REKAPITULASI

RENCANA ANGGARAN BIAYA


NO

URAIAN PEKERJAAN

JUMLAH

PEKERJAAN PERSIAPAN

#N/A

II

PEKERJAAN KAYU

172,191,562.08

III

PEKERJAAN PENUTUP LANTAI & DINDING

373,759,064.20

IV

PEKERJAAN BETON BERTULANG

PEKERJAAN PENUTUP LANGIT-LANGIT

VI

PEKERJAAN LAIN-LAIN

248,871,542.40

VII

PEKERJAAN FINSIHING

57,770,906.40

37,302,676.59
#N/A

JUMLAH
#N/A
PPN 10%
#N/A
TOTAL
#N/A
DIBULATKAN
#N/A
Terbilang :
SATU MILYAR DUA RATUS ENAM PULUH SEMBILAN JUTA SEMBILAN RATUS EMPAT
PULUH TUJUH RIBU RUPIAH

RENCANA ANGGARAN BIAYA (R.A.B)

URAIAN
PEKERJAAN

NO
I

PEKERJAAN PERSIAPAN
1 Pengukuran & Pemasangan Boowplank

II

SAT

A.004

111.00

#N/A

HARGA
SATUAN

JUMLAH
HARGA

#N/A

#N/A
#N/A

PEKERJAAN KAYU
Pasang daun pintu Panel, ky. Lembasung
Pasang daun jendela kaca patri motif
Pasang kaca Patri
Pasang Konsul bawah kanopi Ky. Bangkirai
Pasang plind dinding ky. Ulin

F.005
F.007
L.021
F.002
M.013

30.25
65.25
104.70
0.80
120.00

m
m2
m2
m3
M'

554,800.00
426,080.00
1,141,355.00
5,095,062.50
33,565.00

16,782,700.00
27,801,720.00
119,494,161.73
4,085,180.35
4,027,800.00
172,191,562.08

1
2
3
4
5

PEKERJAAN PENUTUP LANTAI & DINDING


Pasang Lantai Keramik Granite 60x60
Pasang Lantai Kamar mandi 20x20
Pasang Keramik dinding KM/WC 20x25
Pasang plint keramik dinding KM/WC 10x25
Pasang batu palimanan hijau (kolom main entrance)

M.001
M.004
M.006
M.008
M.012

576.00
16.00
32.00
16.00
4.00

M2
M2
M2
M'
M2

619,843.75
229,928.30
270,514.70
179,028.75
382,320.25

357,030,000.00
3,678,852.80
8,656,470.40
2,864,460.00
1,529,281.00
373,759,064.20

G.008

69.00
7.05

M2
M3

61,478.40
1,048,591.00

4,242,009.60
7,392,566.55

G.026

896.52

Kg

18,047.00

16,179,496.44

34.5

M2

275,032.00

9,488,604.00
37,302,676.59

I.007

855.00
855.00

M2
M2

#N/A
145,131.50

#N/A
124,087,432.50
#N/A

K.009
K.009

1.00
2.00
552.00
192.00

Ls
Ls
M'
M'

10,000,000.00
25,000,000.00
253,859.60
253,859.60

10,000,000.00
50,000,000.00
140,130,499.20
48,741,043.20
248,871,542.40

1,364.00
665.60

M2
M2

19,161.00
47,529.00

26,135,604.00
31,635,302.40
57,770,906.40
#N/A

PEKERJAAN BETON BERTULANG


1 Beton 1:2:3
- Plesteran tangga 1:4
- Tangga beton
2 Pembesian
- Tangga beton
3 Bekisting + bongkar
- Tangga beton
PEKERJAAN PENUTUP LANGIT-LANGIT
1 Pasang Rangka Plafond Hollow
2 Pasang Plafond Kayu Bengkirai 2/20

VI
1
2
3
4
VII

VOL

1
2
3
4
5
III

IV

KODE
ANALISA

PEKERJAAN LAIN-LAIN
Pasang Salib (material aluminium stainless finished Crome
Mimbar Utama & Mimbar kecil
Handrail tangga stainlisteel
Handrail mezanin stainlisteel

PEKERJAAN FINSIHING
1 Pengecatan dinding 2x
2 Pengecatan kayu dengan cat kilap 3x

JUMLAH

DINAS PEKERJAAN UMUM


KABUPATEN BULUNGAN

REKAPITULASI ANALISA SNI 2008


TAHUN ANGGARAN 2014
ZONA 1 KECAMATAN TANJUNG SELOR & KECAMATAN TANJUNG PALAS
NO.

KODE
NOMOR
ANALISA ANALISA

JENIS PEKERJAAN

SATUA
N

HARGA SATUAN

A.

PEKERJAAN PERSIAPAN
1
2
3
4
5

A.001
A.002
A.003
A.004
A.005

1A.000
2A.000
3A.000
4A.000
5A.000

6
7
8
9
10

A.006
A.007
A.008
A.009
A.010

11
12
13
14

( Rp )

SNI 03-2835-2002

Membuat 1 m' pagar sementara dari kayu tinggi 2 meter


Membuat 1 m' pagar sementara dari seng gelombang tinggi 2 meter
Membuat 1 m' pagar sementara dari kawat duri tinggi 1.8 meter
Mengerjakan 1 m' pengukuran dan pemasangan bouwplank
Membuat 1 m kantor sementara, dengan lantai plesteran

m'
m'
m'
m'
m

231,282.75
315,432.75
330,552.75
57,963.00
1,405,988.00

6A.000
7A.000
8A.000
9A.000
10A.000

Membuat 1 m gudang semen dan alat-alat


Membuat 1 m rumah jaga konstruksi kayu
Membersihkan 1 m lapangan dan perataan
Membuat 1 m bedeng buruh
Membuat 1 m jalan sementara

m
m
m
m
m

901,244.50
958,200.00
16,000.00
944,489.50
216,376.50

A.011
A.012
A.013
A.014

11A.000
12A.000
13A.000
14A.000

Membongkar 1 m beton bertulang


Membongkar 1 m dinding tembok bata merah
Mengerjakan1 m pengukuran kembali (site)
Membongkar 1 m dinding bata/ pas. batu kali (bongkaran dipakai kembali)

m
m
m
m

646,650.00
604,650.00
30,950.00
282,600.00

15
16
17
18
19

A.015
A.016
A.017
A.018
A.019

15A.000
16A.000
17A.000
18A.000
19A.000

Mengupas 1 m plesteran
Membongkar 1 m plesteran dinding/ siaran
Membongkar 1 m genteng/ sirap ( bongkaran dipakai kembali)
Membongkar 1 m genteng/ sirap (bongkaran tidak dipakai kembali)
Membongkar 1 m rangka atap/ reng/ kaso (bongkaran dipakai kembali)

m
m
m
m
m

13,000.00
13,000.00
52,000.00
10,400.00
33,100.00

20
21
22
23
24

A.020
A.021
A.022
A.023
A.024

20A.000
21A.000
22A.000
23A.000
24A.000

Membongkar
Membongkar
Membongkar
Membongkar
Membongkar

m
m
m
m
m

24,825.00
1,154,000.00
718,000.00
47,300.00
15,600.00

B.
1
2
3

1
1
1
1
1

m
m
m
m
m

rangka atap/ reng/ kaso (bongkaran tidak dipakai kembali)


kuda-kuda/ gording/ balok (bongkaran dipakai kembali)
kuda-kuda/ gording/ balok (bongkaran tidak dipakai kembali)
plafond (bongkaran dipakai kembali)
plafond (bongkaran tidak dipakai kembali)

PEKERJAAN TANAH
B.001
B.001
Menggali 1 m tanah biasa sedalam 1 meter
B.002
B.002
Menggali 1 m tanah biasa sedalam 2 meter
B.003
B.003
Menggali 1 m tanah biasa sedalam 3 meter

4
5
6
7
8

B.004
B.005
B.006
B.007
B.008

B.004
B.005
B.006
B.007
B.008

Menggali 1 m tanah keras sedalam 1 meter


Menggali 1 m tanah cadas sedalam 1 meter
Menggali 1 m tanah lumpur sedalam 1 meter
Mengerjakan 1 m stripping tebing setinggi 1 meter
Membuang 1 m tanah sejauh 30 meter

m
m
m
m
m

B.009

B.009

Membuang 1 m tanah sejauh 150 meter

10
11
12
13

B.010
B.011
B.012
B.013

B.010
B.011
B.012
B.013

Mengurug kembali 1 m galian


Memadatkan 1 m tanah (per 20 cm)
Mengurug 1 m pasir urug
Mengurug 1 m sirtu padat untuk peninggian lantai bangunan

14

B.014

B.014

Mengurug 1 m Tanah Timbunan

C.
1
2

m
m
m
m
m
m
m
m
m

PEKERJAAN PONDASI
C.001
C.001
Memasang 1 m pondasi batu belah; campuran 1 PC : 1 PP
C.002
C.002
Memasang 1 m pondasi batu belah; campuran 1 PC : 2 PP, Batu Belah 15/20

m
m
m
m
m
m
m
m

3
4
5
6

C.003
C.004
C.005
C.006

C.003
C.004
C.005
C.006

Memasang 1 m pondasi batu belah; campuran 1 PC : 2 PP, Batu Gunung


Memasang 1 m pondasi batu belah; campuran 1 PC : 2,5 PP
Memasang 1 m pondasi batu belah; campuran 1 PC : 3 PP
Memasang 1 m pondasi batu belah; campuran 1 PC : 4 PP

7
8
9
10
11

C.007
C.008
C.009
C.010
C.011

C.007
C.008
C.009
C.010
C.011

Memasang 1 m pondasi Batu Gunung; campuran 1 PC : 4 PP


Memasang 1 m pondasi batu belah; campuran 1 PC : 5 PP
Memasang 1 m pondasi batu belah; campuran 1 PC : 6 PP
Memasang 1 m pondasi batu belah; campuran 1 PC : 8 PP
Memasang 1 m batu kosong (anstamping), Batu Belah 15/20

12
13
14
15
16

C.012
C.013
C.014
C.015
C.016

C.012
C.013
C.014
C.015
C.016

Memasang 1 m batu kosong (anstamping), Batu Gunung


Memasang 1 m pondasi siklop; 60% beton campuran 1 PC : 2 PB : 3 KR dan 40 % batu
belah
Memasang 1 m pondasi sumuran; diameter 100 cm
Memasang 1 m' tiang pancang (40x40) cm, beton bertulang
Memasang 1 m' tiang pancang (35x35) cm, beton bertulang

17

C.017

C.0
C.017

Pemancangan Tiang Pancang Beton 25/25 per m'

D.
1

PEKERJAAN DINDING
D.001
D.001 Memasang 1 m dinding bata merah (8x8x16) cm; tebal 1 bata; campuran 1 PC : 1 PP

2
3
4
5
6

D.002
D.003
D.004
D.005
D.006

D.002
D.003
D.004
D.005
D.006

Memasang
Memasang
Memasang
Memasang
Memasang

1
1
1
1
1

m
m
m
m
m

dinding
dinding
dinding
dinding
dinding

bata
bata
bata
bata
bata

merah
merah
merah
merah
merah

(8x8x16)
(8x8x16)
(8x8x16)
(8x8x16)
(8x8x16)

cm;
cm;
cm;
cm;
cm;

tebal
tebal
tebal
tebal
tebal

1
1
1
1
1

bata;
bata;
bata;
bata;
bata;

campuran
campuran
campuran
campuran
campuran

7
8
9
10
11

D.007
D.008
D.009
D.010
D.011

D.007
D.008
D.009
D.010
D.011

Memasang
Memasang
Memasang
Memasang
Memasang

1
1
1
1
1

m
m
m
m
m

dinding
dinding
dinding
dinding
dinding

bata
bata
bata
bata
bata

merah
merah
merah
merah
merah

(8x8x16)
(8x8x16)
(8x8x16)
(8x8x16)
(8x8x16)

cm;
cm;
cm;
cm;
cm;

tebal
tebal
tebal
tebal
tebal

12

D.012

D.012

Memasang 1 m dinding bata merah (8x8x16) cm; tebal bata; campuran 1 PC : 6 PP

bata;
bata;
bata;
bata;
bata;

Rekapitulasi Harga Satuan Pekerjaan

1
1
1
1
1

campuran
campuran
campuran
campuran
campuran

PC
PC
PC
PC
PC

1
1
1
1
1

:
:
:
:
:

PC
PC
PC
PC
PC

2
3
4
5
6

:
:
:
:
:

PP
PP
PP
PP
PP

1
2
3
4
5

PP
PP
PP
PP
PP

m
m
m
m
m

SNI
71,000.00
87,300.00
103,880.00
94,480.00
143,400.00
114,300.00
5,200.00
31,100.00
53,440.00
23,666.67
52,000.00
149,360.00
171,200.00
105,200.00
SNI 03-2836-2002
1,483,825.10
1,268,433.05
1,221,393.05
1,483,825.10
1,156,347.75
1,107,568.00
1,060,528.00
1,060,999.60
1,028,241.15
983,385.60
684,615.60

m
m'
m'

637,575.60
3,286,686.80
1,121,700.80
1,169,080.70
915,357.97

m'

133,600.00

m
m
m
m
m
m
m
m
m
m
m
m

SNI 03-2837-2002
328,956.45
289,342.00
271,319.65
259,885.95
252,933.30
248,342.30
156,196.20
139,360.70
131,239.40
126,337.45
123,239.35
121,192.75

Page 3

NO.

KODE
NOMOR
ANALISA ANALISA

JENIS PEKERJAAN

13

D.013

D.013

Memasang 1 m dinding bata merah (8x8x16) cm; tebal bata; campuran 1 PC : 8 PP

14
15
16

D.014
D.015
D.016

D.014
D.015
D.016

Memasang 1 m dinding bata merah (8x8x16) cm; tebal bata; campuran 1 PC : 8 PP


Memasang 1 m dinding bata merah (8x8x16) cm; tebal bata; campuran 1 PC : 8 PP
Memasang 1 m dinding bata merah (8x8x16) cm; tebal bata; campuran 1 PC : 8 PP

E.
1
2
3
4

PEKERJAAN PLESTERAN
E.001
E.001
Memasang
E.002
E.002
Memasang
E.003
E.003
Memasang
E.004
E.004
Memasang

1
1
1
1

m
m
m
m

plesteran
plesteran
plesteran
plesteran

1
1
1
1

PC
PC
PC
PC

:
:
:
:

1
2
3
4

PP;
PP;
PP;
PP;

tebal
tebal
tebal
tebal

15
15
15
15

mm
mm
mm
mm

5
6
7
8
9

E.005
E.006
E.007
E.008
E.009

E.005
E.006
E.007
E.008
E.009

Memasang
Memasang
Memasang
Memasang
Memasang

1
1
1
1
1

m
m
m
m
m

plesteran
plesteran
plesteran
plesteran
plesteran

1
1
1
1
1

PC
PC
PC
PC
PC

:
:
:
:
:

5
6
7
8
2

PP;
PP;
PP;
PP;
PP;

tebal
tebal
tebal
tebal
tebal

15
15
15
15
20

mm
mm
mm
mm
mm

10
11
12
13
14

E.010
E.011
E.012
E.013
E.014

E.010
E.011
E.012
E.013
E.014

Memasang
Memasang
Memasang
Memasang
Memasang

1
1
1
1
1

m
m
m
m
m

plesteran
plesteran
plesteran
plesteran
plesteran

1
1
1
1
1

PC
PC
PC
PC
PC

:
:
:
:
:

3
4
5
6
2

PP;
PP;
PP;
PP;
PP;

tebal
tebal
tebal
tebal
tebal

20
20
20
20
25

mm
mm
mm
mm
mm

15
16
17
18
19

E.015
E.016
E.017
E.018
E.019

E.015
E.016
E.017
E.018
E.019

Memasang
Memasang
Memasang
Memasang
Memasang

1
1
1
1
1

m
m
m
m
m

plesteran
plesteran
plesteran
plesteran
plesteran

1
1
1
1
1

PC
PC
PC
PC
PC

:
:
:
:
:

3
4
5
2
3

PP;
PP;
PP;
PP;
PP;

tebal
tebal
tebal
tebal
tebal

25
25
25
30
30

mm
mm
mm
mm
mm

20
21
22
23
24

E.020
E.021
E.022
E.023
E.024

E.020
E.021
E.022
E.023
E.024

Memasang
Memasang
Memasang
Memasang
Memasang

1
1
1
1
1

m
m
m
m
m

plesteran 1 PC : 4 PP; tebal 30 mm


plesteran 1 PC : 5 PP; tebal 30 mm
berapen 1 PC : 3 PP; tebal 30 mm
berapen 1 PC : 5 PP; tebal 30 mm
plesteran beton 1 PC : 2 PP; tebal 15 mm

25
26
27
28
29

E.025
E.026
E.027
E.028
E.029

E.025
E.026
E.027
E.028
E.029

Memasang
Memasang
Memasang
Memasang
Memasang

1
1
1
1
1

m plesteran beton 1 PC : 3 PP; tebal 15 mm


m' plesteran skoning 1 PC : 2 PP; lebar 10 mm
m plesteran ciprat 1 PC : 2 PP; lebar 10 mm
m finishing siar pasangan dinding bata merah (=20 m')
m finishing siar pasangan dinding conblock ekspose (=8 m')

30
31
32

E.030
E.031
E.032

E.030
E.031
E.032

Memasang 1 m finishing siar pasangan batu kali adukan 1 PC : 2 PP


Memasang 1 m acian
Memasang 1 m' Benangan sudut

KAYU
F.001
F.002
F.003
F.004
F.005

Membuat dan memasang 1 m kusen pintu dan kusen jendela; Kayu Lembasung/ Kapur
#N/A
Membuat dan memasang 1 m pintu klamp sederhana; Kayu Lembasung/ Kapur
Membuat dan memasang 1 m pintu klamp sederhana; Kayu Meranti
Membuat dan memasang 1 m daun pintu panel; Kayu Lembasung/ Kapur

F.
1
2
3
4
5

PEKERJAAN
F.001
F.002
F.003
F.004
F.005

6
7
8
9

F.006
F.007
F.008
F.009

F.006
F.007
F.008
F.009

Membuat dan memasang 1 m daun pintu panel; Kayu Meranti


Membuat dan memasang 1 m pintu dan jendela kaca; Kayu Lembasung/ Kapur
Membuat dan memasang 1 m pintu dan jendela kaca; Kayu Meranti
Membuat dan memasang 1 m pintu dan jendela jalusi; Lembasung/ Kapur

10
11

F.010
F.011

F.010
F.011

12

F.012

F.012

Membuat dan memasang 1 m pintu dan jendela jalusi; Kayu Meranti


Membuat dan memasang 1 m daun pintu kayu lapis (plywood); rangka tertutup Kayu
Kapur
Membuat
dan memasang 1 m pintu plywood rangkap; rangka ekspose Kayu Kapur

13
14

F.013
F.014

F.013
F.014

Membuat dan memasang 1 m jalusi kusen; Kayu Kapur/ Lembasung


Membuat dan memasang 1 m jalusi kusen; Kayu Meranti

15

F.015

F.015

Membuat dan memasang 1 m pintu teakwood rangkap; rangka ekspose Kayu Kapur

16

F.016

F.016

17
18

F.017
F.018

F.017
F.018

19
20
21
22
23

F.019
F.020
F.021
F.022
F.023

F.019
F.020
F.021
F.022
F.023

Membuat dan memasang 1 m pintu teakwood rangkap lapis formika; rgk. ekspose Ky.
Meranti
Membuat dan memasang 1 m konstruksi kuda kuda konvensional; Kayu Kapur/
Lembasungdan memasang 1 m konstruksi kuda kuda konvensional; Kayu
Membuat
Meranti
Membuat dan memasang 1 m konstruksi kuda kuda ekspose; Kayu Kapur/ Lembasung

24
25
26
27
28

F.024
F.025
F.026
F.027
F.028

F.024
F.025
F.026
F.027
F.028

Membuat dan memasang 1 m rangka atap genteng kodok; Kayu Meranti


Membuat dan memasang 1 m rangka atap genteng keramik; Kayu Kapur/ Lembasung
Membuat dan memasang 1 m rangka atap genteng keramik; Kayu Meranti
Membuat dan memasang 1 m rangka atap genteng beton; Kayu Kapur/ Lembasung
Membuat dan memasang 1 m rangka atap genteng beton; Kayu Meranti

29
30
31
32
33

F.029
F.030
F.031
F.032
F.033

F.029
F.030
F.031
F.032
F.033

Membuat dan memasang 1 m rangka atap genteng metal; Kayu Lembasung/Kapur


Membuat dan memasang 1 m rangka atap genteng metal; Kayu Meranti
Memasang 1 m rangka atap sirap; Kayu Meranti
Memasang 1 m rangka langit-langit (100 x 100) cm; Kayu Meranti
Memasang 1 m rangka langit-langit (50 x 100) cm; Kayu Meranti

34
35
36
37
38

F.034
F.035
F.036
F.037
F.038

F.034
F.035
F.036
F.037
F.038

Memasang
Memasang
Memasang
Memasang
Memasang

39
40
41
42
43

F.039
F.040
F.041
F.042
F.043

F.039
F.040
F.041
F.042
F.043

Memasang 1 m rangka dinding pemisah (60 x 120) cm; Kayu Meranti


Memasang 1 m dinding pemisah teakwood rangkap; Kayu Kapur/ Lembasung
Memasang 1 m dinding pemisah plywood rangkap; Kayu Meranti
Pasangan dinding kayu meranti berlidah per m2 Memasang 1 m dinding lambriziring dari papan; Kayu Meranti

Membuat dan memasang 1 m konstruksi kuda kuda ekspose; Kayu Meranti


Membuat dan memasang 1 m konstruksi gording; Kayu Kapur/ Lembasung
Membuat dan memasang 1 m konstruksi gording; Kayu Meranti
Membuat dan memasang 1 m rangka atap genteng kodok; Kayu Kapur/ Lembasung

1
1
1
1
1

m rangka langit-langit (60 x 60) cm; Kayu Meranti


m' lisplank uk. (3 x 20) cm; Kapur/ Lembasung
m' lisplank uk. (3 x 30) cm; Kayu Kapur/Lembasung
m' lisplank uk. 2x (3 x 20) cm; Kayu Kapur/ Lembasung
m' lisplank uk. 2x (2 x 20) cm; Kayu Kapur/ Lembasung

Rekapitulasi Harga Satuan Pekerjaan

SATUA
N

m
m
m
m

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m'
m
m
m
m
m
m'

m
m
m
m
m
m
m
m
m
m
m

HARGA SATUAN
( Rp )

117,987.50
370,308.80
365,170.25
776,458.80
SNI 03-2837-2002
77,481.68
68,300.68
64,166.77
61,478.40
59,070.78
58,480.17
57,713.72
56,947.27
91,383.29
73,271.41
109,971.20
80,010.09
78,513.56
83,022.95
72,405.25
74,745.30
72,049.65
99,343.25
91,581.85
86,861.90
81,377.55
38,347.55
35,450.78
68,674.70
64,937.55
59,262.95
49,905.30
29,566.56
14,142.00
60,374.60
33,115.00
14,114.15
SNI 03-3434-2002
5,374,062.50
5,095,062.50
239,052.50
239,052.50
554,800.00
554,800.00
426,080.00
426,080.00
599,680.00
599,680.00
541,599.50

589,321.50

m
m
m

468,647.50
468,647.50
470,799.50

561,919.50

m
m
m
m

4,411,240.00
4,411,240.00

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m'
m'
m'
m'
m
m
m
m
m

5,856,440.00
5,856,440.00
3,609,350.00
3,609,350.00
56,584.50
56,584.50
60,324.50
60,324.50
160,182.50
160,182.50
47,687.50
47,687.50
339,280.00
79,355.00
94,028.00
92,193.50
56,661.00
56,602.50
83,164.00
45,681.00
125,577.50
199,909.50
296,927.50
330,680.00
299,520.00

Page 4

NO.

KODE
NOMOR
ANALISA ANALISA

JENIS PEKERJAAN

44

F.044

F.044

Memasang 1 m dinding lambriziring dari plywood ukuran (120 x 240) cm

45
46
47
48
49

F.045
F.046
F.047
F.048
F.049

F.045
F.046
F.047
F.048
F.049
F.0
F.0
F.050
F.051

Memasang 1 m' papan ruiter ukuran 3 x 30 cm; Kayu Meranti


Memasang 1 m' papan ruiter ukuran 2 x 20 cm; Kayu Meranti
Sebuah tiang pancang dicincin dan dilancipkan
Membuat pen pada tiang dan lubang pada balok pemikul tiap-tiap pasangan pen dan
lubang
Memancang
tiang pada tanah lunak per m'

F.052
F.053
F.0
F.054
F.0

Pasangan Lantai dari papan kayu kapur/lembasung per m2 Pasangan lantai dari papan kayu meranti per m2 Apabila hanya diketam salah satu sisinya saja
Pasangan lantai dari papan kayu ulin per m2 Apabila hanya diketam salah satu sisinya saja

F.055
F.056
F.057
F.058

1Ttk Memancang tiang pancang kayu ulin 10/10 - 2 m


1Ttk Memancang tiang pancang kayu ulin 10/10 - 4 m
Rangka badan/tiang jenang dari kayu kapur/lembasung per m3 Pasangan sunduk,kalang dari kayu ulin per m3 -

50
51

F.050
F.051

52
53

F.052
F.053

54

F.054

55
56
57
58

F.055
F.056
F.057
F.058

G.
1
2
3

Untuk tanah biasa 1 1/4 x E.13


Untuk tanah keras 1 1/2 x E.13
Pasangan tongkat, sloop, gelegar dari kayu ulin per m3 Pasangan gelegar kayu kapur/lembasung per m3 -

PEKERJAAN BETON
G.001
G.001 Membuat 1 m beton tumbuk 1 PC : 3 PB : 5 KR, Batu Pecah
G.002
G.002 Membuat 1 m beton tumbuk 1 PC : 3 PB : 5 KR, Kerikil Sungai
G.003
G.003 Membuat 1 m beton tumbuk 1 PC : 3 PB : 6 KR

4
5
6
7
8

G.004
G.005
G.006
G.007
G.008

G.004
G.005
G.006
G.007
G.008

Membuat 1 m beton tumbuk 1 PC : 4 PB : 6 KR


Membuat 1 m lantai kerja beton tumbuk 1 PC : 3 PB : 5 KR; tebal 5 cm,Koral Beton
Membuat 1 m lantai kerja beton tumbuk 1 PC : 3 PB : 5 KR; tebal 5 cm,Kerikil
sungai
Membuat 1 m beton bertulang 1 PC : 2 PB : 3 KR, Batu Pecah

9
10
11
12
13

G.009
G.010
G.011
G.012
G.013

G.009
G.010
G.011
G.012
G.013

Membuat
Membuat
Membuat
Membuat
Membuat

1
1
1
1
1

m
m
m
m
m

beton
beton
beton
beton
beton

bertulang
bertulang
bertulang
bertulang
bertulang

14
15
16
17

G.014
G.015
G.016
G.017

G.014
G.015
G.016
G.017

Membuat
Membuat
Membuat
Membuat

1
1
1
1

m
m
m
m

beton
beton
beton
beton

mutu
mutu
mutu
mutu

f'c=7,4 Mpa (K 100); slump (12 2) cm; w/c = 0,87


f'c=9,8 Mpa (K 125); slump (12 2) cm; w/c = 0,78
f'c=12,2 Mpa (K 150); slump (12 2) cm; w/c = 0,72
f'c=7,4 Mpa (K 100); slump (3-6) cm; w/c = 0,87

18
19
20
21
22

G.018
G.019
G.020
G.021
G.022

G.018
G.019
G.020
G.021
G.022

Membuat
Membuat
Membuat
Membuat
Membuat

1
1
1
1
1

m
m
m
m
m

beton
beton
beton
beton
beton

mutu
mutu
mutu
mutu
mutu

f'c=14,5 Mpa (K 175); slump (12 2) cm; w/c = 0,66


f'c=16,9 Mpa (K 200); slump (12 2) cm; w/c = 0,61
f'c=19,3 Mpa (K 225); slump (12 2) cm; w/c = 0,58
f'c=21,7 Mpa (K 250); slump (12 2) cm; w/c = 0,56
f'c=24 Mpa (K 275); slump (12 2) cm; w/c = 0,53

23
24
25
26
27

G.023
G.024
G.025
G.026
G.027

G.023
G.024
G.025
G.026
G.027

Membuat 1 m beton mutu f'c=26,4 Mpa (K 300); slump (12 2) cm; w/c = 0,52
Membuat 1 m beton mutu f'c=28,8 Mpa (K 325); slump (12 2) cm; w/c = 0,49
Membuat 1 m beton mutu f'c=31,2 Mpa (K 350); slump (12 2) cm; w/c = 0,48
Pembesian 1 kg dengan besi polos atau besi ulir
Memasang 10 kg jaring kawat baja /wiremesh

28
29
30
31
32

G.028
G.029
G.030
G.031
G.032

G.028
G.029
G.030
G.031
G.032

Memasang 1 m bekisting untuk pondasi


1 M2 Bongkar bekesting = 1/5 x upah pasang bekesting pondasi
Memasang 1 m bekisting untuk sloof
1 M2 Bongkar bekesting = 1/5 x upah pasang bekesting sloof
Memasang 1 m bekisting untuk kolom

33
34
35
36
37

G.033
G.034
G.035
G.036
G.037

G.033
G.034
G.035
G.036
G.037

1 M2 Bongkar bekesting = 1/5 x upah pasang bekesting kolom


Memasang 1 m bekisting untuk balok
1 M2 Bongkar bekesting = 1/5 x upah pasang bekesting balok
Memasang 1 m bekisting untuk lantai
1 M2 Bongkar bekesting = 1/5 x upah pasang bekesting lantai

38
39
40
41
42

G.038
G.039
G.040
G.041
G.042

G.038
G.039
G.040
G.041
G.042

Memasang 1 m bekisting untuk dinding


1 M2 Bongkar bekesting = 1/5 x upah pasang bekesting dinding
Memasang 1 m bekisting untuk tangga
1 M2 Bongkar bekesting = 1/5 x upah pasang bekesting tangga
Memasang 1 m jembatan untuk pengecoran beton

43
44
45
46
47

G.043
G.044
G.045
G.046
G.047

G.043
G.044
G.045
G.046
G.047

Memasang
Memasang
Memasang
Memasang
Memasang

1
1
1
1
1

m
m
m
m
m

48
49
50
51

G.048
G.049
G.050
G.051

G.048
G.049
G.050
G.051

Memasang
Memasang
Memasang
Memasang

1
1
1
1

m dinding beton bertulang (150 kg besi + bekisting)


m dinding beton bertulang (200 kg besi + bekisting)
m' kolom praktis beton bertulang (11 x 11 cm)
m' ring balok beton bertulang (10 x 15 cm)

H.
1
2
3
4
5
6
7
8

Membuat 1 m beton bertulang 1 PC : 2 PB : 3 KR, Kerikil Sungai


1
1
1
1
1

PC
PC
PC
PC
PC

:
:
:
:
:

2 PB : 4 KR
2 PB : 2,5 KR
1.5 PB : 3 KR
1.5 PB : 2,5 KR
1 PB : 2 KR

pondasi beton bertulang (150 kg besi + bekisting)


sloof beton bertulang (200 kg besi + bekisting)
kolom beton bertulang (300 kg besi + bekisting)
balok beton bertulang (200 kg besi + bekisting)
kolom beton bertulang (150 kg besi + bekisting)

PEKERJAAN PENUTUP ATAP


H.001
H.001
Memasang 1 m rooflight fibreglass (180 x 90) cm
H.002
H.002
Memasang 1 m atap genteng glazzur
H.003
H.003
Memasang 1 m' bubung genteng glazzur
H.004
H.005
H.006
H.007
H.008

H.004
H.005
H.006
H.007
H.008

Memasang
Memasang
Memasang
Memasang
Memasang

1
1
1
1
1

m atap genteng beton


m' nok genteng beton
m atap sirap
m' nok atap sirap
m atap seng gelombang Bjls 30

Rekapitulasi Harga Satuan Pekerjaan

SATUA
N

m
m
m
Ttk
Ttk
m'
m'
m'
m
m
m
m
m
m
m
1 Ttk
1 Ttk
m3
m3

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
kg
kg
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m

m
m
m'
m
m'
m
m'
m

HARGA SATUAN
( Rp )

74,339.50
50,376.50
39,904.50
40,450.00
73,800.00
172,940.00
216,175.00
259,410.00
6,207,500.00
4,221,650.00
176,640.00
176,640.00
113,860.00
227,310.00
164,530.00
253,306.00
333,672.00
6,908,330.00
6,207,500.00

RSNI-T-13-2002
1,201,178.00
853,468.00
1,202,517.17
1,124,635.50
156,019.23
138,433.90
1,360,331.00
1,048,591.00
1,325,767.50
1,340,260.67
1,231,693.00
1,443,830.50
1,576,708.83
1,193,492.87
1,249,313.92
1,291,330.92
1,124,088.37
1,343,189.74
1,389,240.82
1,428,900.08
1,448,298.39
1,481,547.10
1,491,680.94
1,583,769.42
1,597,067.96
18,047.00
166,570.00
155,975.00
16,484.00
164,225.00
16,484.00
271,140.00
20,922.00
276,090.00
20,922.00
335,140.00
20,922.00
342,890.00
20,922.00
254,110.00
20,922.00
85,320.00
4,867,756.00
5,930,251.00
9,192,491.00
7,046,631.00
6,256,871.00
6,062,481.00
6,707,511.00
98,154.40
123,542.35
SNI 03-3436-2002
94,822.50
141,410.00
109,368.80
112,449.50
119,417.30
189,140.00
58,701.50
64,918.00

Page 5

NO.

