Anda di halaman 1dari 148

LAMPIRAN BERITA ACARA MUTUAL CHECK DAN CONTRACK CANGE ORDER

NOMOR PAKET : 10 (Sepuluh)


PEKERJAAN : Pembanguanan MCK Kec.Sawa
LOKASI : KECAMATAN SAWA KAB. KONAWE
TAHUN ANGGARAN :
KONTRAKTOR : CV : SARANA UTARA

NILAI KONTRAK AWAL NILAI KONTRAK AMANDEMEN I DECREASE ( - )


HARGA JUMLAH BOBOT HARGA JUMLAH BOBOT
NO URAIAN PEKERJAAN
SAT. VOLUME SATUAN HARGA ( % ) VOLUME SATUAN HARGA ( % ) VOLUME
( Rp ) ( Rp ) ( Rp ) ( Rp )

II PEMBANGUANAN MCK
A PEKERJAAN TANAH, PASIR DAN BATU
1 M3 1,052,853.75 0.50 86.15 39,125.00 3,370,618.75 1.59 -59.24
2 M3 898,003.00 0.42 21.54 135,650.00 2,921,901.00 1.38 -
3 M3 185,220.00 0.09 10.80 17,150.00 185,220.00 0.09 -
4 M3 626,157.00 0.30 3.78 165,650.00 626,157.00 0.30 -
5 M3 417,438.00
6 M3 7,971,334.84
7 M3 908,320.39 0.43 123.55 120,148.20 14,844,310.11 7.00 -115.99
12,059,326.98 1.73 21,948,206.86 10.35
B PEKERJAAN BETON
1 Pek. Sloof 15 x 20 cm 1pc : 2psr : 3krl M3 8,353,114.56 3.94 24.62 5,459,552.00 134,414,170.24 63.41 -23.09
2 Pek. Balok 15 x 25 cm 1pc : 2psr : 3krl M3 8,921,705.22 4.21 68.20 6,110,757.00 416,753,627.40 196.60 -66.74
3 Pek. Balok 15 x 20 cm 1pc : 2psr : 3krl M3 7,027,370.55 3.32 1.15 6,110,757.00 7,027,370.55 3.32 -
4 Pek. Kolom 20 x 20 cm 1pc : 2psr : 3krl M3 13,912,536.96 6.56 1.78 7,816,032.00 13,912,536.96 6.56 -
5 Pek. Kolom Praktis 12 x 12 cm 1pc : 2psr : 3krl M3 2,622,768.00 1.24 24.00 109,282.00 2,622,768.00 1.24 -
6 Pek. Pelat Atap Tebal 12 cm 1pc : 2psr : 3krl M3 58,181,723.28 27.45 3.69 7,981,032.00 29,450,008.08 13.89 -
7 Pek. Rabat Beton Stam 1pc : 3psr : 5krl t. 5 cm M3 1,105,453.80 614,141.00
8 Pek. Rabat Beton Keliling Bangunan 1 : 3 : 5k M3 687,837.92 614,141.00
9 Pek. Lisplank Beton Tebal 8 cm 1pc : 2psr : 3krl M3 4,309,757.28 2.03 0.54 7,981,032.00 4,309,757.28 2.03 -
105,122,267.57 48.74 608,490,238.51 287.05

KONTRAK AWAL NILAI KONTRAK AMANDEMEN I DECREASE ( - )


HARGA JUMLAH BOBOT HARGA JUMLAH BOBOT
NO URAIAN PEKERJAAN
SAT. VOLUME SATUAN HARGA ( % ) VOLUME SATUAN HARGA ( % ) VOLUME
( Rp ) ( Rp ) ( Rp ) ( Rp )

C PEKERJAAN DINDING PLESTERAN DAN LANTAI


1 Pek. Dinding Tembok 1/2 Bata 1pc : 2psr 46.50 92,004.90 4,278,227.85 2.02 46.50 92,004.90 4,278,227.85 2.02 -
2 Pek. Dinding Tembok 1/2 Bata 1pc : 5psr 67.11 78,970.16 5,299,687.44 2.50 67.11 78,970.16 5,299,687.44 2.50 -
3 Pek. Plesteran Dinding Trasram 1pc : 2psr 93.00 40,676.11 3,782,878.23 1.78 36.00 40,676.11 1,464,339.96 0.69 -
4 Pek. Plesteran Dinding Tembok 1pc : 5psr 186.00 37,032.41 6,888,028.26 3.25 186.00 37,032.41 6,888,028.26 3.25 -
5 Pas. Tegel Dinding KM/WC 25 x 25 cm (corak) 55.25 121,232.00 6,698,068.00 3.16 123.50 121,232.00 14,972,152.00 7.06 -
6 Pas. Tegel Keramik Lantai WC 20 x 20 cm (corak) 26.67 115,750.00 3,087,052.50 1.46 26.67 115,750.00 3,087,052.50 1.46 -
7 Pek. Plesteran Beton Pondasi 10.50 40,676.11 427,099.16 0.20 40,676.11
30,461,041.43 14.37 35,989,488.01 16.98

D PEK. KUSEN PINTU PINTU DAN VENTILASI


1 Pek. Pas. Pintu KM/WC Aluminium 3,163,500.00 1.49 6.00 527,250.00 3,163,500.00 1.49 -
2 Pek. Kusen Ventilasi Kayu Klas II 735,187.50 0.35 0.25 2,940,750.00 735,187.50 0.35 -
3 Pek. Jalusi 468,014.25 0.22 1.87 250,275.00 468,014.25 0.22 -
4,366,701.75 1.84 3,898,687.50 1.84

E PEK. INSTALASI LISTRIK DAN SANITASI


1 Pas. Instalasi Listrik 1.00 1,250,000.00 0.59 1.00 1,250,000.00 1,250,000.00 0.59 -
2 Pas. Kloset Jongkok 6.00 2,190,360.00 1.03 6.00 365,060.00 2,190,360.00 1.03 -
3 Pas. Floor Drain 7.00 259,420.00 0.12 7.00 37,060.00 259,420.00 0.12 -
4 Pemasangan Pipa Pvc 3/4" AW Untuk Air Bersih 28.00 897,316.00 0.42 28.00 32,047.00 897,316.00 0.42 -
5 Pemasangan Pipa Pvc 3/4" AW Untuk Air Kotor 32.00 1,918,304.00 0.90 32.00 59,947.00 1,918,304.00 0.90 -
6 Pek. Bak. Air Lapis Keramik 7.00 9,192,680.00 4.34 7.00 1,313,240.00 9,192,680.00 4.34 -
7 Pek. Septick Tank 1.00 2,000,000.00 1.00 2,000,000.00 2,000,000.00
8 Pek. Saluran Air Hujan Kel. Bangunan 34.00 3,476,049.84 34.00 102,236.76 3,476,049.84
9 Pas. Kran Air 8.00 260,000.00 0.12 8.00 32,500.00 260,000.00 0.12 -
21,444,129.84 7.53 21,444,129.84 7.53

F PEKERJAAN PENGECETAN
1 Pek.Pengecetan Dinding, Kolom dan Lisplank 5,632,777.35 2.66 332.70 16,930.50 5,632,777.35 2.66 -
2 Pek.Pengecetan Kayu 3 x 186,817.50 0.09 8.28 22,562.50 186,817.50 0.09 -
5,819,594.85 2.75 5,819,594.85 2.75
KONTRAK AWAL NILAI KONTRAK AMANDEMEN I DECREASE ( - )
HARGA JUMLAH BOBOT HARGA JUMLAH BOBOT
NO URAIAN PEKERJAAN
SAT. VOLUME SATUAN HARGA ( % ) VOLUME SATUAN HARGA ( % ) VOLUME
( Rp ) ( Rp ) ( Rp ) ( Rp )

III PEMBANGUNAN TOWER


A PEKERJAAN TANAH, PASIR DAN BATU
1 Pek. Galian Tanah 313,000.00 0.15 8.00 39,125.00 313,000.00 0.15 -
2 Pek. Urugan Kembali Bekas Galian 69,800.50 0.03 4.07 17,150.00 69,800.50 0.03 -
3 Pek. Urugan Pasir Alas Pondasi 66,260.00 0.03 0.40 165,650.00 66,260.00 0.03 -
449,060.50 0.21 449,060.50 0.21

B PEKERJAAN BETON DAN PENGECETAN


1 Pek. Pondasi Beton Bertulang 1pc : 2psr : 3krl 4,734,702.26 2.23 3.00 4,190,002.00 12,570,006.00 5.93
2 Pek. Sloof 15 x 20 cm 1pc : 2psr : 3krl 1,201,101.44 0.57 0.22 5,459,552.00 1,201,101.44 0.57 -
3 Pek. Balok 15 x 30 cm 1pc : 2psr : 3krl 3,971,992.05 1.87 0.65 6,110,757.00 3,971,992.05 1.87 -
4 Pek. Kolom 20 x 20 cm 1pc : 2psr : 3krl 6,878,108.16 3.24 0.88 7,816,032.00 6,878,108.16 3.24 -
5 Pek. Pelat Beton Tebal 12 cm 1pc : 2psr : 3krl 4,389,567.60 2.07 0.55 25,000.00 13,750.00 0.01 -
6 Pek. Rabat Beton Stam 1pc : 3psr : 5krl t. 5 cm 350,060.37 0.57
7 Pek. Plesteran 1pc : 5psr 998,023.45 26.95
8 Pek. Acian Tembok 602,372.92 0.28 26.95 22,351.50 602,372.92 0.28 -
9 Pek. Pengecetan Tembok 455,791.88 0.22 26.95 16,912.50 455,791.88 0.22 -
23,581,720.13 10.49 25,693,122.45 12.12

C PEKERJAAN SUMUR BOR


1 Penyiapan Lokasi Titik Pemboran 1,150,000.00 0.54 3.00 1,150,000.00 3,450,000.00 1.63
2 Mobilitasi dan Demobilitasi Peralatan Bor 1,200,000.00 0.57 1.00 1,200,000.00 1,200,000.00 0.57 -
3 Pemboran Sumur Dalam 5,000,000.00 2.36 1.00 5,000,000.00 5,000,000.00 2.36 -
4 Pengdaan dan Pemasangan Pipa Cassing 1,500,000.00
5 Pengad. dan Pas. Pompa Air (Jet Pump 150 Watt) 2,885,000.00 1.36 1.00 2,885,000.00 2,885,000.00 1.36 -
11,735,000.00 4.83 12,535,000.00 5.91
D PEK. PAS. PIPA DAN ASESSORIS PIPA
1 Pemasangan Pipa PVC 1/2" AW M1 926,304.00 0.44 3.00 28,947.00 86,841.00 0.04
2 Pemasangan Stop Kran Bh 49,000.00 0.02 2.00 24,500.00 49,000.00 0.02 -
3 Bak Air Fibre Glass Kap. 1 M3 Unit 3,000,000.00 1.42 2.00 1,500,000.00 3,000,000.00 1.42 -
4 Pembuatan Tangga Tower (Besi Beton Dia. 16) Ls 350,000.00 0.17 1.00 350,000.00 350,000.00 0.17 -
4,325,304.00 2.04 3,485,841.00 1.64
KONTRAK AWAL NILAI KONTRAK AMANDEMEN I DECREASE ( - )
HARGA JUMLAH BOBOT HARGA JUMLAH BOBOT
NO URAIAN PEKERJAAN
SAT. VOLUME SATUAN HARGA ( % ) VOLUME SATUAN HARGA ( % ) VOLUME
( Rp ) ( Rp ) ( Rp ) ( Rp )

IV PEKERJAAN FINISHING
1 Finishing dan Pembersihan Lokasi Ls 1.00 1 650,000.00 0.31 1.00 650,000.00 650,000.00 0.31 -

650,000.00 0.31 650,000.00 0.31

REAL COAST ( A ) 224,064,147.05 87.97 728,432,528.52 339.13


PPN 10 % x ( A ) 22,406,414.71 72,843,252.85
IMB 2 % x ( A ) 4,481,282.94 14,568,650.57
TOTAL COAST 250,951,844.70 815,844,431.94
DIBULATKAN 250,951,000.00 815,844,000.00

Unaaha, November2006
s
Disetujui Oleh : Diperiksa : Diajukan Oleh :
PPTK Bidang Cipta Karya CV. MEKANIKINDO CONSULTANT CV. SARANA UTARA
Konsultan Pengawas Direktur

AS RULAN, ST, MT A N S A R, A.Md SENAWAN SILONDAE, A.Md


NIP. 19783009200121008 INSPECTOR NPWP : 01.864.588.7-811.000
564,893,000.00
-564,893,000.00
ANGE ORDER

242000000
DECREASE ( - ) DECREASE ( + ) 815,844,000.00
JUMLAH JUMLAH -573,844,000.00
KET.
HARGA VOLUME HARGA
( Rp ) ( Rp )

815,844,000.00 211,984,016.24
- - - Tetap 211,984,307.93 211,984,016.24
- - - Tetap 211,984,307.93 211,984,016.24
- - Tetap 211,984,307.93 211,984,016.24
- - - Tetap 211,984,307.93 211,984,016.24
- - - Tetap 211,984,307.93 211,984,016.24
- - - Tetap 211,984,307.93 211,984,016.24
0.00 211,984,307.93 211,984,016.24
211,984,307.93 211,984,016.24

211,984,307.93 211,984,016.24
-2,317,765.00 - Berkurang 211,984,307.93 211,984,016.24
- - Tetap 211,984,307.93 211,984,016.24 #REF!
- - Tetap 211,984,307.93 211,984,016.24
- - Tetap 211,984,307.93 211,984,016.24

-13,935,989.72 - Berkurang 211,984,307.93 211,984,016.24


-16,253,754.72 0.00 211,984,307.93 211,984,016.24
211,984,307.93 211,984,016.24
211,984,307.93 211,984,016.24
-126,061,055.68 - Berkurang 211,984,307.93 211,984,016.24
-407,831,922.18 Berkurang 211,984,307.93 211,984,016.24
- - Tetap 211,984,307.93 211,984,016.24
- - Tetap 211,984,307.93 211,984,016.24
- - Tetap 211,984,307.93 211,984,016.24
- -3.60 -28,731,715.20 Bertambah 211,984,307.93 211,984,016.24

- - Tetap 211,984,307.93 211,984,016.24


-533,892,977.86 -28,731,715.20 211,984,307.93 211,984,016.24
211,984,307.93 211,984,016.24
211,984,307.93 211,984,016.24
DECREASE ( - ) DECREASE ( + ) 211,984,307.93 211,984,016.24
JUMLAH JUMLAH 211,984,307.93 211,984,016.24
KET.
HARGA VOLUME HARGA 211,984,307.93 211,984,016.24
( Rp ) ( Rp ) 211,984,307.93 211,984,016.24
211,984,307.93 211,984,016.24 30,461,041.43
211,984,307.93 211,984,016.24
- - Tetap 211,984,307.93 211,984,016.24
- - Tetap 211,984,307.93 211,984,016.24
- -57.00 -2,318,538.27 Bertambah 211,984,307.93 211,984,016.24
- - Tetap 211,984,307.93 211,984,016.24
- 123.50 14,972,152.00 Bertambah 211,984,307.93 211,984,016.24
- Tetap 211,984,307.93 211,984,016.24
211,984,307.93 211,984,016.24
0.00 12,653,613.73 211,984,307.93 211,984,016.24
211,984,307.93 211,984,016.24
211,984,307.93 211,984,016.24
- - Tetap 211,984,307.93 211,984,016.24
- - Tetap 211,984,307.93 211,984,016.24
- - Tetap 211,984,307.93 211,984,016.24
0.00 211,984,307.93 211,984,016.24
211,984,307.93 211,984,016.24
211,984,307.93 211,984,016.24
- - Tetap 211,984,307.93 211,984,016.24
- - Tetap 211,984,307.93 211,984,016.24
- - Tetap 211,984,307.93 211,984,016.24
- - Tetap 211,984,307.93 211,984,016.24
- - Tetap 211,984,307.93 211,984,016.24
- - Tetap 211,984,307.93 211,984,016.24

