DIBULATKAN Rp 346,949,000.00
Terbilang :TIGA RATUS EMPAT PULUH ENAM JUTA SEMBILAN RATUS EMPAT PULUH SEMBILAN RIBU RUPIAH
LAPORAN BULANAN
I PEKERJAAN PERSIAPAN
1 Pembersihan Lahan 112.50 M2 0.56% - - 100.000 0.56 100.000 0.56
2 Pemasangan Bowplank 53.00 M1 1.04% 100.000 1.04 100.000 1.04
1.61%
II PEKERJAAN GALIAN TANAH DAN PONDASI
1 Galian Tanah Lubang Pondasi 53.58 M3 1.23% - - 30.000 0.37 30.000 0.37
2 Aanstamping / Pas. Batu kosong 11.28 M3 1.89% - - 50.000 0.94 50.000 0.94
3 Urugan Pasir 2.82 M3 0.30% - - 50.000 0.15 50.000 0.15
4 Pondasi Batu Kali 1 pc : 1 kp : 2 PS 36.63 M3 3.90% - - 50.000 1.95 50.000 1.95
5 Urugan Tanah Kembali 17.86 M3 0.11% - - 50.000 0.06 50.000 0.06
7.42% - - - - - -
III PEKERJAAN PASANGAN DAN PLESTERAN - - - - - -
1 Pas. Dinding 1/2 bata 205.16 M2 11.52% - - - - - -
2 Pasangan Rollag 32.66 M2 1.83% - - - - - -
3 Plesteran Dinding 1PC : 5PS 508.42 M2 8.67% - - - - - -
4 Acian 508.42 M2 6.00%
5 pasangan trasram 1:3 35.25 M2 6.00%
6 Dinding Pagar 13.80 M2 0.62%
34.64% - - - - - -
IV PEKERJAAN PEMBETONAN - - - - - -
1 Sloof 15/20 313.02 M3 1.42% - - - - - -
2 Kolom Praktis 15/15 416.77 M3 1.90% - - - - - -
3 Ringbalk 15/15 302.59 M3 1.38% - - - - - -
4 Sloof 15/20 28.20 M3 0.13% - - - - - -
5 Kolom Praktis 15/15 26.40 M3 0.12% - - - - - -
6 Ringbalk 15/15 21.15 M3 0.10% - - - - - -
7 Sloof 15/20 1 Pc : 2 Ps : 3 Kr 2.11 M3 3.68% - - - - - -
8 Kolom Praktis 15/15 1 Pc 1.98 M3 4.61% - - - - - -
9 Ringbalk 15/20 1 Pc : 2Ps : 3 Kr 1.59 M3 4.03% - - - - - -
10 Rabat Beton Lantai 1 Pc: 3 Ps: 5 Kr 2.50 M3 2.88% - - - - - -
20.24% - - - - - -
V PEKERJAAN PENUTUP LANTAI - - - - - -
1 Lantai keramik granit 60x60 95.04 M2 9.18% - - - - - -
2 Dinding keramik km 20x25 9.92 M2 0.62% - - - - - -
9.79% - - - - - -
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA - - - - - -
1 Pasang kusen kayu (6 x 15) 0.54 1.79% - - - - - -
2 Kusen Pintu - - - - - -
P1 0.05 0.01%
P2 0.06 0.01%
P3 0.04 0.01%
P4 0.09 0.01%
8 Kusen jendela
9 J1 0.07 0.01%
10 J2 0.05 0.01%
11 J3 0.05 0.01%
12 Bouvenlist - - - - - -
13 BV 0.04 0.01% - - - - - -
14 Pintu slide - - - - - -
15 PS 0.10 0.01%
1.86% - - - - - -
VII PEKERJAAN PENGECATAN - - - - - -
1 Pengecatan dinding 508.42 M2 4.01% - - - - - -
2 Pengecetan plafon 95.04 M2 0.75% - - - - - -
4.76% - - - - - -
VIII PEKERJAAN INSTALASI LISTRIK - - - - - -
1 Pasang Stop Kontak 7.00 0.66% - - - - - -
2 Pasang lampu 9.00 1.06% - - - - - -
3 Pasang saklar ganda 3.00 0.08% - - - - - -
4 Pasang saklar tunggal 3.00 0.08% - - - - - -
5 Pasang sekring/MCB 1.00 0.26%
2.12% - - - - - -
IX PEKERJAAN KUNCI DAN PENGGANTUNG - - - - - -
1 Pasang kunci tanam 5.00 set 0.50% - - - - - -
LAPORAN BULANAN
Malang
I PEKERJAAN PERSIAPAN
1 Pembersihan lahan m² 15.00 7.50 1.00 112.50
2 Pengukuran dan pemasangan bouwplank m 17.00 9.50 1.00 53.00
III PEMBESIAN
1 Sloof 15/20
Tulangan Pokok 4Ø12 kg 0.888 70.50 4.00 250.42
Begel 6Ø15 kg 0.222 0.60 470 62.60
Total 313.02
2 Kolom Praktis 15/15
Tulangan Pokok 4Ø12 kg 0.888 4.50 4.00 22.00 351.65
Begel 6Ø15 kg 0.222 0.50 27 22.00 65.12
Total 416.77
3 Ringbalk 15/15
Tulangan Pokok 4Ø12 kg 0.888 70.50 4.00 250.416
Begel 6Ø15 kg 0.222 0.50 470 52.170
Total 302.586
IV BEGESTING
V PENGECORAN
1 Sloof 15/20 1 Pc : 2 Pc : 3 Kr m³ 70.50 0.15 0.20 2.11 pxlxt
2 Kolom Praktis 15/15 m³ 4.00 0.15 0.15 22.00 1.98
3 Ringbalk 15/20 m³ 70.50 0.15 0.15 1.59 pxlxt
4 Rabat Beton Lantai 1 Pc: 3 Ps: 5 Kr m³
5 Pekerjaan Talang Beton m³ 29.26 0.40 11.704
m³
VI PEKERJAAN PASANGAN DINDING BATA
1 Dinding 1/2 bata m² 70.50 4.00 282.00 205.16
2 Dinding Pagar m² 3.45 4.00 13.80
3 Pasangan Trasram m² 70.50 0.50 35.3
X PEKERJAAN KERAMIK
1 Lantai keramik granit 60x60
Teras depan m² 1.50 4.35 6.525
R.tamu m² 3.00 4.50 13.5
R keluarga, R. makan, Dapur m² 6.43 7.00 45.01
K tidur m² 3.00 3.00 9
K tidur utama m² 3 5.5 16.5
Km m² 1.5 1.5 2 4.5
95.035
XI PEKERJAAN FINISHING
1 Pengecatan dinding m² 508.42
2 Pengecetan plafon m² 95.035
I PEKERJAAN PERSIAPAN
1 Pembersihan Lahan 112.50 M2 0.56% - - 80.000 50.00 80.000 50.00
2 Pemasangan Bowplank 53.00 M1 1.04% 80.000 50.00 80.000 50.00
1.61%
II PEKERJAAN GALIAN TANAH DAN PONDASI
1 Galian Tanah Lubang Pondasi 53.58 M3 1.23% - - - - -
2 Aanstamping / Pas. Batu kosong 11.28 M3 1.89% - - - - -
3 Urugan Pasir 2.82 M3 0.30% - - - - -
4 Pondasi Batu Kali 1 pc : 1 kp : 2 PS 36.63 M3 3.90% - - - - -
5 Urugan Tanah Kembali 17.86 M3 0.11% - - - - -
7.42% - - - - - -
III PEKERJAAN PASANGAN DAN PLESTERAN - - - - - -
1 Pas. Dinding 1/2 bata 205.16 M2 11.52% - - - - - -
2 Pasangan Rollag 32.66 M2 1.83% - - - - - -
3 Plesteran Dinding 1PC : 5PS 508.42 M2 8.67% - - - - - -
4 Acian 508.42 M2 6.00%
5 pasangan trasram 1:3 35.25 M2 6.00%
6 Dinding Pagar 13.80 M2 0.62%
34.64% - - - - - -
IV PEKERJAAN PEMBETONAN - - - - - -
1 Sloof 15/20 313.02 M3 1.42% - - - - - -
2 Kolom Praktis 15/15 416.77 M3 1.90% - - - - - -
3 Ringbalk 15/15 302.59 M3 1.38% - - - - - -
4 Sloof 15/20 28.20 M3 0.13% - - - - - -
5 Kolom Praktis 15/15 26.40 M3 0.12% - - - - - -
6 Ringbalk 15/15 21.15 M3 0.10% - - - - - -
7 Sloof 15/20 1 Pc : 2 Ps : 3 Kr 2.11 M3 3.68% - - - - - -
8 Kolom Praktis 15/15 1 Pc 1.98 M3 4.61% - - - - - -
9 Ringbalk 15/20 1 Pc : 2Ps : 3 Kr 1.59 M3 4.03% - - - - - -
10 Rabat Beton Lantai 1 Pc: 3 Ps: 5 Kr 2.50 M3 2.88% - - - - - -
20.24% - - - - - -
V PEKERJAAN PENUTUP LANTAI - - - - - -
1 Lantai keramik granit 60x60 95.04 M2 9.18% - - - - - -
2 Dinding keramik km 20x25 9.92 M2 0.62% - - - - - -
9.79% - - - - - -
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA - - - - - -
1 Pasang kusen kayu (6 x 15) 0.54 1.79% - - - - - -
2 Kusen Pintu - - - - - -
P1 0.05 0.01%
P2 0.06 0.01%
P3 0.04 0.01%
P4 0.09 0.01%
8 Kusen jendela
9 J1 0.07 0.01%
10 J2 0.05 0.01%
11 J3 0.05 0.01%
