Anda di halaman 1dari 4

97,664,869,232

NOMOR PO STATUS APPROVAL JUDUL PO NO LINE KODE ITEM NAMA ITEM QTY UOM HARGA PR HARGA PO SELISIH PR - PONEED BY DATEPROMISED DATE HARI STATUS KETERLAMBATANCURRENCY TOTAL PR TOTAL PO RATE TOTAL PO (IDR) QTY DELIVERKEKURANGAN
JENIS ANGGARAN NOMOR PROCOST TASK DESTINATION TYPE NO PR JUDUL PR USER VENDOR CLOSURE STATUS
119.PJ/061/IP/2023 APPROVED Pengadaan Retrofit AVR Unit 1 PLTA Wadaslintang Dan Retrofit 1 66.632013103 Retrofit Sistem AVR Unit 1 PLTA Wadaslintang 1 Lumpsum ### ### ### 31/01/2024 031/01/2024 00:00:00 100% deliver IDR ### ### 3,201,462,000 1 - CAPEX 23-1505-PPA-CA-NON-NO 01 EXPENSE 15052300Retrofit Sistem AVR Unit 1 PLTA Wadaslintang CIPTO NUGROHO ANDRITZ HYDRO, PT CLOSED
119.PJ/061/IP/2023 APPROVED Pengadaan Retrofit AVR Unit 1 PLTA Wadaslintang Dan Retrofit 2 66.632013103 Retrofit Sistem AVR Unit 1 PLTA Wonogiri 1 Lumpsum ### ### 11,890,500 31/01/2024 031/01/2024 00:00:00 100% deliver IDR ### ### 2,972,136,000 1 - CAPEX 23-1505-PPA-CA-NON-NO 01 EXPENSE 15052300Retrofit Sistem AVR Unit 1 PLTA Wonogiri CIPTO NUGROHO ANDRITZ HYDRO, PT CLOSED
141.PJ/061/IP/2022 APPROVED REVITALISASI PENSTOCK 1 SECTION E-F-G PLTA JELOK MRICA PG 1 66.632007109 Revitalisasi Penstock PLTA Jelok Sect. D-E-F-G 1 Lumpsum ### ### 58,504,390 21/10/2022 124/10/2024 00:00:00 100% deliver IDR ### ### 10,762,049,400 1 - CAPEX 22-1505-PPA-CA-NON-NO 01 EXPENSE 15052200Revitalisasi Penstock PLTA Jelok Sect. D-E-F-G CIPTO NUGROHO PUTRA TEKNIK SEJAHTERA, PT CLOSED
1505000026 APPROVED 0201.Pj/DAN.01.03/PLNIP011002/2023 - Revitalisasi Transfor 1 66.632019103 Revitalisasi Transformator Utama Unit 3 PLTA PB. Soedirman 1 Lumpsum ### ### ### 31/07/2024 030/09/2024 00:00:00 250 hari lagi IDR ### ### 11,236,353,274 - 1 CAPEX 23-1505-PPA-CA-NON-NO 01 EXPENSE 15052301Revitalisasi Transformator Utama Unit 3 PLTA PB. Soedirman CIPTO NUGROHO ELSEWEDY ELECTRIC INDONESIA, PT CLOSED
1505000115 APPROVED 0352.Pj/DAN.01.03/PLNIP011002/2023 Pengadaan Excavator & 2 66.632023001 Pengadaan Amphibious Excavator Waduk Mrica PLTA PBS Tahun 2023 1 Lumpsum ### ### ### 29/03/2024 031/03/2024 00:00:00 67 hari lagi IDR ### ### 6,438,000,000 - 1 CAPEX 23-1505-SAR-CA-NON-NON01 EXPENSE 15052300Pengadaan Amphibious Excavator Waduk Mrica PLTA PBS Tahun 2023 CIPTO NUGROHO TRAKINDO UTAMA, PT CLOSED
1505000149 APPROVED Pekerjaan Operasi dan Pemeliharaan Amphibious Excavator dan 1 66.720700002 Pekerjaan Operasi dan Pemeliharaan Amphibious Excavator dan Excavator Waduk M 1 Lumpsum ### ### ### 01/11/2023 016/09/2024 00:00:00 236 hari lagi IDR ### ### 1,965,833,320 - 1 CAPEX 23-1505-SAR-CA-NON-NON01 EXPENSE 15052304Pekerjaan Operasi dan Pemeliharaan Amphibious Excavator dan Excavator Waduk MricCIPTO NUGROHO SERAYU SURYA SAMUDRA, PT CLOSED
1505000152 APPROVED Pengadaan Material Turbin Mrica PGU Tahun 2024 1 05.029.004.0001SHAFT SEAL TURBIN; TIPE MANETEX 7; DIA. LUAR : 533,9 mm, DIA. DALAM 427 4 Pieces 13,600,000 ### 100,000 29/03/2024 129/03/2024 00:00:00 65 hari lagi IDR 54,400,000 54,000,000 54,000,000 - 4 - INVENTORY 15052305PENGADAAN MATERIAL TURBIN MRICA PGU TAHUN 2024 MOHAMMAD LUTFI RAYULTRA, CV CLOSED
1505000152 APPROVED Pengadaan Material Turbin Mrica PGU Tahun 2024 2 05.029.004.0002FLANGE SHAFT SEAL TURBIN; DIA. LUAR : 543 mm, DIA. DALAM : 465 mm; MATERI 2 Pieces 21,500,000 ### 1,000,000 29/03/2024 129/03/2024 00:00:00 65 hari lagi IDR 43,000,000 41,000,000 41,000,000 - 2 - INVENTORY 15052305PENGADAAN MATERIAL TURBIN MRICA PGU TAHUN 2024 MOHAMMAD LUTFI RAYULTRA, CV CLOSED
1505000152 APPROVED Pengadaan Material Turbin Mrica PGU Tahun 2024 3 05.029.004.0004P EER SHAFT SEAL TURBIN; PANJANG 62 MM, DIA DALAM 11.5 MM, DIA LUAR 1 200 Buah 10,000 10,000 - 29/03/2024 129/03/2024 00:00:00 65 hari lagi IDR 2,000,000 2,000,000 2,000,000 - 200 - INVENTORY 15052305PENGADAAN MATERIAL TURBIN MRICA PGU TAHUN 2024 MOHAMMAD LUTFI RAYULTRA, CV CLOSED
1505000152 APPROVED Pengadaan Material Turbin Mrica PGU Tahun 2024 4 05.031.010.0001SHEARPIN GUIDE VANE; TYPE : PIN; STEEL; DIA. 35 mm x 57 mm 30 Pieces 175,000 170,000 5,000 29/03/2024 129/03/2024 00:00:00 65 hari lagi IDR 5,250,000 5,100,000 5,100,000 - 30 - INVENTORY 15052305PENGADAAN MATERIAL TURBIN MRICA PGU TAHUN 2024 MOHAMMAD LUTFI RAYULTRA, CV CLOSED
1505000157 APPROVED Jasa Pemeliharaan AC PLTA PB Soedirman Tapen Siteki Dan Pl 1 66.632007109 Pemeliharaan AC Kapasitas <2,5 PK Bulan Januari 18 Lumpsum 105,232 104,300 932 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 1,894,176 1,877,400 1,877,400 - 18 OPEX 24-1505-PPA-OP-JAS-3A-0604-12-02 EXPENSE 15052304JASA PEMELIHARAAN AC PLTA PBS, TAPEN, SITEKI DAN PLUMBUNGAN TAHUN 2024 RAHMAT RIZEKI EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000157 APPROVED Jasa Pemeliharaan AC PLTA PB Soedirman Tapen Siteki Dan Pl 2 66.632007109 Pemeliharaan AC Kapasitas >2,5 PK Bulan Januari 1 Lumpsum 120,254 119,200 1,054 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 120,254 119,200 119,200 - 1 OPEX 24-1505-PPA-OP-JAS-3A-0604-12-02 EXPENSE 15052304JASA PEMELIHARAAN AC PLTA PBS, TAPEN, SITEKI DAN PLUMBUNGAN TAHUN 2024 RAHMAT RIZEKI EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000157 APPROVED Jasa Pemeliharaan AC PLTA PB Soedirman Tapen Siteki Dan Pl 3 66.632007109 Pemeliharaan AC Kapasitas <2,5 PK Bulan Februari 18 Lumpsum 105,232 104,300 932 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 1,894,176 1,877,400 1,877,400 - 18 OPEX 24-1505-PPA-OP-JAS-3A-0604-12-02 EXPENSE 15052304JASA PEMELIHARAAN AC PLTA PBS, TAPEN, SITEKI DAN PLUMBUNGAN TAHUN 2024 RAHMAT RIZEKI EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000157 APPROVED Jasa Pemeliharaan AC PLTA PB Soedirman Tapen Siteki Dan Pl 4 66.632007109 Pemeliharaan AC Kapasitas >2,5 PK Bulan Februari 1 Lumpsum 120,254 119,200 1,054 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 120,254 119,200 119,200 - 1 