Huitong Hybrid Tower

Lt.21 Zona 5
Lt.20 n = 4 (K1-E) (K2-E)
Lt.19 (K3-E) (K4-E)
Lt.18
Lt.17
Lt.16 Zona 4
Lt.15 n = 9 (K1-D) (K2-D)
Lt.14 (K3-D) (K4-D)
Lt.13
Lt.12
Zona 3
Lt.11
Lt.10
n = 14 (K1-C) (K2-C)
Lt.9
(K3-C) (K4-C)
Lt.8
Lt.7
Lt.6 Zona 2
Lt.5 n = 19 (K1-B) (K2-B)
Lt.4 (K3-B) (K4-B)
Lt.3
Lt.2
Tributary area K1 : 3,5 m x 3,3 m = 11,55 m2
Lt.1 Zona 1 Tributary area K2 : 7 m x 3,3 m = 23,1 m2
BASEMENT n = 24 (K1-A) (K2-A) Tributary area K3 : 7 m x 7,3 m = 51,1 m2
BASEMENT (K3-A) (K4-A)
BASEMENT
Tributary area K4 : 8 m x 3,5 m = 28 m2

Lokasi : Shenzen, China Dengan menggunakan mutu beton K-250 atau 20 Mpa
Arsitek : JKP Architects Simulasi untuk menentukan nilai kombinasi beban per m2 lantai Beban izin kolom :
Tahun : 2019 gedung ( Ug ) Fu = 0,65 . 0,85 . f’c
Huitong Hybrid Tower adalah Beban mati ( DL ) : = 0,65 . 0,85 . 20
gedung pencakar langit yang Portal & inti : 840 kg/m2 Jadi : = 11,05 Mpa
merupakan bagian dari ruang Berat partisi & dinding : 100 kg/m2 Ug = 1,2 DL + 1,6 LL
kantor dengan tempat parkir Berat Eleman Arsitektural : 100 kg/m2 = 1,2 (1.140) + 1,6 (250)
mobil berteknologi tinggi. Yang Berat Perlengkapan MEP : 100 kg/m2 = 1.368 + 400
memiliki 21 lantai dengan tinggi 1.140 kg/m2 = 1.768 kg/m2
80 m. Beban hidup ( LL ) :
: 250 kg/m2 Nilai Kombinasi beban (Ug)
Lantai kantor
250 kg/m2 1.768 kg/m2

NAMA : AYUB NUR CAHYO NIM : 5220911043 STRUKTUR DAN KONSTRUKSI C


NAMA : AYUB NUR CAHYO NIM : 5220911043 STRUKTUR DAN KONSTRUKSI C