Anda di halaman 1dari 12

KELOMPOK LUAS TOTAL

NAMA RUANG + PERHITUNGAN


RUANG (m²)
Penerimaan Parkir Penunjung + Pengelola
Kapasitas Total = 500 Orang
o Motor = 100 Orang
1 Motor untuk 2 Orang = 50 Unit Motor
o Mobil = 200 Orang
1 Mobil untuk 4 Orang = 50 Unit Mobil 937.5 m² + 60%
o Bus = 200 Orang = 1500 m²
1 Bus untuk 40 Orang = 5 Unit Bus (Analisa
Penulis)
Luas Parkir
o 50 Motor (1 x 2 m = 2 m²) = 100 m²

o 50 Mobil (2.5 x 5 m = 12.5 m²) = 625 m²


o 5 Bus (3,4 x 12,5= 42.5 m²) = 212.5 m²
Sirkulasi 60 %

Lobby (1 Unit)
Kapasitas = 100 Orang 80 m² + 120 m²
Standar Gerak = 0.8 m² = 200 m²
Kebutuhan Ruang Gerak = 100 orang x 0.8 m² = 80 m² (Data Arsitek)
Sirkulasi 150% = 120 m²

Area Ticketing + Area Antrian (1 Unit)


Kapasitas Maks = 100 Orang Ticketing = 12
1 Area Ticketing = 1 Baris Antriean = 50 Orang m² + 1.2 m² = 1
100 Orang = 2 Baris 3.2 m²
Standar 1 Loket = 3 m² x 2 = 6 m² Antrian = 80m²
Sirkulasi 20 % = 93.2 m²
(Data Arsitek)
Standar 1 Baris (50 Orang) = 0,8 m² x 50 x 2 = 80 m²

Ruang Informasi (3 Unit)


(6.4 m² +
Kapasitas = 2 Orang
1.28 m²) x 3
Standar = 3.2 m² per orang = 6.4 m²
= 24 m²
Sirkulasi 20 %

Pos Keamanan (2 Unit) (12.8 m² + 2.5


Kapasitas = 4 Orang 6) x 2
Standar = 3.2 m² per orang = 12.8 m² = 30 m²
Sirkulasi 20 % (Data Arsitek)

Lavatory & Toilet (2 Unit)


Kapasitas Total = 30 Orang
Standar Kebutuhan :
Toilet = 20 Unit = 1.5 m x 2 m /unit
67 m² + 20.5 =
Urinal = 10 Unit = 0.5 m x 0.4 m /unit
87.5 m² x 2
Wastafel = 20 Unit = 0.4 x 0.6 m/unit
= 175 m² (87.5
Sirkulasi = 30 %
m2/unit)
(Data Arsitek)
Toilet = 20 x 3 m² = 60 m²
Urinal = 10 x 0.2 m² = 2 m²
Wastafel = 20 x 0.24 m² = 4.8 m²
Total = 66.8 m²

1. Kelompok Pengelola (Total Luas = 622 m²)


KELOMPOK LUASAN
NAMA RUANG & PERHITUNGAN
RUANG TOTAL (m²)
Kantor R. Kurator/Kepala Musem (1 Unit)
Pengelola 1 Set Meja Kerja = 3 m²
1 Meja Rapat Kecil = 4 m² 24 m2 + 9.6
4 Kursi = 0.6 m x 0.8 m x 4 = 1.92 m² = ~36 m² + 5.5
1 Set Sofa = 3.4 m x 2 m = 6.8 m² m²
2 Set Kabinet = 8 m² = ~42 m²
Sirkulasi 40 % (Data Arsitek
+ Analisa Penu
Toilet = 4 m² lis)
Wastafel = 0.24 m²
Sirkulasi 30 %
Total Luas = 5.5 m²

