NO KONTRAK : NO KONTRAK
TANGGAL : TANGGAL
WAKTU PELAKSANAAN : WAKTU PELAKSANAAN
BOBOT
TERHADA
Harga satuan Jumlah Harga
No Uraian Pekerjaan Satuan Volume BOBOT % MINGGU LALU MINGGU INI SAMPAI MINGGU INI P ITEM
(Rp.) (Rp.) PEKERJA
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT AN (%)
I Pekerjaan Persiapan
1 Papan Nama Proyek bh 1.00 599,139.75 659,053.73 0.04 - - - - - - -
2 Penyedia Air Kerja ls 1.00 3,200,000.00 3,520,000.00 0.20 - - - - - - -
3 Penyedia Listrik Kerja ls 1.00 2,250,000.00 2,475,000.00 0.14 - - - - - - -
4 Pembuatan Direksi Keed Dan Gudang m² 6.00 1,651,423.95 10,899,398.07 0.62 - - - - - - -
5 Pengukuran Dan Pemasangan Bowplank ls 1.00 88,384.23 97,222.65 0.01 - - - - - - -
6 Dokumentasi Dan Pelaporan ls 1.00 4,500,000.00 4,950,000.00 0.28 - - - - - - -
7 As Built Drawing ls 1.00 5,215,000.00 5,736,500.00 0.33 - - - - - - -
8 Pembersihan Akhir ls 1.00 4,050,000.00 4,455,000.00 0.25 - - - - - - -
II PEKERJAAN TAMAN
A Pekerjaan Pasangan
1 Pas. Dinding Batu Bata, 1:3 m³ 60.00 179,605.80 4,506,410.05 0.26 - - - - - - -
2 Pas. Beton Tumbuk m³ 5.06 1,394,762.22 7,763,246.52 0.44 - - - - - - -
3 Pas. Plesteran, Camp. 1 :3 m² 60.00 104,806.10 6,917,202.60 0.40 - - - - - - -
4 Pas. Acian Dinding m² 60.00 58,409.51 3,855,027.66 0.22 - - - - - - -
5 Cat m² 60.00 41,336.13 2,728,184.58 0.16 - - - - - - -
D PEKERJAAN ELEKTRIKAL
1 Pasang Box Panel bh 1.00 40,606.04 44,666.64 0.00 - - - - - - -
2 Pasang MCB bh 2.00 71,860.34 158,092.75 0.01 - - - - - - -
3 Pas. Stop Kontak bh 24.00 191,410.56 5,053,238.78 0.29 - - - - - - -
4 Pas. Saklar Ganda bh 12.00 191,410.56 2,526,619.39 0.14 - - - - - - -
5 Pas. Lampu jari-jari Philips 18 Watt Ttk 48.00 249,028.56 13,148,707.97 0.75 - - - - - - -
6 Pas. Kabel NYM m¹ 250.00 60,794.91 16,718,600.25 0.96 - - - - - - -
7 Penyambungan Baru Listrik 2300VA ls 1.00 2,500,000.00 2,750,000.00 0.16 - - - - - - -
IV PEKERJAAN JAMBAN
A PEKERJAAN TANAH DAN PONDASI
1 Galian Tanah Pondasi Jalur m³ 17.13 119,245.50 2,246,942.96 0.13 - - - - - - -
2 Urugan Pasir bawah Pondasi m³ 1.32 464,092.20 673,861.87 0.04 - - - - - - -
3 Urugan pasir bawah Lantai m³ 0.73 464,092.20 372,666.04 0.02 - - - - - - -
4 Urugan Tanah Gal. Tanah Kembali m³ 4.28 39,748.50 187,135.94 0.01 - - - - - - -
5 Urugan Tanah Bawah Lantai m³ 3.53 387,941.40 1,506,376.46 0.09 - - - - - - -
6 Pas. Pondasi Batu Kosong m³ 3.95 622,795.83 2,706,047.88 0.15 - - 3.95 0.15 3.95 0.15 100.00
7 Pas. Pondasi Batu Kali1:4 m³ 6.20 1,347,805.31 9,192,032.21 0.53 - - 6.20 0.53 6.20 0.53 100.00
D PEKERJAAN PLAFOND
1 Pas. Rangka Plafond Kayu 5/5 Kelas II m² 27.28 140,332.01 4,211,082.96 0.24 - - - - - - -
2 Pas. Penutup Plafond Tripleks 4 mm m² 27.28 61,181.51 1,835,934.75 0.11 - - - - - - -
3 Pas. List Profil Plafond m¹ 61.56 29,917.80 2,025,913.74 0.12 - - - - - - -
4 Cat Plafond m² 27.23 41,336.13 1,240,414.59 0.07 - - - - - - -
F PEKERJAAN ATAP
1 Pas. Kuda-kuda Kayu 5/10 Kayu Kelas II m³ 0.23 9,735,372.90 2,463,049.34 0.14 - - - - - - -
2 Pas. Gording Kayu 5/5 Kayu Kelas II m³ 0.21 9,138,353.40 2,110,959.64 0.12 - - - - - - -
3 Pas. Blk. Kasau Dan Ring, Kayu Kelas II m² 56.88 255,731.85 16,000,630.39 0.92 - - - - - - -
4 Pas. Atap Genteng Multiroof BJLS 0.25mm m² 56.88 153,094.59 9,578,822.31 0.55 - - - - - - -
5 Pas. Bubungan Atap Seng Multiroof m¹ 16.15 206,556.57 3,669,477.47 0.21 - - - - - - -
6 Pas. Listplank Kayu Kelas II m¹ 23.32 97,900.11 2,511,333.62 0.14 - - - - - - -
G PEKERJAAN SANITASI
1 Pek. Septicktank ls 1.00 6,500,000.00 7,150,000.00 0.41 - - - - - - -
2 Pek. Bak Air ls 4.00 1,000,000.00 4,400,000.00 0.25 - - - - - - -
3 Pas. Pipa Air Bersih PVC AW 1/2' m¹ 30.00 25,049.18 826,622.94 0.05 - - - - - - -
4 Pas. Pipa Tinja PVC 4" m¹ 6.00 128,422.21 847,586.59 0.05 - - - - - - -
5 Pas. Pipa Air Kotor PVC 2" m¹ 6.00 55,541.03 366,570.80 0.02 - - - - - - -
6 Pas. Floor Drain bh 4.00 315,717.93 1,389,158.89 0.08 - - - - - - -
7 Pas. Kloset Jongkok bh 4.00 977,829.93 4,302,451.69 0.25 - - - - - - -
8 Pas. Keran Air Km//Wc bh 4.00 86,434.43 380,311.49 0.02 - - - - - - -
9 Penyambungan Baru Air PDAM ls 1.00 3,000,000.00 3,300,000.00 0.19 - - - - - - -
I PEKERJAAN ELEKTRIKAL
1 Pas. Saklar Tunggal bh 4.00 143,557.92 631,654.85 0.04 - - - - - - -
2 Pas. Saklar Ganda bh 2.00 249,028.56 421,103.23 0.02 - - - - - - -
3 Pas. Lampu Philipps Jari-jari 18 Watt m¹ 8.00 21,879.00 2,191,451.33 0.13 - - - - - - -
4 Pas. Pipa Instalasi Listrik m¹ 20.00 60,794.91 481,338.00 0.03 - - - - - - -
5 Pas. Kabel NYM m¹ 40.00 60,794.91 2,674,976.04 0.15 - - - - - - -
J PEKERJAAN LANTAI PAVING
1 Urugan Pasir Bawah Paving m³ 92.24 464,092.20 47,088,650.98 2.69 - - - - - - -
2 Pas. Paving Blok K-300 m² 1,844.78 349,061.13 708,335,090.54 40.51 - - - - - - -
3 CAT Paving m² 1,844.79 41,336.13 83,881,672.49 4.80 - - - - - - -
NO KONTRAK : NO KONTRAK
TANGGAL : TANGGAL
WAKTU PELAKSANAAN : WAKTU PELAKSANAAN
BOBOT
TERHADA
Harga satuan Jumlah Harga
No Uraian Pekerjaan Satuan Volume BOBOT % MINGGU LALU MINGGU INI SAMPAI MINGGU INI P ITEM
(Rp.) (Rp.) PEKERJAA
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT N (%)
I Pekerjaan Persiapan
1 Papan Nama Proyek bh 1.00 599,139.75 659,053.73 0.04 - - - - - - -
2 Penyedia Air Kerja ls 1.00 3,200,000.00 3,520,000.00 0.20 - - - - - - -
3 Penyedia Listrik Kerja ls 1.00 2,250,000.00 2,475,000.00 0.14 - - - - - - -
4 Pembuatan Direksi Keed Dan Gudang m² 6.00 1,651,423.95 10,899,398.07 0.62 - - - - - - -
5 Pengukuran Dan Pemasangan Bowplank ls 1.00 88,384.23 97,222.65 0.01 - - - - - - -
6 Dokumentasi Dan Pelaporan ls 1.00 4,500,000.00 4,950,000.00 0.28 - - - - - - -
7 As Built Drawing ls 1.00 5,215,000.00 5,736,500.00 0.33 - - - - - - -
8 Pembersihan Akhir ls 1.00 4,050,000.00 4,455,000.00 0.25 - - - - - - -
II PEKERJAAN TAMAN
A Pekerjaan Pasangan
1 Pas. Dinding Batu Bata, 1:3 m³ 60.00 179,605.80 4,506,410.05 0.26 - - - - - - -
2 Pas. Beton Tumbuk m³ 5.06 1,394,762.22 7,763,246.52 0.44 - - - - - - -
3 Pas. Plesteran, Camp. 1 :3 m² 60.00 104,806.10 6,917,202.60 0.40 - - - - - - -
4 Pas. Acian Dinding m² 60.00 58,409.51 3,855,027.66 0.22 - - - - - - -
5 Cat m² 60.00 41,336.13 2,728,184.58 0.16 - - - - - - -
D PEKERJAAN ELEKTRIKAL
1 Pasang Box Panel bh 1.00 40,606.04 44,666.64 0.00 - - - - - - -
2 Pasang MCB bh 2.00 71,860.34 158,092.75 0.01 - - - - - - -
3 Pas. Stop Kontak bh 24.00 191,410.56 5,053,238.78 0.29 - - - - - - -
4 Pas. Saklar Ganda bh 12.00 191,410.56 2,526,619.39 0.14 - - - - - - -
5 Pas. Lampu jari-jari Philips 18 Watt Ttk 48.00 249,028.56 13,148,707.97 0.75 - - - - - - -
6 Pas. Kabel NYM m¹ 250.00 60,794.91 16,718,600.25 0.96 - - - - - - -
7 Penyambungan Baru Listrik 2300VA ls 1.00 2,500,000.00 2,750,000.00 0.16 - - - - - - -
IV PEKERJAAN JAMBAN
A PEKERJAAN TANAH DAN PONDASI
1 Galian Tanah Pondasi Jalur m³ 17.13 119,245.50 2,246,942.96 0.13 - - 17.13 0.13 17.13 0.13 100.00
2 Urugan Pasir bawah Pondasi m³ 1.32 464,092.20 673,861.87 0.04 - - 1.32 0.04 1.32 0.04 100.00
3 Urugan pasir bawah Lantai m³ 0.73 464,092.20 372,666.04 0.02 - - - - - - -
4 Urugan Tanah Gal. Tanah Kembali m³ 4.28 39,748.50 187,135.94 0.01 - - - - - - -
5 Urugan Tanah Bawah Lantai m³ 3.53 387,941.40 1,506,376.46 0.09 - - - - - - -
6 Pas. Pondasi Batu Kosong m³ 3.95 622,795.83 2,706,047.88 0.15 - - 3.95 0.15 3.95 0.15 100.00
7 Pas. Pondasi Batu Kali1:4 m³ 6.20 1,347,805.31 9,192,032.21 0.53 - - 6.20 0.53 6.20 0.53 100.00
D PEKERJAAN PLAFOND
1 Pas. Rangka Plafond Kayu 5/5 Kelas II m² 27.28 140,332.01 4,211,082.96 0.24 - - - - - - -
2 Pas. Penutup Plafond Tripleks 4 mm m² 27.28 61,181.51 1,835,934.75 0.11 - - - - - - -
3 Pas. List Profil Plafond m¹ 61.56 29,917.80 2,025,913.74 0.12 - - - - - - -
4 Cat Plafond m² 27.23 41,336.13 1,240,414.59 0.07 - - - - - - -
F PEKERJAAN ATAP
1 Pas. Kuda-kuda Kayu 5/10 Kayu Kelas II m³ 0.23 9,735,372.90 2,463,049.34 0.14 - - - - - - -
2 Pas. Gording Kayu 5/5 Kayu Kelas II m³ 0.21 9,138,353.40 2,110,959.64 0.12 - - - - - - -
3 Pas. Blk. Kasau Dan Ring, Kayu Kelas II m² 56.88 255,731.85 16,000,630.39 0.92 - - - - - - -
4 Pas. Atap Genteng Multiroof BJLS 0.25mm m² 56.88 153,094.59 9,578,822.31 0.55 - - - - - - -
5 Pas. Bubungan Atap Seng Multiroof m¹ 16.15 206,556.57 3,669,477.47 0.21 - - - - - - -
6 Pas. Listplank Kayu Kelas II m¹ 23.32 97,900.11 2,511,333.62 0.14 - - - - - - -
G PEKERJAAN SANITASI
1 Pek. Septicktank ls 1.00 6,500,000.00 7,150,000.00 0.41 - - - - - - -
2 Pek. Bak Air ls 4.00 1,000,000.00 4,400,000.00 0.25 - - - - - - -
3 Pas. Pipa Air Bersih PVC AW 1/2' m¹ 30.00 25,049.18 826,622.94 0.05 - - - - - - -
4 Pas. Pipa Tinja PVC 4" m¹ 6.00 128,422.21 847,586.59 0.05 - - - - - - -
5 Pas. Pipa Air Kotor PVC 2" m¹ 6.00 55,541.03 366,570.80 0.02 - - - - - - -
6 Pas. Floor Drain bh 4.00 315,717.93 1,389,158.89 0.08 - - - - - - -
7 Pas. Kloset Jongkok bh 4.00 977,829.93 4,302,451.69 0.25 - - - - - - -
8 Pas. Keran Air Km//Wc bh 4.00 86,434.43 380,311.49 0.02 - - - - - - -
9 Penyambungan Baru Air PDAM ls 1.00 3,000,000.00 3,300,000.00 0.19 - - - - - - -
I PEKERJAAN ELEKTRIKAL
1 Pas. Saklar Tunggal bh 4.00 143,557.92 631,654.85 0.04 - - - - - - -
2 Pas. Saklar Ganda bh 2.00 249,028.56 421,103.23 0.02 - - - - - - -
3 Pas. Lampu Philipps Jari-jari 18 Watt m¹ 8.00 21,879.00 2,191,451.33 0.13 - - - - - - -
4 Pas. Pipa Instalasi Listrik m¹ 20.00 60,794.91 481,338.00 0.03 - - - - - - -
5 Pas. Kabel NYM m¹ 40.00 60,794.91 2,674,976.04 0.15 - - - - - - -
J PEKERJAAN LANTAI PAVING
1 Urugan Pasir Bawah Paving m³ 92.24 464,092.20 47,088,650.98 2.69 - - - - - - -
2 Pas. Paving Blok K-300 m² 1,844.78 349,061.13 708,335,090.54 40.51 - - - - - - -
3 CAT Paving m² 1,844.79 41,336.13 83,881,672.49 4.80 - - - - - - -
NO KONTRAK : NO KONTRAK
TANGGAL : TANGGAL
WAKTU PELAKSANAAN : WAKTU PELAKSANAAN
BOBOT
TERHADA
Harga satuan Jumlah Harga
No Uraian Pekerjaan Satuan Volume BOBOT % MINGGU LALU MINGGU INI SAMPAI MINGGU INI P ITEM
(Rp.) (Rp.) PEKERJAA
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT N (%)
I Pekerjaan Persiapan
1 Papan Nama Proyek bh 1.00 599,139.75 659,053.73 0.04 - - - - - - -
2 Penyedia Air Kerja ls 1.00 3,200,000.00 3,520,000.00 0.20 - - - - - - -
3 Penyedia Listrik Kerja ls 1.00 2,250,000.00 2,475,000.00 0.14 - - - - - - -
4 Pembuatan Direksi Keed Dan Gudang m² 6.00 1,651,423.95 10,899,398.07 0.62 - - - - - - -
5 Pengukuran Dan Pemasangan Bowplank ls 1.00 88,384.23 97,222.65 0.01 - - - - - - -
6 Dokumentasi Dan Pelaporan ls 1.00 4,500,000.00 4,950,000.00 0.28 - - - - - - -
7 As Built Drawing ls 1.00 5,215,000.00 5,736,500.00 0.33 - - - - - - -
8 Pembersihan Akhir ls 1.00 4,050,000.00 4,455,000.00 0.25 - - - - - - -
II PEKERJAAN TAMAN
A Pekerjaan Pasangan
1 Pas. Dinding Batu Bata, 1:3 m³ 60.00 179,605.80 4,506,410.05 0.26 - - - - - - -
2 Pas. Beton Tumbuk m³ 5.06 1,394,762.22 7,763,246.52 0.44 - - - - - - -
3 Pas. Plesteran, Camp. 1 :3 m² 60.00 104,806.10 6,917,202.60 0.40 - - - - - - -
4 Pas. Acian Dinding m² 60.00 58,409.51 3,855,027.66 0.22 - - - - - - -
5 Cat m² 60.00 41,336.13 2,728,184.58 0.16 - - - - - - -
D PEKERJAAN ELEKTRIKAL
1 Pasang Box Panel bh 1.00 40,606.04 44,666.64 0.00 - - - - - - -
2 Pasang MCB bh 2.00 71,860.34 158,092.75 0.01 - - - - - - -
3 Pas. Stop Kontak bh 24.00 191,410.56 5,053,238.78 0.29 - - - - - - -
4 Pas. Saklar Ganda bh 12.00 191,410.56 2,526,619.39 0.14 - - - - - - -
5 Pas. Lampu jari-jari Philips 18 Watt Ttk 48.00 249,028.56 13,148,707.97 0.75 - - - - - - -
6 Pas. Kabel NYM m¹ 250.00 60,794.91 16,718,600.25 0.96 - - - - - - -
7 Penyambungan Baru Listrik 2300VA ls 1.00 2,500,000.00 2,750,000.00 0.16 - - - - - - -
IV PEKERJAAN JAMBAN
A PEKERJAAN TANAH DAN PONDASI
1 Galian Tanah Pondasi Jalur m³ 17.13 119,245.50 2,246,942.96 0.13 - - 17.13 0.13 17.13 0.13 100.00
2 Urugan Pasir bawah Pondasi m³ 1.32 464,092.20 673,861.87 0.04 - - 1.32 0.04 1.32 0.04 100.00
3 Urugan pasir bawah Lantai m³ 0.73 464,092.20 372,666.04 0.02 - - - - - - -
4 Urugan Tanah Gal. Tanah Kembali m³ 4.28 39,748.50 187,135.94 0.01 - - - - - - -
5 Urugan Tanah Bawah Lantai m³ 3.53 387,941.40 1,506,376.46 0.09 - - - - - - -
6 Pas. Pondasi Batu Kosong m³ 3.95 622,795.83 2,706,047.88 0.15 - - 3.95 0.15 3.95 0.15 100.00
7 Pas. Pondasi Batu Kali1:4 m³ 6.20 1,347,805.31 9,192,032.21 0.53 - - 6.20 0.53 6.20 0.53 100.00
D PEKERJAAN PLAFOND
1 Pas. Rangka Plafond Kayu 5/5 Kelas II m² 27.28 140,332.01 4,211,082.96 0.24 - - - - - - -
2 Pas. Penutup Plafond Tripleks 4 mm m² 27.28 61,181.51 1,835,934.75 0.11 - - - - - - -
3 Pas. List Profil Plafond m¹ 61.56 29,917.80 2,025,913.74 0.12 - - - - - - -
4 Cat Plafond m² 27.23 41,336.13 1,240,414.59 0.07 - - - - - - -
F PEKERJAAN ATAP
1 Pas. Kuda-kuda Kayu 5/10 Kayu Kelas II m³ 0.23 9,735,372.90 2,463,049.34 0.14 - - - - - - -
2 Pas. Gording Kayu 5/5 Kayu Kelas II m³ 0.21 9,138,353.40 2,110,959.64 0.12 - - - - - - -
3 Pas. Blk. Kasau Dan Ring, Kayu Kelas II m² 56.88 255,731.85 16,000,630.39 0.92 - - - - - - -
4 Pas. Atap Genteng Multiroof BJLS 0.25mm m² 56.88 153,094.59 9,578,822.31 0.55 - - - - - - -
5 Pas. Bubungan Atap Seng Multiroof m¹ 16.15 206,556.57 3,669,477.47 0.21 - - - - - - -
6 Pas. Listplank Kayu Kelas II m¹ 23.32 97,900.11 2,511,333.62 0.14 - - - - - - -
G PEKERJAAN SANITASI
1 Pek. Septicktank ls 1.00 6,500,000.00 7,150,000.00 0.41 - - - - - - -
2 Pek. Bak Air ls 4.00 1,000,000.00 4,400,000.00 0.25 - - - - - - -
3 Pas. Pipa Air Bersih PVC AW 1/2' m¹ 30.00 25,049.18 826,622.94 0.05 - - - - - - -
4 Pas. Pipa Tinja PVC 4" m¹ 6.00 128,422.21 847,586.59 0.05 - - - - - - -
5 Pas. Pipa Air Kotor PVC 2" m¹ 6.00 55,541.03 366,570.80 0.02 - - - - - - -
6 Pas. Floor Drain bh 4.00 315,717.93 1,389,158.89 0.08 - - - - - - -
7 Pas. Kloset Jongkok bh 4.00 977,829.93 4,302,451.69 0.25 - - - - - - -
8 Pas. Keran Air Km//Wc bh 4.00 86,434.43 380,311.49 0.02 - - - - - - -
9 Penyambungan Baru Air PDAM ls 1.00 3,000,000.00 3,300,000.00 0.19 - - - - - - -
I PEKERJAAN ELEKTRIKAL
1 Pas. Saklar Tunggal bh 4.00 143,557.92 631,654.85 0.04 - - - - - - -
2 Pas. Saklar Ganda bh 2.00 249,028.56 421,103.23 0.02 - - - - - - -
3 Pas. Lampu Philipps Jari-jari 18 Watt m¹ 8.00 21,879.00 2,191,451.33 0.13 - - - - - - -
4 Pas. Pipa Instalasi Listrik m¹ 20.00 60,794.91 481,338.00 0.03 - - - - - - -
5 Pas. Kabel NYM m¹ 40.00 60,794.91 2,674,976.04 0.15 - - - - - - -
J PEKERJAAN LANTAI PAVING
1 Urugan Pasir Bawah Paving m³ 92.24 464,092.20 47,088,650.98 2.69 - - - - - - -
2 Pas. Paving Blok K-300 m² 1,844.78 349,061.13 708,335,090.54 40.51 - - - - - - -
3 CAT Paving m² 1,844.79 41,336.13 83,881,672.49 4.80 - - - - - - -
NO KONTRAK : NO KONTRAK
TANGGAL : TANGGAL
WAKTU PELAKSANAAN : WAKTU PELAKSANAAN
BOBOT
TERHADA
Harga satuan Jumlah Harga
No Uraian Pekerjaan Satuan Volume BOBOT % MINGGU LALU MINGGU INI SAMPAI MINGGU INI P ITEM
(Rp.) (Rp.) PEKERJAA
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT N (%)
I Pekerjaan Persiapan
1 Papan Nama Proyek bh 1.00 599,139.75 659,053.73 0.04 - - - - - - -
2 Penyedia Air Kerja ls 1.00 3,200,000.00 3,520,000.00 0.20 - - - - - - -
3 Penyedia Listrik Kerja ls 1.00 2,250,000.00 2,475,000.00 0.14 - - - - - - -
4 Pembuatan Direksi Keed Dan Gudang m² 6.00 1,651,423.95 10,899,398.07 0.62 - - - - - - -
5 Pengukuran Dan Pemasangan Bowplank ls 1.00 88,384.23 97,222.65 0.01 - - - - - - -
6 Dokumentasi Dan Pelaporan ls 1.00 4,500,000.00 4,950,000.00 0.28 - - - - - - -
7 As Built Drawing ls 1.00 5,215,000.00 5,736,500.00 0.33 - - - - - - -
8 Pembersihan Akhir ls 1.00 4,050,000.00 4,455,000.00 0.25 - - - - - - -
II PEKERJAAN TAMAN
A Pekerjaan Pasangan
1 Pas. Dinding Batu Bata, 1:3 m³ 60.00 179,605.80 4,506,410.05 0.26 - - - - - - -
2 Pas. Beton Tumbuk m³ 5.06 1,394,762.22 7,763,246.52 0.44 - - - - - - -
3 Pas. Plesteran, Camp. 1 :3 m² 60.00 104,806.10 6,917,202.60 0.40 - - - - - - -
4 Pas. Acian Dinding m² 60.00 58,409.51 3,855,027.66 0.22 - - - - - - -
5 Cat m² 60.00 41,336.13 2,728,184.58 0.16 - - - - - - -
D PEKERJAAN ELEKTRIKAL
1 Pasang Box Panel bh 1.00 40,606.04 44,666.64 0.00 - - - - - - -
2 Pasang MCB bh 2.00 71,860.34 158,092.75 0.01 - - - - - - -
3 Pas. Stop Kontak bh 24.00 191,410.56 5,053,238.78 0.29 - - - - - - -
4 Pas. Saklar Ganda bh 12.00 191,410.56 2,526,619.39 0.14 - - - - - - -
5 Pas. Lampu jari-jari Philips 18 Watt Ttk 48.00 249,028.56 13,148,707.97 0.75 - - - - - - -
6 Pas. Kabel NYM m¹ 250.00 60,794.91 16,718,600.25 0.96 - - - - - - -
7 Penyambungan Baru Listrik 2300VA ls 1.00 2,500,000.00 2,750,000.00 0.16 - - - - - - -
IV PEKERJAAN JAMBAN
A PEKERJAAN TANAH DAN PONDASI
1 Galian Tanah Pondasi Jalur m³ 17.13 119,245.50 2,246,942.96 0.13 - - 17.13 0.13 17.13 0.13 100.00
2 Urugan Pasir bawah Pondasi m³ 1.32 464,092.20 673,861.87 0.04 - - 1.32 0.04 1.32 0.04 100.00
3 Urugan pasir bawah Lantai m³ 0.73 464,092.20 372,666.04 0.02 - - - - - - -
4 Urugan Tanah Gal. Tanah Kembali m³ 4.28 39,748.50 187,135.94 0.01 - - - - - - -
5 Urugan Tanah Bawah Lantai m³ 3.53 387,941.40 1,506,376.46 0.09 - - - - - - -
6 Pas. Pondasi Batu Kosong m³ 3.95 622,795.83 2,706,047.88 0.15 - - 3.95 0.15 3.95 0.15 100.00
7 Pas. Pondasi Batu Kali1:4 m³ 6.20 1,347,805.31 9,192,032.21 0.53 - - 6.20 0.53 6.20 0.53 100.00
D PEKERJAAN PLAFOND
1 Pas. Rangka Plafond Kayu 5/5 Kelas II m² 27.28 140,332.01 4,211,082.96 0.24 - - - - - - -
2 Pas. Penutup Plafond Tripleks 4 mm m² 27.28 61,181.51 1,835,934.75 0.11 - - - - - - -
3 Pas. List Profil Plafond m¹ 61.56 29,917.80 2,025,913.74 0.12 - - - - - - -
4 Cat Plafond m² 27.23 41,336.13 1,240,414.59 0.07 - - - - - - -
F PEKERJAAN ATAP
1 Pas. Kuda-kuda Kayu 5/10 Kayu Kelas II m³ 0.23 9,735,372.90 2,463,049.34 0.14 - - - - - - -
2 Pas. Gording Kayu 5/5 Kayu Kelas II m³ 0.21 9,138,353.40 2,110,959.64 0.12 - - - - - - -
3 Pas. Blk. Kasau Dan Ring, Kayu Kelas II m² 56.88 255,731.85 16,000,630.39 0.92 - - - - - - -
4 Pas. Atap Genteng Multiroof BJLS 0.25mm m² 56.88 153,094.59 9,578,822.31 0.55 - - - - - - -
5 Pas. Bubungan Atap Seng Multiroof m¹ 16.15 206,556.57 3,669,477.47 0.21 - - - - - - -
6 Pas. Listplank Kayu Kelas II m¹ 23.32 97,900.11 2,511,333.62 0.14 - - - - - - -
G PEKERJAAN SANITASI
1 Pek. Septicktank ls 1.00 6,500,000.00 7,150,000.00 0.41 - - - - - - -
2 Pek. Bak Air ls 4.00 1,000,000.00 4,400,000.00 0.25 - - - - - - -
3 Pas. Pipa Air Bersih PVC AW 1/2' m¹ 30.00 25,049.18 826,622.94 0.05 - - - - - - -
4 Pas. Pipa Tinja PVC 4" m¹ 6.00 128,422.21 847,586.59 0.05 - - - - - - -
5 Pas. Pipa Air Kotor PVC 2" m¹ 6.00 55,541.03 366,570.80 0.02 - - - - - - -
6 Pas. Floor Drain bh 4.00 315,717.93 1,389,158.89 0.08 - - - - - - -
7 Pas. Kloset Jongkok bh 4.00 977,829.93 4,302,451.69 0.25 - - - - - - -
8 Pas. Keran Air Km//Wc bh 4.00 86,434.43 380,311.49 0.02 - - - - - - -
9 Penyambungan Baru Air PDAM ls 1.00 3,000,000.00 3,300,000.00 0.19 - - - - - - -
I PEKERJAAN ELEKTRIKAL
1 Pas. Saklar Tunggal bh 4.00 143,557.92 631,654.85 0.04 - - - - - - -
2 Pas. Saklar Ganda bh 2.00 249,028.56 421,103.23 0.02 - - - - - - -
3 Pas. Lampu Philipps Jari-jari 18 Watt m¹ 8.00 21,879.00 2,191,451.33 0.13 - - - - - - -
4 Pas. Pipa Instalasi Listrik m¹ 20.00 60,794.91 481,338.00 0.03 - - - - - - -
5 Pas. Kabel NYM m¹ 40.00 60,794.91 2,674,976.04 0.15 - - - - - - -
J PEKERJAAN LANTAI PAVING
1 Urugan Pasir Bawah Paving m³ 92.24 464,092.20 47,088,650.98 2.69 - - - - - - -
2 Pas. Paving Blok K-300 m² 1,844.78 349,061.13 708,335,090.54 40.51 - - - - - - -
3 CAT Paving m² 1,844.79 41,336.13 83,881,672.49 4.80 - - - - - - -
Kepada Yth,
Di-
Tempat.
Dengan Hormat,
Bersama ini kami sampaikan Progres Realisasi Lapangan (Bulan Oktober Tahun 2017, Pada
Minggu ke 28) dari Pekerjaan Pengawasan Teknik untuk :
Adapun progres Pekerjaan fisik dilapangan pada periode ini adalah : 59.39 %
Demikian Laporan ini kami sampaikan, atas perhatian dan kerja samanya diucapkan terima
kasih.