OPEX 24-1505-PPA-OP-JAS-3A-0604-12-02 EXPENSE 15052304JASA PEMELIHARAAN AC PLTA PBS, TAPEN, SITEKI DAN PLUMBUNGAN TAHUN 2024 RAHMAT RIZEKI EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000157 APPROVED Jasa Pemeliharaan AC PLTA PB Soedirman Tapen Siteki Dan Pl 5 66.632007109 Pemeliharaan AC Kapasitas <2,5 PK Bulan Maret 18 Lumpsum 105,232 104,300 932 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 1,894,176 1,877,400 1,877,400 - 18 OPEX 24-1505-PPA-OP-JAS-3A-0604-12-02 EXPENSE 15052304JASA PEMELIHARAAN AC PLTA PBS, TAPEN, SITEKI DAN PLUMBUNGAN TAHUN 2024 RAHMAT RIZEKI EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000157 APPROVED Jasa Pemeliharaan AC PLTA PB Soedirman Tapen Siteki Dan Pl 6 66.632007109 Pemeliharaan AC Kapasitas >2,5 PK Bulan Maret 1 Lumpsum 120,254 119,200 1,054 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 120,254 119,200 119,200 - 1 OPEX 24-1505-PPA-OP-JAS-3A-0604-12-02 EXPENSE 15052304JASA PEMELIHARAAN AC PLTA PBS, TAPEN, SITEKI DAN PLUMBUNGAN TAHUN 2024 RAHMAT RIZEKI EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000157 APPROVED Jasa Pemeliharaan AC PLTA PB Soedirman Tapen Siteki Dan Pl 7 66.632007109 Pemeliharaan AC Kapasitas <2,5 PK Bulan April 18 Lumpsum 105,232 104,300 932 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 1,894,176 1,877,400 1,877,400 - 18 OPEX 24-1505-PPA-OP-JAS-3A-0604-12-02 EXPENSE 15052304JASA PEMELIHARAAN AC PLTA PBS, TAPEN, SITEKI DAN PLUMBUNGAN TAHUN 2024 RAHMAT RIZEKI EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000157 APPROVED Jasa Pemeliharaan AC PLTA PB Soedirman Tapen Siteki Dan Pl 8 66.632007109 Pemeliharaan AC Kapasitas >2,5 PK Bulan April 1 Lumpsum 120,254 119,200 1,054 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 120,254 119,200 119,200 - 1 OPEX 24-1505-PPA-OP-JAS-3A-0604-12-02 EXPENSE 15052304JASA PEMELIHARAAN AC PLTA PBS, TAPEN, SITEKI DAN PLUMBUNGAN TAHUN 2024 RAHMAT RIZEKI EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000157 APPROVED Jasa Pemeliharaan AC PLTA PB Soedirman Tapen Siteki Dan Pl 9 66.632007109 Pemeliharaan AC Kapasitas <2,5 PK Bulan Mei 18 Lumpsum 105,232 104,300 932 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 1,894,176 1,877,400 1,877,400 - 18 OPEX 24-1505-PPA-OP-JAS-3A-0604-12-02 EXPENSE 15052304JASA PEMELIHARAAN AC PLTA PBS, TAPEN, SITEKI DAN PLUMBUNGAN TAHUN 2024 RAHMAT RIZEKI EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000157 APPROVED Jasa Pemeliharaan AC PLTA PB Soedirman Tapen Siteki Dan Pl 10 66.632007109 Pemeliharaan AC Kapasitas >2,5 PK Bulan Mei 1 Lumpsum 120,254 119,200 1,054 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 120,254 119,200 119,200 - 1 OPEX 24-1505-PPA-OP-JAS-3A-0604-12-02 EXPENSE 15052304JASA PEMELIHARAAN AC PLTA PBS, TAPEN, SITEKI DAN PLUMBUNGAN TAHUN 2024 RAHMAT RIZEKI EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000157 APPROVED Jasa Pemeliharaan AC PLTA PB Soedirman Tapen Siteki Dan Pl 11 66.632007109 Pemeliharaan AC Kapasitas <2,5 PK Bulan Juni 18 Lumpsum 105,232 104,300 932 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 1,894,176 1,877,400 1,877,400 - 18 OPEX 24-1505-PPA-OP-JAS-3A-0604-12-02 EXPENSE 15052304JASA PEMELIHARAAN AC PLTA PBS, TAPEN, SITEKI DAN PLUMBUNGAN TAHUN 2024 RAHMAT RIZEKI EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000157 APPROVED Jasa Pemeliharaan AC PLTA PB Soedirman Tapen Siteki Dan Pl 12 66.632007109 Pemeliharaan AC Kapasitas >2,5 PK Bulan Juni 1 Lumpsum 120,254 119,200 1,054 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 120,254 119,200 119,200 - 1 OPEX 24-1505-PPA-OP-JAS-3A-0604-12-02 EXPENSE 15052304JASA PEMELIHARAAN AC PLTA PBS, TAPEN, SITEKI DAN PLUMBUNGAN TAHUN 2024 RAHMAT RIZEKI EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000157 APPROVED Jasa Pemeliharaan AC PLTA PB Soedirman Tapen Siteki Dan Pl 13 66.632007109 Pemeliharaan AC Kapasitas <2,5 PK Bulan Juli 18 Lumpsum 105,232 104,300 932 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 1,894,176 1,877,400 1,877,400 - 18 OPEX 24-1505-PPA-OP-JAS-3A-0604-12-02 EXPENSE 15052304JASA PEMELIHARAAN AC PLTA PBS, TAPEN, SITEKI DAN PLUMBUNGAN TAHUN 2024 RAHMAT RIZEKI EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000157 APPROVED Jasa Pemeliharaan AC PLTA PB Soedirman Tapen Siteki Dan Pl 14 66.632007109 Pemeliharaan AC Kapasitas >2,5 PK Bulan Juli 1 Lumpsum 120,254 119,200 1,054 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 120,254 119,200 119,200 - 1 OPEX 24-1505-PPA-OP-JAS-3A-0604-12-02 EXPENSE 15052304JASA PEMELIHARAAN AC PLTA PBS, TAPEN, SITEKI DAN PLUMBUNGAN TAHUN 2024 RAHMAT RIZEKI EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000157 APPROVED Jasa Pemeliharaan AC PLTA PB Soedirman Tapen Siteki Dan Pl 15 66.632007109 Pemeliharaan AC Kapasitas <2,5 PK Bulan Agustus 18 Lumpsum 105,232 104,300 932 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 1,894,176 1,877,400 1,877,400 - 18 OPEX 24-1505-PPA-OP-JAS-3A-0604-12-02 EXPENSE 15052304JASA PEMELIHARAAN AC PLTA PBS, TAPEN, SITEKI DAN PLUMBUNGAN TAHUN 2024 RAHMAT RIZEKI EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000157 APPROVED Jasa Pemeliharaan AC PLTA PB Soedirman Tapen Siteki Dan Pl 16 66.632007109 Pemeliharaan AC Kapasitas >2,5 PK Bulan Agustus 1 Lumpsum 120,254 119,200 1,054 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 120,254 119,200 119,200 - 1 OPEX 24-1505-PPA-OP-JAS-3A-0604-12-02 EXPENSE 15052304JASA PEMELIHARAAN AC PLTA PBS, TAPEN, SITEKI DAN PLUMBUNGAN TAHUN 2024 RAHMAT RIZEKI EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000157 APPROVED Jasa Pemeliharaan AC PLTA PB Soedirman Tapen Siteki Dan Pl 17 66.632007109 Pemeliharaan AC Kapasitas <2,5 PK Bulan September 18 Lumpsum 105,232 104,300 932 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 1,894,176 1,877,400 1,877,400 - 18 OPEX 24-1505-PPA-OP-JAS-3A-0604-12-02 