Anda di halaman 1dari 45

RENCANA ANGGARAN BIAYA

RUMAH TIPE ASERA 10x20


PROYEK
LOKASI
SUB. PEKERJAAN

:
:
:

NO

URAIAN PEKERJAAN

SAT.

VOLUME

HARGA
SATUAN
(Rp.)

TOTAL
HARGA
(Rp.)

I.
1

PEKERJAAN PERSIAPAN
Pemasangan bouwplank

II.

PEKERJAAN PONDASI

PONDASI BATU KALI

a.
b.
c.
d.

Galian tanah
Pasir Urug
Urugan tanah kembali
Pasangan pondasi batu kali 1:3

III.
1
2
3

4
5
6
7

PEKERJAAN STRUKTUR DAN DINDING


Sloof 15/20 cm
Kolom Praktis 15/15 cm
Ring Balok 10/15 cm
Beton bertulang K-275
Besi beton
Bekisting
Pasangan Dinding Bata ( 1 : 3 )
Pasangan Dinding Bata ( 1 : 5 )
Plesteran Dinding ( 1 : 3 )
Plesteran Dinding ( 1 : 5 )
Dinding finish batu paras andesit

M'

68.00

M3
M2
M3
M3

53.87
76.96
27.90
25.97

M'
M3
M3
M3
kg
M2
M2
M2
M2
M2
M2

96.20
4.17
0.25
116.88
18,700.09
960.19
326.17
717.60
652.34
1,435.20
8.45

680,000.00
9,746.72
134,398.75

79,475,382.50
182,264,517.83
129,048,335.76
390,788,236.09

IV.
1
2
3
4
5

PEKERJAAN LANTAI
Timbunan tanah
Pasir Urug
Dinding Keramik KM/WC 30/30 cm
Dinding Keramik KM/WC 30/60 cm
Lantai Keramik KM / WC 30/30 cm
Lantai Keramik KM / WC 30/60 cm
Lantai Keramik 30/30 cm
Lantai Keramik 60/60 cm
Lantai Parquet Tangga
Lantai batu andesit 30/30 cm

M3
M2
M2
M2
M2
M2
M2
M2
M2

193.30
386.39
9.12
87.26
2.70
24.90
94.12
205.75
52.80
6.12

V.
1
2

PEKERJAAN ATAP DAN PLAFOND


Pekerjaan rangka atap baja ringan
Pekerjaan rangka atap aluminium
Pasang Atap + insulator
Pasang atap kaca entrance
Plafond Gypsum + rangka
Plafond Gypsum water resistant + rangka
Waterproofing lantai
Waterproofing dinding

M2
M2
M2
M2
M2
M2
M2
M2

38.50
9.00
43.05
9.00
291.57
15.80
67.42
9.00

VI.
1
2
4
5

PEKERJAAN PINTU DAN JENDELA


Pintu
Kayu solid engineering
Daun Pintu & Jendela (set lengkap terpasang) PJ1
Pintu (set lengkap terpasang) P1
Pintu (set lengkap terpasang) P2
Pintu (set lengkap terpasang) P3
Pintu (set lengkap terpasang) P5
Pintu (set lengkap terpasang) P6
Pintu (set lengkap terpasang) P11
Pintu (set lengkap terpasang) P12
Pintu (set lengkap terpasang) P13
Pintu (set lengkap terpasang) P14
Jati kering oven
Pintu (set lengkap terpasang) P4
Aluminium ex YKK profile 4" good finish
Daun Pintu & Jendela (set lengkap terpasang) PJ2
Pintu (set lengkap terpasang) P7
Pintu (set lengkap terpasang) P8
Pintu (set lengkap terpasang) P9
Pintu (set lengkap terpasang) P10
Pintu (set lengkap terpasang) P15
Pintu (set lengkap terpasang) P16
Jendela
Daun Jendela (set lengkap terpasang) J1
Daun Jendela (set lengkap terpasang) J3
Aluminium ex YKK profile 4" good finish
Daun Jendela (set lengkap terpasang) J2
Daun Jendela (set lengkap terpasang) J4
Daun Jendela (set lengkap terpasang) J5
Daun Jendela (set lengkap terpasang) J6
Daun Jendela (set lengkap terpasang) J7
Daun Jendela (set lengkap terpasang) J9
Daun Jendela (set lengkap terpasang) J10
Daun Jendela (set lengkap terpasang) J11
Daun Jendela (set lengkap terpasang) J12
Besi hollow 4x4
PG
Louvre aluminium
Aluminium ex YKK profile 4" good finish
BV1

unit
unit
unit
unit
unit
unit
unit
unit
unit
unit

1.00
1.00
2.00
1.00
2.00
1.00
2.00
4.00
1.00
1.00

unit

1.00

unit
unit
unit
unit
unit
unit
unit

1.00
1.00
1.00
1.00
1.00
1.00
1.00

unit
unit

1.00
1.00

unit
unit
unit
unit
unit
unit
unit
unit
unit

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

unit
unit

1.00
1.00

unit

2.00

VII.
1
3

PEKERJAAN PENGECATAN
Cat Dinding
Cat Plafond

M2
M2

2,087.54
307.37

VIII.
1

PEKERJAAN ELEKTRIKAL
Pemasangan Lampu Taman + Aksesoris
Pemasangan Titik Lampu
Pemasangan Lampu Gantung
Pemasangan Box Sekering
Pemasangan Meter Listrik
Pemasangan Saklar Double

Bh
Ttk
Bh
Bh
Bh
Bh

2.00
77.00
3.00
6.00
2.00
23.00

NO

URAIAN PEKERJAAN

Pemasangan Saklar Tunggal


Pemasangan Saklar Hotel
Pemasangan Stop Kontak
Pemasangan Stop Kontak Dgn Tutup
Pemasangan TV Outlet

SAT.

VOLUME

HARGA
SATUAN
(Rp.)

TOTAL
HARGA
(Rp.)

Bh
Bh
Bh
Bh
Bh

15.00
1.00
41.00
1.00
8.00
-

VIII.
A

PEKERJAAN PLUMBING DAN SANITASI


Pekerjaan Pemasangan

Memasang Closet Jongkok

Bh

1.00

Memasang Closet Monoblok


Pembuatan bak mandi
Memasang Eco Washer

Bh
Bh
Bh

3.00
1.00
2.00

Memasang Wastafel

Bh

4.00

Memasang Meja Wastafel

Bh

1.00

Memasang Faucet

Bh

2.00

Partisi kaca tempered 10 mm (2.1x1.75)

set

2.00

Kaca cermin bevel frameless

Bh

2.00

Bak kontrol dgn tutup (300x300)

Bh

4.00

Flor drain

Bh

16.00

Roof drain

Bh

5.00

Titik jet washer

Bh

6.00

Titik shower

Bh

4.00

Titik kran biasa

Bh

19.00

Ground water tank

Unit

1.00

Septic Tank Dan Peresapan

Unit

1.00

Water tank

Unit

2.00

B
1
2
3

Pekerjaan Perpipaan Air Bersih/Bekas/Kotor


Saluran air bersih 3/4"
Saluran air kotor 4"
Saluran air faecalin 4"

IX.

PEKERJAAN HALAMAN

1
2

M'
M'
M'

Pintu garasi (92.6X2.775) + rangka

Set

1.00

Pagar
Pekerjaan Carport

M1
M2

17.00
36.16

TOTAL I - IX
Per meter bangunan

390,788,200.00
10,855,200.00

DAFTAR HARGA SATUAN UPAH DAN BAHAN

NO.

URAIAN HARGA UPAH

1
2
3
4
5
6
7
10
11
12
13

HARGA

Pekerja
Mandor
Tukang Batu
Tukang Kayu
Tukang Besi
Tukang Keramik
Tukang Plafond
Tukang Pasang Pipa
Tukang Cat
Kepala Tukang
Jaga Malam

NO.

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

40,000.00
50,000.00
60,000.00
60,000.00
60,000.00
60,000.00
60,000.00
60,000.00
60,000.00
70,000.00
25,000.00

SATUAN
4

Org/Hari
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH

URAIAN HARGA BAHAN_BAHAN

HARGA

SATUAN

1
A.
1
2

TIMBUNAN/GALIAN
Tanah Timbun/Merah
Pasir Timbun/Urug

Rp
Rp

57,500.00
61,500.00

M3
M3

Pasir Pasang

Rp

75,500.00

Pasir Beton

Rp

86,400.00

M3

Sirtu

Rp

81,500.00

M3

Tanah Humus

Rp

65,000.00

M3

B.
1
2
3
4
5
6

BAHAN PEREKAT
Portland Cement (PC)
Semen Putih
Lem Kayu
Lem Vinyl/Karet
Perekat Kaca
Waterproof

Rp
Rp
Rp
Rp
Rp
Rp

1,100.00
2,150.00
32,500.00
39,000.00
76,500.00
47,500.00

Kg
Kg
Kg
Kg
Kg
Kg

C.

BATU / BATU CETAKAN

Batu Kerikil/Koral 3 - 5 cm

Rp

159,900.00

M3

Batu Kerikil/Koral 5 - 7 cm

Rp

144,900.00

M3

Batu Kerikil/Koral 7 - 10 cm

Rp

129,900.00

M3

Batu Kerikil/Koral 10 - 15 cm

Rp

114,900.00

M3

Batu Kerikil/Koral 15 - 20 cm

Rp

99,900.00

M3

Batu Pecah 1 - 2 cm

Rp

190,200.00

M3

Batu Pecah 2 - 3 cm

Rp

177,700.00

M3

Batu Pecah 3 - 5 cm

Rp

165,200.00

M3

Batu Pecah 5 - 7 cm

Rp

150,200.00

M3

10

Batu Kacang/Jagung 0,5 - 1 cm

Rp

202,700.00

M3

11

Batu Splyt

Rp

212,700.00

12
13
14

Batu Bata Biasa 5x10x20 cm


Batu Bata Mesin 5x10x20 cm
Batu Bataco 6x12x24 cm

Rp
Rp
Rp

380.00
550.00
3,360.00

M3
Bh
Bh
Bh

Bahan dan Upah


Page 3 of 45

15
16
17
18
19
20
21

Batu Krawang 10x10x20 cm


Batu Krawang 10x15x15 cm
Batu Krawang 10x20x20 cm
Concrete Block (CB) 10
Concrete Block (CB) 15
Concrete Block (CB) 20
Bondbeam 40x20x20 cm

Rp
Rp
Rp
Rp
Rp
Rp
Rp

2,480.00
2,750.00
3,030.00
675.00
1,450.00
2,650.00
26,330.00

Bh
Bh
Bh
Bh
Bh
Bh
Bh

22

Con Block Warna Type Hollan tbl 6 cm

Rp

1,570.00

Bh

23

Con Block Warna Type Uni Pave tbl 6 cm

Rp

1,460.00

Bh

24

Con Block Warna Type Dosex Six tbl 6 cm

Rp

1,680.00

Bh

25

Con Block Warna Type Hexagon tbl 6 cm

Rp

1,600.00

Bh

26

Con Block K 125

Rp

1,610.00

Bh

27

Con Block K 175

Rp

2,630.00

Bh

D.