KODE
NOMOR
ANALISA ANALISA

JENIS PEKERJAAN

H.009

H.009

Memasang 1 m atap seng gelombang Bjls 20

10
11
12
13
14
15

H.010
H.011
H.012
H.013
H.014
H.015

H.010
H.011
H.012
H.013
H.014
H.015

Memasang 1 m' atap bubungan seng Bjls 30


Menutup atap dengan genteng metal surya roof per m2
Menutup bubungan pada genteng metal Surya roof per m'
Menutup Atap dengan genteng Metal sakura roof per m2
Menutup bubungan pada genteng metal Sakura roof per m'
Pasang aluminium foil / sisalation per 1 M2

I.
1

PEKERJAAN LANGIT-LANGIT
I.001
I.001
Memasang 1 m langit-langit lambriziring kayu, tebal 9 mm

2
3
4
5
6

I.002
I.003
I.004
I.005
I.006

I.002
I.003
I.004
I.005
I.006

Memasang
Memasang
Memasang
Memasang
Memasang

1
1
1
1
1

m
m
m
m
m

langit-langit
langit-langit
langit-langit
langit-langit
langit-langit

7
8
9
10
11

I.007
I.008
I.009
I.010
I.011

I.007
I.008
I.009
I.010
I.011

Memasang
Memasang
Memasang
Memasang
Memasang

1
1
1
1
1

m
m
m
m
m

langit-langit lat kayu bengkirai


langit-langit lat kayu meranti
Plywood 9 mm, rangka kayu meranti
Plywood 3mm, rangka kayu meranti
langit-langit gypsum board uk. (120 x 240) cm, tebal 9 mm

12
13

I.012
I.013

I.012
I.013

Memasang 1 m' list gipsum


Memasang 1 m' list kayu profil

J.

plywood ukuran (120 x 240) cm; tbl. 9 mm


plywood ukuran (120 x 240) cm; tbl. 3 mm
plywood ukuran (60 x 120) cm; tbl. 9 mm
plywood ukuran (60 x 120) cm; tbl. 3 mm
teakwood ukuran (60 x 120) cm; tbl. 4 mm dan 6 mm

SATUA
N

m
m'
m
m'
m
m'
m

m
m
m
m
m
m
m
m
m
m
m
m'
m'

PEKERJAAN SANITASI

HARGA SATUAN
( Rp )

47,943.00
151,679.00
167,817.38
128,480.00
112,337.68
128,480.00
73,690.00
SNI 03-2838-2002
184,866.50
80,399.50
45,337.00
77,489.50
42,427.00
77,639.50
145,131.50
139,851.50
179,759.00
143,294.00
52,467.80
45,450.00
32,286.50

SNI

1
2
3
4
5

J.001
J.002
J.003
J.004
J.005

Memasang
Memasang
Memasang
Memasang
Memasang

6
7
8
9
10

J.006
J.007
J.008
J.009
J.010

Memasang 1 buah bak mandi fibreglass volume 0,30 m


Memasang 1 buah bak mandi batu bata volume 0,30 m
Memasang 1 buah badkip fiberglass
Membuat 1 buah bak beton volume 1m
Memasang 1 buah bak kontrol pas. batu bata ukuran (30 x 30) cm tinggi 35 cm

11
12
13
14
15
16
17
18
19

J.011
J.012
J.013
J.014
J.015
J.016
J.017
J.018
J.019

Memasang
Memasang
Memasang
Memasang
Memasang
Memasang
Memasang
Memasang
Memasang

1
1
1
1
1
1
1
1
1

buah bak kontrol pas. batu bata ukuran (45 x 45) cm tinggi 60 cm
buah bak kontrol pas. batu bata ukuran (60 x 60) cm tinggi 65 cm
m' pipa PVC tipe AW "
m' pipa PVC tipe AW "
m' pipa PVC tipe AW 1"
m' pipa PVC tipe AW 1"
m' pipa PVC tipe AW 2"
m' pipa PVC tipe AW 2"
m' pipa PVC tipe AW 3"

m
m
m
m'
m'
m'
m'
m'
m'
m'

20
21
22
23
24

J.020
J.021
J.022
J.023
J.024

Memasang
Memasang
Memasang
Memasang
Memasang

1
1
1
1
1

m' pipa PVC tipe AW 4"


buah bak cuci piring satinless steel
buah kran " atau " Biasa
buah kran " atau " stanlis
buah floordrain

bh
bh
bh
bh

108,556.50
758,550.00
24,975.00
101,775.00
53,630.00

kg
kg
kg

Revisi SNI T-16-2002


27,848.00
33,095.00
35,168.80

K.
1
2
3

1
1
1
1
1

buah
buah
buah
buah
buah

kloset duduk
kloset jongkok porselen
kloset jongkok teraso
urinoir
wastafel

PEKERJAAN BESI DAN ALUMUNIUM


K.001
K.001
Memasang 1 kg rangka atap baja
K.002
K.002
Memasang 1 kg Besi Profil
K.003
K.003
Mengerjakan 100 kg pekerjaan perakitan

bh
bh
bh
bh
bh

2,090,530.00
724,166.50
433,811.50
3,440,046.50
1,852,991.50

bh
bh
bh
bh

1,134,600.00
1,689,454.13
693,150.00
5,960,070.50
631,131.49

m'

4
5
6
7
8

K.004
K.005
K.006
K.007
K.008

K.004
K.005
K.006
K.007
K.008

Mengerjakan 1 cm pengelasan dengan las listrik


Memasang 1 m pintu gulung (rolling door) besi
Memasang 1 m pintu lipat (folding door)
Memasang 1 m rolling door alumunium
Memasang 1 m pintu alumunium

9
10

K.009
K.010

K.009
K.010

Memasang 1 m' Kusen Alumunium 4 "


1 M2 Pintu Kaca Rangka Alumunium SNI 7393 : 2008

m
m
m
m'
m

11

K.011

K.011

1 M2 Daun Jendela Kaca Rangka Alumunium SNI DT 90-0014-2007

841,175.33

12

K.012

K.012

Memasang 1 m terali besi

474,027.35

13
14
15
16
17

K.013
K.014
K.015
K.016
K.017

K.013
K.014
K.015
K.016
K.017

Memasang
Memasang
Memasang
Memasang
Memasang

m
m
m
m'
m'

45,739.00
120,064.45
234,277.00
160,396.50
161,931.50

18
19
20

K.018
K.019
K.020

K.018
K.019
K.020

Memasang 1 m' talang lingkaran 10 cm, seng BJLS 30


Memasang 1 m' talang lingkaran 10 cm, seng BJLS 20
Memasang 1 m' talang U dari PVC

m'
m'
m'

117,585.00
73,536.00
138,050.00

bh
bh
bh
bh
bh

291,370.00
107,900.00
129,050.00
56,905.00
35,270.00

L.

1
1
1
1
1

m kawat harmonika
m kawat nyamuk
m jendela nako & tralis
m' talang datar seng BJLS 30
m' talang miring seng BJLS 30

cm

565,605.70
873,930.69
18,622.00
20,172.00
23,775.75
34,587.00
47,269.25
55,240.75
78,641.50

3,232.30
515,940.00
2,559,200.00
1,491,105.00
956,478.00
253,859.60
1,076,392.20

PEKERJAAN KUNCI DAN KACA


1
2
3
4
5

L.001
L.002
L.004
L.005
L.006

L.001
L.002
L.004
L.005
L.006

Memasang
Memasang
Memasang
Memasang
Memasang

1
1
1
1
1

buah
buah
buah
buah
buah

kunci tanam kwalitas baik


kunci tanam biasa
kunci tanam kamar mandi
engsel pintu
engsel jendela kupu-kupu

6
7
8
9
10

L.007
L.008
L.009
L.010
L.011

L.007
L.008
L.009
L.010
L.011

Memasang 1 buah kait angin


Memasang 1 buah kunci selot
Memasang 1 buah pegangan pintu / door holder
Pasang door closer 1 buah
Pasang door stop 1 buah

bh
bh
bh
bh
bh

39,705.00
43,040.00
396,350.00
203,850.00
38,970.00

11

L.012

L.012

Memasang 1 buah rel pintu dorong

bh

2,378,220.00

Rekapitulasi Harga Satuan Pekerjaan

Page 6

NO.

KODE
NOMOR
ANALISA ANALISA

JENIS PEKERJAAN

12

L.013

L.013

Memasang 1 m kaca polos; tebal 3 mm

13
14
15
16
17
18
19
20

L.014
L.015
L.016
L.017
L.018
L.019
L.020
L.021

L.014
L.015
L.016
L.017
L.018
L.019
L.020
L.021

Memasang
Memasang
Memasang
Memasang
Memasang
Memasang
Memasang
Memasang

M.
1
2
3
4

1
1
1
1
1
1
1
1

m
m
m
m
m
m
m
m

kaca polos; tebal 5 mm


kaca ryben; tebal 3 mm
kaca ryben; tebal 5 mm
kaca ryben; tebal 8 mm
buram; tebal 3 mm
buram; tebal 5 mm
kaca cermin; tebal 3 mm
kaca patri lokal

PEKERJAAN PENUTUP LANTAI DAN DINDING


M.001
M.001 Memasang 1 m lantai keramik ukuran 60 x 60 cm
M.002
M.002 Memasang 1 m lantai keramik ukuran 40 x 40 cm
M.003
M.003 Memasang 1 m lantai keramik ukuran 30 x 30 cm
M.004
M.004 Pasang lantai keramik 20 x 20 cm per 1 M2

6
7

M.005
M.006
M.007
M.008
M.009

M.005
M.006
M.007
M.008
M.009

Memasang
Memasang
Memasang
Memasang
Memasang

1
1
1
1
1

8
9
10
11
12

M.010
M.011
M.012
M.013
M.014

M.010
M.011
M.012
M.013
M.014

Memasang
Memasang
Memasang
Memasang
Memasang

1 m lantai ubin granito ukuran 40x 40 cm (motif khusus)


1 m lantai marmer ukuran 40 x 40 cm
1 m dinding batu alam
1 m' plint kayu ukuran 2 x 10 cm
Koral Sikat Motif M2

N.
1
2
3

m dinding keramik ukuran 20 x 20 cm


m dinding keramik ukuran 20 x 25 cm
m dinding porselin 11 x 11 cm
m' plint keramik ukuran 10 x 20 cm
m lantai ubin granito ukuran 40 x 40 cm

PEKERJAAN PENGECATAN
N.001
Mengikis / mengerok permukaan cat tembok lama 1 M2
N.002
Mencuci bidang permukaan tembok yang pernah di cat per 1 M2
N.003
Mengerok karat cat lama permukaan baja dengan cara manual per 1 m2

4
5
6
7
8

N.004
N.005
N.006
N.007
N.008

Mendempul dan Menggosok 1 m kayu


Mengecat 1 m bidang kayu lama
Mengecat 1 m bidang kayu baru (1 lps plamir, 1 lps cat dsr, 2 lps cat penutup)
Mengecat 1 m bidang kayu baru (1 lps plamir, 1 lps cat dsr, 3 lps cat penutup)
Pelaburan bidang kayu dengan teak oil per 1 M2

9
10
11
12
13
14
15
16
17

N.009
N.010
N.011
N.012
N.013
N.014
N.015
N.016
N.017

Melabur 1 m bidang kayu dengan politur


Melabur 1 m bidang kayu dengan cat residu
Melabur 1 m bidang kayu dengan vernis
Mengecat 1 m bidang tembok baru (1 lps plamir, 1 lps cat dsr, 2 lps cat penutup)
Mengecat 1 m bidang tembok lama (1 lps cat dsr, 2 lps cat penutup)
Mengecat 1 m bidang tembok tidak terlindung dari panas dan hujan
Pengecatan atap memakai cat khusus atap per m2
Pemasangan wall paper per 1 m2
Mengecat 1 m permukaan baja dengan meni besi

18

N.018

Mengecat 1 m permukaan baja dengan meni besi dan perancah

Rekapitulasi Harga Satuan Pekerjaan

SATUA
N

m
m
m
m
m
m
m
m
m

m
m
m
m
m
m
m
m
m
m'
m
m
m
m

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m

HARGA SATUAN
( Rp )

144,315.00
210,205.00
208,775.00
281,485.00
207,380.25
169,285.00
265,865.00
268,835.00
1,141,355.00

619,843.75
231,357.75
224,021.75
229,928.30
265,014.70
270,514.70
301,929.70
179,028.75
363,467.75
1,547,967.75
368,057.75
382,320.25
33,565.00
492,335.65

14,515.00
14,850.00
14,850.00
11,602.00
31,330.00
32,972.00
47,529.00
24,654.00
35,915.00
13,200.00
43,631.00
19,161.00
15,098.00
45,187.00
49,213.30
143,950.00
30,396.00
57,121.00

Page 7

DINAS PEKERJAAN UMUM


KABUPATEN BULUNGAN

ANALISA HARGA SATUAN PEKERJAAN


TAHUN ANGGARAN 2014
NO
1
A.
A.001

A.002

KOEF

SAT

2
3
PEKERJAAN PERSIAPAN
Membuat 1 m' pagar sementara dari kayu tinggi 2 meter
Bahan
Kayu Dolken / Kayu perancah
1.2500
Portland Cement (PC)
2.5000
Pasir Beton (PB)
0.0050
Kerikil Sungai
0.0090
Kayu Meranti 5/7
0.0720
Paku Biasa 2" - 5"
0.0600
Residu
0.4000

Btg
kg
m
m
m
kg
lt

16,000.00
1,820.00
107,150.00
242,000.00
1,870,000.00
21,650.00
11,700.00
Jumlah (1)

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

0.4000
0.2000
0.0200
0.0200

HARGA SAT
Rp.
5

Jumlah (1) + (2)


Membuat 1 m' pagar sementara dari seng gelombang tinggi 2 meter
Bahan
Kayu Dolken / Kayu perancah
1.2500
Btg
Portland Cement (PC)
2.5000
kg
Seng Gelombang 3" - 5"
1.2000
lbr
Pasir Beton (PB)
0.0050
m
Koral Beton (maksimum 30 mm)
0.0090
m
Kayu Meranti 5/7
0.0720
m
Paku Biasa 2" - 5"
0.0600
kg
Meni Kayu
0.4500
Kg

16,000.00
1,820.00
64,950.00
107,150.00
242,000.00
1,870,000.00
21,650.00
24,200.00

Jumlah (1)
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
A.003

0.4000
0.2000
0.0200
0.0200

Jumlah (1) + (2)


Membuat 1 m' pagar sementara dari kawat duri tinggi 1.8 meter
Bahan
Kayu Dolken / Kayu perancah
1.0000
Btg
Portland Cement (PC)
2.0000
kg
Kawat Duri
25.0000
kg
Pasir Beton (PB)
0.0050
m
Koral Beton (maksimum 30 mm)
0.0090
m
Paku Biasa 2" - 5"
0.0600
kg
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

A.004

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

16,000.00
1,820.00
10,100.00
107,150.00
242,000.00
21,650.00
Jumlah (1)

0.3000
0.2000
0.0200
0.0200

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Mengerjakan 1 m' pengukuran dan pemasangan bouwplank
Bahan
Kayu Meranti 5/7
0.0120
Paku Biasa 2" - 5"
0.0200
Kayu Papan Meranti (2 x 20 x 400)
0.0070

m
kg
m

1,870,000.00
21,650.00
1,870,000.00
Jumlah (1)

Analisa Harga Satuan Pekerjaan

Page 8

NO
1

2
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

A.005

KOEF

SAT

HARGA SAT
Rp.
5

0.1000
0.1000
0.0100
0.0050

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Membuat 1 m kantor sementara, dengan lantai plesteran
Bahan
Kayu Dolken / Kayu perancah
1.2500
Kayu Meranti 5/7 (ikat)
0.1800
Paku
0.8500
Besi Strip
1.1000
Semen Portland
35.0000
Pasir Urug
0.1500
Pasir Beton
0.1000
Kerikil Sungai
0.1500
Bata Merah
30.0000
Seng Plat Bjls 20
0.2500
Jendela Nako
2.0000
Kaca Polos 3mm
0.0800
Kunci Tanam
0.1500
Plywood 3 mm
0.0600

m'
m
kg
kg
kg
m
m
m
bh
lbr
bh
m
bh
lbr

16,000.00
1,870,000.00
21,650.00
24,600.00
1,820.00
100,800.00
107,150.00
242,000.00
990.00
15,000.00
122,100.00
113,100.00
211,750.00
60,500.00
Jumlah (1)

Pekerja
Tukang Batu
Tukang Kayu
Kepala Tukang
Mandor

2.0000
1.0000
2.0000
0.3000
0.0500

OH
OH
OH
OH
OH

90,000.00
110,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

1.7000
0.2100
0.3000
10.5000
0.0300
0.0500
1.5000

Btg
m
kg
kg
m
m
lbr

16,000.00
1,870,000.00
21,650.00
1,820.00
107,150.00
242,000.00
64,950.00
Jumlah (1)

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1.0000
2.0000
0.2000
0.0500

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Membuat 1 m rumah jaga konstruksi kayu
Bahan
Kayu Dolken / Kayu perancah
Kayu Meranti 5/7 (ikat)
Paku
Seng Gelombang BJLS 30

3.0000
0.2760
0.7000
1.5000

Btg
m
kg
lbr

16,000.00
1,870,000.00
21,650.00
64,950.00
Jumlah (1)

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1.0000
1.5000
0.1500
0.0500

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Membersihkan 1 m lapangan dan perataan
Pekerja
Mandor

0.1000
0.0500

OH
OH

90,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


A.006

A.007

A.008

Membuat 1 m gudang semen dan alat-alat


Bahan
Kayu Dolken / Kayu perancah
Kayu Meranti 5/7 (ikat)
Paku
Semen Portland
Pasir Beton
Kerikil Sungai
Seng Gelombang BJLS 30

Analisa Harga Satuan Pekerjaan

Page 9

NO
1
A.009

A.010

2
Membuat 1 m bedeng buruh
Bahan
Kayu Dolken / Kayu perancah
Kayu Meranti 5/7 (ikat)
Paku
Semen Portland
Pasir Beton
Kerikil Sungai
Seng Gelombang BJLS 32
Plywood 6 mm

KOEF

SAT

HARGA SAT
Rp.
5

1.2500
0.1860
0.3000
18.0000
0.0300
0.0500
1.5000
1.3500

Btg
m
kg
kg
m
m
lbr
lbr

16,000.00
1,870,000.00
21,650.00
1,820.00
107,150.00
242,000.00
64,950.00
60,500.00
Jumlah (1)

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1.0000
2.0000
0.2000
0.0500

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Membuat 1 m jalan sementara
Bahan
Batu Belah 15/20
Batu Pecah 5/7
Pasir Pasang

0.1500
0.0900
0.0100

m
m
m

431,200.00
595,833.33
107,150.00
Jumlah (1)

Tenaga
Pekerja
Mandor

1.0000
0.0500

OH
OH

90,000.00
140,000.00
Jumlah (2)

Membongkar 1 m beton bertulang


Pekerja
Mandor

6.6670
0.3330

OH
OH

90,000.00
140,000.00
Jumlah

Membongkar 1 m dinding tembok bata merah


Pekerja
Mandor

6.6670
0.0330

OH
OH

90,000.00
140,000.00
Jumlah

Jumlah (1) + (2)


A.011

A.012

A.013

A.014

A.015

A.016

A.017

A.018

A.019

Mengerjakan1 m pengukuran kembali (site)


Pekerja
0.0200
OH
90,000.00
Tukang Kayu
0.0100
OH
110,000.00
Peralatan
0.5000
OH
56,100.00
Jumlah
Membongkar 1 m dinding bata/ pas. batu kali (bongkaran dipakai kembali)
Pekerja
3.0000
OH
90,000.00
Mandor
0.0900
OH
140,000.00
Jumlah
Mengupas 1 m plesteran
Pekerja
0.1250
OH
90,000.00
Mandor
0.0125
OH
140,000.00
Jumlah
Membongkar 1 m plesteran dinding/ siaran
Pekerja
0.1250
OH
90,000.00
Mandor
0.0125
OH
140,000.00
Jumlah
Membongkar 1 m genteng/ sirap ( bongkaran dipakai kembali)
Pekerja
0.5000
OH
90,000.00
Mandor
0.0500
OH
140,000.00
Jumlah
Membongkar 1 m genteng/ sirap (bongkaran tidak dipakai kembali)
Pekerja
0.1000
OH
90,000.00
Mandor
0.0100
OH
140,000.00
Jumlah
Membongkar 1 m rangka atap/ reng/ kaso (bongkaran dipakai kembali)
Pekerja
0.2000
OH
90,000.00
Tukang Kayu
0.1000
OH
110,000.00
Kepala Tukang
0.0100
OH
130,000.00
Mandor
0.0200
OH
140,000.00
Analisa Harga Satuan Pekerjaan

Page 10

NO
1
A.020

A.021

A.022

A.023

A.024

B.
B.001

B.002

B.003

B.004

B.005

B.006

B.007

B.008

2
Jumlah
Membongkar
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah
Membongkar
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah
Membongkar
Pekerja
Tukang Kayu
Mandor
Jumlah
Membongkar
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah
Membongkar
Pekerja
Mandor
Jumlah

KOEF

SAT

HARGA SAT
Rp.
5

1 m rangka atap/ reng/ kaso (bongkaran tidak dipakai kembali)


0.1500
OH
90,000.00
0.0750
OH
110,000.00
0.0075
OH
130,000.00
0.0150
OH
140,000.00
1 m kuda-kuda/ gording/ balok (bongkaran dipakai kembali)
4.0000
OH
90,000.00
6.0000
OH
110,000.00
0.6000
OH
130,000.00
0.4000
OH
140,000.00
1 m kuda-kuda/ gording/ balok (bongkaran tidak
4.0000
3.0000
0.2000

dipakai kembali)
OH
90,000.00
OH
110,000.00
OH
140,000.00

1 m plafond (bongkaran dipakai kembali)


0.1000
0.3000
0.0300
0.0100

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00

1 m plafond (bongkaran tidak dipakai kembali)


0.1500
0.0150

OH
OH

90,000.00
140,000.00

PEKERJAAN TANAH
Menggali 1 m tanah biasa sedalam 1 meter
Tenaga
Pekerja
Mandor
Jumlah
Menggali 1 m tanah biasa sedalam 2 meter
Tenaga
Pekerja
Mandor
Jumlah
Menggali 1 m tanah biasa sedalam 3 meter
Tenaga
Pekerja
Mandor
Jumlah
Menggali 1 m tanah keras sedalam 1 meter
Tenaga
Pekerja
Mandor
Jumlah
Menggali 1 m tanah cadas sedalam 1 meter
Tenaga
Pekerja
Mandor
Jumlah
Menggali 1 m tanah lumpur sedalam 1 meter
Tenaga
Pekerja
Mandor
Jumlah
Mengerjakan 1 m stripping tebing setinggi 1 meter
Tenaga
Pekerja
Mandor
Jumlah
Membuang 1 m tanah sejauh 30 meter
Tenaga
Pekerja
Analisa Harga Satuan Pekerjaan

SNI
0.7500
0.0250

OH
OH

90,000.00
140,000.00

0.9000
0.0450

OH
OH

90,000.00
140,000.00

1.0500
0.0670

OH
OH

90,000.00
140,000.00

1.0000
0.0320

OH
OH

90,000.00
140,000.00

1.5000
0.0600

OH
OH

90,000.00
140,000.00

1.2000
0.0450

OH
OH

90,000.00
140,000.00

0.0500
0.0050

OH
OH

90,000.00
140,000.00

0.3300

OH

90,000.00
Page 11

NO

KOEF

B.010

B.011

B.012

4
OH

Rp.
5
140,000.00

0.5160
0.0500

OH
OH

90,000.00
140,000.00

0.2500
0.0083

OH
OH

90,000.00
140,000.00

0.5000
0.0500

OH
OH

90,000.00
140,000.00

1.2000

100,800.00
Jumlah (1)

0.3000
0.0100

OH
OH

90,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Mengurug 1 m sirtu padat untuk peninggian lantai bangunan
Bahan
Sirtu
1.2000

121,000.00
Jumlah (1)

Tenaga
Pekerja
Mandor

0.2500
0.0250

OH
OH

90,000.00
140,000.00
Jumlah (2)

Mengurug 1 m Tanah Timbunan


Bahan
Tanah Timbunan

1.2000

66,000.00
Jumlah (1)

Tenaga
Pekerja
Mandor

0.2500
0.0250

OH
OH

90,000.00
140,000.00
Jumlah (2)

2
Mandor
Jumlah
Membuang 1 m tanah sejauh 150 meter
Tenaga
Pekerja
Mandor
Jumlah
Mengurug kembali 1 m galian
Tenaga
Pekerja
Mandor
Jumlah
Memadatkan 1 m tanah (per 20 cm)
Tenaga
Pekerja
Mandor
Jumlah
Mengurug 1 m pasir urug
Bahan
Pasir Urug
Tenaga
Pekerja
Mandor

B.013

HARGA SAT

3
0.0100

B.009

SAT

Jumlah (1) + (2)


B.014

Jumlah (1) + (2)


C.
C.001

PEKERJAAN PONDASI
Memasang 1 m pondasi batu belah; campuran 1 PC : 1 PP
Bahan
Batu Belah 15/20
1.2000
Portland Cement (PC)
392.0000
Pasir Pasang (PP)
0.3140

m
kg
m

431,200.00
1,820.00
107,150.00
Jumlah (1)

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

1.5000
0.6000
0.0600
0.0750

SNI 03-2836-2002

Jumlah (1) + (2)


C.002

Memasang 1 m pondasi batu belah; campuran 1 PC : 2 PP, Batu


Bahan
Batu Belah 15/20
1.2000
Portland Cement (PC)
267.0000
Pasir Pasang (PP)
0.4270

Belah 15/20
m
kg
m

431,200.00
1,820.00
107,150.00
Jumlah (1)

Tenaga
Analisa Harga Satuan Pekerjaan

Page 12

NO

KOEF

2
Pekerja
Tukang Batu
Kepala Tukang
Mandor

C.003

Jumlah (1) + (2)


Memasang 1 m pondasi batu belah; campuran 1 PC : 2 PP, Batu
Bahan
Batu Gunung
1.2000
Portland Cement (PC)
267.0000
Pasir Pasang (PP)
0.4270

C.005

C.006

C.007

4
OH
OH
OH
OH

HARGA SAT
Rp.
5
90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Gunung
m
kg
m

392,000.00
1,820.00
107,150.00
Jumlah (1)

1.5000
0.6000
0.0600
0.0750

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m pondasi batu belah; campuran 1 PC : 2,5 PP
Bahan
Batu Belah 15/20
1.2000
Portland Cement (PC)
392.0000
Pasir Pasang (PP)
0.3140

m
kg
m

431,200.00
1,820.00
107,150.00
Jumlah (1)

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1.5000
0.6000
0.0600
0.0750

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m pondasi batu belah; campuran 1 PC : 3 PP
Bahan
Batu Belah 15/20
1.2000
Portland Cement (PC)
202.0000
Pasir Pasang (PP)
0.4850

m
kg
m

431,200.00
1,820.00
107,150.00
Jumlah (1)

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1.5000
0.6000
0.0600
0.0750

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m pondasi batu belah; campuran 1 PC : 4 PP
Bahan
Batu Belah 15/20
1.2000
Portland Cement (PC)
163.0000
Pasir Pasang (PP)
0.5200

m
kg
m

431,200.00
1,820.00
107,150.00
Jumlah (1)

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1.5000
0.7500
0.0750
0.0750

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m pondasi Batu Gunung; campuran 1 PC : 4 PP
Bahan
Batu Gunung
1.2000
Portland Cement (PC)
163.0000
Pasir Pasang (PP)
0.5200

m
kg
m

392,000.00
1,820.00
107,150.00
Jumlah (1)

Tenaga
Pekerja
Tukang Batu
Kepala Tukang

OH
OH
OH

90,000.00
110,000.00
130,000.00

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
C.004

3
1.5000
0.6000
0.0600
0.0750

SAT

1.5000
0.7500
0.0750
Analisa Harga Satuan Pekerjaan

Page 13

NO

KOEF

C.009

C.010

C.011

C.012

C.013

HARGA SAT
Rp.
5
140,000.00
Jumlah (2)

3
0.0750

4
OH

Jumlah (1) + (2)


Memasang 1 m pondasi batu belah; campuran 1 PC : 5 PP
Bahan
Batu Belah 15/20
1.2000
Portland Cement (PC)
136.0000
Pasir Pasang (PP)
0.5440

m
kg
m

431,200.00
1,820.00
107,150.00
Jumlah (1)

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1.5000
0.7500
0.0750
0.0750

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m pondasi batu belah; campuran 1 PC : 6 PP
Bahan
Batu Belah 15/20
1.2000
Portland Cement (PC)
117.0000
Pasir Pasang (PP)
0.5610

m
kg
m

431,200.00
1,820.00
107,150.00
Jumlah (1)

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1.5000
0.7500
0.0750
0.0750

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m pondasi batu belah; campuran 1 PC : 8 PP
Bahan
Batu Belah 15/20
1.2000
Portland Cement (PC)
91.0000
Pasir Pasang (PP)
0.5840

m
kg
m

431,200.00
1,820.00
107,150.00
Jumlah (1)

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1.5000
0.7500
0.0750
0.0750

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m batu kosong (anstamping), Batu Belah 15/20
Bahan
Batu Belah 15/20
1.2000
Pasir Urug
0.4320

m
m

431,200.00
100,800.00
Jumlah (1)

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.7800
0.3900
0.0390
0.0390

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m batu kosong (anstamping), Batu Gunung
Bahan
Batu Gunung
1.2000
Pasir Urug
0.4320

m
m

392,000.00
100,800.00
Jumlah (1)

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Mandor
C.008

SAT

0.7800
0.3900
0.0390
0.0390

Jumlah (1) + (2)


Memasang 1 m pondasi siklop; 60% beton campuran 1 PC : 2 PB : 3 KR dan 40 % batu belah

Analisa Harga Satuan Pekerjaan

Page 14

NO
1

2
Bahan
Batu Belah 15/20
Portland Cement (PC)
Pasir Beton (PB)
Koral (Batu pecah )
Besi Beton
Kawat Beton

KOEF

SAT

HARGA SAT
Rp.
5

0.4800
194.0000
0.3120
0.4680
126.0000
1.8000

m
kg
m
m
m
m

431,200.00
1,820.00
107,150.00
595,833.33
15,400.00
22,000.00
Jumlah (1)

3.4000
0.8500
0.0850
0.1700

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Memasang 1 m pondasi sumuran; diameter 100 cm


Bahan
Batu Belah 15/20
0.4500
Portland Cement (PC)
194.0000
Pasir Beton (PB)
0.3120
Koral (Batu pecah ukuran 5 mm - 40 mm)
0.4680

m
kg
m
m

431,200.00
1,820.00
107,150.00
595,833.33
Jumlah (1)

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

2.3800
0.3000
0.0300
0.0800

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m' tiang pancang (40x40) cm, beton bertulang
Bahan
Pasir Urug
0.0190
Pasir Beton (PB)
0.0940
Koral (Batu pecah ukuran 5 mm - 40 mm)
0.1500
Portland Cement (PC)
60.5000
Besi Beton
45.0000
Kawat Beton
0.9000
Kayu Kaso 5/7
0.0320
Paku
0.1200
Minyak Bekisting
0.0900
Plamuur Tembok
0.2400

m
m
m
kg
kg
kg
m
kg
lt
kg

100,800.00
107,150.00
595,833.33
1,820.00
15,400.00
22,000.00
1,870,000.00
21,650.00
10,600.00
8,360.00
Jumlah (1)

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1.0000
0.6700
0.0670
0.0500

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m' tiang pancang (35x35) cm, beton bertulang
Bahan
Pasir Urug
0.0160
Pasir Beton (PB)
0.0800
Koral (Batu pecah ukuran 5 mm - 40 mm)
0.1250
Portland Cement (PC)
49.0000
Besi Beton
34.5000
Kawat Beton
0.7000
Kayu Kaso 5/7
0.0270
Paku
0.1200
Minyak Bekisting
0.0900
Plamuur Tembok
0.2000

m
m
m
kg
kg
kg
m
kg
lt
kg

100,800.00
107,150.00
595,833.33
1,820.00
15,400.00
22,000.00
1,870,000.00
21,650.00
10,600.00
8,360.00
Jumlah (1)

Tenaga
Pekerja
Tukang Batu
Kepala Tukang

OH
OH
OH

90,000.00
110,000.00
130,000.00

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah (1) + (2)
C.014

C.015

C.016

0.8000
0.5000
0.0500
Analisa Harga Satuan Pekerjaan

Page 15

NO

KOEF

C.017

SAT

HARGA SAT
Rp.
5
140,000.00
Jumlah (2)

Mandor

3
0.0400

4
OH

Jumlah (1) + (2)


Pemancangan Tiang Pancang Beton 25/25 per m'
Alat
Drop Hammer
Alat Bantu

0.1300
1.0000

Jam
Ls

250,000.00
56,100.00
Jumlah (1)

Tenaga
Upah Kerja

1.0000

m'

45,000.00
Jumlah (2)

Jumlah (1) + (2)

D.
D.001

PEKERJAAN DINDING
Memasang 1 m dinding bata merah (8x8x16) cm; tebal 1 bata;
Bahan
Bata Merah
120.0000
Portland Cement (PC)
64.0300
Pasir Pasang (PP)
0.0590
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

D.002

0.6500
0.2000
0.0200
0.0300

Jumlah (1) + (2)


Memasang 1 m dinding bata merah (8x8x16) cm; tebal 1 bata;
Bahan
Bata Merah
120.0000
Portland Cement (PC)
43.5000
Pasir Pasang (PP)
0.0800
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.6000
0.2000
0.0200
0.0300

SNI 03-2837-2002
campuran 1 PC : 1 PP
buah
kg
m

990.00
1,820.00
107,150.00
Jumlah (1)

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

campuran 1 PC : 2 PP
buah
kg
m

990.00
1,820.00
107,150.00
Jumlah (1)

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


D.003

Memasang 1 m dinding bata merah (8x8x16) cm; tebal 1 bata;


Bahan
Bata Merah
120.0000
Portland Cement (PC)
32.9500
Pasir Pasang (PP)
0.0910
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

D.004

0.6000
0.2000
0.0200
0.0300

Jumlah (1) + (2)


Memasang 1 m dinding bata merah (8x8x16) cm; tebal 1 bata;
Bahan
Bata Merah
120.0000
Portland Cement (PC)
26.5500
Pasir Pasang (PP)
0.0930
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.6000
0.2000
0.0200
0.0300
Analisa Harga Satuan Pekerjaan

campuran 1 PC : 3 PP
buah
kg
m

990.00
1,820.00
107,150.00
Jumlah (1)

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

campuran 1 PC : 4 PP
buah
kg
m

990.00
1,820.00
107,150.00
Jumlah (1)

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Page 16

NO
1

D.005

D.008

D.009

0.6000
0.2000
0.0200
0.0300

Jumlah (1) + (2)


Memasang 1 m dinding bata merah (8x8x16) cm; tebal 1 bata;
Bahan
Bata Merah
120.0000
Portland Cement (PC)
18.5000
Pasir Pasang (PP)
0.1220
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

D.007

SAT

Jumlah (1) + (2)


Memasang 1 m dinding bata merah (8x8x16) cm; tebal 1 bata;
Bahan
Bata Merah
120.0000
Portland Cement (PC)
22.2000
Pasir Pasang (PP)
0.1020
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

D.006

KOEF

0.6000
0.2000
0.0200
0.0300

HARGA SAT
Rp.
5
Jumlah (2)

campuran 1 PC : 5 PP
buah
kg
m

990.00
1,820.00
107,150.00
Jumlah (1)

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

campuran 1 PC : 6 PP
buah
kg
m

990.00
1,820.00
107,150.00
Jumlah (1)

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m dinding bata merah (8x8x16) cm; tebal bata; campuran 1 PC : 1 PP
Bahan
Bata Merah
60.0000 buah
990.00
Portland Cement (PC)
27.8000
kg
1,820.00
Pasir Pasang (PP)
0.0280
m
107,150.00
Jumlah (1)
Tenaga
Pekerja
0.3200
OH
90,000.00
Tukang Batu
0.1000
OH
110,000.00
Kepala Tukang
0.0100
OH
130,000.00
Mandor
0.0150
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m dinding bata merah (8x8x16) cm; tebal bata; campuran 1 PC : 2 PP
Bahan
Bata Merah
60.0000 buah
990.00
Portland Cement (PC)
18.9500
kg
1,820.00
Pasir Pasang (PP)
0.0380
m
107,150.00
Jumlah (1)
Tenaga
Pekerja
0.3000
OH
90,000.00
Tukang Batu
0.1000
OH
110,000.00
Kepala Tukang
0.0100
OH
130,000.00
Mandor
0.0150
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m dinding bata merah (8x8x16) cm; tebal bata; campuran 1 PC : 3 PP
Bahan
Bata Merah
60.0000 buah
990.00
Portland Cement (PC)
14.3700
kg
1,820.00
Pasir Pasang (PP)
0.0400
m
107,150.00
Jumlah (1)
Tenaga
Pekerja
0.3000
OH
90,000.00
Tukang Batu
0.1000
OH
110,000.00
Kepala Tukang
0.0100
OH
130,000.00
Mandor
0.0150
OH
140,000.00
Jumlah (2)
Analisa Harga Satuan Pekerjaan

