UKURAN NO JENIS PEKERJAAN P L LS A. Baliho Menempel 4.00 6.00 24.00 1. Besi Siku 4x4x2,8 2. Besi Beton 8mm B. Dudukan Lampu Sorot 1. Besi 1 inch 2. Pipa Dudukan 3. Lampu Sorot 4. Kabel 2,5 x2 C. Pemasangan GRAND TOTAL TEERBILANG: Sebelas Juta Tujuh Ratus Ribu Rupiah HARGA/MTR TOTAL HARGA 375,000 9,000,000
1,200,000 1,200,000
1,500,000 1,500,000 GRAND TOTAL 11,700,000 tus Ribu Rupiah