RPDB II
(…............................) (Annisa, ST) (Rizki Mohamad Akbar, ST) (Ahmad Miftah, S. Pd) (Abdullah Alfayidh, S. Pd)
CEKLIST OPNAME RENCANA PENGGUNAAN DANA BANK TERMIN I 70% (RPDB I)
PROGRAM PELAKSANAAN PENYEDIAAN SARANA DAN PRASARANA SANITASI DI LINGKUNGAN PENDIDIKAN KEAGAMAAN (LPK) TA 2021
I. BAHAN
BAHAN BATU-BATUAN
Batu Kali m3 10.00 10.00 - - 10.00 10.00 - 220,000.00 Rp 2,200,000 2,200,000.00 -
Pasir Pasang m3 23.00 23.00 - - 23.00 23.00 - 190,000.00 Rp 4,370,000 4,370,000.00 -
Pasir Beton m3 12.00 12.00 - - 8.00 8.00 4.00 230,000.00 Rp 1,840,000 1,840,000.00 -
Pasir Urug m3 4.00 4.00 - - 4.00 4.00 - 130,000.00 Rp 520,000 520,000.00 -
Batu split (Kerikil) m3 18.00 18.00 - - 11.00 11.00 7.00 220,000.00 Rp 2,420,000 2,420,000.00 -
batako bh 6,500.00 6,500.00 - - 6,335.00 6,335.00 165.00 850.00 Rp 5,384,750 5,384,750.00 -
Batu Bata ekspos bh - - - - - - - 3,000.00 Rp -
Keramik Ukuran 25 x 40 dus 62.00 12.00 50.00 - - - 12.00 55,000.00 Rp -
Keramik Ukuran 25 x 25 dus 77.00 - 77.00 - - - - 60,000.00 Rp -
Logo PU stainless steel Unit 1.00 - 1.00 - - - - 700,000.00 Rp -
Tulisan "Indonesia Maju" Steinless steel Unit 1.00 - 1.00 - - - - 2,700,000.00 Rp -
BAHAN KAYU
- -
Kayu Kelas III btg 210.00 210.00 - - 47.00 47.00 163.00 29,500.00 Rp 1,386,500 1,386,500.00 -
Balok Kayu Kelas II btg 90.00 90.00 - - 25.00 25.00 65.00 32,000.00 Rp 800,000 800,000.00 -
Bambu cerucuk Ø 15 cm panjang 600 cm btg 20.00 20.00 - - 10.00 10.00 10.00 20,000.00 Rp 200,000 200,000.00 -
Multiplek tebal 0,9 cm lbr 10.00 10.00 - - 2.00 2.00 8.00 140,000.00 Rp 280,000 280,000.00 -
SEMEN
Semen (40 Kg) Sak 214.00 183.00 31.00 - 67.00 67.00 116.00 43,000.00 Rp 2,881,000 2,881,000.00 -
Semen Warna @ 40 Kg kg 20.00 - 20.00 - - - - 7,500.00 Rp -
Waterproofing cementitious kg - - - - - - - - Rp -
BAHAN BESI DAN KAWAT
Besi Ulir Beton panjang 12 meter dia 13 Btg 86.00 86.00 - - 40.00 40.00 46.00 125,000.00 Rp 5,000,000 5,000,000.00 -
Besi Beton panjang 12 meter dia 10 Btg 125.00 125.00 - - 39.00 39.00 86.00 83,000.00 Rp 3,237,000 3,237,000.00 -
Besi Beton panjang 12 meter dia 8 Btg 90.00 90.00 - - 40.00 40.00 50.00 50,000.00 Rp 2,000,000 2,000,000.00 -
Profil besi Beton panjang 12 meter dia 16 Btg 3.00 - 3.00 - - - - 220,000.00 Rp -
Kawat Beton kg 33.00 33.00 - - 4.00 4.00 29.00 23,000.00 Rp 92,000 92,000.00 -
Profil besi siku Btg 8.00 8.00 - - - - 8.00 150,000.00 Rp -
Profil besi hollow Btg 13.00 13.00 - - - - 13.00 224,000.00 Rp -
Plat embaded (konekting rangka) bh 31.00 31.00 - - - - 31.00 28,000.00 Rp -
Plat base plat bh 4.00 4.00 - - - - 4.00 45,000.00 Rp -
Angkur d 12 bh 16.00 16.00 - - - - 16.00 30,000.00 Rp -
Paku kg 22.00 22.00 - - 5.00 5.00 17.00 15,000.00 Rp 75,000 75,000.00 -
Kawat las dus 1 1.00 - - - - 1.00 25,000.00 Rp -
Pipa Galvanis 1" + Aksesoris bh 1.00 1.00 - - - - 1.00 192,000.00 Rp -
BAHAN ATAP
Profil C.75.75 Btg 28.00 - 28.00 - - - - 115,000.00 Rp -
Reng R.34 Btg 28.00 - 28.00 - - - - 40,000.00 Rp -
Atap Spandek berpasir m2 57.00 - 57.00 - - - - 70,000.00 Rp -
Screw Cteks 12-4 x 50 Dus 3.00 2.00 1.00 - - - 2.00 250,000.00 Rp -