Page 17

NO
1
D.010

D.011

D.012

D.013

D.014

KOEF

SAT

HARGA SAT
Rp.
5

2
3
4
Jumlah (1) + (2)
Memasang 1 m dinding bata merah (8x8x16) cm; tebal bata; campuran 1 PC : 4 PP
Bahan
Bata Merah
60.0000 buah
990.00
Portland Cement (PC)
11.5000
kg
1,820.00
Pasir Pasang (PP)
0.0430
m
107,150.00
Jumlah (1)
Tenaga
Pekerja
0.3000
OH
90,000.00
Tukang Batu
0.1000
OH
110,000.00
Kepala Tukang
0.0100
OH
130,000.00
Mandor
0.0150
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m dinding bata merah (8x8x16) cm; tebal bata; campuran 1 PC : 5 PP
Bahan
Bata Merah
60.0000 buah
990.00
Portland Cement (PC)
9.6800
kg
1,820.00
Pasir Pasang (PP)
0.0450
m
107,150.00
Jumlah (1)
Tenaga
Pekerja
0.3000
OH
90,000.00
Tukang Batu
0.1000
OH
110,000.00
Kepala Tukang
0.0100
OH
130,000.00
Mandor
0.0150
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m dinding bata merah (8x8x16) cm; tebal bata; campuran 1 PC : 6 PP
Bahan
Bata Merah
60.0000 buah
990.00
Portland Cement (PC)
8.3200
kg
1,820.00
Pasir Pasang (PP)
0.0490
m
107,150.00
Jumlah (1)
Tenaga
Pekerja
0.3000
OH
90,000.00
Tukang Batu
0.1000
OH
110,000.00
Kepala Tukang
0.0100
OH
130,000.00
Mandor
0.0150
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m dinding bata merah (8x8x16) cm; tebal bata; campuran 1 PC : 8 PP
Bahan
Bata Merah
60.0000 buah
990.00
Portland Cement (PC)
6.5000
kg
1,820.00
Pasir Pasang (PP)
0.0500
m
107,150.00
Jumlah (1)
Tenaga
Pekerja
0.3000
OH
90,000.00
Tukang Batu
0.1000
OH
110,000.00
Kepala Tukang
0.0100
OH
130,000.00
Mandor
0.0150
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m dinding terawang (roster) uk. (12x11x24) cm; campuran spesi 1 PC : 3 PP
Bahan
Bata Terawang / Roster
30.0000 buah
10,000.00
Portland Cement (PC)
14.0000
kg
1,820.00
Pasir Pasang (PP)
0.0320
m
107,150.00
Jumlah (1)
Tenaga
Pekerja
0.3000
OH
90,000.00
Tukang Batu
0.1000
OH
110,000.00
Kepala Tukang
0.0100
OH
130,000.00
Mandor
0.0150
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)

Analisa Harga Satuan Pekerjaan

Page 18

NO
1
D.015

D.016

E.
E.001

E.003

E.004

SAT

HARGA SAT
Rp.
5

Memasang 1 m dinding terawang (roster) uk. (12x11x24) cm; campuran spesi 1 PC : 4 PP


Bahan
Bata Terawang / Roster
30.0000 buah
10,000.00
Portland Cement (PC)
11.0000
kg
1,820.00
Pasir Pasang (PP)
0.0350
m
107,150.00
Jumlah (1)
Tenaga
Pekerja
0.3000
OH
90,000.00
Tukang Batu
0.1000
OH
110,000.00
Kepala Tukang
0.0100
OH
130,000.00
Mandor
0.0150
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m dinding bata berongga ekspose uk. (5x11x24) cm; campuran spesi 1 PC : 3 PP
Bahan
Bata Terawang / Roster
70.0000 buah
10,000.00
Portland Cement (PC)
14.0000
kg
1,820.00
Pasir Pasang (PP)
0.0320
m
107,150.00
Jumlah (1)
Tenaga
Pekerja
0.3000
OH
90,000.00
Tukang Batu
0.1500
OH
110,000.00
Kepala Tukang
0.0150
OH
130,000.00
Mandor
0.0150
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
PEKERJAAN PLESTERAN
Memasang 1 m plesteran 1 PC : 1 PP; tebal 15 mm
Bahan
Portland Cement (PC)
Pasir Pasang (PP)

SNI 03-2837-2002

15.5040
0.0160

kg
m

1,820.00
107,150.00
Jumlah (1)

0.3000
0.1500
0.0150
0.0150

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

10.2240
0.0200

kg
m

1,820.00
107,150.00
Jumlah (1)

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.3000
0.1500
0.0150
0.0150

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m plesteran 1 PC : 3 PP; tebal 15 mm
Bahan
Portland Cement (PC)
Pasir Pasang (PP)

7.7760
0.0230

kg
m

1,820.00
107,150.00
Jumlah (1)

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.3000
0.1500
0.0150
0.0150

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
E.002

KOEF

Jumlah (1) + (2)


Memasang 1 m plesteran 1 PC : 2 PP; tebal 15 mm
Bahan
Portland Cement (PC)
Pasir Pasang (PP)

Jumlah (1) + (2)


Memasang 1 m plesteran 1 PC : 4 PP; tebal 15 mm
Analisa Harga Satuan Pekerjaan

Page 19

NO
1

E.005

E.006

E.007

E.008

E.009

KOEF

SAT

HARGA SAT
Rp.
5

Bahan
Portland Cement (PC)
Pasir Pasang (PP)

6.2400
0.0240

kg
m

1,820.00
107,150.00
Jumlah (1)

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.3000
0.1500
0.0150
0.0150

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m plesteran 1 PC : 5 PP; tebal 15 mm
Bahan
Portland Cement (PC)
Pasir Pasang (PP)

5.1840
0.0260

kg
m

1,820.00
107,150.00
Jumlah (1)

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.3000
0.1500
0.0150
0.0100

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m plesteran 1 PC : 6 PP; tebal 15 mm
Bahan
Portland Cement (PC)
Pasir Pasang (PP)

4.4160
0.0270

kg
m

1,820.00
107,150.00
Jumlah (1)

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.3000
0.1500
0.0150
0.0150

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m plesteran 1 PC : 7 PP; tebal 15 mm
Bahan
Portland Cement (PC)
Pasir Pasang (PP)

3.9360
0.0280

kg
m

1,820.00
107,150.00
Jumlah (1)

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.3000
0.1500
0.0150
0.0150

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m plesteran 1 PC : 8 PP; tebal 15 mm
Bahan
Portland Cement (PC)
Pasir Pasang (PP)

3.4560
0.0290

kg
m

1,820.00
107,150.00
Jumlah (1)

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.3000
0.1500
0.0150
0.0150

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

13.6320
0.0270

kg
m

1,820.00
107,150.00
Jumlah (1)

0.4000

OH

90,000.00

Jumlah (1) + (2)


Memasang 1 m plesteran 1 PC : 2 PP; tebal 20 mm
Bahan
Portland Cement (PC)
Pasir Pasang (PP)
Tenaga
Pekerja
Analisa Harga Satuan Pekerjaan

Page 20

NO

KOEF

E.011

E.012

HARGA SAT
Rp.
5
110,000.00
130,000.00
140,000.00
Jumlah (2)

3
0.2000
0.0200
0.0220

4
OH
OH
OH

10.3680
0.0310

kg
m

1,820.00
107,150.00
Jumlah (1)

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.2600
0.2000
0.0200
0.0220

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m plesteran 1 PC : 4 PP; tebal 20 mm
Bahan
Portland Cement (PC)
Pasir Pasang (PP)

8.3200
0.0320

kg
m

1,820.00
107,150.00
Jumlah (1)

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.4000
0.2000
0.0200
0.2200

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m plesteran 1 PC : 5 PP; tebal 20 mm
Bahan
Portland Cement (PC)
Pasir Pasang (PP)

6.9120
0.0350

kg
m

1,820.00
107,150.00
Jumlah (1)

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.4000
0.2000
0.0200
0.0220

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Memasang 1 m plesteran 1 PC : 6 PP; tebal 20 mm


Bahan
Portland Cement (PC)
Pasir Pasang (PP)

5.8880
0.0360

kg
m

1,820.00
107,150.00
Jumlah (1)

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.4000
0.2000
0.0220
0.0220

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

15.5000
0.0130

kg
m

1,820.00
107,150.00
Jumlah (1)

0.3000
0.2000
0.0200
0.0130

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Tukang Batu
Kepala Tukang
Mandor
E.010

SAT

Jumlah (1) + (2)


Memasang 1 m plesteran 1 PC : 3 PP; tebal 20 mm
Bahan
Portland Cement (PC)
Pasir Pasang (PP)

Jumlah (1) + (2)


E.013

E.014

Jumlah (1) + (2)


Memasang 1 m plesteran 1 PC : 2 PP; tebal 25 mm
Bahan
Portland Cement (PC)
Pasir Pasang (PP)
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

E.015

Jumlah (1) + (2)


Memasang 1 m plesteran 1 PC : 3 PP; tebal 25 mm
Analisa Harga Satuan Pekerjaan

Page 21

NO
1

2
Bahan
Portland Cement (PC)
Pasir Pasang (PP)

E.016

E.017

E.018

KOEF

SAT

HARGA SAT
Rp.
5

11.7500
0.0350

kg
m

1,820.00
107,150.00
Jumlah (1)

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.3000
0.1500
0.0150
0.0130

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m plesteran 1 PC : 4 PP; tebal 25 mm
Bahan
Portland Cement (PC)
Pasir Pasang (PP)

9.4800
0.0380

kg
m

1,820.00
107,150.00
Jumlah (1)

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.3000
0.2000
0.0200
0.0130

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m plesteran 1 PC : 5 PP; tebal 25 mm
Bahan
Portland Cement (PC)
Pasir Pasang (PP)

7.9400
0.0390

kg
m

1,820.00
107,150.00
Jumlah (1)

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.3000
0.2000
0.0200
0.0130

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

18.6500
0.0350

kg
m

1,820.00
107,150.00
Jumlah (1)

0.3200
0.2500
0.0250
0.0150

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

14.1500
0.0390

kg
m

1,820.00
107,150.00
Jumlah (1)

0.3200
0.2500
0.0250
0.0150

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

11.3800
0.0420

kg
m

1,820.00
107,150.00
Jumlah (1)

Jumlah (1) + (2)


Memasang 1 m plesteran 1 PC : 2 PP; tebal 30 mm
Bahan
Portland Cement (PC)
Pasir Pasang (PP)
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah (1) + (2)

E.019

Memasang 1 m plesteran 1 PC : 3 PP; tebal 30 mm


Bahan
Portland Cement (PC)
Pasir Pasang (PP)
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

E.020

Jumlah (1) + (2)


Memasang 1 m plesteran 1 PC : 4 PP; tebal 30 mm
Bahan
Portland Cement (PC)
Pasir Pasang (PP)
Tenaga
Analisa Harga Satuan Pekerjaan

Page 22

NO

KOEF

E.021

E.022

E.023

E.024

E.025

SAT

HARGA SAT
Rp.
5
90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Pekerja
Tukang Batu
Kepala Tukang
Mandor

3
0.3200
0.2500
0.0250
0.0150

4
OH
OH
OH
OH

Jumlah (1) + (2)


Memasang 1 m plesteran 1 PC : 5 PP; tebal 30 mm
Bahan
Portland Cement (PC)
Pasir Pasang (PP)

8.1900
0.0450

kg
m

1,820.00
107,150.00
Jumlah (1)

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.3200
0.2500
0.0250
0.0150

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m berapen 1 PC : 3 PP; tebal 30 mm
Bahan
Portland Cement (PC)
Pasir Pasang (PP)

7.0700
0.0210

kg
m

1,820.00
107,150.00
Jumlah (1)

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.1500
0.0700
0.0070
0.0080

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m berapen 1 PC : 5 PP; tebal 30 mm
Bahan
Portland Cement (PC)
Pasir Pasang (PP)

5.1840
0.0260

kg
m

1,820.00
107,150.00
Jumlah (1)

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.1500
0.0700
0.0070
0.0080

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m plesteran beton 1 PC : 2 PP; tebal 15 mm
Bahan
Portland Cement (PC)
9.3000
Pasir Pasang (PP)
0.0180

kg
m

1,820.00
107,150.00
Jumlah (1)

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.2600
0.2000
0.0200
0.0130

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m plesteran beton 1 PC : 3 PP; tebal 15 mm
Bahan
Portland Cement (PC)
7.0700
Pasir Pasang (PP)
0.0210

kg
m

1,820.00
107,150.00
Jumlah (1)

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

0.2600
0.2000
0.0200
0.0130

Jumlah (1) + (2)

Analisa Harga Satuan Pekerjaan

Page 23

NO
1
E.026

E.027

E.028

E.030

E.031

SAT

HARGA SAT
Rp.
5

Memasang 1 m' plesteran skoning 1 PC : 2 PP; lebar 10 mm


Bahan
Portland Cement (PC)
0.5000
Pasir Pasang (PP)
0.0130

kg
m

1,820.00
107,150.00
Jumlah (1)

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.0800
0.4000
0.0400
0.0040

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m plesteran ciprat 1 PC : 2 PP; lebar 10 mm
Bahan
Portland Cement (PC)
4.3200
Pasir Pasang (PP)
0.0060

kg
m

1,820.00
107,150.00
Jumlah (1)

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

0.3000
0.1000
0.0100
0.0150

Jumlah (1) + (2)


Memasang 1 m finishing siar pasangan dinding bata merah (=20 m')
Bahan
Portland Cement (PC)
3.1080
kg
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

E.029

KOEF

0.1500
0.0750
0.0080
0.0080

OH
OH
OH
OH

1,820.00
Jumlah (1)
90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m finishing siar pasangan dinding conblock ekspose (=8 m')
Bahan
Portland Cement (PC)
1.6000
kg
1,820.00
Jumlah (1)
Tenaga
Pekerja
0.0700
OH
90,000.00
Tukang Batu
0.0350
OH
110,000.00
Kepala Tukang
0.0040
OH
130,000.00
Mandor
0.0040
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m finishing siar pasangan batu kali adukan 1 PC : 2 PP
Bahan
Portland Cement (PC)
6.3400
kg
1,820.00
Pasir Pasang (PP)
0.0120
m
107,150.00
Jumlah (1)
Tenaga
Pekerja
0.3000
OH
90,000.00
Tukang Batu
0.1500
OH
110,000.00
Kepala Tukang
0.0150
OH
130,000.00
Mandor
0.0150
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m acian
Bahan
Portland Cement (PC)
3.2500
kg
1,820.00
Jumlah (1)
Tenaga
Pekerja
0.1500
OH
90,000.00
Tukang Batu
0.1000
OH
110,000.00
Kepala Tukang
0.0100
OH
130,000.00
Analisa Harga Satuan Pekerjaan

Page 24

NO

KOEF

E.032

SAT

HARGA SAT
Rp.
5
140,000.00
Jumlah (2)

Mandor

3
0.0100

4
OH

Jumlah (1) + (2)


Memasang 1 m' Benangan sudut
Bahan
Portland Cement (PC)
Pasir Pasang (PP)

0.0040
0.0130

Zak
m3

72,800.00
107,150.00
Jumlah (1)

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.0300
0.0700
0.0070
0.0080

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


F.
F.001

F.002

F.003

F.004

PEKERJAAN KAYU
SNI 03-3434-2002
Membuat dan memasang 1 m kusen pintu dan kusen jendela; Kayu Lembasung/ Kapur
Bahan
Balok Lembasung/ Kapur
1.1000
m
1,870,000.00
Paku 10 cm
1.2500
kg
21,650.00
Lem Kayu
1.0000
kg
28,000.00
Jumlah (1)
Tenaga
Pekerja
7.0000
OH
90,000.00
Tukang Kayu
21.0000
OH
110,000.00
Kepala Tukang
2.1000
OH
130,000.00
Mandor
0.3500
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat dan memasang 1 m kusen pintu dan kusen jendela; Kayu Kayu Meranti
Bahan
Balok Kayu Meranti / Kayu Kelas II
1.2000
m
1,870,000.00
Paku 10 cm
1.2500
kg
21,650.00
Lem Kayu
1.0000
kg
28,000.00
Jumlah (1)
Tenaga
Pekerja
6.0000
OH
90,000.00
Tukang Kayu
18.0000
OH
110,000.00
Kepala Tukang
1.8000
OH
130,000.00
Mandor
0.3000
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat dan memasang 1 m pintu klamp sederhana; Kayu Lembasung/ Kapur
Bahan
Papan Kayu Lembasung/ kapur
0.0400
m
1,870,000.00
Paku 5 cm - 7 cm
0.0500
kg
21,650.00
Jumlah (1)
Tenaga
Pekerja
0.3500
OH
90,000.00
Tukang Kayu
1.0500
OH
110,000.00
Kepala Tukang
0.1050
OH
130,000.00
Mandor
0.0180
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat dan memasang 1 m pintu klamp sederhana; Kayu Meranti
Bahan
Papan Kayu Meranti
0.0400
m
1,870,000.00
Paku 5 cm - 7 cm
0.0500
kg
21,650.00
Jumlah (1)
Tenaga
Pekerja
0.3500
OH
90,000.00
Tukang Kayu
1.0500
OH
110,000.00
Kepala Tukang
0.1050
OH
130,000.00
Mandor
0.0180
OH
140,000.00
Jumlah (2)
Analisa Harga Satuan Pekerjaan

Page 25

NO
1
F.005

F.006

F.007

F.008

F.009

F.010

KOEF

SAT

HARGA SAT
Rp.
5

2
3
4
Jumlah (1) + (2)
Membuat dan memasang 1 m daun pintu panel; Kayu Lembasung/ Kapur
Bahan
Papan Kayu Lembasung/ kapur
0.0400
m
1,870,000.00
Lem Kayu
0.5000
kg
28,000.00
Jumlah (1)
Tenaga
Pekerja
1.0000
OH
90,000.00
Tukang Kayu
3.0000
OH
110,000.00
Kepala Tukang
0.3000
OH
130,000.00
Mandor
0.0500
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat dan memasang 1 m daun pintu panel; Kayu Meranti
Bahan
Papan Kayu Meranti
0.0400
m
1,870,000.00
Lem Kayu
0.5000
kg
28,000.00
Jumlah (1)
Tenaga
Pekerja
1.0000
OH
90,000.00
Tukang Kayu
3.0000
OH
110,000.00
Kepala Tukang
0.3000
OH
130,000.00
Mandor
0.0500
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat dan memasang 1 m pintu dan jendela kaca; Kayu Lembasung/ Kapur
Bahan
Papan Kayu Lembasung/ Kapur
0.0240
m
1,870,000.00
Lem Kayu
0.3000
kg
28,000.00
Jumlah (1)
Tenaga
Pekerja
0.8000
OH
90,000.00
Tukang Kayu
2.4000
OH
110,000.00
Kepala Tukang
0.2400
OH
130,000.00
Mandor
0.0400
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat dan memasang 1 m pintu dan jendela kaca; Kayu Meranti
Bahan
Papan Kayu Meranti
0.0240
m
1,870,000.00
Lem Kayu
0.3000
kg
28,000.00
Jumlah (1)
Tenaga
Pekerja
0.8000
OH
90,000.00
Tukang Kayu
2.4000
OH
110,000.00
Kepala Tukang
0.2400
OH
130,000.00
Mandor
0.0400
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat dan memasang 1 m pintu dan jendela jalusi; Lembasung/ Kapur
Bahan
Papan Kayu Lembasung/ Kapur
0.0640
m
1,870,000.00
Lem Kayu
0.5000
kg
28,000.00
Jumlah (1)
Tenaga
Pekerja
1.0000
OH
90,000.00
Tukang Kayu
3.0000
OH
110,000.00
Kepala Tukang
0.3000
OH
130,000.00
Mandor
0.0500
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat dan memasang 1 m pintu dan jendela jalusi; Kayu Meranti
Bahan
Papan Kayu Meranti
0.0640
m
1,870,000.00
Lem Kayu
0.5000
kg
28,000.00
Jumlah (1)
Tenaga
Analisa Harga Satuan Pekerjaan

Page 26

NO

KOEF

2
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

F.011

F.012

F.013

F.014

4
OH
OH
OH
OH

HARGA SAT
Rp.
5
90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Membuat dan memasang 1 m daun pintu kayu lapis (plywood); rangka tertutup Kayu Kapur
Bahan
Papan Kayu Kapur
0.0250
m
1,870,000.00
Paku 1 cm - 2,5 cm
0.0300
kg
21,650.00
Lem Kayu
0.5000
kg
28,000.00
Plywood tbl. 9 mm; uk. (90 x 220) cm
1.0000 lembar
154,000.00
Jumlah (1)
Tenaga
Pekerja
0.7000
OH
90,000.00
Tukang Kayu
2.1000
OH
110,000.00
Kepala Tukang
0.2100
OH
130,000.00
Mandor
0.0350
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat dan memasang 1 m pintu plywood rangkap; rangka ekspose Kayu Kapur
Bahan
Papan Kayu Kapur
0.0256
m
1,870,000.00
Paku 1 cm - 2,5 cm
0.0300
kg
21,650.00
Lem Kayu
0.5000
kg
28,000.00
Plywood tbl. 9 mm; uk. (90 x 220) cm
1.0000 lembar
154,000.00
Jumlah (1)
Tenaga
Pekerja
0.8000
OH
90,000.00
Tukang Kayu
2.4000
OH
110,000.00
Kepala Tukang
0.2400
OH
130,000.00
Mandor
0.0400
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat dan memasang 1 m jalusi kusen; Kayu Kapur/ Lembasung
Bahan
Papan Kayu Kapur/ Lembasung
0.0600
m
1,870,000.00
Paku 1 cm - 2,5 cm
0.1500
kg
21,650.00
Jumlah (1)
Tenaga
Pekerja
0.6700
OH
90,000.00
Tukang Kayu
2.0000
OH
110,000.00
Kepala Tukang
0.2000
OH
130,000.00
Mandor
0.3350
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat dan memasang 1 m jalusi kusen; Kayu Meranti
Bahan
Papan Kayu Meranti
0.0600
m
1,870,000.00
Paku 1 cm - 2,5 cm
0.1500
kg
21,650.00
Jumlah (1)
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

F.015

3
1.0000
3.0000
0.3000
0.0500

SAT

0.6700
2.0000
0.2000
0.3350

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Membuat dan memasang 1 m pintu teakwood rangkap; rangka ekspose Kayu Kapur
Bahan
Papan Kayu Kapur
0.0250
m
1,870,000.00
Paku 1 cm - 2,5 cm
0.0300
kg
21,650.00
Lem Kayu
0.3000
kg
28,000.00
Teakwood tbl. 4 mm; uk. (90 x 220) cm
1.0000 lembar
68,200.00
Jumlah (1)
Tenaga
Analisa Harga Satuan Pekerjaan

Page 27

NO

KOEF

2
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

F.016

F.017

F.018

F.019

F.020

3
0.8000
2.4000
0.0400
0.0400

SAT
4
OH
OH
OH
OH

HARGA SAT
Rp.
5
90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Membuat dan memasang 1 m pintu teakwood rangkap lapis formika; rgk. ekspose Ky. Meranti
Bahan
Papan Kayu Meranti
0.0250
m
1,870,000.00
Paku 1 cm - 2,5 cm
0.0300
kg
21,650.00
Lem Kayu
0.8000
kg
28,000.00
Teakwood tbl. 4 mm; uk. (90 x 220) cm
1.0000 lembar
68,200.00
Formika
0.5000 lembar
55,500.00
Jumlah (1)
Tenaga
Pekerja
0.8500
OH
90,000.00
Tukang Kayu
2.5500
OH
110,000.00
Kepala Tukang
0.2550
OH
130,000.00
Mandor
0.0430
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat dan memasang 1 m konstruksi kuda kuda konvensional; Kayu Kapur/ Lembasung
Bahan
Balok Kayu Kapur/ Lembasung
1.1000
m
1,870,000.00
Besi Strip 5 mm
15.0000
kg
24,600.00
Paku 12 cm
5.6000
kg
21,650.00
Jumlah (1)
Tenaga
Pekerja
4.0000
OH
90,000.00
Tukang Kayu
12.0000
OH
110,000.00
Kepala Tukang
1.2000
OH
130,000.00
Mandor
0.2000
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat dan memasang 1 m konstruksi kuda kuda konvensional; Kayu Meranti
Bahan
Balok Kayu Meranti
1.1000
m
1,870,000.00
Besi Strip 5 mm
15.0000
kg
24,600.00
Paku 12 cm
5.6000
kg
21,650.00
Jumlah (1)
Tenaga
Pekerja
4.0000
OH
90,000.00
Tukang Kayu
12.0000
OH
110,000.00
Kepala Tukang
1.2000
OH
130,000.00
Mandor
0.2000
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat dan memasang 1 m konstruksi kuda kuda ekspose; Kayu Kapur/ Lembasung
Bahan
Balok Kayu Kapur/ Lembasung
1.2000
m
1,870,000.00
Besi Strip 5 mm
15.0000
kg
24,600.00
Paku 12 cm
5.6000
kg
21,650.00
Jumlah (1)
Tenaga
Pekerja
6.7000
OH
90,000.00
Tukang Kayu
20.1000
OH
110,000.00
Kepala Tukang
2.0100
OH
130,000.00
Mandor
0.3350
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat dan memasang 1 m konstruksi kuda kuda ekspose; Kayu Meranti
Bahan
Balok Kayu Meranti
1.2000
m
1,870,000.00
Besi Strip 5 mm
15.0000
kg
24,600.00
Paku 12 cm
5.6000
kg
21,650.00
Jumlah (1)
Analisa Harga Satuan Pekerjaan

Page 28

NO
1

2
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

F.021

F.024

F.025

Jumlah (1) + (2)


Membuat dan memasang 1 m konstruksi gording; Kayu Kapur/
Bahan
Balok Kayu Kapur/ Lembasung
1.1000
Besi Strip 5 mm
15.0000
Paku 12 cm
3.0000
2.4000
7.2000
0.7200
0.1200

OH
OH
OH
OH

2.4000
7.2000
0.7200
0.1200

HARGA SAT
Rp.
5
90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Lembasung
m
kg
kg

1,870,000.00
24,600.00
21,650.00
Jumlah (1)

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Membuat dan memasang 1 m konstruksi gording; Kayu Meranti
Bahan
Balok Kayu Meranti
1.1000
m
Besi Strip 5 mm
15.0000
kg
Paku 12 cm
3.0000
kg
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

F.023

SAT

6.7000
20.1000
2.0100
0.3350

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
F.022

KOEF

OH
OH
OH
OH

1,870,000.00
24,600.00
21,650.00
Jumlah (1)
90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Membuat dan memasang 1 m rangka atap genteng kodok; Kayu Kapur/ Lembasung
Bahan
Kaso-kaso (5 x 7) cm
0.0120
m
1,870,000.00
Reng (2 x 3) cm
0.0036
m
1,870,000.00
Paku 5 cm & 10 cm
0.2500
kg
21,650.00
Jumlah (1)
Tenaga
Pekerja
0.1000
OH
90,000.00
Tukang Kayu
0.1000
OH
110,000.00
Kepala Tukang
0.0100
OH
130,000.00
Mandor
0.0050
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat dan memasang 1 m rangka atap genteng kodok; Kayu Meranti
Bahan
Kaso-kaso (5 x 7) cm
0.0120
m
1,870,000.00
Reng (2 x 3) cm
0.0036
m
1,870,000.00
Paku 5 cm & 10 cm
0.2500
kg
21,650.00
Jumlah (1)
Tenaga
Pekerja
0.1000
OH
90,000.00
Tukang Kayu
0.1000
OH
110,000.00
Kepala Tukang
0.0100
OH
130,000.00
Mandor
0.0050
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat dan memasang 1 m rangka atap genteng keramik; Kayu Kapur/ Lembasung
Bahan
Kaso-kaso (5 x 7) cm
0.0140
m
1,870,000.00
Reng (2 x 3) cm
0.0036
m
1,870,000.00
Paku 5 cm & 10 cm
0.2500
kg
21,650.00
Jumlah (1)
Tenaga
Pekerja
0.1000
OH
90,000.00
Analisa Harga Satuan Pekerjaan

Page 29

NO

KOEF

2
Tukang Kayu
Kepala Tukang
Mandor

F.026

F.027

F.028

F.029

F.030

3
0.1000
0.0100
0.0050

SAT
4
OH
OH
OH

HARGA SAT
Rp.
5
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Membuat dan memasang 1 m rangka atap genteng keramik; Kayu Meranti
Bahan
Kaso-kaso (5 x 7) cm
0.0140
m
1,870,000.00
Reng (2 x 3) cm
0.0036
m
1,870,000.00
Paku 5 cm & 10 cm
0.2500
kg
21,650.00
Jumlah (1)
Tenaga
Pekerja
0.1000
OH
90,000.00
Tukang Kayu
0.1000
OH
110,000.00
Kepala Tukang
0.0100
OH
130,000.00
Mandor
0.0050
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat dan memasang 1 m rangka atap genteng beton; Kayu Kapur/ Lembasung
Bahan
Kaso-kaso (5 x 7) cm
0.0140
m
1,870,000.00
Reng (3 x 4) cm
0.0570
m
1,870,000.00
Paku 5 cm & 10 cm
0.2500
kg
21,650.00
Jumlah (1)
Tenaga
Pekerja
0.1000
OH
90,000.00
Tukang Kayu
0.1000
OH
110,000.00
Kepala Tukang
0.0100
OH
130,000.00
Mandor
0.0050
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat dan memasang 1 m rangka atap genteng beton; Kayu Meranti
Bahan
Kaso-kaso (5 x 7) cm
0.0140
m
1,870,000.00
Reng (3 x 4) cm
0.0570
m
1,870,000.00
Paku 5 cm & 10 cm
0.2500
kg
21,650.00
Jumlah (1)
Tenaga
Pekerja
0.1000
OH
90,000.00
Tukang Kayu
0.1000
OH
110,000.00
Kepala Tukang
0.0100
OH
130,000.00
Mandor
0.0050
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat dan memasang 1 m rangka atap genteng metal; Kayu Lembasung/Kapur
Bahan
Kayu Kapur
0.0120
m
1,870,000.00
Paku 5 cm & 10 cm
0.1500
kg
21,650.00
Jumlah (1)
Tenaga
Pekerja
0.1000
OH
90,000.00
Tukang Kayu
0.1000
OH
110,000.00
Kepala Tukang
0.0100
OH
130,000.00
Mandor
0.0050
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat dan memasang 1 m rangka atap genteng metal; Kayu Meranti
Bahan
Kayu Meranti
0.0120
m
1,870,000.00
Paku 5 cm & 10 cm
0.1500
kg
21,650.00
Jumlah (1)
Tenaga
Pekerja
0.1000
OH
90,000.00
Tukang Kayu
0.1000
OH
110,000.00
Kepala Tukang
0.0100
OH
130,000.00
Mandor
0.0050
OH
140,000.00
Jumlah (2)

Analisa Harga Satuan Pekerjaan

Page 30

NO
1

KOEF

SAT

HARGA SAT
Rp.
5

Jumlah (1) + (2)


F.031

F.032

Memasang 1 m rangka atap sirap; Kayu Meranti


Bahan
Kayu Meranti
Paku 5 cm & 10 cm

0.1650
0.2000

m
kg

1,870,000.00
21,650.00
Jumlah (1)

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.1200
0.1200
0.0120
0.0060

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m rangka langit-langit (100 x 100) cm; Kayu Meranti
Bahan
Kaso-kaso (5 x 7) cm
0.0120
m
Paku 7 cm - 10 cm
0.1000
kg
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.1500
0.2500
0.0250
0.0750

OH
OH
OH
OH

1,870,000.00
21,650.00
Jumlah (1)
90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


F.033

Memasang 1 m rangka langit-langit (50 x 100) cm; Kayu Meranti


Bahan
Kaso-kaso (5 x 7) cm
0.0154
m
Paku 7 cm - 10 cm
0.2000
kg
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.1500
0.3000
0.0300
0.0750

OH
OH
OH
OH

1,870,000.00
21,650.00
Jumlah (1)
90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


F.034

Memasang 1 m rangka langit-langit (60 x 60) cm; Kayu Meranti


Bahan
Kaso-kaso (5 x 7) cm
0.0163
m
Paku 7 cm - 10 cm
0.2500
kg
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

F.035

F.036

1,870,000.00
21,650.00
Jumlah (1)

0.2000
0.3000
0.0300
0.0100

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m' lisplank uk. (3 x 20) cm; Kapur/ Lembasung
Bahan
Papan Kayu Kapur/ Lembasung
0.0108
Paku 5 cm - 7 cm
0.1000

m
kg

1,870,000.00
21,650.00
Jumlah (1)

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

0.1000
0.2000
0.0200
0.0050

Jumlah (1) + (2)


Memasang 1 m' lisplank uk. (3 x 30) cm; Kayu Kapur/Lembasung
Bahan
Analisa Harga Satuan Pekerjaan

Page 31

NO

KOEF

F.037

2
Papan Kayu Lembasung
Paku 5 cm - 7 cm

3
0.0110
0.0500

4
m
kg

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.1000
0.2000
0.0250
0.0050

OH
OH
OH
OH

Jumlah (1) + (2)


Memasang 1 m' lisplank uk. 2x (3 x 20) cm; Kayu Kapur/ Lembasung
Bahan
Papan Kayu Kapur/ Lembasung
0.0145
m
Paku 5 cm - 7 cm
0.0600
kg
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

F.038

0.1500
0.2500
0.0250
0.0750

F.040

F.041

Oh
Oh
Oh
Oh

Jumlah (1) + (2)


Memasang 1 m' lisplank uk. 2x (2 x 20) cm; Kayu Kapur/ Lembasung
Bahan
Papan Kayu Kapur/ Lembasung
0.0086
m
Paku 5 cm - 7 cm
0.0600
kg
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

F.039

SAT

0.1000
0.1000
0.0100
0.0500

Oh
Oh
Oh
Oh

HARGA SAT
Rp.
5
1,870,000.00
21,650.00
Jumlah (1)
90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

1,870,000.00
21,650.00
Jumlah (1)
90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

1,870,000.00
21,650.00
Jumlah (1)
90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m rangka dinding pemisah (60 x 120) cm; Kayu Meranti
Bahan
Balok Kayu Meranti
0.0280
m
1,870,000.00
Paku 5 cm - 7 cm
0.1500
kg
21,650.00
Jumlah (1)
Tenaga
Pekerja
0.1500
OH
90,000.00
Tukang Kayu
0.4500
OH
110,000.00
Kepala Tukang
0.0450
OH
130,000.00
Mandor
0.0080
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m dinding pemisah teakwood rangkap; Kayu Kapur/ Lembasung
Bahan
Balok Kayu Kapur/ Lembasung
0.0280
m
1,870,000.00
Paku 5 cm - 10 cm
0.1500
kg
21,650.00
Teakwood tbl. 4 mm; uk. (120 x 240) cm
0.8600 lembar
68,200.00
Lem Kayu
0.5600
kg
28,000.00
Jumlah (1)
Tenaga
Pekerja
0.1500
OH
90,000.00
Tukang Kayu
0.4500
OH
110,000.00
Kepala Tukang
0.0450
OH
130,000.00
Mandor
0.0080
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m dinding pemisah plywood rangkap; Kayu Meranti
Bahan
Balok Kayu Meranti
0.0280
m
1,870,000.00
Paku 5 cm - 10 cm
0.1500
kg
21,650.00
Plywood tbl. 9 mm; uk. (120 x 240) cm
0.8600 lembar
154,000.00
Lem Kayu
0.5600
kg
28,000.00
Jumlah (1)
Analisa Harga Satuan Pekerjaan

Page 32

NO
1

F.042

F.043

F.044

F.045

F.046

KOEF

SAT

HARGA SAT
Rp.
5

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.2000
0.6000
0.0600
0.0100

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Pasangan dinding kayu meranti berlidah per m2 Bahan
Papan kayu meranti
Paku

0.0250
0.2000

M3
Kg

1,870,000.00
21,650.00
Jumlah (1)

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.6000
1.8000
0.1800
0.0300

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m dinding lambriziring dari papan; Kayu Meranti
Bahan
Papan Kayu Meranti
0.0070
Paku 5 cm - 10 cm
0.1000
Paku Skrup 10 cm/ Besi
0.1500

m
kg
kg

1,870,000.00
21,650.00
31,100.00
Jumlah (1)

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

0.6000
1.8000
0.1800
0.0300

Jumlah (1) + (2)


Memasang 1 m dinding lambriziring dari plywood ukuran (120 x 240) cm
Bahan
Plywood tbl. 9 mm; uk. (120 x 240) cm
0.4000 lembar
154,000.00
Paku 5 cm - 10 cm
0.0500
kg
21,650.00
Jumlah (1)
Tenaga
Pekerja
0.0250
OH
90,000.00
Tukang Kayu
0.0750
OH
110,000.00
Kepala Tukang
0.0075
OH
130,000.00
Mandor
0.0013
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m' papan ruiter ukuran 3 x 30 cm; Kayu Meranti
Bahan
Papan Kayu Meranti (2 x 25 x 400)
0.0100
m
1,870,000.00
Paku 5 cm - 10 cm
0.0100
kg
21,650.00
Jumlah (1)
Tenaga
Pekerja
0.0700
OH
90,000.00
Tukang Kayu
0.2000
OH
110,000.00
Kepala Tukang
0.0200
OH
130,000.00
Mandor
0.0040
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m' papan ruiter ukuran 2 x 20 cm; Kayu Meranti
Bahan
Papan Kayu Meranti (2 x 20 x 400)
0.0044
m
1,870,000.00
Paku 5 cm - 10 cm
0.0100
kg
21,650.00
Jumlah (1)
Tenaga
Pekerja
0.0700
OH
90,000.00
Tukang Kayu
0.2000
OH
110,000.00
Kepala Tukang
0.0200
OH
130,000.00
Mandor
0.0040
OH
140,000.00
Jumlah (2)
Analisa Harga Satuan Pekerjaan

