Project :
keterangan
NO. ITEM PEKERJAAN
gambar
TOTAL
note :
belum termasuk pekerjaan : wastafel - pipa air bersih - pipa air kotor - listrik - rangka atap (bila ada)
VOLUME SAT.
0.13 m3
0.32 m3
0.36 m3
bata merah sekam 25.00 m2
bata merah sekam 2.50 m2
55.00 m2
55.00 m2
ex platinum 1.00 bh
20.00 m
rangka hollo 2x4 + gypsum 7.50 m2
cat catylac interior 7.50 m2
cat catylac interior 55.00 m2
6,500,000 832,000
6,500,000 2,047,500
6,500,000 2,340,000
150,000 3,750,000
315,000 787,500
57,000 3,135,000
30,000 1,650,000
487,000 487,000
50,000 1,000,000
185,000 1,387,500
40,000 300,000
50,000 2,750,000
20,466,500
20,466,500