Anda di halaman 1dari 5

WAKTU PELAKSANAAN

NO TIME SCHEDULE (DOMPU)


URAIAN PEKERJAAN BOBOT 10 Mei 21 17 Mei 21 24 Mei 21 31 Mei 21 07 Jun 21 14 Jun 21 21 Jun 21 28 Jun 21 05 Jul 21 12 Jul 21 19 Jul 21 26 Jul 21 02 Agu 21 09 Agu 21 16 Agu 21 23 Agu 21 30 Agu 21 06 Sep 21 13 Sep 21 20 Sep 21 27 Sep 21 04 Okt 21 11 Okt 21 18 Okt 21 25 Okt 21 01 Nov 21
21 Sep 21 22 Sep 21 23 Sep 21 24 Sep 21 25 Sep 21 26 Sep 21
105 UNIT + 2 MOCK UP
PEMBANGUNAN HUNIAN TETAP PASCA BENCANA DI DESA DAHA
16 Mei 21 23 Mei 21 30 Mei 21 06 Jun 21 13 Jun 21 20 Jun 21 27 Jun 21 04 Jul 21 11 Jul 21 18 Jul 21 25 Jul 21 01 Agu 21 08 Agu 21 15 Agu 21 22 Agu 21 29 Agu 21 05 Sep 21 12 Sep 21 19 Sep 21 26 Sep 21 03 Okt 21 10 Okt 21 17 Okt 21 24 Okt 21 31 Okt 21 07 Nov 21

