NAMA PROYEK : PELAKSANAAN PEMBANGUNAN JALAN TOL RUAS PEKANBARU - PADANG

PEMILIK PROYEK : PT HUTAMA KARYA (Persero)


KONSULTAN PENGAWAS : PT ESKAPINDO MATRA Consulting Engineers
KONTRAKTOR PELAKSANA : PT WIJAYA KARYA (Persero) Tbk

SIMULASI PERHITUNGAN UNIBRIDGE


BERAT
TANGGAL
No. MARKING LIST DIR AKTUAL SHOP DWG KETERANGAN
SURAT JALAN
(ton) (ton) (ton)
MC-16 (MARET 2021)
Jembatan Pulau Gadang 2
1 LINE 1
- ACS 1A 16-Feb-21 13,7125 13,7333 13,7181
- CC+ 1A 18-Feb-21 15,3129 15,2360 15,2330
- CC ++ 1 18-Feb-21 16,0192 15,9986 15,9903
- CC+ 1B 18-Feb-21 15,2773 15,2371 15,2330
- ACS 1B 16-Feb-21 13,7084 13,7265 13,7181
TOTAL LINE 1 74,0303 73,9316 73,8925
2 LINE 2
- ACS 2A 18-Feb-21 13,7109 13,7137 13,7181
- CC+ 2A 18-Feb-21 15,2690 15,2492 15,2330
- CC ++ 2 18-Feb-21 16,0158 16,0014 15,9903
- CC+ 2B 18-Feb-21 15,2787 15,2418 15,2330
- ACS 2B 18-Feb-21 13,7061 13,7314 13,7181
TOTAL LINE 2 73,9804 73,9374 73,8925
3 LINE 3
- ACS 3A 18-Feb-21 13,7182 13,7247 13,7181
- CC+ 3A 16-Feb-21 15,2774 15,2437 15,2330
- CC ++ 3 18-Feb-21 15,9993 16,0073 15,9903
- CC+ 3B 16-Feb-21 15,2770 15,2379 15,2330
- ACS 3B 18-Feb-21 13,7149 13,7277 13,7181
TOTAL LINE 3 73,9868 73,9414 73,8925
4 LINE 16
- ACS 16A 18-Feb-21 13,7108 13,7260 13,7181
- CC+ 16A 16-Feb-21 15,2698 15,2471 15,2330
- CC ++ 16 16-Feb-21 16,0069 15,9907 15,9903
- CC+ 16B 16-Feb-21 15,2893 15,2478 15,2330
- ACS 16B 18-Feb-21 13,7210 13,7337 13,7181
TOTAL LINE 16 73,9977 73,9453 73,8925
NAMA PROYEK : PELAKSANAAN PEMBANGUNAN JALAN TOL RUAS PEKANBARU - PADANG
PEMILIK PROYEK : PT HUTAMA KARYA (Persero)
KONSULTAN PENGAWAS : PT ESKAPINDO MATRA Consulting Engineers
KONTRAKTOR PELAKSANA : PT WIJAYA KARYA (Persero) Tbk