KAYU/LANGIT-LANGIT

Balok Kayu Jati

Rp 21,750,000.00

M3

Papan Kayu Jati

Rp 21,913,130.00

M3

Balok Kayu Damar Laut

Rp 8,750,000.00

M3

Papan Kayu Damar Laut

Rp 9,050,000.00

M3

Balok Kayu Meranti Batu

Rp 8,250,000.00

Papan Kayu Meranti Batu

Rp 8,550,000.00

M3

Balok Kayu Kapur

Rp 5,900,000.00

Papan Kayu Kapur

Rp 6,200,000.00

M3

Balok Kayu Meranti Kls. II

Rp 4,950,000.00

M3

10

Papan Kayu Meranti Kls. II

Rp 5,200,000.00

11

Kayu Sembarang/Bekisting

Rp 2,825,000.00

12

Kayu Bakar

Rp

174,900.00

M3

13

Papan Lambsering/Rider

Rp

205,200.00

M2

14

Kayu Lat Asbes 5x30x400 mm

Rp

6,750.00

Btg

15

Kayu Kaso 5 - 7/400 cm

Rp

83,160.00

Btg

16

Kayu Dolken/Kayu Laut 7,5 - 10/400 cm

Rp

17,500.00

Btg

17

Bambu 6 - 8/600 cm

Rp

12,500.00

Btg

18

Bilik Bambu

Rp

14,850.00

M2

19

Kayu Profil 1"

Rp

5,700.00

M'

20

Kayu Profil 2"

Rp

11,400.00

M'

21

Kayu Profil 3"

Rp

17,100.00

M'

22

Kayu Profil 4"

Rp

22,800.00

M'

23

Profil Gypsum 2"

Rp

4,180.00

M'

24

Profil Gypsum 3"

Rp

4,950.00

M'

25

Profil Gypsum 4"

Rp

6,050.00

M'

26

Profil Gypsum 6"

Rp

7,150.00

M'

27

Playwood 120x240 tbl. 18 mm

Rp

223,020.00

Lbr

28

Playwood 120x240 tbl. 12 mm

Rp

148,680.00

Lbr

29

Playwood 120x240 tbl. 9 mm

Rp

111,510.00

Lbr

30

Playwood 120x240 tbl. 6 mm

Rp

74,340.00

Lbr

31

Playwood 120x240 tbl. 4 mm

Rp

49,560.00

Lbr

32

Teakwood 120x240 tbl. 3 mm

Rp

51,980.00

Lbr

33

Triplek Jati 120x240 tbl. 3 mm

Rp

81,380.00

Lbr

Bahan dan Upah


Page 4 of 45

3
3

34

Triplek Sungkai 120x240 tbl. 3 mm

Rp

76,130.00

Lbr

35

Formica 120x240 cm

Rp

70,880.00

Lbr

36

Soft Board 120x240 tbl. 4 mm

Rp

53,450.00

Lbr

37

Soft Board 120x240 tbl. 6 mm

Rp

80,330.00

Lbr

38

Soft Board 120x240 tbl. 9 mm

Rp

120,490.00

Lbr

39

Soft Board 120x240 tbl. 12 mm

Rp

160,600.00

Lbr

40

Gypsum 120x240 tbl. 6 mm

Rp

57,230.00

Lbr

41

Gypsum 120x240 tbl. 9 mm

Rp

68,250.00

Lbr

42

Gypsum 120x240 tbl. 12 mm

Rp

89,250.00

Lbr

43

Asbes Lokal 100x100 cm

Rp

7,880.00

Lbr

44

Asbes Atrisco 100x100 cm t=4 mm

Rp

11,030.00

Lbr

45

Asbes Atrisco 100x100 cm t=5 mm

Rp

13,790.00

Lbr

46

Asbes Atrisco 100x100 cm t=6 mm

Rp

16,550.00

Lbr

47

Akustik 30x30 cm

Rp

7,760.00

Lbr

48

Akustik 30x60 cm

Rp

15,520.00

Lbr

49

Akustik 30x120 cm

Rp

62,080.00

Lbr

E.

BESI/ALLUMINIUM

Besi Beton Polos

Rp

11,850.00

Kg

Besi Beton Ulir

Rp

11,940.00

Kg

Besi Profil WF/INP

Rp

13,170.00

Kg

Besi Siku

Rp

6,740.00

Kg

Besi CNP

Rp

11,220.00

Kg

Besi Plat Strip

Rp

7,320.00

Kg

Besi Plat Polos

Rp

12,390.00

Kg

Kawat Besi Beton

Rp

13,750.00

Kg

Kawat Licin/Seng Polos

Rp

20,480.00

Kg

10

Kawat Duri

Rp

3,660.00

M'

11

Kawat Nyamuk

Rp

10,890.00

M2

12

Kawat Kasa

Rp

12,650.00

13

Kawat Harmonika # 1"

Rp

21,450.00

M2

14

Kawat Burung

Rp

11,550.00

M2

15

Pagar Kawat BRC 120 Polos

Rp

214,500.00

Lbr

16

Pintu Besi

Rp

742,500.00

M2

17

Pintu Gulung Besi

Rp

753,500.00

M2

18

Pintu Lipat Besi

Rp

761,200.00

M2

19

Pintu Rolling Door

Rp

423,500.00

M2

20

Jerajak Besi Bermotif

Rp

315,700.00

M2

21

Jerajak Besi Strip

Rp

283,800.00

M2

22

Rangka Baja Ringan

Rp

161,700.00

M2

23

Kosen Pintu Alluminium (80x210) Coklat

Rp

368,500.00

Bh

24

Kosen Pintu Alluminium (80x210) Putih

Rp

337,700.00

Bh

25

Kosen Jendela Alluminium (120x60) Coklat

Rp

261,250.00

Bh

26

Kosen Jendela Alluminium (120x60) Putih

Rp

225,500.00

Bh

27

Pintu Alluminium (80x210) Coklat

Rp

646,800.00

Bh

28

Pintu Alluminium (80x210) Putih

Rp

554,400.00

Bh

Bahan dan Upah


Page 5 of 45

29

Jendela Alluminium + Kaca 5 mm (120x60) Coklat

Rp

277,200.00

Bh

30

Jendela Alluminium + Kaca 5 mm (120x60) Putih

Rp

237,600.00

Bh

31

Kosen Pintu/Jendela Alluminium Coklat

Rp

71,500.00

M'

32

Kosen Pintu/Jendela Alluminium Putih

Rp

60,500.00

M'

33

Daun Jendela Alluminium Coklat

Rp

49,500.00

M'

34

Daun Jendela Alluminium Putih

Rp

44,000.00

M'

35

Profil Alluminium T

Rp

7,700.00

M'

36

Vention Blinds

Rp

148,500.00

M2

37

Vertical Blinds

Rp

159,500.00

38

Bingkai Naco Niki Hitam

Rp

183,330.00

M2

39

Bingkai Naco Niki Putih

Rp

152,780.00

40

Paku Beton 0,5" - 2"

Rp

280.00

Bh

41

Paku Beton 2" - 5"

Rp

480.00

Bh

42

Paku Biasa 0,5" - 2"

Rp

15,400.00

Kg

43

Paku Biasa 2" - 5"

Rp

13,200.00

Kg

44

Sekrup Macam Ukuran

Rp

19,250.00

Kg

45

Sekrup 0,5" - 2"

Rp

385.00

Bh

46

Sekrup Fisher

Rp

325.00

Bh

47

Bout 5/8" - 8"

Rp

18,150.00

Bh

48

Bout Angker 3/4" - 10"

Rp

41,250.00

Bh

49

Bout Ramset/Dina Bolt

Rp

650.00

Bh

F.

PENUTUP LANTAI DAN DINDING

Ubin Granito 30x30 cm

Rp

23,870.00

Bh

Ubin Granito 40x40 cm

Rp

42,350.00

Bh

Ubin Granito 60x60 cm

Rp

95,150.00

Bh

Ubin Mosaik 30x30 cm

Rp

12,650.00

Bh

Ubin Marmer Ex. Dn

Rp

238,150.00

M2

Ubin Teralux Marmer 30x30 cm

Rp

24,750.00

Bh

Ubin Teralux Marmer 40x40 cm

Rp

44,000.00

Bh

Ubin Teralux Marmer 60x60 cm

Rp

99,550.00

Bh

Ubin Keramik 10x20 cm

Rp

1,100.00

Bh

10

Ubin Keramik 15x15 cm

Rp

1,270.00

Bh

11

Ubin Keramik 20x20 cm

Rp

2,260.00

Bh

12

Ubin Keramik 20x25 cm

Rp

2,860.00

Bh

13

Ubin Keramik 25x25 cm

Rp

3,520.00

Bh

14

Ubin Keramik 30x30 cm

Rp

5,060.00

Bh

15

Ubin Keramik 30x30 cm anti slip

Rp

5,720.00

Bh

16

Ubin Keramik 40x40 cm

Rp

8,800.00

Bh

17

Ubin Keramik Artistik 5x20 cm

Rp

830.00

Bh

18

Ubin Keramik Artistik 10x10 cm

Rp

830.00

Bh

19

Ubin Keramik Artistik 10x20 cm

Rp

1,650.00

Bh

20

Ubin Keramik Essenza 30x30 cm

Rp

19,250.00

Bh

21

Ubin Keramik Essenza 40x40 cm

Rp

34,210.00

Bh

22

Porselen 11x11 cm Putih

Rp

1,100.00

Bh

23

Porselen 11x11 cm Warna

Rp

1,320.00

Bh

Bahan dan Upah


Page 6 of 45

24

Porselen 15x15 cm Putih

25

Porselen 15x15 cm Warna

26

Plint Ubin Teralux Marmer 10x30 cm

27

Plint Ubin Teralux Marmer 10x40 cm

28

Rp

2,090.00

Bh

Rp

2,310.00

Bh

Rp

14,850.00

Bh

Rp

26,400.00

Bh

Plint Ubin Teralux Marmer 10x60 cm

Rp

59,730.00

Bh

29

Plint Ubin Granito 10x30 cm

Rp

25,410.00

Bh

30

Plint Ubin Granito 10x40 cm

Rp

57,090.00

Bh

31

Plint Ubin Granito 10x60 cm

Rp

142,890.00

Bh

32

Plint Ubin Keramik 10x30 cm

Rp

3,740.00

Bh

33

Plint Ubin Keramik 10x40 cm

Rp

5,170.00

Bh

34

Plint Ubin Keramik 10x60 cm

Rp

7,370.00

Bh

35

Plint Ubin Keramik 15x30 cm

Rp

5,280.00

Bh

36

Plint Ubin Keramik 15x40 cm

Rp

7,040.00

Bh

37

Plint Ubin Keramik 15x60 cm

Rp

10,560.00

Bh

38

Batu Lapis Dinding 7x3x24

Rp

1,850.00

Bh

39

Batu Tempel Hitam

Rp

95,000.00

40

Batu Poros

Rp

104,250.00

M2

41

Carpet

Rp

82,500.00

42

Carpet 80% Wool, 20% Nylon

Rp

79,500.00

M2

43

Feltex Carpet 100% Wool-T-21

Rp

77,500.00

M2

44

Underlyer tebal 6 mm/Rubber Corrugated

Rp

95,000.00

45

Vynil Asbes 30x30 cm

Rp

7,480.00

Bh

46

Vynil Karet 30x30 cm KL I

Rp

8,910.00

Bh

47

Vynil Karet 30x30 cm KL II

Rp

8,250.00

Bh

48

Vynil Motif Kembang Ex. Dn 30x30 cm

Rp

8,580.00

Bh

49

Vynil Wall Covering lebar 50 cm

Rp

57,500.00

M2

50

Perquet Jati

Rp

335,000.00

M2

51

Gymfloor

Rp

72,500.00

M2

52

Paku Pancing 60 - 230

Rp

650.00

Bh

53

Sekrup 3,5"

Rp

370.00

Bh

54

Sekrup 3,5"

Rp

18,500.00

Kg

G.

PENUTUP ATAP

Atap Genteng Palentong

Rp

1,520.00

Bh

Atap Genteng Palentong Super

Rp

3,620.00

Bh

Atap Genteng Kodok

Rp

1,970.00

Bh

Atap Genteng Beton

Rp

5,430.00

Bh

Atap Genteng Keramik

Rp

10,350.00

Bh

Atap Genteng Aspal

Rp

10,290.00

Lbr

Atap GentengMetal/Multi Roof 35

Rp

58,300.00

M2

Atap Genteng Asbes Cement 0,35

Rp

60,720.00

Lbr

Atap Sirap

Rp

940.00

Bh

10

Atap Alluminium Gelombang tebal 0,55

Rp

89,250.00

Lbr

11

Atap Seng Gelombang 3'x6' BJLS 35

Rp

54,220.00

Lbr

12

Atap Seng super Deck 3'x6' tebal 0,30

Rp

66,000.00

Lbr

13

Roof Light Fibreglass Gelombang 180x90 cm

Rp

41,170.00

Lbr

Bahan dan Upah


Page 7 of 45

14

Atap Asbes Gelombang 1,8x1,05 tbl. 4 mm

Rp

51,980.00

Lbr

15

Atap Asbes Gelombang 2,1x1,05 tbl. 4 mm

Rp

81,530.00

Lbr

16

Atap Asbes Gelombang 2,4x1,05 tbl. 4 mm

Rp

94,500.00

Lbr

17

Atap Asbes Gelombang 2,7x1,05 tbl. 4 mm

Rp

99,000.00

Lbr

18

Atap Asbes Gelombang 1,8x0,92 tbl. 5 mm

Rp

60,860.00

Lbr

19

Atap Asbes Gelombang 2,1x0,92 tbl. 5 mm

Rp

76,090.00

Lbr

20

Atap Asbes Gelombang 2,4x0,92 tbl. 5 mm

Rp

83,000.00

Lbr

21

Atap Asbes Gelombang 2,7x0,92 tbl. 5 mm

Rp

91,300.00

Lbr

22

Atap Asbes Gelombang 1,8x1,08 tbl. 6 mm

Rp

87,420.00

Lbr

23

Atap Asbes Gelombang 2,1x1,08 tbl. 6 mm

Rp

101,700.00

Lbr

24

Atap Asbes Gelombang 2,4x1,08 tbl. 6 mm

Rp

108,330.00

Lbr

25

Atap Asbes Gelombang 2,7x1,08 tbl. 6 mm

Rp

131,130.00

Lbr

26

Genteng Bubung Palentong

Rp

8,500.00

Bh

27

Genteng Bubung Palentong super

Rp

11,580.00

Bh

28

Genteng Bubung Kodok

Rp

8,690.00

Bh

29

Nok Genteng Beton

Rp

12,220.00

Bh

30

Nok Genteng Keramik

Rp

13,670.00

Bh

31

Nok Genteng Aspal

Rp

26,680.00

Bh

32

Nok Genteng Metal/Multu Roof (Decra Bond)

