ANALISA HARGA SATUAN (SNI)

NO
1
7

URAIAN PEKERJAAN
2
1 UNIT PEMASANGAN PINTU PANIL
BAHAN :
- Kayu Balok/Kaso/Papan Kls I
- Paku Biasa 2"-5"
- Lem Kayu
UPAH :
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor

KOEFISIEN
3

0,1254
0,6272
1,2544

m3
kg
kg

2,0000 org/hr
4,0000 org/hr
0,4000 org/hr
0,2000 org/hr
JUMLAH

HARGA
SATUAN
(Rp.)
4

1.700.000
10.400
20.000

JUMLAH HARGA
MATERIAL
UPAH
(Rp.)
(Rp.)
5
6

213.248
6.523
25.088

35.000
60.000
65.000
70.000
244.859

70.000
240.000
26.000
14.000
350.000

1 UNIT PEMASANGAN PINTU PANIL 2 DAUN


BAHAN :
- Kayu Balok/Kaso/Papan Kls I
- Paku Biasa 2"-5"
- Lem Kayu
UPAH :
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor

0,1762
0,8812
1,7624

m3
kg
kg

2,0000 org/hr
6,0000 org/hr
0,6000 org/hr
0,3000 org/hr
JUMLAH

1.700.000
10.400
20.000

299.608
9.164
35.248

35.000
60.000
65.000
70.000
344.020
DIBULATKAN

594.859

594.800

DIBULATKAN
8

JUMLAH
HARGA
(Rp.)
7

70.000
360.000
39.000
21.000
490.000

834.020

834.000