12 Bouvenlist - - - - - -
13 BV 0.04 0.01% - - - - - -
14 Pintu slide - - - - - -
15 PS 0.10 0.01%
1.86% - - - - - -
VII PEKERJAAN PENGECATAN - - - - - -
1 Pengecatan dinding 508.42 M2 4.01% - - - - - -
2 Pengecetan plafon 95.04 M2 0.75% - - - - - -
4.76% - - - - - -
VIII PEKERJAAN INSTALASI LISTRIK - - - - - -
1 Pasang Stop Kontak 7.00 0.66% - - - - - -
2 Pasang lampu 9.00 1.06% - - - - - -
3 Pasang saklar ganda 3.00 0.08% - - - - - -
4 Pasang saklar tunggal 3.00 0.08% - - - - - -
5 Pasang sekring/MCB 1.00 0.26%
2.12% - - - - - -
IX PEKERJAAN KUNCI DAN PENGGANTUNG - - - - - -
1 Pasang kunci tanam 5.00 set 0.50% - - - - - -
2 Pasang engsel pintu 5.00 set 0.10% - - - - - -
3 Pasang handle pintu 5.00 set 0.24% - - - - - -
4 Pasang engsel jendela 8.00 set 0.10% - - - - - -
5 Pasang grendel jendela 8.00 set 0.24% - - - - - -
6 Pasang rel sleding 8.00 set 0.13% - - - - - -
1.31% - - - - - -
LAPORAN MINGGUAN
Malang
I PEKERJAAN PERSIAPAN
1 Pembersihan Lahan 112.50 M2 0.56% 80.000 0.450 80.000 0.45 160.000 0.90
2 Pemasangan Bowplank 53.00 M1 1.04% 80.000 0.836 80.000 0.84 160.000 1.67
- 1.61% - - - -
II PEKERJAAN GALIAN TANAH DAN PONDASI - - - - -
1 Galian Tanah Lubang Pondasi 53.58 M3 1.23% - - 3.900 0.05 3.900 0.05
2 Aanstamping / Pas. Batu kosong 11.28 M3 1.89% - - 3.900 0.07 3.900 0.07
3 Urugan Pasir 2.82 M3 0.30% - - 3.900 0.01 3.900 0.01
4 Pondasi Batu Kali 1 pc : 1 kp : 2 PS 36.63 M3 3.90% - - 3.900 0.15 3.900 0.15
5 Urugan Tanah Kembali 17.86 M3 0.11% - - 3.900 0.00 3.900 0.00
- - 7.42% - - - - - -
III PEKERJAAN PASANGAN DAN PLESTERAN - - - - - - -
1 Pas. Dinding 1/2 bata 205.16 M2 11.52% - - - - - -
2 Pasangan Rollag 32.66 M2 1.83% - - - - - -
3 Plesteran Dinding 1PC : 5PS 508.42 M2 8.67% - - - - - -
4 Acian 508.42 M2 6.00%
5 pasangan trasram 1:3 35.25 M2 6.00%
6 Dinding Pagar 13.80 M2 0.62%
- - 34.64% - - - - - -
IV PEKERJAAN PEMBETONAN - - - - - - -
1 Sloof 15/20 313.02 M3 1.42% - - 0.940 0.01 0.940 0.01
2 Kolom Praktis 15/15 416.77 M3 1.90% - - 0.940 0.02 0.940 0.02
3 Ringbalk 15/15 302.59 M3 1.38% - - 0.940 0.01 0.940 0.01
4 Sloof 15/20 28.20 M3 0.13% - - - - -
5 Kolom Praktis 15/15 26.40 M3 0.12% - - - - -
6 Ringbalk 15/15 21.15 M3 0.10% - - - - -
7 Sloof 15/20 1 Pc : 2 Ps : 3 Kr 2.11 M3 3.68% - - - - -
8 Kolom Praktis 15/15 1 Pc 1.98 M3 4.61% - - - - -
9 Ringbalk 15/20 1 Pc : 2Ps : 3 Kr 1.59 M3 4.03% - - - - -
10 Rabat Beton Lantai 1 Pc: 3 Ps: 5 Kr 2.50 M3 2.88% - - - - -
- - 20.24% - - - - - -
V PEKERJAAN PENUTUP LANTAI - - - - - - -
1 Lantai keramik granit 60x60 95.04 M2 9.18% - - - - - -
2 Dinding keramik km 20x25 9.92 M2 0.62% - - - - - -
- - 9.79% - - - - - -
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA - - - - - - -
1 Pasang kusen kayu (6 x 15) 0.54 1.79% - - - - - -
2 Kusen Pintu - - - - - - -
P1 0.05 0.01%
P2 0.06 0.01%
P3 0.04 0.01%
P4 0.09 0.01%
Kusen jendela -
J1 0.07 0.01%
J2 0.05 0.01%
J3 0.05 0.01%
3 Bouvenlist - - - - - - -
4 BV 0.04 0.01% - - - - - -
5 Pintu slide - - - - - - -
PS 0.10 0.01%
- - 1.86% - - - - - -
VII PEKERJAAN PENGECATAN - - - - - - -
1 Pengecatan dinding 508.42 M2 4.01% - - - - - -
2 Pengecetan plafon 95.04 M2 0.75% - - - - - -
- - 4.76% - - - - - -
VIII PEKERJAAN INSTALASI LISTRIK - - - - - - -
1 Pasang Stop Kontak 7.00 bh 0.66% - - - - - -
2 Pasang lampu 9.00 titik 1.06% - - - - - -
3 Pasang saklar ganda 3.00 bh 0.08% - - - - - -
4 Pasang saklar tunggal 3.00 bh 0.08% - - - - - -
5 Pasang sekring/MCB 1.00 0.26%
- - 2.12% - - - - - -
IX PEKERJAAN KUNCI DAN PENGGANTUNG - - - - - - -
1 Pasang kunci tanam 5.00 0.50% - - - - - -
2 Pasang engsel pintu 5.00 0.10% - - - - - -
3 Pasang handle pintu 5.00 0.24% - - - - - -
4 Pasang engsel jendela 8.00 0.10% - - - - - -
5 Pasang grendel jendela 8.00 0.24% - - - - - -
6 Pasang rel sleding 8.00 0.13% - - - - - -
- - 1.31% - - - - - -
LAPORAN MINGGUAN
Malang, 17-Aug-2019
I PEKERJAAN PERSIAPAN
1 Pembersihan Lahan 112.50 M2 0.56% 160.000 0.900 - 160.000 0.90
2 Pemasangan Bowplank 53.00 M1 1.04% 160.000 1.672 - 160.000 1.67
- 1.61% - - - -
II PEKERJAAN GALIAN TANAH DAN PONDASI - 0.00% - - - -
1 Galian Tanah Lubang Pondasi 53.58 M3 1.23% 3.900 0.048 3.900 0.05 7.800 0.10
2 Aanstamping / Pas. Batu kosong 11.28 M3 1.89% 3.900 0.074 3.900 0.07 7.800 0.15
3 Urugan Pasir 2.82 M3 0.30% 3.900 0.012 3.900 0.01 7.800 0.02
4 Pondasi Batu Kali 1 pc : 1 kp : 2 PS 36.63 M3 3.90% 3.900 0.152 3.900 0.15 7.800 0.30
5 Urugan Tanah Kembali 17.86 M3 0.11% 3.900 0.004 3.900 0.00 7.800 0.01
- 7.42% - - - - - -
III PEKERJAAN PASANGAN DAN PLESTERAN - 0.00% - - - - - -
1 Pas. Dinding 1/2 bata 205.16 M2 11.52% - - - - - -
2 Pasangan Rollag 32.66 M2 1.83% - - - - - -
3 Plesteran Dinding 1PC : 5PS 508.42 M2 8.67% - - - - - -
4 Acian 508.42 6.00%
5 pasangan trasram 1:3 35.25 6.00%
6 Dinding Pagar 13.80 0.62%
- 34.64% - - - - - -
IV PEKERJAAN PEMBETONAN - 0.00% - - - - - -
1 Sloof 15/20 313.02 M3 1.42% 0.940 0.013 0.940 0.01 1.880 0.03
2 Kolom Praktis 15/15 416.77 M3 1.90% 0.940 0.018 0.940 0.02 1.880 0.04
3 Ringbalk 15/15 302.59 M3 1.38% 0.940 0.013 0.940 0.01 1.880 0.03
4 Sloof 15/20 28.20 M3 0.13% - - 0.070 0.00 0.070 0.00
5 Kolom Praktis 15/15 26.40 M3 0.12% - - 0.070 0.00 0.070 0.00
6 Ringbalk 15/15 21.15 M3 0.10% - - 0.070 0.00 0.070 0.00
7 Sloof 15/20 1 Pc : 2 Ps : 3 Kr 2.11 M3 3.68% - - - - -
8 Kolom Praktis 15/15 1 Pc 1.98 M3 4.61% - - - - -
9 Ringbalk 15/20 1 Pc : 2Ps : 3 Kr 1.59 M3 4.03% - - - - -
10 Rabat Beton Lantai 1 Pc: 3 Ps: 5 Kr 2.50 M3 2.88% - - - - -
- 20.24% - - - - - -
V PEKERJAAN PENUTUP LANTAI - 0.00% - - - - - -
1 Lantai keramik granit 60x60 95.04 M2 9.18% - - - - - -
2 Pasangan keramik lantai 30/30 9.92 M2 0.62% - - - - - -
- 9.79% - - - - - -
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA - 0.00% - - - - - -