- - Tetap 211,984,307.93 211,984,016.24


0.00 211,984,307.93 211,984,016.24
211,984,307.93 211,984,016.24
211,984,307.93 211,984,016.24
- - Tetap 211,984,307.93 211,984,016.24
- - Tetap 211,984,307.93 211,984,016.24
0.00 211,984,307.93 211,984,016.24
211,984,307.93 211,984,016.24
211,984,307.93 211,984,016.24
211,984,307.93 211,984,016.24
DECREASE ( - ) DECREASE ( + ) 211,984,307.93 211,984,016.24
JUMLAH JUMLAH 211,984,307.93 211,984,016.24
KET.
HARGA VOLUME HARGA 211,984,307.93 211,984,016.24
( Rp ) ( Rp ) 211,984,307.93 211,984,016.24
211,984,307.93 211,984,016.24
211,984,307.93 211,984,016.24
211,984,307.93 211,984,016.24
- - Tetap 211,984,307.93 211,984,016.24
- - Tetap 211,984,307.93 211,984,016.24
- - #REF! 211,984,307.93 211,984,016.24
0.00 0.00 211,984,307.93 211,984,016.24
211,984,307.93 211,984,016.24
211,984,307.93 211,984,016.24
Tetap 211,984,307.93 211,984,016.24
- - - Tetap 211,984,307.93 211,984,016.24
- - - Tetap 211,984,307.93 211,984,016.24
- - - Tetap 211,984,307.93 211,984,016.24
- - - Tetap 211,984,307.93 211,984,016.24

- - - Tetap 211,984,307.93 211,984,016.24


- - - Tetap 211,984,307.93 211,984,016.24
0.00 0.00 211,984,307.93 211,984,016.24
211,984,307.93 211,984,016.24
211,984,307.93 211,984,016.24
Tetap 211,984,307.93 211,984,016.24
- - - Tetap 211,984,307.93 211,984,016.24
- - - Tetap 211,984,307.93 211,984,016.24
211,984,307.93 211,984,016.24
- - - Tetap 211,984,307.93 211,984,016.24
0.00 0.00 211,984,307.93 211,984,016.24
211,984,307.93 211,984,016.24
Tetap 211,984,307.93 211,984,016.24
- - - Tetap 211,984,307.93 211,984,016.24
- - - Tetap 211,984,307.93 211,984,016.24
- - - Tetap 211,984,307.93 211,984,016.24
0.00 0.00
211,984,307.93 211,984,016.24
211,984,307.93 211,984,016.24
211,984,307.93 211,984,016.24
211,984,307.93 211,984,016.24
DECREASE ( - ) DECREASE ( + ) 211,984,307.93 211,984,016.24
JUMLAH JUMLAH 211,984,307.93 211,984,016.24
KET.
HARGA VOLUME HARGA 211,984,307.93 211,984,016.24
( Rp ) ( Rp ) 211,984,307.93 211,984,016.24
211,984,307.93 211,984,016.24
211,984,307.93 211,984,016.24
- - Tetap 211,984,307.93 211,984,016.24

0.00 211,984,307.93 211,984,016.24


211,984,307.93 211,984,016.24
23,350,254.25 -16,078,101.47 211,984,307.93 211,984,016.24
2,335,025.43 -1,607,810.15 211,984,307.93 211,984,016.24
467,005.09 -321,562.03 211,984,307.93 211,984,016.24
26,152,284.76 -18,007,473.65 211,984,307.93 211,984,016.24
26,152,000.00 -18,008,000.00 211,984,307.93 211,984,016.24
224,064,147.05 728,432,528.52
November2006

ANA UTARA

AN SILONDAE, A.Md
01.864.588.7-811.000
PEMERINTAH KABUPATEN KONAWE UTARA
SEKRETARIAT DAERAH
BAGIAN EKONOMI DAN PEMBANGUNAN
Alamat. Kelurahan Andowia Kecamatan Asera

LAPORAN KEMAJUAN FISIK BULANAN


Pekerjaan : PEMBANGUANAN MCK KEC. SAWA
No. Kontrak : 460.10/04/SPKK-PNL/DPUTR-KU/IX/2010
Tgl. Kontrak :
Nilai Kontrak : Rp 250,945,000.00
Pelaksana : CV. SARANA UTARA

PERSENTASE KEM
NO. URAIAN PEKERJAAN SAT VOLUME BULAN
%
LALU
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi Ls 1.00 0.00 0.00
2 Pengukuran & Pemas. Bouwplank Ls 1.00 0.00 0.00
3 Penyediaan Air Kerja, Air Minum P3k Ls 1.00 0.00 0.00
4 Pembuatan Papan Nama Proyek Ls 1.00 0.00 0.00
5 Direksi Keet/Barak Kerja Ls 1.00 0.00 0.00
6 Pemb. MC, Back Up Data, Dokumentasi Dll Ls 1.00 0.00 0.00
II PEMBANGUANAN MCK
A PEKERJAAN TANAH, PASIR DAN BATU
1 Galian Tanah Pondasi Batu Gunung M3 26.91 0.00 0.00
2 Urugan Kembali Bekas Galian M3 6.62 0.00 0.00
3 Urugan Tanah Bawah Lantai M3 10.80 0.00 0.00
4 Urugan Pasir Bawah Pondasi M3 3.78 0.00 0.00
5 Pek. Urugan Pasir Alas Lantai Tebal 10 cm M3 2.52 0.00 0.00
6 Pasangan Batu Gunung 1 pc : 4 psr M3 12.11 0.00 0.00
7 Pek. Pas. Batu Kosong M3 7.56 0.00 0.00
B PEKERJAAN BETON
1 Pek. Sloof 15 x 20 cm 1pc : 2psr : 3krl M3 1.53 0.00 0.00
2 Pek. Balok 15 x 25 cm 1pc : 2psr : 3krl M 3
1.46 0.00 0.00
3 Pek. Balok 15 x 20 cm 1pc : 2psr : 3krl M 3
1.15 0.00 0.00
4 Pek. Kolom 20 x 20 cm 1pc : 2psr : 3krl M 3
1.78 0.00 0.00
5 Pek. Kolom Praktis 12 x 12 cm 1pc : 2psr : 3krl M3 24.00 0.00 0.00
6 Pek. Pelat Atap Tebal 12 cm 1pc : 2psr : 3krl M3 7.29 0.00 0.00
7 Pek. Rabat Beton Stam 1pc : 3psr : 5krl t. 5 cm M3 1.80 0.00 0.00
8 Pek. Rabat Beton Keliling Bangunan 1 : 3 : 5k M 3
1.12 0.00 0.00
9 Pek. Lisplank Beton Tebal 8 cm 1pc : 2psr : 3krl M 3
0.54 0.00 0.00
C PEKERJAAN DINDING PLESTERAN DAN LANTAI
1 Pek. Dinding Tembok 1/2 Bata 1pc : 2psr M2 46.50 0.00 0.00
2 Pek. Dinding Tembok 1/2 Bata 1pc : 5psr M2 67.11 0.00 0.00
3 Pek. Plesteran Dinding Trasram 1pc : 2psr M2 93.00 0.00 0.00
4 Pek. Plesteran Dinding Tembok 1pc : 5psr M 2
186.00 0.00 0.00
5 Pas. Tegel Dinding KM/WC 25 x 25 cm (corak) M 2
55.25 0.00 0.00
6 Pas. Tegel Keramik Lantai WC 20 x 20 cm (corak) M 2
26.67 0.00 0.00
7 Pek. Plesteran Beton Pondasi M 2
10.50 0.00 0.00
D PEK. KUSEN PINTU PINTU DAN VENTILASI
1 Pek. Pas. Pintu KM/WC Aluminium Set 6.00 0.00 0.00
2 Pek. Kusen Ventilasi Kayu Klas II M 3
0.25 0.00 0.00
3 Pek. Jalusi M 2
1.87 0.00 0.00
E PEK. INSTALASI LISTRIK DAN SANITASI
1 Pas. Instalasi Listrik Ls 1.00 0.00 0.00
2 Pas. Kloset Jongkok Bh 6.00 0.00 0.00
3 Pas. Floor Drain Bh 7.00 0.00 0.00
4 Pemasangan Pipa Pvc 3/4" AW Untuk Air Bersih M1 28.00 0.00 0.00
5 Pemasangan Pipa Pvc 3/4" AW Untuk Air Kotor M 1
32.00 0.00 0.00
6 Pek. Bak. Air Lapis Keramik Bh 7.00 0.00 0.00
7 Pek. Septick Tank Bh 1.00 0.00 0.00
8 Pek. Saluran Air Hujan Kel. Bangunan M1 34.00 0.00 0.00
9 Pas. Kran Air Bh 8.00 0.00 0.00
F PEKERJAAN PENGECETAN
1 Pek.Pengecetan Dinding, Kolom dan Lisplank M2 332.37 0.00 0.00
2 Pek.Pengecetan Kayu 3 x M 2
8.28 0.00 0.00
III PEMBANGUNAN TOWER
A PEKERJAAN TANAH, PASIR DAN BATU
1 Pek. Galian Tanah M3 8.00 0.00 0.00
2 Pek. Urugan Kembali Bekas Galian M3 4.07 0.00 0.00
3 Pek. Urugan Pasir Alas Pondasi M3 0.40 0.00 0.00
B PEKERJAAN BETON DAN PENGECETAN
1 Pek. Pondasi Beton Bertulang 1pc : 2psr : 3krl M3 1.13 0.00 0.00
2 Pek. Sloof 15 x 20 cm 1pc : 2psr : 3krl M3 0.22 0.00 0.00
3 Pek. Balok 15 x 30 cm 1pc : 2psr : 3krl M3 0.65 0.00 0.00
4 Pek. Kolom 20 x 20 cm 1pc : 2psr : 3krl M3 0.88 0.00 0.00
5 Pek. Pelat Beton Tebal 12 cm 1pc : 2psr : 3krl M3 0.55 0.00 0.00
6 Pek. Rabat Beton Stam 1pc : 3psr : 5krl t. 5 cm M3 0.57 0.00 0.00
7 Pek. Plesteran 1pc : 5psr M2 26.95 0.00 0.00
8 Pek. Acian Tembok M 2
26.95 0.00 0.00
9 Pek. Pengecetan Tembok M 2
26.95 0.00 0.00
C PEKERJAAN SUMUR BOR
1 Penyiapan Lokasi Titik Pemboran Ls 1.00 0.00 0.00
2 Mobilitasi dan Demobilitasi Peralatan Bor Ls 1.00 0.00 0.00
3 Pemboran Sumur Dalam Unit 1.00 0.00 0.00
4 Pengdaan dan Pemasangan Pipa Cassing Unit 1.00 0.00 0.00
5 Pengad. dan Pas. Pompa Air (Jet Pump 150 Watt) Unit 1.00 0.00 0.00
D PEK. PAS. PIPA DAN ASESSORIS PIPA
1 Pemasangan Pipa PVC 1/2" AW M1 32.00 0.00 0.00
2 Pemasangan Stop Kran Bh 2.00 0.00 0.00
3 Bak Air Fibre Glass Kap. 1 M3 Unit 2.00 0.00 0.00
4 Pembuatan Tangga Tower (Besi Beton Dia. 16) Ls 1.00 0.00 0.00
IV PEKERJAAN FINISHING
1 Finishing dan Pembersihan Lokasi Ls 1.00 0.00 0.00

PERSENTASE 0.00

B PPN 10% x A
C IMB 2% x A
D TOTAL COST ( A+B+C)
DIBULATKAN
AWE UTARA
H
ANGUNAN
matan Asera

K BULANAN

BULAN : November 2010

PERSENTASE KEMAJUAN FISIK


BULAN S/D BULAN K E T.
% %
INI INI
7 8 9 10 11

1.00 0.35 1.00 0.35


1.00 0.38 1.00 0.38
1.00 0.48 1.00 0.48
1.00 0.03 1.00 0.03
1.00 0.13 1.00 0.13
1.00 0.00 1.00 0.00

26.91 0.01 26.91 0.01


6.62 0.00 6.62 0.00
10.80 0.02 10.80 0.02
3.78 0.00 3.78 0.00
2.52 0.01 2.52 0.01
12.11 0.08 12.11 0.08
7.56 0.11 7.56 0.11

1.53 0.15 1.53 0.15


1.46 0.14 1.46 0.14
1.15 0.13 1.15 0.13
1.78 0.03 1.78 0.03
24.00 2.68 24.00 2.68
7.29 0.81 7.29 0.81
1.80 0.20 1.80 0.20
1.12 0.13 1.12 0.13
0.54 0.00 0.54 0.00

46.50 0.21 46.50 0.21


67.11 0.00 67.11 0.00
93.00 3.11 93.00 3.11

10.50 1.85 10.50 1.85

6.00 1.25 6.00 1.25


0.25 0.15 0.25 0.15
1.87 10.02 1.87 10.02
1.00 0.92 1.00 0.92
6.00 1.67 6.00 1.67
7.00 0.39 7.00 0.39
28.00 1.29 28.00 1.29
32.00 6.18 32.00 6.18
7.00
1.00
34.00
8.00 0.35 8.00 0.35

332.37 0.03 332.37 0.03


8.28 0.03 8.28 0.03

8.00 0.23 8.00 0.23


4.07 0.03 4.07 0.03
0.40 0.12 0.40 0.12

1.13 0.11 1.13 0.11


0.22 0.02 0.22 0.02
0.65 0.07 0.65 0.07
0.88 0.01 0.88 0.01
0.55 0.06 0.55 0.06
0.57 0.06 0.57 0.06
26.95 3.01 26.95 3.01
26.95 3.01 26.95 3.01
26.95 0.06 26.95 0.06

1.00 5.42 1.00 5.42


1.00 0.43 1.00 0.43
1.00 17.72 1.00 17.72
1.00 - 1.00 -
1.00 5.54 1.00 5.54

32.00 0.51 32.00 0.51


2.00 0.02 2.00 0.02
2.00 0.01 2.00 0.01
1.00 0.48 1.00 0.48

1.00 0.19 1.00 0.19

98.09 98.09

Mengetahui
Kabag Ekonomi & Pembangunan
Setda Kab. Konawe Utara

H. ABUHAERA, S.Sos, M.Si


NIP. 130 931 593
PEMERINTAH DAERAH KABUPATEN KON
BAGIAN ADMINISTRASI PEMBENGUNAN SETDA KAB.
PEMBANGUNAN MCK KABUPATEN KONAWE TA
PEMBANGUANAN SALURAN DRAINASE/GORONG-GORONG DESA LA

