Back Up Lab Com Konawe
Back Up Lab Com Konawe
II PEMBANGUANAN MCK
A PEKERJAAN TANAH, PASIR DAN BATU
1 M3 1,052,853.75 0.50 86.15 39,125.00 3,370,618.75 1.59 -59.24
2 M3 898,003.00 0.42 21.54 135,650.00 2,921,901.00 1.38 -
3 M3 185,220.00 0.09 10.80 17,150.00 185,220.00 0.09 -
4 M3 626,157.00 0.30 3.78 165,650.00 626,157.00 0.30 -
5 M3 417,438.00
6 M3 7,971,334.84
7 M3 908,320.39 0.43 123.55 120,148.20 14,844,310.11 7.00 -115.99
12,059,326.98 1.73 21,948,206.86 10.35
B PEKERJAAN BETON
1 Pek. Sloof 15 x 20 cm 1pc : 2psr : 3krl M3 8,353,114.56 3.94 24.62 5,459,552.00 134,414,170.24 63.41 -23.09
2 Pek. Balok 15 x 25 cm 1pc : 2psr : 3krl M3 8,921,705.22 4.21 68.20 6,110,757.00 416,753,627.40 196.60 -66.74
3 Pek. Balok 15 x 20 cm 1pc : 2psr : 3krl M3 7,027,370.55 3.32 1.15 6,110,757.00 7,027,370.55 3.32 -
4 Pek. Kolom 20 x 20 cm 1pc : 2psr : 3krl M3 13,912,536.96 6.56 1.78 7,816,032.00 13,912,536.96 6.56 -
5 Pek. Kolom Praktis 12 x 12 cm 1pc : 2psr : 3krl M3 2,622,768.00 1.24 24.00 109,282.00 2,622,768.00 1.24 -
6 Pek. Pelat Atap Tebal 12 cm 1pc : 2psr : 3krl M3 58,181,723.28 27.45 3.69 7,981,032.00 29,450,008.08 13.89 -
7 Pek. Rabat Beton Stam 1pc : 3psr : 5krl t. 5 cm M3 1,105,453.80 614,141.00
8 Pek. Rabat Beton Keliling Bangunan 1 : 3 : 5k M3 687,837.92 614,141.00
9 Pek. Lisplank Beton Tebal 8 cm 1pc : 2psr : 3krl M3 4,309,757.28 2.03 0.54 7,981,032.00 4,309,757.28 2.03 -
105,122,267.57 48.74 608,490,238.51 287.05
F PEKERJAAN PENGECETAN
1 Pek.Pengecetan Dinding, Kolom dan Lisplank 5,632,777.35 2.66 332.70 16,930.50 5,632,777.35 2.66 -
2 Pek.Pengecetan Kayu 3 x 186,817.50 0.09 8.28 22,562.50 186,817.50 0.09 -
5,819,594.85 2.75 5,819,594.85 2.75
KONTRAK AWAL NILAI KONTRAK AMANDEMEN I DECREASE ( - )
HARGA JUMLAH BOBOT HARGA JUMLAH BOBOT
NO URAIAN PEKERJAAN
SAT. VOLUME SATUAN HARGA ( % ) VOLUME SATUAN HARGA ( % ) VOLUME
( Rp ) ( Rp ) ( Rp ) ( Rp )
IV PEKERJAAN FINISHING
1 Finishing dan Pembersihan Lokasi Ls 1.00 1 650,000.00 0.31 1.00 650,000.00 650,000.00 0.31 -
Unaaha, November2006
s
Disetujui Oleh : Diperiksa : Diajukan Oleh :
PPTK Bidang Cipta Karya CV. MEKANIKINDO CONSULTANT CV. SARANA UTARA
Konsultan Pengawas Direktur
242000000
DECREASE ( - ) DECREASE ( + ) 815,844,000.00
JUMLAH JUMLAH -573,844,000.00
KET.
HARGA VOLUME HARGA
( Rp ) ( Rp )
815,844,000.00 211,984,016.24
- - - Tetap 211,984,307.93 211,984,016.24
- - - Tetap 211,984,307.93 211,984,016.24
- - Tetap 211,984,307.93 211,984,016.24
- - - Tetap 211,984,307.93 211,984,016.24
- - - Tetap 211,984,307.93 211,984,016.24
- - - Tetap 211,984,307.93 211,984,016.24
0.00 211,984,307.93 211,984,016.24
211,984,307.93 211,984,016.24
211,984,307.93 211,984,016.24
-2,317,765.00 - Berkurang 211,984,307.93 211,984,016.24
- - Tetap 211,984,307.93 211,984,016.24 #REF!
- - Tetap 211,984,307.93 211,984,016.24
- - Tetap 211,984,307.93 211,984,016.24
ANA UTARA
AN SILONDAE, A.Md
01.864.588.7-811.000
PEMERINTAH KABUPATEN KONAWE UTARA
SEKRETARIAT DAERAH
BAGIAN EKONOMI DAN PEMBANGUNAN
Alamat. Kelurahan Andowia Kecamatan Asera
PERSENTASE KEM
NO. URAIAN PEKERJAAN SAT VOLUME BULAN
%
LALU
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi Ls 1.00 0.00 0.00
2 Pengukuran & Pemas. Bouwplank Ls 1.00 0.00 0.00
3 Penyediaan Air Kerja, Air Minum P3k Ls 1.00 0.00 0.00
4 Pembuatan Papan Nama Proyek Ls 1.00 0.00 0.00
5 Direksi Keet/Barak Kerja Ls 1.00 0.00 0.00
6 Pemb. MC, Back Up Data, Dokumentasi Dll Ls 1.00 0.00 0.00
II PEMBANGUANAN MCK
A PEKERJAAN TANAH, PASIR DAN BATU
1 Galian Tanah Pondasi Batu Gunung M3 26.91 0.00 0.00
2 Urugan Kembali Bekas Galian M3 6.62 0.00 0.00
3 Urugan Tanah Bawah Lantai M3 10.80 0.00 0.00
4 Urugan Pasir Bawah Pondasi M3 3.78 0.00 0.00
5 Pek. Urugan Pasir Alas Lantai Tebal 10 cm M3 2.52 0.00 0.00
6 Pasangan Batu Gunung 1 pc : 4 psr M3 12.11 0.00 0.00
7 Pek. Pas. Batu Kosong M3 7.56 0.00 0.00
B PEKERJAAN BETON
1 Pek. Sloof 15 x 20 cm 1pc : 2psr : 3krl M3 1.53 0.00 0.00
2 Pek. Balok 15 x 25 cm 1pc : 2psr : 3krl M 3
1.46 0.00 0.00
3 Pek. Balok 15 x 20 cm 1pc : 2psr : 3krl M 3
1.15 0.00 0.00
4 Pek. Kolom 20 x 20 cm 1pc : 2psr : 3krl M 3
1.78 0.00 0.00
5 Pek. Kolom Praktis 12 x 12 cm 1pc : 2psr : 3krl M3 24.00 0.00 0.00
6 Pek. Pelat Atap Tebal 12 cm 1pc : 2psr : 3krl M3 7.29 0.00 0.00
7 Pek. Rabat Beton Stam 1pc : 3psr : 5krl t. 5 cm M3 1.80 0.00 0.00
8 Pek. Rabat Beton Keliling Bangunan 1 : 3 : 5k M 3
1.12 0.00 0.00
9 Pek. Lisplank Beton Tebal 8 cm 1pc : 2psr : 3krl M 3
0.54 0.00 0.00
C PEKERJAAN DINDING PLESTERAN DAN LANTAI
1 Pek. Dinding Tembok 1/2 Bata 1pc : 2psr M2 46.50 0.00 0.00
2 Pek. Dinding Tembok 1/2 Bata 1pc : 5psr M2 67.11 0.00 0.00
3 Pek. Plesteran Dinding Trasram 1pc : 2psr M2 93.00 0.00 0.00
4 Pek. Plesteran Dinding Tembok 1pc : 5psr M 2
186.00 0.00 0.00
5 Pas. Tegel Dinding KM/WC 25 x 25 cm (corak) M 2
55.25 0.00 0.00
6 Pas. Tegel Keramik Lantai WC 20 x 20 cm (corak) M 2
26.67 0.00 0.00
7 Pek. Plesteran Beton Pondasi M 2
10.50 0.00 0.00
D PEK. KUSEN PINTU PINTU DAN VENTILASI
1 Pek. Pas. Pintu KM/WC Aluminium Set 6.00 0.00 0.00
2 Pek. Kusen Ventilasi Kayu Klas II M 3
0.25 0.00 0.00
3 Pek. Jalusi M 2
1.87 0.00 0.00
