4,096.00
4,659.20
4,876.80
0.867
TABEL DATA 5. DATA HISTORIS BIAYA DAN ALTERNATIF COST DRIVER DEPARTEMEN PULPING VENEER
ALTERNATIF COST DRIVER
TAHUN BULAN BIAYA
JKL UNIT BAHAN UNIT PRODUKSI JAM MESIN
DRIVER
JAM MESIN
11,952.00
12,528.00
11,232.00
12,384.00
12,816.00
12,096.00
13,759.20
14,364.00
12,852.00
11,340.00
10,584.00
12,247.20
12,549.60
13,154.40
11,793.60
13,003.20
13,456.80
12,672.00
14,414.40
15,048.00
13,464.00
11,880.00
11,088.00
12,830.40
13,147.20
13,780.80
12,355.20
13,622.40
14,097.60
11,520.00
13,104.00
13,680.00
12,240.00
10,800.00
10,080.00
11,664.00
-0.074
TABEL DATA 7. DATA HISTORIS BIAYA DAN ALTERNATIF COST DRIVER DEPARTEMEN
FINISHING
ALTERNATIF COST DRIVER
TAHUN BULAN BIAYA UNIT
JKL UNIT BAHAN
PRODUKSI
JANUARI 210,618,500.00 21274.11 27,000.00 9,030.00
FEBRUARI 217,337,750.00 19073.34 24,000.00 9,345.00
MARET 207,720,000.00 21029.58 22,400.00 8,820.00
APRIL 233,806,500.00 21763.17 25,920.00 10,032.75
MEI 243,292,500.00 17784 26,560.00 10,473.75
JUNI 219,577,500.00 20229.3 27,840.00 9,371.25
2017 JULI 195,862,500.00 21118.5 24,960.00 8,268.75
AGUSTUS 184,005,000.00 18895.5 27,520.00 7,717.50
SEPTEMBER 210,091,500.00 16672.5 28,480.00 8,930.25
OKTOBER 214,834,500.00 15561 26,880.00 9,150.75
NOVEMBER 224,320,500.00 18006.3 30,576.00 9,591.75
DESEMBER 202,977,000.00 18450.9 31,920.00 8,599.50
JANUARI 221,949,000.00 19340.1 28,200.00 9,481.50
FEBRUARI 229,063,500.00 17339.4 25,200.00 9,812.25
MARET 218,260,000.00 19117.8 23,520.00 9,240.00
APRIL 245,795,750.00 19784.7 27,216.00 10,510.50
MEI 255,808,750.00 18240 27,888.00 10,972.50
JUNI 230,776,250.00 20748 29,232.00 9,817.50
2018 JULI 205,743,750.00 21660 27,800.00 8,662.50
AGUSTUS 193,227,500.00 19380 28,896.00 8,085.00
SEPTEMBER 220,763,250.00 17100 29,904.00 9,355.50
OKTOBER 225,769,750.00 15960 28,160.00 9,586.50
NOVEMBER 235,782,750.00 18468 32,032.00 10,048.50
DESEMBER 213,253,500.00 18924 33,440.00 9,009.00
JANUARI 233,279,500.00 19836 29,920.00 9,933.00
FEBRUARI 240,789,250.00 17784 26,300.00 10,279.50
MARET 197,180,000.00 19608 23,500.00 8,400.00
APRIL 221,817,250.00 20292 28,512.00 9,555.00
MEI 230,776,250.00 19562.4 28,700.00 9,975.00
JUNI 208,378,750.00 22252.23 29,700.00 8,925.00
2019
JULI 185,981,250.00 23230.35 27,456.00 7,875.00
AGUSTUS 174,782,500.00 20785.05 30,272.00 7,350.00
SEPTEMBER 199,419,750.00 18339.75 31,328.00 8,505.00
OKTOBER 203,899,250.00 17117.1 25,600.00 8,715.00