I PEKERJAAN PERSIAPAN 6.206 0.028 0.028 0.028 0.028 0.028 0.042 0.042 0.549 0.547 0.547 0.676 0.808 0.649 0.647 0.647 0.647 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026
- - - - - - - - - - - - - - - - - - - - - - - - - - -
PEMBANGUNAN HUNIAN TETAP PASCA BENCANA DI DESA DAHA (2UNIT MOCKUP) - - - - - - - - - - - - - - - - - - - - - - - - - - -
II PEKERJAAN STRUKTUR - - - - - - - - - - - - - - - - - - - - - - - - - - -
A PEKERJAAN TANAH 0.006 - - - - - 0.002 0.003 0.001 0.001 - - - - - - - - - - - - - - - - -
B PEKERJAAN PONDASI 0.077 - - - - - 0.008 0.023 0.026 0.018 0.003 - - - - - - - - - - - - - - - -
C PEKERJAAN PEMASANGAN STRUKTUR RISHA & RANGKA BANGUNAN 0.067 - - - - - - 0.010 0.019 0.019 0.019 - - - - - - - - - - - - - - - -
III PEKERJAAN ARSITEKTUR - - - - - - - - - - - - - - - - - - - - - - - - - - -
A PEKERJAAN KOMPONEN DINDING PENUTUP 0.190 - - - - - - - 0.036 0.036 0.036 0.040 0.040 - - - - - - - - - - - - - -
B PEKERJAAN KUSEN DAN PANEL PINTU / JENDELA 0.300 - - - - - - - - - 0.023 0.023 0.150 0.084 0.020 - - - - - - - - - - - -
C PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP 0.282 - - - - - - - - 0.094 0.094 0.094 - - - - - - - - - - - - - - -
D PEKERJAAN RANGKA PLAFOND DAN PENUTUP PLAFOND 0.126 - - - - - - - - - - 0.042 0.042 0.042 - - - - - - - - - - - - -
E PEKERJAAN PENUTUP LANTAI 0.151 - - - - - - - - - 0.050 0.050 0.050 - - - - - - - - - - - - - -
F PEKERJAAN PLESTER ACI DAN PENGECATAN 0.385 - - - - - - - 0.045 0.068 0.068 0.068 0.061 0.037 0.037 - - - - - - - - - - - -
G PEKERJAAN MEJA DAPUR 0.021 - - - - - - - - - - - - 0.001 0.011 0.010 - - - - - - - - - - -
H PEKERJAAN LOGO 0.004 - - - - - - - - - - - - - - - 0.004 - - - - - - - - - -
IV PEKERJAAN MEKANIKAL , ELEKTRIKAL DAN PLUMBING - - - - - - - - - - - - - - - - - - - - - - - - - - -
A PEKERJAAN INSTALASI LISTRIK 0.064 - - - - - - - 0.007 0.007 0.007 0.007 0.022 0.015 - - - - - - - - - - - - -
B PEKERJAAN PLUMBING 0.051 - - - - - - - 0.007 0.007 0.007 0.007 0.014 0.007 - - - - - - - - - - - - -
V PEKERJAAN UTILITAS RUMAH - - - - - - - - - - - - - - - - - - - - - - - - - - -
A PEKERJAAN JALAN SETAPAK 0.007 - - - - - - - - - - - - 0.007 - - - - - - - - - - - - -
B PEKERJAAN PENYAMBUNGAN LISTRIK 0.022 - - - - - - - - - - 0.007 0.007 0.008 - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - - - -
PEMBANGUNAN HUNIAN TETAP PASCA BENCANA DI DESA DAHA (105 UNIT) - - - - - - - - - - - - - - - - - - - - - - - - - - -
II PEKERJAAN STRUKTUR - - - - - - - - - - - - - - - - - - - - - - - - - - -
A PEKERJAAN TANAH 0.313 - - - - - 0.013 0.034 0.013 0.034 0.038 0.038 0.038 0.038 0.032 0.032 0.004 - - - - - - - - - -
B PEKERJAAN PONDASI 4.064 - - - - - - 0.005 0.153 0.153 0.153 0.395 0.395 0.395 0.395 1.009 1.009 - - - - - - - - - -
C PEKERJAAN PEMASANGAN STRUKTUR RISHA & RANGKA BANGUNAN 3.507 - - - - - - 0.000 0.000 0.000 0.000 0.000 0.000 0.405 0.405 0.405 1.145 1.145 - - - - - - - - -
III PEKERJAAN ARSITEKTUR - - - - - - - - - - - - - - - - - - - - - - - - - - -
A PEKERJAAN KOMPONEN DINDING PENUTUP 9.958 - - - - - - 0.002 0.002 0.002 0.002 0.002 0.002 0.766 0.766 0.766 0.766 2.294 2.294 2.294 - - - - - - -
B PEKERJAAN KUSEN DAN PANEL PINTU / JENDELA 15.728 - - - - - - - - - - - 0.342 0.342 1.266 1.266 1.266 1.818 1.585 2.305 2.117 1.388 0.846
Progress s/d 1.174 0.005 0.005
26 September 0.005
C PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP 14.825 - - - - - - - 0.005 0.005 0.005 0.005 0.005 1.847 2.350 2.648 2.648 2.648 2.648 0.005 0.005 - - - - - -
