Anda di halaman 1dari 278

DAFTAR SURVEY HARGA BAHAN

BULAN JUNI-JULI
No Nama Barang Satuan Harga KEL. MASYARAKAT
1 Pekerja Oh Rp 115,000.00 Kel. Masyarakat
2 Tukang Oh Rp 135,000.00 Kel. Masyarakat

No Nama Barang Satuan Harga Toko


1 Tanah Timbunan Ret Rp 200,000.00 Fauzan Adzima
2 Pasir Halus Ret Rp 650,000.00 Fauzan Adzima
3 Ciping 2/3 Ret Rp 1,800,000.00 Fauzan Adzima
4 Semen Zak Rp 65,000.00 Sinar Agung
5 Semen Zak Rp 70,000.00 Sinar Agung
5 Besi 8 Ljr Rp 47,000.00 Sinar Agung
6 Besi 10 Ljr Rp 75,000.00 Sinar Agung
7 Besi 12 Ljr Rp 105,000.00 Sinar Agung
8 Besi 16 Ljr Rp 225,000.00 Sinar Agung
9 Rangka Baja Kayan Trus Btg Rp 115,000.00
10 Kanal Kanal C Taso Btg Rp 115,000.00 Indah Jaya
11 Baja Kanal C Biasa Btg Rp 105,000.00 Karya Mandiri
12 Baut D.S 12-24x50 Dos Rp 140,000.00
13 Skrup Spandek 24x30mm Dos Rp 225,000.00
14 Seng Spandek Lbr Rp 87,000.00 Sinar Agung
15 Cat Aries Gold Galon Rp 280,000.00 Sinar Agung
16 Cat Aries Gold 80 Liter Galon Rp 279,000.00 Sinar Agung
17 Baut Driling 12x50 Dos Rp 325,000.00 Sinar Agung
18 Baut Driling 12x25 Dos Rp 225,000.00 Sinar Agung
19 Dinabolt 8x65 Ktk Rp 500,000.00 Karya Mandiri
20 Plamir A Plus Dos Rp 110,000.00 Sinar Agung
21 Kawat Bendrat Kg Rp 25,000.00 Cahaya Makmur
22 Isbur DMC 12x20 Ktk Rp 165,000.00 Indah Jaya
23 Bak Cat Tipis Pcs Rp 45,000.00 Sinar Agung
24 Lem Plamir VIP C12 BKS Ktk Rp 230,000.00 Indah Jaya
25 Kapi Bh Rp 6,000.00 Indah Jaya
26 Sement Nat Tehel Bks Rp 20,000.00 Cahaya Makmur
27 Pipa 3D Asia Cu Bh Rp 100,000.00 Sinar Agung
28 L Pipa 1 1/2 Bh Rp 7,000.00 Sinar Agung
29 Lem Fox Kg Rp 22,000.00 Sinar Agung
30 Nat Bks Rp 18,000.00 Sinar Agung
31 Keramik 40x40 Putih Dos Rp 65,000.00 Sinar Agung
32 Pipa 3/4 Bh Rp 26,000.00 Sinar Agung
33 Tee 3/4 Bh Rp 4,000.00 Sinar Agung
34 L 3/4 Bh Rp 4,000.00 Sinar Agung
35 Lem Pcs Rp 12,000.00 Sinar Agung
36 Klam Besi 3/4 Pcs Rp 1,000.00 Sinar Agung
37 Paku Beton Ktk Rp 20,000.00 Sinar Agung
38 Sement Putih R. Bull Zak Rp 125,000.00 Indah Jaya
39 Sement Tonasa Zak Rp 70,000.00 Indah Jaya
40 Ijuk Rp 30,000.00 Karya Mandiri
41 Paku Biasa 3" Kg Rp 22,000.00 Cahaya Makmur
42 Paku Biasa 4" Dos Rp 450,000.00 Toko Harapan
43 Paku Beton Kg Rp 21,000.00 Cahaya Makmur
44 Keran 3/4 Plastik Bh Rp 12,000.00 Sinar Agung
45 Kwie 3/4 Bh Rp 4,000.00 Sinar Agung
46 Sole Bh Rp 4,000.00 Sinar Agung
47 Pipa 1 1/2 As D Btg Rp 47,000.00 Sinar Agung
48 Batako Bh Rp 1,100.00 Cv. Harfi
49 Amplas Lbr Rp 5,000.00 Sinar Agung
50 Paku Gipsum Kg Rp 20,000.00 Rajawali
51 Thiner A Gln Rp 125,000.00 Sinar Agung
52 Cat Anan Klg Rp 62,000.00 Sinar Agung
53 Paku Putih Kg Rp 26,000.00 Sejati
54 Paku Ulin 3" Kg Rp 26,000.00 Sejati
55 Playwood 9mm Lbr Rp 145,000.00 Sejati
56 Playwood 9mm Lbr Rp 130,000.00 Cahaya Makmur
57 Bata Ringan Bh Rp 17,000.00 Cahaya Jaya
58 Reng Baja Btg Rp 50,000.00 Karya Mandiri
59 Seng Spandek Merah Lbr Rp 84,000.00 Rajawali
60 Pintu Besi Unit Rp 3,500,000.00
61 Pintu Wc & Kusen Unit Rp 1,200,000.00
Kubik
Rp 57,142.86
Rp 185,714.29
Rp 514,285.71
12000
PERHITUNGAN VOLUME PEKERJ
INFRASTRUKTUR PENDUKUNG LIVE

KAB/KOTA : NUNUKAN
KECAMATAN : NUNUKAN
KEL/DESA : NUNUKAN UTARA
BKM/LKM : TERPADU LESTARI
NAMA KEGIATAN : RUMAH WISATA KULINER
TAHUN ANGGARAN : 2021

DIMENSI
NO JENIS PEKERJAAN PANJANG
(P)
1 2 3
A. PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan Bowplank 50.00
2 Pembersihan Lapangan 50.00
3 Papan Nama Proyek

B. PEKERJAAN LANTAI I
I. PEKERJAAN TANAH DAN PONDASI
1 Galian Tanah pondasi Tapak 80x80x30 0.90
2 Galian Tanah pondasi Tapak 40x40x30 0.50

3 Galian Parit 1 9.41


2 10.51
3 13.26
4 16.05
5 10.77
60.00
4 Galian Sloof 20/40 1 48.20
2 4.20

3 15.20

4 6.20

5 3.80

5 Urugan Tanah Kembali 38.16


6 Urugan Pasir Pasang 155.50
7 Urugan Tanah Timbunan Lantai 16.00
18.00

8 Urugan Tanah Timbunan Selasar Dan Teras Selasar 48.20


Teras 1 15.00

Teras 2 18.00

9 Kayu Bulat Merah dia 8-10 Pjng 4 Meter 4.00


2.00

C. PEKERJAAN BETON BERTULANG LANTAI 1 DAN LANTAI 2


1 Pondasi Tapak Footplate 80x80x30 0.90
Pondasi Tapak Footplate 40x40x30 0.50

2 Perdestail 80x80x30 0.25


3 Perdestail 40x40x30 0.20

4 Sloof Beton 20/40 cm 23.22


Memanjang 50.00
Melintang 4.20
Memanjang 18.20
Melintang 6.20
Memanjang 15.20
93.80
Total Memanjang 98.60
Total Melintang 56.20

7 Kolom Beton 25/25 Lantai 1 0.25

8 Kolom Beton 20/20 cm Lantai 2 0.20


10 Balok Anak 20/30 18.40

11 Balok 20/40 cm 71.40


18.20
7.00

12 RingBalok 20/20 cm 86.00


15.20
4.20

13 Cor Lantai Dak WC 3.00


14 Cor Plat Lantai Lantai II 1 19.00
Sisi Kanan Kiri 1.00

15 Cor Rabat Lantai 1 (K-175) 15.00

18.00

D. PEKERJAAN PASANGAN BATU BATA DAN PLASTERAN

1 Dinding Bata 1 Belakang P=480 4.80

Samping Sudut 3.80

Dinding Tengah 2.90

Dinding Tengah Batako 2.90

Dinding Skat Gerai Batako 2.90

Dinding Skat Gerai 2.92

Dinding Depan Samping 1.75

Dinding WC Gerai 3.00


Dinding WC antara 2.38
Dinding Wc Samping Pintu 2.38
Dinding Dekat Tiang 1.45

2 Dinding Bata 2 Samping 4.80


3 Dinding Bata 3 Depan Atas Balok 15.00

Batako
Bata Merah
4 Bata Parit 1 9.41
2 10.51
3 13.26
4 16.05
5 10.77

5 Pasangan Begesting Bata merah Footplate 80 0.90


Pasangan Begesting Bata merah Footplate 40 0.50

6 Pasangan Begesting Bata Merah Sloof 20/40 154.80

5 Plesteran Dinding 1:4


5 Plesteran Dinding WC 1:4 32.75

6 Plesteran Dinding Bata 1:4 36.35

7 Plesteran Dinding Bata 1:4 342.34

8 Plesteran Dinding Parit 1:4 27.29

E. PEKERJAAN PASANGAN KERAMIK


1 Pasangan Keramik 40x40 Lantai 1 Setiap gerai 2.34

Depan Gerai 1.10

Gerai Tengah 18m 2.23


Lorong 0.50
Depan Pintu Belakang 3.00

2 Pasangan Keramik 20x20 Lantai 1 WC 2.35


2.35

2.70
3 Pasangan Keramik 40x40 Lantai II 19.00
1.00

4 Pasang Singki Bata Ringan 1.00

5 Acian
Kolom 25/25 Lantai II 1.00

Kolom 20/20 Lantai 1 0.80

F. PEKERJAAN PINTU, JENDELA DAN ANGIN ANGIN


1 Pintu Besi Belakang 2 Daun Pintu
2 Pintu WC
3 Pintu Besi Lorong
4 Pintu Rollong Door
4 Angin-Angin
5 Paving Block Hexagonal 3.00

G. PEKERJAAN PENGECATAN
1 Pekerjaan Pengecatan Tembok Luar Dalam Lantai 1 411.44

2 Pekerjaan Pengecatan Kolom 25/25 Lantai 1

3 Pekerjaan Pengecatan Kolom 20/20 Lantai 2

4 Pekerjaan Pengecatan Balok 20/40

H. PEKERJAAN LISTRIK
I Biaya Listrik 4 Amper (17 Unit)
1 Biaya Penyambungan (BP) PLN 17 Untuk 4 Amper
2 Biaya Token/Pulsa
3 Biaya Materai
4 Biaya Sertifikat Like Opererasi (SLO)
5 Jasa Survey Dan Jaminan
6 Instalasi Listrik
II Biaya Listrik 6 Amper (1 Unit)
1 Biaya Penyambungan (BP) PLN 17 Untuk 4 Amper
2 Biaya Token/Pulsa
3 Biaya Materai
4 Biaya Sertifikat Like Opererasi (SLO)
5 Jasa Survey Dan Jaminan
6 Instalasi Listrik
I PEKERJAAN SANITASI
1 Pemasangan Baru Air PDAM
2 Biaya Pendaftaran
3 Tangki Profil 2200
4 Pemasangan Kloset Jongkok
5 Septictank dan Peresapan
6 Pemasangan Keran Air Plastik
7 Pasang Instalasi Air Kotor (pipa PVC Type AW 3 & 4 Inc )
8 Pasang Instalasi Air Bersih (pipa PVC Type AW 3/4 Inc )
9 Aksesoris

J PEKERJAAN ATAP
1 Atap Spandek Lantai I 16.00

2 Atap Spandek Lantai II 19.00

5 Kebutuhan Atap Spandek 346.47

K PEKERJAAN BESI DAN ALMUNIUM


1 Pekerjaan Pagar Besi Hollow 4x2
2 Pekerjaan Pagar Tangga Dan Tangga
3 Pekerjaan Rangka Baja Ringan Rangka Lantai 2 19.00

Rangka Lantai 1 16.00

L SEWA ALAT
1 Molen
AN VOLUME PEKERJAAN
UR PENDUKUNG LIVELIHOOD

DIMENSI (M)
LEBAR TINGGI JUMLAH VOLUME SATUAN
Total Dilapangan Satuan
(L) (T) (N)
4 5 6 7 8

6.00 124.00 m
6.00 477.00 m2
1 1.00 Ls

0.90 1.40 11 12.47 m3


0.50 1.40 14 4.90 m3
17.37 m3
0.20 0.25 0.47 m3
0.20 0.35 0.74 m3
0.20 0.45 1.19 m3
0.20 0.55 1.77 m3
0.20 0.60 1.29 m3
5.46 m3
0.30 0.50 7.23 m3
0.30 0.50 6 0.63
3.78 m3
0.30 0.50 2 2.28
4.56 m3
0.30 0.50 5 0.93
4.65 m3
0.30 0.50 0.57 m3
20.79 m3
38.16 m3
0.30 0.50 23.33 m3
6.00 0.20 19.20 m3
2.00 0.20 7.20 m3
26.40 m3
46.82 m3

1.00 0.10 4.82 m3


4.00 0.10 2 6.00 m3
12.00 m3
2.00 0.10 3.60 m3
20.42 m3
2 2.00 Btg
25 50.00 Btg
4

0.90 1.40 11 12.47 m3


0.50 1.40 14 4.90 m3
17.37 m3
0.25 1.00 11 0.69 m3
0.20 1.00 14 0.56 m3
1.25 m3

23.22 m3
0.30 0.50 7.50 m3
0.30 0.50 6 3.78 m3
0.30 0.50 0 2.73 m3
0.30 0.50 5 4.65 m3
0.30 0.50 2 4.56 m3

0.25 3.80 25 5.94 m3


5.94 m3

0.20 2.00 13 1.04 m3


1.04 m3
0.20 0.30 1.10 m3

5.71 m3
0.20 0.40 2 2.91
0.20 0.40 5 2.80

3.44 m3
0.20 0.20 4 2.43 m3
0.20 0.20 6 1.01 m3

3.00 0.10 2 1.80 m3


7.00 0.10 13.30 m3
1.00 0.10 2 0.10 m3
0.20 m3
4.10 0.10 2 6.15 m3
12.30 m3
2.10 0.10 3.78 m3

3.80 8 18.24 m2
145.92 m2
3.80 2 14.44 m2
28.88 m2
3.80 6 11.02 m2
66.12 m2
3.80 3 11.02 m2
33.06 m2
2.10 3 6.09
18.27 m2
2.10 6 6.13 m2
36.79 m2
3.80 2 6.65 m2
13.30 m2
342.34 m2
2.80 8.40 m2
2.80 6.66 m2
2.80 6.66 m2
3.80 2 5.51 m2
11.02 m2
32.75 m2

1.20 4 0.09 m2
0.35 m2

1.20 2 18.00 m2
36.00 m2
36.35 m2
51.33 m2
327.36
0.25 2.35
0.35 3.68
0.45 5.97
0.55 8.83
0.60 6.46
27.29 m2
0.90 1.00 11 8.91 m2
0.50 1.00 14 3.50 m2
12.41 m2
154.80 m2

877.45 m2
2 65.50 m2

2 72.69 m2

2 684.68 m2

2 54.57 m2

2.92 17 6.83
116.16 m²
14.98 2 16.48
32.96 m²
18.15 40.47 m²
3.00 1.50 m²
2.50 7.50 m²
198.59 m²

2.70 6.35 m²
1.50 4 3.53 m²
14.10 m²
1.50 2 4.05 m²
8.10 m²
28.55 m²

7.00 133.00 m²
1.00 2 1.00
2.00 m²

1.20 17 1.20 m²
20.40 m²

1.50 11 1.50
16.50 m²
1.50 2 1.20
2.40 m²
18.90 m²

1 1.00 Unit
2 2.00 Unit
2 2.00 Unit
10 10.00 Unit
20 20.00 Bh
1.00 12 3.00
36.00 m²

2 822.87 m²

1.00 3.80 2 3.80
7.60 m²
0.80 2.00 2 1.60
3.20 m²
40.00 3.80 2 152.00
304.00 m²
1,137.67 m²

10.00 Unit
10.00 Pcs
10.00 Lbr
10.00 Lbr
10.00 Ls
35.00 Titik

1.00 Unit
1.00 Pcs
1.00 Lbr
1.00 Lbr
1.00 Ls
10.00 Titik

1.00 Sr
1.00 Sr
2.00 Bh
2.00 Bh
1.00 Unit
10.00 Bh
16.00 Bh
15.00 Bh
1.00 Ls

6.00 2 96.00 m2
192.00 m2
8.00 154.47 m2
346.47 m2
0.444 2.00 307.67 LBR
1.62 561.28 Lbr

1.00 Ls
1.00 Ls
8.00 0.819 152.00
185.59 m2

6.00 0.819 96.00


2.00 192.00 m2
234.43 m2
344.00 m2
377.59 m2

1.00 1.00 Ls

345.00 m2
33

38 19
126

5.4
12.15
#REF!
1 batang 2 25
4
100

#REF! #REF!

5.2

46.44 24.2
3.87
4

154.80
#REF!

#REF!

13.40

17
4
4.2 tegel
196 x 69 x 9 cm

27
10
20
200

4000
48 6 8
17 5 85
14.1667
12 6 2
16.1667 16

48 6 8
17 2 34
5.66666667
13.6666667
3 2 6 1
14.6666667 15

262.99 0.444 592.319


23.22 4 92.88 0.888 82.48

93.80
2.178236398 26.14865
2.475268634
20x20 25 1
40x40 6 0.96

x 69 x 9 cm
1 Analisa : AHSP A.2.2.1.4
Item : Pengukuran dan Pemasangan Bouwplank
Satuan : m1

No URAIAN SATUANKOEFISIEN
A TENAGA
1 Pekerja OH 0.100
2 Tukang OH 0.100

JUMLAH TOTAL TENAGA

B BAHAN
1 Kayu 5/7 M3 0.012
2 Paku Kayu Kg 0.02
3 Papan Kayu Kelas III m3 0.007
JUMLAH TOTAL BAHAN

2 Analisa : AHSP A.2.2.1.9


Item : Pembersihan Lapangan dan Perataan
Satuan : m2
No URAIAN SATUANKOEFISIEN
A TENAGA
1 Pekerja OH 0.100
JUMLAH TOTAL TENAGA

3 Analisa : AHSP A.2.3.1.1


Item : Menggali Tanah Biasa Sedalam 1 m
Satuan : m3
No URAIAN SATUANKOEFISIEN
A TENAGA
1 Pekerja OH 0.750
JUMLAH TOTAL TENAGA

3 Analisa : AHSP A.2.3.1.1


Item : Urugan Tanah Kembali
Satuan : m3
No URAIAN SATUANKOEFISIEN
A TENAGA
1 Pekerja OH 0.500
JUMLAH TOTAL TENAGA
5 Analisa : AHSP A3.3.1.1
Item : Pengurugan 1 m3 dengan Pasir Urug
Satuan : m3
No URAIAN SATUANKOEFISIEN
A TENAGA
1 Pekerja OH 0.300
2 Tukang OH 0.010
JUMLAH TOTAL TENAGA
B BAHAN
1 Pasir urug M3 1.200

JUMLAH TOTAL BAHAN

6 Analisa : AHSP A.2.3.1.9


Item : Pengurugan Kembali Tanah Padat
Satuan : m3
No URAIAN SATUANKOEFISIEN
A TENAGA
1 Pekerja OH 0.250
JUMLAH TOTAL TENAGA
BAHAN
1 Tanah Padat M3 1.200
JUMLAH TOTAL TENAGA

7 Analisa : -
Item : Pekerjaan Konstruksi Bawah
Satuan : M2
No URAIAN SATUANKOEFISIEN
A TENAGA
1 Pekerja OH 0.100
2 Tukang kayu OH 0.330
JUMLAH TOTAL TENAGA

B BAHAN
1 Kayu Laut Keras Kelas I (Kayu Merah) Btg' 1.00
JUMLAH TOTAL BAHAN

8 Analisa : AHSP A.4.1.1.20


Item : Pemasangan Bekesting Untuk Pondasi
Satuan : m2
No URAIAN SATUANKOEFISIEN
A TENAGA
1 Pekerja OH 0.520
2 Tukang OH 0.260
JUMLAH TOTAL TENAGA

B BAHAN
1 Kayu Kelas III (Borneo/Dll) M3 0.020
2 Paku Biasa Kg 0.300
3 Minyak Bekesting Liter 0.100
JUMLAH TOTAL BAHAN

9 Analisa : AHSP A.4.1.1.21


Item : Pemasangan Bekesting Untuk Sloof
Satuan : m2

No URAIAN SATUANKOEFISIEN
A TENAGA
1 Pekerja OH 0.520
2 Tukang OH 0.260
JUMLAH TOTAL TENAGA

B BAHAN
1 Kayu Kelas III (Borneo/dll) M3 0.023
2 Paku Biasa 5 cm - 10 cm Kg 0.300
3 Minyak Bekesting Liter 0.100
JUMLAH TOTAL BAHAN

10 Analisa : AHSP A.4.1.1.22


Item : Pemasangan Bekesting Untuk Kolom
Satuan : m2
No URAIAN SATUANKOEFISIEN
A TENAGA
1 Pekerja OH 0.660
2 Tukang OH 0.330
JUMLAH TOTAL TENAGA

B BAHAN
1 Kayu Kelas III (Borneo/dll) M3 0.020
Paku Biasa 5 cm - 10 cm Kg 0.400
Minyak Bekesting Liter 0.200
Kayu Kelas II (Kamper/Kruing/dll) M3 0.008
Multipleks 9 mm Lembar 0.175
Kayu Dolken Ø 8-10/400 cm Batang 2.000
JUMLAH TOTAL BAHAN
11 Analisa : AHSP A.4.1.1.23
Item : Pemasangan Bekesting Untuk Balok
Satuan : m2
No URAIAN SATUANKOEFISIEN
A TENAGA
1 Pekerja OH 0.660
2 Tukang OH 0.330
JUMLAH TOTAL TENAGA

B BAHAN
1 Kayu Kelas III (Borneo/dll) M3 0.020
Paku Biasa 5 cm - 10 cm Kg 0.400
Minyak Bekesting Liter 0.200
Kayu Kelas II (Kamper/Kruing/dll) M3 0.018
Multipleks 9 mm Lembar 0.350
Kayu Dolken Ø 8-10/400 cm Batang 2.000
JUMLAH TOTAL BAHAN

12 Analisa : AHSP A.4.1.1.24


Item : Pemasangan Bekesting Untuk Lantai
Satuan : m2
No URAIAN SATUANKOEFISIEN
A TENAGA
1 Pekerja OH 0.660
2 Tukang OH 0.330
JUMLAH TOTAL TENAGA
B BAHAN
1 Kayu Kelas III (Borneo/dll) M3 0.040
2 Paku Biasa 5 cm - 10 cm Kg 0.400
3 Minyak Bekesting Liter 0.200
4 Multipleks 9 mm Lembar 0.350
5 Kayu Dolken Ø 8-10/400 cm Batang 6.000
JUMLAH TOTAL BAHAN

12 Analisa : AHSP A.4.1.1.24


Item : Pemasangan Bekesting Untuk Lantai Rabat
Satuan : m2
No URAIAN SATUANKOEFISIEN
A TENAGA
1 Pekerja OH 0.660
2 Tukang OH 0.330
JUMLAH TOTAL TENAGA
B BAHAN
1 Kayu Kelas III (Borneo/dll) M3 0.040
2 Paku Biasa 5 cm - 10 cm Kg 0.400
3 Minyak Bekesting Liter 0.200
JUMLAH TOTAL BAHAN

13 Analisa : AHSP A.4.1.1.7


Item : Membuat Beton Mutu f'c = 19.3 MPa (K-225), Slump (12 ± 2 ) cm, w/c = 0.58
Satuan : m3
No URAIAN SATUANKOEFISIEN
A TENAGA
1 Pekerja OH 1.650
2 Tukang OH 0.275
JUMLAH TOTAL TENAGA

B BAHAN
1 Semen Kg 371.000
2 Pasir Beton (1400 kg/m3) Kg 698.000
3 Batu pecah 2-3 cm Kg 1047.000
4 Air Liter 215.000
JUMLAH TOTAL BAHAN

14 Analisa : AHSP A.4.1.1.5


Item : Membuat Beton Mutu f'c = 14.5 MPa (K-175), Slump (12 ± 2 ) cm, w/c = 0.66
Satuan : m3
No URAIAN SATUANKOEFISIEN
A TENAGA
1 Pekerja OH 1.650
2 Tukang OH 0.275
JUMLAH TOTAL TENAGA

B BAHAN
1 Semen Kg 326.000
2 Pasir Beton (1400 kg/m3) Kg 760.000
3 Batu pecah 2-3 cm Kg 1029.000
4 Air Liter 215.000
JUMLAH TOTAL BAHAN

14 Analisa : AHSP A.4.1.1.5


Item : Membuat Beton Mutu f'c = 14.5 MPa (K-175), Slump (12 ± 2 ) cm, w/c = 0.66
Satuan : m3
No URAIAN SATUANKOEFISIEN
A TENAGA
1 Pekerja OH 1.650
2 Tukang OH 0.275
JUMLAH TOTAL TENAGA
B BAHAN
1 Semen Kg 326.000
2 Pasir Beton (1400 kg/m3) Kg 760.000
3 Kerikil (1350 kg/m3) Kg 1029.000
4 Air Liter 215.000
JUMLAH TOTAL BAHAN

15 Analisa : AHSP A.4.1.1.17


Item : Pembesian 10 Kg Dengan Besi Beton Polos 12 mm
Satuan : Kg
No URAIAN SATUANKOEFISIEN
A TENAGA
1 Pekerja OH 0.007
2 Tukang OH 0.007
JUMLAH TOTAL TENAGA

B BAHAN
1 Besi Beton Polos Kg 1.05
2 Kawat Bendrat Kg 0.015
JUMLAH TOTAL BAHAN

16 Analisa : AHSP A.4.1.1.17


Item : Pembesian 10 Kg Dengan Besi Beton Polos 8 mm
Satuan : Kg
No URAIAN SATUANKOEFISIEN
A TENAGA
1 Pekerja OH 0.007
2 Tukang OH 0.007
JUMLAH TOTAL TENAGA

B BAHAN
1 Besi Beton Polos Kg 1.05
2 Kawat Bendrat Kg 0.02
JUMLAH TOTAL BAHAN

17 Analisa : AHSP A.4.1.1.17


Item : Pembesian 10 Kg Dengan Besi Beton Polos 10 mm
Satuan : Kg
No URAIAN SATUANKOEFISIEN
A TENAGA
1 Pekerja OH 0.007
2 Tukang OH 0.007
JUMLAH TOTAL TENAGA

B BAHAN
1 Besi Beton Polos Kg 1.05
2 Kawat Bendrat Kg 0.02
JUMLAH TOTAL BAHAN

18 Analisa : AHSP A.4.1.1.17


Item : Pembesian 10 Kg Dengan Besi Beton Polos 16 mm
Satuan : Kg
No URAIAN SATUANKOEFISIEN
A TENAGA
1 Pekerja OH 0.007
2 Tukang OH 0.007
JUMLAH TOTAL TENAGA

B BAHAN
1 Besi Beton Polos Kg 1.05
2 Kawat Bendrat Kg 0.02
JUMLAH TOTAL BAHAN

20 Analisa : AHSP A.4.4.1.3


Item : Pemasangan Dinding Bata Merah (5x11x22) cm Tebal 1 Batu Camp. 1 SP : 4 PP
Satuan : m2
No URAIAN SATUANKOEFISIEN
A TENAGA
1 Pekerja OH 0.300
2 Tukang OH 0.100
JUMLAH TOTAL TENAGA

B BAHAN
1 Batu Bata Buah 70.00
2 Semen @ 40 Kg Kg 11.50
3 Pasir Pasang (1400 kg/m3) M3 0.043
JUMLAH TOTAL BAHAN
TOTAL (A+B)
20 Analisa : AHSP A.4.4.1.3
Item : Pemasangan Dinding Batako (5x11x22) cm Tebal 1 Batu Camp. 1 SP : 4 PP
Satuan : m2
No URAIAN SATUANKOEFISIEN
A TENAGA
1 Pekerja OH 0.300
2 Tukang OH 0.100
JUMLAH TOTAL TENAGA

B BAHAN
1 Batako Buah 70.00
2 Semen @ 40 Kg Kg 11.50
3 Pasir Pasang (1400 kg/m3) M3 0.043
JUMLAH TOTAL BAHAN
TOTAL (A+B)

22 Analisa : AHSP A.4.4.2.2


Item : Pemasangan Plesteran 1 SP : 4 PP Tebal 15 mm
Satuan : m2
No URAIAN SATUANKOEFISIEN
A TENAGA
1 Pekerja OH 0.300
2 Tukang OH 0.150
JUMLAH TOTAL TENAGA

B BAHAN
1 Semen @ 40 Kg Kg 6.24
2 Pasir Pasang (1400 kg/m3) M3 0.02
JUMLAH TOTAL BAHAN
TOTAL (A+B)

23 Analisa : AHSP A.2.3.1.11.a


Item : Pengurukan Dengan Tanah Urug
Satuan : m3
No URAIAN SATUANKOEFISIEN
A TENAGA
1 Pekerja OH 0.300
JUMLAH TOTAL TENAGA
B BAHAN
1 Tanah Timbun M3 1.200
JUMLAH TOTAL BAHAN
TOTAL (A+B)

24 Analisa : AHSP A.4.4.3.9


Item : Pemasangan Lantai Keramik Ukuran 40 cm x 40 cm
Satuan : m2
No URAIAN SATUANKOEFISIEN
A TENAGA
1 Pekerja OH 0.250
2 Tukang OH 0.125
JUMLAH TOTAL TENAGA

B BAHAN
1 Granit Uk. 40 x 40 cm Bh 6.63
2 Semen @ 40 Kg Kg 9.80
3 Semen Kg 9.80
4 Pasir Pasang (1400 kg/m3) M3 0.045
JUMLAH TOTAL BAHAN
TOTAL (A+B)

25 Analisa : AHSP A.4.4.3.54


Item : Pemasangan 1 m2 Lantai Keramik 20 cm x 20 cm
Satuan : m2
No URAIAN SATUANKOEFISIEN
A TENAGA
1 Pekerja OH 0.700
2 Tukang OH 0.350
JUMLAH TOTAL TENAGA

B BAHAN
1 Keramik 20 x 20 cm Bh 26.50
2 Semen @50kg Kg 10.40
2 Semen @50kg Kg 10.40
4 Pasir Pasang (1400 kg/m3) M3 0.05
JUMLAH TOTAL BAHAN
TOTAL (A+B)

26 Analisa : AHSP A.4.7.1.10


Item : Pengecatan 1 m2 Tembok Baru ( 1 Lapis Plamur, 1 Lapis Cat Dasar, 2 Lapis Cat
Satuan : m2
No URAIAN SATUANKOEFISIEN
A TENAGA
1 Pekerja OH 0.020
2 Tukang OH 0.063
JUMLAH TOTAL TENAGA

B BAHAN
1 Plamur Kg 0.10
2 Cat Dasar Kg 0.10
3 Cat Penutup Interior Setara Jotun Kg 0.26
JUMLAH TOTAL BAHAN
TOTAL (A+B)
27 Analisa : A.4.5.2.39.
Item : Pemasangan 1 m2 Paving Block Natural Tebal 6 cm
Satuan : m2
No URAIAN SATUANKOEFISIEN
A TENAGA
1 Pekerja OH 0.150
2 Tukang OH 0.070
JUMLAH TOTAL TENAGA

B BAHAN
1 Paving Block Hexagonal m2 1.01
2 Pasir beton M3 0.05
JUMLAH TOTAL BAHAN
TOTAL (A+B)

28 Analisa : A. 4.5.2.32a
Item : Pemasangan 1 m2 Atap Zincalume (Spandek)
Satuan : m2
No URAIAN SATUANKOEFISIEN
A TENAGA
1 Pekerja OH 0.020
2 Tukang OH 0.010
JUMLAH TOTAL TENAGA

B BAHAN
1 Atap Apandek 0.30 mm m2 1.10
2 Baut Screw Cteks 12-4x50 Bh 6.00
JUMLAH TOTAL BAHAN
TOTAL (A+B)

29 Analisa : A.4.2.1.22.
Item : 1 m² Pasang Kuda-kuda baja ringan + reng untuk atap asbes/spandek
Satuan : m2
No URAIAN SATUANKOEFISIEN
A TENAGA
1 Pekerja OH 0.200
2 Tukang OH 0.450
JUMLAH TOTAL TENAGA

B BAHAN
1 Baja ringan Canal C-75 M 1.49
2 Baut (Screw Driver) Bh 28.00
3 Dynabolt Bh 1.60
4 Reng M 3.60
JUMLAH TOTAL BAHAN
TOTAL (A+B)
30 Analisa : 4.4.1.26
Item : Pemasangan 1 M2 Dinding Bata Ringan Tebal 10CM
Satuan : m2
No URAIAN SATUANKOEFISIEN
A TENAGA
1 Pekerja OH 0.671
2 Tukang OH 1.300
JUMLAH TOTAL TENAGA

B BAHAN
1 Bata Ringan Tebal 10cm M3 8.40
2 Mortal Kg 0.063
JUMLAH TOTAL BAHAN
TOTAL (A+B)

31 Analisa : A.4.4.2.27.
Item : Pemasangan 1 m2 Acian
Satuan : m2
No URAIAN SATUANKOEFISIEN
A TENAGA
1 Pekerja OH 0.350
2 Tukang OH 0.250
JUMLAH TOTAL TENAGA

B BAHAN
1 Sement Pc Kg 5.184
2 Pasir Pasang M3 0.026
3 Kawat Ram Ayam Ls 1.000
4 Semen Untuk Acian Kg 3.250
JUMLAH TOTAL BAHAN
TOTAL (A+B)
HARGA JUMLAH

Rp 115,000.00 Rp 11,500.00
Rp 135,000.00 Rp 13,500.00

A Rp 25,000.00

Rp3,800,000.00 Rp 45,600.00
Rp 22,000.00 Rp 440.00
Rp3,800,000.00 Rp 26,600.00
Rp 72,640.00