MONTHLY CERTIFICATE

BULAN NOVEMBER 2010

PEKERJAAN : PEMBANGUNAN MCK KEC. SAWA KAB. KONAWE UTA


LOKASI : KEC. ASERA KABUPATEN KONAWE UTARA
NO. KONTRAK : 460.10/03/SPKK-PNL/DPUTR-KU/IX/2010
TANGGAL KONTRAK : 28 SEPTEMBER 2010
SELESAI TANGGAL : 26 DESEMBER 2010

NILAI KONTRAK : Rp 250,951,000.00

PAKET : 10 ( Sepuluh )

KONTRAKTOR PELAKSANA
CV. SARANA UTARA
ABUPATEN KONAWE UTARA
GUNAN SETDA KAB. KONAWE UTARA
ABUPATEN KONAWE TA. 2010
GORONG-GORONG DESA LABUNGGA RUAS 2

Y CERTIFICATE

OVEMBER 2010

C. SAWA KAB. KONAWE UTARA


N KONAWE UTARA
TR-KU/IX/2010

KONSULTAN PENGAWAS
CV. MEKANIKINDO KONSULTANT
PROPINSI : SULAWESI TENGGARA DIREKSI : DINAS PU DAN TATA RUANG LEMBAR : 01
KABUPATEN : KONAWE UTARA KONSULTAN PENGAWAS : CV. MEKANIKINDO KONSULTANT CERTIFIKATE :
NOMOR PAKET : 10 ( Sepuluh ) JENIS PEKERJAAN : PEMBANGUANAN MCK KEC. SAWA TGL. LAPORAN : November 2010
NO. KONTRAK : 460.10/03/SPKK-PNL/DPUTR-KU/IX/2010 : BOBOT S/D BULAN LALU :
NILAI KONTRAK : Rp 250,951,000.00 TARGET FISIK : BOBOT BULAN INI :
TANGGAL KONTRAK : 26 NOVEMBER 2010 LOKASI : KEC. SAWA BOBOT S/D BULAN INI :
PELAKSANA : CV. SARANA UTARA : KABUPATEN KONAWE UTARA
REKAPITULASI
TARGET KONTAK REALISASI S/D BULAN INI
NO URAIAN PEKERJAAN JUMLAH BOBOT HARGA BOBOT TTB KET
SATUAN (Rp) % ( Rp ) % %

I PEKERJAAN PERSIAPAN 4,050,000.00 1.81 4,050,000.00 1.81


II PEMBANGUANAN MCK
A PEKERJAAN TANAH, PASIR DAN BATU 12,059,326.98 5.38 20,531,007.71 9.16
B PEKERJAAN BETON 105,122,267.57 46.92 40,144,332.22 17.92
C PEKERJAAN DINDING PLESTERAN DAN LANTAI 30,461,041.43 13.59 Err:509 Err:509
D PEK. KUSEN PINTU PINTU DAN VENTILASI 4,366,701.75 1.95 10,741,792.31 4.79
E PEK. INSTALASI LISTRIK DAN SANITASI 21,444,129.84 9.57 4,365,413.76 1.95
F PEKERJAAN PENGECETAN 5,819,594.85 2.60 #REF! #REF!
III PEMBANGUNAN TOWER
A PEKERJAAN TANAH, PASIR DAN BATU 449,060.50 0.20 #REF! #REF!
B PEKERJAAN BETON DAN PENGECETAN 23,581,720.13 10.52 #REF! #REF!
C PEKERJAAN SUMUR BOR 11,735,000.00 5.24 #REF! #REF!
D PEK. PAS. PIPA DAN ASESSORIS PIPA 4,325,304.00 1.93 #REF! #REF!
IV PEKERJAAN FINISHING 650,000.00 0.29 #REF! #REF!
JUMLAH 224,064,147.05 100.00 #REF! #REF!
Pajak PPn 10 % 22,406,414.71 #REF!
IBM 2 % 4,481,282.94 #REF!
Total Harga 250,951,844.70 #REF!
Dibulatkan 250,951,000.00 157,000,000.00
PERSENTASE CERTIFIKATE POTONGAN CERTIFIKATE BULAN INI CERTIFIKATE PEMBAYARAN :
Jumlah Certifikate s/d Bulan Lalu ( % ) 0.00 PENGEMBALIAN UANG MUKA ( 0,00%) : Jumlah Certifikate s/d Bln Lalu :
Certifikate yang dibayar Bulan Ini ( Rp ) #REF! RETENSI / PEMELIHARAAN : Jumlah Certifikate Bln Ini :
Jumlah Certifikate s/d Bulan Ini ( % ) #REF! Jumlah Certifikate s/d Bln Ini :

Disetujui Oleh : Diajukan Oleh :


PEJABAT PELAKSANA TEKNIS KEGIATAN Konsultan Pengawas KONTRAKTOR PELAKSANA
BIDANG CIPTA KARYA CV. MEKANIKINDO KONSULTANT CV. SARANA UTARA
Direktur

AS RULAN, ST, MT Ir. SURAYA L. SENAWAN SILONDAE, A.Md


NIP. 19783009200121008 Direktur NPWP : 01.864.588.7-811.000
242000000
#REF!
#REF!

#REF! ###
#REF! ###
#REF! ###

#REF! ###
#REF! ###

#REF! ###
#REF! ###

### ###

### ###
### ###

### ###
### ###
LAPORAN SISTIM MONITORING PROYEK BULAN
BULANAN PEMBANGUNAN MCK KABUPATEN KONAWE UTARA TA. 2010 NOVEMBER
CERTIFIKASI BULANAN
PROPINSI : SULAWESI TENGGARA DIREKSI : DINAS PU DAN TATA RUANG LEMBAR : 02
KABUPATEN : KONAWE UTARA KONSULTAN PENGAWAS : CV. MEKANIKINDO KONSULTANT CERTIFIKATE :
NOMOR PAKET : 10 ( Sepuluh ) JENIS PEKERJAAN : PEMBANGUANAN MCK KEC. SAWA TGL. LAPORAN : November 2010
NO. KONTRAK : 460.10/03/SPKK-PNL/DPUTR-KU/IX/2010 : BOBOT S/D BULAN LALU :
NILAI KONTRAK : Rp 250,951,000.00 TARGET FISIK : BOBOT BULAN INI :
TANGGAL KONTRAK : 26 NOVEMBER 2010 LOKASI : KEC. SAWA BOBOT S/D BULAN INI :
PELAKSANA : CV. SARANA UTARA : KABUPATEN KONAWE UTARA
URAIAN KONRAK
NILAI KONTRAK AWAL REALISASI S/D BULAN LALU REALISASI BULAN INI REALISASI S/D BULAN INI
HARGA JUMLAH JUMLAH JUMLAH JUMLAH
NO URAIAN PEKERJAAN
SAT. SATUAN VOL. HARGA VOL. HARGA VOL. HARGA VOL. HARGA
( Rp ) ( Rp ) ( Rp ) ( Rp ) ( Rp )

I. PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi Ls. 500,000.00 1.00 500,000.00 - - 1.00 500,000.00 1.00 500,000.00
2 Pengukuran & Pemas. Bouwplank Ls. 650,000.00 1.00 650,000.00 - - 1.00 650,000.00 1.00 650,000.00
3 Penyediaan Air Kerja, Air Minum P3k Ls. 500,000.00 1.00 500,000.00 - - 1.00 500,000.00 1.00 500,000.00
4 Pembuatan Papan Nama Proyek Ls. 200,000.00 1.00 200,000.00 - - 1.00 200,000.00 1.00 200,000.00
5 Direksi Keet/Barak Kerja Ls. 1,500,000.00 1.00 1,500,000.00 - - 1.00 1,500,000.00 1.00 1,500,000.00
6 Pemb. MC, Back Up Data, Dokumentasi Dll Ls. 700,000.00 1.00 700,000.00 - - 1.00 700,000.00 1.00 700,000.00
Jumlah 4,050,000.00 4,050,000.00 4,050,000.00

Mengetahui : Diperiksa : Diajukan Oleh :


KOORDINATOR PENGAWAS DIREKSI TEKNIS CV. MEKANIKINDO KONSULTANT CV. SARANA UTARA
BIDANG CIPTA KARYA DINAS PU DAN TATA RUANG KONSULTAN PENGAWAS DIREKTUR

AS RULAN, ST, MT A N S A R, A.Md SENAWAN SILONDAE, A.Md


NIP. 19783009200121008 INSPECTOR NPWP : 01.864.588.7-811.000
242000000
#REF!
#REF!

#REF! ###
#REF! ###
#REF! ###
#REF! ###
#REF! ###
#REF! ###
#REF! ###
#REF! ###
###

#REF! ###

### ###
### ###
### ###
### ###
LAPORAN SISTIM MONITORING PROYEK BULAN
BULANAN PEMBANGUNAN MCK KABUPATEN KONAWE UTARA TA. 2010 NOVEMBER
CERTIFIKASI BULANAN
PROPINSI : SULAWESI TENGGARA DIREKSI : DINAS PU DAN TATA RUANG LEMBAR : 03
KABUPATEN : KONAWE UTARA KONSULTAN PENGAWAS : CV. MEKANIKINDO KONSULTANT CERTIFIKATE :
NOMOR PAKET : 10 ( Sepuluh ) JENIS PEKERJAAN : PEMBANGUANAN MCK KEC. SAWA TGL. LAPORAN : November 2010
NO. KONTRAK : 460.10/03/SPKK-PNL/DPUTR-KU/IX/2010 : BOBOT S/D BULAN LALU :
NILAI KONTRAK : Rp 250,951,000.00 TARGET FISIK : BOBOT BULAN INI :
TANGGAL KONTRAK : 26 NOVEMBER 2010 LOKASI : KEC. SAWA BOBOT S/D BULAN INI :
PELAKSANA : CV. SARANA UTARA : KABUPATEN KONAWE UTARA
URAIAN KONRAK
NILAI KONTRAK AWAL REALISASI S/D BULAN LALU REALISASI BULAN INI REALISASI S/D BULAN INI
HARGA JUMLAH JUMLAH JUMLAH JUMLAH
NO URAIAN PEKERJAAN
SAT. SATUAN VOL. HARGA VOL. HARGA VOL. HARGA VOL. HARGA
( Rp ) ( Rp ) ( Rp ) ( Rp ) ( Rp )
II PEKERJAAN PERSIAPAN
A PEKERJAAN TANAH, PASIR DAN BATU
1 Galian Tanah Pondasi Batu Gunung M3 39,125.00 26.91 1,052,853.75 - - 36.96 1,446,060.00 36.96 1,446,060.00
2 Urugan Kembali Bekas Galian M3 135,650.00 6.62 898,003.00 - - 2.46 333,699.00 2.46 333,699.00
3 Urugan Tanah Bawah Lantai M3 17,150.00 10.80 185,220.00 - - 0.00 0.00 0.00 0.00
4 Urugan Pasir Bawah Pondasi M 3
165,650.00 3.78 626,157.00 - - 6.16 1,020,404.00 6.16 1,020,404.00
5 Pek. Urugan Pasir Alas Lantai Tebal 10 cm M3 165,650.00 2.52 417,438.00 - - 13.50 2,236,275.00 13.50 2,236,275.00
6 Pasangan Batu Gunung 1 pc : 4 psr M 3
658,244.00 12.11 7,971,334.84 - - 21.29 14,014,343.88 21.29 14,014,343.88
7 Pek. Pas. Batu Kosong M3 120,148.20 7.56 908,320.39 - - 12.32 1,480,225.82 12.32 1,480,225.82
Jumlah 12,059,326.98 20,531,007.71 20,531,007.71

Mengetahui : Diperiksa : Diajukan Oleh :


KOORDINATOR PENGAWAS DIREKSI TEKNIS CV. MEKANIKINDO KONSULTANT CV. SARANA UTARA
BIDANG CIPTA KARYA DINAS PU DAN TATA RUANG KONSULTAN PENGAWAS DIREKTUR

AS RULAN, ST, MT A N S A R, A.Md SENAWAN SILONDAE, A.Md


NIP. 19783009200121008 INSPECTOR NPWP : 01.864.588.7-811.000
242000000
#REF!
#REF!

#REF! ###

#REF! ###
#REF! ###
#REF! ###
#REF! ###
#REF! ###

#REF! ###
###
#REF! ###

### ###
### ###
### ###
### ###
LAPORAN SISTIM MONITORING PROYEK BULAN
BULANAN PEMBANGUNAN MCK KABUPATEN KONAWE UTARA TA. 2010 NOVEMBER
CERTIFIKASI BULANAN
PROPINSI : SULAWESI TENGGARA DIREKSI : DINAS PU DAN TATA RUANG LEMBAR : 03
KABUPATEN : KONAWE UTARA KONSULTAN PENGAWAS : CV. MEKANIKINDO KONSULTANT CERTIFIKATE :
NOMOR PAKET : 10 ( Sepuluh ) JENIS PEKERJAAN : PEMBANGUANAN MCK KEC. SAWA TGL. LAPORAN : November 2010
NO. KONTRAK : 460.10/03/SPKK-PNL/DPUTR-KU/IX/2010 : BOBOT S/D BULAN LALU :
NILAI KONTRAK : Rp 250,951,000.00 TARGET FISIK : BOBOT BULAN INI :
TANGGAL KONTRAK : 26 NOVEMBER 2010 LOKASI : KEC. SAWA BOBOT S/D BULAN INI :
PELAKSANA : CV. SARANA UTARA : KABUPATEN KONAWE UTARA
URAIAN KONRAK
NILAI KONTRAK AWAL REALISASI S/D BULAN LALU REALISASI BULAN INI REALISASI S/D BULAN INI
HARGA JUMLAH JUMLAH JUMLAH JUMLAH
NO URAIAN PEKERJAAN
SAT. SATUAN VOL. HARGA VOL. HARGA VOL. HARGA VOL. HARGA
( Rp ) ( Rp ) ( Rp ) ( Rp ) ( Rp )
B PEKERJAAN BETON
1 Pek. Sloof 15 x 20 cm 1pc : 2psr : 3krl M3 5,459,552.00 1.53 8,353,114.56 - - 2.31 12,611,565.12 2.31 12,611,565.12
2 Pek. Balok 15 x 25 cm 1pc : 2psr : 3krl M 3
6,110,757.00 1.46 8,921,705.22 - - 0.64 3,937,771.81 0.64 3,937,771.81
3 Pek. Balok 15 x 20 cm 1pc : 2psr : 3krl M3 6,110,757.00 1.15 7,027,370.55 - - 1.61 9,844,429.53 1.61 9,844,429.53
4 Pek. Kolom 20 x 20 cm 1pc : 2psr : 3krl M3 7,816,032.00 1.78 13,912,536.96 - - 0.30 2,344,809.60 0.30 2,344,809.60
5 Pek. Kolom Praktis 12 x 12 cm 1pc : 2psr : 3krl M3 109,282.00 24.00 2,622,768.00 - - 72.00 7,868,304.00 72.00 7,868,304.00
6 Pek. Pelat Atap Tebal 12 cm 1pc : 2psr : 3krl M3 7,981,032.00 7.29 58,181,723.28 - - 0.00 0.00 0.00 0.00
7 Pek. Rabat Beton Stam 1pc : 3psr : 5krl t. 5 cm M3 614,141.00 1.80 1,105,453.80 - - 5.76 3,537,452.16 5.76 3,537,452.16
8 Pek. Rabat Beton Keliling Bangunan 1 : 3 : 5k M3 614,141.00 1.12 687,837.92 - - 0.00 0.00 0.00 0.00
9 Pek. Lisplank Beton Tebal 8 cm 1pc : 2psr : 3krl M 3
7,981,032.00 0.54 4,309,757.28 - - 0.00 0.00 0.00 0.00
Jumlah 105,122,267.57 40,144,332.22 40,144,332.22

Mengetahui : Diperiksa : Diajukan Oleh :


KOORDINATOR PENGAWAS DIREKSI TEKNIS CV. MEKANIKINDO KONSULTANT CV. SARANA UTARA
BIDANG CIPTA KARYA DINAS PU DAN TATA RUANG KONSULTAN PENGAWAS DIREKTUR

AS RULAN, ST, MT A N S A R, A.Md SENAWAN SILONDAE, A.Md


NIP. 19783009200121008 INSPECTOR NPWP : 01.864.588.7-811.000
242000000
#REF!
#REF!

