A. PEKERJAAN JASA
NO URAIAN PEKERJAAN VOLUME SATUAN HARGA SATUAN TOTAL KET
@ Rp.
1. Pengeboran pilot hole diameter (Ø) 2,5" 18 m 100,000.00 1,800,000.00 Jasa
2. Mobilisasi dan Akomodasi 2 LOT 200,000.00 400,000.00 Jasa
TOTAL PEKERJAAN JASA (A) 2,200,000.00
II POMPA SET
1. Pompa Kecil 1 bh 450,000.00 450,000.00 Simizu
TOTAL MATERIAL DAN POMPA (B) 1,275,000.00