1 Pasang kusen kayu (6 x 15) 0.54 M2 1.79% - - - - - -
2 Kusen Pintu - unit 0.00% - - - - - -
P1 0.05 0.01%
P2 0.06 0.01%
P3 0.04 0.01%
P4 0.09 0.01%
Kusen jendela - 0.00%
J1 0.07 0.01%
J2 0.05 0.01%
J3 0.05 0.01%
3 Bouvenlist - M2 0.00% - - - - - -
4 BV 0.04 M2 0.01% - - - - - -
5 Pintu slide - M2 0.00% - - - - - -
PS 0.10 0.01%
- 1.86% - - - - - -
VII PEKERJAAN PENGECATAN - 0.00% - - - - - -
1 Pengecatan dinding 508.42 M2 4.01% - - - - - -
2 Pengecetan plafon 95.04 M2 0.75% - - - - - -
- 4.76% - - - - - -
VIII PEKERJAAN INSTALASI LISTRIK - 0.00% - - - - - -
1 Pasang Stop Kontak 7.00 bh 0.66% - - - - - -
2 Pasang lampu 9.00 titik 1.06% - - - - - -
3 Pasang saklar ganda 3.00 bh 0.08% - - - - - -
4 Pasang saklar tunggal 3.00 bh 0.08% - - - - - -
Pasang sekring/MCB 1.00 0.26%
- 2.12% - - - - - -
IX PEKERJAAN KUNCI DAN PENGGANTUNG - 0.00% - - - - - -
1 Pasang kunci tanam 5.00 Unit 0.50% - - - - - -
2 Pasang engsel pintu 5.00 bh 0.10% - - - - - -
3 Pasang handle pintu 5.00 bh 0.24% - - - - - -
4 Pasang engsel jendela 8.00 bh 0.10% - - - - - -
5 Pasang grendel jendela 8.00 bh 0.24% - - - - - -
6 Pasang rel sleding 8.00 set 0.13% - - - - - -
- 1.31% - - - - - -
LAPORAN MINGGUAN
Malang, 24-Aug-2019
I PEKERJAAN PERSIAPAN
1 Pembersihan Lahan 112.50 M2 0.56% 160.000 0.900 - 160.000 0.90
2 Pemasangan Bowplank 53.00 M1 1.04% 160.000 1.672 - 160.000 1.67
- - 1.61% - - - -
II PEKERJAAN GALIAN TANAH DAN PONDASI - 0.00% - - - -
1 Galian Tanah Lubang Pondasi 53.58 M3 1.23% 7.800 0.096 - - 7.800 0.10
2 Aanstamping / Pas. Batu kosong 11.28 M3 1.89% 7.800 0.147 - - 7.800 0.15
3 Urugan Pasir 2.82 M3 0.30% 7.800 0.023 - - 7.800 0.02
4 Pondasi Batu Kali 1 pc : 1 kp : 2 PS 36.63 M3 3.90% 7.800 0.304 - - 7.800 0.30
5 Urugan Tanah Kembali 17.86 M3 0.11% 7.800 0.009 - - 7.800 0.01
- - 7.42% - - - - - -
III PEKERJAAN PASANGAN DAN PLESTERAN - 0.00% - - - - - -
1 Pas. Dinding 1/2 bata 205.16 M2 11.52% - - - - - -
2 Pasangan Rollag 32.66 M2 1.83% - - - - - -
3 Plesteran Dinding 1PC : 5PS 508.42 M2 8.67% - - - - - -
Acian 508.42 6.00%
pasangan trasram 1:3 35.25 6.00%
Dinding Pagar 13.80 0.62%
- - 34.64% - - - - - -
IV PEKERJAAN PEMBETONAN - 0.00% - - - - - -
1 Sloof 15/20 313.02 M3 1.42% 1.880 0.027 0.940 0.01 2.820 0.04
2 Kolom Praktis 15/15 416.77 M3 1.90% 1.880 0.036 0.940 0.02 2.820 0.05
3 Ringbalk 15/15 302.59 M3 1.38% 1.880 0.026 0.940 0.01 2.820 0.04
4 Sloof 15/20 28.20 M3 0.13% 0.070 0.000 0.070 0.00 0.140 0.00
5 Kolom Praktis 15/15 26.40 M3 0.12% 0.070 0.000 0.070 0.00 0.140 0.00
6 Ringbalk 15/15 21.15 M3 0.10% 0.070 0.000 0.070 0.00 0.140 0.00
7 Sloof 15/20 1 Pc : 2 Ps : 3 Kr 2.11 M3 3.68% - - 3.080 0.11 3.080 0.11
8 Kolom Praktis 15/15 1 Pc 1.98 M3 4.61% - - 3.080 0.14 3.080 0.14
9 Ringbalk 15/20 1 Pc : 2Ps : 3 Kr 1.59 M3 4.03% - - 3.080 0.12 3.080 0.12
10 Rabat Beton Lantai 1 Pc: 3 Ps: 5 Kr 2.50 M3 2.88% - - 3.080 0.09 3.080 0.09
- - 20.24% - - - - - -
V PEKERJAAN PENUTUP LANTAI - 0.00% - - - - - -
1 Lantai keramik granit 60x60 95.04 M2 9.18% - - - - - -
2 Pasangan keramik lantai 30/30 9.92 M2 0.62% - - - - - -
- - 9.79% - - - - - -
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA - 0.00% - - - - - -
1 Pasang kusen kayu (6 x 15) 0.54 M2 1.79% - - - - - -
2 Kusen Pintu - unit 0.00% - - - - - -
P1 0.05 0.01%
P2 0.06 0.01%
P3 0.04 0.01%
P4 0.09 0.01%
Kusen jendela - 0.00%
J1 0.07 0.01%
J2 0.05 0.01%
J3 0.05 0.01%
3 Bouvenlist - M2 0.00% - - - - - -
4 BV 0.04 M2 0.01% - - - - - -
5 Pintu slide - M2 0.00% - - - - - -
PS 0.10 0.01%
- - 1.86% - - - - - -
VII PEKERJAAN PENGECATAN - 0.00% - - - - - -
1 Pengecatan dinding 508.42 M2 4.01% - - - - - -
2 Pengecetan plafon 95.04 M2 0.75% - - - - - -
- - 4.76% - - - - - -
VIII PEKERJAAN INSTALASI LISTRIK - 0.00% - - - - - -
1 Pasang Stop Kontak 7.00 bh 0.66% - - - - - -
2 Pasang lampu 9.00 titik 1.06% - - - - - -
3 Pasang saklar ganda 3.00 bh 0.08% - - - - - -
4 Pasang saklar tunggal 3.00 bh 0.08% - - - - - -
Pasang sekring/MCB 1.00 0.26%
- - 2.12% - - - - - -
IX PEKERJAAN KUNCI DAN PENGGANTUNG - 0.00% - - - - - -
1 Pasang kunci tanam 5.00 Unit 0.50% - - - - - -
2 Pasang engsel pintu 5.00 bh 0.10% - - - - - -
3 Pasang handle pintu 5.00 bh 0.24% - - - - - -
4 Pasang engsel jendela 8.00 bh 0.10% - - - - - -
5 Pasang grendel jendela 8.00 bh 0.24% - - - - - -
6 Pasang rel sleding 8.00 set 0.13% - - - - - -
- - 1.31% - - - - - -
LAPORAN MINGGUAN
Malang, 31-Aug-2019
I PEKERJAAN PERSIAPAN
1 Pembersihan Lahan 112.50 M2 0.56% 160.000 0.900 - 160.000 0.90
2 Pemasangan Bowplank 53.00 M1 1.04% 160.000 1.672 - 160.000 1.67
- - 1.61% - - - -
II PEKERJAAN GALIAN TANAH DAN PONDASI - 0.00% - - - -
1 Galian Tanah Lubang Pondasi 53.58 M3 1.23% 7.800 0.096 - - 7.800 0.10
2 Aanstamping / Pas. Batu kosong 11.28 M3 1.89% 7.800 0.147 - - 7.800 0.15
3 Urugan Pasir 2.82 M3 0.30% 7.800 0.023 - - 7.800 0.02
4 Pondasi Batu Kali 1 pc : 1 kp : 2 PS 36.63 M3 3.90% 7.800 0.304 - - 7.800 0.30
5 Urugan Tanah Kembali 17.86 M3 0.11% 7.800 0.009 - - 7.800 0.01
- - 7.42% - - - - - -
III PEKERJAAN PASANGAN DAN PLESTERAN - - - - - - -
1 Pas. Dinding 1/2 bata 205.16 M2 11.52% - - 7.160 0.82 7.160 0.82
2 Pasangan Rollag 32.66 M2 1.83% - - 7.160 0.13 7.160 0.13
3 Plesteran Dinding 1PC : 5PS 508.42 M2 8.67% - - 7.160 0.62 7.160 0.62
Acian 508.42 6.00% - - 7.160 0.43 7.160 0.43
pasangan trasram 1:3 35.25 6.00% - - 7.160 0.43 7.160 0.43
Dinding Pagar 13.80 0.62% - - 7.160 0.04 7.160 0.04
- - 34.64% - - - - - -
IV PEKERJAAN PEMBETONAN - 0.00% - - - - - -
1 Sloof 15/20 313.02 M3 1.42% 2.820 0.040 0.940 0.01 3.760 0.05
2 Kolom Praktis 15/15 416.77 M3 1.90% 2.820 0.053 0.940 0.02 3.760 0.07
3 Ringbalk 15/15 302.59 M3 1.38% 2.820 0.039 0.940 0.01 3.760 0.05
4 Sloof 15/20 28.20 M3 0.13% 0.140 0.000 0.070 0.00 0.210 0.00
