Pembersihan Lapangan 2583.50 m¹ 0.200 - 0.200 0.200 0.200
- Untuk > 50 REALISASI
1.2 Mobilisasi dan Demobilisasi Material dan Peralatan Kerja 1.00 ls 0.400 - 0.400 0.400 0.400
Dari Gudang ke Lokasi Kerja
1.3 Dokumentasi Kegiatan 1.00 paket 0.080 - 0.080 0.080 0.080
Mobilisasi dan Demobilisasi Material & Peralatan Kegiatan
ADRIANSYAH, A.Md
NIK. 196601219
LAPORAN MINGGUAN
PEKERJAAN : Pemas. Jaringan Pipa DN. 200 mm HDPE
LOKASI : Simp. 3 Gunung Sariak - Jl. Rimbo Tarok MINGGU KE : II
DEP / INSTP : Perumda Air Minum Kota Padang TANGGAL : 22 November 2021
KONTRAK NO. : 06/S.PERJ-PK/2021, Tanggal 18 November 2021 S/D TANGGAL : 28 November 2021
PELAKSANA : CV. ABDI TAMA
ADRIANSYAH, A.Md
NIK. 196601219
LAPORAN MINGGUAN
ADRIANSYAH, A.Md
NIK. 196601219
TIME SCHEDULE REALISASI
PEKERJAAN : 06/S.PERJ-PK/2021, Tanggal 18 November 2021
LOKASI : Simp. 3 Gunung Sariak - Jl. Rimbo Tarok
DEP / INSTP : Perumda Air Minum Kota Padang
KONTRAK NO. : Simp. 3 Gunung Sariak - Jl. Rimbo Tarok
PELAKSANA : CV. ABDI TAMA
WAKTU PELAKSANAAN
NOVEMBER DESEMBER JANUARI FEBRUARI
BOBOT MGG MGG MGG MGG MGG MGG MGG MGG MGG MGG MGG MGG MGG MGG
No. URAIAN PEKERJAAN VOLUME ADD SAT PEKERJAAN KETERANGAN
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14
18-Nov 22-Nov 29-Nov 6-Dec 13-Dec 20-Dec 27-Dec 3-Jan 10-Jan 17-Jan 24-Jan 31-Jan 7-Feb 14-Feb
(%) 21-Nov 28-Nov 5-Dec 12-Dec 19-Dec 26-Dec 2-Jan 9-Jan 16-Jan 23-Jan 30-Jan 6-Feb 13-Feb 15-Feb
I. PEKERJAAN PERSIAPAN RENCANA
1.1 Pengukuran dan Pembersihan Lapangan 2583.50 m¹ 0.190 - 0.190 0.190 0.190 0.190 0.190 0.190 0.190
- Untuk > 50 - - REALISASI
1.2 Mobilisasi dan Demobilisasi Material dan Peralatan Kerja 1.00 ls 0.360 - 0.360 0.360 0.360 0.360 0.360 0.360 0.360
Dari Gudang ke Lokasi Kerja - -
1.3 Dokumentasi Kegiatan 1.00 paket 0.070 - 0.070 0.070 0.070 0.070 0.070 0.070 0.070
Mobilisasi dan Demobilisasi Material & Peralatan Kegiatan
ADRIANSYAH, A.Md
NIK. 196601219
TIME SCHEDULE REALISASI
PEKERJAAN : 06/S.PERJ-PK/2021, Tanggal 18 November 2021
LOKASI : Simp. 3 Gunung Sariak - Jl. Rimbo Tarok
DEP / INSTP : Perumda Air Minum Kota Padang
KONTRAK NO. : Simp. 3 Gunung Sariak - Jl. Rimbo Tarok
PELAKSANA : CV. ABDI TAMA
WAKTU PELAKSANAAN
NOVEMBER DESEMBER JANUARI FEBRUARI
BOBOT MGG MGG MGG MGG MGG MGG MGG MGG MGG MGG MGG MGG MGG MGG
No. URAIAN PEKERJAAN VOLUME ADD SAT PEKERJAAN KETERANGAN
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14
