PT KORE PROJECTS PT SWADAYA PANGAN PT KORE PROJECTS PT SWADAYA PANGAN


INDONESIA INTERNASIONAL INDONESIA INTERNASIONAL

Sales Contract Kontrak Jual Beli

No. 001/KPI-SPI/XII/2020 Dt. 18.12.2020 No. 001/KPI-SPI/XII/2020 Dt. 18.12.2020


No. PO/ No. PO/

The Seller   :PT KORE PROJECTS INDONESIA Penjual   : PT KORE PROJECTS INDONESIA
Add   : 19th FL. UNIT C, MENARA SUNLIFE Alamat   : 19th FL. UNIT C, MENARA SUNLIFE
MEGA KUNINGAN, JAKARTA MEGA KUNINGAN, JAKARTA
Tel   : +91-8588917023 Telp   : +91-8588917023
Email : vineetrathore25@gmail.com Email : vineetrathore25@gmail.com

Represented by : Director Diwakili Oleh : Direktur

The Buyer : PT. SODARA TANI SENTOSA Pembeli :PT. SODARA TANI SENTOSA
Add : Komplek Pergudangan Ex. Goro no Alamat : Jalan Radin Inten II No. 89 B - D
88 Lantai 2, Jalan Perintis Duren Sawit, DKI Jakarta
Kemerdekaan No. 1, Kelapa Gading Tel & Fax : +6221-22496554
Permai, Jakarta Utara 14240 Website :-
Tel & Fax : +6221-22496554
Website :- Korespondensi
Alamat : Komplek Pergudangan Ex. Goro no
Correspondence 88 Lantai 2, Jalan Perintis
Add : Komplek Pergudangan Ex. Goro no Kemerdekaan No. 1, Kelapa Gading
88 Lantai 2, Jalan Perintis Permai, Jakarta Utara 14240
Kemerdekaan No. 1, Kelapa Gading Tel & Fax : +6221-22496554
Permai, Jakarta Utara 14240 Email : imam.forward@gmail.com
Tel & Fax : +6221-22496554 wid.asmono86@gmail.com
Email : imam.forward@gmail.com
wid.asmono86@gmail.com Diwakili Oleh :  Direktur Utama
Represented by:  President Director Kedua pihak telah sepakat untuk menandatangani
kontrak ini dengan syarat dan ketentuan sebagai berikut:
The two parties have agreed to sign this contract with
terms and conditions as follows: Pasal I: Komoditas-Kuantitas-Harga-Jumlah
Article I: Commodity-Quantity-Price-Amount 1. FRESH GINGER
1. FRESH GINGER Kemasan : 30 Kg Nett, Mesh Bags
Kuantitas : 1 Container (40ft)
Net W.T : 29,000 KG (29MT)
Packing : 30 Kg Nett , Mesh Bags Harga (CNF) : 620.00 US$/MT
Quantity : 1 Container (40ft) Ukuran : 100 – 150 GM (Sesuai Poto)
Net W.T : 29,000 KG (29 MT) Treatmen : Bersih Dicuci dengan Air ( Tanpa ada
Price (CNF) : 620.00 US$/MT tanah)
Size : 100 – 150 GM Jumlah : 17,980 US$
Amount : 17,980 US$

Article II: Quality & Specifications


Pasal II: Kualitas & Spesifikasi

Article III: Delivery


Pasal III: Pengiriman
Means of delivery : By Sea
Shipment (Arrival) : Latest by xxxxx Sarana Pengiriman : Melalui angkutan Laut
Kedatangan : Terakhir
Origin :Any Port, India
Destination : Tanjung Priok, Jakarta, Asal : Any Port, India
Indonesia Tujuan : Tanjung Priok, Jakarta,
Indonesia

Article IV. Payment


Pasal IV. Sistem Pembayaran
1. Price is noted as CNF Tanjung Priok, Jakarta,
Indonesia 1. Harga merupakan CNF Tanjung Priok, Jakarta,
2. 10% Advance and Balance 90% to be paid after Indonesia
email copy of B/L. 2. Uang muka 10% dan Saldo 90% harus
dibayar setelah salinan email B / L.
Article V. Document Required
Pasal V. Dokumen
1. Commercial Invoice
2. Packing List 1. Faktur Tagihan
3. Bill of Lading 2. Daftar Kemasan
4. Phytosanitary Certificate 3. Dokumen pengangkutan barang (BL)
5. Fumigation Certificate 4. Sertifikat Phytosanitary
6. Certificate Of Origin 5. Sertifikat Fumigasi
7. Shipment Advice 6. Surat Keterangan Asal
8. Weight certificate (0.50% Random Sampling) 7. Dokumen Pengiriman
9. Quality,Quantitycertificate 8. Sertifikat Berat, Pengukuran (0,50%
10. Certificate of Analysis samplingAcak)
11. E prior Notice 9. Keterangan Kualitas dan Kuantitas
12. Packaging Declaration 10. Sertifikat Analisis
13. Shipment Arrival Certificate 11. Notifikasi E prior
12. Deklarasi Pengemasan
13. Sertifikat Kedatangan Pengiriman
Article VI. Arbitration

This Contract will be settled by the Indonesia Arbitration Pasal VI. Arbitrasi
center.
Aturan arbitrase berasal dari Hukum Indonesia.