Rp

37,400.00

Bh

33

Nok Genteng Asbes Gelombang Cement 0,35

Rp

30,700.00

Lbr

34

Nok Alluminium Standard 40 cm 18swg 22

Rp

43,540.00

35

Bubung/Nok Stel Gelombang 0,92 m' tbl. 5 mm

Rp

17,810.00

Lbr

36

Bubung/Nok Stel Gelombang 1,05 m' tbl. 4 mm

Rp

23,630.00

Lbr

37

Bubung/Nok Stel Gelombang 1,08 m' tbl. 6 mm

Rp

25,920.00

Lbr

38

Bubung/Nok Paten 0,92 m' tbl. 5 mm

Rp

33,460.00

Lbr

39

Bubung/Nok Paten 1,05 m' tbl. 4 mm

Rp

28,140.00

Lbr

40

Bubung/Nok Paten 1,08 m' tbl. 6 mm

Rp

39,050.00

Lbr

41

Bubung/Nok Stel Rata 0,92 m' tbl. 5 mm

Rp

32,800.00

Lbr

42

Bubung/Nok Stel Rata 1,05 m' tbl. 4 mm

Rp

27,500.00

Lbr

43

Bubung/Nok Stel Rata 1,08 m' tbl. 6 mm

Rp

36,910.00

Lbr

44

Seng Plat 3'x6' BJLS 35

Rp

105,000.00

Lbr

45

Seng Plat 3'x6' BJLS 30

Rp

94,500.00

Lbr

46

Plastic Aerator

Rp

25,000.00

Bh

47

Sisalation/Alluminium Foil

Rp

70,180.00

M2

48

Paku Seng + ring Karet

Rp

18,500.00

Kg

49

Paku Seng + ring Karet

Rp

370.00

Bh

50

Paku Hak panjang 15 cm

Rp

27,750.00

Kg

H.

KUNCI DAN KACA

Kunci Tanam Antik

Rp

203,500.00

Bh

Kunci Tanam Biasa

Rp

81,840.00

Bh

Kunci Tanam Kamar Mandi

Rp

49,720.00

Bh

Kunci Silinder

Rp

31,350.00

Bh

Kunci Selot

Rp

24,750.00

Bh

Kunci Lemari

Rp

11,220.00

Bh

Engsel Pintu 4"

Rp

13,750.00

Bh

Bahan dan Upah


Page 8 of 45

Engsel Jendela 3"

Rp

10,230.00

Bh

Engsel Angin

Rp

22,770.00

Bh

10

Kait Angin

Rp

17,380.00

Bh

11

Rel Pintu Dorong

Rp

145,750.00

Bh

12

Sealent

Rp

35,750.00

Kg

13

Spring Knip

Rp

8,250.00

Bh

14

Door Closer

Rp

99,770.00

Bh

15

Door Handle

Rp

102,740.00

Bh

16

Door Stop

Rp

34,650.00

Bh

17

Espanyolet

Rp

80,410.00

Bh

18

Kaca Block 20x20 cm

Rp

23,650.00

Bh

19

Kaca Polos tbl. 3 mm

Rp

79,200.00

M2

20

Kaca Polos tbl. 5 mm

Rp

132,000.00

21

Kaca Polos tbl. 8 mm

Rp

211,200.00

M2

22

Kaca Reyben tbl. 5 mm

Rp

175,560.00

23

Kaca Reyben tbl. 8 mm

Rp

280,896.00

24

Kaca Buram tbl. 3 mm

Rp

66,000.00

M2

25

Kaca Buram tbl. 5 mm

Rp

101,200.00

26

Kaca Buram tbl. 8 mm

Rp

176,000.00

M2

27

Kaca Cermin tbl. 5 mm

Rp

147,000.00

M2

28

Kaca Cermin tbl. 6 mm

Rp

176,400.00

29

Kaca Cermin tbl. 8 mm

Rp

235,200.00

M2

30

Kaca Patri

Rp

154,000.00

M2

31

Kaca Wireglass

Rp

137,500.00

M2

32

Kaca Reyben Naco 30x60 cm tbl. 5 mm

Rp

12,350.00

Lbr

33

Kaca Bening Naco 30x60 cm tbl. 5 mm

Rp

9,750.00

Lbr

I.

CAT/MINYAK

Cat Dasar

Rp

14,300.00

Kg

Cat Tembok setara Vinilex

Rp

17,600.00

Kg

Cat Minyak untuk Kayu

Rp

32,450.00

Kg

Cat Minyak untuk Besi

Rp

35,750.00

Kg

Cat Menie Kayu

Rp

18,700.00

Kg

Cat Menie Besi

Rp

23,100.00

Kg

Cat Sending

Rp

49,500.00

Kg

Cat Melamix

Rp

53,900.00

Kg

Cat Vernis Jadi

Rp

43,890.00

Kg

10

Plamir

Rp

14,300.00

Kg

11

Dempul Gypsum

Rp

9,460.00

Kg

12

Dempul Cat

Rp

10,780.00

Kg

13

Minyak Cat

Rp

10,010.00

Kg

14

Minyak Bekisting

Rp

5,720.00

Ltr

15

Residu/Kolter

Rp

5,940.00

Ltr

16

Soda Api

Rp

11,000.00

Kg

17

Sabun

Rp

9,350.00

Kg

18

Kuas

Rp

7,150.00

Bh

Bahan dan Upah


Page 9 of 45

2
2

19

Ampelas/Kertas Pasir

Rp

1,650.00

Lbr

20

Wallpaper

Rp

27,830.00

J.

SANITASI/PIPA

Kloset Duduk/Monoblok Lengkap Tangki

2
3

Rp 1,756,700.00

Bh

Kloset Duduk/Monoblok Tangki

Rp 1,265,000.00

Bh

Kloset Jongkok Porselen

Rp

204,820.00

Bh

Bakkif Porselen

Rp 2,750,000.00

Bh

Wastafel

Rp

478,500.00

Bh

Urinoir

Rp

506,880.00

Bh

Kran Air " - "

Rp

24,860.00

Bh

Kran Air Leher Angsa "

Rp

70,180.00

Bh

Kran shower

Rp

84,150.00

Bh

10

Kran Cebok

Rp

65,670.00

Bh

Rp

165,000.00

Bh

11

Bak Fibreglass 0,3 M

12

Bak Fibreglass 1 M

Rp

475,200.00

Bh

13

Bak Cuci Piring Stainless 2 Lobang

Rp

424,270.00

Bh

14

Bak Cuci Piring Teraso 2 Lobang

Rp

247,500.00

Bh

15

Tempat Sabun Keramik

Rp

51,150.00

Bh

16

Floor Drain 4" Stainless

Rp

15,000.00

Bh

17

Stop Kran "

Rp

27,500.00

Bh

18

Tutup Bak Air 1" Kuningan

Rp

12,500.00

Bh

19

Instalasi Air Bersih

Rp

100,000.00

Ttk

20

Instalasi Air kotor/Limbah

Rp

125,000.00

Ttk

21

Buis Beton 15 cm

Rp

10,230.00

M'

22

Buis Beton 20 cm

Rp

16,170.00

M'

23

Buis Beton 30 cm

Rp

18,260.00

M'

24

Buis Beton 15 cm

Rp

17,490.00

M'

25

Buis Beton 20 cm

Rp

24,860.00

M'

26

Buis Beton 30 cm

Rp

51,150.00

M'

27

Buis Beton 40 cm

Rp

57,640.00

M'

28

Buis Beton 50 cm

Rp

87,230.00

M'

29

Buis Beton 60 cm

Rp

123,640.00

M'

30

Buis Beton 80 cm

Rp

182,820.00

M'

31

Buis Beton 100 cm

Rp

314,380.00

M'

32

Pipa PVC Tipe AW "

Rp

30,250.00

Btg

33

Pipa PVC Tipe AW "

Rp

40,540.00

Btg

34

Pipa PVC Tipe AW 1"

Rp

67,500.00

Btg

35

Pipa PVC Tipe AW 1 "

Rp

97,500.00

Btg

36

Pipa PVC Tipe AW 2"

Rp

115,000.00

Btg

37

Pipa PVC Tipe AW 2 "

Rp

132,000.00

Btg

38

Pipa PVC Tipe AW 3"

Rp

162,800.00

Btg

39

Pipa PVC Tipe AW 4"

Rp

272,500.00

Btg

40

Pipa Besi Hitam "

Rp

80,580.00

Btg

41

Pipa Besi Hitam "

Rp

109,840.00

Btg

42

Pipa Besi Hitam 1"

Rp

161,040.00

Btg

Bahan dan Upah


Page 10 of 45

43

Pipa Besi Hitam 1 "

Rp

204,930.00

Btg

44

Pipa Besi Hitam 2"

Rp

259,600.00

Btg

45

Pipa Besi Hitam 2 "

Rp

274,000.00

Btg

46

Pipa Galvanis "

Rp

80,580.00

Btg

47

Pipa Galvanis "

Rp

109,840.00

Btg

48

Pipa Galvanis 1"

Rp

161,040.00

Btg

49

Pipa Galvanis 1 "

Rp

183,040.00

Btg

50

Pipa Galvanis 1 "

Rp

204,930.00

Btg

51

Pipa Galvanis 2"

Rp

259,600.00

Btg

52

Pipa Galvanis 2 "

Rp

286,000.00

Btg

53

Fitting Pipa AW 1"

54

Knee AW 1"

Rp

4,750.00

Bh

55

Tee AW 1"

Rp

6,500.00

Bh

56

Socht AW 1"

Rp

4,250.00

Bh

57

F-Knee 1"

Rp

7,250.00

Bh

58

F-Tee 1"

Rp

11,500.00

Bh

59

Bocht LL-D 1"

Rp

22,500.00

Bh

60

Union Socht 1"

Rp

67,500.00

Bh

61

D-Nipple 1"

Rp

16,500.00

Bh

62

Water Moer 1"

Rp

29,500.00

Bh

K.

LISTRIK/ACCESORIES

Lampu TL 1x20 W Lengkap Kotak

Rp

49,500.00

Set

Lampu TL 1x40 W Lengkap Kotak

Rp

55,000.00

Set

Lampu TL 2x20 W Lengkap Kotak

Rp

148,500.00

Set

Lampu TL 2x40 W Lengkap Kotak

Rp

167,200.00

Set

Lampu TL Bambu 1x20 W Lengkap

Rp

99,000.00

Set

Lampu TL Bambu 1x40 W Lengkap

Rp

112,200.00

Set

Lampu XL 5 W + Fitting

Rp

23,100.00

Set

Lampu XL 8 W + Fitting

Rp

24,750.00

Set

Lampu XL 10 W + Fitting

Rp

26,400.00

Set

10

Lampu XL 14 W + Fitting

Rp

30,250.00

Set

11

Lampu XL 18 W + Fitting

Rp

30,800.00

Set

12

Lampu XL 24 W + Fitting

Rp

35,200.00

Set

13

Lampu Down Light 5 W Lengkap

Rp

49,500.00

Set

14

Lampu Pijar 5 W + Fitting

Rp

3,960.00

Set

15

Lampu Pijar 10 W + Fitting

Rp

4,070.00

Set

16

Lampu Pijar 15 W + Fitting

Rp

4,180.00

Set

17

Lampu Pijar 20 W + Fitting

Rp

4,290.00

Set

18

Lampu Pijar 25 W + Fitting

Rp

4,400.00

Set

19

Lampu Pijar 40 W + Fitting

Rp

4,510.00

Set

20

Stop Kontak Tanam

Rp

9,350.00

Bh

21

Saklar Tunggal

Rp

13,200.00

Bh

22

Saklar Ganda

Rp

14,300.00

Bh

23

Saklar Triple

Rp

16,500.00

Bh

24

Zekring Box 1 Grup

Rp

22,000.00

Unit

Bahan dan Upah


Page 11 of 45

25

Zekring Box 2 Grup

Rp

27,500.00

Unit

26

Zekring Box 3 Grup

Rp

33,000.00

Unit

27

Zekring Box 4 Grup

Rp

38,500.00

Unit

28

MCB 2 Ampere

Rp

30,250.00

Unit

29

MCB 4 Ampere

Rp

38,500.00

Unit

30

MCB 6 Ampere

Rp

61,600.00

Unit

31

MCB 8 Ampere

Rp

90,200.00

Unit

32

Kabel Listrik NYA 1,5 mm

Rp

940.00

M'

33

Kabel Listrik NYA 2,5 mm

Rp

1,650.00

M'

34

Kabel Listrik NYA 4 mm

Rp

7,260.00

M'

35

Kabel Listrik NYM 2 1,5 mm

Rp

3,630.00

M'

36

Kabel Listrik NYM 2 2,5 mm

Rp

9,080.00

M'

37

Kabel Listrik NYM 2 4 mm

Rp

14,520.00

M'

38

Instalasi Listrik Titik Api/Lampu Nyala

Rp

85,000.00

Ttk

Bahan dan Upah


Page 12 of 45

ANALISA ANGGARAN BIAYA BANGUNAN

ID

VOLUME

SAT.