18-Nov 22-Nov 29-Nov 6-Dec 13-Dec 20-Dec 27-Dec 3-Jan 10-Jan 17-Jan 24-Jan 31-Jan 7-Feb 14-Feb
(%) 21-Nov 28-Nov 5-Dec 12-Dec 19-Dec 26-Dec 2-Jan 9-Jan 16-Jan 23-Jan 30-Jan 6-Feb 13-Feb 15-Feb
I. PEKERJAAN PERSIAPAN RENCANA
1.1 Pengukuran dan Pembersihan Lapangan 2583.50 m¹ 0.190 - 0.190 0.190 0.190 0.190 0.190 0.190 0.190 0.190 0.190 0.190 0.190
- Untuk > 50 - - - - - - REALISASI
1.2 Mobilisasi dan Demobilisasi Material dan Peralatan Kerja 1.00 ls 0.360 - 0.360 0.360 0.360 0.360 0.360 0.360 0.360 0.360 0.360 0.360 0.360
Dari Gudang ke Lokasi Kerja - - - - - -
1.3 Dokumentasi Kegiatan 1.00 paket 0.070 - 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070
Mobilisasi dan Demobilisasi Material & Peralatan Kegiatan -
-
II. PEKERJAAN GALIAN DAN URUGAN -
2.1 Galian Tanah Keras Untuk Pemasangan Pipa -
- DN. 200 mm HDPE 2496.00 m¹ 21.180 - 5.030 10.070 15.100 20.140 21.180 21.180 21.180 21.180 21.180 21.180 21.180
2.2 Urugan Pasir Pelindung Untuk Pemasangan Pipa - - - - - - -
- DN. 200 mm HDPE 2496.00 m¹ 15.620 - 3.710 7.430 11.140 14.850 15.620 15.620 15.620 15.620 15.620 15.620 15.620
2.3 Urugan Tanah Bekas Galian Dan Perataan - - - - - - -
- DN. 200 mm HDPE 2496.00 m¹ 3.520 - 0.840 1.680 2.520 3.360 3.520 3.520 3.520 3.520 3.520 3.520 3.520
2.4 Pemadatan Tanah Bekas Urugan - - - - - - -
- DN. 200 mm HDPE 2496.00 m¹ 1.260 - 0.300 0.600 0.900 1.200 1.260 1.260 1.260 1.260 1.260 1.260 1.260
2.5 Bongkar/Perbaikan Jalan Aspal 26.98 m² 1.780 - - 0.210 0.210 0.210 0.980 0.980 1.780 1.780 1.780 1.780 1.780
2.6 Bongkar/Perbaikan Jalan Beton 34.30 m³ 4.770 - - 0.380 0.380 0.380 0.550 2.090 4.770 4.770 4.770 4.770 4.770
2.7 Syphon Pipa DN. 200 mm HDPE 3.00 m¹ 0.080 - - - - 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080
- - -
III. PEKERJAAN PEMASANGAN - -
3.1 Pemasangan Pipa Fitting - - -
- DN. 200 mm HDPE 2496.00 m¹ 14.430 - 3.430 6.860 10.290 13.720 14.430 14.430 14.430 14.430 14.430 14.430 14.430
3.2 Penyambungan Pipa HDPE - - - - - - -
- DN. 200 mm HDPE 405.00 unit 8.640 - 2.110 4.220 6.330 8.440 8.640 8.640 8.640 8.640 8.640 8.640 8.640
3.3 Pencucian Pipa - - - - - - -
- DN. 200 mm HDPE 2583.50 m¹ 0.640 - - - - - - - 0.640 0.640 0.640 0.640 0.640
3.4 Pengetesan Pipa - - - - - - - -
- DN. 200 mm HDPE 2583.50 m¹ 0.600 - - - - - - - - - - - -
3.5 Pemasangan Thrustblock 5.24 m³ 0.420 - - - - - - - 0.420 0.420 0.420 0.420 0.420
3.6 Pemasangan Jembatan Pipa Steel Lengkap Dengan - - - - - - - -
Accessories Pipa dan Lain-lainnya - - - - - - - -