NOVEMBER 212,858,250.00 19806.93 29,120.00 9,135.00
DESEMBER 192,700,500.00 20295.99 30,480.00 8,190.00
-0.3027 -0.0436 0.9980
A 11,761,621.881
B 22,189.211
X 0.998
Y 11,783,766.762
ER DEPARTEMEN
DRIVER
JAM MESIN
6,772.80
7,099.20
6,364.80
7,017.60
7,262.40
6,854.40
7,796.88
8,139.60
7,282.80
6,426.00
5,997.60
6,940.08
7,111.44
7,454.16
6,683.04
7,368.48
7,625.52
7,180.80
8,168.16
8,527.20
7,629.60
6,732.00
6,283.20
7,270.56
7,450.08
7,809.12
7,001.28
7,719.36
7,988.64
6,528.00
7,425.60
7,752.00
6,936.00
6,120.00
5,712.00
6,609.60
-0.0740
TABEL DATA 8. DATA HISTORIS BIAYA DAN ALTERNATIF COST DRIVER DEPARTEMEN PACKING
ALTERNATIF COST DRIVER
TAHUN BULAN BIAYA
JKL UNIT BAHAN UNIT PRODUKSI JAM MESIN
JANUARI 17,149,154.21 23513.49 27,000.00 9,030.00 5,179.20
FEBRUARI 17,572,961.92 21081.06 24,000.00 9,345.00 5,428.80
MARET 16,966,335.20 23243.22 22,400.00 8,820.00 4,867.20
APRIL 18,611,706.29 24054.03 25,920.00 10,032.75 5,366.40
MEI 19,210,023.05 19656 26,560.00 10,473.75 5,553.60
JUNI 17,714,231.15 22358.7 27,840.00 9,371.25 5,241.60
2017 JULI 16,218,439.25 23341.5 24,960.00 8,268.75 5,962.32
AGUSTUS 15,470,543.30 20884.5 27,520.00 7,717.50 6,224.40
SEPTEMBER 17,115,914.39 18427.5 28,480.00 8,930.25 5,569.20
OKTOBER 17,415,072.77 17199 26,880.00 9,150.75 4,914.00
NOVEMBER 18,013,389.53 19901.7 30,576.00 9,591.75 4,586.40
DESEMBER 16,667,176.82 20393.1 31,920.00 8,599.50 5,307.12
JANUARI 17,863,810.34 21375.9 28,200.00 9,481.50 5,438.16
FEBRUARI 18,312,547.91 19164.6 25,200.00 9,812.25 5,700.24
MARET 17,631,131.60 21130.2 23,520.00 9,240.00 5,110.56
APRIL 19,367,912.20 21867.3 27,216.00 10,510.50 5,634.72
MEI 19,999,468.78 20160 27,888.00 10,972.50 5,831.28
JUNI 18,420,577.33 22932 29,232.00 9,817.50 5,491.20
2018 JULI 16,841,685.88 23940 27,800.00 8,662.50 6,246.24
AGUSTUS 16,052,240.15 21420 28,896.00 8,085.00 6,520.80
SEPTEMBER 17,789,020.75 18900 29,904.00 9,355.50 5,834.40
OKTOBER 18,104,799.04 17640 28,160.00 9,586.50 5,148.00
NOVEMBER 18,736,355.62 20412 32,032.00 10,048.50 4,804.80
DESEMBER 17,315,353.31 20916 33,440.00 9,009.00 5,559.84
JANUARI 18,578,466.47 21924 29,920.00 9,933.00 5,697.12
FEBRUARI 19,052,133.91 19656 26,300.00 10,279.50 5,971.68
MARET 16,301,538.80 21672 23,500.00 8,400.00 5,353.92
APRIL 17,855,500.39 22428 28,512.00 9,555.00 5,903.04
MEI 18,420,577.33 21621.6 28,700.00 9,975.00 6,108.96
JUNI 17,007,884.98 24594.57 29,700.00 8,925.00 4,992.00