5 Kolom Praktis 15/15 26.40 M3 0.12% 0.140 0.000 0.070 0.00 0.210 0.00
6 Ringbalk 15/15 21.15 M3 0.10% 0.140 0.000 0.070 0.00 0.210 0.00
7 Sloof 15/20 1 Pc : 2 Ps : 3 Kr 2.11 M3 3.68% 3.080 0.113 3.080 0.11 6.160 0.23
8 Kolom Praktis 15/15 1 Pc 1.98 M3 4.61% 3.080 0.142 3.080 0.14 6.160 0.28
9 Ringbalk 15/20 1 Pc : 2Ps : 3 Kr 1.59 M3 4.03% 3.080 0.124 3.080 0.12 6.160 0.25
10 Rabat Beton Lantai 1 Pc: 3 Ps: 5 Kr 2.50 M3 2.88% 3.080 0.089 3.080 0.09 6.160 0.18
- - 20.24% - - - - - -
V PEKERJAAN PENUTUP LANTAI - 0.00% - - - - - -
1 Lantai keramik granit 60x60 95.04 M2 9.18% - - 3.260 0.30 3.260 0.30
2 Pasangan keramik lantai 30/30 9.92 M2 0.62% - - 3.260 0.02 3.260 0.02
- - 9.79% - - - - - -
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA - 0.00% - - - - - -
1 Pasang kusen kayu (6 x 15) 0.54 M2 1.79% - - - - - -
2 Kusen Pintu - unit 0.00% - - - - - -
P1 0.05 0.01%
P2 0.06 0.01%
P3 0.04 0.01%
P4 0.09 0.01%
Kusen jendela - 0.00%
J1 0.07 0.01%
J2 0.05 0.01%
J3 0.05 0.01%
3 Bouvenlist - M2 0.00% - - - - - -
4 BV 0.04 M2 0.01% - - - - - -
5 Pintu slide - M2 0.00% - - - - - -
PS 0.10 0.01%
- - 1.86% - - - - - -
VII PEKERJAAN PENGECATAN - 0.00% - - - - - -
1 Pengecatan dinding 508.42 M2 4.01% - - - - - -
2 Pengecetan plafon 95.04 M2 0.75% - - - - - -
- - 4.76% - - - - - -
VIII PEKERJAAN INSTALASI LISTRIK - 0.00% - - - - - -
1 Pasang Stop Kontak 7.00 bh 0.66% - - - - - -
2 Pasang lampu 9.00 titik 1.06% - - - - - -
3 Pasang saklar ganda 3.00 bh 0.08% - - - - - -
4 Pasang saklar tunggal 3.00 bh 0.08% - - - - - -
Pasang sekring/MCB 1.00 0.26%
- - 2.12% - - - - - -
IX PEKERJAAN KUNCI DAN PENGGANTUNG - 0.00% - - - - - -
1 Pasang kunci tanam 5.00 Unit 0.50% - - - - - -
2 Pasang engsel pintu 5.00 bh 0.10% - - - - - -
3 Pasang handle pintu 5.00 bh 0.24% - - - - - -
4 Pasang engsel jendela 8.00 bh 0.10% - - - - - -
5 Pasang grendel jendela 8.00 bh 0.24% - - - - - -
6 Pasang rel sleding 8.00 set 0.13% - - - - - -
- - 1.31% - - - - - -
LAPORAN MINGGUAN
Malang, 7-Sep-2019
I PEKERJAAN PERSIAPAN
1 Pembersihan Lahan 112.50 M2 0.56% 160.000 0.900 - 160.000 0.90
2 Pemasangan Bowplank 53.00 M1 1.04% 160.000 1.672 - 160.000 1.67
- - 1.61% - - - -
II PEKERJAAN GALIAN TANAH DAN PONDASI - 0.00% - - - -
1 Galian Tanah Lubang Pondasi 53.58 M3 1.23% 7.800 0.096 - - 7.800 0.10
2 Aanstamping / Pas. Batu kosong 11.28 M3 1.89% 7.800 0.147 - - 7.800 0.15
3 Urugan Pasir 2.82 M3 0.30% 7.800 0.023 - - 7.800 0.02
4 Pondasi Batu Kali 1 pc : 1 kp : 2 PS 36.63 M3 3.90% 7.800 0.304 - - 7.800 0.30
5 Urugan Tanah Kembali 17.86 M3 0.11% 7.800 0.009 - - 7.800 0.01
- - 7.42% - - - - - -
III PEKERJAAN PASANGAN DAN PLESTERAN - - - - - - -
1 Pas. Dinding 1/2 bata 205.16 M2 11.52% 0.825 0.095 7.160 0.82 7.985 0.92
2 Pasangan Rollag 32.66 M2 1.83% 0.131 0.002 7.160 0.13 7.291 0.13
3 Plesteran Dinding 1PC : 5PS 508.42 M2 8.67% 0.621 0.054 7.160 0.62 7.781 0.67
Acian 508.42 6.00% 0.430 0.026 7.160 0.43 7.590 0.46
pasangan trasram 1:3 35.25 6.00% 0.430 0.026 7.160 0.43 7.590 0.46
Dinding Pagar 13.80 0.62% 0.045 0.000 7.160 0.04 7.205 0.04
- - 34.64% - - - - - -
IV PEKERJAAN PEMBETONAN - 0.00% - - - - - -
1 Sloof 15/20 313.02 M3 1.42% 3.760 0.054 0.940 0.01 4.700 0.07
2 Kolom Praktis 15/15 416.77 M3 1.90% 3.760 0.071 0.940 0.02 4.700 0.09
3 Ringbalk 15/15 302.59 M3 1.38% 3.760 0.052 0.940 0.01 4.700 0.06
4 Sloof 15/20 28.20 M3 0.13% 0.210 0.000 0.070 0.00 0.280 0.00
5 Kolom Praktis 15/15 26.40 M3 0.12% 0.210 0.000 0.070 0.00 0.280 0.00
6 Ringbalk 15/15 21.15 M3 0.10% 0.210 0.000 0.070 0.00 0.280 0.00
7 Sloof 15/20 1 Pc : 2 Ps : 3 Kr 2.11 M3 3.68% 6.160 0.227 3.080 0.11 9.240 0.34
8 Kolom Praktis 15/15 1 Pc 1.98 M3 4.61% 6.160 0.284 3.080 0.14 9.240 0.43
9 Ringbalk 15/20 1 Pc : 2Ps : 3 Kr 1.59 M3 4.03% 6.160 0.248 3.080 0.12 9.240 0.37
10 Rabat Beton Lantai 1 Pc: 3 Ps: 5 Kr 2.50 M3 2.88% 6.160 0.178 3.080 0.09 9.240 0.27
- - 20.24% - - - - - -
V PEKERJAAN PENUTUP LANTAI - - - - - - -
1 Lantai keramik granit 60x60 95.04 M2 9.18% 3.260 0.299 3.260 0.30 6.520 0.60
2 Pasangan keramik lantai 30/30 9.92 M2 0.62% 3.260 0.020 3.260 0.02 6.520 0.04
- - 9.79% - - - - - -
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA - 0.00% - - - - - -
1 Pasang kusen kayu (6 x 15) 0.54 M2 1.79% - - 0.470 0.01 0.470 0.01
2 Kusen Pintu unit - - - - -
P1 0.05 0.01% 0.470 0.00 0.470 0.00
P2 0.06 0.01% 0.470 0.00 0.470 0.00
P3 0.04 0.01% 0.470 0.00 0.470 0.00
P4 0.09 0.01% 0.470 0.00 0.470 0.00
Kusen jendela
J1 0.07 0.01% 0.470 0.00 0.470 0.00
J2 0.05 0.01% 0.470 0.00 0.470 0.00
J3 0.05 0.01% 0.470 0.00 0.470 0.00
3 Bouvenlist - M2 0.00% - - 0.470 - 0.470 -
4 BV 0.04 M2 0.01% - - 0.470 0.00 0.470 0.00
5 Pintu slide - M2 0.00% - - 0.470 - 0.470 -
PS 0.10 0.01% 0.470 0.00 0.470 0.00
- - 1.86% - - - - - -
VII PEKERJAAN PENGECATAN - 0.00% - - - - - -
1 Pengecatan dinding 508.42 M2 4.01% - - - - - -
2 Pengecetan plafon 95.04 M2 0.75% - - - - - -
- - 4.76% - - - - - -
VIII PEKERJAAN INSTALASI LISTRIK - - - - - - -
1 Pasang Stop Kontak 7.00 bh 0.66% - - 1.060 0.01 1.060 0.01
2 Pasang lampu 9.00 titik 1.06% - - 1.060 0.01 1.060 0.01
3 Pasang saklar ganda 3.00 bh 0.08% - - 1.060 0.00 1.060 0.00
4 Pasang saklar tunggal 3.00 bh 0.08% - - 1.060 0.00 1.060 0.00
Pasang sekring/MCB 1.00 0.26% 1.060 0.00 1.060 0.00
- - 2.12% - - - - - -
IX PEKERJAAN KUNCI DAN PENGGANTUNG - 0.00% - - - - - -
1 Pasang kunci tanam 5.00 Unit 0.50% - - - - - -
2 Pasang engsel pintu 5.00 bh 0.10% - - - - - -
3 Pasang handle pintu 5.00 bh 0.24% - - - - - -
4 Pasang engsel jendela 8.00 bh 0.10% - - - - - -
5 Pasang grendel jendela 8.00 bh 0.24% - - - - - -
6 Pasang rel sleding 8.00 set 0.13% - - - - - -
- - 1.31% - - - - - -
LAPORAN MINGGUAN
Malang, 14-Sep-2019
I PEKERJAAN PERSIAPAN
1 Pembersihan Lahan 112.50 M2 0.56% 160.000 0.900 - 160.000 0.90