#REF! ###

#REF! ###
#REF! ###
#REF! ###
#REF! ###
#REF! ###

#REF! ###
###
#REF! ###

### ###
### ###
### ###
### ###
LAPORAN SISTIM MONITORING PROYEK BULAN
BULANAN PEMBANGUNAN MCK KABUPATEN KONAWE UTARA TA. 2010 NOVEMBER
CERTIFIKASI BULANAN
PROPINSI : SULAWESI TENGGARA DIREKSI : DINAS PU DAN TATA RUANG LEMBAR : 05
KABUPATEN : KONAWE UTARA KONSULTAN PENGAWAS : CV. MEKANIKINDO KONSULTANT CERTIFIKATE :
NOMOR PAKET : 10 ( Sepuluh ) JENIS PEKERJAAN : PEMBANGUANAN MCK KEC. SAWA TGL. LAPORAN : November 2010
NO. KONTRAK : 460.10/03/SPKK-PNL/DPUTR-KU/IX/2010 : BOBOT S/D BULAN LALU :
NILAI KONTRAK : Rp 250,951,000.00 TARGET FISIK : BOBOT BULAN INI :
TANGGAL KONTRAK : 26 NOVEMBER 2010 LOKASI : KEC. SAWA BOBOT S/D BULAN INI :
PELAKSANA : CV. SARANA UTARA : KABUPATEN KONAWE UTARA
URAIAN KONRAK
NILAI KONTRAK AWAL REALISASI S/D BULAN LALU REALISASI BULAN INI REALISASI S/D BULAN INI
HARGA JUMLAH JUMLAH JUMLAH JUMLAH
NO URAIAN PEKERJAAN
SAT. SATUAN VOL. HARGA VOL. HARGA VOL. HARGA VOL. HARGA
( Rp ) ( Rp ) ( Rp ) ( Rp ) ( Rp )
C PEKERJAAN DINDING PLESTERAN DAN LANTAI
1 Pek. Dinding Tembok 1/2 Bata 1pc : 2psr M2 92,004.90 46.50 4,278,227.85 - - 16.00 1,472,078.40 16.00 1,472,078.40
2 Pek. Dinding Tembok 1/2 Bata 1pc : 5psr M2 78,970.16 67.11 5,299,687.44 - - 145.58 11,496,475.89 145.58 11,496,475.89
3 Pek. Plesteran Dinding Trasram 1pc : 2psr M2 40,676.11 93.00 3,782,878.23 - - Err:509 Err:509 Err:509 Err:509
4 Pek. Plesteran Dinding Tembok 1pc : 5psr M3 37,032.41 186.00 6,888,028.26 - - 280.12 10,373,444.62 280.12 10,373,444.62
5 Pas. Tegel Dinding KM/WC 25 x 25 cm (corak) M2 121,232.00 55.25 6,698,068.00 - - 0.00 0.00 0.00 0.00
6 Pas. Tegel Keramik Lantai WC 20 x 20 cm (corak) M2 115,750.00 26.67 3,087,052.50 - - 1.35 156,262.50 1.35 156,262.50
7 Pek. Plesteran Beton Pondasi M2 40,676.11 10.50 427,099.16 - - 24.15 982,328.06 24.15 982,328.06
Jumlah 30,461,041.43 Err:509 Err:509

Mengetahui : Diperiksa : Diajukan Oleh :


KOORDINATOR PENGAWAS DIREKSI TEKNIS CV. MEKANIKINDO KONSULTANT CV. SARANA UTARA
BIDANG CIPTA KARYA DINAS PU DAN TATA RUANG KONSULTAN PENGAWAS DIREKTUR

AS RULAN, ST, MT A N S A R, A.Md SENAWAN SILONDAE, A.Md


NIP. 19783009200121008 INSPECTOR NPWP : 01.864.588.7-811.000
242000000
#REF!
#REF!

#REF! ###
#REF! ###
#REF! ###
#REF! ###
#REF! ###

#REF! ###
###
#REF! ###

### ###
### ###
### ###
### ###
LAPORAN SISTIM MONITORING PROYEK BULAN
BULANAN PEMBANGUNAN MCK KABUPATEN KONAWE UTARA TA. 2010 NOVEMBER
CERTIFIKASI BULANAN
PROPINSI : SULAWESI TENGGARA DIREKSI : DINAS PU DAN TATA RUANG LEMBAR : 06
KABUPATEN : KONAWE UTARA KONSULTAN PENGAWAS : CV. MEKANIKINDO KONSULTANT CERTIFIKATE :
NOMOR PAKET : 10 ( Sepuluh ) JENIS PEKERJAAN : PEMBANGUANAN MCK KEC. SAWA TGL. LAPORAN : November 2010
NO. KONTRAK : 460.10/03/SPKK-PNL/DPUTR-KU/IX/2010 : BOBOT S/D BULAN LALU :
NILAI KONTRAK : Rp 250,951,000.00 TARGET FISIK : BOBOT BULAN INI :
TANGGAL KONTRAK : 26 NOVEMBER 2010 LOKASI : KEC. SAWA BOBOT S/D BULAN INI :
PELAKSANA : CV. SARANA UTARA : KABUPATEN KONAWE UTARA
URAIAN KONRAK
NILAI KONTRAK AWAL REALISASI S/D BULAN LALU REALISASI BULAN INI REALISASI S/D BULAN INI
HARGA JUMLAH JUMLAH JUMLAH JUMLAH
NO URAIAN PEKERJAAN
SAT. SATUAN VOL. HARGA VOL. HARGA VOL. HARGA VOL. HARGA
( Rp ) ( Rp ) ( Rp ) ( Rp ) ( Rp )
D PEK. KUSEN PINTU PINTU DAN VENTILASI
1 Pek. Pas. Pintu KM/WC Aluminium Set 527,250.00 6.00 3,163,500.00 - - 0.00 0.00 0.00 0.00
2 Pek. Kusen Ventilasi Kayu Klas II M3 2,940,750.00 0.25 735,187.50 - - 3.43 10,099,711.80 3.43 10,099,711.80
3 Pek. Jalusi M2 250,275.00 1.87 468,014.25 - - 2.57 642,080.51 2.57
642,080.51
Jumlah 4,366,701.75 10,741,792.31 10,741,792.31

Mengetahui : Diperiksa : Diajukan Oleh :


KOORDINATOR PENGAWAS DIREKSI TEKNIS CV. MEKANIKINDO KONSULTANT CV. SARANA UTARA
BIDANG CIPTA KARYA DINAS PU DAN TATA RUANG KONSULTAN PENGAWAS DIREKTUR

AS RULAN, ST, MT A N S A R, A.Md SENAWAN SILONDAE, A.Md


NIP. 19783009200121008 INSPECTOR NPWP : 01.864.588.7-811.000
242000000
#REF!
#REF!

#REF! ###
#REF! ###

#REF! ###
#REF! ###
###
#REF! ###

### ###
### ###
### ###
### ###
LAPORAN SISTIM MONITORING PROYEK BULAN
BULANAN PEMBANGUNAN MCK KABUPATEN KONAWE UTARA TA. 2010 NOVEMBER
CERTIFIKASI BULANAN
PROPINSI : SULAWESI TENGGARA DIREKSI : DINAS PU DAN TATA RUANG LEMBAR : 07
KABUPATEN : KONAWE UTARA KONSULTAN PENGAWAS : CV. MEKANIKINDO KONSULTANT CERTIFIKATE :
NOMOR PAKET : 10 ( Sepuluh ) JENIS PEKERJAAN : PEMBANGUANAN MCK KEC. SAWA TGL. LAPORAN : November 2010
NO. KONTRAK : 460.10/03/SPKK-PNL/DPUTR-KU/IX/2010 : GORONG DESA LABUNGGA RUAS 2 BOBOT S/D BULAN LALU :
NILAI KONTRAK : Rp 250,951,000.00 TARGET FISIK : BOBOT BULAN INI :
TANGGAL KONTRAK : 26 NOVEMBER 2010 LOKASI : KEC. SAWA BOBOT S/D BULAN INI :
PELAKSANA : CV. SARANA UTARA : KABUPATEN KONAWE UTARA
URAIAN KONRAK
URAIAN PEKERJAAN NILAI KONTRAK AWAL REALISASI S/D BULAN LALU REALISASI BULAN INI REALISASI S/D BULAN INI
HARGA JUMLAH JUMLAH JUMLAH JUMLAH
NO
SAT. SATUAN VOL. HARGA VOL. HARGA VOL. HARGA VOL. HARGA
( Rp ) ( Rp ) ( Rp ) ( Rp ) ( Rp )
E PEK. INSTALASI LISTRIK DAN SANITASI
1 Pas. Instalasi Listrik Ls 1,250,000.00 1.00 1,250,000.00 - - 0.00 0.00 0.00 0.00
2 Pas. Kloset Jongkok Bh 365,060.00 6.00 2,190,360.00 - - 1.00 365,060.00 1.00 365,060.00
3 Pas. Floor Drain Bh 37,060.00 7.00 259,420.00 - - 1.00 37,060.00 1.00 37,060.00
4 Pemasangan Pipa Pvc 3/4" AW Untuk Air Bersih M1 32,047.00 28.00 897,316.00 - - 4.00 128,188.00 4.00 128,188.00
5 Pemasangan Pipa Pvc 3/4" AW Untuk Air Kotor M1 59,947.00 32.00 1,918,304.00 - - 7.00 419,629.00 7.00 419,629.00
6 Pek. Bak. Air Lapis Keramik Bh 1,313,240.00 7.00 9,192,680.00 - - 1.00 1,313,240.00 1.00 1,313,240.00
7 Pek. Septick Tank Bh 2,000,000.00 1.00 2,000,000.00 - - 1.00 2,000,000.00 1.00 2,000,000.00
8 Pek. Saluran Air Hujan Kel. Bangunan M1 102,236.76 34.00 3,476,049.84 - - 1.00 102,236.76 1.00 102,236.76
9 Pas. Kran Air Bh 32,500.00 8.00 260,000.00 - - 0.00 0.00 0.00 0.00
Jumlah 21,444,129.84 4,365,413.76 4,365,413.76

Mengetahui : Diperiksa : Diajukan Oleh :


KOORDINATOR PENGAWAS DIREKSI TEKNIS CV. MEKANIKINDO KONSULTANT CV. SARANA UTARA
BIDANG CIPTA KARYA DINAS PU DAN TATA RUANG KONSULTAN PENGAWAS DIREKTUR

AS RULAN, ST, MT A N S A R, A.Md SENAWAN SILONDAE, A.Md


NIP. 19783009200121008 INSPECTOR NPWP : 01.864.588.7-811.000
242000000
#REF!
#REF!

#REF! ###

#REF! ###
#REF! ###
#REF! ###
#REF! ###
#REF! ###

#REF! ###
###
#REF! ###

### ###
### ###
### ###
### ###
LAPORAN SISTIM MONITORING PROYEK BULAN
BULANAN PEMBANGUNAN MCK KABUPATEN KONAWE UTARA TA. 2010 NOVEMBER
CERTIFIKASI BULANAN
PROPINSI : SULAWESI TENGGARA DIREKSI : DINAS PU DAN TATA RUANG LEMBAR : 08
KABUPATEN : KONAWE UTARA KONSULTAN PENGAWAS : CV. MEKANIKINDO KONSULTANT CERTIFIKATE :
NOMOR PAKET : 10 ( Sepuluh ) JENIS PEKERJAAN : PEMBANGUANAN MCK KEC. SAWA TGL. LAPORAN : November 2010
NO. KONTRAK : 460.10/03/SPKK-PNL/DPUTR-KU/IX/2010 : BOBOT S/D BULAN LALU :
NILAI KONTRAK : Rp 250,951,000.00 TARGET FISIK : BOBOT BULAN INI :
TANGGAL KONTRAK : 26 NOVEMBER 2010 LOKASI : KEC. SAWA BOBOT S/D BULAN INI :
PELAKSANA : CV. SARANA UTARA : KABUPATEN KONAWE UTARA
URAIAN KONRAK
NILAI KONTRAK AWAL REALISASI S/D BULAN LALU REALISASI BULAN INI REALISASI S/D BULAN INI
HARGA JUMLAH JUMLAH JUMLAH JUMLAH
NO URAIAN PEKERJAAN
SAT. SATUAN VOL. HARGA VOL. HARGA VOL. HARGA VOL. HARGA
( Rp ) ( Rp ) ( Rp ) ( Rp ) ( Rp )
F PEKERJAAN PENGECETAN
1 Pek.Pengecetan Dinding, Kolom dan Lisplank M2 16,930.50 332.70 5,632,777.35 - - 0.00 0.00 0.00 0.00
2 Pek.Pengecetan Kayu 3 x M2 22,562.50 8.28 186,817.50 - - #REF! #REF! #REF! #REF!
Jumlah 5,819,594.85 #REF! #REF!

Mengetahui : Diperiksa : Diajukan Oleh :


KOORDINATOR PENGAWAS DIREKSI TEKNIS CV. MEKANIKINDO KONSULTANT CV. SARANA UTARA
BIDANG CIPTA KARYA DINAS PU DAN TATA RUANG KONSULTAN PENGAWAS DIREKTUR

AS RULAN, ST, MT A N S A R, A.Md SENAWAN SILONDAE, A.Md


NIP. 19783009200121008 INSPECTOR NPWP : 01.864.588.7-811.000
242000000
#REF!
#REF!