SIMULASI PERHITUNGAN UNIBRIDGE


BERAT
TANGGAL
No. MARKING LIST DIR AKTUAL SHOP DWG KETERANGAN
SURAT JALAN
(ton) (ton) (ton)
MC-17 (APRIL 2021)
Jembatan Pulau Gadang 2
1 LINE 25
- ACS 25A 02-Apr-21 13,7162 13,7305 13,7181
- CC+ 25A 02-Apr-21 15,2853 15,2469 15,2330
- CC ++ 25 01-Apr-21 16,0352 15,9921 15,9903
- CC+ 25B 02-Apr-21 15,2711 15,2478 15,2330
- ACS 25B 02-Apr-21 13,7220 13,7302 13,7181
TOTAL LINE 25 74,0298 73,9476 73,8925
2 LINE 26
- ACS 26A 31-Mar-21 13,7306 13,7317 13,7181
- CC+ 26A 02-Apr-21 15,2651 15,2443 15,2330
- CC ++ 26 01-Apr-21 16,0147 15,9921 15,9903
- CC+ 26B 02-Apr-21 15,2678 15,2459 15,2330
- ACS 26B 31-Mar-21 13,7251 13,7306 13,7181
TOTAL LINE 26 74,0033 73,9446 73,8925
Jembatan Tanjung Alai 1
3 LINE 50
- ACS 50A 21-Apr-21 13,7098 13,7253 13,7181
- CC+ 50A 21-Apr-21 15,2774 15,2469 15,2330
- CC ++ 50 21-Apr-21 16,0125 15,9921 15,9903
- CC+ 50B 21-Apr-21 15,2714 15,2469 15,2330
- ACS 50B 21-Apr-21 13,7136 13,7257 13,7181
TOTAL LINE 50 73,9847 73,9368 73,8925
4 LINE 51
- ACS 51A 21-Apr-21 13,7186 13,7318 13,7181
- CC+ 51A 23-Apr-21 15,2805 15,2469 15,2330
- CC ++ 51 21-Apr-21 16,0289 15,9929 15,9903
- CC+ 51B 23-Apr-21 15,2825 15,2471 15,2330
- ACS 51B 21-Apr-21 13,8133 13,7320 13,7181
TOTAL LINE 51 74,1238 73,9507 73,8925
5 LINE 54
- ACS 54A 21-Apr-21 13,7121 13,7319 13,7181
- CC+ 54A 24-Apr-21 15,2764 15,2476 15,2330
- CC ++ 54 21-Apr-21 16,0274 15,9923 15,9903
- CC+ 54B 24-Apr-21 15,2774 15,2468 15,2330
- ACS 54B 21-Apr-21 13,7078 13,7310 13,7181
TOTAL LINE 54 74,0012 73,9496 73,8925
6 LINE 55
- ACS 55A 22-Apr-21 13,7094 13,7318 13,7181
- CC+ 55A 22-Apr-21 15,2815 15,2468 15,2330
- CC ++ 55 22-Apr-21 16,0383 15,9929 15,9903
- CC+ 55B 22-Apr-21 15,2803 15,2472 15,2330
- ACS 55B 22-Apr-21 13,7156 13,7312 13,7181
TOTAL LINE 55 74,0252 73,9499 73,8925
NAMA PROYEK : PELAKSANAAN PEMBANGUNAN JALAN TOL RUAS PEKANBARU - PADANG
PEMILIK PROYEK : PT HUTAMA KARYA (Persero)
KONSULTAN PENGAWAS : PT ESKAPINDO MATRA Consulting Engineers
KONTRAKTOR PELAKSANA : PT WIJAYA KARYA (Persero) Tbk

SIMULASI PERHITUNGAN UNIBRIDGE


BERAT
TANGGAL
No. MARKING LIST DIR AKTUAL SHOP DWG KETERANGAN
SURAT JALAN
(ton) (ton) (ton)
MC-18 (MEI 2021)
Jembatan Pulau Gadang 1
1 LINE 79
- ACS 79A 29-Apr-21 13,7172 13,7319 13,7181
- CC+ 79A 30-Apr-21 15,2827 15,2469 15,2330
- CC ++ 79 30-Apr-21 16,0284 15,9929 15,9903
- CC+ 79B 30-Apr-21 15,2819 15,2471 15,2330
- ACS 79B 29-Apr-21 13,7121 13,7320 13,7181
TOTAL LINE 79 74,0222 73,9508 73,8925
2 LINE 80
- ACS 80A 30-Apr-21 13,7234 13,7318 13,7181
- CC+ 80A 30-Apr-21 16,4139 15,2469 15,2330
- CC ++ 80 30-Apr-21 16,0388 16,1017 15,9903
- CC+ 80B 30-Apr-21 15,2816 15,2478 15,2330
- ACS 80B 30-Apr-21 13,7202 13,7315 13,7181
TOTAL LINE 80 75,1779 74,0597 73,8925
3 LINE 81
- ACS 81A 30-Apr-21 13,7124 13,7430 13,7181
- CC+ 81A 30-Apr-21 15,2717 15,2469 15,2330
- CC ++ 81 30-Apr-21 16,0141 15,9907 15,9903
- CC+ 81B 30-Apr-21 15,2742 15,2478 15,2330
- ACS 81B 30-Apr-21 13,7074 13,7431 13,7181
TOTAL LINE 81 73,9798 73,9715 73,8925
4 LINE 90
- ACS 90A 29-Apr-21 13,7215 13,7429 13,7181
- CC+ 90A 29-Apr-21 15,2751 15,2478 15,2330
- CC ++ 90 29-Apr-21 16,0361 15,9929 15,9903
- CC+ 90B 29-Apr-21 15,2801 15,2478 15,2330
- ACS 90B 29-Apr-21 13,7208 13,7431 13,7181
TOTAL LINE 90 74,0335 73,9745 73,8925
5 LINE 93
- ACS 93A 27-Apr-21 13,7204 13,7397 13,7181
- CC+ 93A 28-Apr-21 15,2662 15,2469 15,2330
- CC ++ 93 27-Apr-21 16,0219 15,9962 15,9903
- CC+ 93B 28-Apr-21 15,2694 15,2478 15,2330
- ACS 93B 27-Apr-21 13,7097 13,7431 13,7181
TOTAL LINE 93 73,9877 73,9736 73,8925