2019
JULI 15,595,192.63 25675.65 27,456.00 7,875.00 5,678.40
AGUSTUS 14,888,846.45 22972.95 30,272.00 7,350.00 5,928.00
SEPTEMBER 16,442,808.04 20270.25 31,328.00 8,505.00 5,304.00
OKTOBER 16,725,346.51 18918.9 25,600.00 8,715.00 4,680.00
NOVEMBER 17,290,423.45 21891.87 29,120.00 9,135.00 4,368.00
DESEMBER 16,019,000.33 22432.41 30,480.00 8,190.00 5,054.40
-0.303 -0.044 0.998 -0.074
A 4,606,522.640
B 1,399.555
X 0.998
Y 4,607,919.399
0.9980022
TABEL 10. DAFTAR % ALOKASI BIAYA DEPARTEMEN
PT SELARAS ALAM
REKAPITULASI ESTIMASI BOP DENGAN DATA HIST
DEPARTEMEN JASA SUMBER TENAGA
BIAYA DEPARTEMEN JASA Rp400,000,000.00
DEPARTEMEN PRODUKSI
LOG POND Rp20,000,000.00 5%
DRY VENEER Rp80,000,000.00 20%
PULPING VENEER Rp120,000,000.00 30%
PRESS MACHINE Rp120,000,000.00 30%
FINISHING Rp40,000,000.00 10%
PACKAGING Rp20,000,000.00 5%
TABEL 10. DAFTAR % ALOKASI BIAYA DEPARTEMEN JASA
PT SELARAS ALAM
REKAPITULASI ESTIMASI BOP DENGAN DATA HISTORIS
PERAWATAN & PERBAIKAN PRASARANA
Rp200,000,000.00 Rp200,000,000.00
5% Rp50,000,000
10% Rp130,000,000
25% Rp210,000,000
30% Rp240,000,000
20% Rp110,000,000
10% Rp60,000,000
PT SELARAS ALAM
REKAPITULASI ESTIMASI BOP DENGAN DATA HISTORIS
BIAYA
NO DEPARTEMEN COST DRIVER
TETAP VARIABEL
1 LOG POND JAM TRANSPORT Rp11,407,604.66 Rp16,675.88
2 DRY VENEER UNIT BAHAN Rp11,330,738.53 Rp1,874.50
3 PULPING VEENER JAM TRANSPORT Rp28,060,257.43 Rp6,530.59
4 PRESS MACHINE UNIT PRODUKSI Rp1,064,662.64 Rp21,111.33
5 FINISHING UNIT PRODUKSI Rp11,761,621.88 Rp22,189.21
6 PACKING UNIT PRODUKSI Rp4,606,522.64 Rp1,399.55
Berdasarkan pertimbangan pada tahun 2020 perusahaan mengestimasi perubahan sebagai berikut
PT SELARAS ALAM
REKAPITULASI ESTIMASI BOP DENGAN DATA HISTORIS
BIAYA
NO DEPARTEMEN COST DRIVER
TETAP VARIABEL
1 LOG POND JAM TRANSPORT Rp11,863,908.85 Rp17,509.67
2 DRY VENEER UNIT BAHAN Rp11,557,353.30 Rp1,930.73
3 PULPING VEENER JKL Rp28,621,462.58 Rp6,661.21
4 PRESS MACHINE UNIT PRODUKSI Rp1,085,955.89 Rp21,744.67
5 FINISHING UNIT PRODUKSI Rp11,996,854.32 Rp22,854.89
6 PACKING UNIT PRODUKSI Rp4,698,653.09 Rp1,441.54
Tabel Data 11. Konsumsi Standart Cost Driver/Unit Produk
COST DRIVER
PRODUK DAN DEPARTEMEN UNIT PRODUKSI
JKL JAM MESIN UNIT BAHAN
WRAPING GRADE WOODFLOOR
LOG POND 25,300 2 0 4
DRY VENEER 25,300 4 8 4
PULPING VENEER 25,300 5 5 4
PREESS MACHINE 25,300 4 6 4
FINISHING 25,300 4 2 4
PACKAGING 25,300 2 1 4
ORDINARY WOODFLOOR