- DN. 200 mm ST L = 9 mtr Kaki Jemb. 1,5 mtr 1.00 unit 0.760 - - - - - 0.500 0.500 0.760 0.760 0.760 0.760 0.760
- DN. 200 mm ST L = 2,5 mtr Kaki Jemb. 1,5 mtr 1.00 unit 0.540 - - - - - - - 0.540 0.540 0.540 0.540 0.540
- DN. 200 mm ST L = 11 mtr Kaki Jemb. 1,5 mtr 0.00 unit - - - - - - - - - - - -
- DN. 200 mm ST L = 4,5 mtr Kaki Jemb. 1,5 mtr 1.00 unit 0.590 - - - - - - - 0.590 0.590 0.590 0.590 0.590
- DN. 200 mm ST L = 12 mtr Kaki Jemb. 1,5 mtr + WO 0.00 unit - - - - - - - - - - - -
- DN. 200 mm ST L = 4 mtr Kaki Jemb. 0,75 mtr 1.00 unit 0.520 - - - 0.520 0.520 0.520 0.520 0.520
- DN. 200 mm ST L = 10 mtr Kaki Jemb. 7,5 mtr + WO 1.00 unit 2.590 - - - 2.590 2.590 2.590 2.590 2.590
- DN. 200 mm ST L = 2 mtr Kaki Jemb. 1,5 mtr 1.00 unit 0.530 - - - 0.530 0.530 0.530 0.530 0.530
- DN. 200 mm ST L = 12 mtr Kaki Jemb. 1,5 mtr 1.00 unit 0.820 - - - 0.820 0.820 0.820 0.820 0.820
- DN. 200 mm ST L = 2,5 mtr Kaki Jemb. 1,5 mtr + WO 1.00 unit 0.830 - - - 0.830 0.830 0.830 0.830 0.830
3.7 Koneksi Ke Pipa Lama Berikut Pencarian Gate Valve, - - - - - - - -
Spindle, Box Street Serta Penyediaan Thrustblock - - - - - - - -
- DN. 250 x 200 mm 1.00 unit 0.280 - - - - - - - 0.280 0.280 0.280 0.280 0.280
3.8 Pek. Jembatan Baja IWF - - - - - - -
1 Pondasi - - - - - - -
a Galian Tanah 5.52 m³ 0.040 - - - - - 0.040 0.040 0.040 0.040 0.040 0.040
b Pekerjaan Kepala Pondasi Sumuran Beton Bertulangn K.225 2.00 unit 0.460 - - - - - - 0.460 0.920 0.920 0.920 0.920
c Pek. Pondasi Sumuran Ø 1m, Beton bertulang dalam 1 m 2.00 unit 0.280 - - - - - - 0.140 0.280 0.280 0.280 0.280
d Pek. Pondasi Sumuran Ø 1m Siklop 60 % Beton bertulang 1:2:3 + 40 % 2.00 unit 0.280 - - - - - - - 0.280 0.280 0.280 0.280
40 % + Batu Kali kedalaman 2 m - - - - - - -
e Pek. Pondasi Sumuran Ø 1m Siklop 60 % Beton bertulang 1:2:3 + 40 % 2.00 unit 0.280 - - - - - - - 0.280 0.280 0.280 0.280
40 % + Batu Kali kedalaman 3 m - - - - - -
f Pek. Pondasi Sumuran Ø 1m Siklop 60 % Beton bertulang 1:2:3 + 40 % 2.00 unit 0.260 - - - - - - 0.260 0.260 0.260 0.260
40 % + Batu Kali kedalaman 4 m - - - - - -
2 Pengadaan dan Pemasangan Jembatan Baja - - -
a Memasang Baja IWF 250x125x6x9 1462.24 kg 5.260 - - - - 5.260 5.260 5.260 5.260 5.260 5.260
b Memasang Support dan Stiffener (UNP120 , siku 60 , 837.43 kg 3.010 - - - - - 3.010 3.010 3.010 3.010 3.010
Plat t. 16mm, 10mm, 8mm ) - - - - - -
c Memasang Pekerjaan Perakitan 2299.67 kg 0.320 - - - - - - 0.160 0.320 0.320 0.320
