CONTOH :
BERAPAKAH KEBUTUHAN MATERIAL STRUKTUR DINDING BATA DENGAN DENAH DAN GAMBAR DETAIL SEPERTI
DIBAWAH INI ? 120

QUANTITY’S CORNER
J1 J1 K1 K1
K1
P1 K1 J1 J1

J1
P1
K1 K1 K1 K1

70
P1

J1 J1

P1
K1 K1
K1 K1 K1
P1 P2

J2

J1 K2 DESAIN :
K1
- DINDING PASANGAN BATA TEBAL ½ BATU DENGAN TINGGI 3.5 M
- KOLOM 15 CM x 15 CM (K1)
- KOLOM 10 CM x 10 CM (K2)
P1
- PINTU UTAMA UK. 210 CM x 90 CM (P1)
K1
K1 K1 K1 J2 - PINTU KAMAR MANDI UK. 210 CM x 80 CM (P2)
- JENDELA UK. 150 CM x 50 CM (J1)
- VENTILASI UK. 50 CM x 50 CM (J2)
LANGKAH1:
HITUNG LUASAN DINDING BATA KESELURUHAN

PANJANG DINDING :

QUANTITY’S CORNER
KT 1
HORISONTAL = (7.5 x 2)+ (2.5 x 4) + 1.5 = 26.5 M
VERTIKAL = (7.5 x 3) + 2.5 + 1.6 = 26.6 M
TOTAL = 53.1 M
KT 2 KT 4

TINGGI DINDING = 3.5 M


LUASAN DINDING = 53.1 M x 3.5 M = 185.85 M2
KT 3
LANGKAH 2 :
HITUNG LUASAN PENGURANG DINDING
J1 J1 K1 K1
K1 PENGURANG DINDING ANTARA LAIN :
P1 K1 J1 J1

QUANTITY’S CORNER
J1 - PINTU P1 = 2.1 x 0.9 x 6 = 11.34 m2
P1
K1 K1 K1 K1 - PINTU P2 = 2.1 x 0.8 x 1 = 1.68 m2
P1
- JENDELA J1 = 1.5 x 0.5 x 8 = 6 m2
J1 J1
- VENTILASI J2 = 0.5 x 0.5 x 2 = 0.5 m2
P1
K1
- KOLOM K1 = 0.15 x 3.5 x 18 = 9.45 m2
K1
K1 K1 K1
P1 P2
- KOLOM K2 = 0.1 x 3.5 x 1 = 0.35 m2

J2
TOTAL = 29.32 m2
J1 K2
K1

P1
K1
K1 K1 K1 J2

LUASAN DINDING BERSIH LUASAN DINDING - PENGURANG DINDING


= = 185.85 - 29.32 = 156.53 M2
LANGKAH 3 :
HITUNG KEBUTUHAN MATERIAL PEKERJAAN DINDING BATA MERAH

PEK. DINDING BATA TEBAL ½ BATU DENGAN CAMPURAN 1 SP : 3PP

QUANTITY’S CORNER
BERDASARKAN SNI, KEBUTUHAN MATERIAL UNTUK TIAP M 2 PEK. DINDING BATA TEBAL ½ BATU,
DENGAN CAMPURAN 1 : 3 ADALAH :
- SEMEN PC = 14.37 KG
- BATA MERAH = 70 BUAH
- PASIR PASANG = 0.04 M3

JUMLAH MATERIAL YANG DIBUTUHKAN ADALAH :

- SEMEN PC = 14.37 x 156.53 = 2,249.33 KG ≈ 2,250 KG (56.25 zak @ 40 kg/ 45 zak @ 50 kg)
- BATA MERAH = 70 x 156.53 = 10,957.1 bh ≈ 11,000 bh
- PASIR PASANG = 0.04 M3 x 156.53 = 6.261 m3 ≈ 6.5 m3