JENIS ALAT : Excavator, Dump Truck, Buldozer, Roller Vibro dan Water Tanker
SATUAN PEMBAYARAN : Rupiah/jam URAIAN ANALISA HARGA SATUAN
Biaya Pasti per Jam G = (E + F) G Rp/jam 111,808.08 43,095.19 107,737.98 109,987.01 12,569.43
3. Biaya bengkel = (6,25% - 8,75%) x J Rp/jam 29,187.50 11,250.00 28,125.00 28,712.11 3,281.25 6.25%
4. Perawatan dan = (12,5%-17,5%) x K Rp/jam 58,375.00 22,500.00 56,250.00 57,424.22 6,562.50 12.50%
perbaikan
Biaya Operasi (per Jam) = P Rp/jam 387,626.79 269,464.29 417,589.29 286,750.61 245,558.04
D. BIAYA OPERASI ALAT / JAM = (G + P) S Rp/jam 499,434.87 312,559.48 525,327.27 396,737.62 258,127.47
E. LAIN - LAIN
1. Bahan Bakar Premium (non subsidi) Mb Liter 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00
2. Bahan Bakar Solar (non subsidi) Ms Liter 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00
3. Minyak Pelumas Mp Liter 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00
ANALISIS PRODUKTIVITAS ALAT BERAT PENGGALIAN DAN ANGKUTAN MATERIAL/HASIL GALIAN LINTAS PULAU
JENIS PEKERJAAN : ANGKUTAN MATERIAL LINTAS PULAU
JARAK ANGKUT : (Asumsi 4); L1= 1 km; L2=10 km dan L3= 2 km
SATUAN PEMBAYARAN : M3
I. ASUMSI
1. Jam kerja efektif per hari Tk 7.00 jam
2. Faktor pengembangan tanah Fk 1.20
3. Faktor pengembangan tanah lepas Fk1 1.00
4. Jarak angkut : dari borrow area (A) ke stock pile 1 (B) L.1 1.00 km
Jarak angkut : dari stock pile 1 (B) ke stock pile 2 ( C) L.2 10.00 km
Jarak angkut : dari stock pile 2 ( C) ke stock pile 3 (lokasi pekerjaan L.3 2.00 km
5. Urutan kerja :
a. Di Borrow Area (A), tanah digali dengan excavator standar
dan dimuat kedalam dump truck.
b. Dump truck mengangkut tanah hasil galian ke stock pile 1 (B)
dengan jarak angkut 1 km.
c. Excavator memuat tanah dari stock pile 1 (B) ke Tongkang.
d. Tongkang mengangkut tanah ke stock pile 2 ( C) dengan jarak
angkut 10 km.
e. Excavator memuat tanah dari stock pile 2 ( C) ka perahu.
f. Perahu mengangkut tanah dari stock pile 2 ( C) ke lokasi
stock pile 3 (lokasi pekerjaan) dengan jarak angkut 2 km.
II. ALAT
a. Excavator Standard ( menggali tanah di borrow area )
Kapasitas Bucket V 0.80 m3
Faktor Bucket Fb 0.70 Pemuatan sedang
Faktor Efisiensi Alat Fa 0.75 Baik
III. Tenaga.
a. Di Borrow Area (A)
Produksi yang menentukan : Excavator Q.1 33.87 m3/jam
Produksi / hari = Tk x Q.1 Q.1' 237.10 m3/jam
Kebutuhan tenaga
- Pekerja P 3.00 orang
- Mandor M 0.30 orang
Koefisien Tenaga / m3
- Pekerja : ( Tk x P ) : Q.1' 0.0886 jam
- Mandor : ( Tk x M ) : Q.1' 0.0089 jam
Koefisien Tenaga / m3
- Pekerja : ( Tk x P ) : Q.3' 0.0620 jam
- Mandor : ( Tk x M ) : Q.3' 0.0062 jam
c. Di Stock Pile 2 ( C)
Produksi yang menentukan : Excavator Q.5 48.36 m3/jam
Produksi / hari = Tk x Q.5 Q.5' 338.51 m3/jam
Kebutuhan tenaga
- Pekerja P 3.00 orang
- Mandor M 0.30 orang
Koefisien Tenaga / m3
- Pekerja : ( Tk x P ) : Q.5' 0.0620 jam
- Mandor : ( Tk x M ) : Q.5' 0.0062 jam
Koefisien Tenaga / m3
- Pekerja : ( Tk x P ) : Q.6' 1.8326 jam
- Pekerja : ( Tk x P ) : Q.6' 0.1833 jam
ANALISIS PRODUKTIVITAS ALAT BERAT PENGGALIAN TANAH DI SUNGAI DENGAN EXCAVATOR YANG DIANGKUT DUMPTRUCK
JENIS PEKERJAAN : GALIAN TANAH / PENGERUKAN SUNGAI
JARAK ANGKUT : 1,0 Km
SATUAN PEMBAYARAN : M3
I. ASUMSI
1. Jam kerja efektif per hari Tk 7.00 jam
2. Faktor pengembangan tanah Fk 1.20
3. Faktor tanah lepas Fk1 1.00
4. Jarak angkut L 1.00 km
5. Tahapan kerja.
a. Posisi Excavator didarat/diatas tanggul
b. Excavator mengeruk / menggali tanah kemudian
dimuat kedalam dump truck
c. Dump truck megangkut tanah hasil galian ke lokasi
pembuangan.
d. Bulldozer menghampar, meratakan dan merapihkan
tanah hasil galian di lokasi pembuangan.