Page 33

NO
1
F.047

2
Jumlah (1) + (2)
Sebuah tiang pancang dicincin dan dilancipkan
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

KOEF

SAT

0.1000
0.2500
0.0250
0.0050

OH
OH
OH
OH

HARGA SAT
Rp.
5

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah

Jumlah (1) + (2)

F.048

F.049

F.050

F.051

F.052

F.053

Membuat pen pada tiang dan lubang pada balok pemikul tiap-tiap pasangan pen dan lubang
Tenaga
Tukang Kayu
0.6000
OH
110,000.00
Kepala Tukang
0.0600
OH
130,000.00
Jumlah
Jumlah (1) + (2)
Memancang tiang pada tanah lunak per m'
Tenaga
Pekerja
1.8000
OH
90,000.00
Tukang Kayu
0.0400
OH
110,000.00
Kepala Tukang
0.0040
OH
130,000.00
Mandor
0.0430
OH
140,000.00
Jumlah
Jumlah (1) + (2)
Untuk tanah biasa 1 1/4 x E.13
Untuk tanah keras 1 1/2 x E.13
Pasangan tongkat, sloop, gelegar dari kayu ulin per m3 Bahan
Balok kayu ulin
1.0000
m
3,850,000.00
Paku ulin
1.0000
kg
27,500.00
Jumlah (1)
Tenaga
Pekerja
5.0000
OH
90,000.00
Tukang Kayu
15.0000
OH
110,000.00
Kepala Tukang
1.5000
OH
130,000.00
Mandor
0.2500
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Pasangan gelegar kayu kapur/lembasung per m3 Bahan
Balok Kayu Kapur/ Lembasung
1.0000
m
1,870,000.00
Paku
1.0000
kg
21,650.00
Jumlah (1)
Tenaga
Pekerja
5.0000
OH
90,000.00
Tukang Kayu
15.0000
OH
110,000.00
Kepala Tukang
1.5000
OH
130,000.00
Mandor
0.2500
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Pasangan Lantai dari papan kayu kapur/lembasung per m2 Bahan
Papan kayu kapur/lembasung
0.0250
m
1,870,000.00
Paku
0.2000
kg
21,650.00
Jumlah (1)
Tenaga
Pekerja
0.2800
OH
90,000.00
Tukang Kayu
0.8000
OH
110,000.00
Kepala Tukang
0.0800
OH
130,000.00
Mandor
0.0140
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Pasangan lantai dari papan kayu meranti per m2 Bahan
Papan kayu meranti
0.0250
m
1,870,000.00
Analisa Harga Satuan Pekerjaan

Page 34

NO

KOEF

F.054

F.055

2
Paku

3
0.2000

4
kg

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.2800
0.8000
0.0800
0.0140

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

m
kg

3,850,000.00
27,500.00
Jumlah (1)

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.2800
0.8000
0.0800
0.0140

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

62,780.00

Jumlah (1) + (2)


Apabila hanya diketam salah satu sisinya saja
1Ttk Memancang tiang pancang kayu ulin 10/10 - 2 m
Bahan
Kayu ulin 10/10 - 2 m
0.0200
1.8000
0.0400
0.0040
0.0430
0.0600

Jumlah (1) + (2)


1Ttk Memancang tiang pancang kayu ulin 10/10 - 4 m
Bahan
Kayu ulin 10/10 - 4 m
0.0400
1.8000
0.0400
0.0040
0.0430
0.1200

62,780.00
m

3,850,000.00
Jumlah (1)

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
56,100.00
Jumlah (2)

3,850,000.00
Jumlah (1)

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
56,100.00
Jumlah (2)

Jumlah (1) + (2)


Rangka badan/tiang jenang dari kayu kapur/lembasung per m3 Bahan
kayu kapur/lembasung
1.2000
m
Paku
0.2000
kg
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

F.058

Rp.
5
21,650.00
Jumlah (1)

0.0250
0.2000

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Alat Bantu
F.057

HARGA SAT

Jumlah (1) + (2)


Apabila hanya diketam salah satu sisinya saja
Pasangan lantai dari papan kayu ulin per m2 Bahan
Papan kayu ulin
Paku ulin

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Alat Bantu
F.056

SAT

Jumlah (1) + (2)


Pasangan sunduk,kalang dari kayu ulin per m3 Bahan
Balok kayu ulin
Paku ulin
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Analisa Harga Satuan Pekerjaan

1,870,000.00
21,650.00
Jumlah (1)

10.0000
30.0000
3.0000
0.5000

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

1.0000
1.0000

m
kg

3,850,000.00
27,500.00
Jumlah (1)

5.0000
15.0000
1.5000

OH
OH
OH

90,000.00
110,000.00
130,000.00
Page 35

NO

KOEF

2
Mandor

3
0.2500

SAT
4
OH

HARGA SAT
Rp.
5
140,000.00
Jumlah (2)

Jumlah (1) + (2)


G.
G.001

G.002

G.003

PEKERJAAN BETON
Membuat 1 m beton tumbuk 1 PC : 3 PB : 5 KR, Batu Pecah
Bahan
Portland Cement (PC)
218.0000
Pasir Beton (PB)
0.5200
Koral Beton (maksimum 30 mm)
0.8700

kg
m
m

1,820.00
107,150.00
641,666.67
Jumlah (1)

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Membuat 1 m beton tumbuk 1 PC : 3 PB : 5 KR, Kerikil Sungai
Bahan
Portland Cement (PC)
218.0000
Pasir Beton (PB)
0.5200
Kerikil Sungai
0.8700

kg
m
m

1,820.00
107,150.00
242,000.00
Jumlah (1)

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1.6500
0.2500
0.0250
0.0800

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

197.0000
0.4700
0.9400

kg
m
m

1,820.00
107,150.00
641,666.67
Jumlah (1)

1.6500
0.2500
0.0250
0.0800

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

173.0000
0.5700
0.8700

kg
m
m

1,820.00
107,150.00
641,666.67
Jumlah (1)

1.6500
0.2500
0.0250
0.0800

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

1.6500
0.2500
0.0250
0.0800

Jumlah (1) + (2)


Membuat 1 m beton tumbuk 1 PC : 3 PB : 6 KR
Bahan
Portland Cement (PC)
Pasir Beton (PB)
Koral Beton (maksimum 30 mm)
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

G.004

Jumlah (1) + (2)


Membuat 1 m beton tumbuk 1 PC : 4 PB : 6 KR
Bahan
Portland Cement (PC)
Pasir Beton (PB)
Koral Beton (maksimum 30 mm)
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

G.005

RSNI-T-13-2002

Jumlah (1) + (2)


Membuat 1 m lantai kerja beton tumbuk 1 PC : 3 PB : 5 KR; tebal 5 cm,Koral Beton
Bahan
Portland Cement (PC)
10.0000
kg
1,820.00
Pasir Beton (PB)
0.0260
m
107,150.00
Koral Beton (maksimum 30 mm)
0.0440
m
641,666.67
Jumlah (1)
Tenaga
Pekerja
1.1500
OH
90,000.00
Tukang Batu
0.0200
OH
110,000.00
Analisa Harga Satuan Pekerjaan

Page 36

NO

KOEF

2
Kepala Tukang
Mandor

G.006

G.007

G.008

G.009

G.010

3
0.0020
0.0060

SAT
4
OH
OH

HARGA SAT
Rp.
5
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Membuat 1 m lantai kerja beton tumbuk 1 PC : 3 PB : 5 KR; tebal 5 cm,Kerikil sungai
Bahan
Portland Cement (PC)
10.0000
kg
1,820.00
Pasir Beton (PB)
0.0260
m
107,150.00
Kerikil sungai
0.0440
m
242,000.00
Jumlah (1)
Tenaga
Pekerja
1.1500
OH
90,000.00
Tukang Batu
0.0200
OH
110,000.00
Kepala Tukang
0.0020
OH
130,000.00
Mandor
0.0060
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat 1 m beton bertulang 1 PC : 2 PB : 3 KR, Batu Pecah
Bahan
Portland Cement (PC)
336.0000
kg
1,820.00
Pasir Beton (PB)
0.5400
m
107,150.00
Koral Beton (maksimum 30 mm)
0.7800
m
641,666.67
Jumlah (1)
Tenaga
Pekerja
1.6500
OH
90,000.00
Tukang Batu
0.2500
OH
110,000.00
Kepala Tukang
0.0250
OH
130,000.00
Mandor
0.0800
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat 1 m beton bertulang 1 PC : 2 PB : 3 KR, Kerikil Sungai
Bahan
Portland Cement (PC)
336.0000
kg
1,820.00
Pasir Beton (PB)
0.5400
m
107,150.00
Kerikil Sungai
0.7800
m
242,000.00
Jumlah (1)
Tenaga
Pekerja
1.6500
OH
90,000.00
Tukang Batu
0.2500
OH
110,000.00
Kepala Tukang
0.0250
OH
130,000.00
Mandor
0.0800
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat 1 m beton bertulang 1 PC : 2 PB : 4 KR
Bahan
Portland Cement (PC)
280.0000
kg
1,820.00
Pasir Beton (PB)
0.4500
m
107,150.00
Koral Beton (maksimum 30 mm)
0.9000
m
641,666.67
Jumlah (1)
Tenaga
Pekerja
1.6500
OH
90,000.00
Tukang Batu
0.2500
OH
110,000.00
Kepala Tukang
0.0250
OH
130,000.00
Mandor
0.0800
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat 1 m beton bertulang 1 PC : 2 PB : 2,5 KR
Bahan
Portland Cement (PC)
352.0000
kg
1,820.00
Pasir Beton (PB)
0.5600
m
107,150.00
Koral Beton (maksimum 30 mm)
0.7000
m
641,666.67
Jumlah (1)
Tenaga
Pekerja
1.6500
OH
90,000.00
Tukang Batu
0.2500
OH
110,000.00
Kepala Tukang
0.0250
OH
130,000.00
Mandor
0.0800
OH
140,000.00
Analisa Harga Satuan Pekerjaan

Page 37

NO
1

KOEF

SAT

HARGA SAT
Rp.
5
Jumlah (2)

Jumlah (1) + (2)

G.011

Membuat 1 m beton bertulang 1 PC : 1.5 PB : 3 KR


Bahan
Portland Cement (PC)
Pasir Beton (PB)
Koral Beton (maksimum 30 mm)

357.0000
0.4200
0.5400

kg
m
m

1,820.00
107,150.00
641,666.67
Jumlah (1)

1.6500
0.2500
0.0250
0.0800

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Membuat 1 m beton bertulang 1 PC : 1.5 PB : 2,5 KR
Bahan
Portland Cement (PC)
386.0000
Pasir Beton (PB)
0.4700
Koral Beton (maksimum 30 mm)
0.7800

kg
m
m

1,820.00
107,150.00
641,666.67
Jumlah (1)

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1.6500
0.2500
0.0250
0.0800

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

479.0000
0.3700
0.7400

kg
m
m

1,820.00
107,150.00
641,666.67
Jumlah (1)

1.6500
0.2500
0.0250
0.0800

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
G.012

G.013

Jumlah (1) + (2)


Membuat 1 m beton bertulang 1 PC : 1 PB : 2 KR
Bahan
Portland Cement (PC)
Pasir Beton (PB)
Koral Beton (maksimum 30 mm)
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

G.014

G.015

Jumlah (1) + (2)


Membuat 1 m beton mutu f'c=7,4 Mpa (K 100); slump (12 2) cm; w/c = 0,87
Bahan
Portland Cement (PC)
247.0000
kg
1,820.00
Pasir Beton (PB)
0.6207
m
107,150.00
Koral Beton (maksimum 30 mm)
0.7400
m
641,666.67
Air
215.0000
liter
40.00
Jumlah (1)
Tenaga
Pekerja
1.6500
OH
90,000.00
Tukang Batu
0.2750
OH
110,000.00
Kepala Tukang
0.0280
OH
130,000.00
Mandor
0.0830
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat 1 m beton mutu f'c=9,8 Mpa (K 125); slump (12 2) cm; w/c = 0,78
Bahan
Portland Cement (PC)
276.0000
kg
1,820.00
Pasir Beton (PB)
0.5914
m
107,150.00
Koral Beton (maksimum 30 mm)
0.7496
m
641,666.67
Air
215.0000
liter
40.00
Jumlah (1)
Tenaga
Pekerja
1.6500
OH
90,000.00
Analisa Harga Satuan Pekerjaan

Page 38

NO

KOEF

2
Tukang Batu
Kepala Tukang
Mandor

G.016

G.017

G.018

G.019

G.020

3
0.2750
0.0280
0.0830

SAT
4
OH
OH
OH

HARGA SAT
Rp.
5
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Membuat 1 m beton mutu f'c=12,2 Mpa (K 150); slump (12 2) cm; w/c = 0,72
Bahan
Portland Cement (PC)
299.0000
kg
1,820.00
Pasir Beton (PB)
0.5707
m
107,150.00
Koral Beton (maksimum 30 mm)
0.7533
m
641,666.67
Air
215.0000
liter
40.00
Jumlah (1)
Tenaga
Pekerja
1.6500
OH
90,000.00
Tukang Batu
0.2750
OH
110,000.00
Kepala Tukang
0.0280
OH
130,000.00
Mandor
0.0830
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat 1 m beton mutu f'c=7,4 Mpa (K 100); slump (3-6) cm; w/c = 0,87
Bahan
Portland Cement (PC)
230.0000
kg
1,820.00
Pasir Beton (PB)
0.6379
m
107,150.00
Koral Beton (maksimum 30 mm)
0.7607
m
641,666.67
Air
200.0000
liter
40.00
Jumlah (1)
Tenaga
Pekerja
1.2000
OH
90,000.00
Tukang Batu
0.2000
OH
110,000.00
Kepala Tukang
0.0200
OH
130,000.00
Mandor
0.0600
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat 1 m beton mutu f'c=14,5 Mpa (K 175); slump (12 2) cm; w/c = 0,66
Bahan
Portland Cement (PC)
326.0000
kg
1,820.00
Pasir Beton (PB)
0.5429
m
107,150.00
Koral Beton (maksimum 30 mm)
0.7622
m
641,666.67
Air
215.0000
liter
40.00
Jumlah (1)
Tenaga
Pekerja
1.6500
OH
90,000.00
Tukang Batu
0.2750
OH
110,000.00
Kepala Tukang
0.0280
OH
130,000.00
Mandor
0.0830
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat 1 m beton mutu f'c=16,9 Mpa (K 200); slump (12 2) cm; w/c = 0,61
Bahan
Portland Cement (PC)
352.0000
kg
1,820.00
Pasir Beton (PB)
0.5221
m
107,150.00
Koral Beton (maksimum 30 mm)
0.7637
m
641,666.67
Air
215.0000
liter
40.00
Jumlah (1)
Tenaga
Pekerja
1.6500
OH
90,000.00
Tukang Batu
0.2750
OH
110,000.00
Kepala Tukang
0.0280
OH
130,000.00
Mandor
0.0830
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat 1 m beton mutu f'c=19,3 Mpa (K 225); slump (12 2) cm; w/c = 0,58
Bahan
Portland Cement (PC)
371.0000
kg
1,820.00
Pasir Beton (PB)
0.4986
m
107,150.00
Analisa Harga Satuan Pekerjaan

Page 39

NO
1

KOEF
2
Koral Beton (maksimum 30 mm)
Air
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

G.021

G.022

G.023

G.024

SAT

3
0.7756
215.0000

4
m
liter

1.6500
0.2750
0.0280
0.0830

OH
OH
OH
OH

HARGA SAT
Rp.
5
641,666.67
40.00
Jumlah (1)
90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Membuat 1 m beton mutu f'c=21,7 Mpa (K 250); slump (12 2) cm; w/c = 0,56
Bahan
Portland Cement (PC)
384.0000
kg
1,820.00
Pasir Beton (PB)
0.4943
m
107,150.00
Koral Beton (maksimum 30 mm)
0.7696
m
641,666.67
Air
215.0000
liter
40.00
Jumlah (1)
Tenaga
Pekerja
1.6500
OH
90,000.00
Tukang Batu
0.2750
OH
110,000.00
Kepala Tukang
0.0280
OH
130,000.00
Mandor
0.0830
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat 1 m beton mutu f'c=24 Mpa (K 275); slump (12 2) cm; w/c = 0,53
Bahan
Portland Cement (PC)
406.0000
kg
1,820.00
Pasir Beton (PB)
0.4886
m
107,150.00
Koral Beton (maksimum 30 mm)
0.7600
m
641,666.67
Air
215.0000
liter
40.00
Jumlah (1)
Tenaga
Pekerja
1.6500
OH
90,000.00
Tukang Batu
0.2750
OH
110,000.00
Kepala Tukang
0.0280
OH
130,000.00
Mandor
0.0830
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat 1 m beton mutu f'c=26,4 Mpa (K 300); slump (12 2) cm; w/c = 0,52
Bahan
Portland Cement (PC)
413.0000
kg
1,820.00
Pasir Beton (PB)
0.4864
m
107,150.00
Koral Beton (maksimum 30 mm)
0.7563
m
641,666.67
Air
215.0000
liter
40.00
Jumlah (1)
Tenaga
Pekerja
1.6500
OH
90,000.00
Tukang Batu
0.2750
OH
110,000.00
Kepala Tukang
0.0280
OH
130,000.00
Mandor
0.0830
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat 1 m beton mutu f'c=28,8 Mpa (K 325); slump (12 2) cm; w/c = 0,49
Bahan
Portland Cement (PC)
439.0000
kg
1,820.00
Pasir Beton (PB)
0.4786
m
107,150.00
Koral Beton (maksimum 30 mm)
0.7452
m
641,666.67
Air
215.0000
liter
40.00
Jumlah (1)
Tenaga
Pekerja
2.1000
OH
90,000.00
Tukang Batu
0.3500
OH
110,000.00
Kepala Tukang
0.0350
OH
130,000.00
Mandor
0.1050
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Analisa Harga Satuan Pekerjaan

Page 40

NO
1
G.025

G.026

G.027

G.028

G.029
G.030

HARGA SAT
Rp.
2
3
4
5
Membuat 1 m beton mutu f'c=31,2 Mpa (K 350); slump (12 2) cm; w/c = 0,48
Bahan
Portland Cement (PC)
448.0000
kg
1,820.00
Pasir Beton (PB)
0.4764
m
107,150.00
Koral Beton (maksimum 30 mm)
0.7407
m
641,666.67
Air
215.0000
liter
40.00
Jumlah (1)
Tenaga
Pekerja
2.1000
OH
90,000.00
Tukang Batu
0.3500
OH
110,000.00
Kepala Tukang
0.0350
OH
130,000.00
Mandor
0.1050
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Pembesian 1 kg dengan besi polos atau besi ulir
Bahan
Besi Beton (polos/ulir)
1.0500
kg
15,400.00
Kawat Beton
0.0150
kg
22,000.00
Jumlah (1)
Tenaga
Pekerja
0.0070
OH
90,000.00
Tukang Besi
0.0070
OH
110,000.00
Kepala Tukang
0.0007
OH
130,000.00
Mandor
0.0004
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 10 kg jaring kawat baja /wiremesh
Bahan
Jaring Kawat Baja dilas/wiremesh
10.2000
kg
15,400.00
Kawat Beton
0.0500
kg
22,000.00
Jumlah (1)
Tenaga
Pekerja
0.0250
OH
90,000.00
Tukang Besi
0.0250
OH
110,000.00
Kepala Tukang
0.0250
OH
130,000.00
Mandor
0.0010
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m bekisting untuk pondasi
Bahan
Kayu Bekisting
0.0400
m
1,650,000.00
Paku 5 cm - 10 cm
0.3000
kg
21,650.00
Minyak Bekisting
0.1000
liter
10,600.00
Jumlah (1)
Tenaga
Pekerja
0.5200
OH
90,000.00
Tukang Kayu
0.2600
OH
110,000.00
Kepala Tukang
0.0260
OH
130,000.00
Mandor
0.0260
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
1 M2 Bongkar bekesting = 1/5 x upah pasang bekesting pondasi
KOEF

SAT

Memasang 1 m bekisting untuk sloof


Bahan
Kayu bekisting
Paku 5 cm - 10 cm
Minyak Bekisting

0.0450
0.3000
0.1000

m
kg
liter

1,650,000.00
21,650.00
10,600.00
Jumlah (1)

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.5200
0.2600
0.0260
0.0260

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Analisa Harga Satuan Pekerjaan

Page 41

NO

KOEF

SAT

1
G.031

2
3
1 M2 Bongkar bekesting = 1/5 x upah pasang bekesting sloof

G.032

Memasang 1 m bekisting untuk kolom


Bahan
Kayu Bekisting
Paku 5 cm - 12 cm
Minyak Bekisting
Balok Kayu
Papan Bekisting
Kayu Perancah

0.0400
0.4000
0.2000
0.0150
0.0200
8.0000

m
kg
liter
m
m3
m'

1,650,000.00
21,650.00
10,600.00
1,650,000.00
1,650,000.00
4,000.00
Jumlah (1)

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.6600
0.3300
0.0330
0.0330

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

G.033
G.034

G.035
G.036

Jumlah (1) + (2)


1 M2 Bongkar bekesting = 1/5 x upah pasang bekesting kolom
Memasang 1 m bekisting untuk balok
Bahan
Kayu Bekisting
Paku 5 cm - 12 cm
Minyak Bekisting
Balok Kayu
Papan Bekisting
Kayu Perancah

0.0400
0.4000
0.2000
0.0180
0.0200
8.0000

m
kg
liter
m
m3
m'

1,650,000.00
21,650.00
10,600.00
1,650,000.00
1,650,000.00
4,000.00
Jumlah (1)

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.6600
0.3300
0.0330
0.0330

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

0.0400
0.4000
0.2000
0.0150
0.0200
24.0000

m
kg
liter
m
m3
m'

1,650,000.00
21,650.00
10,600.00
1,650,000.00
1,650,000.00
4,000.00
Jumlah (1)

0.6600
0.3300
0.0330
0.0330

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


1 M2 Bongkar bekesting = 1/5 x upah pasang bekesting balok
Memasang 1 m bekisting untuk lantai
Bahan
Kayu Bekisting
Paku 5 cm - 12 cm
Minyak Bekisting
Balok Kayu
Papan Bekisting
Kayu Perancah
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

G.037
G.038

HARGA SAT
Rp.
5

Jumlah (1) + (2)


1 M2 Bongkar bekesting = 1/5 x upah pasang bekesting lantai
Memasang 1 m bekisting untuk dinding
Bahan
Kayu Bekisting
Paku 5 cm - 12 cm
Minyak Bekisting
Balok Kayu
Papan Bekisting
Kayu Perancah
Formite/Penjaga jarak Bekisting/spacer

0.0300
0.4000
0.2000
0.0200
0.0200
12.0000
4.0000

m
kg
liter
m
m3
m'
buah

1,650,000.00
21,650.00
10,600.00
1,650,000.00
1,650,000.00
4,000.00
16,000.00
Jumlah (1)

Tenaga
Analisa Harga Satuan Pekerjaan

Page 42

NO

KOEF

2
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

G.039
G.040

G.041
G.042

G.043

4
OH
OH
OH
OH

HARGA SAT
Rp.
5
90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


1 M2 Bongkar bekesting = 1/5 x upah pasang bekesting dinding
Memasang 1 m bekisting untuk tangga
Bahan
Kayu Bekisting
Paku 5 cm - 12 cm
Minyak Bekisting
Balok Kayu
Papan Bekisting
Kayu Perancah

0.0300
0.4000
0.1500
0.0150
0.0200
8.0000

m
kg
liter
m
m3
m'

1,650,000.00
21,650.00
10,600.00
1,650,000.00
1,650,000.00
4,000.00
Jumlah (1)

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.6600
0.3300
0.0330
0.0330

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


1 M2 Bongkar bekesting = 1/5 x upah pasang bekesting tangga
Memasang 1 m jembatan untuk pengecoran beton
Bahan
Kayu Bekisting
Paku 5 cm - 12 cm
Kayu Perancah

0.0264
0.6000
2.0000

m
kg
m'

1,650,000.00
21,650.00
4,000.00
Jumlah (1)

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.1500
0.0500
0.0050
0.0080

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m pondasi beton bertulang (150 kg besi + bekisting)
Bahan
Kayu Bekisting
0.2000
m
Paku 5 cm - 12 cm
1.5000
kg
Minyak Bekisting
0.4000
liter
Besi Beton (polos/ulir)
157.5000
kg
Kawat Beton
2.2500
kg
Portland Cement (PC)
336.0000
kg
Pasir Beton (PB)
0.5400
m
Koral Beton (maksimum 30 mm)
0.8100
m
Tenaga
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

G.044

3
0.6600
0.3300
0.0330
0.0330

SAT

5.3000
0.2750
1.3000
1.0500
0.2620
0.2650

OH
OH
OH
OH
OH
OH

Jumlah (1) + (2)


Memasang 1 m sloof beton bertulang (200 kg besi + bekisting)
Bahan
Kayu Bekisting
0.2700
m
Paku 5 cm - 12 cm
2.0000
kg
Minyak Bekisting
0.6000
liter
Besi Beton (polos/ulir)
210.0000
kg
Kawat Beton
3.0000
kg
Portland Cement (PC)
336.0000
kg
Analisa Harga Satuan Pekerjaan

1,650,000.00
21,650.00
10,600.00
15,400.00
22,000.00
1,820.00
107,150.00
641,666.67
Jumlah (1)
90,000.000
110,000.000
110,000.000
110,000.000
130,000.000
140,000.000
Jumlah (2)

1,650,000.00
21,650.00
10,600.00
15,400.00
22,000.00
1,820.00
Page 43

NO
1

G.045

G.046

G.047

KOEF

SAT

2
Pasir Beton (PB)
Koral Beton (maksimum 30 mm)

3
0.5400
0.8100

4
m
m

Tenaga
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

5.6500
0.2750
1.5600
1.4000
0.3230
0.2830

OH
OH
OH
OH
OH
OH

HARGA SAT
Rp.
5
107,150.00
641,666.67
Jumlah (1)
90,000.00
110,000.00
110,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m kolom beton bertulang (300 kg besi + bekisting)
Bahan
Kayu Bekisting
0.4000
m
1,650,000.00
Paku 5 cm - 12 cm
4.0000
kg
21,650.00
Minyak Bekisting
2.0000
liter
10,600.00
Besi Beton (polos/ulir)
315.0000
kg
15,400.00
Kawat Beton
4.5000
kg
22,000.00
Portland Cement (PC)
336.0000
kg
1,820.00
Pasir Beton (PB)
0.5400
m
107,150.00
Koral Beton (maksimum 30 mm)
0.8100
m
641,666.67
Balok Kayu
0.1500
m
1,650,000.00
Plywood tebal 9 mm
3.5000 lembar
154,000.00
Kayu Perancah
80.0000
m'
4,000.00
Jumlah (1)
Tenaga
Pekerja
7.0500
OH
90,000.00
Tukang Batu
0.2750
OH
110,000.00
Tukang Kayu
1.6500
OH
110,000.00
Tukang Besi
2.1000
OH
110,000.00
Kepala Tukang
0.4030
OH
130,000.00
Mandor
0.3530
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m balok beton bertulang (200 kg besi + bekisting)
Bahan
Kayu Bekisting
0.3200
m
1,650,000.00
Paku 5 cm - 12 cm
3.2000
kg
21,650.00
Minyak Bekisting
1.6000
liter
10,600.00
Besi Beton (polos/ulir)
210.0000
kg
15,400.00
Kawat Beton
3.0000
kg
22,000.00
Portland Cement (PC)
336.0000
kg
1,820.00
Pasir Beton (PB)
0.5400
m
107,150.00
Koral Beton (maksimum 30 mm)
0.8100
m
641,666.67
Balok Kayu
0.1400
m
1,650,000.00
Plywood tebal 9 mm
2.8000 lembar
154,000.00
Kayu Perancah
64.0000
m'
4,000.00
Jumlah (1)
Tenaga
Pekerja
6.3500
OH
90,000.00
Tukang Batu
0.2750
OH
110,000.00
Tukang Kayu
1.6500
OH
110,000.00
Tukang Besi
1.4000
OH
110,000.00
Kepala Tukang
0.3330
OH
130,000.00
Mandor
0.3180
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m kolom beton bertulang (150 kg besi + bekisting)
Bahan
Kayu Bekisting
0.3200
m
1,650,000.00
Paku 5 cm - 12 cm
3.2000
kg
21,650.00
Minyak Bekisting
1.6000
liter
10,600.00
Besi Beton (polos/ulir)
157.5000
kg
15,400.00
Kawat Beton
2.2500
kg
22,000.00
Analisa Harga Satuan Pekerjaan

Page 44

NO
1

2
Portland Cement (PC)
Pasir Beton (PB)
Koral Beton (maksimum 30 mm)
Balok Kayu
Plywood tebal 9 mm
Kayu Perancah
Tenaga
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

G.048

G.049

G.050

HARGA SAT
Rp.
3
4
5
336.0000
kg
1,820.00
0.5400
m
107,150.00
0.8100
m
641,666.67
0.1200
m
1,650,000.00
2.8000 lembar
154,000.00
128.0000
m'
4,000.00
Jumlah (1)
KOEF

5.3000
0.2750
1.3000
1.0500
0.2650
0.2650

SAT

OH
OH
OH
OH
OH
OH

90,000.00
110,000.00
110,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m dinding beton bertulang (150 kg besi + bekisting)
Bahan
Kayu Bekisting
0.2400
m
1,650,000.00
Paku 5 cm - 12 cm
3.2000
kg
21,650.00
Minyak Bekisting
1.6000
liter
10,600.00
Besi Beton (polos/ulir)
157.5000
kg
15,400.00
Kawat Beton
2.2500
kg
22,000.00
Portland Cement (PC)
336.0000
kg
1,820.00
Pasir Beton (PB)
0.5400
m
107,150.00
Koral Beton (maksimum 30 mm)
0.8100
m
641,666.67
Balok Kayu
0.1600
m
1,650,000.00
Plywood tebal 9 mm
2.8000 lembar
154,000.00
Kayu Perancah
96.0000
m'
4,000.00
Jumlah (1)
Tenaga
Pekerja
5.3000
OH
90,000.00
Tukang Batu
0.2750
OH
110,000.00
Tukang Kayu
1.3000
OH
110,000.00
Tukang Besi
1.0500
OH
110,000.00
Kepala Tukang
0.2620
OH
130,000.00
Mandor
0.2650
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m dinding beton bertulang (200 kg besi + bekisting)
Bahan
Kayu Bekisting
0.2500
m
1,650,000.00
Paku 5 cm - 12 cm
3.0000
kg
21,650.00
Minyak Bekisting
1.2000
liter
10,600.00
Besi Beton (polos/ulir)
210.0000
kg
15,400.00
Kawat Beton
3.0000
kg
22,000.00
Portland Cement (PC)
336.0000
kg
1,820.00
Pasir Beton (PB)
0.5400
m
107,150.00
Koral Beton (maksimum 30 mm)
0.8100
m
641,666.67
Balok Kayu Meranti 5/7
0.1050
m
1,650,000.00
Plywood tebal 9 mm
2.5000 lembar
154,000.00
Kayu Perancah
56.0000
m'
4,000.00
Jumlah (1)
Tenaga
Pekerja
5.6500
OH
90,000.00
Tukang Batu
0.2750
OH
110,000.00
Tukang Kayu
1.5600
OH
110,000.00
Tukang Besi
1.4000
OH
110,000.00
Kepala Tukang
0.3230
OH
130,000.00
Mandor
0.2830
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m' kolom praktis beton bertulang (11 x 11 cm)
Bahan
Kayu Bekisting
0.0020
m
1,650,000.00
Paku 5 cm - 12 cm
0.0100
kg
21,650.00
Minyak Bekisting
0.0000
liter
10,600.00
Analisa Harga Satuan Pekerjaan

Page 45

NO
1

G.051

KOEF

SAT

HARGA SAT
Rp.
5
15,400.00
22,000.00
1,820.00
107,150.00
641,666.67
Jumlah (1)

2
Besi Beton (polos/ulir)
Kawat Beton
Portland Cement (PC)
Pasir Beton (PB)
Koral Beton (maksimum 30 mm)

3
3.0000
0.4500
4.0000
0.0060
0.0090

4
kg
kg
kg
m
m

Tenaga
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

0.1800
0.0200
0.0200
0.0200
0.0060
0.0090

OH
OH
OH
OH
OH
OH

90,000.00
110,000.00
110,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m' ring balok beton bertulang (10 x 15 cm)
Bahan
Kayu Bekisting
0.0030
Paku 5 cm - 12 cm
0.0200
Minyak Bekisting
0.0000
Besi Beton (polos/ulir)
3.6000
Kawat Beton
0.0500
Portland Cement (PC)
5.5000
Pasir Beton (PB)
0.0090
Koral Beton (maksimum 30 mm)
0.0150

m
kg
liter
kg
kg
kg
m
m

1,650,000.00
21,650.00
10,600.00
15,400.00
22,000.00
1,820.00
107,150.00
641,666.67
Jumlah (1)

Tenaga
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

OH
OH
OH
OH
OH
OH

90,000.00
110,000.00
110,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

0.2970
0.0330
0.0330
0.0330
0.0100
0.0150

Jumlah (1) + (2)

H.
H.001

H.002

H.003

PEKERJAAN PENUTUP ATAP


Memasang 1 m rooflight fibreglass (180 x 90) cm
Bahan
Rooflight Fibreglass
Paku Biasa 2" - 5"

0.6000
0.0500

lbr
kg

119,800.00
21,650.00
Jumlah (1)

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.1400
0.0670
0.0070
0.0070

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

25.0000

bh

4,700.00
Jumlah (1)

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.1500
0.0750
0.0080
0.0080

Oh
Oh
Oh
Oh

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m' bubung genteng glazzur
Bahan
Genteng bubung glazuur

5.0000

bh

6,100.00

Jumlah (1) + (2)


Memasang 1 m atap genteng glazzur
Bahan
Genteng glazzur

Analisa Harga Satuan Pekerjaan

SNI 03-3436-2002

Page 46

NO

KOEF

H.004

3
8.0000
0.0320

4
Kg
M3

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.4000
0.2000
0.0200
0.0020

Oh
Oh
Oh
Oh

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

11.0000
0.0300

bh
kg

7,300.00
21,650.00
Jumlah (1)

0.2000
0.1000
0.0100
0.0100

OH
OH
OH
OH

90,000.00
110,000.00
110,000.00
140,000.00
Jumlah (2)

3.5000
0.0500
10.8000
0.0320
1.0000

bh
kg
kg
m
kg

9,100.00
21,650.00
1,820.00
107,150.00
16,500.00
Jumlah (1)

0.4000
0.2000
0.0200
0.0200

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

60.0000
0.2000

bh
kg

2,300.00
21,650.00
Jumlah (1)

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.1660
0.2500
0.0250
0.0080

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m' nok atap sirap
Bahan
Seng Plat 3' -6' BJLS 20
Paku " - 1"
Paku 2" - 5"
Papan Kayu Meranti

0.4000
0.0600
0.0500
0.0040

lbr
kg
kg
m

15,000.00
21,650.00
21,650.00
1,870,000.00
Jumlah (1)

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.1250
0.2500
0.0250
0.0060

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m atap seng gelombang Bjls 30
Bahan
Seng Gelombang 3' - 6' BJLS 30
Paku " - 1"

0.7000
0.0200

lbr
kg

64,950.00
21,650.00

Jumlah (1) + (2)


Memasang 1 m atap genteng beton
Bahan
Genteng Beton
Paku 2" - 5"

Jumlah (1) + (2)