KONSULTAN PENGAWAS
CV. ARCHIVIL ENGINEERING
NO KONTRAK : NO KONTRAK
TANGGAL : TANGGAL
WAKTU PELAKSANAAN : WAKTU PELAKSANAAN
BOBOT
TERHADA
Harga satuan Jumlah Harga
No Uraian Pekerjaan Satuan Volume BOBOT % MINGGU LALU MINGGU INI SAMPAI MINGGU INI P ITEM
(Rp.) (Rp.) PEKERJAA
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT N (%)
I Pekerjaan Persiapan
1 Papan Nama Proyek bh 1.00 599,139.75 659,053.73 0.04 - - 1.00 0.04 1.00 0.04 100.00
2 Penyedia Air Kerja ls 1.00 3,200,000.00 3,520,000.00 0.20 - - 1.00 0.20 1.00 0.20 100.00
3 Penyedia Listrik Kerja ls 1.00 2,250,000.00 2,475,000.00 0.14 - - 1.00 0.14 1.00 0.14 100.00
4 Pembuatan Direksi Keed Dan Gudang m² 6.00 1,651,423.95 10,899,398.07 0.62 - - 6.00 0.62 6.00 0.62 100.00
5 Pengukuran Dan Pemasangan Bowplank ls 1.00 88,384.23 97,222.65 0.01 - - 1.00 0.01 1.00 0.01 100.00
6 Dokumentasi Dan Pelaporan ls 1.00 4,500,000.00 4,950,000.00 0.28 - - - - - - -
7 As Built Drawing ls 1.00 5,215,000.00 5,736,500.00 0.33 - - - - - - -
8 Pembersihan Akhir ls 1.00 4,050,000.00 4,455,000.00 0.25 - - - - - - -
-
II PEKERJAAN TAMAN -
A Pekerjaan Pasangan -
1 Pas. Dinding Batu Bata, 1:3 m³ 60.00 179,605.80 4,506,410.05 0.26 - - - - - - -
2 Pas. Beton Tumbuk m³ 5.06 1,394,762.22 7,763,246.52 0.44 - - - - - - -
3 Pas. Plesteran, Camp. 1 :3 m² 60.00 104,806.10 6,917,202.60 0.40 - - - - - - -
4 Pas. Acian Dinding m² 60.00 58,409.51 3,855,027.66 0.22 - - - - - - -
5 Cat m² 60.00 41,336.13 2,728,184.58 0.16 - - - - - - -
-
B PEKERJAAN TANAH TIMBUNAN/POHON -
1 Pek. Timbunan m³ 56.64 387,941.40 24,170,300.99 1.38 - - - - - - -
2 Pohon Ketapang bh 6.00 645,916.20 4,263,046.92 0.24 - - - - - - -
3 Pohon Palm bh 2.00 945,916.20 2,079,915.64 0.12 - - - - - - -
4 Rumput Jepang m² - 145,916.20 0 - - - - - - - -
5 Rabat Beton m³ 5.06 1,394,762.22 7,763,246.52 0.44 - - - - - - -
-
III PEKERJAAN FOOD CORE -
A PEKERJAAN TANAH DAN PONDASI -
1 Galian Tanah Dan Pondasi jalur m³ 49.06 119,245.50 6,435,202.65 0.37 - - - - - - -
2 Urugan Pasir Bawah Pondasi Batu Kali m³ 4.65 464,092.20 2,373,831.60 0.14 - - - - - - -
3 Urugan Tanah Gal. Pondasi Kembali m³ 12.26 39,748.50 536,048.27 0.03 - - - - - - -
4 Urugan Pasir Bawah Lantai m³ 11.76 464,092.20 6,003,496.70 0.34 - - - - - - -
5 Urugan Tanah Bawah Lantai m³ 36.53 387,941.40 15,588,649.28 0.89 - - - - - - -
6 Pas. Batu Kosong m³ 12.69 622,795.83 8,693,606.99 0.50 - - -
7 Pas. Pondasi Batu Kali, Camp 1:4 m³ 24.27 1,347,805.31 35,982,358.36 2.06 - - -
-
B PEKERJAAN BETON DAN BATA -
1 Pekerjaan Sloof 18x25 cm -
- Bekesting Sloof Beton m² 46.50 266,127.54 13,612,423.67 0.78 - - - - - - -
- Tulangan Besi Beton 8 mm -U24 Kg 177.72 13,577.42 2,654,276.99 0.15 - - - - - - -
- Tulangan Besi Beton 12 mm - U39 Kg 347.63 13,577.42 5,191,910.37 0.30 - - - - - - -
- Beton K-175 m³ 4.18 1,548,974.64 7,122,185.39 0.41 - - - - - - -
-
2 Pek. Kolom 15x15 cm -
- Bekesting Sloof Beton m² 46.80 476,031.60 24,506,106.77 1.40 - -
- Tulangan Besi Beton 8 mm -U24 Kg 93.69 13,577.42 1,399,275.33 0.08 - - - - - - -
- Tulangan Besi Beton 12 mm - U39 Kg 340.16 13,577.42 5,080,344.71 0.29 - - - - - - -
- Beton K-175 m³ 1.75 1,548,974.64 2,981,776.18 0.17 - - - - - - -
-
3 Pek. Ring Balok 15x25 cm -
- Bekesting Ring Balok m² 62.94 487,368.09 33,742,442.34 1.93 - - - - - - -
- Tulangan Besi Beton 8 mm -U24 Kg 68.89 13,577.42 1,043,818.47 0.06 - - - - - - -
- Tulangan Besi Beton 12 mm - U39 Kg 149.52 13,577.42 2,233,105.42 0.13 - - - - - - -
- Beton K-175 m³ 3.28 1,548,974.64 5,588,700.50 0.32 - - - - - - -
4 Pek. Lantai Beton Tumbuk, Camp 1:3:5 m³ 9.11 1,394,762.22 13,976,912.21 0.80 - - - - - - -
5 Pek. Bata Lapisan Kolom, Camp 1:3 m² 21.84 177,809.74 4,271,701.19 0.24 - - - - - - -
6 Pek. Plesteran Bata, Camp 1:3 m² 21.84 104,806.10 2,517,861.75 0.14 - - - - - - -
-
C PEKERJAAN KAYU, ATAP, CAT DAN LANTAI -
1 Pek. Pagar Kayu Kelas II m³ 6.43 8,838,220.05 62,512,730.41 3.58 - - - - - -
2 Pek. Lambersering Lapisan Kolom, Kayu Kelas II m² 31.81 340,579.80 11,917,227.78 0.68 - - - - - -
3 Pek. Rangka Plafond Kayu 5/5 Kelas II m² 191.14 140,322.01 29,505,366.43 1.69 - - - - - - -
4 Pek. Penutup Plafond Tripleks 4mm m² 191.14 61,181.51 12,863,657.20 0.74 - - - - - - -
5 Pek. Kuda-Kuda Kayu 5/10 Kelas II m³ 2.25 9,735,372.90 24,095,047.93 1.38 - - - - - - -
6 Pek. Gording Kayu 5/5 Kelas II m³ 1.14 9,138,353.40 11,459,495.16 0.66 - - - - - - -
7 Pek. Rangka Atap Seng Multiroof m² 269.80 255,731.85 75,896,098.44 4.34 - - - - - - -
8 Pek. Penutup Atap Seng Mulltiroof m² 269.80 153,094.59 45,435,412.42 2.60 - - - - - - -
9 Pek. Bubungan Atap Seng Multiroof m¹ 49.50 206,556.57 11,247,005.24 0.64 - - - - - - -
10 Pek. Listplank Papan Kayu Kelas -II m¹ 162.00 97,900.11 17,445,799.60 1.00 - - - - - - -
11 Cat kayu (vernis) m² 359.88 72,224.11 28,591,213.98 1.64 - - - - - - -
12 Pek. Lantai Keramik 40 cm x 40 cm m² 115.05 218,558.54 27,659,676.03 1.58 - - - - - - -
-
D PEKERJAAN ELEKTRIKAL -
1 Pasang Box Panel bh 1.00 40,606.04 44,666.64 0.00 - - - - - - -
2 Pasang MCB bh 2.00 71,860.34 158,092.75 0.01 - - - - - - -
3 Pas. Stop Kontak bh 24.00 191,410.56 5,053,238.78 0.29 - - - - - - -
4 Pas. Saklar Ganda bh 12.00 191,410.56 2,526,619.39 0.14 - - - - - - -
5 Pas. Lampu jari-jari Philips 18 Watt Ttk 48.00 249,028.56 13,148,707.97 0.75 - - - - - - -
6 Pas. Kabel NYM m¹ 250.00 60,794.91 16,718,600.25 0.96 - - - - - - -
7 Penyambungan Baru Listrik 2300VA ls 1.00 2,500,000.00 2,750,000.00 0.16 - - - - - - -
-
IV PEKERJAAN JAMBAN -
A PEKERJAAN TANAH DAN PONDASI -
1 Galian Tanah Pondasi Jalur m³ 17.13 119,245.50 2,246,942.96 0.13 - - 17.13 0.13 17.13 0.13 100.00
2 Urugan Pasir bawah Pondasi m³ 1.32 464,092.20 673,861.87 0.04 - - 1.32 0.04 1.32 0.04 100.00
3 Urugan pasir bawah Lantai m³ 0.73 464,092.20 372,666.04 0.02 - - 0.73 0.02 0.73 0.02 100.00
4 Urugan Tanah Gal. Tanah Kembali m³ 4.28 39,748.50 187,135.94 0.01 - - 4.28 0.01 4.28 0.01 100.00
5 Urugan Tanah Bawah Lantai m³ 3.53 387,941.40 1,506,376.46 0.09 - - - - - - -
6 Pas. Pondasi Batu Kosong m³ 3.95 622,795.83 2,706,047.88 0.15 - - 3.95 0.15 3.95 0.15 100.00
7 Pas. Pondasi Batu Kali1:4 m³ 6.20 1,347,805.31 9,192,032.21 0.53 - - 6.20 0.53 6.20 0.53 100.00
-
B PEKERJAAN BETON BERTULANG -
1 Pekerjaan Sloof 15 cm x 20 cm -
- Bekesting Sloof Beton m² 10.63 266,127.54 3,111,829.33 0.18 - - 10.63 0.18 10.63 0.18 100.00
- Tulangan Besi Beton U-24 Kg 54.16 13,577.42 808,888.37 0.05 - - 54.16 0.05 54.16 0.05 100.00
- Tulangan Besi Beton U-39 Kg 115.88 13,577.42 1,730,686.57 0.10 - - 115.88 0.10 115.88 0.10 100.00
- Beton K-175 m³ 0.87 1,548,974.64 1,482,368.73 0.08 - - 0.87 0.08 0.87 0.08 100.00
2 Pekerjaan Kolom 20 x 20 cm -
- Bekesting Sloof Beton m² 7.92 476,031.60 4,147,187.30 0.24 - - 7.92 0.24 7.92 0.24 100.00
- Tulangan Besi Beton U-24 Kg 17.82 13,577.42 266,144.59 0.02 - - 17.82 0.02 17.82 0.02 100.00
- Tulangan Besi Beton U-39 Kg 38.13 13,577.42 569,477.73 0.03 - - 38.13 0.03 38.13 0.03 100.00
- Beton K-175 m³ 0.36 1,548,974.64 613,393.96 0.04 - - 0.36 0.04 0.36 0.04 100.00
3 Pekerjaan Ring Balok 15 x 25 cm -
- - Bekesting Sloof Beton m² 3.04 487,368.09 1,629,758.89 0.09 - - - - - - -
- - Tulangan Besi Beton U-24 Kg 91.62 13,577.42 1,368,359.54 0.08 - - - - - - -
- - Tulangan Besi Beton U-39 Kg 232.32 13,577.42 3,469,736.84 0.20 - - - - - - -
- - Beton K-175 m³ 1.14 1,548,974.64 1,942,414.20 0.11 - - - - - - -
4 Pekerjaan Kanopi Beton -
- Bakesting kanopi Beton m² 3.90 615,423.60 2,640,167.24 0.15 - - - - - - -
- Tulangan Besi Beton U-24 Kg 28.87 13,577.42 431,178.13 0.02 - - - - - - -
- Beton K-175 m³ 0.16 1,548,974.64 272,619.54 0.02 - - - - - - -
5 Pek. Ring balok Praktis 10cm x 15 cm m¹ 60.40 137,872.75 9,160,265.51 0.52 - - - - - - -
-
C PEKERJAAN DINDING DAN LANTAI -
1 Pas. Dinding 1/2 bata 1:4 m² 57.15 173,035.17 10,877,855.96 0.62 - - - - - - -
2 Pek. Plesteran Dinding 1/2 Bata Camp 1:4 m² 114.29 102,101.29 12,836,072.08 0.73 - - - - - - -
3 Pek. Plesteran Pondasi, Sloof dan Kolom Camp 1:3 m² 20.07 104,806.10 2,313,804.27 0.13 - - - - - - -
4 Acian Dinding, Sloof Dan kolom m² 134.36 58,409.51 8,632,691.94 0.49 - - - - - - -
5 Cat Dinding m² 134.36 41,336.13 6,109,314.67 0.35 - - - - - - -
6 Pas. Lantai Beton tumbuk, Camp 1:3:5 m³ 1.17 1,394,762.22 1,795,058.98 0.10 - - - - - - -
7 Pas. Dindinig Keramik 20x25 cm m² 27.74 384,208.13 11,723,726.88 0.67 - - - - - - -
8 Pas. Lantai Keramik 20x20 cm (texture kasar) m² 15.68 339,673.58 5,858,689.91 0.34 - - - - - - -
-
D PEKERJAAN PLAFOND -
1 Pas. Rangka Plafond Kayu 5/5 Kelas II m² 27.28 140,332.01 4,211,082.96 0.24 - - - - - - -
2 Pas. Penutup Plafond Tripleks 4 mm m² 27.28 61,181.51 1,835,934.75 0.11 - - - - - - -
3 Pas. List Profil Plafond m¹ 61.56 29,917.80 2,025,913.74 0.12 - - - - - - -
4 Cat Plafond m² 27.23 41,336.13 1,240,414.59 0.07 - - - - - - -
-
E PEKERJAAN KUSEN, PINTU DAN JENDELA -
1 Pas. Kusen Pintu, Kayu 8/12 kelas I m³ 0.18 11,609,744.85 2,298,729.48 0.13 - - - - -
2 Pas. Kusen Ventilasi Atap, Kayu 5/10 Kelas II m³ 0.03 8,307,283.05 274,140.34 0.02 - - - - -
3 Pas. Daun Pintu Panel Kayu Kelas I m² 4.86 1,007,384.40 5,385,477.00 0.31 - - - - -
4 Pas. Kisi-kisi Ventilasi Atap, Kayu Kelas II m¹ 0.44 701,649.63 339,598.42 0.02 - - - - - - -
5 Cat Kusen, Pintu & Listplank m² 7.28 72,224.11 578,370.67 0.03 - - - - - - -
6 Pas. Kunci Pintu bh 4.00 160,991.20 708,364.01 0.04 - - - - - - -
7 Pas. Engsel Pintu bh 12.00 188,054.96 2,482,325.47 0.14 - - - - - - -
8 Pas. Grendel Pintu bh 4.00 55,164.78 242,725.03 0.01 - - - - - - -
-
F PEKERJAAN ATAP -
1 Pas. Kuda-kuda Kayu 5/10 Kayu Kelas II m³ 0.23 9,735,372.90 2,463,049.34 0.14 - - - - - - -
2 Pas. Gording Kayu 5/5 Kayu Kelas II m³ 0.21 9,138,353.40 2,110,959.64 0.12 - - - - - - -
3 Pas. Blk. Kasau Dan Ring, Kayu Kelas II m² 56.88 255,731.85 16,000,630.39 0.92 - - - - - - -
4 Pas. Atap Genteng Multiroof BJLS 0.25mm m² 56.88 153,094.59 9,578,822.31 0.55 - - - - - - -
5 Pas. Bubungan Atap Seng Multiroof m¹ 16.15 206,556.57 3,669,477.47 0.21 - - - - - - -
6 Pas. Listplank Kayu Kelas II m¹ 23.32 97,900.11 2,511,333.62 0.14 - - - - - - -
-
G PEKERJAAN SANITASI -
1 Pek. Septicktank ls 1.00 6,500,000.00 7,150,000.00 0.41 - - - - - - -
2 Pek. Bak Air ls 4.00 1,000,000.00 4,400,000.00 0.25 - - - - - - -
3 Pas. Pipa Air Bersih PVC AW 1/2' m¹ 30.00 25,049.18 826,622.94 0.05 - - - - - - -
4 Pas. Pipa Tinja PVC 4" m¹ 6.00 128,422.21 847,586.59 0.05 - - - - - - -
5 Pas. Pipa Air Kotor PVC 2" m¹ 6.00 55,541.03 366,570.80 0.02 - - - - - - -
6 Pas. Floor Drain bh 4.00 315,717.93 1,389,158.89 0.08 - - - - - - -
7 Pas. Kloset Jongkok bh 4.00 977,829.93 4,302,451.69 0.25 - - - - - - -
8 Pas. Keran Air Km//Wc bh 4.00 86,434.43 380,311.49 0.02 - - - - - - -
9 Penyambungan Baru Air PDAM ls 1.00 3,000,000.00 3,300,000.00 0.19 - - - - - - -
-
H PEKERJAAN SEPTICTANK DAN REMBESAN -
1 Pas. Galian tanah m³ 5.52 119,245.50 724,058.68 0.04 - - - - - - -
2 Pas. Galian Pasir m³ 0.42 464,092.20 214,410.60 0.01 - - - - - - -
3 Pas. Dinding Batu Bata, Camp 1:3 m² 14.66 177,809.74 2,867,359.87 0.16 - - - - - - -
4 Plesteran Dinding & Lantai, Camp 1:3 m² 31.28 104,806.10 3,606,168.29 0.21 - - - - - - -
5 Acian Dinding & Lantai m² 31.28 58,409.51 2,009,754.42 0.11 - - - - - - -
6 Pek. Beton Penutup Septictank - -
- - Bekesting m² 3.68 615,423.60 2,491,234.73 0.14 - - - - - - -
- - Tulangan Besi Beton U-24 Kg 24.29 13,577.42 362,775.08 0.02 - - - - - - -
- - Beton K-200 m³ 0.34 1,599,057.76 598,047.60 0.03 - - - - - - -
7 Pas. Pipa Hawa / Vent. Gip 2" m¹ 2.80 170,629.77 525,539.69 0.03 - - - - - - -
8 Pas. Batu Kosong m¹ 0.54 622,795.83 369,940.72 0.02 - - - - - - -
-
I PEKERJAAN ELEKTRIKAL -
1 Pas. Saklar Tunggal bh 4.00 143,557.92 631,654.85 0.04 - - - - - - -
2 Pas. Saklar Ganda bh 2.00 249,028.56 421,103.23 0.02 - - - - - - -
3 Pas. Lampu Philipps Jari-jari 18 Watt m¹ 8.00 21,879.00 2,191,451.33 0.13 - - - - - - -
4 Pas. Pipa Instalasi Listrik m¹ 20.00 60,794.91 481,338.00 0.03 - - - - - - -
5 Pas. Kabel NYM m¹ 40.00 60,794.91 2,674,976.04 0.15 - - - - - - -
-
J PEKERJAAN LANTAI PAVING -
1 Urugan Pasir Bawah Paving m³ 92.24 464,092.20 47,088,650.98 2.69 - - - - - - -
2 Pas. Paving Blok K-300 m² 1,844.78 349,061.13 708,335,090.54 40.51 - - - - - - -
3 CAT Paving m² 1,844.79 41,336.13 83,881,672.49 4.80 - - - - - - -
NO KONTRAK : NO KONTRAK
TANGGAL : TANGGAL
WAKTU PELAKSANAAN : WAKTU PELAKSANAAN
BOBOT
TERHADA
Harga satuan Jumlah Harga
No Uraian Pekerjaan Satuan Volume BOBOT % MINGGU LALU MINGGU INI SAMPAI MINGGU INI P ITEM
(Rp.) (Rp.) PEKERJAA
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT N (%)
I Pekerjaan Persiapan
1 Papan Nama Proyek bh 1.00 599,139.75 659,053.73 0.04 1.00 0.04 - - 1.00 0.04 100.00
2 Penyedia Air Kerja ls 1.00 3,200,000.00 3,520,000.00 0.20 1.00 0.20 - - 1.00 0.20 100.00
3 Penyedia Listrik Kerja ls 1.00 2,250,000.00 2,475,000.00 0.14 1.00 0.14 - - 1.00 0.14 100.00
4 Pembuatan Direksi Keed Dan Gudang m² 6.00 1,651,423.95 10,899,398.07 0.62 6.00 0.62 - - 6.00 0.62 100.00
5 Pengukuran Dan Pemasangan Bowplank ls 1.00 88,384.23 97,222.65 0.01 1.00 0.01 - - 1.00 0.01 100.00
6 Dokumentasi Dan Pelaporan ls 1.00 4,500,000.00 4,950,000.00 0.28 - - - - - - -
7 As Built Drawing ls 1.00 5,215,000.00 5,736,500.00 0.33 - - - - - - -
8 Pembersihan Akhir ls 1.00 4,050,000.00 4,455,000.00 0.25 - - - - - - -
- -
II PEKERJAAN TAMAN - -
A Pekerjaan Pasangan - -
1 Pas. Dinding Batu Bata, 1:3 m³ 60.00 179,605.80 4,506,410.05 0.26 - - - - - - -
2 Pas. Beton Tumbuk m³ 5.06 1,394,762.22 7,763,246.52 0.44 - - - - - - -
3 Pas. Plesteran, Camp. 1 :3 m² 60.00 104,806.10 6,917,202.60 0.40 - - - - - - -
4 Pas. Acian Dinding m² 60.00 58,409.51 3,855,027.66 0.22 - - - - - - -
5 Cat m² 60.00 41,336.13 2,728,184.58 0.16 - - - - - - -
- -
B PEKERJAAN TANAH TIMBUNAN/POHON - -
1 Pek. Timbunan m³ 56.64 387,941.40 24,170,300.99 1.38 - - - - - - -
2 Pohon Ketapang bh 6.00 645,916.20 4,263,046.92 0.24 - - - - - - -
3 Pohon Palm bh 2.00 945,916.20 2,079,915.64 0.12 - - - - - - -
4 Rumput Jepang m² - 145,916.20 0 - - - - - - - -
5 Rabat Beton m³ 5.06 1,394,762.22 7,763,246.52 0.44 - - - - - - -
- -
III PEKERJAAN FOOD CORE - -
A PEKERJAAN TANAH DAN PONDASI - -
1 Galian Tanah Dan Pondasi jalur m³ 49.06 119,245.50 6,435,202.65 0.37 - - - - - - -
2 Urugan Pasir Bawah Pondasi Batu Kali m³ 4.65 464,092.20 2,373,831.60 0.14 - - - - - - -
3 Urugan Tanah Gal. Pondasi Kembali m³ 12.26 39,748.50 536,048.27 0.03 - - - - - - -
4 Urugan Pasir Bawah Lantai m³ 11.76 464,092.20 6,003,496.70 0.34 - - - - - - -
5 Urugan Tanah Bawah Lantai m³ 36.53 387,941.40 15,588,649.28 0.89 - - - - - - -
6 Pas. Batu Kosong m³ 12.69 622,795.83 8,693,606.99 0.50 - - -
7 Pas. Pondasi Batu Kali, Camp 1:4 m³ 24.27 1,347,805.31 35,982,358.36 2.06 - - -
- -
B PEKERJAAN BETON DAN BATA - -
1 Pekerjaan Sloof 18x25 cm - -
- Bekesting Sloof Beton m² 46.50 266,127.54 13,612,423.67 0.78 - - - - - - -
- Tulangan Besi Beton 8 mm -U24 Kg 177.72 13,577.42 2,654,276.99 0.15 - - - - - - -
- Tulangan Besi Beton 12 mm - U39 Kg 347.63 13,577.42 5,191,910.37 0.30 - - - - - - -
- Beton K-175 m³ 4.18 1,548,974.64 7,122,185.39 0.41 - - - - - - -
- -
2 Pek. Kolom 15x15 cm - -
- Bekesting Sloof Beton m² 46.80 476,031.60 24,506,106.77 1.40 - -
- Tulangan Besi Beton 8 mm -U24 Kg 93.69 13,577.42 1,399,275.33 0.08 - - - - - - -
- Tulangan Besi Beton 12 mm - U39 Kg 340.16 13,577.42 5,080,344.71 0.29 - - - - - - -
- Beton K-175 m³ 1.75 1,548,974.64 2,981,776.18 0.17 - - - - - - -
- -
3 Pek. Ring Balok 15x25 cm - -
- Bekesting Ring Balok m² 62.94 487,368.09 33,742,442.34 1.93 - - - - - - -
- Tulangan Besi Beton 8 mm -U24 Kg 68.89 13,577.42 1,043,818.47 0.06 - - - - - - -
- Tulangan Besi Beton 12 mm - U39 Kg 149.52 13,577.42 2,233,105.42 0.13 - - - - - - -
- Beton K-175 m³ 3.28 1,548,974.64 5,588,700.50 0.32 - - - - - - -
4 Pek. Lantai Beton Tumbuk, Camp 1:3:5 m³ 9.11 1,394,762.22 13,976,912.21 0.80 - - - - - - -
5 Pek. Bata Lapisan Kolom, Camp 1:3 m² 21.84 177,809.74 4,271,701.19 0.24 - - - - - - -
6 Pek. Plesteran Bata, Camp 1:3 m² 21.84 104,806.10 2,517,861.75 0.14 - - - - - - -
- -
C PEKERJAAN KAYU, ATAP, CAT DAN LANTAI - -
1 Pek. Pagar Kayu Kelas II m³ 6.43 8,838,220.05 62,512,730.41 3.58 - - - - - -
2 Pek. Lambersering Lapisan Kolom, Kayu Kelas II m² 31.81 340,579.80 11,917,227.78 0.68 - - - - - -
3 Pek. Rangka Plafond Kayu 5/5 Kelas II m² 191.14 140,322.01 29,505,366.43 1.69 - - - - - - -
4 Pek. Penutup Plafond Tripleks 4mm m² 191.14 61,181.51 12,863,657.20 0.74 - - - - - - -
5 Pek. Kuda-Kuda Kayu 5/10 Kelas II m³ 2.25 9,735,372.90 24,095,047.93 1.38 - - - - - - -
6 Pek. Gording Kayu 5/5 Kelas II m³ 1.14 9,138,353.40 11,459,495.16 0.66 - - - - - - -
7 Pek. Rangka Atap Seng Multiroof m² 269.80 255,731.85 75,896,098.44 4.34 - - - - - - -
8 Pek. Penutup Atap Seng Mulltiroof m² 269.80 153,094.59 45,435,412.42 2.60 - - - - - - -
9 Pek. Bubungan Atap Seng Multiroof m¹ 49.50 206,556.57 11,247,005.24 0.64 - - - - - - -
10 Pek. Listplank Papan Kayu Kelas -II m¹ 162.00 97,900.11 17,445,799.60 1.00 - - - - - - -
11 Cat kayu (vernis) m² 359.88 72,224.11 28,591,213.98 1.64 - - - - - - -
12 Pek. Lantai Keramik 40 cm x 40 cm m² 115.05 218,558.54 27,659,676.03 1.58 - - - - - - -
- -
D PEKERJAAN ELEKTRIKAL - -
1 Pasang Box Panel bh 1.00 40,606.04 44,666.64 0.00 - - - - - - -
2 Pasang MCB bh 2.00 71,860.34 158,092.75 0.01 - - - - - - -
3 Pas. Stop Kontak bh 24.00 191,410.56 5,053,238.78 0.29 - - - - - - -
4 Pas. Saklar Ganda bh 12.00 191,410.56 2,526,619.39 0.14 - - - - - - -
5 Pas. Lampu jari-jari Philips 18 Watt Ttk 48.00 249,028.56 13,148,707.97 0.75 - - - - - - -
6 Pas. Kabel NYM m¹ 250.00 60,794.91 16,718,600.25 0.96 - - - - - - -
7 Penyambungan Baru Listrik 2300VA ls 1.00 2,500,000.00 2,750,000.00 0.16 - - - - - - -
- -
IV PEKERJAAN JAMBAN - -
A PEKERJAAN TANAH DAN PONDASI - -
1 Galian Tanah Pondasi Jalur m³ 17.13 119,245.50 2,246,942.96 0.13 17.13 0.13 - - 17.13 0.13 100.00
2 Urugan Pasir bawah Pondasi m³ 1.32 464,092.20 673,861.87 0.04 1.32 0.04 - - 1.32 0.04 100.00
3 Urugan pasir bawah Lantai m³ 0.73 464,092.20 372,666.04 0.02 0.73 0.02 - - 0.73 0.02 100.00
4 Urugan Tanah Gal. Tanah Kembali m³ 4.28 39,748.50 187,135.94 0.01 4.28 0.01 - - 4.28 0.01 100.00
5 Urugan Tanah Bawah Lantai m³ 3.53 387,941.40 1,506,376.46 0.09 - - 3.53 0.09 3.53 0.09 100.00
6 Pas. Pondasi Batu Kosong m³ 3.95 622,795.83 2,706,047.88 0.15 3.95 0.15 - - 3.95 0.15 100.00
7 Pas. Pondasi Batu Kali1:4 m³ 6.20 1,347,805.31 9,192,032.21 0.53 6.20 0.53 - - 6.20 0.53 100.00
- -
B PEKERJAAN BETON BERTULANG - -
1 Pekerjaan Sloof 15 cm x 20 cm - -
- Bekesting Sloof Beton m² 10.63 266,127.54 3,111,829.33 0.18 10.63 0.18 - - 10.63 0.18 100.00
- Tulangan Besi Beton U-24 Kg 54.16 13,577.42 808,888.37 0.05 54.16 0.05 - - 54.16 0.05 100.00
- Tulangan Besi Beton U-39 Kg 115.88 13,577.42 1,730,686.57 0.10 115.88 0.10 - - 115.88 0.10 100.00
- Beton K-175 m³ 0.87 1,548,974.64 1,482,368.73 0.08 0.87 0.08 - - 0.87 0.08 100.00
2 Pekerjaan Kolom 20 x 20 cm - -
- Bekesting Sloof Beton m² 7.92 476,031.60 4,147,187.30 0.24 7.92 0.24 - - 7.92 0.24 100.00
- Tulangan Besi Beton U-24 Kg 17.82 13,577.42 266,144.59 0.02 17.82 0.02 - - 17.82 0.02 100.00
- Tulangan Besi Beton U-39 Kg 38.13 13,577.42 569,477.73 0.03 38.13 0.03 - - 38.13 0.03 100.00
- Beton K-175 m³ 0.36 1,548,974.64 613,393.96 0.04 0.36 0.04 - - 0.36 0.04 100.00
3 Pekerjaan Ring Balok 15 x 25 cm - -
- - Bekesting Sloof Beton m² 3.04 487,368.09 1,629,758.89 0.09 - - 3.04 0.09 3.04 0.09 100.00
- - Tulangan Besi Beton U-24 Kg 91.62 13,577.42 1,368,359.54 0.08 - - 91.62 0.08 91.62 0.08 100.00
- - Tulangan Besi Beton U-39 Kg 232.32 13,577.42 3,469,736.84 0.20 - - 232.32 0.20 232.32 0.20 100.00
- - Beton K-175 m³ 1.14 1,548,974.64 1,942,414.20 0.11 - - 1.14 0.11 1.14 0.11 100.00
4 Pekerjaan Kanopi Beton - -
- Bakesting kanopi Beton m² 3.90 615,423.60 2,640,167.24 0.15 - - 3.90 0.15 3.90 0.15 100.00
- Tulangan Besi Beton U-24 Kg 28.87 13,577.42 431,178.13 0.02 - - 28.87 0.02 28.87 0.02 100.00
- Beton K-175 m³ 0.16 1,548,974.64 272,619.54 0.02 - - 0.16 0.02 0.16 0.02 100.00
5 Pek. Ring balok Praktis 10cm x 15 cm m¹ 60.40 137,872.75 9,160,265.51 0.52 - - 60.40 0.52 60.40 0.52 100.00
- -
C PEKERJAAN DINDING DAN LANTAI - -
1 Pas. Dinding 1/2 bata 1:4 m² 57.15 173,035.17 10,877,855.96 0.62 - - 57.15 0.62 57.15 0.62 100.00
2 Pek. Plesteran Dinding 1/2 Bata Camp 1:4 m² 114.29 102,101.29 12,836,072.08 0.73 - - 114.29 0.73 114.29 0.73 100.00
3 Pek. Plesteran Pondasi, Sloof dan Kolom Camp 1:3 m² 20.07 104,806.10 2,313,804.27 0.13 - - 10.04 0.07 10.04 0.07 50.00
4 Acian Dinding, Sloof Dan kolom m² 134.36 58,409.51 8,632,691.94 0.49 - - - - - - -
5 Cat Dinding m² 134.36 41,336.13 6,109,314.67 0.35 - - - - - - -
6 Pas. Lantai Beton tumbuk, Camp 1:3:5 m³ 1.17 1,394,762.22 1,795,058.98 0.10 - - - - - - -
7 Pas. Dindinig Keramik 20x25 cm m² 27.74 384,208.13 11,723,726.88 0.67 - - - - - - -
8 Pas. Lantai Keramik 20x20 cm (texture kasar) m² 15.68 339,673.58 5,858,689.91 0.34 - - - - - - -
- -
D PEKERJAAN PLAFOND - -
1 Pas. Rangka Plafond Kayu 5/5 Kelas II m² 27.28 140,332.01 4,211,082.96 0.24 - - - - - - -
2 Pas. Penutup Plafond Tripleks 4 mm m² 27.28 61,181.51 1,835,934.75 0.11 - - - - - - -
3 Pas. List Profil Plafond m¹ 61.56 29,917.80 2,025,913.74 0.12 - - - - - - -
4 Cat Plafond m² 27.23 41,336.13 1,240,414.59 0.07 - - - - - - -
- -
E PEKERJAAN KUSEN, PINTU DAN JENDELA - -
1 Pas. Kusen Pintu, Kayu 8/12 kelas I m³ 0.18 11,609,744.85 2,298,729.48 0.13 - - 0.18 0.13 0.18
2 Pas. Kusen Ventilasi Atap, Kayu 5/10 Kelas II m³ 0.03 8,307,283.05 274,140.34 0.02 - - 0.03 0.02 0.03
3 Pas. Daun Pintu Panel Kayu Kelas I m² 4.86 1,007,384.40 5,385,477.00 0.31 - - - - -
4 Pas. Kisi-kisi Ventilasi Atap, Kayu Kelas II m¹ 0.44 701,649.63 339,598.42 0.02 - - 0.44 0.02 0.44 0.02 100.00
5 Cat Kusen, Pintu & Listplank m² 7.28 72,224.11 578,370.67 0.03 - - 2.43 0.01 2.43 0.01 33.33
6 Pas. Kunci Pintu bh 4.00 160,991.20 708,364.01 0.04 - - - - - - -
7 Pas. Engsel Pintu bh 12.00 188,054.96 2,482,325.47 0.14 - - - - - - -
8 Pas. Grendel Pintu bh 4.00 55,164.78 242,725.03 0.01 - - - - - - -
- -
F PEKERJAAN ATAP - -
1 Pas. Kuda-kuda Kayu 5/10 Kayu Kelas II m³ 0.23 9,735,372.90 2,463,049.34 0.14 - - 0.23 0.14 0.23 0.14 100.00
2 Pas. Gording Kayu 5/5 Kayu Kelas II m³ 0.21 9,138,353.40 2,110,959.64 0.12 - - 0.21 0.12 0.21 0.12 100.00
3 Pas. Blk. Kasau Dan Ring, Kayu Kelas II m² 56.88 255,731.85 16,000,630.39 0.92 - - 56.88 0.92 56.88 0.92 100.00
4 Pas. Atap Genteng Multiroof BJLS 0.25mm m² 56.88 153,094.59 9,578,822.31 0.55 - - 56.88 0.55 56.88 0.55 100.00
5 Pas. Bubungan Atap Seng Multiroof m¹ 16.15 206,556.57 3,669,477.47 0.21 - - 16.15 0.21 16.15 0.21 100.00
6 Pas. Listplank Kayu Kelas II m¹ 23.32 97,900.11 2,511,333.62 0.14 - - 23.32 0.14 23.32 0.14 100.00
- -
G PEKERJAAN SANITASI - -
1 Pek. Septicktank ls 1.00 6,500,000.00 7,150,000.00 0.41 - - - - - - -
2 Pek. Bak Air ls 4.00 1,000,000.00 4,400,000.00 0.25 - - - - - - -
3 Pas. Pipa Air Bersih PVC AW 1/2' m¹ 30.00 25,049.18 826,622.94 0.05 - - - - - - -
4 Pas. Pipa Tinja PVC 4" m¹ 6.00 128,422.21 847,586.59 0.05 - - - - - - -
5 Pas. Pipa Air Kotor PVC 2" m¹ 6.00 55,541.03 366,570.80 0.02 - - - - - - -
6 Pas. Floor Drain bh 4.00 315,717.93 1,389,158.89 0.08 - - - - - - -
7 Pas. Kloset Jongkok bh 4.00 977,829.93 4,302,451.69 0.25 - - - - - - -
8 Pas. Keran Air Km//Wc bh 4.00 86,434.43 380,311.49 0.02 - - - - - - -
9 Penyambungan Baru Air PDAM ls 1.00 3,000,000.00 3,300,000.00 0.19 - - - - - - -
- -
H PEKERJAAN SEPTICTANK DAN REMBESAN - -
1 Pas. Galian tanah m³ 5.52 119,245.50 724,058.68 0.04 - - - - - - -
2 Pas. Galian Pasir m³ 0.42 464,092.20 214,410.60 0.01 - - - - - - -
3 Pas. Dinding Batu Bata, Camp 1:3 m² 14.66 177,809.74 2,867,359.87 0.16 - - - - - - -
4 Plesteran Dinding & Lantai, Camp 1:3 m² 31.28 104,806.10 3,606,168.29 0.21 - - - - - - -
5 Acian Dinding & Lantai m² 31.28 58,409.51 2,009,754.42 0.11 - - - - - - -
6 Pek. Beton Penutup Septictank - - -
- - Bekesting m² 3.68 615,423.60 2,491,234.73 0.14 - - - - - - -
- - Tulangan Besi Beton U-24 Kg 24.29 13,577.42 362,775.08 0.02 - - - - - - -
- - Beton K-200 m³ 0.34 1,599,057.76 598,047.60 0.03 - - - - - - -
7 Pas. Pipa Hawa / Vent. Gip 2" m¹ 2.80 170,629.77 525,539.69 0.03 - - - - - - -
8 Pas. Batu Kosong m¹ 0.54 622,795.83 369,940.72 0.02 - - - - - - -
- -
I PEKERJAAN ELEKTRIKAL - -
1 Pas. Saklar Tunggal bh 4.00 143,557.92 631,654.85 0.04 - - - - - - -
2 Pas. Saklar Ganda bh 2.00 249,028.56 421,103.23 0.02 - - - - - - -
3 Pas. Lampu Philipps Jari-jari 18 Watt m¹ 8.00 21,879.00 2,191,451.33 0.13 - - - - - - -
4 Pas. Pipa Instalasi Listrik m¹ 20.00 60,794.91 481,338.00 0.03 - - - - - - -
5 Pas. Kabel NYM m¹ 40.00 60,794.91 2,674,976.04 0.15 - - - - - - -
- -
J PEKERJAAN LANTAI PAVING - -
1 Urugan Pasir Bawah Paving m³ 92.24 464,092.20 47,088,650.98 2.69 - - - - - - -
2 Pas. Paving Blok K-300 m² 1,844.78 349,061.13 708,335,090.54 40.51 - - - - - - -
3 CAT Paving m² 1,844.79 41,336.13 83,881,672.49 4.80 - - - - - - -
NO KONTRAK : NO KONTRAK
TANGGAL : TANGGAL
WAKTU PELAKSANAAN : WAKTU PELAKSANAAN
BOBOT
TERHADAP
Harga satuan Jumlah Harga MINGGU LALU MINGGU INI SAMPAI MINGGU INI
No Uraian Pekerjaan Satuan Volume BOBOT % ITEM
(Rp.) (Rp.) PEKERJAAN
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT (%)
I Pekerjaan Persiapan
1 Papan Nama Proyek bh 1.00 599,139.75 659,053.73 0.04 1.00 0.04 - - 1.00 0.04 100.00
2 Penyedia Air Kerja ls 1.00 3,200,000.00 3,520,000.00 0.20 1.00 0.20 - - 1.00 0.20 100.00
3 Penyedia Listrik Kerja ls 1.00 2,250,000.00 2,475,000.00 0.14 1.00 0.14 - - 1.00 0.14 100.00
4 Pembuatan Direksi Keed Dan Gudang m² 6.00 1,651,423.95 10,899,398.07 0.62 6.00 0.62 - - 6.00 0.62 100.00
5 Pengukuran Dan Pemasangan Bowplank ls 1.00 88,384.23 97,222.65 0.01 1.00 0.01 - - 1.00 0.01 100.00
6 Dokumentasi Dan Pelaporan ls 1.00 4,500,000.00 4,950,000.00 0.28 - - - - - - -
7 As Built Drawing ls 1.00 5,215,000.00 5,736,500.00 0.33 - - - - - - -
8 Pembersihan Akhir ls 1.00 4,050,000.00 4,455,000.00 0.25 - - - - - - -
- - -
II PEKERJAAN TAMAN - - -
A Pekerjaan Pasangan - - -
1 Pas. Dinding Batu Bata, 1:3 m³ 60.00 179,605.80 4,506,410.05 0.26 - - - - - - -
2 Pas. Beton Tumbuk m³ 5.06 1,394,762.22 7,763,246.52 0.44 - - - - - - -
3 Pas. Plesteran, Camp. 1 :3 m² 60.00 104,806.10 6,917,202.60 0.40 - - - - - - -
4 Pas. Acian Dinding m² 60.00 58,409.51 3,855,027.66 0.22 - - - - - - -
5 Cat m² 60.00 41,336.13 2,728,184.58 0.16 - - - - - - -
- - -
B PEKERJAAN TANAH TIMBUNAN/POHON - - -
1 Pek. Timbunan m³ 56.64 387,941.40 24,170,300.99 1.38 - - - - - - -
2 Pohon Ketapang bh 6.00 645,916.20 4,263,046.92 0.24 - - - - - - -
3 Pohon Palm bh 2.00 945,916.20 2,079,915.64 0.12 - - - - - - -
4 Rumput Jepang m² - 145,916.20 0 - - - - - - - -
5 Rabat Beton m³ 5.06 1,394,762.22 7,763,246.52 0.44 - - - - - - -
- - -
III PEKERJAAN FOOD CORE - - -
A PEKERJAAN TANAH DAN PONDASI - - -
1 Galian Tanah Dan Pondasi jalur m³ 49.06 119,245.50 6,435,202.65 0.37 - - 49.06 0.37 49.06 0.37 100.00
2 Urugan Pasir Bawah Pondasi Batu Kali m³ 4.65 464,092.20 2,373,831.60 0.14 - - 4.65 0.14 4.65 0.14 100.00
3 Urugan Tanah Gal. Pondasi Kembali m³ 12.26 39,748.50 536,048.27 0.03 - - 12.26 0.03 12.26 0.03 100.00
4 Urugan Pasir Bawah Lantai m³ 11.76 464,092.20 6,003,496.70 0.34 - - - - - - -
5 Urugan Tanah Bawah Lantai m³ 36.53 387,941.40 15,588,649.28 0.89 - - - - - - -
6 Pas. Batu Kosong m³ 12.69 622,795.83 8,693,606.99 0.50 - - 12.69 0.50 12.69 0.50 100.00
7 Pas. Pondasi Batu Kali, Camp 1:4 m³ 24.27 1,347,805.31 35,982,358.36 2.06 - - 24.27 2.06 24.27 2.06 100.00
- -
B PEKERJAAN BETON DAN BATA - -
1 Pekerjaan Sloof 18x25 cm - - - -
- Bekesting Sloof Beton m² 46.50 266,127.54 13,612,423.67 0.78 - - 46.50 0.78 46.50 0.78 100.00
- Tulangan Besi Beton 8 mm -U24 Kg 177.72 13,577.42 2,654,276.99 0.15 - - 177.72 0.15 177.72 0.15 100.00
- Tulangan Besi Beton 12 mm - U39 Kg 347.63 13,577.42 5,191,910.37 0.30 - - 347.63 0.30 347.63 0.30 100.00
- Beton K-175 m³ 4.18 1,548,974.64 7,122,185.39 0.41 - - 4.18 0.41 4.18 0.41 100.00
- - -
2 Pek. Kolom 15x15 cm - - -
- Bekesting Sloof Beton m² 46.80 476,031.60 24,506,106.77 1.40 - 46.80 1.40 46.80
- Tulangan Besi Beton 8 mm -U24 Kg 93.69 13,577.42 1,399,275.33 0.08 - - 93.69 0.08 93.69 0.08 100.00
- Tulangan Besi Beton 12 mm - U39 Kg 340.16 13,577.42 5,080,344.71 0.29 - - 340.16 0.29 340.16 0.29 100.00
- Beton K-175 m³ 1.75 1,548,974.64 2,981,776.18 0.17 - - 1.75 0.17 1.75 0.17 100.00
- - -
3 Pek. Ring Balok 15x25 cm - - -
- Bekesting Ring Balok m² 62.94 487,368.09 33,742,442.34 1.93 - - - - - - -
- Tulangan Besi Beton 8 mm -U24 Kg 68.89 13,577.42 1,043,818.47 0.06 - - - - - - -
- Tulangan Besi Beton 12 mm - U39 Kg 149.52 13,577.42 2,233,105.42 0.13 - - - - - - -
- Beton K-175 m³ 3.28 1,548,974.64 5,588,700.50 0.32 - - - - - - -
4 Pek. Lantai Beton Tumbuk, Camp 1:3:5 m³ 9.11 1,394,762.22 13,976,912.21 0.80 - - - - - - -
5 Pek. Bata Lapisan Kolom, Camp 1:3 m² 21.84 177,809.74 4,271,701.19 0.24 - - - - - - -
6 Pek. Plesteran Bata, Camp 1:3 m² 21.84 104,806.10 2,517,861.75 0.14 - - - - - - -
- - -
C PEKERJAAN KAYU, ATAP, CAT DAN LANTAI - - -
1 Pek. Pagar Kayu Kelas II m³ 6.43 8,838,220.05 62,512,730.41 3.58 - - - - - -
2 Pek. Lambersering Lapisan Kolom, Kayu Kelas II m² 31.81 340,579.80 11,917,227.78 0.68 - - - - - -
3 Pek. Rangka Plafond Kayu 5/5 Kelas II m² 191.14 140,322.01 29,505,366.43 1.69 - - - - - - -
4 Pek. Penutup Plafond Tripleks 4mm m² 191.14 61,181.51 12,863,657.20 0.74 - - - - - - -
5 Pek. Kuda-Kuda Kayu 5/10 Kelas II m³ 2.25 9,735,372.90 24,095,047.93 1.38 - - - - - - -
6 Pek. Gording Kayu 5/5 Kelas II m³ 1.14 9,138,353.40 11,459,495.16 0.66 - - - - - - -
7 Pek. Rangka Atap Seng Multiroof m² 269.80 255,731.85 75,896,098.44 4.34 - - - - - - -
8 Pek. Penutup Atap Seng Mulltiroof m² 269.80 153,094.59 45,435,412.42 2.60 - - - - - - -
9 Pek. Bubungan Atap Seng Multiroof m¹ 49.50 206,556.57 11,247,005.24 0.64 - - - - - - -
10 Pek. Listplank Papan Kayu Kelas -II m¹ 162.00 97,900.11 17,445,799.60 1.00 - - - - - - -
11 Cat kayu (vernis) m² 359.88 72,224.11 28,591,213.98 1.64 - - - - - - -
12 Pek. Lantai Keramik 40 cm x 40 cm m² 115.05 218,558.54 27,659,676.03 1.58 - - - - - - -
- - -
D PEKERJAAN ELEKTRIKAL - - -
1 Pasang Box Panel bh 1.00 40,606.04 44,666.64 0.00 - - - - - - -
2 Pasang MCB bh 2.00 71,860.34 158,092.75 0.01 - - - - - - -
3 Pas. Stop Kontak bh 24.00 191,410.56 5,053,238.78 0.29 - - - - - - -
4 Pas. Saklar Ganda bh 12.00 191,410.56 2,526,619.39 0.14 - - - - - - -
5 Pas. Lampu jari-jari Philips 18 Watt Ttk 48.00 249,028.56 13,148,707.97 0.75 - - - - - - -
6 Pas. Kabel NYM m¹ 250.00 60,794.91 16,718,600.25 0.96 - - - - - - -
7 Penyambungan Baru Listrik 2300VA ls 1.00 2,500,000.00 2,750,000.00 0.16 - - - - - - -
- - -
IV PEKERJAAN JAMBAN - - -
A PEKERJAAN TANAH DAN PONDASI - - -
1 Galian Tanah Pondasi Jalur m³ 17.13 119,245.50 2,246,942.96 0.13 17.13 0.13 - - 17.13 0.13 100.00
2 Urugan Pasir bawah Pondasi m³ 1.32 464,092.20 673,861.87 0.04 1.32 0.04 - - 1.32 0.04 100.00
3 Urugan pasir bawah Lantai m³ 0.73 464,092.20 372,666.04 0.02 0.73 0.02 - - 0.73 0.02 100.00
4 Urugan Tanah Gal. Tanah Kembali m³ 4.28 39,748.50 187,135.94 0.01 4.28 0.01 - - 4.28 0.01 100.00
5 Urugan Tanah Bawah Lantai m³ 3.53 387,941.40 1,506,376.46 0.09 3.53 0.09 - - 3.53 0.09 100.00
6 Pas. Pondasi Batu Kosong m³ 3.95 622,795.83 2,706,047.88 0.15 3.95 0.15 - - 3.95 0.15 100.00
7 Pas. Pondasi Batu Kali1:4 m³ 6.20 1,347,805.31 9,192,032.21 0.53 6.20 0.53 - - 6.20 0.53 100.00
- - -
B PEKERJAAN BETON BERTULANG - - -
1 Pekerjaan Sloof 15 cm x 20 cm - - -
- Bekesting Sloof Beton m² 10.63 266,127.54 3,111,829.33 0.18 10.63 0.18 - - 10.63 0.18 100.00
- Tulangan Besi Beton U-24 Kg 54.16 13,577.42 808,888.37 0.05 54.16 0.05 - - 54.16 0.05 100.00
- Tulangan Besi Beton U-39 Kg 115.88 13,577.42 1,730,686.57 0.10 115.88 0.10 - - 115.88 0.10 100.00
- Beton K-175 m³ 0.87 1,548,974.64 1,482,368.73 0.08 0.87 0.08 - - 0.87 0.08 100.00
2 Pekerjaan Kolom 20 x 20 cm - - -
- Bekesting Sloof Beton m² 7.92 476,031.60 4,147,187.30 0.24 7.92 0.24 - - 7.92 0.24 100.00
- Tulangan Besi Beton U-24 Kg 17.82 13,577.42 266,144.59 0.02 17.82 0.02 - - 17.82 0.02 100.00
- Tulangan Besi Beton U-39 Kg 38.13 13,577.42 569,477.73 0.03 38.13 0.03 - - 38.13 0.03 100.00
- Beton K-175 m³ 0.36 1,548,974.64 613,393.96 0.04 0.36 0.04 - - 0.36 0.04 100.00
3 Pekerjaan Ring Balok 15 x 25 cm - - -
- - Bekesting Sloof Beton m² 3.04 487,368.09 1,629,758.89 0.09 3.04 0.09 - - 3.04 0.09 100.00
- - Tulangan Besi Beton U-24 Kg 91.62 13,577.42 1,368,359.54 0.08 91.62 0.08 - - 91.62 0.08 100.00
- - Tulangan Besi Beton U-39 Kg 232.32 13,577.42 3,469,736.84 0.20 232.32 0.20 - - 232.32 0.20 100.00
- - Beton K-175 m³ 1.14 1,548,974.64 1,942,414.20 0.11 1.14 0.11 - - 1.14 0.11 100.00
4 Pekerjaan Kanopi Beton - - -
- Bakesting kanopi Beton m² 3.90 615,423.60 2,640,167.24 0.15 3.90 0.15 - - 3.90 0.15 100.00
- Tulangan Besi Beton U-24 Kg 28.87 13,577.42 431,178.13 0.02 28.87 0.02 - - 28.87 0.02 100.00
- Beton K-175 m³ 0.16 1,548,974.64 272,619.54 0.02 0.16 0.02 - - 0.16 0.02 100.00
5 Pek. Ring balok Praktis 10cm x 15 cm m¹ 60.40 137,872.75 9,160,265.51 0.52 60.40 0.52 - - 60.40 0.52 100.00
- - -
C PEKERJAAN DINDING DAN LANTAI - - -
1 Pas. Dinding 1/2 bata 1:4 m² 57.15 173,035.17 10,877,855.96 0.62 57.15 0.62 - - 57.15 0.62 100.00
2 Pek. Plesteran Dinding 1/2 Bata Camp 1:4 m² 114.29 102,101.29 12,836,072.08 0.73 114.29 0.73 - - 114.29 0.73 100.00
3 Pek. Plesteran Pondasi, Sloof dan Kolom Camp 1:3 m² 20.07 104,806.10 2,313,804.27 0.13 10.04 0.07 10.04 0.07 20.07 0.13 100.00
4 Acian Dinding, Sloof Dan kolom m² 134.36 58,409.51 8,632,691.94 0.49 - - 134.36 0.49 134.36 0.49 100.00
5 Cat Dinding m² 134.36 41,336.13 6,109,314.67 0.35 - - - - - - -
6 Pas. Lantai Beton tumbuk, Camp 1:3:5 m³ 1.17 1,394,762.22 1,795,058.98 0.10 - - - - - - -
7 Pas. Dindinig Keramik 20x25 cm m² 27.74 384,208.13 11,723,726.88 0.67 - - - - - - -
8 Pas. Lantai Keramik 20x20 cm (texture kasar) m² 15.68 339,673.58 5,858,689.91 0.34 - - - - - - -
- - -
D PEKERJAAN PLAFOND - - -
1 Pas. Rangka Plafond Kayu 5/5 Kelas II m² 27.28 140,332.01 4,211,082.96 0.24 - - - - - - -
2 Pas. Penutup Plafond Tripleks 4 mm m² 27.28 61,181.51 1,835,934.75 0.11 - - - - - - -
3 Pas. List Profil Plafond m¹ 61.56 29,917.80 2,025,913.74 0.12 - - - - - - -
4 Cat Plafond m² 27.23 41,336.13 1,240,414.59 0.07 - - - - - - -
- - -
E PEKERJAAN KUSEN, PINTU DAN JENDELA - - -
1 Pas. Kusen Pintu, Kayu 8/12 kelas I m³ 0.18 11,609,744.85 2,298,729.48 0.13 0.18 0.13 - - 0.18
2 Pas. Kusen Ventilasi Atap, Kayu 5/10 Kelas II m³ 0.03 8,307,283.05 274,140.34 0.02 0.03 0.02 - - 0.03
3 Pas. Daun Pintu Panel Kayu Kelas I m² 4.86 1,007,384.40 5,385,477.00 0.31 - - - - -
4 Pas. Kisi-kisi Ventilasi Atap, Kayu Kelas II m¹ 0.44 701,649.63 339,598.42 0.02 0.44 0.02 - - 0.44 0.02 100.00
5 Cat Kusen, Pintu & Listplank m² 7.28 72,224.11 578,370.67 0.03 2.43 0.01 - - 2.43 0.01 33.33
6 Pas. Kunci Pintu bh 4.00 160,991.20 708,364.01 0.04 - - - - - - -
7 Pas. Engsel Pintu bh 12.00 188,054.96 2,482,325.47 0.14 - - - - - - -
8 Pas. Grendel Pintu bh 4.00 55,164.78 242,725.03 0.01 - - - - - - -
- - -
F PEKERJAAN ATAP - - -
1 Pas. Kuda-kuda Kayu 5/10 Kayu Kelas II m³ 0.23 9,735,372.90 2,463,049.34 0.14 0.23 0.14 - - 0.23 0.14 100.00
2 Pas. Gording Kayu 5/5 Kayu Kelas II m³ 0.21 9,138,353.40 2,110,959.64 0.12 0.21 0.12 - - 0.21 0.12 100.00
3 Pas. Blk. Kasau Dan Ring, Kayu Kelas II m² 56.88 255,731.85 16,000,630.39 0.92 56.88 0.92 - - 56.88 0.92 100.00
4 Pas. Atap Genteng Multiroof BJLS 0.25mm m² 56.88 153,094.59 9,578,822.31 0.55 56.88 0.55 - - 56.88 0.55 100.00
5 Pas. Bubungan Atap Seng Multiroof m¹ 16.15 206,556.57 3,669,477.47 0.21 16.15 0.21 - - 16.15 0.21 100.00
6 Pas. Listplank Kayu Kelas II m¹ 23.32 97,900.11 2,511,333.62 0.14 23.32 0.14 - - 23.32 0.14 100.00
- - -
G PEKERJAAN SANITASI - - -
1 Pek. Septicktank ls 1.00 6,500,000.00 7,150,000.00 0.41 - - - - - - -
2 Pek. Bak Air ls 4.00 1,000,000.00 4,400,000.00 0.25 - - - - - - -
3 Pas. Pipa Air Bersih PVC AW 1/2' m¹ 30.00 25,049.18 826,622.94 0.05 - - - - - - -
4 Pas. Pipa Tinja PVC 4" m¹ 6.00 128,422.21 847,586.59 0.05 - - - - - - -
5 Pas. Pipa Air Kotor PVC 2" m¹ 6.00 55,541.03 366,570.80 0.02 - - - - - - -
6 Pas. Floor Drain bh 4.00 315,717.93 1,389,158.89 0.08 - - - - - - -
7 Pas. Kloset Jongkok bh 4.00 977,829.93 4,302,451.69 0.25 - - - - - - -
8 Pas. Keran Air Km//Wc bh 4.00 86,434.43 380,311.49 0.02 - - - - - - -
9 Penyambungan Baru Air PDAM ls 1.00 3,000,000.00 3,300,000.00 0.19 - - - - - - -
- - -
H PEKERJAAN SEPTICTANK DAN REMBESAN - - -
1 Pas. Galian tanah m³ 5.52 119,245.50 724,058.68 0.04 - - - - - - -
2 Pas. Galian Pasir m³ 0.42 464,092.20 214,410.60 0.01 - - - - - - -
3 Pas. Dinding Batu Bata, Camp 1:3 m² 14.66 177,809.74 2,867,359.87 0.16 - - - - - - -
4 Plesteran Dinding & Lantai, Camp 1:3 m² 31.28 104,806.10 3,606,168.29 0.21 - - - - - - -
5 Acian Dinding & Lantai m² 31.28 58,409.51 2,009,754.42 0.11 - - - - - - -
6 Pek. Beton Penutup Septictank - - - -
- - Bekesting m² 3.68 615,423.60 2,491,234.73 0.14 - - - - - - -
- - Tulangan Besi Beton U-24 Kg 24.29 13,577.42 362,775.08 0.02 - - - - - - -
- - Beton K-200 m³ 0.34 1,599,057.76 598,047.60 0.03 - - - - - - -
7 Pas. Pipa Hawa / Vent. Gip 2" m¹ 2.80 170,629.77 525,539.69 0.03 - - - - - - -
8 Pas. Batu Kosong m¹ 0.54 622,795.83 369,940.72 0.02 - - - - - - -
- - -
I PEKERJAAN ELEKTRIKAL - - -
1 Pas. Saklar Tunggal bh 4.00 143,557.92 631,654.85 0.04 - - - - - - -
2 Pas. Saklar Ganda bh 2.00 249,028.56 421,103.23 0.02 - - - - - - -
3 Pas. Lampu Philipps Jari-jari 18 Watt m¹ 8.00 21,879.00 2,191,451.33 0.13 - - - - - - -
4 Pas. Pipa Instalasi Listrik m¹ 20.00 60,794.91 481,338.00 0.03 - - - - - - -
5 Pas. Kabel NYM m¹ 40.00 60,794.91 2,674,976.04 0.15 - - - - - - -
- - -
J PEKERJAAN LANTAI PAVING - - -
1 Urugan Pasir Bawah Paving m³ 92.24 464,092.20 47,088,650.98 2.69 - - - - - - -
2 Pas. Paving Blok K-300 m² 1,844.78 349,061.13 708,335,090.54 40.51 - - - - - - -
3 CAT Paving m² 1,844.79 41,336.13 83,881,672.49 4.80 - - - - - - -
-
100.00 7.58 7.23 14.80
TOTAL PEKERJAAN 1,748,475,480.76
SHAIFUDDIN ZUHRI
ROSITA TAUDA, ST,MT
USMAN, S.T.