II. ALAT
a. Excavator Long Arm
Kapasitas Bucket V 0.60 m3
Faktor Bucket Fb 0.70 Kondisi pemuatan sedang
Faktor Efisiensi Alat Fa 0.69 Kondisi operasi alat sedang
Pemeliharaan mesin baik
Waktu Siklus Ts1 Menit
Menggali, swing dan memuat ke dump truck T. 1 0.35 Menit
Swing kembali dan Lain - lain T. 2 0.25 Menit
Ts.1 0.60 Menit
c. Dump Truck
Kapasits Bak V 4.00 m3
Faktor Efisiensi Alat Fa 0.75 Baik
Kecepatan rata-rata bermuatan v.1 20.00 Km/jam
Kecepatan rata-rata kosong v.2 30.00 Km/jam
III. Tenaga
a. Membantu pemuatan tanah oleh Excavator
Produksi yang menentukan : Excavator Q.1 24.15 m3/jam
Produksi / hari = Tk x Q.1 Q.1' 169.05 m3/hari
Kebutuhan tenaga
- Pekerja P 1.00 orang
- Mandor M 0.10 orang
Koefisien Tenaga / m3
- Pekerja : ( Tk x P ) : Q.1' 0.0414 jam
- Mandor : ( Tk x M ) : Q.1' 0.0041 jam
Koefisien Tenaga / m3
- Pekerja : ( Tk x P ) : Q.1' 0.0764 jam
- Mandor : ( Tk x M ) : Q.1' 0.0076 jam
170,000,000.00
170,000,000.00 170,000,000.00
0 0
0 0
a Rupiah
170,000,000.00 170,000,000.00
0 100,000,000
0 1
Seratus
Seratus
170,000,000.00
170,000,000.00 170,000,000.00
0 100,000,000
0 1
ONE HUNDRED
ONE HUNDRED
Tujuh Puluh
Tujuh Puluh
Tujuh Puluh
Juta
170,000,000.00
SEVENTY
SEVENTY
SEVENTY
MILLION
0.00 0.00 0.00
0 0 0
0 0 0
Rupiah
RUPIAHS
0.01
0.00
0
0.01
0.00
0
PEMERINTAH PROVINSI KEPULAUAN RIAU
DINAS PEKERJAAN UMUM
ENGINEERING ESTIMATE ( EE )
KEGIATAN :
PENATAAN KAWASAN KABUPATEN NATUNA
PEKERJAAN
PEMBANGUNAN DRAINASE RAWA GELAM RT. 07 RW. O4
LOKASI
KABUPATEN NATUNA
TAHUN ANGGARAN
2018
DIBUAT OLEH :
KONSULTAN PERENCANA
KOP PERUSAHAAN
REKAPITULASI TOTAL
ENGINEERING ESTIMATE ( EE )
D. DIBULATKAN Rp 170,000,000.00
Ranai,...........................2018
Disetujui Oleh : Dibuat oleh,
Pengguna Anggaran Konsultan Perencana
0 CV. MULTI DIMENSI KONSULTAN
0 HENDRI. ST
0 Team Leader
ENGINEERING ESTIMATE ( EE )
DINAS / LEMBAGA : DINAS PEKERJAAN UMUM
KEGIATAN : PENATAAN KAWASAN KABUPATEN NATUNA
PEKERJAAN : PEMBANGUNAN DRAINASE RAWA GELAM RT. 07 RW. O4
LOKASI : KABUPATEN NATUNA
TAHUN ANGGARAN : 2018
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.5630 120,000.00 67,560.00
2 Mandor L.04 OH 0.0563 180,000.00 10,134.00
Jumlah Harga Tenaga Kerja 77,694.00
B Bahan
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 77,694.00
E Overhead + Profit 15% x D 11,654.10
F Harga Satuan Pekerjaan per - m (D+E)
3
89,348.10
AHSP.Pus Air.22
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.500 120,000.00 60,000.00
2 Mandor L.04 OH 0.050 180,000.00 9,000.00
Jumlah Harga Tenaga Kerja 69,000.00
B Bahan
1 Tanah Timbun M3 1.000 90,000.00 90,000.00
Jumlah Harga Bahan 90,000.00
C Peralatan
1 Pemadat Timbunan (Stamper) E.31 Sewa-hari 0.050 150,000.00 7,500.00
Jumlah Harga Peralatan 7,500.00
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 166,500.00
E Overhead + Profit (Contoh 15%) 15% x D 24,975.00
F Harga Satuan Pekerjaan per - m (D+E)
3
191,475.00
P.01c Pasangan Batu (mutu PP tertentu setara dengan campuran 1 PC:4 PP)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 2.700 120,000.00 324,000.00
2 Tukang batu L.02 OH 0.900 150,000.00 135,000.00
3 Kepala Tukang L.03 OH 0.090 170,000.00 15,300.00
4 Mandor L.04 OH 0.270 180,000.00 48,600.00
Jumlah Harga Tenaga Kerja 522,900.00
B Bahan
1 Batu kali M.05 m3 1.200 564,960.00 677,952.00
2 Pasir Pasang M.14.b m3 0.520 292,603.00 152,153.56
3 Portland Cement M.15 kg 163 1,944.68 316,982.84
Jumlah Harga Bahan 1,147,088.40
C Peralatan
1 Molen E.28.b Sewa-hari 0.167 400,000.00 66,800.00
Jumlah Harga Peralatan 66,800.00
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 1,736,788.40
E Overhead + Profit 10% x D 173,678.84
F Harga Satuan Pekerjaan per - m3 (D+E) 1,910,467.24
P.04f Plesteran + Acian tebal 1,5 cm, dengan mortar jenis PC-PP tipe N (mutu PP tertentu setara dengan campuran 1 PC:4 PP)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.384 120,000.00 46,080.00
2 Tukang batu L.02 OH 0.192 150,000.00 28,800.00
3 Kepala Tukang L.03 OH 0.019 170,000.00 3,230.00
4 Mandor L.04 OH 0.019 180,000.00 3,420.00
Jumlah Harga Tenaga Kerja 81,530.00
B Bahan
1 Pasir Pasang M.14.b m3 0.024 292,603.00 7,022.47
2 Portland Cement M.15 kg 6.280 1,944.68 12,212.59
Jumlah Harga Bahan 19,235.06
C Peralatan
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 100,765.06