d Pengeboran plat tb. s/d 10 mm 492.00 lbg 0.110 - - - - - - 0.110 0.110 0.110 0.110
e Pengeboran plat tb. 10-15 mm 28.00 lbg 0.010 - - - - - - 0.010 0.010 0.010 0.010
f Pengadaan Baut & Angkur Ø19 mm, pjg 60 cm 28.00 bh 0.180 - - - - - - 0.180 0.180 0.180 0.180
g Pengadaan Baut & Angkur 5/8" 176.00 bh 0.100 - - - - - - 0.100 0.100 0.100 0.100
h Pengecatan dan Meni Rangka Baja 77.23 m² 0.600 - - - - - - 0.600 0.600 0.600 0.600
i Pagar Pengaman 2.00 unit 0.700 - - - - - - 0.700 0.700 0.700 0.700
j Alat bantu Perancah 1.00 ls 0.490 - - - - - - 0.490 0.490 0.490 0.490
ADRIANSYAH, A.Md
NIK. 196601219
LAPORAN MINGGUAN
PEKERJAAN : Pemas. Jaringan Pipa DN. 200 mm HDPE
LOKASI : Simp. 3 Gunung Sariak - Jl. Rimbo Tarok MINGGU KE : X
DEP / INSTP : Perumda Air Minum Kota Padang TANGGAL : 17 Januari 2022
KONTRAK NO. : 06/S.PERJ-PK/2021, Tanggal 18 November 2021 S/D TANGGAL : 23 Januari 2022
PELAKSANA : CV. ABDI TAMA
ADRIANSYAH, A.Md
NIK. 196601219
LAPORAN MINGGUAN
PEKERJAAN : Pemas. Jaringan Pipa DN. 200 mm HDPE
LOKASI : Simp. 3 Gunung Sariak - Jl. Rimbo Tarok MINGGU KE : XI
DEP / INSTP : Perumda Air Minum Kota Padang TANGGAL : 24 Januari 2022
KONTRAK NO. : 06/S.PERJ-PK/2021, Tanggal 18 November 2021 S/D TANGGAL : 30 Januari 2022
PELAKSANA : CV. ABDI TAMA
IRWANDI CHAN, ST
NIK. 197404322
LAPORAN MINGGUAN
PEKERJAAN : Pemas. Jaringan Pipa DN. 200 mm HDPE
LOKASI : Simp. 3 Gunung Sariak - Jl. Rimbo Tarok MINGGU KE : XII
DEP / INSTP : Perumda Air Minum Kota Padang TANGGAL : 31 Januari 2022
KONTRAK NO. : 06/S.PERJ-PK/2021, Tanggal 18 November 2021 S/D TANGGAL : 6 Februari 2022
PELAKSANA : CV. ABDI TAMA
IRWANDI CHAN, ST
NIK. 197404322
TIME SCHEDULE REALISASI
PEKERJAAN : 06/S.PERJ-PK/2021, Tanggal 18 November 2021
LOKASI : Simp. 3 Gunung Sariak - Jl. Rimbo Tarok
DEP / INSTP : Perumda Air Minum Kota Padang
KONTRAK NO. : Simp. 3 Gunung Sariak - Jl. Rimbo Tarok
PELAKSANA : CV. ABDI TAMA
WAKTU PELAKSANAAN
NOVEMBER DESEMBER JANUARI FEBRUARI
BOBOT MGG MGG MGG MGG MGG MGG MGG MGG MGG MGG MGG MGG MGG MGG
No. URAIAN PEKERJAAN VOLUME ADD SAT PEKERJAAN KETERANGAN
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14
18-Nov 22-Nov 29-Nov 6-Dec 13-Dec 20-Dec 27-Dec 3-Jan 10-Jan 17-Jan 24-Jan 31-Jan 7-Feb 14-Feb
(%) 21-Nov 28-Nov 5-Dec 12-Dec 19-Dec 26-Dec 2-Jan 9-Jan 16-Jan 23-Jan 30-Jan 6-Feb 13-Feb 15-Feb
I. PEKERJAAN PERSIAPAN RENCANA
1.1 Pengukuran dan Pembersihan Lapangan 2583.50 m¹ 0.190 - 0.190 0.190 0.190 0.190 0.190 0.190 0.190 0.190 0.190 0.190 0.190 0.190 0.190 0.190