TOTAL (A+B) Rp 97,640.00

HARGA JUMLAH

Rp 115,000.00 Rp 11,500.00
A Rp 11,500.00

HARGA JUMLAH

Rp 115,000.00 Rp 86,250.00
A Rp 86,250.00

HARGA JUMLAH

Rp 115,000.00 Rp 57,500.00
A Rp 57,500.00
HARGA JUMLAH

Rp 115,000.00 Rp 34,500.00
Rp 135,000.00 Rp 1,350.00
A Rp 35,850.00

Rp 214,285.71 Rp 257,142.86

Rp 257,142.86
TOTAL (A+B) Rp 292,992.86

HARGA JUMLAH

Rp 115,000.00 Rp 28,750.00
A Rp 28,750.00

Rp 57,142.86 Rp 68,571.43
A Rp 97,321.43

HARGA JUMLAH

Rp 115,000.00 Rp 11,500.00
Rp 135,000.00 Rp 44,550.00
A Rp 56,050.00

Rp 55,000.00 Rp 55,000.00
Rp 55,000.00

TOTAL (A+B) Rp 111,050.00

HARGA JUMLAH
Rp 115,000.00 Rp 59,800.00
Rp 135,000.00 Rp 35,100.00
A Rp 94,900.00

Rp3,800,000.00 Rp 76,000.00
Rp 22,000.00 Rp 6,600.00
Rp 15,000.00 Rp 1,500.00
Rp 84,100.00
TOTAL (A+B) Rp 179,000.00

HARGA JUMLAH

Rp 115,000.00 Rp 59,800.00
Rp 135,000.00 Rp 35,100.00
A Rp 94,900.00

Rp3,800,000.00 Rp 85,500.00
Rp 22,000.00 Rp 6,600.00
Rp 15,000.00 Rp 1,500.00
Rp 93,600.00
TOTAL (A+B) Rp 188,500.00

HARGA JUMLAH

Rp 115,000.00 Rp 75,900.00
Rp 135,000.00 Rp 44,550.00
A Rp 120,450.00

Rp3,800,000.00
Rp 76,000.00
Rp 22,000.00 Rp 8,800.00
Rp 15,000.00 Rp 3,000.00
Rp5,000,000.00
Rp 37,500.00
Rp 130,000.00Rp 22,750.00
Rp 40,000.00 Rp 80,000.00
Rp 228,050.00
TOTAL (A+B) Rp 348,500.00
6

HARGA JUMLAH

Rp 115,000.00 Rp 75,900.00
Rp 135,000.00 Rp 44,550.00
A Rp 120,450.00

Rp3,800,000.00
Rp 76,000.00
Rp 22,000.00 Rp 8,800.00
Rp 15,000.00 Rp 3,000.00
Rp5,000,000.00
Rp 90,000.00
Rp 130,000.00Rp 45,500.00
Rp 40,000.00 Rp 80,000.00
Rp 303,300.00
TOTAL (A+B) Rp 423,750.00

HARGA JUMLAH

Rp 115,000.00 Rp 75,900.00
Rp 135,000.00 Rp 44,550.00
A Rp 120,450.00

Rp3,800,000.00
Rp 152,000.00
Rp 22,000.00 Rp 8,800.00
Rp 15,000.00 Rp 3,000.00
Rp 130,000.00Rp 45,500.00
Rp 40,000.00 Rp 240,000.00
Rp 449,300.00
TOTAL (A+B) Rp 569,750.00

HARGA JUMLAH

Rp 115,000.00 Rp 75,900.00
Rp 135,000.00 Rp 44,550.00
A Rp 120,450.00
Rp3,800,000.00 Rp 152,000.00
Rp 22,000.00 Rp 8,800.00
Rp 15,000.00 Rp 3,000.00
Rp 163,800.00
TOTAL (A+B) Rp 284,250.00

(12 ± 2 ) cm, w/c = 0.58

HARGA JUMLAH

Rp 115,000.00 Rp 189,750.00
Rp 135,000.00 Rp 37,125.00
A Rp 226,875.00

Rp 1,400.00
Rp 519,400.00
Rp 132.65
Rp 92,591.84
Rp 380.95
Rp 398,857.14
Rp 50.00
Rp 10,750.00
Rp 1,021,598.98
TOTAL (A+B) Rp 1,248,473.98

(12 ± 2 ) cm, w/c = 0.66

HARGA JUMLAH

Rp 115,000.00 Rp 189,750.00
Rp 135,000.00 Rp 37,125.00
A Rp 226,875.00

Rp 1,400.00
Rp 456,400.00
Rp 132.65
Rp 100,816.33
Rp 380.95
Rp 392,000.00
Rp 50.00
Rp 10,750.00
Rp 959,966.33
TOTAL (A+B) Rp 1,186,841.33

(12 ± 2 ) cm, w/c = 0.66

HARGA JUMLAH

Rp 115,000.00 Rp 189,750.00
Rp 135,000.00 Rp 37,125.00
A Rp 226,875.00
Rp 1,300.00
Rp 423,800.00
Rp 154.76
Rp 117,619.05
Rp 444.44
Rp 457,333.33
Rp 65.00
Rp 13,975.00
Rp 1,012,727.38
TOTAL (A+B) Rp 1,239,602.38

HARGA JUMLAH

Rp 115,000.00 Rp 805.00
Rp 135,000.00 Rp 945.00
A Rp 1,750.00

Rp 9,849.91 Rp 10,342.40
Rp 25,000.00 Rp 375.00
Rp 10,717.40
TOTAL (A+B) Rp 12,467.40

HARGA JUMLAH

Rp 115,000.00 Rp 805.00
Rp 135,000.00 Rp 945.00
A Rp 1,750.00

Rp 9,915.61 Rp 10,411.39
Rp 25,000.00 Rp 375.00
Rp 10,786.39
TOTAL (A+B) Rp 12,536.39
HARGA JUMLAH

Rp 115,000.00 Rp 805.00
Rp 135,000.00 Rp 945.00
A Rp 1,750.00

Rp 10,135.14 Rp 10,641.89
Rp 25,000.00 Rp 375.00
Rp 11,016.89
TOTAL (A+B) Rp 12,766.89

HARGA JUMLAH

Rp 115,000.00 Rp 805.00
Rp 135,000.00 Rp 945.00
A Rp 1,750.00

Rp 11,867.09 Rp 12,460.44
Rp 25,000.00 Rp 375.00
Rp 12,835.44
TOTAL (A+B) Rp 14,585.44

1 Batu Camp. 1 SP : 4 PP

HARGA JUMLAH

Rp 115,000.00 Rp 34,500.00
Rp 135,000.00 Rp 13,500.00
A Rp 48,000.00

Rp 1,100.00 Rp 77,000.00
Rp 1,400.00 Rp 16,100.00
Rp 214,285.71 Rp 9,214.29
Rp 102,314.29
TOTAL (A+B) Rp 150,314.29
atu Camp. 1 SP : 4 PP

HARGA JUMLAH

Rp 115,000.00 Rp 34,500.00
Rp 135,000.00 Rp 13,500.00
A Rp 48,000.00

Rp 1,200.00 Rp 84,000.00
Rp 1,400.00 Rp 16,100.00
Rp 214,285.71 Rp 9,214.29
Rp 109,314.29
TOTAL (A+B) Rp 157,314.29

HARGA JUMLAH

Rp 115,000.00 Rp 34,500.00
Rp 135,000.00 Rp 20,250.00
A Rp 54,750.00

Rp 1,400.00 Rp 8,736.00
Rp 214,285.71 Rp 5,142.86
Rp 13,878.86
TOTAL (A+B) Rp 68,628.86

HARGA JUMLAH

Rp 115,000.00 Rp 34,500.00
A Rp 34,500.00

Rp 57,143 Rp 68,571.43
Rp 68,571.43
TOTAL (A+B) Rp 103,071.43
HARGA JUMLAH

Rp 115,000.00 Rp 28,750.00
Rp 135,000.00 Rp 16,875.00
A Rp 45,625.00

Rp 10,833.33 Rp 71,825.00
Rp 1,400.00Rp 13,720.00
Rp 1,400.00Rp 13,720.00
Rp 214,285.71Rp 9,642.86
Rp 108,907.86
TOTAL (A+B) Rp 154,532.86

HARGA JUMLAH

Rp 115,000.00 Rp 80,500.00
Rp 135,000.00 Rp 47,250.00
A Rp 127,750.00

Rp 2,250.00Rp 59,625.00
Rp 1,400.00Rp 14,560.00
Rp 1,400.00Rp 14,560.00
Rp 214,285.71Rp 9,642.86
Rp 98,387.86
TOTAL (A+B) Rp 226,137.86

apis Cat Dasar, 2 Lapis Cat Penutup ) Exterior dan Iterior

HARGA JUMLAH

Rp 115,000.00 Rp 2,300.00
Rp 135,000.00 Rp 8,505.00
A Rp 10,805.00

Rp 22,000.00 Rp 2,200.00
Rp 3,500.00 Rp 350.00
Rp 3,487.50 Rp 906.75
Rp 3,456.75
TOTAL (A+B) Rp 14,261.75
HARGA JUMLAH

Rp 115,000.00 Rp 17,250.00
Rp 135,000.00 Rp 9,450.00
A Rp 26,700.00

Rp 4,000.00 Rp 4,040.00
Rp 185,714.29 Rp 9,285.71
Rp 13,325.71
TOTAL (A+B) Rp 40,025.71

HARGA JUMLAH

Rp 115,000.00 Rp 2,300.00
Rp 135,000.00 Rp 1,350.00
A Rp 3,650.00

Rp 87,000.00 Rp 95,700.00
Rp 933.33 Rp 5,600.00
Rp 101,300.00
TOTAL (A+B) Rp 104,950.00

p asbes/spandek

HARGA JUMLAH

Rp 115,000.00 Rp 23,000.00
Rp 135,000.00 Rp 60,750.00
A Rp 83,750.00

Rp 19,166.67
Rp 28,520.00 Baut screw driver
Rp 933.33
Rp 26,133.33
Rp 2,000.00
Rp 3,200.00 6000
Rp 8,333.33
Rp 30,000.00 250
Rp 87,853.33 ###
TOTAL (A+B) Rp 171,603.33
HARGA JUMLAH

Rp 115,000.00 Rp 77,165.00
Rp 135,000.00 Rp 175,500.00
A Rp 252,665.00

Rp 17,000.00 Rp 142,800.00
Rp 2,750.00 Rp 173.25
Rp 142,973.25
TOTAL (A+B) Rp 395,638.25

HARGA JUMLAH

Rp 115,000.00 Rp 40,250.00
Rp 135,000.00 Rp 33,750.00
A Rp 74,000.00

Rp 1,400.00 Rp 7,257.60
Rp 214,285.71 Rp 5,571.43
Rp 8,000.00 Rp 8,000.00
Rp 1,400.00 Rp 4,550.00
Rp 25,379.03
TOTAL (A+B) Rp 99,379.03
DAFTAR KUANTITAS PEKERJAAN
INFRASTRUKTUR PENDUKUNG LIVELIHOOD

KAB/KOTA : NUNUKAN
KECAMATAN : NUNUKAN
KEL/DESA : NUNUKAN UTARA
BKM/LKM : TERPADU LESTARI
NAMA KEGIATAN : RUMAH WISATA KULINER
TAHUN ANGGARAN : 2021

NO JENIS PEKERJAAN VOLUME SATUAN


1 2 3 4
A. PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan Bowplank 124.00 m
2 Pembersihan Lapangan 477.00 m²
B. PEKERJAAN LANTAI I
I. PEKERJAAN TANAH DAN PONDASI
a. Pekerjaan Tanah dan Pondasi Tapak
1 Galian Tanah pondasi Tapak 80x80x30 12.47 m3
2 Galian Tanah pondasi Tapak 40x40x30 4.90 m3
3 Galian Parit 5.46 m3
4 Galian Sloof 20/40 20.79 m3
5 Urugan Tanah Kembali 38.16 m3
6 Pengurugan Kembali Tanah Padat 46.82 m3
7 Urugan Pasir Pasang 23.33 m3
8 Kayu Bulat Merah dia 8-10 Pjng 4 Meter 50.00 Btg
C PEKERJAAN BETON BERTULANG
1 Pondasi Tapak Footplate 80x80x30 12.47 m3
- Beagisting Tapak Pondasi 13.20 m²
- Pembesian Tapak Pondasi 273.43 Kg
2 Pondasi Tapak Footplate 40x40x30 4.90 m3
- Beagisting Tapak Pondasi 13.44 m²
- Pembesian Tapak Pondasi 298.29 Kg
3 Perdestail 80x80x30 0.69 m3
- Beagisting Pendestal 11.00 m²
- Pembesian Pendestal 76.17 Kg
4 Perdestail 40x40x30 0.56 m3
- Beagisting Pendestal 11.20 m²
- Pembesian Pendestal 96.94 Kg
5 Sloof Beton 20/40 cm 23.22 m3
- Beagisting Sloof 123.84 m²
- Pembesian Sloof 347.21 Kg
8 Kolom Beton 25/25 Lantai 1 2.61 m3
- Beagisting kolom 20.90 m²
- Pembesian Kolom 307.50 Kg
9 Kolom Beton 20/20 cm Lantai 2 1.04 m3
- Beagisting kolom 10.40 m²
- Pembesian Kolom 185.47 Kg
11 Balok Anak 20/30 cm 1.10 m3
- Beagisting Balok 11.04 m²
- Pembesian Balok 156.81 Kg
12 Balok 20/40 cm 5.71 m3
- Beagisting Balok 57.12 m²
- Pembesian Balok 871.44 Kg
13 Ring Balok 20/20 cm 3.44 m3
- Beagisting Balok 17.20 m²
- Pembesian Balok 450.17 Kg
14 Cor Lantai Dak WC 1.80 m3
- Beagisting Lantai 9.00 m2
- Pembesian Lantai 221.94 Kg
15 Cor Plat Lantai Lantai II 13.50 m3
- Beagisting Lantai 133.00 m2
- Pembesian Lantai 3,279.78 Kg
16 Cor Rabat Lantai 1 (K-175) 16.08 m3
- Beagisting Lantai 80.40 m2
D PEKERJAAN PASANGAN DAN PLASTERAN
1 Pasangan Dinding Bata Merah 1:4 327.36 m2
2 Pasangan Dinding Batako 1:4 51.33 m2
3 Plesteran Dinding bata 1:4 877.45 m2
4 Pasangan Begesting Bata merah Footplate 80 8.91 m2
5 Pasangan Begesting Bata merah Footplate 40 3.50 m2
6 Pasangan Begesting Bata Merah Sloof 20/40 154.80 m2
7 Acian 18.90 m2
E Pekerjaaan Lantai Keramik
1 Pasangan Keramik 40x40 Lantai 1 198.59 m2
2 Pasangan Keramik 20x20 Lantai 1 WC 28.55 m2
3 Pasangan Keramik 40x40 Lantai II 135.00 m2
4 Pasangan Singki 17.00 Unit
5 Paving Blcok Hexagonal 36.00 m2
F PEKERJAAN PINTU, JENDELA DAN ANGIN ANGIN
1 Pintu Besi Belakang 2 Daun Pintu 1.00 Unit
2 Pintu WC 2.00 Unit
3 Pintu Besi Lorong 2.00 Unit
4 Pintu Rollong Door 10.00 Unit
5 Angin-Angin 20.00 Bh
G PEKERJAAN PENGECATAN
1 Pekerjaan cat tembok 1,137.67 m2
H PEKERJAAN LISTRIK
A Biaya Listrik 4 Amper (17 Unit)
1 Biaya Penyambungan (BP) PLN 17 Untuk 4 Amper 10.00 Unit
2 Biaya Token/Pulsa 10.00 Pcs
2 Biaya Materai 10.00 Lbr
3 Biaya Sertifikat Like Opererasi (SLO) 10.00 Lbr
4 Jasa Survey Dan Jaminan 10.00 Ls
5 Instalasi Listrik 35.00 Titik
B Biaya Listrik 6 Amper (1 Unit)
1 Biaya Penyambungan (BP) PLN 17 Untuk 4 Amper 1.00 Unit
2 Biaya Token/Pulsa 1.00 Pcs
2 Biaya Materai 1.00 Lbr
3 Biaya Sertifikat Like Opererasi (SLO) 1.00 Lbr
4 Jasa Survey Dan Jaminan 1.00 Ls
5 Instalasi Listrik 10.00 Titik
IX PEKERJAAN SANITASI
1 Pemasangan Baru Air PDAM 1.00 Sr
2 Biaya Pendaftaran 1.00 Sr
3 Tangki Profil 2200 2.00 Bh
4 Pemasangan Kloset Jongkok 2.00 Bh
5 Septictank dan Peresapan 1.00 Unit
6 Pemasangan Keran Air Plastik 10.00 Bh
7 Pasang Instalasi Air Kotor (pipa PVC Type AW 3 & 4 Inc ) 16.00 Bh
8 Pasang Instalasi Air Bersih (pipa PVC Type AW 3/4 Inc ) 15.00 Bh
9 Aksesoris 1.00 Ls
J PEKERJAAN ATAP
1 Atap Spandek Lantai I 192.00 m2
2 Atap Spandek Lantai II 346.47 m2
K PEKERJAAN BESI DAN ALMUNIUM
1 Pekerjaan Pagar Hollow 4x2 cm Dan Tangga 1.00 Ls
2 Pekerjaan Rangka Baja Ringan 377.59 m2
L SEWA ALAT
1 Molen 1.00 Ls
M KESEHATAN DAN KESELAMATAN KERJA (K3)
1 Topi Pelindung Diri ( Safety Helmet ) 30.00 Bh
2 Perlindungan Pernapasan Dan Mulut ( Masker ) 30.00 Bh
3 Sarung Tangan ( Safety Gloves ) 30.00 Psg
4 Sepatu Keselamatan Kerja ( Safety Shoes ) 30.00 Psg
5 Rompi Keselamatan Kerja ( Safety Vest ) 30.00 Bh
6 Peralatan P3K ( Kotak P3K, Obat Luka, Perban DLL 1.00 Unit
7 Asuransi Kesehatan 1.00 Ls
8 Spanduk 1.00 Lb

Diverifikasi Oleh :
Askot Infrastruktur Fasilitator Teknik UPL/TIPP

( Sahril S.T ) ( Novianto Christy (.......................................................)


Adrian )
DAFTAR HARGA SATUAN JADI PEKERJAAN
INFRASTRUKTUR PENDUKUNG LIVELIHOOD

KAB/KOTA : NUNUKAN
KECAMATAN : NUNUKAN
KEL/DESA : NUNUKAN UTARA
BKM/LKM : TERPADU LESTARI
NAMA KEGIATA: RUMAH WISATA KULINER
TAHUN ANGGA : 2021

NO JENIS PEKERJAAN HARGA


1 2 3
A. PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan Bowplank Rp 97,640.00
2 Pembersihan Lapangan Rp 11,500.00
B. PEKERJAAN LANTAI I
I. PEKERJAAN TANAH DAN PONDASI
a. Pekerjaan Tanah dan Pondasi Tapak
1 Galian Tanah pondasi Tapak 80x80x30 Rp 86,250.00
2 Galian Tanah pondasi Tapak 40x40x30 Rp 86,250.00
3 Galian Parit Rp 86,250.00
4 Galian Sloof 20/40 Rp 86,250.00
5 Urugan Tanah Kembali Rp 57,500.00
6 Pengurugan Kembali Tanah Padat Rp 97,321.43
7 Urugan Pasir Pasang Rp 292,992.86
8 Kayu Bulat Merah dia 8-10 Pjng 4 Meter Rp 55,000.00
C PEKERJAAN BETON BERTULANG
1 Pondasi Tapak Footplate 80x80x30 Rp 1,248,473.98
- Beagisting Tapak Pondasi Rp 179,000.00
- Pembesian Tapak Pondasi Rp 12,467.40
2 Pondasi Tapak Footplate 40x40x30 Rp 1,248,473.98
- Beagisting Tapak Pondasi Rp 179,000.00
- Pembesian Tapak Pondasi Rp 12,467.40
3 Perdestail 80x80x30 Rp 1,248,473.98
Beagisting Pendestal Rp 348,500.00
Pembesian Pendestal Rp 12,467.40
4 Perdestail 40x40x30 Rp 1,248,473.98
- Beagisting Pendestal Rp 348,500.00
- Pembesian Pendestal Rp 12,467.40
5 Sloof Beton 20/40 cm Rp 1,248,473.98
- Beagisting Sloof Rp 188,500.00
- Pembesian Sloof Rp 14,585.44
6 Sloof Beton 15/15 cm Rp 1,248,473.98
- Beagisting Sloof Rp 188,500.00
- Pembesian Sloof Rp 12,467.40
8 Kolom Beton 25/25 Lantai 1 Rp 1,248,473.98
- Beagisting kolom Rp 348,500.00
- Pembesian Kolom Rp 12,467.40
9 Kolom Beton 20/20 cm Lantai 2 Rp 1,248,473.98
- Beagisting kolom Rp 348,500.00
- Pembesian Kolom Rp 12,467.40
11 Balok Anak 20/30 cm Rp 1,248,473.98
- Beagisting Balok Rp 423,750.00
- Pembesian Balok Rp 14,585.44
12 Balok 20/40 cm Rp 1,248,473.98
- Beagisting Balok Rp 423,750.00
- Pembesian Balok Rp 14,585.44
13 Ring Balok 20/20 cm Rp 1,248,473.98
- Beagisting Balok Rp 423,750.00
- Pembesian Balok Rp 12,467.40
14 Cor Lantai Dak WC Rp 1,186,841.33
- Beagisting Lantai Rp 569,750.00
- Pembesian Lantai Rp 12,766.89
15 Cor Plat Lantai Lantai II Rp 1,248,473.98
- Beagisting Lantai Rp 569,750.00
- Pembesian Lantai Rp 12,766.89
16 Cor Rabat Lantai 1 (K-175) Rp 1,186,841.33
- Beagisting Lantai Rp 284,250.00
D PEKERJAAN PASANGAN DAN PLASTERAN
1 Pasangan Dinding Bata Merah 1:4 Rp 150,314.29
2 Pasangan Dinding Batako 1:4 Rp 157,314.29
3 Plesteran Dinding bata 1:4 Rp 68,628.86
4 Pasangan Begesting Bata merah Footplate 80 Rp 150,314.29
5 Pasangan Begesting Bata merah Footplate 40 Rp 150,314.29
6 Pasangan Begesting Bata Merah Sloof 20/40 Rp 150,314.29
7 Acian Rp 99,379.03
E PEKERJAAN LANTAI
1 Pekerjaaan Lantai Keramik
1 Pasangan Keramik 40x40 Lantai 1 Rp 154,532.86
2 Pasangan Keramik 20x20 Lantai 1 WC Rp 226,137.86
3 Pasangan Keramik 40x40 Lantai II Rp 154,532.86
4 Pasangan Singki Rp 200,000.00
5 Paving Blcok Hexagonal Rp 40,025.71
F PEKERJAAN PINTU DAN JENDELA
1 Pintu Besi Belakang 2 Daun Pintu Rp 1,500,000
2 Pintu WC Rp 1,200,000
3 Pintu Besi Lorong Rp 1,000,000
4 Pintu Rollong Door Rp 6,500,000
5 Angin-Angin Rp 50,000
G PEKERJAAN PENGECATAN
1 Pekerjaan cat tembok Rp 14,261.75
H PEKERJAAN LISTRIK
A Biaya Listrik 4 Amper (17 Unit)
1 Biaya Penyambungan (BP) PLN 17 Untuk 4 Amper Rp 421,000.00
2 Biaya Token/Pulsa Rp 50,000.00
2 Biaya Materai Rp 10,000.00
3 Biaya Sertifikat Like Opererasi (SLO) Rp 40,000.00
4 Jasa Survey Dan Jaminan Rp 525,000.00
5 Instalasi Listrik Rp 165,000.00
B Biaya Listrik 6 Amper (1 Unit)
1 Biaya Penyambungan (BP) PLN 1 Untuk 6 Amper Rp 1,218,000.00
2 Biaya Token/Pulsa Rp 50,000.00
2 Biaya Materai Rp 10,000.00
3 Biaya Sertifikat Like Opererasi (SLO) Rp 95,000.00
4 Jasa Survey Dan Jaminan Rp 730,000.00
5 Instalasi Listrik Rp 170,000.00
I PEKERJAAN SANITASI
1 Pemasangan Baru Air PDAM Rp 2,260,000.00
2 Biaya Pendaftaran Rp 16,000.00
3 Tangki Profil 2200 Rp 2,850,000.00
4 Pemasangan Kloset Jongkok Rp 330,000.00
5 Septictank dan Peresapan Rp 6,000,000.00
6 Pemasangan Keran Air Plastik Rp 22,000.00
7 Pasang Instalasi Air Kotor (pipa PVC Type AW 3 & 4 Inc ) Rp 85,000.00
8 Pasang Instalasi Air Bersih (pipa PVC Type AW 3/4 Inc ) Rp 80,000.00
9 Aksesoris Rp 2,154,000.00
J PEKERJAAN ATAP
1 Atap Spandek Lantai I Rp 104,950.00
2 Atap Spandek Lantai II Rp 104,950.00
K PEKERJAAN BESI DAN ALMUNIUM
1 Pekerjaan Pagar Hollow 4x2 cm Dan Tangga Rp 65,000,000.00
2 Pekerjaan Rangka Baja Ringan Rp 171,603.33
L SEWA ALAT
1 Molen Rp 5,000,000.00
M KESEHATAN DAN KESELAMATAN KERJA (K3)
1 Topi Pelindung Diri ( Safety Helmet ) Rp 45,000.00
2 Perlindungan Pernapasan Dan Mulut ( Masker ) Rp 40,000.00
3 Sarung Tangan ( Safety Gloves ) Rp 7,000.00
4 Sepatu Keselamatan Kerja ( Safety Shoes ) Rp 90,000.00
5 Rompi Keselamatan Kerja ( Safety Vest ) Rp 45,000.00
6 Peralatan P3K ( Kotak P3K, Obat Luka, Perban DLL Rp 500,000.00
7 Asuransi Kesehatan Rp 2,390,000.00
8 Spanduk Rp 300,000.00
REALISASI ANGGARAN BIAYA
KAB/KOTA : NUNUKAN
KECAMATAN : NUNUKAN
KEL/DESA : NUNUKAN TENGAH
NAMA KEGIATAN : PEMBANGGUNAN KANTIN SEKOLAH SMA NEGERI 1 NUNUKAN
TAHUN ANGGARAN : 2023

NO JENIS PEKERJAAN VOLUME SATUAN HARGA SATUAN JUMLAH


1 2 3 4 5 6
A. PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan Bowplank 124.00 m Rp 97,640.00 Rp 12,107,360
2 Pembersihan Lapangan 477.00 m2 Rp 11,500.00 Rp 5,485,500
JUMLAH HARGA PEKERJAAN PERSIAPAN Rp 17,592,860
B PEKERJAAN TANAH DAN PONDASI
- Pekerjaan Tanah dan Pondasi Tapak
1 Galian Tanah pondasi Tapak 80x80x30 12.47 m3 Rp 86,250.00 Rp 1,075,882
2 Galian Tanah pondasi Tapak 40x40x30 4.90 m3 Rp 86,250.00 Rp 422,625
3 Galian Parit 5.46 m3 Rp 86,250.00 Rp 470,709
4 Galian Sloof 20/40 20.79 m3
Rp 86,250.00 Rp 1,793,138
5 Urugan Tanah Kembali 38.16 m3 Rp 57,500.00 Rp 2,194,430
6 Pengurugan Kembali Tanah Padat 46.82 m3 Rp 97,321.43 Rp 4,556,589
7 Urugan Pasir Pasang 23.33 m Rp 3
292,992.86 Rp 6,834,058
8 Kayu Bulat Merah dia 8-10 Pjng 4 Meter 50.00 Btg Rp 55,000.00 Rp 2,750,000
JUMLAH HARGA PEKERJAAN TANAH DAN PONDASI Rp 20,097,432
C PEKERJAAN BETON BERTULANG
1 Pondasi Tapak Footplate 80x80x30
- Beagisting Tapak Pondasi 13.20 m² Rp 179,000.00 Rp 2,362,800
- Pembesian Tapak Pondasi 273.43 Kg Rp 12,467.40 Rp 3,408,963
Cor Beton K-225 12.47 m3 Rp 1,248,473.98 Rp 15,573,464
2 Pondasi Tapak Footplate 40x40x30
- Beagisting Tapak Pondasi 13.44 m² Rp 179,000.00 Rp 2,405,760
- Pembesian Tapak Pondasi 298.29 Kg Rp 12,467.40 Rp 3,718,868
Cor Beton K-225 4.90 m3 Rp 1,248,473.98 Rp 6,117,522
3 Perdestail 80x80x30
- Beagisting Pendestal 11.00 m² Rp 348,500.00 Rp 3,833,500
- Pembesian Pendestal 76.17 Kg Rp 12,467.40 Rp 949,640
Cor Beton K-225 0.69 m3 Rp 1,248,473.98 Rp 858,326
4 Perdestail 40x40x30
- Beagisting Pendestal 11.20 m² Rp 348,500.00 Rp 3,903,200
- Pembesian Pendestal 96.94 Kg Rp 12,467.40 Rp 1,208,632
Cor Beton K-225 0.56 m3 Rp 1,248,473.98 Rp 699,145
5 Sloof Beton 20/40 cm
- Beagisting Sloof 123.84 m² Rp 188,500.00 Rp 23,343,840
- Pembesian Sloof 347.21 Kg Rp 14,585.44 Rp 5,064,253
Cor Beton K-225 23.22 m3 Rp 1,248,473.98 Rp 28,989,566
8 Kolom Beton 25/25 Lantai 1
- Beagisting kolom 20.90 m² Rp 348,500.00 Rp 7,283,650
- Pembesian Kolom 307.50 Kg Rp 12,467.40 Rp 3,833,716
Cor Beton K-225 2.61 m3 Rp 1,248,473.98 Rp 3,261,638
9 Kolom Beton 20/20 cm Lantai 2
- Beagisting kolom 10.40 m² Rp 348,500.00 Rp 3,624,400
- Pembesian Kolom 185.47 Kg Rp 12,467.40 Rp 2,312,304
Cor Beton K-225 1.04 m3 Rp 1,248,473.98 Rp 1,298,413
11 Balok Anak 20/30
- Beagisting Balok 11.04 m² Rp 423,750.00 Rp 4,678,200
- Pembesian Balok 156.81 Kg Rp 14,585.44 Rp 2,287,201
Cor Beton K-225 1.10 m3 Rp 1,248,473.98 Rp 1,378,315
12 Balok 20/40 cm
- Beagisting Balok 57.12 m² Rp 423,750.00 Rp 24,204,600
- Pembesian Balok 871.44 Kg Rp 14,585.44 Rp 12,710,353
Cor Beton K-225 5.71 m3 Rp 1,248,473.98 Rp 7,131,283
13 Ringbalk 20/20 cm
- Beagisting Balok 17.20 m² Rp 423,750.00 Rp 7,288,500
- Pembesian Balok 450.17 Kg Rp 12,467.40 Rp 5,612,408
Cor Beton K-225 3.44 m3 Rp 1,248,473.98 Rp 4,294,750
14 Cor Lantai Dak WC
- Beagisting Lantai 9.00 m² Rp 569,750.00 Rp 5,127,750
- Pembesian Lantai 221.94 Kg Rp 12,766.89 Rp 2,833,484
- Cor Beton K-175 1.80 m3 Rp 1,186,841.33 Rp 2,136,314
15 Cor Plat Lantai Lantai II
- Begesting Lantai 133.00 m² Rp 569,750.00 Rp 75,776,750
- Pembesian Lantai 3,279.78 Kg Rp 12,766.89 Rp 41,872,597
- Cor Beton K-225 13.50 m3 Rp 1,248,473.98 Rp 16,854,399
16 Cor Rabat Lantai 1 (K-175)
- Begesting Lantai 80.40 m² Rp 284,250.00 Rp 22,853,700
- Cor Beton K-175 16.08 m3 Rp 1,186,841.33 Rp 19,084,409
JUMLAH HARGA PEKERJAAN BETON BERTULANG Rp 380,176,615
D PEKERJAAN PASANGAN DAN PLASTERAN
1 Pasangan Dinding Bata Merah 1:4 327.36 m² Rp 150,314.29 Rp 49,206,768
2 Pasangan Dinding Batako 1:4 51.33 m² Rp 157,314.29 Rp 8,074,942
3 Plesteran Dinding bata 1:4 877.45 m² Rp 68,628.86 Rp 60,218,353
4 Pasangan Begesting Bata merah Footplate 80 8.91 m² Rp 150,314.29 Rp 1,339,300
5 Pasangan Begesting Bata merah Footplate 40 3.50 m² Rp 150,314.29 Rp 526,100
6 Pasangan Begesting Bata Merah Sloof 20/40 154.80 m² Rp 150,314.29 Rp 23,268,651
7 Acian 18.90 m² Rp 99,379.03 Rp 1,878,264
JUMLAH HARGA PASANGAN BATA DAN PLESTERAN Rp 144,512,378
E PEKERJAAN LANTAI
- Pekerjaaan Lantai Keramik & Paving
1 Pasangan Keramik 40x40 Lantai 1 198.59 m² Rp 154,532.86 Rp 30,688,386
2 Pasangan Keramik 20x20 Lantai 1 WC 28.55 m² Rp 226,137.86 Rp 6,455,105
3 Pasangan Keramik 40x40 Lantai II 135.00 m² Rp 154,532.86 Rp 20,861,936
4 Pasangan Singki 17.00 Unit Rp 200,000.00 Rp 3,400,000
5 Paving Blcok Hexagonal 36.00 m² Rp 40,025.71 Rp 1,440,926
JUMLAH HARGA LANTAI KERAMIK Rp 62,846,353
F PEKERJAAN PINTU
1 Pintu Besi Belakang 2 Daun Pintu 1.00 Unit 1,500,000.00 Rp 1,500,000
2 Pintu WC 2.00 Unit 1,200,000.00 Rp 2,400,000
3 Pintu Besi Lorong 2.00 Unit 1,000,000.00 Rp 2,000,000
4 Pintu Rollong Door 10.00 Unit 6,500,000.00 Rp 65,000,000
5 Angin-Angin 20.00 Bh 50,000.00 Rp 1,000,000
JUMLAH HARGA PINTU DAN JENDELA Rp 71,900,000
G PEKERJAAN PENGECATAN
1 Pekerjaan cat tembok 1,137.67 m2 Rp 14,261.75 Rp 16,225,229
JUMLAH HARGA PEGECETAN Rp 16,225,229
H PEKERJAAN LISTRIK
- Biaya Listrik 4 Amper (17 Unit)
1 Biaya Penyambungan (BP) PLN 17 Untuk 4 Amper 10.00 Unit Rp 421,000.00 Rp 4,210,000
2 Biaya Token/Pulsa 10.00 Pcs Rp 50,000.00 Rp 500,000
3 Biaya Materai 10.00 Lbr Rp 10,000.00 Rp 100,000
4 Biaya Sertifikat Like Opererasi (SLO) 10.00 Lbr Rp 40,000.00 Rp 400,000
5 Jasa Survey Dan Jaminan 10.00 Ls Rp 525,000.00 Rp 5,250,000
6 Instalasi Listrik 35.00 Titik Rp 165,000.00 Rp 5,775,000
- Biaya Listrik 6 Amper (1 Unit)
1 Biaya Penyambungan (BP) PLN 1 Untuk 6 Amper 1.00 Unit Rp 1,218,000.00 Rp 1,218,000
2 Biaya Token/Pulsa 1.00 Pcs Rp 50,000.00 Rp 50,000
3 Biaya Materai 1.00 Lbr Rp 10,000.00 Rp 10,000
4 Biaya Sertifikat Like Opererasi (SLO) 1.00 Lbr Rp 95,000.00 Rp 95,000
5 Jasa Survey Dan Jaminan 1.00 Ls Rp 730,000.00 Rp 730,000
6 Instalasi Listrik 10.00 Titik Rp 170,000.00 Rp 1,700,000
JUMLAH HARGA INSTALASI LISTRIK Rp 20,038,000
I PEKERJAAN SANITASI
1 Pemasangan Baru Air PDAM 1.00 Sr Rp 2,260,000.00 Rp 2,260,000
2 Biaya Pendaftaran 1.00 Sr Rp 16,000.00 Rp 16,000
3 Tangki Profil 2200 2.00 Bh Rp 2,850,000.00 Rp 5,700,000
4 Pemasangan Kloset Jongkok 2.00 Bh Rp 330,000.00 Rp 660,000
5 Septictank dan Peresapan 1.00 Unit Rp 6,000,000.00 Rp 6,000,000
6 Pemasangan Keran Air Plastik 10.00 Bh Rp 22,000.00 Rp 220,000
7 Pasang Instalasi Air Kotor (pipa PVC Type AW 3 & 4 Inc ) 16.00 Bh Rp 85,000.00 Rp 1,360,000
8 Pasang Instalasi Air Bersih (pipa PVC Type AW 3/4 Inc ) 15.00 Bh Rp 80,000.00 Rp 1,200,000
9 Aksesoris 1.00 Ls Rp 2,154,000.00 Rp 2,154,000
JUMLAH HARGA SANITASI Rp 19,570,000
J PEKERJAAN ATAP
1 Atap Spandek Lantai I 192.00 m2 Rp 104,950.00 Rp 20,150,400
2 Atap Spandek Lantai II 346.47 m2 Rp 104,950.00 Rp 36,362,189
JUMLAH HARGA ATAP Rp 56,512,589
K PEKERJAAN BESI DAN ALMUNIUM
1 Pekerjaan Pagar Hollow 4x2 cm Dan Tangga 1.00 Ls Rp 65,000,000 Rp 65,000,000
2 Pekerjaan Rangka Baja Ringan 377.59 m2 Rp 171,603 Rp 64,796,078
JUMLAH HARGA BESI DAN ALMUNIUM Rp 129,796,078
L SEWA ALAT
1 Molen 1.00 Ls Rp 5,000,000 Rp 5,000,000
JUMLAH HARGA SEWA ALAT Rp 5,000,000
M KESEHATAN DAN KESELAMATAN KERJA (K3)
1 Topi Pelindung Diri ( Safety Helmet ) 30.00 Bh Rp 45,000.00 Rp 1,350,000
2 Perlindungan Pernapasan Dan Mulut ( Masker ) 30.00 Bh Rp 40,000.00 Rp 1,200,000
3 Sarung Tangan ( Safety Gloves ) 30.00 Psg Rp 7,000.00 Rp 210,000
4 Sepatu Keselamatan Kerja ( Safety Shoes ) 30.00 Psg Rp 90,000.00 Rp 2,700,000
5 Rompi Keselamatan Kerja ( Safety Vest ) 30.00 Bh Rp 45,000.00 Rp 1,350,000
6 Peralatan P3K ( Kotak P3K, Obat Luka, Perban DLL 1.00 Unit Rp 500,000.00 Rp 500,000
7 Asuransi Kesehatan 1.00 Ls Rp 2,390,000.00 Rp 2,390,000
8 Spanduk 1.00 Lb Rp 300,000.00 Rp 300,000
JUMLAH HARGA KESEHATAN DAN KESELAMATAN KERJA (K3) Rp 10,000,000
TOTAL Rp 954,267,533
TOTAL PEMBULATAN Rp 954,267,000
Terbilang : Sembilan Ratus Lima Puluh Empat Juta Dua Ratus Enam Puluh Tujuh Ribu Rupiah
REKAP REALISASI ANGGARAN BIAYA