E Overhead + Profit 15% x D 15,114.76
F Harga Satuan Pekerjaan per - m (D+E)
2
115,879.82
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.036 150,000.00 5,400.00
2 Tukang batu L.02 OH 0.060 170,000.00 10,200.00
3 Kepala tukang L.03 OH 0.006 180,000.00 1,080.00
4 Mandor L.04 OH 0.002 180,000.00 324.00
Jumlah Harga Tenaga Kerja 17,004.00
B Bahan
1 Pipa PVC Ø 2" - M' 1.000 11,000.00 11,000.00
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.4208 120,000.00 50,496.00
2 Tukang tembok L.02 OH 0.0526 150,000.00 7,890.00
3 Mandor L.04 OH 0.0421 180,000.00 7,578.00
Jumlah Harga Tenaga Kerja 65,964.00
B Bahan
1 Segmen Bttom ø 35 Cm ( Plat Sambung + M.18.g m 1.03 356,500.00 367,195.00
Sepatu Pensil )
Jumlah Harga Bahan 367,195.00
C Peralatan
1 Tripod tinggi 9 m E.45 Sewa-hari 0.0526 1,000,000.00 52,600.00
2 Hammer 1 - 2 ton (manual) E.01.b Sewa-hari 0.0526 1,000,000.00 52,600.00
3 Alat penyambung tiang pancang E.02.a bh 0.2500 200,000.00 50,000.00
Jumlah Harga Peralatan 155,200.00
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 588,359.00
E Overhead + Profit 10% x D 58,835.90
F Harga Satuan Pekerjaan per - m' (D+E) 647,194.90
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.4208 120,000.00 50,496.00
2 Tukang tembok L.02 OH 0.0526 150,000.00 7,890.00
3 Mandor L.04 OH 0.0421 180,000.00 7,578.00
Jumlah Harga Tenaga Kerja 65,964.00
B Bahan
1 Segmen Bttom ø 40 Cm ( Plat Sambung + M.18.g m 1.03 460,000.00 473,800.00
Sepatu Pensil )
Jumlah Harga Bahan 473,800.00
C Peralatan
1 Tripod tinggi 9 m E.45 Sewa-hari 0.0526 1,000,000.00 52,600.00
2 Hammer 1 - 2 ton (manual) E.01.b Sewa-hari 0.0526 1,000,000.00 52,600.00
3 Alat penyambung tiang pancang E.02.a bh 0.2500 200,000.00 50,000.00
Jumlah Harga Peralatan 155,200.00
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 694,964.00
E Overhead + Profit (Contoh 15%) 10% x D 69,496.40
F Harga Satuan Pekerjaan per - m' (D+E) 764,460.40
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.4208 120,000.00 50,496.00
2 Tukang tembok L.02 OH 0.0526 150,000.00 7,890.00
3 Mandor L.04 OH 0.0421 180,000.00 7,578.00
Jumlah Harga Tenaga Kerja 65,964.00
B Bahan
1 Segmen Middle ø 35 Cm ( Plat Sambung + Plat M.18.g m 1.03 385,250.00 396,807.50
Sambung )
Jumlah Harga Bahan 396,807.50
C Peralatan
1 Tripod tinggi 5 m E.45 Sewa-hari 0.0526 1,000,000.00 52,600.00
2 Hammer 1 - 2 ton (manual) E.01.b Sewa-hari 0.0526 1,000,000.00 52,600.00
3 Alat penyambung tiang pancang E.02.a bh 0.2500 200,000.00 50,000.00
Jumlah Harga Peralatan 155,200.00
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 617,971.50
E Overhead + Profit (Contoh 15%) 10% x D 61,797.15
F Harga Satuan Pekerjaan per - m' (D+E) 679,768.65
F.08 Tiang Pancang Segmen Middle ø 40 Cm ( Plat Sambung + Plat Sambung )
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.4208 120,000.00 50,496.00
2 Tukang tembok L.02 OH 0.0526 150,000.00 7,890.00
3 Mandor L.04 OH 0.0421 180,000.00 7,578.00
Jumlah Harga Tenaga Kerja 65,964.00
B Bahan
1 Segmen Middle ø 40 Cm ( Plat Sambung + Plat M.18.g m 1.03 483,000.00 497,490.00
Sambung )
Jumlah Harga Bahan 497,490.00
C Peralatan
1 Tripod tinggi 5 m E.45 Sewa-hari 0.0526 1,000,000.00 52,600.00
2 Hammer 1 - 2 ton (manual) E.01.b Sewa-hari 0.0526 1,000,000.00 52,600.00
3 Alat penyambung tiang pancang E.02.a bh 0.2500 200,000.00 50,000.00
Jumlah Harga Peralatan 155,200.00
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 718,654.00
E Overhead + Profit (Contoh 15%) 10% x D 71,865.40
F Harga Satuan Pekerjaan per - m' (D+E) 790,519.40
AHSP.Pus Air.26
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 1.323 120,000.00 158,760.00
2 Tukang batu L.02 OH 0.189 150,000.00 28,350.00
3 Kepala tukang L.03 OH 0.019 170,000.00 3,230.00
4 Mandor L.04 OH 0.132 180,000.00 23,814.00
Jumlah Harga Tenaga Kerja 214,154.00
B Bahan
1 PC / Portland Cement M.15 kg 326 1,944.68 633,965.68
2 PB / Pasir Beton M.14.a kg 760 209.00 158,841.63
3 Kr / Krikil M.12 kg 1029 657.88 676,959.28
4 Air M.02 L 215 30.00 6,450.00
Jumlah Harga Bahan 1,476,216.59
C Peralatan
1 Molen kapasitas 0,3 m3 E.28.b Sewa-hari 0.250 400,000.00 100,000.00
Jumlah Harga Peralatan 100,000.00
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 1,790,370.59
E Overhead + Profit 10% x D 196,940.76
F Harga Satuan Pekerjaan per - m3 (D+E) 1,987,311.36