2 Pemasangan Bowplank 53.00 M1 1.04% 160.000 1.672 - 160.000 1.67
- - 1.61% - - - -
II PEKERJAAN GALIAN TANAH DAN PONDASI - 0.00% - - - -
1 Galian Tanah Lubang Pondasi 53.58 M3 1.23% 7.800 0.096 - - 7.800 0.10
2 Aanstamping / Pas. Batu kosong 11.28 M3 1.89% 7.800 0.147 - - 7.800 0.15
3 Urugan Pasir 2.82 M3 0.30% 7.800 0.023 - - 7.800 0.02
4 Pondasi Batu Kali 1 pc : 1 kp : 2 PS 36.63 M3 3.90% 7.800 0.304 - - 7.800 0.30
5 Urugan Tanah Kembali 17.86 M3 0.11% 7.800 0.009 - - 7.800 0.01
- - 7.42% - - - - - -
III PEKERJAAN PASANGAN DAN PLESTERAN - 0.00% - - - - - -
1 Pas. Dinding 1/2 bata 205.16 M2 11.52% 7.985 0.920 7.160 0.82 15.145 1.74
2 Pasangan Rollag 32.66 M2 1.83% 7.291 0.134 7.160 0.13 14.451 0.26
3 Plesteran Dinding 1PC : 5PS 508.42 M2 8.67% 7.781 0.675 7.160 0.62 14.941 1.30
Acian 508.42 6.00% 7.590 0.455 7.160 0.43 14.750 0.88
pasangan trasram 1:3 35.25 6.00% 7.590 0.455 7.160 0.43 14.750 0.88
Dinding Pagar 13.80 0.62% 7.205 0.045 7.160 0.04 14.365 0.09
- - 34.64% - - - - - -
IV PEKERJAAN PEMBETONAN - 0.00% - - - - - -
1 Sloof 15/20 313.02 M3 1.42% 4.700 0.067 - - 4.700 0.07
2 Kolom Praktis 15/15 416.77 M3 1.90% 4.700 0.089 - - 4.700 0.09
3 Ringbalk 15/15 302.59 M3 1.38% 4.700 0.065 - - 4.700 0.06
4 Sloof 15/20 28.20 M3 0.13% 0.280 0.000 0.070 0.00 0.350 0.00
5 Kolom Praktis 15/15 26.40 M3 0.12% 0.280 0.000 0.070 0.00 0.350 0.00
6 Ringbalk 15/15 21.15 M3 0.10% 0.280 0.000 0.070 0.00 0.350 0.00
7 Sloof 15/20 1 Pc : 2 Ps : 3 Kr 2.11 M3 3.68% 9.240 0.340 3.080 0.11 12.320 0.45
8 Kolom Praktis 15/15 1 Pc 1.98 M3 4.61% 9.240 0.426 3.080 0.14 12.320 0.57
9 Ringbalk 15/20 1 Pc : 2Ps : 3 Kr 1.59 M3 4.03% 9.240 0.372 3.080 0.12 12.320 0.50
10 Rabat Beton Lantai 1 Pc: 3 Ps: 5 Kr 2.50 M3 2.88% 9.240 0.266 3.080 0.09 12.320 0.36
- - 20.24% - - - - - -
V PEKERJAAN PENUTUP LANTAI - - - - - - -
1 Lantai keramik granit 60x60 95.04 M2 9.18% 6.520 0.598 3.260 0.30 9.780 0.90
2 Pasangan keramik lantai 30/30 9.92 M2 0.62% 6.520 0.040 3.260 0.02 9.780 0.06
- - 9.79% - - - - - -
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA - 0.00% - - - - - -
1 Pasang kusen kayu (6 x 15) 0.54 M2 1.79% 0.470 0.008 0.470 0.01 0.940 0.02
2 Kusen Pintu - unit 0.00% - - - - - -
P1 0.05 0.01% 0.470 0.000 0.470 0.00 0.940 0.00
P2 0.06 0.01% 0.470 0.000 0.470 0.00 0.940 0.00
P3 0.04 0.01% 0.470 0.000 0.470 0.00 0.940 0.00
P4 0.09 0.01% 0.470 0.000 0.470 0.00 0.940 0.00
Kusen jendela - 0.00% - - - - - -
J1 0.07 0.01% 0.470 0.000 0.470 0.00 0.940 0.00
J2 0.05 0.01% 0.470 0.000 0.470 0.00 0.940 0.00
J3 0.05 0.01% 0.470 0.000 0.470 0.00 0.940 0.00
3 Bouvenlist - M2 0.00% 0.470 - 0.470 - 0.940 -
4 BV 0.04 M2 0.01% 0.470 0.000 0.470 0.00 0.940 0.00
5 Pintu slide - M2 0.00% 0.470 - 0.470 - 0.940 -
PS 0.10 0.01% 0.470 0.000 0.470 0.00 0.940 0.00
- - 1.86% - - - - - -
VII PEKERJAAN PENGECATAN - 0.00% - - - - - -
1 Pengecatan dinding 508.42 M2 4.01% - - - - - -
2 Pengecetan plafon 95.04 M2 0.75% - - - - - -
- - 4.76% - - - - - -
VIII PEKERJAAN INSTALASI LISTRIK - 0.00% - - - - - -
1 Pasang Stop Kontak 7.00 bh 0.66% 1.060 0.007 1.060 0.01 2.120 0.01
2 Pasang lampu 9.00 titik 1.06% 1.060 0.011 1.060 0.01 2.120 0.02
3 Pasang saklar ganda 3.00 bh 0.08% 1.060 0.001 1.060 0.00 2.120 0.00
4 Pasang saklar tunggal 3.00 bh 0.08% 1.060 0.001 1.060 0.00 2.120 0.00
Pasang sekring/MCB 1.00 0.26% 1.060 0.003 1.060 0.00 2.120 0.01
- - 2.12% - - - - - -
IX PEKERJAAN KUNCI DAN PENGGANTUNG - 0.00% - - - - - -
1 Pasang kunci tanam 5.00 Unit 0.50% - - - - - -
2 Pasang engsel pintu 5.00 bh 0.10% - - - - - -
3 Pasang handle pintu 5.00 bh 0.24% - - - - - -
4 Pasang engsel jendela 8.00 bh 0.10% - - - - - -
5 Pasang grendel jendela 8.00 bh 0.24% - - - - - -
6 Pasang rel sleding 8.00 set 0.13% - - - - - -
- - 1.31% - - - - - -
LAPORAN MINGGUAN
Malang, 21-Sep-2019
I PEKERJAAN PERSIAPAN
1 Pembersihan Lahan 112.50 M2 0.56% 160.000 0.900 - 160.000 0.90
2 Pemasangan Bowplank 53.00 M1 1.04% 160.000 1.672 - 160.000 1.67
- - 1.61% - - - -
II PEKERJAAN GALIAN TANAH DAN PONDASI - 0.00% - - - -
1 Galian Tanah Lubang Pondasi 53.58 M3 1.23% 7.800 0.096 - - 7.800 0.10
2 Aanstamping / Pas. Batu kosong 11.28 M3 1.89% 7.800 0.147 - - 7.800 0.15
3 Urugan Pasir 2.82 M3 0.30% 7.800 0.023 - - 7.800 0.02
4 Pondasi Batu Kali 1 pc : 1 kp : 2 PS 36.63 M3 3.90% 7.800 0.304 - - 7.800 0.30
5 Urugan Tanah Kembali 17.86 M3 0.11% 7.800 0.009 - - 7.800 0.01
- - 7.42% - - - - - -
III PEKERJAAN PASANGAN DAN PLESTERAN - - - - - - -
1 Pas. Dinding 1/2 bata 205.16 M2 11.52% 15.145 1.744 7.160 0.82 22.305 2.57
2 Pasangan Rollag 32.66 M2 1.83% 14.451 0.265 7.160 0.13 21.611 0.40
3 Plesteran Dinding 1PC : 5PS 508.42 M2 8.67% 14.941 1.296 7.160 0.62 22.101 1.92
Acian 508.42 6.00% 14.750 0.885 7.160 0.43 21.910 1.31
pasangan trasram 1:3 35.25 6.00% 14.750 0.885 7.160 0.43 21.910 1.31
Dinding Pagar 13.80 0.62% 14.365 0.090 7.160 0.04 21.525 0.13
- - 34.64% - - - - - -
IV PEKERJAAN PEMBETONAN - 0.00% - - - - - -
1 Sloof 15/20 313.02 M3 1.42% 4.700 0.067 - - 4.700 0.07
2 Kolom Praktis 15/15 416.77 M3 1.90% 4.700 0.089 - - 4.700 0.09
3 Ringbalk 15/15 302.59 M3 1.38% 4.700 0.065 - - 4.700 0.06
4 Sloof 15/20 28.20 M3 0.13% 0.350 0.000 - - 0.350 0.00
5 Kolom Praktis 15/15 26.40 M3 0.12% 0.350 0.000 - - 0.350 0.00
6 Ringbalk 15/15 21.15 M3 0.10% 0.350 0.000 - - 0.350 0.00
7 Sloof 15/20 1 Pc : 2 Ps : 3 Kr 2.11 M3 3.68% 12.320 0.454 - - 12.320 0.45
8 Kolom Praktis 15/15 1 Pc 1.98 M3 4.61% 12.320 0.568 - - 12.320 0.57
9 Ringbalk 15/20 1 Pc : 2Ps : 3 Kr 1.59 M3 4.03% 12.320 0.496 - - 12.320 0.50
10 Rabat Beton Lantai 1 Pc: 3 Ps: 5 Kr 2.50 M3 2.88% 12.320 0.355 - - 12.320 0.36
- - 20.24% - - - - - -
V PEKERJAAN PENUTUP LANTAI - 0.00% - - - - - -
1 Lantai keramik granit 60x60 95.04 M2 9.18% - - 30.000 2.75 30.000 2.75