- Untuk > 50 - - - - - - - - - REALISASI
1.2 Mobilisasi dan Demobilisasi Material dan Peralatan Kerja 1.00 ls 0.360 - 0.360 0.360 0.360 0.360 0.360 0.360 0.360 0.360 0.360 0.360 0.360 0.360 0.360 0.360
Dari Gudang ke Lokasi Kerja - - - - - - - - -
1.3 Dokumentasi Kegiatan 1.00 paket 0.070 - 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070
Mobilisasi dan Demobilisasi Material & Peralatan Kegiatan - - - -
- - - -
II. PEKERJAAN GALIAN DAN URUGAN - - - -
2.1 Galian Tanah Keras Untuk Pemasangan Pipa - - - -
- DN. 200 mm HDPE 2496.00 m¹ 21.180 - 5.030 10.070 15.100 20.140 21.180 21.180 21.180 21.180 21.180 21.180 21.180 21.180 21.180 21.180
2.2 Urugan Pasir Pelindung Untuk Pemasangan Pipa - - - - - - - - - -
- DN. 200 mm HDPE 2496.00 m¹ 15.620 - 3.710 7.430 11.140 14.850 15.620 15.620 15.620 15.620 15.620 15.620 15.620 15.620 15.620 15.620
2.3 Urugan Tanah Bekas Galian Dan Perataan - - - - - - - - - -
- DN. 200 mm HDPE 2496.00 m¹ 3.520 - 0.840 1.680 2.520 3.360 3.520 3.520 3.520 3.520 3.520 3.520 3.520 3.520 3.520 3.520
2.4 Pemadatan Tanah Bekas Urugan - - - - - - - - - -
- DN. 200 mm HDPE 2496.00 m¹ 1.260 - 0.300 0.600 0.900 1.200 1.260 1.260 1.260 1.260 1.260 1.260 1.260 1.260 1.260 1.260
2.5 Bongkar/Perbaikan Jalan Aspal 26.98 m² 1.780 - - 0.210 0.210 0.210 0.980 0.980 1.780 1.780 1.780 1.780 1.780 1.780 1.780 1.780
2.6 Bongkar/Perbaikan Jalan Beton 34.30 m³ 4.770 - - 0.380 0.380 0.380 0.550 2.090 4.770 4.770 4.770 4.770 4.770 4.770 4.770 4.770
2.7 Syphon Pipa DN. 200 mm HDPE 3.00 m¹ 0.080 - - - - 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080
- - - - - -
III. PEKERJAAN PEMASANGAN - - - - -
3.1 Pemasangan Pipa Fitting - - - - - -
- DN. 200 mm HDPE 2496.00 m¹ 14.430 - 3.430 6.860 10.290 13.720 14.430 14.430 14.430 14.430 14.430 14.430 14.430 14.430 14.430 14.430
3.2 Penyambungan Pipa HDPE - - - - - - - - - -
- DN. 200 mm HDPE 405.00 unit 8.640 - 2.110 4.220 6.330 8.440 8.640 8.640 8.640 8.640 8.640 8.640 8.640 8.640 8.640 8.640
3.3 Pencucian Pipa - - - - - - - - - -
- DN. 200 mm HDPE 2583.50 m¹ 0.640 - - - - - - - 0.640 0.640 0.640 0.640 0.640 0.640 0.640 0.640
3.4 Pengetesan Pipa - - - - - - - - - - -
- DN. 200 mm HDPE 2583.50 m¹ 0.600 - - - - - - - - - - - - - - -
3.5 Pemasangan Thrustblock 5.24 m³ 0.420 - - - - - - - 0.420 0.420 0.420 0.420 0.420 0.420 0.420 0.420
3.6 Pemasangan Jembatan Pipa Steel Lengkap Dengan - - - - - - - - - - -