NIP. 19800101 2008032 002 SITE ENGINEER
PROGRES MINGGUAN
MINGGU KE 08 PERIODE : 20 AGUSTUS S/D 26 AGUSTUS 2018
NO KONTRAK : NO KONTRAK
TANGGAL : TANGGAL
WAKTU PELAKSANAAN : WAKTU PELAKSANAAN
BOBOT
TERHADAP
Harga satuan Jumlah Harga
No Uraian Pekerjaan Satuan Volume BOBOT % MINGGU LALU MINGGU INI SAMPAI MINGGU INI ITEM
(Rp.) (Rp.) PEKERJAAN
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT (%)
I Pekerjaan Persiapan
1 Papan Nama Proyek bh 1.00 599,139.75 659,053.73 0.04 1.00 0.04 - - 1.00 0.04 100.00
2 Penyedia Air Kerja ls 1.00 3,200,000.00 3,520,000.00 0.20 1.00 0.20 - - 1.00 0.20 100.00
3 Penyedia Listrik Kerja ls 1.00 2,250,000.00 2,475,000.00 0.14 1.00 0.14 - - 1.00 0.14 100.00
4 Pembuatan Direksi Keed Dan Gudang m² 6.00 1,651,423.95 10,899,398.07 0.62 6.00 0.62 - - 6.00 0.62 100.00
5 Pengukuran Dan Pemasangan Bowplank ls 1.00 88,384.23 97,222.65 0.01 1.00 0.01 - - 1.00 0.01 100.00
6 Dokumentasi Dan Pelaporan ls 1.00 4,500,000.00 4,950,000.00 0.28 - - - - - - -
7 As Built Drawing ls 1.00 5,215,000.00 5,736,500.00 0.33 - - - - - - -
8 Pembersihan Akhir ls 1.00 4,050,000.00 4,455,000.00 0.25 - - - - - - -
- - -
II PEKERJAAN TAMAN - - -
A Pekerjaan Pasangan - - -
1 Pas. Dinding Batu Bata, 1:3 m³ 60.00 179,605.80 4,506,410.05 0.26 - - - - - - -
2 Pas. Beton Tumbuk m³ 5.06 1,394,762.22 7,763,246.52 0.44 - - - - - - -
3 Pas. Plesteran, Camp. 1 :3 m² 60.00 104,806.10 6,917,202.60 0.40 - - - - - - -
4 Pas. Acian Dinding m² 60.00 58,409.51 3,855,027.66 0.22 - - - - - - -
5 Cat m² 60.00 41,336.13 2,728,184.58 0.16 - - - - - - -
- - -
B PEKERJAAN TANAH TIMBUNAN/POHON - - -
1 Pek. Timbunan m³ 56.64 387,941.40 24,170,300.99 1.38 - - - - - - -
2 Pohon Ketapang bh 6.00 645,916.20 4,263,046.92 0.24 - - - - - - -
3 Pohon Palm bh 2.00 945,916.20 2,079,915.64 0.12 - - - - - - -
4 Rumput Jepang m² - 145,916.20 0 - - - - - - - -
5 Rabat Beton m³ 5.06 1,394,762.22 7,763,246.52 0.44 - - - - - - -
- - -
III PEKERJAAN FOOD CORE - - -
A PEKERJAAN TANAH DAN PONDASI - - -
1 Galian Tanah Dan Pondasi jalur m³ 49.06 119,245.50 6,435,202.65 0.37 49.06 0.37 - - 49.06 0.37 100.00
2 Urugan Pasir Bawah Pondasi Batu Kali m³ 4.65 464,092.20 2,373,831.60 0.14 4.65 0.14 - - 4.65 0.14 100.00
3 Urugan Tanah Gal. Pondasi Kembali m³ 12.26 39,748.50 536,048.27 0.03 12.26 0.03 - - 12.26 0.03 100.00
4 Urugan Pasir Bawah Lantai m³ 11.76 464,092.20 6,003,496.70 0.34 - - 11.76 0.34 11.76 0.34 100.00
5 Urugan Tanah Bawah Lantai m³ 36.53 387,941.40 15,588,649.28 0.89 - - 36.53 0.89 36.53 0.89 100.00
6 Pas. Batu Kosong m³ 12.69 622,795.83 8,693,606.99 0.50 12.69 0.50 - 12.69 0.50 100.00
7 Pas. Pondasi Batu Kali, Camp 1:4 m³ 24.27 1,347,805.31 35,982,358.36 2.06 24.27 2.06 - 24.27 2.06 100.00
- - -
B PEKERJAAN BETON DAN BATA - - -
1 Pekerjaan Sloof 18x25 cm - - -
- Bekesting Sloof Beton m² 46.50 266,127.54 13,612,423.67 0.78 46.50 0.78 - - 46.50 0.78 100.00
- Tulangan Besi Beton 8 mm -U24 Kg 177.72 13,577.42 2,654,276.99 0.15 177.72 0.15 - - 177.72 0.15 100.00
- Tulangan Besi Beton 12 mm - U39 Kg 347.63 13,577.42 5,191,910.37 0.30 347.63 0.30 - - 347.63 0.30 100.00
- Beton K-175 m³ 4.18 1,548,974.64 7,122,185.39 0.41 4.18 0.41 - - 4.18 0.41 100.00
- - - -
2 Pek. Kolom 15x15 cm - - - -
- Bekesting Sloof Beton m² 46.80 476,031.60 24,506,106.77 1.40 46.80 1.40 - 46.80 1.40 100.00
- Tulangan Besi Beton 8 mm -U24 Kg 93.69 13,577.42 1,399,275.33 0.08 93.69 0.08 - - 93.69 0.08 100.00
- Tulangan Besi Beton 12 mm - U39 Kg 340.16 13,577.42 5,080,344.71 0.29 340.16 0.29 - - 340.16 0.29 100.00
- Beton K-175 m³ 1.75 1,548,974.64 2,981,776.18 0.17 1.75 0.17 - - 1.75 0.17 100.00
- - -
3 Pek. Ring Balok 15x25 cm - - -
- Bekesting Ring Balok m² 62.94 487,368.09 33,742,442.34 1.93 - - 62.94 1.93 62.94 1.93 100.00
- Tulangan Besi Beton 8 mm -U24 Kg 68.89 13,577.42 1,043,818.47 0.06 - - 68.89 0.06 68.89 0.06 100.00
- Tulangan Besi Beton 12 mm - U39 Kg 149.52 13,577.42 2,233,105.42 0.13 - - 149.52 0.13 149.52 0.13 100.00
- Beton K-175 m³ 3.28 1,548,974.64 5,588,700.50 0.32 - - 3.28 0.32 3.28 0.32 100.00
4 Pek. Lantai Beton Tumbuk, Camp 1:3:5 m³ 9.11 1,394,762.22 13,976,912.21 0.80 - - 9.11 0.80 9.11 0.80 100.00
5 Pek. Bata Lapisan Kolom, Camp 1:3 m² 21.84 177,809.74 4,271,701.19 0.24 - - - - - - -
6 Pek. Plesteran Bata, Camp 1:3 m² 21.84 104,806.10 2,517,861.75 0.14 - - - - - - -
- - -
C PEKERJAAN KAYU, ATAP, CAT DAN LANTAI - - -
1 Pek. Pagar Kayu Kelas II m³ 6.43 8,838,220.05 62,512,730.41 3.58 - - - - - -
2 Pek. Lambersering Lapisan Kolom, Kayu Kelas II m² 31.81 340,579.80 11,917,227.78 0.68 - - - - - -
3 Pek. Rangka Plafond Kayu 5/5 Kelas II m² 191.14 140,322.01 29,505,366.43 1.69 - - - - - - -
4 Pek. Penutup Plafond Tripleks 4mm m² 191.14 61,181.51 12,863,657.20 0.74 - - - - - - -
5 Pek. Kuda-Kuda Kayu 5/10 Kelas II m³ 2.25 9,735,372.90 24,095,047.93 1.38 - - - - - - -
6 Pek. Gording Kayu 5/5 Kelas II m³ 1.14 9,138,353.40 11,459,495.16 0.66 - - - - - - -
7 Pek. Rangka Atap Seng Multiroof m² 269.80 255,731.85 75,896,098.44 4.34 - - - - - - -
8 Pek. Penutup Atap Seng Mulltiroof m² 269.80 153,094.59 45,435,412.42 2.60 - - - - - - -
9 Pek. Bubungan Atap Seng Multiroof m¹ 49.50 206,556.57 11,247,005.24 0.64 - - - - - - -
10 Pek. Listplank Papan Kayu Kelas -II m¹ 162.00 97,900.11 17,445,799.60 1.00 - - - - - - -
11 Cat kayu (vernis) m² 359.88 72,224.11 28,591,213.98 1.64 - - - - - - -
12 Pek. Lantai Keramik 40 cm x 40 cm m² 115.05 218,558.54 27,659,676.03 1.58 - - - - - - -
- - -
D PEKERJAAN ELEKTRIKAL - - -
1 Pasang Box Panel bh 1.00 40,606.04 44,666.64 0.00 - - - - - - -
2 Pasang MCB bh 2.00 71,860.34 158,092.75 0.01 - - - - - - -
3 Pas. Stop Kontak bh 24.00 191,410.56 5,053,238.78 0.29 - - - - - - -
4 Pas. Saklar Ganda bh 12.00 191,410.56 2,526,619.39 0.14 - - - - - - -
5 Pas. Lampu jari-jari Philips 18 Watt Ttk 48.00 249,028.56 13,148,707.97 0.75 - - - - - - -
6 Pas. Kabel NYM m¹ 250.00 60,794.91 16,718,600.25 0.96 - - - - - - -
7 Penyambungan Baru Listrik 2300VA ls 1.00 2,500,000.00 2,750,000.00 0.16 - - - - - - -
- - -
IV PEKERJAAN JAMBAN - - -
A PEKERJAAN TANAH DAN PONDASI - - -
1 Galian Tanah Pondasi Jalur m³ 17.13 119,245.50 2,246,942.96 0.13 17.13 0.13 - - 17.13 0.13 100.00
2 Urugan Pasir bawah Pondasi m³ 1.32 464,092.20 673,861.87 0.04 1.32 0.04 - - 1.32 0.04 100.00
3 Urugan pasir bawah Lantai m³ 0.73 464,092.20 372,666.04 0.02 0.73 0.02 - - 0.73 0.02 100.00
4 Urugan Tanah Gal. Tanah Kembali m³ 4.28 39,748.50 187,135.94 0.01 4.28 0.01 - - 4.28 0.01 100.00
5 Urugan Tanah Bawah Lantai m³ 3.53 387,941.40 1,506,376.46 0.09 3.53 0.09 - - 3.53 0.09 100.00
6 Pas. Pondasi Batu Kosong m³ 3.95 622,795.83 2,706,047.88 0.15 3.95 0.15 - - 3.95 0.15 100.00
7 Pas. Pondasi Batu Kali1:4 m³ 6.20 1,347,805.31 9,192,032.21 0.53 6.20 0.53 - - 6.20 0.53 100.00
- - -
B PEKERJAAN BETON BERTULANG - - -
1 Pekerjaan Sloof 15 cm x 20 cm - - -
- Bekesting Sloof Beton m² 10.63 266,127.54 3,111,829.33 0.18 10.63 0.18 - - 10.63 0.18 100.00
- Tulangan Besi Beton U-24 Kg 54.16 13,577.42 808,888.37 0.05 54.16 0.05 - - 54.16 0.05 100.00
- Tulangan Besi Beton U-39 Kg 115.88 13,577.42 1,730,686.57 0.10 115.88 0.10 - - 115.88 0.10 100.00
- Beton K-175 m³ 0.87 1,548,974.64 1,482,368.73 0.08 0.87 0.08 - - 0.87 0.08 100.00
2 Pekerjaan Kolom 20 x 20 cm - - -
- Bekesting Sloof Beton m² 7.92 476,031.60 4,147,187.30 0.24 7.92 0.24 - - 7.92 0.24 100.00
- Tulangan Besi Beton U-24 Kg 17.82 13,577.42 266,144.59 0.02 17.82 0.02 - - 17.82 0.02 100.00
- Tulangan Besi Beton U-39 Kg 38.13 13,577.42 569,477.73 0.03 38.13 0.03 - - 38.13 0.03 100.00
- Beton K-175 m³ 0.36 1,548,974.64 613,393.96 0.04 0.36 0.04 - - 0.36 0.04 100.00
3 Pekerjaan Ring Balok 15 x 25 cm - - -
- - Bekesting Sloof Beton m² 3.04 487,368.09 1,629,758.89 0.09 3.04 0.09 - - 3.04 0.09 100.00
- - Tulangan Besi Beton U-24 Kg 91.62 13,577.42 1,368,359.54 0.08 91.62 0.08 - - 91.62 0.08 100.00
- - Tulangan Besi Beton U-39 Kg 232.32 13,577.42 3,469,736.84 0.20 232.32 0.20 - - 232.32 0.20 100.00
- - Beton K-175 m³ 1.14 1,548,974.64 1,942,414.20 0.11 1.14 0.11 - - 1.14 0.11 100.00
4 Pekerjaan Kanopi Beton - - -
- Bakesting kanopi Beton m² 3.90 615,423.60 2,640,167.24 0.15 3.90 0.15 - - 3.90 0.15 100.00
- Tulangan Besi Beton U-24 Kg 28.87 13,577.42 431,178.13 0.02 28.87 0.02 - - 28.87 0.02 100.00
- Beton K-175 m³ 0.16 1,548,974.64 272,619.54 0.02 0.16 0.02 - - 0.16 0.02 100.00
5 Pek. Ring balok Praktis 10cm x 15 cm m¹ 60.40 137,872.75 9,160,265.51 0.52 60.40 0.52 - - 60.40 0.52 100.00
- - -
C PEKERJAAN DINDING DAN LANTAI - - -
1 Pas. Dinding 1/2 bata 1:4 m² 57.15 173,035.17 10,877,855.96 0.62 57.15 0.62 - - 57.15 0.62 100.00
2 Pek. Plesteran Dinding 1/2 Bata Camp 1:4 m² 114.29 102,101.29 12,836,072.08 0.73 114.29 0.73 - - 114.29 0.73 100.00
3 Pek. Plesteran Pondasi, Sloof dan Kolom Camp 1:3 m² 20.07 104,806.10 2,313,804.27 0.13 20.07 0.13 - - 20.07 0.13 100.00
4 Acian Dinding, Sloof Dan kolom m² 134.36 58,409.51 8,632,691.94 0.49 134.36 0.49 - - 134.36 0.49 100.00
5 Cat Dinding m² 134.36 41,336.13 6,109,314.67 0.35 - - - - - - -
6 Pas. Lantai Beton tumbuk, Camp 1:3:5 m³ 1.17 1,394,762.22 1,795,058.98 0.10 - - - - - - -
7 Pas. Dindinig Keramik 20x25 cm m² 27.74 384,208.13 11,723,726.88 0.67 - - - - - - -
8 Pas. Lantai Keramik 20x20 cm (texture kasar) m² 15.68 339,673.58 5,858,689.91 0.34 - - - - - - -
D PEKERJAAN PLAFOND
1 Pas. Rangka Plafond Kayu 5/5 Kelas II m² 27.28 140,332.01 4,211,082.96 0.24 - - - - - - -
2 Pas. Penutup Plafond Tripleks 4 mm m² 27.28 61,181.51 1,835,934.75 0.11 - - - - - - -
3 Pas. List Profil Plafond m¹ 61.56 29,917.80 2,025,913.74 0.12 - - - - - - -
4 Cat Plafond m² 27.23 41,336.13 1,240,414.59 0.07 - - - - - - -
- - - -
E PEKERJAAN KUSEN, PINTU DAN JENDELA - - - -
1 Pas. Kusen Pintu, Kayu 8/12 kelas I m³ 0.18 11,609,744.85 2,298,729.48 0.13 0.18 0.13 - - 0.18 0.13 100.00
2 Pas. Kusen Ventilasi Atap, Kayu 5/10 Kelas II m³ 0.03 8,307,283.05 274,140.34 0.02 0.03 0.02 - - 0.03 0.02 100.00
3 Pas. Daun Pintu Panel Kayu Kelas I m² 4.86 1,007,384.40 5,385,477.00 0.31 - - - - - - -
4 Pas. Kisi-kisi Ventilasi Atap, Kayu Kelas II m¹ 0.44 701,649.63 339,598.42 0.02 0.44 0.02 - - 0.44 0.02 100.00
5 Cat Kusen, Pintu & Listplank m² 7.28 72,224.11 578,370.67 0.03 2.43 0.01 - - 2.43 0.01 33.33
6 Pas. Kunci Pintu bh 4.00 160,991.20 708,364.01 0.04 - - - - - - -
7 Pas. Engsel Pintu bh 12.00 188,054.96 2,482,325.47 0.14 - - - - - - -
8 Pas. Grendel Pintu bh 4.00 55,164.78 242,725.03 0.01 - - - - - - -
- - - -
F PEKERJAAN ATAP - - - -
1 Pas. Kuda-kuda Kayu 5/10 Kayu Kelas II m³ 0.23 9,735,372.90 2,463,049.34 0.14 0.23 0.14 - - 0.23 0.14 100.00
2 Pas. Gording Kayu 5/5 Kayu Kelas II m³ 0.21 9,138,353.40 2,110,959.64 0.12 0.21 0.12 - - 0.21 0.12 100.00
3 Pas. Blk. Kasau Dan Ring, Kayu Kelas II m² 56.88 255,731.85 16,000,630.39 0.92 56.88 0.92 - - 56.88 0.92 100.00
4 Pas. Atap Genteng Multiroof BJLS 0.25mm m² 56.88 153,094.59 9,578,822.31 0.55 56.88 0.55 - - 56.88 0.55 100.00
5 Pas. Bubungan Atap Seng Multiroof m¹ 16.15 206,556.57 3,669,477.47 0.21 16.15 0.21 - - 16.15 0.21 100.00
6 Pas. Listplank Kayu Kelas II m¹ 23.32 97,900.11 2,511,333.62 0.14 23.32 0.14 - - 23.32 0.14 100.00
- - - -
G PEKERJAAN SANITASI - - - -
1 Pek. Septicktank ls 1.00 6,500,000.00 7,150,000.00 0.41 - - - - - - -
2 Pek. Bak Air ls 4.00 1,000,000.00 4,400,000.00 0.25 - - - - - - -
3 Pas. Pipa Air Bersih PVC AW 1/2' m¹ 30.00 25,049.18 826,622.94 0.05 - - - - - - -
4 Pas. Pipa Tinja PVC 4" m¹ 6.00 128,422.21 847,586.59 0.05 - - - - - - -
5 Pas. Pipa Air Kotor PVC 2" m¹ 6.00 55,541.03 366,570.80 0.02 - - - - - - -
6 Pas. Floor Drain bh 4.00 315,717.93 1,389,158.89 0.08 - - - - - - -
7 Pas. Kloset Jongkok bh 4.00 977,829.93 4,302,451.69 0.25 - - - - - - -
8 Pas. Keran Air Km//Wc bh 4.00 86,434.43 380,311.49 0.02 - - - - - - -
9 Penyambungan Baru Air PDAM ls 1.00 3,000,000.00 3,300,000.00 0.19 - - - - - - -
- - - -
H PEKERJAAN SEPTICTANK DAN REMBESAN - - - -
1 Pas. Galian tanah m³ 5.52 119,245.50 724,058.68 0.04 - - - - - - -
2 Pas. Galian Pasir m³ 0.42 464,092.20 214,410.60 0.01 - - - - - - -
3 Pas. Dinding Batu Bata, Camp 1:3 m² 14.66 177,809.74 2,867,359.87 0.16 - - - - - - -
4 Plesteran Dinding & Lantai, Camp 1:3 m² 31.28 104,806.10 3,606,168.29 0.21 - - - - - - -
5 Acian Dinding & Lantai m² 31.28 58,409.51 2,009,754.42 0.11 - - - - - - -
6 Pek. Beton Penutup Septictank - - - - -
- - Bekesting m² 3.68 615,423.60 2,491,234.73 0.14 - - - - - - -
- - Tulangan Besi Beton U-24 Kg 24.29 13,577.42 362,775.08 0.02 - - - - - - -
- - Beton K-200 m³ 0.34 1,599,057.76 598,047.60 0.03 - - - - - - -
7 Pas. Pipa Hawa / Vent. Gip 2" m¹ 2.80 170,629.77 525,539.69 0.03 - - - - - - -
8 Pas. Batu Kosong m¹ 0.54 622,795.83 369,940.72 0.02 - - - - - - -
- - - -
I PEKERJAAN ELEKTRIKAL - - - -
1 Pas. Saklar Tunggal bh 4.00 143,557.92 631,654.85 0.04 - - - - - - -
2 Pas. Saklar Ganda bh 2.00 249,028.56 421,103.23 0.02 - - - - - - -
3 Pas. Lampu Philipps Jari-jari 18 Watt m¹ 8.00 21,879.00 2,191,451.33 0.13 - - - - - - -
4 Pas. Pipa Instalasi Listrik m¹ 20.00 60,794.91 481,338.00 0.03 - - - - - - -
5 Pas. Kabel NYM m¹ 40.00 60,794.91 2,674,976.04 0.15 - - - - - - -
- - - -
J PEKERJAAN LANTAI PAVING - - - -
1 Urugan Pasir Bawah Paving m³ 92.24 464,092.20 47,088,650.98 2.69 - - - - - - -
2 Pas. Paving Blok K-300 m² 1,844.78 349,061.13 708,335,090.54 40.51 - - - - - - -
3 CAT Paving m² 1,844.79 41,336.13 83,881,672.49 4.80 - - - - - - -
-
100.00 14.80 4.47 19.28
TOTAL PEKERJAAN 1,748,475,480.76
SHAIFUDDIN ZUHRI
ROSITA TAUDA, ST,MT
USMAN, S.T.
NIP. 19800101 2008032 002 SITE ENGINEER
DOKUMENTASI PELAKSANAAN
PEMBANGUNAN FASILITAS LAHAN PARKIR DERMAGA SEMUT MANGGA DUA
KONSULTAN PENGAWASAN
CV. USRAH
DOKUMENTASI PELAKSANAAN
PEMBANGUNAN FASILITAS LAHAN PARKIR DERMAGA SEMUT MANGGA DUA
KONSULTAN PENGAWASAN
CV. USRAH
DOKUMENTASI PELAKSANAAN
PEMBANGUNAN FASILITAS LAHAN PARKIR DERMAGA SEMUT MANGGA DUA
KONSULTAN PENGAWASAN
CV. USRAH
PROGRES MINGGUAN
MINGGU KE 09 PERIODE : 27 AGUSTUS S/D 02 SEPTEMBER 2018
NO KONTRAK : NO KONTRAK
TANGGAL : TANGGAL
WAKTU PELAKSANAAN : WAKTU PELAKSANAAN
BOBOT
TERHADAP
Harga satuan Jumlah Harga
No Uraian Pekerjaan Satuan Volume BOBOT % MINGGU LALU MINGGU INI SAMPAI MINGGU INI ITEM
(Rp.) (Rp.) PEKERJAAN
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT (%)
I Pekerjaan Persiapan
1 Papan Nama Proyek bh 1.00 599,139.75 659,053.73 0.04 1.00 0.04 - - 1.00 0.04 100.00
2 Penyedia Air Kerja ls 1.00 3,200,000.00 3,520,000.00 0.20 1.00 0.20 - - 1.00 0.20 100.00
3 Penyedia Listrik Kerja ls 1.00 2,250,000.00 2,475,000.00 0.14 1.00 0.14 - - 1.00 0.14 100.00
4 Pembuatan Direksi Keed Dan Gudang m² 6.00 1,651,423.95 10,899,398.07 0.62 6.00 0.62 - - 6.00 0.62 100.00
5 Pengukuran Dan Pemasangan Bowplank ls 1.00 88,384.23 97,222.65 0.01 1.00 0.01 - - 1.00 0.01 100.00
6 Dokumentasi Dan Pelaporan ls 1.00 4,500,000.00 4,950,000.00 0.28 - - - - - - -
7 As Built Drawing ls 1.00 5,215,000.00 5,736,500.00 0.33 - - - - - - -
8 Pembersihan Akhir ls 1.00 4,050,000.00 4,455,000.00 0.25 - - - - - - -
- - -
II PEKERJAAN TAMAN - - -
A Pekerjaan Pasangan - - -
1 Pas. Dinding Batu Bata, 1:3 m³ 60.00 179,605.80 4,506,410.05 0.26 - - - - - - -
2 Pas. Beton Tumbuk m³ 5.06 1,394,762.22 7,763,246.52 0.44 - - - - - - -
3 Pas. Plesteran, Camp. 1 :3 m² 60.00 104,806.10 6,917,202.60 0.40 - - - - - - -
4 Pas. Acian Dinding m² 60.00 58,409.51 3,855,027.66 0.22 - - - - - - -
5 Cat m² 60.00 41,336.13 2,728,184.58 0.16 - - - - - - -
- - -
B PEKERJAAN TANAH TIMBUNAN/POHON - - -
1 Pek. Timbunan m³ 56.64 387,941.40 24,170,300.99 1.38 - - - - - - -
2 Pohon Ketapang bh 6.00 645,916.20 4,263,046.92 0.24 - - - - - - -
3 Pohon Palm bh 2.00 945,916.20 2,079,915.64 0.12 - - - - - - -
4 Rumput Jepang m² - 145,916.20 0 - - - - - - - -
5 Rabat Beton m³ 5.06 1,394,762.22 7,763,246.52 0.44 - - - - - - -
- - -
III PEKERJAAN FOOD CORE - - -
A PEKERJAAN TANAH DAN PONDASI - - -
1 Galian Tanah Dan Pondasi jalur m³ 49.06 119,245.50 6,435,202.65 0.37 49.06 0.37 - - 49.06 0.37 100.00
2 Urugan Pasir Bawah Pondasi Batu Kali m³ 4.65 464,092.20 2,373,831.60 0.14 4.65 0.14 - - 4.65 0.14 100.00
3 Urugan Tanah Gal. Pondasi Kembali m³ 12.26 39,748.50 536,048.27 0.03 12.26 0.03 - - 12.26 0.03 100.00
4 Urugan Pasir Bawah Lantai m³ 11.76 464,092.20 6,003,496.70 0.34 11.76 0.34 - - 11.76 0.34 100.00
5 Urugan Tanah Bawah Lantai m³ 36.53 387,941.40 15,588,649.28 0.89 36.53 0.89 - - 36.53 0.89 100.00
6 Pas. Batu Kosong m³ 12.69 622,795.83 8,693,606.99 0.50 12.69 0.50 - 12.69 0.50 100.00
7 Pas. Pondasi Batu Kali, Camp 1:4 m³ 24.27 1,347,805.31 35,982,358.36 2.06 24.27 2.06 - 24.27 2.06 100.00
- - -
B PEKERJAAN BETON DAN BATA - - -
1 Pekerjaan Sloof 18x25 cm - - -
- Bekesting Sloof Beton m² 46.50 266,127.54 13,612,423.67 0.78 46.50 0.78 - - 46.50 0.78 100.00
- Tulangan Besi Beton 8 mm -U24 Kg 177.72 13,577.42 2,654,276.99 0.15 177.72 0.15 - - 177.72 0.15 100.00
- Tulangan Besi Beton 12 mm - U39 Kg 347.63 13,577.42 5,191,910.37 0.30 347.63 0.30 - - 347.63 0.30 100.00
- Beton K-175 m³ 4.18 1,548,974.64 7,122,185.39 0.41 4.18 0.41 - - 4.18 0.41 100.00
- - - -
2 Pek. Kolom 15x15 cm - - - -
- Bekesting Sloof Beton m² 46.80 476,031.60 24,506,106.77 1.40 46.80 1.40 - 46.80 1.40 100.00
- Tulangan Besi Beton 8 mm -U24 Kg 93.69 13,577.42 1,399,275.33 0.08 93.69 0.08 - - 93.69 0.08 100.00
- Tulangan Besi Beton 12 mm - U39 Kg 340.16 13,577.42 5,080,344.71 0.29 340.16 0.29 - - 340.16 0.29 100.00
- Beton K-175 m³ 1.75 1,548,974.64 2,981,776.18 0.17 1.75 0.17 - - 1.75 0.17 100.00
- - -
3 Pek. Ring Balok 15x25 cm - - -
- Bekesting Ring Balok m² 62.94 487,368.09 33,742,442.34 1.93 62.94 1.93 - - 62.94 1.93 100.00
- Tulangan Besi Beton 8 mm -U24 Kg 68.89 13,577.42 1,043,818.47 0.06 68.89 0.06 - - 68.89 0.06 100.00
- Tulangan Besi Beton 12 mm - U39 Kg 149.52 13,577.42 2,233,105.42 0.13 149.52 0.13 - - 149.52 0.13 100.00
- Beton K-175 m³ 3.28 1,548,974.64 5,588,700.50 0.32 3.28 0.32 - - 3.28 0.32 100.00
4 Pek. Lantai Beton Tumbuk, Camp 1:3:5 m³ 9.11 1,394,762.22 13,976,912.21 0.80 9.11 0.80 - - 9.11 0.80 100.00
5 Pek. Bata Lapisan Kolom, Camp 1:3 m² 21.84 177,809.74 4,271,701.19 0.24 - - 21.84 0.24 21.84 0.24 100.00
6 Pek. Plesteran Bata, Camp 1:3 m² 21.84 104,806.10 2,517,861.75 0.14 - - 10.92 0.07 10.92 0.07 50.00
- - -
C PEKERJAAN KAYU, ATAP, CAT DAN LANTAI - - -
1 Pek. Pagar Kayu Kelas II m³ 6.43 8,838,220.05 62,512,730.41 3.58 - - - - - - -
2 Pek. Lambersering Lapisan Kolom, Kayu Kelas II m² 31.81 340,579.80 11,917,227.78 0.68 - - - - - - -
3 Pek. Rangka Plafond Kayu 5/5 Kelas II m² 191.14 140,322.01 29,505,366.43 1.69 - - - - - - -
4 Pek. Penutup Plafond Tripleks 4mm m² 191.14 61,181.51 12,863,657.20 0.74 - - - - - - -
5 Pek. Kuda-Kuda Kayu 5/10 Kelas II m³ 2.25 9,735,372.90 24,095,047.93 1.38 - - 2.25 1.38 2.25 1.38 100.00
6 Pek. Gording Kayu 5/5 Kelas II m³ 1.14 9,138,353.40 11,459,495.16 0.66 - - 1.14 0.66 1.14 0.66 100.00
7 Pek. Rangka Atap Seng Multiroof m² 269.80 255,731.85 75,896,098.44 4.34 - - 134.90 2.17 134.90 2.17 50.00
8 Pek. Penutup Atap Seng Mulltiroof m² 269.80 153,094.59 45,435,412.42 2.60 - - - - - - -
9 Pek. Bubungan Atap Seng Multiroof m¹ 49.50 206,556.57 11,247,005.24 0.64 - - - - - - -
10 Pek. Listplank Papan Kayu Kelas -II m¹ 162.00 97,900.11 17,445,799.60 1.00 - - - - - - -
11 Cat kayu (vernis) m² 359.88 72,224.11 28,591,213.98 1.64 - - - - - - -
12 Pek. Lantai Keramik 40 cm x 40 cm m² 115.05 218,558.54 27,659,676.03 1.58 - - - - - - -
- - -
D PEKERJAAN ELEKTRIKAL - - -
1 Pasang Box Panel bh 1.00 40,606.04 44,666.64 0.00 - - - - - - -
2 Pasang MCB bh 2.00 71,860.34 158,092.75 0.01 - - - - - - -
3 Pas. Stop Kontak bh 24.00 191,410.56 5,053,238.78 0.29 - - - - - - -
4 Pas. Saklar Ganda bh 12.00 191,410.56 2,526,619.39 0.14 - - - - - - -
5 Pas. Lampu jari-jari Philips 18 Watt Ttk 48.00 249,028.56 13,148,707.97 0.75 - - - - - - -
6 Pas. Kabel NYM m¹ 250.00 60,794.91 16,718,600.25 0.96 - - - - - - -
7 Penyambungan Baru Listrik 2300VA ls 1.00 2,500,000.00 2,750,000.00 0.16 - - - - - - -
- - -
IV PEKERJAAN JAMBAN - - -
A PEKERJAAN TANAH DAN PONDASI - - -
1 Galian Tanah Pondasi Jalur m³ 17.13 119,245.50 2,246,942.96 0.13 17.13 0.13 - - 17.13 0.13 100.00
2 Urugan Pasir bawah Pondasi m³ 1.32 464,092.20 673,861.87 0.04 1.32 0.04 - - 1.32 0.04 100.00
3 Urugan pasir bawah Lantai m³ 0.73 464,092.20 372,666.04 0.02 0.73 0.02 - - 0.73 0.02 100.00
4 Urugan Tanah Gal. Tanah Kembali m³ 4.28 39,748.50 187,135.94 0.01 4.28 0.01 - - 4.28 0.01 100.00
5 Urugan Tanah Bawah Lantai m³ 3.53 387,941.40 1,506,376.46 0.09 3.53 0.09 - - 3.53 0.09 100.00
6 Pas. Pondasi Batu Kosong m³ 3.95 622,795.83 2,706,047.88 0.15 3.95 0.15 - - 3.95 0.15 100.00
7 Pas. Pondasi Batu Kali1:4 m³ 6.20 1,347,805.31 9,192,032.21 0.53 6.20 0.53 - - 6.20 0.53 100.00
- - -
B PEKERJAAN BETON BERTULANG - - -
1 Pekerjaan Sloof 15 cm x 20 cm - - -
- Bekesting Sloof Beton m² 10.63 266,127.54 3,111,829.33 0.18 10.63 0.18 - - 10.63 0.18 100.00
- Tulangan Besi Beton U-24 Kg 54.16 13,577.42 808,888.37 0.05 54.16 0.05 - - 54.16 0.05 100.00
- Tulangan Besi Beton U-39 Kg 115.88 13,577.42 1,730,686.57 0.10 115.88 0.10 - - 115.88 0.10 100.00
- Beton K-175 m³ 0.87 1,548,974.64 1,482,368.73 0.08 0.87 0.08 - - 0.87 0.08 100.00
2 Pekerjaan Kolom 20 x 20 cm - - -
- Bekesting Sloof Beton m² 7.92 476,031.60 4,147,187.30 0.24 7.92 0.24 - - 7.92 0.24 100.00
- Tulangan Besi Beton U-24 Kg 17.82 13,577.42 266,144.59 0.02 17.82 0.02 - - 17.82 0.02 100.00
- Tulangan Besi Beton U-39 Kg 38.13 13,577.42 569,477.73 0.03 38.13 0.03 - - 38.13 0.03 100.00
- Beton K-175 m³ 0.36 1,548,974.64 613,393.96 0.04 0.36 0.04 - - 0.36 0.04 100.00
3 Pekerjaan Ring Balok 15 x 25 cm - - -
- - Bekesting Sloof Beton m² 3.04 487,368.09 1,629,758.89 0.09 3.04 0.09 - - 3.04 0.09 100.00
- - Tulangan Besi Beton U-24 Kg 91.62 13,577.42 1,368,359.54 0.08 91.62 0.08 - - 91.62 0.08 100.00
- - Tulangan Besi Beton U-39 Kg 232.32 13,577.42 3,469,736.84 0.20 232.32 0.20 - - 232.32 0.20 100.00
- - Beton K-175 m³ 1.14 1,548,974.64 1,942,414.20 0.11 1.14 0.11 - - 1.14 0.11 100.00
4 Pekerjaan Kanopi Beton - - -
- Bakesting kanopi Beton m² 3.90 615,423.60 2,640,167.24 0.15 3.90 0.15 - - 3.90 0.15 100.00
- Tulangan Besi Beton U-24 Kg 28.87 13,577.42 431,178.13 0.02 28.87 0.02 - - 28.87 0.02 100.00
- Beton K-175 m³ 0.16 1,548,974.64 272,619.54 0.02 0.16 0.02 - - 0.16 0.02 100.00
5 Pek. Ring balok Praktis 10cm x 15 cm m¹ 60.40 137,872.75 9,160,265.51 0.52 60.40 0.52 - - 60.40 0.52 100.00
- - -
C PEKERJAAN DINDING DAN LANTAI - - -
1 Pas. Dinding 1/2 bata 1:4 m² 57.15 173,035.17 10,877,855.96 0.62 57.15 0.62 - - 57.15 0.62 100.00
2 Pek. Plesteran Dinding 1/2 Bata Camp 1:4 m² 114.29 102,101.29 12,836,072.08 0.73 114.29 0.73 - - 114.29 0.73 100.00
3 Pek. Plesteran Pondasi, Sloof dan Kolom Camp 1:3 m² 20.07 104,806.10 2,313,804.27 0.13 20.07 0.13 - - 20.07 0.13 100.00
4 Acian Dinding, Sloof Dan kolom m² 134.36 58,409.51 8,632,691.94 0.49 134.36 0.49 - - 134.36 0.49 100.00
5 Cat Dinding m² 134.36 41,336.13 6,109,314.67 0.35 - - - - - - -
6 Pas. Lantai Beton tumbuk, Camp 1:3:5 m³ 1.17 1,394,762.22 1,795,058.98 0.10 - - - - - - -
7 Pas. Dindinig Keramik 20x25 cm m² 27.74 384,208.13 11,723,726.88 0.67 - - - - - - -
8 Pas. Lantai Keramik 20x20 cm (texture kasar) m² 15.68 339,673.58 5,858,689.91 0.34 - - - - - - -
- -
D PEKERJAAN PLAFOND - -
1 Pas. Rangka Plafond Kayu 5/5 Kelas II m² 27.28 140,332.01 4,211,082.96 0.24 - - - - - - -
2 Pas. Penutup Plafond Tripleks 4 mm m² 27.28 61,181.51 1,835,934.75 0.11 - - - - - - -
3 Pas. List Profil Plafond m¹ 61.56 29,917.80 2,025,913.74 0.12 - - - - - - -
4 Cat Plafond m² 27.23 41,336.13 1,240,414.59 0.07 - - - - - - -
- - - -
E PEKERJAAN KUSEN, PINTU DAN JENDELA - - - -
1 Pas. Kusen Pintu, Kayu 8/12 kelas I m³ 0.18 11,609,744.85 2,298,729.48 0.13 0.18 0.13 - - 0.18 0.13 100.00
2 Pas. Kusen Ventilasi Atap, Kayu 5/10 Kelas II m³ 0.03 8,307,283.05 274,140.34 0.02 0.03 0.02 - - 0.03 0.02 100.00
3 Pas. Daun Pintu Panel Kayu Kelas I m² 4.86 1,007,384.40 5,385,477.00 0.31 - - - - - - -
4 Pas. Kisi-kisi Ventilasi Atap, Kayu Kelas II m¹ 0.44 701,649.63 339,598.42 0.02 0.44 0.02 - - 0.44 0.02 100.00
5 Cat Kusen, Pintu & Listplank m² 7.28 72,224.11 578,370.67 0.03 2.43 0.01 - - 2.43 0.01 33.33
6 Pas. Kunci Pintu bh 4.00 160,991.20 708,364.01 0.04 - - - - - - -
7 Pas. Engsel Pintu bh 12.00 188,054.96 2,482,325.47 0.14 - - - - - - -
8 Pas. Grendel Pintu bh 4.00 55,164.78 242,725.03 0.01 - - - - - - -
- - - -
F PEKERJAAN ATAP - - - -
1 Pas. Kuda-kuda Kayu 5/10 Kayu Kelas II m³ 0.23 9,735,372.90 2,463,049.34 0.14 0.23 0.14 - - 0.23 0.14 100.00
2 Pas. Gording Kayu 5/5 Kayu Kelas II m³ 0.21 9,138,353.40 2,110,959.64 0.12 0.21 0.12 - - 0.21 0.12 100.00
3 Pas. Blk. Kasau Dan Ring, Kayu Kelas II m² 56.88 255,731.85 16,000,630.39 0.92 56.88 0.92 - - 56.88 0.92 100.00
4 Pas. Atap Genteng Multiroof BJLS 0.25mm m² 56.88 153,094.59 9,578,822.31 0.55 56.88 0.55 - - 56.88 0.55 100.00
5 Pas. Bubungan Atap Seng Multiroof m¹ 16.15 206,556.57 3,669,477.47 0.21 16.15 0.21 - - 16.15 0.21 100.00
6 Pas. Listplank Kayu Kelas II m¹ 23.32 97,900.11 2,511,333.62 0.14 23.32 0.14 - - 23.32 0.14 100.00
- - - -
G PEKERJAAN SANITASI - - - -
1 Pek. Septicktank ls 1.00 6,500,000.00 7,150,000.00 0.41 - - 1.00 0.41 1.00 0.41 100.00
2 Pek. Bak Air ls 4.00 1,000,000.00 4,400,000.00 0.25 - - - - - - -
3 Pas. Pipa Air Bersih PVC AW 1/2' m¹ 30.00 25,049.18 826,622.94 0.05 - - - - - - -
4 Pas. Pipa Tinja PVC 4" m¹ 6.00 128,422.21 847,586.59 0.05 - - - - - - -
5 Pas. Pipa Air Kotor PVC 2" m¹ 6.00 55,541.03 366,570.80 0.02 - - - - - - -
6 Pas. Floor Drain bh 4.00 315,717.93 1,389,158.89 0.08 - - - - - - -
7 Pas. Kloset Jongkok bh 4.00 977,829.93 4,302,451.69 0.25 - - - - - - -
8 Pas. Keran Air Km//Wc bh 4.00 86,434.43 380,311.49 0.02 - - - - - - -
9 Penyambungan Baru Air PDAM ls 1.00 3,000,000.00 3,300,000.00 0.19 - - - - - - -
- - - -
H PEKERJAAN SEPTICTANK DAN REMBESAN - - - -
1 Pas. Galian tanah m³ 5.52 119,245.50 724,058.68 0.04 - - 5.52 0.04 5.52 0.04 100.00
2 Pas. Galian Pasir m³ 0.42 464,092.20 214,410.60 0.01 - - 0.42 0.01 0.42 0.01 100.00
3 Pas. Dinding Batu Bata, Camp 1:3 m² 14.66 177,809.74 2,867,359.87 0.16 - - 14.66 0.16 14.66 0.16 100.00
4 Plesteran Dinding & Lantai, Camp 1:3 m² 31.28 104,806.10 3,606,168.29 0.21 - - 31.28 0.21 31.28 0.21 100.00
5 Acian Dinding & Lantai m² 31.28 58,409.51 2,009,754.42 0.11 - - 31.28 0.11 31.28 0.11 100.00
6 Pek. Beton Penutup Septictank - - - - -
- - Bekesting m² 3.68 615,423.60 2,491,234.73 0.14 - - 3.68 0.14 3.68 0.14 100.00
- - Tulangan Besi Beton U-24 Kg 24.29 13,577.42 362,775.08 0.02 - - 24.29 0.02 24.29 0.02 100.00
- - Beton K-200 m³ 0.34 1,599,057.76 598,047.60 0.03 - - 0.34 0.03 0.34 0.03 100.00
7 Pas. Pipa Hawa / Vent. Gip 2" m¹ 2.80 170,629.77 525,539.69 0.03 - - 2.80 0.03 2.80 0.03 100.00
8 Pas. Batu Kosong m¹ 0.54 622,795.83 369,940.72 0.02 - - 0.54 0.02 0.54 0.02 100.00
- - - -
I PEKERJAAN ELEKTRIKAL - - - -
1 Pas. Saklar Tunggal bh 4.00 143,557.92 631,654.85 0.04 - - - - - - -
2 Pas. Saklar Ganda bh 2.00 249,028.56 421,103.23 0.02 - - - - - - -
3 Pas. Lampu Philipps Jari-jari 18 Watt m¹ 8.00 21,879.00 2,191,451.33 0.13 - - - - - - -
4 Pas. Pipa Instalasi Listrik m¹ 20.00 60,794.91 481,338.00 0.03 - - - - - - -
5 Pas. Kabel NYM m¹ 40.00 60,794.91 2,674,976.04 0.15 - - - - - - -
- - - -
J PEKERJAAN LANTAI PAVING - - - -
1 Urugan Pasir Bawah Paving m³ 92.24 464,092.20 47,088,650.98 2.69 - - - - - - -
2 Pas. Paving Blok K-300 m² 1,844.78 349,061.13 708,335,090.54 40.51 - - - - - - -
3 CAT Paving m² 1,844.79 41,336.13 83,881,672.49 4.80 - - - - - - -
-
100.00 19.28 5.72 24.99
TOTAL PEKERJAAN 1,748,475,480.76
SHAIFUDDIN ZUHRI
ROSITA TAUDA, ST,MT
USMAN, S.T.