E PEK. INSTALASI LISTRIK DAN SANITASI
1 Pas. Instalasi Listrik Ls 1.00 0.00 0.00
2 Pas. Kloset Jongkok Bh 6.00 0.00 0.00
3 Pas. Floor Drain Bh 7.00 0.00 0.00
4 Pemasangan Pipa Pvc 3/4" AW Untuk Air Bersih M1 28.00 0.00 0.00
5 Pemasangan Pipa Pvc 3/4" AW Untuk Air Kotor M 1
32.00 0.00 0.00
6 Pek. Bak. Air Lapis Keramik Bh 7.00 0.00 0.00
7 Pek. Septick Tank Bh 1.00 0.00 0.00
8 Pek. Saluran Air Hujan Kel. Bangunan M1 34.00 0.00 0.00
9 Pas. Kran Air Bh 8.00 0.00 0.00
F PEKERJAAN PENGECETAN
1 Pek.Pengecetan Dinding, Kolom dan Lisplank M2 332.37 0.00 0.00
2 Pek.Pengecetan Kayu 3 x M 2
8.28 0.00 0.00
III PEMBANGUNAN TOWER
A PEKERJAAN TANAH, PASIR DAN BATU
1 Pek. Galian Tanah M3 8.00 0.00 0.00
2 Pek. Urugan Kembali Bekas Galian M3 4.07 0.00 0.00
3 Pek. Urugan Pasir Alas Pondasi M3 0.40 0.00 0.00
B PEKERJAAN BETON DAN PENGECETAN
1 Pek. Pondasi Beton Bertulang 1pc : 2psr : 3krl M3 1.13 0.00 0.00
2 Pek. Sloof 15 x 20 cm 1pc : 2psr : 3krl M3 0.22 0.00 0.00
3 Pek. Balok 15 x 30 cm 1pc : 2psr : 3krl M3 0.65 0.00 0.00
4 Pek. Kolom 20 x 20 cm 1pc : 2psr : 3krl M3 0.88 0.00 0.00
5 Pek. Pelat Beton Tebal 12 cm 1pc : 2psr : 3krl M3 0.55 0.00 0.00
6 Pek. Rabat Beton Stam 1pc : 3psr : 5krl t. 5 cm M3 0.57 0.00 0.00
7 Pek. Plesteran 1pc : 5psr M2 26.95 0.00 0.00
8 Pek. Acian Tembok M 2
26.95 0.00 0.00
9 Pek. Pengecetan Tembok M 2
26.95 0.00 0.00
C PEKERJAAN SUMUR BOR
1 Penyiapan Lokasi Titik Pemboran Ls 1.00 0.00 0.00
2 Mobilitasi dan Demobilitasi Peralatan Bor Ls 1.00 0.00 0.00
3 Pemboran Sumur Dalam Unit 1.00 0.00 0.00
4 Pengdaan dan Pemasangan Pipa Cassing Unit 1.00 0.00 0.00
5 Pengad. dan Pas. Pompa Air (Jet Pump 150 Watt) Unit 1.00 0.00 0.00
D PEK. PAS. PIPA DAN ASESSORIS PIPA
1 Pemasangan Pipa PVC 1/2" AW M1 32.00 0.00 0.00
2 Pemasangan Stop Kran Bh 2.00 0.00 0.00
3 Bak Air Fibre Glass Kap. 1 M3 Unit 2.00 0.00 0.00
4 Pembuatan Tangga Tower (Besi Beton Dia. 16) Ls 1.00 0.00 0.00
IV PEKERJAAN FINISHING
1 Finishing dan Pembersihan Lokasi Ls 1.00 0.00 0.00
PERSENTASE 0.00
B PPN 10% x A
C IMB 2% x A
D TOTAL COST ( A+B+C)
DIBULATKAN
AWE UTARA
H
ANGUNAN
matan Asera
K BULANAN
98.09 98.09
Mengetahui
Kabag Ekonomi & Pembangunan
Setda Kab. Konawe Utara
MONTHLY CERTIFICATE
PAKET : 10 ( Sepuluh )
KONTRAKTOR PELAKSANA
CV. SARANA UTARA
ABUPATEN KONAWE UTARA
GUNAN SETDA KAB. KONAWE UTARA
ABUPATEN KONAWE TA. 2010
GORONG-GORONG DESA LABUNGGA RUAS 2
Y CERTIFICATE
OVEMBER 2010
KONSULTAN PENGAWAS
CV. MEKANIKINDO KONSULTANT
PROPINSI : SULAWESI TENGGARA DIREKSI : DINAS PU DAN TATA RUANG LEMBAR : 01
KABUPATEN : KONAWE UTARA KONSULTAN PENGAWAS : CV. MEKANIKINDO KONSULTANT CERTIFIKATE :
NOMOR PAKET : 10 ( Sepuluh ) JENIS PEKERJAAN : PEMBANGUANAN MCK KEC. SAWA TGL. LAPORAN : November 2010
NO. KONTRAK : 460.10/03/SPKK-PNL/DPUTR-KU/IX/2010 : BOBOT S/D BULAN LALU :
NILAI KONTRAK : Rp 250,951,000.00 TARGET FISIK : BOBOT BULAN INI :
TANGGAL KONTRAK : 26 NOVEMBER 2010 LOKASI : KEC. SAWA BOBOT S/D BULAN INI :
PELAKSANA : CV. SARANA UTARA : KABUPATEN KONAWE UTARA
REKAPITULASI
TARGET KONTAK REALISASI S/D BULAN INI
NO URAIAN PEKERJAAN JUMLAH BOBOT HARGA BOBOT TTB KET
SATUAN (Rp) % ( Rp ) % %
#REF! ###
#REF! ###
#REF! ###
#REF! ###
#REF! ###
#REF! ###
#REF! ###
### ###
### ###
### ###
### ###
### ###
LAPORAN SISTIM MONITORING PROYEK BULAN
BULANAN PEMBANGUNAN MCK KABUPATEN KONAWE UTARA TA. 2010 NOVEMBER
CERTIFIKASI BULANAN
PROPINSI : SULAWESI TENGGARA DIREKSI : DINAS PU DAN TATA RUANG LEMBAR : 02
KABUPATEN : KONAWE UTARA KONSULTAN PENGAWAS : CV. MEKANIKINDO KONSULTANT CERTIFIKATE :
NOMOR PAKET : 10 ( Sepuluh ) JENIS PEKERJAAN : PEMBANGUANAN MCK KEC. SAWA TGL. LAPORAN : November 2010
NO. KONTRAK : 460.10/03/SPKK-PNL/DPUTR-KU/IX/2010 : BOBOT S/D BULAN LALU :
NILAI KONTRAK : Rp 250,951,000.00 TARGET FISIK : BOBOT BULAN INI :
TANGGAL KONTRAK : 26 NOVEMBER 2010 LOKASI : KEC. SAWA BOBOT S/D BULAN INI :
PELAKSANA : CV. SARANA UTARA : KABUPATEN KONAWE UTARA
URAIAN KONRAK
NILAI KONTRAK AWAL REALISASI S/D BULAN LALU REALISASI BULAN INI REALISASI S/D BULAN INI
HARGA JUMLAH JUMLAH JUMLAH JUMLAH
NO URAIAN PEKERJAAN
SAT. SATUAN VOL. HARGA VOL. HARGA VOL. HARGA VOL. HARGA
( Rp ) ( Rp ) ( Rp ) ( Rp ) ( Rp )
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi Ls. 500,000.00 1.00 500,000.00 - - 1.00 500,000.00 1.00 500,000.00
2 Pengukuran & Pemas. Bouwplank Ls. 650,000.00 1.00 650,000.00 - - 1.00 650,000.00 1.00 650,000.00
3 Penyediaan Air Kerja, Air Minum P3k Ls. 500,000.00 1.00 500,000.00 - - 1.00 500,000.00 1.00 500,000.00
4 Pembuatan Papan Nama Proyek Ls. 200,000.00 1.00 200,000.00 - - 1.00 200,000.00 1.00 200,000.00
5 Direksi Keet/Barak Kerja Ls. 1,500,000.00 1.00 1,500,000.00 - - 1.00 1,500,000.00 1.00 1,500,000.00
6 Pemb. MC, Back Up Data, Dokumentasi Dll Ls. 700,000.00 1.00 700,000.00 - - 1.00 700,000.00 1.00 700,000.00
Jumlah 4,050,000.00 4,050,000.00 4,050,000.00
#REF! ###
#REF! ###
#REF! ###
#REF! ###
#REF! ###
#REF! ###
#REF! ###
#REF! ###
###
#REF! ###
### ###
### ###
### ###
### ###
LAPORAN SISTIM MONITORING PROYEK BULAN
BULANAN PEMBANGUNAN MCK KABUPATEN KONAWE UTARA TA. 2010 NOVEMBER
CERTIFIKASI BULANAN
PROPINSI : SULAWESI TENGGARA DIREKSI : DINAS PU DAN TATA RUANG LEMBAR : 03