Memasang 1 m' nok genteng beton
Bahan
Nok Genteng Beton
Paku 2" - 5"
Portland Cement (PC)
Pasir Pasang
Cement Warna
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

H.006

H.007

H.008

HARGA SAT
Rp.
5
1,820.00
107,150.00
Jumlah (1)

Semen portland
Pasir Pasang

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
H.005

SAT

Jumlah (1) + (2)


Memasang 1 m atap sirap
Bahan
Genteng Sirap
Paku " - 1"

Analisa Harga Satuan Pekerjaan

Page 47

NO
1

H.009

H.010

KOEF

SAT

HARGA SAT
Rp.
5
Jumlah (1)

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.1200
0.0600
0.0060
0.0060

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m atap seng gelombang Bjls 20
Bahan
Seng Gelombang 3' - 6' BJLS 20
Paku " - 1"

0.7000
0.0200

lbr
kg

40,700.00
21,650.00
Jumlah (1)

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.1200
0.0600
0.0060
0.0060

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

1.0000
0.0600
0.0400

m
kg
m3

52,500.00
21,650.00
1,870,000.00

Jumlah (1) + (2)


Memasang 1 m' atap bubungan seng Bjls 30
Bahan
Seng Plat 3' - 6' BJLS 30
Paku " - 1"

Papan Lembasung/ Sejenis

Jumlah (1)
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

H.011

H.012

H.013

0.1500
0.0700
0.0080
0.0060

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Menutup atap dengan genteng metal surya roof per m2
Bahan
Genteng metal surya roof
1.6234
Paku genteng metal
12.0000

lbr
Bh

79,375.00
605.00
Jumlah (1)

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.2000
0.1000
0.0100
0.0100

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Menutup bubungan pada genteng metal Surya roof per m'
Bahan
Bubungan surya roof
2.5000
Paku genteng metal
10.0000
Kayu Lembasung/ sejenis
0.0040

Bh
Bh
m

33,300.00
605.00
1,870,000.00
Jumlah (1)

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.2000
0.1000
0.0100
0.0100

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Menutup Atap dengan genteng Metal sakura roof per m2
Bahan
Genteng metal sakura roof
1.6234
Paku genteng metal
12.0000

lbr
Bh

45,200.00
605.00
Jumlah (1)

Tenaga
Pekerja
Tukang Kayu

OH
OH

90,000.00
110,000.00

0.2000
0.1000
Analisa Harga Satuan Pekerjaan

Page 48

NO

KOEF

H.015

HARGA SAT
Rp.
5
130,000.00
140,000.00
Jumlah (2)

3
0.0100
0.0100

4
OH
OH

Jumlah (1) + (2)


Menutup bubungan pada genteng metal Sakura roof per m'
Bahan
Bubungan sakura roof
2.5000
Paku genteng metal
10.0000
Kayu Lembasung/ sejenis
0.0040

Bh
Bh
m

33,300.00
605.00
1,870,000.00
Jumlah (1)

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.2000
0.1000
0.0100
0.0100

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Pasang aluminium foil / sisalation per 1 M2
Bahan
Sisalation / aluminium foil

1.0500

50,400.00
Jumlah (1)

Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

0.1500
0.0500
0.0050
0.0080

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Kepala Tukang
Mandor
H.014

SAT

Jumlah (1) + (2)

I.
I.001

I.002

I.003

PEKERJAAN LANGIT-LANGIT
Memasang 1 m langit-langit lambriziring kayu, tebal 9 mm
Bahan
Papan Kayu
0.0150
Paku Triplek
0.0100

m
kg

1,870,000.00
21,650.00
Jumlah (1)

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

0.6000
0.8000
0.0800
0.0300

SNI 03-2838-2002

Jumlah (1) + (2)


Memasang 1 m langit-langit plywood ukuran (120 x 240) cm; tbl. 9 mm
Bahan
Plywood tbl. 9 mm
0.3750 lembar
154,000.00
Paku Triplek
0.0300
kg
21,650.00
Jumlah (1)
Tenaga
Pekerja
0.1000
OH
90,000.00
Tukang Kayu
0.1000
OH
110,000.00
Kepala Tukang
0.0100
OH
130,000.00
Mandor
0.0050
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m langit-langit plywood ukuran (120 x 240) cm; tbl. 3 mm
Bahan
Plywood tbl. 3 mm
0.3750 lembar
60,500.00
Paku Triplek
0.0300
kg
21,650.00
Jumlah (1)
Tenaga
Pekerja
0.1000
OH
90,000.00
Tukang Kayu
0.1000
OH
110,000.00
Kepala Tukang
0.0100
OH
130,000.00
Mandor
0.0050
OH
140,000.00
Analisa Harga Satuan Pekerjaan

Page 49

NO
1

I.004

SAT

Jumlah (1) + (2)


Memasang 1 m langit-langit plywood ukuran (60 x 120) cm; tbl. 9 mm
Bahan
Plywood tbl. 9 mm
0.3750 lembar
Paku Triplek
0.0300
kg
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

I.005

KOEF

0.0700
0.1000
0.0100
0.0035

OH
OH
OH
OH

Jumlah (1) + (2)


Memasang 1 m langit-langit plywood ukuran (60 x 120) cm; tbl. 3 mm
Bahan
Plywood tbl. 3 mm
0.3750 lembar
Paku Triplek
0.0300
kg
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0700
0.1000
0.0100
0.0035

OH
OH
OH
OH

HARGA SAT
Rp.
5
Jumlah (2)

154,000.00
21,650.00
Jumlah (1)
90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

60,500.00
21,650.00
Jumlah (1)
90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


I.006

I.007

I.008

I.009

Memasang 1 m langit-langit teakwood ukuran (60 x 120) cm; tbl. 4 mm dan 6 mm


Bahan
Teakwood
0.3750 lembar
154,400.00
Paku Triplek
0.0300
kg
21,650.00
Jumlah (1)
Tenaga
Pekerja
0.0700
OH
90,000.00
Tukang Kayu
0.1000
OH
110,000.00
Kepala Tukang
0.0100
OH
130,000.00
Mandor
0.0035
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m langit-langit lat kayu bengkirai
Bahan
Papan Kayu Bengkirai
0.0240
m
2,090,000.00
Paku
0.0100
kg
21,650.00
Paku Sekrup
0.0500
kg
31,100.00
Jumlah (1)
Tenaga
Pekerja
0.2000
OH
90,000.00
Tukang Kayu
0.6000
OH
110,000.00
Kepala Tukang
0.0600
OH
130,000.00
Mandor
0.0100
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m langit-langit lat kayu meranti
Bahan
Papan Kayu Meranti
0.0240
m
1,870,000.00
Paku
0.0100
kg
21,650.00
Paku Sekrup
0.0500
kg
31,100.00
Jumlah (1)
Tenaga
Pekerja
0.2000
OH
90,000.00
Tukang Kayu
0.6000
OH
110,000.00
Kepala Tukang
0.0600
OH
130,000.00
Mandor
0.0100
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m Plywood 9 mm, rangka kayu meranti
Analisa Harga Satuan Pekerjaan

Page 50

NO
1

I.010

I.011

I.012

I.013

J.
J.001

KOEF

SAT

HARGA SAT
Rp.
5

Bahan
Kaso Kayu Meranti
Paku
Plywood 4' x 8' x 9 mm

0.0230
0.0600
0.3900

m
kg
lbr

1,870,000.00
21,650.00
154,000.00
Jumlah (1)

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.2700
0.4000
0.0400
0.0135

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m Plywood 3mm, rangka kayu meranti
Bahan
Kaso Kayu Meranti
Paku
Plywood 4' x 8' x 3mm

0.0230
0.0600
0.3900

m
kg
lbr

1,870,000.00
21,650.00
60,500.00
Jumlah (1)

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.2700
0.4000
0.0400
0.0135

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m langit-langit gypsum board uk. (120 x 240) cm, tebal 9 mm
Bahan
Gypsum Board
0.3640 lembar
91,200.00
Paku Sekrup
0.1100
kg
31,100.00
Jumlah (1)
Tenaga
Pekerja
0.1000
OH
90,000.00
Tukang Kayu
0.0500
OH
110,000.00
Kepala Tukang
0.0050
OH
130,000.00
Mandor
0.0050
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m' list gipsum
Bahan
List gipsum
1.0500
m'
30,000.00
Tepung Gipsum
0.1500
kg
5,000.00
Jumlah (1)
Tenaga
Pekerja
0.0600
OH
90,000.00
Tukang Kayu
0.0600
OH
110,000.00
Kepala Tukang
0.0060
OH
130,000.00
Mandor
0.0030
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m' list kayu profil
Bahan
List Kayu Profil
1.0500
m'
20,000.00
Paku Triplek
0.0100
kg
21,650.00
Jumlah (1)
Tenaga
Pekerja
0.0500
OH
90,000.00
Tukang Kayu
0.0500
OH
110,000.00
Kepala Tukang
0.0050
OH
130,000.00
Mandor
0.0030
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)

PEKERJAAN SANITASI
Memasang 1 buah kloset duduk
Bahan
Analisa Harga Satuan Pekerjaan

SNI

Page 51

NO

KOEF

2
Kolset Duduk
Perlengkapan

J.002

J.003

J.004

3.3000
1.1000
0.0010
0.1600

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 buah kloset jongkok porselen
Bahan
Kloset Jongkok Porselen
Portland Cement (PC)
Pasir Pasang

1.0000
6.0000
0.0100

bh
kg
m

239,775.00
1,820.00
107,150.00
Jumlah (1)

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1.0000
1.5000
1.5000
0.1600

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 buah kloset jongkok teraso
Bahan
Kloset Jongkok Teraso
Bata Merah 8 x 8 x 16 cm
Portland Cement (PC)
Pasir Pasang

1.0000
6.0000
6.0000
0.0100

bh
bh
kg
m

106,480.00
990.00
1,820.00
107,150.00
Jumlah (1)

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1.0000
1.5000
0.3000
0.1100

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

1.0000
bh
30% harga urinoir
6.0000
kg
0.0100
m

2,462,350.00
738,705.00
1,820.00
107,150.00
Jumlah (1)

Jumlah (1) + (2)


Memasang 1 buah urinoir
Bahan
Urinoir
Perlengkapan
Portland Cement (PC)
Pasir Pasang

1.0000
1.0000
0.1000
0.1000

Jumlah (1) + (2)


Memasang 1 buah wastafel
Bahan
Wastafel
Perlengkapan
Portland Cement (PC)
Pasir Pasang
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

J.006

3
4
1.0000
bh
6% harga kloset

HARGA SAT
Rp.
5
1,650,000.00
99,000.00
Jumlah (1)

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
J.005

SAT

OH
OH
OH
OH

1.0000
bh
12% harga wastafel
6.0000
kg
0.0100
m
1.2000
1.4500
0.1500
0.1000

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

1,375,000.00
165,000.00
1,820.00
107,150.00
Jumlah (1)
90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 buah bak mandi fibreglass volume 0,30 m
Analisa Harga Satuan Pekerjaan

Page 52

NO
1

2
Bahan
Bak Fibreglass
Perlengkapan

J.008

500,000.00
90,000.00
Jumlah (1)

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 buah bak mandi batu bata volume 0,30 m
Bahan
Bata Merah 8 x x8 x 16 cm
223.4375
Portland Cement (PC)
120.0000
Pasir Pasang
0.3000
Keramik Dinding 20x25 cm
2.1780
Semen Nat
6.0000

bh
kg
m
m
kg

990.00
1,820.00
107,150.00
77,000.00
16,500.00
Jumlah (1)

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

6.0000
3.0000
0.3000
0.3000

Jumlah (1) + (2)


Memasang 1 buah badkip fiberglass
Bahan
Badkip Fibreglass
Perlengkapan

1.0000
bh
20% harga badkip
0.0000
0.0750
0.7500
0.2500

Jumlah (1) + (2)


Membuat 1 buah bak beton volume 1m
Bahan
Beton 1 : 1 : 2 (G.009)
Besi Beton
Kayu Cetakan
Keramik Dinding 20x25 cm
Perlengkapan
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

J.010

HARGA SAT
Rp.
5

1.8000
2.7000
0.5400
0.1100

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
J.009

SAT

1.0000
bh
18% harga bak

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
J.007

KOEF

0.9000
180.0000
0.0800
5.0000
10% harga total
3.5000
4.5000
0.9000
0.9000

OH
OH
OH
OH

552,400.00
110,480.00
Jumlah (1)
90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

m
1,443,830.50
kg
15,400.00
m
1,650,000.00
m
77,000.00
bahan 318,623.05
Jumlah (1)
OH
OH
OH
OH

90,000.00
110,000.00
71,500.00
77,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 buah bak kontrol pas. batu bata ukuran (30 x 30) cm tinggi 35 cm
Bahan
Bata Merah 8 x 8 x 16 cm
94.4010
bh
990.00
Portland Cement (PC)
44.0000
kg
1,820.00
Pasir Pasang
0.0700
m
107,150.00
Batu Kerikil
0.0700
m
242,000.00
Besi Beton
1.6000
kg
15,400.00
Pasir Beton
0.0600
m
107,150.00
Jumlah (1)
Tenaga
Pekerja
3.2000
OH
90,000.00
Tukang Batu
1.0150
OH
110,000.00
Kepala Tukang
0.0015
OH
130,000.00
Mandor
0.0160
OH
140,000.00
Analisa Harga Satuan Pekerjaan

Page 53

NO
1

J.011

J.012

J.013

J.014

J.015

KOEF

SAT

HARGA SAT
Rp.
5
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 buah bak kontrol pas. batu bata ukuran (45 x 45) cm tinggi 60 cm
Bahan
Bata Merah 8 x 8 x 16 cm
162.7603
bh
990.00
Portland Cement (PC)
77.0000
kg
1,820.00
Pasir Pasang
0.1300
m
107,150.00
Batu Kerikil
0.0200
m
242,000.00
Besi Beton
2.6000
kg
15,400.00
Pasir Beton
0.0900
m
107,150.00
Jumlah (1)
Tenaga
Pekerja
1.4200
OH
90,000.00
Tukang Batu
0.4730
OH
110,000.00
Kepala Tukang
0.0470
OH
130,000.00
Mandor
0.0710
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 buah bak kontrol pas. batu bata ukuran (60 x 60) cm tinggi 65 cm
Bahan
Bata Merah 8 x 8 x 16 cm
241.5365
bh
990.00
Portland Cement (PC)
114.0000
kg
1,820.00
Pasir Pasang
0.1840
m
107,150.00
Batu Kerikil
0.0330
m
242,000.00
Besi Beton
4.8500
kg
15,400.00
Pasir Beton
0.1200
m
107,150.00
Jumlah (1)
Tenaga
Pekerja
2.1600
OH
90,000.00
Tukang Batu
0.7200
OH
110,000.00
Kepala Tukang
0.0720
OH
130,000.00
Mandor
0.1080
OH
140,000.00
Tukang Gali/Buruh Tak terlatih
0.1000
OH
140,000
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m' pipa PVC tipe AW "
Bahan
Pipa PVC
1.2000
m'
5,000.00
Perlengkapan
35% harga pipa
1,750.00
Jumlah (1)
Tenaga
Pekerja
0.0360
OH
90,000.00
Tukang Batu
0.0600
OH
110,000.00
Kepala Tukang
0.0060
OH
130,000.00
Mandor
0.0018
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m' pipa PVC tipe AW "
Bahan
Pipa PVC
1.2000
m'
6,000.00
Perlengkapan
35% harga pipa
2,100.00
Jumlah (1)
Tenaga
Pekerja
0.0360
OH
90,000.00
Tukang Batu
0.0600
OH
110,000.00
Kepala Tukang
0.0060
OH
130,000.00
Mandor
0.0018
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m' pipa PVC tipe AW 1"
Bahan
Pipa PVC
Perlengkapan
Tenaga
Pekerja

1.2000
m'
35% harga pipa
0.0360

Analisa Harga Satuan Pekerjaan

OH

8,325.00
2,913.75
Jumlah (1)
90,000.00
Page 54

NO

KOEF

2
Tukang Batu
Kepala Tukang
Mandor

J.016

Jumlah (1) + (2)


Memasang 1 m' pipa PVC tipe AW 1"
Bahan
Pipa PVC
Perlengkapan
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

J.017

Jumlah (1) + (2)


Memasang 1 m' pipa PVC tipe AW 2"
Bahan
Pipa PVC
Perlengkapan

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
J.019

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
J.020

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
J.021

1.2000
m'
35% harga pipa

19,975.00
6,991.25
Jumlah (1)

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

1.2000
m'
35% harga pipa

28,625.00
10,018.75
Jumlah (1)

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

1.2000
m'
35% harga pipa

34,950.00
12,232.50
Jumlah (1)

0.0810
0.1350
0.0135
0.0041

Jumlah (1) + (2)


Memasang 1 m' pipa PVC tipe AW 4"
Bahan
Pipa PVC
Perlengkapan

15,300.00
5,355.00
Jumlah (1)
90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

0.0360
0.0600
0.0060
0.0018

Jumlah (1) + (2)


Memasang 1 m' pipa PVC tipe AW 3"
Bahan
Pipa PVC
Perlengkapan

HARGA SAT
Rp.
5
110,000.00
130,000.00
140,000.00
Jumlah (2)

OH
OH
OH
OH

0.0540
0.0900
0.0090
0.0027

Jumlah (1) + (2)


Memasang 1 m' pipa PVC tipe AW 2"
Bahan
Pipa PVC
Perlengkapan

4
OH
OH
OH

1.2000
m'
35% harga pipa
0.0360
0.0600
0.0060
0.0018

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
J.018

3
0.0600
0.0060
0.0018

SAT

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

1.2000
m'
35% harga pipa

54,250.00
18,987.50
Jumlah (1)

0.0810
0.1350
0.0135
0.0041

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 buah bak cuci piring satinless steel
Bahan
Analisa Harga Satuan Pekerjaan

Page 55

NO

KOEF

J.022

J.023

J.024

K.002

HARGA SAT
Rp.
5
532,400.00
186,340.00
Jumlah (1)

Bak Cuci Satinless Steel


Water Drain + Aksesoris

3
1.0000
1.0000

4
bh
set

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.0300
0.3000
0.0300
0.0015

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 buah kran " atau " Biasa
Bahan
Kran Air
Seal Tape

1.0000
0.0250

bh
bh

11,000.00
3,000.00
Jumlah (1)

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.0100
0.1000
0.0100
0.0050

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 buah kran " atau " stanlis
Bahan
Kran Air
Seal Tape

1.0000
0.0250

bh
bh

88,000.00
3,000.00
Jumlah (1)

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.0100
0.1000
0.0100
0.0050

OH
OH
OH
OH

90,000.00
110,000.00
110,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 buah floordrain
Bahan
Floordrain

1.0000

bh

39,930.00
Jumlah (1)

0.0100
0.1000
9.0000
0.5625
0.0650

OH
OH
m'
m
ls

90,000.00
110,000.00
108,556.50
23,666.67
500,000.00

Tenaga
Pekerja
Tukang Batu
Pipa PVC 4" berlobang jenis AW
Urugan kembali perataan tanah
Tambahan upah
Jumlah
K.
K.001

SAT

PEKERJAAN BESI DAN ALUMUNIUM


Memasang 1 kg rangka atap baja
Bahan
Besi Profil IWF
Meni Besi

1.1000
0.0800

kg
kg

Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor

0.0600
0.0060
0.0060
0.0003

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 kg Besi Profil
Bahan
Besi Profil

1.1500

kg

17,300.00
Jumlah (1)

Tenaga
Pekerja

0.0600

OH

90,000.00

Analisa Harga Satuan Pekerjaan

Revisi SNI T-16-2002

17,300.00
24,200.00
Jumlah (1)

Page 56

NO

KOEF

K.003

K.004

K.005

K.006

K.007

K.008

SAT

HARGA SAT
Rp.
5
110,000.00
130,000.00
140,000.00
Jumlah (2)

Tukang Besi
Kepala Tukang
Mandor

3
0.0600
0.0060
0.0030

4
OH
OH
OH

Jumlah (1) + (2)


Mengerjakan 100 kg pekerjaan perakitan
Bahan
Solar
Minyak Pelumas

1.0000
0.1000

ltr
ltr

9,900.00
39,900.00
Jumlah (1)

Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor
Sewa Alat

0.1000
0.1000
0.0010
0.0050
0.0080

OH
OH
OH
OH
Jam

90,000.00
110,000.00
130,000.00
140,000.00
56,100.00
Jumlah (2)

Jumlah (1) + (2)


Mengerjakan 1 cm pengelasan dengan las listrik
Bahan
Kawat Las Listrik
Solar
Minyak Pelumas

0.04
0.0300
0.0040

kg
ltr
ltr

29,700.00
9,900.00
39,900.00
Jumlah (1)

Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor
Sewa Alat

0.0040
0.0020
0.0002
0.0002
0.0170

OH
OH
OH
OH
Jam

90,000.00
110,000.00
130,000.00
140,000.00
56,100.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m pintu gulung (rolling door) besi
Bahan
Pintu Gulung (Rolling Door) Besi

1.0000

259,500.00
Jumlah (1)

Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor

1.2000
1.2000
0.1200
0.0060

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m pintu lipat (folding door)
Bahan
Pintu Lipat (Folding Door)

1.0000

2,462,400.00
Jumlah (1)

Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor

0.4400
0.4400
0.0440
0.0220

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m rolling door alumunium
Bahan
Rolling Door Alumunium

1.0000

1,271,105.00
Jumlah (1)

Tenaga
Pekerja
Tukang Alumunium
Kepala Tukang
Mandor

1.0000
1.0000
0.1000
0.0500

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m pintu alumunium
Bahan
Analisa Harga Satuan Pekerjaan

Page 57

NO
1

K.009

K.010

K.011

Pintu Alumunium

K.013

SAT

4
m2

1.000

HARGA SAT
Rp.
5
732,100.00
Jumlah (1)

Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor

1.0500
1.0500
0.1050
0.0052

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m' Kusen Alumunium 4 "
Bahan
Kusen Alumunium
Skrub Fixer
Sealent

1.1000
2.0000
0.0600

m'
Bh
Tube

199,650.00
10,000.00
79,860.00
Jumlah (1)

Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor

0.0430
0.0430
0.0043
0.0021

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


1 M2 Pintu Kaca Rangka Alumunium SNI 7393 : 2008
Bahan
Rangka Pintu Alumunium
Profil kaca
Sealent

4.4000
4.5000
0.2700

m'
m'
Tube

199,650.00
35,000.00
79,860.00
Jumlah (1)

Tenaga
Pekerja
Tukang
Kep Tukang
Mandor

0.0850
0.0850
0.0090
0.0050

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


1 M2 Daun Jendela Kaca Rangka Alumunium SNI DT 90-0014-2007
Bahan
Rangka Daun Jendela Alumunium
3.4125
m'
Profil kaca
3.4125
m'
Sealent
0.2700 Tube
Tenaga
Pekerja
Tukang
Kep Tukang
Mandor

K.012

KOEF

0.0850
0.0850
0.0090
0.0050

199,650.00
35,000.00
79,860.00
Jumlah (1)

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

11.5000
27.0800

m'
cm

1,666.67
3,232.30
Jumlah (1)

Tenaga
Pekerja
Tukang Las
Kepala Tukang
Mandor

1.6700
1.6700
0.1670
0.0830

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m kawat harmonika
Bahan
Kawat Harmonika
Paku Biasa " - 1"
Kayu Papan meranti

1.1000
0.0200
0.0018

m
kg
m

18,700.00
21,650.00
1,870,000.00

Jumlah (1) + (2)


Memasang 1 m terali besi
Bahan
Besi Strip 2 x 3
Pengelasan

Analisa Harga Satuan Pekerjaan

Page 58

NO
1

2
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

K.014

K.015

K.016

K.017

K.018

KOEF

SAT

HARGA SAT
Rp.
5
Jumlah (1)

0.1000
0.1000
0.0100
0.0005

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

1.1000
1.7160
11.1100

m
kg
cm

18,700.00
24,600.00
3,232.30
Jumlah (1)

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.1000
0.1000
0.0100
0.0005

OH
OH
OH
OH

49,500.00
60,500.00
71,500.00
77,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m jendela nako & tralis
Bahan
Jendela Nako / kaca 5 mm
Paku sekrup 1 - 2,5 cm
Besi Strip

1.1000
0.0200
0.0250

lbr
kg
kg

173,000.00
31,100.00
24,600.00
Jumlah (1)

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.2000
0.2000
0.0200
0.0010

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m' talang datar seng BJLS 30
Bahan
Seng Plat 3' x 6 ' BJLS 30
Paku Biasa " - 1" atau sekrup
Kayu lembasung/kapur

1.1000
0.0150
0.0190

m
kg
m

52,500.00
31,100.00
1,870,000.00
Jumlah (1)

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.2000
0.4000
0.0250
0.0100

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m' talang miring seng BJLS 30
Bahan
Seng Plat 3' x 6 ' BJLS 30
Paku Biasa " - 1" atau sekrup
Kayu lembasung/kapur
Flincote/Meni Besi

1.1000
0.0150
0.0190
0.3000

m
kg
m
kg

52,500.00
31,100.00
1,870,000.00
24,200.00
Jumlah (1)

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.1500
0.4000
0.0250
0.0013

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m' talang lingkaran 10 cm, seng BJLS 30
Bahan
Seng Plat 3' x 6 ' BJLS 30
1.1000
Paku Biasa " - 1" atau sekrup
0.1000
Besi Strip
0.5000

m
kg
kg

52,500.00
31,100.00
24,600.00
Jumlah (1)

Jumlah (1) + (2)


Memasang 1 m kawat nyamuk
Bahan
Kawat Nyamuk
Besi Strip (0,2 x 2 cm)
Pengelasan

Analisa Harga Satuan Pekerjaan

Page 59

NO
1

2
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

KOEF

SAT

HARGA SAT
Rp.
5

0.1500
0.2500
0.0250
0.0013

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Memasang 1 m' talang lingkaran 10 cm, seng BJLS 20


Bahan
Seng Plat 3' x 6 ' BJLS 20
1.1000
Paku Biasa " - 1" atau sekrup
0.0100
Besi Strip
0.5000

lbr
kg
kg

15,000.00
31,100.00
24,600.00
Jumlah (1)

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.1500
0.2500
0.0250
0.0013

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m' talang U dari PVC
Bahan
Talang U dari PVC
Klam U

1.0000
1.0000

m
bh

28,750.00
18,700.00
Jumlah (1)

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.3000
0.5000
0.0500
0.0150

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

PEKERJAAN KUNCI DAN KACA


Memasang 1 buah kunci tanam kwalitas baik
Bahan
Kunci Tanam

1.0000

bh

211,750.00
Jumlah (1)

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0600
0.6000
0.0600
0.0030

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 buah kunci tanam biasa
Bahan
Kunci Tanam Biasa

1.0000

bh

50,000.00
Jumlah (1)

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0050
0.5000
0.0050
0.0003

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 buah kunci tanam kamar mandi
Bahan
Kunci Tanam Kamar Mandi

1.0000

bh

72,600.00
Jumlah (1)

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang

0.0050
0.5000
0.0050

OH
OH
OH

90,000.00
110,000.00
130,000.00

Jumlah (1) + (2)


K.019

K.020

Jumlah (1) + (2)

L.
L.001

L.002

L.004

Analisa Harga Satuan Pekerjaan

Page 60

NO

KOEF

L.005

L.006

SAT

HARGA SAT
Rp.
5
140,000.00
Jumlah (2)

Mandor

3
0.0025

4
OH

Jumlah (1) + (2)


Memasang 1 buah engsel pintu
Bahan
Engsel Pintu

1.0000

bh

37,000.00
Jumlah (1)

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0150
0.1500
0.0150
0.0008

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 buah engsel jendela kupu-kupu
Bahan
Engsel Jendela Kupu-Kupu

1.0000

bh

22,000.00
Jumlah (1)

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0100
0.1000
0.0100
0.0005

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Memasang 1 buah kait angin


Bahan
Kait Angin

1.0000

bh

19,800.00
Jumlah (1)

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0150
0.1500
0.0150
0.0008

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 buah kunci selot
Bahan
Kunci Selot / Gerendel

1.0000

bh

16,500.00
Jumlah (1)

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0200
0.2000
0.0200
0.0010

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 buah pegangan pintu / door holder
Bahan
Pegangan Pintu

1.0000

bh

330,000.00
Jumlah (1)

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0500
0.5000
0.0500
0.0025

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Pasang door closer 1 buah
Bahan
Door closer

1.0000

bh

137,500.00
Jumlah (1)

Tenaga
Pekerja

0.0500

OH

90,000.00

Jumlah (1) + (2)

L.007

L.008

L.009

L.010

Analisa Harga Satuan Pekerjaan

Page 61

NO

KOEF

L.011

SAT

HARGA SAT
Rp.
5
110,000.00
130,000.00
140,000.00
Jumlah (2)

Tukang Kayu
Kepala Tukang
Mandor

3
0.5000
0.0500
0.0025

4
OH
OH
OH

Jumlah (1) + (2)


Pasang door stop 1 buah
Bahan
Door stop

1.0000

bh

27,500.00
Jumlah (1)

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.1000
0.0100
0.0100
0.0005

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Memasang 1 buah rel pintu dorong


Bahan
Rel Pintu Dorong

1.0000

bh

2,298,600.00
Jumlah (1)

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0600
0.6000
0.0600
0.0030

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m kaca polos; tebal 3 mm
Bahan
Kaca

1.1000

113,100.00
Jumlah (1)

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0150
0.1500
0.0150
0.0008

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Memasang 1 m kaca polos; tebal 5 mm


Bahan
Kaca

1.1000

173,000.00
Jumlah (1)

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0150
0.1500
0.0150
0.0008

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m kaca ryben; tebal 3 mm
Bahan
Kaca

1.1000

171,700.00
Jumlah (1)

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0150
0.1500
0.0150
0.0008

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m kaca ryben; tebal 5 mm
Bahan
Kaca

1.1000

237,800.00
Jumlah (1)

Jumlah (1) + (2)


L.012

L.013

Jumlah (1) + (2)


L.014

L.015

L.016

Tenaga
Analisa Harga Satuan Pekerjaan

Page 62

NO

KOEF

L.018

L.019

L.020

L.021

SAT

HARGA SAT
Rp.
5
49,500.00
60,500.00
71,500.00
77,000.00
Jumlah (2)

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

3
0.0150
0.1500
0.0150
0.0008

4
OH
OH
OH
OH

Jumlah (1) + (2)


Memasang 1 m buram; tebal 3 mm
Bahan
Kaca

1.1000

135,800.00
Jumlah (1)

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0150
0.1500
0.0150
0.0008

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m buram; tebal 5 mm
Bahan
Kaca

1.1000

223,600.00
Jumlah (1)

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0150
0.1500
0.0150
0.0008

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m kaca cermin; tebal 3 mm
Bahan
Kaca

1.1000

226,300.00
Jumlah (1)

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0150
0.1500
0.0150
0.0008

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Memasang 1 m kaca patri lokal
Bahan
Kaca

1.1000

1,019,500.00
Jumlah (1)

Tenaga
Jumlah (1)
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah (1) + (2)
M.001 Memasang 1 m lantai keramik ukuran 60 x 60 cm
Bahan
Keramik 60 x 60 cm
Portland Cement (PC)
Pasir Pasang
Semen Warna
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.2600
0.1300
0.0130
0.0130

OH
OH
OH
OH

49,500.00
60,500.00
71,500.00
77,000.00
Jumlah (2)

1.0000
9.6000
0.0450
1.3000

m
kg
m
kg

465,850.00
1,820.00
107,150.00
16,500.00
Jumlah (1)

0.7000
0.3500
0.0350
0.0300

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)

Analisa Harga Satuan Pekerjaan

Page 63

NO
1

M.002 Memasang 1 m lantai keramik ukuran 40 x 40 cm


Bahan
Keramik 40 x 40 cm
Portland Cement (PC)
Pasir Pasang
Semen Warna
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah (1) + (2)
M.003 Memasang 1 m lantai keramik ukuran 30 x 30 cm
Bahan
Keramik 30 x 30 cm
Portland Cement (PC)
Pasir Pasang
Semen Warna
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah (1) + (2)
M.004 Pasang lantai keramik 20 x 20 cm per 1 M2
Bahan
keramik 20 x 20 cm
Portland Cement (PC)
Pasir Pasang
Semen Warna
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah (1) + (2)
M.005 Memasang 1 m dinding keramik ukuran 20 x 20 cm
Bahan
Keramik
Portland Cement (PC)
Pasir Pasang
Semen Warna
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah (1) + (2)
M.006 Memasang 1 m dinding keramik ukuran 20 x 25 cm
Bahan
Keramik
Portland Cement (PC)
Pasir Pasang
Semen Warna
Tenaga
Pekerja
Tukang Batu
Analisa Harga Satuan Pekerjaan

KOEF

SAT

HARGA SAT
Rp.
5

1.0000
9.8000
0.0450
1.3000

m
kg
m
kg

77,000.00
1,820.00
107,150.00
16,500.00
Jumlah (1)

0.7000
0.3500
0.0350
0.0300

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

1.0000
10.0000
0.0450
1.5000

m
kg
m
kg

66,000.00
1,820.00
107,150.00
16,500.00
Jumlah (1)

0.7000
0.3500
0.0350
0.0300

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

1.0000
10.4000
0.0420
1.5000

m
kg
m
kg

71,500.00
1,820.00
107,150.00
16,500.00
Jumlah (1)

0.7000
0.3500
0.0350
0.0300

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

1.0000
9.3000
0.0180
1.9400

m
kg
m
kg

71,500.00
1,820.00
107,150.00
16,500.00
Jumlah (1)

0.9000
0.4500
0.0450
0.0450

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

1.0000
9.3000
0.0180
1.9400

m
kg
m
kg

77,000.00
1,820.00
107,150.00
16,500.00
Jumlah (1)

0.9000
0.4500

OH
OH

90,000.00
110,000.00
Page 64

NO

KOEF

SAT

HARGA SAT
Rp.
5
130,000.00
140,000.00
Jumlah (2)

3
0.0450
0.0450

4
OH
OH

1.0000
9.3000
0.0180
1.5000

m
kg
m
kg

99,825.00
1,820.00
107,150.00
16,500.00
Jumlah (1)

1.0000
0.5000
0.0500
0.0500

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

5.3000
1.1400
0.0030
0.0250

bh
kg
m
kg

29,500.00
1,820.00
107,150.00
16,500.00
Jumlah (1)

0.0900
0.0900
0.0090
0.0050

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


M.009 Memasang 1 m lantai ubin granito ukuran 40 x 40 cm
Bahan
Ubin Granito 40 x 40 cm
1.0000
Portland Cement (PC)
9.8000
Pasir Pasang
0.0450
Semen Warna
1.3000

m2
kg
m
kg

279,600.00
1,820.00
107,150.00
16,500.00
Jumlah (1)

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Kepala Tukang
Mandor
Jumlah (1) + (2)
M.007 Memasang 1 m dinding porselin 11 x 11 cm
Bahan
porselin
Portland Cement (PC)
Pasir Pasang
Semen Warna
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah (1) + (2)
M.008 Memasang 1 m' plint keramik ukuran 10 x 20 cm
Bahan
Plint Keramik 10/20
Portland Cement (PC)
Pasir Pasang
Semen Warna
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.2500
0.1250
0.0130
0.0130

Jumlah (1) + (2)


M.010 Memasang 1 m lantai ubin granito ukuran 40x 40 cm (motif khusus)
Bahan
Ubin Granito 40 x 40 cm
1.0000
m2
Portland Cement (PC)
9.8000
kg
Pasir Pasang
0.0450
m
Semen Warna
1.3000
kg
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah (1) + (2)
M.011 Memasang 1 m lantai marmer ukuran 40 x 40 cm
Bahan
Marmer
Portland Cement (PC)
Pasir Pasang
Analisa Harga Satuan Pekerjaan

1,464,100.00
1,820.00
107,150.00
16,500.00
Jumlah (1)

0.2500
0.1250
0.0130
0.0130

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

1.0000
9.8000
0.0450

m
kg
m

213,000.00
1,820.00
107,150.00
Page 65

NO

KOEF

SAT

HARGA SAT
Rp.
5
16,500.00
Jumlah (1)