NIP. 19800101 2008032 002 SITE ENGINEER
PROGRES MINGGUAN
MINGGU KE 10 PERIODE : 03 SEPTEMBER S/D 09 SEPTEMBER 2018
NO KONTRAK : NO KONTRAK
TANGGAL : TANGGAL
WAKTU PELAKSANAAN : WAKTU PELAKSANAAN
BOBOT
TERHADAP
Harga satuan Jumlah Harga
No Uraian Pekerjaan Satuan Volume BOBOT % MINGGU LALU MINGGU INI SAMPAI MINGGU INI ITEM
(Rp.) (Rp.) PEKERJAAN
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT (%)
I Pekerjaan Persiapan
1 Papan Nama Proyek bh 1.00 599,139.75 659,053.73 0.04 1.00 0.04 - - 1.00 0.04 100.00
2 Penyedia Air Kerja ls 1.00 3,200,000.00 3,520,000.00 0.20 1.00 0.20 - - 1.00 0.20 100.00
3 Penyedia Listrik Kerja ls 1.00 2,250,000.00 2,475,000.00 0.14 1.00 0.14 - - 1.00 0.14 100.00
4 Pembuatan Direksi Keed Dan Gudang m² 6.00 1,651,423.95 10,899,398.07 0.62 6.00 0.62 - - 6.00 0.62 100.00
5 Pengukuran Dan Pemasangan Bowplank ls 1.00 88,384.23 97,222.65 0.01 1.00 0.01 - - 1.00 0.01 100.00
6 Dokumentasi Dan Pelaporan ls 1.00 4,500,000.00 4,950,000.00 0.28 - - - - - - -
7 As Built Drawing ls 1.00 5,215,000.00 5,736,500.00 0.33 - - - - - - -
8 Pembersihan Akhir ls 1.00 4,050,000.00 4,455,000.00 0.25 - - - - - - -
- - -
II PEKERJAAN TAMAN - - -
A Pekerjaan Pasangan - - -
1 Pas. Dinding Batu Bata, 1:3 m³ 60.00 179,605.80 4,506,410.05 0.26 - - 3.11 0.01 3.11 0.01 5.18
2 Pas. Beton Tumbuk m³ 5.06 1,394,762.22 7,763,246.52 0.44 - - - - - - -
3 Pas. Plesteran, Camp. 1 :3 m² 60.00 104,806.10 6,917,202.60 0.40 - - - - - - -
4 Pas. Acian Dinding m² 60.00 58,409.51 3,855,027.66 0.22 - - - - - - -
5 Cat m² 60.00 41,336.13 2,728,184.58 0.16 - - - - - - -
- - -
B PEKERJAAN TANAH TIMBUNAN/POHON - - -
1 Pek. Timbunan m³ 56.64 387,941.40 24,170,300.99 1.38 - - - - - - -
2 Pohon Ketapang bh 6.00 645,916.20 4,263,046.92 0.24 - - - - - - -
3 Pohon Palm bh 2.00 945,916.20 2,079,915.64 0.12 - - - - - - -
4 Rumput Jepang m² - 145,916.20 0 - - #VALUE! - - - #VALUE! -
5 Rabat Beton m³ 5.06 1,394,762.22 7,763,246.52 0.44 - - - - - - -
- - -
III PEKERJAAN FOOD CORE - - -
A PEKERJAAN TANAH DAN PONDASI - - -
1 Galian Tanah Dan Pondasi jalur m³ 49.06 119,245.50 6,435,202.65 0.37 49.06 0.37 - - 49.06 0.37 100.00
2 Urugan Pasir Bawah Pondasi Batu Kali m³ 4.65 464,092.20 2,373,831.60 0.14 4.65 0.14 - - 4.65 0.14 100.00
3 Urugan Tanah Gal. Pondasi Kembali m³ 12.26 39,748.50 536,048.27 0.03 12.26 0.03 - - 12.26 0.03 100.00
4 Urugan Pasir Bawah Lantai m³ 11.76 464,092.20 6,003,496.70 0.34 11.76 0.34 - - 11.76 0.34 100.00
5 Urugan Tanah Bawah Lantai m³ 36.53 387,941.40 15,588,649.28 0.89 36.53 0.89 - - 36.53 0.89 100.00
6 Pas. Batu Kosong m³ 12.69 622,795.83 8,693,606.99 0.50 12.69 0.50 - 12.69 0.50 100.00
7 Pas. Pondasi Batu Kali, Camp 1:4 m³ 24.27 1,347,805.31 35,982,358.36 2.06 24.27 2.06 - 24.27 2.06 100.00
- - -
B PEKERJAAN BETON DAN BATA - - -
1 Pekerjaan Sloof 18x25 cm - - -
- Bekesting Sloof Beton m² 46.50 266,127.54 13,612,423.67 0.78 46.50 0.78 - - 46.50 0.78 100.00
- Tulangan Besi Beton 8 mm -U24 Kg 177.72 13,577.42 2,654,276.99 0.15 177.72 0.15 - - 177.72 0.15 100.00
- Tulangan Besi Beton 12 mm - U39 Kg 347.63 13,577.42 5,191,910.37 0.30 347.63 0.30 - - 347.63 0.30 100.00
- Beton K-175 m³ 4.18 1,548,974.64 7,122,185.39 0.41 4.18 0.41 - - 4.18 0.41 100.00
- - - -
2 Pek. Kolom 15x15 cm - - - -
- Bekesting Sloof Beton m² 46.80 476,031.60 24,506,106.77 1.40 46.80 1.40 - 46.80 1.40 100.00
- Tulangan Besi Beton 8 mm -U24 Kg 93.69 13,577.42 1,399,275.33 0.08 93.69 0.08 - - 93.69 0.08 100.00
- Tulangan Besi Beton 12 mm - U39 Kg 340.16 13,577.42 5,080,344.71 0.29 340.16 0.29 - - 340.16 0.29 100.00
- Beton K-175 m³ 1.75 1,548,974.64 2,981,776.18 0.17 1.75 0.17 - - 1.75 0.17 100.00
- - -
3 Pek. Ring Balok 15x25 cm - - -
- Bekesting Ring Balok m² 62.94 487,368.09 33,742,442.34 1.93 62.94 1.93 - - 62.94 1.93 100.00
- Tulangan Besi Beton 8 mm -U24 Kg 68.89 13,577.42 1,043,818.47 0.06 68.89 0.06 - - 68.89 0.06 100.00
- Tulangan Besi Beton 12 mm - U39 Kg 149.52 13,577.42 2,233,105.42 0.13 149.52 0.13 - - 149.52 0.13 100.00
- Beton K-175 m³ 3.28 1,548,974.64 5,588,700.50 0.32 3.28 0.32 - - 3.28 0.32 100.00
4 Pek. Lantai Beton Tumbuk, Camp 1:3:5 m³ 9.11 1,394,762.22 13,976,912.21 0.80 9.11 0.80 - - 9.11 0.80 100.00
5 Pek. Bata Lapisan Kolom, Camp 1:3 m² 21.84 177,809.74 4,271,701.19 0.24 21.84 0.24 - - 21.84 0.24 100.00
6 Pek. Plesteran Bata, Camp 1:3 m² 21.84 104,806.10 2,517,861.75 0.14 10.92 0.07 - - 10.92 0.07 50.00
- - -
C PEKERJAAN KAYU, ATAP, CAT DAN LANTAI - - -
1 Pek. Pagar Kayu Kelas II m³ 6.43 8,838,220.05 62,512,730.41 3.58 - - - - - - -
2 Pek. Lambersering Lapisan Kolom, Kayu Kelas II m² 31.81 340,579.80 11,917,227.78 0.68 - - - - - - -
3 Pek. Rangka Plafond Kayu 5/5 Kelas II m² 191.14 140,322.01 29,505,366.43 1.69 - - - - - - -
4 Pek. Penutup Plafond Tripleks 4mm m² 191.14 61,181.51 12,863,657.20 0.74 - - - - - - -
5 Pek. Kuda-Kuda Kayu 5/10 Kelas II m³ 2.25 9,735,372.90 24,095,047.93 1.38 2.25 1.38 - - 2.25 1.38 100.00
6 Pek. Gording Kayu 5/5 Kelas II m³ 1.14 9,138,353.40 11,459,495.16 0.66 1.14 0.66 - - 1.14 0.66 100.00
7 Pek. Rangka Atap Seng Multiroof m² 269.80 255,731.85 75,896,098.44 4.34 134.90 2.17 134.90 2.17 269.80 4.34 100.00
8 Pek. Penutup Atap Seng Mulltiroof m² 269.80 153,094.59 45,435,412.42 2.60 - - 269.80 2.60 269.80 2.60 100.00
9 Pek. Bubungan Atap Seng Multiroof m¹ 49.50 206,556.57 11,247,005.24 0.64 - - 49.50 0.64 49.50 0.64 100.00
10 Pek. Listplank Papan Kayu Kelas -II m¹ 162.00 97,900.11 17,445,799.60 1.00 - - 162.00 1.00 162.00 1.00 100.00
11 Cat kayu (vernis) m² 359.88 72,224.11 28,591,213.98 1.64 - - 71.00 0.32 71.00 0.32 19.73
12 Pek. Lantai Keramik 40 cm x 40 cm m² 115.05 218,558.54 27,659,676.03 1.58 - - - - - - -
- - -
D PEKERJAAN ELEKTRIKAL - - -
1 Pasang Box Panel bh 1.00 40,606.04 44,666.64 0.00 - - - - - - -
2 Pasang MCB bh 2.00 71,860.34 158,092.75 0.01 - - - - - - -
3 Pas. Stop Kontak bh 24.00 191,410.56 5,053,238.78 0.29 - - - - - - -
4 Pas. Saklar Ganda bh 12.00 191,410.56 2,526,619.39 0.14 - - - - - - -
5 Pas. Lampu jari-jari Philips 18 Watt Ttk 48.00 249,028.56 13,148,707.97 0.75 - - - - - - -
6 Pas. Kabel NYM m¹ 250.00 60,794.91 16,718,600.25 0.96 - - - - - - -
7 Penyambungan Baru Listrik 2300VA ls 1.00 2,500,000.00 2,750,000.00 0.16 - - - - - - -
- - -
IV PEKERJAAN JAMBAN - - -
A PEKERJAAN TANAH DAN PONDASI - - -
1 Galian Tanah Pondasi Jalur m³ 17.13 119,245.50 2,246,942.96 0.13 17.13 0.13 - - 17.13 0.13 100.00
2 Urugan Pasir bawah Pondasi m³ 1.32 464,092.20 673,861.87 0.04 1.32 0.04 - - 1.32 0.04 100.00
3 Urugan pasir bawah Lantai m³ 0.73 464,092.20 372,666.04 0.02 0.73 0.02 - - 0.73 0.02 100.00
4 Urugan Tanah Gal. Tanah Kembali m³ 4.28 39,748.50 187,135.94 0.01 4.28 0.01 - - 4.28 0.01 100.00
5 Urugan Tanah Bawah Lantai m³ 3.53 387,941.40 1,506,376.46 0.09 3.53 0.09 - - 3.53 0.09 100.00
6 Pas. Pondasi Batu Kosong m³ 3.95 622,795.83 2,706,047.88 0.15 3.95 0.15 - - 3.95 0.15 100.00
7 Pas. Pondasi Batu Kali1:4 m³ 6.20 1,347,805.31 9,192,032.21 0.53 6.20 0.53 - - 6.20 0.53 100.00
- - -
B PEKERJAAN BETON BERTULANG - - -
1 Pekerjaan Sloof 15 cm x 20 cm - - -
- Bekesting Sloof Beton m² 10.63 266,127.54 3,111,829.33 0.18 10.63 0.18 - - 10.63 0.18 100.00
- Tulangan Besi Beton U-24 Kg 54.16 13,577.42 808,888.37 0.05 54.16 0.05 - - 54.16 0.05 100.00
- Tulangan Besi Beton U-39 Kg 115.88 13,577.42 1,730,686.57 0.10 115.88 0.10 - - 115.88 0.10 100.00
- Beton K-175 m³ 0.87 1,548,974.64 1,482,368.73 0.08 0.87 0.08 - - 0.87 0.08 100.00
2 Pekerjaan Kolom 20 x 20 cm - - -
- Bekesting Sloof Beton m² 7.92 476,031.60 4,147,187.30 0.24 7.92 0.24 - - 7.92 0.24 100.00
- Tulangan Besi Beton U-24 Kg 17.82 13,577.42 266,144.59 0.02 17.82 0.02 - - 17.82 0.02 100.00
- Tulangan Besi Beton U-39 Kg 38.13 13,577.42 569,477.73 0.03 38.13 0.03 - - 38.13 0.03 100.00
- Beton K-175 m³ 0.36 1,548,974.64 613,393.96 0.04 0.36 0.04 - - 0.36 0.04 100.00
3 Pekerjaan Ring Balok 15 x 25 cm - - -
- - Bekesting Sloof Beton m² 3.04 487,368.09 1,629,758.89 0.09 3.04 0.09 - - 3.04 0.09 100.00
- - Tulangan Besi Beton U-24 Kg 91.62 13,577.42 1,368,359.54 0.08 91.62 0.08 - - 91.62 0.08 100.00
- - Tulangan Besi Beton U-39 Kg 232.32 13,577.42 3,469,736.84 0.20 232.32 0.20 - - 232.32 0.20 100.00
- - Beton K-175 m³ 1.14 1,548,974.64 1,942,414.20 0.11 1.14 0.11 - - 1.14 0.11 100.00
4 Pekerjaan Kanopi Beton - - -
- Bakesting kanopi Beton m² 3.90 615,423.60 2,640,167.24 0.15 3.90 0.15 - - 3.90 0.15 100.00
- Tulangan Besi Beton U-24 Kg 28.87 13,577.42 431,178.13 0.02 28.87 0.02 - - 28.87 0.02 100.00
- Beton K-175 m³ 0.16 1,548,974.64 272,619.54 0.02 0.16 0.02 - - 0.16 0.02 100.00
5 Pek. Ring balok Praktis 10cm x 15 cm m¹ 60.40 137,872.75 9,160,265.51 0.52 60.40 0.52 - - 60.40 0.52 100.00
- - -
C PEKERJAAN DINDING DAN LANTAI - - -
1 Pas. Dinding 1/2 bata 1:4 m² 57.15 173,035.17 10,877,855.96 0.62 57.15 0.62 - - 57.15 0.62 100.00
2 Pek. Plesteran Dinding 1/2 Bata Camp 1:4 m² 114.29 102,101.29 12,836,072.08 0.73 114.29 0.73 - - 114.29 0.73 100.00
3 Pek. Plesteran Pondasi, Sloof dan Kolom Camp 1:3 m² 20.07 104,806.10 2,313,804.27 0.13 20.07 0.13 - - 20.07 0.13 100.00
4 Acian Dinding, Sloof Dan kolom m² 134.36 58,409.51 8,632,691.94 0.49 134.36 0.49 - - 134.36 0.49 100.00
5 Cat Dinding m² 134.36 41,336.13 6,109,314.67 0.35 - - - - - - -
6 Pas. Lantai Beton tumbuk, Camp 1:3:5 m³ 1.17 1,394,762.22 1,795,058.98 0.10 - - - - - - -
7 Pas. Dindinig Keramik 20x25 cm m² 27.74 384,208.13 11,723,726.88 0.67 - - - - - - -
8 Pas. Lantai Keramik 20x20 cm (texture kasar) m² 15.68 339,673.58 5,858,689.91 0.34 - - - - - - -
- -
D PEKERJAAN PLAFOND - -
1 Pas. Rangka Plafond Kayu 5/5 Kelas II m² 27.28 140,332.01 4,211,082.96 0.24 - - - - - - -
2 Pas. Penutup Plafond Tripleks 4 mm m² 27.28 61,181.51 1,835,934.75 0.11 - - - - - - -
3 Pas. List Profil Plafond m¹ 61.56 29,917.80 2,025,913.74 0.12 - - - - - - -
4 Cat Plafond m² 27.23 41,336.13 1,240,414.59 0.07 - - - - - - -
- - - -
E PEKERJAAN KUSEN, PINTU DAN JENDELA - - - -
1 Pas. Kusen Pintu, Kayu 8/12 kelas I m³ 0.18 11,609,744.85 2,298,729.48 0.13 0.18 0.13 - - 0.18 0.13 100.00
2 Pas. Kusen Ventilasi Atap, Kayu 5/10 Kelas II m³ 0.03 8,307,283.05 274,140.34 0.02 0.03 0.02 - - 0.03 0.02 100.00
3 Pas. Daun Pintu Panel Kayu Kelas I m² 4.86 1,007,384.40 5,385,477.00 0.31 - - - - - - -
4 Pas. Kisi-kisi Ventilasi Atap, Kayu Kelas II m¹ 0.44 701,649.63 339,598.42 0.02 0.44 0.02 - - 0.44 0.02 100.00
5 Cat Kusen, Pintu & Listplank m² 7.28 72,224.11 578,370.67 0.03 2.43 0.01 - - 2.43 0.01 33.33
6 Pas. Kunci Pintu bh 4.00 160,991.20 708,364.01 0.04 - - - - - - -
7 Pas. Engsel Pintu bh 12.00 188,054.96 2,482,325.47 0.14 - - - - - - -
8 Pas. Grendel Pintu bh 4.00 55,164.78 242,725.03 0.01 - - - - - - -
- - - -
F PEKERJAAN ATAP - - - -
1 Pas. Kuda-kuda Kayu 5/10 Kayu Kelas II m³ 0.23 9,735,372.90 2,463,049.34 0.14 0.23 0.14 - - 0.23 0.14 100.00
2 Pas. Gording Kayu 5/5 Kayu Kelas II m³ 0.21 9,138,353.40 2,110,959.64 0.12 0.21 0.12 - - 0.21 0.12 100.00
3 Pas. Blk. Kasau Dan Ring, Kayu Kelas II m² 56.88 255,731.85 16,000,630.39 0.92 56.88 0.92 - - 56.88 0.92 100.00
4 Pas. Atap Genteng Multiroof BJLS 0.25mm m² 56.88 153,094.59 9,578,822.31 0.55 56.88 0.55 - - 56.88 0.55 100.00
5 Pas. Bubungan Atap Seng Multiroof m¹ 16.15 206,556.57 3,669,477.47 0.21 16.15 0.21 - - 16.15 0.21 100.00
6 Pas. Listplank Kayu Kelas II m¹ 23.32 97,900.11 2,511,333.62 0.14 23.32 0.14 - - 23.32 0.14 100.00
- - - -
G PEKERJAAN SANITASI - - - -
1 Pek. Septicktank ls 1.00 6,500,000.00 7,150,000.00 0.41 1.00 0.41 - - 1.00 0.41 100.00
2 Pek. Bak Air ls 4.00 1,000,000.00 4,400,000.00 0.25 - - 4.00 0.25 4.00 0.25 100.00
3 Pas. Pipa Air Bersih PVC AW 1/2' m¹ 30.00 25,049.18 826,622.94 0.05 - - 30.00 0.05 30.00 0.05 100.00
4 Pas. Pipa Tinja PVC 4" m¹ 6.00 128,422.21 847,586.59 0.05 - - 6.00 0.05 6.00 0.05 100.00
5 Pas. Pipa Air Kotor PVC 2" m¹ 6.00 55,541.03 366,570.80 0.02 - - 6.00 0.02 6.00 0.02 100.00
6 Pas. Floor Drain bh 4.00 315,717.93 1,389,158.89 0.08 - - - - - - -
7 Pas. Kloset Jongkok bh 4.00 977,829.93 4,302,451.69 0.25 - - - - - - -
8 Pas. Keran Air Km//Wc bh 4.00 86,434.43 380,311.49 0.02 - - - - - - -
9 Penyambungan Baru Air PDAM ls 1.00 3,000,000.00 3,300,000.00 0.19 - - - - - - -
- - - -
H PEKERJAAN SEPTICTANK DAN REMBESAN - - - -
1 Pas. Galian tanah m³ 5.52 119,245.50 724,058.68 0.04 5.52 0.04 - - 5.52 0.04 100.00
2 Pas. Galian Pasir m³ 0.42 464,092.20 214,410.60 0.01 0.42 0.01 - - 0.42 0.01 100.00
3 Pas. Dinding Batu Bata, Camp 1:3 m² 14.66 177,809.74 2,867,359.87 0.16 14.66 0.16 - - 14.66 0.16 100.00
4 Plesteran Dinding & Lantai, Camp 1:3 m² 31.28 104,806.10 3,606,168.29 0.21 31.28 0.21 - - 31.28 0.21 100.00
5 Acian Dinding & Lantai m² 31.28 58,409.51 2,009,754.42 0.11 31.28 0.11 - - 31.28 0.11 100.00
6 Pek. Beton Penutup Septictank - - - - -
- - Bekesting m² 3.68 615,423.60 2,491,234.73 0.14 3.68 0.14 - - 3.68 0.14 100.00
- - Tulangan Besi Beton U-24 Kg 24.29 13,577.42 362,775.08 0.02 24.29 0.02 - - 24.29 0.02 100.00
- - Beton K-200 m³ 0.34 1,599,057.76 598,047.60 0.03 0.34 0.03 - - 0.34 0.03 100.00
7 Pas. Pipa Hawa / Vent. Gip 2" m¹ 2.80 170,629.77 525,539.69 0.03 2.80 0.03 - - 2.80 0.03 100.00
8 Pas. Batu Kosong m¹ 0.54 622,795.83 369,940.72 0.02 0.54 0.02 - - 0.54 0.02 100.00
- - - -
I PEKERJAAN ELEKTRIKAL - - - -
1 Pas. Saklar Tunggal bh 4.00 143,557.92 631,654.85 0.04 - - - - - - -
2 Pas. Saklar Ganda bh 2.00 249,028.56 421,103.23 0.02 - - - - - - -
3 Pas. Lampu Philipps Jari-jari 18 Watt m¹ 8.00 21,879.00 2,191,451.33 0.13 - - - - - - -
4 Pas. Pipa Instalasi Listrik m¹ 20.00 60,794.91 481,338.00 0.03 - - - - - - -
5 Pas. Kabel NYM m¹ 40.00 60,794.91 2,674,976.04 0.15 - - - - - - -
- - - -
J PEKERJAAN LANTAI PAVING - - - -
1 Urugan Pasir Bawah Paving m³ 92.24 464,092.20 47,088,650.98 2.69 - - - - - - -
2 Pas. Paving Blok K-300 m² 1,844.78 349,061.13 708,335,090.54 40.51 - - - - - - -
3 CAT Paving m² 1,844.79 41,336.13 83,881,672.49 4.80 - - - - - - -
-
100.00 #VALUE! 7.11 #VALUE!
TOTAL PEKERJAAN 1,748,475,480.76
SHAIFUDDIN ZUHRI
ROSITA TAUDA, ST,MT
USMAN, S.T.
NIP. 19800101 2008032 002 SITE ENGINEER
PROGRES MINGGUAN
MINGGU KE 11 PERIODE : 10 SEPTEMBER S/D 16 SEPTEMBER 2018
NO KONTRAK : NO KONTRAK
TANGGAL : TANGGAL
WAKTU PELAKSANAAN : WAKTU PELAKSANAAN
BOBOT
TERHADAP
Harga satuan Jumlah Harga
No Uraian Pekerjaan Satuan Volume BOBOT % MINGGU LALU MINGGU INI SAMPAI MINGGU INI ITEM
(Rp.) (Rp.) PEKERJAAN
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT (%)
I Pekerjaan Persiapan
1 Papan Nama Proyek bh 1.00 599,139.75 659,053.73 0.04 1.00 0.04 - - 1.00 0.04 100.00
2 Penyedia Air Kerja ls 1.00 3,200,000.00 3,520,000.00 0.20 1.00 0.20 - - 1.00 0.20 100.00
3 Penyedia Listrik Kerja ls 1.00 2,250,000.00 2,475,000.00 0.14 1.00 0.14 - - 1.00 0.14 100.00
4 Pembuatan Direksi Keed Dan Gudang m² 6.00 1,651,423.95 10,899,398.07 0.62 6.00 0.62 - - 6.00 0.62 100.00
5 Pengukuran Dan Pemasangan Bowplank ls 1.00 88,384.23 97,222.65 0.01 1.00 0.01 - - 1.00 0.01 100.00
6 Dokumentasi Dan Pelaporan ls 1.00 4,500,000.00 4,950,000.00 0.28 - - - - - - -
7 As Built Drawing ls 1.00 5,215,000.00 5,736,500.00 0.33 - - - - - - -
8 Pembersihan Akhir ls 1.00 4,050,000.00 4,455,000.00 0.25 - - - - - - -
- - -
II PEKERJAAN TAMAN - - -
A Pekerjaan Pasangan - - -
1 Pas. Dinding Batu Bata, 1:3 m³ 60.00 179,605.80 4,506,410.05 0.26 3.11 0.01 18.00 0.08 21.11 0.09 35.18
2 Pas. Beton Tumbuk m³ 5.06 1,394,762.22 7,763,246.52 0.44 - - 5.06 0.44 5.06 0.44 100.00
3 Pas. Plesteran, Camp. 1 :3 m² 60.00 104,806.10 6,917,202.60 0.40 - - 1.21 0.01 1.21 0.01 2.02
4 Pas. Acian Dinding m² 60.00 58,409.51 3,855,027.66 0.22 - - 20.20 0.07 20.20 0.07 33.67
5 Cat m² 60.00 41,336.13 2,728,184.58 0.16 - - - - - - -
- - -
B PEKERJAAN TANAH TIMBUNAN/POHON - - -
1 Pek. Timbunan m³ 56.64 387,941.40 24,170,300.99 1.38 - - - - - - -
2 Pohon Ketapang bh 6.00 645,916.20 4,263,046.92 0.24 - - - - - - -
3 Pohon Palm bh 2.00 945,916.20 2,079,915.64 0.12 - - - - - - -
4 Rumput Jepang m² - 145,916.20 0 - - #VALUE! - - - #VALUE! -
5 Rabat Beton m³ 5.06 1,394,762.22 7,763,246.52 0.44 - - - - - - -
- - -
III PEKERJAAN FOOD CORE - - -
A PEKERJAAN TANAH DAN PONDASI - - -
1 Galian Tanah Dan Pondasi jalur m³ 49.06 119,245.50 6,435,202.65 0.37 49.06 0.37 - - 49.06 0.37 100.00
2 Urugan Pasir Bawah Pondasi Batu Kali m³ 4.65 464,092.20 2,373,831.60 0.14 4.65 0.14 - - 4.65 0.14 100.00
3 Urugan Tanah Gal. Pondasi Kembali m³ 12.26 39,748.50 536,048.27 0.03 12.26 0.03 - - 12.26 0.03 100.00
4 Urugan Pasir Bawah Lantai m³ 11.76 464,092.20 6,003,496.70 0.34 11.76 0.34 - - 11.76 0.34 100.00
5 Urugan Tanah Bawah Lantai m³ 36.53 387,941.40 15,588,649.28 0.89 36.53 0.89 - - 36.53 0.89 100.00
6 Pas. Batu Kosong m³ 12.69 622,795.83 8,693,606.99 0.50 12.69 0.50 - 12.69 0.50 100.00
7 Pas. Pondasi Batu Kali, Camp 1:4 m³ 24.27 1,347,805.31 35,982,358.36 2.06 24.27 2.06 - 24.27 2.06 100.00
- - -
B PEKERJAAN BETON DAN BATA - - -
1 Pekerjaan Sloof 18x25 cm - - -
- Bekesting Sloof Beton m² 46.50 266,127.54 13,612,423.67 0.78 46.50 0.78 - - 46.50 0.78 100.00
- Tulangan Besi Beton 8 mm -U24 Kg 177.72 13,577.42 2,654,276.99 0.15 177.72 0.15 - - 177.72 0.15 100.00
- Tulangan Besi Beton 12 mm - U39 Kg 347.63 13,577.42 5,191,910.37 0.30 347.63 0.30 - - 347.63 0.30 100.00
- Beton K-175 m³ 4.18 1,548,974.64 7,122,185.39 0.41 4.18 0.41 - - 4.18 0.41 100.00
- - - -
2 Pek. Kolom 15x15 cm - - - -
- Bekesting Sloof Beton m² 46.80 476,031.60 24,506,106.77 1.40 46.80 1.40 - 46.80 1.40 100.00
- Tulangan Besi Beton 8 mm -U24 Kg 93.69 13,577.42 1,399,275.33 0.08 93.69 0.08 - - 93.69 0.08 100.00
- Tulangan Besi Beton 12 mm - U39 Kg 340.16 13,577.42 5,080,344.71 0.29 340.16 0.29 - - 340.16 0.29 100.00
- Beton K-175 m³ 1.75 1,548,974.64 2,981,776.18 0.17 1.75 0.17 - - 1.75 0.17 100.00
- - -
3 Pek. Ring Balok 15x25 cm - - -
- Bekesting Ring Balok m² 62.94 487,368.09 33,742,442.34 1.93 62.94 1.93 - - 62.94 1.93 100.00
- Tulangan Besi Beton 8 mm -U24 Kg 68.89 13,577.42 1,043,818.47 0.06 68.89 0.06 - - 68.89 0.06 100.00
- Tulangan Besi Beton 12 mm - U39 Kg 149.52 13,577.42 2,233,105.42 0.13 149.52 0.13 - - 149.52 0.13 100.00
- Beton K-175 m³ 3.28 1,548,974.64 5,588,700.50 0.32 3.28 0.32 - - 3.28 0.32 100.00
4 Pek. Lantai Beton Tumbuk, Camp 1:3:5 m³ 9.11 1,394,762.22 13,976,912.21 0.80 9.11 0.80 - - 9.11 0.80 100.00
5 Pek. Bata Lapisan Kolom, Camp 1:3 m² 21.84 177,809.74 4,271,701.19 0.24 21.84 0.24 - - 21.84 0.24 100.00
6 Pek. Plesteran Bata, Camp 1:3 m² 21.84 104,806.10 2,517,861.75 0.14 10.92 0.07 - - 10.92 0.07 50.00
- - -
C PEKERJAAN KAYU, ATAP, CAT DAN LANTAI - - -
1 Pek. Pagar Kayu Kelas II m³ 6.43 8,838,220.05 62,512,730.41 3.58 - - - - - - -
2 Pek. Lambersering Lapisan Kolom, Kayu Kelas II m² 31.81 340,579.80 11,917,227.78 0.68 - - - - - - -
3 Pek. Rangka Plafond Kayu 5/5 Kelas II m² 191.14 140,322.01 29,505,366.43 1.69 - - 95.57 0.84 95.57 0.84 50.00
4 Pek. Penutup Plafond Tripleks 4mm m² 191.14 61,181.51 12,863,657.20 0.74 - - 95.57 0.37 95.57 0.37 50.00
5 Pek. Kuda-Kuda Kayu 5/10 Kelas II m³ 2.25 9,735,372.90 24,095,047.93 1.38 2.25 1.38 - - 2.25 1.38 100.00
6 Pek. Gording Kayu 5/5 Kelas II m³ 1.14 9,138,353.40 11,459,495.16 0.66 1.14 0.66 - - 1.14 0.66 100.00
7 Pek. Rangka Atap Seng Multiroof m² 269.80 255,731.85 75,896,098.44 4.34 269.80 4.34 - - 269.80 4.34 100.00
8 Pek. Penutup Atap Seng Mulltiroof m² 269.80 153,094.59 45,435,412.42 2.60 269.80 2.60 - - 269.80 2.60 100.00
9 Pek. Bubungan Atap Seng Multiroof m¹ 49.50 206,556.57 11,247,005.24 0.64 49.50 0.64 - - 49.50 0.64 100.00
10 Pek. Listplank Papan Kayu Kelas -II m¹ 162.00 97,900.11 17,445,799.60 1.00 162.00 1.00 - - 162.00 1.00 100.00
11 Cat kayu (vernis) m² 359.88 72,224.11 28,591,213.98 1.64 71.00 0.32 - - 71.00 0.32 19.73
12 Pek. Lantai Keramik 40 cm x 40 cm m² 115.05 218,558.54 27,659,676.03 1.58 - - - - - - -
- - -
D PEKERJAAN ELEKTRIKAL - - -
1 Pasang Box Panel bh 1.00 40,606.04 44,666.64 0.00 - - - - - - -
2 Pasang MCB bh 2.00 71,860.34 158,092.75 0.01 - - - - - - -
3 Pas. Stop Kontak bh 24.00 191,410.56 5,053,238.78 0.29 - - - - - - -
4 Pas. Saklar Ganda bh 12.00 191,410.56 2,526,619.39 0.14 - - - - - - -
5 Pas. Lampu jari-jari Philips 18 Watt Ttk 48.00 249,028.56 13,148,707.97 0.75 - - - - - - -
6 Pas. Kabel NYM m¹ 250.00 60,794.91 16,718,600.25 0.96 - - 16.00 0.06 16.00 0.06 6.40
7 Penyambungan Baru Listrik 2300VA ls 1.00 2,500,000.00 2,750,000.00 0.16 - - - - - - -
- - -
IV PEKERJAAN JAMBAN - - -
A PEKERJAAN TANAH DAN PONDASI - - -
1 Galian Tanah Pondasi Jalur m³ 17.13 119,245.50 2,246,942.96 0.13 17.13 0.13 - - 17.13 0.13 100.00
2 Urugan Pasir bawah Pondasi m³ 1.32 464,092.20 673,861.87 0.04 1.32 0.04 - - 1.32 0.04 100.00
3 Urugan pasir bawah Lantai m³ 0.73 464,092.20 372,666.04 0.02 0.73 0.02 - - 0.73 0.02 100.00
4 Urugan Tanah Gal. Tanah Kembali m³ 4.28 39,748.50 187,135.94 0.01 4.28 0.01 - - 4.28 0.01 100.00
5 Urugan Tanah Bawah Lantai m³ 3.53 387,941.40 1,506,376.46 0.09 3.53 0.09 - - 3.53 0.09 100.00
6 Pas. Pondasi Batu Kosong m³ 3.95 622,795.83 2,706,047.88 0.15 3.95 0.15 - - 3.95 0.15 100.00
7 Pas. Pondasi Batu Kali1:4 m³ 6.20 1,347,805.31 9,192,032.21 0.53 6.20 0.53 - - 6.20 0.53 100.00
- - -
B PEKERJAAN BETON BERTULANG - - -
1 Pekerjaan Sloof 15 cm x 20 cm - - -
- Bekesting Sloof Beton m² 10.63 266,127.54 3,111,829.33 0.18 10.63 0.18 - - 10.63 0.18 100.00
- Tulangan Besi Beton U-24 Kg 54.16 13,577.42 808,888.37 0.05 54.16 0.05 - - 54.16 0.05 100.00
- Tulangan Besi Beton U-39 Kg 115.88 13,577.42 1,730,686.57 0.10 115.88 0.10 - - 115.88 0.10 100.00
- Beton K-175 m³ 0.87 1,548,974.64 1,482,368.73 0.08 0.87 0.08 - - 0.87 0.08 100.00
2 Pekerjaan Kolom 20 x 20 cm - - -
- Bekesting Sloof Beton m² 7.92 476,031.60 4,147,187.30 0.24 7.92 0.24 - - 7.92 0.24 100.00
- Tulangan Besi Beton U-24 Kg 17.82 13,577.42 266,144.59 0.02 17.82 0.02 - - 17.82 0.02 100.00
- Tulangan Besi Beton U-39 Kg 38.13 13,577.42 569,477.73 0.03 38.13 0.03 - - 38.13 0.03 100.00
- Beton K-175 m³ 0.36 1,548,974.64 613,393.96 0.04 0.36 0.04 - - 0.36 0.04 100.00
3 Pekerjaan Ring Balok 15 x 25 cm - - -
- - Bekesting Sloof Beton m² 3.04 487,368.09 1,629,758.89 0.09 3.04 0.09 - - 3.04 0.09 100.00
- - Tulangan Besi Beton U-24 Kg 91.62 13,577.42 1,368,359.54 0.08 91.62 0.08 - - 91.62 0.08 100.00
- - Tulangan Besi Beton U-39 Kg 232.32 13,577.42 3,469,736.84 0.20 232.32 0.20 - - 232.32 0.20 100.00
- - Beton K-175 m³ 1.14 1,548,974.64 1,942,414.20 0.11 1.14 0.11 - - 1.14 0.11 100.00
4 Pekerjaan Kanopi Beton - - -
- Bakesting kanopi Beton m² 3.90 615,423.60 2,640,167.24 0.15 3.90 0.15 - - 3.90 0.15 100.00
- Tulangan Besi Beton U-24 Kg 28.87 13,577.42 431,178.13 0.02 28.87 0.02 - - 28.87 0.02 100.00
- Beton K-175 m³ 0.16 1,548,974.64 272,619.54 0.02 0.16 0.02 - - 0.16 0.02 100.00
5 Pek. Ring balok Praktis 10cm x 15 cm m¹ 60.40 137,872.75 9,160,265.51 0.52 60.40 0.52 - - 60.40 0.52 100.00
- - -
C PEKERJAAN DINDING DAN LANTAI - - -
1 Pas. Dinding 1/2 bata 1:4 m² 57.15 173,035.17 10,877,855.96 0.62 57.15 0.62 - - 57.15 0.62 100.00
2 Pek. Plesteran Dinding 1/2 Bata Camp 1:4 m² 114.29 102,101.29 12,836,072.08 0.73 114.29 0.73 - - 114.29 0.73 100.00
3 Pek. Plesteran Pondasi, Sloof dan Kolom Camp 1:3 m² 20.07 104,806.10 2,313,804.27 0.13 20.07 0.13 - - 20.07 0.13 100.00
4 Acian Dinding, Sloof Dan kolom m² 134.36 58,409.51 8,632,691.94 0.49 134.36 0.49 - - 134.36 0.49 100.00
5 Cat Dinding m² 134.36 41,336.13 6,109,314.67 0.35 - - - - - - -
6 Pas. Lantai Beton tumbuk, Camp 1:3:5 m³ 1.17 1,394,762.22 1,795,058.98 0.10 - - 1.17 0.10 1.17 0.10 100.00
7 Pas. Dindinig Keramik 20x25 cm m² 27.74 384,208.13 11,723,726.88 0.67 - - 27.74 0.67 27.74 0.67 100.00
8 Pas. Lantai Keramik 20x20 cm (texture kasar) m² 15.68 339,673.58 5,858,689.91 0.34 - - - - - - -
- -
D PEKERJAAN PLAFOND - -
1 Pas. Rangka Plafond Kayu 5/5 Kelas II m² 27.28 140,332.01 4,211,082.96 0.24 - - 27.28 0.24 27.28 0.24 100.00
2 Pas. Penutup Plafond Tripleks 4 mm m² 27.28 61,181.51 1,835,934.75 0.11 - - 27.28 0.11 27.28 0.11 100.00
3 Pas. List Profil Plafond m¹ 61.56 29,917.80 2,025,913.74 0.12 - - - - - - -
4 Cat Plafond m² 27.23 41,336.13 1,240,414.59 0.07 - - 2.27 0.01 2.27 0.01 8.33
- - - -
E PEKERJAAN KUSEN, PINTU DAN JENDELA - - - -
1 Pas. Kusen Pintu, Kayu 8/12 kelas I m³ 0.18 11,609,744.85 2,298,729.48 0.13 0.18 0.13 - - 0.18 0.13 100.00
2 Pas. Kusen Ventilasi Atap, Kayu 5/10 Kelas II m³ 0.03 8,307,283.05 274,140.34 0.02 0.03 0.02 - - 0.03 0.02 100.00
3 Pas. Daun Pintu Panel Kayu Kelas I m² 4.86 1,007,384.40 5,385,477.00 0.31 - - - - - - -
4 Pas. Kisi-kisi Ventilasi Atap, Kayu Kelas II m¹ 0.44 701,649.63 339,598.42 0.02 0.44 0.02 - - 0.44 0.02 100.00
5 Cat Kusen, Pintu & Listplank m² 7.28 72,224.11 578,370.67 0.03 2.43 0.01 - - 2.43 0.01 33.33
6 Pas. Kunci Pintu bh 4.00 160,991.20 708,364.01 0.04 - - - - - - -
7 Pas. Engsel Pintu bh 12.00 188,054.96 2,482,325.47 0.14 - - - - - - -
8 Pas. Grendel Pintu bh 4.00 55,164.78 242,725.03 0.01 - - - - - - -
- - - -
F PEKERJAAN ATAP - - - -
1 Pas. Kuda-kuda Kayu 5/10 Kayu Kelas II m³ 0.23 9,735,372.90 2,463,049.34 0.14 0.23 0.14 - - 0.23 0.14 100.00
2 Pas. Gording Kayu 5/5 Kayu Kelas II m³ 0.21 9,138,353.40 2,110,959.64 0.12 0.21 0.12 - - 0.21 0.12 100.00
3 Pas. Blk. Kasau Dan Ring, Kayu Kelas II m² 56.88 255,731.85 16,000,630.39 0.92 56.88 0.92 - - 56.88 0.92 100.00
4 Pas. Atap Genteng Multiroof BJLS 0.25mm m² 56.88 153,094.59 9,578,822.31 0.55 56.88 0.55 - - 56.88 0.55 100.00
5 Pas. Bubungan Atap Seng Multiroof m¹ 16.15 206,556.57 3,669,477.47 0.21 16.15 0.21 - - 16.15 0.21 100.00
6 Pas. Listplank Kayu Kelas II m¹ 23.32 97,900.11 2,511,333.62 0.14 23.32 0.14 - - 23.32 0.14 100.00
- - - -
G PEKERJAAN SANITASI - - - -
1 Pek. Septicktank ls 1.00 6,500,000.00 7,150,000.00 0.41 1.00 0.41 - - 1.00 0.41 100.00
2 Pek. Bak Air ls 4.00 1,000,000.00 4,400,000.00 0.25 4.00 0.25 - - 4.00 0.25 100.00
3 Pas. Pipa Air Bersih PVC AW 1/2' m¹ 30.00 25,049.18 826,622.94 0.05 30.00 0.05 - - 30.00 0.05 100.00
4 Pas. Pipa Tinja PVC 4" m¹ 6.00 128,422.21 847,586.59 0.05 6.00 0.05 - - 6.00 0.05 100.00
5 Pas. Pipa Air Kotor PVC 2" m¹ 6.00 55,541.03 366,570.80 0.02 6.00 0.02 - - 6.00 0.02 100.00
6 Pas. Floor Drain bh 4.00 315,717.93 1,389,158.89 0.08 - - - - - - -
7 Pas. Kloset Jongkok bh 4.00 977,829.93 4,302,451.69 0.25 - - - - - - -
8 Pas. Keran Air Km//Wc bh 4.00 86,434.43 380,311.49 0.02 - - - - - - -
9 Penyambungan Baru Air PDAM ls 1.00 3,000,000.00 3,300,000.00 0.19 - - - - - - -
- - - -
H PEKERJAAN SEPTICTANK DAN REMBESAN - - - -
1 Pas. Galian tanah m³ 5.52 119,245.50 724,058.68 0.04 5.52 0.04 - - 5.52 0.04 100.00
2 Pas. Galian Pasir m³ 0.42 464,092.20 214,410.60 0.01 0.42 0.01 - - 0.42 0.01 100.00
3 Pas. Dinding Batu Bata, Camp 1:3 m² 14.66 177,809.74 2,867,359.87 0.16 14.66 0.16 - - 14.66 0.16 100.00
4 Plesteran Dinding & Lantai, Camp 1:3 m² 31.28 104,806.10 3,606,168.29 0.21 31.28 0.21 - - 31.28 0.21 100.00
5 Acian Dinding & Lantai m² 31.28 58,409.51 2,009,754.42 0.11 31.28 0.11 - - 31.28 0.11 100.00
6 Pek. Beton Penutup Septictank - - - - -
- - Bekesting m² 3.68 615,423.60 2,491,234.73 0.14 3.68 0.14 - - 3.68 0.14 100.00
- - Tulangan Besi Beton U-24 Kg 24.29 13,577.42 362,775.08 0.02 24.29 0.02 - - 24.29 0.02 100.00
- - Beton K-200 m³ 0.34 1,599,057.76 598,047.60 0.03 0.34 0.03 - - 0.34 0.03 100.00
7 Pas. Pipa Hawa / Vent. Gip 2" m¹ 2.80 170,629.77 525,539.69 0.03 2.80 0.03 - - 2.80 0.03 100.00
8 Pas. Batu Kosong m¹ 0.54 622,795.83 369,940.72 0.02 0.54 0.02 - - 0.54 0.02 100.00
- - - -
I PEKERJAAN ELEKTRIKAL - - - -
1 Pas. Saklar Tunggal bh 4.00 143,557.92 631,654.85 0.04 - - - - - - -
2 Pas. Saklar Ganda bh 2.00 249,028.56 421,103.23 0.02 - - - - - - -
3 Pas. Lampu Philipps Jari-jari 18 Watt m¹ 8.00 21,879.00 2,191,451.33 0.13 - - - - - - -
4 Pas. Pipa Instalasi Listrik m¹ 20.00 60,794.91 481,338.00 0.03 - - - - - - -
5 Pas. Kabel NYM m¹ 40.00 60,794.91 2,674,976.04 0.15 - - - - - - -
- - - -
J PEKERJAAN LANTAI PAVING - - - -
1 Urugan Pasir Bawah Paving m³ 92.24 464,092.20 47,088,650.98 2.69 - - - - - - -
2 Pas. Paving Blok K-300 m² 1,844.78 349,061.13 708,335,090.54 40.51 - - - - - - -
3 CAT Paving m² 1,844.79 41,336.13 83,881,672.49 4.80 - - - - - - -
-
100.00 #VALUE! 3.00 #VALUE!