EXPENSE 15052304JASA PEMELIHARAAN AC PLTA PBS, TAPEN, SITEKI DAN PLUMBUNGAN TAHUN 2024 RAHMAT RIZEKI EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000157 APPROVED Jasa Pemeliharaan AC PLTA PB Soedirman Tapen Siteki Dan Pl 18 66.632007109 Pemeliharaan AC Kapasitas >2,5 PK Bulan September 1 Lumpsum 120,254 119,200 1,054 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 120,254 119,200 119,200 - 1 OPEX 24-1505-PPA-OP-JAS-3A-0604-12-02 EXPENSE 15052304JASA PEMELIHARAAN AC PLTA PBS, TAPEN, SITEKI DAN PLUMBUNGAN TAHUN 2024 RAHMAT RIZEKI EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000157 APPROVED Jasa Pemeliharaan AC PLTA PB Soedirman Tapen Siteki Dan Pl 19 66.632007109 Pemeliharaan AC Kapasitas <2,5 PK Bulan Oktober 18 Lumpsum 105,232 104,300 932 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 1,894,176 1,877,400 1,877,400 - 18 OPEX 24-1505-PPA-OP-JAS-3A-0604-12-02 EXPENSE 15052304JASA PEMELIHARAAN AC PLTA PBS, TAPEN, SITEKI DAN PLUMBUNGAN TAHUN 2024 RAHMAT RIZEKI EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000157 APPROVED Jasa Pemeliharaan AC PLTA PB Soedirman Tapen Siteki Dan Pl 20 66.632007109 Pemeliharaan AC Kapasitas >2,5 PK Bulan Oktober 1 Lumpsum 120,254 119,200 1,054 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 120,254 119,200 119,200 - 1 OPEX 24-1505-PPA-OP-JAS-3A-0604-12-02 EXPENSE 15052304JASA PEMELIHARAAN AC PLTA PBS, TAPEN, SITEKI DAN PLUMBUNGAN TAHUN 2024 RAHMAT RIZEKI EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000157 APPROVED Jasa Pemeliharaan AC PLTA PB Soedirman Tapen Siteki Dan Pl 21 66.632007109 Pemeliharaan AC Kapasitas <2,5 PK Bulan November 18 Lumpsum 105,232 104,300 932 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 1,894,176 1,877,400 1,877,400 - 18 OPEX 24-1505-PPA-OP-JAS-3A-0604-12-02 EXPENSE 15052304JASA PEMELIHARAAN AC PLTA PBS, TAPEN, SITEKI DAN PLUMBUNGAN TAHUN 2024 RAHMAT RIZEKI EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000157 APPROVED Jasa Pemeliharaan AC PLTA PB Soedirman Tapen Siteki Dan Pl 22 66.632007109 Pemeliharaan AC Kapasitas >2,5 PK Bulan November 1 Lumpsum 120,254 119,200 1,054 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 120,254 119,200 119,200 - 1 OPEX 24-1505-PPA-OP-JAS-3A-0604-12-02 EXPENSE 15052304JASA PEMELIHARAAN AC PLTA PBS, TAPEN, SITEKI DAN PLUMBUNGAN TAHUN 2024 RAHMAT RIZEKI EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000157 APPROVED Jasa Pemeliharaan AC PLTA PB Soedirman Tapen Siteki Dan Pl 23 66.632007109 Pemeliharaan AC Kapasitas <2,5 PK Bulan Desember 18 Lumpsum 105,232 104,300 932 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 1,894,176 1,877,400 1,877,400 - 18 OPEX 24-1505-PPA-OP-JAS-3A-0604-12-02 EXPENSE 15052304JASA PEMELIHARAAN AC PLTA PBS, TAPEN, SITEKI DAN PLUMBUNGAN TAHUN 2024 RAHMAT RIZEKI EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000157 APPROVED Jasa Pemeliharaan AC PLTA PB Soedirman Tapen Siteki Dan Pl 24 66.632007109 Pemeliharaan AC Kapasitas >2,5 PK Bulan Desember 1 Lumpsum 120,254 119,200 1,054 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 120,254 119,200 119,200 - 1 OPEX 24-1505-PPA-OP-JAS-3A-0604-12-02 EXPENSE 15052304JASA PEMELIHARAAN AC PLTA PBS, TAPEN, SITEKI DAN PLUMBUNGAN TAHUN 2024 RAHMAT RIZEKI EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000158 APPROVED 0455.Pj/DAN.01.02/PLNIP011002/2023 - Jasa Pengerukan Deng 1 66.632003104 PEKERJAAN JASA PENGERUKAN DENGAN SKEMA VOLUMETRIC HASIL KERUK DI AR 1 Lumpsum ### ### ### 12/11/2023 030/06/2024 00:00:00 158 hari lagi IDR ### ### 10,129,371,600 - 1 OPEX 24-1505-PPA-OP-JAS-3F-0104-20-02 EXPENSE 15052305PEKERJAAN JASA PENGERUKAN DENGAN SKEMA VOLUMETRIC HASIL KERUK DI AREA AGUNG WIDYANTO ARTHA DAYA COALINDO, PT CLOSED
1505000160 APPROVED Jasa Pembersihan CWS PLTA PBS Dan Rabas-Rabas JTM 20kv TS 1 66.632007109 Jasa Rabas - Rabas JTM 20 KV TW 1 1 Lumpsum 14,976,675 ### 14,175 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 14,976,675 14,962,500 14,962,500 - 1 OPEX 24-1505-PPA-OP-JAS-3A-0633-05-01 EXPENSE 15052304JASA PEMBERSIHAN CWS PLTA PBS DAN RABAS-RABAS JTM 20KV TSP TAHUN 2024 EKO PUJIYANTO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000160 APPROVED Jasa Pembersihan CWS PLTA PBS Dan Rabas-Rabas JTM 20kv TS 2 66.632007109 Jasa Rabas - Rabas JTM 20 KV TW 2 1 Lumpsum 14,976,675 ### 14,175 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 14,976,675 14,962,500 14,962,500 - 1 OPEX 24-1505-PPA-OP-JAS-3A-0633-05-01 EXPENSE 15052304JASA PEMBERSIHAN CWS PLTA PBS DAN RABAS-RABAS JTM 20KV TSP TAHUN 2024 EKO PUJIYANTO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000160 APPROVED Jasa Pembersihan CWS PLTA PBS Dan Rabas-Rabas JTM 20kv TS 3 66.632007109 Jasa Rabas - Rabas JTM 20 KV TW 3 1 Lumpsum 14,976,675 ### 14,175 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 14,976,675 14,962,500 14,962,500 - 1 OPEX 24-1505-PPA-OP-JAS-3A-0633-05-01 EXPENSE 15052304JASA PEMBERSIHAN CWS PLTA PBS DAN RABAS-RABAS JTM 20KV TSP TAHUN 2024 EKO PUJIYANTO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000160 APPROVED Jasa Pembersihan CWS PLTA PBS Dan Rabas-Rabas JTM 20kv TS 4 66.632007109 Jasa Rabas - Rabas JTM 20 KV TW 4 1 Lumpsum 14,976,675 ### 14,175 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 14,976,675 14,962,500 14,962,500 - 1 OPEX 24-1505-PPA-OP-JAS-3A-0633-05-01 EXPENSE 15052304JASA PEMBERSIHAN CWS PLTA PBS DAN RABAS-RABAS JTM 20KV TSP TAHUN 2024 EKO PUJIYANTO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000160 APPROVED Jasa Pembersihan CWS PLTA PBS Dan Rabas-Rabas JTM 20kv TS 5 66.632005101 Jasa Pembersihan Strainer No. 1 s/d 6 PLTA PBS TW 1 1 Lumpsum 4,564,320 4,560,000 4,320 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 4,564,320 4,560,000 4,560,000 - 1 OPEX 24-1505-PPA-OP-JAS-3A-0604-12-01 EXPENSE 15052304JASA PEMBERSIHAN CWS PLTA PBS DAN RABAS-RABAS JTM 20KV TSP