NO
1
7
URAIAN PEKERJAAN
2
1 UNIT PEMASANGAN PINTU PANIL
BAHAN :
- Kayu Balok/Kaso/Papan Kls I
- Paku Biasa 2"-5"
- Lem Kayu
UPAH :
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor
KOEFISIEN
3
0,1254
0,6272
1,2544
m3
kg
kg
2,0000 org/hr
4,0000 org/hr
0,4000 org/hr
0,2000 org/hr
JUMLAH
HARGA
SATUAN
(Rp.)
4
1.700.000
10.400
20.000
JUMLAH HARGA
MATERIAL
UPAH
(Rp.)
(Rp.)
5
6
213.248
6.523
25.088
35.000
60.000
65.000
70.000
244.859
70.000
240.000
26.000
14.000
350.000
0,1762
0,8812
1,7624
m3
kg
kg
2,0000 org/hr
6,0000 org/hr
0,6000 org/hr
0,3000 org/hr
JUMLAH
1.700.000
10.400
20.000
299.608
9.164
35.248
35.000
60.000
65.000
70.000
344.020
DIBULATKAN
594.859
594.800
DIBULATKAN
8
JUMLAH
HARGA
(Rp.)
7
70.000
360.000
39.000
21.000
490.000
834.020
834.000