Screw Cteks 10 x 16 -16 Dus 1.00 1.00 - - - - 1.00 150,000.00 Rp -
GRC plank tebal 10 mm lebar 10 cm panjang 2,4 m btg 14.00 - 14.00 - - - - 60,000.00 Rp -
BAHAN CAT
Plamuur kg 9.00 - 9.00 - - - - 20,000.00 Rp -
Amplas lbr 10.00 - 10.00 - - - - 8,000.00 Rp -
Cat Menie (Minyak) kg 7.00 - 7.00 - - - - 30,000.00 Rp -
Cat Dasar (Tembok) Kaleng 2.00 - 2.00 - - - - 150,000.00 Rp -
Cat Penutup (Minyak) kg 7.00 - 7.00 - - - - 126,000.00 Rp -
Unit/ Kebutuhan Kebutuhan Kebutuhan Realisasi Pengajuan Jumlah
No Uraian Sisa Harga Satuan Jumlah Pengajuan Sesuai Notafaktur Deviasi Keterangan
Satuan 100% 70% 30% Tahap Lalu Saat Ini RPDB I Kumulatif
Rekomendasi
Diverifikasi oleh :
5 24/07/2021 Pembayaran Upah Pekerja Periode 18 Juli 2021 - 24 Juli 2021 015/UP/VII/21 Rp 3,180,000 Rp 8,460,000
(…............................) (Annisa, ST) (Rizki Mohamad Akbar, ST) (Ahmad Miftah, S. Pd) (Abdullah Alfayidh, S. Pd)
BUKU KAS UMUM TIM PELAKSANA LPK ASSALAFIYAH SIDAMULYA
BULAN AGUSTUS 2021 (RPDB 2)
(…............................) (Annisa, ST) (Rizki Mohamad Akbar, ST) (Ahmad Miftah, S. Pd) (Abdullah Alfayidh, S. Pd)
BUKU UPAH TIM PELAKSANA ASSALAFIYAH SIDAMULYA
RPDB 2
(…............................) Annisa, ST (Rizki Mohamad Akbar, ST) (Ahmad Miftah, S. Pd) (Abdullah Alfayidh, S. Pd)
BUKU UPAH TIM PELAKSANA ASSALAFIYAH SIDAMULYA
Bulan Agustus 2021 (RPDB 2)
JUMLAH Rp 11,640,000
(…............................) Annisa, ST (Rizki Mohamad Akbar, ST) (Ahmad Miftah, S. Pd) (Abdullah Alfayidh, S. Pd)
BUKU OPERASIONAL TIM PELAKSANA
RPDB 2
No Tanggal Nama Barang Nomor Bukti Volume Satuan Harga Satuan Jumlah
(…............................) (Annisa, ST) (Rizki Mohamad Akbar, ST) (Ahmad Miftah, S. Pd) (Abdullah Alfayidh, S. Pd)
BUKU SWADAYA TIM PELAKSANA
RPDB 2
Harga Jumlah
No. Tanggal Uraian Unit
( Rp.) ( Rp.)
1 2 3 4 5 6
Jumlah :
(…............................) (Annisa, ST) (Rizki Mohamad Akbar, ST) (Ahmad Miftah, S. Pd) (Abdullah Alfayidh, S. Pd)
BUKU MATERIAL LPK ASSALAFIYAH SIDAMULYA
BULAN JULI 2021 (RPDB 2)
Supplier / Toko
No Tanggal Nama Barang Nomor Bukti Volume Satuan Harga Satuan Jumlah
Material
1 23/07/2021 TB. Latansa Pasir Pasang 013/MT/VII/21 2 m3 Rp 200,000 Rp 400,000
Pasir Beton 2 m3 Rp 260,000 Rp 520,000
Pasir Urug 2 m3 Rp 130,000 Rp 260,000
Batu split (Kerikil) 2 m3 Rp 250,000 Rp 500,000
Kayu Kelas III 70 Btg Rp 27,000 Rp 1,890,000
Balok kayu kelas II 62 Lbr Rp 32,000 Rp 1,984,000
Bambu cerucuk Ø 15 cm panjang 600 cm 30 Btg Rp 20,000 Rp 600,000
Multiplek tebal 0,9 cm 40 Lbr Rp 140,000 Rp 5,600,000
Semen (40 Kg) 76 ZAK Rp 44,000 Rp 3,344,000
Semen Warna @ 40 Kg 10 KG Rp 7,500 Rp 75,000
TOTAL Rp 15,173,000
2 24/07/2021 TB. Latansa Besi Beton panjang 12 meter Ø 10 014/MT/VII/21 117 Btg Rp 90,000 Rp 10,530,000
Besi Beton panjang 12 meter Ø 8 9 Btg Rp 50,000 Rp 450,000
Kawat Beton 2 KG Rp 25,000 Rp 50,000
Waterstop 21 m Rp 95,000 Rp 1,995,000
Paku 4 Kg Rp 20,000 Rp 80,000
TOTAL Rp 13,105,000
JUMLAH 28,278,000
Subang, 01 Agustus 2021
Diverivikasi Oleh: Diperiksa Oleh: Dibuat Oleh:
Tim PPK KI Pelaksanaan TFL Ketua Tim Pelaksana Bendahara Tim Pelaksana