Accessories Pipa dan Lain-lainnya - - - - - - - - - - -
- DN. 200 mm ST L = 9 mtr Kaki Jemb. 1,5 mtr 1.00 unit 0.760 - - - - - 0.500 0.500 0.760 0.760 0.760 0.760 0.760 0.760 0.760 0.760
- DN. 200 mm ST L = 2,5 mtr Kaki Jemb. 1,5 mtr 1.00 unit 0.540 - - - - - - - 0.540 0.540 0.540 0.540 0.540 0.540 0.540 0.540
- DN. 200 mm ST L = 11 mtr Kaki Jemb. 1,5 mtr 0.00 unit - - - - - - - - - - - - - - -
- DN. 200 mm ST L = 4,5 mtr Kaki Jemb. 1,5 mtr 1.00 unit 0.590 - - - - - - - 0.590 0.590 0.590 0.590 0.590 0.590 0.590 0.590
- DN. 200 mm ST L = 12 mtr Kaki Jemb. 1,5 mtr + WO 0.00 unit - - - - - - - - - - - - - - -
- DN. 200 mm ST L = 4 mtr Kaki Jemb. 0,75 mtr 1.00 unit 0.520 - - - 0.520 0.520 0.520 0.520 0.520 0.520 0.520 0.520
- DN. 200 mm ST L = 10 mtr Kaki Jemb. 7,5 mtr + WO 1.00 unit 2.590 - - - 2.590 2.590 2.590 2.590 2.590 2.590 2.590 2.590
- DN. 200 mm ST L = 2 mtr Kaki Jemb. 1,5 mtr 1.00 unit 0.530 - - - 0.530 0.530 0.530 0.530 0.530 0.530 0.530 0.530
- DN. 200 mm ST L = 12 mtr Kaki Jemb. 1,5 mtr 1.00 unit 0.820 - - - 0.820 0.820 0.820 0.820 0.820 0.820 0.820 0.820
- DN. 200 mm ST L = 2,5 mtr Kaki Jemb. 1,5 mtr + WO 1.00 unit 0.830 - - - 0.830 0.830 0.830 0.830 0.830 0.830 0.830 0.830
3.7 Koneksi Ke Pipa Lama Berikut Pencarian Gate Valve, - - - - - - - - - - -
Spindle, Box Street Serta Penyediaan Thrustblock - - - - - - - - - - -
- DN. 250 x 200 mm 1.00 unit 0.280 - - - - - - - 0.280 0.280 0.280 0.280 0.280 0.280 0.280 0.280
3.8 Pek. Jembatan Baja IWF - - - - - - - - - -
1 Pondasi - - - - - - - - - -
a Galian Tanah 5.52 m³ 0.040 - - - - - 0.040 0.040 0.040 0.040 0.040 0.040 0.040 0.040 0.040
b Pekerjaan Kepala Pondasi Sumuran Beton Bertulangn K.225 2.00 unit 0.460 - - - - - - 0.460 0.920 0.920 0.920 0.920 0.920 0.920 0.920
c Pek. Pondasi Sumuran Ø 1m, Beton bertulang dalam 1 m 2.00 unit 0.280 - - - - - - 0.140 0.280 0.280 0.280 0.280 0.280 0.280 0.280
d Pek. Pondasi Sumuran Ø 1m Siklop 60 % Beton bertulang 1:2:3 + 40 % 2.00 unit 0.280 - - - - - - - 0.280 0.280 0.280 0.280 0.280 0.280 0.280
40 % + Batu Kali kedalaman 2 m - - - - - - - - - -
e Pek. Pondasi Sumuran Ø 1m Siklop 60 % Beton bertulang 1:2:3 + 40 % 2.00 unit 0.280 - - - - - - - 0.280 0.280 0.280 0.280 0.280 0.280 0.280
40 % + Batu Kali kedalaman 3 m - - - - - - - - -
f Pek. Pondasi Sumuran Ø 1m Siklop 60 % Beton bertulang 1:2:3 + 40 % 2.00 unit 0.260 - - - - - - 0.260 0.260 0.260 0.260 0.260 0.260 0.260
40 % + Batu Kali kedalaman 4 m - - - - - - - - -
