VOLUME HARGA SATUAN JUMLAH BOBOT S/D OPNAME LALU OPNAME INI S/D OPNAME INI
NO URAIAN PEKERJAAN SATUAN PRESTASI
(ADD) (ADD) (ADD) (ADD) VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT

IV PEKERJAAN PRASARANA FASILITAS PENDUKUNG


A PEKERJAAN HALAMAN, SALURAN, BAK TANAMAN DAN LAIN-LAIN
I PEKERJAAN HALAMAN
1 Urugan tanah m3 591,50 168.025,00 99.386.787,50 15,761 354,013 9,433 207,91 5,540 561,93 14,973 95,00
2 Cor rabat beton mutu f'c=14,5 Mpa tb. 10 cm m3 102,09 856.555,95 87.445.796,94 13,867 96,99 13,174 96,99 13,174 95,00
3 Acian rabat beton m2 1020,86 43.362,00 44.266.531,32 7,020 969,82 6,669 969,82 6,669 95,00
4 Pasangan paving block tb. 8 cm, mutu K225 m2 291,34 290.694,14 84.690.830,75 13,430 170,73 7,870 170,73 7,870 58,60

II PEKERJAAN SALURAN
1 Galian tanah saluran m3 27,00 77.750,00 2.099.250,00 0,333 27,00 0,333 27,00 0,333 100,00
2 Urugan pasir bawah saluran tb. 5 cm m3 3,52 283.100,00 996.512,00 0,158 3,52 0,158 3,52 0,158 100,00
3 Pasangan saluran 1/2 bata camp. 1:2 m2 104,71 180.175,39 18.866.165,09 2,992 93,45 2,670 93,45 2,670 89,25
4 Cor dasar saluran mutu f'c=14,5 Mpa m3 1,87 1.029.136,17 1.924.484,64 0,305 1,44 0,235 1,44 0,235 76,90
5 Plesteran saluran camp. 1:2 m2 116,67 57.937,00 6.759.509,79 1,072 77,47 0,712 77,47 0,712 66,40
6 Acian saluran m2 116,67 43.362,00 5.059.044,54 0,802 43,75 0,301 43,75 0,301 37,50
7 Pasangan grill m1 149,58 200.000,00 29.916.000,00 4,744 87,65 2,780 87,65 2,780 58,60

III PEKERJAAN BAK TANAMAN, TIANG BENDERA DAN LAIN-LAIN


1 Urugan pasir bawah bak tb. 5 cm m3 0,68 283.100,00 192.508,00 0,031
2 Urugan pasir bawah trap tiang bendera tb. 5 cm m3 0,45 283.100,00 127.395,00 0,020
3 Pasangan rollag bak tanaman 1 bata camp. 1:2 m2 37,13 290.984,50 10.804.254,49 1,713
5 Pasangan trap tiang bendera 1/2 bata camp. 1:2 m2 2,97 180.175,39 535.120,91 0,085
6 Cor beton trap tiang bendera mutu f'c=14,5 Mpa tb. 10 cm m3 0,18 1.029.136,17 185.244,51 0,029
7 Plesteran bak camp. 1:2 tb. 15 mm m2 81,06 57.937,00 4.696.373,22 0,745
8 Plesteran trap tiang bendera camp. 1:2 tb. 15 mm m2 1,35 57.937,00 78.214,95 0,012
9 Acian bak m2 43,93 43.362,00 1.904.892,66 0,302
10 Acian trap tiang bendera m2 3,09 43.362,00 133.988,58 0,021
11 Pengecatan bak dengan cat tembok eksterior m2 43,93 42.367,60 1.861.208,67 0,295
12 Urugan tanah subur m3 7,12 123.750,00 881.100,00 0,140
13 Penanaman pohon kersen pohon 13,00 85.000,00 1.105.000,00 0,175
14 Pasangan tiang bendera unit 1,00 4.000.000,00 4.000.000,00 0,634
- Tiang galvanis, angkur, asesoris
- Katrol aluminium, tali, bendera
15 Pasangan bak sampah unit 6,00 2.000.000,00 12.000.000,00 1,903
- Bak sampah 3R 60 liter (bahan fiberglass)
- Stand penyangga besi hollow 5 cm
- Pembuatan tulisan peringatan

IV PEKERJAAN SANITASI
1 Pasangan kran air bh 9,00 227.067,50 2.043.607,50 0,324
2 Pasangan pipa PVC tipe AW diameter 1” (air sabun) m1 173,00 47.206,50 8.166.724,50 1,295
3 Instalasi penangkal petir elektrostatis 3,00 13.000.000,00 39.000.000,00 6,185

V PEKERJAAN TRAP DAN RAM SELASAR


1 Pasangan rollag ram 1 bata camp. 1:2 m2 8,52 180.175,39 1.535.094,32 0,243
2 Urugan tanah bawah ram m3 1,64 168.025,00 275.561,00 0,044
3 Cor ram beton mutu f'c=14,5 Mpa tb. 10 cm m3 0,99 1.029.136,17 1.018.844,81 0,162
4 Plesteran rollag ram camp. 1:2 tb. 15 mm m2 5,39 57.937,00 312.280,43 0,050
VOLUME HARGA SATUAN JUMLAH BOBOT S/D OPNAME LALU OPNAME INI S/D OPNAME INI
NO URAIAN PEKERJAAN SATUAN PRESTASI
(ADD) (ADD) (ADD) (ADD) VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT
5 Acian trap dan ram m2 15,25 43.362,00 661.270,50 0,105
6 Pengecatan rollag ram dengan cat tembok eksterior m2 5,39 42.367,60 228.361,36 0,036
7 Pasangan railing ram pipa Dia. 2" Galv. Fin. Cat m1 16,65 650.000,00 10.822.500,00 1,716