Ruang General Manager 14 m² + 5.5 m²


1 Set Meja Kerja = 2 m² = ~20 m² + 4.2
2 Kursi Tamu = 0.6 m x 0.8 m x 2 = 0.96 m² m²
1 Set Sofa = 3.4 m x 2 m = 6.8 m² = ~25 m2
1 Set Kabinet = 4 m² (Data Arsitek
Sirkulasi 40 % + Analisa Penu
lis)
Toilet = 3 m²
Wastafel = 0.24 m²
Sirkulasi 30 %
Total Luas = 4.2 m²

Ruang Manager (2 Unit)


1 Set Meja Kerja = 2 m² 6.96 m² + 2.78
2 Kursi Tamu = 0.6 m x 0.8 m x 2 = 0.96 m² m² = ~10 m2 +
1 Set Kabinet = 4 m² 4.2 m²
Sirkulasi 40 % = ~15 m² x 2
= 30 m²
Toilet = 3 m² (Data Arsitek
Wastafel = 0.24 m² + Analisa Penu
Sirkulasi 30 % lis)
Total Luas = 4.2 m²

Ruang Staff Manager (2 Unit) 48 m² + 14.4 =


~62 m² x 2
Kapasitas = 10 Orang = 124 m²
Standar = 4.8 m²/orang = 48 m² (Data Arsitek
Sirkulasi 30 % + Analisa Penu
lis)

Ruang Staff Kurator (1 Unit) 24 m² + 7.2 = ~


32 m2
Kapasitas = 5 Orang
(Data Arsitek
Standar = 4.8 m²/orang = 24 m²
+ Analisa Penu
Sirkulasi 30 %
lis)

Ruang Rapat 50 m² + 0.4 = 5


0 m²
Kapasitas = 25 Orang
(Data Arsitek
Standar = 2 m²/orang = 50 m²
+ Analisa Penu
Sirkulasi 40 %
lis)

Lavatory & Toilet Staff (2 Unit) 50 m² + 15 = 6


Kapasitas Total = 20 Orang 5 m² x 2
Standar Kebutuhan : = 130 m² (62
Toilet = 15 Unit = 1.5 m x 2 m /unit m²/unit)
Urinal = 5 Unit = 0.5 m x 0.4 m /unit
Wastafel = 10 Unit = 0.4 x 0.6 m/unit
Sirkulasi = 30 %

Toilet = 15 x 3 m² = 45 m² (Data Arsitek)


Urinal = 5 x 0.2 m² = 1 m²
Wastafel = 10 x 0.24 m² = 2.4 m²
Total = 50 m²

Studio Foto & Presentasi (1 Unit)


2 Meja Gambar = 2.5 m² x 2 = 5 m²
1 Meja Diskusi = 1.7 m x 2 m = 3.4 m² 45 m² + 18
6 Kursi = 0.6 m x 0.8 m x 6 = 2.88 m² = 63 m²
Dokumentasi
1 Meja Kerja = 1.2 m x 2 m2 = 2.4 m² (Yulanda
4 Kabinet = 4 x 2 m x 2m = 16 m² 2006)
Studio Foto = 4 m x 4m = 16 m²
Sirkulasi 40 %

2. Kelompok Pendidikan (Total Luasan = 366 m²)


KELOMPOK LUASAN
NAMA RUANG & PERHITUNGAN
RUANG TOTAL (m²)
Studio

Kapasitas = 50 Orang
140 m²
Standar = 2 m²/orang = 100 m²
Pendidikan (Studi Presese
Sirkulasi 40 %
den)
Ruang Seminar 160 m² + 64
Kapasitas = 100 Orang = 224 m²
Standar = 1.6 m²/orang (Classroom Setup) = 160 m² (Yulanda
Sirkulasi 40 % 2006)

Coworking Space 384 m² + 115.2


= ~500 m²
Kapasitas = 80 Orang
(Data Arsitek
Standar = 4.8 m²/orang = 384 m²
+ Analisa Penu
Sirkulasi 30 %
lis))