(…............................) (Annisa, ST) (Rizki Mohamad Akbar, ST) (Ahmad Miftah, S. Pd) (Abdullah Alfayidh, S. Pd)
CATATAN HARIAN MATERIAL
Jenis Material Tutup Manhole plat bordes t = 2 mm (lengkap dengan kait dan cat anti karat)
Supplier / Toko Sumber Dana (Rp) Material Masuk Material Keluar Stok Material Paraf
No Tanggal Catatan
Pemasok Dana Bantuan Swadaya Vol. Satuan Vol. Satuan Vol. Satuan Pengambil Material Penanggung Jawab
Pek. Beton Pelat Lantai beton campuran sitemix 1 0.16 m3 0.16 m3 0.16 m3 1 1 Cerah
Pek. Beton Pelat Lantai Beton campuran sitemix 1 0.18 m3 0.18 m3 0.18 m3 2 Cerah
Pek. Beton campuran sitemix 1pc : 2ps :3kr 0.65 m3 0.65 m3 0.65 m3 1 1 Cerah
7 Pasangan batu bata (1/2 bata) 1Pc : 3 Ps 0.46 m2 0.46 m2 0.46 m2 1 Cerah
8 Pekerjaan Balok 15 x 20
8 Pekerjaan Balok 15 x 20
8 Pekerjaan Balok 15 x 20
8 Pekerjaan Balok 15 x 20
8 Pekerjaan Balok 15 x 20
8 Pekerjaan Balok 15 x 20
8 Pekerjaan Balok 15 x 20
1 Pekerjaan Dinding
1 Pekerjaan Dinding
1 Pekerjaan Dinding
1 Pekerjaan Dinding
1 Pekerjaan Dinding
1 Pekerjaan Dinding
1 Pekerjaan Dinding
LPK #REF! Jenis Kegiatan : Pelaksanaan Penyediaan Sarana dan Prasarana Sanitasi di LPK
Desa/Kel. #REF! Masa Kerja : 140 Hari
Kec./Kab./Kota #REF! Program TA : 2021
Periode : 18 Juli 2021 - 24 Juli 2021
Dana Bantuan : Rp 200,000,000
a b c d e f g h i j k=(i/f)x100% k*(e/200jt)*100%
C PEKERJAAN BAK INLET
1 Pelat Lantai dasar
Pek. Beton Pelat Lantai beton campuran sitemix 1pc : 2ps :3kr 0.156 m3 799680 124750.08 0.06237504 0 0.06237504 0.06237504 0 100 0.06237504
Tulangan besi polos d 8 jarak sengkang 20 cm 9.164 kg 12965 118811.26 0.05940563 0 0.05940563 0.05940563 0 100 0.05940563
Pemasangan bekisting kayu 0.48 m2 193000 92640 0.04632 0 0.04632 0.04632 0 100 0.04632
4 Waterstop lebar 200 mm 2.75 m1 188300 517825 0.2589125 0 0.2589125 0.2589125 0 100 0.2589125
D PEKERJAAN BAK SETTLER & AF
1 Pelat Lantai dasar
Pek. Beton Pelat Lantai beton campuran sitemix 1pc : 2ps :3kr 1.25775 m3 799680 1005797.52 0.50289876 0 0.50289876 0.50289876 0 100 0.50289876
Tulangan besi polos d 10 jarak sengkang 20 cm 112.406 kg 12965 1457343.79 0.728671895 0 0.728671895 0.728671895 0 100 0.728671895
Pemasangan bekisting kayu 2.325 m2 193215.446 449225.91195 0.224612955975 0 0.224612955975 0.224612955975 0 100 0.224612955975
5 Waterstop lebar 200 mm 15.27 m1 188300 2875341 1.4376705 0 1.4376705 1.4376705 0 100 1.4376705
E PEKERJAAN BAK DESINFEKTAN
1 Pelat Lantai dasar
Pek. Beton Pelat Lantai Beton campuran sitemix 1pc : 2ps :3kr 0.1755 m3 799680 140343.84 0.07017192 0 0.07017192 0.07017192 0 100 0.07017192
Tulangan besi polos d 8 jarak sengkang 20 cm 9.7565 kg 12965 126493.0225 0.06324651125 0 0.06324651125 0.06324651125 0 100 0.06324651125
Pemasangan bekisting kayu 0.4575 m2 193215.446 88396.066545 0.0441980332725 0 0.0441980332725 0.0441980332725 0 100 0.0441980332725
4 Waterstop lebar 200 mm 2.75 m1 188300 517825 0.2589125 0 0.2589125 0.2589125 0 100 0.2589125
(………..................................................…………) Annisa, ST Rizki Mohamad Akbar, ST (Ahmad Miftah, S. Pd) (Abdullah Alfayidh, S. Pd)