TOTAL PEKERJAAN 1,748,475,480.76
SHAIFUDDIN ZUHRI
ROSITA TAUDA, ST,MT
USMAN, S.T.
NIP. 19800101 2008032 002 SITE ENGINEER
PROGRES MINGGUAN
MINGGU KE 12 PERIODE : 17 SEPTEMBER S/D 23 SEPTEMBER 2018
NO KONTRAK : NO KONTRAK
TANGGAL : TANGGAL
WAKTU PELAKSANAAN : WAKTU PELAKSANAAN
BOBOT
TERHADAP
Harga satuan Jumlah Harga
No Uraian Pekerjaan Satuan Volume BOBOT % MINGGU LALU MINGGU INI SAMPAI MINGGU INI ITEM
(Rp.) (Rp.) PEKERJAAN
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT (%)
I Pekerjaan Persiapan
1 Papan Nama Proyek bh 1.00 599,139.75 659,053.73 0.04 1.00 0.04 - - 1.00 0.04 100.00
2 Penyedia Air Kerja ls 1.00 3,200,000.00 3,520,000.00 0.20 1.00 0.20 - - 1.00 0.20 100.00
3 Penyedia Listrik Kerja ls 1.00 2,250,000.00 2,475,000.00 0.14 1.00 0.14 - - 1.00 0.14 100.00
4 Pembuatan Direksi Keed Dan Gudang m² 6.00 1,651,423.95 10,899,398.07 0.62 6.00 0.62 - - 6.00 0.62 100.00
5 Pengukuran Dan Pemasangan Bowplank ls 1.00 88,384.23 97,222.65 0.01 1.00 0.01 - - 1.00 0.01 100.00
6 Dokumentasi Dan Pelaporan ls 1.00 4,500,000.00 4,950,000.00 0.28 - - - - - - -
7 As Built Drawing ls 1.00 5,215,000.00 5,736,500.00 0.33 - - - - - - -
8 Pembersihan Akhir ls 1.00 4,050,000.00 4,455,000.00 0.25 - - - - - - -
- - -
II PEKERJAAN TAMAN - - -
A Pekerjaan Pasangan - - -
1 Pas. Dinding Batu Bata, 1:3 m³ 60.00 179,605.80 4,506,410.05 0.26 21.11 0.09 - - 21.11 0.09 35.18
2 Pas. Beton Tumbuk m³ 5.06 1,394,762.22 7,763,246.52 0.44 5.06 0.44 - - 5.06 0.44 100.00
3 Pas. Plesteran, Camp. 1 :3 m² 60.00 104,806.10 6,917,202.60 0.40 1.21 0.01 0.40 0.00 1.61 0.01 2.68
4 Pas. Acian Dinding m² 60.00 58,409.51 3,855,027.66 0.22 20.20 0.07 - - 20.20 0.07 33.67
5 Cat m² 60.00 41,336.13 2,728,184.58 0.16 - - - - - - -
- - -
B PEKERJAAN TANAH TIMBUNAN/POHON - - -
1 Pek. Timbunan m³ 56.64 387,941.40 24,170,300.99 1.38 - - - - - - -
2 Pohon Ketapang bh 6.00 645,916.20 4,263,046.92 0.24 - - - - - - -
3 Pohon Palm bh 2.00 945,916.20 2,079,915.64 0.12 - - - - - - -
4 Rumput Jepang m² - 145,916.20 0 - - #VALUE! - - - #VALUE! -
5 Rabat Beton m³ 5.06 1,394,762.22 7,763,246.52 0.44 - - - - - - -
- - -
III PEKERJAAN FOOD CORE - - -
A PEKERJAAN TANAH DAN PONDASI - - -
1 Galian Tanah Dan Pondasi jalur m³ 49.06 119,245.50 6,435,202.65 0.37 49.06 0.37 - - 49.06 0.37 100.00
2 Urugan Pasir Bawah Pondasi Batu Kali m³ 4.65 464,092.20 2,373,831.60 0.14 4.65 0.14 - - 4.65 0.14 100.00
3 Urugan Tanah Gal. Pondasi Kembali m³ 12.26 39,748.50 536,048.27 0.03 12.26 0.03 - - 12.26 0.03 100.00
4 Urugan Pasir Bawah Lantai m³ 11.76 464,092.20 6,003,496.70 0.34 11.76 0.34 - - 11.76 0.34 100.00
5 Urugan Tanah Bawah Lantai m³ 36.53 387,941.40 15,588,649.28 0.89 36.53 0.89 - - 36.53 0.89 100.00
6 Pas. Batu Kosong m³ 12.69 622,795.83 8,693,606.99 0.50 12.69 0.50 - 12.69 0.50 100.00
7 Pas. Pondasi Batu Kali, Camp 1:4 m³ 24.27 1,347,805.31 35,982,358.36 2.06 24.27 2.06 - 24.27 2.06 100.00
- - -
B PEKERJAAN BETON DAN BATA - - -
1 Pekerjaan Sloof 18x25 cm - - -
- Bekesting Sloof Beton m² 46.50 266,127.54 13,612,423.67 0.78 46.50 0.78 - - 46.50 0.78 100.00
- Tulangan Besi Beton 8 mm -U24 Kg 177.72 13,577.42 2,654,276.99 0.15 177.72 0.15 - - 177.72 0.15 100.00
- Tulangan Besi Beton 12 mm - U39 Kg 347.63 13,577.42 5,191,910.37 0.30 347.63 0.30 - - 347.63 0.30 100.00
- Beton K-175 m³ 4.18 1,548,974.64 7,122,185.39 0.41 4.18 0.41 - - 4.18 0.41 100.00
- - - -
2 Pek. Kolom 15x15 cm - - - -
- Bekesting Sloof Beton m² 46.80 476,031.60 24,506,106.77 1.40 46.80 1.40 - 46.80 1.40 100.00
- Tulangan Besi Beton 8 mm -U24 Kg 93.69 13,577.42 1,399,275.33 0.08 93.69 0.08 - - 93.69 0.08 100.00
- Tulangan Besi Beton 12 mm - U39 Kg 340.16 13,577.42 5,080,344.71 0.29 340.16 0.29 - - 340.16 0.29 100.00
- Beton K-175 m³ 1.75 1,548,974.64 2,981,776.18 0.17 1.75 0.17 - - 1.75 0.17 100.00
- - -
3 Pek. Ring Balok 15x25 cm - - -
- Bekesting Ring Balok m² 62.94 487,368.09 33,742,442.34 1.93 62.94 1.93 - - 62.94 1.93 100.00
- Tulangan Besi Beton 8 mm -U24 Kg 68.89 13,577.42 1,043,818.47 0.06 68.89 0.06 - - 68.89 0.06 100.00
- Tulangan Besi Beton 12 mm - U39 Kg 149.52 13,577.42 2,233,105.42 0.13 149.52 0.13 - - 149.52 0.13 100.00
- Beton K-175 m³ 3.28 1,548,974.64 5,588,700.50 0.32 3.28 0.32 - - 3.28 0.32 100.00
4 Pek. Lantai Beton Tumbuk, Camp 1:3:5 m³ 9.11 1,394,762.22 13,976,912.21 0.80 9.11 0.80 - - 9.11 0.80 100.00
5 Pek. Bata Lapisan Kolom, Camp 1:3 m² 21.84 177,809.74 4,271,701.19 0.24 21.84 0.24 - - 21.84 0.24 100.00
6 Pek. Plesteran Bata, Camp 1:3 m² 21.84 104,806.10 2,517,861.75 0.14 10.92 0.07 - - 10.92 0.07 50.00
- - -
C PEKERJAAN KAYU, ATAP, CAT DAN LANTAI - - -
1 Pek. Pagar Kayu Kelas II m³ 6.43 8,838,220.05 62,512,730.41 3.58 - - - - - - -
2 Pek. Lambersering Lapisan Kolom, Kayu Kelas II m² 31.81 340,579.80 11,917,227.78 0.68 - - - - - - -
3 Pek. Rangka Plafond Kayu 5/5 Kelas II m² 191.14 140,322.01 29,505,366.43 1.69 95.57 0.84 95.57 0.84 191.14 1.69 100.00
4 Pek. Penutup Plafond Tripleks 4mm m² 191.14 61,181.51 12,863,657.20 0.74 95.57 0.37 0.57 - 96.14 0.37 -
5 Pek. Kuda-Kuda Kayu 5/10 Kelas II m³ 2.25 9,735,372.90 24,095,047.93 1.38 2.25 1.38 - - 2.25 1.38 100.00
6 Pek. Gording Kayu 5/5 Kelas II m³ 1.14 9,138,353.40 11,459,495.16 0.66 1.14 0.66 - - 1.14 0.66 100.00
7 Pek. Rangka Atap Seng Multiroof m² 269.80 255,731.85 75,896,098.44 4.34 269.80 4.34 - - 269.80 4.34 100.00
8 Pek. Penutup Atap Seng Mulltiroof m² 269.80 153,094.59 45,435,412.42 2.60 269.80 2.60 - - 269.80 2.60 100.00
9 Pek. Bubungan Atap Seng Multiroof m¹ 49.50 206,556.57 11,247,005.24 0.64 49.50 0.64 - - 49.50 0.64 100.00
10 Pek. Listplank Papan Kayu Kelas -II m¹ 162.00 97,900.11 17,445,799.60 1.00 162.00 1.00 - - 162.00 1.00 100.00
11 Cat kayu (vernis) m² 359.88 72,224.11 28,591,213.98 1.64 71.00 0.32 - - 71.00 0.32 19.73
12 Pek. Lantai Keramik 40 cm x 40 cm m² 115.05 218,558.54 27,659,676.03 1.58 - - - - - - -
- - -
D PEKERJAAN ELEKTRIKAL - - -
1 Pasang Box Panel bh 1.00 40,606.04 44,666.64 0.00 - - - - - - -
2 Pasang MCB bh 2.00 71,860.34 158,092.75 0.01 - - - - - - -
3 Pas. Stop Kontak bh 24.00 191,410.56 5,053,238.78 0.29 - - - - - - -
4 Pas. Saklar Ganda bh 12.00 191,410.56 2,526,619.39 0.14 - - - - - - -
5 Pas. Lampu jari-jari Philips 18 Watt Ttk 48.00 249,028.56 13,148,707.97 0.75 - - - - - - -
6 Pas. Kabel NYM m¹ 250.00 60,794.91 16,718,600.25 0.96 16.00 0.06 16.00 0.06 32.00 0.12 12.80
7 Penyambungan Baru Listrik 2300VA ls 1.00 2,500,000.00 2,750,000.00 0.16 - - - - - - -
- - -
IV PEKERJAAN JAMBAN - - -
A PEKERJAAN TANAH DAN PONDASI - - -
1 Galian Tanah Pondasi Jalur m³ 17.13 119,245.50 2,246,942.96 0.13 17.13 0.13 - - 17.13 0.13 100.00
2 Urugan Pasir bawah Pondasi m³ 1.32 464,092.20 673,861.87 0.04 1.32 0.04 - - 1.32 0.04 100.00
3 Urugan pasir bawah Lantai m³ 0.73 464,092.20 372,666.04 0.02 0.73 0.02 - - 0.73 0.02 100.00
4 Urugan Tanah Gal. Tanah Kembali m³ 4.28 39,748.50 187,135.94 0.01 4.28 0.01 - - 4.28 0.01 100.00
5 Urugan Tanah Bawah Lantai m³ 3.53 387,941.40 1,506,376.46 0.09 3.53 0.09 - - 3.53 0.09 100.00
6 Pas. Pondasi Batu Kosong m³ 3.95 622,795.83 2,706,047.88 0.15 3.95 0.15 - - 3.95 0.15 100.00
7 Pas. Pondasi Batu Kali1:4 m³ 6.20 1,347,805.31 9,192,032.21 0.53 6.20 0.53 - - 6.20 0.53 100.00
- - -
B PEKERJAAN BETON BERTULANG - - -
1 Pekerjaan Sloof 15 cm x 20 cm - - -
- Bekesting Sloof Beton m² 10.63 266,127.54 3,111,829.33 0.18 10.63 0.18 - - 10.63 0.18 100.00
- Tulangan Besi Beton U-24 Kg 54.16 13,577.42 808,888.37 0.05 54.16 0.05 - - 54.16 0.05 100.00
- Tulangan Besi Beton U-39 Kg 115.88 13,577.42 1,730,686.57 0.10 115.88 0.10 - - 115.88 0.10 100.00
- Beton K-175 m³ 0.87 1,548,974.64 1,482,368.73 0.08 0.87 0.08 - - 0.87 0.08 100.00
2 Pekerjaan Kolom 20 x 20 cm - - -
- Bekesting Sloof Beton m² 7.92 476,031.60 4,147,187.30 0.24 7.92 0.24 - - 7.92 0.24 100.00
- Tulangan Besi Beton U-24 Kg 17.82 13,577.42 266,144.59 0.02 17.82 0.02 - - 17.82 0.02 100.00
- Tulangan Besi Beton U-39 Kg 38.13 13,577.42 569,477.73 0.03 38.13 0.03 - - 38.13 0.03 100.00
- Beton K-175 m³ 0.36 1,548,974.64 613,393.96 0.04 0.36 0.04 - - 0.36 0.04 100.00
3 Pekerjaan Ring Balok 15 x 25 cm - - -
- - Bekesting Sloof Beton m² 3.04 487,368.09 1,629,758.89 0.09 3.04 0.09 - - 3.04 0.09 100.00
- - Tulangan Besi Beton U-24 Kg 91.62 13,577.42 1,368,359.54 0.08 91.62 0.08 - - 91.62 0.08 100.00
- - Tulangan Besi Beton U-39 Kg 232.32 13,577.42 3,469,736.84 0.20 232.32 0.20 - - 232.32 0.20 100.00
- - Beton K-175 m³ 1.14 1,548,974.64 1,942,414.20 0.11 1.14 0.11 - - 1.14 0.11 100.00
4 Pekerjaan Kanopi Beton - - -
- Bakesting kanopi Beton m² 3.90 615,423.60 2,640,167.24 0.15 3.90 0.15 - - 3.90 0.15 100.00
- Tulangan Besi Beton U-24 Kg 28.87 13,577.42 431,178.13 0.02 28.87 0.02 - - 28.87 0.02 100.00
- Beton K-175 m³ 0.16 1,548,974.64 272,619.54 0.02 0.16 0.02 - - 0.16 0.02 100.00
5 Pek. Ring balok Praktis 10cm x 15 cm m¹ 60.40 137,872.75 9,160,265.51 0.52 60.40 0.52 - - 60.40 0.52 100.00
- - -
C PEKERJAAN DINDING DAN LANTAI - - -
1 Pas. Dinding 1/2 bata 1:4 m² 57.15 173,035.17 10,877,855.96 0.62 57.15 0.62 - - 57.15 0.62 100.00
2 Pek. Plesteran Dinding 1/2 Bata Camp 1:4 m² 114.29 102,101.29 12,836,072.08 0.73 114.29 0.73 - - 114.29 0.73 100.00
3 Pek. Plesteran Pondasi, Sloof dan Kolom Camp 1:3 m² 20.07 104,806.10 2,313,804.27 0.13 20.07 0.13 - - 20.07 0.13 100.00
4 Acian Dinding, Sloof Dan kolom m² 134.36 58,409.51 8,632,691.94 0.49 134.36 0.49 - - 134.36 0.49 100.00
5 Cat Dinding m² 134.36 41,336.13 6,109,314.67 0.35 - - - - - - -
6 Pas. Lantai Beton tumbuk, Camp 1:3:5 m³ 1.17 1,394,762.22 1,795,058.98 0.10 1.17 0.10 - - 1.17 0.10 100.00
7 Pas. Dindinig Keramik 20x25 cm m² 27.74 384,208.13 11,723,726.88 0.67 27.74 0.67 - - 27.74 0.67 100.00
8 Pas. Lantai Keramik 20x20 cm (texture kasar) m² 15.68 339,673.58 5,858,689.91 0.34 - - 7.84 0.17 7.84 0.17 50.00
- -
D PEKERJAAN PLAFOND - -
1 Pas. Rangka Plafond Kayu 5/5 Kelas II m² 27.28 140,332.01 4,211,082.96 0.24 27.28 0.24 - - 27.28 0.24 100.00
2 Pas. Penutup Plafond Tripleks 4 mm m² 27.28 61,181.51 1,835,934.75 0.11 27.28 0.11 - - 27.28 0.11 100.00
3 Pas. List Profil Plafond m¹ 61.56 29,917.80 2,025,913.74 0.12 - - - - - - -
4 Cat Plafond m² 27.23 41,336.13 1,240,414.59 0.07 2.27 0.01 2.27 0.01 4.54 0.01 16.67
- - - -
E PEKERJAAN KUSEN, PINTU DAN JENDELA - - - -
1 Pas. Kusen Pintu, Kayu 8/12 kelas I m³ 0.18 11,609,744.85 2,298,729.48 0.13 0.18 0.13 - - 0.18 0.13 100.00
2 Pas. Kusen Ventilasi Atap, Kayu 5/10 Kelas II m³ 0.03 8,307,283.05 274,140.34 0.02 0.03 0.02 - - 0.03 0.02 100.00
3 Pas. Daun Pintu Panel Kayu Kelas I m² 4.86 1,007,384.40 5,385,477.00 0.31 - - - - - - -
4 Pas. Kisi-kisi Ventilasi Atap, Kayu Kelas II m¹ 0.44 701,649.63 339,598.42 0.02 0.44 0.02 - - 0.44 0.02 100.00
5 Cat Kusen, Pintu & Listplank m² 7.28 72,224.11 578,370.67 0.03 2.43 0.01 - - 2.43 0.01 33.33
6 Pas. Kunci Pintu bh 4.00 160,991.20 708,364.01 0.04 - - - - - - -
7 Pas. Engsel Pintu bh 12.00 188,054.96 2,482,325.47 0.14 - - - - - - -
8 Pas. Grendel Pintu bh 4.00 55,164.78 242,725.03 0.01 - - - - - - -
- - - -
F PEKERJAAN ATAP - - - -
1 Pas. Kuda-kuda Kayu 5/10 Kayu Kelas II m³ 0.23 9,735,372.90 2,463,049.34 0.14 0.23 0.14 - - 0.23 0.14 100.00
2 Pas. Gording Kayu 5/5 Kayu Kelas II m³ 0.21 9,138,353.40 2,110,959.64 0.12 0.21 0.12 - - 0.21 0.12 100.00
3 Pas. Blk. Kasau Dan Ring, Kayu Kelas II m² 56.88 255,731.85 16,000,630.39 0.92 56.88 0.92 - - 56.88 0.92 100.00
4 Pas. Atap Genteng Multiroof BJLS 0.25mm m² 56.88 153,094.59 9,578,822.31 0.55 56.88 0.55 - - 56.88 0.55 100.00
5 Pas. Bubungan Atap Seng Multiroof m¹ 16.15 206,556.57 3,669,477.47 0.21 16.15 0.21 - - 16.15 0.21 100.00
6 Pas. Listplank Kayu Kelas II m¹ 23.32 97,900.11 2,511,333.62 0.14 23.32 0.14 - - 23.32 0.14 100.00
- - - -
G PEKERJAAN SANITASI - - - -
1 Pek. Septicktank ls 1.00 6,500,000.00 7,150,000.00 0.41 1.00 0.41 - - 1.00 0.41 100.00
2 Pek. Bak Air ls 4.00 1,000,000.00 4,400,000.00 0.25 4.00 0.25 - - 4.00 0.25 100.00
3 Pas. Pipa Air Bersih PVC AW 1/2' m¹ 30.00 25,049.18 826,622.94 0.05 30.00 0.05 - - 30.00 0.05 100.00
4 Pas. Pipa Tinja PVC 4" m¹ 6.00 128,422.21 847,586.59 0.05 6.00 0.05 - - 6.00 0.05 100.00
5 Pas. Pipa Air Kotor PVC 2" m¹ 6.00 55,541.03 366,570.80 0.02 6.00 0.02 - - 6.00 0.02 100.00
6 Pas. Floor Drain bh 4.00 315,717.93 1,389,158.89 0.08 - - 4.00 0.08 4.00 0.08 100.00
7 Pas. Kloset Jongkok bh 4.00 977,829.93 4,302,451.69 0.25 - - 4.00 0.25 4.00 0.25 100.00
8 Pas. Keran Air Km//Wc bh 4.00 86,434.43 380,311.49 0.02 - - 4.00 0.02 4.00 0.02 100.00
9 Penyambungan Baru Air PDAM ls 1.00 3,000,000.00 3,300,000.00 0.19 - - - - - - -
- - - -
H PEKERJAAN SEPTICTANK DAN REMBESAN - - - -
1 Pas. Galian tanah m³ 5.52 119,245.50 724,058.68 0.04 5.52 0.04 - - 5.52 0.04 100.00
2 Pas. Galian Pasir m³ 0.42 464,092.20 214,410.60 0.01 0.42 0.01 - - 0.42 0.01 100.00
3 Pas. Dinding Batu Bata, Camp 1:3 m² 14.66 177,809.74 2,867,359.87 0.16 14.66 0.16 - - 14.66 0.16 100.00
4 Plesteran Dinding & Lantai, Camp 1:3 m² 31.28 104,806.10 3,606,168.29 0.21 31.28 0.21 - - 31.28 0.21 100.00
5 Acian Dinding & Lantai m² 31.28 58,409.51 2,009,754.42 0.11 31.28 0.11 - - 31.28 0.11 100.00
6 Pek. Beton Penutup Septictank - - - - -
- - Bekesting m² 3.68 615,423.60 2,491,234.73 0.14 3.68 0.14 - - 3.68 0.14 100.00
- - Tulangan Besi Beton U-24 Kg 24.29 13,577.42 362,775.08 0.02 24.29 0.02 - - 24.29 0.02 100.00
- - Beton K-200 m³ 0.34 1,599,057.76 598,047.60 0.03 0.34 0.03 - - 0.34 0.03 100.00
7 Pas. Pipa Hawa / Vent. Gip 2" m¹ 2.80 170,629.77 525,539.69 0.03 2.80 0.03 - - 2.80 0.03 100.00
8 Pas. Batu Kosong m¹ 0.54 622,795.83 369,940.72 0.02 0.54 0.02 - - 0.54 0.02 100.00
- - - -
I PEKERJAAN ELEKTRIKAL - - - -
1 Pas. Saklar Tunggal bh 4.00 143,557.92 631,654.85 0.04 - - - - - - -
2 Pas. Saklar Ganda bh 2.00 249,028.56 421,103.23 0.02 - - - - - - -
3 Pas. Lampu Philipps Jari-jari 18 Watt m¹ 8.00 21,879.00 2,191,451.33 0.13 - - - - - - -
4 Pas. Pipa Instalasi Listrik m¹ 20.00 60,794.91 481,338.00 0.03 - - - - - - -
5 Pas. Kabel NYM m¹ 40.00 60,794.91 2,674,976.04 0.15 - - - - - - -
- - - -
J PEKERJAAN LANTAI PAVING - - - -
1 Urugan Pasir Bawah Paving m³ 92.24 464,092.20 47,088,650.98 2.69 - - - - - - -
2 Pas. Paving Blok K-300 m² 1,844.78 349,061.13 708,335,090.54 40.51 - - - - - - -
3 CAT Paving m² 1,844.79 41,336.13 83,881,672.49 4.80 - - - - - - -
-
100.00 #VALUE! 1.43 #VALUE!
TOTAL PEKERJAAN 1,748,475,480.76
SHAIFUDDIN ZUHRI
ROSITA TAUDA, ST,MT
USMAN, S.T.
NIP. 19800101 2008032 002 SITE ENGINEER
DOKUMENTASI PELAKSANAAN
PEMBANGUNAN FASILITAS LAHAN PARKIR DERMAGA SEMUT MANGGA DUA
KONSULTAN PENGAWASAN
CV. ARCHIVIL ENGGINEERING
DOKUMENTASI PELAKSANAAN
PEMBANGUNAN FASILITAS LAHAN PARKIR DERMAGA SEMUT MANGGA DUA
KONSULTAN PENGAWASAN
CV. USRAH
DOKUMENTASI PELAKSANAAN
PEMBANGUNAN FASILITAS LAHAN PARKIR DERMAGA SEMUT MANGGA DUA
KONSULTAN PENGAWASAN
CV. USRAH
PROGRES MINGGUAN
MINGGU KE 13 PERIODE : 24 SEPTEMBER S/D 30 SEPTEMBER 2018
NO KONTRAK : NO KONTRAK
TANGGAL : TANGGAL
WAKTU PELAKSANAAN : WAKTU PELAKSANAAN
BOBOT
TERHADAP
Harga satuan Jumlah Harga
No Uraian Pekerjaan Satuan Volume BOBOT % MINGGU LALU MINGGU INI SAMPAI MINGGU INI ITEM
(Rp.) (Rp.) PEKERJAAN
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT (%)
I Pekerjaan Persiapan
1 Papan Nama Proyek bh 1.00 599,139.75 659,053.73 0.04 1.00 0.04 - - 1.00 0.04 100.00
2 Penyedia Air Kerja ls 1.00 3,200,000.00 3,520,000.00 0.20 1.00 0.20 - - 1.00 0.20 100.00
3 Penyedia Listrik Kerja ls 1.00 2,250,000.00 2,475,000.00 0.14 1.00 0.14 - - 1.00 0.14 100.00
4 Pembuatan Direksi Keed Dan Gudang m² 6.00 1,651,423.95 10,899,398.07 0.62 6.00 0.62 - - 6.00 0.62 100.00
5 Pengukuran Dan Pemasangan Bowplank ls 1.00 88,384.23 97,222.65 0.01 1.00 0.01 - - 1.00 0.01 100.00
6 Dokumentasi Dan Pelaporan ls 1.00 4,500,000.00 4,950,000.00 0.28 - - - - - - -
7 As Built Drawing ls 1.00 5,215,000.00 5,736,500.00 0.33 - - - - - - -
8 Pembersihan Akhir ls 1.00 4,050,000.00 4,455,000.00 0.25 - - - - - - -
- - -
II PEKERJAAN TAMAN - - -
A Pekerjaan Pasangan - - -
1 Pas. Dinding Batu Bata, 1:3 m³ 60.00 179,605.80 4,506,410.05 0.26 21.11 0.09 38.89 0.17 60.00 0.26 100.00
2 Pas. Beton Tumbuk m³ 5.06 1,394,762.22 7,763,246.52 0.44 5.06 0.44 - - 5.06 0.44 100.00
3 Pas. Plesteran, Camp. 1 :3 m² 60.00 104,806.10 6,917,202.60 0.40 1.61 0.01 58.39 0.38 60.00 0.40 100.00
4 Pas. Acian Dinding m² 60.00 58,409.51 3,855,027.66 0.22 20.20 0.07 - - 20.20 0.07 33.67
5 Cat m² 60.00 41,336.13 2,728,184.58 0.16 - - - - - - -
- - -
B PEKERJAAN TANAH TIMBUNAN/POHON - - -
1 Pek. Timbunan m³ 56.64 387,941.40 24,170,300.99 1.38 - - 56.64 1.38 56.64 1.38 100.00
2 Pohon Ketapang bh 6.00 645,916.20 4,263,046.92 0.24 - - - - - - -
3 Pohon Palm bh 2.00 945,916.20 2,079,915.64 0.12 - - - - - - -
4 Rumput Jepang m² - 145,916.20 0 - - - - - - - -
5 Rabat Beton m³ 5.06 1,394,762.22 7,763,246.52 0.44 - - - - - - -
- - -
III PEKERJAAN FOOD CORE - - -
A PEKERJAAN TANAH DAN PONDASI - - -
1 Galian Tanah Dan Pondasi jalur m³ 49.06 119,245.50 6,435,202.65 0.37 49.06 0.37 - - 49.06 0.37 100.00
2 Urugan Pasir Bawah Pondasi Batu Kali m³ 4.65 464,092.20 2,373,831.60 0.14 4.65 0.14 - - 4.65 0.14 100.00
3 Urugan Tanah Gal. Pondasi Kembali m³ 12.26 39,748.50 536,048.27 0.03 12.26 0.03 - - 12.26 0.03 100.00
4 Urugan Pasir Bawah Lantai m³ 11.76 464,092.20 6,003,496.70 0.34 11.76 0.34 - - 11.76 0.34 100.00
5 Urugan Tanah Bawah Lantai m³ 36.53 387,941.40 15,588,649.28 0.89 36.53 0.89 - - 36.53 0.89 100.00
6 Pas. Batu Kosong m³ 12.69 622,795.83 8,693,606.99 0.50 12.69 0.50 - 12.69 0.50 100.00
7 Pas. Pondasi Batu Kali, Camp 1:4 m³ 24.27 1,347,805.31 35,982,358.36 2.06 24.27 2.06 - 24.27 2.06 100.00
- - -
B PEKERJAAN BETON DAN BATA - - -
1 Pekerjaan Sloof 18x25 cm - - -
- Bekesting Sloof Beton m² 46.50 266,127.54 13,612,423.67 0.78 46.50 0.78 - - 46.50 0.78 100.00
- Tulangan Besi Beton 8 mm -U24 Kg 177.72 13,577.42 2,654,276.99 0.15 177.72 0.15 - - 177.72 0.15 100.00
- Tulangan Besi Beton 12 mm - U39 Kg 347.63 13,577.42 5,191,910.37 0.30 347.63 0.30 - - 347.63 0.30 100.00
- Beton K-175 m³ 4.18 1,548,974.64 7,122,185.39 0.41 4.18 0.41 - - 4.18 0.41 100.00
- - - -
2 Pek. Kolom 15x15 cm - - - -
- Bekesting Sloof Beton m² 46.80 476,031.60 24,506,106.77 1.40 46.80 1.40 - 46.80 1.40 100.00
- Tulangan Besi Beton 8 mm -U24 Kg 93.69 13,577.42 1,399,275.33 0.08 93.69 0.08 - - 93.69 0.08 100.00
- Tulangan Besi Beton 12 mm - U39 Kg 340.16 13,577.42 5,080,344.71 0.29 340.16 0.29 - - 340.16 0.29 100.00
- Beton K-175 m³ 1.75 1,548,974.64 2,981,776.18 0.17 1.75 0.17 - - 1.75 0.17 100.00
- - -
3 Pek. Ring Balok 15x25 cm - - -
- Bekesting Ring Balok m² 62.94 487,368.09 33,742,442.34 1.93 62.94 1.93 - - 62.94 1.93 100.00
- Tulangan Besi Beton 8 mm -U24 Kg 68.89 13,577.42 1,043,818.47 0.06 68.89 0.06 - - 68.89 0.06 100.00
- Tulangan Besi Beton 12 mm - U39 Kg 149.52 13,577.42 2,233,105.42 0.13 149.52 0.13 - - 149.52 0.13 100.00
- Beton K-175 m³ 3.28 1,548,974.64 5,588,700.50 0.32 3.28 0.32 - - 3.28 0.32 100.00
4 Pek. Lantai Beton Tumbuk, Camp 1:3:5 m³ 9.11 1,394,762.22 13,976,912.21 0.80 9.11 0.80 - - 9.11 0.80 100.00
5 Pek. Bata Lapisan Kolom, Camp 1:3 m² 21.84 177,809.74 4,271,701.19 0.24 21.84 0.24 - - 21.84 0.24 100.00
6 Pek. Plesteran Bata, Camp 1:3 m² 21.84 104,806.10 2,517,861.75 0.14 10.92 0.07 10.92 0.07 21.84 0.14 100.00
- - -
C PEKERJAAN KAYU, ATAP, CAT DAN LANTAI - - -
1 Pek. Pagar Kayu Kelas II m³ 6.43 8,838,220.05 62,512,730.41 3.58 - - - - - - -
2 Pek. Lambersering Lapisan Kolom, Kayu Kelas II m² 31.81 340,579.80 11,917,227.78 0.68 - - 31.81 0.68 31.81 0.68 -
3 Pek. Rangka Plafond Kayu 5/5 Kelas II m² 191.14 140,322.01 29,505,366.43 1.69 191.14 1.69 - - 191.14 1.69 100.00
4 Pek. Penutup Plafond Tripleks 4mm m² 191.14 61,181.51 12,863,657.20 0.74 96.14 0.37 95.00 - 191.14 0.37 -
5 Pek. Kuda-Kuda Kayu 5/10 Kelas II m³ 2.25 9,735,372.90 24,095,047.93 1.38 2.25 1.38 - - 2.25 1.38 100.00
6 Pek. Gording Kayu 5/5 Kelas II m³ 1.14 9,138,353.40 11,459,495.16 0.66 1.14 0.66 - - 1.14 0.66 100.00
7 Pek. Rangka Atap Seng Multiroof m² 269.80 255,731.85 75,896,098.44 4.34 269.80 4.34 - - 269.80 4.34 100.00
8 Pek. Penutup Atap Seng Mulltiroof m² 269.80 153,094.59 45,435,412.42 2.60 269.80 2.60 - - 269.80 2.60 100.00
9 Pek. Bubungan Atap Seng Multiroof m¹ 49.50 206,556.57 11,247,005.24 0.64 49.50 0.64 - - 49.50 0.64 100.00
10 Pek. Listplank Papan Kayu Kelas -II m¹ 162.00 97,900.11 17,445,799.60 1.00 162.00 1.00 - - 162.00 1.00 100.00
11 Cat kayu (vernis) m² 359.88 72,224.11 28,591,213.98 1.64 71.00 0.32 288.88 1.31 359.88 1.64 100.00
12 Pek. Lantai Keramik 40 cm x 40 cm m² 115.05 218,558.54 27,659,676.03 1.58 - - - - - - -
- - -
D PEKERJAAN ELEKTRIKAL - - -
1 Pasang Box Panel bh 1.00 40,606.04 44,666.64 0.00 - - - - - - -
2 Pasang MCB bh 2.00 71,860.34 158,092.75 0.01 - - - - - - -
3 Pas. Stop Kontak bh 24.00 191,410.56 5,053,238.78 0.29 - - - - - - -
4 Pas. Saklar Ganda bh 12.00 191,410.56 2,526,619.39 0.14 - - 12.00 0.14 12.00 0.14 100.00
5 Pas. Lampu jari-jari Philips 18 Watt Ttk 48.00 249,028.56 13,148,707.97 0.75 - - - - - - -
6 Pas. Kabel NYM m¹ 250.00 60,794.91 16,718,600.25 0.96 32.00 0.12 - - 32.00 0.12 12.80
7 Penyambungan Baru Listrik 2300VA ls 1.00 2,500,000.00 2,750,000.00 0.16 - - - - - - -
- - -
IV PEKERJAAN JAMBAN - - -
A PEKERJAAN TANAH DAN PONDASI - - -
1 Galian Tanah Pondasi Jalur m³ 17.13 119,245.50 2,246,942.96 0.13 17.13 0.13 - - 17.13 0.13 100.00
2 Urugan Pasir bawah Pondasi m³ 1.32 464,092.20 673,861.87 0.04 1.32 0.04 - - 1.32 0.04 100.00
3 Urugan pasir bawah Lantai m³ 0.73 464,092.20 372,666.04 0.02 0.73 0.02 - - 0.73 0.02 100.00
4 Urugan Tanah Gal. Tanah Kembali m³ 4.28 39,748.50 187,135.94 0.01 4.28 0.01 - - 4.28 0.01 100.00
5 Urugan Tanah Bawah Lantai m³ 3.53 387,941.40 1,506,376.46 0.09 3.53 0.09 - - 3.53 0.09 100.00
6 Pas. Pondasi Batu Kosong m³ 3.95 622,795.83 2,706,047.88 0.15 3.95 0.15 - - 3.95 0.15 100.00
7 Pas. Pondasi Batu Kali1:4 m³ 6.20 1,347,805.31 9,192,032.21 0.53 6.20 0.53 - - 6.20 0.53 100.00
- - -
B PEKERJAAN BETON BERTULANG - - -
1 Pekerjaan Sloof 15 cm x 20 cm - - -
- Bekesting Sloof Beton m² 10.63 266,127.54 3,111,829.33 0.18 10.63 0.18 - - 10.63 0.18 100.00
- Tulangan Besi Beton U-24 Kg 54.16 13,577.42 808,888.37 0.05 54.16 0.05 - - 54.16 0.05 100.00
- Tulangan Besi Beton U-39 Kg 115.88 13,577.42 1,730,686.57 0.10 115.88 0.10 - - 115.88 0.10 100.00
- Beton K-175 m³ 0.87 1,548,974.64 1,482,368.73 0.08 0.87 0.08 - - 0.87 0.08 100.00
2 Pekerjaan Kolom 20 x 20 cm - - -
- Bekesting Sloof Beton m² 7.92 476,031.60 4,147,187.30 0.24 7.92 0.24 - - 7.92 0.24 100.00
- Tulangan Besi Beton U-24 Kg 17.82 13,577.42 266,144.59 0.02 17.82 0.02 - - 17.82 0.02 100.00
- Tulangan Besi Beton U-39 Kg 38.13 13,577.42 569,477.73 0.03 38.13 0.03 - - 38.13 0.03 100.00
- Beton K-175 m³ 0.36 1,548,974.64 613,393.96 0.04 0.36 0.04 - - 0.36 0.04 100.00
3 Pekerjaan Ring Balok 15 x 25 cm - - -
- - Bekesting Sloof Beton m² 3.04 487,368.09 1,629,758.89 0.09 3.04 0.09 - - 3.04 0.09 100.00
- - Tulangan Besi Beton U-24 Kg 91.62 13,577.42 1,368,359.54 0.08 91.62 0.08 - - 91.62 0.08 100.00
- - Tulangan Besi Beton U-39 Kg 232.32 13,577.42 3,469,736.84 0.20 232.32 0.20 - - 232.32 0.20 100.00
- - Beton K-175 m³ 1.14 1,548,974.64 1,942,414.20 0.11 1.14 0.11 - - 1.14 0.11 100.00
4 Pekerjaan Kanopi Beton - - -
- Bakesting kanopi Beton m² 3.90 615,423.60 2,640,167.24 0.15 3.90 0.15 - - 3.90 0.15 100.00
- Tulangan Besi Beton U-24 Kg 28.87 13,577.42 431,178.13 0.02 28.87 0.02 - - 28.87 0.02 100.00
- Beton K-175 m³ 0.16 1,548,974.64 272,619.54 0.02 0.16 0.02 - - 0.16 0.02 100.00
5 Pek. Ring balok Praktis 10cm x 15 cm m¹ 60.40 137,872.75 9,160,265.51 0.52 60.40 0.52 - - 60.40 0.52 100.00
- - -
C PEKERJAAN DINDING DAN LANTAI - - -
1 Pas. Dinding 1/2 bata 1:4 m² 57.15 173,035.17 10,877,855.96 0.62 57.15 0.62 - - 57.15 0.62 100.00
2 Pek. Plesteran Dinding 1/2 Bata Camp 1:4 m² 114.29 102,101.29 12,836,072.08 0.73 114.29 0.73 - - 114.29 0.73 100.00
3 Pek. Plesteran Pondasi, Sloof dan Kolom Camp 1:3 m² 20.07 104,806.10 2,313,804.27 0.13 20.07 0.13 - - 20.07 0.13 100.00
4 Acian Dinding, Sloof Dan kolom m² 134.36 58,409.51 8,632,691.94 0.49 134.36 0.49 - - 134.36 0.49 100.00
5 Cat Dinding m² 134.36 41,336.13 6,109,314.67 0.35 - - 67.18 0.17 67.18 0.17 50.00
6 Pas. Lantai Beton tumbuk, Camp 1:3:5 m³ 1.17 1,394,762.22 1,795,058.98 0.10 1.17 0.10 - - 1.17 0.10 100.00
7 Pas. Dindinig Keramik 20x25 cm m² 27.74 384,208.13 11,723,726.88 0.67 27.74 0.67 - - 27.74 0.67 100.00
8 Pas. Lantai Keramik 20x20 cm (texture kasar) m² 15.68 339,673.58 5,858,689.91 0.34 7.84 0.17 - - 7.84 0.17 50.00
- -
D PEKERJAAN PLAFOND - -
1 Pas. Rangka Plafond Kayu 5/5 Kelas II m² 27.28 140,332.01 4,211,082.96 0.24 27.28 0.24 - - 27.28 0.24 100.00
2 Pas. Penutup Plafond Tripleks 4 mm m² 27.28 61,181.51 1,835,934.75 0.11 27.28 0.11 - - 27.28 0.11 100.00
3 Pas. List Profil Plafond m¹ 61.56 29,917.80 2,025,913.74 0.12 - - - - - - -
4 Cat Plafond m² 27.23 41,336.13 1,240,414.59 0.07 4.54 0.01 22.69 0.06 27.23 0.07 100.00
- - - -
E PEKERJAAN KUSEN, PINTU DAN JENDELA - - - -
1 Pas. Kusen Pintu, Kayu 8/12 kelas I m³ 0.18 11,609,744.85 2,298,729.48 0.13 0.18 0.13 - - 0.18 0.13 100.00
2 Pas. Kusen Ventilasi Atap, Kayu 5/10 Kelas II m³ 0.03 8,307,283.05 274,140.34 0.02 0.03 0.02 - - 0.03 0.02 100.00
3 Pas. Daun Pintu Panel Kayu Kelas I m² 4.86 1,007,384.40 5,385,477.00 0.31 - - 4.86 0.31 4.86 0.31 100.00
4 Pas. Kisi-kisi Ventilasi Atap, Kayu Kelas II m¹ 0.44 701,649.63 339,598.42 0.02 0.44 0.02 - - 0.44 0.02 100.00
5 Cat Kusen, Pintu & Listplank m² 7.28 72,224.11 578,370.67 0.03 2.43 0.01 3.64 0.02 6.07 0.03 83.33
6 Pas. Kunci Pintu bh 4.00 160,991.20 708,364.01 0.04 - - 4.00 0.04 4.00 0.04 100.00
7 Pas. Engsel Pintu bh 12.00 188,054.96 2,482,325.47 0.14 - - 12.00 0.14 12.00 0.14 100.00
8 Pas. Grendel Pintu bh 4.00 55,164.78 242,725.03 0.01 - - 4.00 0.01 4.00 0.01 100.00
- - - -
F PEKERJAAN ATAP - - - -
1 Pas. Kuda-kuda Kayu 5/10 Kayu Kelas II m³ 0.23 9,735,372.90 2,463,049.34 0.14 0.23 0.14 - - 0.23 0.14 100.00
2 Pas. Gording Kayu 5/5 Kayu Kelas II m³ 0.21 9,138,353.40 2,110,959.64 0.12 0.21 0.12 - - 0.21 0.12 100.00
3 Pas. Blk. Kasau Dan Ring, Kayu Kelas II m² 56.88 255,731.85 16,000,630.39 0.92 56.88 0.92 - - 56.88 0.92 100.00
4 Pas. Atap Genteng Multiroof BJLS 0.25mm m² 56.88 153,094.59 9,578,822.31 0.55 56.88 0.55 - - 56.88 0.55 100.00
5 Pas. Bubungan Atap Seng Multiroof m¹ 16.15 206,556.57 3,669,477.47 0.21 16.15 0.21 - - 16.15 0.21 100.00
6 Pas. Listplank Kayu Kelas II m¹ 23.32 97,900.11 2,511,333.62 0.14 23.32 0.14 - - 23.32 0.14 100.00
- - - -
G PEKERJAAN SANITASI - - - -
1 Pek. Septicktank ls 1.00 6,500,000.00 7,150,000.00 0.41 1.00 0.41 - - 1.00 0.41 100.00
2 Pek. Bak Air ls 4.00 1,000,000.00 4,400,000.00 0.25 4.00 0.25 - - 4.00 0.25 100.00
3 Pas. Pipa Air Bersih PVC AW 1/2' m¹ 30.00 25,049.18 826,622.94 0.05 30.00 0.05 - - 30.00 0.05 100.00
4 Pas. Pipa Tinja PVC 4" m¹ 6.00 128,422.21 847,586.59 0.05 6.00 0.05 - - 6.00 0.05 100.00
5 Pas. Pipa Air Kotor PVC 2" m¹ 6.00 55,541.03 366,570.80 0.02 6.00 0.02 - - 6.00 0.02 100.00
6 Pas. Floor Drain bh 4.00 315,717.93 1,389,158.89 0.08 4.00 0.08 - - 4.00 0.08 100.00
7 Pas. Kloset Jongkok bh 4.00 977,829.93 4,302,451.69 0.25 4.00 0.25 - - 4.00 0.25 100.00
8 Pas. Keran Air Km//Wc bh 4.00 86,434.43 380,311.49 0.02 4.00 0.02 - - 4.00 0.02 100.00
9 Penyambungan Baru Air PDAM ls 1.00 3,000,000.00 3,300,000.00 0.19 - - - - - - -
- - - -
H PEKERJAAN SEPTICTANK DAN REMBESAN - - - -
1 Pas. Galian tanah m³ 5.52 119,245.50 724,058.68 0.04 5.52 0.04 - - 5.52 0.04 100.00
2 Pas. Galian Pasir m³ 0.42 464,092.20 214,410.60 0.01 0.42 0.01 - - 0.42 0.01 100.00
3 Pas. Dinding Batu Bata, Camp 1:3 m² 14.66 177,809.74 2,867,359.87 0.16 14.66 0.16 - - 14.66 0.16 100.00
4 Plesteran Dinding & Lantai, Camp 1:3 m² 31.28 104,806.10 3,606,168.29 0.21 31.28 0.21 - - 31.28 0.21 100.00
5 Acian Dinding & Lantai m² 31.28 58,409.51 2,009,754.42 0.11 31.28 0.11 - - 31.28 0.11 100.00
6 Pek. Beton Penutup Septictank - - - - -
- - Bekesting m² 3.68 615,423.60 2,491,234.73 0.14 3.68 0.14 - - 3.68 0.14 100.00
- - Tulangan Besi Beton U-24 Kg 24.29 13,577.42 362,775.08 0.02 24.29 0.02 - - 24.29 0.02 100.00
- - Beton K-200 m³ 0.34 1,599,057.76 598,047.60 0.03 0.34 0.03 - - 0.34 0.03 100.00
7 Pas. Pipa Hawa / Vent. Gip 2" m¹ 2.80 170,629.77 525,539.69 0.03 2.80 0.03 - - 2.80 0.03 100.00
8 Pas. Batu Kosong m¹ 0.54 622,795.83 369,940.72 0.02 0.54 0.02 - - 0.54 0.02 100.00
- - - -
I PEKERJAAN ELEKTRIKAL - - - -
1 Pas. Saklar Tunggal bh 4.00 143,557.92 631,654.85 0.04 - - - - - - -
2 Pas. Saklar Ganda bh 2.00 249,028.56 421,103.23 0.02 - - - - - - -
3 Pas. Lampu Philipps Jari-jari 18 Watt m¹ 8.00 21,879.00 2,191,451.33 0.13 - - - - - - -
4 Pas. Pipa Instalasi Listrik m¹ 20.00 60,794.91 481,338.00 0.03 - - - - - - -
5 Pas. Kabel NYM m¹ 40.00 60,794.91 2,674,976.04 0.15 - - - - - - -
- - - -
J PEKERJAAN LANTAI PAVING - - - -
1 Urugan Pasir Bawah Paving m³ 92.24 464,092.20 47,088,650.98 2.69 - - 46.12 1.35 46.12 1.35 50.00
2 Pas. Paving Blok K-300 m² 1,844.78 349,061.13 708,335,090.54 40.51 - - 922.39 20.26 922.39 20.26 50.00
3 CAT Paving m² 1,844.79 41,336.13 83,881,672.49 4.80 - - - - - - -
-
100.00 36.54 26.50 63.04
TOTAL PEKERJAAN 1,748,475,480.76
SHAIFUDDIN ZUHRI
ROSITA TAUDA, ST,MT
USMAN, S.T.
