Anda di halaman 1dari 1

RAB RENOVASI DAN PENGADAAN TPA BAITURRAHIM

No. Uraian Sat. Vol. Harga Satuan Jumlah Harga


(Rp) (Rp)
A. PEK. RENOVASI BANGUNAN
1 Polywood (Dinding + Plafon) Lbr 50 61,000 3,050,000
2 Balok Rangka (Dinding + Plafond) M3 2 2,800,000 4,200,000
3 Paku Biasa Kg 15 18,000 270,000
4 Semen PC @ 50kg Zak 25 68,000 1,700,000
5 Pasir Pasang M3 4 98,000 392,000
6 Upah Tukang Ls 1 4,500,000 4,500,000
7 Cat Dinding + Plafond Kg 30 47,500 1,425,000
8 Pemasangan KWH 450 watt Ls 1 3,000,000 3,000,000
9 Pek. Titik Lampu + Lampu 15Watt Ttk 1 75,000 75,000
10 Papan Tulis (White Board) Bh 1 250,000 250,000
SUB. TOTAL A 18,862,000
B. PENGADAAN PERLENGKAPAN
1 Kipas Angin Bh 3 350,000 1,050,000
2 Meja Kantor + Kursi (kayu lokal) Bh 1 700,000 700,000
3 Lemari Rak (kayu lokal) Bh 1 1,200,000 1,200,000
4 Mushaf Tulis Iqra Bh 50 25,000 1,250,000
5 Al-Qur'an Besar Bh 100 80,000 8,000,000
6 Buku Iqro Bh 100 15,000 1,500,000
7 Meja Lipat/Belajar Bh 35 65,000 2,275,000
SUB. TOTAL B 15,975,000
JUMLAH TOTAL 34,837,000
DIBULATKAN 34,900,000
Terbilang :
TIGA PULUH EMPAT JUTA SEMBILAN RATUS RIBU RUPIAH

Palu, 20 Desember 2023

Dibuat oleh,
TPA BAITURRAHIM

MOHAMMAD JASMIN
Pembina Utama

Anda mungkin juga menyukai