AHSP.Pus Air.27
B.07 1 m3 beton mutu, f’c = 19,3 MPa (K225), slump (12±2) cm, w/c = 0,58
B.07b Menggunakan Molen
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 1.323 120,000.00 158,760.00
2 Tukang batu L.02 OH 0.189 150,000.00 28,350.00
3 Kepala tukang L.03 OH 0.019 170,000.00 3,230.00
4 Mandor L.04 OH 0.132 180,000.00 23,760.00
Jumlah Harga Tenaga Kerja 214,100.00
B Bahan
1 PC / Portland Cement M.15 kg 371 1,944.68 721,476.28
2 PB / Pasir Beton M.14.a kg 698 209.00 145,883.50
3 Kr / Krikil M.12 kg 1047 657.88 688,801.14
4 Air M.02 L 215 30.00 6,450.00
Jumlah Harga Bahan 1,562,610.91
C Peralatan
1 Molen E.28.b Sewa-hari 0.250 400,000.00 100,000.00
Jumlah Harga Peralatan 100,000.00
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 1,876,710.91
E Overhead + Profit 10% x D 206,438.20
F Harga Satuan Pekerjaan per - m3 (D+E) 2,083,149.11
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.700 120,000.00 84,000.00
2 Tukang besi L.02 OH 0.700 150,000.00 105,000.00
3 Kepala tukang L.03 OH 0.070 170,000.00 11,900.00
4 Mandor L.04 OH 0.070 180,000.00 12,600.00
Jumlah Harga Tenaga Kerja 213,500.00
B Bahan
1 Besi Beton (polos/ulir) M.55.d kg 105 14,000.00 1,470,000.00
2 Kawat Ikat M.60 kg 1.5 25,000.00 37,500.00
Jumlah Harga Bahan 1,507,500.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 1,721,000.00
E Overhead + Profit 15% x D 258,150.00
F Harga Satuan Pekerjaan per - 100kg (D+E) 1,979,150.00
G Harga Satuan Pekerjaan per - 1 Kg = ( F/100 ) 19,791.50
AHSP.Pus Air.28
B.21.b 1 m2 Bekisting untuk lantai permukaan beton biasa dengan multiflex 9 mm atau 12 mm (tanpa perancah)
1 2 3 4 5 6 8
A Tenaga Kerja
1 Pekerja L.01 OH 0.200 120,000.00 24,000.00
2 Tukang kayu L.02 OH 0.100 150,000.00 15,000.00
3 Kepala tukang L.03 OH 0.010 170,000.00 1,700.00
4 Mandor L.04 OH 0.020 180,000.00 3,600.00
Jumlah Harga Tenaga Kerja 44,300.00
B Bahan
1 Multiflex 12 mm M.38.d lbr 0.353 190,000.00 67,070.00
2 Kaso 5/7 cm M.33.d m3 0.020 1,875,000.00 37,500.00
3 Paku 5 cm dan 7 cm M.65.b kg 0.25 35,000.00 8,750.00
4 Minyak bekisting M.129 L 0.2 10,000.00 2,000.00
Jumlah Harga Bahan 115,320.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 159,620.00
E Overhead + Profit 10% x D 15,962.00
F Harga Satuan Pekerjaan per - m2 (D+E) 175,582.00
CATATAN: * Bahan digunakan lebih dari 1 (satu) kali, yang ke-1, koefisien 0,353 (multiflex) dan 0,020 (Kaso)
yang ke-2, koefisien menjadi 0,203 (multiflex) dan 0,008 (Kaso)
yang ke-3, koefisien menjadi 0,128 (multiflex) dan 0,005 (Kaso)
yang ke-4, koefisien menjadi 0,091 ( multiflex) dan 0,003 (kaso)
AHSP.Pus Air.29
1 2 4 5 6 7
A Tenaga Kerja
1 Pekerja OH 0.20 120,000.00 24,000.00
2 Tukang besi OH 0.10 150,000.00 15,000.00
3 Tukang tembok OH 0.10 150,000.00 15,000.00
3 Mandor OH 0.02 180,000.00 3,600.00
Jumlah Harga Tenaga Kerja 57,600.00
B Bahan
1 Seng Gelombang BJLS-30 (t=0,05) lbr 1.200 60,200.00 72,240.00
tinggi 1,8 m’ dan lebar 0,9m’
2 Baja L 40.40.4 kg 13.500 12,000.00 162,000.00
3 Kawat seng 3mm kg 0.300 25,000.00 7,500.00
4 Pas. Batu uk. 20/50, t=40cm m3 0.150 1,689,359.83 253,403.97 *
Jumlah Harga Bahan 495,143.97
C Peralatan
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 552,743.97
E Overhead & profit (Contoh 15%) 15% x D 82,911.60
F Harga Satuan Pekerjaan per - m2 (D+E) 635,655.57
1 2 4 5 6 7
A Tenaga Kerja
1 Pekerja OH 0.180 120,000.00 21,600.00
2 Tukang kayu OH 0.100 150,000.00 15,000.00
3 Tukang tembok OH 0.080 150,000.00 12,000.00
3 Mandor OH 0.018 180,000.00 3,240.00
Jumlah Harga Tenaga Kerja 51,840.00
B Bahan
1 Seng Gelombang BJLS-30 (t=0,05) lbr 1.200 60,200.00
tinggi 1,8 m’ dan lebar 0,9m’ 72,240.00
2 Kaso 5/7 kayu kelas II m3 0.035 1,500,000.00 52,500.00
3 Paku seng kg 0.300 16,500.00 4,950.00
4 Paku 7 cm kg 0.120 12,000.00 1,440.00
5 Pas. Batu uk. 20/50, t=40cm m3 0.150 1,689,359.83 253,403.97
Jumlah Harga Bahan 384,533.97
C Peralatan
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 436,373.97
E Overhead & profit (Contoh 15%) 15% x D 65,456.10
F Harga Satuan Pekerjaan per - m2 (D+E) 501,830.07
AHSP.Pus Air.30
1 2 4 5 6 7
A. Tenaga Kerja
1 Pekerja OH 1.20 120,000.00 144,000.00
2 Tukang Tembok/batu OH 0.40 150,000.00 60,000.00
3 Kepala tukang batu OH 0.04 170,000.00 6,800.00
4 Mandor OH 0.12 180,000.00 21,600.00
Jumlah Harga Tenaga Kerja 232,400.00