Realisasi Kemajuan Pelaksanaan Minggu 6
LPK #REF! Jenis Kegiatan : Pelaksanaan Penyediaan Sarana dan Prasarana Sanitasi di LPK
Desa/Kel. #REF! Masa Kerja : 140 Hari
Kec./Kab./Kota #REF! Program TA : 2021
Periode : 25 Juli 2021 - 01 Agustus 2021
Dana Bantuan : Rp 200,000,000
a b c d e f g h i j k=(i/f)x100% k*(e/200jt)*100%
C PEKERJAAN BAK INLET
2 Dinding
Pek. Beton Pelat Dinding beton campuran sitemix 1pc : 2ps :3kr 0.28275 m3 799680 226109.52 0.11305476 0 0.11305476 0.11305476 0 100 0.11305476
Tulangan besi polos d 8 jarak sengkang 20 cm 15.563 kg 12965 201774.295 0.1008871475 0 0.1008871475 0.1008871475 0 100 0.1008871475
Pemasangan bekisting multiplek 2.92 m2 81300 237396 0.118698 0 0.118698 0.118698 0 100 0.118698
6 Ring balk praktis 10/15 1 m1 100910 100910 0.050455 0 0.050455 0.050455 0 100 0.050455
7 Pasangan batu bata (1/2 bata) 1Pc : 3 Ps 0.46 m2 96150 44229 0.0221145 0 0.0221145 0.0221145 0 100 0.0221145
8 Plesteran 1Pc : 3 Ps 0.92 m2 35601.6 32753.472 0.016376736 0 0.016376736 0.016376736 0 100 0.016376736
9 Acian 0.92 m2 23575 21689 0.0108445 0 0.0108445 0.0108445 0 100 0.0108445
Prestasi Rencana : 32
(………..................................................…………) Annisa, ST Rizki Mohamad Akbar, ST (Ahmad Miftah, S. Pd) (Abdullah Alfayidh, S. Pd)
Realisasi Kemajuan Pelaksanaan Minggu 7
LPK #REF! Jenis Kegiatan : Pelaksanaan Penyediaan Sarana dan Prasarana Sanitasi di LPK
Desa/Kel. #REF! Masa Kerja : 140 Hari
Kec./Kab./Kota #REF! Program TA : 2021
Periode : 01 Agustus 2021 - 07 Agustus 2021
Dana Bantuan : Rp 200,000,000
a b c d e f g h i j k=(i/f)x100% k*(e/200jt)*100%
II PEKERJAAN STRUKTUR
8 Pekerjaan Balok 15 x 20
- Bekisting 13.2 m2 158700 2094840 1.04742 0 1.04742 1.04742 0 100 1.04742
- Pembesian 147.33858 Kg 12445 1833628.60321 0.916814301605 0 0.916814301605 0.916814301605 0 100 0.916814301605
- Pengecoran 0.8145 m3 799680 651339.36 0.32566968 0 0.32566968 0.32566968 0 100 0.32566968
Tim PPK KI Pelaksana TFL Ketua Tim Pelaksana Bendahara Tim Pelaksana
(………..................................................…………) Annisa, ST Rizki Mohamad Akbar, ST (Ahmad Miftah, S. Pd) (Abdullah Alfayidh, S. Pd)
Realisasi Kemajuan Pelaksanaan Minggu 8
LPK #REF! Jenis Kegiatan : Pelaksanaan Penyediaan Sarana dan Prasarana Sanitasi di LPK
Desa/Kel. #REF! Masa Kerja : 140 Hari
Kec./Kab./Kota #REF! Program TA : 2021
Periode : 08 Agustus 2021 - 14 Agustus 2021
Dana Bantuan : Rp 200,000,000
a b c d e f g h i j k=(i/f)x100% k*(e/200jt)*100%
III PEKERJAAN ARSITEKTUR
1 Pekerjaan Dinding
Pekerjaan Plesteran dinding 77.6736 m2 35601.6 2765304.43776 1.38265221888 0 1.38265221888 1.38265221888 0 100 1.38265221888
(………..................................................…………) Annisa, ST Rizki Mohamad Akbar, ST (Ahmad Miftah, S. Pd) (Abdullah Alfayidh, S. Pd)
REALISASI KEMAJUAN PELAKSANAAN BULANAN (RPDB 2)
LPK : ASSALAFIYAH SIDAMULYA Jenis Kegiatan : Pelaksanaan Penyediaan Sarana dan Prasarana Sanitasi di LPK
Desa/Kel. : Ciasem Baru Masa Kerja : 140 Hari