Semen Warna

3
1.3000

4
kg

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.7000
0.3500
0.0350
0.0350

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

1.1000
11.7500
0.0350

m
kg
m

223,850.00
1,820.00
107,150.00
Jumlah (1)

0.7000
0.3500
0.0350
0.0350

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

0.0030
0.0500

m
kg

1,870,000.00
31,100.00
Jumlah (1)

0.1200
0.1200
0.0120
0.0060

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

3.0000
14.1600
0.0230

Zak
kg
M3

75,000.00
1,820.00
107,150.00
Jumlah (1)

0.6000
1.5000
0.0900
0.0600

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


M.012 Memasang 1 m dinding batu alam
Bahan
Batu Paras
Portland Cement (PC)
Pasir Pasang
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah (1) + (2)
M.013 Memasang 1 m' plint kayu ukuran 2 x 10 cm
Bahan
Papan Kayu Lembasung
Paku Sekrup 5 cm
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah (1) + (2)
M.014 Memasang Koral Sikat Motif M2
Bahan
Koral Sikat
Portland Cement (PC)
Pasir Pasang
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah (1) + (2)

N.
N.001

PEKERJAAN PENGECATAN
Mengikis / mengerok permukaan cat tembok lama 1 M2
Bahan
Soda Api
0.0500

kg

13,300.00
Jumlah (1)

Tenaga
Pekerja
Mandor

OH
OH

90,000.00
140,000.00
Jumlah (2)

0.1500
0.0025

SNI

Jumlah (1) + (2)


N.002

Mencuci bidang permukaan tembok yang pernah di cat per 1 M2


Bahan
Sabun
0.0500
kg

20,000.00
Jumlah (1)

Tenaga
Analisa Harga Satuan Pekerjaan

Page 66

NO

KOEF

2
Pekerja
Mandor

N.003

N.004

N.005

N.006

N.007

3
0.1500
0.0025

SAT
4
OH
OH

HARGA SAT
Rp.
5
90,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Mengerok karat cat lama permukaan baja dengan cara manual per 1 m2
Bahan
Sabun
0.0500
kg
20,000.00
Jumlah (1)
Tenaga
Pekerja
0.1500
OH
90,000.00
Mandor
0.0025
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Mendempul dan Menggosok 1 m kayu
Bahan
Dempul Jadi
Minyak Cat/ tinner
Batu Apung

0.0800
0.0200
0.0100

kg
kg
kg

22,000.00
25,300.00
46,600.00
Jumlah (1)

Tenaga
Pekerja
Tukang Cat
Kepala Tukang
Mandor

0.0400
0.0400
0.0040
0.0025

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Mengecat 1 m bidang kayu lama
Bahan
Plamir
Cat Dasar
Cat Penutup

0.1500
0.1700
0.1700

kg
kg
kg

22,000.00
24,200.00
47,300.00
Jumlah (1)

Tenaga
Pekerja
Tukang Cat
Kepala Tukang
Mandor

0.0700
0.0750
0.0075
0.0025

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Mengecat 1 m bidang kayu baru (1 lps plamir, 1 lps cat dsr, 2 lps cat penutup)
Bahan
Cat Meni
0.2000
kg
24,200.00
Plamir
0.1500
kg
22,000.00
Cat Dasar
0.1700
kg
24,200.00
Cat Penutup
0.2600
kg
47,300.00
Jumlah (1)
Tenaga
Pekerja
0.0700
OH
90,000.00
Tukang Cat
0.0090
OH
110,000.00
Kepala Tukang
0.0060
OH
130,000.00
Mandor
0.0025
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Mengecat 1 m bidang kayu baru (1 lps plamir, 1 lps cat dsr, 3 lps cat penutup)
Bahan
Cat Meni
0.2000
kg
24,200.00
Plamir
0.1500
kg
22,000.00
Cat Dasar
0.1700
kg
24,200.00
Cat Penutup
0.3500
kg
47,300.00
Jumlah (1)
Tenaga
Pekerja
0.0700
OH
90,000.00
Tukang Cat
0.1050
OH
110,000.00
Kepala Tukang
0.0040
OH
130,000.00
Mandor
0.0025
OH
140,000.00
Analisa Harga Satuan Pekerjaan

Page 67

NO
1

N.008

N.009

N.010

N.011

N.012

N.013

KOEF

SAT

HARGA SAT
Rp.
5
Jumlah (2)

Jumlah (1) + (2)


Pelaburan bidang kayu dengan teak oil per 1 M2
Bahan
Teak oil

0.3600

Ltr

33,400.00
Jumlah (1)

Tenaga
Pekerja
Tukang Cat
Kepala Tukang
Mandor

0.0400
0.0600
0.0160
0.0025

Oh
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Melabur 1 m bidang kayu dengan politur
Bahan
Politur
Politur Jadi
Ampelas

0.2000
0.1500
2.0000

kg
kg
lbr

47,300.00
49,500.00
5,000.00
Jumlah (1)

Tenaga
Tukang Cat
Kepala Tukang
Mandor

0.0600
0.0160
0.0025

OH
OH
OH

110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Melabur 1 m bidang kayu dengan cat residu
Bahan
Residu

0.3500

ltr

9,600.00
Jumlah (1)

Tenaga
Pekerja
Mandor

0.1000
0.0060

OH
OH

90,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Melabur 1 m bidang kayu dengan vernis
Bahan
Vernis
Dempul
Ampelas
Kuas

0.1500
0.0500
0.1000
0.0100

ltr
kg
lbr
bh

49,500.00
22,000.00
5,000.00
17,600.00
Jumlah (1)

Tenaga
Pekerja
Tukang Cat
Kepala Tukang
Mandor

0.1600
0.1600
0.0160
0.0025

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Mengecat 1 m bidang tembok baru (1 lps plamir, 1 lps cat dsr, 2 lps cat penutup)
Bahan
Plamir
0.1000
kg
8,360.00
Cat Dasar
0.1000
kg
24,200.00
Cat Penutup
0.2600
kg
23,100.00
Jumlah (1)
Tenaga
Pekerja
0.0200
OH
90,000.00
Tukang Cat
0.0630
OH
110,000.00
Kepala Tukang
0.0063
OH
130,000.00
Mandor
0.0025
OH
140,000.00
Jumlah (2)
Jumlah (1) + (2)
Mengecat 1 m bidang tembok lama (1 lps cat dsr, 2 lps cat penutup)
Bahan
Cat Alkali
0.1000
kg
44,000.00
Cat ICI Weathershield
0.3600
kg
85,800.00
Jumlah (1)
Tenaga
Analisa Harga Satuan Pekerjaan

Page 68

NO

KOEF

N.015

N.016

N.017

N.018

SAT

HARGA SAT
Rp.
5
90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Pekerja
Tukang Cat
Kepala Tukang
Mandor

3
0.0200
0.0630
0.0063
0.0025

4
OH
OH
OH
OH

Jumlah (1) + (2)


Pengecatan atap memakai cat khusus atap per m2
Bahan
Cat khusus

0.3500

Kg

115,500.00
Jumlah (1)

Tenaga
Pekerja
Tukang Cat
Kepala Tukang
Mandor

0.0167
0.0050
0.0500
0.0017

Oh
Oh
Oh
Oh

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)


Pemasangan wall paper per 1 m2
Bahan
Wall paper
Perekat / lem

1.2000
0.2000

M2
Kg

93,200.00
38,500.00
Jumlah (1)

Tenaga
Pekerja
Tukang Cat
Kepala Tukang
Mandor

0.0200
0.2000
0.0020
0.0025

Jumlah (1) + (2)


Mengecat 1 m permukaan baja dengan meni besi
Bahan
Meni Besi
Kuas

0.1000
0.0100

kg
bh

24,200.00
17,600.00
Jumlah (1)

Tenaga
Pekerja
Tukang Cat
Kepala Tukang
Mandor

0.0200
0.2000
0.0200
0.0100

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Oh
Oh
Oh
Oh

Jumlah (1) + (2)


Mengecat 1 m permukaan baja dengan meni besi dan perancah
Bahan
Meni Besi
0.1000
kg
Kuas
0.0100
bh
Perancah Kayu
0.0020
m
Tenaga
Pekerja
Tukang Cat
Kepala Tukang
Mandor

0.2500
0.2250
0.0225
0.0075

OH
OH
OH
OH

90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

24,200.00
17,600.00
1,650,000.00
Jumlah (1)
90,000.00
110,000.00
130,000.00
140,000.00
Jumlah (2)

Jumlah (1) + (2)

Analisa Harga Satuan Pekerjaan

Page 69

NALISA HARGA SATUAN PEKERJAAN


TAHUN ANGGARAN 2014
JUMLAH
Rp.
6=(3x5)
SNI 03-2835-2002
20,000.00
4,550.00
535.75
2,178.00
134,640.00
1,299.00
4,680.00
167,882.75
36,000.00
22,000.00
2,600.00
2,800.00
63,400.00
231,282.75
20,000.00
4,550.00
77,940.00
535.75
2,178.00
134,640.00
1,299.00
10,890.00
252,032.75
36,000.00
22,000.00
2,600.00
2,800.00
63,400.00
315,432.75
16,000.00
3,640.00
252,500.00
535.75
2,178.00
1,299.00
276,152.75
27,000.00
22,000.00
2,600.00
2,800.00
54,400.00
330,552.75
22,440.00
433.00
13,090.00
35,963.00
Analisa Harga Satuan Pekerjaan

Page 70

JUMLAH
Rp.
6=(3x5)
9,000.00
11,000.00
1,300.00
700.00
22,000.00
57,963.00
20,000.00
336,600.00
18,402.50
27,060.00
63,700.00
15,120.00
10,715.00
36,300.00
29,700.00
3,750.00
244,200.00
9,048.00
31,762.50
3,630.00
849,988.00
180,000.00
110,000.00
220,000.00
39,000.00
7,000.00
556,000.00
1,405,988.00

27,200.00
392,700.00
6,495.00
19,110.00
3,214.50
12,100.00
97,425.00
558,244.50
90,000.00
220,000.00
26,000.00
7,000.00
343,000.00
901,244.50
48,000.00
516,120.00
15,155.00
97,425.00
676,700.00
90,000.00
165,000.00
19,500.00
7,000.00
281,500.00
958,200.00
9,000.00
7,000.00
16,000.00
Analisa Harga Satuan Pekerjaan

Page 71

JUMLAH
Rp.
6=(3x5)

20,000.00
347,820.00
6,495.00
32,760.00
3,214.50
12,100.00
97,425.00
81,675.00
601,489.50
90,000.00
220,000.00
26,000.00
7,000.00
343,000.00
944,489.50
64,680.00
53,625.00
1,071.50
119,376.50
90,000.00
7,000.00
97,000.00
216,376.50
600,030.00
46,620.00
646,650.00
600,030.00
4,620.00
604,650.00
1,800.00
1,100.00
28,050.00
30,950.00
270,000.00
12,600.00
282,600.00
11,250.00
1,750.00
13,000.00
11,250.00
1,750.00
13,000.00
45,000.00
7,000.00
52,000.00
9,000.00
1,400.00
10,400.00
18,000.00
11,000.00
1,300.00
2,800.00
Analisa Harga Satuan Pekerjaan

Page 72

JUMLAH
Rp.
6=(3x5)
33,100.00
13,500.00
8,250.00
975.00
2,100.00
24,825.00
360,000.00
660,000.00
78,000.00
56,000.00
1,154,000.00
360,000.00
330,000.00
28,000.00
718,000.00
9,000.00
33,000.00
3,900.00
1,400.00
47,300.00
13,500.00
2,100.00
15,600.00
SNI
67,500.00
3,500.00
71,000.00
81,000.00
6,300.00
87,300.00
94,500.00
9,380.00
103,880.00
90,000.00
4,480.00
94,480.00
135,000.00
8,400.00
143,400.00
108,000.00
6,300.00
114,300.00
4,500.00
700.00
5,200.00
29,700.00
Analisa Harga Satuan Pekerjaan

Page 73

JUMLAH
Rp.
6=(3x5)
1,400.00
31,100.00
46,440.00
7,000.00
53,440.00
22,500.00
1,166.67
23,666.67
45,000.00
7,000.00
52,000.00
120,960.00
120,960.00
27,000.00
1,400.00
28,400.00
149,360.00
145,200.00
145,200.00
22,500.00
3,500.00
26,000.00
171,200.00

79,200.00
79,200.00
22,500.00
3,500.00
26,000.00
105,200.00
SNI 03-2836-2002
517,440.00
713,440.00
33,645.10
1,264,525.10
135,000.00
66,000.00
7,800.00
10,500.00
219,300.00
1,483,825.10

517,440.00
485,940.00
45,753.05
1,049,133.05

Analisa Harga Satuan Pekerjaan

Page 74

JUMLAH
Rp.
6=(3x5)
135,000.00
66,000.00
7,800.00
10,500.00
219,300.00
1,268,433.05
470,400.00
485,940.00
45,753.05
1,002,093.05
135,000.00
66,000.00
7,800.00
10,500.00
219,300.00
1,221,393.05
517,440.00
713,440.00
33,645.10
1,264,525.10
135,000.00
66,000.00
7,800.00
10,500.00
219,300.00
1,483,825.10
517,440.00
367,640.00
51,967.75
937,047.75
135,000.00
66,000.00
7,800.00
10,500.00
219,300.00
1,156,347.75
517,440.00
296,660.00
55,718.00
869,818.00
135,000.00
82,500.00
9,750.00
10,500.00
237,750.00
1,107,568.00
470,400.00
296,660.00
55,718.00
822,778.00
135,000.00
82,500.00
9,750.00
Analisa Harga Satuan Pekerjaan

Page 75

JUMLAH
Rp.
6=(3x5)
10,500.00
237,750.00
1,060,528.00
517,440.00
247,520.00
58,289.60
823,249.60
135,000.00
82,500.00
9,750.00
10,500.00
237,750.00
1,060,999.60
517,440.00
212,940.00
60,111.15
790,491.15
135,000.00
82,500.00
9,750.00
10,500.00
237,750.00
1,028,241.15
517,440.00
165,620.00
62,575.60
745,635.60
135,000.00
82,500.00
9,750.00
10,500.00
237,750.00
983,385.60
517,440.00
43,545.60
560,985.60
70,200.00
42,900.00
5,070.00
5,460.00
123,630.00
684,615.60
470,400.00
43,545.60
513,945.60

70,200.00
42,900.00
5,070.00
5,460.00
123,630.00
637,575.60
siklop; 60% beton campuran 1 PC : 2 PB : 3 KR dan 40 % batu belah

Analisa Harga Satuan Pekerjaan

Page 76

JUMLAH
Rp.
6=(3x5)
206,976.00
353,080.00
33,430.80
278,850.00
1,940,400.00
39,600.00
2,852,336.80
306,000.00
93,500.00
11,050.00
23,800.00
434,350.00
3,286,686.80

sumuran; diameter 100 cm


194,040.00
353,080.00
33,430.80
278,850.00
859,400.80
214,200.00
33,000.00
3,900.00
11,200.00
262,300.00
1,121,700.80

ancang (40x40) cm, beton bertulang


1,915.20
10,072.10
89,375.00
110,110.00
693,000.00
19,800.00
59,840.00
2,598.00
954.00
2,006.40
989,670.70
90,000.00
73,700.00
8,710.00
7,000.00
179,410.00
1,169,080.70

ancang (35x35) cm, beton bertulang


1,612.80
8,572.00
74,479.17
89,180.00
531,300.00
15,400.00
50,490.00
2,598.00
954.00
1,672.00
776,257.97
72,000.00
55,000.00
6,500.00
Analisa Harga Satuan Pekerjaan

Page 77

JUMLAH
Rp.
6=(3x5)
5,600.00
139,100.00
915,357.97

cang Beton 25/25 per m'


32,500.00
56,100.00
88,600.00
45,000.00
45,000.00
133,600.00

SNI 03-2837-2002
bata merah (8x8x16) cm; tebal 1 bata; campuran 1 PC : 1 PP
118,800.00
116,534.60
6,321.85
241,656.45
58,500.00
22,000.00
2,600.00
4,200.00
87,300.00
328,956.45

bata merah (8x8x16) cm; tebal 1 bata; campuran 1 PC : 2 PP


118,800.00
79,170.00
8,572.00
206,542.00
54,000.00
22,000.00
2,600.00
4,200.00
82,800.00
289,342.00

bata merah (8x8x16) cm; tebal 1 bata; campuran 1 PC : 3 PP


118,800.00
59,969.00
9,750.65
188,519.65
54,000.00
22,000.00
2,600.00
4,200.00
82,800.00
271,319.65

bata merah (8x8x16) cm; tebal 1 bata; campuran 1 PC : 4 PP


118,800.00
48,321.00
9,964.95
177,085.95
54,000.00
22,000.00
2,600.00
4,200.00
Analisa Harga Satuan Pekerjaan

Page 78

JUMLAH
Rp.
6=(3x5)
82,800.00
259,885.95

bata merah (8x8x16) cm; tebal 1 bata; campuran 1 PC : 5 PP


118,800.00
40,404.00
10,929.30
170,133.30
54,000.00
22,000.00
2,600.00
4,200.00
82,800.00
252,933.30

bata merah (8x8x16) cm; tebal 1 bata; campuran 1 PC : 6 PP


118,800.00
33,670.00
13,072.30
165,542.30
54,000.00
22,000.00
2,600.00
4,200.00
82,800.00
248,342.30

bata merah (8x8x16) cm; tebal bata; campuran 1 PC : 1 PP


59,400.00
50,596.00
3,000.20
112,996.20
28,800.00
11,000.00
1,300.00
2,100.00
43,200.00
156,196.20

bata merah (8x8x16) cm; tebal bata; campuran 1 PC : 2 PP


59,400.00
34,489.00
4,071.70
97,960.70
27,000.00
11,000.00
1,300.00
2,100.00
41,400.00
139,360.70

bata merah (8x8x16) cm; tebal bata; campuran 1 PC : 3 PP


59,400.00
26,153.40
4,286.00
89,839.40
27,000.00
11,000.00
1,300.00
2,100.00
41,400.00
Analisa Harga Satuan Pekerjaan

Page 79

JUMLAH
Rp.
6=(3x5)
131,239.40

bata merah (8x8x16) cm; tebal bata; campuran 1 PC : 4 PP


59,400.00
20,930.00
4,607.45
84,937.45
27,000.00
11,000.00
1,300.00
2,100.00
41,400.00
126,337.45

bata merah (8x8x16) cm; tebal bata; campuran 1 PC : 5 PP


59,400.00
17,617.60
4,821.75
81,839.35
27,000.00
11,000.00
1,300.00
2,100.00
41,400.00
123,239.35

bata merah (8x8x16) cm; tebal bata; campuran 1 PC : 6 PP


59,400.00
15,142.40
5,250.35
79,792.75
27,000.00
11,000.00
1,300.00
2,100.00
41,400.00
121,192.75

bata merah (8x8x16) cm; tebal bata; campuran 1 PC : 8 PP


59,400.00
11,830.00
5,357.50
76,587.50
27,000.00
11,000.00
1,300.00
2,100.00
41,400.00
117,987.50

terawang (roster) uk. (12x11x24) cm; campuran spesi 1 PC : 3 PP


300,000.00
25,480.00
3,428.80
328,908.80
27,000.00
11,000.00
1,300.00
2,100.00
41,400.00
370,308.80

Analisa Harga Satuan Pekerjaan

Page 80

JUMLAH
Rp.
6=(3x5)

terawang (roster) uk. (12x11x24) cm; campuran spesi 1 PC : 4 PP


300,000.00
20,020.00
3,750.25
323,770.25

27,000.00
11,000.00
1,300.00
2,100.00
41,400.00
365,170.25
bata berongga ekspose uk. (5x11x24) cm; campuran spesi 1 PC : 3 PP
700,000.00
25,480.00
3,428.80
728,908.80
27,000.00
16,500.00
1,950.00
2,100.00
47,550.00
776,458.80
SNI 03-2837-2002

n 1 PC : 1 PP; tebal 15 mm
28,217.28
1,714.40
29,931.68
27,000.00
16,500.00
1,950.00
2,100.00
47,550.00
77,481.68

n 1 PC : 2 PP; tebal 15 mm
18,607.68
2,143.00
20,750.68
27,000.00
16,500.00
1,950.00
2,100.00
47,550.00
68,300.68

n 1 PC : 3 PP; tebal 15 mm
14,152.32
2,464.45
16,616.77
27,000.00
16,500.00
1,950.00
2,100.00
47,550.00
64,166.77

n 1 PC : 4 PP; tebal 15 mm
Analisa Harga Satuan Pekerjaan

Page 81

JUMLAH
Rp.
6=(3x5)
11,356.80
2,571.60
13,928.40
27,000.00
16,500.00
1,950.00
2,100.00
47,550.00
61,478.40

n 1 PC : 5 PP; tebal 15 mm
9,434.88
2,785.90
12,220.78
27,000.00
16,500.00
1,950.00
1,400.00
46,850.00
59,070.78

n 1 PC : 6 PP; tebal 15 mm
8,037.12
2,893.05
10,930.17
27,000.00
16,500.00
1,950.00
2,100.00
47,550.00
58,480.17

n 1 PC : 7 PP; tebal 15 mm
7,163.52
3,000.20
10,163.72
27,000.00
16,500.00
1,950.00
2,100.00
47,550.00
57,713.72

n 1 PC : 8 PP; tebal 15 mm
6,289.92
3,107.35
9,397.27
27,000.00
16,500.00
1,950.00
2,100.00
47,550.00
56,947.27

n 1 PC : 2 PP; tebal 20 mm
24,810.24
2,893.05
27,703.29
36,000.00
Analisa Harga Satuan Pekerjaan

Page 82

JUMLAH
Rp.
6=(3x5)
22,000.00
2,600.00
3,080.00
63,680.00
91,383.29

n 1 PC : 3 PP; tebal 20 mm
18,869.76
3,321.65
22,191.41
23,400.00
22,000.00
2,600.00
3,080.00
51,080.00
73,271.41

n 1 PC : 4 PP; tebal 20 mm
15,142.40
3,428.80
18,571.20
36,000.00
22,000.00
2,600.00
30,800.00
91,400.00
109,971.20

n 1 PC : 5 PP; tebal 20 mm
12,579.84
3,750.25
16,330.09
36,000.00
22,000.00
2,600.00
3,080.00
63,680.00
80,010.09

n 1 PC : 6 PP; tebal 20 mm
10,716.16
3,857.40
14,573.56
36,000.00
22,000.00
2,860.00
3,080.00
63,940.00
78,513.56

n 1 PC : 2 PP; tebal 25 mm
28,210.00
1,392.95
29,602.95
27,000.00
22,000.00
2,600.00
1,820.00
53,420.00
83,022.95

n 1 PC : 3 PP; tebal 25 mm
Analisa Harga Satuan Pekerjaan

Page 83

JUMLAH
Rp.
6=(3x5)
21,385.00
3,750.25
25,135.25
27,000.00
16,500.00
1,950.00
1,820.00
47,270.00
72,405.25

n 1 PC : 4 PP; tebal 25 mm
17,253.60
4,071.70
21,325.30
27,000.00
22,000.00
2,600.00
1,820.00
53,420.00
74,745.30

n 1 PC : 5 PP; tebal 25 mm
14,450.80
4,178.85
18,629.65
27,000.00
22,000.00
2,600.00
1,820.00
53,420.00
72,049.65

n 1 PC : 2 PP; tebal 30 mm
33,943.00
3,750.25
37,693.25
28,800.00
27,500.00
3,250.00
2,100.00
61,650.00
99,343.25

n 1 PC : 3 PP; tebal 30 mm
25,753.00
4,178.85
29,931.85
28,800.00
27,500.00
3,250.00
2,100.00
61,650.00
91,581.85

n 1 PC : 4 PP; tebal 30 mm
20,711.60
4,500.30
25,211.90

Analisa Harga Satuan Pekerjaan

Page 84

JUMLAH
Rp.
6=(3x5)
28,800.00
27,500.00
3,250.00
2,100.00
61,650.00
86,861.90

n 1 PC : 5 PP; tebal 30 mm
14,905.80
4,821.75
19,727.55
28,800.00
27,500.00
3,250.00
2,100.00
61,650.00
81,377.55
1 PC : 3 PP; tebal 30 mm
12,867.40
2,250.15
15,117.55
13,500.00
7,700.00
910.00
1,120.00
23,230.00
38,347.55
1 PC : 5 PP; tebal 30 mm
9,434.88
2,785.90
12,220.78
13,500.00
7,700.00
910.00
1,120.00
23,230.00
35,450.78

n beton 1 PC : 2 PP; tebal 15 mm


16,926.00
1,928.70
18,854.70
23,400.00
22,000.00
2,600.00
1,820.00
49,820.00
68,674.70

n beton 1 PC : 3 PP; tebal 15 mm


12,867.40
2,250.15
15,117.55
23,400.00
22,000.00
2,600.00
1,820.00
49,820.00
64,937.55

Analisa Harga Satuan Pekerjaan

Page 85

JUMLAH
Rp.
6=(3x5)

n skoning 1 PC : 2 PP; lebar 10 mm


910.00
1,392.95
2,302.95
7,200.00
44,000.00
5,200.00
560.00
56,960.00
59,262.95

n ciprat 1 PC : 2 PP; lebar 10 mm


7,862.40
642.90
8,505.30
27,000.00
11,000.00
1,300.00
2,100.00
41,400.00
49,905.30

g siar pasangan dinding bata merah (=20 m')


5,656.56
5,656.56
13,500.00
8,250.00
1,040.00
1,120.00
23,910.00
29,566.56

g siar pasangan dinding conblock ekspose (=8 m')


2,912.00
2,912.00
6,300.00
3,850.00
520.00
560.00
11,230.00
14,142.00

g siar pasangan batu kali adukan 1 PC : 2 PP


11,538.80
1,285.80
12,824.60
27,000.00
16,500.00
1,950.00
2,100.00
47,550.00
60,374.60

5,915.00
5,915.00
13,500.00
11,000.00
1,300.00
Analisa Harga Satuan Pekerjaan

Page 86

JUMLAH
Rp.
6=(3x5)
1,400.00
27,200.00
33,115.00

n sudut
291.20
1,392.95
1,684.15
2,700.00
7,700.00
910.00
1,120.00
12,430.00
14,114.15

SNI 03-3434-2002
g 1 m kusen pintu dan kusen jendela; Kayu Lembasung/ Kapur
2,057,000.00
27,062.50
28,000.00
2,112,062.50
630,000.00
2,310,000.00
273,000.00
49,000.00
3,262,000.00
5,374,062.50

g 1 m kusen pintu dan kusen jendela; Kayu Kayu Meranti


2,244,000.00
27,062.50
28,000.00
2,299,062.50
540,000.00
1,980,000.00
234,000.00
42,000.00
2,796,000.00
5,095,062.50

g 1 m pintu klamp sederhana; Kayu Lembasung/ Kapur


74,800.00
1,082.50
75,882.50
31,500.00
115,500.00
13,650.00
2,520.00
163,170.00
239,052.50

g 1 m pintu klamp sederhana; Kayu Meranti


74,800.00
1,082.50
75,882.50
31,500.00
115,500.00
13,650.00
2,520.00
163,170.00
Analisa Harga Satuan Pekerjaan

Page 87

JUMLAH
Rp.
6=(3x5)
239,052.50

g 1 m daun pintu panel; Kayu Lembasung/ Kapur


74,800.00
14,000.00
88,800.00
90,000.00
330,000.00
39,000.00
7,000.00
466,000.00
554,800.00

g 1 m daun pintu panel; Kayu Meranti


74,800.00
14,000.00
88,800.00
90,000.00
330,000.00
39,000.00
7,000.00
466,000.00
554,800.00

g 1 m pintu dan jendela kaca; Kayu Lembasung/ Kapur


44,880.00
8,400.00
53,280.00
72,000.00
264,000.00
31,200.00
5,600.00
372,800.00
426,080.00

g 1 m pintu dan jendela kaca; Kayu Meranti


44,880.00
8,400.00
53,280.00
72,000.00
264,000.00
31,200.00
5,600.00
372,800.00
426,080.00

g 1 m pintu dan jendela jalusi; Lembasung/ Kapur


119,680.00
14,000.00
133,680.00
90,000.00
330,000.00
39,000.00
7,000.00
466,000.00
599,680.00

g 1 m pintu dan jendela jalusi; Kayu Meranti


119,680.00
14,000.00
133,680.00

Analisa Harga Satuan Pekerjaan

Page 88

JUMLAH
Rp.
6=(3x5)
90,000.00
330,000.00
39,000.00
7,000.00
466,000.00
599,680.00
g 1 m daun pintu kayu lapis (plywood); rangka tertutup Kayu Kapur
46,750.00
649.50
14,000.00
154,000.00
215,399.50
63,000.00
231,000.00
27,300.00
4,900.00
326,200.00
541,599.50

g 1 m pintu plywood rangkap; rangka ekspose Kayu Kapur


47,872.00
649.50
14,000.00
154,000.00
216,521.50
72,000.00
264,000.00
31,200.00
5,600.00
372,800.00
589,321.50

g 1 m jalusi kusen; Kayu Kapur/ Lembasung


112,200.00
3,247.50
115,447.50
60,300.00
220,000.00
26,000.00
46,900.00
353,200.00
468,647.50

g 1 m jalusi kusen; Kayu Meranti


112,200.00
3,247.50
115,447.50
60,300.00
220,000.00
26,000.00
46,900.00
353,200.00
468,647.50

g 1 m pintu teakwood rangkap; rangka ekspose Kayu Kapur


46,750.00
649.50
8,400.00
68,200.00
123,999.50

Analisa Harga Satuan Pekerjaan

Page 89

JUMLAH
Rp.
6=(3x5)
72,000.00
264,000.00
5,200.00
5,600.00
346,800.00
470,799.50
g 1 m pintu teakwood rangkap lapis formika; rgk. ekspose Ky. Meranti
46,750.00
649.50
22,400.00
68,200.00
27,750.00
165,749.50
76,500.00
280,500.00
33,150.00
6,020.00
396,170.00
561,919.50

g 1 m konstruksi kuda kuda konvensional; Kayu Kapur/ Lembasung


2,057,000.00
369,000.00
121,240.00
2,547,240.00
360,000.00
1,320,000.00
156,000.00
28,000.00
1,864,000.00
4,411,240.00

g 1 m konstruksi kuda kuda konvensional; Kayu Meranti


2,057,000.00
369,000.00
121,240.00
2,547,240.00
360,000.00
1,320,000.00
156,000.00
28,000.00
1,864,000.00
4,411,240.00

g 1 m konstruksi kuda kuda ekspose; Kayu Kapur/ Lembasung


2,244,000.00
369,000.00
121,240.00
2,734,240.00
603,000.00
2,211,000.00
261,300.00
46,900.00
3,122,200.00
5,856,440.00

g 1 m konstruksi kuda kuda ekspose; Kayu Meranti


2,244,000.00
369,000.00
121,240.00
2,734,240.00
Analisa Harga Satuan Pekerjaan

Page 90

JUMLAH
Rp.
6=(3x5)
603,000.00
2,211,000.00
261,300.00
46,900.00
3,122,200.00
5,856,440.00

g 1 m konstruksi gording; Kayu Kapur/ Lembasung


2,057,000.00
369,000.00
64,950.00
2,490,950.00
216,000.00
792,000.00
93,600.00
16,800.00
1,118,400.00
3,609,350.00

g 1 m konstruksi gording; Kayu Meranti


2,057,000.00
369,000.00
64,950.00
2,490,950.00
216,000.00
792,000.00
93,600.00
16,800.00
1,118,400.00
3,609,350.00

g 1 m rangka atap genteng kodok; Kayu Kapur/ Lembasung


22,440.00
6,732.00
5,412.50
34,584.50
9,000.00
11,000.00
1,300.00
700.00
22,000.00
56,584.50

g 1 m rangka atap genteng kodok; Kayu Meranti


22,440.00
6,732.00
5,412.50
34,584.50
9,000.00
11,000.00
1,300.00
700.00
22,000.00
56,584.50

g 1 m rangka atap genteng keramik; Kayu Kapur/ Lembasung


26,180.00
6,732.00
5,412.50
38,324.50
9,000.00
Analisa Harga Satuan Pekerjaan

Page 91

JUMLAH
Rp.
6=(3x5)
11,000.00
1,300.00
700.00
22,000.00
60,324.50

g 1 m rangka atap genteng keramik; Kayu Meranti


26,180.00
6,732.00
5,412.50
38,324.50
9,000.00
11,000.00
1,300.00
700.00
22,000.00
60,324.50

g 1 m rangka atap genteng beton; Kayu Kapur/ Lembasung


26,180.00
106,590.00
5,412.50
138,182.50
9,000.00
11,000.00
1,300.00
700.00
22,000.00
160,182.50

g 1 m rangka atap genteng beton; Kayu Meranti


26,180.00
106,590.00
5,412.50
138,182.50
9,000.00
11,000.00
1,300.00
700.00
22,000.00
160,182.50

g 1 m rangka atap genteng metal; Kayu Lembasung/Kapur


22,440.00
3,247.50
25,687.50
9,000.00
11,000.00
1,300.00
700.00
22,000.00
47,687.50

g 1 m rangka atap genteng metal; Kayu Meranti


22,440.00
3,247.50
25,687.50
9,000.00
11,000.00
1,300.00
700.00
22,000.00

Analisa Harga Satuan Pekerjaan

Page 92

JUMLAH
Rp.
6=(3x5)
47,687.50

atap sirap; Kayu Meranti


308,550.00
4,330.00
312,880.00
10,800.00
13,200.00
1,560.00
840.00
26,400.00
339,280.00

angit-langit (100 x 100) cm; Kayu Meranti


22,440.00
2,165.00
24,605.00
13,500.00
27,500.00
3,250.00
10,500.00
54,750.00
79,355.00

angit-langit (50 x 100) cm; Kayu Meranti


28,798.00
4,330.00
33,128.00
13,500.00
33,000.00
3,900.00
10,500.00
60,900.00
94,028.00

angit-langit (60 x 60) cm; Kayu Meranti


30,481.00
5,412.50
35,893.50
18,000.00
33,000.00
3,900.00
1,400.00
56,300.00
92,193.50

uk. (3 x 20) cm; Kapur/ Lembasung


20,196.00
2,165.00
22,361.00
9,000.00
22,000.00
2,600.00
700.00
34,300.00
56,661.00

uk. (3 x 30) cm; Kayu Kapur/Lembasung

Analisa Harga Satuan Pekerjaan

Page 93

JUMLAH
Rp.
6=(3x5)
20,570.00
1,082.50
21,652.50
9,000.00
22,000.00
3,250.00
700.00
34,950.00
56,602.50

uk. 2x (3 x 20) cm; Kayu Kapur/ Lembasung


27,115.00
1,299.00
28,414.00
13,500.00
27,500.00
3,250.00
10,500.00
54,750.00
83,164.00

uk. 2x (2 x 20) cm; Kayu Kapur/ Lembasung


16,082.00
1,299.00
17,381.00
9,000.00
11,000.00
1,300.00
7,000.00
28,300.00
45,681.00

dinding pemisah (60 x 120) cm; Kayu Meranti


52,360.00
3,247.50
55,607.50
13,500.00
49,500.00
5,850.00
1,120.00
69,970.00
125,577.50

pemisah teakwood rangkap; Kayu Kapur/ Lembasung


52,360.00
3,247.50
58,652.00
15,680.00
129,939.50
13,500.00
49,500.00
5,850.00
1,120.00
69,970.00
199,909.50

pemisah plywood rangkap; Kayu Meranti


52,360.00
3,247.50
132,440.00
15,680.00
203,727.50
Analisa Harga Satuan Pekerjaan