TAHUN 2024 EKO PUJIYANTO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000160 APPROVED Jasa Pembersihan CWS PLTA PBS Dan Rabas-Rabas JTM 20kv TS 6 66.632005101 Jasa Pembersihan Strainer No. 1 s/d 6 PLTA PBS TW 2 1 Lumpsum 4,564,320 4,560,000 4,320 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 4,564,320 4,560,000 4,560,000 - 1 OPEX 24-1505-PPA-OP-JAS-3A-0604-12-01 EXPENSE 15052304JASA PEMBERSIHAN CWS PLTA PBS DAN RABAS-RABAS JTM 20KV TSP TAHUN 2024 EKO PUJIYANTO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000160 APPROVED Jasa Pembersihan CWS PLTA PBS Dan Rabas-Rabas JTM 20kv TS 7 66.632005101 Jasa Pembersihan Strainer No. 1 s/d 6 PLTA PBS TW 3 1 Lumpsum 4,564,320 4,560,000 4,320 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 4,564,320 4,560,000 4,560,000 - 1 OPEX 24-1505-PPA-OP-JAS-3A-0604-12-01 EXPENSE 15052304JASA PEMBERSIHAN CWS PLTA PBS DAN RABAS-RABAS JTM 20KV TSP TAHUN 2024 EKO PUJIYANTO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000160 APPROVED Jasa Pembersihan CWS PLTA PBS Dan Rabas-Rabas JTM 20kv TS 8 66.632005101 Jasa Pembersihan Strainer No. 1 s/d 6 PLTA PBS TW 4 1 Lumpsum 5,134,860 5,130,000 4,860 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 5,134,860 5,130,000 5,130,000 - 1 OPEX 24-1505-PPA-OP-JAS-3A-0604-12-01 EXPENSE 15052304JASA PEMBERSIHAN CWS PLTA PBS DAN RABAS-RABAS JTM 20KV TSP TAHUN 2024 EKO PUJIYANTO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000160 APPROVED Jasa Pembersihan CWS PLTA PBS Dan Rabas-Rabas JTM 20kv TS 9 66.632005101 Jasa Pembersihan Air Cooling Sytem Generator PLTA PBS unit 1,2 & 3 TW 1 1 Lumpsum 4,564,320 4,560,000 4,320 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 4,564,320 4,560,000 4,560,000 - 1 OPEX 24-1505-PPA-OP-JAS-3A-0604-12-01 EXPENSE 15052304JASA PEMBERSIHAN CWS PLTA PBS DAN RABAS-RABAS JTM 20KV TSP TAHUN 2024 EKO PUJIYANTO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000160 APPROVED Jasa Pembersihan CWS PLTA PBS Dan Rabas-Rabas JTM 20kv TS 10 66.632005101 Jasa Pembersihan Air Cooling Sytem Generator PLTA PBS unit 1,2 & 3 TW 2 1 Lumpsum 4,564,320 4,560,000 4,320 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 4,564,320 4,560,000 4,560,000 - 1 OPEX 24-1505-PPA-OP-JAS-3A-0604-12-01 EXPENSE 15052304JASA PEMBERSIHAN CWS PLTA PBS DAN RABAS-RABAS JTM 20KV TSP TAHUN 2024 EKO PUJIYANTO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000160 APPROVED Jasa Pembersihan CWS PLTA PBS Dan Rabas-Rabas JTM 20kv TS 11 66.632005101 Jasa Pembersihan Air Cooling Sytem Generator PLTA PBS unit 1,2 & 3 TW 3 1 Lumpsum 4,564,320 4,560,000 4,320 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 4,564,320 4,560,000 4,560,000 - 1 OPEX 24-1505-PPA-OP-JAS-3A-0604-12-01 EXPENSE 15052304JASA PEMBERSIHAN CWS PLTA PBS DAN RABAS-RABAS JTM 20KV TSP TAHUN 2024 EKO PUJIYANTO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000160 APPROVED Jasa Pembersihan CWS PLTA PBS Dan Rabas-Rabas JTM 20kv TS 12 66.632005101 Jasa Pembersihan Air Cooling Sytem Generator PLTA PBS unit 1,2 & 3 TW 4 1 Lumpsum 5,134,860 5,130,000 4,860 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 5,134,860 5,130,000 5,130,000 - 1 OPEX 24-1505-PPA-OP-JAS-3A-0604-12-01 EXPENSE 15052304JASA PEMBERSIHAN CWS PLTA PBS DAN RABAS-RABAS JTM 20KV TSP TAHUN 2024 EKO PUJIYANTO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000160 APPROVED Jasa Pembersihan CWS PLTA PBS Dan Rabas-Rabas JTM 20kv TS 13 66.632005101 Jasa Pembersihan Oil Bearing Generator PLTA PBS unit 1,2 & 3 TW 1 1 Lumpsum 4,564,320 4,560,000 4,320 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 4,564,320 4,560,000 4,560,000 - 1 OPEX 24-1505-PPA-OP-JAS-3A-0604-12-01 EXPENSE 15052304JASA PEMBERSIHAN CWS PLTA PBS DAN RABAS-RABAS JTM 20KV TSP TAHUN 2024 EKO PUJIYANTO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000160 APPROVED Jasa Pembersihan CWS PLTA PBS Dan Rabas-Rabas JTM 20kv TS 14 66.632005101 Jasa Pembersihan Oil Bearing Generator PLTA PBS unit 1,2 & 3 TW 2 1 Lumpsum 4,564,320 4,560,000 4,320 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 4,564,320 4,560,000 4,560,000 - 1 OPEX 24-1505-PPA-OP-JAS-3A-0604-12-01 EXPENSE 15052304JASA PEMBERSIHAN CWS PLTA PBS DAN RABAS-RABAS JTM 20KV TSP TAHUN 2024 EKO PUJIYANTO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000160 APPROVED Jasa Pembersihan CWS PLTA PBS Dan Rabas-Rabas JTM 20kv TS 15 66.632005101 Jasa Pembersihan Oil Bearing Generator PLTA PBS unit 1,2 & 3 TW 3 1 Lumpsum 4,564,320 4,560,000 4,320 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 4,564,320 4,560,000 4,560,000 - 1 OPEX 24-1505-PPA-OP-JAS-3A-0604-12-01 EXPENSE 15052304JASA PEMBERSIHAN CWS PLTA PBS DAN RABAS-RABAS JTM 20KV TSP TAHUN 2024 EKO PUJIYANTO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000160 APPROVED Jasa Pembersihan CWS PLTA PBS Dan Rabas-Rabas JTM 20kv TS 16 66.632005101 Jasa Pembersihan Oil Bearing Generator PLTA PBS unit 1,2 & 3 TW 4 1 Lumpsum 5,134,860 5,130,000 4,860 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 5,134,860 5,130,000 5,130,000 - 1 OPEX 24-1505-PPA-OP-JAS-3A-0604-12-01 EXPENSE 15052304JASA PEMBERSIHAN CWS PLTA PBS DAN RABAS-RABAS JTM 20KV TSP TAHUN 2024 EKO PUJIYANTO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000160 APPROVED Jasa Pembersihan CWS PLTA PBS Dan Rabas-Rabas JTM 20kv TS 17 66.632005101 Jasa Pembersihan Oil Bearing Turbin PLTA PBS unit 1,2 & 3 TW 1 1 Lumpsum 4,564,320 4,560,000 4,320 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 4,564,320 4,560,000 4,560,000 - 1 OPEX 24-1505-PPA-OP-JAS-3A-0604-12-01 EXPENSE 15052304JASA PEMBERSIHAN CWS PLTA PBS DAN RABAS-RABAS JTM 20KV TSP TAHUN 2024 EKO PUJIYANTO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000160 APPROVED Jasa Pembersihan CWS PLTA PBS Dan Rabas-Rabas JTM 20kv TS 18 66.632005101 Jasa Pembersihan Oil Bearing Turbin PLTA PBS unit 1,2 & 3 TW 2 1 Lumpsum 