KABUPATEN : KONAWE UTARA KONSULTAN PENGAWAS : CV. MEKANIKINDO KONSULTANT CERTIFIKATE :
NOMOR PAKET : 10 ( Sepuluh ) JENIS PEKERJAAN : PEMBANGUANAN MCK KEC. SAWA TGL. LAPORAN : November 2010
NO. KONTRAK : 460.10/03/SPKK-PNL/DPUTR-KU/IX/2010 : BOBOT S/D BULAN LALU :
NILAI KONTRAK : Rp 250,951,000.00 TARGET FISIK : BOBOT BULAN INI :
TANGGAL KONTRAK : 26 NOVEMBER 2010 LOKASI : KEC. SAWA BOBOT S/D BULAN INI :
PELAKSANA : CV. SARANA UTARA : KABUPATEN KONAWE UTARA
URAIAN KONRAK
NILAI KONTRAK AWAL REALISASI S/D BULAN LALU REALISASI BULAN INI REALISASI S/D BULAN INI
HARGA JUMLAH JUMLAH JUMLAH JUMLAH
NO URAIAN PEKERJAAN
SAT. SATUAN VOL. HARGA VOL. HARGA VOL. HARGA VOL. HARGA
( Rp ) ( Rp ) ( Rp ) ( Rp ) ( Rp )
II PEKERJAAN PERSIAPAN
A PEKERJAAN TANAH, PASIR DAN BATU
1 Galian Tanah Pondasi Batu Gunung M3 39,125.00 26.91 1,052,853.75 - - 36.96 1,446,060.00 36.96 1,446,060.00
2 Urugan Kembali Bekas Galian M3 135,650.00 6.62 898,003.00 - - 2.46 333,699.00 2.46 333,699.00
3 Urugan Tanah Bawah Lantai M3 17,150.00 10.80 185,220.00 - - 0.00 0.00 0.00 0.00
4 Urugan Pasir Bawah Pondasi M 3
165,650.00 3.78 626,157.00 - - 6.16 1,020,404.00 6.16 1,020,404.00
5 Pek. Urugan Pasir Alas Lantai Tebal 10 cm M3 165,650.00 2.52 417,438.00 - - 13.50 2,236,275.00 13.50 2,236,275.00
6 Pasangan Batu Gunung 1 pc : 4 psr M 3
658,244.00 12.11 7,971,334.84 - - 21.29 14,014,343.88 21.29 14,014,343.88
7 Pek. Pas. Batu Kosong M3 120,148.20 7.56 908,320.39 - - 12.32 1,480,225.82 12.32 1,480,225.82
Jumlah 12,059,326.98 20,531,007.71 20,531,007.71
#REF! ###
#REF! ###
#REF! ###
#REF! ###
#REF! ###
#REF! ###
#REF! ###
###
#REF! ###
### ###
### ###
### ###
### ###
LAPORAN SISTIM MONITORING PROYEK BULAN
BULANAN PEMBANGUNAN MCK KABUPATEN KONAWE UTARA TA. 2010 NOVEMBER
CERTIFIKASI BULANAN
PROPINSI : SULAWESI TENGGARA DIREKSI : DINAS PU DAN TATA RUANG LEMBAR : 03
KABUPATEN : KONAWE UTARA KONSULTAN PENGAWAS : CV. MEKANIKINDO KONSULTANT CERTIFIKATE :
NOMOR PAKET : 10 ( Sepuluh ) JENIS PEKERJAAN : PEMBANGUANAN MCK KEC. SAWA TGL. LAPORAN : November 2010
NO. KONTRAK : 460.10/03/SPKK-PNL/DPUTR-KU/IX/2010 : BOBOT S/D BULAN LALU :
NILAI KONTRAK : Rp 250,951,000.00 TARGET FISIK : BOBOT BULAN INI :
TANGGAL KONTRAK : 26 NOVEMBER 2010 LOKASI : KEC. SAWA BOBOT S/D BULAN INI :
PELAKSANA : CV. SARANA UTARA : KABUPATEN KONAWE UTARA
URAIAN KONRAK
NILAI KONTRAK AWAL REALISASI S/D BULAN LALU REALISASI BULAN INI REALISASI S/D BULAN INI
HARGA JUMLAH JUMLAH JUMLAH JUMLAH
NO URAIAN PEKERJAAN
SAT. SATUAN VOL. HARGA VOL. HARGA VOL. HARGA VOL. HARGA
( Rp ) ( Rp ) ( Rp ) ( Rp ) ( Rp )
B PEKERJAAN BETON
1 Pek. Sloof 15 x 20 cm 1pc : 2psr : 3krl M3 5,459,552.00 1.53 8,353,114.56 - - 2.31 12,611,565.12 2.31 12,611,565.12
2 Pek. Balok 15 x 25 cm 1pc : 2psr : 3krl M 3
6,110,757.00 1.46 8,921,705.22 - - 0.64 3,937,771.81 0.64 3,937,771.81
3 Pek. Balok 15 x 20 cm 1pc : 2psr : 3krl M3 6,110,757.00 1.15 7,027,370.55 - - 1.61 9,844,429.53 1.61 9,844,429.53
4 Pek. Kolom 20 x 20 cm 1pc : 2psr : 3krl M3 7,816,032.00 1.78 13,912,536.96 - - 0.30 2,344,809.60 0.30 2,344,809.60
5 Pek. Kolom Praktis 12 x 12 cm 1pc : 2psr : 3krl M3 109,282.00 24.00 2,622,768.00 - - 72.00 7,868,304.00 72.00 7,868,304.00
6 Pek. Pelat Atap Tebal 12 cm 1pc : 2psr : 3krl M3 7,981,032.00 7.29 58,181,723.28 - - 0.00 0.00 0.00 0.00
7 Pek. Rabat Beton Stam 1pc : 3psr : 5krl t. 5 cm M3 614,141.00 1.80 1,105,453.80 - - 5.76 3,537,452.16 5.76 3,537,452.16
8 Pek. Rabat Beton Keliling Bangunan 1 : 3 : 5k M3 614,141.00 1.12 687,837.92 - - 0.00 0.00 0.00 0.00
9 Pek. Lisplank Beton Tebal 8 cm 1pc : 2psr : 3krl M 3
7,981,032.00 0.54 4,309,757.28 - - 0.00 0.00 0.00 0.00
Jumlah 105,122,267.57 40,144,332.22 40,144,332.22
#REF! ###
#REF! ###
#REF! ###
#REF! ###
#REF! ###
#REF! ###
#REF! ###
###
#REF! ###
### ###
### ###
### ###
### ###
LAPORAN SISTIM MONITORING PROYEK BULAN
BULANAN PEMBANGUNAN MCK KABUPATEN KONAWE UTARA TA. 2010 NOVEMBER
CERTIFIKASI BULANAN
PROPINSI : SULAWESI TENGGARA DIREKSI : DINAS PU DAN TATA RUANG LEMBAR : 05
KABUPATEN : KONAWE UTARA KONSULTAN PENGAWAS : CV. MEKANIKINDO KONSULTANT CERTIFIKATE :
NOMOR PAKET : 10 ( Sepuluh ) JENIS PEKERJAAN : PEMBANGUANAN MCK KEC. SAWA TGL. LAPORAN : November 2010
NO. KONTRAK : 460.10/03/SPKK-PNL/DPUTR-KU/IX/2010 : BOBOT S/D BULAN LALU :
NILAI KONTRAK : Rp 250,951,000.00 TARGET FISIK : BOBOT BULAN INI :
TANGGAL KONTRAK : 26 NOVEMBER 2010 LOKASI : KEC. SAWA BOBOT S/D BULAN INI :
PELAKSANA : CV. SARANA UTARA : KABUPATEN KONAWE UTARA
URAIAN KONRAK
NILAI KONTRAK AWAL REALISASI S/D BULAN LALU REALISASI BULAN INI REALISASI S/D BULAN INI
HARGA JUMLAH JUMLAH JUMLAH JUMLAH
NO URAIAN PEKERJAAN
SAT. SATUAN VOL. HARGA VOL. HARGA VOL. HARGA VOL. HARGA
( Rp ) ( Rp ) ( Rp ) ( Rp ) ( Rp )
C PEKERJAAN DINDING PLESTERAN DAN LANTAI
1 Pek. Dinding Tembok 1/2 Bata 1pc : 2psr M2 92,004.90 46.50 4,278,227.85 - - 16.00 1,472,078.40 16.00 1,472,078.40
2 Pek. Dinding Tembok 1/2 Bata 1pc : 5psr M2 78,970.16 67.11 5,299,687.44 - - 145.58 11,496,475.89 145.58 11,496,475.89
3 Pek. Plesteran Dinding Trasram 1pc : 2psr M2 40,676.11 93.00 3,782,878.23 - - Err:509 Err:509 Err:509 Err:509