B. Bahan
1 Kaso 5/7 m3 0.35 1,875,000.00 656,250.00 *
2 Dinding triplek 4mm lbr 1.00 80,000.00 80,000.00
3 Fondasi pas. Batu m3 0.17 1,689,359.83 278,744.37
5 Plafon asbes 3 mm (1x1 m) lbr 1.24 25,000.00 31,000.00
6 Paku kg 0.75 35,000.00 26,250.00
7 Asbes gelombang lbr 0.30 50,000.00 15,000.00
8 Paku asbes kg 0.10 16,500.00 1,650.00
9 Floor lantai (Beton lantai kerja) m3 0.15 1,544,615.28 231,692.29 *
10 Pintu double teakwood rangka kayu m2 0.10 200,000.00 20,000.00
11 Jendela kaca nako daun 1.00 25,000.00 25,000.00
12 Cat dinding/plafon m2 16.50 110,000.00 1,815,000.00
Jumlah Harga Bahan 3,180,586.66
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah harga tenaga, bahan dan peralatan ( A + B + C ) 3,412,986.66
E Overhead & profit (Contoh 15%) 15% x D 511,948.00
F Harga satuan pekerjaan per - m2( D + E ) 3,924,934.66
1 2 4 5 6 7
A. Tenaga Kerja
1 Pekerja OH 1.00 120,000.00 120,000.00
2 Tukang kayu OH 1.00 150,000.00 150,000.00
3 Kepala tukang kayu OH 0.10 170,000.00 17,000.00
4 Tukang Cat dan Tulis OH 1.50 150,000.00 225,000.00
5 Mandor OH 0.1 180,000.00 18,000.00
Jumlah Harga Tenaga Kerja 410,000.00
B. Bahan
1 Multiplek tebal 18 mm Lbr 1.00 250,000.00 250,000.00
2 Kayu 8/12 kelas II m3 0.077 3,750,000 288,750.00
3 Paku campuran 5 cm dan 7cm kg 1.25 35,000.00 43,750.00
4 Cat kayu kg 2.50 37,450.00 93,625.00
Jumlah Harga Bahan 676,125.00
C Peralatan
Jumlah Harga Peralatan
LA.04 Mobilisasi
LA.04c Fasilitas
Berdasarkan asumsi kemudahan dalam pelaksanaan pekerjaan diperlukan luas berbagai fasilitas seperti
pada koefisien berikut ini.
Harga Satuan Jumlah
No Uraian Satuan Koefisien
(Rp) (Rp)
1 2 4 5 6 7
A. Tenaga Kerja
LA.07 Penggambaran
1) Peta situasi atau peta steak out bangunan
LA.07a Penggambaran dengan CAD untuk 1 bh gambar (file autocad) layout, tampak potongan dan detail untuk kondisi tidak rumit dan banyak bentuk-bentu
1 2 4 5 6 7
A. Tenaga Kerja
1 Drafter CAD OH 1.00 100,000.00 100,000.00
2 Desain engineer OH 0.5 500,000.00 250,000.00
Jumlah Harga Tenaga Kerja 350,000.00
B. Bahan
LA.07b Penggambaran secara manual untuk 1 buah gambar layout, tampak, potongan dan detail untuk kondisi tidak rumit dan banyak duplikasi bentuk gamb
Harga Satuan Jumlah
No Uraian Satuan Koefisien
(Rp) (Rp)
1 2 4 5 6 7
A. Tenaga Kerja
1 Drafter OH 1.25 100,000.00 125,000.00
2 Desain engineer OH 0.1 500,000.00 50,000.00
Jumlah Harga Tenaga Kerja 175,000.00
B. Bahan
1 Kertas HVS atau kalkir (A1) lbr 1.2 1,850.00 2,220.00
2 Tinta Rapido bh 0.05 40,000.00 2,000.00
3 Pena Rapido bh 0.01 75,000.00 750.00
Jumlah Harga Bahan 4,970.00
C Peralatan
Jumlah Harga Peralatan 0
LA.07c Pencetakan 1 buah gambar layout, tampak, potongan dan detail untuk kondisi tidak rumit ukuran A1
Harga Satuan Jumlah
No Uraian Satuan Koefisien
(Rp) (Rp)
1 2 4 5 6 7
A. Tenaga Kerja
1 Operator printer OH 0.08 200,000.00 16,000.00
Jumlah Harga Tenaga Kerja 16,000.00
B. Bahan
1 Kertas HVS atau kalkir m2 0.3 1,850.00 555.00
2 Tinta printer/plotter set 0.05 35,000.00 1,750.00
Jumlah Harga Bahan 2,305.00
C Peralatan
1 Sewa komputer Sewa-bulan 0.001 1,000,000.00 1,000.00
2 Sewa scanner ukuran A4 Sewa-bulan 0.01 250,000.00 2,500.00
Jumlah Harga Peralatan 3,500.00
Lain-lain
Fotocopy kertas A4 halaman 200.00 250.00 50,000.00
Menjilid buah 1.00 13,500.00 13,500.00
A Jumlah 27,000.00
B Overhead & profit (Contoh 15%) 15% x D 4,050.00
C Harga satuan pekerjaan ( D + E ) 31,050.00
* Disesuaikan dengan jumlah halaman
LA.08b 1 set As built drawing (reduce dan copy kalkir serta blue/black print)
Harga Satuan Jumlah
No Uraian Satuan Koefisien
(Rp) (Rp)
1 2 4 5* 6 7
A Lain-lain
Copy kalkir Ac lembar 40 6,500.00 260,000.00
copy kalkir reduce z1% lembar 40 16,500.00 660,000.00
copy kalkir reduce z2% lembar 40 12,500.00 500,000.00
blue/black print Ac lembar 40 2,600.00 104,000.00
blue/black print A2 lembar 40 2,000.00 80,000.00
blue/black print A3 lembar 40 1,250.00 50,000.00
Menjilid A1 buah 1 17,500.00 17,500.00
Menjilid A2 buah 1 11,500.00 11,500.00
Menjilid A3 buah 1 6,750.00 6,750.00
A Jumlah 1,689,750.00
B Overhead & profit (Contoh 15%) 15% x D 253,462.50
C Harga satuan pekerjaan per - set ( D + E ) 1,943,212.50
* Jumlah exemplar/lembar disesuaikan dengan kebutuhan
Pekerjaan Rawa
L.14
Pekerjaan Airtanah
L.15
Harga
No Uraian Satuan Kode Satuan Dasar Ket.