4,564,320 4,560,000 4,320 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 4,564,320 4,560,000 4,560,000 - 1 OPEX 24-1505-PPA-OP-JAS-3A-0604-12-01 EXPENSE 15052304JASA PEMBERSIHAN CWS PLTA PBS DAN RABAS-RABAS JTM 20KV TSP TAHUN 2024 EKO PUJIYANTO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000160 APPROVED Jasa Pembersihan CWS PLTA PBS Dan Rabas-Rabas JTM 20kv TS 19 66.632005101 Jasa Pembersihan Oil Bearing Turbin PLTA PBS unit 1,2 & 3 TW 3 1 Lumpsum 4,564,320 4,560,000 4,320 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 4,564,320 4,560,000 4,560,000 - 1 OPEX 24-1505-PPA-OP-JAS-3A-0604-12-01 EXPENSE 15052304JASA PEMBERSIHAN CWS PLTA PBS DAN RABAS-RABAS JTM 20KV TSP TAHUN 2024 EKO PUJIYANTO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000160 APPROVED Jasa Pembersihan CWS PLTA PBS Dan Rabas-Rabas JTM 20kv TS 20 66.632005101 Jasa Pembersihan Oil Bearing Turbin PLTA PBS unit 1,2 & 3 TW 4 1 Lumpsum 5,134,860 5,130,000 4,860 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 5,134,860 5,130,000 5,130,000 - 1 OPEX 24-1505-PPA-OP-JAS-3A-0604-12-01 EXPENSE 15052304JASA PEMBERSIHAN CWS PLTA PBS DAN RABAS-RABAS JTM 20KV TSP TAHUN 2024 EKO PUJIYANTO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000161 APPROVED Jasa Pemeliharaan Rutin AC Kantor dan Eksternal Mrica PGU Ta 1 66.632017125 Pemeliharaan AC Kantor dan Eksternal Kapasitas <2,5 PK Bulan Januari 152 Unit 105,232 104,000 1,232 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 15,995,264 15,808,000 15,808,000 - 152 OPEX 24-1505-PPA-OP-JAS-3K-0142-01-01 EXPENSE 15052304Jasa Pemeliharaan Rutin AC Kantor dan Eksternal Mrica PGU Tahun 2024 ANDRIYAN SUNARKO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000161 APPROVED Jasa Pemeliharaan Rutin AC Kantor dan Eksternal Mrica PGU Ta 2 66.632017125 Pemeliharaan AC Kantor dan Eksternal Kapasitas >2,5 PK Bulan Januari 22 Unit 120,254 119,000 1,254 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 2,645,588 2,618,000 2,618,000 - 22 OPEX 24-1505-PPA-OP-JAS-3K-0142-01-01 EXPENSE 15052304Jasa Pemeliharaan Rutin AC Kantor dan Eksternal Mrica PGU Tahun 2024 ANDRIYAN SUNARKO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000161 APPROVED Jasa Pemeliharaan Rutin AC Kantor dan Eksternal Mrica PGU Ta 3 66.632017125 Pemeliharaan AC Kantor dan Eksternal Kapasitas <2,5 PK Bulan Februari 152 Unit 105,232 104,000 1,232 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 15,995,264 15,808,000 15,808,000 - 152 OPEX 24-1505-PPA-OP-JAS-3K-0142-01-01 EXPENSE 15052304Jasa Pemeliharaan Rutin AC Kantor dan Eksternal Mrica PGU Tahun 2024 ANDRIYAN SUNARKO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000161 APPROVED Jasa Pemeliharaan Rutin AC Kantor dan Eksternal Mrica PGU Ta 4 66.632017125 Pemeliharaan AC Kantor dan Eksternal Kapasitas >2,5 PK Bulan Februari 22 Unit 120,254 119,000 1,254 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 2,645,588 2,618,000 2,618,000 - 22 OPEX 24-1505-PPA-OP-JAS-3K-0142-01-01 EXPENSE 15052304Jasa Pemeliharaan Rutin AC Kantor dan Eksternal Mrica PGU Tahun 2024 ANDRIYAN SUNARKO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000161 APPROVED Jasa Pemeliharaan Rutin AC Kantor dan Eksternal Mrica PGU Ta 5 66.632017125 Pemeliharaan AC Kantor dan Eksternal Kapasitas <2,5 PK Bulan Maret 152 Unit 105,232 104,000 1,232 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 15,995,264 15,808,000 15,808,000 - 152 OPEX 24-1505-PPA-OP-JAS-3K-0142-01-01 EXPENSE 15052304Jasa Pemeliharaan Rutin AC Kantor dan Eksternal Mrica PGU Tahun 2024 ANDRIYAN SUNARKO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000161 APPROVED Jasa Pemeliharaan Rutin AC Kantor dan Eksternal Mrica PGU Ta 6 66.632017125 Pemeliharaan AC Kantor dan Eksternal Kapasitas >2,5 PK Bulan Maret 22 Unit 120,254 119,000 1,254 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 2,645,588 2,618,000 2,618,000 - 22 OPEX 24-1505-PPA-OP-JAS-3K-0142-01-01 EXPENSE 15052304Jasa Pemeliharaan Rutin AC Kantor dan Eksternal Mrica PGU Tahun 2024 ANDRIYAN SUNARKO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000161 APPROVED Jasa Pemeliharaan Rutin AC Kantor dan Eksternal Mrica PGU Ta 7 66.632017125 Pemeliharaan AC Kantor dan Eksternal Kapasitas <2,5 PK Bulan April 152 Unit 105,232 104,000 1,232 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 15,995,264 15,808,000 15,808,000 - 152 OPEX 24-1505-PPA-OP-JAS-3K-0142-01-01 EXPENSE 15052304Jasa Pemeliharaan Rutin AC Kantor dan Eksternal Mrica PGU Tahun 2024 ANDRIYAN SUNARKO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000161 APPROVED Jasa Pemeliharaan Rutin AC Kantor dan Eksternal Mrica PGU Ta 8 66.632017125 Pemeliharaan AC Kantor dan Eksternal Kapasitas >2,5 PK Bulan April 22 Unit 120,254 119,000 1,254 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 2,645,588 2,618,000 2,618,000 - 22 OPEX 24-1505-PPA-OP-JAS-3K-0142-01-01 EXPENSE 15052304Jasa Pemeliharaan Rutin AC Kantor dan Eksternal Mrica PGU Tahun 2024 ANDRIYAN SUNARKO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000161 APPROVED Jasa Pemeliharaan Rutin AC Kantor dan Eksternal Mrica PGU Ta 9 66.632017125 Pemeliharaan AC Kantor dan Eksternal Kapasitas <2,5 PK Bulan Mei 152 Unit 105,232 104,000 1,232 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 15,995,264 15,808,000 15,808,000 - 152 OPEX 24-1505-PPA-OP-JAS-3K-0142-01-01 EXPENSE 15052304Jasa Pemeliharaan Rutin AC Kantor dan Eksternal Mrica PGU Tahun 2024 ANDRIYAN SUNARKO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000161 APPROVED Jasa Pemeliharaan Rutin AC Kantor dan Eksternal Mrica PGU Ta 10 66.632017125 Pemeliharaan AC Kantor dan Eksternal Kapasitas >2,5 PK Bulan Mei 22 Unit 120,254 119,000 1,254 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 2,645,588 2,618,000 2,618,000 - 22 OPEX 24-1505-PPA-OP-JAS-3K-0142-01-01 EXPENSE 15052304Jasa Pemeliharaan