Kec./Kab./Kota : Ciasem Kab. Subang Program TA : 2021
Periode : 18 Juli - 14 Agustus 2021
Dana Bantuan : Rp 200,000,000
a b c d e f g h i j k=(i/f)x100% k*(e/200jt)*100%
II PEKERJAAN STRUKTUR
8 Pekerjaan Balok 15 x 20
- Bekisting 13.2 m2 Rp 158,700 Rp 2,094,840 1.04742 1.04742 1.04742 0 100 1.04742
- Pembesian 147.338578 Kg Rp 12,445 Rp 1,833,629 0.916814301605 0.916814301605 0.916814301605 0 100 0.916814301605
- Pengecoran 0.8145 m3 Rp 799,680 Rp 651,339 0.32566968 0.32566968 0.32566968 0 100 0.32566968
5 Waterstop lebar 200 mm 15.27 m1 Rp 188,300 Rp 2,875,341 1.4376705 1.4376705 1.4376705 0 100 1.4376705
6 Ring balk praktis 10/15 1 m1 Rp 100,910 Rp 100,910 0.050455 0.050455 0.050455 0 100 0.050455
7 Pasangan batu bata (1/2 bata) 1Pc : 3 Ps 0.46 m2 Rp 96,150 Rp 44,229 0.0221145 0.0221145 0.0221145 0 100 0.0221145
8 Plesteran 1Pc : 3 Ps 0.92 m2 Rp 35,602 Rp 32,753 0.016376736 0.016376736 0.016376736 0 100 0.016376736
9 Acian 0.92 m2 Rp 23,575 Rp 21,689 0.0108445 0.0108445 0.0108445 0 100 0.0108445
4 Waterstop lebar 200 mm 2.75 m1 Rp 188,300 Rp 517,825 0.2589125 0.2589125 0.2589125 0 100 0.2589125
(………..................................................…………) Annisa, ST Rizki Mohamad Akbar, ST (Ahmad Miftah, S. Pd) (Abdullah Alfayidh, S. Pd)
LAPORAN PENGGUNAAN DANA 2 (LPD2)
Jumlah Pelaporan Periode Lalu Jumlah Pelaporan Periode Ini Realisasi Kumulatif
No Uraian
Volume Harga Satuan Jumlah (Rp) Volume Harga Satuan Jumlah (Rp) Volume Harga Satuan Jumlah (Rp)
I BAHAN
BAHAN BATU-BATUAN
1 Batu Kali 11 Rp 240,000 Rp 2,640,000 0 Rp 240,000 Rp - 11 Rp 240,000 Rp 2,640,000
2 Pasir Pasang 8 Rp 200,000 Rp 1,600,000 2 Rp 200,000 Rp 400,000 10 Rp 200,000 Rp 2,000,000
3 Pasir Beton 8 Rp 260,000 Rp 2,080,000 2 Rp 260,000 Rp 520,000 10 Rp 260,000 Rp 2,600,000
4 Pasir Urug 3 Rp 130,000 Rp 390,000 2 Rp 130,000 Rp 260,000 5 Rp 130,000 Rp 650,000
5 Batu split (Kerikil) 4 Rp 250,000 Rp 1,000,000 2 Rp 250,000 Rp 500,000 6 Rp 250,000 Rp 1,500,000
6 Batu bata merah 4510 Rp 850 Rp 3,833,500 0 Rp 850 Rp - 4510 Rp 850 Rp 3,833,500
7 Keramik Ukuran 25 x 25 0 Rp 60,000 Rp - 0 Rp 60,000 Rp - 0 Rp 60,000 Rp -
8 Keramik Ukuran 25 x 40 0 Rp 65,000 Rp - 0 Rp 65,000 Rp - 0 Rp 65,000 Rp -
9 Logo PU stainless steel 0 Rp 2,700,000 Rp - 0 Rp 2,700,000 Rp - 0 Rp 2,700,000 Rp -
BAHAN KAYU
12 Kayu Kelas III 70 Rp 27,000 Rp 1,890,000 70 Rp 27,000 Rp 1,890,000 140 Rp 27,000 Rp 3,780,000
13 Balok Kayu Kelas II 48 Rp 32,000 Rp 1,536,000 62 Rp 32,000 Rp 1,984,000 110 Rp 32,000 Rp 3,520,000
14 Bambu cerucuk Ø 15 cm panjang 600 cm 30 Rp 20,000 Rp 600,000 30 Rp 20,000 Rp 600,000 60 Rp 20,000 Rp 1,200,000
15 Multiplek tebal 0,9 cm 0 Rp 140,000 Rp - 40 Rp 140,000 Rp 5,600,000 40 Rp 140,000 Rp 5,600,000
SEMEN
16 Semen (40 Kg) 75 Rp 44,000 Rp 3,300,000 76 Rp 44,000 Rp 3,344,000 151 Rp 44,000 Rp 6,644,000
17 Semen Warna @ 40 Kg 0 Rp 7,500 Rp - 10 Rp 7,500 Rp 75,000 10 Rp 7,500 Rp 75,000
BAHAN BESI DAN KAWAT
19 Besi Ulir Beton panjang 12 meter Ø 13 82 Rp 135,000 Rp 11,070,000 0 Rp 135,000 Rp - 82 Rp 135,000 Rp 11,070,000
20 Besi Beton panjang 12 meter Ø 10 10 Rp 90,000 Rp 900,000 117 Rp 90,000 Rp 10,530,000 127 Rp 90,000 Rp 11,430,000