2 Pasangan keramik lantai 30/30 9.92 M2 0.62% - - 30.000 0.19 30.000 0.19
- - 9.79% - - - - - -
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA - 0.00% - - - - - -
1 Pasang kusen kayu (6 x 15) 0.54 M2 1.79% 0.940 0.017 0.470 0.01 1.410 0.03
2 Kusen Pintu - unit 0.00% - - - - - -
P1 0.05 0.01% 0.940 0.000 0.470 0.00 1.410 0.00
P2 0.06 0.01% 0.940 0.000 0.470 0.00 1.410 0.00
P3 0.04 0.01% 0.940 0.000 0.470 0.00 1.410 0.00
P4 0.09 0.01% 0.940 0.000 0.470 0.00 1.410 0.00
Kusen jendela - 0.00% - - - - - -
J1 0.07 0.01% 0.940 0.000 0.470 0.00 1.410 0.00
J2 0.05 0.01% 0.940 0.000 0.470 0.00 1.410 0.00
J3 0.05 0.01% 0.940 0.000 0.470 0.00 1.410 0.00
3 Bouvenlist - M2 0.00% 0.940 - 0.470 - 1.410 -
4 BV 0.04 M2 0.01% 0.940 0.000 0.470 0.00 1.410 0.00
5 Pintu slide - M2 0.00% 0.940 - 0.470 - 1.410 -
PS 0.10 0.01% 0.940 0.000 0.470 0.00 1.410 0.00
- - 1.86% - - - - - -
VII PEKERJAAN PENGECATAN - 0.00% - - - - - -
1 Pengecatan dinding 508.42 M2 4.01% - - - - - -
2 Pengecetan plafon 95.04 M2 0.75% - - - - - -
- - 4.76% - - - - - -
VIII PEKERJAAN INSTALASI LISTRIK - 0.00% - - - - - -
1 Pasang Stop Kontak 7.00 bh 0.66% - - - - - -
2 Pasang lampu 9.00 titik 1.06% - - - - - -
3 Pasang saklar ganda 3.00 bh 0.08% - - - - - -
4 Pasang saklar tunggal 3.00 bh 0.08% - - - - - -
Pasang sekring/MCB 1.00 0.26%
- - 2.12% - - - - - -
IX PEKERJAAN KUNCI DAN PENGGANTUNG - 0.00% - - - - - -
1 Pasang kunci tanam 5.00 Unit 0.50% - - - - - -
2 Pasang engsel pintu 5.00 bh 0.10% - - - - - -
3 Pasang handle pintu 5.00 bh 0.24% - - - - - -
4 Pasang engsel jendela 8.00 bh 0.10% - - - - - -
5 Pasang grendel jendela 8.00 bh 0.24% - - - - - -
6 Pasang rel sleding 8.00 set 0.13% - - - - - -
- - 1.31% - - - - - -
LAPORAN MINGGUAN
Malang, 28-Sep-2019
I PEKERJAAN PERSIAPAN
1 Pembersihan Lahan 112.50 M2 0.56% 160.000 0.900 - 160.000 0.90
2 Pemasangan Bowplank 53.00 M1 1.04% 160.000 1.672 - 160.000 1.67
- - 1.61% - - - -
II PEKERJAAN GALIAN TANAH DAN PONDASI - 0.00% - - - -
1 Galian Tanah Lubang Pondasi 53.58 M3 1.23% 7.800 0.096 - - 7.800 0.10
2 Aanstamping / Pas. Batu kosong 11.28 M3 1.89% 7.800 0.147 - - 7.800 0.15
3 Urugan Pasir 2.82 M3 0.30% 7.800 0.023 - - 7.800 0.02
4 Pondasi Batu Kali 1 pc : 1 kp : 2 PS 36.63 M3 3.90% 7.800 0.304 - - 7.800 0.30
5 Urugan Tanah Kembali 17.86 M3 0.11% 7.800 0.009 - - 7.800 0.01
- - 7.42% - - - - - -
III PEKERJAAN PASANGAN DAN PLESTERAN - 0.00% - - - - - -
1 Pas. Dinding 1/2 bata 205.16 M2 11.52% 22.305 2.569 7.160 0.82 29.465 3.39
2 Pasangan Rollag 32.66 M2 1.83% 21.611 0.396 7.160 0.13 28.771 0.53
3 Plesteran Dinding 1PC : 5PS 508.42 M2 8.67% 22.101 1.917 7.160 0.62 29.261 2.54
Acian 508.42 6.00% 21.910 1.314 7.160 0.43 29.070 1.74
pasangan trasram 1:3 35.25 6.00% 21.910 1.314 7.160 0.43 29.070 1.74
Dinding Pagar 13.80 0.62% 21.525 0.134 7.160 0.04 28.685 0.18
- - 34.64% - - - - - -
IV PEKERJAAN PEMBETONAN - 0.00% - - - - - -
1 Sloof 15/20 313.02 M3 1.42% 4.700 0.067 - - 4.700 0.07
2 Kolom Praktis 15/15 416.77 M3 1.90% 4.700 0.089 - - 4.700 0.09
3 Ringbalk 15/15 302.59 M3 1.38% 4.700 0.065 - - 4.700 0.06
4 Sloof 15/20 28.20 M3 0.13% 0.350 0.000 - - 0.350 0.00
5 Kolom Praktis 15/15 26.40 M3 0.12% 0.350 0.000 - - 0.350 0.00
6 Ringbalk 15/15 21.15 M3 0.10% 0.350 0.000 - - 0.350 0.00
7 Sloof 15/20 1 Pc : 2 Ps : 3 Kr 2.11 M3 3.68% 12.320 0.454 - - 12.320 0.45
8 Kolom Praktis 15/15 1 Pc 1.98 M3 4.61% 12.320 0.568 - - 12.320 0.57
9 Ringbalk 15/20 1 Pc : 2Ps : 3 Kr 1.59 M3 4.03% 12.320 0.496 - - 12.320 0.50
10 Rabat Beton Lantai 1 Pc: 3 Ps: 5 Kr 2.50 M3 2.88% 12.320 0.355 - - 12.320 0.36
- - 20.24% - - - - - -
V PEKERJAAN PENUTUP LANTAI - 0.00% - - - - - -
1 Lantai keramik granit 60x60 95.04 M2 9.18% 30.000 2.753 30.000 2.75 60.000 5.51
2 Pasangan keramik lantai 30/30 9.92 M2 0.62% 30.000 0.185 30.000 0.19 60.000 0.37
- - 9.79% - - - - - -
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA - 0.00% - - - - - -
1 Pasang kusen kayu (6 x 15) 0.54 M2 1.79% 1.410 0.025 0.470 0.01 1.880 0.03
2 Kusen Pintu - unit 0.00% - - - - - -
P1 0.05 0.01% 1.410 0.000 0.470 0.00 1.880 0.00
P2 0.06 0.01% 1.410 0.000 0.470 0.00 1.880 0.00
P3 0.04 0.01% 1.410 0.000 0.470 0.00 1.880 0.00
P4 0.09 0.01% 1.410 0.000 0.470 0.00 1.880 0.00
Kusen jendela - 0.00% - - - - - -
J1 0.07 0.01% 1.410 0.000 0.470 0.00 1.880 0.00
J2 0.05 0.01% 1.410 0.000 0.470 0.00 1.880 0.00
J3 0.05 0.01% 1.410 0.000 0.470 0.00 1.880 0.00
3 Bouvenlist - M2 0.00% 1.410 - 0.470 - 1.880 -
4 BV 0.04 M2 0.01% 1.410 0.000 0.470 0.00 1.880 0.00
5 Pintu slide - M2 0.00% 1.410 - 0.470 - 1.880 -
PS 0.10 0.01% 1.410 0.000 0.470 0.00 1.880 0.00
- - 1.86% - - - - - -
VII PEKERJAAN PENGECATAN - 0.00% - - - - - -
1 Pengecatan dinding 508.42 M2 4.01% - - - - - -
2 Pengecetan plafon 95.04 M2 0.75% - - - - - -
- - 4.76% - - - - - -
VIII PEKERJAAN INSTALASI LISTRIK - 0.00% - - - - - -
1 Pasang Stop Kontak 7.00 bh 0.66% - - - - - -
2 Pasang lampu 9.00 titik 1.06% - - - - - -
3 Pasang saklar ganda 3.00 bh 0.08% - - - - - -
4 Pasang saklar tunggal 3.00 bh 0.08% - - - - - -
Pasang sekring/MCB 1.00 0.26%
- - 2.12% - - - - - -
IX PEKERJAAN KUNCI DAN PENGGANTUNG - 0.00% - - - - - -
1 Pasang kunci tanam 5.00 Unit 0.50% - - - - - -
2 Pasang engsel pintu 5.00 bh 0.10% - - - - - -
3 Pasang handle pintu 5.00 bh 0.24% - - - - - -
4 Pasang engsel jendela 8.00 bh 0.10% - - - - - -
5 Pasang grendel jendela 8.00 bh 0.24% - - - - - -
6 Pasang rel sleding 8.00 set 0.13% - - - - - -
- - 1.31% - - - - - -
LAPORAN MINGGUAN
Malang, 5-Oct-2019
I PEKERJAAN PERSIAPAN
1 Pembersihan Lahan 112.50 M2 0.56% 160.000 0.900 - 160.000 0.90
2 Pemasangan Bowplank 53.00 M1 1.04% 160.000 1.672 - 160.000 1.67
- - 1.61% - - - -
II PEKERJAAN GALIAN TANAH DAN PONDASI - 0.00% - - - -