KAB/KOTA : NUNUKAN
KECAMATAN : NUNUKAN
KEL/DESA : NUNUKAN TENGAH
NAMA KEGIATAN : PEMBANGGUNAN KANTIN SEKOLAH SMA NEGERI 1 NUNUKAN
TAHUN ANGGARAN : 2023

NO URAIAN JUMLAH
A PEKERJAAN PERSIAPAN Rp 17,592,860
B PEKERJAAN TANAH DAN PONDASI Rp 20,097,432
C PEKERJAAN BETON BERTULANG Rp 380,176,615
D PEKERJAAN PASANGAN DAN PLASTERAN Rp 144,512,378
E PEKERJAAN LANTAI Rp 62,846,353
F PEKERJAAN PINTU Rp 71,900,000
G PEKERJAAN PENGECATAN Rp 16,225,229
H PEKERJAAN LISTRIK Rp 20,038,000
I PEKERJAAN SANITASI Rp 19,570,000
J PEKERJAAN ATAP Rp 56,512,589
K PEKERJAAN BESI DAN ALMUNIUM Rp 129,796,078
L SEWA ALAT Rp 5,000,000
M KESEHATAN DAN KESELAMATAN KERJA (K3) Rp 10,000,000
TOTAL Rp 954,267,533
TOTAL PEMBULATAN Rp 954,267,000

Terbilang : Sembilan Ratus Lima Puluh Empat Juta Dua Ratus Enam Puluh Tujuh Ribu Rupiah
REKAP RINCIAN REALISASI ANGGARAN BIAYA
INFRASTRUKTUR PENDUKUNG LIVELIHOOD

KAB/KOTA : NUNUKAN
KECAMATAN : NUNUKAN
KEL/DESA : NUNUKAN UTARA
BKM/LKM : TERPADU LESTARI
NAMA KEGIATAN : RUMAH WISATA KULINER
TAHUN ANGGARAN : 2021

NO URAIAN JUMLAH
A TENAGA KERJA Rp 242,135,000
B BAHAN #NAME?
C PEKERJAAN PINTU & ANGIN-ANGIN Rp 71,900,000
D PEKERJAAN BESI DAN ALMUNIUM Rp 65,000,000
E SEWA ALAT Rp 5,000,000
F PEKERJAAN LISTRIK Rp 19,993,000
G PEKERJAAN SANITASI Rp 19,628,000
H KESEHATAN DAN KESELAMATAN KERJA (K3) Rp 10,000,000
I #NAME? #NAME?
TOTAL #NAME?
TOTAL PEMBULATAN #NAME?

Dibuat Oleh :
Diverifikasi Oleh :
Askot Infrastruktur Fasilitator Teknik UPL/TIPP

( Sahril S.T ) ( Novianto Christy Adrian ) (.......................................................)


Diverifikasi Oleh :
Askot Infrastruktur Fasilitator Teknik UPL/TIPP

( Sahril S.T ) ( Novianto Christy Adrian ) (.......................................................)


RINCIAN REALISASI ANGGARAN
INFRASTRUKTUR PENDUKUNG LIVELIHOOD

KAB/KOTA : NUNUKAN
KECAMATAN : NUNUKAN
KEL/DESA : NUNUKAN UTARA
BKM/LKM : TERPADU LESTARI
NAMA KEGIATAN : RUMAH WISATA KULINER
TAHUN ANGGARAN : 2021

NO URAIAN SATUAN VOLUME


1 2 3 4.00

A TENAGA KERJA
1 Pekerja OH 1,373
2 Tukang OH 624
Total Upah
B BAHAN
1 Kayu Kelas III 5/7 m3 2.00
2 Paku Biasa Kg 210
3 Papan Kayu Kelas III m3 8.00
4 Tanah Timbunan Padat m 3
56
5 Pasir Urug m 3
28
6 Kayu Pencang Btg 50
7 Minyak Begesting Liter 75
8 Kawat Bendrat Kg 85
9 Semen Zak 878
10 Semen Tambahan Zak #NAME?
11 Pasir Beton m3 #NAME?
12 Batu Pecah 2-3cm m 3
#NAME?
13 Air Liter #NAME?
14 Kayu Kelas II m3 #NAME?
15 Multipleks 9mm Lbr #NAME?
16 Kayu Perancah Btg #NAME?
17 Batu Bata Merah Bh 22,915
18 Batako Bh 3,593
19 Kawat Ram Ayam m 4
20 Pasir Pasang m3 #NAME?
21 Tegel Keramik 40x40 Ktk 369
22 Tegel Keramik 20x20 Ktk 38
23 Bata Hebel Bh 17
24 Paving Exagonal Bh 36
25 Cat Aries Gold Liter 82
26 Plamur Bks 23
27 Atap Spandek Lbr 263
28 Baut Screw Cteks 12-4x50 Ktk 92
29 Baja Ringan Canal C-75 Btg 200
30 Dynabolt Ktk 5
31 Reng Btg 227
32 Besi 8 Polos Full Ljr 366
33 Besi 10 Polos Full Ljr 722
34 Besi 12 Polos Full Ljr 228
35 Besi 16 Polos Full Ljr 151
36 Ijuk Gulung 5
37 Semen Putih R. Bull Zak 12.00
38 Amplas Lbr 20
39 Nat Keramik Bks 35
40 Lem Plamir Bks 10
TOTAL B
C PEKERJAAN PINTU & ANGIN-ANGIN
1 Pintu Besi Belakang 2 Daun Pintu Unit 1.00
2 Pintu WC Unit 2.00
3 Pintu Besi Lorong Unit 2.00
4 Pintu Rollong Door Unit 10.00
5 Angin-Angin Bh 20.00
TOTAL PEKERJAAN PINTU & ANGIN-A
D PEKERJAAN BESI DAN ALMUNIUM
1 Pekerjaan Pagar Hollow 4x2 cm Dan Tangga Ls 1.00
TOTAL PEKERJAAN BESI DAN ALMU
E SEWA ALAT
1 Molen Ls 1.00
TOTAL SEWA
F PEKERJAAN LISTRIK
1 Biaya Listrik 4 Amper (17 Unit)
1 Biaya Penyambungan (BP) PLN 17 Untuk 4 Amper Unit 10.00
2 Biaya Token/Pulsa Pcs 10.00
3 Biaya Materai Lbr 10.00
4 Biaya Sertifikat Like Opererasi (SLO) Lbr 10.00
5 Jasa Survey Dan Jaminan Ls 10.00
6 Instalasi Listrik Titik 35.00
BIAYA 4 A
2 Biaya Listrik 6 Amper (1 Unit)
1 Biaya Penyambungan (BP) PLN 1 Untuk 6 Amper Unit 1.00
2 Biaya Token/Pulsa Pcs 1.00
3 Biaya Materai Lbr 1.00
4 Biaya Sertifikat Like Opererasi (SLO) Lbr 1.00
5 Jasa Survey Dan Jaminan Ls 1.00
6 Instalasi Listrik Titik 10.00
BIAYA 6 A
TOTAL BIAYA LIS
G PEKERJAAN SANITASI
1 Pemasangan Baru Air PDAM Sr 1.00
2 Biaya Pendaftaran Sr 1.00
3 Tangki Profil 2200 Bh 2.00
4 Pemasangan Kloset Jongkok Bh 2.00
5 Septictank dan Peresapan Unit 1.00
6 Pemasangan Keran Air Plastik Bh 10.00
7 Pasang Instalasi Air Kotor (pipa PVC Type AW 3 & 4 Inc ) Bh 16.00
8 Pasang Instalasi Air Bersih (pipa PVC Type AW 3/4 Inc ) Bh 15.00
9 Aksesoris Ls 1.00
TOTAL PEKERJAAN SAN
H KESEHATAN DAN KESELAMATAN KERJA (K3)
1 Topi Pelindung Diri ( Safety Helmet ) Bh 30.00
2 Perlindungan Pernapasan Dan Mulut ( Masker ) Bh 30.00
3 Sarung Tangan ( Safety Gloves ) Psg 30.00
4 Sepatu Keselamatan Kerja ( Safety Shoes ) Psg 30.00
5 Rompi Keselamatan Kerja ( Safety Vest ) Bh 30.00
6 Peralatan P3K ( Kotak P3K, Obat Luka, Perban DLL Unit 1.00
7 Asuransi Kesehatan Ls 1.00
8 Spanduk Lb 1.00
TOT
I #NAME?
1 #NAME? #NAME? #NAME?
2 #NAME? #NAME? #NAME?
3 #NAME? #NAME? #NAME?
4 #NAME? #NAME? #NAME?
5 #NAME? #NAME? #NAME?
6 #NAME? #NAME? #NAME?
7 #NAME? #NAME? #NAME?
8 #NAME? #NAME? #NAME?
TOTAL BIAYA ADMINIS
JUMLAH T
JUMLAH PEMBUL
HARGA JUMLAH HARGA
SATUAN (RP) (RP)
5 6

Rp 115,000 Rp 157,895,000
Rp 135,000 Rp 84,240,000
Total Upah Rp 242,135,000

Rp 3,800,000 Rp 7,600,000
Rp 22,000 Rp 4,620,000
Rp 3,800,000 Rp 30,400,000
Rp 57,143 Rp 3,210,000
Rp 214,286 Rp 5,997,000
Rp 55,000 Rp 2,750,000
Rp 15,000 Rp 1,125,000
Rp 25,000 Rp 2,125,000
Rp 70,000 Rp 61,460,000
Rp 70,000 #NAME?
Rp 185,714 #NAME?
Rp 514,286 #NAME?
Rp 50 #NAME?
Rp 5,000,000 #NAME?
Rp 130,000 #NAME?
Rp 40,000 #NAME?
Rp 1,100 Rp 25,206,000
Rp 1,200 Rp 4,311,000
Rp 8,000 Rp 32,000
Rp 214,286 #NAME?
Rp 65,000 Rp 23,959,000
Rp 45,000 Rp 1,701,000
Rp 17,000 Rp 289,000
Rp 4,000 Rp 145,000
Rp 56,000 Rp 4,587,000
Rp 110,000 Rp 2,502,000
Rp 88,000 Rp 23,143,000
Rp 140,000 Rp 12,883,000 Rp 129,267,000
Rp 115,000 Rp 23,000,000 Rp 61,460,000
Rp 500,000 Rp 2,500,000 Rp 190,727,000
Rp 50,000 Rp 11,327,000
Rp 47,000 Rp 17,202,000 Err:509
Rp 75,000 Rp 54,150,000 477
Rp 105,000 Rp 23,940,000 Err:509
Rp 225,000 Rp 33,975,000 55
Rp 30,000 Rp 150,000
Rp 125,000 Rp 1,500,000
Rp 5,000 Rp 100,000
Rp 18,000 Rp 630,000
Rp 230,000 Rp 2,300,000 Pengadaan
TOTAL BAHAN #NAME?
Besi 8 227
Rp 1,500,000 Rp 1,500,000 Besi 10
Rp 1,200,000 Rp 2,400,000 Besi 12 143
Rp 1,000,000 Rp 2,000,000 Besi 16 88
Rp 6,500,000 Rp 65,000,000 Semen 350
Rp 50,000 Rp 1,000,000
PINTU & ANGIN-ANGIN Rp 71,900,000

Rp 65,000,000 Rp 65,000,000
N BESI DAN ALMUNIUM Rp 65,000,000

Rp 5,000,000 Rp 5,000,000
TOTAL SEWA ALAT Rp 5,000,000

Rp 421,000 Rp 4,210,000
Rp 50,000 Rp 500,000
Rp 10,000 Rp 100,000
Rp 40,000 Rp 400,000
Rp 520,000 Rp 5,200,000
Rp 170,000 Rp 5,950,000
BIAYA 4 AMPER Rp 16,360,000

Rp 1,218,000 Rp 1,218,000
Rp 50,000 Rp 50,000
Rp 10,000 Rp 10,000
Rp 95,000 Rp 95,000
Rp 560,000 Rp 560,000
Rp 170,000 Rp 1,700,000
BIAYA 6 AMPER Rp 3,633,000
TOTAL BIAYA LISTRIK Rp 19,993,000
Rp 2,260,000 Rp 2,260,000
Rp 16,000 Rp 16,000
Rp 2,850,000 Rp 5,700,000
Rp 330,000 Rp 660,000
Rp 6,000,000 Rp 6,000,000
Rp 22,000 Rp 220,000
Rp 85,000 Rp 1,360,000
Rp 80,000 Rp 1,200,000
Rp 2,212,000 Rp 2,212,000
L PEKERJAAN SANITASI Rp 19,628,000

Rp 45,000 Rp 1,350,000
Rp 40,000 Rp 1,200,000
Rp 7,000 Rp 210,000
Rp 90,000 Rp 2,700,000
Rp 45,000 Rp 1,350,000
Rp 1,283,000 Rp 1,283,000
Rp 1,607,000 Rp 1,607,000
Rp 300,000 Rp 300,000
TOTAL K3 Rp 10,000,000

#NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME?
L BIAYA ADMINISTRASI #NAME?
JUMLAH TOTAL #NAME? Rp 995,000,000
JUMLAH PEMBULATAN #NAME? #NAME?

Tenaga Rp 242,135,000
Bahan #NAME? #NAME?
Alat #REF!
Administrasi #NAME?
#NAME?
#NAME?
Rp 61,460,000
Err:509 Rp 129,267,000 Rp 17,202,000
497 Rp 54,150,000
#NAME? Rp 23,940,000
#NAME? Rp 33,975,000
Rp 190,727,000

39 100
100 100 100 300 122
85
49 14
528
#NAME?
Rp 242,135,000
#NAME?

Bahan #NAME?
Tenaga Rp 242,135,000
Administrasi #NAME?
Alat Rp 5,000,000
#NAME?
366 47000 Rp 17,202,000.00
722 75000 Rp 54,150,000.00
228 105000 Rp 23,940,000.00
151 225000 Rp 33,975,000.00
878 65000 Rp 57,070,000.00
Rp 186,337,000.00
RENCANA ANGGARAN BIAYA PERUBAHAN ( PEKERJAAN TAMBAH KURANG )
INFRASTRUKTUR PENDUKUNG LIVELIHOOD
Kelurahan : Nunukan Utara Paket Pekerjaan : Paket 1
Kecamatan : Nunukan Pelaksana : KSM Pesisir
Kabupaten : Nunukan No. Surat Perjanjian Kerjasama : …........
Provinsi : KALIMANTAN UTARA LKM : Terpadu Lestari

RAB AWAL RAB PERUBAHAN PEKERJAAN TAMBAH PEKERJAAN KURANG


NO URAIAN KEGIATAN
VOLUME SAT HARGA SAT JUMLAH HARGA VOLUME SAT HARGA SAT JUMLAH HARGA VOLUME HARGA SAT JUMLAH HARGA VOLUME HARGA SAT JUMLAH HARGA
A PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan Bowplank 132.30 m² Rp 101,360 Rp 13,409,928 124.00 m² Rp 97,640 Rp 12,107,360 12.85 Rp 101,360 Rp 1,302,568
2 Pembersihan Lapangan 690.95 m³ Rp 11,500 Rp 7,945,925 477.00 m³ Rp 11,500 Rp 5,485,500

B PEKERJAAN LANTAI I
I PEKERJAAN TANAH DAN PONDASI
a Pekerjaan Tanah dan Pondasi Tapak
1 Galian Tanah pondasi Tapak 11.97 m³ Rp 86,250 Rp 1,032,240 17.37 m³ Rp 86,250 Rp 1,498,507 5.41 Rp 86,250 Rp 466,267
2 Urugan Kembali tanah galian 3.99 m³ Rp 142,500 Rp 568,480 38.16 m³ Rp 57,500 Rp 2,194,430 34.17 Rp 57,500 Rp 1,625,950
3 Galian Parit 5.46 m³ Rp 86,250 Rp 470,709 5.46 Rp 86,250 Rp 470,709
4 Galian Sloof 20/40 20.79 m³ Rp 86,250 Rp 1,793,138 20.79 Rp 86,250 Rp 1,793,138
5 Pengurukan Kembali Tanah Padat 16.16 m³ Rp 142,500 Rp 2,302,088 46.82 m³ Rp 97,321 Rp 4,556,589 30.67 Rp 97,321 Rp 2,254,502
6 Urugan Pasir Pasang 23.33 m³ Rp 292,993 Rp 6,834,058 23.33 Rp 292,993 Rp 6,834,058
7 Pancang Tiang Kayu Keras Kelas I t = 10 cm alas Pondasi 3.56 m3 Rp 10,737,500 Rp 38,250,000 50.00 Btg Rp 55,000 Rp 2,750,000 3.32 Rp 10,682,500 Rp 35,500,000

II PEKERJAAN BETON BERTULANG


Pondasi Tapak 80 dan 100
1 - Beagisting Tapak Pondasi 28.72 m² Rp 181,800 Rp 4,971,296 28.72 Rp 181,800 Rp 4,971,296
- Pembesian Tapak Pondasi 910.38 Kg Rp 11,930 Rp 10,860,765 910.38 Rp 11,930 Rp 10,860,765
- Cor Beron K225 6.29 m³ Rp 1,275,555 Rp 8,025,793 6.29 Rp 1,275,555 Rp 8,025,793
2 Pondasi Tapak Footplate 80x80x30
- Beagisting Tapak Pondasi 13.20 m² Rp 179,000 Rp 2,362,800 13.20 Rp 179,000 Rp 2,362,800
- Pembesian Tapak Pondasi 273.43 Kg Rp 12,467 Rp 3,408,963 273.43 Rp 12,467 Rp 3,408,963
- Cor Beton K-225 12.47 m³ Rp 1,248,474 Rp 15,573,464 12.47 Rp 1,248,474 Rp 15,573,464
3 Pondasi Tapak Footplate 40x40x30
- Beagisting Tapak Pondasi 13.44 m² Rp 179,000 Rp 2,405,760 13.44 Rp 179,000 Rp 2,405,760
- Pembesian Tapak Pondasi 298.29 Kg Rp 12,467 Rp 3,718,868 298.29 Rp 12,467 Rp 3,718,868
- Cor Beton K-225 4.90 m³ Rp 1,248,474 Rp 6,117,522 4.90 Rp 1,248,474 Rp 6,117,522
4 Perdestail 80x80x30
- Beagisting Pendestal 11.00 m² Rp 348,500 Rp 3,833,500 11.00 Rp 348,500 Rp 3,833,500
- Pembesian Pendestal 76.17 Kg Rp 12,467 Rp 949,640 76.17 Rp 12,467 Rp 949,640
- Cor Beton K-225 0.69 m³ Rp 1,248,474 Rp 858,326 0.69 Rp 1,248,474 Rp 858,326
5 Perdestail 40x40x30
- Beagisting Pendestal 11.20 m² Rp 348,500 Rp 3,903,200 11.20 Rp 348,500 Rp 3,903,200
- Pembesian Pendestal 96.94 Kg Rp 12,467 Rp 1,208,632 96.94 Rp 12,467 Rp 1,208,632
- Cor Beton K-225 0.56 m³ Rp 1,248,474 Rp 699,145 0.56 Rp 1,248,474 Rp 699,145
6 Sloof Beton 20/40 cm
- Beagisting Sloof 60.00 m² Rp 191,800 Rp 11,508,000 123.84 m² Rp 188,500 Rp 23,343,840 63.84 Rp 188,500 Rp 11,835,840
- Pembesian Sloof 1861.38 Kg Rp 11,930 Rp 22,206,074 347.21 Kg Rp 14,585 Rp 5,064,253 1436.88 Rp 11,930 Rp 17,141,821
- Cor Beron K225 12.00 m³ Rp 1,275,555 Rp 15,306,662 23.22 m³ Rp 1,248,474 Rp 28,989,566 11.22 Rp 1,275,555 -Rp 13,682,904
7 #NAME?
- #NAME? #NAME? m² #NAME? #NAME? #NAME? #NAME? #NAME?
- #NAME? #NAME? Kg #NAME? #NAME? #NAME? #NAME? #NAME?
- #NAME? #NAME? m³ #NAME? #NAME? #NAME? #NAME? #NAME?
8 #NAME?
- Beagisting kolom 21.28 m² Rp 360,550 Rp 7,672,504 #NAME? m² #NAME? #NAME? #NAME? Rp 360,550 #NAME?
- Pembesian Kolom 332.54 Kg Rp 11,930 Rp 3,967,113 #NAME? Kg #NAME? #NAME? #NAME? #NAME? #NAME?
- Cor Beron K225 2.13 m³ Rp 1,275,555 Rp 2,714,381 #NAME? m³ #NAME? #NAME? #NAME? Rp 1,275,555 #NAME?
9 Kolom Beton 25/25 Lantai 1
- Beagisting kolom 9.94 m² Rp 360,550 Rp 3,584,232 20.90 m² Rp 348,500 Rp 7,283,650 10.96 Rp 348,500 Rp 3,699,418
- Pembesian Kolom 446.82 Kg Rp 11,930 Rp 5,330,514 307.50 Kg Rp 12,467 Rp 3,833,716 139.32 Rp 360,550 Rp 1,496,798
- Cor Beron K225 2.61 m³ Rp 1,275,555 Rp 3,332,388 2.61 m³ Rp 1,248,474 Rp 3,261,638 Rp 70,750
10 Kolom Beton 20/20 cm Lantai 2
- Beagisting kolom 10.40 m² Rp 348,500 Rp 3,624,400 10.40 Rp 348,500 Rp 3,624,400
- Pembesian Kolom 185.47 Kg Rp 12,467 Rp 2,312,304 185.47 Rp 12,467 Rp 2,312,304
- Cor Beton K-225 1.04 m³ Rp 1,248,474 Rp 1,298,413 1.04 Rp 1,248,474 Rp 1,298,413
11 Kolom Beton 20/30 cm
Beagisting Balok 121.60 m² Rp 180,275 Rp 21,921,440 121.60 Rp 180,275 Rp 21,921,440
Pembesian Balok 652.67 Kg Rp 11,930 Rp 7,786,299 652.67 Rp 11,930 Rp 7,786,299
#NAME? 0.84 m³ Rp 1,275,555 Rp 1,071,466 0.84 Rp 1,275,555 Rp 1,071,466
12 #NAME? 0.00
- #NAME? #NAME? m² #NAME? #NAME? #NAME? #NAME? #NAME?
- #NAME? #NAME? Kg #NAME? #NAME? #NAME? #NAME? #NAME?
- #NAME? #NAME? m³ #NAME? #NAME? #NAME? #NAME? #NAME?
13 Balok Anak 20/30
- Beagisting Balok 11.04 m² Rp 423,750 Rp 4,678,200 11.04 Rp 423,750 Rp 4,678,200
- Pembesian Balok 156.81 Kg Rp 14,585 Rp 2,287,201 156.81 Rp 14,585 Rp 2,287,201
- Cor Beton K-225 1.10 m³ Rp 1,248,474 Rp 1,378,315 1.10 Rp 1,248,474 Rp 1,378,315
14 Balok 20/40 cm
- Beagisting Balok 54.00 m² Rp 435,450 Rp 23,514,300 57.12 m² Rp 423,750 Rp 24,204,600 3.12 Rp 423,750 Rp 690,300
- Pembesian Balok 1043.99 Kg Rp 11,930 Rp 12,454,655 871.44 Kg Rp 14,585 Rp 12,710,353 Rp 14,585 Rp 255,698 172.55 Rp 435,450
- Cor Beron K225 7.20 m³ Rp 1,275,555 Rp 9,183,997 5.71 m³ Rp 1,248,474 Rp 7,131,283 1.49 Rp 11,930 Rp 2,052,714
15 Balok 15/15 cm
- Beagisting Balok 21.60 m² Rp 435,450 Rp 9,405,720 21.60 Rp 435,450 Rp 9,405,720
- Pembesian Balok 471.86 Kg Rp 11,930 Rp 5,629,272 471.86 Rp 11,930 Rp 5,629,272
- Cor Beron K225 2.16 m³ Rp 1,275,555 Rp 2,755,199 2.16 Rp 1,275,555 Rp 2,755,199
16 Ringbalk 20/20 cm
Beagisting Balok 17.20 m² Rp 423,750 Rp 7,288,500 17.20 Rp 423,750 Rp 7,288,500
Pembesian Balok 450.17 Kg Rp 12,467 Rp 5,612,408 450.17 Rp 12,467 Rp 5,612,408
Cor Beton K-225 3.44 m³ Rp 1,248,474 Rp 4,294,750 3.44 Rp 1,248,474 Rp 4,294,750
17 Plat bordes
- Beagisting Bordes 12.18 m² Rp 680,450 Rp 8,290,433 12.18 Rp 680,450 Rp 8,290,433
- Pembesian Borde 114.42 Kg Rp 11,930 Rp 1,365,048 114.42 Rp 11,930 Rp 1,365,048
- Cor Beron K225 0.64 m³ Rp 1,275,555 Rp 817,950 0.64 Rp 1,275,555 Rp 817,950
18 Cor Lantai Dak WC
- Beagisting Lantai 9.00 m² Rp 569,750 Rp 5,127,750 9.00 Rp 569,750 Rp 5,127,750
- Pembesian Lantai 221.94 Kg Rp 12,767 Rp 2,833,484 221.94 Rp 12,767 Rp 2,833,484
- Cor Beton K-175 1.80 m³ Rp 1,186,841 Rp 2,136,314 1.80 Rp 1,186,841 Rp 2,136,314
19 Plat Tangga
- Beagisting Plat 20.53 m² Rp 362,200 Rp 7,437,234 20.53 Rp 362,200 Rp 7,437,234
- Pembesian Plat 434.63 Kg Rp 11,930 Rp 5,185,125 434.63 Rp 11,930 Rp 5,185,125
- Cor Beron K225 0.28 m³ Rp 1,275,555 Rp 355,115 0.28 Rp 1,275,555 Rp 355,115
20 Plat Anak Tangga
- Beagisting Plat 12.18 m² Rp 362,200 Rp 4,412,954 12.18 Rp 362,200 Rp 4,412,954
- Pembesian Plat 114.42 Kg Rp 11,930 Rp 1,365,048 114.42 Rp 11,930 Rp 1,365,048
- Cor Beron K225 0.56 m³ Rp 1,275,555 Rp 714,311 0.56 Rp 1,275,555 Rp 714,311
21 Cor Plat Lantai Lantai II
- Begesting Lantai 160.00 m² Rp 680,450 Rp 108,872,000 133.00 m² Rp 569,750 Rp 75,776,750 27.00 Rp 680,450 Rp 33,095,250
- Pembesian Lantai 287.70 Kg Rp 11,930 Rp 3,432,234 3279.78 Kg Rp 12,767 Rp 41,872,597 2992.08 Rp 12,767 Rp 38,440,363
- Cor Beton K-225 16.00 m³ Rp 1,275,555 Rp 20,408,883 13.50 m³ Rp 1,248,474 Rp 16,854,399 2.50 Rp 1,275,555 Rp 3,554,484
22 Rabat Lantai
- Begesting Lantai 80.40 m² Rp 284,250 Rp 22,853,700 80.40 Rp 284,250 Rp 22,853,700
- Cor Beton K-100 30.07 m³ Rp 947,852 Rp 28,504,286 30.07 Rp 947,852 Rp 28,504,286
- Cor Beton K-175 16.08 m³ Rp 1,186,841 Rp 19,084,409 16.08 Rp 1,186,841 Rp 19,084,409
23 Relling tangga Besi Hollow (Pengecatan + Pemasangan) 7.30 m² Rp 325,000 Rp 2,371,200 7.30 Rp 325,000 Rp 2,371,200
24 Cordak 13.76 m³ Rp 947,852 Rp 13,038,655 13.76 Rp 947,852 Rp 13,038,655
25 Lisplank 1.80 m³ Rp 98,900 Rp 178,020 1.80 Rp 98,900 Rp 178,020
26 Lisplank Beton 16.20 m³ Rp 947,852 Rp 12,555,206 16.20 Rp 947,852 Rp 12,555,206
27 Lisplank Papan 0.56 m² Rp 98,900 Rp 55,384 0.56 Rp 98,900 Rp 55,384

III PEKERJAAN PASANGAN DAN PLASTERAN


1 Pasangan Dinding Bata 1 : 4 212.80 m² Rp 146,950 Rp 31,270,960 327.36 m² Rp 68,629 Rp 49,206,768 114.56 Rp 68,629 Rp 17,935,808
2 Plesteran Dinding bata 1 : 4 425.60 m² Rp 65,605 Rp 27,921,427 51.33 m² Rp 150,314 Rp 60,218,353 Rp 150,314 Rp 32,296,925 374.27 Rp 65,605
3 Pasangan Dinding Batako 1:4 51.33 m² Rp 157,314 Rp 8,074,942 51.33 Rp 157,314 Rp 8,074,942
4 Acian 18.90 m² Rp 99,379 Rp 1,878,264 18.90 Rp 99,379 Rp 1,878,264