4 Pek. Plesteran Dinding Tembok 1pc : 5psr M3 37,032.41 186.00 6,888,028.26 - - 280.12 10,373,444.62 280.12 10,373,444.62
5 Pas. Tegel Dinding KM/WC 25 x 25 cm (corak) M2 121,232.00 55.25 6,698,068.00 - - 0.00 0.00 0.00 0.00
6 Pas. Tegel Keramik Lantai WC 20 x 20 cm (corak) M2 115,750.00 26.67 3,087,052.50 - - 1.35 156,262.50 1.35 156,262.50
7 Pek. Plesteran Beton Pondasi M2 40,676.11 10.50 427,099.16 - - 24.15 982,328.06 24.15 982,328.06
Jumlah 30,461,041.43 Err:509 Err:509
#REF! ###
#REF! ###
#REF! ###
#REF! ###
#REF! ###
#REF! ###
###
#REF! ###
### ###
### ###
### ###
### ###
LAPORAN SISTIM MONITORING PROYEK BULAN
BULANAN PEMBANGUNAN MCK KABUPATEN KONAWE UTARA TA. 2010 NOVEMBER
CERTIFIKASI BULANAN
PROPINSI : SULAWESI TENGGARA DIREKSI : DINAS PU DAN TATA RUANG LEMBAR : 06
KABUPATEN : KONAWE UTARA KONSULTAN PENGAWAS : CV. MEKANIKINDO KONSULTANT CERTIFIKATE :
NOMOR PAKET : 10 ( Sepuluh ) JENIS PEKERJAAN : PEMBANGUANAN MCK KEC. SAWA TGL. LAPORAN : November 2010
NO. KONTRAK : 460.10/03/SPKK-PNL/DPUTR-KU/IX/2010 : BOBOT S/D BULAN LALU :
NILAI KONTRAK : Rp 250,951,000.00 TARGET FISIK : BOBOT BULAN INI :
TANGGAL KONTRAK : 26 NOVEMBER 2010 LOKASI : KEC. SAWA BOBOT S/D BULAN INI :
PELAKSANA : CV. SARANA UTARA : KABUPATEN KONAWE UTARA
URAIAN KONRAK
NILAI KONTRAK AWAL REALISASI S/D BULAN LALU REALISASI BULAN INI REALISASI S/D BULAN INI
HARGA JUMLAH JUMLAH JUMLAH JUMLAH
NO URAIAN PEKERJAAN
SAT. SATUAN VOL. HARGA VOL. HARGA VOL. HARGA VOL. HARGA
( Rp ) ( Rp ) ( Rp ) ( Rp ) ( Rp )
D PEK. KUSEN PINTU PINTU DAN VENTILASI
1 Pek. Pas. Pintu KM/WC Aluminium Set 527,250.00 6.00 3,163,500.00 - - 0.00 0.00 0.00 0.00
2 Pek. Kusen Ventilasi Kayu Klas II M3 2,940,750.00 0.25 735,187.50 - - 3.43 10,099,711.80 3.43 10,099,711.80
3 Pek. Jalusi M2 250,275.00 1.87 468,014.25 - - 2.57 642,080.51 2.57
642,080.51
Jumlah 4,366,701.75 10,741,792.31 10,741,792.31
#REF! ###
#REF! ###
#REF! ###
#REF! ###
###
#REF! ###
### ###
### ###
### ###
### ###
LAPORAN SISTIM MONITORING PROYEK BULAN
BULANAN PEMBANGUNAN MCK KABUPATEN KONAWE UTARA TA. 2010 NOVEMBER
CERTIFIKASI BULANAN
PROPINSI : SULAWESI TENGGARA DIREKSI : DINAS PU DAN TATA RUANG LEMBAR : 07
KABUPATEN : KONAWE UTARA KONSULTAN PENGAWAS : CV. MEKANIKINDO KONSULTANT CERTIFIKATE :
NOMOR PAKET : 10 ( Sepuluh ) JENIS PEKERJAAN : PEMBANGUANAN MCK KEC. SAWA TGL. LAPORAN : November 2010
NO. KONTRAK : 460.10/03/SPKK-PNL/DPUTR-KU/IX/2010 : GORONG DESA LABUNGGA RUAS 2 BOBOT S/D BULAN LALU :
NILAI KONTRAK : Rp 250,951,000.00 TARGET FISIK : BOBOT BULAN INI :
TANGGAL KONTRAK : 26 NOVEMBER 2010 LOKASI : KEC. SAWA BOBOT S/D BULAN INI :
PELAKSANA : CV. SARANA UTARA : KABUPATEN KONAWE UTARA
URAIAN KONRAK
URAIAN PEKERJAAN NILAI KONTRAK AWAL REALISASI S/D BULAN LALU REALISASI BULAN INI REALISASI S/D BULAN INI
HARGA JUMLAH JUMLAH JUMLAH JUMLAH
NO
SAT. SATUAN VOL. HARGA VOL. HARGA VOL. HARGA VOL. HARGA
( Rp ) ( Rp ) ( Rp ) ( Rp ) ( Rp )
E PEK. INSTALASI LISTRIK DAN SANITASI
1 Pas. Instalasi Listrik Ls 1,250,000.00 1.00 1,250,000.00 - - 0.00 0.00 0.00 0.00
2 Pas. Kloset Jongkok Bh 365,060.00 6.00 2,190,360.00 - - 1.00 365,060.00 1.00 365,060.00
3 Pas. Floor Drain Bh 37,060.00 7.00 259,420.00 - - 1.00 37,060.00 1.00 37,060.00
4 Pemasangan Pipa Pvc 3/4" AW Untuk Air Bersih M1 32,047.00 28.00 897,316.00 - - 4.00 128,188.00 4.00 128,188.00
5 Pemasangan Pipa Pvc 3/4" AW Untuk Air Kotor M1 59,947.00 32.00 1,918,304.00 - - 7.00 419,629.00 7.00 419,629.00
6 Pek. Bak. Air Lapis Keramik Bh 1,313,240.00 7.00 9,192,680.00 - - 1.00 1,313,240.00 1.00 1,313,240.00
7 Pek. Septick Tank Bh 2,000,000.00 1.00 2,000,000.00 - - 1.00 2,000,000.00 1.00 2,000,000.00
8 Pek. Saluran Air Hujan Kel. Bangunan M1 102,236.76 34.00 3,476,049.84 - - 1.00 102,236.76 1.00 102,236.76
9 Pas. Kran Air Bh 32,500.00 8.00 260,000.00 - - 0.00 0.00 0.00 0.00
Jumlah 21,444,129.84 4,365,413.76 4,365,413.76
#REF! ###
#REF! ###
#REF! ###
#REF! ###
#REF! ###
#REF! ###
#REF! ###
###
#REF! ###
### ###
### ###
### ###
### ###
LAPORAN SISTIM MONITORING PROYEK BULAN
BULANAN PEMBANGUNAN MCK KABUPATEN KONAWE UTARA TA. 2010 NOVEMBER
CERTIFIKASI BULANAN
PROPINSI : SULAWESI TENGGARA DIREKSI : DINAS PU DAN TATA RUANG LEMBAR : 08
KABUPATEN : KONAWE UTARA KONSULTAN PENGAWAS : CV. MEKANIKINDO KONSULTANT CERTIFIKATE :
NOMOR PAKET : 10 ( Sepuluh ) JENIS PEKERJAAN : PEMBANGUANAN MCK KEC. SAWA TGL. LAPORAN : November 2010
NO. KONTRAK : 460.10/03/SPKK-PNL/DPUTR-KU/IX/2010 : BOBOT S/D BULAN LALU :
NILAI KONTRAK : Rp 250,951,000.00 TARGET FISIK : BOBOT BULAN INI :
TANGGAL KONTRAK : 26 NOVEMBER 2010 LOKASI : KEC. SAWA BOBOT S/D BULAN INI :
PELAKSANA : CV. SARANA UTARA : KABUPATEN KONAWE UTARA
URAIAN KONRAK
NILAI KONTRAK AWAL REALISASI S/D BULAN LALU REALISASI BULAN INI REALISASI S/D BULAN INI
HARGA JUMLAH JUMLAH JUMLAH JUMLAH
NO URAIAN PEKERJAAN
SAT. SATUAN VOL. HARGA VOL. HARGA VOL. HARGA VOL. HARGA
( Rp ) ( Rp ) ( Rp ) ( Rp ) ( Rp )
F PEKERJAAN PENGECETAN
1 Pek.Pengecetan Dinding, Kolom dan Lisplank M2 16,930.50 332.70 5,632,777.35 - - 0.00 0.00 0.00 0.00
2 Pek.Pengecetan Kayu 3 x M2 22,562.50 8.28 186,817.50 - - #REF! #REF! #REF! #REF!
Jumlah 5,819,594.85 #REF! #REF!