URAIAN

HARGA SATUAN
(Rp.)

JUMLAH HARGA MATERIAL


(Rp.)

PEKERJAAN TANAH
An. A.1

An. A.3

An. A.18a

An. A.18b

1 m3 Galian Tanah Biasa Manual < 1500mm


0.65 org
Pekerja
0.021666667 org
Mandor

@ Rp.
@ Rp.

1 m3 Menimbun dan Memadatkan < 1500mm


0.1625 org
Pekerja
0.005416667 org
Mandor

@ Rp.
@ Rp.

1 m3 Timbunan Pasir Urug


1.2 m3
0.21125 org
0.007041667 org

Pasir urug
Pekerja
Mandor

@ Rp.
@ Rp.
@ Rp.

Tanah urug
Pekerja
Mandor

@ Rp.
@ Rp.
@ Rp.

An. F.0

An. G.32.g

1 m3 Timbunan Tanah
1.1 m3
0.21125 org
0.007041667 org

An. G.31.m

1 M3 Pasangan Batu Kali 1:3


1.2
4.0321
0.378
4
0.2
2
0.2

M3
Zak
M3
Org
Org
Org
Org

Batu Kali
Semen PC @ 40 Kg
Pasir Pasang
Pekerja
Mandor
Tukang Batu
Kepala Tukang

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

1 m' Pekerjaan Bowplank


0.0045
0.006666667
0.004
0.04
0.014
0.0007

m3
kg
org
org
org
org

Kayu sembarang
Paku kayu
Kepala tukang
Tukang Batu
Pekerja
Mandor

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

Buah
Zak
M3
Org
Org
Org
Org

Batu Bata
Semen PC @ 40 Kg
Pasir Pasang
Pekerja
Mandor
Tukang Batu
Kepala Tukang

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

1 M3 Pasangan Batu Bata 1:3


420
4.6
0.33
4
0.2
1.5
0.15

35,000
40,000
Jumlah
Upah x 3/4

35,000
40,000
Rp.
50,000 = Rp.
35,000
40,000
Jumlah
Upah x 1

60,000
60,000

Rp.
35,000 = Rp.
35,000
40,000

38,500
38,500

Rp.
120,000 = Rp.
38,850 = Rp.
50,000 = Rp.
35,000
40,000
50,000
60,000
Jumlah
Upah x
2/5

319,550
144,000
156,647
18,900

Rp.
2,500,000 = Rp.
11,500 = Rp.
60,000
50,000
35,000
40,000
Jumlah
Upah x
2/5

11,330
11,250
77

Rp.
380 = Rp.
38,850 = Rp.
50,000 = Rp.
35,000
40,000
50,000
60,000
Jumlah
Upah x
7/20

354,810
159,600
178,710
16,500

PEKERJAAN PONDASI
PP

6.5.
6.5.1.

Pasangan pondasi batu kali, 1Pc : 4Ps


1 m3
Bahan
Batu Belah 15/20 cm
Analisa Pekerjaan
Page 13 of 45

1.100 M3

6.5.2.

Semen Portland
Pasir Pasang

163.000 Kg
0.520 M3

x
x

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1.500
0.600
0.060
0.075

x
x
x
x

OH
OH
OH
OH

PEKERJAAN BETON
An. I.2

Sup. G.42

An. G.44

110 Kg Mengerjakan (memotong/memasang) besi beton bertulang


110 Kg
Besi Beton
1.5 Kg
Kawat Beton
9 Org
Pekerja
9 Org
Tukang
3 Org
Kepala Tukang

1 M3 Pekerjaan betonan K175


1 M3
20 M2
124 Kg

Zak
M3
M3
Org
Org
Org
Org

1 M2 Mengerjakan Cetakan Beton


0.04 M3
0.4 Kg
0.2 Org
0.01 Org
0.5 Org
0.05 Org

Rp.

17,620

An. G.44
An.F.8c
An.I.2

Rp.
= Rp.
= Rp.
= Rp.

269,080
243,720
7,740
17,620

Rp.
= Rp.
= Rp.
= Rp.

243,720
164,724
17,000
62,000

Semen PC @ 40 Kg
Pasir Pasang
Batu Kerikil
Pekerja
Mandor
Tukang
Kepala Tukang

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

Kayu Kelas Kuat IV (Sembarang)


Paku
Pekerja
Mandor
Tukang
Kepala Tukang

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
x
x

1 M2 Mengerjakan bekisting sloof, kolom dan balok praktis


0.0123 M3
Kayu Kelas Kuat IV (Sembarang)
0.01845 Kg
Paku
1.25 Jam
Memasang dan menyetel
0.75 Jam
Membongkar dan reparasi
0.285714286 Org
Pekerja
0.014285714 Org
Mandor
0.142857143 Org
Tukang
0.014285714 Org
Kepala Tukang
Bahan
Upah

An. F.8e

1,925,000
13,500

Untuk 1 Kg pembesian

Bahan
Upah
An. F.8c

17,500 = Rp.
9,000 = Rp.
35,000
40,000
50,000
Jumlah
Upah x 1/8

1 M3 Beton Cor 1:3:6


4.24
0.34
0.62
6
0.3
1
0.1

An. F.8a

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

1 M2 Mengerjakan bekisting lantai/duck beton


0.035555556 M3
Kayu Kelas Kuat IV (Sembarang)
0.355555556 Kg
Paku
0.385868935 lbr
Triplex 4mm

Analisa Pekerjaan
Page 14 of 45

1/2
5/8

@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
x
x

1/4
2/5

@ Rp.
@ Rp.
@ Rp.

38,850
50,000
100,000
35,000
40,000
50,000
60,000
Jumlah
Upah x

4/9

Rp.
2,500,000 = Rp.
11,500 = Rp.
35,000
40,000
50,000
60,000
Jumlah = Rp.
= Rp.

52,300
100,000
4,600

Rp.
2,500,000 = Rp.
11,500 = Rp.

7,740
30,750
212

35,000
40,000
50,000
60,000
Jumlah = Rp.
= Rp.

30,962
7,740

Rp.
2,500,000 = Rp.
11,500 = Rp.
45,000 = Rp.

36,780
88,889
4,089
17,364

104,600
52,300

2
1
0.428571429
0.021428571
0.214285714
0.021428571

Jam
Jam
Org
Org
Org
Org

Memasang dan menyetel


Membongkar dan reparasi
Pekerja
Mandor
Tukang
Kepala Tukang

@ Rp.
@ Rp.
@ Rp.
@ Rp.
Bahan

PB

1/3

35,000
40,000
50,000
60,000
Jumlah = Rp.
= Rp.
Rp.
= Rp.
= Rp.
= Rp.

110,342
36,780
2,263,960
243,720
82,040
1,938,200

Sup. G.43a

1 M3 Pekerjaan beton bertulang sloof & kolom/balok praktis K175


1 M3
An. G.43
10 M2
An.F.8c
110 Kg
An.I.2

Sup. G.43b

1 M3 Pekerjaan beton bertulang pondasi & kolom K175


1 M3
An. G.43
18 M2
An.F.8c
115 Kg
An.I.2

Rp.
= Rp.
= Rp.
= Rp.

2,409,340
243,720
139,320
2,026,300

Sup. G.43c

1 M3 Pekerjaan beton bertulang balok & plat K175


1 M3
An. G.43
12 M2
An.F.8c
130 Kg
An.I.2

Rp.
= Rp.
= Rp.
= Rp.

2,627,200
243,720
92,880
2,290,600

6.46.
6.46.1.

Membuat ring balok beton bertulang (10x15) cm


1 m3
Bahan
Kayu Sembarang, papan
Paku Biasa 2" - 5"
Besi Beton Polos
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton 1/ 2

0.003
0.020
3.600
0.050
5.500
0.009
0.015

M3
Kg
Kg
Kg
Kg
M3
M3

x
x
x
x
x
x
x

Tenaga
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

0.100
0.033
0.033
0.033
0.010
0.005

OH
OH
OH
OH
OH
OH

x
x
x
x
x
x

6.46.2.

PEKERJAAN DINDING DAN LANTAI


An. G.32.l

An. G.32.k

An. G.50.l

1 M2 Pasangan 1/2 Batu Bata 1:5


60 Buah
0.26 Zak
0.05472 M3
0.54 Org
0.027 Org
0.18 Org
0.018 Org

Batu Bata
Semen PC @ 40 Kg
Pasir Pasang
Pekerja
Mandor
Tukang Batu
Kepala Tukang

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

1 M2 Pasangan 1/2 Batu Bata 1:3


60 Buah
0.46 Zak
0.04134 M3
0.54 Org
0.027 Org
0.18 Org
0.018 Org

Batu Bata
Semen PC @ 40 Kg
Pasir Pasang
Pekerja
Mandor
Tukang Batu
Kepala Tukang

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

1 M2 Plasteran 1:3 tebal 15 mm

Rp.
380 = Rp.
38,850 = Rp.
50,000 = Rp.
35,000
40,000
50,000
60,000
Jumlah
Upah x
1/3

35,640
22,800
10,101
2,736

Rp.
380 = Rp.
38,850 = Rp.
50,000 = Rp.
35,000
40,000
50,000
60,000
Jumlah
Upah x
1/3

42,740
22,800
17,871
2,067

Rp.

Analisa Pekerjaan
Page 15 of 45

8,900

0.204
0.0194
0.4
0.02
0.15
0.015

An. G.50.r

An. G.16

Zak
M3
Org
Org
Org
Org

Semen PC @ 40 Kg
Pasir Pasang
Pekerja
Mandor
Tukang
Kepala Tukang

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

1 M2 Plasteran 1:5 tebal 15 mm


0.135 Zak
0.026125 M3
0.4 Org
0.02 Org
0.15 Org
0.015 Org

Semen PC @ 40 Kg
Pasir Pasang
Pekerja
Mandor
Tukang
Kepala Tukang

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

Semen PC @ 40 Kg
Pasir Pasang

@ Rp.
@ Rp.

Keramik 20 x 20 cm
Semen PC @ 40 Kg
Semen Putih
Pasir Pasang
Pekerja
Mandor
Tukang
Kepala Tukang

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

1 M3 Perekat 1:3
11.249 Zak
1.08 M3

An. G.72c

An. G.72d

An. G. 141

An. G.68b

1 M2 Ubin Keramik 20 x 20 cm Pas 1:3


1 M2
0.32 Zak
0.01076 Zak
0.038 M3
0.5 Org
0.025 Org
0.25 Org
0.025 Org

1 M2 Ubin Keramik 30 x 30 cm Pas 1:4


1 M2
0.256 Zak
0.0124 Zak
0.042 M3
0.5 Org
0.025 Org
0.25 Org
0.025 Org

Keramik 30 x 30 cm
Semen PC @ 40 Kg
Semen Putih
Pasir Pasang
Pekerja
Mandor
Tukang
Kepala Tukang

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

1 M2 Pemasangan Keramik Dinding 20 x 25 cm Pas 1:3


1 M2
Keramik 20 x 25 cm
0.02 M3
Perekat 1:3 (G.16)
1 Org
Pekerja
0.05 Org
Mandor
0.5 Org
Tukang
0.05 Org
Kepala Tukang

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

1 M' Pasangan Plint Ubin Keramik 10 x 30 cm Pas 1:4


0.25 M2
Keramik 30 x 30 cm
0.064 Zak
Semen PC @ 40 Kg
0.0085 M3
Pasir Pasang
0.3 Org
Pekerja
0.015 Org
Mandor
0.15 Org
Tukang
0.015 Org
Kepala Tukang

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

Analisa Pekerjaan
Page 16 of 45

38,850 = Rp.
50,000 = Rp.
35,000
40,000
50,000
60,000
Jumlah
Upah x
1/3

7,925
970

Rp.
38,850 = Rp.
50,000 = Rp.
35,000
40,000
50,000
60,000
Jumlah
Upah x
1/3

6,550
5,245
1,306

Rp.
38,850 = Rp.
50,000 = Rp.