Rutin AC Kantor dan Eksternal Mrica PGU Tahun 2024 ANDRIYAN SUNARKO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000161 APPROVED Jasa Pemeliharaan Rutin AC Kantor dan Eksternal Mrica PGU Ta 11 66.632017125 Pemeliharaan AC Kantor dan Eksternal Kapasitas <2,5 PK Bulan Juni 152 Unit 105,232 104,000 1,232 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 15,995,264 15,808,000 15,808,000 - 152 OPEX 24-1505-PPA-OP-JAS-3K-0142-01-01 EXPENSE 15052304Jasa Pemeliharaan Rutin AC Kantor dan Eksternal Mrica PGU Tahun 2024 ANDRIYAN SUNARKO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000161 APPROVED Jasa Pemeliharaan Rutin AC Kantor dan Eksternal Mrica PGU Ta 12 66.632017125 Pemeliharaan AC Kantor dan Eksternal Kapasitas >2,5 PK Bulan Juni 22 Unit 120,254 119,000 1,254 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 2,645,588 2,618,000 2,618,000 - 22 OPEX 24-1505-PPA-OP-JAS-3K-0142-01-01 EXPENSE 15052304Jasa Pemeliharaan Rutin AC Kantor dan Eksternal Mrica PGU Tahun 2024 ANDRIYAN SUNARKO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000161 APPROVED Jasa Pemeliharaan Rutin AC Kantor dan Eksternal Mrica PGU Ta 13 66.632017125 Pemeliharaan AC Kantor dan Eksternal Kapasitas <2,5 PK Bulan Juli 152 Unit 105,232 104,000 1,232 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 15,995,264 15,808,000 15,808,000 - 152 OPEX 24-1505-PPA-OP-JAS-3K-0142-01-01 EXPENSE 15052304Jasa Pemeliharaan Rutin AC Kantor dan Eksternal Mrica PGU Tahun 2024 ANDRIYAN SUNARKO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000161 APPROVED Jasa Pemeliharaan Rutin AC Kantor dan Eksternal Mrica PGU Ta 14 66.632017125 Pemeliharaan AC Kantor dan Eksternal Kapasitas >2,5 PK Bulan Juli 22 Unit 120,254 119,000 1,254 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 2,645,588 2,618,000 2,618,000 - 22 OPEX 24-1505-PPA-OP-JAS-3K-0142-01-01 EXPENSE 15052304Jasa Pemeliharaan Rutin AC Kantor dan Eksternal Mrica PGU Tahun 2024 ANDRIYAN SUNARKO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000161 APPROVED Jasa Pemeliharaan Rutin AC Kantor dan Eksternal Mrica PGU Ta 15 66.632017125 Pemeliharaan AC Kantor dan Eksternal Kapasitas <2,5 PK Bulan Agustus 152 Unit 105,232 104,000 1,232 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 15,995,264 15,808,000 15,808,000 - 152 OPEX 24-1505-PPA-OP-JAS-3K-0142-01-01 EXPENSE 15052304Jasa Pemeliharaan Rutin AC Kantor dan Eksternal Mrica PGU Tahun 2024 ANDRIYAN SUNARKO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000161 APPROVED Jasa Pemeliharaan Rutin AC Kantor dan Eksternal Mrica PGU Ta 16 66.632017125 Pemeliharaan AC Kantor dan Eksternal Kapasitas >2,5 PK Bulan Agustus 22 Unit 120,254 119,000 1,254 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 2,645,588 2,618,000 2,618,000 - 22 OPEX 24-1505-PPA-OP-JAS-3K-0142-01-01 EXPENSE 15052304Jasa Pemeliharaan Rutin AC Kantor dan Eksternal Mrica PGU Tahun 2024 ANDRIYAN SUNARKO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000161 APPROVED Jasa Pemeliharaan Rutin AC Kantor dan Eksternal Mrica PGU Ta 17 66.632017125 Pemeliharaan AC Kantor dan Eksternal Kapasitas <2,5 PK Bulan September 152 Unit 105,232 104,000 1,232 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 15,995,264 15,808,000 15,808,000 - 152 OPEX 24-1505-PPA-OP-JAS-3K-0142-01-01 EXPENSE 15052304Jasa Pemeliharaan Rutin AC Kantor dan Eksternal Mrica PGU Tahun 2024 ANDRIYAN SUNARKO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000161 APPROVED Jasa Pemeliharaan Rutin AC Kantor dan Eksternal Mrica PGU Ta 18 66.632017125 Pemeliharaan AC Kantor dan Eksternal Kapasitas >2,5 PK Bulan September 22 Unit 120,254 119,000 1,254 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 2,645,588 2,618,000 2,618,000 - 22 OPEX 24-1505-PPA-OP-JAS-3K-0142-01-01 EXPENSE 15052304Jasa Pemeliharaan Rutin AC Kantor dan Eksternal Mrica PGU Tahun 2024 ANDRIYAN SUNARKO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000161 APPROVED Jasa Pemeliharaan Rutin AC Kantor dan Eksternal Mrica PGU Ta 19 66.632017125 Pemeliharaan AC Kantor dan Eksternal Kapasitas <2,5 PK Bulan Oktober 152 Unit 105,232 104,000 1,232 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 15,995,264 15,808,000 15,808,000 - 152 OPEX 24-1505-PPA-OP-JAS-3K-0142-01-01 EXPENSE 15052304Jasa Pemeliharaan Rutin AC Kantor dan Eksternal Mrica PGU Tahun 2024 ANDRIYAN SUNARKO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000161 APPROVED Jasa Pemeliharaan Rutin AC Kantor dan Eksternal Mrica PGU Ta 20 66.632017125 Pemeliharaan AC Kantor dan Eksternal Kapasitas >2,5 PK Bulan Oktober 22 Unit 120,254 119,000 1,254 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 2,645,588 2,618,000 2,618,000 - 22 OPEX 24-1505-PPA-OP-JAS-3K-0142-01-01 EXPENSE 15052304Jasa Pemeliharaan Rutin AC Kantor dan Eksternal Mrica PGU Tahun 2024 ANDRIYAN SUNARKO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000161 APPROVED Jasa Pemeliharaan Rutin AC Kantor dan Eksternal Mrica PGU Ta 21 66.632017125 Pemeliharaan AC Kantor dan Eksternal Kapasitas <2,5 PK Bulan November 152 Unit 105,232 104,000 1,232 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 15,995,264 15,808,000 15,808,000 - 152 OPEX 24-1505-PPA-OP-JAS-3K-0142-01-01 EXPENSE 15052304Jasa Pemeliharaan Rutin AC Kantor dan Eksternal Mrica PGU Tahun 2024 ANDRIYAN SUNARKO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000161 APPROVED Jasa Pemeliharaan Rutin AC Kantor dan Eksternal Mrica PGU Ta 22 66.632017125 Pemeliharaan AC Kantor dan Eksternal Kapasitas >2,5 PK Bulan November 22 Unit 120,254 119,000 1,254 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 2,645,588 2,618,000 2,618,000 - 22 OPEX 24-1505-PPA-OP-JAS-3K-0142-01-01 EXPENSE 15052304Jasa Pemeliharaan Rutin AC Kantor dan Eksternal Mrica PGU Tahun 2024 ANDRIYAN SUNARKO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000161 APPROVED Jasa