DAFTAR REFERENSI PROYEK

NO NAMA PROYEK NAMA PELANGGAN Omzet (Rp.) DURASI PEKERJAAN

1 PLTU BENGKAYANG (BUMIRAMA) Consortium of PT. BUMI RAMA NUSANTARA,ALTON INT.,OJSC 1,704,748,500 02.06.2014s.d. 31.08.2014
2 PLTU Sritex Sukoharjo (348 btg)  RAYON UTAMA MAKMUR, PT  1,675,280,500  29.04.2014s.d. 30.06.2014
3 PLTU KETAPANG 2x10MW  WIJAYA KARYA DPK, PT  3,069,282,000  10.03.2014s.d. 30.04.2014
4 PLTU Sritex Sukoharjo  RAYON UTAMA MAKMUR, PT  9,218,961,100  07.01.2014s.d. 31.03.2014
5 PLTU PARIT BARU SAMPIT  CITICON ADHI ANUGRAHA,PT  17,534,484,000  20.01.2014s.d. 15.04.2014
6 PLTU Tenayan Raya 2x110 MW (Use Piles 1)  Rekayasa Industri, PT  83,395,478,550  02.12.2011s.d. 30.03.2013
7 PLTU JUNGKAT 2013 - LOKO  Consortium of PT. BUMI RAMA NUSANTARA,ALTON INT.,OJSC  8,037,601,650  07.10.2013s.d. 31.12.2013
8 PLTU Tenayan Raya 2x110 MW  Rekayasa Industri, PT  7,619,748,300  04.07.2013s.d. 04.09.2013
9 PLTU Timika 4x7 MW Tahap III  Rekadaya Elektrika, PT  5,722,860,000  08.07.2013s.d. 30.09.2013
10 PLTU 2x100 MW KARIANGAU 2  ADHI KARYA (PERSERO) EPC Division, PT  7,568,140,000  21.05.2012s.d. 19.06.2013
11 PLTU 2X7 MW Berau-kaltim  Hasta Prajatama, PT  8,076,140,000  07.02.2013s.d. 18.04.2013
12 Jalan Layang Non Tol Kampung Melayu - Tanah Abang Waskita Karya, Adhi Karya, KSO PT. ISTAKA KARYA (Pesero)-Sumber Sari Cipta Marga 141,763,862,500 2012
13 Cilacap 1x660 MW Coal Fired Steam Power Plant D&C ENGINEERING COMPANY, PT 135,967,080,000 2013
14 PEMB. TERM. PETIKEMAS KALIBARU TAHAP 1 Pembangunan Perumahan, PT 116,537,620,000 2013
15 GOLD COST MIXED USE DEVELOPMENT MULTI ARTHA PRATAMA, PT 100,630,180,000 2013
16 PLTU Tenayan Raya 2x110 MW (Use Piles 1) - (P03)Rekayasa Industri, PT 82,208,198,550 2012
17 BOGOR OUTER RING ROAD - (P00) WIJAYA KARYA, PT ,DSU-I 79,000,000,112 2012
18 Double Track PB-1 & PB-3 Dephub Dirjen Perkeretaapian Satker Jatim 74,858,100,000 2012
19 Krakatau Steel Expantion Plant POSCO E&C INDONESIA, PT 71,681,707,500 2012
20 RFCC Project di Cilacap (Tiang Pancang & Pipe Rack)ADHI KARYA (Persero) Tbk, PT 58,601,224,935 2013
21 PERLUASAN TERMINAL 3 - SOETTA KAWAHAPEJAYA INDONESIA - KSO 53,995,272,000 2013
22 Proyek Lisdes sulselbar 2013 PLN (Persero) Wilayah Sulselrabar, PT 47,235,920,002 2013
23 SITE OFFICE PROJECT - POSCO Krakatau Enginering, PT 47,120,793,000 2012
24 Gorgon Barrow Island LNG Jetty & Marine Saipem SA 44,104,789,123 2012
25 Podomoro City Medan Sinar Menara Deli,PT 36,999,126,000 2013
26 PLTU Pangkalan Susu 2x200MW JO Guangdong Power Engineering Corporacion - PT Bagus Karya 35,909,000,000 2012
27 Senoro Gas Development Batch II Tripatra Engineers and Constructors, PT 35,463,828,000 2013
28 Pengadaan Bantalan Beton Inv. 2011 Vol. 65.590 bhKAI- (P01)
(Persero) DIVRE III SUMSEL, PT 29,646,680,000 2012
29 ISM JV KS-POSCO Krakatau Enginering, PT 29,306,717,850 2012-2013
30 PTBA-EPC of Tarahan Port Expansion Phase 5 di Lpg KE - China Huadian Eng Co. Ltd JO 29,132,535,369 2012-2013
31 Dermaga Jetty Senoro Gas Development Project JOB Pertamina - Medco E&P Tomori Sulawesi 28,070,802,320 2012-2013
32 Fly Over Jakabaring Palembang Wijaya Karya, PT 27,503,000,000 2012-2013
33 Marunda Refinery - (P01) SIGMA MUTIARA, PT 27,300,002,840 2012
34 Pembangunan Extention KCP II Lampung Plant Project SIGMA
- (P02)
MUTIARA, PT 25,992,750,000 2012
35 Jalur Ganda Cirebon - Larangan Satker Pembangunan Jalur Ganda Cirebon - Kroya 25,452,000,000 2013
36 JEMBATAN KAPUK NAGA INDAH Waskita Karya, PT 25,132,655,269 2013