#REF! ###
#REF! ###
#REF! ###
###
#REF! ###

### ###
### ###
### ###
### ###
LAPORAN SISTIM MONITORING PROYEK BULAN
BULANAN PEMBANGUNAN MCK KABUPATEN KONAWE UTARA TA. 2010 NOVEMBER
CERTIFIKASI BULANAN
PROPINSI : SULAWESI TENGGARA DIREKSI : DINAS PU DAN TATA RUANG LEMBAR : 09
KABUPATEN : KONAWE UTARA KONSULTAN PENGAWAS : CV. MEKANIKINDO KONSULTANT CERTIFIKATE :
NOMOR PAKET : 10 ( Sepuluh ) JENIS PEKERJAAN : PEMBANGUANAN MCK KEC. SAWA TGL. LAPORAN : November 2010
NO. KONTRAK : 460.10/03/SPKK-PNL/DPUTR-KU/IX/2010 : BOBOT S/D BULAN LALU :
NILAI KONTRAK : Rp 250,951,000.00 TARGET FISIK : BOBOT BULAN INI :
TANGGAL KONTRAK : 26 NOVEMBER 2010 LOKASI : KEC. SAWA BOBOT S/D BULAN INI :
PELAKSANA : CV. SARANA UTARA : KABUPATEN KONAWE UTARA
URAIAN KONRAK
NILAI KONTRAK AWAL REALISASI S/D BULAN LALU REALISASI BULAN INI REALISASI S/D BULAN INI
HARGA JUMLAH JUMLAH JUMLAH JUMLAH
NO URAIAN PEKERJAAN
SAT. SATUAN VOL. HARGA VOL. HARGA VOL. HARGA VOL. HARGA
( Rp ) ( Rp ) ( Rp ) ( Rp ) ( Rp )

III PEMBANGUNAN TOWER


A PEKERJAAN TANAH, PASIR DAN BATU
1 Pek. Galian Tanah M3 39,125.00 8.00 313,000.00 - - #REF! #REF! #REF! #REF!
2 Pek. Urugan Kembali Bekas Galian M3 17,150.00 4.07 69,800.50 - - #REF! #REF! #REF! #REF!
3 Pek. Urugan Pasir Alas Pondasi M3 165,650.00 0.40 66,260.00 - - #REF! #REF! #REF! #REF!
Jumlah 449,060.50 #REF! #REF!

Mengetahui : Diperiksa : Diajukan Oleh :


KOORDINATOR PENGAWAS DIREKSI TEKNIS CV. MEKANIKINDO KONSULTANT CV. SARANA UTARA
BIDANG CIPTA KARYA DINAS PU DAN TATA RUANG KONSULTAN PENGAWAS DIREKTUR

AS RULAN, ST, MT A N S A R, A.Md SENAWAN SILONDAE, A.Md


NIP. 19783009200121008 INSPECTOR NPWP : 01.864.588.7-811.000
242000000
#REF!
#REF!

#REF! ###
#REF! ###
#REF! ###
#REF! ###
###
#REF! ###

### ###
### ###
### ###
### ###
LAPORAN SISTIM MONITORING PROYEK BULAN
BULANAN PEMBANGUNAN MCK KABUPATEN KONAWE UTARA TA. 2010 NOVEMBER
CERTIFIKASI BULANAN
PROPINSI : SULAWESI TENGGARA DIREKSI : DINAS PU DAN TATA RUANG LEMBAR : 10
KABUPATEN : KONAWE UTARA KONSULTAN PENGAWAS : CV. MEKANIKINDO KONSULTANT CERTIFIKATE :
NOMOR PAKET : 10 ( Sepuluh ) JENIS PEKERJAAN : PEMBANGUANAN MCK KEC. SAWA TGL. LAPORAN : November 2010
NO. KONTRAK : 460.10/03/SPKK-PNL/DPUTR-KU/IX/2010 : BOBOT S/D BULAN LALU :
NILAI KONTRAK : Rp 250,951,000.00 TARGET FISIK : BOBOT BULAN INI :
TANGGAL KONTRAK : 26 NOVEMBER 2010 LOKASI : KEC. SAWA BOBOT S/D BULAN INI :
PELAKSANA : CV. SARANA UTARA : KABUPATEN KONAWE UTARA
URAIAN KONRAK
NILAI KONTRAK AWAL REALISASI S/D BULAN LALU REALISASI BULAN INI REALISASI S/D BULAN INI
HARGA JUMLAH JUMLAH JUMLAH JUMLAH
NO URAIAN PEKERJAAN
SAT. SATUAN VOL. HARGA VOL. HARGA VOL. HARGA VOL. HARGA
( Rp ) ( Rp ) ( Rp ) ( Rp ) ( Rp )
B PEKERJAAN BETON DAN PENGECETAN
1 Pek. Pondasi Beton Bertulang 1pc : 2psr : 3krl M3 4,190,002.00 1.13 4,734,702.26 - - #REF! #REF! #REF! #REF!
2 Pek. Sloof 15 x 20 cm 1pc : 2psr : 3krl M3 5,459,552.00 0.22 1,201,101.44 - - #REF! #REF! #REF! #REF!
3 Pek. Balok 15 x 30 cm 1pc : 2psr : 3krl M3 6,110,757.00 0.65 3,971,992.05 - - #REF! #REF! #REF! #REF!
4 Pek. Kolom 20 x 20 cm 1pc : 2psr : 3krl M3 7,816,032.00 0.88 6,878,108.16 - - #REF! #REF! #REF! #REF!
5 Pek. Pelat Beton Tebal 12 cm 1pc : 2psr : 3krl M3 7,981,032.00 0.55 4,389,567.60 - - #REF! #REF! #REF! #REF!
6 Pek. Rabat Beton Stam 1pc : 3psr : 5krl t. 5 cm M3 614,141.00 0.57 350,060.37 - - #REF! #REF! #REF! #REF!
7 Pek. Plesteran 1pc : 5psr M2 37,032.41 26.95 998,023.45 - - #REF! #REF! #REF! #REF!
8 Pek. Acian Tembok M2 22,351.50 26.95 602,372.92 - - #REF! #REF! #REF! #REF!
9 Pek. Pengecetan Tembok M2 16,912.50 26.95 455,791.88 - - #REF! #REF! #REF! #REF!
Jumlah 23,581,720.13 #REF! #REF!

Mengetahui : Diperiksa : Diajukan Oleh :


KOORDINATOR PENGAWAS DIREKSI TEKNIS CV. MEKANIKINDO KONSULTANT CV. SARANA UTARA
BIDANG CIPTA KARYA DINAS PU DAN TATA RUANG KONSULTAN PENGAWAS DIREKTUR

AS RULAN, ST, MT A N S A R, A.Md SENAWAN SILONDAE, A.Md


NIP. 19783009200121008 INSPECTOR NPWP : 01.864.588.7-811.000
242000000
#REF!
#REF!

#REF! ###

#REF! ###
#REF! ###
#REF! ###
#REF! ###
#REF! ###

#REF! ###
###
#REF! ###

### ###
### ###
### ###
### ###
LAPORAN SISTIM MONITORING PROYEK BULAN
BULANAN PEMBANGUNAN MCK KABUPATEN KONAWE UTARA TA. 2010 NOVEMBER
CERTIFIKASI BULANAN
PROPINSI : SULAWESI TENGGARA DIREKSI : DINAS PU DAN TATA RUANG LEMBAR : 11
KABUPATEN : KONAWE UTARA KONSULTAN PENGAWAS : CV. MEKANIKINDO KONSULTANT CERTIFIKATE :
NOMOR PAKET : 10 ( Sepuluh ) JENIS PEKERJAAN : PEMBANGUANAN MCK KEC. SAWA TGL. LAPORAN : November 2010
NO. KONTRAK : 460.10/03/SPKK-PNL/DPUTR-KU/IX/2010 : BOBOT S/D BULAN LALU :
NILAI KONTRAK : Rp 250,951,000.00 TARGET FISIK : BOBOT BULAN INI :
TANGGAL KONTRAK : 26 NOVEMBER 2010 LOKASI : KEC. SAWA BOBOT S/D BULAN INI :
PELAKSANA : CV. SARANA UTARA : KABUPATEN KONAWE UTARA
URAIAN KONRAK
NILAI KONTRAK AWAL REALISASI S/D BULAN LALU REALISASI BULAN INI REALISASI S/D BULAN INI
HARGA JUMLAH JUMLAH JUMLAH JUMLAH
NO URAIAN PEKERJAAN
SAT. SATUAN VOL. HARGA VOL. HARGA VOL. HARGA VOL. HARGA
( Rp ) ( Rp ) ( Rp ) ( Rp ) ( Rp )
C PEKERJAAN SUMUR BOR
1 Penyiapan Lokasi Titik Pemboran Ls 1,150,000.00 1.00 1,150,000.00 - - #REF! #REF! #REF! #REF!
2 Mobilitasi dan Demobilitasi Peralatan Bor Ls 1,200,000.00 1.00 1,200,000.00 - - #REF! #REF! #REF! #REF!
3 Pemboran Sumur Dalam Unit 5,000,000.00 1.00 5,000,000.00 - - #REF! #REF! #REF! #REF!
4 Pengdaan dan Pemasangan Pipa Cassing Unit 1,500,000.00 1.00 1,500,000.00 - - #REF! #REF! #REF! #REF!
5 Pengad. dan Pas. Pompa Air (Jet Pump 150 Watt) Unit 2,885,000.00 1.00 2,885,000.00 - - #REF! #REF! #REF! #REF!
Jumlah 11,735,000.00 #REF! #REF!

Mengetahui : Diperiksa : Diajukan Oleh :


KOORDINATOR PENGAWAS DIREKSI TEKNIS CV. MEKANIKINDO KONSULTANT CV. SARANA UTARA
BIDANG CIPTA KARYA DINAS PU DAN TATA RUANG KONSULTAN PENGAWAS DIREKTUR

AS RULAN, ST, MT A N S A R, A.Md SENAWAN SILONDAE, A.Md


NIP. 19783009200121008 INSPECTOR NPWP : 01.864.588.7-811.000
242000000
#REF!
#REF!

#REF! ###

#REF! ###
#REF! ###
#REF! ###
#REF! ###
#REF! ###
###
#REF! ###

### ###
### ###
### ###
### ###
LAPORAN SISTIM MONITORING PROYEK
BULANAN PEMBANGUNAN MCK KABUPATEN KONAWE UTARA TA. 2010
CERTIFIKASI BULANAN
PROPINSI : SULAWESI TENGGARA DIREKSI : DINAS PU DAN TATA RU
KABUPATEN : KONAWE UTARA KONSULTAN PENGAWAS : CV. MEKANIKINDO KON
NOMOR PAKET : 10 ( Sepuluh ) JENIS PEKERJAAN : PEMBANGUANAN MCK K
NO. KONTRAK : 460.10/03/SPKK-PNL/DPUTR-KU/IX/2010 :
NILAI KONTRAK : Rp 250,951,000.00 TARGET FISIK :
TANGGAL KONTRAK : 26 NOVEMBER 2010 LOKASI : KEC. SAWA
PELAKSANA : CV. SARANA UTARA : KABUPATEN KONAWE U
URAIAN KONRAK
NILAI KONTRAK AWAL REALISASI S/D BULAN LAL
HARGA JUMLAH
NO URAIAN PEKERJAAN
SAT. SATUAN VOL. HARGA VOL.
( Rp ) ( Rp )
D PEK. PAS. PIPA DAN ASESSORIS PIPA
1 Pemasangan Pipa PVC 1/2" AW M1 28,947.00 32.00 926,304.00 -
2 Pemasangan Stop Kran Bh 24,500.00 2.00 49,000.00 -
3 Bak Air Fibre Glass Kap. 1 M3 Unit 1,500,000.00 2.00 3,000,000.00 -
4 Pembuatan Tangga Tower (Besi Beton Dia. 16) LS 350,000.00 1.00 350,000.00 -
Jumlah 4,325,304.00

Mengetahui :
KOORDINATOR PENGAWAS DIREKSI TEKNIS CV. MEKANIKINDO KO
BIDANG CIPTA KARYA DINAS PU DAN TATA RUANG KONSULTAN PENG

AS RULAN, ST, MT A N S A R, A.M


NIP. 19783009200121008
G PROYEK BULAN
KONAWE UTARA TA. 2010 NOVEMBER
LANAN
DINAS PU DAN TATA RUANG LEMBAR : 12
CV. MEKANIKINDO KONSULTANT CERTIFIKATE :
PEMBANGUANAN MCK KEC. SAWA TGL. LAPORAN : November 2010
BOBOT S/D BULAN LALU :
BOBOT BULAN INI :
KEC. SAWA BOBOT S/D BULAN INI :
KABUPATEN KONAWE UTARA
RAK
EALISASI S/D BULAN LALU REALISASI BULAN INI REALISASI S/D BULAN INI
JUMLAH JUMLAH JUMLAH
HARGA VOL. HARGA VOL. HARGA
( Rp ) ( Rp ) ( Rp )

- #REF! #REF! #REF! #REF!


- #REF! #REF! #REF! #REF!
- #REF! #REF! #REF! #REF!
- #REF! #REF! #REF! #REF!
#REF! #REF!

Diperiksa : Diajukan Oleh :


CV. MEKANIKINDO KONSULTANT CV. SARANA UTARA
KONSULTAN PENGAWAS DIREKTUR

A N S A R, A.Md SENAWAN SILONDAE, A.Md


INSPECTOR NPWP : 01.864.588.7-811.000
242000000
#REF!
#REF!

#REF! ###

#REF! ###
#REF! ###
#REF! ###
#REF! ###
###
#REF! ###

### ###
### ###
### ###
### ###
LAPORAN SISTIM MONITORING PROYEK BULAN
BULANAN PEMBANGUNAN MCK KABUPATEN KONAWE UTARA TA. 2010 NOVEMBER
CERTIFIKASI BULANAN
PROPINSI : SULAWESI TENGGARA DIREKSI : DINAS PU DAN TATA RUANG LEMBAR : 12
KABUPATEN : KONAWE UTARA KONSULTAN PENGAWAS : CV. MEKANIKINDO KONSULTANT CERTIFIKATE :
NOMOR PAKET : 10 ( Sepuluh ) JENIS PEKERJAAN : PEMBANGUANAN MCK KEC. SAWA TGL. LAPORAN : November 2010
NO. KONTRAK : 460.10/03/SPKK-PNL/DPUTR-KU/IX/2010 : BOBOT S/D BULAN LALU :
NILAI KONTRAK : Rp 250,951,000.00 TARGET FISIK : BOBOT BULAN INI :
TANGGAL KONTRAK : 26 NOVEMBER 2010 LOKASI : KEC. SAWA BOBOT S/D BULAN INI :
PELAKSANA : CV. SARANA UTARA : KABUPATEN KONAWE UTARA
URAIAN KONRAK
NILAI KONTRAK AWAL REALISASI S/D BULAN LALU REALISASI BULAN INI REALISASI S/D BULAN INI
HARGA JUMLAH JUMLAH JUMLAH JUMLAH
NO URAIAN PEKERJAAN
SAT. SATUAN VOL. HARGA VOL. HARGA VOL. HARGA VOL. HARGA
( Rp ) ( Rp ) ( Rp ) ( Rp ) ( Rp )
D PEKERJAAN FINISHING

1 Finishing dan Pembersihan Lokasi LS 650,000.00 #REF! #REF! - - #REF! #REF! #REF! #REF!

Jumlah #REF! #REF! #REF!

Mengetahui : Diperiksa : Diajukan Oleh :


KOORDINATOR PENGAWAS DIREKSI TEKNIS CV. MEKANIKINDO KONSULTANT CV. SARANA UTARA
BIDANG CIPTA KARYA DINAS PU DAN TATA RUANG KONSULTAN PENGAWAS DIREKTUR

AS RULAN, ST, MT A N S A R, A.Md SENAWAN SILONDAE, A.Md


NIP. 19783009200121008 INSPECTOR NPWP : 01.864.588.7-811.000
242000000
#REF!
#REF!