1 Galian Tanah Lubang Pondasi 53.58 M3 1.23% 7.800 0.096 - - 7.800 0.10
2 Aanstamping / Pas. Batu kosong 11.28 M3 1.89% 7.800 0.147 - - 7.800 0.15
3 Urugan Pasir 2.82 M3 0.30% 7.800 0.023 - - 7.800 0.02
4 Pondasi Batu Kali 1 pc : 1 kp : 2 PS 36.63 M3 3.90% 7.800 0.304 - - 7.800 0.30
5 Urugan Tanah Kembali 17.86 M3 0.11% 7.800 0.009 - - 7.800 0.01
- - 7.42% - - - - - -
III PEKERJAAN PASANGAN DAN PLESTERAN - 0.00% - - - - - -
1 Pas. Dinding 1/2 bata 205.16 M2 11.52% 29.465 3.393 7.160 0.82 36.625 4.22
2 Pasangan Rollag 32.66 M2 1.83% 28.771 0.528 7.160 0.13 35.931 0.66
3 Plesteran Dinding 1PC : 5PS 508.42 M2 8.67% 29.261 2.538 7.160 0.62 36.421 3.16
Acian 508.42 6.00% 29.070 1.744 7.160 0.43 36.230
pasangan trasram 1:3 35.25 6.00% 29.070 1.744 7.160 0.43 36.230
Dinding Pagar 13.80 0.62% 28.685 0.179 7.160 0.04 35.845
- - 34.64% - - - - - -
IV PEKERJAAN PEMBETONAN - 0.00% - - - - - -
1 Sloof 15/20 313.02 M3 1.42% 4.700 0.067 - - 4.700 0.07
2 Kolom Praktis 15/15 416.77 M3 1.90% 4.700 0.089 - - 4.700 0.09
3 Ringbalk 15/15 302.59 M3 1.38% 4.700 0.065 - - 4.700 0.06
4 Sloof 15/20 28.20 M3 0.13% 0.350 0.000 - - 0.350 0.00
5 Kolom Praktis 15/15 26.40 M3 0.12% 0.350 0.000 - - 0.350 0.00
6 Ringbalk 15/15 21.15 M3 0.10% 0.350 0.000 - - 0.350 0.00
7 Sloof 15/20 1 Pc : 2 Ps : 3 Kr 2.11 M3 3.68% 12.320 0.454 - - 12.320 0.45
8 Kolom Praktis 15/15 1 Pc 1.98 M3 4.61% 12.320 0.568 - - 12.320 0.57
9 Ringbalk 15/20 1 Pc : 2Ps : 3 Kr 1.59 M3 4.03% 12.320 0.496 - - 12.320 0.50
10 Rabat Beton Lantai 1 Pc: 3 Ps: 5 Kr 2.50 M3 2.88% 12.320 0.355 - - 12.320 0.36
- - 20.24% - - - - - -
V PEKERJAAN PENUTUP LANTAI - 0.00% - - - - - -
1 Lantai keramik granit 60x60 95.04 M2 9.18% 60.000 5.506 40.000 3.67 100.000 9.18
2 Pasangan keramik lantai 30/30 9.92 M2 0.62% 60.000 0.370 40.000 0.25 100.000 0.62
- - 9.79% - - - - - -
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA - 0.00% - - - - - -
1 Pasang kusen kayu (6 x 15) 0.54 M2 1.79% 0.025 0.000 - 0.025 0.03
2 Kusen Pintu - unit 0.00% - - - - -
P1 0.05 0.01% 0.000 0.000
P2 0.06 0.01% 0.000 0.000
P3 0.04 0.01% 0.000 0.000
P4 0.09 0.01% 0.000 0.000
Kusen jendela - 0.00% - -
J1 0.07 0.01% 0.000 0.000
J2 0.05 0.01% 0.000 0.000
J3 0.05 0.01% 0.000 0.000
3 Bouvenlist - M2 0.00% - - - - -
4 BV 0.04 M2 0.01% 0.000 0.000 - 0.000 0.00
5 Pintu slide - M2 0.00% - - - - -
PS 0.10 0.01% 0.000 0.000
- - 1.86% - - - - - -
VII PEKERJAAN PENGECATAN - 0.00% - - - - - -
1 Pengecatan dinding 508.42 M2 4.01% - - - - - -
2 Pengecetan plafon 95.04 M2 0.75% - - - - - -
- - 4.76% - - - - - -
VIII PEKERJAAN INSTALASI LISTRIK - 0.00% - - - - - -
1 Pasang Stop Kontak 7.00 bh 0.66% - - - - - -
2 Pasang lampu 9.00 titik 1.06% - - - - - -
3 Pasang saklar ganda 3.00 bh 0.08% - - - - - -
4 Pasang saklar tunggal 3.00 bh 0.08% - - - - - -
Pasang sekring/MCB 1.00 0.26%
- - 2.12% - - - - - -
IX PEKERJAAN KUNCI DAN PENGGANTUNG - 0.00% - - - - - -
1 Pasang kunci tanam 5.00 Unit 0.50% - - 1.310 0.01 1.310 0.01
2 Pasang engsel pintu 5.00 bh 0.10% - - 1.310 0.00 1.310 0.00
3 Pasang handle pintu 5.00 bh 0.24% - - 1.310 0.00 1.310 0.00
4 Pasang engsel jendela 8.00 bh 0.10% - - 1.310 0.00 1.310 0.00
5 Pasang grendel jendela 8.00 bh 0.24% - - 1.310 0.00 1.310 0.00
6 Pasang rel sleding 8.00 set 0.13% - - 1.310 0.00 1.310 0.00
- - 1.31% - - - - -
LAPORAN MINGGUAN
Malang, 12-Oct-2019
I PEKERJAAN PERSIAPAN
1 Pembersihan Lahan 112.50 M2 0.56% 160.000 0.900 - 160.000 0.90
2 Pemasangan Bowplank 53.00 M1 1.04% 160.000 1.672 - 160.000 1.67
- - 1.61% - - - -
II PEKERJAAN GALIAN TANAH DAN PONDASI - 0.00% - - - -
1 Galian Tanah Lubang Pondasi 53.58 M3 1.23% 7.800 0.096 - - 7.800 0.10
2 Aanstamping / Pas. Batu kosong 11.28 M3 1.89% 7.800 0.147 - - 7.800 0.15
3 Urugan Pasir 2.82 M3 0.30% 7.800 0.023 - - 7.800 0.02
4 Pondasi Batu Kali 1 pc : 1 kp : 2 PS 36.63 M3 3.90% 7.800 0.304 - - 7.800 0.30
5 Urugan Tanah Kembali 17.86 M3 0.11% 7.800 0.009 - - 7.800 0.01
- - 7.42% - - - - - -
III PEKERJAAN PASANGAN DAN PLESTERAN - 0.00% - - - - - -
1 Pas. Dinding 1/2 bata 205.16 M2 11.52% 36.625 4.218 - - 36.625 4.22
2 Pasangan Rollag 32.66 M2 1.83% 35.931 0.659 35.931 0.66
3 Plesteran Dinding 1PC : 5PS 508.42 M2 8.67% 36.421 3.158 36.421 3.16
Acian 508.42 6.00% 36.230 2.174 36.230 2.17
pasangan trasram 1:3 35.25 6.00% 36.230 2.174 36.230 2.17
Dinding Pagar 13.80 0.62% 35.845 0.223 35.845 0.22
- - 34.64% - - - - - -
IV PEKERJAAN PEMBETONAN - 0.00% - - - - - -
1 Sloof 15/20 313.02 M3 1.42% 4.700 0.067 - - 4.700 0.07
2 Kolom Praktis 15/15 416.77 M3 1.90% 4.700 0.089 - - 4.700 0.09
3 Ringbalk 15/15 302.59 M3 1.38% 4.700 0.065 - - 4.700 0.06
4 Sloof 15/20 28.20 M3 0.13% 0.350 0.000 - - 0.350 0.00
5 Kolom Praktis 15/15 26.40 M3 0.12% 0.350 0.000 - - 0.350 0.00
6 Ringbalk 15/15 21.15 M3 0.10% 0.350 0.000 - - 0.350 0.00
7 Sloof 15/20 1 Pc : 2 Ps : 3 Kr 2.11 M3 3.68% 12.320 0.454 - - 12.320 0.45
8 Kolom Praktis 15/15 1 Pc 1.98 M3 4.61% 12.320 0.568 - - 12.320 0.57
9 Ringbalk 15/20 1 Pc : 2Ps : 3 Kr 1.59 M3 4.03% 12.320 0.496 - - 12.320 0.50
10 Rabat Beton Lantai 1 Pc: 3 Ps: 5 Kr 2.50 M3 2.88% 12.320 0.355 - - 12.320 0.36
- - 20.24% - - - - - -
V PEKERJAAN PENUTUP LANTAI - 0.00% - - - - - -
1 Lantai keramik granit 60x60 95.04 M2 9.18% 100.000 9.176 - - 100.000 9.18
2 Pasangan keramik lantai 30/30 9.92 M2 0.62% 100.000 0.617 - - 100.000 0.62
- - 9.79% - - - - - -
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA - 0.00% - - - - - -
1 Pasang kusen kayu (6 x 15) 0.54 M2 1.79% 0.025 0.000 30.000 0.54 30.025 0.03
2 Kusen Pintu - unit 0.00% - - 30.000 - 30.000 -
P1 0.05 0.01%
P2 0.06 0.01%
P3 0.04 0.01%
P4 0.09 0.01%
Kusen jendela - 0.00%
J1 0.07 0.01%
J2 0.05 0.01%
J3 0.05 0.01%
3 Bouvenlist - M2 0.00% - - 30.000 - 30.000 -
4 BV 0.04 M2 0.01% 0.000 0.000 30.000 0.00 30.000 0.00