IV PEKERJAAN LANTAI
a Pekerjaaan Lantai Keramik & Paving
1 Pasangan Keramik 40x40 Lantai 2 118.30 m² Rp 148,892 Rp 17,613,907 135.00 m² Rp 154,533 Rp 20,861,936 16.70 Rp 154,533 Rp 3,248,029
2 Pasangan Keramik 40x40 Lantai 1 116.48 m² Rp 148,892 Rp 16,842,924 198.59 m² Rp 226,138 Rp 30,688,386 82.11 Rp 226,138 Rp 13,845,463
3 Pasangan Keramik 20x20 Lantai 1 191.40 m² Rp 148,892 Rp 28,497,901 28.55 m² Rp 154,533 Rp 6,455,105 162.86 Rp 148,892 Rp 22,042,796
4 Pasangan Keramik WC 25x25 3.00 m² Rp 556,185 Rp 1,668,555 3.00 Rp 556,185 Rp 1,668,555
5 Pasangan Singki 17.00 Bh Rp 200,000 Rp 3,400,000 17.00 Rp 200,000 Rp 3,400,000
6 Paiving Hexagonal 288.00 m² Rp 30,740 Rp 8,853,120 36.00 m² Rp 40,026 Rp 1,440,926 252.00 Rp 30,740 Rp 7,412,194

V PEKERJAAN PINTU
1 Pintu Besi Belakang 2 Daun Pintu 1.00 Unit Rp 1,500,000 Rp 1,500,000 1.00 Rp 1,500,000 Rp 1,500,000
2 Pintu WC 2.00 Unit Rp 250,000 Rp 500,000 2.00 Unit Rp 1,200,000 Rp 2,400,000 Rp 1,200,000 Rp 1,900,000
3 Kusen Pintu 2.00 Unit Rp 650,000 Rp 1,300,000 2.00 Rp 650,000 Rp 1,300,000
2 Pintu Besi Lorong 2.00 Unit Rp 1,000,000 Rp 2,000,000 2.00 Rp 1,000,000 Rp 2,000,000
3 Pintu Rollong Door 9.00 Unit Rp 11,000,000 Rp 99,000,000 10.00 Unit Rp 6,500,000 Rp 65,000,000 1.00 Rp 6,500,000 -Rp 34,000,000
4 Angin-Angin 20.00 m2 Rp 150,000 Rp 508,500 20.00 Bh Rp 50,000 Rp 1,000,000 Rp 50,000 Rp 491,500

VI PEKERJAAN PENGECATAN
1 Pekerjaan cat tembok 425.60 m² Rp 24,590 Rp 10,465,504 1137.67 m² Rp 14,262 Rp 16,225,229 712.07 Rp 14,262 Rp 5,759,725

VII PEKERJAAN LISTRIK


1 Pemasukan Listrik Dari PLN 1.00 Unit Rp 18,700,000 Rp 18,700,000 1.00 Rp 18,700,000 Rp 18,700,000
2 MCB 2 Phase 10 A 3.00 Unit Rp 100,000 Rp 300,000 3.00 Rp 100,000 Rp 300,000
3 Lampu HE Douwn light 25 watt + Asesories 15.00 Set Rp 45,000 Rp 675,000 15.00 Rp 45,000 Rp 675,000
4 Saklar Tunggal 8.00 Bh Rp 15,000 Rp 120,000 8.00 Rp 15,000 Rp 120,000
5 Saklar Ganda 18.00 Bh Rp 20,000 Rp 360,000 18.00 Rp 20,000 Rp 360,000
6 Stop kontak 20.00 Bh Rp 25,000 Rp 500,000 20.00 Rp 25,000 Rp 500,000
7 Pipa PVC Untuk Kabel NYA 2,5 mm Tertanam Dalam Dinding 1.00 Ls Rp 500,000 Rp 500,000 1.00 Rp 500,000 Rp 500,000
8 Instalasi Titik Penerangan, fitting termasuk kabel NYA 2,5 mm 66.00 Titik Rp 300,000 Rp 19,800,000 66.00 Rp 300,000 Rp 19,800,000
dalam pipa PVC fitting lampu dan kelengkapan instalasi

H PEKERJAAN LISTRIK
a Biaya Listrik 4 Amper (17 Unit)
Biaya Penyambungan (BP) PLN 17 Untuk 4 Amper 10.00 Unit Rp 421,000 Rp 4,210,000 10.00 Rp 421,000 Rp 4,210,000
Biaya Token/Pulsa 10.00 Pcs Rp 50,000 Rp 500,000 10.00 Rp 50,000 Rp 500,000
Biaya Materai 10.00 Lbr Rp 10,000 Rp 100,000 10.00 Rp 10,000 Rp 100,000
Biaya Sertifikat Like Opererasi (SLO) 10.00 Lbr Rp 40,000 Rp 400,000 10.00 Rp 40,000 Rp 400,000
Jasa Survey Dan Jaminan 10.00 Ls Rp 525,000 Rp 5,250,000 10.00 Rp 525,000 Rp 5,250,000
Instalasi Listrik 35.00 Titik Rp 165,000 Rp 5,775,000 35.00 Rp 165,000 Rp 5,775,000
b Biaya Listrik 6 Amper (1 Unit) 0.00
Biaya Penyambungan (BP) PLN 1 Untuk 6 Amper 1.00 Unit Rp 1,218,000 Rp 1,218,000 1.00 Rp 1,218,000 Rp 1,218,000
Biaya Token/Pulsa 1.00 Pcs Rp 50,000 Rp 50,000 1.00 Rp 50,000 Rp 50,000
Biaya Materai 1.00 Lbr Rp 10,000 Rp 10,000 1.00 Rp 10,000 Rp 10,000
Biaya Sertifikat Like Opererasi (SLO) 1.00 Lbr Rp 95,000 Rp 95,000 1.00 Rp 95,000 Rp 95,000
Jasa Survey Dan Jaminan 1.00 Ls Rp 730,000 Rp 730,000 1.00 Rp 730,000 Rp 730,000
Instalasi Listrik 10.00 Titik Rp 170,000 Rp 1,700,000 10.00 Rp 170,000 Rp 1,700,000

VIII PEKERJAAN SANITASI


1 Pemasukan Air PDAM 1.00 Unit Rp 5,000,000 Rp 5,000,000 1.00 Sr Rp 2,260,000 Rp 2,260,000 Rp 5,000,000 Rp 2,740,000
2 Biaya Pendaftaran Baru 1.00 Sr Rp 16,000 Rp 16,000 1.00 Rp 16,000 Rp 16,000
3 Pemasangan Kloset Jongkok 2.00 Bh Rp 155,000 Rp 310,000 2.00 Ls Rp 330,000 Rp 660,000 Rp 350,000
4 Septictank dan Peresapan 1.00 Unit Rp 10,000,000 Rp 10,000,000 1.00 Unit Rp 6,000,000 Rp 6,000,000 Rp 10,000,000 Rp 4,000,000
5 Pasang Kran Air 24.00 Unit Rp 5,000 Rp 120,000 10.00 Bh Rp 22,000 Rp 220,000 Rp 100,000 14.00
6 Pasang Instalasi Air Kotor (pipa PVC Type AW 3 & 4 Inc ) 6.00 Bh Rp 95,000 Rp 570,000 16.00 Bh Rp 85,000 Rp 1,360,000 10.00 Rp 85,000 Rp 790,000
7 Pasang Instalasi Air Bersih (pipa PVC Type AW 3/4 Inc ) 40.00 bh Rp 95,000 Rp 3,800,000 15.00 Bh Rp 80,000 Rp 1,200,000 25.00 Rp 95,000 Rp 2,600,000
8 Tangki Profil 2200 2.00 Bh Rp 2,850,000 Rp 5,700,000 2.00 bh Rp 2,850,000 Rp 5,700,000
9 Aksesoris 1.00 Ls Rp 5,000,000 Rp 5,000,000 1.00 Ls Rp 2,154,000 Rp 2,154,000 Rp 5,000,000 Rp 2,846,000
10 Pipa PVC Pembuangan Air Dari Lantai 2 4.00 bh Rp 120,000 Rp 480,000 4.00 Rp 120,000 Rp 480,000
11 #NAME? #NAME? m² #NAME? #NAME? #NAME? #NAME? #NAME?

III PEKERJAAN ATAP


1 Atap Teras 100.14 m² Rp 71,400 Rp 7,150,279 100.14 Rp 71,400 Rp 7,150,279
2 Atap Teras II 120.00 m² Rp 71,400 Rp 8,568,000 120.00 Rp 71,400 Rp 8,568,000
3 Atap Spandek Lantai I 303.40 m² Rp 61,648 Rp 18,703,886 192.00 m² Rp 104,950 Rp 20,150,400 Rp 1,446,514 111.40
4 Atap Spandek Lantai II 346.47 m² Rp 104,950 Rp 36,362,189 346.47 Rp 104,950 Rp 36,362,189

IV PEKERJAAN BESI DAN ALMUNIUM


1 Pekerjaan Pagar Hollow 4x2 cm Dan Tangga 1.00 Ls Rp 65,000,000 Rp 65,000,000 1.00 Rp 65,000,000 Rp 65,000,000
2 Pagar Besi Hollow 4X4 85.98 m² Rp 233,000 Rp 20,034,272 85.98 Rp 233,000 Rp 20,034,272
3 Pagar Tangga 8.63 m² Rp 462,500 Rp 3,992,300 8.63 Rp 462,500 Rp 3,992,300
4 Rangka Atap Besi Hollow 4X4 259.00 m² Rp 233,000 Rp 60,347,000 259.00 Rp 233,000 Rp 60,347,000
5 Pemasangan Rangka Besi c 75 180.00 m² Rp 257,542 Rp 46,357,638 377.59 m² Rp 171,603 Rp 64,796,078 197.59 Rp 171,603 Rp 18,438,440

L SEWA ALAT
1 Molen 1.00 Ls Rp 5,000,000 Rp 5,000,000 1.00 Rp 5,000,000 Rp 5,000,000

D ESTETIKA
1 Gapura 1.00 Ls Rp 8,000,000 Rp 8,000,000 1.00 Rp 8,000,000 Rp 8,000,000
2 Estetika 1.00 Bh Rp 7,100,000 Rp 7,100,000 1.00 Rp 7,100,000 Rp 7,100,000
3 Aksesoris + Properti 1.00 Ls Rp 10,800,000 Rp 10,800,000 1.00 Rp 10,800,000 Rp 10,800,000

E Kesehatan dan Keselamatan Kerja (K3)


1 Topi Pelindung Diri (Safety Helmet) 30.00 bh Rp 45,000 Rp 1,350,000 30.00 Bh Rp 45,000 Rp 1,350,000
2 Perlindung Pernapasan dan Mulut (Masker) 30.00 bh Rp 40,000 Rp 1,200,000 30.00 Bh Rp 40,000 Rp 1,200,000
3 Sarung Tangan (Safety Gloves) 30.00 Psg Rp 7,000 Rp 210,000 30.00 Psg Rp 7,000 Rp 210,000
4 Sepatu Keselamatan (Safety Shoes) 30.00 Psg Rp 90,000 Rp 2,700,000 30.00 Psg Rp 90,000 Rp 2,700,000
5 Rompi Keselamatan (Safety Vest) 30.00 bh Rp 45,000 Rp 1,350,000 30.00 Bh Rp 45,000 Rp 1,350,000
6 Peralatan P3K (Kotak P3K, Obat Luka, Perban DLL) 1.00 Unit Rp 500,000 Rp 500,000 1.00 Unit Rp 500,000 Rp 500,000
7 Asuransi kesehatan 1.00 Ls Rp 2,390,000 Rp 2,390,000 1.00 Ls Rp 2,390,000 Rp 2,390,000
8 Spanduk 1.00 Lb Rp 300,000 Rp 300,000 1.00 Lb Rp 300,000 Rp 300,000

F Biaya Administrasi
1 Papan Nama Kegiatan 1.00 Ls Rp 250,000 Rp 250,000 #NAME? #NAME? #NAME? #NAME?
2 Administrasi Kegiatan, Backup Data, dd 1.00 Ls Rp 150,000 Rp 150,000 #NAME? #NAME? #NAME? #NAME?
3 Pelaporan Kemajuan & Akhir 1.00 Ls Rp 200,000 Rp 200,000 #NAME? #NAME? #NAME? #NAME?
4 Photo Copy/Penggandaan 1.00 Ls Rp 350,000 Rp 350,000 #NAME? #NAME? #NAME? #NAME?
5 Biaya Alat Tulis Kantor (ATK) 1.00 Ls Rp 200,000 Rp 200,000 #NAME? #NAME? #NAME? #NAME?
6 Biaya Operasional (Transport, Konsumsi, Rapat, dll) 1.00 Ls Rp 100,000 Rp 100,000 #NAME? #NAME? #NAME? #NAME?
7 Photo Kegiatan (0%, 25%, 50%, 75%, 100%) 1.00 Ls Rp 100,000 Rp 100,000 #NAME? #NAME? #NAME? #NAME?
8 Materai Secukupnya 1.00 Ls Rp 150,000 Rp 150,000 #NAME? #NAME? #NAME? #NAME?
Rp 995,000,000 #NAME? #NAME? #NAME?

Diverifikasi Oleh ; Diperiksa DIBUAT OLEH;


Fasilitator Fasilitator LKM TERPADU LESTARI KSM PESISIR

( Syahril) ( Novianto Christy Adrian ) ( .................................................) ( .................................................)


KAB/KOTA : NUNUKAN
KECAMATAN : NUNUKAN
KEL/DESA : NUNUKAN UTARA
BKM/LKM : TERPADU LESTARI
NAMA KEGIATAN : RUMAH WISATA KULINER
TAHUN ANGGARAN : 2021

NO URAIAN SATUAN
1 2 3
A TENAGA KERJA
1 Pekerja OH
2 Tukang OH
B BAHAN
1 Kayu Kelas III 5/7 m3
2 Paku Biasa Kg
3 Papan Kayu Kelas III m3
4 Tanah Timbunan Padat m3
5 Pasir Urug m3
6 Kayu Pencang Btg
7 Minyak Begesting Liter
8 Kawat Bendrat Kg
9 Semen Zak
10 Semen Tambahan Zak
11 Pasir Beton m3
12 Batu Pecah 2-3cm m3
13 Air Liter
14 Kayu Kelas II m3
15 Multipleks 9mm Lbr
16 Kayu Perancah Btg
17 Batu Bata Merah Bh
18 Batako Bh
19 Kawat Ram Ayam m
20 Pasir Pasang m3
21 Tegel Keramik 40x40 Ktk
22 Tegel Keramik 20x20 Ktk
23 Bata Hebel Bh
24 Paving Exagonal Bh
25 Cat Aries Gold Liter
26 Plamur Bks
27 Atap Spandek Lbr
28 Baut Screw Cteks 12-4x50 Ktk
29 Baja Ringan Canal C-75 Btg
30 Dynabolt Ktk
31 Reng Btg
32 Besi 8 Polos Full Ljr
33 Besi 10 Polos Full Ljr
34 Besi 12 Polos Full Ljr
35 Besi 16 Polos Full Ljr
36 Ijuk Gulung
37 Semen Putih R. Bull Zak
38 Amplas Lbr
39 Nat Keramik Bks
40 Lem Plamir Bks
C PEKERJAAN PINTU & ANGIN-ANGIN
1 Pintu Besi Belakang 2 Daun Pintu Unit
2 Pintu WC Unit
3 Pintu Besi Lorong Unit
4 Pintu Rollong Door Unit
5 Angin-Angin Bh
D PEKERJAAN BESI DAN ALMUNIUM
1 Pekerjaan Pagar Hollow 4x2 cm Dan Tangga Ls
E SEWA ALAT
1 Molen Ls
F PEKERJAAN LISTRIK
1 Biaya Listrik 4 Amper (17 Unit)
1 Biaya Penyambungan (BP) PLN 17 Untuk 4 Amper Unit
2 Biaya Token/Pulsa Pcs
3 Biaya Materai Lbr
4 Biaya Sertifikat Like Opererasi (SLO) Lbr
5 Jasa Survey Dan Jaminan Ls
6 Instalasi Listrik Titik
2 Biaya Listrik 6 Amper (1 Unit)
1 Biaya Penyambungan (BP) PLN 1 Untuk 6 Amper Unit
2 Biaya Token/Pulsa Pcs
3 Biaya Materai Lbr
4 Biaya Sertifikat Like Opererasi (SLO) Lbr
5 Jasa Survey Dan Jaminan Ls
6 Instalasi Listrik Titik
G PEKERJAAN SANITASI
1 Pemasangan Baru Air PDAM Sr
2 Biaya Pendaftaran Sr
3 Tangki Profil 2200 Bh
4 Pemasangan Kloset Jongkok Bh
5 Septictank dan Peresapan Unit
6 Pemasangan Keran Air Plastik Bh
7 Pasang Instalasi Air Kotor (pipa PVC Type AW 3 & 4 Inc ) Bh
8 Pasang Instalasi Air Bersih (pipa PVC Type AW 3/4 Inc ) Bh
9 Aksesoris Ls
H KESEHATAN DAN KESELAMATAN KERJA (K3)
1 Topi Pelindung Diri ( Safety Helmet ) Bh
2 Perlindungan Pernapasan Dan Mulut ( Masker ) Bh
3 Sarung Tangan ( Safety Gloves ) Psg
4 Sepatu Keselamatan Kerja ( Safety Shoes ) Psg
5 Rompi Keselamatan Kerja ( Safety Vest ) Bh
6 Peralatan P3K ( Kotak P3K, Obat Luka, Perban DLL Unit
7 Asuransi Kesehatan Ls
8 Spanduk Lb
I #NAME?
1 #NAME? #NAME?
2 #NAME? #NAME?
3 #NAME? #NAME?
4 #NAME? #NAME?
5 #NAME? #NAME?
6 #NAME? #NAME?
7 #NAME? #NAME?
8 #NAME? #NAME?
RINCIAN REALISASI ANGGARAN DARI KENAIKAN HARGA
INFRASTRUKTUR PENDUKUNG LIVELIHOOD

NUNUKAN
NUNUKAN
NUNUKAN UTARA
TERPADU LESTARI
RUMAH WISATA KULINER

BULA
JANUARI FEBRUARI MARET APRIL MEI
8 9 10 11 12

Rp 115,000 Rp 115,000 Rp 115,000 Rp 115,000 Rp 115,000


Rp 135,000 Rp 135,000 Rp 135,000 Rp 135,000 Rp 135,000

Rp 4,000,000 Rp 4,000,000 Rp 4,000,000 Rp 4,000,000 Rp 3,800,000


Rp 18,000 Rp 18,000 Rp 18,000 Rp 18,000 Rp 22,000
Rp 4,000,000 Rp 4,000,000 Rp 4,000,000 Rp 4,000,000 Rp 3,800,000
Rp 90,000 Rp 90,000 Rp 90,000 Rp 90,000 Rp 57,143
Rp 114,286 Rp 114,286 Rp 114,286 Rp 114,286 Rp 214,286
Rp 360,000 Rp 360,000 Rp 360,000 Rp 360,000 Rp 360,000
Rp 15,000 Rp 15,000 Rp 15,000 Rp 15,000 Rp 15,000
Rp 25,000 Rp 25,000 Rp 25,000 Rp 25,000 Rp 25,000
Rp 70,000 Rp 70,000 Rp 70,000 Rp 70,000 Rp 70,000
Rp 65,000 Rp 65,000 Rp 65,000 Rp 65,000 Rp 65,000
Rp 220,000 Rp 220,000 Rp 220,000 Rp 220,000 Rp 220,000
Rp 575,000 Rp 575,000 Rp 575,000 Rp 575,000 Rp 575,000
Rp 50 Rp 50 Rp 50 Rp 50 Rp 50
Rp 5,000,000 Rp 5,000,000 Rp 5,000,000 Rp 5,000,000 Rp 5,000,000
Rp 128,000 Rp 128,000 Rp 128,000 Rp 128,000 Rp 128,000
Rp 45,000 Rp 45,000 Rp 45,000 Rp 45,000 Rp 45,000
Rp 1,200 Rp 1,200 Rp 1,200 Rp 1,200 Rp 1,200
- - - - -
- - - - Rp 8,000
Rp 114,286 Rp 114,286 Rp 114,286 Rp 114,286 Rp 114,286
Rp 75,000 Rp 75,000 Rp 75,000 Rp 75,000 Rp 75,000
Rp 59,000 Rp 59,000 Rp 59,000 Rp 59,000 Rp 59,000
- - - - -
- - - - -
- - - - -
Rp 30,000 Rp 30,000 Rp 30,000 Rp 30,000 Rp 30,000
Rp 70,000
- - - - -
Rp 98,000 Rp 98,000 Rp 98,000 Rp 98,000 Rp 98,000
- - - - -
- - - - -
Rp 48,000 Rp 48,000 Rp 48,000 Rp 48,000 Rp 47,000
Rp 73,000 Rp 73,000 Rp 73,000 Rp 73,000 Rp 75,000
Rp 100,000 Rp 100,000 Rp 100,000 Rp 100,000 Rp 105,000
- - - - Rp 225,000
- - - - Rp 30,000
- - - - Rp 125,000
- - - - Rp 5,000
- - - - Rp 18,000
- - - - -

- - - - -
Rp 385,000 Rp 385,000 Rp 385,000 Rp 385,000 Rp 385,000
- - - - -
Rp 6,500,000 Rp 6,500,000 Rp 6,500,000 Rp 6,500,000 Rp 6,500,000
Rp 50,000 Rp 50,000 Rp 50,000 Rp 50,000 Rp 50,000

- - - - Rp 65,000,000

- - - - Rp 5,000,000

- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
RI KENAIKAN HARGA
G LIVELIHOOD

BULAN KENAIKAN HARGA


JUNI JULI AGUSTUS SEPTEMBER
13 14 15 16

Rp 115,000 Rp 115,000 Rp 115,000 Rp 115,000


Rp 135,000 Rp 135,000 Rp 135,000 Rp 135,000

Rp 3,800,000 Rp 3,800,000 Rp 3,800,000 Rp 3,800,000


Rp 22,000 Rp 22,000 Rp 22,000 Rp 22,000
Rp 3,800,000 Rp 3,800,000 Rp 3,800,000 Rp 3,800,000
Rp 57,143 Rp 57,143 Rp 57,143 Rp 57,143
Rp 214,286 Rp 214,286 Rp 214,286 Rp 214,286
Rp 55,000 Rp 55,000 Rp 55,000 Rp 55,000
Rp 15,000 Rp 15,000 Rp 15,000 Rp 15,000
Rp 25,000 Rp 25,000 Rp 25,000 Rp 25,000
Rp 70,000
Rp 65,000 Rp 68,000 Rp 68,000 Rp 68,000
Rp 220,000 Rp 220,000 Rp 185,714 Rp 185,714
Rp 1,800,000 Rp 1,800,000 Rp 1,800,000 Rp 1,800,000
Rp 50 Rp 50 Rp 50 Rp 50
Rp 5,000,000 Rp 5,000,000 Rp 5,000,000 Rp 5,000,000
Rp 130,000 Rp 130,000 Rp 130,000 Rp 130,000
Rp 45,000 Rp 45,000 Rp 45,000 Rp 45,000
Rp 1,200 Rp 1,200 Rp 1,200 Rp 1,200
- - - -
Rp 8,000 Rp 8,000 Rp 8,000 Rp 8,000
Rp 214,286 Rp 214,286 Rp 214,286 Rp 214,286
- - - -
- - - -
Rp 17,000 Rp 17,000 Rp 17,000 Rp 17,000
- - - -
- - - -
Rp 110,000 Rp 110,000 Rp 110,000 Rp 110,000

Rp 140,000 Rp 140,000 Rp 140,000 Rp 140,000


Rp 115,000 Rp 115,000 Rp 115,000 Rp 115,000
- - - -
- - - -
Rp 47,000 Rp 47,000 Rp 47,000 Rp 49,000
Rp 75,000 Rp 75,000 Rp 75,000 Rp 75,000
Rp 105,000 Rp 100,000 Rp 100,000 Rp 100,000
Rp 225,000 Rp 225,000 Rp 225,000 Rp 225,000
Rp 30,000 Rp 30,000 Rp 30,000 Rp 30,000
Rp 125,000 Rp 125,000 Rp 125,000 Rp 125,000
Rp 5,000 Rp 5,000 Rp 5,000 Rp 5,000
Rp 18,000 Rp 18,000 Rp 18,000 Rp 18,000
- - - -

- - - -
Rp 385,000 Rp 385,000 Rp 385,000 Rp 385,000
- - - -
Rp 6,500,000 Rp 6,500,000 Rp 6,500,000 Rp 6,500,000
Rp 50,000 Rp 50,000 Rp 50,000 Rp 50,000

Rp 65,000,000 Rp 65,000,000 Rp 65,000,000 Rp 65,000,000

Rp 5,000,000 Rp 5,000,000 Rp 5,000,000 Rp 5,000,000

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
OKTOBER NOVEMBER DESEMBER
17 18 19

Rp 115,000 Rp 115,000 Rp 115,000


Rp 135,000 Rp 135,000 Rp 135,000

Rp 3,800,000 Rp 3,800,000 Rp 3,800,000


Rp 22,000 Rp 22,000 Rp 22,000
Rp 3,800,000 Rp 3,800,000 Rp 3,800,000
Rp 57,143 Rp 57,143 Rp 57,143
Rp 214,286 Rp 214,286 Rp 214,286
Rp 55,000 Rp 55,000 Rp 55,000
Rp 15,000 Rp 15,000 Rp 15,000
Rp 25,000 Rp 25,000 Rp 25,000

Rp 70,000 Rp 70,000 Rp 70,000


Rp 185,714 Rp 185,714 Rp 185,714
Rp 1,800,000 Rp 1,800,000 Rp 1,800,000
Rp 50 Rp 50 Rp 50
Rp 5,000,000 Rp 5,000,000 Rp 5,000,000
Rp 130,000 Rp 130,000 Rp 130,000
Rp 45,000 Rp 45,000 Rp 45,000
Rp 1,100 Rp 1,100 Rp 1,100
Rp 1,200 Rp 1,200 Rp 1,200
Rp 8,000 Rp 8,000 Rp 8,000
Rp 214,286 Rp 214,286 Rp 214,286
- Rp 65,000 Rp 65,000
- Rp 45,000 Rp 45,000
Rp 17,000 Rp 17,000 Rp 17,000
Rp 4,000 Rp 4,000 Rp 4,000
Rp 56,000 Rp 56,000 Rp 56,000
Rp 110,000 Rp 110,000 Rp 110,000

Rp 140,000 Rp 140,000 Rp 140,000


Rp 115,000 Rp 115,000 Rp 115,000
Rp 500,000 Rp 500,000 Rp 500,000
Rp 50,000 Rp 50,000 Rp 50,000
Rp 49,000 Rp 49,000 Rp 49,000
Rp 75,000 Rp 75,000 Rp 75,000
Rp 100,000 Rp 105,000 Rp 105,000
Rp 225,000 Rp 225,000 Rp 225,000
Rp 30,000 Rp 30,000 Rp 30,000
Rp 125,000 Rp 125,000 Rp 125,000
Rp 5,000 Rp 5,000 Rp 5,000
Rp 18,000 Rp 18,000 Rp 18,000
- Rp 230,000 Rp 230,000

- Rp 1,500,000 Rp 1,500,000
Rp 385,000 Rp 1,200,000 Rp 1,200,000
- Rp 1,000,000 Rp 1,000,000
Rp 6,500,000 Rp 6,500,000 Rp 6,500,000
Rp 50,000 Rp 50,000 Rp 50,000

Rp 65,000,000 Rp 65,000,000 Rp 65,000,000

Rp 5,000,000

- - -
- - -
- - -
- - -
- - -
- - -

- - -
- - -
- - -
- - -
- - -
- - -

- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
INFRASTRUKTUR PENDUKUNG LIVELIHOOD

KAB/KOTA : NUNUKAN
KECAMATAN : NUNUKAN
KEL/DESA : NUNUKAN UTARA
BKM/LKM : TERPADU LESTARI
NAMA KEGIATAN : RUMAH WISATA KULINER
TAHUN ANGGARAN : 2021

NO URAIAN SATUAN

1 2 3
A TENAGA KERJA
1 Pekerja OH
2 Tukang OH

B BAHAN
1 Kayu Kelas III 5/7 m3
2 Paku Biasa Kg
3 Papan Kayu Kelas III m3
4 Tanah Timbunan Padat m3
5 Pasir Urug m3
6 Kayu Pencang Btg
7 Minyak Begesting Liter
8 Kawat Bendrat Kg
9 Semen Zak
10 Semen Tambahan Zak
11 Pasir Beton m3
12 Batu Pecah 2-3cm m3
13 Air Liter
14 Kayu Kelas II m3
15 Multipleks 9mm Lbr
16 Kayu Perancah Btg
17 Batu Bata Merah Bh
18 Batako Bh
19 Kawat Ram Ayam m
20 Pasir Pasang m3
21 Tegel Keramik 40x40 Ktk
22 Tegel Keramik 20x20 Ktk
23 Bata Hebel Bh
24 Paving Exagonal Bh
25 Cat Aries Gold Liter
26 Plamur Bks
27 Atap Spandek Lbr
28 Baut Screw Cteks 12-4x50 Ktk
29 Baja Ringan Canal C-75 Btg
30 Dynabolt Ktk
31 Reng Btg
32 Besi 8 Polos Full Ljr
33 Besi 10 Polos Full Ljr
34 Besi 12 Polos Full Ljr
35 Besi 16 Polos Full Ljr
36 Ijuk Gulung
37 Semen Putih R. Bull Zak
38 Amplas Lbr
39 Nat Keramik Bks
40 Lem Plamir Bks
TOTAL BAHAN
C PEKERJAAN PINTU & ANGIN-ANGIN
1 Pintu Besi Belakang 2 Daun Pintu Unit
2 Pintu WC Unit
3 Pintu Besi Lorong Unit
4 Pintu Rollong Door Unit
5 Angin-Angin Bh
TOTAL PEKERJAAN PINTU & ANGIN-ANGIN
D PEKERJAAN BESI DAN ALMUNIUM
1 Pekerjaan Pagar Hollow 4x2 cm Dan Tangga Ls
TOTAL PEKERJAAN BESI DAN ALMUNIUM
E SEWA ALAT
1 Molen Ls
TOTAL SEWA ALAT
F PEKERJAAN LISTRIK
1 Biaya Listrik 4 Amper (17 Unit)
1 Biaya Penyambungan (BP) PLN 17 Untuk 4 Amper Unit
2 Biaya Token/Pulsa Pcs
3 Biaya Materai Lbr
4 Biaya Sertifikat Like Opererasi (SLO) Lbr
5 Jasa Survey Dan Jaminan Ls
6 Instalasi Listrik Titik
BIAYA 4 AMPER
2 Biaya Listrik 6 Amper (1 Unit)
1 Biaya Penyambungan (BP) PLN 1 Untuk 6 Amper Unit
2 Biaya Token/Pulsa Pcs
3 Biaya Materai Lbr
4 Biaya Sertifikat Like Opererasi (SLO) Lbr
5 Jasa Survey Dan Jaminan Ls
6 Instalasi Listrik Titik
BIAYA 6 AMPER
TOTAL BIAYA LISTRIK
G PEKERJAAN SANITASI
1 Pemasangan Baru Air PDAM Sr
2 Biaya Pendaftaran Sr
3 Tangki Profil 2200 Bh
4 Pemasangan Kloset Jongkok Bh
5 Septictank dan Peresapan Unit
6 Pemasangan Keran Air Plastik Bh
7 Pasang Instalasi Air Kotor (pipa PVC Type AW 3 & 4 Inc ) Bh
8 Pasang Instalasi Air Bersih (pipa PVC Type AW 3/4 Inc ) Bh
9 Aksesoris Ls
TOTAL PEKERJAAN SANITASI
H KESEHATAN DAN KESELAMATAN KERJA (K3)
1 Topi Pelindung Diri ( Safety Helmet ) Bh
2 Perlindungan Pernapasan Dan Mulut ( Masker ) Bh
3 Sarung Tangan ( Safety Gloves ) Psg
4 Sepatu Keselamatan Kerja ( Safety Shoes ) Psg
5 Rompi Keselamatan Kerja ( Safety Vest ) Bh
6 Peralatan P3K ( Kotak P3K, Obat Luka, Perban DLL Unit
7 Asuransi Kesehatan Ls
8 Spanduk Lb
TOTAL K3
I BIAYA ADMINISTRASI
1 Papan Nama Kegiatan Ls
2 Administrasi Kegiatan, Backup Data, dd Ls
3 Pelaporan Kemajuan & Akhir Ls
4 Photo Copy/Penggandaan Ls
5 Biaya Alat Tulis Kantor (ATK) Ls
6 Biaya Operasional (Transport, Konsumsi, Rapat, dll) Ls
7 Photo Kegiatan (0%, 25%, 50%, 75%, 100%) Ls
8 Materai Secukupnya Ls
NUNUKAN
NUNUKAN
NUNUKAN UTARA
TERPADU LESTARI
RUMAH WISATA KULINER

KETERANGAN
4

HARGA DARI KELOMPOK MASYARAKAT


HARGA DARI KELOMPOK MASYARAKAT
HARGA SURVEY ULANG KE PDAM
HARGA SURVEY ULANG KE PDAM
HARGA TETAP
HARGA TETAP
HARGA TETAP
HARGA TETAP
HARGA TETAP
HARGA TETAP
KENAIKAN HARGA KARNA KEBUTUHAN DILAPANGAN

HARGA SURVEY
HARGA SURVEY
HARGA SURVEY
HARGA SURVEY
HARGA SURVEY
HARGA SURVEY
HARGA SURVEY
HARGA SURVEY

HARGA KETENTUAN
HARGA KETENTUAN
HARGA KETENTUAN
HARGA KETENTUAN
HARGA KETENTUAN
HARGA KETENTUAN
HARGA KETENTUAN
HARGA KETENTUAN
Lampiran BA No : Form - RAB1
PROGRAM KOTA TANPA KUMUH (KOTAKU

HASIL KESEPAKATAN HARGA SATUAN UPAH/BAHAN/ALAT


BULAN : MEI - DESEMBER 2020
Kota : Nunukan
Kecamatan : Nunukan Selatan Jenis Kegiatan : PIKE-BM Tanggal Dilaksanakan Survey :
Kelurahan/Desa : Nunukan Selatan Volume : No. Lembar : ____dari____
KSM/Panitia : Dharma Bhakti Lokasi : Nunukan Selatan

No Lembar ……..dari …..


