LOKASI : MADRASAH IBTIDAIYAH NEGERI 7 KABUPATEN BARITO KUALA (FASILITAS PENDUKUNG) TANGGAL OPNAME :
VOLUME HARGA SATUAN JUMLAH BOBOT S/D OPNAME LALU OPNAME INI S/D OPNAME INI
NO URAIAN PEKERJAAN SATUAN PRESTASI
(ADD) (ADD) (ADD) (ADD) VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT
II PEKERJAAN SALURAN
1 Galian tanah saluran m3 27,00 77.750,00 2.099.250,00 0,333 27,00 0,333 27,00 0,333 100,00
2 Urugan pasir bawah saluran tb. 5 cm m3 3,52 283.100,00 996.512,00 0,158 3,52 0,158 3,52 0,158 100,00
3 Pasangan saluran 1/2 bata camp. 1:2 m2 104,71 180.175,39 18.866.165,09 2,992 93,45 2,670 93,45 2,670 89,25
4 Cor dasar saluran mutu f'c=14,5 Mpa m3 1,87 1.029.136,17 1.924.484,64 0,305 1,44 0,235 1,44 0,235 76,90
5 Plesteran saluran camp. 1:2 m2 116,67 57.937,00 6.759.509,79 1,072 77,47 0,712 77,47 0,712 66,40
6 Acian saluran m2 116,67 43.362,00 5.059.044,54 0,802 43,75 0,301 43,75 0,301 37,50
7 Pasangan grill m1 149,58 200.000,00 29.916.000,00 4,744 87,65 2,780 87,65 2,780 58,60
IV PEKERJAAN SANITASI
1 Pasangan kran air bh 9,00 227.067,50 2.043.607,50 0,324
2 Pasangan pipa PVC tipe AW diameter 1” (air sabun) m1 173,00 47.206,50 8.166.724,50 1,295
3 Instalasi penangkal petir elektrostatis 3,00 13.000.000,00 39.000.000,00 6,185