D PEKERJAAN RANGKA PLAFOND DAN PENUTUP PLAFOND 6.605 - - - - - - - - - - 0.003 0.003 0.003 0.748 0.748 0.572 0.572 0.988 0.988 0.988
Rencana: 78.265 -
0.988 0.003 0.003 - -
E PEKERJAAN PENUTUP LANTAI 7.907 - - - - - - - - - - - - - 0.005 0.181 0.181 0.181 0.181 0.477 2.610 Progress:
2.046 2.046 23.794
- - - -
F PEKERJAAN PLESTER ACI DAN PENGECATAN 20.221 - - - - - - - - - - - - - 0.001 0.002 1.307 1.256 1.979 2.367 1.674 2.063 1.878
Deviasi 2.365 2.978 1.176
: (54.516) 1.176
G PEKERJAAN MEJA DAPUR 1.110 - - - - - - - - - - - 0.004 0.005 0.005 0.005 0.001 0.001 0.001 0.001 0.001 0.001 0.148 0.148 0.394 0.394 -
H PEKERJAAN LOGO 0.218 - - - - - - - - - - - - 0.001 0.001 0.001 0.001 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.074
IV PEKERJAAN MEKANIKAL , ELEKTRIKAL DAN PLUMBING - - - - - - - - - - - - - - - - - - - - - - - - - - -
A PEKERJAAN INSTALASI LISTRIK 3.365 - - - - - - - - - - - 0.010 0.010 0.010 0.010 0.010 0.019 0.019 0.019 0.433 0.519 0.521 0.283 0.478 0.478 0.546
B PEKERJAAN PLUMBING 2.686 - - - - - - - - - - - 0.030 0.030 0.030 0.079 0.079 0.039 0.039 0.039 0.039 0.009 0.443 0.443 0.462 0.462 0.462
V PEKERJAAN UTILITAS RUMAH - - - - - - - - - - - - - - - - - - - - - - - - - - -
A PEKERJAAN JALAN SETAPAK 0.388 - - - - - - - - - - - - - - 0.003 0.005 0.049 0.049 0.049 0.012 0.012 0.054 0.054 0.054 0.025 0.023
B PEKERJAAN PENYAMBUNGAN LISTRIK 1.147 - - - - - - - - - - - - - - - - 0.001 0.001 0.011 0.011 0.227 0.117 0.117 0.221 0.221 0.221
100.000 - - - - - - - - - - - - - - - - - - - - - - - - - -
RENCANA MINGGUAN 0.028 0.028 0.028 0.028 0.028 0.064 0.119 0.864 0.992 1.053 1.458 0.289 0.670 0.961 1.116 1.378 1.438 1.404 1.228 1.133 1.042 1.042 1.042 1.042 1.042 1.042 1.042 6.097 4.629 4.633 2.802 2.533
RENCANA KOMULATIF MINGGUAN - 0.028 0.057 0.085 0.113 0.141 0.206 0.324 1.188 2.180 3.233 4.691 6.715 11.408 18.137 25.948 35.593 45.657 55.484 64.081 72.012 73.054 74.096 75.138 76.181 77.223 78.265 79.307 85.404 90.033 94.665 97.467 100.000
REALISASI MINGGUAN 0.428 0.428 0.428 0.428 0.428 0.428 0.428 0.428 0.428 0.428 3.429 0.329 0.567 0.024 0.019 0.016 0.022 0.069 0.467 0.474 0.512 0.477 0.141 0.161 0.264 0.160
REALISASI KOMULATIF MINGGUAN - 0.428 0.857 1.285 1.714 2.142 2.570 2.999 3.427 3.856 4.284 7.713 10.470 14.429 17.838 18.051 18.213 18.351 18.712 20.092 22.033 22.545 23.022 23.164 23.324 23.588 23.749
DEVIASI - 0.400 0.800 1.200 1.601 2.001 2.365 2.674 2.239 1.676 1.051 3.022 3.755 3.021 (0.299) (7.897) (17.380) (27.306) (36.772) (43.989) (49.979) (50.509) (51.074) (51.975) (52.856) (53.634) (54.516)
TIME SCHEDULE (BIMA) WAKTU PELAKSANAAN
NO URAIAUNIT
185 N PEKERJAAN BOBOT 10 Mei 21 17 Mei 21 24 Mei 21 31 Mei 21 07 Jun 21 14 Jun 21 21 Jun 21 28 Jun 21 05 Jul 21 12 Jul 21 19 Jul 21 26 Jul 21 02 Agu 21 09 Agu 21 16 Agu 21 23 Agu 21 30 Agu 21 06 Sep 21 13 Sep 21 20 Sep 21 27 Sep 21 04 Okt 21 11 Okt 21 18 Okt 21 25 Okt 21 01 Nov 21
21 Sep 21 22 Sep 21 23 Sep 21 24 Sep 21 25 Sep 21 26 Sep 21
16 Mei 21 23 Mei 21 30 Mei 21 06 Jun 21 13 Jun 21 20 Jun 21 27 Jun 21 04 Jul 21 11 Jul 21 18 Jul 21 25 Jul 21 01 Agu 21 08 Agu 21 15 Agu 21 22 Agu 21 29 Agu 21 05 Sep 21 12 Sep 21 19 Sep 21 26 Sep 21 03 Okt 21 10 Okt 21 17 Okt 21 24 Okt 21 31 Okt 21 07 Nov 21
PEMBANGUNAN HUNIAN TETAP PASCA BENCANA DI DESA TAMBE (185 UNIT) -
I PEKERJAAN PERSIAPAN 7.623 0.069 0.069 0.069 0.069 0.069 0.113 0.113 0.113 0.475 0.475 0.475 0.475 1.199 1.199 1.199 1.156 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029
I PEKERJAAN STRUKTUR - - - - - - - - - - - - - - - - - - - - - - - - - - -