#REF! ###
#REF! ###
#REF! ###
###
#REF! ###
### ###
### ###
### ###
### ###
LAPORAN SISTIM MONITORING PROYEK BULAN
BULANAN PEMBANGUNAN MCK KABUPATEN KONAWE UTARA TA. 2010 NOVEMBER
CERTIFIKASI BULANAN
PROPINSI : SULAWESI TENGGARA DIREKSI : DINAS PU DAN TATA RUANG LEMBAR : 09
KABUPATEN : KONAWE UTARA KONSULTAN PENGAWAS : CV. MEKANIKINDO KONSULTANT CERTIFIKATE :
NOMOR PAKET : 10 ( Sepuluh ) JENIS PEKERJAAN : PEMBANGUANAN MCK KEC. SAWA TGL. LAPORAN : November 2010
NO. KONTRAK : 460.10/03/SPKK-PNL/DPUTR-KU/IX/2010 : BOBOT S/D BULAN LALU :
NILAI KONTRAK : Rp 250,951,000.00 TARGET FISIK : BOBOT BULAN INI :
TANGGAL KONTRAK : 26 NOVEMBER 2010 LOKASI : KEC. SAWA BOBOT S/D BULAN INI :
PELAKSANA : CV. SARANA UTARA : KABUPATEN KONAWE UTARA
URAIAN KONRAK
NILAI KONTRAK AWAL REALISASI S/D BULAN LALU REALISASI BULAN INI REALISASI S/D BULAN INI
HARGA JUMLAH JUMLAH JUMLAH JUMLAH
NO URAIAN PEKERJAAN
SAT. SATUAN VOL. HARGA VOL. HARGA VOL. HARGA VOL. HARGA
( Rp ) ( Rp ) ( Rp ) ( Rp ) ( Rp )
#REF! ###
#REF! ###
#REF! ###
#REF! ###
###
#REF! ###
### ###
### ###
### ###
### ###
LAPORAN SISTIM MONITORING PROYEK BULAN
BULANAN PEMBANGUNAN MCK KABUPATEN KONAWE UTARA TA. 2010 NOVEMBER
CERTIFIKASI BULANAN
PROPINSI : SULAWESI TENGGARA DIREKSI : DINAS PU DAN TATA RUANG LEMBAR : 10
KABUPATEN : KONAWE UTARA KONSULTAN PENGAWAS : CV. MEKANIKINDO KONSULTANT CERTIFIKATE :
NOMOR PAKET : 10 ( Sepuluh ) JENIS PEKERJAAN : PEMBANGUANAN MCK KEC. SAWA TGL. LAPORAN : November 2010
NO. KONTRAK : 460.10/03/SPKK-PNL/DPUTR-KU/IX/2010 : BOBOT S/D BULAN LALU :
NILAI KONTRAK : Rp 250,951,000.00 TARGET FISIK : BOBOT BULAN INI :
TANGGAL KONTRAK : 26 NOVEMBER 2010 LOKASI : KEC. SAWA BOBOT S/D BULAN INI :
PELAKSANA : CV. SARANA UTARA : KABUPATEN KONAWE UTARA
URAIAN KONRAK
NILAI KONTRAK AWAL REALISASI S/D BULAN LALU REALISASI BULAN INI REALISASI S/D BULAN INI
HARGA JUMLAH JUMLAH JUMLAH JUMLAH
NO URAIAN PEKERJAAN
SAT. SATUAN VOL. HARGA VOL. HARGA VOL. HARGA VOL. HARGA
( Rp ) ( Rp ) ( Rp ) ( Rp ) ( Rp )
B PEKERJAAN BETON DAN PENGECETAN
1 Pek. Pondasi Beton Bertulang 1pc : 2psr : 3krl M3 4,190,002.00 1.13 4,734,702.26 - - #REF! #REF! #REF! #REF!
2 Pek. Sloof 15 x 20 cm 1pc : 2psr : 3krl M3 5,459,552.00 0.22 1,201,101.44 - - #REF! #REF! #REF! #REF!
3 Pek. Balok 15 x 30 cm 1pc : 2psr : 3krl M3 6,110,757.00 0.65 3,971,992.05 - - #REF! #REF! #REF! #REF!
4 Pek. Kolom 20 x 20 cm 1pc : 2psr : 3krl M3 7,816,032.00 0.88 6,878,108.16 - - #REF! #REF! #REF! #REF!
5 Pek. Pelat Beton Tebal 12 cm 1pc : 2psr : 3krl M3 7,981,032.00 0.55 4,389,567.60 - - #REF! #REF! #REF! #REF!
6 Pek. Rabat Beton Stam 1pc : 3psr : 5krl t. 5 cm M3 614,141.00 0.57 350,060.37 - - #REF! #REF! #REF! #REF!
7 Pek. Plesteran 1pc : 5psr M2 37,032.41 26.95 998,023.45 - - #REF! #REF! #REF! #REF!
8 Pek. Acian Tembok M2 22,351.50 26.95 602,372.92 - - #REF! #REF! #REF! #REF!
9 Pek. Pengecetan Tembok M2 16,912.50 26.95 455,791.88 - - #REF! #REF! #REF! #REF!
Jumlah 23,581,720.13 #REF! #REF!
#REF! ###
#REF! ###
#REF! ###
#REF! ###
#REF! ###
#REF! ###
#REF! ###
###
#REF! ###
### ###
### ###
### ###
### ###
LAPORAN SISTIM MONITORING PROYEK BULAN
BULANAN PEMBANGUNAN MCK KABUPATEN KONAWE UTARA TA. 2010 NOVEMBER
CERTIFIKASI BULANAN
PROPINSI : SULAWESI TENGGARA DIREKSI : DINAS PU DAN TATA RUANG LEMBAR : 11
KABUPATEN : KONAWE UTARA KONSULTAN PENGAWAS : CV. MEKANIKINDO KONSULTANT CERTIFIKATE :
NOMOR PAKET : 10 ( Sepuluh ) JENIS PEKERJAAN : PEMBANGUANAN MCK KEC. SAWA TGL. LAPORAN : November 2010
NO. KONTRAK : 460.10/03/SPKK-PNL/DPUTR-KU/IX/2010 : BOBOT S/D BULAN LALU :
NILAI KONTRAK : Rp 250,951,000.00 TARGET FISIK : BOBOT BULAN INI :
TANGGAL KONTRAK : 26 NOVEMBER 2010 LOKASI : KEC. SAWA BOBOT S/D BULAN INI :
PELAKSANA : CV. SARANA UTARA : KABUPATEN KONAWE UTARA
URAIAN KONRAK
NILAI KONTRAK AWAL REALISASI S/D BULAN LALU REALISASI BULAN INI REALISASI S/D BULAN INI
HARGA JUMLAH JUMLAH JUMLAH JUMLAH
NO URAIAN PEKERJAAN
SAT. SATUAN VOL. HARGA VOL. HARGA VOL. HARGA VOL. HARGA
( Rp ) ( Rp ) ( Rp ) ( Rp ) ( Rp )
C PEKERJAAN SUMUR BOR
1 Penyiapan Lokasi Titik Pemboran Ls 1,150,000.00 1.00 1,150,000.00 - - #REF! #REF! #REF! #REF!
2 Mobilitasi dan Demobilitasi Peralatan Bor Ls 1,200,000.00 1.00 1,200,000.00 - - #REF! #REF! #REF! #REF!
3 Pemboran Sumur Dalam Unit 5,000,000.00 1.00 5,000,000.00 - - #REF! #REF! #REF! #REF!
4 Pengdaan dan Pemasangan Pipa Cassing Unit 1,500,000.00 1.00 1,500,000.00 - - #REF! #REF! #REF! #REF!
5 Pengad. dan Pas. Pompa Air (Jet Pump 150 Watt) Unit 2,885,000.00 1.00 2,885,000.00 - - #REF! #REF! #REF! #REF!
Jumlah 11,735,000.00 #REF! #REF!
#REF! ###
#REF! ###
#REF! ###
#REF! ###
#REF! ###
#REF! ###
###
#REF! ###
### ###
### ###
### ###
### ###
LAPORAN SISTIM MONITORING PROYEK
BULANAN PEMBANGUNAN MCK KABUPATEN KONAWE UTARA TA. 2010
CERTIFIKASI BULANAN
PROPINSI : SULAWESI TENGGARA DIREKSI : DINAS PU DAN TATA RU
KABUPATEN : KONAWE UTARA KONSULTAN PENGAWAS : CV. MEKANIKINDO KON
NOMOR PAKET : 10 ( Sepuluh ) JENIS PEKERJAAN : PEMBANGUANAN MCK K
NO. KONTRAK : 460.10/03/SPKK-PNL/DPUTR-KU/IX/2010 :
NILAI KONTRAK : Rp 250,951,000.00 TARGET FISIK :
TANGGAL KONTRAK : 26 NOVEMBER 2010 LOKASI : KEC. SAWA
PELAKSANA : CV. SARANA UTARA : KABUPATEN KONAWE U
URAIAN KONRAK
NILAI KONTRAK AWAL REALISASI S/D BULAN LAL
HARGA JUMLAH
NO URAIAN PEKERJAAN
SAT. SATUAN VOL. HARGA VOL.
