Anda di halaman 1dari 16

Field Development Project MS UPPER

KELOMPOK 3

Hilman Lazuardi 071.14.074 Geologi


Dimas Panji 071.14.047 Penilaian Formasi
Catherine R.B.N 071.14.037 Reservoir
Fikri Tama 071.14.060 Produksi
Fachri Rizaldy 071.14.052 Drilling
Arkhan 071.14.175 Fasilitas Produksi
Putri Oditha 071.14. Ekonomi
William Sihombing 071.12.222 HSE
OUTLINE
Geologi
Penilaian Formasi
Reservoir
Produksi
Fasilitas Produksi
Skenario Pengembangan
Drilling
Ekonomi
HSE, ASR dan CSR
WORKFLOW
PENILAIAN
DATA GEOLOGI RESERVOIR
FORMASI

SKENARIO SURFACE
PEMBORAN PRODUKSI
PENGEMBANGAN FACILITY

EKONOMI HSE & CSR


SUMMARY
GEOLOGI
GEOLOGI REGIONAL
GEOLOGI REGIONAL
GEOLOGI REGIONAL
LINGKUNGAN PENGENDAPAN

Deepwater fan
STRATIGRAFI GEOLOGI

Batuan reservoir
STRUKTUR GEOLOGI
PETROLEUM SYSTEM

• SOURCE ROCK
• MIGRATION
• RESERVOIR
• CAP ROCK
• TRAP
LAPISAN MS UPPER
PENENTUAN VOLUME BULK

h (m) A (m2) int (m) Ai / Ai-1 metode Vb (m3) Vb (cuft)


0 20351562 25
25 19864410.5 25 0.976063189 Trapezoid 502699656.3 17750324862
50 15976562.5 25 0.804280726 Trapezoid 448012162.5 15819309458
75 10000000 25 0.62591687 Trapezoid 324707031.3 11465405273
100 2968750 25 0.296875 Pyramid 97292634.11 3435402911
111 624375 11 0.210315789 Pyramid 11863567.83 418902580
Total Vb 1399674138 49,422,493,822
1.399674138 cuft
KM3
SKENARIO
PENGEMBANGAN
PENENTUAN ____

Anda mungkin juga menyukai