NIP. 19800101 2008032 002 SITE ENGINEER
PROGRES MINGGUAN
MINGGU KE 14 PERIODE : 01 OKTOBER S/D 07 OKTOBER 2018
NO KONTRAK : NO KONTRAK :
TANGGAL : TANGGAL :
WAKTU PELAKSANAAN : WAKTU PELAKSANAAN :
BOBOT
TERHADAP
Harga satuan Jumlah Harga
No Uraian Pekerjaan Satuan Volume BOBOT % MINGGU LALU MINGGU INI SAMPAI MINGGU INI ITEM
(Rp.) (Rp.) PEKERJAAN
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT (%)
I Pekerjaan Persiapan
1 Papan Nama Proyek bh 1.00 599,139.75 659,053.73 0.04 1.00 0.04 - - 1.00 0.04 100.00
2 Penyedia Air Kerja ls 1.00 3,200,000.00 3,520,000.00 0.20 1.00 0.20 - - 1.00 0.20 100.00
3 Penyedia Listrik Kerja ls 1.00 2,250,000.00 2,475,000.00 0.14 1.00 0.14 - - 1.00 0.14 100.00
4 Pembuatan Direksi Keed Dan Gudang m² 6.00 1,651,423.95 10,899,398.07 0.62 6.00 0.62 - - 6.00 0.62 100.00
5 Pengukuran Dan Pemasangan Bowplank ls 1.00 88,384.23 97,222.65 0.01 1.00 0.01 - - 1.00 0.01 100.00
6 Dokumentasi Dan Pelaporan ls 1.00 4,500,000.00 4,950,000.00 0.28 - - - - - - -
7 As Built Drawing ls 1.00 5,215,000.00 5,736,500.00 0.33 - - - - - - -
8 Pembersihan Akhir ls 1.00 4,050,000.00 4,455,000.00 0.25 - - - - - - -
- -
II PEKERJAAN TAMAN - -
A Pekerjaan Pasangan - -
1 Pas. Dinding Batu Bata, 1:3 m³ 60.00 179,605.80 4,506,410.05 0.26 60.00 0.26 - - 60.00 0.26 100.00
2 Pas. Beton Tumbuk m³ 5.06 1,394,762.22 7,763,246.52 0.44 5.06 0.44 - - 5.06 0.44 100.00
3 Pas. Plesteran, Camp. 1 :3 m² 60.00 104,806.10 6,917,202.60 0.40 60.00 0.40 - - 60.00 0.40 100.00
4 Pas. Acian Dinding m² 60.00 58,409.51 3,855,027.66 0.22 20.20 0.07 - - 20.20 0.07 33.67
5 Cat m² 60.00 41,336.13 2,728,184.58 0.16 - - - - - - -
- -
B PEKERJAAN TANAH TIMBUNAN/POHON - -
1 Pek. Timbunan m³ 56.64 387,941.40 24,170,300.99 1.38 56.64 1.38 - - 56.64 1.38 100.00
2 Pohon Ketapang bh 6.00 645,916.20 4,263,046.92 0.24 - - 6.00 0.24 6.00 0.24 100.00
3 Pohon Palm bh 2.00 945,916.20 2,079,915.64 0.12 - - 2.00 0.12 2.00 0.12 100.00
4 Rumput Jepang m² - 145,916.20 0 - - - - - - - -
5 Rabat Beton m³ 5.06 1,394,762.22 7,763,246.52 0.44 - - - - - - -
- -
III PEKERJAAN FOOD CORE - -
A PEKERJAAN TANAH DAN PONDASI - -
1 Galian Tanah Dan Pondasi jalur m³ 49.06 119,245.50 6,435,202.65 0.37 49.06 0.37 - - 49.06 0.37 100.00
2 Urugan Pasir Bawah Pondasi Batu Kali m³ 4.65 464,092.20 2,373,831.60 0.14 4.65 0.14 - - 4.65 0.14 100.00
3 Urugan Tanah Gal. Pondasi Kembali m³ 12.26 39,748.50 536,048.27 0.03 12.26 0.03 - - 12.26 0.03 100.00
4 Urugan Pasir Bawah Lantai m³ 11.76 464,092.20 6,003,496.70 0.34 11.76 0.34 - - 11.76 0.34 100.00
5 Urugan Tanah Bawah Lantai m³ 36.53 387,941.40 15,588,649.28 0.89 36.53 0.89 - - 36.53 0.89 100.00
6 Pas. Batu Kosong m³ 12.69 622,795.83 8,693,606.99 0.50 12.69 0.50 - 12.69 0.50 100.00
7 Pas. Pondasi Batu Kali, Camp 1:4 m³ 24.27 1,347,805.31 35,982,358.36 2.06 24.27 2.06 - 24.27 2.06 100.00
- -
B PEKERJAAN BETON DAN BATA - -
1 Pekerjaan Sloof 18x25 cm - -
- Bekesting Sloof Beton m² 46.50 266,127.54 13,612,423.67 0.78 46.50 0.78 - - 46.50 0.78 100.00
- Tulangan Besi Beton 8 mm -U24 Kg 177.72 13,577.42 2,654,276.99 0.15 177.72 0.15 - - 177.72 0.15 100.00
- Tulangan Besi Beton 12 mm - U39 Kg 347.63 13,577.42 5,191,910.37 0.30 347.63 0.30 - - 347.63 0.30 100.00
- Beton K-175 m³ 4.18 1,548,974.64 7,122,185.39 0.41 4.18 0.41 - - 4.18 0.41 100.00
- -
2 Pek. Kolom 15x15 cm - -
- Bekesting Sloof Beton m² 46.80 476,031.60 24,506,106.77 1.40 46.80 1.40 - 46.80 1.40 100.00
- Tulangan Besi Beton 8 mm -U24 Kg 93.69 13,577.42 1,399,275.33 0.08 93.69 0.08 - - 93.69 0.08 100.00
- Tulangan Besi Beton 12 mm - U39 Kg 340.16 13,577.42 5,080,344.71 0.29 340.16 0.29 - - 340.16 0.29 100.00
- Beton K-175 m³ 1.75 1,548,974.64 2,981,776.18 0.17 1.75 0.17 - - 1.75 0.17 100.00
- -
3 Pek. Ring Balok 15x25 cm - -
- Bekesting Ring Balok m² 62.94 487,368.09 33,742,442.34 1.93 62.94 1.93 - - 62.94 1.93 100.00
- Tulangan Besi Beton 8 mm -U24 Kg 68.89 13,577.42 1,043,818.47 0.06 68.89 0.06 - - 68.89 0.06 100.00
- Tulangan Besi Beton 12 mm - U39 Kg 149.52 13,577.42 2,233,105.42 0.13 149.52 0.13 - - 149.52 0.13 100.00
- Beton K-175 m³ 3.28 1,548,974.64 5,588,700.50 0.32 3.28 0.32 - - 3.28 0.32 100.00
4 Pek. Lantai Beton Tumbuk, Camp 1:3:5 m³ 9.11 1,394,762.22 13,976,912.21 0.80 9.11 0.80 - - 9.11 0.80 100.00
5 Pek. Bata Lapisan Kolom, Camp 1:3 m² 21.84 177,809.74 4,271,701.19 0.24 21.84 0.24 - - 21.84 0.24 100.00
6 Pek. Plesteran Bata, Camp 1:3 m² 21.84 104,806.10 2,517,861.75 0.14 21.84 0.14 - - 21.84 0.14 100.00
- -
C PEKERJAAN KAYU, ATAP, CAT DAN LANTAI - -
1 Pek. Pagar Kayu Kelas II m³ 6.43 8,838,220.05 62,512,730.41 3.58 - - - - - - -
2 Pek. Lambersering Lapisan Kolom, Kayu Kelas II m² 31.81 340,579.80 11,917,227.78 0.68 31.81 0.68 - - 31.81 0.68 -
3 Pek. Rangka Plafond Kayu 5/5 Kelas II m² 191.14 140,322.01 29,505,366.43 1.69 191.14 1.69 - - 191.14 1.69 100.00
4 Pek. Penutup Plafond Tripleks 4mm m² 191.14 61,181.51 12,863,657.20 0.74 191.14 0.74 - - 191.14 0.74 -
5 Pek. Kuda-Kuda Kayu 5/10 Kelas II m³ 2.25 9,735,372.90 24,095,047.93 1.38 2.25 1.38 - - 2.25 1.38 100.00
6 Pek. Gording Kayu 5/5 Kelas II m³ 1.14 9,138,353.40 11,459,495.16 0.66 1.14 0.66 - - 1.14 0.66 100.00
7 Pek. Rangka Atap Seng Multiroof m² 269.80 255,731.85 75,896,098.44 4.34 269.80 4.34 - - 269.80 4.34 100.00
8 Pek. Penutup Atap Seng Mulltiroof m² 269.80 153,094.59 45,435,412.42 2.60 269.80 2.60 - - 269.80 2.60 100.00
9 Pek. Bubungan Atap Seng Multiroof m¹ 49.50 206,556.57 11,247,005.24 0.64 49.50 0.64 - - 49.50 0.64 100.00
10 Pek. Listplank Papan Kayu Kelas -II m¹ 162.00 97,900.11 17,445,799.60 1.00 162.00 1.00 - - 162.00 1.00 100.00
11 Cat kayu (vernis) m² 359.88 72,224.11 28,591,213.98 1.64 359.88 1.64 - - 359.88 1.64 100.00
12 Pek. Lantai Keramik 40 cm x 40 cm m² 115.05 218,558.54 27,659,676.03 1.58 - - - - - - -
- -
D PEKERJAAN ELEKTRIKAL - -
1 Pasang Box Panel bh 1.00 40,606.04 44,666.64 0.00 - - - - - - -
2 Pasang MCB bh 2.00 71,860.34 158,092.75 0.01 - - - - - - -
3 Pas. Stop Kontak bh 24.00 191,410.56 5,053,238.78 0.29 - - - - - - -
4 Pas. Saklar Ganda bh 12.00 191,410.56 2,526,619.39 0.14 12.00 0.14 - - 12.00 0.14 100.00
5 Pas. Lampu jari-jari Philips 18 Watt Ttk 48.00 249,028.56 13,148,707.97 0.75 - - - - - - -
6 Pas. Kabel NYM m¹ 250.00 60,794.91 16,718,600.25 0.96 32.00 0.12 - - 32.00 0.12 12.80
7 Penyambungan Baru Listrik 2300VA ls 1.00 2,500,000.00 2,750,000.00 0.16 - - - - - - -
- -
IV PEKERJAAN JAMBAN - -
A PEKERJAAN TANAH DAN PONDASI - -
1 Galian Tanah Pondasi Jalur m³ 17.13 119,245.50 2,246,942.96 0.13 17.13 0.13 - - 17.13 0.13 100.00
2 Urugan Pasir bawah Pondasi m³ 1.32 464,092.20 673,861.87 0.04 1.32 0.04 - - 1.32 0.04 100.00
3 Urugan pasir bawah Lantai m³ 0.73 464,092.20 372,666.04 0.02 0.73 0.02 - - 0.73 0.02 100.00
4 Urugan Tanah Gal. Tanah Kembali m³ 4.28 39,748.50 187,135.94 0.01 4.28 0.01 - - 4.28 0.01 100.00
5 Urugan Tanah Bawah Lantai m³ 3.53 387,941.40 1,506,376.46 0.09 3.53 0.09 - - 3.53 0.09 100.00
6 Pas. Pondasi Batu Kosong m³ 3.95 622,795.83 2,706,047.88 0.15 3.95 0.15 - - 3.95 0.15 100.00
7 Pas. Pondasi Batu Kali1:4 m³ 6.20 1,347,805.31 9,192,032.21 0.53 6.20 0.53 - - 6.20 0.53 100.00
- -
B PEKERJAAN BETON BERTULANG - -
1 Pekerjaan Sloof 15 cm x 20 cm - -
- Bekesting Sloof Beton m² 10.63 266,127.54 3,111,829.33 0.18 10.63 0.18 - - 10.63 0.18 100.00
- Tulangan Besi Beton U-24 Kg 54.16 13,577.42 808,888.37 0.05 54.16 0.05 - - 54.16 0.05 100.00
- Tulangan Besi Beton U-39 Kg 115.88 13,577.42 1,730,686.57 0.10 115.88 0.10 - - 115.88 0.10 100.00
- Beton K-175 m³ 0.87 1,548,974.64 1,482,368.73 0.08 0.87 0.08 - - 0.87 0.08 100.00
2 Pekerjaan Kolom 20 x 20 cm - -
- Bekesting Sloof Beton m² 7.92 476,031.60 4,147,187.30 0.24 7.92 0.24 - - 7.92 0.24 100.00
- Tulangan Besi Beton U-24 Kg 17.82 13,577.42 266,144.59 0.02 17.82 0.02 - - 17.82 0.02 100.00
- Tulangan Besi Beton U-39 Kg 38.13 13,577.42 569,477.73 0.03 38.13 0.03 - - 38.13 0.03 100.00
- Beton K-175 m³ 0.36 1,548,974.64 613,393.96 0.04 0.36 0.04 - - 0.36 0.04 100.00
3 Pekerjaan Ring Balok 15 x 25 cm - -
- - Bekesting Sloof Beton m² 3.04 487,368.09 1,629,758.89 0.09 3.04 0.09 - - 3.04 0.09 100.00
- - Tulangan Besi Beton U-24 Kg 91.62 13,577.42 1,368,359.54 0.08 91.62 0.08 - - 91.62 0.08 100.00
- - Tulangan Besi Beton U-39 Kg 232.32 13,577.42 3,469,736.84 0.20 232.32 0.20 - - 232.32 0.20 100.00
- - Beton K-175 m³ 1.14 1,548,974.64 1,942,414.20 0.11 1.14 0.11 - - 1.14 0.11 100.00
4 Pekerjaan Kanopi Beton - -
- Bakesting kanopi Beton m² 3.90 615,423.60 2,640,167.24 0.15 3.90 0.15 - - 3.90 0.15 100.00
- Tulangan Besi Beton U-24 Kg 28.87 13,577.42 431,178.13 0.02 28.87 0.02 - - 28.87 0.02 100.00
- Beton K-175 m³ 0.16 1,548,974.64 272,619.54 0.02 0.16 0.02 - - 0.16 0.02 100.00
5 Pek. Ring balok Praktis 10cm x 15 cm m¹ 60.40 137,872.75 9,160,265.51 0.52 60.40 0.52 - - 60.40 0.52 100.00
- -
C PEKERJAAN DINDING DAN LANTAI - -
1 Pas. Dinding 1/2 bata 1:4 m² 57.15 173,035.17 10,877,855.96 0.62 57.15 0.62 - - 57.15 0.62 100.00
2 Pek. Plesteran Dinding 1/2 Bata Camp 1:4 m² 114.29 102,101.29 12,836,072.08 0.73 114.29 0.73 - - 114.29 0.73 100.00
3 Pek. Plesteran Pondasi, Sloof dan Kolom Camp 1:3 m² 20.07 104,806.10 2,313,804.27 0.13 20.07 0.13 - - 20.07 0.13 100.00
4 Acian Dinding, Sloof Dan kolom m² 134.36 58,409.51 8,632,691.94 0.49 134.36 0.49 - - 134.36 0.49 100.00
5 Cat Dinding m² 134.36 41,336.13 6,109,314.67 0.35 67.18 0.17 - - 67.18 0.17 50.00
6 Pas. Lantai Beton tumbuk, Camp 1:3:5 m³ 1.17 1,394,762.22 1,795,058.98 0.10 1.17 0.10 - - 1.17 0.10 100.00
7 Pas. Dindinig Keramik 20x25 cm m² 27.74 384,208.13 11,723,726.88 0.67 27.74 0.67 - - 27.74 0.67 100.00
8 Pas. Lantai Keramik 20x20 cm (texture kasar) m² 15.68 339,673.58 5,858,689.91 0.34 7.84 0.17 - - 7.84 0.17 50.00
- -
D PEKERJAAN PLAFOND - -
1 Pas. Rangka Plafond Kayu 5/5 Kelas II m² 27.28 140,332.01 4,211,082.96 0.24 27.28 0.24 - - 27.28 0.24 100.00
2 Pas. Penutup Plafond Tripleks 4 mm m² 27.28 61,181.51 1,835,934.75 0.11 27.28 0.11 - - 27.28 0.11 100.00
3 Pas. List Profil Plafond m¹ 61.56 29,917.80 2,025,913.74 0.12 - - - - - - -
4 Cat Plafond m² 27.23 41,336.13 1,240,414.59 0.07 27.23 0.07 - - 27.23 0.07 100.00
- -
E PEKERJAAN KUSEN, PINTU DAN JENDELA - -
1 Pas. Kusen Pintu, Kayu 8/12 kelas I m³ 0.18 11,609,744.85 2,298,729.48 0.13 0.18 0.13 - - 0.18 0.13 100.00
2 Pas. Kusen Ventilasi Atap, Kayu 5/10 Kelas II m³ 0.03 8,307,283.05 274,140.34 0.02 0.03 0.02 - - 0.03 0.02 100.00
3 Pas. Daun Pintu Panel Kayu Kelas I m² 4.86 1,007,384.40 5,385,477.00 0.31 4.86 0.31 - - 4.86 0.31 100.00
4 Pas. Kisi-kisi Ventilasi Atap, Kayu Kelas II m¹ 0.44 701,649.63 339,598.42 0.02 0.44 0.02 - - 0.44 0.02 100.00
5 Cat Kusen, Pintu & Listplank m² 7.28 72,224.11 578,370.67 0.03 6.07 0.03 - - 6.07 0.03 83.33
6 Pas. Kunci Pintu bh 4.00 160,991.20 708,364.01 0.04 4.00 0.04 - - 4.00 0.04 100.00
7 Pas. Engsel Pintu bh 12.00 188,054.96 2,482,325.47 0.14 12.00 0.14 - - 12.00 0.14 100.00
8 Pas. Grendel Pintu bh 4.00 55,164.78 242,725.03 0.01 4.00 0.01 - - 4.00 0.01 100.00
- -
F PEKERJAAN ATAP - -
1 Pas. Kuda-kuda Kayu 5/10 Kayu Kelas II m³ 0.23 9,735,372.90 2,463,049.34 0.14 0.23 0.14 - - 0.23 0.14 100.00
2 Pas. Gording Kayu 5/5 Kayu Kelas II m³ 0.21 9,138,353.40 2,110,959.64 0.12 0.21 0.12 - - 0.21 0.12 100.00
3 Pas. Blk. Kasau Dan Ring, Kayu Kelas II m² 56.88 255,731.85 16,000,630.39 0.92 56.88 0.92 - - 56.88 0.92 100.00
4 Pas. Atap Genteng Multiroof BJLS 0.25mm m² 56.88 153,094.59 9,578,822.31 0.55 56.88 0.55 - - 56.88 0.55 100.00
5 Pas. Bubungan Atap Seng Multiroof m¹ 16.15 206,556.57 3,669,477.47 0.21 16.15 0.21 - - 16.15 0.21 100.00
6 Pas. Listplank Kayu Kelas II m¹ 23.32 97,900.11 2,511,333.62 0.14 23.32 0.14 - - 23.32 0.14 100.00
- -
G PEKERJAAN SANITASI - -
1 Pek. Septicktank ls 1.00 6,500,000.00 7,150,000.00 0.41 1.00 0.41 - - 1.00 0.41 100.00
2 Pek. Bak Air ls 4.00 1,000,000.00 4,400,000.00 0.25 4.00 0.25 - - 4.00 0.25 100.00
3 Pas. Pipa Air Bersih PVC AW 1/2' m¹ 30.00 25,049.18 826,622.94 0.05 30.00 0.05 - - 30.00 0.05 100.00
4 Pas. Pipa Tinja PVC 4" m¹ 6.00 128,422.21 847,586.59 0.05 6.00 0.05 - - 6.00 0.05 100.00
5 Pas. Pipa Air Kotor PVC 2" m¹ 6.00 55,541.03 366,570.80 0.02 6.00 0.02 - - 6.00 0.02 100.00
6 Pas. Floor Drain bh 4.00 315,717.93 1,389,158.89 0.08 4.00 0.08 - - 4.00 0.08 100.00
7 Pas. Kloset Jongkok bh 4.00 977,829.93 4,302,451.69 0.25 4.00 0.25 - - 4.00 0.25 100.00
8 Pas. Keran Air Km//Wc bh 4.00 86,434.43 380,311.49 0.02 4.00 0.02 - - 4.00 0.02 100.00
9 Penyambungan Baru Air PDAM ls 1.00 3,000,000.00 3,300,000.00 0.19 - - - - - - -
- -
H PEKERJAAN SEPTICTANK DAN REMBESAN - -
1 Pas. Galian tanah m³ 5.52 119,245.50 724,058.68 0.04 5.52 0.04 - - 5.52 0.04 100.00
2 Pas. Galian Pasir m³ 0.42 464,092.20 214,410.60 0.01 0.42 0.01 - - 0.42 0.01 100.00
3 Pas. Dinding Batu Bata, Camp 1:3 m² 14.66 177,809.74 2,867,359.87 0.16 14.66 0.16 - - 14.66 0.16 100.00
4 Plesteran Dinding & Lantai, Camp 1:3 m² 31.28 104,806.10 3,606,168.29 0.21 31.28 0.21 - - 31.28 0.21 100.00
5 Acian Dinding & Lantai m² 31.28 58,409.51 2,009,754.42 0.11 31.28 0.11 - - 31.28 0.11 100.00
6 Pek. Beton Penutup Septictank - -
- - Bekesting m² 3.68 615,423.60 2,491,234.73 0.14 3.68 0.14 - - 3.68 0.14 100.00
- - Tulangan Besi Beton U-24 Kg 24.29 13,577.42 362,775.08 0.02 24.29 0.02 - - 24.29 0.02 100.00
- - Beton K-200 m³ 0.34 1,599,057.76 598,047.60 0.03 0.34 0.03 - - 0.34 0.03 100.00
7 Pas. Pipa Hawa / Vent. Gip 2" m¹ 2.80 170,629.77 525,539.69 0.03 2.80 0.03 - - 2.80 0.03 100.00
8 Pas. Batu Kosong m¹ 0.54 622,795.83 369,940.72 0.02 0.54 0.02 - - 0.54 0.02 100.00
- -
I PEKERJAAN ELEKTRIKAL - -
1 Pas. Saklar Tunggal bh 4.00 143,557.92 631,654.85 0.04 - - - - - - -
2 Pas. Saklar Ganda bh 2.00 249,028.56 421,103.23 0.02 - - - - - - -
3 Pas. Lampu Philipps Jari-jari 18 Watt m¹ 8.00 21,879.00 2,191,451.33 0.13 - - - - - - -
4 Pas. Pipa Instalasi Listrik m¹ 20.00 60,794.91 481,338.00 0.03 - - - - - - -
5 Pas. Kabel NYM m¹ 40.00 60,794.91 2,674,976.04 0.15 - - - - - - -
- -
J PEKERJAAN LANTAI PAVING - -
1 Urugan Pasir Bawah Paving m³ 92.24 464,092.20 47,088,650.98 2.69 46.12 1.35 21.00 0.61 67.12 1.96 72.77
2 Pas. Paving Blok K-300 m² 1,844.78 349,061.13 708,335,090.54 40.51 922.39 20.26 400.00 8.78 1,322.39 29.04 71.68
3 CAT Paving m² 1,844.79 41,336.13 83,881,672.49 4.80 - - - - - - -
SHAIFUDDIN ZUHRI
ROSITA TAUDA, ST,MT
USMAN, S.T.