V PEKERJAAN PENGECATAN PAGAR & LOGO


1 Pekerjaan Galian Pondasi m3 15,71 77.750,00 1.221.452,50 0,194 15,710 0,194 15,71 0,194 100,00
2 Pekerjaan Pancangan Galam Dia. 3 m btg 330,00 25.000,00 8.250.000,00 1,308 330,000 1,308 330,00 1,308 100,00
3 Pekerjaan Pasir Urug Bawah Pondasi m3 5,24 283.100,00 1.483.444,00 0,235 5,240 0,235 5,24 0,235 100,00
4 Pekerjaan Lantai Kerja m3 2,62 856.555,95 2.244.176,59 0,356 2,620 0,356 2,62 0,356 100,00
5 Pekerjaan Bekisting Poer Plat m2 13,44 206.338,00 2.773.182,72 0,440 13,440 0,440 13,44 0,440 100,00
6 Pekerjaan Pembesian Poer Plat kg 507,31 17.550,72 8.903.655,76 1,412 507,310 1,412 507,31 1,412 100,00
7 Pekerjaan Beton Poer Plat Cor beton Mutu f’= 21,7 MPa (K 250) m3 3,43 1.092.828,26 3.748.400,93 0,594 3,430 0,594 3,43 0,594 100,00
8 PEKERJAAN KOLOM - K1 (20/20)
Pekerjaan Bekisting m2 47,36 271.139,00 12.841.143,04 2,036 47,360 2,036 47,36 2,036 100,00
Pekerjaan Pembesian kg 435,26 17.550,72 7.639.126,39 1,211 435,260 1,211 435,26 1,211 100,00
Pekerjaan Beton Kolom Cor beton Mutu f’= 21,7 MPa (K 250) m3 2,37 1.092.828,26 2.590.002,98 0,411 2,370 0,411 2,37 0,411 100,00
9 PEKERJAAN SLOOF - S1 (15/20)
Pekerjaan Bekisting m2 21,47 157.498,00 3.381.482,06 0,536 21,470 0,536 21,47 0,536 100,00
Pekerjaan Pembesian kg 371,57 17.550,72 6.521.321,03 1,034 371,570 1,034 371,57 1,034 100,00
Pekerjaan Beton Sloof Cor beton Mutu f’= 21,7 MPa (K 250) m3 1,61 1.092.828,26 1.759.453,50 0,279 1,610 0,279 1,61 0,279 100,00
10 Pekerjaan Ring Balok Praktis m 53,67 118.448,00 6.357.104,16 1,008 53,67 1,008 53,67 1,008 100,00
11 PASANGAN DINDING BATA RINGAN T=10cm m2 68,71 180.175,39 12.379.851,05 1,963 53,903 1,540 14,81 0,423 68,71 1,963 100,00
12 Plesteran m2 105,22 57.937,00 6.096.131,14 0,967 29,388 0,270 75,83 0,697 105,22 0,967 100,00
13 Acian m2 160,10 43.362,00 6.942.256,20 1,101 146,03 1,004 146,03 1,004 91,21
14 Keramik 20x25 m2 301.888,40
15 PASANG PINTU HOLLOW GALV. 8/8 & 4/4 FIN CAT m2 15,30 600.000,00 9.180.000,00 1,456
16 PASANG AKSESORIS PAGAR HOLLOW GALV. 4/4 & 2/4 FIN CAT m2 600.000,00
17 Font Steinless Tulisan "MADRASAH IBTIDAIYAH NEGERI 7 " unit 1,00 2.700.000,00 2.700.000,00 0,428
18 Pengecatan pagar dengan cat tembok eksterior m2 160,10 42.367,60 6.783.052,76 1,076
19 Pasangan logo identitas stainless PU dan KEMENAG bh 2,00 2.400.000,00 4.800.000,00 0,761
20 Pasangan batu gunung camp. 1:3 m3 21,44 886.424,00 19.004.930,56 3,014 21,44 3,014 21,44 3,014 100,00
21 Plesteran kamprot pagar m2 53,67 53.843,46 2.889.778,50 0,458 53,67 0,458 53,67 0,458 100,00
24 Variasi kolom pintu gerbang m2 15,30 400.000,00 6.120.000,00 0,971
630.590.403,83 100,000 21,290 47,046 68,336

Mengetahui Diperiksa Dibuat Oleh :

Krisna Kusuma Wijaya Herli Budianto …..................


Manager Proyek Astek Pelaksana SubKon

ESTIMASI PERHITUNGAN PEMBAYARAN TERMIN


Rp 17.341.236,11 nilai PPH 2,75%
Rp 502.864.317,53 82% Nilai Kontrak Sub-kontraktor
Rp 236.575.627,38 Nilai Tagihan Tim Sub-kontraktor
Rp - Pengembalian DP 10%
Rp 11.828.781,37 Retensi Nilai Pekerjaan 5 % ( Pemeliharaan )
Rp 224.746.846,01 Pembayaran Tagihan Tim Sub-kontraktor
47,046% Bobot yang dibayar