491,020
437,024
54,000

Rp.
= Rp.
= Rp.
= Rp.
= Rp.

53,940
38,850
12,432
753
1,900

38,850
38,850
70,000
50,000
35,000
40,000
50,000
60,000
Jumlah
Upah x

35,000
38,000
75,000
50,000
35,000
40,000
50,000
60,000
Jumlah
Upah x

1/2
Rp.
= Rp.
= Rp.
= Rp.
= Rp.

47,760
35,000
9,728
930
2,100

3/8

Rp.
38,850 = Rp.
9,820 = Rp.
35,000
40,000
50,000
60,000
Jumlah
Upah x
7/25

39,050
38,850
196

Rp.
35,700 = Rp.
38,850 = Rp.
50,000 = Rp.
35,000
40,000
50,000
60,000
Jumlah
Upah x
1/2

11,840
8,925
2,486
425

An. G.70

1 M' Pasangan bon-bon keramik


1 m'
0.00625 Zak
0.1 Org
0.01 Org

Rp.
8,400 = Rp.
75,000 = Rp.
50,000
60,000
Jumlah
Upah x 1/2

8,870
8,400
469

Rp.
2,500,000 = Rp.
35,000
40,000
50,000
60,000
Jumlah
Upah x 2/5

2,750,000
2,750,000

Rp.
2,500,000 = Rp.
11,500 = Rp.
35,000
40,000
50,000
60,000
Jumlah
Upah x 3/4

13,590
13,333
256

Rp.
2,500,000 = Rp.
35,000
40,000
50,000
60,000
Jumlah
Upah x
2/5

2,750,000
2,750,000

Rp.
2,500,000 = Rp.
35,000
40,000
50,000
60,000
Jumlah
Upah x
1/30

87,500
87,500

Rp.
2,500,000 = Rp.
15,000 = Rp.
11,500 = Rp.
35,000
40,000
50,000
60,000
Jumlah
Upah x
1/10

105,080
92,500
12,000
575

@ Rp.
@ Rp.
@ Rp.

Rp.
12,000 = Rp.
2,500,000 = Rp.
7,500 = Rp.

31,040
204,000
225,000
62,685

@ Rp.
@ Rp.
@ Rp.

11,500 = Rp.
7,090
6,430

2,519

Bon-bon keramik kecil


Semen Putih
Tukang
Kepala Tukang

@ Rp.
@ Rp.
@ Rp.
@ Rp.

Kayu SK
Pekerja
Mandor
Tukang
Kepala tukang

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

Papan sembarang
Paku
Pekerja
Mandor
Tukang
Kepala tukang

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

PEKERJAAN KAYU, ATAP & PLAFOND


An. F.22

An. F.21

An. F.27a

An. F.33a

An. F.36

An. F.80a2
Hitungan

1 m3 Pekerjaan Kuda-Kuda
1.1
8
0.4
24
2.4

m3
org
org
org
org

1 m' Pekerjaan Lesplank 22 cm


0.005 m3
0.022 kg
0.062 org
0.003 org
0.178 org
0.018 org

1 m3 Pekerjaan Kozen Tanpa Jalusi/Ventilasi


1.1 m3
Kayu Damar
12 org
Pekerja
0.6 org
Mandor
36 org
Tukang
3.6 org
Kepala tukang

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

1 m2 Pekerjaan Daun Pintu Panel


0.035 m3
2.5 org
0.125 org
7.5 org
0.75 org

Papan Meranti
Pekerja
Mandor
Tukang
Kepala tukang

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

1 m2 Pekerjaan Daun Pintu/Jendela Kaca


0.037 m3
0.8 m2
0.05 kg
2 org
0.1 org
6 org
0.6 org

Papan Meranti (steam)


Kaca 4mm
Paku
Pekerja
Mandor
Tukang
Kepala tukang

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

1 m2 Pekerjaan Plafond Asbes + Rangka


15.92
17 lbr
Asbes
0.090 m3
Kayu SK
8.358 bt
Kayu lat
Kayu Profil
0.219 kg
Paku
0.09
Upah An. F10
15.92
Upah An. H.80a
Analisa Pekerjaan
Page 17 of 45

Untuk 1 m2

An. F.19

PPA

6.38.
6.38.1.

6.38.2.

PPA

6.39.
6.39.1.

6.39.2.

PLL

6.20.
6.20.1.

6.20.2.

Bahan
Upah

1 m2 Pekerjaan Rangka Atap Seng


0.011 m3
0.1 kg
0.015 org
0.00075 org
0.1 org
0.01 org

x
x

Kayu Meranti
Paku
Pekerja
Mandor
Tukang
Kepala tukang

Jumlah = Rp.
= Rp.

494,204
31,040

Rp.
2,500,000 = Rp.
11,500 = Rp.
35,000
40,000
50,000
60,000
Jumlah
Upah x 3/4

28,650
27,500
1,150

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

Pasang atap seng gelombang


1 m2
Bahan
Seng Gelombang 3'x6' BJLS 30
Paku Seng

0.700 Lbr
0.040 Kg

x
x

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.120
0.060
0.006
0.006

OH
OH
OH
OH

x
x
x
x

1 m'
Pasang atap nok seng
Bahan
Seng Plat 3'x6' BJLS 35
Paku Seng

0.300 Lbr
0.020 Kg

x
x

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.150
0.070
0.008
0.006

OH
OH
OH
OH

x
x
x
x

Langit-langit asbes (1,00x1,00) m rangka kayu meranti


1 m2
Bahan
Kayu Meranti, balok
Paku
Asbes 1,00x1,00 m

0.012 M3
0.060 Kg
1.100 Lbr

x
x
x

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.180
0.320
0.032
0.009

x
x
x
x

OH
OH
OH
OH

PEKERJAAN SANITASI
PS

6.25.
6.25.1.

6.25.2.

PS

6.31.
6.31.1.

6.31.2.

Memasang 1 m' pipa PVC tipe AW diameter "


Bahan
Pipa PVC
Perlengkapan
35%
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1.200 M'
harga pipa

0.036
0.060
0.006
0.0018

Memasang 1 m' pipa PVC tipe AW diameter 3"


Bahan
Pipa PVC
Perlengkapan
35%
Tenaga
Pekerja

OH
OH
OH
OH

1.200 M'
harga pipa

0.081 OH
Analisa Pekerjaan
Page 18 of 45

x
x

x
x
x
x

x
x

Tukang Batu
Kepala Tukang
Mandor

PS

6.35.
6.35.1.

6.35.2.

PS

6.36.
6.36.1.

6.36.2.

0.135 OH
0.0135 OH
0.0041 OH

x
x
x

Memasang 1 buah kran diameter " atau "


Bahan
Kran air
Seal Tape

1.000 Bh
0.025 Kg

x
x

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.010
0.100
0.010
0.005

OH
OH
OH
OH

x
x
x
x

Memasang 1 buah floor drain


Bahan
Floor Drain

1.000 Bh

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.010
0.100
0.010
0.005

OH
OH
OH
OH

x
x
x
x

1 buah Pasang kunci tanam biasa


Bahan
Kunci Tanam Biasa

1.000 Bh

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.010
0.500
0.010
0.005

OH
OH
OH
OH

x
x
x
x

1 buah Pasang kunci tanam kamar mandi


Bahan
Kunci Tanam Kamar Mandi

1.000 Bh

PEKERJAAN KUNCI DAN KACA

PKK

6.2.
6.2.1.

6.2.2.

PKK

6.3.
6.3.1.

6.3.2.

PKK

6.5.
6.5.1.

6.5.2.

PKK

6.9.
6.9.1.

6.9.2.

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.005
0.500
0.005
0.0025

1 buah Pasang engsel pintu


Bahan
Engsel Pintu
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

OH
OH
OH
OH

x
x
x
x

1.000 Bh

0.015
0.150
0.015
0.00075

1 buah Pasang kait angin


Bahan
Kait Angin
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

OH
OH
OH
OH

x
x
x
x

1.000 Bh

0.015
0.150
0.015
0.00075
Analisa Pekerjaan
Page 19 of 45

OH
OH
OH
OH

x
x
x
x

PKK

6.10.
6.10.1.

6.10.2.

PKK

6.12.
6.12.1.

6.12.2.

PKK

6.16.
6.16.1.

6.16.2.

1 buah Pasang door closer


Bahan
Door Closer

1.000 Bh

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.050
0.500
0.050
0.0025

1 buah Pasang pegangan pintu/door holder


Bahan
Pegangan Pintu/Door Holder
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

OH
OH
OH
OH

x
x
x
x

1.000 Bh

0.050
0.500
0.050
0.0025

Pasang kaca tebal 3 mm


1 m2
Bahan
Kaca Polos
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

OH
OH
OH
OH

x
x
x
x

1.100 M2

0.015
0.150
0.015
0.00075

OH
OH
OH
OH

x
x
x
x

PEKERJAAN ELEKTRIKAL
An. R.21

An. R.41

1 titik Pekerjaan jaringan lampu


12.5 m'
9.4 m'
1.55 btg
1 ls
10 m'

Kabel NYA 2,5 mm2


Kabel NYA 1,5 mm2
Pipa kabel
Fittings, t-dos & inbow
Upah pemasangan

Pekerjaan Panel Bagi (PB) Dalam dg Grounding


4.5 m'
Kabel NYA 4 mm2
5 m'
Kawat BC 4mm2
2 Unit
Stud MG
0.166666667 btg
Pipa kabel
0.25 btg
Pipa Galvanis 5/8"
1 Unit
Upah pemasangan

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

2,100
2,100
7,500
2,000
3,150

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

5,400
5,400
40,000
7,500
45,000
30,000

@ Rp.
@ Rp.
@ Rp.
@ Rp.

35,000
40,000
50,000
60,000
Jumlah
Upah x

Rp.
= Rp.
= Rp.
= Rp.
= Rp.

59,620
26,250
19,740
11,625
2,000

Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

143,800
24,300
27,000
80,000
1,250
11,250

PEKERJAAN PENGECATAN
An. K23

100 m2 Upah pengecatan 1 lapis


4 Org
0.2 Org
6 Org
0.6 Org

Pekerja
Mandor
Tukang
Kepala Tukang
Untuk 1 m2 = 1/100

An. K23.a

An. K23.b

1 m2 Pengecatan dengan Cat Tembok 3x


0.333333333 kg
Cat tembok
1 Ls
Peralatan
3
Upah K.23
1 m2 Pengecatan dengan Cat Kayu 3x

Analisa Pekerjaan
Page 20 of 45

@ Rp.
@ Rp.
@ Rp.

1/300

Rp.
9,000 = Rp.
300 = Rp.
1,610
Rp.

3,300
3,000
300

6,310

0.22664
0.038
0.057142857
1
7.5
An. K23.c

An. K23.d

kg
ltr
kg
Ls

Cat minyak
Minyak cat
Wood Filler
Peralatan
Upah K.23

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

1 m2 Pengecatan plafond dengan Cat Tembok 3x


0.333333333 kg
Cat tembok
1 Ls
Peralatan
3.6
Upah K.23
1 m2 Pengecatan seng 2x
0.212475 kg
1 Ls
2.4

Cat seng
Peralatan
Upah K.23

20,000
5,000
6,000
1,240
1,610

= Rp.
= Rp.
= Rp.
= Rp.

4,533
190
343
1,240

@ Rp.
@ Rp.
@ Rp.

Rp.
9,000 = Rp.
450 = Rp.
1,610

3,450
3,000
450

@ Rp.
@ Rp.
@ Rp.

Rp.
17,500 = Rp.
583 = Rp.
1,610

4,300
3,718
583

PEKERJAAN TAMAN
An. T.81
1 m' Pekerjaan pagar batu bata
Dihitung untuk
10.00 m'
Tinggi arsitektural
0.40 m'
0.63 m3
0.13 m3
0.24 m3
6.00 m2
2.80 m2
2.80 m2

Galian An. A.1


Lantai Kerja An. G.44
Batu bata 1:3
Batu bata 1:5
Plasteran 1:4
Pengecatan An. K23a

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

17,710
74,430
52,760
45,660
14,280
8,130
Jumlah
Untuk 1 m'

An. T.82
1 m' Pekerjaan pagar batu bata t: 1 m
Dihitung untuk
10.00 m'
Tinggi arsitektural
1.00 m'
2.03 m3
0.23 m3
0.70 m3
1.11 m3
12.00 m2
3.50 m2
3.50 m2

Galian An. A.1


Lantai Kerja An. G.44
Pasangan Batu Kali 1:3
Menimbun tanah kembali
Batu bata 1:4 An. G.32i
Plasteran 1:4 An. G.50q
Pengecatan An. K23a

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

17,710
396,210
423,550
5,910
45,660
14,280
9,090
Jumlah
Untuk 1 m'

PEKERJAAN SUPPLEMEN
An. Z.11

An. Z.21

An. T.81

1 Unit Bak Mandi uk. 60 x 60 x 60 cm


0.018 m3
0.018 m3
0.72 m2

Timbunan pasir
Beton 1:3:5
Pas.1/4 bata 1:2 An. G.32n 3/4

@ Rp.
@ Rp.
@ Rp.