KESEPAKATAN HARGA SATUAN
HARGA SATUAN HASIL SURVEY*) TERENDAH
HARGA SATUAN
SESUAI STANDAR Kelp.Masy. - 1 Kelp.Masy.-2 Kelp.Masy.-3
No. Uraian Tenaga Kerja Sat. KABUPATEN (Rp) Nama: Nama: ___________ Nama: ___________ HARGA SATUAN
KETERANGAN
Almt : ___________ Almt : ___________ Almt : ___________ (Rp)
Telp : ____________ Telp : ____________ Telp : ____________
(1) (2) (3) (4) (5) (6) (7) (8) (9)
I. TENAGA KERJA :
1. Pekerja HOK - 120,000 125,000 115,000 115,000 Kelp.Masy.-3
2. Tukang HOK - 150,000 140,000 135,000 135,000 Kelp.Masy.-3
KESEPAKATAN HARGA SATUAN
HARGA SATUAN HASIL SURVEY*) TERENDAH
HARGA SATUAN Pemasok - 1 Pemasok - 2 Pemasok - 3
SESUAI STANDAR
KABUPATEN (Rp) Nama: Ayu Nama: Kembar Sejahtera Nama: CV. Mario Jaya HARGA SATUAN
No. Uraian Bahan/Alat Sat. Nama Toko/Pemasok
(Rp)
Almt : Almt : Jl. Sei. Bilal Almt : Jl. Teuku Umar
Telp : - Telp : - Telp :-
(1) (2) (3) (4) (5) (6) (7) (8) (9)

II. BAHAN/MATERIAL :
1 Kayu Kelas I m3 - 9,000,000 11,000,000 10,500,000 9,000,000 Pemasok - 1
2 Kayu Kelas I 3/20 m3 - 9,000,000 11,000,000 10,500,000 9,000,000 Pemasok - 1
3 Kayu Kelas I 5/10 m3 - 9,000,000 11,000,000 10,500,000 9,000,000 Pemasok - 1
4 Kayu Kelas II m3 - 5,000,000 5,800,000 5,700,000 5,000,000 Pemasok - 1
5 Kayu Kelas III m3 - 3,500,000 3,800,000 3,800,000 3,800,000 Pemasok - 1
6 Kayu Laut Dia 10mm-15mm / 4m Btg - 40,000 80,000 70,000 40,000 Tanah Merah
7 Kayu Dolken Dia 10mm-15mm/4m Btg 55,000 80,000 70,000 55,000 Tanah Merah
KESEPAKATAN HARGA SATUAN
HARGA SATUAN HASIL SURVEY*) TERENDAH
HARGA SATUAN
No Uraian Bahan/Alat Sat. SESUAI STANDAR Toko/Pemasok - 1 Toko/Pemasok - 2 Toko/Pemasok - 3
KABUPATEN (Rp) Nama: Cahaya Makmur Nama: Karya Mandiri Nama: Sinar Agung HARGA SATUAN
Nama Toko/Pemasok
Almt : Jl. Tanjung Almt : Jl. TVRI Almt : Jl. Yos Sudarso (Rp)
Telp : - Telp : - Telp :-
(2) (3) (4) (5) (6) (7) (8) (9)
1 Playwood 9 mm Lbr - 130,000 130,000 135,000 130,000 Cahaya Makmur
2 Paku ulin Kg - 30,000 27,000 20,000 20,000 Karya Mandiri
3 Paku Beton Kg 20,000 20,000 20,000 20,000 Sinar Agung
4 Paku Biasa Kg - 22,000 22,000 22,000 22,000 Cahaya Makmur
5 Paku Tripleks kg - 25,000 22,000 22,000 22,000 Karya Mandiri
6 Paku Skrup Halus kg - - - 27,000 27,000 Sinar Agung
7 Paku Skrup Kasar kg - - - 27,000 27,000 Sinar Agung
8 Baut Driling 12x50 Dos 325,000 325,000 Sinar Agung
9 Baut Driling 12x25 Dos 225,000 225,000 Sinar Agung
10 Dinabolt 8x65 Dos 500,000 500,000 Sinar Agung
11 Kaso Baja Ringan 6 meter Btg - - - 98,000 98,000 Karya Mandiri
12 Baja Ringan Kayan Trus Btg - 115,000
13 Kanal C Tasso Btg - 115,000 115,000 Sinar Agung
14 Kanal C Biasa Btg - 105,000.00 105,000 Karya Mandiri
15 Reng Baja Btg 50,000.00 50,000 Karya Mandiri
16 Semen Portland zak - 70,000 70,000 65,000 70,000 Sinar Agung
17 Semen Portland Tambahan zak 75,000 80,000 70,000 70,000 Sinar Agung
18 Besi Polos Ø 8/12m Ljr - 55,000 50,000 47,000 47,000 Sinar Agung
19 Besi Polos Ø 10/12m Ljr - 78,000 75,000 75,000 75,000 Sinar Agung
20 Besi Polos Ø 12/12m Ljr - 110,000 107,000 105,000 105,000 Sinar Agung
21 Besi Polos Ø 16/12m Ljr 230,000 235,000 225,000 225,000 Sinar Agung
22 Wiremesh besi M6 Roll - - - 4,500,000 4,500,000 Sinar Agung
23 Wiremesh besi M12 Lembar - - - 1,000,000 1,000,000 Sinar Agung
24 Keramik Putih 40x40 cm Dos - 65,000 75,000 65,000 65,000 Sinar Agung
25 Keramik 20x20 Cm Dos - 45,000 Sinar Agung
26 Kawat Beton kg - 25,000 25,000 25,000 25,000 Karya Mandiri
27 Plamir 5 kg - 110,000 110,000.00 110,000 110,000 Sinar Agung
28 Minyak Begesting Liter - - - 15,000.00 15,000 Indah Jaya
29 Cat Aries Liter 58,000 58,000 56,000 56,000 Sinar Agung
30 Cat Nippon Liter - - 60,000 - 60,000 Karya Mandiri
31 Cat Avian Liter - - - 60,000 60,000 Sinar Agung
32 Cat No Droop 5 Liter - - - 200,000 200,000 Sinar Agung
33 Talang Air Maspion Btg - - 108,000 - 108,000 Karya Mandiri
34 Talang Air Btg - - - 65,000 65,000 Sinar Agung
35 Atap Spandek Lbr - - 88,000 90,000 88,000 Karya Mandiri
36 Pipa PVC 2" Btg - - 47,000 - 47,000 Karya Mandiri
37 Pipa PVC 3" Btg - - 73,000 - 73,000 Karya Mandiri
38 Pipa PVC 4" Btg - - 105,000 - 105,000 Karya Mandiri
39 Tee 3/4 Bh 4,000.00 4,000 Sinar Agung
40 L 3/4 Bh 4,000.00 4,000 Sinar Agung
41 Lem Pipa Pcs 12,000.00 12,000 Sinar Agung
42 Bak Cuci Piring 1 Mata Bh 180,000.00 180,000 180,000.00 180,000 Sinar Agung
43 Tangki Profil 1100 Bh - - - 1,700,000 1,700,000 Sinar Agung
44 Tangki Profil 2200 Bh - - - 2,850,000 2,850,000 Sinar Agung
45 Fitting Tempel Biasa Bh - - - 10,000 10,000 Sinar Agung
46 Floor Drain Stainless Steel Set - - - 85,000 85,000 Sinar Agung
47 Isolasi Listrik Roll - - - 10,000 10,000 Sinar Agung
48 Kabel NVA 100 m - - - 215,000 215,000 Sinar Agung
49 Kait Angin Jendela Psg - - - 25,000 25,000 Sinar Agung
50 Klem Kabel 6 m m - - - 10,000 10,000 Sinar Agung
51 Klosed Vito Bh - - - 155,000 155,000 Sinar Agung
52 Kunci Pintu Bh - - - 150,000 150,000 Sinar Agung
53 Lampu TL Bundar 20 Watt Bh - - - 50,000 50,000 Sinar Agung
54 List Profil Gypsum m - - - 27,000 27,000 Sinar Agung
55 L Joint PVC Ø 2 Inci Bh - - - 10,000 10,000 Sinar Agung
56 L Joint PVC Ø 3 Inci Bh - - - 13,000 13,000 Sinar Agung
57 L Joint PVC Ø 4 Inci Bh - - - 20,000 20,000 Sinar Agung
58 Air Liter 50 50 Sinar Agung
59 MCB Bh - - - 70,000 70,000 Sinar Agung
60 Pipa GIP Medium B Ø 1/2" 6 m m - - - 130,000 130,000 Sinar Agung
61 Pipa GIP Medium B Ø 3/4" 6 m m - - - 155,000 155,000 Sinar Agung
KESEPAKATAN HARGA SATUAN
HARGA SATUAN HASIL SURVEY*) TERENDAH
HARGA SATUAN Pemasok - 1 Pemasok - 2 Pemasok - 3
SESUAI STANDAR
KABUPATEN (Rp) Nama: Ayu Nama: Kembar Sejahtera Nama: CV. Mario Jaya HARGA SATUAN
No. Uraian Bahan/Alat Sat. Nama Toko/Pemasok
(Rp)
Almt : Almt : Jl. Sei. Bilal Almt : Jl. Teuku Umar
Telp : - Telp : - Telp :-
(1) (2) (3) (4) (5) (6) (7) (8) (9)

62 Pipa GIP Medium B Ø 1" 6 m m - - - 195,000 195,000 Sinar Agung


63 Pipa GIP Medium B Ø 1 1/2" 6 m m - - - 230,000 230,000 Sinar Agung
64 Pipa GIP Medium B Ø 2" 6 m m - - - 385,000 385,000 Sinar Agung
65 Pipa GIP Medium B Ø 3" 6 m m - - - 440,000 440,000 Sinar Agung
66 Pipa GIP Medium B Ø 4" 6 m m - - - 755,000 755,000 Sinar Agung
67 Pipa PVC Ø 3 Inci Btg - - - 90,000 90,000 Sinar Agung
68 Pipa PVC Ø 4 Inci Btg - - - 125,000 125,000 Sinar Agung
69 Besi Hollow 4x4 Btg 135,000 135,000 Sinar Agung
70 Pintu PVC WC Bh 385,000 Sinar Agung
71 Paving Block Bh 4,000 Sinar Agung
72 Pintu PVC WC dan Kusen Set 1,200,000 Sinar Agung
73 Pintu Rolling Door Set 6,500,000 Bengkel Las Sederhana
74 Pintu Besi Set 3,500,000
75 Kawat Ram Ayam Ls 8,000.00 9,000.00 8,000 8,000
75 Tangga Besi dan Pagar Besi Set 65,000,000 Bengkel Las Sederhana
76 Ijuk M3 30,000 Karya Mandiri
77 Keran Air Bh 12,000 12,000 Sinar Agung
78 Singki Bh 250,000 250,000 250,000 250,000 Sinar Agung
79 Papan Gypsum Lbr - - 67,000 65,000 65,000 Sinar Agung
KESEPAKATAN HARGA SATUAN
0 TERENDAH
HARGA SATUAN
SESUAI STANDAR Pemasok - 1 Pemasok - 2 Pemasok - 3
KABUPATEN (Rp) Nama: CV. Fauzan Adzima Nama: Nama: Fauzan Adzima HARGA SATUAN
No Uraian Bahan/Alat Sat. Nama Toko/Pemasok
Almt : Jl. Persemaian Almt : Jl. Kampung Butun Almt : Jl. Tanjung Batu (Rp)
Telp : - Telp : - Telp :-
(2) (3) (4) (5) (6) (7) (8) (9)
1 Pasir Halus/Pasir Pasang Ret - 750,000 - 650,000 214,286 Pemasok - 1
2 Pasir Beton Ret - 650,000 650,000 185,714 Pemasok - 1
3 Tanah Timbunan Kasar Ret - 200,000 - 57,143 Pemasok - 1
4 Angin Angin Bh - - 50,000 - 50,000 Pemasok - 2
5 Bata Merah Bh - 1,100.00 1,100 - 1,100 Pemasok - 1
6 Batako Bh 1,200 1,200 Pemasok - 2
7 Bata Hebel Bh 17,000 Cahaya Jaya
8 Chipping/Kerikil Ret - 1,800,000 2,000,000 2,200,000 514,286 Pemasok - 1
9 Paving Block Bh
*) Harga Satuan sampai dilokasi Kegiatan (sudah termasuk biaya Transport) Nunukan, ...........................2021

: Mengetahu : Mengetahui : Diperiksa/Diverifikasi Oleh : Diperiksa/Verifikasi Oleh Dibuat/Disepakati Oleh


.…………………… : Kades/Lurah .…………………… : B K M Faskel UPL .…………………… : KSM/Panitia

: Nama : Nama : Nama : Nama : Nama

Jabatan : Kades/Lurah Jabatan : Ketua BKM Jabatan : Faskel : Jabatan Jabatan : Ketua KSM/Panitia

: Tandatangan : Tandatangan : Tandatangan : Tandatangan : Tandatangan


C
ANALISA TEKNIS BETON BERTULANG ( BESI + BEKISTING ) o
r

Beton Bertulang Besi Beton Begisting B


L Volume / 1 m3 Beton
e
u
No. Uraian Beton Dimensi Ø Besi Berat Potongan t Pembesian Kg Cor Beton Begisting Jumlah
Vol m3 Axis Jlh. Berat Kg Pjg m1 Lbr m1 Luas m2 a
mm Kg/m1 m
o
s M2 M2 Pemakaian
P L T Pjg Jlh 2
n
1.1 Pondasi Foot Plat 100/100/30 cm 1.00 1.00 0.30 0.300 X 12 0.888 2.00 7 12.4286 4.00 0.30 1.200 - 273.4301 3.300 13.20 1
13.200
0.25 0.25 1.00 0.063 Y 12 0.888 2.00 7 12.4286 1.000 1.000 1.000
- Z 12 0.888 1.30 6 6.9245 - - 11.000 76.170 0.688 11.000
- - - -
- - - -
- - - -
0.300 24.8573 13.200
571.7174 5.9880 26.6
1.2 Pondasi Foot Plat 80/80/30 cm 0.80 0.80 0.30 0.192 X 12 0.888 2.00 6 10.6531 3.20 0.30 0.960 - 298.2874 2.688 13.44 1
- 13.440
0.20 0.20 1.00 0.040 Y 12 0.888 2.00 6 10.6531 1.000 0.800 0.800
- Z 12 0.888 1.30 6 6.9245 - - 11.200 96.943 0.560 11.200
- - - -
- - - -
0.192 21.3062 13.440

2.1 Sloof Melintang 20/40 cm 56.20 0.20 0.40 4.496 Pokok 16 1.578 56.20 6 532.2 56.20 0.80 44.960 - 173.6064 4.4960 44.9600 1
Extra 16 1.578 56.20 1 89

Beugel 8 0.395 1.08 374.7 159.7 1,277.238


4.496 781 44.960

2.1 Sloof Memanjang 20/40 cm 98.60 0.20 0.40 7.888 Pokok 16 1.578 98.60 6 933.7 98.60 0.80 78.880 - 173.6064 7.8880 78.8800 1
Extra 16 1.578 98.60 1 155.6145
Sabuk - 98.60 -

Beugel 8 0.395 1.08 657.3 280.106 110.519


7.888 1,369 78.880
2.1 Sloof Melintang 15/15 cm 2.00 0.15 0.15 0.045 Pokok 12 0.888 2.00 6 10.7 2.00 0.30 0.600 - 292.8512 0.0900 0.6000 1
Extra - 2.00 -
Sabuk - 2.00 -

Beugel 8 0.395 0.48 13.33 2.5 0.996


0.045 13 0.600

2.1 Sloof Memanjang 15/15 cm 3.00 0.15 0.15 0.068 Pokok 12 0.888 3.00 6 16.0 3.00 0.30 0.900 - 292.8512 0.0675 0.9000 1
Extra - 3.00 -
Sabuk - 3.00 -

Beugel 8 0.395 0.48 20 3.788 1.495


0.068 20 0.900

3.1 Kolom 25/25 cm 0.25 0.25 3.80 0.238 Pokok 12 0.888 0.25 6 1.5000 3.80 1.00 3.800 - 14.6480 2.6125 20.9000 2
11 16.5000
Beugel 8 0.395 0.90 38 34.2000 148.4335
11 376.2000
35.7000
0.238 392.7000 3.800 148.433

3.2 Kolom 20/20 cm 0.20 0.20 3.80 0.152 Pokok 12 0.888 3.80 4 15.2000 3.80 0.80 3.040 - 188.9153 2.1280 21.2800 2
14 212.8000

Beugel 8 0.395 0.70 38 26.6000 146.9341


14 372.4000
41.8000
0.152 254.6000 3.040 335.849

4.3 Balok Anak 20/30 cm 18.40 0.20 0.30 1.104 Pokok 16 1.578 18.40 4 116.1585 18.40 0.60 11.040 - 116.1585 1.1040 11.0400 1
Extra
Sabuk

Beugel 8 0.395 0.84 122.7 40.6555 40.6555


1.104 156.8139 11.040 156.814

4.3 Balok 20/20 cm 86.00 0.20 0.20 3.440 Pokok 12 0.888 86.00 4 305.3894 172.00 0.20 34.400 - 305.3894 3.4400 17.2000 2
Extra
Sabuk

Beugel 8 0.395 0.64 573.3 144.7772 144.7772


3.440 450.1667 172.00 0.20 34.400 450.167

5.2 Ring Balok 20/40 cm 71.40 0.20 0.40 5.712 Pokok 16 1.578 71.40 6 676.1180 71.40 0.80 57.120 - 676.1180 5.7120 57.12 1
Extra
Sabuk

Beugel 8 0.395 1.04 476 195.3230 195.3230


5.712 871.4410 0.80 57.120 871.441
6.1 Rabat Beton 10 cm 15.00 4.10 0.10 6.150 X atas - 15.00 - 15.00 4.10 61.500 - - 12.3000 61.50 2
2.000 X bwh - 15.00 - 2.00 123.000
Extra X - 15.00 -
Y atas - 4.10 -
Y bwh - 4.10 -
Extra Y - 15.00 -
12.300 - 4.10 123.000
6.2 Rabat Beton 10 cm 18.00 2.10 0.10 3.780 X atas - 18.00 - 18.00 2.10 37.800 - - 3.7800 18.90 2
X bwh - 18.00 -
Extra X - 18.00 -
Y atas - 2.10 -
Y bwh - 2.10 -
Extra Y - 18.00 -
3.780 - 2.10 37.800

6.2 Plat Lantai 10 cm 19.00 7.00 0.10 13.300 X atas 10 0.617 19.00 190 819.9450 19.00 7.00 133.000 - 3,279.7800 13.3000 133.00 1
X bwh 10 0.617 19.00 190 819.9450
Extra X - 19.00 -
Y atas 10 0.617 7.00 70 819.9450
Y bwh 10 0.617 7.00 70 819.9450
Extra Y - 19.00 -
13.300 3,279.7800 7.00 133.000
Plat Lantai 10 cm Sisi kanan Kiri 1.00 1.00 0.10 0.100 X atas 10 0.617 1.00 10 6.1650 1.00 1.00 1.000 - 24.6600 0.1000 1.00 1
X bwh 10 0.617 1.00 10 6.1650
Extra X - 1.00 -
Y atas 10 0.617 1.00 10 6.1650
Y bwh 10 0.617 1.00 10 6.1650
Extra Y - 1.00 -
0.100 24.6600 1.00 1.000

6.2 Plate Lantai WC 3.00 3.00 0.10 0.900 X atas 10 0.617 3.00 30 55.4850 3.00 3.00 9.000 - 221.9400 0.9000 9.00 1
X bwh 10 0.617 3.00 30 55.4850
Extra X - 3.00 -
Y atas 10 0.617 3.00 30 55.4850
Y bwh 10 0.617 3.00 30 55.4850
Extra Y - 3.00 -
0.900 221.9400 3.00 9.000

3.1 Kolom 25/25 cm lantai 2 Err:509 0.25 ### Err:509 Pokok 12 0.888 Err:509 6 Err:509 Err:509 1.00 Err:509 - Err:509 Err:509 Err:509 2
11 Err:509
-
-

Beugel 8 0.395 Err:509 ### Err:509 Err:509


11 Err:509
Err:509
Err:509 Err:509 Err:509 Err:509
3.1 Kolom 20/20 cm lantai 2 0.20 0.20 2.00 0.080 Pokok 12 0.888 0.20 6 1.2000 2.00 0.80 1.600 - 13.8491 1.0400 10.4000 2
13 15.6000
-
-

Beugel 8 0.395 4.24 20 33.4587 171.6190


13 434.9629
34.6587
0.080 450.5629 1.600 185.468

Diverifikasi Oleh :
Askot Infrastruktur Fasilitator Teknik UPL/TIPP

( Sahril S.T ) ( Novianto Christy Adrian ) (.......................................................)


A PEKERJAAN PERSIAPAN
1 PEMBERSIHAN LAPANGAN

NO URAIAN SATUAN KOEFISIEN


TENAGA
1 Pekerja OH 0.1

2 PEMASANGAN BOWPLANK

NO TENAGA SATUAN KOEFISIEN


TENAGA
1 Pekerja OH 0.1
2 Tukang OH 0.1

BAHAN
1 Kayu 5/7 M3 0.012
2 Paku Kayu Kg 0.02
3 Papan Kayu Kelas III m3 0.007

B PEKERJAAN TANAH DAN PONDASI


- Pekerjaan Tanah dan Pondasi Tapak
1 Galian Tanah pondasi Tapak 80x80x30

NO URAIAN SATUAN KOEFISIEN


TENAGA
1 Pekerja OH 0.75

2 Galian Tanah pondasi Tapak 40x40x30

NO URAIAN SATUAN KOEFISIEN


TENAGA
1 Pekerja OH 0.75

3 Galian Parit

NO URAIAN SATUAN KOEFISIEN


TENAGA
1 Err:509 Err:509 Err:509
2 Err:509 Err:509 Err:509

4 Galian Sloof 20/40

NO URAIAN SATUAN KOEFISIEN


TENAGA
1 Pekerja OH Err:509
2 Tukang OH Err:509
5 Urugan Tanah Kembali

NO URAIAN SATUAN KOEFISIEN


TENAGA
1 Pekerja OH 0.5

6 Pengurugan Kembali Tanah Padat

NO URAIAN SATUAN KOEFISIEN


TENAGA
1 Pekerja OH 0.25

BAHAN
1 Tanah Padat M3 1.2

7 Urugan Pasir Pasang

NO URAIAN SATUAN KOEFISIEN


TENAGA
1 Pekerja OH 0.3
2 Tukang OH 0.01

BAHAN
1 Pasir urug M3 1.2

8 Kayu Bulat Merah dia 8-10 Pjng 4 Meter


BAHAN
1 Kayu Merah Btg

C PEKERJAAN BETON BERTULANG


1 Pondasi Tapak Footplate 80x80x30
- Beagisting Tapak Pondasi
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 0.52
2 Tukang OH 0.26

BAHAN
1 Kayu Kelas III (Borneo/dll) M3 0.02
2 Paku Biasa Kg 0.3
3 Minyak Bekesting Liter 0.1

- Pembesian Tapak Pondasi


NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 0.007
2 Tukang OH 0.007

BAHAN
1 Besi Beton Polos Kg 1.05
2 Kawat Bendrat Kg 0.015

- Cor Beton K-225


NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 1.65
2 Tukang OH 0.275

BAHAN
1 Semen Kg 371
2 Pasir Beton (1400 kg/m3) Kg 698
3 Batu pecah 2-3 cm Kg 1047
4 Air Liter 215

2 Pondasi Tapak Footplate 40x40x30

- Beagisting Tapak Pondasi


NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 0.52
2 Tukang OH 0.26

BAHAN
1 Kayu Kelas III (Borneo/dll) M3 0.02
2 Paku Biasa Kg 0.3
3 Minyak Bekesting Liter 0.1

- Pembesian Tapak Pondasi


NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 0.007
2 Tukang OH 0.007

BAHAN
1 Besi Beton Polos Kg 1.05
2 Kawat Bendrat Kg 0.015
- Cor Beton K-225
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 1.65
2 Tukang OH 0.275

BAHAN
1 Semen Kg 371
2 Pasir Beton (1400 kg/m3) Kg 698
3 Batu pecah 2-3 cm Kg 1047
4 Air Liter 215

3 Perdestail 80x80x30
- Beagisting Pendestal
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 0.66
2 Tukang OH 0.33

BAHAN
1 Kayu Kelas III (Borneo/dll) M3 0.02
2 Paku Biasa 5 cm - 10 cm Kg 0.4
3 Minyak Bekesting Liter 0.2
4 Kayu Kelas II (Kamper/Kruing/dll) M3 0.018
5 Multipleks 9 mm Lembar 0.35
6 Kayu Dolken Ø 8-10/400 cm Batang 2

- Pembesian Tapak Pondasi


NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 0.007
2 Tukang OH 0.007

BAHAN
1 Besi Beton Polos Kg 1.05
2 Kawat Bendrat Kg 0.015

- Cor Beton K-225


NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 1.65
2 Tukang OH 0.275

BAHAN
1 Semen Kg 371
2 Pasir Beton (1400 kg/m3) Kg 698
3 Batu pecah 2-3 cm Kg 1047
4 Air Liter 215

4 Perdestail 40x40x30
- Beagisting Pendestal
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 0.66
2 Tukang OH 0.33

BAHAN
1 Kayu Kelas III (Borneo/dll) M3 0.02
2 Paku Biasa 5 cm - 10 cm Kg 0.4
3 Minyak Bekesting Liter 0.2
4 Kayu Kelas II (Kamper/Kruing/dll) M3 0.018
5 Multipleks 9 mm Lembar 0.35
6 Kayu Dolken Ø 8-10/400 cm Batang 2

- Pembesian Pendestal
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 0.007
2 Tukang OH 0.007

BAHAN
1 Besi Beton Polos Kg 1.05
2 Kawat Bendrat Kg 0.015

- Cor Beton K-225


NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 1.65
2 Tukang OH 0.275

BAHAN
1 Semen Kg 371
2 Pasir Beton (1400 kg/m3) Kg 698
3 Batu pecah 2-3 cm Kg 1047
4 Air Liter 215

5 Sloof Beton 20/40 cm


- Beagisting Sloof
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 0.52
2 Tukang OH 0.26

BAHAN
1 Kayu Kelas III (Borneo/dll) M3 0.0225
2 Paku Biasa 5 cm - 10 cm Kg 0.30
3 Minyak Bekesting Liter 0.1

- Pembesian Sloof
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 0.007
2 Tukang OH 0.007

BAHAN
1 Besi Beton Polos Kg 1.05
2 Kawat Bendrat Kg 0.015

- Cor Beton K-225


NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 1.65
2 Tukang OH 0.275

BAHAN
1 Semen Kg 371
2 Pasir Beton (1400 kg/m3) Kg 698
3 Batu pecah 2-3 cm Kg 1047
4 Air Liter 215

6 ###
- #NAME?
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 0.52
2 Tukang OH 0.26

BAHAN
1 Kayu Kelas III (Borneo/dll) M3 0.0225
2 Paku Biasa 5 cm - 10 cm Lembar 0.3
3 Minyak Bekesting Batang 0.1

- #NAME?
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 0.007
2 Tukang OH 0.007

BAHAN
1 Besi Beton Polos Kg 1.05
2 Kawat Bendrat Kg 0.015

- Cor Beton K-225


NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 1.65
2 Tukang OH 0.275

BAHAN
1 Semen Kg 371
2 Pasir Beton (1400 kg/m3) Kg 698
3 Batu pecah 2-3 cm Kg 1047
4 Air Liter 215

7 ###
- #NAME?
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 0.66
2 Tukang OH 0.33

BAHAN
1 Kayu Kelas III (Borneo/dll) M3 0.02
2 Paku Biasa 5 cm - 10 cm Kg 0.4
3 Minyak Bekesting Liter 0.2
4 Kayu Kelas II (Kamper/Kruing/dll) M3 0.0075
5 Multipleks 9 mm Lembar 0.175
6 Kayu Dolken Ø 8-10/400 cm Batang 2

- #NAME?
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 0.007
2 Tukang OH 0.007

BAHAN
1 Besi Beton Polos Kg 1.05
2 Kawat Bendrat Kg 0.015

- #NAME?
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 1.65
2 Tukang OH 0.275

BAHAN
1 Semen Kg 371
2 Pasir Beton (1400 kg/m3) Kg 698
3 Batu pecah 2-3 cm Kg 1047
4 Air Liter 215

8 Kolom Beton 25/25 Lantai 1


- Beagisting kolom
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 0.66
2 Tukang OH 0.33

BAHAN
1 Kayu Kelas III (Borneo/dll) M3 0.02
2 Paku Biasa 5 cm - 10 cm Kg 0.4
3 Minyak Bekesting Liter 0.2
4 Kayu Kelas II (Kamper/Kruing/dll) M3 0.0075
5 Multipleks 9 mm Lembar 0.175
6 Kayu Dolken Ø 8-10/400 cm Batang 2

- Pembesian Kolom
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 0.007
2 Tukang OH 0.007

BAHAN
1 Besi Beton Polos Kg 1.05
2 Kawat Bendrat Kg 0.015

- Cor Beton K-225


NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 1.65
2 Tukang OH 0.275

BAHAN
1 Semen Kg 371
2 Pasir Beton (1400 kg/m3) Kg 698
3 Batu pecah 2-3 cm Kg 1047
4 Air Liter 215

9 Kolom Beton 20/20 cm Lantai 2


- Beagisting kolom
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 0.66
2 Tukang OH 0.33

BAHAN
1 Kayu Kelas III (Borneo/dll) M3 0.02
2 Paku Biasa 5 cm - 10 cm Kg 0.4
3 Minyak Bekesting Liter 0.2
4 Kayu Kelas II (Kamper/Kruing/dll) M3 0.0075
5 Multipleks 9 mm Lembar 0.175
6 Kayu Dolken Ø 8-10/400 cm Batang 2

- Pembesian Kolom
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 0.007
2 Tukang OH 0.007

BAHAN
1 Besi Beton Polos Kg 1.05
2 Kawat Bendrat Kg 0.015

- Cor Beton K-225


NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 1.65
2 Tukang OH 0.275

BAHAN
1 Semen Kg 371
2 Pasir Beton (1400 kg/m3) Kg 698
3 Batu pecah 2-3 cm Kg 1047
4 Air Liter 215

10 ###
- #NAME?
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 0.66
2 Tukang OH 0.33

BAHAN
1 Kayu Kelas III (Borneo/dll) M3 0.02
2 Paku Biasa 5 cm - 10 cm Kg 0.4
3 Minyak Bekesting Liter 0.2
4 Kayu Kelas II (Kamper/Kruing/dll) M3 0.0075
5 Multipleks 9 mm Lembar 0.175
6 Kayu Dolken Ø 8-10/400 cm Batang 2

- #NAME?
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 0.007
2 Tukang OH 0.007

BAHAN
1 Besi Beton Polos Kg 1.05
2 Kawat Bendrat Kg 0.015

- #NAME?
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 1.65
2 Tukang OH 0.275

BAHAN
1 Semen Kg 371
2 Pasir Beton (1400 kg/m3) Kg 698
3 Batu pecah 2-3 cm Kg 1047
4 Air Liter 215

11 Balok Anak 20/30


- Beagisting Balok
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 0.66
2 Tukang OH 0.33

BAHAN
1 Kayu Kelas III (Borneo/dll) M3 0.02
2 Paku Biasa 5 cm - 10 cm Kg 0.4
3 Minyak Bekesting Liter 0.2
4 Kayu Kelas II (Kamper/Kruing/dll) M3 0.018
5 Multipleks 9 mm Lembar 0.35
6 Kayu Dolken Ø 8-10/400 cm Batang 2

- Pembesian Balok
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 0.007
2 Tukang OH 0.007

BAHAN
1 Besi Beton Polos Kg 1.05
2 Kawat Bendrat Kg 0.02

- Cor Beton K-225


NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 1.65
2 Tukang OH 0.275

BAHAN
1 Semen Kg 371
2 Pasir Beton (1400 kg/m3) Kg 698
3 Batu pecah 2-3 cm Kg 1047
4 Air Liter 215

12 Balok 20/40 cm
- Beagisting Balok
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 0.66
2 Tukang OH 0.33

BAHAN
1 Kayu Kelas III (Borneo/dll) M3 0.02
2 Paku Biasa 5 cm - 10 cm Kg 0.4
3 Minyak Bekesting Liter 0.2
4 Kayu Kelas II (Kamper/Kruing/dll) M3 0.018
5 Multipleks 9 mm Lembar 0.35
6 Kayu Dolken Ø 8-10/400 cm Batang 2

- Pembesian Balok
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 0.007
2 Tukang OH 0.007

BAHAN
1 Besi Beton Polos Kg 1.05
2 Kawat Bendrat Kg 0.02

- Cor Beton K-225


NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 1.65
2 Tukang OH 0.275

BAHAN
1 Semen Kg 371
2 Pasir Beton (1400 kg/m3) Kg 698
3 Batu pecah 2-3 cm Kg 1047
4 Air Liter 215
13 Ringbalk 20/20 cm
- Beagisting Balok
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 0.66
2 Tukang OH 0.33

BAHAN
1 Kayu Kelas III (Borneo/dll) M3 0.02
2 Paku Biasa 5 cm - 10 cm Kg 0.4
3 Minyak Bekesting Liter 0.2
4 Kayu Kelas II (Kamper/Kruing/dll) M3 0.018
5 Multipleks 9 mm Lembar 0.35
6 Kayu Dolken Ø 8-10/400 cm Batang 2

- Pembesian Balok
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 0.007
2 Tukang OH 0.007

BAHAN
1 Besi Beton Polos Kg 1.05
2 Kawat Bendrat Kg 0.015

- Cor Beton K-225


NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 1.65
2 Tukang OH 0.275

BAHAN
1 Semen Kg 371
2 Pasir Beton (1400 kg/m3) Kg 698
3 Batu pecah 2-3 cm Kg 1047
4 Air Liter 215