2 Pengadaan dan Pemasangan Jembatan Baja - - - - - - -
a Memasang Baja IWF 250x125x6x9 1462.24 kg 5.260 - - - - 5.260 5.260 5.260 5.260 5.260 5.260 5.260 5.260 5.260
b Memasang Support dan Stiffener (UNP120 , siku 60 , 837.43 kg 3.010 - - - - - 3.010 3.010 3.010 3.010 3.010 3.010 3.010 3.010
Plat t. 16mm, 10mm, 8mm ) - - - - - - - - -
c Memasang Pekerjaan Perakitan 2299.67 kg 0.320 - - - - - - 0.160 0.320 0.320 0.320 0.320 0.320 0.320
d Pengeboran plat tb. s/d 10 mm 492.00 lbg 0.110 - - - - - - 0.110 0.110 0.110 0.110 0.110 0.110 0.110
e Pengeboran plat tb. 10-15 mm 28.00 lbg 0.010 - - - - - - 0.010 0.010 0.010 0.010 0.010 0.010 0.010
f Pengadaan Baut & Angkur Ø19 mm, pjg 60 cm 28.00 bh 0.180 - - - - - - 0.180 0.180 0.180 0.180 0.180 0.180 0.180
g Pengadaan Baut & Angkur 5/8" 176.00 bh 0.100 - - - - - - 0.100 0.100 0.100 0.100 0.100 0.100 0.100
h Pengecatan dan Meni Rangka Baja 77.23 m² 0.600 - - - - - - 0.600 0.600 0.600 0.600 0.600 0.600 0.600
i Pagar Pengaman 2.00 unit 0.700 - - - - - - 0.700 0.700 0.700 0.700 0.700 0.700 0.700
j Alat bantu Perancah 1.00 ls 0.490 - - - - - - 0.490 0.490 0.490 0.490 0.490 0.490 0.490
3 Pek. Kawat Bronjong - - - - - - -
a Galian Tanah 8.00 m³ 0.060 - - - 0.060 0.060 0.060 0.060 0.060 0.060
b Pemasangan Bronjong Pabrikasi 32.00 m³ 2.290 - - - 2.290 2.290 2.290 2.290 2.290 2.290
c Selimut Beton K. 175 Tb. 10 cm 5.48 m³ 0.440 - - - 0.440 0.440 0.440 0.440 0.440 0.440
d Bekisting 30.00 m² 0.590 - - - 0.590 0.590 0.590 0.590 0.590 0.590
4 Pek. Turap Penahan Tanah 0.080 0.160 0.160 0.160 0.160 0.160 0.160
a Galian Tanah 9.86 m³ 0.080 - - - 1.070 1.070 1.070 1.070 1.070 1.070
b Pas. Batu Kali 1 : 4 13.50 m³ 1.070 - - - 0.360 0.360 0.360 0.360 0.360 0.360
c Pas. Plesteran + Acian 33.86 m² 0.360 - - - 0.020 0.020 0.020 0.020 0.020 0.020
d Pas. Beton Tumbuk 1:3:5 0.32 m³ 0.020 - - - 0.180 0.180 0.180 0.180 0.180 0.180
e Urugan Tanah Timbunan 17.85 m³ 0.180 - - - 0.040 0.040 0.040 0.040 0.040 0.040
Buis Beton Dia. 100 cm 2.00 bh 0.040 - - - - - - - -
- - - -
IV. PEKERJAAN PENYELESAIAN - - - -
4.1 Pembersihan Lokasi Kerja 2595.00 m¹ 0.240 - - - - 0.240 0.240 0.240 0.240 0.240
4.2 Pembuangan Sisa Tanah dan Lain-lain Dari Lokasi Kerja - - - - - - - - -
- Untuk DN. 100 - 400 > 50 2595.00 m¹ 1.060 - - - - - - - - 1.060 1.060 1.060 1.060 1.060
4.3 Pembuatan Gambar Pelaksanaan (As Built Drawing) 1.00 ls 0.170 - - - - - - - - 0.170 0.170 0.170 0.170 0.170