3. Kelompok Penunjang (Total Luasan = 270 m²)


KELOMPOK LUASAN
NAMA RUANG & PERHITUNGAN
RUANG TOTAL (m²)
Penunjang Cafetaria 80 m² + 24 = 10
Kapasitas = 50 Orang 4 m²
Standar Gerak = 1.6 m²/orang = 80 m² (Yulanda
Sirkulasi 30 % 2006)

Toko Retail
95 m² + 19 = 11
Kapasitas = 50 Orang
4 m²
Standar Gerak = 1.6 m²/orang = 80 m²
(Yulanda
Kasir & Ruang Staff = 3 m x 5 m = 15 m²
2006)
Sirkulasi 20 %
Lavatory & Toilet Staff (2 Unit) 20 m² + 6 = 26
Kapasitas Total = 10 Orang m² x 2
Standar Kebutuhan : = 52 m² (26 m²/
Toilet = 6 Unit = 1.5 m x 2 m /unit unit)
Urinal = 4 Unit = 0.5 m x 0.4 m /unit (Data Arsitek)
Wastafel = 6 Unit = 0.4 x 0.6 m/unit
Sirkulasi = 30 %

Toilet = 6 x 3 m² = 18 m²
Urinal = 4 x 0.2 m² = 0.8 m²
Wastafel = 6 x 0.24 m² = 1.44 m²
Total = 20 m²
4. Kelompok Keamanan Super (Total Luasan = 183 m²)
KELOMPOK LUASAN
NAMA RUANG & PERHITUNGAN
RUANG TOTAL (m²)
150 m²
Ruang Penyimpanan Koleksi (Yulanda
2006)

Ruang Jaringan Komputer (CCTV)


Kapasitas = 5 orang 21 m²
Standar Gerak = 1.6 m²/orang = 8 m² (Data Arsitek
20 Unit Monitor CCTV = 20 x 0.2 m x 0.4 m = 1.6 m² + Analisis
Keamanan
5 Meja = 5 x 1 m x 2 m = 10 m² Penulis)
Super
5 Kursi = 5 x 0.6 m x 0.8 m = 1.44 m²

Ruang Peralatan Keamanan


10 m² + 2 =
3 Rak = 3 x 1 m x 2 m = 6 m² 12 m²
2 Lemari = 2 x 2 m = 4 m² (Data Arsitek
Sirkulasi 20 % + Analisis
Penulis)

5. Kelompok Pemeliharaan Koleksi (Total Luas = 373 m²)


KELOMPOK LUASAN
NAMA RUANG & PERHITUNGAN
RUANG TOTAL (m²)
Pemeliharaan Parkir Kendaraan 115 m²
Koleksi 3 Truk = 3 x 8 m x 3 m = 72 m² (Analisis Penul
Sirkulasi 60 % is)

Area Loading Dock


Kapasitas = 10 Orang 56 m²
Ruang Gerak 1.6 m²/orang = 16 m² (Analisis Penul
Ruang Gerak Muatan = 24 m² is)
Sirkulasi 40 %

Laboraturium Konservasi 150 m²


Ruang Penyimpanan Temporer = 60 m² (Analisis Penul
Lab. Penelitian = 60 m² is)
R. Konservasi = 40 m²
R. Karantina = 40 m²
Workshop 100 m²
Ruang Restorasi = 80 m² (Analisis Penul
Gudang Alat = 20 m² is)

Lavatory & Toilet Staff (2 Unit)


Kapasitas Total = 10 Orang
Standar Kebutuhan :
Toilet = 6 Unit = 1.5 m x 2 m /unit
20 m² + 6 = 26
Urinal = 4 Unit = 0.5 m x 0.4 m /unit
m² x 2
Wastafel = 6 Unit = 0.4 x 0.6 m/unit
= 52 m² (26 m²/
Sirkulasi = 30 %
unit)
(Data Arsitek)
Toilet = 6 x 3 m² = 18 m²
Urinal = 4 x 0.2 m² = 0.8 m²
Wastafel = 6 x 0.24 m² = 1.44 m²
Total = 20 m²