( Rp. )
1 2 3 4 5 6
I UPAH TENAGA KERJA
1 Pekerja OH L.01 120,000.00
2 Tukang OH L.02 150,000.00
3 Kepala Tukang OH L.03 170,000.00
4 Mandor OH L.04 180,000.00
5 Juru ukur, operator/mekanik alat berat/Teknisi OH L.05 135,000.00
6 Pembantu Juru ukur & operator/mekanik alat berat OH L.06 150,000.00
7 Akhli muda OH L.07 350,000.00
8 Akhli madya OH L.08 450,000.00
9 Akhli utama OH L.09 500,000.00
10 Supir truck OH L.10 160,000.00
11 Supir kendaraan < 2 ton (termasuk sedan) OH L.11 120,000.00
12 Kenek OH L.12 100,000.00
13 Penjaga malam/Satpam OH L.13 85,000.00
14 Drafter CAD/manual OH L.14 100,000.00
15 Desain Engineer OH L.15 500,000.00
16 Operator komputer/printer/ploter OH L.16 200,000.00
II BAHAN / MATERIAL
A KELOMPOK AIR, TANAH, BATU DAN SEMEN
1 Air m3 M.02 30,000.00
2 Batu / batu kali/ batu belah m3 M.05 350,000.00
3 Kerikil/Koral/Agregat Beton m3 M.12 600,000.00
4 Pasir beton m3 M.14.a 150,000.00
5 Pasir pasang kali/gunung m3 M.14.b 150,000.00
6 Portland Cement (PC 50 kg / zak) zak M.15 85,800.00
B KELOMPOK KAYU
1 Kayu balok klas 3 (Albasia) m3 M.33.d 1,875,000.00
2 Kayu papan bekisting kelas 3 m3 M.35.a 1,500,000.00
C KELOMPOK LOGAM
1 Paku biasa 1 cm - 3 cm kg M.64.a 35,000.00
III LAIN-LAIN
1 Pipa PVC Ø 2" m' M.144.t 11,000.00
HSD.Pus Air.40
T.15b.1) Menurunkan 1 m3 material sampai beda tinggi 1 m 22,704.00 20,020.00 19,401.00 24.70 30.90 26,419.00 26,006.00 24,768.00 1,032.00 1,444.00 1,651.00 1,651.00 1,857.00 13,416.00 16,512.00 19,608.00
T.15b.2) Menurunkan 1 m3 material sampai beda tinggi 2 m 34,056.00 30,031.00 29,102.00 37.10 46.40 39,628.00 39,009.00 37,152.00 1,548.00 2,167.00 2,476.00 2,476.00 2,786.00 20,124.00 24,768.00 29,412.00
T.15b.3) Menurunkan 1 m3 material sampai beda tinggi 3 m 44,376.00 39,131.00 37,921.00 48.40 60.50 51,637.00 50,830.00 48,410.00 2,017.00 2,823.00 3,227.00 3,227.00 3,630.00 26,222.00 32,273.00 38,324.00
T.15b.4) Menurunkan 1 m3 material sampai beda tinggi 4 m 53,406.00 47,094.00 45,637.00 58.20 72.80 62,145.00 61,174.00 58,261.00 2,427.00 3,398.00 3,884.00 3,884.00 4,369.00 31,558.00 38,840.00 46,123.00
T.15b.5) Menurunkan 1 m3 material sampai beda tinggi 5 m 61,662.00 54,374.00 52,692.00 67.20 84.00 71,752.00 70,631.00 67,267.00 2,802.00 3,923.00 4,484.00 4,484.00 5,045.00 36,436.00 44,845.00 53,253.00
T.15b.6) Menurunkan 1 m3 material sampai beda tinggi 6 m 69,402.00 61,199.00 59,307.00 75.70 94.60 80,758.00 79,496.00 75,711.00 3,154.00 4,416.00 5,047.00 5,047.00 5,678.00 41,010.00 50,474.00 59,938.00
T.15b.7) Menurunkan 1 m3 material sampai beda tinggi 7 m 75,852.00 66,887.00 64,818.00 82.70 103.40 88,264.00 86,885.00 82,747.00 3,447.00 4,826.00 5,516.00 5,516.00 6,206.00 44,821.00 55,165.00 65,508.00
T.15b.8) Menurunkan 1 m3 material sampai beda tinggi 8 m 82,044.00 72,347.00 70,110.00 89.50 111.80 95,469.00 93,977.00 89,502.00 3,729.00 5,220.00 5,966.00 5,966.00 6,712.00 48,480.00 59,668.00 70,856.00
T.15b.9) Menurunkan 1 m3 material sampai beda tinggi 9 m 87,462.00 77,125.00 74,740.00 95.40 119.20 101,773.00 100,183.00 95,413.00 3,975.00 5,565.00 6,360.00 6,360.00 7,155.00 51,682.00 63,608.00 75,535.00
T.15b.10) Menurunkan 1 m3 material sampai beda tinggi 10 m 92,364.00 81,448.00 78,929.00 100.70 125.90 107,478.00 105,798.00 100,760.00 4,198.00 5,877.00 6,717.00 6,717.00 7,557.00 54,578.00 67,173.00 79,768.00
T.15b.11) Menurunkan 1 m3 material sampai beda tinggi > 10 m untuk setiap penambahan 1 m 4,386.00 3,867.00 3,748.00 4.70 5.90 5,103.00 5,023.00 4,784.00 199.00 279.00 318.00 318.00 358.00 2,591.00 3,189.00 3,787.00