Page 94

JUMLAH
Rp.
6=(3x5)
18,000.00
66,000.00
7,800.00
1,400.00
93,200.00
296,927.50

meranti berlidah per m2 46,750.00


4,330.00
51,080.00
54,000.00
198,000.00
23,400.00
4,200.00
279,600.00
330,680.00

lambriziring dari papan; Kayu Meranti


13,090.00
2,165.00
4,665.00
19,920.00
54,000.00
198,000.00
23,400.00
4,200.00
279,600.00
299,520.00

lambriziring dari plywood ukuran (120 x 240) cm


61,600.00
1,082.50
62,682.50
2,250.00
8,250.00
975.00
182.00
11,657.00
74,339.50

uiter ukuran 3 x 30 cm; Kayu Meranti


18,700.00
216.50
18,916.50
6,300.00
22,000.00
2,600.00
560.00
31,460.00
50,376.50

uiter ukuran 2 x 20 cm; Kayu Meranti


8,228.00
216.50
8,444.50
6,300.00
22,000.00
2,600.00
560.00
31,460.00
Analisa Harga Satuan Pekerjaan

Page 95

JUMLAH
Rp.
6=(3x5)
39,904.50

cincin dan dilancipkan


9,000.00
27,500.00
3,250.00
700.00
40,450.00
40,450.00

g dan lubang pada balok pemikul tiap-tiap pasangan pen dan lubang
66,000.00
7,800.00
73,800.00
73,800.00

anah lunak per m'


162,000.00
4,400.00
520.00
6,020.00
172,940.00
172,940.00
216,175.00
259,410.00

, gelegar dari kayu ulin per m3 3,850,000.00


27,500.00
3,877,500.00
450,000.00
1,650,000.00
195,000.00
35,000.00
2,330,000.00
6,207,500.00

kapur/lembasung per m3 1,870,000.00


21,650.00
1,891,650.00
450,000.00
1,650,000.00
195,000.00
35,000.00
2,330,000.00
4,221,650.00

pan kayu kapur/lembasung per m2 46,750.00


4,330.00
51,080.00
25,200.00
88,000.00
10,400.00
1,960.00
125,560.00
176,640.00

an kayu meranti per m2 46,750.00


Analisa Harga Satuan Pekerjaan

Page 96

JUMLAH
Rp.
6=(3x5)
4,330.00
51,080.00
25,200.00
88,000.00
10,400.00
1,960.00
125,560.00
176,640.00
113,860.00

an kayu ulin per m2 96,250.00


5,500.00
101,750.00
25,200.00
88,000.00
10,400.00
1,960.00
125,560.00
227,310.00
164,530.00

ancang kayu ulin 10/10 - 2 m


77,000.00
77,000.00
162,000.00
4,400.00
520.00
6,020.00
3,366.00
176,306.00
253,306.00

ancang kayu ulin 10/10 - 4 m


154,000.00
154,000.00
162,000.00
4,400.00
520.00
6,020.00
6,732.00
179,672.00
333,672.00

ang dari kayu kapur/lembasung per m3 2,244,000.00


4,330.00
2,248,330.00
900,000.00
3,300,000.00
390,000.00
70,000.00
4,660,000.00
6,908,330.00
dari kayu ulin per m3 3,850,000.00
27,500.00
3,877,500.00
450,000.00
1,650,000.00
195,000.00
Analisa Harga Satuan Pekerjaan

Page 97

JUMLAH
Rp.
6=(3x5)
35,000.00
2,330,000.00
6,207,500.00
RSNI-T-13-2002

mbuk 1 PC : 3 PB : 5 KR, Batu Pecah


396,760.00
55,718.00
558,250.00
1,010,728.00
148,500.00
27,500.00
3,250.00
11,200.00
190,450.00
1,201,178.00

mbuk 1 PC : 3 PB : 5 KR, Kerikil Sungai


396,760.00
55,718.00
210,540.00
663,018.00
148,500.00
27,500.00
3,250.00
11,200.00
190,450.00
853,468.00

mbuk 1 PC : 3 PB : 6 KR
358,540.00
50,360.50
603,166.67
1,012,067.17
148,500.00
27,500.00
3,250.00
11,200.00
190,450.00
1,202,517.17

mbuk 1 PC : 4 PB : 6 KR
314,860.00
61,075.50
558,250.00
934,185.50
148,500.00
27,500.00
3,250.00
11,200.00
190,450.00
1,124,635.50

ja beton tumbuk 1 PC : 3 PB : 5 KR; tebal 5 cm,Koral Beton


18,200.00
2,785.90
28,233.33
49,219.23
103,500.00
2,200.00
Analisa Harga Satuan Pekerjaan

Page 98

JUMLAH
Rp.
6=(3x5)
260.00
840.00
106,800.00
156,019.23

ja beton tumbuk 1 PC : 3 PB : 5 KR; tebal 5 cm,Kerikil sungai


18,200.00
2,785.90
10,648.00
31,633.90
103,500.00
2,200.00
260.00
840.00
106,800.00
138,433.90

tulang 1 PC : 2 PB : 3 KR, Batu Pecah


611,520.00
57,861.00
500,500.00
1,169,881.00
148,500.00
27,500.00
3,250.00
11,200.00
190,450.00
1,360,331.00

tulang 1 PC : 2 PB : 3 KR, Kerikil Sungai


611,520.00
57,861.00
188,760.00
858,141.00
148,500.00
27,500.00
3,250.00
11,200.00
190,450.00
1,048,591.00

tulang 1 PC : 2 PB : 4 KR
509,600.00
48,217.50
577,500.00
1,135,317.50
148,500.00
27,500.00
3,250.00
11,200.00
190,450.00
1,325,767.50

tulang 1 PC : 2 PB : 2,5 KR
640,640.00
60,004.00
449,166.67
1,149,810.67
148,500.00
27,500.00
3,250.00
11,200.00
Analisa Harga Satuan Pekerjaan

Page 99

JUMLAH
Rp.
6=(3x5)
190,450.00
1,340,260.67

tulang 1 PC : 1.5 PB : 3 KR
649,740.00
45,003.00
346,500.00
1,041,243.00
148,500.00
27,500.00
3,250.00
11,200.00
190,450.00
1,231,693.00

tulang 1 PC : 1.5 PB : 2,5 KR


702,520.00
50,360.50
500,500.00
1,253,380.50
148,500.00
27,500.00
3,250.00
11,200.00
190,450.00
1,443,830.50

tulang 1 PC : 1 PB : 2 KR
871,780.00
39,645.50
474,833.33
1,386,258.83
148,500.00
27,500.00
3,250.00
11,200.00
190,450.00
1,576,708.83

tu f'c=7,4 Mpa (K 100); slump (12 2) cm; w/c = 0,87


449,540.00
66,509.54
474,833.33
8,600.00
999,482.87
148,500.00
30,250.00
3,640.00
11,620.00
194,010.00
1,193,492.87

tu f'c=9,8 Mpa (K 125); slump (12 2) cm; w/c = 0,78


502,320.00
63,371.57
481,012.35
8,600.00
1,055,303.92
148,500.00
Analisa Harga Satuan Pekerjaan

Page 100

JUMLAH
Rp.
6=(3x5)
30,250.00
3,640.00
11,620.00
194,010.00
1,249,313.92

tu f'c=12,2 Mpa (K 150); slump (12 2) cm; w/c = 0,72


544,180.00
61,152.04
483,388.89
8,600.00
1,097,320.92
148,500.00
30,250.00
3,640.00
11,620.00
194,010.00
1,291,330.92

tu f'c=7,4 Mpa (K 100); slump (3-6) cm; w/c = 0,87


418,600.00
68,346.39
488,141.98
8,000.00
983,088.37
108,000.00
22,000.00
2,600.00
8,400.00
141,000.00
1,124,088.37

tu f'c=14,5 Mpa (K 175); slump (12 2) cm; w/c = 0,66


593,320.00
58,167.14
489,092.59
8,600.00
1,149,179.74
148,500.00
30,250.00
3,640.00
11,620.00
194,010.00
1,343,189.74

tu f'c=16,9 Mpa (K 200); slump (12 2) cm; w/c = 0,61


640,640.00
55,947.61
490,043.21
8,600.00
1,195,230.82
148,500.00
30,250.00
3,640.00
11,620.00
194,010.00
1,389,240.82

tu f'c=19,3 Mpa (K 225); slump (12 2) cm; w/c = 0,58


675,220.00
53,421.93
Analisa Harga Satuan Pekerjaan

Page 101

JUMLAH
Rp.
6=(3x5)
497,648.15
8,600.00
1,234,890.08
148,500.00
30,250.00
3,640.00
11,620.00
194,010.00
1,428,900.08

tu f'c=21,7 Mpa (K 250); slump (12 2) cm; w/c = 0,56


698,880.00
52,962.71
493,845.68
8,600.00
1,254,288.39
148,500.00
30,250.00
3,640.00
11,620.00
194,010.00
1,448,298.39

tu f'c=24 Mpa (K 275); slump (12 2) cm; w/c = 0,53


738,920.00
52,350.43
487,666.67
8,600.00
1,287,537.10
148,500.00
30,250.00
3,640.00
11,620.00
194,010.00
1,481,547.10

tu f'c=26,4 Mpa (K 300); slump (12 2) cm; w/c = 0,52


751,660.00
52,120.82
485,290.12
8,600.00
1,297,670.94
148,500.00
30,250.00
3,640.00
11,620.00
194,010.00
1,491,680.94

tu f'c=28,8 Mpa (K 325); slump (12 2) cm; w/c = 0,49


798,980.00
51,278.93
478,160.49
8,600.00
1,337,019.42
189,000.00
38,500.00
4,550.00
14,700.00
246,750.00
1,583,769.42
Analisa Harga Satuan Pekerjaan

Page 102

JUMLAH
Rp.
6=(3x5)

tu f'c=31,2 Mpa (K 350); slump (12 2) cm; w/c = 0,48


815,360.00
51,049.32
475,308.64
8,600.00
1,350,317.96
189,000.00
38,500.00
4,550.00
14,700.00
246,750.00
1,597,067.96

besi polos atau besi ulir


16,170.00
330.00
16,500.00
630.00
770.00
91.00
56.00
1,547.00
18,047.00

kawat baja /wiremesh


157,080.00
1,100.00
158,180.00
2,250.00
2,750.00
3,250.00
140.00
8,390.00
166,570.00

g untuk pondasi
66,000.00
6,495.00
1,060.00
73,555.00
46,800.00
28,600.00
3,380.00
3,640.00
82,420.00
155,975.00
16,484.00

g untuk sloof
74,250.00
6,495.00
1,060.00
81,805.00
46,800.00
28,600.00
3,380.00
3,640.00
82,420.00
164,225.00
Analisa Harga Satuan Pekerjaan

Page 103

JUMLAH
Rp.
6=(3x5)
16,484.00

g untuk kolom
66,000.00
8,660.00
2,120.00
24,750.00
33,000.00
32,000.00
166,530.00
59,400.00
36,300.00
4,290.00
4,620.00
104,610.00
271,140.00
20,922.00

g untuk balok
66,000.00
8,660.00
2,120.00
29,700.00
33,000.00
32,000.00
171,480.00
59,400.00
36,300.00
4,290.00
4,620.00
104,610.00
276,090.00
20,922.00

g untuk lantai
66,000.00
8,660.00
2,120.00
24,750.00
33,000.00
96,000.00
230,530.00
59,400.00
36,300.00
4,290.00
4,620.00
104,610.00
335,140.00
20,922.00

g untuk dinding
49,500.00
8,660.00
2,120.00
33,000.00
33,000.00
48,000.00
64,000.00
238,280.00

Analisa Harga Satuan Pekerjaan

Page 104

JUMLAH
Rp.
6=(3x5)
59,400.00
36,300.00
4,290.00
4,620.00
104,610.00
342,890.00
20,922.00

g untuk tangga
49,500.00
8,660.00
1,590.00
24,750.00
33,000.00
32,000.00
149,500.00
59,400.00
36,300.00
4,290.00
4,620.00
104,610.00
254,110.00
20,922.00

n untuk pengecoran beton


43,560.00
12,990.00
8,000.00
64,550.00
13,500.00
5,500.00
650.00
1,120.00
20,770.00
85,320.00

beton bertulang (150 kg besi + bekisting)


330,000.00
32,475.00
4,240.00
2,425,500.00
49,500.00
611,520.00
57,861.00
519,750.00
4,030,846.00
477,000.00
30,250.00
143,000.00
115,500.00
34,060.00
37,100.00
836,910.00
4,867,756.00

ton bertulang (200 kg besi + bekisting)


445,500.00
43,300.00
6,360.00
3,234,000.00
66,000.00
611,520.00
Analisa Harga Satuan Pekerjaan

Page 105

JUMLAH
Rp.
6=(3x5)
57,861.00
519,750.00
4,984,291.00
508,500.00
30,250.00
171,600.00
154,000.00
41,990.00
39,620.00
945,960.00
5,930,251.00

eton bertulang (300 kg besi + bekisting)


660,000.00
86,600.00
21,200.00
4,851,000.00
99,000.00
611,520.00
57,861.00
519,750.00
247,500.00
539,000.00
320,000.00
8,013,431.00
634,500.00
30,250.00
181,500.00
231,000.00
52,390.00
49,420.00
1,179,060.00
9,192,491.00

eton bertulang (200 kg besi + bekisting)


528,000.00
69,280.00
16,960.00
3,234,000.00
66,000.00
611,520.00
57,861.00
519,750.00
231,000.00
431,200.00
256,000.00
6,021,571.00
571,500.00
30,250.00
181,500.00
154,000.00
43,290.00
44,520.00
1,025,060.00
7,046,631.00

eton bertulang (150 kg besi + bekisting)


528,000.00
69,280.00
16,960.00
2,425,500.00
49,500.00
Analisa Harga Satuan Pekerjaan

Page 106

JUMLAH
Rp.
6=(3x5)
611,520.00
57,861.00
519,750.00
198,000.00
431,200.00
512,000.00
5,419,571.00
477,000.00
30,250.00
143,000.00
115,500.00
34,450.00
37,100.00
837,300.00
6,256,871.00

beton bertulang (150 kg besi + bekisting)


396,000.00
69,280.00
16,960.00
2,425,500.00
49,500.00
611,520.00
57,861.00
519,750.00
264,000.00
431,200.00
384,000.00
5,225,571.00
477,000.00
30,250.00
143,000.00
115,500.00
34,060.00
37,100.00
836,910.00
6,062,481.00

beton bertulang (200 kg besi + bekisting)


412,500.00
64,950.00
12,720.00
3,234,000.00
66,000.00
611,520.00
57,861.00
519,750.00
173,250.00
385,000.00
224,000.00
5,761,551.00
508,500.00
30,250.00
171,600.00
154,000.00
41,990.00
39,620.00
945,960.00
6,707,511.00

raktis beton bertulang (11 x 11 cm)


3,300.00
216.50
Analisa Harga Satuan Pekerjaan

Page 107

JUMLAH
Rp.
6=(3x5)
46,200.00
9,900.00
7,280.00
642.90
5,775.00
73,314.40
16,200.00
2,200.00
2,200.00
2,200.00
780.00
1,260.00
24,840.00
98,154.40

ok beton bertulang (10 x 15 cm)


4,950.00
433.00
55,440.00
1,100.00
10,010.00
964.35
9,625.00
82,522.35
26,730.00
3,630.00
3,630.00
3,630.00
1,300.00
2,100.00
41,020.00
123,542.35

SNI 03-3436-2002

t fibreglass (180 x 90) cm


71,880.00
1,082.50
72,962.50
12,600.00
7,370.00
910.00
980.00
21,860.00
94,822.50

nteng glazzur
117,500.00
117,500.00
13,500.00
8,250.00
1,040.00
1,120.00
23,910.00
141,410.00

genteng glazzur
30,500.00
Analisa Harga Satuan Pekerjaan

Page 108

JUMLAH
Rp.
6=(3x5)
14,560.00
3,428.80
48,488.80
36,000.00
22,000.00
2,600.00
280.00
60,880.00
109,368.80

nteng beton
80,300.00
649.50
80,949.50
18,000.00
11,000.00
1,100.00
1,400.00
31,500.00
112,449.50

teng beton
31,850.00
1,082.50
19,656.00
3,428.80
16,500.00
56,017.30
36,000.00
22,000.00
2,600.00
2,800.00
63,400.00
119,417.30

ap
138,000.00
4,330.00
142,330.00
14,940.00
27,500.00
3,250.00
1,120.00
46,810.00
189,140.00

p sirap
6,000.00
1,299.00
1,082.50
7,480.00
15,861.50
11,250.00
27,500.00
3,250.00
840.00
42,840.00
58,701.50

ng gelombang Bjls 30
45,465.00
433.00
Analisa Harga Satuan Pekerjaan

Page 109

JUMLAH
Rp.
6=(3x5)
45,898.00
10,800.00
6,600.00
780.00
840.00
19,020.00
64,918.00

ng gelombang Bjls 20
28,490.00
433.00
28,923.00
10,800.00
6,600.00
780.00
840.00
19,020.00
47,943.00

bungan seng Bjls 30


52,500.00
1,299.00
74,800.00
128,599.00
13,500.00
7,700.00
1,040.00
840.00
23,080.00
151,679.00

enteng metal surya roof per m2


128,857.38
7,260.00
136,117.38
18,000.00
11,000.00
1,300.00
1,400.00
31,700.00
167,817.38

a genteng metal Surya roof per m'


83,250.00
6,050.00
7,480.00
96,780.00
18,000.00
11,000.00
1,300.00
1,400.00
31,700.00
128,480.00

enteng Metal sakura roof per m2


73,377.68
7,260.00
80,637.68
18,000.00
11,000.00
Analisa Harga Satuan Pekerjaan

Page 110

JUMLAH
Rp.
6=(3x5)
1,300.00
1,400.00
31,700.00
112,337.68

a genteng metal Sakura roof per m'


83,250.00
6,050.00
7,480.00
96,780.00
18,000.00
11,000.00
1,300.00
1,400.00
31,700.00
128,480.00

sisalation per 1 M2
52,920.00
52,920.00
13,500.00
5,500.00
650.00
1,120.00
20,770.00
73,690.00

SNI 03-2838-2002

ngit lambriziring kayu, tebal 9 mm


28,050.00
216.50
28,266.50
54,000.00
88,000.00
10,400.00
4,200.00
156,600.00
184,866.50

ngit plywood ukuran (120 x 240) cm; tbl. 9 mm


57,750.00
649.50
58,399.50
9,000.00
11,000.00
1,300.00
700.00
22,000.00
80,399.50

ngit plywood ukuran (120 x 240) cm; tbl. 3 mm


22,687.50
649.50
23,337.00
9,000.00
11,000.00
1,300.00
700.00
Analisa Harga Satuan Pekerjaan

Page 111

JUMLAH
Rp.
6=(3x5)
22,000.00
45,337.00

ngit plywood ukuran (60 x 120) cm; tbl. 9 mm


57,750.00
649.50
58,399.50
6,300.00
11,000.00
1,300.00
490.00
19,090.00
77,489.50

ngit plywood ukuran (60 x 120) cm; tbl. 3 mm


22,687.50
649.50
23,337.00
6,300.00
11,000.00
1,300.00
490.00
19,090.00
42,427.00

ngit teakwood ukuran (60 x 120) cm; tbl. 4 mm dan 6 mm


57,900.00
649.50
58,549.50
6,300.00
11,000.00
1,300.00
490.00
19,090.00
77,639.50

ngit lat kayu bengkirai


50,160.00
216.50
1,555.00
51,931.50
18,000.00
66,000.00
7,800.00
1,400.00
93,200.00
145,131.50

ngit lat kayu meranti


44,880.00
216.50
1,555.00
46,651.50
18,000.00
66,000.00
7,800.00
1,400.00
93,200.00
139,851.50
9 mm, rangka kayu meranti
Analisa Harga Satuan Pekerjaan

Page 112

JUMLAH
Rp.
6=(3x5)
43,010.00
1,299.00
60,060.00
104,369.00
24,300.00
44,000.00
5,200.00
1,890.00
75,390.00
179,759.00
3mm, rangka kayu meranti
43,010.00
1,299.00
23,595.00
67,904.00
24,300.00
44,000.00
5,200.00
1,890.00
75,390.00
143,294.00

ngit gypsum board uk. (120 x 240) cm, tebal 9 mm


33,196.80
3,421.00
36,617.80
9,000.00
5,500.00
650.00
700.00
15,850.00
52,467.80

um
31,500.00
750.00
32,250.00
5,400.00
6,600.00
780.00
420.00
13,200.00
45,450.00
profil
21,000.00
216.50
21,216.50
4,500.00
5,500.00
650.00
420.00
11,070.00
32,286.50

SNI
duduk

Analisa Harga Satuan Pekerjaan

Page 113

JUMLAH
Rp.
6=(3x5)
1,650,000.00
99,000.00
1,650,000.00
297,000.00
121,000.00
130.00
22,400.00
440,530.00
2,090,530.00
jongkok porselen
239,775.00
10,920.00
1,071.50
251,766.50
90,000.00
165,000.00
195,000.00
22,400.00
472,400.00
724,166.50
jongkok teraso
106,480.00
5,940.00
10,920.00
1,071.50
124,411.50
90,000.00
165,000.00
39,000.00
15,400.00
309,400.00
433,811.50

r
2,462,350.00
738,705.00
10,920.00
1,071.50
3,213,046.50
90,000.00
110,000.00
13,000.00
14,000.00
227,000.00
3,440,046.50

fel
1,375,000.00
165,000.00
10,920.00
1,071.50
1,551,991.50
108,000.00
159,500.00
19,500.00
14,000.00
301,000.00
1,852,991.50

andi fibreglass volume 0,30 m


Analisa Harga Satuan Pekerjaan

Page 114

JUMLAH
Rp.
6=(3x5)
500,000.00
90,000.00
590,000.00
162,000.00
297,000.00
70,200.00
15,400.00
544,600.00
1,134,600.00

andi batu bata volume 0,30 m


221,203.13
218,400.00
32,145.00
167,706.00
99,000.00
738,454.13
540,000.00
330,000.00
39,000.00
42,000.00
951,000.00
1,689,454.13

p fiberglass
552,400.00
110,480.00
552,400.00
8,250.00
97,500.00
35,000.00
140,750.00
693,150.00

ton volume 1m
1,299,447.45
2,772,000.00
132,000.00
385,000.00
318,623.05
4,907,070.50
315,000.00
495,000.00
64,350.00
69,300.00
554,400.00
#REF!

ontrol pas. batu bata ukuran (30 x 30) cm tinggi 35 cm


93,456.99
80,080.00
7,500.50
16,940.00
24,640.00
6,429.00
229,046.49
288,000.00
111,650.00
195.00
2,240.00
Analisa Harga Satuan Pekerjaan

Page 115

JUMLAH
Rp.
6=(3x5)
402,085.00
631,131.49

ontrol pas. batu bata ukuran (45 x 45) cm tinggi 60 cm


161,132.70
140,140.00
13,929.50
4,840.00
40,040.00
9,643.50
369,725.70
127,800.00
52,030.00
6,110.00
9,940.00
195,880.00
565,605.70

ontrol pas. batu bata ukuran (60 x 60) cm tinggi 65 cm


239,121.09
207,480.00
19,715.60
7,986.00
74,690.00
12,858.00
561,850.69
194,400.00
79,200.00
9,360.00
15,120.00
14,000.00
312,080.00
873,930.69

C tipe AW "
6,000.00
1,750.00
7,750.00
3,240.00
6,600.00
780.00
252.00
10,872.00
18,622.00

C tipe AW "
7,200.00
2,100.00
9,300.00
3,240.00
6,600.00
780.00
252.00
10,872.00
20,172.00

C tipe AW 1"
9,990.00
2,913.75
12,903.75
3,240.00
Analisa Harga Satuan Pekerjaan

Page 116

JUMLAH
Rp.
6=(3x5)
6,600.00
780.00
252.00
10,872.00
23,775.75

C tipe AW 1"
18,360.00
5,355.00
23,715.00
3,240.00
6,600.00
780.00
252.00
10,872.00
34,587.00

C tipe AW 2"
23,970.00
6,991.25
30,961.25
4,860.00
9,900.00
1,170.00
378.00
16,308.00
47,269.25

C tipe AW 2"
34,350.00
10,018.75
44,368.75
3,240.00
6,600.00
780.00
252.00
10,872.00
55,240.75

C tipe AW 3"
41,940.00
12,232.50
54,172.50
7,290.00
14,850.00
1,755.00
574.00
24,469.00
78,641.50

C tipe AW 4"
65,100.00
18,987.50
84,087.50
7,290.00
14,850.00
1,755.00
574.00
24,469.00
108,556.50

uci piring satinless steel

Analisa Harga Satuan Pekerjaan

Page 117

JUMLAH
Rp.
6=(3x5)
532,400.00
186,340.00
718,740.00
2,700.00
33,000.00
3,900.00
210.00
39,810.00
758,550.00

" atau " Biasa


11,000.00
75.00
11,075.00
900.00
11,000.00
1,300.00
700.00
13,900.00
24,975.00

" atau " stanlis


88,000.00
75.00
88,075.00
900.00
11,000.00
1,100.00
700.00
13,700.00
101,775.00

rain
39,930.00
39,930.00
900.00
11,000.00
977,008.50
13,312.50
32,500.00
#REF!
Revisi SNI T-16-2002

atap baja
19,030.00
1,936.00
20,966.00
5,400.00
660.00
780.00
42.00
6,882.00
27,848.00

fil
19,895.00
19,895.00
5,400.00
Analisa Harga Satuan Pekerjaan

Page 118

JUMLAH
Rp.
6=(3x5)
6,600.00
780.00
420.00
13,200.00
33,095.00

erjaan perakitan
9,900.00
3,990.00
13,890.00
9,000.00
11,000.00
130.00
700.00
448.80
21,278.80
35,168.80

elasan dengan las listrik


1,188.00
297.00
159.60
1,644.60
360.00
220.00
26.00
28.00
953.70
1,587.70
3,232.30

lung (rolling door) besi


259,500.00
259,500.00
108,000.00
132,000.00
15,600.00
840.00
256,440.00
515,940.00

at (folding door)
2,462,400.00
2,462,400.00
39,600.00
48,400.00
5,720.00
3,080.00
96,800.00
2,559,200.00

oor alumunium
1,271,105.00
1,271,105.00
90,000.00
110,000.00
13,000.00
7,000.00
220,000.00
1,491,105.00

umunium

Analisa Harga Satuan Pekerjaan

Page 119

JUMLAH
Rp.
6=(3x5)
732,100.00
732,100.00
94,500.00
115,500.00
13,650.00
728.00
224,378.00
956,478.00

umunium 4 "
219,615.00
20,000.00
4,791.60
244,406.60
3,870.00
4,730.00
559.00
294.00
9,453.00
253,859.60

Alumunium SNI 7393 : 2008


878,460.00
157,500.00
21,562.20
1,057,522.20
7,650.00
9,350.00
1,170.00
700.00
18,870.00
1,076,392.20
Rangka Alumunium SNI DT 90-0014-2007
681,305.63
119,437.50
21,562.20
822,305.33
7,650.00
9,350.00
1,170.00
700.00
18,870.00
841,175.33

si
19,166.67
87,530.68
106,697.35
150,300.00
183,700.00
21,710.00
11,620.00
367,330.00
474,027.35

armonika
20,570.00
433.00
3,366.00
Analisa Harga Satuan Pekerjaan

Page 120

JUMLAH
Rp.
6=(3x5)
24,369.00
9,000.00
11,000.00
1,300.00
70.00
21,370.00
45,739.00

yamuk
20,570.00
42,213.60
35,910.85
98,694.45
4,950.00
6,050.00
715.00
38.50
11,753.50
#REF!

nako & tralis


190,300.00
622.00
615.00
191,537.00
18,000.00
22,000.00
2,600.00
140.00
42,740.00
234,277.00

atar seng BJLS 30


57,750.00
466.50
35,530.00
93,746.50
18,000.00
44,000.00
3,250.00
1,400.00
66,650.00
160,396.50

miring seng BJLS 30


57,750.00
466.50
35,530.00
7,260.00
101,006.50
13,500.00
44,000.00
3,250.00
175.00
60,925.00
161,931.50

lingkaran 10 cm, seng BJLS 30


57,750.00
3,110.00
12,300.00
73,160.00
Analisa Harga Satuan Pekerjaan

Page 121

JUMLAH
Rp.
6=(3x5)
13,500.00
27,500.00
3,250.00
175.00
44,425.00
117,585.00

lingkaran 10 cm, seng BJLS 20


16,500.00
311.00
12,300.00
29,111.00
13,500.00
27,500.00
3,250.00
175.00
44,425.00
73,536.00
dari PVC
28,750.00
18,700.00
47,450.00
27,000.00
55,000.00
6,500.00
2,100.00
90,600.00
138,050.00

tanam kwalitas baik


211,750.00
211,750.00
5,400.00
66,000.00
7,800.00
420.00
79,620.00
291,370.00

tanam biasa
50,000.00
128,775.00
450.00
55,000.00
650.00
35.00
56,135.00
184,910.00

tanam kamar mandi


72,600.00
72,600.00
450.00
55,000.00
650.00
Analisa Harga Satuan Pekerjaan

Page 122

JUMLAH
Rp.
6=(3x5)
350.00
56,450.00
129,050.00

l pintu
37,000.00
37,000.00
1,350.00
16,500.00
1,950.00
105.00
19,905.00
56,905.00

l jendela kupu-kupu
22,000.00
22,000.00
900.00
11,000.00
1,300.00
70.00
13,270.00
35,270.00

ngin
19,800.00
19,800.00
1,350.00
16,500.00
1,950.00
105.00
19,905.00
39,705.00

selot
16,500.00
16,500.00
1,800.00
22,000.00
2,600.00
140.00
26,540.00
43,040.00

ngan pintu / door holder


330,000.00
330,000.00
4,500.00
55,000.00
6,500.00
350.00
66,350.00
396,350.00

ah
137,500.00
137,500.00
4,500.00
Analisa Harga Satuan Pekerjaan

Page 123

JUMLAH
Rp.
6=(3x5)
55,000.00
6,500.00
350.00
66,350.00
203,850.00
27,500.00
27,500.00
9,000.00
1,100.00
1,300.00
70.00
11,470.00
38,970.00

ntu dorong
2,298,600.00
2,298,600.00
5,400.00
66,000.00
7,800.00
420.00
79,620.00
2,378,220.00

os; tebal 3 mm
124,410.00
124,410.00
1,350.00
16,500.00
1,950.00
105.00
19,905.00
144,315.00

os; tebal 5 mm
190,300.00
190,300.00
1,350.00
16,500.00
1,950.00
105.00
19,905.00
210,205.00

ben; tebal 3 mm
188,870.00
188,870.00
1,350.00
16,500.00
1,950.00
105.00
19,905.00
208,775.00

ben; tebal 5 mm
261,580.00
196,432.50

Analisa Harga Satuan Pekerjaan

Page 124

JUMLAH
Rp.
6=(3x5)
742.50
9,075.00
1,072.50
57.75
10,947.75
207,380.25

tebal 3 mm
149,380.00
149,380.00
1,350.00
16,500.00
1,950.00
105.00
19,905.00
169,285.00

tebal 5 mm
245,960.00
245,960.00
1,350.00
16,500.00
1,950.00
105.00
19,905.00
265,865.00

min; tebal 3 mm
248,930.00
248,930.00
1,350.00
16,500.00
1,950.00
105.00
19,905.00
268,835.00

tri lokal
1,121,450.00
1,121,450.00
1,121,450.00
12,870.00
7,865.00
929.50
1,001.00
22,665.50
1,144,115.50

eramik ukuran 60 x 60 cm
465,850.00
17,472.00
4,821.75
21,450.00
509,593.75
63,000.00
38,500.00
4,550.00
4,200.00
110,250.00
619,843.75

Analisa Harga Satuan Pekerjaan

Page 125

JUMLAH
Rp.
6=(3x5)

eramik ukuran 40 x 40 cm
77,000.00
17,836.00
4,821.75
21,450.00
121,107.75
63,000.00
38,500.00
4,550.00
4,200.00
110,250.00
231,357.75

eramik ukuran 30 x 30 cm
66,000.00
18,200.00
4,821.75
24,750.00
113,771.75
63,000.00
38,500.00
4,550.00
4,200.00
110,250.00
224,021.75

0 x 20 cm per 1 M2
71,500.00
18,928.00
4,500.30
24,750.00
119,678.30
63,000.00
38,500.00
4,550.00
4,200.00
110,250.00
229,928.30

keramik ukuran 20 x 20 cm
71,500.00
16,926.00
1,928.70
32,010.00
122,364.70
81,000.00
49,500.00
5,850.00
6,300.00
142,650.00
265,014.70

keramik ukuran 20 x 25 cm
77,000.00
16,926.00
1,928.70
32,010.00
127,864.70
81,000.00
49,500.00
Analisa Harga Satuan Pekerjaan

Page 126

JUMLAH
Rp.
6=(3x5)
5,850.00
6,300.00
142,650.00
270,514.70

porselin 11 x 11 cm
99,825.00
16,926.00
1,928.70
24,750.00
143,429.70
90,000.00
55,000.00
6,500.00
7,000.00
158,500.00
301,929.70

amik ukuran 10 x 20 cm
156,350.00
2,074.80
321.45
412.50
159,158.75
8,100.00
9,900.00
1,170.00
700.00
19,870.00
179,028.75

bin granito ukuran 40 x 40 cm


279,600.00
17,836.00
4,821.75
21,450.00
323,707.75
22,500.00
13,750.00
1,690.00
1,820.00
39,760.00
363,467.75

bin granito ukuran 40x 40 cm (motif khusus)


1,464,100.00
17,836.00
4,821.75
21,450.00
1,508,207.75
22,500.00
13,750.00
1,690.00
1,820.00
39,760.00
1,547,967.75

armer ukuran 40 x 40 cm
213,000.00
17,836.00
4,821.75
Analisa Harga Satuan Pekerjaan

Page 127

JUMLAH
Rp.
6=(3x5)
21,450.00
257,107.75
63,000.00
38,500.00
4,550.00
4,900.00
110,950.00
368,057.75

batu alam
246,235.00
21,385.00
3,750.25
271,370.25
63,000.00
38,500.00
4,550.00
4,900.00
110,950.00
382,320.25

u ukuran 2 x 10 cm
5,610.00
1,555.00
7,165.00
10,800.00
13,200.00
1,560.00
840.00
26,400.00
33,565.00

otif M2
225,000.00
25,771.20
2,464.45
253,235.65
54,000.00
165,000.00
11,700.00
8,400.00
239,100.00
492,335.65

SNI

mukaan cat tembok lama 1 M2


665.00
665.00
13,500.00
350.00
13,850.00
14,515.00

1,000.00
1,000.00

Analisa Harga Satuan Pekerjaan

Page 128

JUMLAH
Rp.
6=(3x5)
13,500.00
350.00
13,850.00
14,850.00

1,000.00
1,000.00
13,500.00
350.00
13,850.00
14,850.00

sok 1 m kayu
1,760.00
506.00
466.00
2,732.00
3,600.00
4,400.00
520.00
350.00
8,870.00
11,602.00

ayu lama
3,300.00
4,114.00
8,041.00
15,455.00
6,300.00
8,250.00
975.00
350.00
15,875.00
31,330.00

ayu baru (1 lps plamir, 1 lps cat dsr, 2 lps cat penutup)
4,840.00
3,300.00
4,114.00
12,298.00
24,552.00
6,300.00
990.00
780.00
350.00
8,420.00
32,972.00

ayu baru (1 lps plamir, 1 lps cat dsr, 3 lps cat penutup)
4,840.00
3,300.00
4,114.00
16,555.00
28,809.00
6,300.00
11,550.00
520.00
350.00
Analisa Harga Satuan Pekerjaan

Page 129

JUMLAH
Rp.
6=(3x5)
18,720.00
47,529.00

engan teak oil per 1 M2


12,024.00
12,024.00
3,600.00
6,600.00
2,080.00
350.00
12,630.00
24,654.00

u dengan politur
9,460.00
7,425.00
10,000.00
26,885.00
6,600.00
2,080.00
350.00
9,030.00
35,915.00

u dengan cat residu


3,360.00
3,360.00
9,000.00
840.00
9,840.00
13,200.00

u dengan vernis
7,425.00
1,100.00
500.00
176.00
9,201.00
14,400.00
17,600.00
2,080.00
350.00
34,430.00
43,631.00

embok baru (1 lps plamir, 1 lps cat dsr, 2 lps cat penutup)
836.00
2,420.00
6,006.00
9,262.00
1,800.00
6,930.00
819.00
350.00
9,899.00
19,161.00

embok lama (1 lps cat dsr, 2 lps cat penutup)


4,400.00
30,888.00
35,288.00

Analisa Harga Satuan Pekerjaan

Page 130

JUMLAH
Rp.
6=(3x5)
1,800.00
6,930.00
819.00
350.00
9,899.00
45,187.00

ai cat khusus atap per m2


40,425.00
40,425.00
1,500.30
550.00
6,500.00
238.00
8,788.30
49,213.30

per 1 m2
111,840.00
7,700.00
119,540.00
1,800.00
22,000.00
260.00
350.00
24,410.00
143,950.00

an baja dengan meni besi


2,420.00
176.00
2,596.00
1,800.00
22,000.00
2,600.00
1,400.00
27,800.00
30,396.00

an baja dengan meni besi dan perancah


2,420.00
176.00
3,300.00
5,896.00
22,500.00
24,750.00
2,925.00
1,050.00
51,225.00
57,121.00

Analisa Harga Satuan Pekerjaan

Page 131

I.1

Rangka Holow
0.8000
kg
0.1100
kg
0.1500
kg
0.1000
oh
0.05
oh
0.005
oh
0.0050
oh

Profil holow
Paku sekrup
Kawat penggantung
Pekerja
Tukang
Kepala tukang
Mandor

m2
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

DINAS PEKERJAAN UMUM


KABUPATEN BULUNGAN

DAFTAR HARGA SATUAN BAHAN DAN UPAH


TAHUN 2014

NO.

