Page 1 of 8
F. BAHAN BESI
1 Baut Rp. / Kg
2 Besi Beton Rp. / Kg
3 Besi Beton dia. 10 mm Rp. 70,000 / Btg
4 Besi Beton dia. 8 mm ks Rp. 46,500 / Btg
5 Besi Beton dia. 6 mm 10 Rp. 33,000 / Btg
4 Besi Strip (3/4 x 4) mm Rp. / Btg
5 Kawat beton Rp. 20,000 / Kg
8 Paku Beton Rp. / Kg
9 Paku Biasa Rp. 18,000 / Kg
10 Paku GRC Rp. / Kg
11 Paku GRC Rp. / Bks
12 Paku Halus Rp. / Kg
13 Paku Halus Rp. / Kotak
14 Paku Seng Rp. 25,000 / Kg
15 Paku Sekrup Rp. / Kg
H. BAHAN SANITAIR
1 Closet Jongkok Standar Rp. 120,000 / Bh
2 Daun Pintu Fiber Wc/Km Terpasang Rp. 175,000 / Bh
3 Daun Pintu Fiber Wc/Km Belum Terpasang Rp. / Bh
4 Floor Drain Besi Rp. / Bh
5 Floor Drain Plastik Rp. / Bh
6 Isolatif Rp. / Bh
7 Kran Air Plastik Rp. 10,000 / Bh
8 Kran Air Besi Rp. / Bh
9 Lem Pipa Rp. / Kg
10 Pintu Fiber Rp. / Set
11 Pipa PVC, Dia 1/2" Rp. 20,000 / Btg
12 Pipa PVC, Dia 3/4" Rp. / Btg
13 Pipa PVC, Dia 1" Rp. / Btg
14 Pipa PVC, Dia 1 1/2" Rp. / Btg
15 Pipa PVC, Dia 2" Rp. / Btg
16 Pipa PVC, Dia 2 1/2" Rp. / Btg
17 Pipa PVC, Dia 3" Rp. 55,000 / Btg
18 Pipa PVC, Dia 4" Rp. 125,000 / Btg
19 Reducer PVC dari 2" ke 1 " Rp. / Bh
20 Dop 1/2" Rp. / Bh
21 Tee 1/2" x 1/2" Rp. / Bh
22 Stop valve 1/2" Rp. / Bh
23 Elbow 1/2" Rp. / Bh
24 Gate valve 1/2" Rp. / Bh
25 Uriniour Rp. / Bh
26 Pipa T Bagus Rp. / Unit
27 Pipa T Biasa Rp. / Unit
28 Pipa Elbow 3" Rp. / Unit
29 Pipa Turunan Rp. / Unit
30 Pipa L 2" Rp. / Unit
31 Pipa T 2 " Rp. / Unit
32 Sambungan Pipa 2" Rp. / Unit
Page 2 of 8
kayu BATANG 2700000 2000000
10x10 25 108,000 80,000
8x10 31 87,000 64,516
5x10 50 54,000 40,000
4x6 104 26,000 19,231
5x7 71 38,000 28,169
RENCANA ANGGARAN BIAYA ( RAB )
SUMBER DANA
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN (Rp) TOTAL HARGA (Rp) SWADAYA
APBD
DANA TUNAI VOLUME MATERIAL
I Pekerjaan Kolom
Pekerjaan bekisting - - - -
Cor Beton Kolom, Ukuran 10 cm x 10 cm min. T=3m - - - -
- Besi beton Φ10 mm SNI Btg 70,000.00 - - - -
Besi beton Φ 8 mm SNI 35 Btg 43,000.00 1,505,000.00 35.00 1,505,000.00 - 0
Besi beton Φ 6 mm SNI 20 Btg 22,000.00 440,000.00 20.00 440,000.00 -
- Semen @ 50 kg 36 Zak 65,000.00 2,340,000.00 36.00 2,340,000.00 -
- Pasir Beton 3 truk 300,000.00 900,000.00 3.00 900,000.00 -
- Batu kerikil 0.5 m3 1,500,000.00 750,000.00 0.50 750,000.00 -
II Dinding Permanen - - - -
1 Tembok M2 - - - -
- Pasir Pasang M3 300,000.00 - - - -
- Semen @ 50 kg Zak 65,000.00 - - - -
- Batu Bata atau Batako 8000 Bh 550.00 4,400,000.00 8,000.00 4,400,000.00 - 0
2 Pekerjaan Plester - - - -
- Pasir Pasang M3 300,000.00 - - - -
- Semen @ 50 kg Zak 65,000.00 - - - -
III Dinding Kayu/Papan/kawat plasteran - - - -
Papan M3 - - - -
Kawat Harmonika roll - - - -
IV Pekerjaan Pintu dan Jendela - - - -
- Daun Pintu Kayu, Ukuran (200 cm x 80 cm) Unit 500,000.00 - - - -
- Daun Pintu Kayu, Ukuran (200 cm x 90 cm) 2 Unit 500,000.00 1,000,000.00 2.00 1,000,000.00 -