LOG POND 44,900 1 0 3
DRY VENEER 44,900 3 6 3
PULPING VENEER 44,900 4 4 3
PREESS MACHINE 44,900 3 5 3
FINISHING 44,900 3 1 3
PACKAGING 44,900 2 1 3
BASE WOODFLOOR
LOG POND 21,500 1 0 2
DRY VENEER 21,500 2 4 2
PULPING VENEER 21,500 3 3 2
PREESS MACHINE 21,500 2 4 2
FINISHING 21,500 2 1 2
PACKAGING 21,500 2 1 2
BLOCK BOARD WOODFLOOR
LOG POND 34,000 1 0 3
DRY VENEER 34,000 3 6 3
PULPING VENEER 34,000 4 5 3
PREESS MACHINE 34,000 4 5 3
FINISHING 34,000 3 2 3
PACKAGING 34,000 2 1 3
ER TABEL DATA 12. KAPASITAS MAKSIMAL PADA MASING-MASING DEPARTEMEN
JAM TRANSPORT DEPARTEMEN COST DRIVER
LOG POND JAM TRANSPORT
0.5 DRY VENEER UNIT BAHAN
0.5 PULPING VENEER JKL
0.5 PREESS MACHINE UNIT PRODUKSI
0.5 FINISHING UNIT PRODUKSI
0.5 PACKAGING UNIT PRODUKSI
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
DA MASING-MASING DEPARTEMEN
KAPASITAS MAKSIMAL
120,000
750,000
1,000,000
200,000
200,000
200,000
PT SELARAS ALAM
ANGGARAN FLEKSIBEL BOP DEPARTEMEN LOG POND
PERSENTAS
KAPASITAS TINGKAT AKTUAL YANG DIHARAPKAN
60%
Anggaran Fleksibel 125,700 unit
Jam Transport 62,850 jam 72,000.00
Estimasi BOP
Variabel Rp1,100,482,998.85 Rp1,260,696,514.20
Tetap Rp61,863,908.85 Rp61,863,906.91
Total BOP Rp1,162,346,907.70 Rp1,322,560,421.11
Tarif BOP
Tarif Variabel Rp17,509.67 Rp17,509.67
Tarif Tetap Rp984.31 Rp859.22
Tarif Total Rp18,493.98 Rp18,368.89
PT SELARAS ALAM
ANGGARAN FLEKSIBEL BOP DEPARTEMEN DRY VENEER
PERSENTASE KAPASITAS
KAPASITAS TINGKAT AKTUAL YANG DIHARAPKAN
60%
Anggaran Fleksibel 125,700 unit
Unit Bahan 380,900 jam 450,000
Estimasi BOP
Variabel Rp735,415,647.35 Rp868,829,197.45
Tetap Rp141,557,353.30 Rp141,557,353.30
Total BOP Rp876,973,000.65 Rp1,010,386,550.75
Tarif BOP
Tarif Variabel Rp1,930.73 Rp1,930.73
Tarif Tetap Rp371.64 Rp314.57
Tarif Total Rp2,302.37 Rp2,245.30
PT SELARAS ALAM
ANGGARAN FLEKSIBEL BOP DEPARTEMEN PULPING VENEER
PERSENTASE KAPASITAS
KAPASITAS TINGKAT AKTUAL YANG DIHARAPKAN
60%
Anggaran Fleksibel 125,700 unit
JKL 506,600 jam 600,000
Estimasi BOP
Variabel Rp3,374,566,654.31 Rp3,996,723,238.43
Tetap Rp238,621,462.58 Rp238,621,462.58
Total BOP Rp3,613,188,116.89 Rp4,235,344,701.01
Tarif BOP
Tarif Variabel Rp6,661.21 Rp6,661.21
Tarif Tetap Rp471.03 Rp397.70
Tarif Total Rp7,132.23 Rp7,058.91
PT SELARAS ALAM
ANGGARAN FLEKSIBEL BOP DEPARTEMEN PRESS MACHINE
PERSENTASE KAPASITAS
KAPASITAS TINGKAT AKTUAL YANG DIHARAPKAN
60%
Anggaran Fleksibel 125,700 Unit
Unit Produksi 125,700 Jam 120,000