46,180
368,820
52,760

1 Unit septic tank uk. 1 x 1.5 x 1.5 m


2.25 m3
0.075 m3
7.5 m2
7.5 m2
0.075 m3
0.5 m'

Galian tanah
Beton 1:3:5
Pasangan batu bata 1:3
Plasteran 1:3
Beton bertulang
Pipa GIP dia. 2"

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

17,710
368,820
48,310
17,230
611,860
10,000

1 m2 pekerjaan car port


0.125 m3
0.125 m3
0.075 m3

Galian tanah
Rabat beton 1:3:6
Pasir Urug

@ Rp.
@ Rp.
@ Rp.

17,710
368,820
46,180

Analisa Pekerjaan
Page 21 of 45

S
JUMLAH HARGA UPAH (Rp.)

Rp.
= Rp.
= Rp.
= Rp.
= Rp.

17,710
22,750
867
23,617
17,710

Rp.
= Rp.
= Rp.

5,910
5,688
217

Rp.

7,680

= Rp.
= Rp.
= Rp.
= Rp.

7,394
282
7,676
7,680

Rp.

7,680

= Rp.
= Rp.

7,394
282

Rp.

104,000

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

140,000
8,000
100,000
12,000
260,000
104,000

Rp.

2,760

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

240
2,000
490
28
2,758
1,100

Rp.

81,200

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

140,000
8,000
75,000
9,000
232,000
81,200

Rp

175,000.00

Rp

Analisa Pekerjaan
Page 22 of 45

192,500.00

Rp
Rp
Jumlah (1)

1,100.00
50,000.00

=
=
=

Rp
Rp
Rp

179,300.00
26,000.00
397,800.00

Rp
Rp
Rp
Rp
Jumlah (2)
Jumlah (1) + (2)

35,000.00
40,000.00
50,000.00
60,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

52,500.00
24,000.00
3,000.00
4,500.00
84,000.00
481,800.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
Rp.

315,000
360,000
150,000
825,000
99,000
900

Rp.
= Rp.
= Rp.
= Rp.

133,430
125,100
7,430
900

Rp.

125,100

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

210,000
12,000
50,000
6,000
278,000
125,100

Rp.

22,130

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

7,000
400
25,000
3,000
35,400

= Rp.

22,130

Rp.

7,430

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

10,000
571
7,143
857
18,571

= Rp.

7,430

Rp.

27,860

ok

ok

ok

Analisa Pekerjaan
Page 23 of 45

= Rp.
= Rp.
= Rp.
= Rp.

15,000
857
10,714
1,286

Rp.
= Rp.
= Rp.
Rp.
= Rp.
= Rp.

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Jumlah (1)
Rp
Rp
Rp
Rp
Rp
Rp
Jumlah (2)
Jumlah (1) + (2)

237,240
133,740
103,500
206,160
89,160
117,000

2,500,000.00
11,500.00
10,000.00
12,500.00
1,100.00
50,000.00
125,000.00

=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

7,500.00
230.00
36,000.00
625.00
6,050.00
450.00
1,875.00
52,730.00

35,000.00
50,000.00
50,000.00
50,000.00
60,000.00
40,000.00

=
=
=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

3,500.00
1,650.00
1,650.00
1,650.00
600.00
200.00
9,250.00
61,980.00

Rp.

10,020

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

18,900
1,080
9,000
1,080
30,060
10,020

Rp.

10,020

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

18,900
1,080
9,000
1,080
30,060
10,020

Rp.

7,730

Analisa Pekerjaan
Page 24 of 45

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

14,000
800
7,500
900
23,200
7,730

Rp.

7,730

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

14,000
800
7,500
900
23,200
7,730

Rp.

16,250

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

17,500
1,000
12,500
1,500
32,500
16,250

Rp.

12,190

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

17,500
1,000
12,500
1,500
32,500
12,190

Rp.

18,200

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

35,000
2,000
25,000
3,000
65,000
18,200

Rp.

9,750

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

10,500
600
7,500
900
19,500
9,750
Analisa Pekerjaan
Page 25 of 45

Rp.

2,800

= Rp.
= Rp.
= Rp.
= Rp.

5,000
600
5,600
2,800

Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

656,000
280,000
16,000
1,200,000
144,000
1,640,000
656,000

Rp.

9,200

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

2,178
124
8,889
1,067
12,260
9,200

Rp.

1,082,400

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

420,000
24,000
1,800,000
216,000
2,460,000
1,082,400

Rp.

17,080

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

87,500
5,000
375,000
45,000
512,500
17,080

Rp.

41,000

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
Rp.

= Rp.
= Rp.

Rp.
Rp.

104,580
175,694

1.68

Rp.
Rp.

146,080
166,531

1.14

70,000
4,000
300,000
36,000
410,000
41,000
6,470

638
102,366
Analisa Pekerjaan
Page 26 of 45

= Rp.

103,004

= Rp.

6,470

Rp.

4,620

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

525
30
5,000
600
6,160
4,620

Rp
Rp
Jumlah (1)

54,000.00
11,500.00

=
=
=

Rp
Rp
Rp

37,800.00
460.00
38,260.00

Rp
Rp
Rp
Rp
Jumlah (2)
Jumlah (1) + (2)

35,000.00
50,000.00
60,000.00
40,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

4,200.00
3,000.00
360.00
240.00
7,800.00
46,060.00

100,000.00
11,500.00

=
=
=

Rp
Rp
Rp

30,000.00
230.00
30,230.00

35,000.00
50,000.00
60,000.00
40,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

5,250.00
3,500.00
480.00
240.00
9,470.00
39,700.00

2,500,000.00
11,500.00
11,000.00

=
=
=
=

Rp
Rp
Rp
Rp

30,000.00
690.00
12,100.00
42,790.00

35,000.00
50,000.00
60,000.00
40,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

6,300.00
16,000.00
1,920.00
360.00
24,580.00
61,225.00

5,000.00
5,000.00

=
=
=

Rp
Rp
Rp

6,000.00
1,750.00
7,750.00

Rp
Rp
Rp
Rp
Jumlah (2)
Jumlah (1) + (2)

35,000.00
50,000.00
60,000.00
40,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

1,260.00
3,000.00
360.00
72.00
4,692.00
12,442.00

Rp
Rp
Jumlah (1)

25,000.00
25,000.00

=
=
=

Rp
Rp
Rp

30,000.00
8,750.00
38,750.00

Rp

35,000.00

Rp

2,835.00

Rp
Rp
Jumlah (1)
Rp
Rp
Rp
Rp
Jumlah (2)
Jumlah (1) + (2)

Rp
Rp
Rp
Jumlah (1)
Rp
Rp
Rp
Rp
Jumlah (2)
Jumlah (1) + (2)

Rp
Rp
Jumlah (1)

Analisa Pekerjaan
Page 27 of 45

Rp
Rp
Rp
Jumlah (2)
Jumlah (1) + (2)

50,000.00
60,000.00
40,000.00

=
=
=
=
=

Rp
Rp
Rp
Rp
Rp

6,750.00
810.00
164.00
10,559.00
49,309.00

Rp
Rp
Jumlah (1)

15,000.00
70,000.00

=
=
=

Rp
Rp
Rp

15,000.00
1,750.00
16,750.00

Rp
Rp
Rp
Rp
Jumlah (2)
Jumlah (1) + (2)

35,000.00
50,000.00
60,000.00
40,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

350.00
5,000.00
600.00
200.00
6,150.00
22,900.00

Rp
Jumlah (1)

10,000.00

=
=

Rp
Rp

10,000.00
10,000.00

Rp
Rp
Rp
Rp
Jumlah (2)
Jumlah (1) + (2)

35,000.00
50,000.00
60,000.00
40,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

350.00
5,000.00
600.00
200.00
6,150.00
16,150.00

Rp
Jumlah (1)

50,000.00

=
=

Rp
Rp

50,000.00
50,000.00

Rp
Rp
Rp
Rp
Jumlah (2)
Jumlah (1) + (2)

35,000.00
50,000.00
60,000.00
40,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

350.00
25,000.00
600.00
200.00
26,150.00
76,150.00

Rp
Jumlah (1)

50,000.00

=
=

Rp
Rp

50,000.00
50,000.00

Rp
Rp
Rp
Rp
Jumlah (2)
Jumlah (1) + (2)

35,000.00
50,000.00
60,000.00
40,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

175.00
25,000.00
300.00
100.00
25,575.00
75,575.00

Rp
Jumlah (1)

10,000.00

=
=

Rp
Rp

10,000.00
10,000.00

Rp
Rp
Rp
Rp
Jumlah (2)
Jumlah (1) + (2)

35,000.00
50,000.00
60,000.00
40,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

525.00
7,500.00
900.00
30.00
8,955.00
18,955.00

Rp
Jumlah (1)

12,500.00

=
=

Rp
Rp

12,500.00
12,500.00

Rp
Rp
Rp
Rp

35,000.00
50,000.00
60,000.00
40,000.00

=
=
=
=

Rp
Rp
Rp
Rp

525.00
7,500.00
900.00
30.00

Analisa Pekerjaan
Page 28 of 45

Jumlah (2)
Jumlah (1) + (2)

=
=

Rp
Rp

8,955.00
21,455.00

Rp
Jumlah (1)

50,000.00

=
=

Rp
Rp

50,000.00
50,000.00

Rp
Rp
Rp
Rp
Jumlah (2)
Jumlah (1) + (2)

35,000.00
50,000.00
60,000.00
40,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

1,750.00
25,000.00
3,000.00
100.00
29,850.00
79,850.00

Rp
Jumlah (1)

45,000.00

=
=

Rp
Rp

45,000.00
45,000.00

Rp
Rp
Rp
Rp
Jumlah (2)
Jumlah (1) + (2)

35,000.00
50,000.00
60,000.00
40,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

1,750.00
25,000.00
3,000.00
100.00
29,850.00
74,850.00

Rp
Jumlah (1)

50,000.00

=
=

Rp
Rp

55,000.00
55,000.00

Rp
Rp
Rp
Rp
Jumlah (2)
Jumlah (1) + (2)

35,000.00
50,000.00
60,000.00
40,000.00

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

525.00
7,500.00
900.00
30.00
8,955.00
63,955.00

Rp.

31,500

= Rp.

31,500

Rp.

30,000

= Rp.

30,000

Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

1,610
140,000
8,000
300,000
36,000
484,000
1,610

Rp.

4,830

= Rp.

4,830

Rp.

12,080

Analisa Pekerjaan
Page 29 of 45

= Rp.

12,075

Rp.

5,800

= Rp.

5,796

Rp.

3,860

= Rp.

3,864

Rp.

36,980

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

11,069
9,304
12,768
273,960
39,984
22,764
369,849
36,980

Rp.

105,790

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

35,951
89,147
296,485
6,560
547,920
49,980
31,815
1,057,858
105,790

Rp.
= Rp.
= Rp.
= Rp.

45,500
831
6,639
37,987

Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

610,000
39,848
27,662
362,325
129,225
45,890
5,000

Rp.
= Rp.
= Rp.
= Rp.

51,800
2,214
46,103
3,464

Analisa Pekerjaan
Page 30 of 45

ANALISA ANGGARAN BIAYA


ID

VOLUME

SAT.

URAIAN

HARGA

HARGA

SATUAN

MATERIAL

PEKERJAAN PINTU JENDELA


1 Pintu Panel (80 x 205) + 1 Jendela (60 x 120)

Rp.

363,380

1.68

m2

An. F33a (daun pintu)

@ Rp.

104,580 = Rp.

175,690

0.72

m2

An. F36 (daun jendela)

@ Rp.

146,080 = Rp.

105,180

Bh

Kunci slot

@ Rp.

24,750 = Rp.

24,750

Bh

Engsel 4"

@ Rp.

9,450 = Rp.

18,900

Bh

Engsel 3"

@ Rp.

7,880 = Rp.

15,760

Bh

Grendel 2"

@ Rp.

5,250 = Rp.

5,250

Bh

Hak angin

@ Rp.

7,350 = Rp.

7,350

Bh

Handle

@ Rp.

10,500 = Rp.

10,500

Bh

Upah pemasangan asesoris

@ Rp.

7,500

Unit

Upah pemasangan

@ Rp.

10,000

1 Pintu Panel (80 x 205) + 1 Jendela (40 x 120)

Rp.

328,320

1.68

m2

An. F33a (daun pintu)

@ Rp.

104,580 = Rp.