Pemeliharaan Rutin AC Kantor dan Eksternal Mrica PGU Ta 23 66.632017125 Pemeliharaan AC Kantor dan Eksternal Kapasitas <2,5 PK Bulan Desember 152 Unit 105,232 104,000 1,232 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 15,995,264 15,808,000 15,808,000 - 152 OPEX 24-1505-PPA-OP-JAS-3K-0142-01-01 EXPENSE 15052304Jasa Pemeliharaan Rutin AC Kantor dan Eksternal Mrica PGU Tahun 2024 ANDRIYAN SUNARKO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000161 APPROVED Jasa Pemeliharaan Rutin AC Kantor dan Eksternal Mrica PGU Ta 24 66.632017125 Pemeliharaan AC Kantor dan Eksternal Kapasitas >2,5 PK Bulan Desember 22 Unit 120,254 119,000 1,254 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 2,645,588 2,618,000 2,618,000 - 22 OPEX 24-1505-PPA-OP-JAS-3K-0142-01-01 EXPENSE 15052304Jasa Pemeliharaan Rutin AC Kantor dan Eksternal Mrica PGU Tahun 2024 ANDRIYAN SUNARKO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000168 APPROVED Sewa Laptop User Tahun 2024 - Tahun 3 1 66.720700002 Sewa Laptop - 45 Unit (1 Bulan) 12 Lumpsum 30,156,261 ### 39,261 31/12/2024 231/12/2024 00:00:00 342 hari lagi IDR 361,875,132 361,404,000 361,404,000 - 12 OPEX 24-1505-PPA-OP-JAS-3K-0204-08-02 EXPENSE 15052304Sewa Laptop User Tahun 2024 - Tahun 3 REZA AULIA SADEWA SUPRANET VISINDO SINERGI, PT CLOSED
1505000169 APPROVED PENGADAAN MATERIAL MEKANIK MRICA PGU TAHUN 2024 1 42.003.006.0009FILTER ELEMENT; TYPE: HC9600FCP4H; MERK: PALL CORALON 4 Pieces 6,050,000 5,000,000 1,050,000 29/03/2024 129/03/2024 00:00:00 65 hari lagi IDR 24,200,000 20,000,000 20,000,000 - 4 - INVENTORY 15052305PENGADAAN MATERIAL MEKANIK MRICA PGU TAHUN 2024 MOHAMMAD LUTFI RAYBENS PRO INDONESIA, PT CLOSED
1505000169 APPROVED PENGADAAN MATERIAL MEKANIK MRICA PGU TAHUN 2024 2 42.003.006.0059FILTER ELEMENT; TYPE: HC9600FCP8H; MERK: PALL CORALON 4 Pieces 8,250,000 6,430,000 1,820,000 29/03/2024 129/03/2024 00:00:00 65 hari lagi IDR 33,000,000 25,720,000 25,720,000 - 4 - INVENTORY 15052305PENGADAAN MATERIAL MEKANIK MRICA PGU TAHUN 2024 MOHAMMAD LUTFI RAYBENS PRO INDONESIA, PT CLOSED
1505000169 APPROVED PENGADAAN MATERIAL MEKANIK MRICA PGU TAHUN 2024 3 39.003.002.0273MECHANICAL SEAL INNER; PART NUMBER: 8009230; TYPE: NP 3202 HT; MERK: F 1 Pieces 33,880,000 ### 3,880,000 29/03/2024 129/03/2024 00:00:00 65 hari lagi IDR 33,880,000 30,000,000 30,000,000 - 1 - INVENTORY 15052305PENGADAAN MATERIAL MEKANIK MRICA PGU TAHUN 2024 MOHAMMAD LUTFI RAYBENS PRO INDONESIA, PT CLOSED
1505000169 APPROVED PENGADAAN MATERIAL MEKANIK MRICA PGU TAHUN 2024 4 33.001.004.0312BEARING; TYPE: ANGULAR CONTACT BALL BEARINGS, DOUBLE ROW; P/N: 3308A-2 2 Pieces 4,950,000 2,310,000 2,640,000 29/03/2024 129/03/2024 00:00:00 65 hari lagi IDR 9,900,000 4,620,000 4,620,000 - 2 - INVENTORY 15052305PENGADAAN MATERIAL MEKANIK MRICA PGU TAHUN 2024 MOHAMMAD LUTFI RAYBENS PRO INDONESIA, PT CLOSED
1505000169 APPROVED PENGADAAN MATERIAL MEKANIK MRICA PGU TAHUN 2024 5 33.001.004.0313BEARING; TYPE: ANGULAR CONTACT BALL BEARINGS, DOUBLE ROW; P/N: 3314 A 2 Pieces 10,450,000 ### 260,000 29/03/2024 129/03/2024 00:00:00 65 hari lagi IDR 20,900,000 20,380,000 20,380,000 - 2 - INVENTORY 15052305PENGADAAN MATERIAL MEKANIK MRICA PGU TAHUN 2024 MOHAMMAD LUTFI RAYBENS PRO INDONESIA, PT CLOSED
1505000169 APPROVED PENGADAAN MATERIAL MEKANIK MRICA PGU TAHUN 2024 6 05.022.019.0065O -RING KIT SET; PART NUMBER : 82 96 98; TYPE : NP 3202 HT; MERK : FLYGT 1 Pieces 16,720,000 ### 1,000,000 29/03/2024 129/03/2024 00:00:00 65 hari lagi IDR 16,720,000 15,720,000 15,720,000 - 1 - INVENTORY 15052305PENGADAAN MATERIAL MEKANIK MRICA PGU TAHUN 2024 MOHAMMAD LUTFI RAYBENS PRO INDONESIA, PT CLOSED
1505000169 APPROVED PENGADAAN MATERIAL MEKANIK MRICA PGU TAHUN 2024 7 39.003.002.0170MECHANICAL SEAL, INNER FLYGT 4292 701 1 Pieces 18,150,000 ### 2,630,000 29/03/2024 129/03/2024 00:00:00 65 hari lagi IDR 18,150,000 15,520,000 15,520,000 - 1 - INVENTORY 15052305PENGADAAN MATERIAL MEKANIK MRICA PGU TAHUN 2024 MOHAMMAD LUTFI RAYBENS PRO INDONESIA, PT CLOSED
1505000169 APPROVED PENGADAAN MATERIAL MEKANIK MRICA PGU TAHUN 2024 8 39.003.002.0171MECHANICAL SEAL, OUTER FLYGT 4292 700 1 Pieces 18,480,000 ### 2,210,000 29/03/2024 129/03/2024 00:00:00 65 hari lagi IDR 18,480,000 16,270,000 16,270,000 - 1 - INVENTORY 15052305PENGADAAN MATERIAL MEKANIK MRICA PGU TAHUN 2024 MOHAMMAD LUTFI RAYBENS PRO INDONESIA, PT CLOSED
1505000169 APPROVED PENGADAAN MATERIAL MEKANIK MRICA PGU TAHUN 2024 9 33.001.001.1132DEEP GROOVE BALL BEARINGS, SINGLE ROW; TYPE : 6207-Z/C3; MERK : SKF 2 Pieces 660,000 630,000 30,000 29/03/2024 129/03/2024 00:00:00 65 hari lagi IDR 1,320,000 1,260,000 1,260,000 - 2 - INVENTORY 15052305PENGADAAN MATERIAL MEKANIK MRICA PGU TAHUN 2024 MOHAMMAD LUTFI RAYBENS PRO INDONESIA, PT CLOSED
1505000169 APPROVED PENGADAAN MATERIAL MEKANIK MRICA PGU TAHUN 2024 10 33.001.001.1081SINGLE ROW BALL BEARING 3307 C3 NSK 2 Pieces 5,720,000 5,350,000 370,000 29/03/2024 129/03/2024 00:00:00 65 hari lagi IDR 11,440,000 10,700,000 10,700,000 - 2 - INVENTORY 15052305PENGADAAN MATERIAL MEKANIK MRICA PGU TAHUN 2024 MOHAMMAD LUTFI RAYBENS PRO INDONESIA, PT CLOSED
1505000169 APPROVED PENGADAAN MATERIAL MEKANIK MRICA PGU TAHUN 2024 11 39.003.006.0781O -RING KIT RUBBER; P/N : 803233; FLYGT 1 Pieces 18,150,000 ### 863,102 29/03/2024 129/03/2024 00:00:00 65 hari lagi IDR 18,150,000 17,286,898 17,286,898 - 1 - INVENTORY 15052305PENGADAAN MATERIAL MEKANIK MRICA PGU TAHUN 2024 MOHAMMAD LUTFI RAYBENS PRO INDONESIA, PT CLOSED
1505000169 APPROVED PENGADAAN MATERIAL MEKANIK MRICA PGU TAHUN 2024 12 39.003.002.0341MECHANICAL SEAL COOLING WATER PUMP; TIPE : 3217.181; P/N: PN 7206331; 1 Pieces 18,480,000 ### 2,930,000 29/03/2024 129/03/2024 00:00:00 65 hari lagi IDR 18,480,000 15,550,000 15,550,000 - 1 - INVENTORY 15052305PENGADAAN MATERIAL MEKANIK MRICA PGU TAHUN 2024 MOHAMMAD LUTFI RAYBENS PRO INDONESIA, PT CLOSED