6. Kelompok Servis (Total Luasan = 133 m²)


KELOMPOK LUASAN
NAMA RUANG & PERHITUNGAN
RUANG TOTAL (m²)
Servis Ruang MEE (1 Unit)
33 m²
R. Pompa = 9 m²
(Yulanda
R. Trafo & Genset = 15 m²
2006)
R. Kontrol = 9 m²

Ruang AHU (1 Unit)


30 m²
Kapasitas = 20 Unit AHU
(Yulanda
AHU = 0.6 m²/unit = 1.2 m²
2006)
Sirkulasi = 20 %

Ruang Cleaning Service & Office Boy (1 Unit)


Kapasitas = 20 Orang
20 m2
Gudang Alat = 9 m²
(Data Arsitek
Loker 20 Unit = 20 x 0.4 m x 0,4 m = 3.2 m²
+ Analisis Pen
Kursi 3 Unit = 3 x 1.55 m x 0.8 m = 3.72 m²
ulis)
Sirkulasi = 20 %
Gudang (1 Unit) 24 m²
3 Rak = 3 x 1 m x 2 m = 6 m² (Data Arsitek
1 Lemari = 2 m² + Analisis Pen
Sirkulasi 200 % ulis)

Lavatory & Toilet Staff (1 Unit)


Kapasitas Total = 10 Orang
Standar Kebutuhan :
Toilet = 6 Unit = 1.5 m x 2 m /unit
Urinal = 4 Unit = 0.5 m x 0.4 m /unit 20 m² + 6
Wastafel = 6 Unit = 0.4 x 0.6 m/unit = 26 m²
Sirkulasi = 30 % (Data Arsitek)

Toilet = 6 x 3 m² = 18 m²
Urinal = 4 x 0.2 m² = 0.8 m²
Wastafel = 6 x 0.24 m² = 1.44 m²
Total = 20 m²

7. Kelompok Pameran Temporer (Total Luas = 831 m²)


KELOMPOK LUASAN
NAMA RUANG & PERHITUNGAN
RUANG TOTAL (m²)
Ruang Pameran Temporer
Objek Pameran/Benda Koleksi 2D & 3D
Ukuran Kecil [< 1 m²] = 1.8 m x 1.6 m = 2.88 m²
Ukuran Sedang [1-2 m²] = 1 m x 3.6 m = 3.6 m²
138 m² + 102
Ukuran Besar [> 2 m²] = 2 m x 5 m = 10 m²
m² = 240 m² + 1
Benda 2D
20
Ukuran Kecil = 25 unit karya = 25 x 2.88 m² = 72 m²
Pameran = 360 m²
Ukuran Sedang = 10 unit karya = 10 x 3.6 m² = 36 m²
(Data Arsitek
Ukuran Besar = 3 unit karya = 3 x 10 m = 30 m²
+ Analisis Pen
Benda 3D
ulis)
Ukuran Kecil = 20 unit karya = 20 x 2.88 m² = 57.6 m²
Ukuran Sedang = 7 unit karya = 7 x 3.6 m² = 25.2 m²
Ukuran Besar = 2 unit karya = 2 x 10 m = 20 m²
Sirkulasi 50 %

8. Kelompok Pameran Tetap (Total Luas = 1578 m²)


BENDA JUMLAH TOTAL LUASAN
Zaman DIMENSI LUASAN
PAMERAN KARYA (Analisis Penulis)

Kecil [< 1 m²] 3 5 m² 75 m²


Maket Sedang [1-2 m²] 3 7 m² 70 m² 145 m²
Besar [> 2 m²] 0 12 m² -
Pra Sejarah

Kecil [< 1 m²] 0 5 m² -


Pakaian Sedang [1-2 m²] 5 7 m² 35 m² 35 m²
Besar [> 2 m²] 0 12 m² -

Kecil [< 1 m²] 15 5 m² 75 m²


Keris Sedang [1-2 m²] 0 7 m² - 75 m²
Besar [> 2 m²] 0 12 m² -
Kesultanan Palembang

