MINGGU 6
1/27/2024
1/29/2024
1/29/2024
1/30/2024
1/31/2024
2/1/2024
2/1/2024
2/2/2024
2/3/2024
MINGGU 7
2/3/2024
2/5/2024
2/7/2024
2/8/2024
2/10/2024
MINGGU 8
2/11/2024
2/12/2024
2/13/2024
2/13/2024
2/15/2024
2/15/2024
2/16/2024
2/16/2024
2/17/2024
REKAP DANA RENOV RUMAH E-8
Keterangan
MINGGU 6
Paku 3"
Resibon
Pisau Beton
1 Terpal Cor
DP servis molen
Semen + Pralon
1 L Damdex
2 Hollow
1 Roll blendrat
Gaji Tenaga
MINGGU 7
Hollow 4x4
10 semen grobogan
Resibon besi
1 sika top
Operasional 1 minggu
MINGGU 8
DP Listrik
NO DROP
4 kg paku
5 elbow 3"
30 lmbar triplek
2 kg pwku 4cm
Konsumsi 1 minggu
Nominal Rp.
U6
32,000.00
10,000.00
85,000.00
8,587,000.00
7,650,000.00
260,000.00
550,000.00
16,665,200.00
500,000.00
750,000.00
18,915,200.00
416,000.00
84,000.00
100,000.00
400,000.00
500,000.00
1,200,000.00
545,000.00
1,200,000.00
65,000.00
90,000.00
333,000.00
2,200,000.00
12,583,000.00
450,000.00
2,600,000.00
7,000,000.00
2,500,000.00
13,800,000.00
11,300,000.00
U7
1,550,000.00
1,550,000.00
480,000.00
480,000.00
1,156,000.00
1,156,000.00
13,000.00
57,000.00
126,000.00
2,400,000.00
2,880,000.00
480,000.00
20,000.00
3,500,000.00
4,210,000.00
480,000.00
210,000.00
1,100,000.00
13,985,000.00
12,885,000.00
U8
480,000.00
7,480,000.00
7,000,000.00
94,000.00
2,835,000.00
88,000.00
120,000.00
2,835,000.00
2,475,000.00
36,000.00
22,000.00
1,000,000.00
10,740,000.00
9,740,000.00
99,921,200.00