Jumlah Total 100.000
RENCANA BOBOT PEKERJAAN 0.680 10.280 10.280 10.280 10.280 10.290 9.260 9.260 9.260 9.260 9.240 1.630 1.630 1.630
RENCANA KUMULATIF BOBOT PEKERJAAN 0.680 10.960 21.240 31.520 41.800 52.090 61.350 70.610 79.870 89.130 95.110 96.740 98.370 100.000
REALISASI BOBOT PEKERJAAN - 16.040 16.030 15.420 15.510 4.380 6.840 15.110 3.850 5.290 1.470 - - - -
REALISASI KUMULATIF BOBOT PEKERJAAN - 16.040 32.070 47.490 63.000 67.380 74.220 89.330 93.180 98.470 99.940 99.940 99.940 99.940 99.940
IRWANDI CHAN, ST
NIK. 197404322
LAPORAN MINGGUAN
PEKERJAAN : Pemas. Jaringan Pipa DN. 200 mm HDPE
LOKASI : Simp. 3 Gunung Sariak - Jl. Rimbo Tarok MINGGU KE : XIV
DEP / INSTP : Perumda Air Minum Kota Padang TANGGAL : 14 Februari 2022
KONTRAK NO. : 06/S.PERJ-PK/2021, Tanggal 18 November 2021 S/D TANGGAL : 15 Februari 2022
PELAKSANA : CV. ABDI TAMA
IRWANDI CHAN, ST
NIK. 197404322
LAPORAN BULAN 4 (ADDENDUM)
PENGAWAS
DIVISI PERENCANAAN
KONTRAKTOR PELAKSANA
I. PEKERJAAN PERSIAPAN
1.1 Pengukuran dan Pembersihan Lapangan m¹ 2,583.50 0.19 2,583.50 2,583.50 0.19
- Untuk > 50
1.2 Mobilisasi dan Demobilisasi Material dan Peralatan Kerja ls 1.00 0.36 1.00 1.00 1.00 0.36
Dari Gudang ke Lokasi Kerja
1.3 Dokumentasi Kegiatan paket 1.00 0.07 1.00 1.00 1.00 0.07
Mobilisasi dan Demobilisasi Material & Peralatan Kegiatan
SUB TOTAL - I 0.62 0.62
ADRIANSYAH, A.Md
NIK. 196601219
LAPORAN MINGGUAN
PEKERJAAN : Pemas. Jaringan Pipa DN. 200 mm HDPE
LOKASI : Simp. 3 Gunung Sariak - Jl. Rimbo Tarok MINGGU KE : IX
DEP / INSTP : Perumda Air Minum Kota Padang TANGGAL : 10 Januari 2022
KONTRAK NO. : 06/S.PERJ-PK/2021, Tanggal 18 November 2021 S/D TANGGAL : 16 Januari 2022
PELAKSANA : CV. ABDI TAMA
I. PEKERJAAN PERSIAPAN
1.1 Pengukuran dan Pembersihan Lapangan m¹ 2,595.00 0.19 2,595.00 2,595.00 0.19
- Untuk > 50
1.2 Mobilisasi dan Demobilisasi Material dan Peralatan Kerja ls 1.00 0.36 1.00 1.00 1.00 0.36
Dari Gudang ke Lokasi Kerja
1.3 Dokumentasi Kegiatan paket 1.00 0.07 1.00 1.00 1.00 0.07
Mobilisasi dan Demobilisasi Material & Peralatan Kegiatan
SUB TOTAL - I 0.62 0.62
I. PEKERJAAN PERSIAPAN
1.1 Pengukuran dan Pembersihan Lapangan m¹ 2,595.00 0.19 2,595.00 2,595.00 0.19
- Untuk > 50
1.2 Mobilisasi dan Demobilisasi Material dan Peralatan Kerja ls 1.00 0.36 1.00 1.00 1.00 0.36
Dari Gudang ke Lokasi Kerja
1.3 Dokumentasi Kegiatan paket 1.00 0.07 1.00 1.00 1.00 0.07
Mobilisasi dan Demobilisasi Material & Peralatan Kegiatan
SUB TOTAL - I 0.62 0.62