T.15c.1) Menaikan 1 m3 material sampai beda tinggi 1 m 46,956.00 41,406.00 40,126.00 51.20 64.00 54,639.00 53,785.00 51,224.00 2,134.00 2,988.00 3,414.00 3,414.00 3,841.00 27,746.00 34,149.00 40,552.00
T.15c.2) Menaikan 1 m3 material sampai beda tinggi 2 m 70,434.00 62,109.00 60,189.00 76.80 96.00 81,959.00 80,678.00 76,837.00 3,201.00 4,482.00 5,122.00 5,122.00 5,762.00 41,620.00 51,224.00 60,829.00
T.15c.3) Menaikan 1 m3 material sampai beda tinggi 3 m 92,880.00 81,903.00 79,370.00 101.30 126.60 108,078.00 106,389.00 101,323.00 4,221.00 5,910.00 6,754.00 6,754.00 7,599.00 54,883.00 67,549.00 80,214.00
T.15c.4) Menaikan 1 m3 material sampai beda tinggi 4 m 115,326.00 101,696.00 98,551.00 125.80 157.20 134,197.00 132,100.00 125,810.00 5,242.00 7,338.00 8,387.00 8,387.00 9,435.00 68,147.00 83,873.00 99,599.00
T.15c.5) Menaikan 1 m3 material sampai beda tinggi 5 m 136,740.00 120,579.00 116,850.00 149.10 186.40 159,115.00 156,629.00 149,170.00 6,215.00 8,701.00 9,944.00 9,944.00 11,187.00 80,800.00 99,447.00 118,093.00
T.15c.6) Menaikan 1 m3 material sampai beda tinggi 6 m 157,380.00 138,780.00 134,488.00 171.60 214.60 183,133.00 180,271.00 171,687.00 7,153.00 10,015.00 11,445.00 11,445.00 12,876.00 92,997.00 114,458.00 135,919.00
T.15c.7) Menaikan 1 m3 material sampai beda tinggi 7 m 177,780.00 156,769.00 151,921.00 193.90 242.40 206,871.00 203,638.00 193,941.00 8,080.00 11,313.00 12,929.00 12,929.00 14,545.00 105,051.00 129,294.00 153,537.00
T.15c.8) Menaikan 1 m3 material sampai beda tinggi 8 m 197,040.00 173,753.00 168,379.00 214.90 268.60 229,282.00 225,700.00 214,952.00 8,956.00 12,538.00 14,330.00 14,330.00 16,121.00 116,432.00 143,301.00 170,170.00
T.15c.9) Menaikan 1 m3 material sampai beda tinggi 9 m 216,240.00 190,684.00 184,786.00 235.80 294.80 251,624.00 247,693.00 235,898.00 9,829.00 13,760.00 15,726.00 15,726.00 17,692.00 127,778.00 157,265.00 186,752.00
T.15c.10) Menaikan 1 m3 material sampai beda tinggi 10 m 234,540.00 206,821.00 200,425.00 255.80 319.80 272,919.00 268,654.00 255,861.00 10,660.00 14,925.00 17,057.00 17,057.00 19,189.00 138,591.00 170,574.00 202,557.00
T.15c.11) Menaikan 1 m3 material sampai beda tinggi > 10 m untuk setiap penambahan 1 m 17,820.00 15,714.00 15,228.00 19.40 24.30 20,736.00 20,412.00 19,440.00 810.00 1,134.00 1,296.00 1,296.00 1,458.00 10,530.00 12,960.00 15,390.00
T.15b.1) Menurunkan 1 m3 material sampai beda tinggi 1 m 26,109.60 23,023.00 22,311.00 28.40 35.60 30,382.00 29,907.00 28,483.00 1,186.00 1,661.00 1,898.00 1,898.00 2,136.00 15,428.00 18,988.00 22,549.00
T.15b.2) Menurunkan 1 m3 material sampai beda tinggi 2 m 39,164.40 34,535.00 33,467.00 42.70 53.40 45,573.00 44,861.00 42,724.00 1,780.00 2,492.00 2,848.00 2,848.00 3,204.00 23,142.00 28,483.00 33,823.00
T.15b.3) Menurunkan 1 m3 material sampai beda tinggi 3 m 51,032.40 45,001.00 43,609.00 55.60 69.50 59,383.00 58,455.00 55,671.00 2,319.00 3,247.00 3,711.00 3,711.00 4,175.00 30,155.00 37,114.00 44,073.00
T.15b.4) Menurunkan 1 m3 material sampai beda tinggi 4 m 61,416.90 54,158.00 52,483.00 67.00 83.70 71,466.00 70,350.00 67,000.00 2,791.00 3,908.00 4,466.00 4,466.00 5,025.00 36,291.00 44,666.00 53,041.00
T.15b.5) Menurunkan 1 m3 material sampai beda tinggi 5 m 70,911.30 62,530.00 60,596.00 77.30 96.60 82,514.00 81,225.00 77,357.00 3,223.00 4,512.00 5,157.00 5,157.00 5,801.00 41,902.00 51,571.00 61,241.00
T.15b.6) Menurunkan 1 m3 material sampai beda tinggi 6 m 79,812.30 70,379.00 68,203.00 87.00 108.80 92,872.00 91,421.00 87,067.00 3,627.00 5,078.00 5,804.00 5,804.00 6,530.00 47,161.00 58,045.00 68,928.00
T.15b.7) Menurunkan 1 m3 material sampai beda tinggi 7 m 87,229.80 76,920.00 74,541.00 95.10 118.90 101,503.00 99,917.00 95,159.00 3,964.00 5,550.00 6,343.00 6,343.00 7,136.00 51,544.00 63,439.00 75,334.00
