A.3 Rencana Pengecoran M43
A.3 Rencana Pengecoran M43
1 BALOK LT. 3
BI-1A 1.70 0.20 0.35 0.02 0.12 1.00 0.02 m³ Beton K325 Nfa
BI-1 4.48 0.30 0.35 0.02 0.12 1.00 0.37 m³ Beton K325 Nfa
BI-2 52.55 0.30 0.60 0.02 0.12 1.00 9.36 m³ Beton K325 Nfa
BI-3 23.00 0.30 0.65 0.02 0.12 1.00 4.39 m³ Beton K325 Nfa
BA1 35.36 0.20 0.30 0.02 0.12 1.00 2.02 m³ Beton K325 Nfa
BA2 31.16 0.20 0.35 0.02 0.12 1.00 2.08 m³ Beton K325 Nfa
BA4 3.11 0.25 0.55 0.02 0.12 1.00 0.33 m³ Beton K325 Nfa
BA6 35.72 0.25 0.60 0.02 0.12 1.00 5.26 m³ Beton K325 Nfa
BA7 3.15 0.25 0.40 0.02 0.12 1.00 0.22 m³ Beton K325 Nfa
KS1 1.00 0.30 0.35 0.02 0.12 1.00 0.01 m³ Beton K325 Nfa
KS2 1.00 0.25 0.35 0.02 0.12 1.00 (0.01) m³ Beton K325 Nfa
NB : Kebutuhan cor balok, plat tangga 1-2 dan kolom struktur lt. 2
CATATAN REVISI KETERANGAN M ENG ETA HUI / APP ROVED K OOR DIN ATOR K OOR DIN ATOR J UDUL GAMBAR SKALA PROYEK
R E VIS IONS NOT E DR AW ING T I T LE S C ALE P R OJ E C T
M ENG ETA HUI / APP ROVED K OORDIN ATOR D IG AM BAR
T ANGGAL N O . L EMBAR JU M L A H LBR
GAMBAR AREA COR KOLOM LT. 2
GAMBAR AREA COR KOLOM LT. 2
CATATAN REVISI KETERANGAN MENGETAHUI / APPROVED KOORDINATOR KOORDINATOR JUDUL GAMBAR SKALA PROYEK
R E V I S IO N S NOTE D RA WIN G TITLE S CA L E P RO J E CT
GAMBAR AREA COR RAMP TANGGA
GAMBAR AREA COR TANGGA 1 dan 2
CATATAN REVISI KETERANGAN MENGETAHUI / APPROVED KOORDINATOR KOORDINATOR JUDUL GAMBAR SKALA PROYEK
R E V IS I O N S NOTE D RA W IN G T IT L E S CA L E PRO JECT