175,690

0.48

m2

An. F36 (daun jendela)

@ Rp.

146,080 = Rp.

70,120

Bh

Kunci Slot

@ Rp.

24,750 = Rp.

24,750

Bh

Engsel 4"

@ Rp.

9,450 = Rp.

18,900

Bh

Engsel 3"

@ Rp.

7,880 = Rp.

15,760

Bh

Grendel 2"

@ Rp.

5,250 = Rp.

5,250

Bh

Hak angin

@ Rp.

7,350 = Rp.

7,350

Bh

Handle

@ Rp.

10,500 = Rp.

10,500

Bh

Upah pemasangan asesoris

@ Rp.

7,500

Unit

Upah pemasangan

@ Rp.

10,000

1.68

m2

An. F33a (daun pintu)

@ Rp.

104,580 = Rp.

175,690

Bh

Kunci Slot

@ Rp.

24,750 = Rp.

24,750

Bh

Engsel 4"

@ Rp.

9,450 = Rp.

18,900

Bh

Upah pemasangan asesoris

@ Rp.

7,500

Unit

Upah pemasangan

@ Rp.

10,000

Unit

Daun Pintu PVC Standart

@ Rp.

54,600 = Rp.

54,600

Bh

Kunci Putar

@ Rp.

40,000 = Rp.

40,000

Bh

Engsel 4"

@ Rp.

9,450 = Rp.

18,900

Bh

Upah pemasangan asesoris

@ Rp.

7,500

Unit

Upah pemasangan

@ Rp.

10,000

0.72

m2

An. F36 (daun jendela)

@ Rp.

146,080 = Rp.

105,180

Bh

Engsel 3"

@ Rp.

7,880 = Rp.

15,760

Bh

Grendel 2"

@ Rp.

5,250 = Rp.

5,250

Bh

Hak angin

@ Rp.

7,350 = Rp.

7,350

Bh

Handle

@ Rp.

10,500 = Rp.

10,500

Bh

Upah pemasangan asesoris

@ Rp.

7,500

Unit

Upah pemasangan

@ Rp.

10,000

0.48

m2

An. F36 (daun jendela)

@ Rp.

146,080 = Rp.

70,120

Bh

Engsel 3"

@ Rp.

7,880 = Rp.

15,760

Bh

Grendel 2"

@ Rp.

5,250 = Rp.

5,250

Bh

Hak angin

@ Rp.

7,350 = Rp.

7,350

Bh

Handle

@ Rp.

10,500 = Rp.

10,500

Bh

Upah pemasangan asesoris

@ Rp.

7,500

Unit

Upah pemasangan

@ Rp.

10,000

1 Pintu Panel (80 x 205)

Rp.

1 Pintu PVC

KM

Rp.

1 Jendela (60 x 120)

Rp.

1 Jendela (40 x 120)

Rp.

Analisa Pekerjaan
Page 31 of 45

219,340

113,500

144,040

108,980

Ventilasi 15/20

Rp.
0.004 m3
1

Unit

Pemasangan kusen

@ Rp. 3,832,400 = Rp.

Upah pemasangan

@ Rp.

Analisa Pekerjaan
Page 32 of 45

7,500

16,100
16,100

S
HARGA
UPAH
Rp.

80,000

= Rp.

60,000

= Rp.

20,000

Rp.

80,000

= Rp.

60,000

= Rp.

20,000

Rp.

32,500

= Rp.

22,500

= Rp.

10,000

Rp.

32,500

= Rp.

22,500

= Rp.

10,000

Rp.

47,500

= Rp.

37,500

= Rp.

10,000

Rp.

47,500

= Rp.

37,500

= Rp.

10,000

Rp.

443,380

Rp.

408,320

Rp.

251,840

Rp.

146,000

Rp.

191,540

Rp.

156,480

Analisa Pekerjaan
Page 33 of 45

Rp.
= Rp.

7,500

Rp.

7,500

Analisa Pekerjaan
Page 34 of 45

23,600

REKAPITULASI DAFTAR ANALISA 2


No.

JENIS PEKERJAAN

ANALISA

VOLUME

HARGA BAHAN
(RP)
5

HARGA UPAH
(Rp)
6

1
2
A PEKERJAAN TANAH
1 m3 Galian Tanah Biasa Manual < 1500mm
1 m3 Menimbun dan Memadatkan < 1500mm
1 m3 Timbunan Pasir Urug
1 m3 Timbunan Tanah
1 M3 Pasangan Batu Kali 1:3
1 m' Pekerjaan Bowplank
1 M3 Pasangan Batu Bata 1:3

An. A.1
An. A.3
An. A.18a
An. A.18b
An. G.31.m
An. F.0
An. G.32.g

60,000.00
38,500.00
319,550.00
11,330.00
354,810.00

17,710.00
5,910.00
7,680.00
7,680.00
104,000.00
2,760.00
81,200.00

B PEKERJAAN PONDASI
Pasangan pondasi batu kali, 1Pc : 4Ps
110 Kg Mengerjakan (memotong/memasang) besi beton bertulang
1 M3 Pekerjaan betonan K175
1 M3 Beton Cor 1:3:6
1 M2 Mengerjakan Cetakan Beton
1 M2 Mengerjakan bekisting sloof, kolom dan balok praktis
1 M2 Mengerjakan bekisting lantai/duck beton
1 M3 Pekerjaan beton bertulang sloof & kolom/balok praktis K175
1 M3 Pekerjaan beton bertulang pondasi & kolom K175
1 M3 Pekerjaan beton bertulang balok & plat K175
1 M2 Mengerjakan bekisting lantai/duck beton
Membuat ring balok beton bertulang (10x15) cm

6.5.
An. I.2
Sup. G.42
An. G.44
An. F.8a
An. F.8c
An. F.8e
Sup. G.43a
Sup. G.43b
Sup. G.43c
An. F.8e
6.46.

397,800.00
17,620.00
269,080.00
243,720.00
52,300.00
7,740.00
36,780.00
2,263,960.00
2,409,340.00
2,627,200.00
36,780.00
52,730.00

84,000.00
900.00
133,430.00
125,100.00
22,130.00
7,430.00
27,860.00

C PEKERJAAN DINDING DAN LANTAI


1 M2 Pasangan 1/2 Batu Bata 1:5
1 M2 Pasangan 1/2 Batu Bata 1:3
1 M2 Plasteran 1:3 tebal 15 mm
1 M2 Plasteran 1:5 tebal 15 mm
1 M3 Perekat 1:3
1 M2 Ubin Keramik 20 x 20 cm Pas 1:3
1 M2 Ubin Keramik 30 x 30 cm Pas 1:4
1 M2 Pemasangan Keramik Dinding 20 x 25 cm Pas 1:3
1 M' Pasangan Plint Ubin Keramik 10 x 30 cm Pas 1:4
1 M' Pasangan bon-bon keramik

An. G.32.l
An. G.32.k
An. G.50.l
An. G.50.r
An. G.16
An. G.72c
An. G.72d
An. G. 141
An. G.68b
An. G.70

35,640.00
42,740.00
8,900.00
6,550.00
491,020.00
53,940.00
47,760.00
39,050.00
11,840.00
8,870.00

10,020.00
10,020.00
7,730.00
7,730.00

D PEKERJAAN KAYU, ATAP & PLAFOND


1 m3 Pekerjaan Kuda-Kuda
1 m' Pekerjaan Lesplank 22 cm
1 m3 Pekerjaan Kozen Tanpa Jalusi/Ventilasi
1 m2 Pekerjaan Daun Pintu Panel
1 m2 Pekerjaan Daun Pintu/Jendela Kaca
1 m2 Pekerjaan Plafond Asbes + Rangka
1 m2 Pekerjaan Rangka Atap Seng
Pasang atap seng gelombang
Pasang atap nok seng
Langit-langit asbes (1,00x1,00) m rangka kayu meranti

An. F.22
An. F.21
An. F.27a
An. F.33a
An. F.36
An. F.80a2
An. F.19
6.38.
6.39.
6.20.

2,750,000.00
13,590.00
2,750,000.00
87,500.00
105,080.00
31,040.00
28,650.00
38,260.00
30,230.00
42,790.00

656,000.00
9,200.00
1,082,400.00
17,080.00
41,000.00
6,470.00
4,620.00
7,800.00
9,470.00
24,580.00

7,750.00
38,750.00
16,750.00
10,000.00

4,692.00
10,559.00
6,150.00
6,150.00

E PEKERJAAN SANITASI
Memasang 1 m' pipa PVC tipe AW diameter "
Memasang 1 m' pipa PVC tipe AW diameter 3"
Memasang 1 buah kran diameter " atau "
Memasang 1 buah floor drain

6.25.
6.31.
6.35.
6.36.

237,240.00
206,160.00
27,860.00
9,250.00

16,250.00
12,190.00
18,200.00
9,750.00
2,800.00

F PEKERJAAN KUNCI DAN KACA


Pasang kunci tanam biasa
Pasang kunci tanam kamar mandi
Pasang engsel pintu
Pasang kait angin
Pasang door closer
Pasang pegangan pintu/door holder
Pasang kaca tebal 3 mm

6.2.
6.3.
6.5.
6.9.
6.10.
6.12.
6.16.

50,000.00
50,000.00
10,000.00
12,500.00
50,000.00
45,000.00
55,000.00

26,150.00
25,575.00
8,955.00
8,955.00
29,850.00
29,850.00
8,955.00

G PEKERJAAN ELEKTRIKAL
1 titik Pekerjaan jaringan lampu
Pekerjaan Panel Bagi (PB) Dalam dg Grounding

An. R.21
An. R.41

59,620.00
143,800.00

31,500.00
30,000.00

H PEKERJAAN PENGECATAN
100 m2 Upah pengecatan 1 lapis
1 m2 Pengecatan dengan Cat Tembok 3x
1 m2 Pengecatan dengan Cat Kayu 3x
1 m2 Pengecatan plafond dengan Cat Tembok 3x
1 m2 Pengecatan seng 2x

An. K23
An. K23.a
An. K23.b
An. K23.c
An. K23.d

3,300.00
6,310.00
3,450.00
4,300.00

1,610.00
4,830.00
12,080.00
5,800.00
3,860.00

An. T.81
An. T.82

36,980.00
105,790.00

An. Z.11
An. Z.21
An. T.81

45,500.00
610,000.00
51,800.00
363,380.00
328,320.00
219,340.00
113,500.00
144,040.00
108,980.00
16,100.00

PEKERJAAN TAMAN
1 m' Pekerjaan pagar batu bata
1 m' Pekerjaan pagar batu bata t: 1 m
PEKERJAAN SUPPLEMEN
1 Unit Bak Mandi uk. 60 x 60 x 60 cm
1 Unit septic tank uk. 1 x 1.5 x 1.5 m
1 m2 pekerjaan car port
1 Pintu Panel (80 x 205) + 1 Jendela (60 x 120)
1 Pintu Panel (80 x 205) + 1 Jendela (40 x 120)
1 Pintu Panel (80 x 205)
1 Pintu PVC
1 Jendela (60 x 120)
1 Jendela (40 x 120)
Ventilasi 15/20

80,000.00
80,000.00
32,500.00
32,500.00
47,500.00
47,500.00

JUMLAH HARGA
(Rp)
7
17,710.00
5,910.00
67,680.00
46,180.00
423,550.00
14,090.00
436,010.00

481,800.00
18,520.00
402,510.00
368,820.00
74,430.00
15,170.00
64,640.00
2,263,960.00
2,646,580.00
2,833,360.00
64,640.00
61,980.00

45,660.00
52,760.00
16,630.00
14,280.00
491,020.00
70,190.00
59,950.00
57,250.00
21,590.00
11,670.00

3,406,000.00
22,790.00
3,832,400.00
104,580.00
146,080.00
37,510.00
33,270.00
46,060.00
39,700.00
67,370.00

12,442.00
49,309.00
22,900.00
16,150.00

76,150.00
75,575.00
18,955.00
21,455.00
79,850.00
74,850.00
63,955.00

91,120.00
173,800.00

1,610.00
8,130.00
18,390.00
9,250.00
8,160.00

36,980.00
105,790.00

45,500.00
610,000.00
51,800.00
443,380.00
408,320.00
251,840.00
146,000.00
191,540.00
156,480.00
16,100.00

RENCANA ANGGARAN BIAYA

RUMAH TIPE ASERA 10x20


PROYEK
LOKASI
SUB. PEKERJAAN

:
:
:

NO

URAIAN PEKERJAAN

SAT.

VOLUME

HARGA
SATUAN
(Rp.)

TOTAL
HARGA
(Rp.)

I.
1

PEKERJAAN PERSIAPAN
Pemasangan bouwplank

II.

PEKERJAAN PONDASI

PONDASI BATU KALI

a.
b.
c.
d.