T.15b.8) Menurunkan 1 m3 material sampai beda tinggi 8 m 94,350.60 83,200.00 80,626.00 102.90 128.60 109,789.00 108,074.00 102,927.00 4,288.00 6,004.00 6,861.00 6,861.00 7,719.00 55,752.00 68,618.00 81,484.00
T.15b.9) Menurunkan 1 m3 material sampai beda tinggi 9 m 100,581.30 88,694.00 85,951.00 109.70 137.10 117,040.00 115,211.00 109,725.00 4,571.00 6,400.00 7,315.00 7,315.00 8,229.00 59,434.00 73,150.00 86,865.00
T.15b.10) Menurunkan 1 m3 material sampai beda tinggi 10 m 106,218.60 93,665.00 90,768.00 115.80 144.80 123,599.00 121,668.00 115,874.00 4,828.00 6,759.00 7,724.00 7,724.00 8,690.00 62,765.00 77,249.00 91,734.00
T.15b.11) Menurunkan 1 m3 material sampai beda tinggi > 10 m untuk setiap penambahan 1 m 5,043.90 4,447.00 4,310.00 5.50 6.80 5,869.00 5,777.00 5,502.00 229.00 320.00 366.00 366.00 412.00 2,980.00 3,668.00 4,356.00
T.15c.1) Menaikan 1 m3 material sampai beda tinggi 1 m 53,999.40 47,617.00 46,144.00 58.90 73.60 62,835.00 61,853.00 58,908.00 2,454.00 3,436.00 3,927.00 3,927.00 4,418.00 31,908.00 39,272.00 46,635.00
T.15c.2) Menaikan 1 m3 material sampai beda tinggi 2 m 80,999.10 71,426.00 69,217.00 88.30 110.40 94,253.00 92,780.00 88,362.00 3,681.00 5,154.00 5,890.00 5,890.00 6,627.00 47,863.00 58,908.00 69,953.00
T.15c.3) Menaikan 1 m3 material sampai beda tinggi 3 m 106,812.00 94,188.00 91,275.00 116.50 145.60 124,290.00 122,348.00 116,522.00 4,855.00 6,797.00 7,768.00 7,768.00 8,739.00 63,116.00 77,681.00 92,246.00
T.15c.4) Menaikan 1 m3 material sampai beda tinggi 4 m 132,624.90 116,951.00 113,334.00 144.60 180.80 154,327.00 151,915.00 144,681.00 6,028.00 8,439.00 9,645.00 9,645.00 10,851.00 78,369.00 96,454.00 114,539.00
T.15c.5) Menaikan 1 m3 material sampai beda tinggi 5 m 157,251.00 138,666.00 134,378.00 171.50 214.40 182,982.00 180,123.00 171,546.00 7,147.00 10,006.00 11,436.00 11,436.00 12,865.00 92,921.00 114,364.00 135,807.00
T.15c.6) Menaikan 1 m3 material sampai beda tinggi 6 m 180,987.00 159,597.00 154,661.00 197.40 246.80 210,603.00 207,312.00 197,440.00 8,226.00 11,517.00 13,162.00 13,162.00 14,808.00 106,946.00 131,626.00 156,306.00
T.15c.7) Menaikan 1 m3 material sampai beda tinggi 7 m 204,447.00 180,285.00 174,709.00 223.00 278.70 237,901.00 234,184.00 223,033.00 9,293.00 13,010.00 14,868.00 14,868.00 16,727.00 120,809.00 148,688.00 176,567.00
T.15c.8) Menaikan 1 m3 material sampai beda tinggi 8 m 226,596.00 199,816.00 193,636.00 247.10 308.90 263,675.00 259,555.00 247,195.00 10,299.00 14,419.00 16,479.00 16,479.00 18,539.00 133,897.00 164,797.00 195,696.00
T.15c.9) Menaikan 1 m3 material sampai beda tinggi 9 m 248,676.00 219,287.00 212,504.00 271.20 339.10 289,368.00 284,847.00 271,282.00 11,303.00 15,824.00 18,085.00 18,085.00 20,346.00 146,944.00 180,855.00 214,765.00
T.15c.10) Menaikan 1 m3 material sampai beda tinggi 10 m 269,721.00 237,844.00 230,488.00 294.20 367.80 313,857.00 308,953.00 294,241.00 12,260.00 17,164.00 19,616.00 19,616.00 22,068.00 159,380.00 196,160.00 232,940.00
T.15c.11) Menaikan 1 m3 material sampai beda tinggi > 10 m untuk setiap penambahan 1 m 20,493.00 18,071.00 17,512.00 22.30 27.90 23,846.00 23,473.00 22,356.00 931.00 1,304.00 1,490.00 1,490.00 1,676.00 12,109.00 14,904.00 17,698.00
AHSP.Pus Air.42
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 1.9500 120,000.00 234,000.00
2 Mandor L.04 OH 0.0975 180,000.00 17,550.00
Jumlah Harga Tenaga Kerja 251,550.00
B Bahan
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan -
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C) 251,550.00
289,282.50