NIP. 19800101 2008032 002 SITE ENGINEER
PROGRES MINGGUAN
MINGGU KE 15 PERIODE : 08 OKTOBER S/D 14 OKTOBER 2018
NO KONTRAK : NO KONTRAK :
TANGGAL : TANGGAL :
WAKTU PELAKSANAAN : WAKTU PELAKSANAAN :
BOBOT
TERHADAP
Harga satuan Jumlah Harga
No Uraian Pekerjaan Satuan Volume BOBOT % MINGGU LALU MINGGU INI SAMPAI MINGGU INI ITEM
(Rp.) (Rp.) PEKERJAAN
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT (%)
I Pekerjaan Persiapan
1 Papan Nama Proyek bh 1.00 599,139.75 659,053.73 0.04 1.00 0.04 - - 1.00 0.04 100.00
2 Penyedia Air Kerja ls 1.00 3,200,000.00 3,520,000.00 0.20 1.00 0.20 - - 1.00 0.20 100.00
3 Penyedia Listrik Kerja ls 1.00 2,250,000.00 2,475,000.00 0.14 1.00 0.14 - - 1.00 0.14 100.00
4 Pembuatan Direksi Keed Dan Gudang m² 6.00 1,651,423.95 10,899,398.07 0.62 6.00 0.62 - - 6.00 0.62 100.00
5 Pengukuran Dan Pemasangan Bowplank ls 1.00 88,384.23 97,222.65 0.01 1.00 0.01 - - 1.00 0.01 100.00
6 Dokumentasi Dan Pelaporan ls 1.00 4,500,000.00 4,950,000.00 0.28 - - - - - - -
7 As Built Drawing ls 1.00 5,215,000.00 5,736,500.00 0.33 - - - - - - -
8 Pembersihan Akhir ls 1.00 4,050,000.00 4,455,000.00 0.25 - - - - - - -
- -
II PEKERJAAN TAMAN - -
A Pekerjaan Pasangan - -
1 Pas. Dinding Batu Bata, 1:3 m³ 60.00 179,605.80 4,506,410.05 0.26 60.00 0.26 - - 60.00 0.26 100.00
2 Pas. Beton Tumbuk m³ 5.06 1,394,762.22 7,763,246.52 0.44 5.06 0.44 - - 5.06 0.44 100.00
3 Pas. Plesteran, Camp. 1 :3 m² 60.00 104,806.10 6,917,202.60 0.40 60.00 0.40 - - 60.00 0.40 100.00
4 Pas. Acian Dinding m² 60.00 58,409.51 3,855,027.66 0.22 20.20 0.07 39.80 0.15 60.00 0.22 100.00
5 Cat m² 60.00 41,336.13 2,728,184.58 0.16 - - - - - - -
- -
B PEKERJAAN TANAH TIMBUNAN/POHON - -
1 Pek. Timbunan m³ 56.64 387,941.40 24,170,300.99 1.38 56.64 1.38 - - 56.64 1.38 100.00
2 Pohon Ketapang bh 6.00 645,916.20 4,263,046.92 0.24 6.00 0.24 - - 6.00 0.24 100.00
3 Pohon Palm bh 2.00 945,916.20 2,079,915.64 0.12 2.00 0.12 - - 2.00 0.12 100.00
4 Rumput Jepang m² - 145,916.20 0 - - - - - - - -
5 Rabat Beton m³ 5.06 1,394,762.22 7,763,246.52 0.44 - - - - - - -
- -
III PEKERJAAN FOOD CORE - -
A PEKERJAAN TANAH DAN PONDASI - -
1 Galian Tanah Dan Pondasi jalur m³ 49.06 119,245.50 6,435,202.65 0.37 49.06 0.37 - - 49.06 0.37 100.00
2 Urugan Pasir Bawah Pondasi Batu Kali m³ 4.65 464,092.20 2,373,831.60 0.14 4.65 0.14 - - 4.65 0.14 100.00
3 Urugan Tanah Gal. Pondasi Kembali m³ 12.26 39,748.50 536,048.27 0.03 12.26 0.03 - - 12.26 0.03 100.00
4 Urugan Pasir Bawah Lantai m³ 11.76 464,092.20 6,003,496.70 0.34 11.76 0.34 - - 11.76 0.34 100.00
5 Urugan Tanah Bawah Lantai m³ 36.53 387,941.40 15,588,649.28 0.89 36.53 0.89 - - 36.53 0.89 100.00
6 Pas. Batu Kosong m³ 12.69 622,795.83 8,693,606.99 0.50 12.69 0.50 - 12.69 0.50 100.00
7 Pas. Pondasi Batu Kali, Camp 1:4 m³ 24.27 1,347,805.31 35,982,358.36 2.06 24.27 2.06 - 24.27 2.06 100.00
- -
B PEKERJAAN BETON DAN BATA - -
1 Pekerjaan Sloof 18x25 cm - -
- Bekesting Sloof Beton m² 46.50 266,127.54 13,612,423.67 0.78 46.50 0.78 - - 46.50 0.78 100.00
- Tulangan Besi Beton 8 mm -U24 Kg 177.72 13,577.42 2,654,276.99 0.15 177.72 0.15 - - 177.72 0.15 100.00
- Tulangan Besi Beton 12 mm - U39 Kg 347.63 13,577.42 5,191,910.37 0.30 347.63 0.30 - - 347.63 0.30 100.00
- Beton K-175 m³ 4.18 1,548,974.64 7,122,185.39 0.41 4.18 0.41 - - 4.18 0.41 100.00
- -
2 Pek. Kolom 15x15 cm - -
- Bekesting Sloof Beton m² 46.80 476,031.60 24,506,106.77 1.40 46.80 1.40 - 46.80 1.40 100.00
- Tulangan Besi Beton 8 mm -U24 Kg 93.69 13,577.42 1,399,275.33 0.08 93.69 0.08 - - 93.69 0.08 100.00
- Tulangan Besi Beton 12 mm - U39 Kg 340.16 13,577.42 5,080,344.71 0.29 340.16 0.29 - - 340.16 0.29 100.00
- Beton K-175 m³ 1.75 1,548,974.64 2,981,776.18 0.17 1.75 0.17 - - 1.75 0.17 100.00
- -
3 Pek. Ring Balok 15x25 cm - -
- Bekesting Ring Balok m² 62.94 487,368.09 33,742,442.34 1.93 62.94 1.93 - - 62.94 1.93 100.00
- Tulangan Besi Beton 8 mm -U24 Kg 68.89 13,577.42 1,043,818.47 0.06 68.89 0.06 - - 68.89 0.06 100.00
- Tulangan Besi Beton 12 mm - U39 Kg 149.52 13,577.42 2,233,105.42 0.13 149.52 0.13 - - 149.52 0.13 100.00
- Beton K-175 m³ 3.28 1,548,974.64 5,588,700.50 0.32 3.28 0.32 - - 3.28 0.32 100.00
4 Pek. Lantai Beton Tumbuk, Camp 1:3:5 m³ 9.11 1,394,762.22 13,976,912.21 0.80 9.11 0.80 - - 9.11 0.80 100.00
5 Pek. Bata Lapisan Kolom, Camp 1:3 m² 21.84 177,809.74 4,271,701.19 0.24 21.84 0.24 - - 21.84 0.24 100.00
6 Pek. Plesteran Bata, Camp 1:3 m² 21.84 104,806.10 2,517,861.75 0.14 21.84 0.14 - - 21.84 0.14 100.00
- -
C PEKERJAAN KAYU, ATAP, CAT DAN LANTAI - -
1 Pek. Pagar Kayu Kelas II m³ 6.43 8,838,220.05 62,512,730.41 3.58 - - - - - - -
2 Pek. Lambersering Lapisan Kolom, Kayu Kelas II m² 31.81 340,579.80 11,917,227.78 0.68 31.81 0.68 - - 31.81 0.68 -
3 Pek. Rangka Plafond Kayu 5/5 Kelas II m² 191.14 140,322.01 29,505,366.43 1.69 191.14 1.69 - - 191.14 1.69 100.00
4 Pek. Penutup Plafond Tripleks 4mm m² 191.14 61,181.51 12,863,657.20 0.74 191.14 0.74 - - 191.14 0.74 -
5 Pek. Kuda-Kuda Kayu 5/10 Kelas II m³ 2.25 9,735,372.90 24,095,047.93 1.38 2.25 1.38 - - 2.25 1.38 100.00
6 Pek. Gording Kayu 5/5 Kelas II m³ 1.14 9,138,353.40 11,459,495.16 0.66 1.14 0.66 - - 1.14 0.66 100.00
7 Pek. Rangka Atap Seng Multiroof m² 269.80 255,731.85 75,896,098.44 4.34 269.80 4.34 - - 269.80 4.34 100.00
8 Pek. Penutup Atap Seng Mulltiroof m² 269.80 153,094.59 45,435,412.42 2.60 269.80 2.60 - - 269.80 2.60 100.00
9 Pek. Bubungan Atap Seng Multiroof m¹ 49.50 206,556.57 11,247,005.24 0.64 49.50 0.64 - - 49.50 0.64 100.00
10 Pek. Listplank Papan Kayu Kelas -II m¹ 162.00 97,900.11 17,445,799.60 1.00 162.00 1.00 - - 162.00 1.00 100.00
11 Cat kayu (vernis) m² 359.88 72,224.11 28,591,213.98 1.64 359.88 1.64 - - 359.88 1.64 100.00
12 Pek. Lantai Keramik 40 cm x 40 cm m² 115.05 218,558.54 27,659,676.03 1.58 - - - - - - -
- -
D PEKERJAAN ELEKTRIKAL - -
1 Pasang Box Panel bh 1.00 40,606.04 44,666.64 0.00 - - - - - - -
2 Pasang MCB bh 2.00 71,860.34 158,092.75 0.01 - - - - - - -
3 Pas. Stop Kontak bh 24.00 191,410.56 5,053,238.78 0.29 - - - - - - -
4 Pas. Saklar Ganda bh 12.00 191,410.56 2,526,619.39 0.14 12.00 0.14 - - 12.00 0.14 100.00
5 Pas. Lampu jari-jari Philips 18 Watt Ttk 48.00 249,028.56 13,148,707.97 0.75 - - - - - - -
6 Pas. Kabel NYM m¹ 250.00 60,794.91 16,718,600.25 0.96 32.00 0.12 - - 32.00 0.12 12.80
7 Penyambungan Baru Listrik 2300VA ls 1.00 2,500,000.00 2,750,000.00 0.16 - - - - - - -
- -
IV PEKERJAAN JAMBAN - -
A PEKERJAAN TANAH DAN PONDASI - -
1 Galian Tanah Pondasi Jalur m³ 17.13 119,245.50 2,246,942.96 0.13 17.13 0.13 - - 17.13 0.13 100.00
2 Urugan Pasir bawah Pondasi m³ 1.32 464,092.20 673,861.87 0.04 1.32 0.04 - - 1.32 0.04 100.00
3 Urugan pasir bawah Lantai m³ 0.73 464,092.20 372,666.04 0.02 0.73 0.02 - - 0.73 0.02 100.00
4 Urugan Tanah Gal. Tanah Kembali m³ 4.28 39,748.50 187,135.94 0.01 4.28 0.01 - - 4.28 0.01 100.00
5 Urugan Tanah Bawah Lantai m³ 3.53 387,941.40 1,506,376.46 0.09 3.53 0.09 - - 3.53 0.09 100.00
6 Pas. Pondasi Batu Kosong m³ 3.95 622,795.83 2,706,047.88 0.15 3.95 0.15 - - 3.95 0.15 100.00
7 Pas. Pondasi Batu Kali1:4 m³ 6.20 1,347,805.31 9,192,032.21 0.53 6.20 0.53 - - 6.20 0.53 100.00
- -
B PEKERJAAN BETON BERTULANG - -
1 Pekerjaan Sloof 15 cm x 20 cm - -
- Bekesting Sloof Beton m² 10.63 266,127.54 3,111,829.33 0.18 10.63 0.18 - - 10.63 0.18 100.00
- Tulangan Besi Beton U-24 Kg 54.16 13,577.42 808,888.37 0.05 54.16 0.05 - - 54.16 0.05 100.00
- Tulangan Besi Beton U-39 Kg 115.88 13,577.42 1,730,686.57 0.10 115.88 0.10 - - 115.88 0.10 100.00
- Beton K-175 m³ 0.87 1,548,974.64 1,482,368.73 0.08 0.87 0.08 - - 0.87 0.08 100.00
2 Pekerjaan Kolom 20 x 20 cm - -
- Bekesting Sloof Beton m² 7.92 476,031.60 4,147,187.30 0.24 7.92 0.24 - - 7.92 0.24 100.00
- Tulangan Besi Beton U-24 Kg 17.82 13,577.42 266,144.59 0.02 17.82 0.02 - - 17.82 0.02 100.00
- Tulangan Besi Beton U-39 Kg 38.13 13,577.42 569,477.73 0.03 38.13 0.03 - - 38.13 0.03 100.00
- Beton K-175 m³ 0.36 1,548,974.64 613,393.96 0.04 0.36 0.04 - - 0.36 0.04 100.00
3 Pekerjaan Ring Balok 15 x 25 cm - -
- - Bekesting Sloof Beton m² 3.04 487,368.09 1,629,758.89 0.09 3.04 0.09 - - 3.04 0.09 100.00
- - Tulangan Besi Beton U-24 Kg 91.62 13,577.42 1,368,359.54 0.08 91.62 0.08 - - 91.62 0.08 100.00
- - Tulangan Besi Beton U-39 Kg 232.32 13,577.42 3,469,736.84 0.20 232.32 0.20 - - 232.32 0.20 100.00
- - Beton K-175 m³ 1.14 1,548,974.64 1,942,414.20 0.11 1.14 0.11 - - 1.14 0.11 100.00
4 Pekerjaan Kanopi Beton - -
- Bakesting kanopi Beton m² 3.90 615,423.60 2,640,167.24 0.15 3.90 0.15 - - 3.90 0.15 100.00
- Tulangan Besi Beton U-24 Kg 28.87 13,577.42 431,178.13 0.02 28.87 0.02 - - 28.87 0.02 100.00
- Beton K-175 m³ 0.16 1,548,974.64 272,619.54 0.02 0.16 0.02 - - 0.16 0.02 100.00
5 Pek. Ring balok Praktis 10cm x 15 cm m¹ 60.40 137,872.75 9,160,265.51 0.52 60.40 0.52 - - 60.40 0.52 100.00
- -
C PEKERJAAN DINDING DAN LANTAI - -
1 Pas. Dinding 1/2 bata 1:4 m² 57.15 173,035.17 10,877,855.96 0.62 57.15 0.62 - - 57.15 0.62 100.00
2 Pek. Plesteran Dinding 1/2 Bata Camp 1:4 m² 114.29 102,101.29 12,836,072.08 0.73 114.29 0.73 - - 114.29 0.73 100.00
3 Pek. Plesteran Pondasi, Sloof dan Kolom Camp 1:3 m² 20.07 104,806.10 2,313,804.27 0.13 20.07 0.13 - - 20.07 0.13 100.00
4 Acian Dinding, Sloof Dan kolom m² 134.36 58,409.51 8,632,691.94 0.49 134.36 0.49 - - 134.36 0.49 100.00
5 Cat Dinding m² 134.36 41,336.13 6,109,314.67 0.35 67.18 0.17 - - 67.18 0.17 50.00
6 Pas. Lantai Beton tumbuk, Camp 1:3:5 m³ 1.17 1,394,762.22 1,795,058.98 0.10 1.17 0.10 - - 1.17 0.10 100.00
7 Pas. Dindinig Keramik 20x25 cm m² 27.74 384,208.13 11,723,726.88 0.67 27.74 0.67 - - 27.74 0.67 100.00
8 Pas. Lantai Keramik 20x20 cm (texture kasar) m² 15.68 339,673.58 5,858,689.91 0.34 7.84 0.17 - - 7.84 0.17 50.00
- -
D PEKERJAAN PLAFOND - -
1 Pas. Rangka Plafond Kayu 5/5 Kelas II m² 27.28 140,332.01 4,211,082.96 0.24 27.28 0.24 - - 27.28 0.24 100.00
2 Pas. Penutup Plafond Tripleks 4 mm m² 27.28 61,181.51 1,835,934.75 0.11 27.28 0.11 - - 27.28 0.11 100.00
3 Pas. List Profil Plafond m¹ 61.56 29,917.80 2,025,913.74 0.12 - - - - - - -
4 Cat Plafond m² 27.23 41,336.13 1,240,414.59 0.07 27.23 0.07 - - 27.23 0.07 100.00
- -
E PEKERJAAN KUSEN, PINTU DAN JENDELA - -
1 Pas. Kusen Pintu, Kayu 8/12 kelas I m³ 0.18 11,609,744.85 2,298,729.48 0.13 0.18 0.13 - - 0.18 0.13 100.00
2 Pas. Kusen Ventilasi Atap, Kayu 5/10 Kelas II m³ 0.03 8,307,283.05 274,140.34 0.02 0.03 0.02 - - 0.03 0.02 100.00
3 Pas. Daun Pintu Panel Kayu Kelas I m² 4.86 1,007,384.40 5,385,477.00 0.31 4.86 0.31 - - 4.86 0.31 100.00
4 Pas. Kisi-kisi Ventilasi Atap, Kayu Kelas II m¹ 0.44 701,649.63 339,598.42 0.02 0.44 0.02 - - 0.44 0.02 100.00
5 Cat Kusen, Pintu & Listplank m² 7.28 72,224.11 578,370.67 0.03 6.07 0.03 - - 6.07 0.03 83.33
6 Pas. Kunci Pintu bh 4.00 160,991.20 708,364.01 0.04 4.00 0.04 - - 4.00 0.04 100.00
7 Pas. Engsel Pintu bh 12.00 188,054.96 2,482,325.47 0.14 12.00 0.14 - - 12.00 0.14 100.00
8 Pas. Grendel Pintu bh 4.00 55,164.78 242,725.03 0.01 4.00 0.01 - - 4.00 0.01 100.00
- -
F PEKERJAAN ATAP - -
1 Pas. Kuda-kuda Kayu 5/10 Kayu Kelas II m³ 0.23 9,735,372.90 2,463,049.34 0.14 0.23 0.14 - - 0.23 0.14 100.00
2 Pas. Gording Kayu 5/5 Kayu Kelas II m³ 0.21 9,138,353.40 2,110,959.64 0.12 0.21 0.12 - - 0.21 0.12 100.00
3 Pas. Blk. Kasau Dan Ring, Kayu Kelas II m² 56.88 255,731.85 16,000,630.39 0.92 56.88 0.92 - - 56.88 0.92 100.00
4 Pas. Atap Genteng Multiroof BJLS 0.25mm m² 56.88 153,094.59 9,578,822.31 0.55 56.88 0.55 - - 56.88 0.55 100.00
5 Pas. Bubungan Atap Seng Multiroof m¹ 16.15 206,556.57 3,669,477.47 0.21 16.15 0.21 - - 16.15 0.21 100.00
6 Pas. Listplank Kayu Kelas II m¹ 23.32 97,900.11 2,511,333.62 0.14 23.32 0.14 - - 23.32 0.14 100.00
- -
G PEKERJAAN SANITASI - -
1 Pek. Septicktank ls 1.00 6,500,000.00 7,150,000.00 0.41 1.00 0.41 - - 1.00 0.41 100.00
2 Pek. Bak Air ls 4.00 1,000,000.00 4,400,000.00 0.25 4.00 0.25 - - 4.00 0.25 100.00
3 Pas. Pipa Air Bersih PVC AW 1/2' m¹ 30.00 25,049.18 826,622.94 0.05 30.00 0.05 - - 30.00 0.05 100.00
4 Pas. Pipa Tinja PVC 4" m¹ 6.00 128,422.21 847,586.59 0.05 6.00 0.05 - - 6.00 0.05 100.00
5 Pas. Pipa Air Kotor PVC 2" m¹ 6.00 55,541.03 366,570.80 0.02 6.00 0.02 - - 6.00 0.02 100.00
6 Pas. Floor Drain bh 4.00 315,717.93 1,389,158.89 0.08 4.00 0.08 - - 4.00 0.08 100.00
7 Pas. Kloset Jongkok bh 4.00 977,829.93 4,302,451.69 0.25 4.00 0.25 - - 4.00 0.25 100.00
8 Pas. Keran Air Km//Wc bh 4.00 86,434.43 380,311.49 0.02 4.00 0.02 - - 4.00 0.02 100.00
9 Penyambungan Baru Air PDAM ls 1.00 3,000,000.00 3,300,000.00 0.19 - - - - - - -
- -
H PEKERJAAN SEPTICTANK DAN REMBESAN - -
1 Pas. Galian tanah m³ 5.52 119,245.50 724,058.68 0.04 5.52 0.04 - - 5.52 0.04 100.00
2 Pas. Galian Pasir m³ 0.42 464,092.20 214,410.60 0.01 0.42 0.01 - - 0.42 0.01 100.00
3 Pas. Dinding Batu Bata, Camp 1:3 m² 14.66 177,809.74 2,867,359.87 0.16 14.66 0.16 - - 14.66 0.16 100.00
4 Plesteran Dinding & Lantai, Camp 1:3 m² 31.28 104,806.10 3,606,168.29 0.21 31.28 0.21 - - 31.28 0.21 100.00
5 Acian Dinding & Lantai m² 31.28 58,409.51 2,009,754.42 0.11 31.28 0.11 - - 31.28 0.11 100.00
6 Pek. Beton Penutup Septictank - -
- - Bekesting m² 3.68 615,423.60 2,491,234.73 0.14 3.68 0.14 - - 3.68 0.14 100.00
- - Tulangan Besi Beton U-24 Kg 24.29 13,577.42 362,775.08 0.02 24.29 0.02 - - 24.29 0.02 100.00
- - Beton K-200 m³ 0.34 1,599,057.76 598,047.60 0.03 0.34 0.03 - - 0.34 0.03 100.00
7 Pas. Pipa Hawa / Vent. Gip 2" m¹ 2.80 170,629.77 525,539.69 0.03 2.80 0.03 - - 2.80 0.03 100.00
8 Pas. Batu Kosong m¹ 0.54 622,795.83 369,940.72 0.02 0.54 0.02 - - 0.54 0.02 100.00
- -
I PEKERJAAN ELEKTRIKAL - -
1 Pas. Saklar Tunggal bh 4.00 143,557.92 631,654.85 0.04 - - 4.00 0.04 4.00 0.04 100.00
2 Pas. Saklar Ganda bh 2.00 249,028.56 421,103.23 0.02 - - 2.00 0.02 2.00 0.02 100.00
3 Pas. Lampu Philipps Jari-jari 18 Watt m¹ 8.00 21,879.00 2,191,451.33 0.13 - - - - - - -
4 Pas. Pipa Instalasi Listrik m¹ 20.00 60,794.91 481,338.00 0.03 - - 20.00 0.03 20.00 0.03 100.00
5 Pas. Kabel NYM m¹ 40.00 60,794.91 2,674,976.04 0.15 - - 40.00 0.15 40.00 0.15 100.00
- -
J PEKERJAAN LANTAI PAVING - -
1 Urugan Pasir Bawah Paving m³ 92.24 464,092.20 47,088,650.98 2.69 67.12 1.96 - - 67.12 1.96 72.77
2 Pas. Paving Blok K-300 m² 1,844.78 349,061.13 708,335,090.54 40.51 1,322.39 29.04 375.00 8.24 1,697.39 37.27 92.01
3 CAT Paving m² 1,844.79 41,336.13 83,881,672.49 4.80 - - - - - - -
SHAIFUDDIN ZUHRI
ROSITA TAUDA, ST,MT
USMAN, S.T.
NIP. 19800101 2008032 002 SITE ENGINEER
PROGRES MINGGUAN
MINGGU KE 16 PERIODE : 15 OKTOBER S/D 21 OKTOBER 2018
NO KONTRAK : NO KONTRAK :
TANGGAL : TANGGAL :
WAKTU PELAKSANAAN : WAKTU PELAKSANAAN :
BOBOT
TERHADAP
Harga satuan Jumlah Harga
No Uraian Pekerjaan Satuan Volume BOBOT % MINGGU LALU MINGGU INI SAMPAI MINGGU INI ITEM
(Rp.) (Rp.) PEKERJAAN
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT (%)
I Pekerjaan Persiapan
1 Papan Nama Proyek bh 1.00 599,139.75 659,053.73 0.04 1.00 0.04 - - 1.00 0.04 100.00
2 Penyedia Air Kerja ls 1.00 3,200,000.00 3,520,000.00 0.20 1.00 0.20 - - 1.00 0.20 100.00
3 Penyedia Listrik Kerja ls 1.00 2,250,000.00 2,475,000.00 0.14 1.00 0.14 - - 1.00 0.14 100.00
4 Pembuatan Direksi Keed Dan Gudang m² 6.00 1,651,423.95 10,899,398.07 0.62 6.00 0.62 - - 6.00 0.62 100.00
5 Pengukuran Dan Pemasangan Bowplank ls 1.00 88,384.23 97,222.65 0.01 1.00 0.01 - - 1.00 0.01 100.00
6 Dokumentasi Dan Pelaporan ls 1.00 4,500,000.00 4,950,000.00 0.28 - - - - - - -
7 As Built Drawing ls 1.00 5,215,000.00 5,736,500.00 0.33 - - - - - - -
8 Pembersihan Akhir ls 1.00 4,050,000.00 4,455,000.00 0.25 - - - - - - -
- -
II PEKERJAAN TAMAN - -
A Pekerjaan Pasangan - -
1 Pas. Dinding Batu Bata, 1:3 m³ 60.00 179,605.80 4,506,410.05 0.26 60.00 0.26 - - 60.00 0.26 100.00
2 Pas. Beton Tumbuk m³ 5.06 1,394,762.22 7,763,246.52 0.44 5.06 0.44 - - 5.06 0.44 100.00
3 Pas. Plesteran, Camp. 1 :3 m² 60.00 104,806.10 6,917,202.60 0.40 60.00 0.40 - - 60.00 0.40 100.00
4 Pas. Acian Dinding m² 60.00 58,409.51 3,855,027.66 0.22 60.00 0.22 - - 60.00 0.22 100.00
5 Cat m² 60.00 41,336.13 2,728,184.58 0.16 - - - - - - -
- -
B PEKERJAAN TANAH TIMBUNAN/POHON - -
1 Pek. Timbunan m³ 56.64 387,941.40 24,170,300.99 1.38 56.64 1.38 - - 56.64 1.38 100.00
2 Pohon Ketapang bh 6.00 645,916.20 4,263,046.92 0.24 6.00 0.24 - - 6.00 0.24 100.00
3 Pohon Palm bh 2.00 945,916.20 2,079,915.64 0.12 2.00 0.12 - - 2.00 0.12 100.00
4 Rumput Jepang m² - 145,916.20 0 - - #VALUE! - - - #VALUE! -
5 Rabat Beton m³ 5.06 1,394,762.22 7,763,246.52 0.44 - - - - - - -
- -
III PEKERJAAN FOOD CORE - -
A PEKERJAAN TANAH DAN PONDASI - -
1 Galian Tanah Dan Pondasi jalur m³ 49.06 119,245.50 6,435,202.65 0.37 49.06 0.37 - - 49.06 0.37 100.00
2 Urugan Pasir Bawah Pondasi Batu Kali m³ 4.65 464,092.20 2,373,831.60 0.14 4.65 0.14 - - 4.65 0.14 100.00
3 Urugan Tanah Gal. Pondasi Kembali m³ 12.26 39,748.50 536,048.27 0.03 12.26 0.03 - - 12.26 0.03 100.00
4 Urugan Pasir Bawah Lantai m³ 11.76 464,092.20 6,003,496.70 0.34 11.76 0.34 - - 11.76 0.34 100.00
5 Urugan Tanah Bawah Lantai m³ 36.53 387,941.40 15,588,649.28 0.89 36.53 0.89 - - 36.53 0.89 100.00
6 Pas. Batu Kosong m³ 12.69 622,795.83 8,693,606.99 0.50 12.69 0.50 - 12.69 0.50 100.00
7 Pas. Pondasi Batu Kali, Camp 1:4 m³ 24.27 1,347,805.31 35,982,358.36 2.06 24.27 2.06 - 24.27 2.06 100.00
- -
B PEKERJAAN BETON DAN BATA - -
1 Pekerjaan Sloof 18x25 cm - -
- Bekesting Sloof Beton m² 46.50 266,127.54 13,612,423.67 0.78 46.50 0.78 - - 46.50 0.78 100.00
- Tulangan Besi Beton 8 mm -U24 Kg 177.72 13,577.42 2,654,276.99 0.15 177.72 0.15 - - 177.72 0.15 100.00
- Tulangan Besi Beton 12 mm - U39 Kg 347.63 13,577.42 5,191,910.37 0.30 347.63 0.30 - - 347.63 0.30 100.00
- Beton K-175 m³ 4.18 1,548,974.64 7,122,185.39 0.41 4.18 0.41 - - 4.18 0.41 100.00
- -
2 Pek. Kolom 15x15 cm - -
- Bekesting Sloof Beton m² 46.80 476,031.60 24,506,106.77 1.40 46.80 1.40 - 46.80 1.40 100.00
- Tulangan Besi Beton 8 mm -U24 Kg 93.69 13,577.42 1,399,275.33 0.08 93.69 0.08 - - 93.69 0.08 100.00
- Tulangan Besi Beton 12 mm - U39 Kg 340.16 13,577.42 5,080,344.71 0.29 340.16 0.29 - - 340.16 0.29 100.00
- Beton K-175 m³ 1.75 1,548,974.64 2,981,776.18 0.17 1.75 0.17 - - 1.75 0.17 100.00
- -
3 Pek. Ring Balok 15x25 cm - -
- Bekesting Ring Balok m² 62.94 487,368.09 33,742,442.34 1.93 62.94 1.93 - - 62.94 1.93 100.00
- Tulangan Besi Beton 8 mm -U24 Kg 68.89 13,577.42 1,043,818.47 0.06 68.89 0.06 - - 68.89 0.06 100.00
- Tulangan Besi Beton 12 mm - U39 Kg 149.52 13,577.42 2,233,105.42 0.13 149.52 0.13 - - 149.52 0.13 100.00
- Beton K-175 m³ 3.28 1,548,974.64 5,588,700.50 0.32 3.28 0.32 - - 3.28 0.32 100.00
4 Pek. Lantai Beton Tumbuk, Camp 1:3:5 m³ 9.11 1,394,762.22 13,976,912.21 0.80 9.11 0.80 - - 9.11 0.80 100.00
5 Pek. Bata Lapisan Kolom, Camp 1:3 m² 21.84 177,809.74 4,271,701.19 0.24 21.84 0.24 - - 21.84 0.24 100.00
6 Pek. Plesteran Bata, Camp 1:3 m² 21.84 104,806.10 2,517,861.75 0.14 21.84 0.14 - - 21.84 0.14 100.00
- -
C PEKERJAAN KAYU, ATAP, CAT DAN LANTAI - -
1 Pek. Pagar Kayu Kelas II m³ 6.43 8,838,220.05 62,512,730.41 3.58 - - - - - - -
2 Pek. Lambersering Lapisan Kolom, Kayu Kelas II m² 31.81 340,579.80 11,917,227.78 0.68 31.81 0.68 - - 31.81 0.68 -
3 Pek. Rangka Plafond Kayu 5/5 Kelas II m² 191.14 140,322.01 29,505,366.43 1.69 191.14 1.69 - - 191.14 1.69 100.00
4 Pek. Penutup Plafond Tripleks 4mm m² 191.14 61,181.51 12,863,657.20 0.74 191.14 0.74 - - 191.14 0.74 -
5 Pek. Kuda-Kuda Kayu 5/10 Kelas II m³ 2.25 9,735,372.90 24,095,047.93 1.38 2.25 1.38 - - 2.25 1.38 100.00
6 Pek. Gording Kayu 5/5 Kelas II m³ 1.14 9,138,353.40 11,459,495.16 0.66 1.14 0.66 - - 1.14 0.66 100.00
7 Pek. Rangka Atap Seng Multiroof m² 269.80 255,731.85 75,896,098.44 4.34 269.80 4.34 - - 269.80 4.34 100.00
8 Pek. Penutup Atap Seng Mulltiroof m² 269.80 153,094.59 45,435,412.42 2.60 269.80 2.60 - - 269.80 2.60 100.00
9 Pek. Bubungan Atap Seng Multiroof m¹ 49.50 206,556.57 11,247,005.24 0.64 49.50 0.64 - - 49.50 0.64 100.00
10 Pek. Listplank Papan Kayu Kelas -II m¹ 162.00 97,900.11 17,445,799.60 1.00 162.00 1.00 - - 162.00 1.00 100.00
11 Cat kayu (vernis) m² 359.88 72,224.11 28,591,213.98 1.64 359.88 1.64 - - 359.88 1.64 100.00
12 Pek. Lantai Keramik 40 cm x 40 cm m² 115.05 218,558.54 27,659,676.03 1.58 - - - - - - -
- -
D PEKERJAAN ELEKTRIKAL - -
1 Pasang Box Panel bh 1.00 40,606.04 44,666.64 0.00 - - - - - - -
2 Pasang MCB bh 2.00 71,860.34 158,092.75 0.01 - - - - - - -
3 Pas. Stop Kontak bh 24.00 191,410.56 5,053,238.78 0.29 - - - - - - -
4 Pas. Saklar Ganda bh 12.00 191,410.56 2,526,619.39 0.14 12.00 0.14 - - 12.00 0.14 100.00
5 Pas. Lampu jari-jari Philips 18 Watt Ttk 48.00 249,028.56 13,148,707.97 0.75 - - - - - - -
6 Pas. Kabel NYM m¹ 250.00 60,794.91 16,718,600.25 0.96 32.00 0.12 - - 32.00 0.12 12.80
7 Penyambungan Baru Listrik 2300VA ls 1.00 2,500,000.00 2,750,000.00 0.16 - - - - - - -
- -
IV PEKERJAAN JAMBAN - -
A PEKERJAAN TANAH DAN PONDASI - -
1 Galian Tanah Pondasi Jalur m³ 17.13 119,245.50 2,246,942.96 0.13 17.13 0.13 - - 17.13 0.13 100.00
2 Urugan Pasir bawah Pondasi m³ 1.32 464,092.20 673,861.87 0.04 1.32 0.04 - - 1.32 0.04 100.00
3 Urugan pasir bawah Lantai m³ 0.73 464,092.20 372,666.04 0.02 0.73 0.02 - - 0.73 0.02 100.00
4 Urugan Tanah Gal. Tanah Kembali m³ 4.28 39,748.50 187,135.94 0.01 4.28 0.01 - - 4.28 0.01 100.00
5 Urugan Tanah Bawah Lantai m³ 3.53 387,941.40 1,506,376.46 0.09 3.53 0.09 - - 3.53 0.09 100.00
6 Pas. Pondasi Batu Kosong m³ 3.95 622,795.83 2,706,047.88 0.15 3.95 0.15 - - 3.95 0.15 100.00
7 Pas. Pondasi Batu Kali1:4 m³ 6.20 1,347,805.31 9,192,032.21 0.53 6.20 0.53 - - 6.20 0.53 100.00
- -
B PEKERJAAN BETON BERTULANG - -
1 Pekerjaan Sloof 15 cm x 20 cm - -
- Bekesting Sloof Beton m² 10.63 266,127.54 3,111,829.33 0.18 10.63 0.18 - - 10.63 0.18 100.00
- Tulangan Besi Beton U-24 Kg 54.16 13,577.42 808,888.37 0.05 54.16 0.05 - - 54.16 0.05 100.00
- Tulangan Besi Beton U-39 Kg 115.88 13,577.42 1,730,686.57 0.10 115.88 0.10 - - 115.88 0.10 100.00
- Beton K-175 m³ 0.87 1,548,974.64 1,482,368.73 0.08 0.87 0.08 - - 0.87 0.08 100.00
2 Pekerjaan Kolom 20 x 20 cm - -
- Bekesting Sloof Beton m² 7.92 476,031.60 4,147,187.30 0.24 7.92 0.24 - - 7.92 0.24 100.00
- Tulangan Besi Beton U-24 Kg 17.82 13,577.42 266,144.59 0.02 17.82 0.02 - - 17.82 0.02 100.00
- Tulangan Besi Beton U-39 Kg 38.13 13,577.42 569,477.73 0.03 38.13 0.03 - - 38.13 0.03 100.00
- Beton K-175 m³ 0.36 1,548,974.64 613,393.96 0.04 0.36 0.04 - - 0.36 0.04 100.00
3 Pekerjaan Ring Balok 15 x 25 cm - -
- - Bekesting Sloof Beton m² 3.04 487,368.09 1,629,758.89 0.09 3.04 0.09 - - 3.04 0.09 100.00
- - Tulangan Besi Beton U-24 Kg 91.62 13,577.42 1,368,359.54 0.08 91.62 0.08 - - 91.62 0.08 100.00
- - Tulangan Besi Beton U-39 Kg 232.32 13,577.42 3,469,736.84 0.20 232.32 0.20 - - 232.32 0.20 100.00
- - Beton K-175 m³ 1.14 1,548,974.64 1,942,414.20 0.11 1.14 0.11 - - 1.14 0.11 100.00
4 Pekerjaan Kanopi Beton - -
- Bakesting kanopi Beton m² 3.90 615,423.60 2,640,167.24 0.15 3.90 0.15 - - 3.90 0.15 100.00
- Tulangan Besi Beton U-24 Kg 28.87 13,577.42 431,178.13 0.02 28.87 0.02 - - 28.87 0.02 100.00
- Beton K-175 m³ 0.16 1,548,974.64 272,619.54 0.02 0.16 0.02 - - 0.16 0.02 100.00
5 Pek. Ring balok Praktis 10cm x 15 cm m¹ 60.40 137,872.75 9,160,265.51 0.52 60.40 0.52 - - 60.40 0.52 100.00
- -
C PEKERJAAN DINDING DAN LANTAI - -
1 Pas. Dinding 1/2 bata 1:4 m² 57.15 173,035.17 10,877,855.96 0.62 57.15 0.62 - - 57.15 0.62 100.00
2 Pek. Plesteran Dinding 1/2 Bata Camp 1:4 m² 114.29 102,101.29 12,836,072.08 0.73 114.29 0.73 - - 114.29 0.73 100.00
3 Pek. Plesteran Pondasi, Sloof dan Kolom Camp 1:3 m² 20.07 104,806.10 2,313,804.27 0.13 20.07 0.13 - - 20.07 0.13 100.00
4 Acian Dinding, Sloof Dan kolom m² 134.36 58,409.51 8,632,691.94 0.49 134.36 0.49 - - 134.36 0.49 100.00
5 Cat Dinding m² 134.36 41,336.13 6,109,314.67 0.35 67.18 0.17 - - 67.18 0.17 50.00
6 Pas. Lantai Beton tumbuk, Camp 1:3:5 m³ 1.17 1,394,762.22 1,795,058.98 0.10 1.17 0.10 - - 1.17 0.10 100.00
7 Pas. Dindinig Keramik 20x25 cm m² 27.74 384,208.13 11,723,726.88 0.67 27.74 0.67 - - 27.74 0.67 100.00
8 Pas. Lantai Keramik 20x20 cm (texture kasar) m² 15.68 339,673.58 5,858,689.91 0.34 7.84 0.17 - - 7.84 0.17 50.00
- -
D PEKERJAAN PLAFOND - -
1 Pas. Rangka Plafond Kayu 5/5 Kelas II m² 27.28 140,332.01 4,211,082.96 0.24 27.28 0.24 - - 27.28 0.24 100.00
2 Pas. Penutup Plafond Tripleks 4 mm m² 27.28 61,181.51 1,835,934.75 0.11 27.28 0.11 - - 27.28 0.11 100.00
3 Pas. List Profil Plafond m¹ 61.56 29,917.80 2,025,913.74 0.12 - - - - - - -
4 Cat Plafond m² 27.23 41,336.13 1,240,414.59 0.07 27.23 0.07 - - 27.23 0.07 100.00
- -
E PEKERJAAN KUSEN, PINTU DAN JENDELA - -
1 Pas. Kusen Pintu, Kayu 8/12 kelas I m³ 0.18 11,609,744.85 2,298,729.48 0.13 0.18 0.13 - - 0.18 0.13 100.00
2 Pas. Kusen Ventilasi Atap, Kayu 5/10 Kelas II m³ 0.03 8,307,283.05 274,140.34 0.02 0.03 0.02 - - 0.03 0.02 100.00
3 Pas. Daun Pintu Panel Kayu Kelas I m² 4.86 1,007,384.40 5,385,477.00 0.31 4.86 0.31 - - 4.86 0.31 100.00
4 Pas. Kisi-kisi Ventilasi Atap, Kayu Kelas II m¹ 0.44 701,649.63 339,598.42 0.02 0.44 0.02 - - 0.44 0.02 100.00
5 Cat Kusen, Pintu & Listplank m² 7.28 72,224.11 578,370.67 0.03 6.07 0.03 - - 6.07 0.03 83.33
6 Pas. Kunci Pintu bh 4.00 160,991.20 708,364.01 0.04 4.00 0.04 - - 4.00 0.04 100.00
7 Pas. Engsel Pintu bh 12.00 188,054.96 2,482,325.47 0.14 12.00 0.14 - - 12.00 0.14 100.00
8 Pas. Grendel Pintu bh 4.00 55,164.78 242,725.03 0.01 4.00 0.01 - - 4.00 0.01 100.00
- -
F PEKERJAAN ATAP - -
1 Pas. Kuda-kuda Kayu 5/10 Kayu Kelas II m³ 0.23 9,735,372.90 2,463,049.34 0.14 0.23 0.14 - - 0.23 0.14 100.00
2 Pas. Gording Kayu 5/5 Kayu Kelas II m³ 0.21 9,138,353.40 2,110,959.64 0.12 0.21 0.12 - - 0.21 0.12 100.00
3 Pas. Blk. Kasau Dan Ring, Kayu Kelas II m² 56.88 255,731.85 16,000,630.39 0.92 56.88 0.92 - - 56.88 0.92 100.00
4 Pas. Atap Genteng Multiroof BJLS 0.25mm m² 56.88 153,094.59 9,578,822.31 0.55 56.88 0.55 - - 56.88 0.55 100.00
5 Pas. Bubungan Atap Seng Multiroof m¹ 16.15 206,556.57 3,669,477.47 0.21 16.15 0.21 - - 16.15 0.21 100.00
6 Pas. Listplank Kayu Kelas II m¹ 23.32 97,900.11 2,511,333.62 0.14 23.32 0.14 - - 23.32 0.14 100.00
- -
G PEKERJAAN SANITASI - -
1 Pek. Septicktank ls 1.00 6,500,000.00 7,150,000.00 0.41 1.00 0.41 - - 1.00 0.41 100.00
2 Pek. Bak Air ls 4.00 1,000,000.00 4,400,000.00 0.25 4.00 0.25 - - 4.00 0.25 100.00
3 Pas. Pipa Air Bersih PVC AW 1/2' m¹ 30.00 25,049.18 826,622.94 0.05 30.00 0.05 - - 30.00 0.05 100.00
4 Pas. Pipa Tinja PVC 4" m¹ 6.00 128,422.21 847,586.59 0.05 6.00 0.05 - - 6.00 0.05 100.00
5 Pas. Pipa Air Kotor PVC 2" m¹ 6.00 55,541.03 366,570.80 0.02 6.00 0.02 - - 6.00 0.02 100.00
6 Pas. Floor Drain bh 4.00 315,717.93 1,389,158.89 0.08 4.00 0.08 - - 4.00 0.08 100.00
7 Pas. Kloset Jongkok bh 4.00 977,829.93 4,302,451.69 0.25 4.00 0.25 - - 4.00 0.25 100.00
8 Pas. Keran Air Km//Wc bh 4.00 86,434.43 380,311.49 0.02 4.00 0.02 - - 4.00 0.02 100.00
9 Penyambungan Baru Air PDAM ls 1.00 3,000,000.00 3,300,000.00 0.19 - - - - - - -
- -
H PEKERJAAN SEPTICTANK DAN REMBESAN - -
1 Pas. Galian tanah m³ 5.52 119,245.50 724,058.68 0.04 5.52 0.04 - - 5.52 0.04 100.00
2 Pas. Galian Pasir m³ 0.42 464,092.20 214,410.60 0.01 0.42 0.01 - - 0.42 0.01 100.00
3 Pas. Dinding Batu Bata, Camp 1:3 m² 14.66 177,809.74 2,867,359.87 0.16 14.66 0.16 - - 14.66 0.16 100.00
4 Plesteran Dinding & Lantai, Camp 1:3 m² 31.28 104,806.10 3,606,168.29 0.21 31.28 0.21 - - 31.28 0.21 100.00
5 Acian Dinding & Lantai m² 31.28 58,409.51 2,009,754.42 0.11 31.28 0.11 - - 31.28 0.11 100.00
6 Pek. Beton Penutup Septictank - -
- - Bekesting m² 3.68 615,423.60 2,491,234.73 0.14 3.68 0.14 - - 3.68 0.14 100.00
- - Tulangan Besi Beton U-24 Kg 24.29 13,577.42 362,775.08 0.02 24.29 0.02 - - 24.29 0.02 100.00
- - Beton K-200 m³ 0.34 1,599,057.76 598,047.60 0.03 0.34 0.03 - - 0.34 0.03 100.00
7 Pas. Pipa Hawa / Vent. Gip 2" m¹ 2.80 170,629.77 525,539.69 0.03 2.80 0.03 - - 2.80 0.03 100.00
8 Pas. Batu Kosong m¹ 0.54 622,795.83 369,940.72 0.02 0.54 0.02 - - 0.54 0.02 100.00
- -
I PEKERJAAN ELEKTRIKAL - -
1 Pas. Saklar Tunggal bh 4.00 143,557.92 631,654.85 0.04 4.00 0.04 - - 4.00 0.04 100.00
2 Pas. Saklar Ganda bh 2.00 249,028.56 421,103.23 0.02 2.00 0.02 - - 2.00 0.02 100.00
3 Pas. Lampu Philipps Jari-jari 18 Watt m¹ 8.00 21,879.00 2,191,451.33 0.13 - - - - - - -
4 Pas. Pipa Instalasi Listrik m¹ 20.00 60,794.91 481,338.00 0.03 20.00 0.03 - - 20.00 0.03 100.00
5 Pas. Kabel NYM m¹ 40.00 60,794.91 2,674,976.04 0.15 40.00 0.15 - - 40.00 0.15 100.00
- -
J PEKERJAAN LANTAI PAVING - -
1 Urugan Pasir Bawah Paving m³ 92.24 464,092.20 47,088,650.98 2.69 67.12 1.96 25.12 0.73 92.24 2.69 100.00
2 Pas. Paving Blok K-300 m² 1,844.78 349,061.13 708,335,090.54 40.51 1,697.39 37.27 147.39 3.24 1,844.78 40.51 100.00
3 CAT Paving m² 1,844.79 41,336.13 83,881,672.49 4.80 - - - - - - -
SHAIFUDDIN ZUHRI
ROSITA TAUDA, ST,MT
USMAN, S.T.
NIP. 19800101 2008032 002 SITE ENGINEER
DOKUMENTASI PELAKSANAAN
PEMBANGUNAN FASILITAS LAHAN PARKIR DERMAGA SEMUT MANGGA DUA
KONSULTAN PENGAWASAN
CV. ARCHIVIL ENGGINEERING
DOKUMENTASI PELAKSANAAN
PEMBANGUNAN FASILITAS LAHAN PARKIR DERMAGA SEMUT MANGGA DUA
KONSULTAN PENGAWASAN
CV. USRAH
DOKUMENTASI PELAKSANAAN
PEMBANGUNAN FASILITAS LAHAN PARKIR DERMAGA SEMUT MANGGA DUA
KONSULTAN PENGAWASAN
CV. USRAH
PROGRES MINGGUAN
MINGGU KE 17 PERIODE : 22 OKTOBER S/D 28 OKTOBER 2018
NO KONTRAK : NO KONTRAK :
TANGGAL : TANGGAL :
WAKTU PELAKSANAAN : WAKTU PELAKSANAAN :
BOBOT
TERHADAP
Harga satuan Jumlah Harga
No Uraian Pekerjaan Satuan Volume BOBOT % MINGGU LALU MINGGU INI SAMPAI MINGGU INI ITEM
(Rp.) (Rp.) PEKERJAAN
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT (%)
I Pekerjaan Persiapan
1 Papan Nama Proyek bh 1.00 599,139.75 659,053.73 0.04 1.00 0.04 - - 1.00 0.04 100.00
2 Penyedia Air Kerja ls 1.00 3,200,000.00 3,520,000.00 0.20 1.00 0.20 - - 1.00 0.20 100.00
3 Penyedia Listrik Kerja ls 1.00 2,250,000.00 2,475,000.00 0.14 1.00 0.14 - - 1.00 0.14 100.00
4 Pembuatan Direksi Keed Dan Gudang m² 6.00 1,651,423.95 10,899,398.07 0.62 6.00 0.62 - - 6.00 0.62 100.00
5 Pengukuran Dan Pemasangan Bowplank ls 1.00 88,384.23 97,222.65 0.01 1.00 0.01 - - 1.00 0.01 100.00
6 Dokumentasi Dan Pelaporan ls 1.00 4,500,000.00 4,950,000.00 0.28 - - - - - - -
7 As Built Drawing ls 1.00 5,215,000.00 5,736,500.00 0.33 - - - - - - -
8 Pembersihan Akhir ls 1.00 4,050,000.00 4,455,000.00 0.25 - - - - - - -
II PEKERJAAN TAMAN
A Pekerjaan Pasangan
1 Pas. Dinding Batu Bata, 1:3 m³ 60.00 179,605.80 4,506,410.05 0.26 60.00 0.26 - - 60.00 0.26 100.00
2 Pas. Beton Tumbuk m³ 5.06 1,394,762.22 7,763,246.52 0.44 5.06 0.44 - - 5.06 0.44 100.00
3 Pas. Plesteran, Camp. 1 :3 m² 60.00 104,806.10 6,917,202.60 0.40 60.00 0.40 - - 60.00 0.40 100.00
4 Pas. Acian Dinding m² 60.00 58,409.51 3,855,027.66 0.22 20.20 0.07 39.80 0.15 60.00 0.22 100.00
5 Cat m² 60.00 41,336.13 2,728,184.58 0.16 - - - - - - -
D PEKERJAAN ELEKTRIKAL
1 Pasang Box Panel bh 1.00 40,606.04 44,666.64 0.00 - - - - - - -
2 Pasang MCB bh 2.00 71,860.34 158,092.75 0.01 - - - - - - -
3 Pas. Stop Kontak bh 24.00 191,410.56 5,053,238.78 0.29 - - - - - - -
4 Pas. Saklar Ganda bh 12.00 191,410.56 2,526,619.39 0.14 12.00 0.14 - - 12.00 0.14 100.00
5 Pas. Lampu jari-jari Philips 18 Watt Ttk 48.00 249,028.56 13,148,707.97 0.75 - - - - - - -
6 Pas. Kabel NYM m¹ 250.00 60,794.91 16,718,600.25 0.96 32.00 0.12 - - 32.00 0.12 12.80
7 Penyambungan Baru Listrik 2300VA ls 1.00 2,500,000.00 2,750,000.00 0.16 - - - - - - -
IV PEKERJAAN JAMBAN
A PEKERJAAN TANAH DAN PONDASI
1 Galian Tanah Pondasi Jalur m³ 17.13 119,245.50 2,246,942.96 0.13 17.13 0.13 - - 17.13 0.13 100.00
2 Urugan Pasir bawah Pondasi m³ 1.32 464,092.20 673,861.87 0.04 1.32 0.04 - - 1.32 0.04 100.00
3 Urugan pasir bawah Lantai m³ 0.73 464,092.20 372,666.04 0.02 0.73 0.02 - - 0.73 0.02 100.00
4 Urugan Tanah Gal. Tanah Kembali m³ 4.28 39,748.50 187,135.94 0.01 4.28 0.01 - - 4.28 0.01 100.00
5 Urugan Tanah Bawah Lantai m³ 3.53 387,941.40 1,506,376.46 0.09 3.53 0.09 - - 3.53 0.09 100.00
6 Pas. Pondasi Batu Kosong m³ 3.95 622,795.83 2,706,047.88 0.15 3.95 0.15 - - 3.95 0.15 100.00
7 Pas. Pondasi Batu Kali1:4 m³ 6.20 1,347,805.31 9,192,032.21 0.53 6.20 0.53 - - 6.20 0.53 100.00
D PEKERJAAN PLAFOND
1 Pas. Rangka Plafond Kayu 5/5 Kelas II m² 27.28 140,332.01 4,211,082.96 0.24 27.28 0.24 - - 27.28 0.24 100.00
2 Pas. Penutup Plafond Tripleks 4 mm m² 27.28 61,181.51 1,835,934.75 0.11 27.28 0.11 - - 27.28 0.11 100.00
3 Pas. List Profil Plafond m¹ 61.56 29,917.80 2,025,913.74 0.12 - - - - - - -
4 Cat Plafond m² 27.23 41,336.13 1,240,414.59 0.07 27.23 0.07 - - 27.23 0.07 100.00
F PEKERJAAN ATAP
1 Pas. Kuda-kuda Kayu 5/10 Kayu Kelas II m³ 0.23 9,735,372.90 2,463,049.34 0.14 0.23 0.14 - - 0.23 0.14 100.00
2 Pas. Gording Kayu 5/5 Kayu Kelas II m³ 0.21 9,138,353.40 2,110,959.64 0.12 0.21 0.12 - - 0.21 0.12 100.00
3 Pas. Blk. Kasau Dan Ring, Kayu Kelas II m² 56.88 255,731.85 16,000,630.39 0.92 56.88 0.92 - - 56.88 0.92 100.00
4 Pas. Atap Genteng Multiroof BJLS 0.25mm m² 56.88 153,094.59 9,578,822.31 0.55 56.88 0.55 - - 56.88 0.55 100.00
5 Pas. Bubungan Atap Seng Multiroof m¹ 16.15 206,556.57 3,669,477.47 0.21 16.15 0.21 - - 16.15 0.21 100.00
6 Pas. Listplank Kayu Kelas II m¹ 23.32 97,900.11 2,511,333.62 0.14 23.32 0.14 - - 23.32 0.14 100.00
G PEKERJAAN SANITASI
1 Pek. Septicktank ls 1.00 6,500,000.00 7,150,000.00 0.41 1.00 0.41 - - 1.00 0.41 100.00
2 Pek. Bak Air ls 4.00 1,000,000.00 4,400,000.00 0.25 4.00 0.25 - - 4.00 0.25 100.00
3 Pas. Pipa Air Bersih PVC AW 1/2' m¹ 30.00 25,049.18 826,622.94 0.05 30.00 0.05 - - 30.00 0.05 100.00
4 Pas. Pipa Tinja PVC 4" m¹ 6.00 128,422.21 847,586.59 0.05 6.00 0.05 - - 6.00 0.05 100.00
5 Pas. Pipa Air Kotor PVC 2" m¹ 6.00 55,541.03 366,570.80 0.02 6.00 0.02 - - 6.00 0.02 100.00
6 Pas. Floor Drain bh 4.00 315,717.93 1,389,158.89 0.08 4.00 0.08 - - 4.00 0.08 100.00
7 Pas. Kloset Jongkok bh 4.00 977,829.93 4,302,451.69 0.25 4.00 0.25 - - 4.00 0.25 100.00
8 Pas. Keran Air Km//Wc bh 4.00 86,434.43 380,311.49 0.02 4.00 0.02 - - 4.00 0.02 100.00
9 Penyambungan Baru Air PDAM ls 1.00 3,000,000.00 3,300,000.00 0.19 - - - - - - -
I PEKERJAAN ELEKTRIKAL
1 Pas. Saklar Tunggal bh 4.00 143,557.92 631,654.85 0.04 - - - - - - -
2 Pas. Saklar Ganda bh 2.00 249,028.56 421,103.23 0.02 - - - - - - -
3 Pas. Lampu Philipps Jari-jari 18 Watt m¹ 8.00 21,879.00 2,191,451.33 0.13 - - - - - - -
4 Pas. Pipa Instalasi Listrik m¹ 20.00 60,794.91 481,338.00 0.03 - - - - - - -
5 Pas. Kabel NYM m¹ 40.00 60,794.91 2,674,976.04 0.15 - - - - - - -
J PEKERJAAN LANTAI PAVING
1 Urugan Pasir Bawah Paving m³ 92.24 464,092.20 47,088,650.98 2.69 46.12 1.35 21.00 0.61 67.12 1.96 72.77
2 Pas. Paving Blok K-300 m² 1,844.78 349,061.13 708,335,090.54 40.51 922.39 20.26 400.00 8.78 1,322.39 29.04 71.68
3 CAT Paving m² 1,844.79 41,336.13 83,881,672.49 4.80 - - - - - - -
SHAIFUDDIN ZUHRI
ROSITA TAUDA, ST,MT
USMAN, S.T.