Kecil [< 1 m²] 10 5 m² 50 m²


Naskah Sedang [1-2 m²] 0 7 m² - 50 m²
Besar [> 2 m²] 0 12 m² -

Kecil [< 1 m²] 10 5 m² 50 m²


Senjata Sedang [1-2 m²] 0 7 m² - 74 m²
Besar [> 2 m²] 2 12 m² 24 m²

Kecil [< 1 m²] 0 5 m² -


Pakaian Sedang [1-2 m²] 5 7 m² 35 m² 35 m²
Masa Penajajahan

Besar [> 2 m²] 0 12 m² -

Kecil [< 1 m²] 10 5 m² 50 m²


Senjata Sedang [1-2 m²] 0 7 m² - 74 m²
Besar [> 2 m²] 2 12 m² 24 m²

Kecil [< 1 m²] 0 5 m² -


Kemerdekaan

Ukiran Sedang [1-2 m²] 0 7 m² - 60 m²


Besar [> 2 m²] 5 12 m² 60 m²

Kerajinana Kecil [< 1 m²] 15 5 m² 45 m² 45 m²


Sedang [1-2 m²] 0 7 m² -
Tradisional
Besar [> 2 m²] 0 12 m² -

Anyaman Kecil [< 1 m²] 20 5 m² 100 m²


Rotan Sedang [1-2 m²] 0 7 m² - 100 m²
/Bambu Besar [> 2 m²] 0 12 m² -

Peralatan Kecil [< 1 m²] 10 5 m² 50 m²


Melamar Sedang [1-2 m²] 0 7 m² - 50 m²
/Kawin Besar [> 2 m²] 0 12 m² -

Perlengkapan Kecil [< 1 m²] 15 5 m² 45 m²


Rumah Sedang [1-2 m²] 0 7 m² - 45 m²
Tangga Besar [> 2 m²] 0 12 m² -

Peralatan Kecil [< 1 m²] 20 5 m² 100 m²


Mata Sedang [1-2 m²] 0 7 m² - 100 m²
Pencaharian Besar [> 2 m²] 0 12 m² -

Kecil [< 1 m²] 0 5 m² -


Batik Sedang [1-2 m²] 0 7 m² - 46 m²
Besar [> 2 m²] 3 12 m² 36 m²

Kecil [< 1 m²] 0 5 m² -


Songket Sedang [1-2 m²] 0 7 m² - 46 m²
Besar [> 2 m²] 3 12 m² 36 m²

Kecil [< 1 m²] 3 5 m² 15 m²


Pakain Khas
Sedang [1-2 m²] 3 7 m² 21 m² 72 m²
Tradisional
Besar [> 2 m²] 3 12 m² 36 m²
1052 m² + 526 m²
Sirkulasi 50 %
= 1578 m²

Besaran Total Luasan Ruang Perancangan Museum Seni Budaya di Palembang


adalah :
o Kel. Ruang Penerimaan : 2.116 m²
o Kel. Ruang Pengelola : 622 m²
o Kel. Ruang Pendidikan : 366 m²
o Kel. Ruang Penunjang : 270 m²
o Kel. Ruang Super Aman : 183 m²
o Kel. Ruang Pemeliharaan : 373 m²
o Kel. Ruang Servis : 133 m²
o Kel. Ruang Pameran Temporer : 831 m²
o Kel. Ruang Pameran Tetap : 1.578 m² +
Total Luas Kebutuhan Kel. Ruang Museum : 6.472 m²

Luas Lahan : ± 1 Ha
Luasan Kebutuhan Ruang : 6.472 m²
Luas Bangunan (KDB = 60 %) : ± 0.65 Ha
GSB : 12 m

Anda mungkin juga menyukai