Praktis) 1
No Uraian Kode Satuan Koefisien Harga Satu
A TENAGA
Pekerja L.01.01 OH 0.1500 80,000
Tukang Kayu / Besi L.02.04 OH 0.5000 120,000
Kepala tukang L.03.01 OH 0.0800 150,000
Mandor L.04.01 OH 0.0060 125,000
JUMLAH TENAGA KERJA
B BAHAN
Multipleks 9 mm M2 1 47,030
GRC board 3mm M2 1 17,014
Smartruss C 75.75 M' 3 18,983
Dynabolt Dia. 12 x 120 mm Bh 3 4,000
Screw Cteks 10 x 16-16 Bh 4 700
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) -
ANALISA PRAKTIS
Pasang 1m2 High Pressure Laminated (HPL)
No Uraian Kode Satuan Koefisien Harga Satu
A TENAGA
Pekerja L.01.01 OH 0.3750 80,000
Tukang Besi L.02.05 OH 0.0850 120,000
Kepala Tukang L.03.01 OH 0.0085 150,000
Mandor L.04.01 OH 0.0020 125,000
JUMLAH TENAGA KERJA
B BAHAN
HPL M2 1.1000 90,505
Lem kg 0.2500 24,900
12,000.00
60,000.00
12,000.00
750.00
84,750.00
51,733.40
18,715.28
53,283.53
10,192.62
2,720.91
136,645.75
-
221,395.75
22,139.57
243,535.00
12,000.00
60,000.00
12,000.00
750.00
84,750.00
470,597.79
176,470.20
3,500.00
10,397.77
660,965.76
132,193.15
-
811,812.34
81,181.23
892,993.00
Jumlah Harga (Rp.)
30,000.00
10,200.00
1,275.00
250.00
41,725.00
99,556.01
6,225.00
105,781.01
-
-
147,506.01
14,750.60
162,256.00