A PEKERJAAN TANAH 0.314 - - - - - - - 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.014 0.028 0.028 0.153 0.004 0.004 0.004 - - - -
B PEKERJAAN PONDASI 4.079 - - - - - - - - 0.005 0.005 0.005 0.005 0.314 0.314 0.314 0.314 0.314 0.623 0.623 0.623 0.623 - - - - -
C PEKERJAAN PEMASANGAN STRUKTUR RISHA & RANGKA BANGUNAN 3.519 - - - - - - - - 0.168 0.225 0.284 0.284 0.284 0.284 0.284 0.284 0.284 0.284 0.284 0.284 0.284 - - - - -
I I PEKERJAAN ARSITEKTUR - - - - - - - - - - - - - - - - - - - - - - - - - - -
A PEKERJAAN KOMPONEN DINDING PENUTUP 9.994 - - - - - - - - 0.033 0.033 0.033 0.033 0.989 0.989 0.989 0.989 0.989 0.989 0.989 0.989 0.989 0.956 - - - -
B PEKERJAAN KUSEN DAN PANEL PINTU / JENDELA 15.785 - - - - - - - - - - - - - 0.342 0.342 0.342 1.216 1.216 1.216 1.553 1.553 3.041 3.041 1.351 0.359 0.213
C PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP 14.879 - - - - - - - - - 0.333 0.333 0.333 1.145 1.145 1.145 2.362 1.145 1.145 1.145 1.145 2.362 1.145 - - - -
D PEKERJAAN RANGKA PLAFOND DAN PENUTUP PLAFOND 6.630 - - - - - - - - - - - - 0.510 0.510 0.510 0.510 0.510 0.510 0.003 0.003 0.003 0.003 0.510 1.524 1.524 -
E PEKERJAAN PENUTUP LANTAI 7.936 - - - - - - - - - - - - - - - 0.005 0.882 0.882 0.882 0.882 0.882 0.882 1.320 1.320 - -
F PEKERJAAN PLESTER ACI DAN PENGECATAN 20.295 - - - - - - - - - - - - - 0.001 0.002 1.307 1.703 1.999 2.650 2.551 2.551 3.004 3.004 0.006 0.982 0.535
G PEKERJAAN MEJA DAPUR 1.114 - - - - - - - - - - - 0.004 0.005 0.005 0.005 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.343 0.035
H PEKERJAAN LOGO 0.218 - - - - - - - - - - - - 0.001 0.001 0.001 0.001 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.074
Progress s/d 26 September
IV PEKERJAAN MEKANIKAL , ELEKTRIKAL DAN PLUMBING - - - - - - - - - - - - - - - - - - - - - -
Rencana: - 68.074- - - -
A PEKERJAAN INSTALASI LISTRIK 3.377 - - - - - - - - - - - 0.010 0.010 0.010 0.117 0.117 0.261 0.261 0.261 0.261 0.261 0.297 19.059
Progress: 0.297 0.297 0.297 0.619
B PEKERJAAN PLUMBING 2.695 - - - - - - - - - - - 0.030 0.030 0.030 0.130 0.130 0.204 0.204 0.204 0.204 Deviasi : (49.015)
0.204 0.204 0.204 0.294 0.294 0.327
V PEKERJAAN UTILITAS RUMAH
A PEKERJAAN JALAN SETAPAK 0.389 - - - - - - - - - - - - - - 0.007 0.016 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.032 0.023
B PEKERJAAN PENYAMBUNGAN LISTRIK 1.151 - - - - - - - - - - - - - - - - 0.107 0.107 0.117 0.117 0.117 0.117 0.117 0.117 0.117 0.117
100.000
RENCANA MINGGUAN 0.069 0.069 0.069 0.069 0.069 0.113 0.113 0.122 0.691 1.081 1.140 0.169 0.642 0.691 0.722 0.986 1.115 1.202 1.241 1.254 1.428 1.428 1.428 1.428 1.428 1.428 1.428 9.817 8.658 5.072 3.992 1.973
RENCANA KOMULATIF MINGGUAN - 0.069 0.138 0.207 0.276 0.345 0.458 0.570 0.693 1.384 2.465 3.605 4.790 9.286 14.126 19.181 25.821 33.626 42.037 50.726 59.506 60.934 62.362 63.790 65.218 66.646 68.074 69.502 79.319 87.977 93.049 97.041 99.014
REALISASI MINGGUAN 0.210 0.210 0.210 0.210 0.210 0.210 0.210 0.210 0.210 1.028 1.028 1.199 0.609 0.025 0.022 0.028 0.043 0.094 0.560 0.164 0.322 0.227 0.265 0.190 0.128 0.386
REALISASI KOMULATIF MINGGUAN 0 0.210 0.420 0.629 0.839 1.049 1.259 1.469 1.679 1.888 2.916 3.944 7.752 11.314 14.217 14.336 14.485 15.030 15.548 16.993 17.541 17.863 18.090 18.355 18.545 18.673 19.059
DEVIASI - 0.141 0.282 0.422 0.563 0.704 0.801 0.898 0.986 0.505 0.451 0.339 2.963 2.028 0.091 (4.845) (11.337) (18.596) (26.489) (33.734) (41.965) (43.071) (44.272) (45.435) (46.673) (47.973) (49.015)
PROGRESS PELAKSANAAN

