Analisa Pemasangan Ac Ngs 4
Analisa Pemasangan Ac Ngs 4
HARGA SATUAN
NO. ANALIS JENIS PEKERJAAN VOL. SAT. UPAH (Rp) BAHAN (Rp) ALAT (Rp) JUMLAH HARGA (Rp)
(Rp)
40 ABK-I.603 Pekerjaan Pemasangan Instalasi Kabel AC 1.00 unit 97,384.00 18,869.00 - 116,253.00
HARGA SATUAN
NO. ANALIS JENIS PEKERJAAN VOL. SAT. UPAH (Rp) BAHAN (Rp) ALAT (Rp) JUMLAH HARGA (Rp)
(Rp)
Pekerjaan Pemasangan Instalasi Pipa AC
300 ABK-IX.598 1.00 ttk 422,500.00 547,520.00 - 970,020.00
Central LG VRV (10 PK)
1.000 OH Pekerja 200,000.00 200,000.00 200,000.00
0.890 OH Kepala Tukang 250,000.00 222,500.00 222,500.00
UPAH
HARGA SATUAN
NO. ANALIS JENIS PEKERJAAN VOL. SAT. UPAH (Rp) BAHAN (Rp) ALAT (Rp) JUMLAH HARGA (Rp)
(Rp)
Pekerjaan Pemasangan Instalasi Pipa AC
301 ABK-IX.597 1.00 ttk 422,500.00 750,000.00 - 1,172,500.00
Central LG VRV (15 PK)
1.000 OH Pekerja 200,000.00 200,000.00 200,000.00
UPAH
HARGA SATUAN
NO. ANALIS JENIS PEKERJAAN VOL. SAT. UPAH (Rp) BAHAN (Rp) ALAT (Rp) JUMLAH HARGA (Rp)
(Rp)
Pekerjaan Pemasangan MCCB 3 Phase 40
309 ABK-IX.608 1.00 ttk 512,000.00 1,388,500.00 128,000.00 2,028,500.00
Ampere
2.000 OH Tukang Listrik 128,000.00 256,000.00 256,000.00
1.000 OH Kepala Tukang 128,000.00 128,000.00 128,000.00
1.000 OH Mandor 128,000.00 128,000.00 128,000.00
HARGA SATUAN
NO. ANALIS JENIS PEKERJAAN VOL. SAT. UPAH (Rp) BAHAN (Rp) ALAT (Rp) JUMLAH HARGA (Rp)
(Rp)
Pekerjaan Pemasangan MCCB 3 Phase 32
310 ABK-IX.609 1.00 ttk 512,000.00 1,288,500.00 128,000.00 1,928,500.00
Ampere
2.000 OH Tukang Listrik 128,000.00 256,000.00 256,000.00
1.000 OH Kepala Tukang 128,000.00 128,000.00 128,000.00
1.000 OH Mandor 128,000.00 128,000.00 128,000.00
HARGA SATUAN
NO. ANALIS JENIS PEKERJAAN VOL. SAT. UPAH (Rp) BAHAN (Rp) ALAT (Rp) JUMLAH HARGA (Rp)
(Rp)
Pekerjaan Pemasangan MCB 1 Phase 16
311 ABK-IX.610 1.00 ttk 217,600.00 93,500.00 128,000.00 456,300.00
Ampere
1.000 OH Tukang Listrik 128,000.00 128,000.00 128,000.00
0.700 OH Kepala Tukang 128,000.00 89,600.00 89,600.00
UPAH
HARGA SATUAN
NO. ANALIS JENIS PEKERJAAN VOL. SAT. UPAH (Rp) BAHAN (Rp) ALAT (Rp) JUMLAH HARGA (Rp)
(Rp)
312 ABK-IX.606 Pekerjaan Pemasangan Panel 1.00 unit 592,800.00 1,353,500.00 119,910.00 2,066,210.00