( Rp ) ( Rp )
D PEK. PAS. PIPA DAN ASESSORIS PIPA
1 Pemasangan Pipa PVC 1/2" AW M1 28,947.00 32.00 926,304.00 -
2 Pemasangan Stop Kran Bh 24,500.00 2.00 49,000.00 -
3 Bak Air Fibre Glass Kap. 1 M3 Unit 1,500,000.00 2.00 3,000,000.00 -
4 Pembuatan Tangga Tower (Besi Beton Dia. 16) LS 350,000.00 1.00 350,000.00 -
Jumlah 4,325,304.00
Mengetahui :
KOORDINATOR PENGAWAS DIREKSI TEKNIS CV. MEKANIKINDO KO
BIDANG CIPTA KARYA DINAS PU DAN TATA RUANG KONSULTAN PENG
#REF! ###
#REF! ###
#REF! ###
#REF! ###
#REF! ###
###
#REF! ###
### ###
### ###
### ###
### ###
LAPORAN SISTIM MONITORING PROYEK BULAN
BULANAN PEMBANGUNAN MCK KABUPATEN KONAWE UTARA TA. 2010 NOVEMBER
CERTIFIKASI BULANAN
PROPINSI : SULAWESI TENGGARA DIREKSI : DINAS PU DAN TATA RUANG LEMBAR : 12
KABUPATEN : KONAWE UTARA KONSULTAN PENGAWAS : CV. MEKANIKINDO KONSULTANT CERTIFIKATE :
NOMOR PAKET : 10 ( Sepuluh ) JENIS PEKERJAAN : PEMBANGUANAN MCK KEC. SAWA TGL. LAPORAN : November 2010
NO. KONTRAK : 460.10/03/SPKK-PNL/DPUTR-KU/IX/2010 : BOBOT S/D BULAN LALU :
NILAI KONTRAK : Rp 250,951,000.00 TARGET FISIK : BOBOT BULAN INI :
TANGGAL KONTRAK : 26 NOVEMBER 2010 LOKASI : KEC. SAWA BOBOT S/D BULAN INI :
PELAKSANA : CV. SARANA UTARA : KABUPATEN KONAWE UTARA
URAIAN KONRAK
NILAI KONTRAK AWAL REALISASI S/D BULAN LALU REALISASI BULAN INI REALISASI S/D BULAN INI
HARGA JUMLAH JUMLAH JUMLAH JUMLAH
NO URAIAN PEKERJAAN
SAT. SATUAN VOL. HARGA VOL. HARGA VOL. HARGA VOL. HARGA
( Rp ) ( Rp ) ( Rp ) ( Rp ) ( Rp )
D PEKERJAAN FINISHING
1 Finishing dan Pembersihan Lokasi LS 650,000.00 #REF! #REF! - - #REF! #REF! #REF! #REF!
#REF! ###
#REF! ###
#REF! ###
#REF! ###
###
#REF! ###
### ###
### ###
### ###
### ###
PEMERINTAH DAERAH KABUPATEN KONAWE
DINAS PENDIDIKAN
Alamat : Kompleks Perkantoran Unaaha
BACK UP VOLUME
TAHUN ANGGARAN
2013
BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : LEMBAR : 1
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : TANGGAL :
NO. KONTRAK : - KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : Rp 318,000,000.00 KEGIATAN : DANA INSENTIF DAERAH ( DID) T.A 2014 BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEKERJAAN PERSIAPAN
MUH.AFZAN
3 Penyediaan Air Kerja. Air Minum. P3K Satuan LS 1.00 Sataf Teknik
DIPERIKSA OLEH :
4 Pembuatan Bangsal Kerja Satuan LS 1.00 CV. PANCAPILAR KREASINDO
MURSYIDUDDIN H ,ST
6 Administrasi, Dokumentasi Dan Pelaporan Satuan LS 1.00 Direktur
BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR : 2
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : - KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : Rp 318,000,000.00 KEGIATAN : DANA INSENTIF DAERAH ( DID) T.A 2014 BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEK. TANAH DAN PASIR DAN BATU
1 Galian Tanah Pondasi Batu Gunung LUASAN PENAMPANG RUMUS = DIBUAT OLEH :
a = 0.80 M a x t x p CV. PANCAPILAR KREASINDO
t = 0.60 M
p = 77.00 M 0.80 x 0.60 x 77.00
N
SKETSA/GAMBAR DIMENSI VOLUME KETERANGAN
O
MURSYIDUDDIN H ,ST
Direktur
6 Pasangan Batu Gunung 1 pc : 4 psr LUASAN PENAMPANG RUMUS =
a = 0.25 M a + b : 2 x t x p
b = 0.54 M
t = 0.70 M 0.25 + 0.54 : 2 x 0.70 77.00
p = 77.00 M
Volume Pas. Podasi Batu Gunung = 21.29 M3
BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR : 4
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : - KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : Rp 318,000,000.00 KEGIATAN : DANA INSENTIF DAERAH ( DID) T.A 2014 BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEK. TANAH DAN PASIR DAN BATU
Pek.
7 Pas. Batu Kosong LUASAN PENAMPANG RUMUS = DIBUAT OLEH :
a = 0.80 M a x t x p CV. PANCAPILAR KREASINDO
t = 0.20 M
p = 77.00 M 0.80 x 0.20 x 77.00
DIPERIKSA OLEH :
CV. PANCAPILAR KREASINDO
MURSYIDUDDIN H ,ST
Direktur
BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR : 5
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : - KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : Rp 318,000,000.00 KEGIATAN : DANA INSENTIF DAERAH ( DID) T.A 2014 BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEKERJAAN. BETON
1 Pekerjaan Sloof 15 X 20 cm 1pc : 2psr : 3krl LUASAN PENAMPANG RUMUS = DIBUAT OLEH :
a = 0.15 M a x t x p CV. PANCAPILAR KREASINDO
t = 0.20 M
p = 77.00 M 0.15 x 0.20 x 77.00
MURSYIDUDDIN H ,ST
Direktur
2.b Pek. Kolom Praktis/ utama 15 x 20 Cm, 1 Pc : 2 Psr : 3 Krl LUASAN PENAMPANG RUMUS =
a = 0.15 M a x b x t x Jml
b = 0.25 M
t = 3.58 M 0.15 x 0.25 x 3.58 x 12.00
Jml = 12.00 Bh
Volume Kolom 15 x 20 = 1.61 M3
7.16
12
12
3
3
3
3
36
12
3
2
2
3
22
BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR : 6
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : - KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : Rp 318,000,000.00 KEGIATAN : DANA INSENTIF DAERAH ( DID) T.A 2014 BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEKERJAAN. BETON
3 Pek. Kolom Teras 1Pc : 2 Psr : 3 Krl LUASAN PENAMPANG RUMUS = DIBUAT OLEH :
a = 0.15 M a x b x t x jml CV. PANCAPILAR KREASINDO
b = 0.25 M
t = 3.58 M 0.15 x 0.25 x 3.58 x 6.00
jml = 6.00 M
Volume kolom teras = 0.81 M3 JAKI PATRIAWAN
StafTeknik
4 Pek. Ring Balok 15 x 20, 1 Pc : 2 Psr : 3 Krl LUASAN PENAMPANG RUMUS = DIPERIKSA OLEH :
p = 81.00 M p CV. PANCAPILAR KREASINDO
81.00
a = 9.00 M a x b x t
p = 15.00 M
t = 0.07 M 9.00 x 15.00 x 0.07
40
28
81
149
0.07
12
12
3
3
3
3
36
12
3
2
2
3
22
BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR : 7
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : - KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : Rp 318,000,000.00 KEGIATAN : DANA INSENTIF DAERAH ( DID) T.A 2014 BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEKERJAAN. BETON
DIBUAT OLEH :
6 Pek. Rabat Beton Keliling T, 7 Cm, 1 Pc : 3 Psr : 5 Krl + Acian LUASAN PENAMPANG RUMUS = CV. PANCAPILAR KREASINDO
a = 0.80 M a x b x t
p = 54.40 M
t = 0.07 M 0.80 x 54.40 x 0.07
JAKI PATRIAWAN
Volume Rabat = 3.05 M
3
StafTeknik
DIPERIKSA OLEH :
7 Pek.Saluran Air Hujan Keliling LUASAN PENAMPANG RUMUS = CV. PANCAPILAR KREASINDO
p = 55.20 M p
55.20
40
28
81
149
0.07
12
12
3
3
3
3
36
12
3
2
2
3
22
BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR : 8
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : - KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : Rp 318,000,000.00 KEGIATAN : DANA INSENTIF DAERAH ( DID) T.A 2014 BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEK.DINDING PLESTER DAN PROFIL
0.25
NO SKETSA/GAMBAR DIMENSI VOLUME KETERANGAN
1.35
0.7
1 Pek. Dinding Tembok 1/2 Bata 1pc : 2psr LUASAN PENAMPANG RUMUS = DIBUAT OLEH : 2.94
t = 0.30 M t x p - Bukaan CV. PANCAPILAR KREASINDO
p = 62.00 M
Bukaan = 2.60 M2 0.30 x 62.00 - 2.60
1
a Volume Bata 1 : 2 16.00 M2 3.6
JAKI PATRIAWAN
2 Pek. Dinding Tembok 1/2 Bata 1pc : 5psr LUASAN PENAMPANG RUMUS = StafTeknik
t = 3.28 M t x p - Bukaan 0.39
p = 62.00 M 3.28 x 62.00 - 57.78 DIPERIKSA OLEH : 1.17
Bukaan = 57.78 M2 CV. PANCAPILAR KREASINDO
Volume Bata 1 : 5 145.58 M2
luas bukaan
panjang
0.7
0.60
KURANG
4.485 2.04
40.365 4.08
3.105 3.77
18.63 11.31
KURANG
DIPERIKSA OLEH :
CV. PANCAPILAR KREASINDO
40
28
81
149
#REF!