14 Cor Lantai Dak WC


- Beagisting Lantai
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 0.66
2 Tukang OH 0.33
BAHAN
1 Kayu Kelas III (Borneo/dll) M3 0.04
2 Paku Biasa 5 cm - 10 cm Kg 0.4
3 Minyak Bekesting Liter 0.2
4 Multipleks 9 mm Lembar 0.35
5 Kayu Dolken Ø 8-10/400 cm Batang 6

- Pembesian Lantai
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 0.007
2 Tukang OH 0.007

BAHAN
1 Besi Beton Polos Kg 1.05
2 Kawat Bendrat Kg 0.02

- Cor Beton K-175


NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 1.65
2 Tukang OH 0.275

BAHAN
1 Semen Kg 326
2 Pasir Beton (1400 kg/m3) Kg 760
3 Batu pecah 2-3 cm Kg 1029
4 Air Liter 215

15 Cor Plat Lantai Lantai II


- Begesting Lantai
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 0.66
2 Tukang OH 0.33

BAHAN
1 Kayu Kelas III (Borneo/dll) M3 0.04
2 Paku Biasa 5 cm - 10 cm Kg 0.4
3 Minyak Bekesting Liter 0.2
4 Multipleks 9 mm Lembar 0.35
5 Kayu Dolken Ø 8-10/400 cm Batang 6
- Pembesian Lantai
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 0.007
2 Tukang OH 0.007

BAHAN
1 Besi Beton Polos Kg 1.05
2 Kawat Bendrat Kg 0.02

- Cor Beton K-225


NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 1.65
2 Tukang OH 0.275

BAHAN
1 Semen Kg 371
2 Pasir Beton (1400 kg/m3) Kg 698
3 Batu pecah 2-3 cm Kg 1047
4 Air Liter 215

16 Cor Rabat Lantai 1 (K-175)


NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 1.65
2 Tukang OH 0.275

BAHAN
1 Semen Kg 326
2 Pasir Beton (1400 kg/m3) Kg 760
3 Batu pecah 2-3 cm Kg 1029
4 Air Liter 215

D PEKERJAAN PASANGAN DAN PLASTERAN


1 Pasangan Dinding Bata Merah 1:4
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 0.3
2 Tukang OH 0.1
BAHAN
1 Batu Bata Buah 70
2 Semen @ 40 Kg Kg 11.5
3 Pasir Pasang (1400 kg/m3) M3 0.043

2 Pasangan Dinding Batako 1:4


NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 0.3
2 Tukang OH 0.1

BAHAN
1 Batako Buah 70
2 Semen @ 40 Kg Kg 11.5
3 Pasir Pasang (1400 kg/m3) M3 0.043

3 Plesteran Dinding bata 1:4


NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 0.3
2 Tukang OH 0.15

BAHAN
1 Semen @ 40 Kg Kg 6.24
2 Pasir Pasang (1400 kg/m3) M3 0.024

4 Acian
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 0.35
2 Tukang OH 0.25

BAHAN
1 Sement Pc Kg 5.184
2 Pasir Pasang M3 0.026
3 Kawat Ram Ayam Ls 1
4 Semen Untuk Acian Kg 3.25

E PEKERJAAN LANTAI
Pekerjaaan Lantai Keramik & Paving
1 Pasangan Keramik 40x40 Lantai 1
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 0.25
2 Tukang OH 0.125

BAHAN
1 Granit Uk. 40 x 40 cm Bh 6.63
2 Semen @ 40 Kg Kg 9.8
3 Semen Kg 9.8
4 Pasir Pasang (1400 kg/m3) M3 0.045

2 Pasangan Keramik 20x20 Lantai 1 WC


NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 0.7
2 Tukang OH 0.35

BAHAN
1 Keramik 20 x 20 cm Bh 26.5
2 Semen @50kg Kg 10.4
3 Semen @50kg Kg 10.4
4 Pasir Pasang (1400 kg/m3) M3 0.045

3 Pasangan Keramik 40x40 Lantai II


NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 0.25
2 Tukang OH 0.125

BAHAN
1 Granit Uk. 40 x 40 cm Bh 6.63
2 Semen @ 40 Kg Kg 9.8
3 Semen Kg 9.8
4 Pasir Pasang (1400 kg/m3) M3 0.045

4 Pasangan Singki
1 Singki

5 Paving Blcok Hexagonal


NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 0.15
2 Tukang OH 0.07

BAHAN
1 Paving Block Hexagonal m2 1.01
2 Pasir beton M3 0.05

F PEKERJAAN PINTU
1 Pintu Besi Belakang 2 Daun Pintu
2 Pintu WC
3 Pintu Besi Lorong
4 Pintu Rollong Door
5 Angin-Angin

G PEKERJAAN PENGECATAN
1 Pekerjaan cat tembok
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 0.02
2 Tukang OH 0.063

BAHAN
1 Plamur Kg 0.1
2 Cat Dasar Kg 0.1
3 Cat Penutup Interior Setara Jotun Kg 0.26

H PEKERJAAN LISTRIK
- Biaya Listrik 4 Amper (17 Unit)
1 Biaya Listrik 4 Amper (17 Unit)
2 Biaya Penyambungan (BP) PLN 17 Untuk 4 Amper
3 Biaya Token/Pulsa
4 Biaya Materai
5 Biaya Sertifikat Like Opererasi (SLO)
6 Jasa Survey Dan Jaminan
- Biaya Listrik 6 Amper (1 Unit)
1 Biaya Penyambungan (BP) PLN 1 Untuk 6 Amper
2 Biaya Token/Pulsa
3 Biaya Materai
4 Biaya Sertifikat Like Opererasi (SLO)
5 Jasa Survey Dan Jaminan
6 Instalasi Listrik

I PEKERJAAN SANITASI
1 Pemasangan Baru Air PDAM
2 Biaya Pendaftaran
3 Tangki Profil 2200
4 Pemasangan Kloset Jongkok
5 Septictank dan Peresapan
6 Pemasangan Keran Air Plastik
7 Pasang Instalasi Air Kotor (pipa PVC Type AW 3 & 4 Inc )
8 Pasang Instalasi Air Bersih (pipa PVC Type AW 3/4 Inc )
9 Aksesoris
### #NAME?

J PEKERJAAN ATAP
1 Atap Spandek Lantai I
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 0.02
2 Tukang OH 0.01

BAHAN
1 Atap Apandek 0.30 mm m2 1.1
2 Baut Screw Cteks 12-4x50 Bh 6

2 Atap Spandek Lantai II


NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 0.02
2 Tukang OH 0.01

BAHAN
1 Atap Apandek 0.30 mm m2 1.1
2 Baut Screw Cteks 12-4x50 Bh 6

K PEKERJAAN BESI DAN ALMUNIUM


1 Pekerjaan Pagar Hollow 4x2 cm Dan Tangga
2 Pekerjaan Rangka Baja Ringan
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 0.2
2 Tukang OH 0.45

BAHAN
1 Baja ringan Canal C-75 M 1.488
2 Baut (Screw Driver) Bh 28
3 Dynabolt Bh 1.6
4 Reng M 3.6
L SEWA ALAT
1 Molen

M KESEHATAN DAN KESELAMATAN KERJA (K3)


1 Topi Pelindung Diri ( Safety Helmet )
2 Perlindungan Pernapasan Dan Mulut ( Masker )
3 Sarung Tangan ( Safety Gloves )
4 Sepatu Keselamatan Kerja ( Safety Shoes )
5 Rompi Keselamatan Kerja ( Safety Vest )
6 Peralatan P3K ( Kotak P3K, Obat Luka, Perban DLL
7 Asuransi Kesehatan
8 Spanduk

N ###
1 #NAME?
2 #NAME?
3 #NAME?
4 #NAME?
5 #NAME?
6 #NAME?
7 #NAME?
8 #NAME?
HARGA VOLUME KOEFISIEN JUMLAH

Rp 115,000 477.00 47.70 Rp 5,485,500


Rp 5,485,500

HARGA VOLUME KOEFISIEN JUMLAH

Rp 115,000 124.00 12.40 Rp 1,426,000


Rp 135,000 124.00 12.40 Rp 1,674,000
Rp 3,100,000

Rp 3,800,000 124.00 1.49 Rp 5,654,400


Rp 22,000 124.00 2.48 Rp 54,560
Rp 3,800,000 124.00 0.87 Rp 3,298,400
Rp 9,007,360

HARGA VOLUME KOEFISIEN JUMLAH

Rp 115,000 12.47 9.36 Rp 1,075,883


Rp 1,075,883

HARGA VOLUME KOEFISIEN JUMLAH

Rp 115,000 4.90 3.68 Rp 422,625


Rp 422,625

HARGA VOLUME KOEFISIEN JUMLAH

Err:509 5.46 Err:509 Err:509


Err:509 5.46 Err:509 Err:509
Err:509

HARGA VOLUME KOEFISIEN JUMLAH

Rp 115,000 20.79 Err:509 Err:509


Rp 135,000 20.79 Err:509 Err:509
Err:509
HARGA VOLUME KOEFISIEN JUMLAH

Rp 115,000 38.16 19.08 Rp 2,194,430


Rp 2,194,430

HARGA VOLUME KOEFISIEN JUMLAH

Rp 115,000 46.82 11.71 Rp 1,346,075


Rp 1,346,075

Rp 57,143 46.82 56.18 Rp 3,210,514


Rp 3,210,514
Rp 4,556,589

HARGA VOLUME KOEFISIEN JUMLAH

Rp 115,000 23.33 7.00 Rp 804,713


Rp 135,000 23.33 0.23 Rp 31,489
Rp 836,201

Rp 214,286 23.33 27.99 Rp 5,997,857


Rp 5,997,857
Rp 6,834,058

Rp 2,750,000
Rp 55,000 50.00 Rp 2,750,000

HARGA VOLUME KOEFISIEN JUMLAH

Rp 115,000 13.20 6.86 Rp 789,360


Rp 135,000 13.20 3.43 Rp 463,320
Rp 1,252,680

Rp 3,800,000 13.20 0.26 Rp 1,003,200


Rp 22,000 13.20 3.96 Rp 87,120
Rp 15,000 13.20 1.32 Rp 19,800
Rp 1,110,120
Rp 2,362,800
HARGA VOLUME KOEFISIEN JUMLAH

Rp 115,000 273.43 1.91 Rp 220,111


Rp 135,000 273.43 1.91 Rp 258,391
Rp 478,503

Rp 9,850 273.43 287.10 Rp 2,827,924


Rp 25,000 273.43 4.10 Rp 102,536
Rp 2,930,460
Rp 3,408,963

HARGA VOLUME KOEFISIEN JUMLAH

Rp 115,000 12.47 20.58 Rp 2,366,941


Rp 135,000 12.47 3.43 Rp 463,097
Rp 2,830,039

Rp 1,400 12.47 4627.85 Rp 6,478,996


Rp 133 12.47 8706.85 Rp 1,154,991
Rp 381 12.47 13060.28 Rp 4,975,344
Rp 50 12.47 2681.91 Rp 134,096
Rp 12,743,426
Rp 15,573,464

HARGA VOLUME KOEFISIEN JUMLAH

Rp 115,000 13.44 6.99 Rp 803,712


Rp 135,000 13.44 3.49 Rp 471,744
Rp 1,275,456

Rp 3,800,000 13.44 0.27 Rp 1,021,440


Rp 22,000 13.44 4.03 Rp 88,704
Rp 15,000 13.44 1.34 Rp 20,160
Rp 1,130,304
Rp 2,405,760

HARGA VOLUME KOEFISIEN JUMLAH

Rp 115,000 298.29 2.09 Rp 240,121


Rp 135,000 298.29 2.09 Rp 281,882
Rp 522,003

Rp 9,850 298.29 313.20 Rp 3,085,008


Rp 25,000 298.29 4.47 Rp 111,858
Rp 3,196,865
Rp 3,718,868

HARGA VOLUME KOEFISIEN JUMLAH

Rp 115,000 4.90 8.08 Rp 929,775


Rp 135,000 4.90 1.35 Rp 181,913
Rp 1,111,688

Rp 1,400 4.90 1817.90 Rp 2,545,060


Rp 133 4.90 3420.20 Rp 453,700
Rp 381 4.90 5130.30 Rp 1,954,400
Rp 50 4.90 1053.50 Rp 52,675
Rp 5,005,835
Rp 6,117,523

HARGA VOLUME KOEFISIEN JUMLAH

Rp 115,000 11.00 7.26 Rp 834,900


Rp 135,000 11.00 3.63 Rp 490,050
Rp 1,324,950

Rp 3,800,000 11.00 0.22 Rp 836,000


Rp 22,000 11.00 4.40 Rp 96,800
Rp 15,000 11.00 2.20 Rp 33,000
Rp 5,000,000 11.00 0.20 Rp 990,000
Rp 130,000 11.00 3.85 Rp 500,500
Rp 40,000 11.00 22.00 Rp 880,000
Rp 3,336,300
Rp 4,661,250

HARGA VOLUME KOEFISIEN JUMLAH

Rp 115,000 76.17 0.53 Rp 61,317


Rp 135,000 76.17 0.53 Rp 71,980
Rp 133,297

Rp 9,850 76.17 79.98 Rp 787,779


Rp 25,000 76.17 1.14 Rp 28,564
Rp 816,342
Rp 949,640

HARGA VOLUME KOEFISIEN JUMLAH


Rp 115,000 0.69 1.13 Rp 130,453
Rp 135,000 0.69 0.19 Rp 25,523
Rp 155,977

Rp 1,400 0.69 255.06 Rp 357,088


Rp 133 0.69 479.88 Rp 63,657
Rp 381 0.69 719.81 Rp 274,214
Rp 50 0.69 147.81 Rp 7,391
Rp 702,349
Rp 858,326

HARGA VOLUME KOEFISIEN JUMLAH

Rp 115,000 11.20 7.39 Rp 850,080


Rp 135,000 11.20 3.70 Rp 498,960
Rp 1,349,040

Rp 3,800,000 11.20 0.22 Rp 851,200


Rp 22,000 11.20 4.48 Rp 98,560
Rp 15,000 11.20 2.24 Rp 33,600
Rp 5,000,000 11.20 0.20 Rp 1,008,000
Rp 130,000 11.20 3.92 Rp 509,600
Rp 40,000 11.20 22.40 Rp 896,000
Rp 3,396,960
Rp 4,746,000

HARGA VOLUME KOEFISIEN JUMLAH

Rp 115,000 96.94 0.68 Rp 78,039


Rp 135,000 96.94 0.68 Rp 91,612
Rp 169,651

Rp 9,850 96.94 101.79 Rp 1,002,627


Rp 25,000 96.94 1.45 Rp 36,354
Rp 1,038,981
Rp 1,208,632

HARGA VOLUME KOEFISIEN JUMLAH

Rp 115,000 0.56 0.92 Rp 106,260


Rp 135,000 0.56 0.15 Rp 20,790
Rp 127,050

Rp 1,400 0.56 207.76 Rp 290,864


Rp 133 0.56 390.88 Rp 51,851
Rp 381 0.56 586.32 Rp 223,360
Rp 50 0.56 120.40 Rp 6,020
Rp 572,095
Rp 699,145

HARGA VOLUME KOEFISIEN JUMLAH

Rp 115,000 123.84 64.40 Rp 7,405,632


Rp 135,000 123.84 32.20 Rp 4,346,784
Rp 11,752,416

Rp 3,800,000 123.84 2.79 Rp 10,588,320


Rp 22,000 123.84 37.15 Rp 817,344
Rp 15,000 123.84 12.38 Rp 185,760
Rp 11,591,424
Rp 23,343,840

HARGA VOLUME KOEFISIEN JUMLAH

Rp 115,000 347.21 2.43 Rp 279,506


Rp 135,000 347.21 2.43 Rp 328,116
Rp 607,622

Rp 11,867 347.21 364.57 Rp 4,326,425


Rp 25,000 347.21 5.21 Rp 130,205
Rp 4,456,630
Rp 5,064,253

HARGA VOLUME KOEFISIEN JUMLAH

Rp 115,000 23.22 38.31 Rp 4,405,995


Rp 135,000 23.22 6.39 Rp 862,043
Rp 5,268,037

Rp 1,400 23.22 8614.62 Rp 12,060,468


Rp 133 23.22 16207.56 Rp 2,149,982
Rp 381 23.22 24311.34 Rp 9,261,463
Rp 50 23.22 4992.30 Rp 249,615
Rp 23,721,528
Rp 28,989,566

HARGA VOLUME KOEFISIEN JUMLAH


Rp 115,000 #NAME? #NAME? #NAME?
Rp 135,000 #NAME? #NAME? #NAME?
#NAME?

Rp 3,800,000 #NAME? #NAME? #NAME?


Rp 22,000 #NAME? #NAME? #NAME?
Rp 15,000 #NAME? #NAME? #NAME?
#NAME?
#NAME? #NAME?

HARGA VOLUME KOEFISIEN JUMLAH

Rp 115,000 #NAME? #NAME? #NAME?


Rp 135,000 #NAME? #NAME? #NAME?
#NAME?

Rp 11,867 #NAME? #NAME? #NAME?


Rp 25,000 #NAME? #NAME? #NAME?
#NAME?
#NAME?

HARGA VOLUME KOEFISIEN JUMLAH

Rp 115,000 #NAME? #NAME? #NAME?


Rp 135,000 #NAME? #NAME? #NAME?
#NAME?

Rp 1,400 #NAME? #NAME? #NAME?


Rp 133 #NAME? #NAME? #NAME?
Rp 381 #NAME? #NAME? #NAME?
Rp 50 #NAME? #NAME? #NAME?
#NAME?
#NAME?

HARGA VOLUME KOEFISIEN JUMLAH

115000 #NAME? #NAME? #NAME?


135000 #NAME? #NAME? #NAME?
#NAME?

3800000 #NAME? #NAME? #NAME?


22000 #NAME? #NAME? #NAME?
15000 #NAME? #NAME? #NAME?
5000000 #NAME? #NAME? #NAME?
130000 #NAME? #NAME? #NAME?
40000 #NAME? #NAME? #NAME?
#NAME?
#NAME?

HARGA VOLUME KOEFISIEN JUMLAH

Rp 115,000 #NAME? #NAME? #NAME?


Rp 135,000 #NAME? #NAME? #NAME?
#NAME?

Rp 9,850 #NAME? #NAME? #NAME?


Rp 25,000 #NAME? #NAME? #NAME?
#NAME?
#NAME?

HARGA VOLUME KOEFISIEN JUMLAH

Rp 115,000 #NAME? #NAME? #NAME?


Rp 135,000 #NAME? #NAME? #NAME?
#NAME?

Rp 1,400 #NAME? #NAME? #NAME?


Rp 133 #NAME? #NAME? #NAME?
Rp 381 #NAME? #NAME? #NAME?
Rp 50 #NAME? #NAME? #NAME?
#NAME?
#NAME?

HARGA VOLUME KOEFISIEN JUMLAH

115000 20.90 13.79 Rp 1,586,310


135000 20.90 6.90 Rp 931,095
Rp 2,517,405

3800000 20.90 0.42 Rp 1,588,400


22000 20.90 8.36 Rp 183,920
15000 20.90 4.18 Rp 62,700
5000000 20.90 0.16 Rp 783,750
130000 20.90 3.66 Rp 475,475
40000 20.90 41.80 Rp 1,672,000
Rp 4,766,245
Rp 7,283,650

HARGA VOLUME KOEFISIEN JUMLAH


Rp 115,000 307.50 2.15 Rp 247,537
Rp 135,000 307.50 2.15 Rp 290,587
Rp 538,124

Rp 9,850 307.50 322.87 Rp 3,180,281


Rp 25,000 307.50 4.61 Rp 115,312
Rp 3,295,593
Rp 3,833,716

HARGA VOLUME KOEFISIEN JUMLAH

Rp 115,000 2.61 4.31 Rp 495,722


Rp 135,000 2.61 0.72 Rp 96,989
Rp 592,711

Rp 1,400 2.61 969.24 Rp 1,356,933


Rp 133 2.61 1823.52 Rp 241,896
Rp 381 2.61 2735.29 Rp 1,042,014
Rp 50 2.61 561.69 Rp 28,084
Rp 2,668,927
Rp 3,261,638

HARGA VOLUME KOEFISIEN JUMLAH

115000 10.40 6.86 Rp 789,360


135000 10.40 3.43 Rp 463,320
Rp 1,252,680

3800000 10.40 0.21 Rp 790,400


22000 10.40 4.16 Rp 91,520
15000 10.40 2.08 Rp 31,200
5000000 10.40 0.08 Rp 390,000
130000 10.40 1.82 Rp 236,600
40000 10.40 20.80 Rp 832,000
Rp 2,371,720
Rp 3,624,400

HARGA VOLUME KOEFISIEN JUMLAH

Rp 115,000 185.47 1.30 Rp 149,302


Rp 135,000 185.47 1.30 Rp 175,267
Rp 324,569

Rp 9,850 185.47 194.74 Rp 1,918,185


Rp 25,000 185.47 2.78 Rp 69,551
Rp 1,987,735
Rp 2,312,304

HARGA VOLUME KOEFISIEN JUMLAH

Rp 115,000 1.04 1.72 Rp 197,340


Rp 135,000 1.04 0.29 Rp 38,610
Rp 235,950

Rp 1,400 1.04 385.84 Rp 540,176


Rp 133 1.04 725.92 Rp 96,296
Rp 381 1.04 1088.88 Rp 414,811
Rp 50 1.04 223.60 Rp 11,180
Rp 1,062,463
Rp 1,298,413

HARGA VOLUME KOEFISIEN JUMLAH

115000 #NAME? #NAME? #NAME?


135000 #NAME? #NAME? #NAME?
#NAME?

3800000 #NAME? #NAME? #NAME?


22000 #NAME? #NAME? #NAME?
15000 #NAME? #NAME? #NAME?
5000000 #NAME? #NAME? #NAME?
130000 #NAME? #NAME? #NAME?
40000 #NAME? #NAME? #NAME?
#NAME?
#NAME?

HARGA VOLUME KOEFISIEN JUMLAH

Rp 115,000 #NAME? #NAME? #NAME?


Rp 135,000 #NAME? #NAME? #NAME?
#NAME?

Rp 9,850 #NAME? #NAME? #NAME?


Rp 25,000 #NAME? #NAME? #NAME?
#NAME?
#NAME?

HARGA VOLUME KOEFISIEN JUMLAH


Rp 115,000 #NAME? #NAME? #NAME?
Rp 135,000 #NAME? #NAME? #NAME?
#NAME?

Rp 1,400 #NAME? #NAME? #NAME?


Rp 133 #NAME? #NAME? #NAME?
Rp 381 #NAME? #NAME? #NAME?
Rp 50 #NAME? #NAME? #NAME?
#NAME?
#NAME?

HARGA VOLUME KOEFISIEN JUMLAH

115000 11.04 7.29 Rp 837,936


135000 11.04 3.64 Rp 491,832
Rp 1,329,768

3800000 11.04 0.22 Rp 839,040


22000 11.04 4.42 Rp 97,152
15000 11.04 2.21 Rp 33,120
5000000 11.04 0.20 Rp 993,600
130000 11.04 3.86 Rp 502,320
40000 11.04 22.08 Rp 883,200
Rp 3,348,432
Rp 4,678,200

HARGA VOLUME KOEFISIEN JUMLAH

115000 156.81 1.10 Rp 126,235


135000 156.81 1.10 Rp 148,189
Rp 274,424

11867.08860759 156.81 164.65 Rp 1,953,971


25000 156.81 2.35 Rp 58,805
Rp 2,012,776
Rp 2,287,201

HARGA VOLUME KOEFISIEN JUMLAH

Rp 115,000 1.10 1.82 Rp 209,484


Rp 135,000 1.10 0.30 Rp 40,986
Rp 250,470

Rp 1,400 1.10 409.58 Rp 573,418


Rp 133 1.10 770.59 Rp 102,221
Rp 381 1.10 1155.89 Rp 440,338
Rp 50 1.10 237.36 Rp 11,868
Rp 1,127,845
Rp 1,378,315

HARGA VOLUME KOEFISIEN JUMLAH

115000 57.12 37.70 Rp 4,335,408


135000 57.12 18.85 Rp 2,544,696
Rp 6,880,104

3800000 57.12 1.14 Rp 4,341,120


22000 57.12 22.85 Rp 502,656
15000 57.12 11.42 Rp 171,360
5000000 57.12 1.03 Rp 5,140,800
130000 57.12 19.99 Rp 2,598,960
40000 57.12 114.24 Rp 4,569,600
Rp 17,324,496
Rp 24,204,600

HARGA VOLUME KOEFISIEN JUMLAH

115000 871.44 6.10 Rp 701,510


135000 871.44 6.10 Rp 823,512
Rp 1,525,022

11867.08860759 871.44 915.01 Rp 10,858,541


25000 871.44 13.07 Rp 326,790
Rp 11,185,331
Rp 12,710,353

HARGA VOLUME KOEFISIEN JUMLAH

Rp 115,000 5.71 9.42 Rp 1,083,852


Rp 135,000 5.71 1.57 Rp 212,058
Rp 1,295,910

Rp 1,400 5.71 2119.15 Rp 2,966,813


Rp 133 5.71 3986.98 Rp 528,885
Rp 381 5.71 5980.46 Rp 2,278,272
Rp 50 5.71 1228.08 Rp 61,404
Rp 5,835,373
Rp 7,131,283
HARGA VOLUME KOEFISIEN JUMLAH

115000 17.20 11.35 Rp 1,305,480


135000 17.20 5.68 Rp 766,260
Rp 2,071,740

3800000 17.20 0.34 Rp 1,307,200


22000 17.20 6.88 Rp 151,360
15000 17.20 3.44 Rp 51,600
5000000 17.20 0.31 Rp 1,548,000
130000 17.20 6.02 Rp 782,600
40000 17.20 34.40 Rp 1,376,000
Rp 5,216,760
Rp 7,288,500

HARGA VOLUME KOEFISIEN JUMLAH

Rp 115,000 450.17 3.15 Rp 362,384


Rp 135,000 450.17 3.15 Rp 425,407
Rp 787,792

Rp 9,850 450.17 472.67 Rp 4,655,804


Rp 25,000 450.17 6.75 Rp 168,812
Rp 4,824,617
Rp 5,612,408

HARGA VOLUME KOEFISIEN JUMLAH

Rp 115,000 3.44 5.68 Rp 652,740


Rp 135,000 3.44 0.95 Rp 127,710
Rp 780,450

Rp 1,400 3.44 1276.24 Rp 1,786,736


Rp 133 3.44 2401.12 Rp 318,516
Rp 381 3.44 3601.68 Rp 1,372,069
Rp 50 3.44 739.60 Rp 36,980
Rp 3,514,300
Rp 4,294,750

HARGA VOLUME KOEFISIEN JUMLAH

115000 9.00 5.94 Rp 683,100


135000 9.00 2.97 Rp 400,950
Rp 1,084,050

3800000 9.00 0.36 Rp 1,368,000


22000 9.00 3.60 Rp 79,200
15000 9.00 1.80 Rp 27,000
130000 9.00 3.15 Rp 409,500
40000 9.00 54.00 Rp 2,160,000
Rp 4,043,700
Rp 5,127,750

HARGA VOLUME KOEFISIEN JUMLAH

115000 221.94 1.55 Rp 178,662


135000 221.94 1.55 Rp 209,733
Rp 388,395

10135.13513514 221.94 233.04 Rp 2,361,861


25000 221.94 3.33 Rp 83,228
Rp 2,445,089
Rp 2,833,484

HARGA VOLUME KOEFISIEN JUMLAH

115000 1.80 2.97 Rp 341,550


135000 1.80 0.50 Rp 66,825
Rp 408,375

1400 1.80 586.80 Rp 821,520


132.6530612245 1.80 1368.00 Rp 181,469
380.9523809524 1.80 1852.20 Rp 705,600
50 1.80 387.00 Rp 19,350
Rp 1,727,939
Rp 2,136,314

HARGA VOLUME KOEFISIEN JUMLAH

115000 133.00 87.78 Rp 10,094,700


135000 133.00 43.89 Rp 5,925,150
Rp 16,019,850

3800000 133.00 5.32 Rp 20,216,000


22000 133.00 53.20 Rp 1,170,400
15000 133.00 26.60 Rp 399,000
130000 133.00 46.55 Rp 6,051,500
40000 133.00 798.00 Rp 31,920,000
Rp 59,756,900
Rp 75,776,750

HARGA VOLUME KOEFISIEN JUMLAH

115000 3,279.78 22.96 Rp 2,640,223


135000 3,279.78 22.96 Rp 3,099,392
Rp 5,739,615

10135.13513514 3,279.78 3443.77 Rp 34,903,064


25000 3,279.78 49.20 Rp 1,229,918
Rp 36,132,982
Rp 41,872,597

HARGA VOLUME KOEFISIEN JUMLAH

Rp 115,000 13.50 22.28 Rp 2,561,625


Rp 135,000 13.50 3.71 Rp 501,188
Rp 3,062,813

Rp 1,400 13.50 5008.50 Rp 7,011,900


Rp 133 13.50 9423.00 Rp 1,249,990
Rp 381 13.50 14134.50 Rp 5,384,571
Rp 50 13.50 2902.50 Rp 145,125
Rp 13,791,586
Rp 16,854,399

HARGA VOLUME KOEFISIEN JUMLAH

115000 0.00 0.00 Rp -


135000 0.00 0.00 Rp -
Rp -

1400 0.00 0.00 Rp -


132.6530612245 0.00 0.00 Rp -
380.9523809524 0.00 0.00 Rp -
50 0.00 0.00 Rp -
Rp -
Rp -

HARGA VOLUME KOEFISIEN JUMLAH

115000 327.36 98.21 Rp 11,293,893


135000 327.36 32.74 Rp 4,419,350
Rp 15,713,243

1100 327.36 22915.15 Rp 25,206,660


1400 327.36 3764.63 Rp 5,270,483
214285.7142857 327.36 14.08 Rp 3,016,381
Rp 33,493,525
Rp 49,206,768

HARGA VOLUME KOEFISIEN JUMLAH

115000 51.33 15.40 Rp 1,770,885


135000 51.33 5.13 Rp 692,955
Rp 2,463,840

1200 51.33 3593.10 Rp 4,311,720


1400 51.33 590.30 Rp 826,413
214285.7142857 51.33 2.21 Rp 472,969
Rp 5,611,102
Rp 8,074,942

HARGA VOLUME KOEFISIEN JUMLAH

115000 877.45 263.23 Rp 30,272,006


135000 877.45 131.62 Rp 17,768,351
Rp 48,040,357

1400 877.45 5475.28 Rp 7,665,398


214285.7142857 877.45 21.06 Rp 4,512,597
Rp 12,177,995
Rp 60,218,353

HARGA VOLUME KOEFISIEN JUMLAH

115000 18.90 6.61 Rp 760,725


135000 18.90 4.73 Rp 637,875
Rp 1,398,600

1400 18.90 97.98 Rp 137,169


214285.7142857 18.90 0.49 Rp 105,300
8000 18.90 18.90 Rp 151,200
1400 18.90 61.43 Rp 85,995
Rp 479,664
Rp 1,878,264
HARGA VOLUME KOEFISIEN JUMLAH

115000 198.59 49.65 Rp 5,709,408


135000 198.59 24.82 Rp 3,351,174
Rp 9,060,582

10833.33333333 198.59 1316.64 Rp 14,263,590


1400 198.59 1946.16 Rp 2,724,629
1400 198.59 1946.16 Rp 2,724,629
214285.7142857 198.59 8.94 Rp 1,914,957
Rp 21,627,804
Rp 30,688,386

HARGA VOLUME KOEFISIEN JUMLAH

115000 28.55 19.98 Rp 2,297,873


135000 28.55 9.99 Rp 1,348,751
Rp 3,646,624

2250 28.55 756.44 Rp 1,701,996


1400 28.55 296.87 Rp 415,615
1400 28.55 296.87 Rp 415,615
214285.7142857 28.55 1.28 Rp 275,255
Rp 2,808,481
Rp 6,455,105

HARGA VOLUME KOEFISIEN JUMLAH

115000 135.00 33.75 Rp 3,881,250


135000 135.00 16.88 Rp 2,278,125
Rp 6,159,375

10833.33333333 135.00 895.05 Rp 9,696,375


1400 135.00 1323.00 Rp 1,852,200
1400 135.00 1323.00 Rp 1,852,200
214285.7142857 135.00 6.08 Rp 1,301,786
Rp 14,702,561
Rp 20,861,936

Rp 200,000 17.00 Rp 3,400,000

HARGA VOLUME KOEFISIEN JUMLAH

115000 36.00 5.40 Rp 621,000


135000 36.00 2.52 Rp 340,200
Rp 961,200

4000 36.00 36.36 Rp 145,440


185714.2857143 36.00 1.80 Rp 334,286
Rp 479,726
Rp 1,440,926

Rp 1,500,000 1.00 Rp 1,500,000


Rp 1,200,000 2.00 Rp 2,400,000
Rp 1,000,000 2.00 Rp 2,000,000
Rp 6,500,000 10.00 Rp 65,000,000
Rp 50,000 20.00 Rp 1,000,000

HARGA VOLUME KOEFISIEN JUMLAH

115000 1,137.67 22.75 Rp 2,616,651


135000 1,137.67 71.67 Rp 9,675,921
Rp 12,292,572

22000 1,137.67 113.77 Rp 2,502,884


3500 1,137.67 113.77 Rp 398,186
3487.5 1,137.67 295.80 Rp 1,031,586
Rp 3,932,656
Rp 16,225,229

Rp 421,000 10.00 Rp 4,210,000


Rp 50,000 10.00 Rp 500,000
Rp 10,000 10.00 Rp 100,000
Rp 40,000 10.00 Rp 400,000
Rp 525,000 10.00 Rp 5,250,000
Rp 165,000 35.00 Rp 5,775,000

Rp 1,218,000 1.00 Rp 1,218,000


Rp 50,000 1.00 Rp 50,000
Rp 10,000 1.00 Rp 10,000
Rp 95,000 1.00 Rp 95,000
Rp 730,000 1.00 Rp 730,000
Rp 170,000 10.00 Rp 1,700,000
Rp 20,038,000

Rp 2,260,000 1.00 Rp 2,260,000


Rp 16,000 1.00 Rp 16,000
Rp 2,850,000 2.00 Rp 5,700,000
Rp 330,000 2.00 Rp 660,000
Rp 6,000,000 1.00 Rp 6,000,000
Rp 22,000 10.00 Rp 220,000
Rp 85,000 16.00 Rp 1,360,000
Rp 80,000 15.00 Rp 1,200,000
Rp 2,154,000 1.00 Rp 2,154,000
#NAME? #NAME? #NAME?
#NAME?

