RENCANA ANGGARAN BIAYA

JUMLAH
NO URAIAN VOLUME SATUAN HARGA SATUAN
(Rp)
RENCANA ANGGARAN BIAYA PEMBANGUNAN PONPES
1
DAN WC
1.1 PEMBERSIHAN LAHAN 50 M 40.000 2.000.000
1.2 KAYU KUSEN 1 Pkt 7.136.000 7.136.000
1.3 PEKERJAAN PERSIAPAN 32 Pkt 75.000 2.400.000
1.4 BESI 12 FL SNI 50 Lt 142.000 7.100.000
1.5 BESI 10 FL SNI 60 Lt 93.000 5.580.000
1.6 BESI 6 FULL SNI 30 Lt 45.000 1.350.000
1.7 PASIR 2 Truk 1.450.000 2.900.000
1.8 BATU PASANG 1 Truk 1.450.000 1.450.000
1.9 SEMEN 100 Sak 72.000 7.200.000
1.10 BATA HEBEL 3 M3 625.000 1.875.000
1.11 KAYU KASO 30 Batang 22.000 660.000
1.12 KAYU RENG 50 Batang 22.000 1.100.000
1.13 PINTU PANEL 8 Bh 500.000 4.000.000
1.14 PINTU WC 5 Bh 250.000 1.250.000
1.15 UPAH TUKANG 120 Hari 150.000 18.000.000
1.16 UPAH LADEN 120 Hari 120.000 14.400.000
1.17 KERAMIK LANTAI 50 M 70.000 3.500.000
1.18 KERAMIK DINDING 40 M 61.200 2.448.000
1.19 CAT TEMBOK 6 Bh 654.000 3.924.000
1.20 KLOSET 5 Bh 280.000 1.400.000
1.21 PARALON 1/2 IN 10 Bh 30.000 300.000
1.22 KRAN 20 Bh 27.000 540.000
1.23 MESIN POMPA AIR 1 Bh 467.000 467.000
1.24 GLASS BOX 6 Dus 145.000 870.000
1.25 LAPORAN 1 Hari 1.440.000 1.440.000
1.26 KASO BAJARINGAN 50 Batang 93.000 4.650.000
1.27 RENG BAJARINGAN 45 Batang 43.000 1.935.000
1.28 SARINGAN KRAN AIR 25 Bh 5.000 125.000
SUB TOTAL 100.000.000
JUMLAH 100.000.000
TERBILANG (Seratus Juta Rupiah)

Bandung, 17 April 2023


BENDAHARA, pimpinan ponpes
PONDOK PESANTREN AT- TAUFIQIYYAH

SITI ZAENAB ABDUL HANAN