No Material jml satuan harga Total (jmlxhrg)

1 Mata bor Makita 6mm 1 unit 20,000 20,000


2 T dos Matsui putih 3 unit 3,500 10,500
3 kabel ETHERNA 2x1.5 15 meter 7,000 105,000
4 Skakel broco 3 unit 14,000 42,000
5 stop kontak broco 3 unit 12,000 36,000
6 fitting plafon broco 1 unit 12,500 12,500
7 klem tembok no.9 1 pak 18,000 18,000
8 fisher + skrup 8 set 500 4,000
9 A-plus 1 sak 70,000 70,000
10 GRC board 7 lbr 57,000 399,000
11 perban gyp 2 gulung 10,000 20,000
12 kanal C KCN 7 ljr 95,000 665,000
13 Kalsium 1 sak 40,000 40,000
14 Semen putih 3 roda 1 sak 196,000 196,000
15 sliper 2 unit 4,000 8,000
16 lem rajawali 4 dus 42,000 168,000
17 Avian gold aries @5kg 2 kaleng 68,000 136,000
18 Kuas 4" 1 unit 15,000 15,000
19 Semen Gresik 1 sak 52,000 52,000
20 Parason 1 kg 28,000 28,000
21 Timba cor 2 unit 6,000 12,000
22 GRC board 2 lbr 58,000 116,000
23 Aries Gold 5W 1 kaleng 68,000 68,000
24 lem rajawali 1 sak 30,000 30,000
25 ongkos kirim 1 5,000 5,000
26 Hollow 2x4 1 ljr 23,000 23,000
27 Hollow 4x4 1 ljr 28,000 28,000
28 Cat Paragon @1kg 3 kaleng 32,000 96,000
29 kanal C KCN 1 ljr 95,000 95,000
30 2 item (g bisa dibaca) 1 set 36000 36,000
31 cat Avian Emerald @5kg 2 kaleng 96,700 193,400
5 item material (tidak bisa
32 dibaca) 1 set 189,000 189,000
kabel ETHERNA 2x1.5 10 meter 6,000 60,000
fisch TS601200 1 unit 160,000 160,000
Konsumsi tukang 6 hari 45,000 270,000
ongkos transport pintu 1 unit 150,000 150,000
ongkos bersih2 sampah 1 unit 100,000 100,000
ongkos buang lemari bekas 1 unit 30,000 30,000
0
0

60% = 3,123,840
40%= 2,082,560
Toko Alamat Keterangan

Toko listrik "lia 2" Jl. Bungurasih utara I/1A SDA 1/5/2019
Toko listrik "lia 2" Jl. Bungurasih utara I/1A SDA 1/12/2019
Toko listrik "lia 2" Jl. Bungurasih utara I/1A SDA 12/30/2018
Toko listrik "lia 2" Jl. Bungurasih utara I/1A SDA 12/24/2018
Toko listrik "lia 2" Jl. Bungurasih utara I/1A SDA 12/24/2018
Toko listrik "lia 2" Jl. Bungurasih utara I/1A SDA 12/24/2018
Toko listrik "lia 2" Jl. Bungurasih utara I/1A SDA 12/24/2018
Toko listrik "lia 2" Jl. Bungurasih utara I/1A SDA 12/24/2018
Toko Bangunan "RR" Menanggal II No.23 SBY 12/16/2028
Toko Bangunan "RR" Menanggal II No.23 SBY 12/16/2028
Toko Bangunan "RR" Menanggal II No.23 SBY 12/16/2028
Toko Bangunan "RR" Menanggal II No.23 SBY 12/16/2028
Toko Bangunan "RR" Menanggal II No.23 SBY 12/16/2028
Toko Bangunan "RR" Menanggal II No.23 SBY 12/16/2028
Toko Bangunan "RR" Menanggal II No.23 SBY 12/16/2028
Toko Bangunan "RR" Menanggal II No.23 SBY 12/16/2028
Toko Bangunan "RR" Menanggal II No.23 SBY 12/16/2028
Toko Bangunan "RR" Menanggal II No.23 SBY 12/16/2028
Toko Bangunan "RR" Menanggal II No.23 SBY 12/16/2028
Toko Bangunan "RR" Menanggal II No.23 SBY 12/16/2028
Toko Bangunan "RR" Menanggal II No.23 SBY 12/16/2028
Toko Bangunan "RR" Menanggal II No.23 SBY 12/23/2018
Toko Bangunan "RR" Menanggal II No.23 SBY 12/23/2018
Toko Bangunan "RR" Menanggal II No.23 SBY 12/23/2018
Toko Bangunan "RR" Menanggal II No.23 SBY 12/23/2018
Toko Bangunan "RR" Menanggal II No.23 SBY 12/17/2018
Toko Bangunan "RR" Menanggal II No.23 SBY 12/17/2018
Toko Bangunan "RR" Menanggal II No.23 SBY 12/17/2018
Toko Bangunan "RR" Menanggal II No.23 SBY 12/16/2018
Toko Bangunan Sri Rejeki Surabaya 12/16/2018
Depo bangunan Gedangan sidoarjo 12/24/2018

Toko bangunan "solomon" Jl. Barata jaya 16B surabaya 12/14/2018


bawaan tukang 12/30/2018
Transmart ngagel surabaya 1/6/2019
Total Pengeluaran material : 3,706,400
Harga borong kerja : 1,500,000
total 5,206,400
1,200,000 3,123,840 - 1,200,000 1,923,840