- Kusen Pintu, Ukuran (200 cm x 90 cm) kls II 2 Unit 300,000.00 600,000.00 2.00 600,000.00 -
- Kusen Pintu, Ukuran (200 cm x 80 cm) kls II Unit 300,000.00 - - - -
- Kusen Jendela, Ukuran (50 cm x 150 cm) kls II 4 Unit 250,000.00 1,000,000.00 4.00 1,000,000.00 - 0
- Daun Jendela Kaca, Ukuran (50 cm x 150 cm) Unit 300,000.00 - - - -
- Handle Pintu dan Kunci Pintu Set 85,000.00 - - - -
SUMBER DANA
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN (Rp) TOTAL HARGA (Rp) SWADAYA
APBD
DANA TUNAI VOLUME MATERIAL
- Handle Jendela dan Kunci Jendela Set - - - -
- Engsel Pintu Set 20,000.00 - - - -
- Engsel Jendela Set 15,000.00 - - - -
V Ring Balok - - - -
Pekerjaan bekisting - - - -
Pekerjaan Cor Beton - - - -
Besi beton Φ 10 mm SNI Btg 70,000.00 - - - -
Besi beton Φ 8 mm SNI Btg 49,000.00 - - - -
- Semen @ 50 kg Zak 65,000.00 - - - -
lobang angin bh 20,000.00 - - - -
- Batu Kerikil M3 1,500,000.00 - - - -
VI Pekerjaan Struktur Atap Btg - - - -
- Kayu rangka kuda-kuda, Ukuran (5 cm x 10 cm x 4 Btg 56,000.00 - - - -
m)
Papan lantai 2 x 25 m3 - - - -
- Kayu gordeng/Usuk, Ukuran (5 cm x 7 cm m ) 45 Btg 39,000.00 1,755,000.00 45.00 1,755,000.00 -
VII Pekerjaan Penutup Atap - - - -
1 Penutup Atap - - - -
- Seng gelombang 6 kaki (0,2 cm x 80 cm x 210 cm) kodi 810,000.00 - - - -
- Seng gelombang 7 kaki (0,2 cm x 80 cm x 210 cm) 2.5 kodi 1,000,000.00 2,500,000.00 2.50 2,500,000.00 -
- bubungan seng plat M 15,000.00 - - - -
VIII Pekerjaan Lantai - - - -
1 Lantai Rabat Campuran minimal 1:5:3, T=5 cm - - - -
Papan 20 x 3 lbr - - - -
papan 20 x2 m3 - - - -
M3 - - - -
SUMBER DANA
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN (Rp) TOTAL HARGA (Rp) SWADAYA
APBD
DANA TUNAI VOLUME MATERIAL
IX MCK - - - -
- Pipa Air Kotor, Ukuran 4" Unit 120,000.00 - - - - 0
- Closet Jongkok Unit 110,000.00 - - - - 0
- Pipa Air Bersih, Ukuran 1/2" Btg 23,000.00 - - - -
- Pipa Air Kotor, Ukuran 3" Btg 80,000.00 - - - - 0
L bow Bh 25,000.00 - - - - 0
- Pintu Kamar Mandi Set 220,000.00 - - - - 0
X Lain-lain - - - -
- Paku 2" 3.5 KG 20,000.00 70,000.00 3.50 70,000.00 -
- Paku 2,5" KG 20,000.00 - - - -
- Paku 3" 3 KG 20,000.00 60,000.00 3.00 60,000.00 -
- Paku 3,5" Kg 20,000.00 - - - - 0.00
- Paku 4" Kg 20,000.00 - - - - 0.00
- Paku seng 4 Kg 25,000.00 100,000.00 4.00 100,000.00 - 0
- Kawat ikat 4 Kg 20,000.00 80,000.00 4.00 80,000.00 - 0
Lobang Angin Bh - - - - 0
XI Upah Kerja - - - -
- Tukang ls 2,500,000.00 - - - - 0
JUMLAH 17,500,000.00 -
Jambi, 2023
Difasilitasi, Diajukan oleh,
Fasilitator Pendamping Ketua KPB Penerima Bantuan
Disahkan oleh,
Tim Teknis Kota Jambi
Nomor BNBA
Nama Penerima Bantuan Ristoni Purba
Nomor KTP 1571071708840326
Alamat Jl. Bensol Lr. Rambutan IV Rt.016
Kelurahan Kenali Asam Bawah
Kecamatan Kota Baru
Kota Jambi
Nomor Rekening Penerima Bantuan
Nama Toko/Penyedia Bahan Bangunan
Penerima Bantuan
Ristoni Purba