HARGA VOLUME KOEFISIEN JUMLAH

115000 192.00 3.84 Rp 441,600


135000 192.00 1.92 Rp 259,200
Rp 700,800

87000 192.00 211.20 Rp 18,374,400


933.3333333333 192.00 1152.00 Rp 1,075,200
Rp 19,449,600
Rp 20,150,400

HARGA VOLUME KOEFISIEN JUMLAH

115000 346.47 6.93 Rp 796,885


135000 346.47 3.46 Rp 467,737
Rp 1,264,621

87000 346.47 381.12 Rp 33,157,327


933.3333333333 346.47 2078.83 Rp 1,940,241
Rp 35,097,567
Rp 36,362,189

Rp 65,000,000 1.00 Rp 65,000,000

HARGA VOLUME KOEFISIEN JUMLAH

115000 377.59 75.52 Rp 8,684,620


135000 377.59 169.92 Rp 22,938,725
Rp 31,623,346

19166.66666667 377.59 561.86 Rp 10,768,929


933.3333333333 377.59 10572.58 Rp 9,867,742
2000 377.59 604.15 Rp 1,208,295
8333.333333333 377.59 1359.33 Rp 11,327,766
Rp 33,172,732
Rp 64,796,078
Rp 5,000,000 1.00 Rp 5,000,000

Rp 45,000 30.00 Rp 1,350,000


Rp 40,000 30.00 Rp 1,200,000
Rp 7,000 30.00 Rp 210,000
Rp 90,000 30.00 Rp 2,700,000
Rp 45,000 30.00 Rp 1,350,000
Rp 500,000 1.00 Rp 500,000
Rp 2,390,000 1.00 Rp 2,390,000
Rp 300,000 1.00 Rp 300,000

#NAME? #NAME? #NAME?


#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
RENCANA ANGGARAN BIAYA
INFRASTRUKTUR PENDUKUNG LIVELIHOOD

KAB/KOTA : NUNUKAN
KECAMATAN : NUNUKAN

KEL/DESA : NUNUKAN UTARA


BKM/LKM : TERPADU LESTARI
NAMA KEGIATAN : RUMAH WISATA KULINER
TAHUN ANGGARAN : 2021

NO JENIS PEKERJAAN VOLUME SATUAN HARGA SATUAN JUMLAH

1 2 3 4 5 6
A. PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan Bowplank 132.30 m Rp 101,360.00 Rp 13,409,928
2 Pembersihan Lapangan 690.95 m2 Rp 11,500.00 Rp 7,945,925
JUMLAH TOTAL PEKERJAAN PERSIAPAN Rp 21,355,853
B. PEKERJAAN LANTAI I
I. PEKERJAAN TANAH DAN PONDASI
a. Pekerjaan Tanah dan Pondasi Tapak
1 Galian Tanah pondasi Tapak 11.97 m3 Rp 86,250.00 Rp 1,032,240
2 Urugan Kembali tanah galian 3.99 m3 Rp 142,500.00 Rp 568,480
3 Pancang Tiang Kayu Keras Kelas I t = 10 cm alas Pondasi 3.56 m3 Rp 10,737,500.00 Rp 38,250,000
JUMLAH TOTAL PEKERJAAN TANAH DAN PONDASI Rp 39,850,720
II. PEKERJAAN BETON BERTULANG
1 Pondasi Tapak PT1 (tapak pondasi)
- Beagisting Tapak Pondasi 28.72 m² Rp 181,800.00 Rp 4,971,296
- Pembesian Tapak Pondasi 910.38 Kg Rp 11,929.91 Rp 10,860,765
Cor Beron K225 6.29 m3 Rp 1,275,555.16 Rp 8,025,793
2 Sloof Beton 20/40 cm
- Beagisting Sloof 60.00 m² Rp 191,800.00 Rp 11,508,000
- Pembesian Sloof 1,861.38 Kg Rp 11,929.91 Rp 22,206,074
Cor Beron K225 12.00 m3 Rp 1,275,555.16 Rp 15,306,662
3 Kolom Beton 20/20 cm
- Beagisting kolom 21.28 m² Rp 360,550.00 Rp 7,672,504
- Pembesian Kolom 332.54 Kg Rp 11,929.91 Rp 3,967,113
Cor Beron K225 2.13 m3 Rp 1,275,555.16 Rp 2,714,381
4 Kolom Beton 25/25 cm
- Beagisting kolom 9.94 m² Rp 360,550.00 Rp 3,584,232
- Pembesian Kolom 446.82 Kg Rp 11,929.91 Rp 5,330,514
Cor Beron K225 2.61 m3 Rp 1,275,555.16 Rp 3,332,388
5 Balok 20/40 cm
- Beagisting Balok 54.00 m² Rp 435,450.00 Rp 23,514,300
- Pembesian Balok 1,043.99 Kg Rp 11,929.91 Rp 12,454,655
Cor Beron K225 7.20 m3 Rp 1,275,555.16 Rp 9,183,997
6 Balok 15/15 cm
- Beagisting Balok 21.60 m² Rp 435,450.00 Rp 9,405,720
- Pembesian Balok 471.86 Kg Rp 11,929.91 Rp 5,629,272
Cor Beron K225 2.16 m3 Rp 1,275,555.16 Rp 2,755,199
7 Plat Tangga
- Beagisting Plat 20.53 m² Rp 362,200.00 Rp 7,437,234
- Pembesian Plat 434.63 Kg Rp 11,929.91 Rp 5,185,125
Cor Beron K225 0.28 m3 Rp 1,275,555.16 Rp 355,115
8 Plat bordes
- Beagisting Bordes 12.18 m² Rp 680,450.00 Rp 8,290,433
- Pembesian Borde 114.42 Kg Rp 11,929.91 Rp 1,365,048
Cor Beron K225 0.64 m3 Rp 1,275,555.16 Rp 817,950
9 Plat Anak Tangga
- Beagisting Plat 12.18 m² Rp 362,200.00 Rp 4,412,954
- Pembesian Plat 114.42 Kg Rp 11,929.91 Rp 1,365,048
Cor Beron K225 0.56 m3 Rp 1,275,555.16 Rp 714,311
10 Relling tangga Besi Hollow (Pengecatan + Pemasangan) 7.30 m2 Rp 325,000.00 Rp 2,371,200
JUMLAH TOTAL PEKERJAAN BETON BERTULANG Rp 194,737,284
III. PEKERJAAN PASANGAN DAN PLASTERAN
1 Pasangan Dinding Bata 1 : 4 212.80 m2 Rp 146,950.00 Rp 31,270,960
2 Plesteran Dinding bata 1 : 4 425.60 m2 Rp 65,604.86 Rp 27,921,427
3 Angin-Angin 3.39 m2 Rp 150,000.00 Rp 508,500
JUMLAH TOTAL PASANGAN BATA DAN PLESTERAN Rp 59,700,887
IV. PEKERJAAN LANTAI
a. Pekerjaaan Timbunan dan Urugan
1 Urugan Tanah Kembali 16.16 m3 Rp 142,500.00 Rp 2,302,088
2 Selasar Dan Teras 7.87 m3 Rp 947,852.22 Rp 7,456,280
3 Rabat Lantai 22.21 m3 Rp 947,852.22 Rp 21,048,006
JUMLAH TOTAL TIMBUNAN DAN URUGAN Rp 30,806,373
B. Pekerjaaan Lantai Keramik
1 Pasangan Keramik 40x40 Lantai 2 118.30 m3 Rp 148,891.86 Rp 17,613,907
2 Pasangan Keramik 20x20 Lantai 1 191.40 m3 Rp 148,891.86 Rp 28,497,901
3 Pasangan Keramik WC 25x25 3.00 m3 Rp 556,185.14 Rp 1,668,555
JUMLAH TOTAL LANTAI KERAMIK Rp 47,780,364
V PEKERJAAN PINTU DAN JENDELA
1 Pintu WC PVC 2.00 Unit 250,000.00 Rp 500,000
2 Kusen Pintu 2.00 Unit 650,000.00 Rp 1,300,000
3 Pintu Rolling Door 9.00 Unit 11,000,000.00 Rp 99,000,000
\ Rp 100,800,000
VI PEKERJAAN PENGECATAN
1 Pekerjaan cat tembok 425.60 m2 Rp 24,590.00 Rp 10,465,504
JUMLAH TOTAL PEGECETAN Rp 10,465,504
VII PEKERJAAN LISTRIK
1 Pemasukan Listrik Dari PLN 1.00 Unit Rp 18,700,000.00 Rp 18,700,000
2 MCB 2 Phase 10 A 3.00 Unit Rp 100,000.00 Rp 300,000
3 Lampu HE Douwn light 25 watt + Asesories 15.00 Set Rp 45,000.00 Rp 675,000
4 Saklar Tunggal 8.00 Bh Rp 15,000.00 Rp 120,000
5 Saklar Ganda 18.00 Bh Rp 20,000.00 Rp 360,000
6 Stop kontak 20.00 Bh Rp 25,000.00 Rp 500,000
7 Pipa PVC Untuk Kabel NYA 2,5 mm Tertanam Dalam Dinding 1.00 Ls Rp 500,000.00 Rp 500,000
8 Instalasi Titik Penerangan, fitting termasuk kabel NYA 2,5 mm 66.00 Titik Rp 300,000.00 Rp 19,800,000
dalam pipa PVC fitting lampu dan kelengkapan instalasi
JUMLAH INSTALASI LISTRIK Rp 40,955,000
VIII PEKERJAAN SANITASI
1 Pemasukan Air PDAM 1.00 Unit Rp 5,000,000.00 Rp 5,000,000
2 Pemasangan Kloset Jongkok 2.00 Bh Rp 155,000.00 Rp 310,000
3 Septictank dan Peresapan 1.00 Unit Rp 10,000,000.00 Rp 10,000,000
4 Pasang Kran Air 24.00 Unit Rp 5,000.00 Rp 120,000
5 Pasang Instalasi Air Kotor (pipa PVC Type AW 3 & 4 Inc ) 6.00 Bh Rp 95,000.00 Rp 570,000
6 Pasang Instalasi Air Bersih (pipa PVC Type AW 3/4 Inc ) 40.00 bh Rp 95,000.00 Rp 3,800,000
7 Tangki Profil 2200 2.00 Bh Rp 2,850,000.00 Rp 5,700,000
8 Aksesoris 1.00 Ls Rp 5,000,000.00 Rp 5,000,000
9 Pipa PVC Pembuangan Air Dari Lantai 2 4.00 bh Rp 120,000.00 Rp 480,000
JUMLAH SANITASI Rp 30,980,000
C PEKERJAAN LANTAI II
I PEKERJAAN BETON BERTULANG
1 Kolom Beton 20/30 cm 0.84 m3 Rp 1,275,555.16 Rp 1,071,466
- Beagisting Balok 121.60 m2 Rp 180,275.00 Rp 21,921,440
- Pembesian Balok 652.67 Kg Rp 11,929.91 Rp 7,786,299
2 Cordak 13.76 m2 Rp 947,852.22 Rp 13,038,655
3 Lisplank 1.80 m3 Rp 98,900.00 Rp 178,020
4 Lantai 16.00 m3 Rp 1,275,555.16 Rp 20,408,883
- Beagisting Lantai 160.00 m2 Rp 680,450.00 Rp 108,872,000
- Pembesian Lantai 287.70 Kg Rp 11,929.91 Rp 3,432,234
JUMLAH BETON BERTULAN Rp 176,708,997
II PEKERJAAN LANTAI
1 Lantai Keramik 40 x 40 116.48 m2 Rp 148,891.86 Rp 16,842,924
2 Paping Teras 138.00 m2 Rp 30,740.00 Rp 4,242,120
3 Paping Parkiran 150.00 m2 Rp 30,740.00 Rp 4,611,000
JUMLAH PEKERJAAN LANTAI Rp 25,696,044
III PEKERJAAN ATAP
1 Atap Teras 100.14 m2 Rp 71,400.00 Rp 7,150,279
2 Atap Teras II 120.00 m2 Rp 71,400.00 Rp 8,568,000
3 Atap Seng Spandek 303.40 m2 Rp 61,648.43 Rp 18,703,886
4 Lisplank Beton 16.20 m2 Rp 947,852.22 Rp 12,555,206
5 Lisplank Papan 0.56 m2 Rp 98,900.00 Rp 55,384
JUMLAH ATAP Rp 47,032,756
IV PEKERJAAN BESI DAN ALMUNIUM
1 Pagar Besi Hollow 4X4 85.98 m2 Rp 233,000 Rp 20,034,272
2 Pagar Tangga 8.63 m2 Rp 462,500 Rp 3,992,300
3 Rangka Atap Besi Hollow 4X4 259.00 m2 Rp 233,000 Rp 60,347,000
4 Pemasangan Rangka Besi c 75 180.00 m2 Rp 257,542 Rp 46,357,638
JUMLAH ATAP Rp 130,731,210
VI ESTETIKA
1 Gapura 1 Ls Rp 8,000,000 Rp 8,000,000
2 Estetika 1.00 Bh Rp 7,100,000 Rp 7,100,000
3 Aksesoris + Properti 1.00 Ls Rp 10,800,000 Rp 10,800,000
JUMLAH ATAP Rp 25,900,000
D Kesehatan dan Keselamatan Kerja (K3)
1 Topi Pelindung Diri (Safety Helmet) 30.00 bh Rp 45,000.00 Rp 1,350,000
2 Perlindung Pernapasan dan Mulut (Masker) 30.00 bh Rp 40,000.00 Rp 1,200,000
3 Sarung Tangan (Safety Gloves) 30.00 Psg Rp 7,000.00 Rp 210,000
4 Sepatu Keselamatan (Safety Shoes) 30.00 Psg Rp 90,000.00 Rp 2,700,000
5 Rompi Keselamatan (Safety Vest) 30.00 bh Rp 45,000.00 Rp 1,350,000
6 Peralatan P3K (Kotak P3K, Obat Luka, Perban DLL) 1.00 Unit Rp 500,000.00 Rp 500,000
7 Asuransi kesehatan 1.00 Ls Rp 2,390,000.00 Rp 2,390,000
8 Spanduk 1.00 Lb Rp 300,000.00 Rp 300,000
JUMLAH KESEHATAN DAN KESELAMATAN KERJA (K3) Rp 10,000,000
E Biaya Administrasi
1 Papan Nama Kegiatan 1.00 Ls Rp 250,000.00 Rp 250,000
2 Administrasi Kegiatan, Backup Data, dd 1.00 Ls Rp 150,000.00 Rp 150,000
3 Pelaporan Kemajuan & Akhir 1.00 Ls Rp 200,000.00 Rp 200,000
4 Photo Copy/Penggandaan 1.00 Ls Rp 350,000.00 Rp 350,000
5 Biaya Alat Tulis Kantor (ATK) 1.00 Ls Rp 200,000.00 Rp 200,000
6 Biaya Operasional (Transport, Konsumsi, Rapat, dll) 1.00 Ls Rp 100,000.00 Rp 100,000
7 Photo Kegiatan (0%, 25%, 50%, 75%, 100%) 1.00 Ls Rp 100,000.00 Rp 100,000
8 Materai Secukupnya 1.00 Ls Rp 150,000.00 Rp 150,000
JUMLAH BIAYA ADMINISTRASI Rp 1,500,000
JUMLAH TOTAL Rp 995,000,992
JUMLAH TOTAL PEMBULATAN Rp 995,000,000

Diverifikasi Oleh :
Askot Infrastruktur Fasilitator Teknik UPL/TIPP

( Sahril S.T ) ( Novianto Christy Adrian ) (.......................................................)


A PEKERJAAN PERSIAPAN
1 PEMBERSIHAN LAPANGAN

NO URAIAN SATUAN KOEFISIEN


TENAGA
1 Pekerja OH 47.70

2 PEMASANGAN BOWPLANK

NO TENAGA SATUAN KOEFISIEN


TENAGA
1 Pekerja OH 12.40
2 Tukang OH 12.40

BAHAN
1 Kayu 5/7 M3 1.49
2 Paku Kayu Kg 2.48
3 Papan Kayu Kelas III m3 0.87

B PEKERJAAN TANAH DAN PONDASI


- Pekerjaan Tanah dan Pondasi Tapak
1 Galian Tanah pondasi Tapak 80x80x30

NO URAIAN SATUAN KOEFISIEN


TENAGA
1 Pekerja OH 9.36

2 Galian Tanah pondasi Tapak 40x40x30

NO URAIAN SATUAN KOEFISIEN


TENAGA
1 Pekerja OH 3.68

3 Galian Parit

NO URAIAN SATUAN KOEFISIEN


TENAGA
1 Err:509 Err:509 Err:509
2 Err:509 Err:509 Err:509

4 Galian Sloof 20/40

NO URAIAN SATUAN KOEFISIEN


TENAGA
1 Pekerja OH Err:509
2 Tukang OH Err:509
5 Urugan Tanah Kembali

NO URAIAN SATUAN KOEFISIEN


TENAGA
1 Pekerja OH 19.08

6 Pengurugan Kembali Tanah Padat

NO URAIAN SATUAN KOEFISIEN


TENAGA
1 Pekerja OH 11.71

BAHAN
1 Tanah Padat M3 56.18

7 Urugan Pasir Pasang

NO URAIAN SATUAN KOEFISIEN


TENAGA
1 Pekerja OH 7.00
2 Tukang OH 0.23

BAHAN
1 Pasir urug M3 27.99

8 Kayu Bulat Merah dia 8-10 Pjng 4 Meter


BAHAN
1 Kayu Merah Btg

C PEKERJAAN BETON BERTULANG


1 Pondasi Tapak Footplate 80x80x30
- Beagisting Tapak Pondasi
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 6.86
2 Tukang OH 3.43

BAHAN
1 Kayu Kelas III (Borneo/dll) M3 0.26
2 Paku Biasa Kg 3.96
3 Minyak Bekesting Liter 1.32
- Pembesian Tapak Pondasi
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 1.91
2 Tukang OH 1.91

BAHAN
1 Besi Beton Polos Kg 287.10
2 Kawat Bendrat Kg 4.10

- Cor Beton K-225


NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 20.58
2 Tukang OH 3.43

BAHAN
1 Semen Kg 4627.85
2 Pasir Beton (1400 kg/m3) Kg 8706.85
3 Batu pecah 2-3 cm Kg 13060.28
4 Air Liter 2681.91

2 Pondasi Tapak Footplate 40x40x30

- Beagisting Tapak Pondasi


NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 6.99
2 Tukang OH 3.49

BAHAN
1 Kayu Kelas III (Borneo/dll) M3 0.27
2 Paku Biasa Kg 4.03
3 Minyak Bekesting Liter 1.34

- Pembesian Tapak Pondasi


NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 2.09
2 Tukang OH 2.09

BAHAN
1 Besi Beton Polos Kg 313.20
2 Kawat Bendrat Kg 4.47

- Cor Beton K-225


NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 8.08
2 Tukang OH 1.35

BAHAN
1 Semen Kg 1817.90
2 Pasir Beton (1400 kg/m3) Kg 3420.20
3 Batu pecah 2-3 cm Kg 5130.30
4 Air Liter 1053.50

3 Perdestail 80x80x30
- Beagisting Pendestal
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 7.26
2 Tukang OH 3.63

BAHAN
1 Kayu Kelas III (Borneo/dll) M3 0.22
2 Paku Biasa 5 cm - 10 cm Kg 4.40
3 Minyak Bekesting Liter 2.20
4 Kayu Kelas II (Kamper/Kruing/dll) M3 0.20
5 Multipleks 9 mm Lembar 3.85
6 Kayu Dolken Ø 8-10/400 cm Batang 22.00

- Pembesian Tapak Pondasi


NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 0.53
2 Tukang OH 0.53
BAHAN
1 Besi Beton Polos Kg 79.98
2 Kawat Bendrat Kg 1.14

- Cor Beton K-225


NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 1.13
2 Tukang OH 0.19

BAHAN
1 Semen Kg 255.06
2 Pasir Beton (1400 kg/m3) Kg 479.88
3 Batu pecah 2-3 cm Kg 719.81
4 Air Liter 147.81

4 Perdestail 40x40x30
- Beagisting Pendestal
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 7.39
2 Tukang OH 3.70

BAHAN
1 Kayu Kelas III (Borneo/dll) M3 0.22
2 Paku Biasa 5 cm - 10 cm Kg 4.48
3 Minyak Bekesting Liter 2.24
4 Kayu Kelas II (Kamper/Kruing/dll) M3 0.20
5 Multipleks 9 mm Lembar 3.92
6 Kayu Dolken Ø 8-10/400 cm Batang 22.40

- Pembesian Pendestal
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 0.68
2 Tukang OH 0.68

BAHAN
1 Besi Beton Polos Kg 101.79
2 Kawat Bendrat Kg 1.45

- Cor Beton K-225


NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 0.92
2 Tukang OH 0.15

BAHAN
1 Semen Kg 207.76
2 Pasir Beton (1400 kg/m3) Kg 390.88
3 Batu pecah 2-3 cm Kg 586.32
4 Air Liter 120.40

5 Sloof Beton 20/40 cm


- Beagisting Sloof
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 64.40
2 Tukang OH 32.20

BAHAN
1 Kayu Kelas III (Borneo/dll) M3 2.79
2 Paku Biasa 5 cm - 10 cm Kg 37.15
3 Minyak Bekesting Liter 12.38

- Pembesian Sloof
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 2.43
2 Tukang OH 2.43

BAHAN
1 Besi Beton Polos Kg 364.57
2 Kawat Bendrat Kg 5.21

- Cor Beton K-225


NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 38.31
2 Tukang OH 6.39

BAHAN
1 Semen Kg 8614.62
2 Pasir Beton (1400 kg/m3) Kg 16207.56
3 Batu pecah 2-3 cm Kg 24311.34
4 Air Liter 4992.30

6 ###
- #NAME?
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH #NAME?
2 Tukang OH #NAME?

BAHAN
1 Kayu Kelas III (Borneo/dll) M3 #NAME?
2 Paku Biasa 5 cm - 10 cm Lembar #NAME?
3 Minyak Bekesting Batang #NAME?

- #NAME?
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH #NAME?
2 Tukang OH #NAME?

BAHAN
1 Besi Beton Polos Kg #NAME?
2 Kawat Bendrat Kg #NAME?

- Cor Beton K-225


NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH #NAME?
2 Tukang OH #NAME?

BAHAN
1 Semen Kg #NAME?
2 Pasir Beton (1400 kg/m3) Kg #NAME?
3 Batu pecah 2-3 cm Kg #NAME?
4 Air Liter #NAME?

7 ###
- #NAME?
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH #NAME?
2 Tukang OH #NAME?

BAHAN
1 Kayu Kelas III (Borneo/dll) M3 #NAME?
2 Paku Biasa 5 cm - 10 cm Kg #NAME?
3 Minyak Bekesting Liter #NAME?
4 Kayu Kelas II (Kamper/Kruing/dll) M3 #NAME?
5 Multipleks 9 mm Lembar #NAME?
6 Kayu Dolken Ø 8-10/400 cm Batang #NAME?

- #NAME?
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH #NAME?
2 Tukang OH #NAME?

BAHAN
1 Besi Beton Polos Kg #NAME?
2 Kawat Bendrat Kg #NAME?

- #NAME?
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH #NAME?
2 Tukang OH #NAME?

BAHAN
1 Semen Kg #NAME?
2 Pasir Beton (1400 kg/m3) Kg #NAME?
3 Batu pecah 2-3 cm Kg #NAME?
4 Air Liter #NAME?
8 Kolom Beton 25/25 Lantai 1
- Beagisting kolom
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 13.79
2 Tukang OH 6.90

BAHAN
1 Kayu Kelas III (Borneo/dll) M3 0.42
2 Paku Biasa 5 cm - 10 cm Kg 8.36
3 Minyak Bekesting Liter 4.18
4 Kayu Kelas II (Kamper/Kruing/dll) M3 0.16
5 Multipleks 9 mm Lembar 3.66
6 Kayu Dolken Ø 8-10/400 cm Batang 41.80

- Pembesian Kolom
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 2.15
2 Tukang OH 2.15

BAHAN
1 Besi Beton Polos Kg 322.87
2 Kawat Bendrat Kg 4.61

- Cor Beton K-225


NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 4.31
2 Tukang OH 0.72

BAHAN
1 Semen Kg 969.24
2 Pasir Beton (1400 kg/m3) Kg 1823.52
3 Batu pecah 2-3 cm Kg 2735.29
4 Air Liter 561.69
9 Kolom Beton 20/20 cm Lantai 2
- Beagisting kolom
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 6.86
2 Tukang OH 3.43

BAHAN
1 Kayu Kelas III (Borneo/dll) M3 0.21
2 Paku Biasa 5 cm - 10 cm Kg 4.16
3 Minyak Bekesting Liter 2.08
4 Kayu Kelas II (Kamper/Kruing/dll) M3 0.08
5 Multipleks 9 mm Lembar 1.82
6 Kayu Dolken Ø 8-10/400 cm Batang 20.80

- Pembesian Kolom
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 1.30
2 Tukang OH 1.30

BAHAN
1 Besi Beton Polos Kg 194.74
2 Kawat Bendrat Kg 2.78

- Cor Beton K-225


NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 1.72
2 Tukang OH 0.29

BAHAN
1 Semen Kg 385.84
2 Pasir Beton (1400 kg/m3) Kg 725.92
3 Batu pecah 2-3 cm Kg 1088.88
4 Air Liter 223.60

10 ###
- #NAME?
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH #NAME?
2 Tukang OH #NAME?

BAHAN
1 Kayu Kelas III (Borneo/dll) M3 #NAME?
2 Paku Biasa 5 cm - 10 cm Kg #NAME?
3 Minyak Bekesting Liter #NAME?
4 Kayu Kelas II (Kamper/Kruing/dll) M3 #NAME?
5 Multipleks 9 mm Lembar #NAME?
6 Kayu Dolken Ø 8-10/400 cm Batang #NAME?

- #NAME?
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH #NAME?
2 Tukang OH #NAME?

BAHAN
1 Besi Beton Polos Kg #NAME?
2 Kawat Bendrat Kg #NAME?

- #NAME?
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH #NAME?
2 Tukang OH #NAME?

BAHAN
1 Semen Kg #NAME?
2 Pasir Beton (1400 kg/m3) Kg #NAME?
3 Batu pecah 2-3 cm Kg #NAME?
4 Air Liter #NAME?

11 Balok Anak 20/30


- Beagisting Balok
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 7.29
2 Tukang OH 3.64
BAHAN
1 Kayu Kelas III (Borneo/dll) M3 0.22
2 Paku Biasa 5 cm - 10 cm Kg 4.42
3 Minyak Bekesting Liter 2.21
4 Kayu Kelas II (Kamper/Kruing/dll) M3 0.20
5 Multipleks 9 mm Lembar 3.86
6 Kayu Dolken Ø 8-10/400 cm Batang 22.08

- Pembesian Balok
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 1.10
2 Tukang OH 1.10

BAHAN
1 Besi Beton Polos Kg 164.65
2 Kawat Bendrat Kg 2.35

- Cor Beton K-225


NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 1.82
2 Tukang OH 0.30

BAHAN
1 Semen Kg 409.58
2 Pasir Beton (1400 kg/m3) Kg 770.59
3 Batu pecah 2-3 cm Kg 1155.89
4 Air Liter 237.36

12 Balok 20/40 cm
- Beagisting Balok
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 37.70
2 Tukang OH 18.85

BAHAN
1 Kayu Kelas III (Borneo/dll) M3 1.14
2 Paku Biasa 5 cm - 10 cm Kg 22.85
3 Minyak Bekesting Liter 11.42
4 Kayu Kelas II (Kamper/Kruing/dll) M3 1.03
5 Multipleks 9 mm Lembar 19.99
6 Kayu Dolken Ø 8-10/400 cm Batang 114.24

- Pembesian Balok
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 6.10
2 Tukang OH 6.10

BAHAN
1 Besi Beton Polos Kg 915.01
2 Kawat Bendrat Kg 13.07

- Cor Beton K-225


NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 9.42
2 Tukang OH 1.57

BAHAN
1 Semen Kg 2119.15
2 Pasir Beton (1400 kg/m3) Kg 3986.98
3 Batu pecah 2-3 cm Kg 5980.46
4 Air Liter 1228.08

13 Ringbalk 20/20 cm
- Beagisting Balok
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 11.35
2 Tukang OH 5.68

BAHAN
1 Kayu Kelas III (Borneo/dll) M3 0.34
2 Paku Biasa 5 cm - 10 cm Kg 6.88
3 Minyak Bekesting Liter 3.44
4 Kayu Kelas II (Kamper/Kruing/dll) M3 0.31
5 Multipleks 9 mm Lembar 6.02
6 Kayu Dolken Ø 8-10/400 cm Batang 34.40

- Pembesian Balok
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 3.15
2 Tukang OH 3.15

BAHAN
1 Besi Beton Polos Kg 472.67
2 Kawat Bendrat Kg 6.75

- Cor Beton K-225


NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 5.68
2 Tukang OH 0.95

BAHAN
1 Semen Kg 1276.24
2 Pasir Beton (1400 kg/m3) Kg 2401.12
3 Batu pecah 2-3 cm Kg 3601.68
4 Air Liter 739.60

14 Cor Lantai Dak WC


- Beagisting Lantai
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 5.94
2 Tukang OH 2.97

BAHAN
1 Kayu Kelas III (Borneo/dll) M3 0.36
2 Paku Biasa 5 cm - 10 cm Kg 3.60
3 Minyak Bekesting Liter 1.80
4 Multipleks 9 mm Lembar 3.15
5 Kayu Dolken Ø 8-10/400 cm Batang 54.00
- Pembesian Lantai
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 1.55
2 Tukang OH 1.55

BAHAN
1 Besi Beton Polos Kg 233.04
2 Kawat Bendrat Kg 3.33

- Cor Beton K-175


NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 2.97
2 Tukang OH 0.50

BAHAN
1 Semen Kg 586.80
2 Pasir Beton (1400 kg/m3) Kg 1368.00
3 Batu pecah 2-3 cm Kg 1852.20
4 Air Liter 387.00

15 Cor Plat Lantai Lantai II


- Begesting Lantai
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 87.78
2 Tukang OH 43.89

BAHAN
1 Kayu Kelas III (Borneo/dll) M3 5.32
2 Paku Biasa 5 cm - 10 cm Kg 53.20
3 Minyak Bekesting Liter 26.60
4 Multipleks 9 mm Lembar 46.55
5 Kayu Dolken Ø 8-10/400 cm Batang 798.00

- Pembesian Lantai
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 22.96
2 Tukang OH 22.96

BAHAN
1 Besi Beton Polos Kg 3443.77
2 Kawat Bendrat Kg 49.20

- Cor Beton K-225


NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 22.28
2 Tukang OH 3.71

BAHAN
1 Semen Kg 5008.50
2 Pasir Beton (1400 kg/m3) Kg 9423.00
3 Batu pecah 2-3 cm Kg 14134.50
4 Air Liter 2902.50

16 Cor Rabat Lantai 1 (K-175)


- Begesting Lantai
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 53.06
2 Tukang OH 26.53

BAHAN
1 Kayu Kelas III (Borneo/dll) M3 3.22
2 Paku Biasa 5 cm - 10 cm Kg 32.16
3 Minyak Bekesting Liter 16.08

- Cor Beton K-175


NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 26.53
2 Tukang OH 4.42

BAHAN
1 Semen Kg 5242.08
2 Pasir Beton (1400 kg/m3) Kg 12220.80
3 Batu pecah 2-3 cm Kg 16546.32
4 Air Liter 3457.20

D PEKERJAAN PASANGAN DAN PLASTERAN


1 Pasangan Dinding Bata Merah 1:4
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 98.21
2 Tukang OH 32.74

BAHAN
1 Batu Bata Buah 22915.15
2 Semen @ 40 Kg Kg 3764.63
3 Pasir Pasang (1400 kg/m3) M3 14.08

2 Pasangan Dinding Batako 1:4


NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 15.40
2 Tukang OH 5.13

BAHAN
1 Batako Buah 3593.10
2 Semen @ 40 Kg Kg 590.30
3 Pasir Pasang (1400 kg/m3) M3 2.21

3 Plesteran Dinding bata 1:4


NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 263.23
2 Tukang OH 131.62

BAHAN
1 Semen @ 40 Kg Kg 5475.28
2 Pasir Pasang (1400 kg/m3) M3 21.06

4 Acian
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 6.61
2 Tukang OH 4.73

BAHAN
1 Sement Pc Kg 97.98
2 Pasir Pasang M3 0.49
3 Kawat Ram Ayam Ls 18.90
4 Semen Untuk Acian Kg 61.43

E PEKERJAAN LANTAI
Pekerjaaan Lantai Keramik & Paving
1 Pasangan Keramik 40x40 Lantai 1
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 49.65
2 Tukang OH 24.82

BAHAN
1 Granit Uk. 40 x 40 cm Bh 1316.64
2 Semen @ 40 Kg Kg 1946.16
3 Semen Kg 1946.16
4 Pasir Pasang (1400 kg/m3) M3 8.94

2 Pasangan Keramik 20x20 Lantai 1 WC


NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 19.98
2 Tukang OH 9.99

BAHAN
1 Keramik 20 x 20 cm Bh 756.44
2 Semen @50kg Kg 296.87
3 Semen @50kg Kg 296.87
4 Pasir Pasang (1400 kg/m3) M3 1.28

3 Pasangan Keramik 40x40 Lantai II


NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 33.75
2 Tukang OH 16.88

BAHAN
1 Granit Uk. 40 x 40 cm Bh 895.05
2 Semen @ 40 Kg Kg 1323.00
3 Semen Kg 1323.00
4 Pasir Pasang (1400 kg/m3) M3 6.08

4 Pasangan Singki
1 Singki 17.00

5 Paving Blcok Hexagonal


NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 5.40
2 Tukang OH 2.52

BAHAN
1 Paving Block Hexagonal m2 36.36
2 Pasir beton M3 1.80

F PEKERJAAN PINTU
1 Pintu Besi Belakang 2 Daun Pintu
2 Pintu WC
3 Pintu Besi Lorong
4 Pintu Rollong Door
5 Angin-Angin

G PEKERJAAN PENGECATAN
1 Pekerjaan cat tembok
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 22.75
2 Tukang OH 71.67

BAHAN
1 Plamur Kg 113.77
2 Cat Dasar Kg 113.77
3 Cat Penutup Interior Setara Jotun Kg 295.80
H PEKERJAAN LISTRIK
- Biaya Listrik 4 Amper (17 Unit)
1 Biaya Listrik 4 Amper (17 Unit) 10.00
2 Biaya Penyambungan (BP) PLN 17 Untuk 4 Amper 10.00
3 Biaya Token/Pulsa 10.00
4 Biaya Materai 10.00
5 Biaya Sertifikat Like Opererasi (SLO) 10.00
6 Jasa Survey Dan Jaminan 35.00
- Biaya Listrik 6 Amper (1 Unit)
1 Biaya Penyambungan (BP) PLN 1 Untuk 6 Amper 1.00
2 Biaya Token/Pulsa 1.00
3 Biaya Materai 1.00
4 Biaya Sertifikat Like Opererasi (SLO) 1.00
5 Jasa Survey Dan Jaminan 1.00
6 Instalasi Listrik 10.00

I PEKERJAAN SANITASI
1 Pemasangan Baru Air PDAM 1.00
2 Biaya Pendaftaran 1.00
3 Tangki Profil 2200 2.00
4 Pemasangan Kloset Jongkok 2.00
5 Septictank dan Peresapan 1.00
6 Pemasangan Keran Air Plastik 10.00
7 Pasang Instalasi Air Kotor (pipa PVC Type AW 3 & 4 In 16.00
8 Pasang Instalasi Air Bersih (pipa PVC Type AW 3/4 Inc 15.00
9 Aksesoris 1.00
### #NAME?
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH #NAME?
2 Tukang OH #NAME?