21 Besi Beton panjang 12 meter Ø 8 70 Rp 50,000 Rp 3,500,000 9 Rp 50,000 Rp 450,000 79 Rp 50,000 Rp 3,950,000
22 Profil besi Beton panjang 12 meter Ø16 0 Rp 220,000 Rp - 0 Rp 220,000 Rp - 0 Rp 220,000 Rp -
23 Kawat Beton 20 Rp 25,000 Rp 500,000 2 Rp 25,000 Rp 50,000 22 Rp 25,000 Rp 550,000
24 Profil besi siku 0 Rp 12,000 Rp - 0 Rp 12,000 Rp - 0 Rp 12,000 Rp -
25 Profil besi siku tebal 5mm 0 Rp 220,000 Rp - 0 Rp 220,000 Rp - 0 Rp 220,000 Rp -
26 Profil besi hollow 20 x 20 panjang 6 m 0 Rp 80,000 Rp - 0 Rp 80,000 Rp - 0 Rp 80,000 Rp -
27 Paku 11 Rp 20,000 Rp 220,000 4 Rp 20,000 Rp 80,000 15 Rp 20,000 Rp 300,000
28 Kawat las 0 Rp 25,000 Rp - 0 Rp 25,000 Rp - 0 Rp 25,000 Rp -
29 Plat embeeded t = 3 mm 0 Rp 20,000 Rp - 0 Rp 20,000 Rp - 0 Rp 20,000 Rp -
30 Baseplat t = 8 mm 0 Rp 34,000 Rp - 0 Rp 34,000 Rp - 0 Rp 34,000 Rp -
31 Pipa Galvanis 1" + Aksesoris 0 Rp 192,000 Rp - 0 Rp 192,000 Rp - 0 Rp 192,000 Rp -
32 Angkur dia 12 0 Rp 45,000 Rp - 0 Rp 45,000 Rp - 0 Rp 45,000 Rp -
Jumlah Pelaporan Periode Lalu Jumlah Pelaporan Periode Ini Realisasi Kumulatif
No Uraian
Volume Harga Satuan Jumlah (Rp) Volume Harga Satuan Jumlah (Rp) Volume Harga Satuan Jumlah (Rp)
BAHAN ATAP
35 Profil C.75.75 0 Rp 120,000 Rp - 0 Rp 120,000 Rp - 0 Rp 120,000 Rp -
36 Reng R.34 0 Rp 48,000 Rp - 0 Rp 48,000 Rp - 0 Rp 48,000 Rp -
37 Atap Spandek berpasir 0 Rp 70,000 Rp - 0 Rp 70,000 Rp - 0 Rp 70,000 Rp -
38 Screw Cteks 12-4 x 50 0 Rp 2,000 Rp - 0 Rp 2,000 Rp - 0 Rp 2,000 Rp -
39 Screw Cteks 10 x 16 -16 0 Rp 1,000 Rp - 0 Rp 1,000 Rp - 0 Rp 1,000 Rp -
40 GRC plank tebal 10 mm lebar 10 cm panjang 2,4 m 0 Rp 65,000 Rp - 0 Rp 65,000 Rp - 0 Rp 65,000 Rp -
BAHAN CAT
41 Plamuur 0 Rp 40,000 Rp - 0 Rp 40,000 Rp - 0 Rp 40,000 Rp -
42 Amplas 0 Rp 5,500 Rp - 0 Rp 5,500 Rp - 0 Rp 5,500 Rp -
43 Cat Menie (Minyak) 0 Rp 30,000 Rp - 0 Rp 30,000 Rp - 0 Rp 30,000 Rp -
44 Cat Dasar (Tembok) 0 Rp 30,000 Rp - 0 Rp 30,000 Rp - 0 Rp 30,000 Rp -
45 Cat Penutup (Minyak) 0 Rp 30,000 Rp - 0 Rp 30,000 Rp - 0 Rp 30,000 Rp -
46 Cat Penutup (Tembok dan Plafond) 0 Rp 30,000 Rp - 0 Rp 30,000 Rp - 0 Rp 30,000 Rp -
47 Pengencer/Minyak Cat 0 Rp 22,000 Rp - 0 Rp 22,000 Rp - 0 Rp 22,000 Rp -
SANITER
48 Kloset Jongkok 0 Rp 262,500 Rp - 0 Rp 262,500 Rp - 0 Rp 262,500 Rp -
49 Kran Air dia 3/4" tipe tuas 0 Rp 30,000 Rp - 0 Rp 30,000 Rp - 0 Rp 30,000 Rp -
50 Head shower tanam Lengkap dengan kran ganda 0 Rp 300,000 Rp - 0 Rp 300,000 Rp - 0 Rp 300,000 Rp -
51 Tempat sabun 0 Rp 40,000 Rp - 0 Rp 40,000 Rp - 0 Rp 40,000 Rp -
52 Saringan Floordrain 10x10 cm steinless steel 0 Rp 40,000 Rp - 0 Rp 40,000 Rp - 0 Rp 40,000 Rp -
53 Ember & Gayung 0 Rp 75,000 Rp - 0 Rp 75,000 Rp - 0 Rp 75,000 Rp -
BAHAN PINTU
54 Pintu PVC Kamar Mandi 0 Rp 300,000 Rp - 0 Rp 300,000 Rp - 0 Rp 300,000 Rp -
BAHAN LISTRIK
55 Pipa Listrik 5/8" 0 Rp 5,500 Rp - 0 Rp 5,500 Rp - 0 Rp 5,500 Rp -
56 Tee Doos 0 Rp 5,000 Rp - 0 Rp 5,000 Rp - 0 Rp 5,000 Rp -
57 L.Bow 0 Rp 2,000 Rp - 0 Rp 2,000 Rp - 0 Rp 2,000 Rp -
58 Las Dop 0 Rp 3,000 Rp - 0 Rp 3,000 Rp - 0 Rp 3,000 Rp -