#REF! ###

#REF! ###
#REF! ###
#REF! ###
###
#REF! ###

### ###
### ###
### ###
### ###
PEMERINTAH DAERAH KABUPATEN KONAWE
DINAS PENDIDIKAN
Alamat : Kompleks Perkantoran Unaaha

BACK UP VOLUME

PEKERJAAN : PEMB. GEDUNG PERPUSTAKAAN

LOKASI : SMPN 1 WONGGEDUKU

TAHUN ANGGARAN
2013
BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : LEMBAR : 1
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : TANGGAL :
NO. KONTRAK : - KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : Rp 318,000,000.00 KEGIATAN : DANA INSENTIF DAERAH ( DID) T.A 2014 BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEKERJAAN PERSIAPAN

NO SKETSA/GAMBAR DIMENSI VOLUME KETERANGAN

1 Pembersihan Lokasi Satuan LS 1.00 DIBUAT OLEH :


CV. PANCAPILAR KREASINDO

2 Pengukuran & Pemas. Bouwplank Satuan LS 1.00

MUH.AFZAN
3 Penyediaan Air Kerja. Air Minum. P3K Satuan LS 1.00 Sataf Teknik

DIPERIKSA OLEH :
4 Pembuatan Bangsal Kerja Satuan LS 1.00 CV. PANCAPILAR KREASINDO

5 Pembuatan Papan Nama Proyek Satuan LS 1.00

MURSYIDUDDIN H ,ST
6 Administrasi, Dokumentasi Dan Pelaporan Satuan LS 1.00 Direktur
BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR : 2
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : - KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : Rp 318,000,000.00 KEGIATAN : DANA INSENTIF DAERAH ( DID) T.A 2014 BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEK. TANAH DAN PASIR DAN BATU

NO SKETSA/GAMBAR DIMENSI VOLUME KETERANGAN

1 Galian Tanah Pondasi Batu Gunung LUASAN PENAMPANG RUMUS = DIBUAT OLEH :
a = 0.80 M a x t x p CV. PANCAPILAR KREASINDO
t = 0.60 M
p = 77.00 M 0.80 x 0.60 x 77.00

Volume Galian Tanah = 36.96 M3


JAKI PATRIAWAN
2 Urugan Kembali Bekas Galian LUASAN PENAMPANG RUMUS = Staf Teknik
a = 0.24 M a + b : 2 x t x p
b = 0.17 M DIPERIKSA OLEH :
t = 0.25 M 0.24 + 0.17 : 2 x 0.25 x 48.00 CV. PANCAPILAR KREASINDO
p = 48.00 M
Volume Urugan Tanah = 2.46 M3

3 Urugan Tanah Bawah Lantai LUASAN PENAMPANG RUMUS =


a = 9.00 M a x p x t MURSYIDUDDIN H ,ST
p = 15.00 M 9.00 x 15.00 x 0.40 a = 54 M3 Direktur
t = 0.40 M
BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR : 3
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : - KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : Rp 318,000,000.00 KEGIATAN : DANA INSENTIF DAERAH ( DID) T.A 2014 BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEK. TANAH DAN PASIR DAN BATU

N
SKETSA/GAMBAR DIMENSI VOLUME KETERANGAN
O

4 Urugan Pasir Bawah Pondasi Ukuran Penampang RUMUS = DIBUAT OLEH :


a = 0.80 M a x p x t CV. PANCAPILAR KREASINDO
t = 0.10 M
p = 77.00 M 0.80 x 0.10 x 77.00

Volume Urugan Pasir = 6.16 M3


JAKI PATRIAWAN
Staf Teknik
5 Urugan Pasir Bawah Lantai tebal 10 Cm LUASAN PENAMPANG RUMUS =
a = 9.00 M a x p x t DIPERIKSA OLEH :
P = 15.00 M 9.00 x 15.00 x 0.10 CV. PANCAPILAR KREASINDO
T = 0.10 M
Volume Urugan Pasir = 13.50 M3

MURSYIDUDDIN H ,ST
Direktur
6 Pasangan Batu Gunung 1 pc : 4 psr LUASAN PENAMPANG RUMUS =
a = 0.25 M a + b : 2 x t x p
b = 0.54 M
t = 0.70 M 0.25 + 0.54 : 2 x 0.70 77.00
p = 77.00 M
Volume Pas. Podasi Batu Gunung = 21.29 M3
BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR : 4
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : - KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : Rp 318,000,000.00 KEGIATAN : DANA INSENTIF DAERAH ( DID) T.A 2014 BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEK. TANAH DAN PASIR DAN BATU

NO SKETSA/GAMBAR DIMENSI VOLUME KETERANGAN

Pek.
7 Pas. Batu Kosong LUASAN PENAMPANG RUMUS = DIBUAT OLEH :
a = 0.80 M a x t x p CV. PANCAPILAR KREASINDO
t = 0.20 M
p = 77.00 M 0.80 x 0.20 x 77.00

Volume Batu Kosong = 12.32 M3 JAKI PATRIAWAN


Sataf Teknik

DIPERIKSA OLEH :
CV. PANCAPILAR KREASINDO

MURSYIDUDDIN H ,ST
Direktur
BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR : 5
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : - KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : Rp 318,000,000.00 KEGIATAN : DANA INSENTIF DAERAH ( DID) T.A 2014 BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEKERJAAN. BETON

NO SKETSA/GAMBAR DIMENSI VOLUME KETERANGAN

1 Pekerjaan Sloof 15 X 20 cm 1pc : 2psr : 3krl LUASAN PENAMPANG RUMUS = DIBUAT OLEH :
a = 0.15 M a x t x p CV. PANCAPILAR KREASINDO
t = 0.20 M
p = 77.00 M 0.15 x 0.20 x 77.00

Volume Sloof = 2.31 M3 JAKI PATRIAWAN


2.a Pek. Kolom Praktis/ utama 15 x 15 Cm, 1 Pc : 2 Psr : 3 Krl LUASAN PENAMPANG RUMUS StafTeknik
a = 0.15 M a x p x t x jml
p = 0.15 M 0.15 x 0.15 x 3.58 x 8.00 DIPERIKSA OLEH :
t = 3.58 M CV. PANCAPILAR KREASINDO
jml = 8.00 Bh Volume kolom 15/15 = 0.64 M3

MURSYIDUDDIN H ,ST
Direktur

2.b Pek. Kolom Praktis/ utama 15 x 20 Cm, 1 Pc : 2 Psr : 3 Krl LUASAN PENAMPANG RUMUS =
a = 0.15 M a x b x t x Jml
b = 0.25 M
t = 3.58 M 0.15 x 0.25 x 3.58 x 12.00
Jml = 12.00 Bh
Volume Kolom 15 x 20 = 1.61 M3

Volume Kolom = 2.26 M3


81
36
117

7.16

12
12
3
3
3

3
36

12
3
2
2
3
22
BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR : 6
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : - KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : Rp 318,000,000.00 KEGIATAN : DANA INSENTIF DAERAH ( DID) T.A 2014 BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEKERJAAN. BETON

NO SKETSA/GAMBAR DIMENSI VOLUME KETERANGAN

3 Pek. Kolom Teras 1Pc : 2 Psr : 3 Krl LUASAN PENAMPANG RUMUS = DIBUAT OLEH :
a = 0.15 M a x b x t x jml CV. PANCAPILAR KREASINDO
b = 0.25 M
t = 3.58 M 0.15 x 0.25 x 3.58 x 6.00
jml = 6.00 M
Volume kolom teras = 0.81 M3 JAKI PATRIAWAN
StafTeknik

4 Pek. Ring Balok 15 x 20, 1 Pc : 2 Psr : 3 Krl LUASAN PENAMPANG RUMUS = DIPERIKSA OLEH :
p = 81.00 M p CV. PANCAPILAR KREASINDO

81.00

Volume Ring Balok = 81.00 M1


MURSYIDUDDIN H ,ST
5 Pek. Rabat Beton Alas Lantai T, 7 Cm, 1 Pc : 3 Psr : 5 Krl + Acian LUASAN PENAMPANG RUMUS = Direktur

a = 9.00 M a x b x t
p = 15.00 M
t = 0.07 M 9.00 x 15.00 x 0.07

Volume Rabat = 9.45 M3


81
28
109

40
28
81
149

0.07

12
12
3
3
3
3
36

12
3
2
2
3
22
BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR : 7
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : - KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : Rp 318,000,000.00 KEGIATAN : DANA INSENTIF DAERAH ( DID) T.A 2014 BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEKERJAAN. BETON

NO SKETSA/GAMBAR DIMENSI VOLUME KETERANGAN

DIBUAT OLEH :
6 Pek. Rabat Beton Keliling T, 7 Cm, 1 Pc : 3 Psr : 5 Krl + Acian LUASAN PENAMPANG RUMUS = CV. PANCAPILAR KREASINDO
a = 0.80 M a x b x t
p = 54.40 M
t = 0.07 M 0.80 x 54.40 x 0.07
JAKI PATRIAWAN
Volume Rabat = 3.05 M
3
StafTeknik

DIPERIKSA OLEH :
7 Pek.Saluran Air Hujan Keliling LUASAN PENAMPANG RUMUS = CV. PANCAPILAR KREASINDO
p = 55.20 M p

55.20

Volume Rabat = 55.20 M3 MURSYIDUDDIN H ,ST


Direktur
81
28
109

40
28
81
149

0.07

12
12
3
3
3
3
36

12
3
2
2
3
22
BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR : 8
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : - KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : Rp 318,000,000.00 KEGIATAN : DANA INSENTIF DAERAH ( DID) T.A 2014 BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEK.DINDING PLESTER DAN PROFIL

0.25
NO SKETSA/GAMBAR DIMENSI VOLUME KETERANGAN
1.35
0.7
1 Pek. Dinding Tembok 1/2 Bata 1pc : 2psr LUASAN PENAMPANG RUMUS = DIBUAT OLEH : 2.94
t = 0.30 M t x p - Bukaan CV. PANCAPILAR KREASINDO
p = 62.00 M
Bukaan = 2.60 M2 0.30 x 62.00 - 2.60
1
a Volume Bata 1 : 2 16.00 M2 3.6
JAKI PATRIAWAN
2 Pek. Dinding Tembok 1/2 Bata 1pc : 5psr LUASAN PENAMPANG RUMUS = StafTeknik
t = 3.28 M t x p - Bukaan 0.39
p = 62.00 M 3.28 x 62.00 - 57.78 DIPERIKSA OLEH : 1.17
Bukaan = 57.78 M2 CV. PANCAPILAR KREASINDO
Volume Bata 1 : 5 145.58 M2
luas bukaan
panjang

3 Pek. Plesteran Dididng 1 : 2 LUASAN PENAMPANG RUMUS = MURSYIDUDDIN H ,ST


t = 0.30 M p x t - bukaan x 2 Direktur
p = 62.00 M 62.00 x 0.30 - 2.60 x 2
Bukaan = 2.60 M
Volume Plesteran 1 : 2 = 32.00 M2
0.45

0.7

0.60
KURANG

4.485 2.04
40.365 4.08
3.105 3.77
18.63 11.31

luas bukaan 74.385


54
82 28

KURANG

Pas. Dinding Trasraam 1 : 2


BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR : 9
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : - KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : Rp 318,000,000.00 KEGIATAN : DANA INSENTIF DAERAH ( DID) T.A 2014 BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEK.DINDING PLESTER DAN PROFIL

NO SKETSA/GAMBAR DIMENSI VOLUME KETERANGAN

4 Pek. Plesteran Dididng 1 : 5 LUASAN PENAMPANG RUMUS = DIBUAT OLEH :


t = 3.28 M t x p - Bukaan x 2 CV. PANCAPILAR KREASINDO
p = 62.00 M 3.28 x 62.00 - 57.78 x 2
bukaan = 57.78 M
a Volume Plesteran 1 : 5 = 291.17 M2
JAKI PATRIAWAN
Staf Teknik

DIPERIKSA OLEH :
CV. PANCAPILAR KREASINDO

5 Pek. Plesteran kolom 1 : 2 LUASAN PENAMPANG RUMUS =


t = 3.58 M p x t x Jml
p = 0.35 M 0.35 x 3.58 x 12.00
jumlah = 12.00 M Volume Plesteran Kolom 1 : 2 = 15.04 M2 MURSYIDUDDIN H ,ST
Direktur

LUASAN PENAMPANG RUMUS =


t = 3.58 M t x p x l x jml x 2
p = 0.25 M 3.58 x 0.25 x 0.15 x 6.00 x 2.00
l = 0.15 M Volume Plesteran Kolom 1 : 2 = 1.61 M2

Volume Plesteran Kolom 1 : 2 = 16.65 M2


81 22.4
28 58
109 80.4

40
28
81
149

#REF!

12

12
3
3
3

3
36

12
3
2
2
3
22
BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR : 10
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : - KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : Rp 318,000,000.00 KEGIATAN : DANA INSENTIF DAERAH ( DID) T.A 2014 BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEK.DINDING PLESTER DAN PROFIL

NO SKETSA/GAMBAR DIMENSI VOLUME KETERANGAN

DIBUAT OLEH :
6 Pek. Plesteran Pondasi 1 : 2 CV. PANCAPILAR KREASINDO
LUASAN PENAMPANG RUMUS =
p = 48.00 M p x l
l = 0.40 M 48.00 x 0.40
Volume Plesteran Pondasi 1 : = 19.20 M2 JAKI PATRIAWAN
Staf Teknik

DIPERIKSA OLEH :
CV. PANCAPILAR KREASINDO

MURSYIDUDDIN H ,ST
Direktur
81 22.4
28 58
109 80.4

40
28
81
149

#REF!