BAHAN
1 Batu Bata Buah #NAME?
2 Semen @ 40 Kg Kg #NAME?
3 Pasir Pasang (1400 kg/m3) M3 #NAME?

J PEKERJAAN ATAP
1 Atap Spandek Lantai I
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 3.84
2 Tukang OH 1.92
BAHAN
1 Atap Apandek 0.30 mm m2 211.20
2 Baut Screw Cteks 12-4x50 Bh 1152.00

2 Atap Spandek Lantai II


NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 6.93
2 Tukang OH 3.46

BAHAN
1 Atap Apandek 0.30 mm m2 381.12
2 Baut Screw Cteks 12-4x50 Bh 2078.83

K PEKERJAAN BESI DAN ALMUNIUM


1 Pekerjaan Pagar Hollow 4x2 cm Dan Tangga
2 Pekerjaan Rangka Baja Ringan
NO URAIAN SATUAN KOEFISIEN
TENAGA
1 Pekerja OH 75.52
2 Tukang OH 169.92

BAHAN
1 Baja ringan Canal C-75 M 561.86
2 Baut (Screw Driver) Bh 10572.58
3 Dynabolt Bh 604.15
4 Reng M 1359.33

L SEWA ALAT
1 Molen

M KESEHATAN DAN KESELAMATAN KERJA (K3)


1 Topi Pelindung Diri ( Safety Helmet )
2 Perlindungan Pernapasan Dan Mulut ( Masker )
3 Sarung Tangan ( Safety Gloves )
4 Sepatu Keselamatan Kerja ( Safety Shoes )
5 Rompi Keselamatan Kerja ( Safety Vest )
6 Peralatan P3K ( Kotak P3K, Obat Luka, Perban DLL
7 Asuransi Kesehatan
8 Spanduk

N ###
1 #NAME?
2 #NAME?
3 #NAME?
4 #NAME?
5 #NAME?
6 #NAME?
7 #NAME?
8 #NAME?
Besi 8 Besi 10 Besi 12 Besi 16
287.101584
313.201728
101.7905616
364.57344
#NAME?
#NAME?
322.874202
194.74143694387
#NAME?
164.65462272
915.01304832
472.6749888
233.037
3443.769

OEFISIEN
0 3676.806 #NAME? #NAME?

- 7.4000 10.6600 18.9600

496.86567567568 #NAME? #NAME?


Pekerja Tukang Kayu Kelas III Paku Biasa

47.7

12.4
12.40

1.49
2.48

9.3555

3.675

Err:509
Err:509

Err:509
Err:509
19.082

6.9975
0.23

6.864
3.43

3.96
1.91401056
1.91

20.5821
3.43

6.9888
3.49

4.03
2.08801152
2.09

8.085
1.35

7.26
3.63

4.40

0.533188656
0.53
1.134375
0.19

7.392
3.70

4.48

0.678603744
0.68
0.924
0.15

64.3968
32.20

37.15

2.4304896
2.43
38.313
6.39

#NAME?
#NAME?

#NAME?

#NAME?
#NAME?

#NAME?
#NAME?
#NAME?
#NAME?

#NAME?

#NAME?
#NAME?

#NAME?
#NAME?
13.794
6.90

8.36

2.15249468
2.15

4.310625
0.72
6.864
3.43

4.16

1.29827624629248
1.30

1.716
0.29
#NAME?
#NAME?

#NAME?

#NAME?
#NAME?

#NAME?
#NAME?
4.42

1.0976974848
1.10

37.6992
18.85
22.85

6.1000869888
6.10

9.4248
1.57

6.88
3.151166592
3.15

5.94
2.97

3.60
1.55
1.55

2.97
0.50

53.20
22.96
22.96

22.28
3.71

53.06
26.53

32.16

26.53
4.42
98.21
32.74

15.40
5.13

263.23
131.62
6.61
4.73

49.65
24.82

19.98
9.99

33.75
16.88

5.40
2.52

22.75
71.67
#NAME?
#NAME?

3.84
1.92
6.93
3.46

75.52
169.92
#NAME? #NAME? 1.488 #NAME?

#NAME? #NAME?
Rp 115,000 Rp 135,000
#NAME? #NAME?

#NAME?

#NAME?
#NAME?
Rp 71,900,000
Rp 65,000,000
Rp 5,000,000

Rp 20,038,000
Rp 19,570,000
Rp 10,000,000
#NAME?
#NAME?

Rp 995,000,000.00
#NAME?
Papan Kayu Kelas III Tanah Timbunan PadatPasir Urug Kayu Pencang

0.87
56.18

27.99

50.00

0.26
0.27
0.22
0.22
2.79
#NAME?
#NAME?
0.42
0.21
#NAME?
0.22

1.14
0.34
0.36
5.32
3.22
#NAME? 56.184 27.99 50
Minyak Begesting Kawat Bendrat Semen Pasir Beton Batu Pecah 2-3cm Air
1.32
4.10

4627.85
8706.85
13060.28
2681.91

1.34
4.47

1817.90
3420.20
5130.30
1053.50

2.20
1.14

255.06
479.88
719.81
147.81

2.24
1.45

207.76
390.88
586.32
120.40

12.38

5.21
8614.62
16207.56
24311.34
4992.30

#NAME?

#NAME?

#NAME?
#NAME?
#NAME?
#NAME?

#NAME?

#NAME?

#NAME?
#NAME?
#NAME?
#NAME?
4.18

4.61

969.24
1823.52
2735.29
561.69
2.08

2.78

385.84
725.92
1088.88
223.60
#NAME?

#NAME?

#NAME?
#NAME?
#NAME?
#NAME?
2.21

2.35

409.58
770.59
1155.89
237.36
11.42

13.07

2119.15
3986.98
5980.46
1228.08

3.44
6.75

1276.24
2401.12
3601.68
739.60

1.80
3.33

586.80
1368.00
1852.20
387.00

26.60
49.20

5008.50
9423.00
14134.50
2902.50

16.08

5242.08
12220.80
16546.32
3457.20

3764.63

590.30

5475.28
97.98

61.43

1946.16
1946.16

296.87
296.87
1323.00
1323.00

1.80
#NAME?
#NAME? #NAME? ### #NAME? #NAME? ###

#NAME?
878
#NAME?
11985
240
#NAME?
Kayu Kelas II Multipleks 9mm Kayu Perancah Batu Bata Merah Batako
0.20
3.85
22.00
0.20
3.92
22.40
#NAME?
#NAME?
#NAME?
0.16
3.66
41.80
0.08
1.82
20.80
#NAME?
#NAME?
#NAME?
0.20
3.86
22.08
1.03
19.99
114.24

0.31
6.02
34.40

3.15
54.00
46.55
798.00
22915.15

3593.10
#NAME? #NAME? #NAME? 22915.1455555556 3593.1
Kawat Ram Ayam Pasir Pasang Tegel Keramik 40x40 Tegel Keramik 20x20
14.08

2.21

21.06
0.49
18.90

1316.64

8.94

756.44

1.28
895.05

6.08
#NAME?
18.9 #NAME? 2211.689103 756.4425
Bata Hebel Paving Exagonal Cat Aries Gold Plamur Atap Spandek
17.00

36.36

113.77
113.77
295.80
211.20

381.12
17 36.36 409.5628 113.7674 592.318699187
Baut Screw Cteks 12-4x50 Baja Ringan Canal C-75 Dynabolt Reng
1152.00

2078.83

561.86
10572.58
604.15
1359.33
13803.4104648739 561.857172161172 604.1474969 1359.332
RINCIAN REALISASI ANGGARAN
INFRASTRUKTUR PENDUKUNG LIVELIHOOD

KAB/KOTA : NUNUKAN
KECAMATAN : NUNUKAN
KEL/DESA : NUNUKAN UTARA
BKM/LKM : TERPADU LESTARI
NAMA KEGIATAN : RUMAH WISATA KULINER
TAHUN ANGGARAN : 2021

NO URAIAN SATUAN VOLUME


1 2 3 4.00

A TENAGA KERJA
1 Pekerja OH 1,373.00
2 Tukang OH 624.00
Total Upah
B BAHAN
1 Kayu Kelas III 5/7 m3 1.49
2 Paku Biasa m 3
#NAME?
3 Papan Kayu Kelas III m 3
#NAME?
4 Tanah Timbunan Padat m 3
56.18
5 Pasir Urug m 3
27.99
3 Kayu Pencang Btg 50.00
5 Minyak Begesting Liter #NAME?
6 Kawat Bendrat Kg #NAME?
7 Semen Zak #NAME?
8 Semen Zak 239.70
8 Pasir Beton m3 #NAME?
9 Batu Pecah 2-3cm m 3
#NAME?
10 Air Liter #NAME?
11 Kayu Kelas II m3 #NAME?
12 Multipleks 9mm Lbr #NAME?
13 Kayu Perancah Btg #NAME?
14 Batu Bata Merah Bh 22,915.15
15 Batako Bh 3,593.10
16 Kawat Ram Ayam Ls 18.90
17 Pasir Pasang m3 #NAME?
18 Tegel Keramik 40x40 Ktk 368.61
19 Tegel Keramik 20x20 Ktk 37.82
20 Bata Hebel Bh 17.00
21 Paving Exagonal Bh 36.36
22 Cat Aries Gold Liter 81.91
23 Plamur Bks 22.75
24 Atap Spandek Lbr 262.99
25 Baut Screw Cteks 12-4x50 Ktk 92.02
26 Baja Ringan Canal C-75 Btg 96.87
27 Dynabolt Bh 2.42
28 Reng Btg 234.37
29 Besi 8 Polos Full Ljr 225.96
30 Besi 10 Polos Full Ljr 622.05
31 Besi 12 Polos Full Ljr 176.83
32 Besi 16 Polos Full Ljr 95.87
33 Thiner A Gln 2.00
35 Ijuk Gulung 6.82
36 Amplas Lbr 35.00
37 Sement Putih R. Bull Zak 25.00
38 Cat Anan Kaleng 10.00
39 Nat Keramik Bks 30.00
40 Lem Plamir Bks 2.00
TOTAL B
C PEKERJAAN PINTU & ANGIN-ANGIN
1 Pintu Besi Belakang 2 Daun Pintu Unit 1.00
2 Pintu WC Unit 2.00
3 Pintu Besi Lorong Unit 2.00
4 Pintu Rollong Door Unit 10.00
5 Angin-Angin Bh 20.00
TOTAL PEKERJAAN PINTU & ANGIN-A
C PEKERJAAN BESI DAN ALMUNIUM
1 Pekerjaan Pagar Hollow 4x2 cm Dan Tangga Ls 1.00
TOTAL PEKERJAAN BESI DAN ALMU
C SEWA ALAT
1 Molen Ls 1.00
TOTAL SEWA
III PEKERJAAN LISTRIK
A Biaya Listrik 4 Amper (17 Unit)
1 Biaya Penyambungan (BP) PLN 17 Untuk 4 Amper Unit 10.00
2 Biaya Token/Pulsa Pcs 10.00
3 Biaya Materai Lbr 10.00
4 Biaya Sertifikat Like Opererasi (SLO) Lbr 10.00
5 Jasa Survey Dan Jaminan Ls 10.00
6 Instalasi Listrik Titik 35.00
BIAYA 4 A
B Biaya Listrik 6 Amper (1 Unit)
1 Biaya Penyambungan (BP) PLN 1 Untuk 6 Amper Unit 1.00
2 Biaya Token/Pulsa Pcs 1.00
3 Biaya Materai Lbr 1.00
4 Biaya Sertifikat Like Opererasi (SLO) Lbr 1.00
5 Jasa Survey Dan Jaminan Ls 1.00
6 Instalasi Listrik Titik 10.00
BIAYA 6 A
TOTAL BIAYA LIS
IV PEKERJAAN SANITASI
1 Pemasangan Baru Air PDAM Sr 1.00
2 Biaya Pendaftaran Sr 1.00
3 Tangki Profil 2200 Bh 2.00
4 Pemasangan Kloset Jongkok Bh 2.00
5 Septictank dan Peresapan Unit 1.00
6 Pemasangan Keran Air Plastik Bh 10.00
7 Pasang Instalasi Air Kotor (pipa PVC Type AW 3 & 4 Inc ) Bh 16.00
8 Pasang Instalasi Air Bersih (pipa PVC Type AW 3/4 Inc ) Bh 15.00
9 Aksesoris Ls 1.00
TOTAL PEKERJAAN SAN
V KESEHATAN DAN KESELAMATAN KERJA (K3)
1 Topi Pelindung Diri ( Safety Helmet ) Bh 30.00
2 Perlindungan Pernapasan Dan Mulut ( Masker ) Bh 30.00
3 Sarung Tangan ( Safety Gloves ) Psg 30.00
4 Sepatu Keselamatan Kerja ( Safety Shoes ) Psg 30.00
5 Rompi Keselamatan Kerja ( Safety Vest ) Bh 30.00
6 Peralatan P3K ( Kotak P3K, Obat Luka, Perban DLL Unit 1.00
7 Asuransi Kesehatan Ls 1.00
8 Spanduk Lb 1.00
TOT
VI #NAME?
1 #NAME? #NAME? #NAME?
2 #NAME? #NAME? #NAME?
3 #NAME? #NAME? #NAME?
4 #NAME? #NAME? #NAME?
5 #NAME? #NAME? #NAME?
6 #NAME? #NAME? #NAME?
7 #NAME? #NAME? #NAME?
8 #NAME? #NAME? #NAME?
TOTAL BIAYA ADMINIS
JUMLAH T
JUMLAH PEMBUL
HARGA JUMLAH HARGA
SATUAN (RP) (RP)
5 6

Rp 115,000 Rp 157,895,000
Rp 135,000 Rp 84,240,000
Total Upah Rp 242,135,000

Rp 3,800,000 Rp 5,654,400
Rp 22,000 #NAME?
Rp 3,800,000 #NAME?
Rp 57,143 Rp 3,210,514
Rp 214,286 Rp 5,997,857
Rp 55,000 Rp 2,750,000
Rp 15,000 #NAME?
Rp 25,000 #NAME?
Rp 70,000 #NAME?
Rp 70,000 Rp 16,779,000
Rp 185,714 #NAME?
Rp 514,286 #NAME?
Rp 50 #NAME?
Rp 5,000,000 #NAME?
Rp 130,000 #NAME?
Rp 40,000 #NAME?
Rp 1,100 Rp 25,206,660
Rp 1,200 Rp 4,311,720
Rp 8,000 Rp 151,200
Rp 214,286 #NAME?
Rp 65,000 Rp 23,959,965
Rp 45,000 Rp 1,701,996
Rp 17,000 Rp 289,000
Rp 4,000 Rp 145,440
Rp 56,000 Rp 4,587,103
Rp 110,000 Rp 2,502,884
Rp 88,000 Rp 23,143,076
Rp 140,000 Rp 12,883,183
Rp 115,000 Rp 11,140,272
Rp 500,000 Rp 1,208,295
Rp 50,000 Rp 11,718,378
Rp 47,000 Rp 10,620,013
Rp 75,000 Rp 46,654,054
Rp 105,000 Rp 18,566,768
Rp 225,000 Rp 21,571,701
Rp 125,000 Rp 250,000
Rp 30,000 Rp 204,600
Rp 5,000 Rp 175,000
Rp 125,000 Rp 3,125,000
Rp 62,000 Rp 620,000
Rp 18,000 Rp 540,000
Rp 230,000 Rp 460,000
TOTAL BAHAN #NAME?

Rp 1,500,000 Rp 1,500,000
Rp 1,200,000 Rp 2,400,000
Rp 1,000,000 Rp 2,000,000
Rp 6,500,000 Rp 65,000,000
Rp 50,000 Rp 1,000,000
PINTU & ANGIN-ANGIN Rp 71,900,000

Rp 65,000,000 Rp 65,000,000
N BESI DAN ALMUNIUM Rp 65,000,000

Rp 5,000,000 Rp 5,000,000
TOTAL SEWA ALAT Rp 5,000,000

Rp 421,000 Rp 4,210,000
Rp 50,000 Rp 500,000
Rp 10,000 Rp 100,000
Rp 40,000 Rp 400,000
Rp 525,000 Rp 5,250,000
Rp 165,000 Rp 5,775,000
BIAYA 4 AMPER Rp 16,235,000

Rp 1,218,000 Rp 1,218,000
Rp 50,000 Rp 50,000
Rp 10,000 Rp 10,000
Rp 95,000 Rp 95,000
Rp 730,000 Rp 730,000
Rp 170,000 Rp 1,700,000
BIAYA 6 AMPER Rp 3,803,000
TOTAL BIAYA LISTRIK Rp 20,038,000

Rp 2,260,000 Rp 2,260,000
Rp 16,000 Rp 16,000
Rp 2,850,000 Rp 5,700,000
Rp 330,000 Rp 660,000
Rp 6,000,000 Rp 6,000,000
Rp 22,000 Rp 220,000
Rp 85,000 Rp 1,360,000
Rp 80,000 Rp 1,200,000
Rp 2,154,000 Rp 2,154,000
L PEKERJAAN SANITASI Rp 19,570,000

Rp 45,000 Rp 1,350,000
Rp 40,000 Rp 1,200,000
Rp 7,000 Rp 210,000
Rp 90,000 Rp 2,700,000
Rp 45,000 Rp 1,350,000
Rp 500,000 Rp 500,000
Rp 2,390,000 Rp 2,390,000
Rp 300,000 Rp 300,000
TOTAL K3 Rp 10,000,000

#NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME?
L BIAYA ADMINISTRASI #NAME?
JUMLAH TOTAL #NAME? Rp 995,000,000
JUMLAH PEMBULATAN #NAME? #NAME?

Tenaga Rp 242,135,000
Bahan #NAME? #NAME?
Alat #REF!
Administrasi #NAME?
#NAME?
#NAME?
#NAME?
Rp 242,135,000
#NAME?
Lampiran BA No : Form - RAB1
PROGRAM KOTA TANPA KUMUH (KOTAKU

HASIL KESEPAKATAN HARGA SATUAN UPAH/BAHAN/ALAT


BULAN : JANUARI 2020
Kota : Nunukan
Kecamatan : Nunukan Selatan Jenis Kegiatan : PIKE-BM Tanggal Dilaksanakan Survey :
Kelurahan/Desa : Nunukan Selatan Volume : No. Lembar : ____dari____
KSM/Panitia : Dharma Bhakti Lokasi : Nunukan Selatan

No Lembar ……..dari …..


KESEPAKATAN HARGA SATUAN
HARGA SATUAN HASIL SURVEY*) TERENDAH
HARGA SATUAN
SESUAI STANDAR Kelp.Masy. - 1 Kelp.Masy.-2 Kelp.Masy.-3
No. Uraian Tenaga Kerja Sat. KABUPATEN (Rp) Nama: Nama: ___________ Nama: ___________ HARGA SATUAN
KETERANGAN
Almt : ___________ Almt : ___________ Almt : ___________ (Rp)
Telp : ____________ Telp : ____________ Telp : ____________
(1) (2) (3) (4) (5) (6) (7) (8) (9)
I. TENAGA KERJA :
1. Pekerja HOK - 120,000 125,000 115,000 115,000 Kelp.Masy.-3
2. Tukang HOK - 150,000 140,000 135,000 135,000 Kelp.Masy.-3
KESEPAKATAN HARGA SATUAN
HARGA SATUAN HASIL SURVEY*) TERENDAH
HARGA SATUAN Pemasok - 1 Pemasok - 2 Pemasok - 3
SESUAI STANDAR
KABUPATEN (Rp) Nama: Ayu Nama: Kembar Sejahtera Nama: CV. Mario Jaya HARGA SATUAN
No. Uraian Bahan/Alat Sat. Nama Toko/Pemasok
(Rp)
Almt : Almt : Jl. Sei. Bilal Almt : Jl. Teuku Umar
Telp : - Telp : - Telp :-
(1) (2) (3) (4) (5) (6) (7) (8) (9)

II. BAHAN/MATERIAL :
1 Kayu Kelas I m3 - 9,000,000 11,000,000 10,500,000 9,000,000 Pemasok - 1
2 Kayu Kelas I 3/20 m3 - 9,000,000 11,000,000 10,500,000 9,000,000 Pemasok - 1
3 Kayu Kelas I 5/10 m3 - 9,000,000 11,000,000 10,500,000 9,000,000 Pemasok - 1
4 Kayu Kelas II m3 - 5,000,000 5,800,000 5,700,000 5,000,000 Pemasok - 1
5 Kayu Kelas III m3 - 3,500,000 3,800,000 3,800,000 3,800,000 Pemasok - 1
6 Kayu Laut Dia 10mm-15mm / 4m Btg - 40,000 80,000 70,000 40,000 Tanah Merah
7 Kayu Dolken Dia 10mm-15mm/4m Btg 55,000 80,000 70,000 55,000 Tanah Merah
KESEPAKATAN HARGA SATUAN
HARGA SATUAN HASIL SURVEY*) TERENDAH
HARGA SATUAN
No Uraian Bahan/Alat Sat. SESUAI STANDAR Toko/Pemasok - 1 Toko/Pemasok - 2 Toko/Pemasok - 3
KABUPATEN (Rp) Nama: Cahaya Makmur Nama: Karya Mandiri Nama: Sinar Agung HARGA SATUAN
Nama Toko/Pemasok
Almt : Jl. Tanjung Almt : Jl. TVRI Almt : Jl. Yos Sudarso (Rp)
Telp : - Telp : - Telp :-
(2) (3) (4) (5) (6) (7) (8) (9)
1 Playwood 9 mm Lbr - 130,000 130,000 135,000 130,000 Cahaya Makmur
2 Paku ulin Kg - 30,000 27,000 20,000 20,000 Karya Mandiri
3 Paku Beton Kg 20,000 20,000 20,000 20,000 Sinar Agung
4 Paku Biasa Kg - 22,000 22,000 22,000 22,000 Cahaya Makmur
5 Paku Tripleks kg - 25,000 22,000 22,000 22,000 Karya Mandiri
6 Paku Skrup Halus kg - - - 27,000 27,000 Sinar Agung
7 Paku Skrup Kasar kg - - - 27,000 27,000 Sinar Agung
8 Baut Driling 12x50 Dos 325,000 325,000 Sinar Agung
9 Baut Driling 12x25 Dos 225,000 225,000 Sinar Agung
10 Dinabolt 8x65 Dos 500,000 500,000 Sinar Agung
11 Kaso Baja Ringan 6 meter Btg - - - 98,000 98,000 Karya Mandiri
12 Baja Ringan Kayan Trus Btg - 115,000
13 Kanal C Tasso Btg - 115,000 115,000 Sinar Agung
14 Kanal C Biasa Btg - 105,000.00 105,000 Karya Mandiri
15 Reng Baja Btg 50,000.00 50,000 Karya Mandiri
16 Semen Portland zak - 70,000 65,000 65,000 65,000 Sinar Agung
17 Semen Portland Tambahan zak 75,000 80,000 70,000 70,000 Sinar Agung
18 Besi Polos Ø 8/12m Ljr - 55,000 50,000 47,000 47,000 Sinar Agung
19 Besi Polos Ø 10/12m Ljr - 78,000 75,000 75,000 75,000 Sinar Agung
20 Besi Polos Ø 12/12m Ljr - 110,000 107,000 105,000 105,000 Sinar Agung
21 Besi Polos Ø 16/12m Ljr 230,000 235,000 225,000 225,000 Sinar Agung
22 Wiremesh besi M6 Roll - - - 4,500,000 4,500,000 Sinar Agung
23 Wiremesh besi M12 Lembar - - - 1,000,000 1,000,000 Sinar Agung
24 Keramik Putih 40x40 cm Dos - 65,000 75,000 65,000 65,000 Sinar Agung
25 Keramik 20x20 Cm Dos - 45,000 Sinar Agung
26 Kawat Beton kg - 25,000 25,000 25,000 25,000 Karya Mandiri
27 Plamir 5 kg - 110,000 110,000.00 110,000 110,000 Sinar Agung
28 Minyak Begesting Liter - - - 15,000.00 15,000 Indah Jaya
29 Cat Aries Liter 58,000 58,000 56,000 56,000 Sinar Agung
30 Cat Nippon Liter - - 60,000 - 60,000 Karya Mandiri
31 Cat Avian Liter - - - 60,000 60,000 Sinar Agung
32 Cat No Droop 5 Liter - - - 200,000 200,000 Sinar Agung
33 Talang Air Maspion Btg - - 108,000 - 108,000 Karya Mandiri
34 Talang Air Btg - - - 65,000 65,000 Sinar Agung
35 Atap Spandek Lbr - - 88,000 90,000 88,000 Karya Mandiri
36 Pipa PVC 2" Btg - - 47,000 - 47,000 Karya Mandiri
37 Pipa PVC 3" Btg - - 73,000 - 73,000 Karya Mandiri
38 Pipa PVC 4" Btg - - 105,000 - 105,000 Karya Mandiri
39 Tee 3/4 Bh 4,000.00 4,000 Sinar Agung
40 L 3/4 Bh 4,000.00 4,000 Sinar Agung
41 Lem Pipa Pcs 12,000.00 12,000 Sinar Agung
42 Bak Cuci Piring 1 Mata Bh 180,000.00 180,000 180,000.00 180,000 Sinar Agung
43 Tangki Profil 1100 Bh - - - 1,700,000 1,700,000 Sinar Agung
44 Tangki Profil 2200 Bh - - - 2,850,000 2,850,000 Sinar Agung
45 Fitting Tempel Biasa Bh - - - 10,000 10,000 Sinar Agung
46 Floor Drain Stainless Steel Set - - - 85,000 85,000 Sinar Agung
47 Isolasi Listrik Roll - - - 10,000 10,000 Sinar Agung
48 Kabel NVA 100 m - - - 215,000 215,000 Sinar Agung
49 Kait Angin Jendela Psg - - - 25,000 25,000 Sinar Agung
50 Klem Kabel 6 m m - - - 10,000 10,000 Sinar Agung
51 Klosed Vito Bh - - - 155,000 155,000 Sinar Agung
52 Kunci Pintu Bh - - - 150,000 150,000 Sinar Agung
53 Lampu TL Bundar 20 Watt Bh - - - 50,000 50,000 Sinar Agung
54 List Profil Gypsum m - - - 27,000 27,000 Sinar Agung
55 L Joint PVC Ø 2 Inci Bh - - - 10,000 10,000 Sinar Agung
56 L Joint PVC Ø 3 Inci Bh - - - 13,000 13,000 Sinar Agung
57 L Joint PVC Ø 4 Inci Bh - - - 20,000 20,000 Sinar Agung
58 Air Liter 50 50 Sinar Agung
59 MCB Bh - - - 70,000 70,000 Sinar Agung
60 Pipa GIP Medium B Ø 1/2" 6 m m - - - 130,000 130,000 Sinar Agung
61 Pipa GIP Medium B Ø 3/4" 6 m m - - - 155,000 155,000 Sinar Agung
62 Pipa GIP Medium B Ø 1" 6 m m - - - 195,000 195,000 Sinar Agung
KESEPAKATAN HARGA SATUAN
HARGA SATUAN HASIL SURVEY*) TERENDAH
HARGA SATUAN Pemasok - 1 Pemasok - 2 Pemasok - 3
SESUAI STANDAR
KABUPATEN (Rp) Nama: Ayu Nama: Kembar Sejahtera Nama: CV. Mario Jaya HARGA SATUAN
No. Uraian Bahan/Alat Sat. Nama Toko/Pemasok
(Rp)
Almt : Almt : Jl. Sei. Bilal Almt : Jl. Teuku Umar
Telp : - Telp : - Telp :-
(1) (2) (3) (4) (5) (6) (7) (8) (9)

63 Pipa GIP Medium B Ø 1 1/2" 6 m m - - - 230,000 230,000 Sinar Agung


64 Pipa GIP Medium B Ø 2" 6 m m - - - 385,000 385,000 Sinar Agung
65 Pipa GIP Medium B Ø 3" 6 m m - - - 440,000 440,000 Sinar Agung
66 Pipa GIP Medium B Ø 4" 6 m m - - - 755,000 755,000 Sinar Agung
67 Pipa PVC Ø 3 Inci Btg - - - 90,000 90,000 Sinar Agung
68 Pipa PVC Ø 4 Inci Btg - - - 125,000 125,000 Sinar Agung
69 Besi Hollow 4x4 Btg 135,000 135,000 Sinar Agung
70 Pintu PVC WC Bh 385,000 Sinar Agung
71 Paving Block Bh 4,000 Sinar Agung
72 Pintu PVC WC dan Kusen Set 1,200,000 Sinar Agung
73 Pintu Rolling Door Set 6,500,000 Bengkel Las Sederhana
74 Pintu Besi Set 3,500,000
75 Kawat Ram Ayam Ls 8,000.00 9,000.00 8,000 8,000
75 Tangga Besi dan Pagar Besi Set 65,000,000 Bengkel Las Sederhana
76 Ijuk M3 30,000 Karya Mandiri
77 Keran Air Bh 12,000 12,000 Sinar Agung
78 Singki Bh 250,000 250,000 250,000 250,000 Sinar Agung
79 Papan Gypsum Lbr - - 67,000 65,000 65,000 Sinar Agung
KESEPAKATAN HARGA SATUAN
0 TERENDAH
HARGA SATUAN
SESUAI STANDAR Pemasok - 1 Pemasok - 2 Pemasok - 3
KABUPATEN (Rp) Nama: CV. Fauzan Adzima Nama: Nama: Fauzan Adzima HARGA SATUAN
No Uraian Bahan/Alat Sat. Nama Toko/Pemasok
Almt : Jl. Persemaian Almt : Jl. Kampung Butun Almt : Jl. Tanjung Batu (Rp)
Telp : - Telp : - Telp :-
(2) (3) (4) (5) (6) (7) (8) (9)
1 Pasir Halus/Pasir Pasang Ret - 650,000 - 650,000 185,714 Pemasok - 1
2 Pasir Beton Ret - 650,000 650,000 185,714 Pemasok - 1
3 Tanah Timbunan Kasar Ret - 200,000 - 57,143 Pemasok - 1
4 Angin Angin Bh - - 50,000 - 50,000 Pemasok - 2
5 Bata Merah Bh - 1,100.00 1,100 - 1,100 Pemasok - 1
6 Batako Bh 1,200 1,200 Pemasok - 2
7 Bata Hebel Bh 17,000 Cahaya Jaya
8 Chipping/Kerikil Ret - 1,800,000 2,000,000 2,200,000 514,286 Pemasok - 1
9 Paving Block Bh
*) Harga Satuan sampai dilokasi Kegiatan (sudah termasuk biaya Transport) Nunukan, ...........................2019

: Mengetahu : Mengetahui : Diperiksa/Diverifikasi Oleh : Diperiksa/Verifikasi Oleh Dibuat/Disepakati Oleh


.…………………… : Kades/Lurah .…………………… : B K M Faskel UPL .…………………… : KSM/Panitia

: Nama : Nama : Nama : Nama : Nama

Jabatan : Kades/Lurah Jabatan : Ketua BKM Jabatan : Faskel : Jabatan Jabatan : Ketua KSM/Panitia

: Tandatangan : Tandatangan : Tandatangan : Tandatangan : Tandatangan


REKAPITULASI REALISASI ANGGARAN BIAYA
INFRASTRUKTUR PENDUKUNG LIVELIHOOD

Kab/Kota : Nunukan
Kecamatan : Nunukan
Kel./Desa : Nunukan Utara
BKM : Terpadu Lestari
Nama Kegiatan : Rumah Wisata Kuliner
Nama KSM : Pesisir

NO NAMA PAKET JENIS PEKERJAAN SATUAN VOLUME HARGA

1 Rumah Wisata Kuliner Unit 1.00 Rp 954,267,000.00


Paket 1 Jumlah Total Rp 954,267,000.00
Jumlah Pembulatan Rp 954,267,000.00
Terbilang :
Sembilan Ratus Sembilan Puluh Lima Juta Rupiah

: Diverifikasi Oleh : Dibuat Oleh


,Askot Infra Fasilitator Teknik, UPL/TIPP

) Syahril, S.T ( )..............................( ) Novianto Christy Adrian, S.T (

Anda mungkin juga menyukai