12
12
3
3
3
3
36
12
3
2
2
3
22
BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR : 10
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : - KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : Rp 318,000,000.00 KEGIATAN : DANA INSENTIF DAERAH ( DID) T.A 2014 BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEK.DINDING PLESTER DAN PROFIL
DIBUAT OLEH :
6 Pek. Plesteran Pondasi 1 : 2 CV. PANCAPILAR KREASINDO
LUASAN PENAMPANG RUMUS =
p = 48.00 M p x l
l = 0.40 M 48.00 x 0.40
Volume Plesteran Pondasi 1 : = 19.20 M2 JAKI PATRIAWAN
Staf Teknik
DIPERIKSA OLEH :
CV. PANCAPILAR KREASINDO
MURSYIDUDDIN H ,ST
Direktur
81 22.4
28 58
109 80.4
40
28
81
149
#REF!
12
12
3
3
3
3
36
12
3
2
2
3
22
BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR : 11
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : - KONSULTAN PENGAWAS : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : Rp 318,000,000.00 KEGIATAN : DANA INSENTIF DAERAH ( DID) T.A 2014 BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEK. KUSEN,PINTU,JENDELA & VENTILASI & PENGGANTUNG
1 Pek. Kusen Pintu, Ventilasi dan Jendela LUASAN PENAMPANG RUMUS = DIBUAT OLEH :
a = 0.15 M a x t x p CV. MEKANIKINDO KONSULTANT
t = 0.07 M
p = 175.30 M 0.15 x 0.07 x 175.30
L = 0.82 M l x p x Jml
p = 2.12 M 0.82 x 2.12 x 3.00
Jml = 3.00 Bh
Volume Pas. Pintu Panil Jati = 5.22 M2 MURSYIDUDDIN H ,ST
3 Pek. Pas. Bingkai Jendela Kaca Kayu Jati Direktur
Volume Pas. Pintu Panil Jati = 8.65 M2
6.9
5.4 46.8 PANIL PANIL
p
6.9
7.8 69.9
2.24 L
1.2
1.84 13.76
1.6 6.88 PANIL
27.24
KURANG
a = 0.48 M a x p x jml
a
p = 0.82 M JAKI PATRIAWAN
Jml = 1.00 M 0.48 x 0.82 x 1.00 Staf Teknik
KACA 5 mm
= 0.39
p
P
L = 0.70 M 0.70 x 2.10 x 1.00
P = 2.10 M Volume Pintu Panil Jati = 11.55 M2
Jml = 1.00 Bh
#REF!
5.8 a
2.6 20
6.9
5.4 46.8 PANIL PANIL
p
6.9
7.8 69.9
2.24 L
1.84 #REF!
1.6 #REF!
PANIL
KURANG
JAKI PATRIAWAN
Staf Teknik
3 Pek. Pas. Balok Apit , konsol & Balok Angin Luasan Penampang RUMUS MURSYIDUDDIN H ,ST
a = 0.06 M a x t x p Direktur
t = 0.12 M 0.06 x 0.12 x 91.12
p = 91.12 M
406
KURANG
Erdiman, A.Md
BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR : 15
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : - KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : Rp 318,000,000.00 KEGIATAN : DANA INSENTIF DAERAH ( DID) T.A 2014 BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEK.KUDA - KUDA,KAP DAN ATAP PENUTUP
p = 3.09 M p x l x 2
l. = 2.82 M 3.09 x 2.82 x 2.00
Volume Pas.Rangka At = 17.43 M2 MURSYIDUDDIN H ,ST
Direktur
Erdiman, A.Md
BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR : 16
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : - KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : Rp 318,000,000.00 KEGIATAN : DANA INSENTIF DAERAH ( DID) T.A 2014 BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEK.KUDA - KUDA,KAP DAN ATAP PENUTUP
DIBUAT OLEH :
5 Pek. Nok Atap LUAS PENAMPANG CV. MEKANIKINDO KONSULTANT
p = 26.62 M
JAKI PATRIAWAN
6 Pek. List Plank Luasan Penampang Staf Teknik
p = 71.08 M
Volume Pas. List Plank = 71.08 M1 DIPERIKSA OLEH :
CV. PANCAPILAR KREASINDO
MURSYIDUDDIN H ,ST
Direktur
KURANG
Erdiman, A.Md
BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR : 17
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : - KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : Rp 318,000,000.00 KEGIATAN : DANA INSENTIF DAERAH ( DID) T.A 2014 BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEK.PENGECETAN DAN FINISHING
MURSYIDUDDIN H ,ST
3 Pek. Pengecetan Jalusi,Pintu & jendela LUASAN PENAMPANG RUMUS = Direktur
Pas.Pintu = 8.65 8.65 + 2.57 + 22.04
Pas. Bingkai Jendela = 2.57
Pas. Jalusi 22.04
Volume Pengecetan pintu = 33.26 M2
81 22.4
28 58
109 80.4
40
28
81
149
0.00
0.00
12
12
3
3
3
3
36
12
3
2
2
3
22
BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR : 18
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : - KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : Rp 318,000,000.00 KEGIATAN : DANA INSENTIF DAERAH ( DID) T.A 2014 BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEK.PENGECETAN DAN FINISHING
DIPERIKSA OLEH :
CV. PANCAPILAR KREASINDO
MURSYIDUDDIN H ,ST
Direktur
81 22.4
28 58
109 80.4
40
28
81
149
#REF!
#REF!
12
3
3
18
12
3
2
2
3
22
#REF!
CALCULATION SHEET
KABUPATEN : #REF! PELAKSANA : - LEMBAR :
PEKERJAAN : #REF! DIREKSI : - TANGGAL :
NO. KONTRAK : KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : KEGIATAN : #REF! BOBOT :
LOKASI : #REF! PEKERJAAN : PEK. INSTALASI LISTRIK DAN SANITASI
5 Pemasangan Pipa Pvc 3/4" AW Untuk Air Kotor - Panjang Pipa PVC 3/4" = 7.00 M1
BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR : 13
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : - KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : Rp 318,000,000.00 KEGIATAN : DANA INSENTIF DAERAH ( DID) T.A 2014 BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEK.RANGKA PLAFOND & PENGGANTUNG
JAKI PATRIAWAN
Staf Teknik
406
KURANG
Erdiman, A.Md
BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR : 10
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : - KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : Rp 318,000,000.00 KEGIATAN : DANA INSENTIF DAERAH ( DID) T.A 2014 BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEK.DINDING PLESTER DAN PROFIL
DIPERIKSA OLEH :
CV. PANCAPILAR KREASINDO
MURSYIDUDDIN H ,ST
Direktur
81 22.4
28 58
109 80.4
40
28
81
149
0.00
12
12
3
3
3
3
36
12
3
2
2
3
22
BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR : 6
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : - KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : Rp 318,000,000.00 KEGIATAN : DANA INSENTIF DAERAH ( DID) T.A 2014 BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEKERJAAN. BETON
6 Pek. Rabat Beton Keliling T, 7 Cm, 1 Pc : 3 Psr : 5 Krl LUASAN PENAMPANG RUMUS = DIBUAT OLEH :
a = 0.85 M a x b x t CV. PANCAPILAR KREASINDO
p = 44.80 M
t = 0.07 M 0.85 x 44.80 x 0.07
DIPERIKSA OLEH :
CV. PANCAPILAR KREASINDO
7 Pek. Saluran Air Hujan keliling LUASAN PENAMPANG RUMUS =
p = 44.80 M p
44.80
MURSYIDUDDIN H ,ST
Volume Salluran = 44.80 M3 Direktur
81
28
109
40
28
81
149
#REF!
12
12
3
3
3
3
36
12
3
2
2
3
22
BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR : 14
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : - KONSULTAN PERENCAN : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : Rp 318,000,000.00 KEGIATAN : DANA INSENTIF DAERAH ( DID) T.A 2014 BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEK. INSTALASI LISTRIK
MURSYIDUDDIN H ,ST
Direktur
KURANG
JAKI PATRIAWAN
Staf Teknik
DIPERIKSA OLEH :
CV. PANCAPILAR KREASINDO
MURSYIDUDDIN H ,ST
Direktur
81 22.4
28 58
109 80.4
40
28
81
149
0.00
0.00
12
12
3
3
3
3
36
12
3
2
2
3
22
#REF!
