batu kosong
1.2 batu belah 300,000 360,000
0.3 pasir urug 175,000 52,500
-
0.78 pkj 75,000 58,500
0.39 tkbt 90,000 35,100
0.039 kpltkn 120,000 4,680
0.039 mndor 150,000 5,850
516,630
12 80,000
12 0.888 10.6560
7,507.51
1 KG BESI POLOS
1.05 bsei polos 7,507.51 7,882.9
0.015 kawat beto 50,000 750.0
-
0.007 pkj 75,000 525.0
0.007 tkbt 90,000 630.0
0.0007 kpltkn 120,000 84.0
0.0003 mndor 150,000 45.0
9,917
1 m2 bekistibg
0.045 kayu teren 550,000 24,750
0.3 paku biasa 20,000 6,000
0.1 minyak bek 20,000 2,000
-
0.3 pkj 75,000 22,500
0.26 tkbt 90,000 23,400
0.026 kpltkn 120,000 3,120
0.005 mndor 150,000 750
82,520
25,997,845
3,220,523
Cell Rencana JADWAL PELAKSANAAN PEKERJAAN
H 15 Pekerjaan : PERENCANAAN RUMAH TINGGAL TYPE 53 NAMA ASESOR : Dsr. SUWARDANA AJI, ST
Kota : MAKASSAR NAMA PESERTA : H. ABAR
Luas : 53 m2
PERIODE PELAKSANAAN
NO. URAIAN TOTAL HARGA BOBOT BULAN I BULAN II BULAN III BULAN IV KET.
( Rp.) (%) I II III IV I II III IV I II III IV I II
III PEK. BETON DAN DINDING 76,922,092.90 23.275 -2.225 8.500 8.500 8.500 80
Tim Perencana
H . ABAR
data grafik
0 1 2 3 4 5 6 7 8 9 10 11 12 13 #REF!
0 0.5 0.7 7.2 10.9 23.8 35.7 47.6 63.3 72.1 82.1 88.7 91.2 95.4 98.1
91
JADWAL PELAKSANAAN PEKERJAAN
Pekerjaan : PERENCANAAN RUMAH TINGGAL TYPE 53 NAMA ASESOR : Dsr. SUWARDANA AJI, ST
Kota : PAREPARE NAMA PESERTA : HASRUL
Luas : 53 m2
PERIODE PELAKSANAAN
NO. URAIAN TOTAL HARGA BOBOT BULAN I BULAN II BULAN III BULAN IV KET.
( Rp.) (%) I II III IV I II III IV I II III IV I II
100
I PEKERJAAN PERSIAPAN 3,000,000.00 0.716 0.358 0.358
III PEK. BETON DAN DINDING 115,176,600.00 27.502 2.002 8.500 8.500 8.500 80
RENCANA 10
XI PEK. PERLENGKAPAN 21,580,020.00 5.153 2.653 2.500
Tim Perencana
HASRUL