4.000 OH Pekerja 97,000.00 388,000.00 388,000.00
0.600 OH Tukang Listrik 128,000.00 76,800.00 76,800.00
UPAH
HARGA SATUAN
NO. ANALIS JENIS PEKERJAAN VOL. SAT. UPAH (Rp) BAHAN (Rp) ALAT (Rp) JUMLAH HARGA (Rp)
(Rp)
314 ABK-IX.543 Pengisian Freon R410 A 1.00 can 107,240.00 5,750,000.00 808,271.00 6,665,511.00
1.000 OH Pekerja 97,000.00 97,000.00 97,000.00
UPAH
HARGA SATUAN
NO. ANALIS JENIS PEKERJAAN VOL. SAT. UPAH (Rp) BAHAN (Rp) ALAT (Rp) JUMLAH HARGA (Rp)
(Rp)
315 ABK-IX.614 Pemasangan Planum Suply Indor AHU 1.00 ttk 320,000.00 5,142,880.00 - 5,462,880.00
2.000 OH Pekerja 100,000.00 200,000.00 200,000.00
UPAH
HARGA SATUAN
NO. ANALIS JENIS PEKERJAAN VOL. SAT. UPAH (Rp) BAHAN (Rp) ALAT (Rp) JUMLAH HARGA (Rp)
(Rp)
316 ABK-IX.615 Pemasangan Planum Suplay Indor 10 PK 1.00 ttk 320,000.00 3,524,000.00 - 3,844,000.00
HARGA SATUAN
NO. ANALIS JENIS PEKERJAAN VOL. SAT. UPAH (Rp) BAHAN (Rp) ALAT (Rp) JUMLAH HARGA (Rp)
(Rp)
318 ABK-IX.617 Pemasangan Planum Return Indor 10 PK 1.00 ttk 320,000.00 2,920,000.00 - 3,240,000.00
HARGA SATUAN
NO. ANALIS JENIS PEKERJAAN VOL. SAT. UPAH (Rp) BAHAN (Rp) ALAT (Rp) JUMLAH HARGA (Rp)
(Rp)
319 ABK-IX.618 Pemasangan Ducting 700x300 1.00 m 296,400.00 1,458,000.00 - 1,754,400.00
2.000 OH Pekerja 97,000.00 194,000.00 194,000.00
UPAH
HARGA SATUAN
NO. ANALIS JENIS PEKERJAAN VOL. SAT. UPAH (Rp) BAHAN (Rp) ALAT (Rp) JUMLAH HARGA (Rp)
(Rp)
320 ABK-IX.619 Pemasangan Ducting 500x300 1.00 bh 296,400.00 1,400,000.00 - 1,696,400.00
2.000 OH Pekerja 97,000.00 194,000.00 194,000.00
UPAH
HARGA SATUAN
NO. ANALIS JENIS PEKERJAAN VOL. SAT. UPAH (Rp) BAHAN (Rp) ALAT (Rp) JUMLAH HARGA (Rp)
(Rp)
322 ABK-IX.621 Pemasangan Box Suplay Ducting AHU 1.00 bh 393,400.00 1,050,000.00 - 1,443,400.00
HARGA SATUAN
NO. ANALIS JENIS PEKERJAAN VOL. SAT. UPAH (Rp) BAHAN (Rp) ALAT (Rp) JUMLAH HARGA (Rp)
(Rp)
323 ABK-IX.622 Pemasangan Bak Drain AHU 1.00 bh 490,400.00 4,158,400.00 - 4,648,800.00
4.000 OH Pekerja 97,000.00 388,000.00 388,000.00
UPAH
HARGA SATUAN
NO. ANALIS JENIS PEKERJAAN VOL. SAT. UPAH (Rp) BAHAN (Rp) ALAT (Rp) JUMLAH HARGA (Rp)
(Rp)
324 ABK-IX.623 Pemasangan Bak Drain Indor 10 PK 1.00 bh 490,400.00 2,342,080.00 - 2,832,480.00
4.000 OH Pekerja 97,000.00 388,000.00 388,000.00
UPAH