Progress s/d 26 September Rencana 100% (Unit)


No. UNOR/Kegiatan Target (Unit)
s/d 5% 5% - 10 % 10% - 49% 51% - 99% 100% s/d Sept s/d Okt Setelah Okt Total
1 Desa Tambe 185 4 12 42 38 0 96 96 185 185

2 Desa Daha 107 6 12 54 16 0 83 107 107 107

JUMLAH 292 10 24 96 54 0 179 203 292 292


RENCANA KEBUTUHAN TENAGA KERJA
(BIMA & DOMPU)

Rencana/Kebutuhan Unit Organisasi


No. JUMLAH
Tenaga Kerja (TK) SDA CK Perumahan
1 Realisasi TK s/d Juli 104
Bulan Agustus
2 a. Rencana TK Agustus 146
b. Realisasi TK s/d Agustus 76
Rencana TK September 365
3 a. Desa Tambe 210
b. Desa Daha 155
LAPORAN JUMLAH TENAGA KERJA
(BIMA & DOMPU)

KABUPATEN BIMA
Jumlah Tenaga Kerja
No. Kelas Tenaga Kerja Tanggal
20-Sep 21-Sep 22-Sep 23-Sep 24-Sep 25-Sep 26-Sep
1 Pelaksana Lapangan 2 2 2 2 2 2 2
2 Kepala Tukang 0 0 0 0 0 0 0
3 Mandor 10 10 10 10 10 10 10
4 Tukang 56 55 56 54 54 56 57
5 Tenaga 57 53 54 52 53 55 56
6 Operator Alat Berat 0 0 0 0 0 0 0
7 Surveyor 0 0 0 0 0 0 0
8 Ass. Surveyor 0 0 0 0 0 0 0
Total 125 120 122 118 119 123 125

KABUPATEN DOMPU
Jumlah Tenaga Kerja
No. Kelas Tenaga Kerja Tanggal
20-Sep 21-Sep 22-Sep 23-Sep 24-Sep 25-Sep 26-Sep
1 Pelaksana Lapangan 2 2 2 2 2 2 2
2 Kepala Tukang 4 4 4 4 4 4 4
3 Mandor 2 2 2 2 2 2 2
4 Tukang 60 51 49 50 46 46 41
5 Tenaga 56 50 47 48 45 45 39
6 Operator Alat Berat 0 0 0 0 0 0 0
7 Surveyor 0 0 0 0 0 0 0
8 Ass. Surveyor 0 0 0 0 0 0 0
Total 124 109 104 106 99 99 88

Anda mungkin juga menyukai