59 Klem Pipa Listrik 0 Rp 1,000 Rp - 0 Rp 1,000 Rp - 0 Rp 1,000 Rp -
60 Mangkok (Listrik) 0 Rp 2,000 Rp - 0 Rp 2,000 Rp - 0 Rp 2,000 Rp -
61 Pipa PVC Dia 1/2" ( AW ) 0 Rp 25,000 Rp - 0 Rp 25,000 Rp - 0 Rp 25,000 Rp -
62 MCB 0 Rp 50,000 Rp - 0 Rp 50,000 Rp - 0 Rp 50,000 Rp -
63 Box MCB 0 Rp 40,000 Rp - 0 Rp 40,000 Rp - 0 Rp 40,000 Rp -
64 Lampu tempel plafond fitting plc + bohlam 0 Rp 25,000 Rp - 0 Rp 25,000 Rp - 0 Rp 25,000 Rp -
65 Isolasi 0 Rp 10,000 Rp - 0 Rp 10,000 Rp - 0 Rp 10,000 Rp -
66 Saklar (standar) 0 Rp 17,000 Rp - 0 Rp 17,000 Rp - 0 Rp 17,000 Rp -
67 Kabel NYM 3x2,5 mm2 0 Rp 600,000 Rp - 0 Rp 600,000 Rp - 0 Rp 600,000 Rp -
BAHAN PLAMBING
68 Pipa PVC Dia 4" ( Biasa/D ) 0 Rp 100,000 Rp - 0 Rp 100,000 Rp - 0 Rp 100,000 Rp -
69 Pipa PVC tipe AW Ø 4" 0 Rp 200,000 Rp - 0 Rp 200,000 Rp - 0 Rp 200,000 Rp -
70 Elbow PVC L 90 Derajat Diameter 4" 0 Rp 25,000 Rp - 0 Rp 25,000 Rp - 0 Rp 25,000 Rp -
71 Tee pipa PVC diameter 4” 0 Rp 41,000 Rp - 0 Rp 41,000 Rp - 0 Rp 41,000 Rp -
72 Socket Pipa PVC 4" 0 Rp 11,500 Rp - 0 Rp 11,500 Rp - 0 Rp 11,500 Rp -
73 Pipa PVC tipe AW Ø 3" 0 Rp 160,000 Rp - 0 Rp 160,000 Rp - 0 Rp 160,000 Rp -
Jumlah Pelaporan Periode Lalu Jumlah Pelaporan Periode Ini Realisasi Kumulatif
No Uraian
Volume Harga Satuan Jumlah (Rp) Volume Harga Satuan Jumlah (Rp) Volume Harga Satuan Jumlah (Rp)
74 Pipa PVC tipe D Ø 3" 0 Rp 80,000 Rp - 0 Rp 80,000 Rp - 0 Rp 80,000 Rp -
75 Tee pipa PVC 3" 0 Rp 20,000 Rp - 0 Rp 20,000 Rp - 0 Rp 20,000 Rp -
76 Elbow PVC Diameter 3" 0 Rp 20,000 Rp - 0 Rp 20,000 Rp - 0 Rp 20,000 Rp -
77 Pipa PVC Tipe AW D 2" 0 Rp 90,000 Rp - 0 Rp 90,000 Rp - 0 Rp 90,000 Rp -
78 Pipa PVC tipe AW Ø 1/2" 0 Rp 28,000 Rp - 0 Rp 28,000 Rp - 0 Rp 28,000 Rp -
79 Pipa PVC tipe AW Ø 1" 0 Rp 48,000 Rp - 0 Rp 48,000 Rp - 0 Rp 48,000 Rp -
80 Pipa PVC AW 3/4" 0 Rp 40,000 Rp - 0 Rp 40,000 Rp - 0 Rp 40,000 Rp -
81 Tee pipa PVC diameter 3/4” 0 Rp 5,000 Rp - 0 Rp 5,000 Rp - 0 Rp 5,000 Rp -
82 Lem Pipa PVC 0 Rp 10,000 Rp - 0 Rp 10,000 Rp - 0 Rp 10,000 Rp -
83 Sealtape 0 Rp 5,000 Rp - 0 Rp 5,000 Rp - 0 Rp 5,000 Rp -
84 Tangki air fiberglass 1000 liter 0 Rp 1,800,000 Rp - 0 Rp 1,800,000 Rp - 0 Rp 1,800,000 Rp -
85 Water level control 0 Rp 150,000 Rp - 0 Rp 150,000 Rp - 0 Rp 150,000 Rp -
86 Stopkran 0 Rp 40,000 Rp - 0 Rp 40,000 Rp - 0 Rp 40,000 Rp -
87 Waterstop PVC lebar 200mm 0 Rp 95,000 Rp - 21 Rp 95,000 Rp 1,995,000 21 Rp 95,000 Rp 1,995,000
88 Tutup Manhole plat bordes t = 2 mm 0 Rp 500,000 Rp - 0 Rp 500,000 Rp - 0 Rp 500,000 Rp -
89 Floating Clorin feeder (pengumpan klorin apung) 0 Rp 140,000 Rp - 0 Rp 140,000 Rp - 0 Rp 140,000 Rp -
90 Khlorin Tablet 0 Rp 60,000 Rp - 0 Rp 60,000 Rp - 0 Rp 60,000 Rp -
91 Pemasangan media filter, bahan botol air mineral 0 Rp 1,300,000 Rp - 0 Rp 1,300,000 Rp - 0 Rp 1,300,000 Rp -
92 Bak Kontrol precast dia. 40 & tutup beton 0 Rp 200,000 Rp - 0 Rp 200,000 Rp - 0 Rp 200,000 Rp -
93 Grease trap precast dia. 40 cm & Tutup Beton 0 Rp 200,000 Rp - 0 Rp 200,000 Rp - 0 Rp 200,000 Rp -
Jumlah Dana Material Rp 28,278,000 Jumlah Dana Kumulatif Rp 63,337,500
II UPAH