12

12
3
3
3

3
36
12
3
2
2
3
22
BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR : 11
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : - KONSULTAN PENGAWAS : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : Rp 318,000,000.00 KEGIATAN : DANA INSENTIF DAERAH ( DID) T.A 2014 BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEK. KUSEN,PINTU,JENDELA & VENTILASI & PENGGANTUNG

NO SKETSA/GAMBAR DIMENSI VOLUME KETERANGAN

1 Pek. Kusen Pintu, Ventilasi dan Jendela LUASAN PENAMPANG RUMUS = DIBUAT OLEH :
a = 0.15 M a x t x p CV. MEKANIKINDO KONSULTANT
t = 0.07 M
p = 175.30 M 0.15 x 0.07 x 175.30

Volume Balok Kayu Kls II = 1.84 M3


JAKI PATRIAWAN
2 Pek. Pas. Pintu Panil Jati LUAS PENAMPANG RUMUS = Staf Teknik
L = 1.62 M l x p
L
p = 2.12 M 1.62 x 2.12 DIPERIKSA OLEH :
CV. PANCAPILAR KREASINDO
PANIL

Volume Pas. Pintu Panil Jati = 3.43 M2


P

L = 0.82 M l x p x Jml
p = 2.12 M 0.82 x 2.12 x 3.00
Jml = 3.00 Bh
Volume Pas. Pintu Panil Jati = 5.22 M2 MURSYIDUDDIN H ,ST
3 Pek. Pas. Bingkai Jendela Kaca Kayu Jati Direktur
Volume Pas. Pintu Panil Jati = 8.65 M2

a LUASAN PENAMPANG RUMUS =


KACA 5 mm
a = 0.07 M a x p
p
p

= 36.65 M 0.07 x 36.65


Volume Pas. Bingkai Jendela = 2.57 M2
1 Pek. Pas. Pintu Panil Jati LUAS PENAMPANG RUMUS =
L = 0.80 M l x p x Jml
p = 2.10 M 0.80 x 2.10 x 6.00
Jml = 4.00 Bh L x P x Jml

L = 0.70 M 0.70 x 2.10 x 1.00


P = 2.10 M Volume Pintu Panil Jati = 11.55 M2
Jml = 1.00 Bh
150.46
5.8 a
2.6 20

6.9
5.4 46.8 PANIL PANIL

p
6.9
7.8 69.9
2.24 L

1.2
1.84 13.76
1.6 6.88 PANIL

27.24

KURANG

-55.25 Erdiman, A.Md


BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR : 12
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : - KONSULTAN PENGAWAS : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : Rp 318,000,000.00 KEGIATAN : DANA INSENTIF DAERAH ( DID) T.A 2014 BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEK. KUSEN,PINTU,JENDELA & VENTILASI & PENGGANTUNG

NO SKETSA/GAMBAR DIMENSI VOLUME KETERANGAN

4 Pek. Kaca Bening 5 mm LUASAN PENAMPANG RUMUS = DIBUAT OLEH :


a = 0.68 M a x p x jml CV. MEKANIKINDO KONSULTANT
p = 0.88 M
Jml = 8.00 M 0.68 x 0.88 x 8.00 = 4.79

a = 0.48 M a x p x jml
a
p = 0.82 M JAKI PATRIAWAN
Jml = 1.00 M 0.48 x 0.82 x 1.00 Staf Teknik
KACA 5 mm
= 0.39
p

a = 0.48 M a x p x jml DIPERIKSA OLEH :


p = 0.68 M CV. PANCAPILAR KREASINDO
Jml = 6.00 M 0.48 x 0.68 x 6.00
= 1.96
a = 0.92 M a x p x jml
p = 1.02 M MURSYIDUDDIN H ,ST
Jml = 4.00 M 0.92 x 1.02 x 4.00 Direktur
= 3.75
a = 0.72 M a x p x jml
p = 0.92 M
Jml = 3.00 M 0.72 x 0.92 x 3.00
= 1.99
a = 0.68 M a x p x jml
p = 0.98 M
Jml = 2.00 M 0.68 x 0.98 x 2.00
= 1.33

Volume Pas.Kaca = 14.21 M2


1 Pek. Pas. Pintu Panil Jati LUAS PENAMPANG RUMUS =
L = 0.80 M l x p x Jml L

p = 2.10 M 0.80 x 2.10 x 6.00


Jml = 4.00 Bh L x P x Jml PANIL

P
L = 0.70 M 0.70 x 2.10 x 1.00
P = 2.10 M Volume Pintu Panil Jati = 11.55 M2
Jml = 1.00 Bh
#REF!
5.8 a
2.6 20

6.9
5.4 46.8 PANIL PANIL

p
6.9
7.8 69.9

2.24 L

1.84 #REF!
1.6 #REF!
PANIL

KURANG

#REF! Erdiman, A.Md


BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR : 13
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : - KONSULTAN PERENCAN : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : Rp 318,000,000.00 KEGIATAN : DANA INSENTIF DAERAH ( DID) T.A 2014 BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEK. KUSEN,PINTU,JENDELA & VENTILASI & PENGGANTUNG

NO SKETSA/GAMBAR DIMENSI VOLUME KETERANGAN

5 Pas. Kunci Pintu Tanam 2 x Putar 4.00 Bh DIBUAT OLEH :


CV. MEKANIKINDO KONSULTANT
6 Pas.Engsel Pintu 15.00 Bh

7 Pas. Engsel Jendela 30.00 Bh

8 Pas. Grendel Pintu 7.00 Bh JAKI PATRIAWAN


Staf Teknik
9 Pas. Grendel Jendela 15.00 Bh DIPERIKSA OLEH :
CV. PANCAPILAR KREASINDO
10 Pas. Hak Angin Standar 30.00 Bh

11 pek. Pas. Jalusi LUAS PENAMPANG RUMUS =


a = 0.15 M a x p MURSYIDUDDIN H ,ST
p = 146.96 M 0.15 X 146.96 Direktur

Volume Pas. Jalusi = 22.04 M2


KURANG

#REF! Erdiman, A.Md


BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR : 14
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : - KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : Rp 318,000,000.00 KEGIATAN : DANA INSENTIF DAERAH ( DID) T.A 2014 BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEK.KUDA - KUDA,KAP DAN ATAP PENUTUP

NO SKETSA/GAMBAR DIMENSI VOLUME KETERANGAN

1 Pek. Kuda - Kuda LUAS PENAMPANG RUMUS DIBUAT OLEH :


a = 0.12 M a x t x p CV. MEKANIKINDO KONSULTANT
t = 0.08 M 0.12 x 0.08 x 173.82
p = 173.82 M Volume Kuda -Kuda = 1.67 M3

JAKI PATRIAWAN
Staf Teknik

2 Pek. Pas. Gording LUAS PENAMPANG RUMUS DIPERIKSA OLEH :


a = 0.12 M a x t x p CV. PANCAPILAR KREASINDO
t = 0.06 M 0.12 x 0.06 x 276.20
p = 276.20 M Volume Gording = 1.99 M3

3 Pek. Pas. Balok Apit , konsol & Balok Angin Luasan Penampang RUMUS MURSYIDUDDIN H ,ST
a = 0.06 M a x t x p Direktur
t = 0.12 M 0.06 x 0.12 x 91.12
p = 91.12 M

Volume Pas = 0.66 M3


L
22.9
183.2

406

KURANG

Erdiman, A.Md
BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR : 15
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : - KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : Rp 318,000,000.00 KEGIATAN : DANA INSENTIF DAERAH ( DID) T.A 2014 BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEK.KUDA - KUDA,KAP DAN ATAP PENUTUP

NO SKETSA/GAMBAR DIMENSI VOLUME KETERANGAN

4 Pek. Pas. Atap LUAS PENAMPANG RUMUS DIBUAT OLEH :


p = 11.94 M p x l x 2 CV. MEKANIKINDO KONSULTANT
l. = 7.32 M 11.94 x 7.32 x 2.00
Volume Pas.Rangka At = 174.80 M2
L
p = 4.45 M p x l x 2
l. = 2.28 M 4.45 x 2.28 x 2.00 JAKI PATRIAWAN
Volume Pas.Rangka At = 20.29 M2 Staf Teknik

p = 3.07 M p x l x 2 DIPERIKSA OLEH :


l. = 2.05 M 3.07 x 2.05 x 2.00 CV. PANCAPILAR KREASINDO
Volume Pas.Rangka At = 12.59 M2

p = 3.09 M p x l x 2
l. = 2.82 M 3.09 x 2.82 x 2.00
Volume Pas.Rangka At = 17.43 M2 MURSYIDUDDIN H ,ST
Direktur

Volume Pas.Rangka At = 225.11 M2


KURANG

Erdiman, A.Md
BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR : 16
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : - KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : Rp 318,000,000.00 KEGIATAN : DANA INSENTIF DAERAH ( DID) T.A 2014 BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEK.KUDA - KUDA,KAP DAN ATAP PENUTUP

NO SKETSA/GAMBAR DIMENSI VOLUME KETERANGAN

DIBUAT OLEH :
5 Pek. Nok Atap LUAS PENAMPANG CV. MEKANIKINDO KONSULTANT
p = 26.62 M

Volume Nok Atap = 26.62 M1

JAKI PATRIAWAN
6 Pek. List Plank Luasan Penampang Staf Teknik
p = 71.08 M
Volume Pas. List Plank = 71.08 M1 DIPERIKSA OLEH :
CV. PANCAPILAR KREASINDO

MURSYIDUDDIN H ,ST
Direktur
KURANG

Erdiman, A.Md
BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR : 17
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : - KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : Rp 318,000,000.00 KEGIATAN : DANA INSENTIF DAERAH ( DID) T.A 2014 BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEK.PENGECETAN DAN FINISHING

NO SKETSA/GAMBAR DIMENSI VOLUME KETERANGAN

1 Pek. Pengecetan Diniding Tembok LUASAN PENAMPANG RUMUS = DIBUAT OLEH :


a + p CV. MEKANIKINDO KONSULTANT
Plesteran 1 : 2 = 32.00
Plesteran 1 : 5 = 291.17 32.00 + 291.17

Volume pengecetan Tembok = 323.17 M2 JAKI PATRIAWAN


Staf Teknik
2 Pek. Pengecetan Kayu Baru LUASAN PENAMPANG RUMUS
Pas. Kusen = 175.30 175.30 x 0.30 DIPERIKSA OLEH :
CV. PANCAPILAR KREASINDO
Volume Pengecetan kayu = 52.59 M2

MURSYIDUDDIN H ,ST
3 Pek. Pengecetan Jalusi,Pintu & jendela LUASAN PENAMPANG RUMUS = Direktur
Pas.Pintu = 8.65 8.65 + 2.57 + 22.04
Pas. Bingkai Jendela = 2.57
Pas. Jalusi 22.04
Volume Pengecetan pintu = 33.26 M2
81 22.4
28 58
109 80.4

40
28
81
149

0.00

0.00

12
12
3
3
3
3
36

12
3
2
2
3
22
BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR : 18
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : - KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : Rp 318,000,000.00 KEGIATAN : DANA INSENTIF DAERAH ( DID) T.A 2014 BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEK.PENGECETAN DAN FINISHING

NO SKETSA/GAMBAR DIMENSI VOLUME KETERANGAN

4 Pek. Pengecetan List Plank LUASAN PENAMPANG RUMUS = DIBUAT OLEH :


p = 71.08 M 71.08 x 0.25 CV. MEKANIKINDO KONSULTANT

Volume Pengecetan list plank = 17.77 M2

5 Pembersihan Sisa-sisa Kotoran LS 1.00


JAKI PATRIAWAN
Staf Teknik

DIPERIKSA OLEH :
CV. PANCAPILAR KREASINDO

MURSYIDUDDIN H ,ST
Direktur
81 22.4
28 58
109 80.4

40
28

81

149

#REF!

#REF!

12
3
3
18
12
3
2
2
3
22
#REF!
CALCULATION SHEET
KABUPATEN : #REF! PELAKSANA : - LEMBAR :
PEKERJAAN : #REF! DIREKSI : - TANGGAL :
NO. KONTRAK : KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : KEGIATAN : #REF! BOBOT :
LOKASI : #REF! PEKERJAAN : PEK. INSTALASI LISTRIK DAN SANITASI

NO SKETSA/GAMBAR DIMENSI VOLUME KETERANGAN

1 Pas. Instalasi Listrik Stuan LS DIBUAT OLEH :


CV. MEKANIKINDO CONSULTANT
2 Pas. Kloset Jongkok -

- Jumlah Kloset Jongkok = 1.00 Bh


INDRA KIRANA
Staf teknik
3 Pas. Floor Drain
DIPERIKSA OLEH :
- Jumlah Ploor Drain = 1.00 Bh CV. PANCAPILAR KREASINDO

4 Pemasangan Pipa Pvc 3/4" AW Untuk Air Bersih


MURSYIDUDDIN H ,ST
- Panjang Pipa PVC 3/4" = 4.00 M1 Direktur

5 Pemasangan Pipa Pvc 3/4" AW Untuk Air Kotor - Panjang Pipa PVC 3/4" = 7.00 M1
BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR : 13
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : - KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : Rp 318,000,000.00 KEGIATAN : DANA INSENTIF DAERAH ( DID) T.A 2014 BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEK.RANGKA PLAFOND & PENGGANTUNG

NO SKETSA/GAMBAR DIMENSI VOLUME KETERANGAN

1 Pas. Rangka Plafond LUAS PENAMPANG RUMUS DIBUAT OLEH :


p = 18.00 M p x l CV. MEKANIKINDO KONSULTANT
l. = 12.00 M 18.00 x 12.00
Volume Rangka Plafond = 216.00 M2

JAKI PATRIAWAN
Staf Teknik

2 Pek. Pas. Plafond tripleks 3 mm LUAS PENAMPANG RUMUS DIPERIKSA OLEH :


p = 18.00 M p x l CV. PANCAPILAR KREASINDO
l. = 12.00 M 18.00 x 12.00
Volume Plafond = 216.00 M2

3 Pek. Pas. List Plafond tripleks Luasan Penampang MURSYIDUDDIN H ,ST


p = 181.00 M Direktur

Volume List Plafond = 181.00 M1


L
22.9
183.2

406

KURANG

Erdiman, A.Md
BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR : 10
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : - KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : Rp 318,000,000.00 KEGIATAN : DANA INSENTIF DAERAH ( DID) T.A 2014 BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEK.DINDING PLESTER DAN PROFIL

NO SKETSA/GAMBAR DIMENSI VOLUME KETERANGAN

7 Pek. Plesteran pondasi 1 : 3 LUASAN PENAMPANG RUMUS = DIBUAT OLEH :


t = 0.20 M p x t CV. PANCAPILAR KREASINDO
p = 54.00 M
54.00 x 0.20

Volume Plesteran 1 : 3 = 10.80 M2 JAKI PATRIAWAN


SrafTeknik

DIPERIKSA OLEH :
CV. PANCAPILAR KREASINDO

MURSYIDUDDIN H ,ST
Direktur
81 22.4
28 58
109 80.4

40
28
81
149

0.00

12
12
3
3
3
3
36

12
3
2
2
3
22
BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR : 6
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : - KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : Rp 318,000,000.00 KEGIATAN : DANA INSENTIF DAERAH ( DID) T.A 2014 BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEKERJAAN. BETON

NO SKETSA/GAMBAR DIMENSI VOLUME KETERANGAN

6 Pek. Rabat Beton Keliling T, 7 Cm, 1 Pc : 3 Psr : 5 Krl LUASAN PENAMPANG RUMUS = DIBUAT OLEH :
a = 0.85 M a x b x t CV. PANCAPILAR KREASINDO
p = 44.80 M
t = 0.07 M 0.85 x 44.80 x 0.07

Volume Rabat = 2.67 M3 JAKI PATRIAWAN


StafTeknik

DIPERIKSA OLEH :
CV. PANCAPILAR KREASINDO
7 Pek. Saluran Air Hujan keliling LUASAN PENAMPANG RUMUS =
p = 44.80 M p

44.80
MURSYIDUDDIN H ,ST
Volume Salluran = 44.80 M3 Direktur
81
28
109

40
28
81
149

#REF!

