Uraian Panjang Buah Volume Satuan Harga Satuan (Rp) Jumlah (Rp) Total (Rp)
Bahan
Kanal C 75 0.6 25 15 62.5 ljr 95,000 5,937,500
Reng 0.40 9 25 37.5 ljr 40,000 1,500,000
Baut Kanal 3 kotak 200,000 600,000
Paku beton 1" 2 kotak 20,000 40,000
Genteng Plat 9 5.6 504 bh 6,500 3,276,000
Cat genteng 4 galon 170,000 680,000
Sub jumlah bahan 12,033,500
Upah
pembongkaran atap 1 ls 500,000 500,000
rangka baja ringan 50.4 m2 40,000 2,016,000
pasang genteng 50.4 m2 20,000 1,008,000
cat genteng 50.4 m2 10,000 504,000
Sub jumlah upah 4,028,000