5 Pintu slide - M2 0.00% - - 30.000 - 30.000 -
PS 0.10 0.01%
- - 1.86% - - - - - -
VII PEKERJAAN PENGECATAN - 0.00% - - - - - -
1 Pengecatan dinding 508.42 M2 4.01% - - 2.380 0.10 2.380 0.10
2 Pengecetan plafon 95.04 M2 0.75% - - 2.380 0.02 2.380 0.02
- - 4.76% - - - - - -
VIII PEKERJAAN INSTALASI LISTRIK - 0.00% - - - - - -
1 Pasang Stop Kontak 7.00 bh 0.66% - - - - - -
2 Pasang lampu 9.00 titik 1.06% - - - - - -
3 Pasang saklar ganda 3.00 bh 0.08% - - - - - -
4 Pasang saklar tunggal 3.00 bh 0.08% - - - - - -
Pasang sekring/MCB 1.00 0.26%
- - 2.12% - - - - - -
IX PEKERJAAN KUNCI DAN PENGGANTUNG - 0.00% - - - - - -
1 Pasang kunci tanam 5.00 Unit 0.50% - - - - - -
2 Pasang engsel pintu 5.00 bh 0.10% - - - - - -
3 Pasang handle pintu 5.00 bh 0.24% - - - - - -
4 Pasang engsel jendela 8.00 bh 0.10% - - - - - -
5 Pasang grendel jendela 8.00 bh 0.24% - - - - - -
6 Pasang rel sleding 8.00 set 0.13% - - - - - -
- - 1.31% - - - - - -
LAPORAN MINGGUAN
Malang, 19-Oct-2019
I PEKERJAAN PERSIAPAN
1 Pembersihan Lahan 112.50 M2 0.56% 160.000 0.900 - 160.000 0.90
2 Pemasangan Bowplank 53.00 M1 1.04% 160.000 1.672 - 160.000 1.67
- - 1.61% - - - -
II PEKERJAAN GALIAN TANAH DAN PONDASI - 0.00% - - - -
1 Galian Tanah Lubang Pondasi 53.58 M3 1.23% 7.800 0.096 - - 7.800 0.10
2 Aanstamping / Pas. Batu kosong 11.28 M3 1.89% 7.800 0.147 - - 7.800 0.15
3 Urugan Pasir 2.82 M3 0.30% 7.800 0.023 - - 7.800 0.02
4 Pondasi Batu Kali 1 pc : 1 kp : 2 PS 36.63 M3 3.90% 7.800 0.304 - - 7.800 0.30
5 Urugan Tanah Kembali 17.86 M3 0.11% 7.800 0.009 - - 7.800 0.01
- - 7.42% - - - - - -
III PEKERJAAN PASANGAN DAN PLESTERAN - 0.00% - - - - - -
1 Pas. Dinding 1/2 bata 205.16 M2 11.52% 36.625 4.218 - - 36.625 4.22
2 Pasangan Rollag 32.66 M2 1.83% 35.931 0.659 - - 35.931 0.66
3 Plesteran Dinding 1PC : 5PS 508.42 M2 8.67% 36.421 3.158 - - 36.421 3.16
Acian 508.42 6.00% 36.230 2.174 36.230 2.17
pasangan trasram 1:3 35.25 6.00% 36.230 2.174 36.230 2.17
Dinding Pagar 13.80 0.62% 35.845 0.223 35.845 0.22
- - 34.64% - - - - - -
IV PEKERJAAN PEMBETONAN - 0.00% - - - - - -
1 Sloof 15/20 313.02 M3 1.42% 4.700 0.067 - - 4.700 0.07
2 Kolom Praktis 15/15 416.77 M3 1.90% 4.700 0.089 - - 4.700 0.09
3 Ringbalk 15/15 302.59 M3 1.38% 4.700 0.065 - - 4.700 0.06
4 Sloof 15/20 28.20 M3 0.13% 0.350 0.000 - - 0.350 0.00
5 Kolom Praktis 15/15 26.40 M3 0.12% 0.350 0.000 - - 0.350 0.00
6 Ringbalk 15/15 21.15 M3 0.10% 0.350 0.000 - - 0.350 0.00
7 Sloof 15/20 1 Pc : 2 Ps : 3 Kr 2.11 M3 3.68% 12.320 0.454 - - 12.320 0.45
8 Kolom Praktis 15/15 1 Pc 1.98 M3 4.61% 12.320 0.568 - - 12.320 0.57
9 Ringbalk 15/20 1 Pc : 2Ps : 3 Kr 1.59 M3 4.03% 12.320 0.496 - - 12.320 0.50
10 Rabat Beton Lantai 1 Pc: 3 Ps: 5 Kr 2.50 M3 2.88% 12.320 0.355 - - 12.320 0.36
- - 20.24% - - - - - -
V PEKERJAAN PENUTUP LANTAI - 0.00% - - - - - -
1 Lantai keramik granit 60x60 95.04 M2 9.18% 100.000 9.176 - - 100.000 9.18
2 Pasangan keramik lantai 30/30 9.92 M2 0.62% 100.000 0.617 - - 100.000 0.62
- - 9.79% - - - - - -
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA - 0.00% - - - - - -
1 Pasang kusen kayu (6 x 15) 0.54 M2 1.79% 30.025 0.536 40.000 0.71 70.025 1.25
2 Kusen Pintu - unit 0.00% 30.000 - 40.000 - 70.000 -
P1 0.05 0.01%
P2 0.06 0.01%
P3 0.04 0.01%
P4 0.09 0.01%
Kusen jendela - 0.00%
J1 0.07 0.01%
J2 0.05 0.01%
J3 0.05 0.01%
3 Bouvenlist - M2 0.00% 30.000 - 40.000 - 70.000 -
4 BV 0.04 M2 0.01% 30.000 0.002 40.000 0.00 70.000 0.00
5 Pintu slide - M2 0.00% 30.000 - 40.000 - 70.000 -
PS 0.10 0.01%
- - 1.86% - - - - - -
VII PEKERJAAN PENGECATAN - 0.00% - - - - - -
1 Pengecatan dinding 508.42 M2 4.01% 2.380 0.095 2.380 0.10 4.760 0.19
2 Pengecetan plafon 95.04 M2 0.75% 2.380 0.018 2.380 0.02 4.760 0.04
- - 4.76% - - - - - -
VIII PEKERJAAN INSTALASI LISTRIK - 0.00% - - - - - -
1 Pasang Stop Kontak 7.00 bh 0.66% - - 50.000 0.33 50.000 0.33
2 Pasang lampu 9.00 titik 1.06% - - 50.000 0.53 50.000 0.53
3 Pasang saklar ganda 3.00 bh 0.08% - - 50.000 0.04 50.000 0.04
4 Pasang saklar tunggal 3.00 bh 0.08% - - 50.000 0.04 50.000 0.04
Pasang sekring/MCB 1.00 0.26%
- - 2.12% - - - - - -
IX PEKERJAAN KUNCI DAN PENGGANTUNG - 0.00% - - - - - -
1 Pasang kunci tanam 5.00 Unit 0.50% - - 50.000 0.25 50.000 0.25
2 Pasang engsel pintu 5.00 bh 0.10% - - 50.000 0.05 50.000 0.05
3 Pasang handle pintu 5.00 bh 0.24% - - 50.000 0.12 50.000 0.12
4 Pasang engsel jendela 8.00 bh 0.10% - - 50.000 0.05 50.000 0.05
5 Pasang grendel jendela 8.00 bh 0.24% - - 50.000 0.12 50.000 0.12
6 Pasang rel sleding 8.00 set 0.13% - - 50.000 0.06 50.000 0.06
- - 1.31% - - - - - -
LAPORAN MINGGUAN
Malang, 26-Oct-2019
IV PEKERJAAN BEGESTING
V PEKERJAAN PENGECORAN
3 Kusen jendela
- J1 0.07 Rp 489,095.00 Rp 33,982.32
- J2 0.05 Rp 489,095.00 Rp 25,618.80
- J3 0.05 Rp 489,095.00 Rp 24,078.15
4 Bouvenlist Rp -
- BV 0.04 Rp 489,095.00 Rp 19,544.24
5 Pintu slide
- PS 0.10 Rp 489,095.00 Rp 46,571.63
Sub Total Rp 6,456,155.42
IX PEKERJAAN PLAFON
X PEKERJAAN KERAMIK
III PEKERJAAN PASANGAN DAN PLESTERAN 10.67% 3.20% 4.27% 2.13% 1.07%
VI PEKERJAAN KUSEN DAN DAUN PINTU JENDELA 34.23% 3.42% 10.27% 6.85% 6.85% 3.42% 1.71% 1.71%
X PEKERJAAN SANITASI AIR BERSIH dan KOTOR 0.59% 0.42% 0.06% 0.06% 0.06%
JUMLAH 100.00%
RENCANA 0 2.46% 3.49% 4.56% 5.99% 8.78% 11.57% 15.14% 12.93% 11.49% 8.29% 7.53% 3.63% 1.88% 0.91% 0.91% 0.45% 100%
RENCANA KOMULATIF 0 2.46% 5.95% 10.51% 16.50% 25.28% 36.85% 51.99% 64.92% 76.41% 84.69% 92.22% 95.85% 97.73% 98.64% 99.55% 100% 100%
REALISASI - 2.67% 9.94% 9.61% 12.86% 0.06% 0.06% 0.03% 1.92% 7.43% 18.33% 11.46% 14.90% 4.34% 2.13% 2.13% 2.13% 100%
REALISASI KOMULATIF 0 2.67% 12.60% 22.22% 35.08% 35.14% 35.19% 35.23% 37.15% 44.58% 62.91% 74.37% 89.26% 93.61% 95.74% 97.87% 100% 100%
RENCANA
REALISASI Malang, 23-November-2019