Galian tanah
Pasir Urug
Urugan tanah kembali
Pasangan pondasi batu kali 1:3

III.
1
2
3

4
5
6
7

IV.
1
2
3
4
5

V.
1
2

VI.
1
2
4
5

PEKERJAAN STRUKTUR DAN DINDING


Sloof 15/20 cm
Kolom Praktis 15/15 cm
Ring Balok 10/15 cm
Beton bertulang
Bekisting
Pasangan Dinding Bata ( 1 : 3 )
Pasangan Dinding Bata ( 1 : 5 )
Plesteran Dinding ( 1 : 3 )
Plesteran Dinding ( 1 : 5 )
Dinding finish batu paras andesit
PEKERJAAN LANTAI
Timbunan tanah
Pasir Urug
Dinding Keramik KM/WC 30/30 cm
Dinding Keramik KM/WC 30/60 cm
Lantai Keramik KM / WC 30/30 cm
Lantai Keramik KM / WC 30/60 cm
Lantai Keramik 30/30 cm
Lantai Keramik 60/60 cm
Lantai Parquet Tangga
Lantai batu andesit 30/30 cm
PEKERJAAN ATAP DAN PLAFOND
Pekerjaan rangka atap baja ringan
Pekerjaan rangka atap aluminium
Pasang Atap + insulator
Pasang atap kaca entrance
Plafond Gypsum + rangka
Plafond Gypsum water resistant + rangka
Waterproofing lantai
Waterproofing dinding

PEKERJAAN PINTU DAN JENDELA


Pintu
Kayu solid engineering
Daun Pintu & Jendela (set lengkap terpasang) PJ1
Pintu (set lengkap terpasang) P1
Pintu (set lengkap terpasang) P2
Pintu (set lengkap terpasang) P3
Pintu (set lengkap terpasang) P5
Pintu (set lengkap terpasang) P6
Pintu (set lengkap terpasang) P11
Pintu (set lengkap terpasang) P12
Pintu (set lengkap terpasang) P13
Pintu (set lengkap terpasang) P14
Jati kering oven
Pintu (set lengkap terpasang) P4
Aluminium ex YKK profile 4" good finish
Daun Pintu & Jendela (set lengkap terpasang) PJ2
Pintu (set lengkap terpasang) P7
Pintu (set lengkap terpasang) P8
Pintu (set lengkap terpasang) P9
Pintu (set lengkap terpasang) P10
Pintu (set lengkap terpasang) P15
Pintu (set lengkap terpasang) P16
Jendela
Daun Jendela (set lengkap terpasang) J1
Daun Jendela (set lengkap terpasang) J3
Aluminium ex YKK profile 4" good finish
Daun Jendela (set lengkap terpasang) J2
Daun Jendela (set lengkap terpasang) J4
Daun Jendela (set lengkap terpasang) J5
Daun Jendela (set lengkap terpasang) J6
Daun Jendela (set lengkap terpasang) J7
Daun Jendela (set lengkap terpasang) J9
Daun Jendela (set lengkap terpasang) J10
Daun Jendela (set lengkap terpasang) J11
Daun Jendela (set lengkap terpasang) J12
Besi hollow 4x4
PG
Louvre aluminium
Aluminium ex YKK profile 4" good finish
BV1

M'

68.00

14,090.00
Sub Total - I :

958,120.00
958,120.00

M3
M2
M3
M3

53.87
76.96
27.90
25.97

17,710.00
67,680.00
5,910.00
423,550.00
Sub Total - II :

954,073.12
5,208,652.80
164,877.18
11,001,287.70

M'
M3
M3
M3
M2
M2
M2
M2
M2
M2

96.20
4.17
0.25
116.88
960.19
326.17
717.60
652.34
1,435.20
8.45

2,263,960.00
2,263,960.00
61,980.00

217,792,952.00
9,439,015.23
15,665.45

52,760.00
45,660.00
16,630.00
14,280.00

17,208,729.20
32,765,616.00
10,848,414.20
20,494,656.00

Sub Total - III :

308,565,048.08

46,180.00
67,680.00
57,250.00

8,926,386.19
26,150,536.80
522,120.00

70,190.00

189,513.00

59,950.00

5,642,194.25

Sub Total - IV :

41,430,750.24

33,270.00

1,280,895.00

46,060.00

1,982,883.00

Sub Total - V :

3,263,778.00

M3
M2
M2
M2
M2
M2
M2
M2
M2

M2
M2
M2
M2
M2
M2
M2
M2

193.30
386.39
9.12
87.26
2.70
24.90
94.12
205.75
52.80
6.12

38.50
9.00
43.05
9.00
291.57
15.80
67.42
9.00

unit
unit
unit
unit
unit
unit
unit
unit
unit
unit

1.00
1.00
2.00
1.00
2.00
1.00
2.00
4.00
1.00
1.00

443,380.00
251,840.00
146,000.00

443,380.00
251,840.00
292,000.00

unit

1.00

unit
unit
unit
unit
unit
unit
unit

1.00
1.00
1.00
1.00
1.00
1.00
1.00

408,320.00

408,320.00

unit
unit

1.00
1.00

191,540.00

191,540.00

unit
unit
unit
unit
unit
unit
unit
unit
unit

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

50,000.00

50,000.00

unit
unit

1.00
1.00

unit

2.00

16,100.00
Sub Total - VI :

32,200.00
1,669,280.00

VII.
1
3

PEKERJAAN PENGECATAN
Cat Dinding
Cat Plafond

M2
M2

2,087.54
307.37

8,130.00
9,250.00
Sub Total - VII :

16,971,700.20
2,843,184.06
19,814,884.26

VIII.
1

PEKERJAAN ELEKTRIKAL
Pemasangan Lampu Taman + Aksesoris
Pemasangan Titik Lampu
Pemasangan Lampu Gantung
Pemasangan Box Sekering
Pemasangan Meter Listrik
Pemasangan Saklar Double
Pemasangan Saklar Tunggal

Bh
Ttk
Bh
Bh
Bh
Bh
Bh

2.00
77.00
3.00
6.00
2.00
23.00
15.00

26,400.00

52,800.00

NO

URAIAN PEKERJAAN

Pemasangan Saklar Hotel


Pemasangan Stop Kontak
Pemasangan Stop Kontak Dgn Tutup
Pemasangan TV Outlet

VIII.
A

SAT.

VOLUME

HARGA
SATUAN
(Rp.)

TOTAL
HARGA
(Rp.)

Bh
Bh
Bh
Bh

1.00
41.00
1.00
8.00

Sub Total - VIII :

52,800.00

PEKERJAAN PLUMBING DAN SANITASI


Pekerjaan Pemasangan

Memasang Closet Jongkok

Bh

1.00

173,950.00

173,950.00

Memasang Closet Monoblok


Pembuatan bak mandi
Memasang Eco Washer

Bh
Bh
Bh

3.00
1.00
2.00

45,500.00
-

45,500.00

Memasang Wastafel

Bh

4.00

Memasang Meja Wastafel

Bh

1.00

76,150.00

Memasang Faucet

Bh

2.00

75,575.00

Partisi kaca tempered 10 mm (2.1x1.75)

set

2.00

18,955.00

Kaca cermin bevel frameless

Bh

2.00

21,455.00

Bak kontrol dgn tutup (300x300)

Bh

4.00

Flor drain

Bh

16.00

Roof drain

Bh

5.00

Titik jet washer

Bh

6.00

Titik shower

Bh

4.00

Titik kran biasa

Bh

19.00

Ground water tank

Unit

1.00

Septic Tank Dan Peresapan

Unit

1.00

Water tank

Unit

2.00

B
1
2
3

Pekerjaan Perpipaan Air Bersih/Bekas/Kotor


Saluran air bersih 3/4"
Saluran air kotor 4"
Saluran air faecalin 4"

IX.

PEKERJAAN HALAMAN

1
2

M'
M'
M'

Pintu garasi (92.6X2.775) + rangka

Set

1.00

Pagar
Pekerjaan Carport

M1
M2

17.00
36.16

610,000.00

610,000.00

Sub Total - VIIIA :

829,450.00

49,309.00
49,309.00
4,692.00
Sub Total - VIII B :
Total VIII A + VIII B:

829,450.00

105,790.00
51,800.00
Sub Total - IX :

1,798,430.00
1,873,088.00
3,671,518.00

TOTAL I - IX
Per meter bangunan

380,255,600.00
10,562,700.00

REKAPITULASI

RENCANA ANGGARAN BIAYA


PROYEK
LOKASI
SUB. PEKERJAAN
NO
I.
II.
III.
IV.
V.
VI.
VII.
VIII.
VIII.
IX.

:
:
:
URAIAN PEKERJAAN
PEKERJAAN PERSIAPAN
PEKERJAAN PONDASI
PEKERJAAN STRUKTUR DAN DINDING
PEKERJAAN LANTAI
PEKERJAAN ATAP DAN PLAFOND
PEKERJAAN PINTU DAN JENDELA
PEKERJAAN PENGECATAN
PEKERJAAN ELEKTRIKAL
PEKERJAAN PLUMBING DAN SANITASI
PEKERJAAN HALAMAN

JUMLAH
DIBULATKAN
permeter bangunan
TERBILANG : Tiga Puluh Delapan Juta Lima Ratus Tiga Puluh Ribu Empat Ratus Rupiah

JUMLAH HARGA
(Rp.)
958,120.00
308,565,048.08
41,430,750.24
3,263,778.00
1,669,280.00
19,814,884.26
52,800.00
829,450.00
3,671,518.00
380,255,628.58
380,255,600.00
10,562,700.00

PEKERJAAN PERSIAPAN
Pemasangan bouwplank
PEKERJAAN PONDASI

0.00
30
5
5

- 0.20
20

80
35

PONDASI BATU KALI P=


Galian tanah
Pasir Urug
Urugan tanah kembali
Pasangan pondasi batu kali 1:3
PONDASI BATU BATA

33.125 m

15

20
40

7.95
0.6625
2.815625
3.478125
6.625 m

- 0.05
- 0.20

30

20
5

Galian tanah25
Pasir Urug
Urugan tanah kembali
Pasangan bata 1:3

0.165625
0.0828125
0.06625
0.19875

PEKERJAAN STRUKTUR DAN DINDING


Sloof 15/20 cm
0.99375
Kolom Praktis 15/15 cm
0.0675
Ring Balok 10/15 cm
0.496875
Pasangan Dinding Bata ( 1 : 3 )
10.2375
Pasangan Dinding Bata ( 1 : 5 )
92.1375
Plesteran Dinding ( 1 : 3 )
20.475
Plesteran Dinding ( 1 : 5 )
186.555
PEKERJAAN LANTAI
Timbunan tanah
Pasir Urug
Dinding Keramik KM/WC 20/25 cm
Lantai Keramik KM / WC 20/20 cm
Lantai Keramik 30/30 cm

3.3125
1.65625
5.2
1.89
34.3

11.5 bh

8.7

0.77625

7.56

93.2775

Pekerjaan Bon-Bon Keramik

PEKERJAAN ATAP DAN PLAFOND


Pekerjaan rangka atap
3.3125
Pasang Atap seng gelombang
Pasang atap nok seng
Pemasangan Lesplank
Langit-langit asbes + rangka kayu meranti
PEKERJAAN PINTU DAN JENDELA
Pekerjaan Kusen Pintu & Jendela
Daun Pintu & Jendela (set lengkap terpasang) PJ1
Daun Pintu & Jendela (set lengkap terpasang) PJ2
Daun Pintu (set lengkap terpasang) P1
Pintu PVC (set lengkap terpasang) P2
Daun Jendela (set lengkap terpasang) J1
Daun Jendela (set lengkap terpasang) J2
Profil Ventilasi
PEKERJAAN PENGECATAN
Cat Dinding
Cat Kayu
Cat Plafond
PEKERJAAN ELEKTRIKAL
Pemasangan Lampu XL 10 W + Aksesoris
Pemasangan Instalasi listrik
Pemasangan Panel sekering dalam
Pemasangan Stop Kontak
Pemasangan Saklar Tunggal
Pemasangan Saklar Ganda
PEKERJAAN PLUMBING DAN SANITASI
Pekerjaan Pemasangan
Memasang Closed Jongkok
Pembuatan bak mandi
Memasang Floor Drain
Memasang Kran air
Septic Tank Dan Peresapan
Pekerjaan Perpipaan Air Bersih/Bekas/Kotor
Memasang Pipa Buangan Air Limbah Type AW Dia. 3" + Ass.
Memasang Pipa Buangan Air Kotor Type AW Dia. 3" + Ass.
Memasang Pipa Air Bersih Type AW Dia. 1/2" + Ass.

PEKERJAAN HALAMAN
Pagar Batu Bata t : 1m
Pekerjaan Carport

Anda mungkin juga menyukai