12
12
3
3
3
3
36

12
3
2
2
3
22
BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR : 14
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : - KONSULTAN PERENCAN : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : Rp 318,000,000.00 KEGIATAN : DANA INSENTIF DAERAH ( DID) T.A 2014 BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEK. INSTALASI LISTRIK

NO SKETSA/GAMBAR DIMENSI VOLUME KETERANGAN

1 Pemasangan instalasi listrik 5.00 Titik DIBUAT OLEH :


CV. MEKANIKINDO KONSULTANT
2 Pasangan Lampu TL 20 Watt 5.00 Bh

3 Pasangan Stop Kontak Merk Bronco 11.00 Bh

4 Pasangan Saklar Double Merk Bronco 2.00 Bh JAKI PATRIAWAN


Staf Teknik

5 Pasangan Saklar Tunggal Ex Clipsal 1.00 Bh DIPERIKSA OLEH :


CV. PANCAPILAR KREASINDO
6 Pasangan MCB 50 A 1 Phasa Merling Gering 1.00 Bh

MURSYIDUDDIN H ,ST
Direktur
KURANG

#REF! Erdiman, A.Md


BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR : 20
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : - KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : Rp 318,000,000.00 KEGIATAN : DANA INSENTIF DAERAH ( DID) T.A 2014 BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEK.PEMBERSIHAN AKHIR

NO SKETSA/GAMBAR DIMENSI VOLUME KETERANGAN

7 Pembersihan Sisa-sisa Kotoran LS 1.00 DIBUAT OLEH :


CV. MEKANIKINDO KONSULTANT

JAKI PATRIAWAN
Staf Teknik

DIPERIKSA OLEH :
CV. PANCAPILAR KREASINDO

MURSYIDUDDIN H ,ST
Direktur
81 22.4
28 58

109 80.4

40
28
81
149

0.00

0.00

12
12
3
3
3
3
36
12
3
2
2
3
22
#REF!
CALCULATION SHEET
KABUPATEN : #REF! PELAKSANA : LEMBAR :
PEKERJAAN : #REF! DIREKSI : - TANGGAL :
NO. KONTRAK : KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : KEGIATAN : #REF! BOBOT :
LOKASI : #REF! PEKERJAAN : PEK. INSTALASI LISTRIK DAN SANITASI

NO SKETSA/GAMBAR DIMENSI VOLUME KETERANGAN

6 Pek. Bak. Air Lapis Keramik DIBUAT OLEH :


KONTRAKTOR PELAKSANA
- Jumlah Bak Air Keramik = 1.00 Bh -

INDRA KIRANA
Staf Teknik
7 Pek. Septick Tank
DIPERIKSA OLEH :
- CV. PANCAPILAR KREASINDO

Jumlah Ploor Drain = 1.00 Bh

MURSYIDUDDIN H ,ST
- Direktur
#REF!
CALCULATION SHEET
KABUPATEN : #REF! PELAKSANA : LEMBAR :
PEKERJAAN : #REF! DIREKSI : - TANGGAL :
NO. KONTRAK : KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : KEGIATAN : #REF! BOBOT :
LOKASI : #REF! PEKERJAAN : PEK. INSTALASI LISTRIK DAN SANITASI

NO SKETSA/GAMBAR DIMENSI VOLUME KETERANGAN

8 Pek. Pas. Kran Air DIBUAT OLEH :


CV.MEKANIKINDO CONSULTANT
- Pek Pas. Kran Air = 1.00 M1 -

INDRA KIRANA
Staf Teknik

DIPERIKSA OLEH :
- CV. PANCAPILAR KREASINDO

MURSYIDUDDIN H ,ST
Direktur
24
6

4
0.5
BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR :
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : - KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : Rp 318,000,000.00 KEGIATAN : DANA INSENTIF DAERAH ( DID) T.A 2014 BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEK.DINDING PLESTER DAN PROFIL

NO SKETSA/GAMBAR DIMENSI VOLUME KETERANGAN

17 Pek. Pas. Tegel Plint 10 x 40 Cm LUASAN PENAMPANG RUMUS = DIBUAT OLEH :


p = 108.00 M p CV. INDA JAYA

108.00

Volume Tegel Plint = 108.0 M1 LAINDA


Direktur
18 Pek. Pas Batu Stage/ Podium LUASAN PENAMPANG RUMUS =
a = 0.25 M a x t x p x jml DIPERIKSA OLEH :
a t = 0.50 M CV. PANCAPILAR KREASINDO
p = 6.90 M 0.25 x 0.25 x 6.90 x 3
KACA 5 mm

jml = 3 bh
p

Volume Pas Batu = 5.25 M2

MURSYIDUDDIN H ,ST
19 Pek. Saluran Air Hujan Keliling Bangunan LUASAN PENAMPANG RUMUS = Direktur

p = 82.00 M p

0.00

Volume Pas, Saluran = 82.00 M1


81 22.4
28 58
109 80.4

40
28
81
149

30.7
92.1
3.00
23.1

115.2 12
12
3
3
3
3
36

12
3
2
2
3
22
BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR :
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : - KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : Rp 318,000,000.00 KEGIATAN : DANA INSENTIF DAERAH ( DID) T.A 2014 BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEK. TANAH DAN PASIR

NO SKETSA/GAMBAR DIMENSI VOLUME KETERANGAN

1 Galian Tanah Pondasi Batu Gunung LUASAN PENAMPANG RUMUS = DIBUAT OLEH :
a = 0.95 M a + b : 2 x t x p -
b = 0.80 M
t = 0.70 M 0.95 + 0.80 : 2 x 0.70 x 117.00
p = 117.00 M
Volume Galian Tanah = 70.20 M3
LAINDA
2 Urugan Kembali Bekas Galian LUASAN PENAMPANG RUMUS = Direktur
a = 0.40 M a + b : 2 x t x p
b = 0.24 M DIPERIKSA OLEH :
t = 0.76 M 0.40 + 0.24 : 2 x 0.76 x 72.00 CV. PANCAPILAR KREASINDO 12
p = 72.00 M 12
Volume Urugan Tanah = 17.55 M3 12
3
3
MURSYIDUDDIN H ,ST 2
3 Urugan Tanah Bawah Lantai LUASAN PENAMPANG RUMUS = Direktur 3
a = 9.00 M a x p x t 3
p = 27.00 M 2
t = 1.00 M 9.00 x 27.00 x 1.00 3
3
Volume Urugan Tanah = 243.00 M
3 58
750,000,000.00
45,000,000.00
30,000,000.00

81.00
36.00
117.00

2 Galian Tanah Pondasi Poor Plat

28.8
=
BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR :
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : - KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : Rp 318,000,000.00 KEGIATAN : DANA INSENTIF DAERAH ( DID) T.A 2014 BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEK. TANAH DAN PASIR DAN BATU

0.25
NO SKETSA/GAMBAR DIMENSI VOLUME KETERANGAN
1.35
0.7
3 Pek. Dinding Tembok 1/2 Bata 1pc : 2psr LUASAN PENAMPANG RUMUS = DIBUAT OLEH : 2.94
t = 0.30 M t x p - Bukaan CV. INDA JAYA
p = 82.00 M
Bukaan = 1.70 M2 0.30 x 82.00 - 1.70
1
Volume Bata 1 : 3 23.43 M2 3.6
LAINDA
4 Pek. Dinding Tembok 1/2 Bata 1pc : 5psr LUASAN PENAMPANG RUMUS = Direktur
t = 3.20 M t x p - Bukaan 0.39
p = 82.00 M DIPERIKSA OLEH : 1.17
Bukaan = 74.39 M2 3.20 x 82.00 - 74.39 CV. PANCAPILAR KREASINDO

Volume Bata 1 : 5 188.01 M2 luas bukaan


panjang
3 Pek. Plesteran Dinding Trasram 1pc : 2psr LUASAN PENAMPANG RUMUS =
t = 0.30 M p x t - Bukaan x 2 MURSYIDUDDIN H ,ST
p = 53.74 M Direktur

Bukaan = 1.70 M2 53.74 x 0.30 - 1.70 x 2

Volume Plesteran 1 : 2 = 28.84 M2


0.45

0.7

0.60
KURANG

4.485 2.04
40.365 4.08
3.105 3.77
18.63 11.31

luas bukaan 74.385


54
82 28

KURANG

Pas. Dinding Trasraam 1 : 2


BACK UP DATA
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR :
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : KEGIATAN : PEMB. GADUNG LAB.KOMPUTER BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEK. BETON

NO SKETSA/GAMBAR DIMENSI VOLUME KETERANGAN

4 Pek. Kolom 15 x 25 Cm 1 Pc : 2 Psr : 3 Krl #REF! RUMUS = DIBUAT OLEH :


a = 0.15 M #REF! x b x t x Jml KONTRAKTOR PELAKSANA
b = 0.25 M -
t = 4.00 M 0.15 x 0.25 x 4.00 x 2.00
jml = 2.00 Bh
Volume Kolom 15 x 15 = 0.30 M3

Pelaksana

5 Pek. Ring Balok 15 x 15 cm 1 Pc : 2 Psr : 3 Krl LUASAN PENAMPANG RUMUS = DIPERIKSA OLEH :
a = 0.15 M a x b x p KONSULTAN PENGAWAS
b = 0.15 M CV. PANCAPILAR KREASINDO
p = 72.00 M 0.15 x 0.15 x 72.00

Volume Ring Balok 15 x 15 = 1.62 M3


Panjang Ring balok 15 x 15 = 72.00 M1 MURSYIDUDDIN H ,ST
INSPECTOR
Pekerjaan Sloof 15/20 cm 1pc : 2psr : 3krl
(200 kg + Bekisting)Tower

9
27.2
36.2
=
BACK UP DATA
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR :
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : KONSULTAN PENGAWAS : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : KEGIATAN : PEMB. GADUNG LAB.KOMPUTER BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEK. BETON

NO SKETSA/GAMBAR DIMENSI VOLUME KETERANGAN

6 Pek. Rabat Beton Stamp. 1 Pc : 3 Psr : 5 Krl. LUASAN PENAMPANG RUMUS = DIBUAT OLEH :
L = 96.00 M L x t CV. MEKANIKINDO CONSULTANT
t = 0.06 M -
96.00 x 0.06

Volume Rabat Beton Stam = 5.76 M3 INDRA KIRANA


Staf Teknik

DIPERIKSA OLEH :
CV. PANCAPILAR KREASINDO

MURSYIDUDDIN H ,ST
Direktur
4.4 8.8
13.55 27.1

35.90
BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR :
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : KEGIATAN : PEMB. GADUNG LAB.KOMPUTER BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEK. DINDING PLESTERAN DAN LANTAI

NO SKETSA/GAMBAR DIMENSI VOLUME KETERANGAN

4 Pek. Plesteran Dinding Tembok 1pc : 5psr LUASAN PENAMPANG RUMUS = DIBUAT OLEH :
p = 53.47 M p x t - Bukaan x 2 CV. MEKANIKINDO CONSULTANT
t = 3.70 M 53.47 x 3.70 - 57.78 x 2 -
Bukaan = 57.78 M2
Volume Plesteran 1 : 5 = 280.12 M2
INDRA KIRANA
Staf Teknik
DIPERIKSA OLEH :
CV. PANCAPILAR KREASINDO

0.60

MURSYIDUDDIN H ,ST
Direktur
5 Pas. Tegel Keramik Lantai WC 20 x 20 cm (corak) LUASAN PENAMPANG -55.25
a = 1.50 M a x p - b
p = 1.50 M
b = 0.90 M2 1.50 x 1.50 - 0.90

Volume Tegel 20/20 1.35 M2


KURANG

Erdiman, A.Md
BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR :
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : KEGIATAN : PEMB. GADUNG LAB.KOMPUTER BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEK. DINDING PLESTERAN DAN LANTAI

NO SKETSA/GAMBAR DIMENSI VOLUME KETERANGAN

6 Pek. Plesteran Beton Pondasi LUASAN PENAMPANG RUMUS = DIBUAT OLEH :


a = 0.03 M a + b + c x p CV. MEKANIKINDO CONSULTANT
b = 0.20 M -
c = 0.30 M 0.03 + 0.20 + 0.30 x 46.00
p = 46.00 M
Volume Plesteran Pondasi 1 : 3 = 24.15 M2 INDRA KIRANA
Staf Teknik

DIPERIKSA OLEH :
CV. PANCAPILAR KREASINDO
7 Pek. Pasangan Tegel Lantai 40 x 40 cm LUAS PENAMPANG

L = 96.00 M2
L
MURSYIDUDDIN H ,ST
Vol. Pas.Tegel 40 x 40 = 96.00 M2 Direktur
KURANG

-55.25 Erdiman, A.Md

96

p
BACK UP VOLUME
CALCULATION SHEET
KABUPATEN : KONAWE PELAKSANA : - LEMBAR :
PEKERJAAN : PEMB. GADUNG LAB.KOMPUTER DIREKSI : - TANGGAL :
NO. KONTRAK : KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : KEGIATAN : PEMB. GADUNG LAB.KOMPUTER BOBOT :
LOKASI : SAMN 1 KONAWE PEKERJAAN : PEK. KUSEN PINTU PINTU DAN VENTILASI

NO SKETSA/GAMBAR DIMENSI VOLUME KETERANGAN

1 Pek. Pas.jedela kaca Mati LUAS PENAMPANG RUMUS = DIBUAT OLEH :


a a = 0.50 M l x p x Jml CV. MEKANIKINDO CONSULTANT
a p = 1.70 M 0.50 x 1.70 x 2.00 -
Jml = 2.00 Bh Volume Jendela Kaca Mati = 1.7 M2
p

KACA 5 mm

INDRA KIRANA
Staf Teknik

DIPERIKSA OLEH :
b LUAS PENAMPANG CV. PANCAPILAR KREASINDO
p a = 0.20 M L x P x Jml
a

KACA 5 mm

P = 0.70 M 0.20 x 0.70 x 16.00


Jml = 16.00 Bh Volume Jendela Kaca Mati = 2.24 M2

MURSYIDUDDIN H ,ST
c LUAS PENAMPANG Direktur
a = 0.62 M L x P x Jml
a
P = 1.08 M 0.62 x 1.08 x 10.00
KACA 5 mm Jml = 10.00 Bh Volume Jendela Kaca Mati = 6.70 M2
p

Volume Jendela Kaca Mati = 10.64 M2


a

PANIL PANIL
p

PANIL
P

KURANG

#REF! Erdiman, A.Md


#REF!
CALCULATION SHEET
KABUPATEN : #REF! PELAKSANA : LEMBAR :
PEKERJAAN : #REF! DIREKSI : - TANGGAL :
NO. KONTRAK : KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : KEGIATAN : PEMBANGUNAN MCK KEC. SAWA BOBOT :
LOKASI : #REF! PEKERJAAN : PEKERJAAN PENGECETAN

NO SKETSA/GAMBAR DIMENSI VOLUME KETERANGAN

1 Kayu a = 0.00 M a + b + c DIBUAT OLEH :


b = 3.43 M CV. MEKANIKINDO CONSULTANT
c = 2.57 M 0.00 + 3.43 + 2.57 x -
Volume Pengecetan = 6.00 M2

INDRA KIRANA
Pelaksana

DIPERIKSA OLEH :
CV. PANCAPILAR KREASINDO

MURSYIDUDDIN H ,ST
Direktur
24
6
4.40
13.55 4
189.772 0.5
43.13
54.77 L

287.67
#REF!
CALCULATION SHEET
KABUPATEN : #REF! PELAKSANA : LEMBAR :
PEKERJAAN : #REF! DIREKSI : - TANGGAL :
NO. KONTRAK : KONSULTAN PERENCANA : CV. PANCAPILAR KREASINDO CERTIFIKAT :
NILAI KONTRAK : KEGIATAN : PEMBANGUNAN MCK KEC. SAWA BOBOT :
LOKASI : #REF! PEKERJAAN : PEK.PEMBERSIHAN

NO SKETSA/GAMBAR DIMENSI VOLUME KETERANGAN

1 Pek. Pembersihan Sisa - Sisa Kotoran DIBUAT OLEH :


Ls Volume = 1.00 LS CV. MEKANIKINDO CONSULTANT
-

INDRA KIRANA
Pelaksana

DIPERIKSA OLEH :
CV. PANCAPILAR KREASINDO

MURSYIDUDDIN H ,ST
Direktur
24
6
4.40
13.55 4
189.772 0.5
43.13
54.77

287.67