1505000169 APPROVED PENGADAAN MATERIAL MEKANIK MRICA PGU TAHUN 2024 13 39.003.002.0339MECHANICAL SEAL COOLING WATER PUMP; TIPE : 3217.181; P/N: PN 7206330; 1 Pieces 18,920,000 ### 2,610,000 29/03/2024 129/03/2024 00:00:00 65 hari lagi IDR 18,920,000 16,310,000 16,310,000 - 1 - INVENTORY 15052305PENGADAAN MATERIAL MEKANIK MRICA PGU TAHUN 2024 MOHAMMAD LUTFI RAYBENS PRO INDONESIA, PT CLOSED
1505000171 APPROVED Jasa Pemeliharaan Kebersihan Industrial Cleaning Area Sub Uni 1 66.632017125 Tenaga Pemeliharaan Kebersihan Area PLTA Ketenger @ 9 Orang 12 Monthly 41,480,478 ### 1,517,778 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 497,765,736 479,552,400 479,552,400 - 12 OPEX 24-1505-PPA-OP-JAS-3A-0509-35-01 EXPENSE 15052305Jasa Pemeliharaan Kebersihan Industrial Cleaning Area Sub Unit Mrica PGU Tahun 202ANDRIYAN SUNARKO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000171 APPROVED Jasa Pemeliharaan Kebersihan Industrial Cleaning Area Sub Uni 2 66.632017125 Tenaga Pemeliharaan Kebersihan Area PLTA Timo @ 4 Orang 12 Monthly 21,214,764 ### 715,164 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 254,577,168 245,995,200 245,995,200 - 12 OPEX 24-1505-PPA-OP-JAS-3A-0532-35-01 EXPENSE 15052305Jasa Pemeliharaan Kebersihan Industrial Cleaning Area Sub Unit Mrica PGU Tahun 202ANDRIYAN SUNARKO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000171 APPROVED Jasa Pemeliharaan Kebersihan Industrial Cleaning Area Sub Uni 3 66.632017125 Tenaga Pemeliharaan Kebersihan Area PLTA KDO, SDRJ, KLB @ 17 Orang 12 Monthly 75,470,565 ### 2,368,865 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 905,646,780 877,220,400 877,220,400 - 12 OPEX 24-1505-PPA-OP-JAS-3A-0518-35-01 EXPENSE 15052305Jasa Pemeliharaan Kebersihan Industrial Cleaning Area Sub Unit Mrica PGU Tahun 202ANDRIYAN SUNARKO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000171 APPROVED Jasa Pemeliharaan Kebersihan Industrial Cleaning Area Sub Uni 4 66.632017125 Tenaga Pemeliharaan Kebersihan Area PLTM Siteki @ 3 Orang 12 Monthly 12,939,381 ### 456,381 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 155,272,572 149,796,000 149,796,000 - 12 OPEX 24-1505-PPA-OP-JAS-3A-0537-35-01 EXPENSE 15052305Jasa Pemeliharaan Kebersihan Industrial Cleaning Area Sub Unit Mrica PGU Tahun 202ANDRIYAN SUNARKO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000171 APPROVED Jasa Pemeliharaan Kebersihan Industrial Cleaning Area Sub Uni 5 66.632017125 Tenaga Pemeliharaan Kebersihan Area PLTM Plumbungan @ 4 Orang 12 Monthly 17,252,508 ### 608,508 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 207,030,096 199,728,000 199,728,000 - 12 OPEX 24-1505-PPA-OP-JAS-3A-0538-35-01 EXPENSE 15052305Jasa Pemeliharaan Kebersihan Industrial Cleaning Area Sub Unit Mrica PGU Tahun 202ANDRIYAN SUNARKO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000171 APPROVED Jasa Pemeliharaan Kebersihan Industrial Cleaning Area Sub Uni 6 66.632017125 Tenaga Pemeliharaan Kebersihan Area PLTM Tapen @ 4 Orang 12 Monthly 17,252,508 ### 608,508 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 207,030,096 199,728,000 199,728,000 - 12 OPEX 24-1505-PPA-OP-JAS-3A-0533-35-01 EXPENSE 15052305Jasa Pemeliharaan Kebersihan Industrial Cleaning Area Sub Unit Mrica PGU Tahun 202ANDRIYAN SUNARKO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000171 APPROVED Jasa Pemeliharaan Kebersihan Industrial Cleaning Area Sub Uni 7 66.632017125 Tenaga Pemeliharaan Kebersihan Area PLTA PBS @ 8 Orang 12 Monthly 34,505,016 ### 1,217,016 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 414,060,192 399,456,000 399,456,000 - 12 OPEX 24-1505-PPA-OP-JAS-3A-0504-35-01 EXPENSE 15052305Jasa Pemeliharaan Kebersihan Industrial Cleaning Area Sub Unit Mrica PGU Tahun 202ANDRIYAN SUNARKO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000171 APPROVED Jasa Pemeliharaan Kebersihan Industrial Cleaning Area Sub Uni 8 66.632017125 Tenaga Pemeliharaan Kebersihan Area PLTA WDL, PJKL, Sempor @ 17 orang 12 Monthly 75,676,248 ### 2,411,348 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 908,114,976 879,178,800 879,178,800 - 12 OPEX 24-1505-PPA-OP-JAS-3A-0515-35-01 EXPENSE 15052305Jasa Pemeliharaan Kebersihan Industrial Cleaning Area Sub Unit Mrica PGU Tahun 202ANDRIYAN SUNARKO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000171 APPROVED Jasa Pemeliharaan Kebersihan Industrial Cleaning Area Sub Uni 9 66.632017125 Tenaga Pemeliharaan Kebersihan Area PLTA Tulis @ 4 Orang 12 Monthly 17,252,508 ### 608,508 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 207,030,096 199,728,000 199,728,000 - 12 OPEX 24-1505-PPA-OP-JAS-3A-0536-35-01 EXPENSE 15052305Jasa Pemeliharaan Kebersihan Industrial Cleaning Area Sub Unit Mrica PGU Tahun 202ANDRIYAN SUNARKO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000171 APPROVED Jasa Pemeliharaan Kebersihan Industrial Cleaning Area Sub Uni 10 66.632017125 Tenaga Pemeliharaan Kebersihan Area PLTA Garung @ 5 Orang 12 Monthly 22,643,445 ### 765,445 01/01/2024 031/12/2024 00:00:00 342 hari lagi IDR 271,721,340 262,536,000 262,536,000 - 12 OPEX 24-1505-PPA-OP-JAS-3A-0512-35-01 EXPENSE 15052305Jasa Pemeliharaan Kebersihan Industrial Cleaning Area Sub Unit Mrica PGU Tahun 202ANDRIYAN SUNARKO EKINDO MANDIRI SEJAHTERA, PT CLOSED
1505000171 APPROVED Jasa Pemeliharaan Kebersihan Industrial Cleaning Area Sub Uni 11 66.632017125 Tenaga Pemeliharaan K
AND TO_CHAR(PROMISED_DATE,'YYYY') LIKE '%2024%' ESCAPE '!'
ORDER BY "PO_NUM", "LINE_NUM"
PO_NUM A
AUTHORIZATION_STATUSB
PO_DESC C
LINE_NUM D
ITEMNUM E
ITEMDESC F
QUANTITY G
UOM H
PR_UNIT_PRICE I
UNIT_PRICE J
SELISIH_PR_PO K
NEED_BY_DATE L
PROMISED_DATE M
HARI N
LABEL_TERLAMBAT O
CURRENCY_CODE P
AMT_PR Q
AMT_ORI R
RATE S
AMT T
QTY_DELIV U
QTY_DEF V
PROJECT_CATEGORY W
PROJECT_NAME X
TASK_NUMBER Y
DESTINATION_TYPE_CODEZ
NOMOR_PR AA
JUDUL_PR AB
LAST_NAME AC

Anda mungkin juga menyukai