1 Pekerja 85 Rp 120,000 Rp 10,200,000 55.00 Rp 120,000 Rp 6,600,000 140.00 Rp 240,000 Rp 16,800,000
2 Tukang 70 Rp 140,000 Rp 9,800,000 36.00 Rp 140,000 Rp 5,040,000 106.00 Rp 280,000 Rp 14,840,000
Jumlah Dana Upah Rp 11,640,000 Jumlah Dana Kumulatif Rp 31,640,000
III. OPERASIONAL
Alat Tulis Kantor
1 Kertas HVS A4 1 Rp 43,000 Rp 43,000 0 Rp 43,000 Rp - 1.00 Rp 86,000 Rp 43,000
2 Materai 10000 13 Rp 10,000 Rp 130,000 4 Rp 10,000 Rp 40,000 17.00 Rp 20,000 Rp 170,000
3 Kwitansi 1 Rp 7,000 Rp 7,000 1 Rp 7,000 Rp 7,000 2.00 Rp 14,000 Rp 14,000
4 Buku Double Folio 1 Rp 25,000 Rp 25,000 1 Rp 25,000 Rp 25,000 2.00 Rp 50,000 Rp 50,000
5 Printer Uk. A4 & F4 1 Rp 1,500,000 Rp 1,500,000 0 Rp 1,500,000 Rp - 1.00 Rp 3,000,000 Rp 1,500,000
Tinta Printer
8 Hitam 0 Rp 45,000 Rp - 0 Rp 45,000 Rp - - Rp 90,000 Rp -
9 Merah 0 Rp 45,000 Rp - 0 Rp 45,000 Rp - - Rp 90,000 Rp -
10 Biru 0 Rp 45,000 Rp - 0 Rp 45,000 Rp - - Rp 90,000 Rp -
11 Kuning 0 Rp 45,000 Rp - 0 Rp 45,000 Rp - - Rp 90,000 Rp -
12 Stapler 1 Rp 10,000 Rp 10,000 0 Rp 10,000 Rp - 1.00 Rp 20,000 Rp 10,000
13 Isi Stapler 1 Rp 5,000 Rp 5,000 0 Rp 5,000 Rp - 1.00 Rp 10,000 Rp 5,000
14 Pulpen 1 Rp 30,000 Rp 30,000 0 Rp 30,000 Rp - 1.00 Rp 60,000 Rp 30,000
15 Map Folder Plastik 3 Rp 5,000 Rp 15,000 2 Rp 5,000 Rp 10,000 5.00 Rp 10,000 Rp 25,000
16 Fotocopy laporan LPJ 70%, 100% & Penjilidan 0 Rp 2,000,000 Rp - 0 Rp 2,000,000 Rp - - Rp 4,000,000 Rp -
Jumlah Pelaporan Periode Lalu Jumlah Pelaporan Periode Ini Realisasi Kumulatif
No Uraian
Volume Harga Satuan Jumlah (Rp) Volume Harga Satuan Jumlah (Rp) Volume Harga Satuan Jumlah (Rp)
17 Transport Perjalanan Tim Pelaksana 0 Rp 750,000 Rp - 0 Rp 750,000 Rp - - Rp 1,500,000 Rp -
18 Pulsa Tim Pelaksana (Ketua dan Bendahara) 0 Rp 569,500 Rp - 0 Rp 569,500 Rp - - Rp 1,139,000 Rp -
Jumlah Total Penggunaan Dana RPDB II Rp 40,000,000 Jumlah Dana Kumulatif Rp 100,000,000
(…............................) (Annisa, ST) Rizki Mohamad Akbar, ST (Ahmad Miftah, S. Pd) (Abdullah Alfayidh, S. Pd)
RENCANA KERJA PENYEDIAAN SARPRAS SANITASI DI LINGKUNGAN LPK SUBANG TAHAP I
KEGIATAN : TAHAP I
TAHUN ANGGARAN : 2021
7 Juni '21 14 Juni 21 21 Juni '21 28 Juni '21 5 Juli '21 12 Juli '21 19 Juli '21 26 Juli '21 2 Agu '21 9 Agu '21 16 Agu '21 23 Agu '21
12-Jul-21 19-Jul-21 26-Jul-21 2-Aug-21 9-Aug-21 16-Aug-21 23-Aug-21 31-Aug-21 6-Sep-21 13-Sep-21 20-Sep-21 27-Sep-21 4-Oct-21
Bobot Durasi
No Uraian Pekerjaan Juni - Juli Juli - Agustus Agustus - September September
Keterangan
% MINGGU KE -
1 2 3 4 5 6 7 8 9 10 11 12 13
II PEKERJAAN STRUKTUR
1 Pekerjaan Tanah 1.092 1 1.092
4 Pekerjaan Torn Air (asumsi sudah ada pompa transfer menuju tangki air) 7.019 4
BOBOT PRESTASI MINGGUAN RENCANA (%) 100.000 80 2.399 6.715 7.162 7.626 5.410 4.147 14.685 3.360 16.999 9.332 7.603 8.926 5.636
BOBOT PRESTASI KUMULATIF RENCANA (%) 2.399 9.115 16.277 23.903 29.313 33.461 48.146 51.505 68.504 77.836 85.439 94.365 100.000
BOBOT PRESTASI MINGGUAN REALISASI (%) 2.450 Err:508 Err:508 0.000
BOBOT PRESTASI KUMULATIF REALISASI (%) 2.450 Err:508 Err:508 Err:508
DEVIASI 0.036 Err:508 Err:508 Err:508