CALCULATION SHEET
KABUPATEN : #REF! PELAKSANA : LEMBAR :
PEKERJAAN : #REF! DIREKSI : - TANGGAL :
NO. KONTRAK : KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : KEGIATAN : #REF! BOBOT :
LOKASI : #REF! PEKERJAAN : PEK. INSTALASI LISTRIK DAN SANITASI
INDRA KIRANA
Staf Teknik
7 Pek. Septick Tank
DIPERIKSA OLEH :
- CV. PANCAPILAR KREASINDO
MURSYIDUDDIN H ,ST
- Direktur
#REF!
CALCULATION SHEET
KABUPATEN : #REF! PELAKSANA : LEMBAR :
PEKERJAAN : #REF! DIREKSI : - TANGGAL :
NO. KONTRAK : KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : KEGIATAN : #REF! BOBOT :
LOKASI : #REF! PEKERJAAN : PEK. INSTALASI LISTRIK DAN SANITASI
INDRA KIRANA
Staf Teknik
DIPERIKSA OLEH :
- CV. PANCAPILAR KREASINDO
MURSYIDUDDIN H ,ST
Direktur
24
6
4
0.5
BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR :
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : - KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : Rp 318,000,000.00 KEGIATAN : DANA INSENTIF DAERAH ( DID) T.A 2014 BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEK.DINDING PLESTER DAN PROFIL
108.00
jml = 3 bh
p
MURSYIDUDDIN H ,ST
19 Pek. Saluran Air Hujan Keliling Bangunan LUASAN PENAMPANG RUMUS = Direktur
p = 82.00 M p
0.00
40
28
81
149
30.7
92.1
3.00
23.1
115.2 12
12
3
3
3
3
36
12
3
2
2
3
22
BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR :
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : - KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : Rp 318,000,000.00 KEGIATAN : DANA INSENTIF DAERAH ( DID) T.A 2014 BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEK. TANAH DAN PASIR
1 Galian Tanah Pondasi Batu Gunung LUASAN PENAMPANG RUMUS = DIBUAT OLEH :
a = 0.95 M a + b : 2 x t x p -
b = 0.80 M
t = 0.70 M 0.95 + 0.80 : 2 x 0.70 x 117.00
p = 117.00 M
Volume Galian Tanah = 70.20 M3
LAINDA
2 Urugan Kembali Bekas Galian LUASAN PENAMPANG RUMUS = Direktur
a = 0.40 M a + b : 2 x t x p
b = 0.24 M DIPERIKSA OLEH :
t = 0.76 M 0.40 + 0.24 : 2 x 0.76 x 72.00 CV. PANCAPILAR KREASINDO 12
p = 72.00 M 12
Volume Urugan Tanah = 17.55 M3 12
3
3
MURSYIDUDDIN H ,ST 2
3 Urugan Tanah Bawah Lantai LUASAN PENAMPANG RUMUS = Direktur 3
a = 9.00 M a x p x t 3
p = 27.00 M 2
t = 1.00 M 9.00 x 27.00 x 1.00 3
3
Volume Urugan Tanah = 243.00 M
3 58
750,000,000.00
45,000,000.00
30,000,000.00
81.00
36.00
117.00
28.8
=
BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR :
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : - KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : Rp 318,000,000.00 KEGIATAN : DANA INSENTIF DAERAH ( DID) T.A 2014 BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEK. TANAH DAN PASIR DAN BATU
0.25
NO SKETSA/GAMBAR DIMENSI VOLUME KETERANGAN
1.35
0.7
3 Pek. Dinding Tembok 1/2 Bata 1pc : 2psr LUASAN PENAMPANG RUMUS = DIBUAT OLEH : 2.94
t = 0.30 M t x p - Bukaan CV. INDA JAYA
p = 82.00 M
Bukaan = 1.70 M2 0.30 x 82.00 - 1.70
1
Volume Bata 1 : 3 23.43 M2 3.6
LAINDA
4 Pek. Dinding Tembok 1/2 Bata 1pc : 5psr LUASAN PENAMPANG RUMUS = Direktur
t = 3.20 M t x p - Bukaan 0.39
p = 82.00 M DIPERIKSA OLEH : 1.17
Bukaan = 74.39 M2 3.20 x 82.00 - 74.39 CV. PANCAPILAR KREASINDO
0.7
0.60
KURANG
4.485 2.04
40.365 4.08
3.105 3.77
18.63 11.31
KURANG
Pelaksana
5 Pek. Ring Balok 15 x 15 cm 1 Pc : 2 Psr : 3 Krl LUASAN PENAMPANG RUMUS = DIPERIKSA OLEH :
a = 0.15 M a x b x p KONSULTAN PENGAWAS
b = 0.15 M CV. PANCAPILAR KREASINDO
p = 72.00 M 0.15 x 0.15 x 72.00
9
27.2
36.2
=
BACK UP DATA
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR :
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : KONSULTAN PENGAWAS : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : KEGIATAN : PEMB. GADUNG LAB.KOMPUTER BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEK. BETON
6 Pek. Rabat Beton Stamp. 1 Pc : 3 Psr : 5 Krl. LUASAN PENAMPANG RUMUS = DIBUAT OLEH :
L = 96.00 M L x t CV. MEKANIKINDO CONSULTANT
t = 0.06 M -
96.00 x 0.06
DIPERIKSA OLEH :
CV. PANCAPILAR KREASINDO
MURSYIDUDDIN H ,ST
Direktur
4.4 8.8
13.55 27.1
35.90
BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR :
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : KEGIATAN : PEMB. GADUNG LAB.KOMPUTER BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEK. DINDING PLESTERAN DAN LANTAI
4 Pek. Plesteran Dinding Tembok 1pc : 5psr LUASAN PENAMPANG RUMUS = DIBUAT OLEH :
p = 53.47 M p x t - Bukaan x 2 CV. MEKANIKINDO CONSULTANT
t = 3.70 M 53.47 x 3.70 - 57.78 x 2 -
Bukaan = 57.78 M2
Volume Plesteran 1 : 5 = 280.12 M2
INDRA KIRANA
Staf Teknik
DIPERIKSA OLEH :
CV. PANCAPILAR KREASINDO
0.60
MURSYIDUDDIN H ,ST
Direktur
5 Pas. Tegel Keramik Lantai WC 20 x 20 cm (corak) LUASAN PENAMPANG -55.25
a = 1.50 M a x p - b
p = 1.50 M
b = 0.90 M2 1.50 x 1.50 - 0.90
Erdiman, A.Md
BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR :
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : KEGIATAN : PEMB. GADUNG LAB.KOMPUTER BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEK. DINDING PLESTERAN DAN LANTAI
DIPERIKSA OLEH :
CV. PANCAPILAR KREASINDO
7 Pek. Pasangan Tegel Lantai 40 x 40 cm LUAS PENAMPANG
L = 96.00 M2
L
MURSYIDUDDIN H ,ST
Vol. Pas.Tegel 40 x 40 = 96.00 M2 Direktur
KURANG
96
p
BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR :
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : KEGIATAN : PEMB. GADUNG LAB.KOMPUTER BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEK. KUSEN PINTU PINTU DAN VENTILASI
KACA 5 mm
INDRA KIRANA
Staf Teknik
DIPERIKSA OLEH :
b LUAS PENAMPANG CV. PANCAPILAR KREASINDO
p a = 0.20 M L x P x Jml
a
KACA 5 mm
MURSYIDUDDIN H ,ST
c LUAS PENAMPANG Direktur
a = 0.62 M L x P x Jml
a
P = 1.08 M 0.62 x 1.08 x 10.00
KACA 5 mm Jml = 10.00 Bh Volume Jendela Kaca Mati = 6.70 M2
p
PANIL PANIL
p
PANIL
P
KURANG
INDRA KIRANA
Pelaksana
DIPERIKSA OLEH :
CV. PANCAPILAR KREASINDO
MURSYIDUDDIN H ,ST
Direktur
24
6
4.40
13.55 4
189.772 0.5
43.13
54.77 L
287.67
#REF!
CALCULATION SHEET
KABUPATEN : #REF! PELAKSANA : LEMBAR :
PEKERJAAN : #REF! DIREKSI : - TANGGAL :
NO. KONTRAK : KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : KEGIATAN : PEMBANGUNAN MCK KEC. SAWA BOBOT :
LOKASI : #REF! PEKERJAAN : PEK.PEMBERSIHAN
INDRA KIRANA
Pelaksana
DIPERIKSA OLEH :
CV. PANCAPILAR KREASINDO
MURSYIDUDDIN H ,ST
Direktur
24
6
4.40
13.55 4
189.772 0.5
43.13
54.77
287.67