Estimasi BOP
Variabel Rp2,733,304,907.58 Rp2,609,360,293.63
Tetap Rp241,085,955.89 Rp241,085,955.89
Total BOP Rp2,974,390,863.47 Rp2,850,446,249.52
Tarif BOP
Tarif Variabel Rp21,744.67 Rp21,744.67
Tarif Tetap Rp1,917.95 Rp2,009.05
Tarif Total Rp23,662.62 Rp23,753.72
PT SELARAS ALAM
ANGGARAN FLEKSIBEL BOP DEPARTEMEN FINISHING
PERSENTASE KAPASITAS
KAPASITAS TINGKAT AKTUAL YANG DIHARAPKAN
60%
Anggaran Fleksibel 125,700 Unit
Unit Produksi 125,700 Jam 120,000
Estimasi BOP
Variabel Rp2,872,859,366.36 Rp2,742,586,507.27
Tetap Rp121,996,854.32 Rp121,996,854.32
Total BOP Rp2,994,856,220.68 Rp2,864,583,361.59
Tarif BOP
Tarif Variabel Rp22,854.89 Rp22,854.89
Tarif Tetap Rp970.54 Rp1,016.64
Tarif Total Rp23,825.43 Rp23,871.53
PT SELARAS ALAM
ANGGARAN FLEKSIBEL BOP DEPARTEMEN PACKAGING
PERSENTASE KAPASITAS
KAPASITAS TINGKAT AKTUAL YANG DIHARAPKAN
60%
Anggaran Fleksibel 125700 Unit
Unit Produksi 125700 Jam 120,000
Estimasi BOP
Variabel Rp181,201,761.45 Rp172,984,975.13
Tetap Rp64,698,653.09 Rp71,996,854.32
Total BOP Rp245,900,414.54 Rp244,981,829.45
Tarif BOP
Tarif Variabel Rp1,441.54 Rp1,441.54
Tarif Tetap Rp514.71 Rp599.97
Tarif Total Rp1,956.25 Rp2,041.51
PT SELARAS ALAM
SIBEL BOP DEPARTEMEN LOG POND
KAPASITAS MAX 120,000
PERSENTASE KAPASITAS
70% 80% 90% 100%
PT SELARAS ALAM
IBEL BOP DEPARTEMEN DRY VENEER
KAPASITAS MAX 750,000
APASITAS
70% 80% 90% 100%
PT SELARAS ALAM
EL BOP DEPARTEMEN PULPING VENEER
KAPASITAS MAX 1,000,000
APASITAS
70% 80% 90% 100%
700,000 800,000 900,000 1,000,000
PT SELARAS ALAM
EL BOP DEPARTEMEN PRESS MACHINE
KAPASITAS MAX 200,000
APASITAS
70% 80% 90% 100%
PT SELARAS ALAM
SIBEL BOP DEPARTEMEN FINISHING
KAPASITAS MAX 200,000
APASITAS
70% 80% 90% 100%
PT SELARAS ALAM
IBEL BOP DEPARTEMEN PACKAGING
KAPASITAS MAX 200,000
APASITAS
70% 80% 90% 100%
STNDARD STANDARD
STANDARD PRICE QUALITY (SQ) / COST BAHAN
BAHAN BAKU SATUAN (SP) / M3 UNIT BAKU
KAYU M3 1,500,000 4 6,000,000
TOTAL STANDARD COST BIAYA BAHAN BAKU
STNDARD STANDARD
STANDARD PRICE QUALITY (SQ) / COST BAHAN
BAHAN BAKU SATUAN (SP) / M3 UNIT BAKU
KAYU M3 1,500,000 3 4,500,000
TOTAL STANDARD COST BIAYA BAHAN BAKU
STNDARD STANDARD
STANDARD PRICE QUALITY (SQ) / COST BAHAN
BAHAN BAKU SATUAN (SP) / M3 UNIT BAKU
KAYU M3
TOTAL STANDARD COST BIAYA BAHAN BAKU
STNDARD STANDARD
STANDARD PRICE QUALITY (SQ) / COST BAHAN
BAHAN BAKU SATUAN (SP) / M3 UNIT BAKU
KAYU M3
TOTAL STANDARD COST BIAYA BAHAN BAKU