Article VII. Effective date and Validity terms


Pasal VII. Masa Berlaku
1. The sale is irrevocable.
2. This contract is valid from moment of its signing 1. Penjualan tidak dapat dikembalikan.
by both parties. 2. Kontrak ini valid saat telah ditandatangani kedua
3. The Contract is valid till the 31st Jan 2021. belah pihak
3. Kontrak ini berlaku hingga 31 Januari 2021

Article VIII. Inspection


Pasal VIII. Inspeksi
Weight, Quantity, Quality, Packing and condition of
Fresh Ginger to be treated as final at port of loading as Berat, Kuantiti, Kualitas, Kemasan dan kondisi Jahe
inspected and certified by Buyers appointed diperiksa akhir inspeksi di pelabuhan muat dan
independent surveyor’s as much as 29 MT’s all sertifikasi oleh pembeli menunjuk independent surveyor
expenses there to on account of Buyer. yang disetujui sebanyak 29 MT dan biaya menjadi
tanggungan penjual
Seller shall do pre shipment inspection before shipment
Penjual harus melakukan ‘Pre Shipment Inspection’
sebelum pengapalan
Surveyor at loading port shall issue complete
certificate(s) and or report(s) on weight by random Surveyor di pelabuhan muat menerbitkan sertifikat dan
sampling of 0.5% goods, Quantity, Quality and Packing. laporan dengan berat sampling acak lengkap dari 0,5%
jumlah barang, kuantitas, kualitas dan kemasan

Article IX. Force Majeure


Pasal IX. Force Majeure
Should the Shipment be delayed or prevented by the
reasons including: Kedua belah pihak setuju terhadap kejadian Force
1. Natural Disaster (Flood, Earthquake, Thunder Majeure seperti :
and other natural Disaster) 1. Bencana Alam (Banjir, Gempa Bumi, Petir dan
2. Pandemic nCov 19, Social Unrest, atau benca lainnya)
Demonstrations, War, etc or delay/cessation of 2. Pandemic nCov 19, Gejolak Sosial,
work, the failure of the working system of one of Demonstrasi, Perang, lainnya yang
the parties menyebabkan penundaan, kegagalan sistem
3. The rules or the Decision of The Government in pekerjaan dari salah satu pihak
the field of Politics, Monetary and Legislation 3. Kebijakan Pemerintah menyangkut Politik,
which has direct on business activities of the Moneter dan Legislasi yang berpengaruh
parties langsung pada kegiatan bisnis dari kedua belah
pihak
The party under Force Majeure case must inform the
event to the other party within 14 (fourteen) days of force
majeure from the date of occurrence of event by email a Pihak dalam kasus Force Majeure harus
notice of Force Majeure and both the parties are menginformasikan acara tersebut kepada pihak lain
required to hold talks about the continuation of the dalam waktu 14 (empat belas) hari dari force majeure
implementation of this Contract. sejak tanggal terjadinya peristiwa melalui email
pemberitahuan Force Majeure dan kedua belah pihak
diharuskan untuk mengadakan pembicaraan tentang
Article X. General / Other Conditions kelanjutan dari pelaksanaan Kontrak ini

Pasal X. Lain-Lain
1. A plus minus variation of 5% in quantity will be
acceptable.

2. The parties have committed to carry out this 1. Toleransi plus minus 5% Quantity masih dapat
contract fully and fairly. Any changes during diterima.
implementation of the contract shall be mutual
agreed in writing. 2. Kedua belah pihak setuju untuk membawa
kontrak secara penuh dan adil . Perubahan
3. The parties have signed this contract in 2 (two) dalam persetujuan atas persetujuan kedua
originals with equal legal value, 1(one) of which belah pihak
be kept by each party. However, should there be
differences between the Indonesian language 3. Kedua belah pihak menandatangani kontrak
version and the English version, the English dalam 2 (dua) berkas asli yang memiliki
version shall prevail over the Indonesian version kekuatan hukum yang sama, 1 (satu) akan
and it shall serve as official reference of legal disimpan masing-masing pihak.Bila terdapat
value. perbedaan antara versi bahasa Indonesia dan
bahasa Inggris, versi bahasa Inggris menjadi
4. All banking charges within India shall be for dasar dari versi bahasa Indonesia sebagai
seller’s account and outside India for Buyer’s referensi resmi nilai hukum
account.
4. Semua biaya bank yang timbul di India menjadi
5. Free time Combined Demurrage and Detention tanggung jawab Penjual dan diluar India
to be applied in 5 (five) calendar days at menjadi tanggung jawab Pembeli.
destination port.
5. Waktu bebas biaya demmurrage diberikan
6. Buyer will provide verification order within 2 selama 5 (lima) hari kalender di pelabuhan
days upon providing photographs of bag by tujuan.
Seller.
6. Pembeli akan menerbitkan verifikasi order
dalam 2hari setelah penjual menyediakan foto
karung (bag).

Untuk dan atas nama


For and on Behalf of
Pihak Penjual Pihak Pembeli
FOR THE SELLER FOR THE BUYER

(VINEET RATHORE) (WIDODO ASMONO)


PT KORE PROJECTS INDONESIA PT. SWADAYA PANGAN INTERNASIONAL