NIP. 19800101 2008032 002 SITE ENGINEER
PROGRES MINGGUAN
MINGGU KE 18 PERIODE : 29 OKTOBER S/D 04 NOVEMBER 2018
NO KONTRAK : NO KONTRAK :
TANGGAL : TANGGAL :
WAKTU PELAKSANAAN : WAKTU PELAKSANAAN :
BOBOT
TERHADAP
Harga satuan Jumlah Harga
No Uraian Pekerjaan Satuan Volume BOBOT % MINGGU LALU MINGGU INI SAMPAI MINGGU INI ITEM
(Rp.) (Rp.) PEKERJAAN
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT (%)
I Pekerjaan Persiapan
1 Papan Nama Proyek bh 1.00 599,139.75 659,053.73 0.04 1.00 0.04 - - 1.00 0.04 100.00
2 Penyedia Air Kerja ls 1.00 3,200,000.00 3,520,000.00 0.20 1.00 0.20 - - 1.00 0.20 100.00
3 Penyedia Listrik Kerja ls 1.00 2,250,000.00 2,475,000.00 0.14 1.00 0.14 - - 1.00 0.14 100.00
4 Pembuatan Direksi Keed Dan Gudang m² 6.00 1,651,423.95 10,899,398.07 0.62 6.00 0.62 - - 6.00 0.62 100.00
5 Pengukuran Dan Pemasangan Bowplank ls 1.00 88,384.23 97,222.65 0.01 1.00 0.01 - - 1.00 0.01 100.00
6 Dokumentasi Dan Pelaporan ls 1.00 4,500,000.00 4,950,000.00 0.28 - - - - - - -
7 As Built Drawing ls 1.00 5,215,000.00 5,736,500.00 0.33 - - - - - - -
8 Pembersihan Akhir ls 1.00 4,050,000.00 4,455,000.00 0.25 - - - - - - -
II PEKERJAAN TAMAN
A Pekerjaan Pasangan
1 Pas. Dinding Batu Bata, 1:3 m³ 60.00 179,605.80 4,506,410.05 0.26 60.00 0.26 - - 60.00 0.26 100.00
2 Pas. Beton Tumbuk m³ 5.06 1,394,762.22 7,763,246.52 0.44 5.06 0.44 - - 5.06 0.44 100.00
3 Pas. Plesteran, Camp. 1 :3 m² 60.00 104,806.10 6,917,202.60 0.40 60.00 0.40 - - 60.00 0.40 100.00
4 Pas. Acian Dinding m² 60.00 58,409.51 3,855,027.66 0.22 20.20 0.07 39.80 0.15 60.00 0.22 100.00
5 Cat m² 60.00 41,336.13 2,728,184.58 0.16 - - - - - - -
D PEKERJAAN ELEKTRIKAL
1 Pasang Box Panel bh 1.00 40,606.04 44,666.64 0.00 - - - - - - -
2 Pasang MCB bh 2.00 71,860.34 158,092.75 0.01 - - - - - - -
3 Pas. Stop Kontak bh 24.00 191,410.56 5,053,238.78 0.29 - - - - - - -
4 Pas. Saklar Ganda bh 12.00 191,410.56 2,526,619.39 0.14 12.00 0.14 - - 12.00 0.14 100.00
5 Pas. Lampu jari-jari Philips 18 Watt Ttk 48.00 249,028.56 13,148,707.97 0.75 - - - - - - -
6 Pas. Kabel NYM m¹ 250.00 60,794.91 16,718,600.25 0.96 32.00 0.12 - - 32.00 0.12 12.80
7 Penyambungan Baru Listrik 2300VA ls 1.00 2,500,000.00 2,750,000.00 0.16 - - - - - - -
IV PEKERJAAN JAMBAN
A PEKERJAAN TANAH DAN PONDASI
1 Galian Tanah Pondasi Jalur m³ 17.13 119,245.50 2,246,942.96 0.13 17.13 0.13 - - 17.13 0.13 100.00
2 Urugan Pasir bawah Pondasi m³ 1.32 464,092.20 673,861.87 0.04 1.32 0.04 - - 1.32 0.04 100.00
3 Urugan pasir bawah Lantai m³ 0.73 464,092.20 372,666.04 0.02 0.73 0.02 - - 0.73 0.02 100.00
4 Urugan Tanah Gal. Tanah Kembali m³ 4.28 39,748.50 187,135.94 0.01 4.28 0.01 - - 4.28 0.01 100.00
5 Urugan Tanah Bawah Lantai m³ 3.53 387,941.40 1,506,376.46 0.09 3.53 0.09 - - 3.53 0.09 100.00
6 Pas. Pondasi Batu Kosong m³ 3.95 622,795.83 2,706,047.88 0.15 3.95 0.15 - - 3.95 0.15 100.00
7 Pas. Pondasi Batu Kali1:4 m³ 6.20 1,347,805.31 9,192,032.21 0.53 6.20 0.53 - - 6.20 0.53 100.00
D PEKERJAAN PLAFOND
1 Pas. Rangka Plafond Kayu 5/5 Kelas II m² 27.28 140,332.01 4,211,082.96 0.24 27.28 0.24 - - 27.28 0.24 100.00
2 Pas. Penutup Plafond Tripleks 4 mm m² 27.28 61,181.51 1,835,934.75 0.11 27.28 0.11 - - 27.28 0.11 100.00
3 Pas. List Profil Plafond m¹ 61.56 29,917.80 2,025,913.74 0.12 - - - - - - -
4 Cat Plafond m² 27.23 41,336.13 1,240,414.59 0.07 27.23 0.07 - - 27.23 0.07 100.00
F PEKERJAAN ATAP
1 Pas. Kuda-kuda Kayu 5/10 Kayu Kelas II m³ 0.23 9,735,372.90 2,463,049.34 0.14 0.23 0.14 - - 0.23 0.14 100.00
2 Pas. Gording Kayu 5/5 Kayu Kelas II m³ 0.21 9,138,353.40 2,110,959.64 0.12 0.21 0.12 - - 0.21 0.12 100.00
3 Pas. Blk. Kasau Dan Ring, Kayu Kelas II m² 56.88 255,731.85 16,000,630.39 0.92 56.88 0.92 - - 56.88 0.92 100.00
4 Pas. Atap Genteng Multiroof BJLS 0.25mm m² 56.88 153,094.59 9,578,822.31 0.55 56.88 0.55 - - 56.88 0.55 100.00
5 Pas. Bubungan Atap Seng Multiroof m¹ 16.15 206,556.57 3,669,477.47 0.21 16.15 0.21 - - 16.15 0.21 100.00
6 Pas. Listplank Kayu Kelas II m¹ 23.32 97,900.11 2,511,333.62 0.14 23.32 0.14 - - 23.32 0.14 100.00
G PEKERJAAN SANITASI
1 Pek. Septicktank ls 1.00 6,500,000.00 7,150,000.00 0.41 1.00 0.41 - - 1.00 0.41 100.00
2 Pek. Bak Air ls 4.00 1,000,000.00 4,400,000.00 0.25 4.00 0.25 - - 4.00 0.25 100.00
3 Pas. Pipa Air Bersih PVC AW 1/2' m¹ 30.00 25,049.18 826,622.94 0.05 30.00 0.05 - - 30.00 0.05 100.00
4 Pas. Pipa Tinja PVC 4" m¹ 6.00 128,422.21 847,586.59 0.05 6.00 0.05 - - 6.00 0.05 100.00
5 Pas. Pipa Air Kotor PVC 2" m¹ 6.00 55,541.03 366,570.80 0.02 6.00 0.02 - - 6.00 0.02 100.00
6 Pas. Floor Drain bh 4.00 315,717.93 1,389,158.89 0.08 4.00 0.08 - - 4.00 0.08 100.00
7 Pas. Kloset Jongkok bh 4.00 977,829.93 4,302,451.69 0.25 4.00 0.25 - - 4.00 0.25 100.00
8 Pas. Keran Air Km//Wc bh 4.00 86,434.43 380,311.49 0.02 4.00 0.02 - - 4.00 0.02 100.00
9 Penyambungan Baru Air PDAM ls 1.00 3,000,000.00 3,300,000.00 0.19 - - - - - - -
I PEKERJAAN ELEKTRIKAL
1 Pas. Saklar Tunggal bh 4.00 143,557.92 631,654.85 0.04 - - - - - - -
2 Pas. Saklar Ganda bh 2.00 249,028.56 421,103.23 0.02 - - - - - - -
3 Pas. Lampu Philipps Jari-jari 18 Watt m¹ 8.00 21,879.00 2,191,451.33 0.13 - - - - - - -
4 Pas. Pipa Instalasi Listrik m¹ 20.00 60,794.91 481,338.00 0.03 - - - - - - -
5 Pas. Kabel NYM m¹ 40.00 60,794.91 2,674,976.04 0.15 - - - - - - -
J PEKERJAAN LANTAI PAVING
1 Urugan Pasir Bawah Paving m³ 92.24 464,092.20 47,088,650.98 2.69 46.12 1.35 21.00 0.61 67.12 1.96 72.77
2 Pas. Paving Blok K-300 m² 1,844.78 349,061.13 708,335,090.54 40.51 922.39 20.26 400.00 8.78 1,322.39 29.04 71.68
3 CAT Paving m² 1,844.79 41,336.13 83,881,672.49 4.80 - - - - - - -
SHAIFUDDIN ZUHRI
ROSITA TAUDA, ST,MT
USMAN, S.T.
NIP. 19800101 2008032 002 SITE ENGINEER
PROGRES MINGGUAN
MINGGU KE 19 PERIODE : 05 NOVEMBER S/D 11 NOVEMBER 2018
NO KONTRAK : NO KONTRAK :
TANGGAL : TANGGAL :
WAKTU PELAKSANAAN : WAKTU PELAKSANAAN :
BOBOT
TERHADAP
Harga satuan Jumlah Harga
No Uraian Pekerjaan Satuan Volume BOBOT % MINGGU LALU MINGGU INI SAMPAI MINGGU INI ITEM
(Rp.) (Rp.) PEKERJAAN
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT (%)
I Pekerjaan Persiapan
1 Papan Nama Proyek bh 1.00 599,139.75 659,053.73 0.04 1.00 0.04 - - 1.00 0.04 100.00
2 Penyedia Air Kerja ls 1.00 3,200,000.00 3,520,000.00 0.20 1.00 0.20 - - 1.00 0.20 100.00
3 Penyedia Listrik Kerja ls 1.00 2,250,000.00 2,475,000.00 0.14 1.00 0.14 - - 1.00 0.14 100.00
4 Pembuatan Direksi Keed Dan Gudang m² 6.00 1,651,423.95 10,899,398.07 0.62 6.00 0.62 - - 6.00 0.62 100.00
5 Pengukuran Dan Pemasangan Bowplank ls 1.00 88,384.23 97,222.65 0.01 1.00 0.01 - - 1.00 0.01 100.00
6 Dokumentasi Dan Pelaporan ls 1.00 4,500,000.00 4,950,000.00 0.28 - - - - - - -
7 As Built Drawing ls 1.00 5,215,000.00 5,736,500.00 0.33 - - - - - - -
8 Pembersihan Akhir ls 1.00 4,050,000.00 4,455,000.00 0.25 - - - - - - -
II PEKERJAAN TAMAN
A Pekerjaan Pasangan
1 Pas. Dinding Batu Bata, 1:3 m³ 60.00 179,605.80 4,506,410.05 0.26 60.00 0.26 - - 60.00 0.26 100.00
2 Pas. Beton Tumbuk m³ 5.06 1,394,762.22 7,763,246.52 0.44 5.06 0.44 - - 5.06 0.44 100.00
3 Pas. Plesteran, Camp. 1 :3 m² 60.00 104,806.10 6,917,202.60 0.40 60.00 0.40 - - 60.00 0.40 100.00
4 Pas. Acian Dinding m² 60.00 58,409.51 3,855,027.66 0.22 20.20 0.07 39.80 0.15 60.00 0.22 100.00
5 Cat m² 60.00 41,336.13 2,728,184.58 0.16 - - - - - - -
D PEKERJAAN ELEKTRIKAL
1 Pasang Box Panel bh 1.00 40,606.04 44,666.64 0.00 - - - - - - -
2 Pasang MCB bh 2.00 71,860.34 158,092.75 0.01 - - - - - - -
3 Pas. Stop Kontak bh 24.00 191,410.56 5,053,238.78 0.29 - - - - - - -
4 Pas. Saklar Ganda bh 12.00 191,410.56 2,526,619.39 0.14 12.00 0.14 - - 12.00 0.14 100.00
5 Pas. Lampu jari-jari Philips 18 Watt Ttk 48.00 249,028.56 13,148,707.97 0.75 - - - - - - -
6 Pas. Kabel NYM m¹ 250.00 60,794.91 16,718,600.25 0.96 32.00 0.12 - - 32.00 0.12 12.80
7 Penyambungan Baru Listrik 2300VA ls 1.00 2,500,000.00 2,750,000.00 0.16 - - - - - - -
IV PEKERJAAN JAMBAN
A PEKERJAAN TANAH DAN PONDASI
1 Galian Tanah Pondasi Jalur m³ 17.13 119,245.50 2,246,942.96 0.13 17.13 0.13 - - 17.13 0.13 100.00
2 Urugan Pasir bawah Pondasi m³ 1.32 464,092.20 673,861.87 0.04 1.32 0.04 - - 1.32 0.04 100.00
3 Urugan pasir bawah Lantai m³ 0.73 464,092.20 372,666.04 0.02 0.73 0.02 - - 0.73 0.02 100.00
4 Urugan Tanah Gal. Tanah Kembali m³ 4.28 39,748.50 187,135.94 0.01 4.28 0.01 - - 4.28 0.01 100.00
5 Urugan Tanah Bawah Lantai m³ 3.53 387,941.40 1,506,376.46 0.09 3.53 0.09 - - 3.53 0.09 100.00
6 Pas. Pondasi Batu Kosong m³ 3.95 622,795.83 2,706,047.88 0.15 3.95 0.15 - - 3.95 0.15 100.00
7 Pas. Pondasi Batu Kali1:4 m³ 6.20 1,347,805.31 9,192,032.21 0.53 6.20 0.53 - - 6.20 0.53 100.00
D PEKERJAAN PLAFOND
1 Pas. Rangka Plafond Kayu 5/5 Kelas II m² 27.28 140,332.01 4,211,082.96 0.24 27.28 0.24 - - 27.28 0.24 100.00
2 Pas. Penutup Plafond Tripleks 4 mm m² 27.28 61,181.51 1,835,934.75 0.11 27.28 0.11 - - 27.28 0.11 100.00
3 Pas. List Profil Plafond m¹ 61.56 29,917.80 2,025,913.74 0.12 - - - - - - -
4 Cat Plafond m² 27.23 41,336.13 1,240,414.59 0.07 27.23 0.07 - - 27.23 0.07 100.00
F PEKERJAAN ATAP
1 Pas. Kuda-kuda Kayu 5/10 Kayu Kelas II m³ 0.23 9,735,372.90 2,463,049.34 0.14 0.23 0.14 - - 0.23 0.14 100.00
2 Pas. Gording Kayu 5/5 Kayu Kelas II m³ 0.21 9,138,353.40 2,110,959.64 0.12 0.21 0.12 - - 0.21 0.12 100.00
3 Pas. Blk. Kasau Dan Ring, Kayu Kelas II m² 56.88 255,731.85 16,000,630.39 0.92 56.88 0.92 - - 56.88 0.92 100.00
4 Pas. Atap Genteng Multiroof BJLS 0.25mm m² 56.88 153,094.59 9,578,822.31 0.55 56.88 0.55 - - 56.88 0.55 100.00
5 Pas. Bubungan Atap Seng Multiroof m¹ 16.15 206,556.57 3,669,477.47 0.21 16.15 0.21 - - 16.15 0.21 100.00
6 Pas. Listplank Kayu Kelas II m¹ 23.32 97,900.11 2,511,333.62 0.14 23.32 0.14 - - 23.32 0.14 100.00
G PEKERJAAN SANITASI
1 Pek. Septicktank ls 1.00 6,500,000.00 7,150,000.00 0.41 1.00 0.41 - - 1.00 0.41 100.00
2 Pek. Bak Air ls 4.00 1,000,000.00 4,400,000.00 0.25 4.00 0.25 - - 4.00 0.25 100.00
3 Pas. Pipa Air Bersih PVC AW 1/2' m¹ 30.00 25,049.18 826,622.94 0.05 30.00 0.05 - - 30.00 0.05 100.00
4 Pas. Pipa Tinja PVC 4" m¹ 6.00 128,422.21 847,586.59 0.05 6.00 0.05 - - 6.00 0.05 100.00
5 Pas. Pipa Air Kotor PVC 2" m¹ 6.00 55,541.03 366,570.80 0.02 6.00 0.02 - - 6.00 0.02 100.00
6 Pas. Floor Drain bh 4.00 315,717.93 1,389,158.89 0.08 4.00 0.08 - - 4.00 0.08 100.00
7 Pas. Kloset Jongkok bh 4.00 977,829.93 4,302,451.69 0.25 4.00 0.25 - - 4.00 0.25 100.00
8 Pas. Keran Air Km//Wc bh 4.00 86,434.43 380,311.49 0.02 4.00 0.02 - - 4.00 0.02 100.00
9 Penyambungan Baru Air PDAM ls 1.00 3,000,000.00 3,300,000.00 0.19 - - - - - - -
I PEKERJAAN ELEKTRIKAL
1 Pas. Saklar Tunggal bh 4.00 143,557.92 631,654.85 0.04 - - - - - - -
2 Pas. Saklar Ganda bh 2.00 249,028.56 421,103.23 0.02 - - - - - - -
3 Pas. Lampu Philipps Jari-jari 18 Watt m¹ 8.00 21,879.00 2,191,451.33 0.13 - - - - - - -
4 Pas. Pipa Instalasi Listrik m¹ 20.00 60,794.91 481,338.00 0.03 - - - - - - -
5 Pas. Kabel NYM m¹ 40.00 60,794.91 2,674,976.04 0.15 - - - - - - -
J PEKERJAAN LANTAI PAVING
1 Urugan Pasir Bawah Paving m³ 92.24 464,092.20 47,088,650.98 2.69 46.12 1.35 21.00 0.61 67.12 1.96 72.77
2 Pas. Paving Blok K-300 m² 1,844.78 349,061.13 708,335,090.54 40.51 922.39 20.26 400.00 8.78 1,322.39 29.04 71.68
3 CAT Paving m² 1,844.79 41,336.13 83,881,672.49 4.80 - - - - - - -
SHAIFUDDIN ZUHRI
ROSITA TAUDA, ST,MT
USMAN, S.T.
NIP. 19800101 2008032 002 SITE ENGINEER
PROGRES MINGGUAN
MINGGU KE 18 PERIODE : 05 NOVEMBER S/D 11 NOVEMBER 2018
NO KONTRAK : NO KONTRAK :
TANGGAL : TANGGAL :
WAKTU PELAKSANAAN : WAKTU PELAKSANAAN :
BOBOT
TERHADAP
Harga satuan Jumlah Harga
No Uraian Pekerjaan Satuan Volume BOBOT % MINGGU LALU MINGGU INI SAMPAI MINGGU INI ITEM
(Rp.) (Rp.) PEKERJAAN
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT (%)
I Pekerjaan Persiapan
1 Papan Nama Proyek bh 1.00 599,139.75 659,053.73 0.04 1.00 0.04 - - 1.00 0.04 100.00
2 Penyedia Air Kerja ls 1.00 3,200,000.00 3,520,000.00 0.20 1.00 0.20 - - 1.00 0.20 100.00
3 Penyedia Listrik Kerja ls 1.00 2,250,000.00 2,475,000.00 0.14 1.00 0.14 - - 1.00 0.14 100.00
4 Pembuatan Direksi Keed Dan Gudang m² 6.00 1,651,423.95 10,899,398.07 0.62 6.00 0.62 - - 6.00 0.62 100.00
5 Pengukuran Dan Pemasangan Bowplank ls 1.00 88,384.23 97,222.65 0.01 1.00 0.01 - - 1.00 0.01 100.00
6 Dokumentasi Dan Pelaporan ls 1.00 4,500,000.00 4,950,000.00 0.28 - - - - - - -
7 As Built Drawing ls 1.00 5,215,000.00 5,736,500.00 0.33 - - - - - - -
8 Pembersihan Akhir ls 1.00 4,050,000.00 4,455,000.00 0.25 - - - - - - -
II PEKERJAAN TAMAN
A Pekerjaan Pasangan
1 Pas. Dinding Batu Bata, 1:3 m³ 60.00 179,605.80 4,506,410.05 0.26 60.00 0.26 - - 60.00 0.26 100.00
2 Pas. Beton Tumbuk m³ 5.06 1,394,762.22 7,763,246.52 0.44 5.06 0.44 - - 5.06 0.44 100.00
3 Pas. Plesteran, Camp. 1 :3 m² 60.00 104,806.10 6,917,202.60 0.40 60.00 0.40 - - 60.00 0.40 100.00
4 Pas. Acian Dinding m² 60.00 58,409.51 3,855,027.66 0.22 20.20 0.07 39.80 0.15 60.00 0.22 100.00
5 Cat m² 60.00 41,336.13 2,728,184.58 0.16 - - - - - - -
D PEKERJAAN ELEKTRIKAL
1 Pasang Box Panel bh 1.00 40,606.04 44,666.64 0.00 - - - - - - -
2 Pasang MCB bh 2.00 71,860.34 158,092.75 0.01 - - - - - - -
3 Pas. Stop Kontak bh 24.00 191,410.56 5,053,238.78 0.29 - - - - - - -
4 Pas. Saklar Ganda bh 12.00 191,410.56 2,526,619.39 0.14 12.00 0.14 - - 12.00 0.14 100.00
5 Pas. Lampu jari-jari Philips 18 Watt Ttk 48.00 249,028.56 13,148,707.97 0.75 - - - - - - -
6 Pas. Kabel NYM m¹ 250.00 60,794.91 16,718,600.25 0.96 32.00 0.12 - - 32.00 0.12 12.80
7 Penyambungan Baru Listrik 2300VA ls 1.00 2,500,000.00 2,750,000.00 0.16 - - - - - - -
IV PEKERJAAN JAMBAN
A PEKERJAAN TANAH DAN PONDASI
1 Galian Tanah Pondasi Jalur m³ 17.13 119,245.50 2,246,942.96 0.13 17.13 0.13 - - 17.13 0.13 100.00
2 Urugan Pasir bawah Pondasi m³ 1.32 464,092.20 673,861.87 0.04 1.32 0.04 - - 1.32 0.04 100.00
3 Urugan pasir bawah Lantai m³ 0.73 464,092.20 372,666.04 0.02 0.73 0.02 - - 0.73 0.02 100.00
4 Urugan Tanah Gal. Tanah Kembali m³ 4.28 39,748.50 187,135.94 0.01 4.28 0.01 - - 4.28 0.01 100.00
5 Urugan Tanah Bawah Lantai m³ 3.53 387,941.40 1,506,376.46 0.09 3.53 0.09 - - 3.53 0.09 100.00
6 Pas. Pondasi Batu Kosong m³ 3.95 622,795.83 2,706,047.88 0.15 3.95 0.15 - - 3.95 0.15 100.00
7 Pas. Pondasi Batu Kali1:4 m³ 6.20 1,347,805.31 9,192,032.21 0.53 6.20 0.53 - - 6.20 0.53 100.00
D PEKERJAAN PLAFOND
1 Pas. Rangka Plafond Kayu 5/5 Kelas II m² 27.28 140,332.01 4,211,082.96 0.24 27.28 0.24 - - 27.28 0.24 100.00
2 Pas. Penutup Plafond Tripleks 4 mm m² 27.28 61,181.51 1,835,934.75 0.11 27.28 0.11 - - 27.28 0.11 100.00
3 Pas. List Profil Plafond m¹ 61.56 29,917.80 2,025,913.74 0.12 - - - - - - -
4 Cat Plafond m² 27.23 41,336.13 1,240,414.59 0.07 27.23 0.07 - - 27.23 0.07 100.00
F PEKERJAAN ATAP
1 Pas. Kuda-kuda Kayu 5/10 Kayu Kelas II m³ 0.23 9,735,372.90 2,463,049.34 0.14 0.23 0.14 - - 0.23 0.14 100.00
2 Pas. Gording Kayu 5/5 Kayu Kelas II m³ 0.21 9,138,353.40 2,110,959.64 0.12 0.21 0.12 - - 0.21 0.12 100.00
3 Pas. Blk. Kasau Dan Ring, Kayu Kelas II m² 56.88 255,731.85 16,000,630.39 0.92 56.88 0.92 - - 56.88 0.92 100.00
4 Pas. Atap Genteng Multiroof BJLS 0.25mm m² 56.88 153,094.59 9,578,822.31 0.55 56.88 0.55 - - 56.88 0.55 100.00
5 Pas. Bubungan Atap Seng Multiroof m¹ 16.15 206,556.57 3,669,477.47 0.21 16.15 0.21 - - 16.15 0.21 100.00
6 Pas. Listplank Kayu Kelas II m¹ 23.32 97,900.11 2,511,333.62 0.14 23.32 0.14 - - 23.32 0.14 100.00
G PEKERJAAN SANITASI
1 Pek. Septicktank ls 1.00 6,500,000.00 7,150,000.00 0.41 1.00 0.41 - - 1.00 0.41 100.00
2 Pek. Bak Air ls 4.00 1,000,000.00 4,400,000.00 0.25 4.00 0.25 - - 4.00 0.25 100.00
3 Pas. Pipa Air Bersih PVC AW 1/2' m¹ 30.00 25,049.18 826,622.94 0.05 30.00 0.05 - - 30.00 0.05 100.00
4 Pas. Pipa Tinja PVC 4" m¹ 6.00 128,422.21 847,586.59 0.05 6.00 0.05 - - 6.00 0.05 100.00
5 Pas. Pipa Air Kotor PVC 2" m¹ 6.00 55,541.03 366,570.80 0.02 6.00 0.02 - - 6.00 0.02 100.00
6 Pas. Floor Drain bh 4.00 315,717.93 1,389,158.89 0.08 4.00 0.08 - - 4.00 0.08 100.00
7 Pas. Kloset Jongkok bh 4.00 977,829.93 4,302,451.69 0.25 4.00 0.25 - - 4.00 0.25 100.00
8 Pas. Keran Air Km//Wc bh 4.00 86,434.43 380,311.49 0.02 4.00 0.02 - - 4.00 0.02 100.00
9 Penyambungan Baru Air PDAM ls 1.00 3,000,000.00 3,300,000.00 0.19 - - - - - - -
I PEKERJAAN ELEKTRIKAL
1 Pas. Saklar Tunggal bh 4.00 143,557.92 631,654.85 0.04 - - - - - - -
2 Pas. Saklar Ganda bh 2.00 249,028.56 421,103.23 0.02 - - - - - - -
3 Pas. Lampu Philipps Jari-jari 18 Watt m¹ 8.00 21,879.00 2,191,451.33 0.13 - - - - - - -
4 Pas. Pipa Instalasi Listrik m¹ 20.00 60,794.91 481,338.00 0.03 - - - - - - -
5 Pas. Kabel NYM m¹ 40.00 60,794.91 2,674,976.04 0.15 - - - - - - -
J PEKERJAAN LANTAI PAVING
1 Urugan Pasir Bawah Paving m³ 92.24 464,092.20 47,088,650.98 2.69 46.12 1.35 21.00 0.61 67.12 1.96 72.77
2 Pas. Paving Blok K-300 m² 1,844.78 349,061.13 708,335,090.54 40.51 922.39 20.26 400.00 8.78 1,322.39 29.04 71.68
3 CAT Paving m² 1,844.79 41,336.13 83,881,672.49 4.80 - - - - - - -
SHAIFUDDIN ZUHRI
ROSITA TAUDA, ST,MT
USMAN, S.T.
NIP. 19800101 2008032 002 SITE ENGINEER
Harga satuan
No Uraian Pekerjaan Volume Satuan harga BOBOT %
(Rp.)
I PEKERJAAN PERSIAPAN
1 Papan Nama Proyek 1.00 bh 599,139.75 659,053.73 0.04
2 Penyedia Air Kerja 1.00 ls 3,200,000 3,520,000.00 0.20
3 Penyedia Listrik Kerja 1.00 ls 2,250,000.00 2,475,000.00 0.14
4 Pembuatan Direksi Keed Dan Gudang 6.00 m² 1,651,423.95 10,899,398.07 0.62
5 Pengukuran Dan Pemasangan Bowplank 1.00 ls 88,384.23 97,222.65 0.01
6 Dokumentasi Dan Pelaporan 1.00 ls 4,500,000.00 4,950,000.00 0.28
7 As Built Drawing 1.00 ls 5,215,000.00 5,736,500.00 0.33
8 Pembersihan Akhir 1.00 ls 4,050,000.00 4,455,000.00 0.25
II PEKERJAAN TAMAN
A Pekerjaan Pasangan
1 Pas. Dinding Batu Bata, 1:3 60.00 m³ 179,605.80 4,506,410.05 0.26
2 Pas. Beton Tumbuk 5.06 m³ 1,394,762.22 7,763,246.52 0.44
3 Pas. Plesteran, Camp. 1 :3 60.00 m² 104,806.10 6,917,202.60 0.40
4 Pas. Acian Dinding 60.00 m² 58,409.51 3,855,027.66 0.22
5 Cat 60.00 m² 41,336.13 2,728,184.58 0.16
D PEKERJAAN ELEKTRIKAL
1 Pasang Box Panel 1.00 bh 40,606.04 44,666.64 0.00
2 Pasang MCB 2.00 bh 71,860.34 158,092.75 0.01
3 Pas. Stop Kontak 24.00 bh 191,410.56 5,053,238.78 0.29
4 Pas. Saklar Ganda 12.00 bh 191,410.56 2,526,619.39 0.14
5 Pas. Lampu jari-jari Philips 18 Watt 48.00 Ttk 249,028.56 13,148,707.97 0.75
6 Pas. Kabel NYM 250.00 m¹ 60,794.91 16,718,600.25 0.96
7 Penyambungan Baru Listrik 2300VA 1.00 ls 2,500,000.00 2,750,000.00 0.16
IV PEKERJAAN JAMBAN
A PEKERJAAN TANAH DAN PONDASI
1 Galian Tanah Pondasi Jalur 17.13 m³ 119,245.50 2,246,942.96 0.13
2 Urugan Pasir bawah Pondasi 1.32 m³ 464,092.20 673,861.87 0.04
3 Urugan pasir bawah Lantai 0.73 m³ 464,092.20 372,666.04 0.02
4 Urugan Tanah Gal. Tanah Kembali 4.28 m³ 39,748.50 187,135.94 0.01
5 Urugan Tanah Bawah Lantai 3.53 m³ 387,941.40 1,506,376.46 0.09
6 Pas. Pondasi Batu Kosong 3.95 m³ 622,795.83 2,706,047.88 0.15
7 Pas. Pondasi Batu Kali1:4 6.20 m³ 1,347,805.31 9,192,032.21 0.53
F PEKERJAAN ATAP
1 Pas. Kuda-kuda Kayu 5/10 Kayu Kelas II 0.23 m³ 9,735,372.90 2,463,049.34 0.14
2 Pas. Gording Kayu 5/5 Kayu Kelas II 0.21 m³ 9,138,353.40 2,110,959.64 0.12
3 Pas. Blk. Kasau Dan Ring, Kayu Kelas II 56.88 m² 255,731.85 16,000,630.39 0.92
4 Pas. Atap Genteng Multiroof BJLS 0.25mm 56.88 m² 153,094.59 9,578,822.31 0.55
5 Pas. Bubungan Atap Seng Multiroof 16.15 m¹ 206,556.57 3,669,477.47 0.21
6 Pas. Listplank Kayu Kelas II 23.32 m¹ 97,900.11 2,511,333.62 0.14
G PEKERJAAN SANITASI
1 Pek. Septicktank 1.00 ls 6,500,000.00 7,150,000.00 0.41
2 Pek. Bak Air 4.00 ls 1,000,000.00 4,400,000.00 0.25
3 Pas. Pipa Air Bersih PVC AW 1/2' 30.00 m¹ 25,049.18 826,622.94 0.05
4 Pas. Pipa Tinja PVC 4" 6.00 m¹ 128,422.21 847,586.59 0.05
5 Pas. Pipa Air Kotor PVC 2" 6.00 m¹ 55,541.03 366,570.80 0.02
6 Pas. Floor Drain 4.00 bh 315,717.93 1,389,158.89 0.08
7 Pas. Kloset Jongkok 4.00 bh 977,829.93 4,302,451.69 0.25
8 Pas. Keran Air Km//Wc 4.00 bh 86,434.43 380,311.49 0.02
9 Penyambungan Baru Air PDAM 1.00 ls 3,000,000.00 3,300,000.00 0.19
I PEKERJAAN ELEKTRIKAL
1 Pas. Saklar Tunggal 4.00 bh 143,557.92 631,654.85 0.04
2 Pas. Saklar Ganda 2.00 bh 191,410.56 421,103.23 0.02
3 Pas. Lampu Philipps Jari-jari 18 Watt 8.00 bh 249,028.56 2,191,451.33 0.13
4 Pas. Pipa Instalasi Listrik 20.00 m¹ 21,879.00 481,338.00 0.03
5 Pas. Kabel NYM 40.00 m¹ 60,794.91 2,674,976.04 0.15
0.00 6.4
31.81 31.81 0.0
95.57 95.57 191.14 0.0
95.57 0.57 95 191.14 0.0
2.25 2.25 0.0
1.14 1.14 0.0
134.9 134.9 269.80 0.0
269.8 269.80 0.0
49.50 49.50 0.0
162.00 162.00 0.0
71.00 288.88 359.88 0.0
115.05 115.05 0.0
0.00 1.0
0.00 2.0
0.00 24.0
12.00 12.00 0.0
0.00 48.0
16.00 16.00 32.00 218.0
0.00 1.0
NO KONTRAK :
TANGGAL :
WAKTU PELAKSANAAN
:
I Pekerjaan Persiapan
1 Papan Nama Proyek bh 1.00 599,139.75 659,053.73 0.04
2 Penyedia Air Kerja ls 1.00 3,200,000.00 3,520,000.00 0.20
3 Penyedia Listrik Kerja ls 1.00 2,250,000.00 2,475,000.00 0.14
4 Pembuatan Direksi Keed Dan Gudang m² 6.00 1,651,423.95 10,899,398.07 0.62
5 Pengukuran Dan Pemasangan Bowplank ls 1.00 88,384.23 97,222.65 0.01
6 Dokumentasi Dan Pelaporan ls 1.00 4,500,000.00 4,950,000.00 0.28
7 As Built Drawing ls 1.00 5,215,000.00 5,736,500.00 0.33
8 Pembersihan Akhir ls 1.00 4,050,000.00 4,455,000.00 0.25
II PEKERJAAN TAMAN
A Pekerjaan Pasangan
1 Pas. Dinding Batu Bata, 1:3 m³ 60.00 179,605.80 4,506,410.05 0.26
2 Pas. Beton Tumbuk m³ 5.06 1,394,762.22 7,763,246.52 0.44
3 Pas. Plesteran, Camp. 1 :3 m² 60.00 104,806.10 6,917,202.60 0.40
4 Pas. Acian Dinding m² 60.00 58,409.51 3,855,027.66 0.22
5 Cat m² 60.00 41,336.13 2,728,184.58 0.16
D PEKERJAAN ELEKTRIKAL
1 Pasang Box Panel kg 1.00 40,606.04 44,666.64 0.00
2 Pasang MCB kg 2.00 71,860.34 158,092.75 0.01
3 Pas. Stop Kontak kg 24.00 191,410.56 5,053,238.78 0.29
4 Pas. Saklar Ganda m³ 12.00 191,410.56 2,526,619.39 0.14
5 Pas. Lampu jari-jari Philips 18 Watt m³ 48.00 249,028.56 13,148,707.97 0.75
6 Pas. Kabel NYM m³ 250.00 60,794.91 16,718,600.25 0.96
7 Penyambungan Baru Listrik 2300VA m³ 1.00 2,500,000.00 2,750,000.00 0.16
IV PEKERJAAN JAMBAN
A PEKERJAAN TANAH DAN PONDASI
1 Galian Tanah Pondasi Jalur m' 17.13 119,245.50 2,246,942.96 0.13
2 Urugan Pasir bawah Pondasi m³ 1.32 464,092.20 673,861.87 0.04
3 Urugan pasir bawah Lantai kg 0.73 464,092.20 372,666.04 0.02
4 Urugan Tanah Gal. Tanah Kembali kg 4.28 39,748.50 187,135.94 0.01
5 Urugan Tanah Bawah Lantai kg 3.53 387,941.40 1,506,376.46 0.09
6 Pas. Pondasi Batu Kosong m² 3.95 622,795.83 2,706,047.88 0.15
7 Pas. Pondasi Batu Kali1:4 m³ 6.20 1,347,805.31 9,192,032.21 0.53
D PEKERJAAN PLAFOND
1 Pas. Rangka Plafond Kayu 5/5 Kelas II m² 27.28 140,332.01 4,211,082.96 0.24
2 Pas. Penutup Plafond Tripleks 4 mm m² 27.28 61,181.51 1,835,934.75 0.11
3 Pas. List Profil Plafond m² 61.56 29,917.80 2,025,913.74 0.12
4 Cat Plafond m' 27.23 41,336.13 1,240,414.59 0.07
F PEKERJAAN ATAP
1 Pas. Kuda-kuda Kayu 5/10 Kayu Kelas II unit 0.23 9,735,372.90 2,463,049.34 0.14
2 Pas. Gording Kayu 5/5 Kayu Kelas II unit 0.21 9,138,353.40 2,110,959.64 0.12
3 Pas. Blk. Kasau Dan Ring, Kayu Kelas II unit 56.88 255,731.85 16,000,630.39 0.92
4 Pas. Atap Genteng Multiroof BJLS 0.25mm 56.88 153,094.59 9,578,822.31 0.55
5 Pas. Bubungan Atap Seng Multiroof 16.15 206,556.57 3,669,477.47 0.21
6 Pas. Listplank Kayu Kelas II 23.32 97,900.11 2,511,333.62 0.14
G PEKERJAAN SANITASI
1 Pek. Septicktank m² 1.00 6,500,000.00 7,150,000.00 0.41
2 Pek. Bak Air m² 4.00 1,000,000.00 4,400,000.00 0.25
3 Pas. Pipa Air Bersih PVC AW 1/2' m² 30.00 25,049.18 826,622.94 0.05
4 Pas. Pipa Tinja PVC 4" m² 6.00 128,422.21 847,586.59 0.05
5 Pas. Pipa Air Kotor PVC 2" 6.00 55,541.03 366,570.80 0.02
6 Pas. Floor Drain 4.00 315,717.93 1,389,158.89 0.08
7 Pas. Kloset Jongkok 4.00 977,829.93 4,302,451.69 0.25
8 Pas. Keran Air Km//Wc 4.00 86,434.43 380,311.49 0.02
9 Penyambungan Baru Air PDAM 1.00 3,000,000.00 3,300,000.00 0.19
I PEKERJAAN ELEKTRIKAL
1 Pas. Saklar Tunggal titik 4.00 143,557.92 631,654.85 0.04
2 Pas. Saklar Ganda ls/m' 2.00 191,410.56 421,103.23 0.02
3 Pas. Lampu Philipps Jari-jari 18 Watt bh 8.00 249,028.56 2,191,451.33 0.13
4 Pas. Pipa Instalasi Listrik bh 20.00 21,879.00 481,338.00 0.03
5 Pas. Kabel NYM bh 40.00 60,794.91 2,674,976.04 0.15
1,748,475,480.76 100.00
TOTAL PEKERJAAN
DI SETUJUI OLEH