URAIAN

1
A.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
B.

1
2
1
2
3
4
5

6
7
8
9
10
11
12
13

14
15
16
17
18
19
20
21
21
22
23
24
25
26
27
28
29
30

31

32

33

34

35

2
UPAH TENAGA :
Tukang
Tukang kayu
Tukang batu
Tukang besi
Tukang las
Tukang cat
Tukang plitur
Tukang bor
Tukang listrik
Tukang pipa ledeng
Tukang kapur
Tukang gali
Kepala Tukang
Kepala tukang kayu
Kepala tukang batu
Kepala tukang besi
Kepala tukang las
Kepala tukang cat
Kepala tukang plitur
Kepala tukang bor
Pekerja
Mandor
Sopir
Kernet / pembantu sopir
Mekanik terlatih
Operator
Operator tak terlatih
Operator terlatih
Operator semi terlatih
Buruh
Buruh terlatih
Buruh semi terlatih
Buruh tak terlatih
BAHAN:
Kelompok Material Alam :
Tanah
Tanah urug
Tanah urug Pilihan
Pasir dan Tanah
Pasir urug
Pasir batu (sirtu)
Pasir pasang / Pasir Beton
Tanah Timbunan
Tanah Timbunan Pilihan
Batu
Batu gunung
Batu belah 15/20
Batu kali besar
Batu kali kecil
Kerikil sungai
Batu teraso
Batu granito
Abu Batu
Koral Sikat
Batu Pecah Tangan
Batu pecah tangan 2-3 cm (split)
Batu pecah tangan 3-5 cm
Batu pecah tangan 5-7 cm
Batu Pecah Mesin
Batu pecah mesin 0,5-1 cm
Batu pecah mesin 1-2 cm
Batu pecah mesin 2-3 cm
Batu pecah mesin 3-5 cm
Batu Tempel
Batu Tempel (muka segi 6) tebal 10 cm
Batu Tempel Palimanan Hijau
Batu Tempel Palimanan Kuning
Batu Tempel (Tidak Beraturan) Kecil
Batu Tempel (Tidak Beraturan) Besar
Batu Candi Tempel 20/20, 5/20
Batu Bata
Batu bata ukuran 8 x 8 x 16 cm
Batu bata bali
Batako
Kapur pasang
Kelompok Kayu & Langit-langit
Kayu Jati
a.
Kayu Jati Klas 2 : Balok 8/15
b.
Kayu Jati Klas 3 : Balok 8/15
c.
Papan kayu jati
Kayu Kamper
a.
Kayu Kamper : Balok 8/15
b.
Kayu Kamper : 5/7 & 4/6
c.
Kayu Kamper : 3/4 & 3/5
d.
Kayu Kamper : 2/3
e.
Papan kamper
Kayu Bangkirai
a.
Kayu Bangkirai : Balok 10/10
b.
Kayu Bangkirai : Balok 8/15
c.
Kayu Bangkirai : 5/7 & 4/6
d.
Kayu Bangkirai : 3/4 & 3/5
e.
Kayu Bangkirai : 2/3
f.
Papan bangkirai ( 2 x 20 x 400 )
g.
Papan bangkirai ( 2 x 25 x 400 )
h
Papan bangkirai ( 2 x 30 x 400 )
Kayu Kruing / Lembasung
a.
Kayu Kruing : Balok 8/15
b.
Kayu Kruing : 5/7 & 4/6
c.
Kayu Kruing : 3/4 & 3/5
d.
Kayu Kruing : 2/3
Kayu Meranti
a.
Kayu Kalimantan ( Meranti ) : Balok 10/1
b.
Kayu Kalimantan ( Meranti ) : Balok 8/15
c.
Kayu Kalimantan ( Meranti ) 5/7 & 4/6
d.
Kayu Kalimantan ( Meranti ) : 3/4 & 3/5
e.
Kayu Kalimantan ( Meranti ) : 2/3
f.
Papan Meranti ( 2 x 20 x 400 )
g
Papan Meranti ( 2 x 25 x 400 )
Kayu Ulin
a
Kayu Ulin : 5/10
b.
Kayu Ulin : 10/10
c.
Kayu Ulin : 12/12
d
Kayu Ulin : 15/15
e.
Kayu Ulin : 20/20
f
Papan Ulin ( 2,5 x 20 x 400 )
g
Papan Ulin ( 5 x 20 x 400 )
h
Papan Ulin ( 9 x 25 x 400 )
i
Papan Ulin ( 2,5 x 20 x 200 )

SATUAN

HARGA HARGA HARGA


SATUAN
2012
SATUAN
Rp. BUL;UNGAN Rp.
Zona 1
Zona 2

HARGA
SATUAN
Rp.
Zona 3

Tjg.Selor
Tjg.Palas

Tg. Palas Tengah


Tg.Palas Utara

Sekatak

HARGA
SATUAN
Rp.
Zona 4

HARGA
SATUAN
Rp.
Zona 5

HARGA
SATUAN
Rp.
Zona 6

HARGA
SATUAN
Rp.
Zona 7

10

Tg. Palas timur Peso Hilir


Tg. Palas Barat

PESO

11

hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari

110,000 ###
110,000 ###
110,000 ###
110,000 ###
110,000 ###
110,000 ###
110,000 ###
110,000 ###
110,000 ###
110,000 ###
110,000 ###

110,000
110,000
110,000
110,000
110,000
110,000
110,000
110,000
110,000
110,000
110,000

110,000
110,000
110,000
110,000
110,000
110,000
110,000
110,000
110,000
110,000
110,000

110,000
110,000
110,000
110,000
110,000
110,000
110,000
110,000
110,000
110,000
110,000

110,000
110,000
110,000
110,000
110,000
110,000
110,000
110,000
110,000
110,000
110,000

110,000
110,000
110,000
110,000
110,000
110,000
110,000
110,000
110,000
110,000
110,000

110,000
110,000
110,000
110,000
110,000
110,000
110,000
110,000
110,000
110,000
110,000

hari
hari
hari
hari
hari
hari
hari

130,000 ###
130,000 ###
130,000 ###
130,000 ###
130,000 ###
130,000 ###
130,000 ###

130,000
130,000
130,000
130,000
130,000
130,000
130,000

130,000
130,000
130,000
130,000
130,000
130,000
130,000

130,000
130,000
130,000
130,000
130,000
130,000
130,000

130,000
130,000
130,000
130,000
130,000
130,000
130,000

130,000
130,000
130,000
130,000
130,000
130,000
130,000

130,000
130,000
130,000
130,000
130,000
130,000
130,000

hari
hari
hari
hari

140,000 ###
120,000 ###
90,000 ###
130,000 ###

140,000
120,000
90,000
130,000

140,000
120,000
90,000
130,000

140,000
120,000
90,000
130,000

140,000
120,000
90,000
130,000

140,000
120,000
90,000
130,000

140,000
120,000
90,000
130,000

hari
hari
hari

85,000 ###
120,000 ###
100,000 ###

85,000
120,000
100,000

85,000
120,000
100,000

85,000
120,000
100,000

85,000
120,000
100,000

85,000
120,000
100,000

85,000
120,000
100,000

hari
hari
hari

90,000 ###
85,000 ###
80,000 ###

90,000
85,000
80,000

90,000
85,000
80,000

90,000
85,000
80,000

90,000
85,000
80,000

90,000
85,000
80,000

90,000
85,000
80,000

m
m

61,875 ###
66,000 ###

61,900
66,000

61,900
66,000

61,900
66,000

61,900
66,000

61,900
66,000

330,000
412,500

m
m
m
m3
m3

100,800 ###
121,000
107,150 ###
82,500
140,000

198,000
198,000
267,630
82,500
90,750

220,000
275,000
242,000
82,500
90,750

110,000
137,500
310,640
82,500
90,750

100,800
121,000
168,000
91,667
100,833

187,000
149,100
190,400
110,000
121,000

385,000
465,900
453,200
110,000
121,000

m
m
m
m
m
kg
kg
m
Zak

392,000
431,200 ###
177,760 ###
177,760 ###
242,000 ###
13,600 ###
13,600 ###
641,667
75,000

297,000
459,900
177,760
177,760
165,000
13,900
13,900
684,400
80,000

278,438
429,000
177,760
177,760
242,000
14,000
14,000
440,000
75,000

625,000
681,400
381,260
381,260
357,280
14,000
14,000
891,667
118,500

278,438
431,200
177,760
177,760
242,000
14,100
14,100
703,450
75,000

371,250
574,900
192,500
192,500
242,000
14,300
14,300
1,650,000
100,000

696,900
766,600
495,000
495,000
495,000
14,200
14,200
1,265,000
133,300

m
m
m

595,833 ###
595,833
595,833

385,000
385,000
385,000

396,000
396,000
396,000

845,833
845,833
845,833

412,500
412,500
412,500

1,595,000
1,595,000
1,595,000

1,210,000
1,210,000
1,210,000

m
m
m
m

641,667
641,667
641,667
641,667

440,000
440,000
440,000
440,000

440,000
440,000
440,000
440,000

891,667
891,667
891,667
891,667

703,450
703,450
703,450
703,450

1,650,000
1,650,000
1,650,000
1,650,000

1,265,000
1,265,000
1,265,000
1,265,000

buah
m
m
m
m
m

223,850
266,200
199,650
199,650
146,410

227,100
270,000
202,500
202,500
148,500

227,400
270,500
202,800
202,800
148,800

227,900
271,100
203,300
203,300
149,100

227,600
270,700
203,000
203,000
148,900

228,100
271,300
203,500
203,500
149,200

228,000
271,200
203,400
203,400
149,100

buah
buah
buah
m3

990
1,175 ###
2,750 ###
232,925

1,100
1,200
3,300
251,600

1,300
1,300
3,300
270,200

1,200
1,400
4,400
279,500

1,320
1,400
4,400
279,500

1,200
1,500
3,520
298,100

1,870
2,200
###
298,100

m
m
m

14,241,700
14,241,700
14,241,700

14,448,600
14,448,600
14,448,600

14,456,400
14,456,400
14,456,400

14,491,600
14,491,600
14,491,600

14,475,900
14,475,900
14,475,900

14,511,100
14,511,100
14,511,100

14,511,100
14,511,100
14,511,100

m
m
m
m
m

2,090,000
2,090,000
2,090,000
2,090,000
2,090,000

1,811,300
1,811,300
1,811,300
1,811,300
1,811,300

1,741,700
1,741,700
1,741,700
1,741,700
1,741,700

1,741,700
1,741,700
1,741,700
1,741,700
1,741,700

1,741,700
1,741,700
1,741,700
1,741,700
1,741,700

1,811,300
1,811,300
1,811,300
1,811,300
1,811,300

2,786,700
2,786,700
2,786,700
2,786,700
2,786,700

m
m
m
m
m
m
m
m

2,035,000 ###
2,090,000 ###
2,090,000 ###
2,310,000 ###
2,310,000 ###
2,090,000 ###
2,090,000 ###
2,090,000 ###

1,763,700
1,811,300
1,811,300
2,002,000
2,002,000
1,811,300
1,811,300
1,811,300

1,695,800
1,741,700
1,741,700
1,925,000
1,925,000
1,741,700
1,741,700
1,741,700

2,200,000
2,200,000
2,200,000
2,200,000
2,200,000
2,200,000
2,200,000
2,200,000

1,540,000
1,741,700
1,650,000
1,925,000
1,925,000
1,650,000
1,741,700
1,741,700

1,763,700
1,811,300
1,811,300
2,002,000
2,002,000
1,811,300
1,811,300
1,811,300

3,080,000
3,080,000
3,080,000
3,080,000
3,080,000
3,080,000
3,080,000
3,080,000

m
m
m
m

1,870,000
1,870,000
1,870,000
1,870,000

1,620,700
1,620,700
1,620,700
1,620,700

1,558,300
1,558,300
1,558,300
1,558,300

2,200,000
2,200,000
2,200,000
2,200,000

1,558,300
1,558,300
1,558,300
1,558,300

1,620,700
1,620,700
1,620,700
1,620,700

1,980,000
1,980,000
1,980,000
1,980,000

m
m
m
m
m
m
m

1,870,000 ###
1,870,000 ###
1,870,000 ###
1,870,000 ###
1,870,000 ###
1,870,000 ###
1,870,000 ###

1,726,200
1,726,200
1,726,200
1,726,200
1,726,200
1,726,200
1,726,200

1,654,200
1,654,200
1,654,200
1,654,200
1,654,200
1,654,200
1,654,200

1,650,000
1,650,000
1,650,000
1,650,000
1,650,000
1,650,000
1,650,000

1,320,000
1,654,200
1,654,200
1,654,200
1,654,200
1,320,000
1,654,200

1,726,200
1,726,200
1,726,200
1,726,200
1,726,200
1,726,200
1,726,200

2,589,200
2,589,200
2,589,200
2,589,200
2,589,200
2,589,200
2,589,200

m
m
m
m
m
m
m
m
m

3,850,000 ###
3,850,000 ###
3,850,000 ###
4,400,000 ###
6,050,000 ###
3,850,000 ###
4,950,000 ###
4,950,000 ###
3,850,000 ###

3,850,000
3,850,000
3,850,000
4,400,000
5,610,000
3,850,000
4,950,000
5,610,000
3,850,000

3,300,000
3,575,000
3,575,000
3,575,000
4,675,000
3,575,000
3,575,000
4,400,000
3,575,000

3,850,000
3,850,000
3,850,000
3,850,000
###
3,850,000
3,850,000
###
3,850,000

3,080,000
3,575,000
3,575,000
3,575,000
4,675,000
3,080,000
3,575,000
4,400,000
3,080,000

3,300,000
3,850,000
3,850,000
3,850,000
5,610,000
4,400,000
4,400,000
4,400,000
4,400,000

6,050,000
6,050,000
6,050,000
6,050,000
6,050,000
6,820,000
8,250,000
8,250,000
6,820,000

Page 133

KETERANGAN

BUNYU

36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62

63

64
65
66
67
68
69
70
71

Kayu Begesting, Perancah, Dolken


Kayu Rawa (merah)
m
Papan Cetak ( kayu rawa ) uk 2 x 20 x 400
m
Kayu bakar
m
Kayu stoot ( bambu ), 5 m
btg
Kayu perancah 4m
btg
Kayu perancah
m
Dolken 5 kayu rawa (merah)
btg
Dolken 12 kayu rawa (merah)
btg
Lain-lain
Ijuk
kg
Pintu Kayu panil ukuran 80 x 220 cm
buah
Teakwood
Teakwood tebal 3 mm
lbr
Teakwood tebal 3 mm uk. 90 x 120 cm
lbr
Teakwood tebal 4 mm uk. 90 x 210 cm
lbr
Teakwood tebal 4 mm uk. 120 x 240 cm
lbr
Multiplek
Multipleks 9 mm
lbr
Multipleks 12 mm
lbr
Board Pabrikasi
Hardpleks 0,35 mm 1,22 x 2,44 m, kalsiboard (tahan api) lbr
Gipsum Board
lbr
Asbes Datar uk. 100x100
lbr
GRC Board
lbr
Eternit
m
Plywood
Plywood 3 mm uk. 90 x 220 cm
lbr
Plywood 4 mm
lbr
Plywood 9 mm uk. 120 x 240 mm
lbr
List Kayu Profil
List Kayu Profil 1/3
m'
List Kayu Profil 1/5
m'
List Kayu Profil 2/4
m'
List Gipsum
m'
Tepung Gipsum
Kg
Triplek 4 mm uk 120 x 240
lbr
Kelompok Fiber, Besi& Baja
Paku & Baut
Paku biasa
kg
Paku ulin
kg
Paku besi
kg
Paku atap metal
kg
Paku seng gelombang
kg
Baut 1/2 - 45 cm
buah
Mur Baut Panjang
buah
Mur Baut Pendek
buah
Besi
Besi beton polos
kg
Besi beton ulir
kg
Besi beton U-24
kg
Besi beton U-39
kg
Besi Strip ( tebal 5 mm, lebar 5 cm )
kg
Besi Strip ( tebal 3 mm - 12 m )
lembar
Besi klam U
buah
m'
Besi hollow 4 x 4 cm tebal 1.2 mm

72
73
74
75
76
77
78
79
80 Kanopi ( Besi Tempa )
Pagar BRC
81 Pagar BRC Galvanis 90 x 240 cm
82 Pagar BRC Galvanis 120 x 240 cm
83 Tiang BRC Galvanis panjang 120 cm
84 Tiang BRC Galvanis panjang 150 cm
Pintu
85 Pintu PVC (lengkap; kusen + daun)
86 Rolling Door Besi
87 Folding Door ( 3x2,5 )
88 Rell Pintu Dorong / 5m'
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104

Kawat
Kawat duri
Kawat duri
Kawat harmonika 4 x 4 cm
Kawat Ayam
Kawat beton (bindrad)
Kawat bronjong Q 4 mm
Kawat galvanis Q 1 mm
Kawat Las
Kawat Las Listrik RD 26
Kawat Las Listrik RB 26
Baja
Bondex ( plat beton )
Wiremesh M6
Baja plat
Baja siku L 50.50.4
Baja IWF
Pengadaan rangka baja ringan

1,100,000
1,100,000
49,500
5,000
14,500
1,650,000
16,000
30,000

1,430,000
1,430,000
49,500
4,800
13,800
1,650,000
15,200
28,500

1,100,000
1,100,000
###
4,800
13,800
1,650,000
15,200
28,500

1,320,000
1,320,000
49,500
4,800
13,800
1,650,000
15,200
28,500

1,650,000
1,650,000
49,500
5,000
14,500
1,650,000
16,000
30,000

1,440,000
1,440,000
###
8,000
23,300
2,420,000
33,000
48,000

31,600
732,050

32,100
742,700

32,100
743,100

32,200
744,900

32,100
744,100

32,200
745,900

32,200
745,900

133,100
93,200
113,100
154,400

135,000
94,600
114,700
156,600

135,100
94,600
114,800
156,700

135,400
94,800
115,100
157,100

135,300
94,700
115,000
156,900

135,600
95,000
115,200
157,300

135,600
95,000
115,200
157,300

154,000
203,500

156,200
206,500

156,300
206,600

156,700
207,100

156,500
206,800

156,900
207,300

156,900
207,300

81,200
91,200
17,300
76,230
20,000

82,400
92,525
17,600
77,300
20,300

82,400
92,600
17,600
77,400
20,300

82,600
92,800
17,600
77,600
20,400

82,500
92,700
17,600
77,500
20,300

82,700
92,925
17,600
77,700
20,400

82,700
###
17,600
77,700
20,400

60,500
68,200
154,000

61,400
69,200
156,200

61,400
69,200
156,300

77,000
69,400
156,700

61,500
69,300
156,500

61,600
69,500
156,900

61,600
69,500
156,900

13,300
20,000
20,000
30,000
5,000
73,200

13,500
20,300
20,300
30,500
5,100
74,300

13,600
20,400
20,400
30,600
5,100
74,700

13,500
20,400
20,400
30,500
5,100
74,500

13,600
20,400
20,400
30,600
5,100
74,700

13,600
20,400
20,400
30,600
5,100
74,700

13,700
20,500
20,500
30,800
5,100
75,200

21,650
27,500
31,100
30,250
25,300
33,000
26,400
24,200

22,000
28,050
31,500
30,800
25,800
33,400
26,800
24,500

22,000
28,600
31,600
30,900
25,900
33,800
27,100
24,800

22,000
29,700
31,700
31,200
26,100
34,600
27,700
25,400

22,000
###
31,700
31,200
27,500
33,900
27,100
24,900

22,800
30,800
31,700
33,600
28,100
35,500
28,400
26,100

19,800
29,700
31,800
30,800
27,500
33,900
27,100
24,900

15,400
16,500
15,400
16,720
24,600
20,000
18,700
38,500
1,064,800

15,700
16,800
15,700
17,000
25,000
20,300
19,250
39,100
1,080,300

16,800
18,000
16,800
18,200
25,000
20,300
19,800
39,100
1,081,900

21,300
22,800
21,300
23,100
25,000
20,400
20,900
39,200
1,084,000

19,000
20,400
19,000
20,700
25,000
20,300
###
39,100
1,082,700

22,400
24,000
22,400
24,300
25,100
20,400
22,000
39,200
1,085,100

21,300
22,800
21,300
23,100
25,100
20,400
19,800
39,200
1,084,800

lbr
lbr
btg
btg

299,475
366,025
106,500
126,400

304,900
372,700
108,400
128,700

326,700
399,300
116,200
137,900

413,800
505,800
147,200
174,700

370,300
452,500
131,700
156,300

435,600
532,400
154,900
183,900

413,800
505,800
147,200
174,700

unit
m
m
Bh

385,000
259,500
2,462,400
2,298,600

392,000
264,200
2,507,200
2,340,400

420,000
283,100
2,686,300
2,507,600

532,000
358,600
3,402,600
3,176,200

476,000
320,800
3,044,400
2,841,900

560,000
377,500
3,581,700
3,343,400

532,000
358,600
3,402,600
3,176,200

roll
kg
m
m
kg
kg
kg
kg
kg
kg

90,750
10,100
18,700
17,600
22,000
34,100
70,500
33,000
29,700
154,000

104,400
11,600
21,500
20,200
25,300
39,200
81,100
38,000
34,200
177,100

105,300
11,700
21,700
20,400
27,500
39,600
81,800
38,300
34,500
178,600

106,200
11,800
21,900
20,600
34,900
39,900
82,500
38,600
34,700
180,200

107,100
11,900
22,100
22,000
39,000
40,200
83,200
38,900
35,000
181,700

108,900
12,100
22,400
21,100
44,600
40,900
84,600
39,600
35,600
184,800

105,300
11,700
21,700
20,400
25,400
39,600
81,800
38,300
34,500
178,600

m
m
lembar
kg
kg
m

163,600
105,500
425,900
15,000
17,300
308,000

166,000
107,000
432,100
15,200
17,600
312,500

166,200
107,200
432,700
15,200
17,600
312,900

166,500
107,400
433,500
15,300
17,600
313,500

166,300
107,300
433,000
15,300
17,600
313,100

166,700
107,500
434,100
15,300
17,600
313,900

166,700
107,500
433,900
15,300
17,600
313,800

137,500
27,500

158,100
31,600

159,500
31,900

160,900
32,200

162,300
32,500

163,600
32,700

165,000
33,000

buah
buah
buah

211,750
50,000
72,600

243,500

245,600

247,800

249,900

252,000

254,100

83,500

84,200

84,900

85,700

86,400

87,100

buah
buah
buah
buah

143,000
37,000
9,900
22,000

164,500
42,600
11,400
25,300

165,900
42,900
11,500
25,500

167,300
43,300
11,600
25,700

168,700
43,700
11,700
26,000

170,200
44,000
11,800
26,200

171,600
44,400
11,900
26,400

psg
psg
psg

5,500
19,800
24,200

6,300
22,800
27,800

6,400
23,000
28,100

6,400
23,200
28,300

6,500
23,400
28,600

6,500
23,600
28,800

6,600
23,800
29,000

buah
buah

11,000
22,000

12,700
25,300

12,800
25,500

12,900
25,700

13,000
26,000

13,100
26,200

13,200
26,400

buah
buah

5,500
16,500

6,300
19,000

6,400
19,100

6,400
19,300

6,500
19,500

6,500
19,600

6,600
19,800

buah
buah
buah

330,000
275,000
385,000

379,500
316,300
442,800

382,800
319,000
446,600

386,100
321,800
450,500

389,400
324,500
454,300

392,700
327,300
458,200

396,000
330,000
462,000

m
m
m

465,850
512,400
50,400

475,200
522,600
51,400

477,200
524,900
51,600

477,800
525,500
51,700

480,700
528,700
52,000

488,100
536,900
52,800

490,700
539,700
53,100

m'
m'

199,650
146,400

203,600
149,300

204,500
150,000

204,800
150,100

206,000
151,100

209,200
153,400

210,300
154,200

unit
unit
unit
unit

2,435,700
2,395,800
2,701,900
2,662,000

2,484,400
2,443,700
2,755,900
2,715,200

2,495,000
2,454,100
2,767,700
2,726,800

2,498,000
2,457,100
2,771,000
2,730,100

2,513,200
2,472,100
2,787,900
2,746,700

2,552,000
2,510,200
2,830,900
2,789,100

2,565,700
2,523,700
2,846,100
2,804,100

unit
unit
unit
unit
unit
unit
unit
unit
m
m

599,000
599,000
532,400
532,400
665,500
665,500
599,000
599,000
825,200
758,700

611,000
611,000
543,000
543,000
678,800
678,800
611,000
611,000
841,700
773,900

613,400
613,400
545,200
545,200
681,500
681,500
613,400
613,400
845,000
776,900

615,200
615,200
546,800
546,800
683,500
683,500
615,200
615,200
847,500
779,200

618,100
618,100
549,400
549,400
686,800
686,800
618,100
618,100
851,600
783,000

627,800
627,800
558,000
558,000
697,400
697,400
627,800
627,800
864,800
795,100

624,800
624,800
555,300
555,300
694,100
694,100
624,800
624,800
860,700
791,400

Acesories Daun Pintu & Daun Jendela


Lain-lain
105 Door closer
106 Door stoper
Kunci tanam

107
108
109
110
111
112
113
114
115
116
117
118
119
120

Kunci tanam kwalitas baik


Kunci tanam biasa
Kunci putar kamar mandi
Engsel
Engsel pintu Nylon (kwalitas prima)
Engsel pintu kuningan
Engsel jendela Nylon
Engsel jendela kuningan
Kait Angin
Kait angin 6"
Kait angin 8"
Kait angin 10"
Hak Angin
Hak angin biasa
Hak angin kualitas baik
Grendel
Grendel biasa
Grendel kualitas baik
Handle
Tarikan / Pegangan pintu kwalitas baik
Tarikan / Pegangan pintu biasa
Tarikan / Pegangan pintu aluminium

Kelompok Aluminium
Plat aluminium
121 Aluminium composite panel 3 mm + rangka
122 Aluminium composite panel 4 mm + rangka
123 Aluminium foil
Kusen Aluminium
124 Kusen Almunium 4" Coklat
125 Kusen Almunium 4" Putih
Pintu+Kaca Aluminium
126 Pintu Kaca Rayban Alumunium 4" Putih
127 Pintu Kaca Bening Alumunium 4" Putih
128 Pintu Kaca Rayban Alumunium 4" Coklat
129 Pintu Kaca Bening Alumunium 4" Coklat
Jendela+Kaca Aluminium
130 Jendela Kaca Rayban Alumunium 4" Putih Engsel S
131 Jendela Kaca Rayban Alumunium 4" Putih Engsel A
132 Jendela Kaca Bening Alumunium 4" Putih Engsel S
133 Jendela Kaca Bening Alumunium 4" Putih Engsel Ay
134 Jendela Kaca Rayban Alumunium 4" Coklat Engsel
135 Jendela Kaca Rayban Alumunium 4" Coklat Engsel
136 Jendela Kaca Bening Alumunium 4" Coklat Engsel
137 Jendela Kaca Bening Alumunium 4" Coklat Engsel
138 Jendela Kaca Mati Rayban Alumunium 4"
139 Jendela Kaca Mati Bening Alumunium 4"

990,000
990,000
49,500 ###
5,500
16,000 ###
1,650,000 ###
17,600
33,000

Page 134

140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156

157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211

212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
262

243

Pintu Aluminium
Pintu Lipat Varia
Rolling Door Alumunium
Pintu Alumunium
Pintu almunium
Jendela BV Aluminium
Jendela Casemen standard BV tanpa kaca (A 4,5m'
Jendela Casemen standard BV tanpa kaca (A 4,5m'
Jendela Casemen BV tanpa kaca (A 2,8m' )Gloss
Jendela Casemen BV tanpa kaca (A 2,8m' )Doff
Jendela Sliding Aluminium
Jendela Sliding ekonomi standard kaca ( A 4,5 m') G
Jendela Sliding ekonomi standard kaca ( A 4,5 m') D
Jalusi Aluminium
Louvre( Jalusi ) 7 cm,coklat,merk superex
Louvre( Jalusi ) 10 cm,coklat,merk superex
Rangka Plafon & Dinding
Plafon spandel,coklat,merk superex
Rangka curtain wall,coklat,merk superex
Sunscren Alumunium
Lain-lain
Sealent
Puzzdith - 100 XR
Profil Kaca
Kelompok Penutup Lantai & Dinding :
Keramik Lantai
Keramik polos kw. 1 ukuran 20 x 20 cm
Keramik motif kw. 1 ukuran 20 x 20 cm
Keramik polos kw.1 ukuran 30 x 30 cm
Keramik motif kw.1 ukuran 30 x 30 cm
Keramik motif granit kw.1 ukuran 30 x 30 cm
Keramik polos kw.1 ukuran 40 x 40 cm
Keramik motif kw.1 ukuran 40 x 40 cm
Keramik motif granit kw.1 ukuran 40 x 40 cm
Keramik polos kw.1 ukuran 60 x 60 cm
Keramik motif kw.1 ukuran 60 x 60 cm
Keramik motif granit kw.1 ukuran 60 x 60 cm
Keramik Dinding
Keramik dinding polos kw.1 ukuran 20 x 25 cm
Keramik dinding motif kw.1 uikuran 20 x 25 cm
Keramik dinding polos kw 1 uk. 10 x 20 cm
Keramik dinding polos kw 1 uk. 10 x 25 cm
Lain-lain
Stepnozing anak tangga
List keramik
Keramik siku
Granit
Granit Import
Granito uk. 30 x 30 cm
Granito uk. 40 x 40 cm
Keramik Artistik
Keramik Artistik 10/20 ;
Keramik Artistik 10/10
Porselin 11 x 11 cm
Mozaik 20 x 20 cm
Mozaik 30 x 30 cm
Marmer
marmer 40 x 40 x 2
marmer 60 x 60 x 2
marmer 30 x 30 x 2
marmer 30 x 10 x 2
Ubin PC
Ubin PC abu - abu
Ubin plint PC abu - abu
Ubin PC warna
Ubin plint PC warna
Parquet
Parquet indoor
Parquet outdoor
Paving
Paving blok natural segi 4 tb. 6 cm (K.175) kw. 1
Paving blok natural segi 6 tb. 6 cm (K.175) kw. 1
Paving blok natural segi 4 tb. 8 cm (K.175) kw. 1
Paving blok natural segi 6 tb. 8 cm (K.175) kw. 1
Paving blok natural segi 4 tb. 8 cm (K.350) kw. 1
Paving blok natural segi 6 tb. 8 cm (K.350) kw. 1
Paving blok natural segi 4 tb. 10 cm (K.350) kw. 1
Paving blok natural segi 6 tb. 10 cm (K.350) kw. 1
Kanstin
Kanstin uk. 15 x 20 x 30 x 60 cm
Kanstin uk. 10 x 15 x 30 x 60 cm
Kanstin uk. 10 x 20 x 50 cm
Kanstin beton cetak 10 x 20 x 40 cm
Kanstin beton cetak 15 x 30 x 60 cm
Grefel
Grefel beton 20 cm
Grefel beton 30 cm
Roster
Roster bata (10x20)
Roster beton (10x20)
Roster keramik (25x25)
Roster keramik (20x20)
Kelompok Atap :
Genteng
Genteng pres lokal
Genteng pres jatiwangi
Genteng pres open jatiwangi
Genteng pres morando biasa
Genteng pres morando glasur
Genteng beton polos
Genteng beton warna
Genteng mortir
Nok
Nok genteng pres lokal
Nok genteng pres jatiwangi
Nok genteng pres open jatiwangi
Nok genteng morando biasa
Nok genteng pres morando glasur
Nok genteng beton polos
Nok genteng beton warna
Sirap
Atap Sirap 4 lapis
Polikarbonat
Atap Polikarbonat + rangka besi tempa
Atap Polikarbonat + rangka Stainless
Atap Polikarbonat; lebar = 120 cm tebal
Atap Polikarbonat; lebar = 120 cm tipis
Seng gelombang
Seng gelombang BJLS 30
Seng gelombang (210 x 80 x 0.2 cm)
Seng gelombang 3'-6' (90 x 180 x 0.2 cm)
Seng plat
Seng Plat BJLS 30 lebar 90 cm ; panjang 180
Seng Plat BJLS 30 lebar 60 cm ; panjang 180 cm
Seng Plat BJLS 30 lebar 30 cm ; panjang 180 cm
Seng Plat BJLS 20 lebar 20 cm ; panjang 180 cm
Fiber
Atap fiber gelombang 90cm x 180cm
Atap fiber glass
Talang U pvc
Fiberglass gelombang uk. 180 x 80 cm
Fiberglass plat lebar 100 cm
Metal
Atap metal 77 cm x 80 cm (Sakura Roof)
Atap metal 77 cm x 80 cm (Surya Roof)
Atap metal 77 cm x 80 cm (Multi Roof)
Bubungan metal

m
m
m
unit

1,904,700
1,271,105
732,100
1,264,450

1,942,800
1,296,500
746,800
1,289,800

1,950,400
1,301,600
749,700
1,294,800

1,956,100
1,305,400
751,900
1,298,600

1,965,600
1,311,800
755,500
1,304,900

1,996,100
1,332,100
767,200
1,325,100

1,986,600
1,325,800
763,600
1,318,800

Bh
Bh
Bh
Bh

600,350
675,400
469,050
515,875

612,400
688,900
478,400
526,200

614,700
691,600
480,300
528,200

616,500
693,600
481,700
529,800

619,600
697,000
484,100
532,400

629,100
707,700
491,500
540,600

626,200
704,500
489,200
538,100

Bh
Bh

598,950
469,050

610,900
478,400

555,900
435,300

615,200
481,700

618,100
484,000

627,700
491,600

624,700
489,200

m'
m'

30,050 ###
60,000 ###

30,600
61,100

30,800
61,400

30,800
61,500

31,000
61,900

31,500
62,800

32,700
65,200

m
m
m

431,425 ###
337,625 ###
753,975 ###

440,100
344,400
769,100

441,800
345,700
772,100

443,100
346,700
774,400

445,200
348,500
778,100

452,200
353,800
790,200

450,000
352,200
786,400

Kg
Liter
m'

79,860
41,625
35,000

81,500
42,500
35,700

81,800
42,600
35,800

82,000
42,800
35,900

82,500
43,000
36,100

83,700
43,600
36,700

83,400
43,500
36,600

m
m
m
m
m
m
m
m
m
m
m

71,500
71,500
66,000
71,500
199,650
77,000
93,500
266,200
192,500
192,500
465,850

72,600
72,600
67,000
72,600
202,600
78,100
94,900
270,200
195,400
195,400
472,800

72,700
72,700
67,100
72,700
202,900
78,200
95,000
270,500
195,600
195,600
473,400

72,800
72,800
67,200
72,800
203,200
78,400
95,200
271,000
196,000
196,000
474,200

72,700
72,700
67,100
72,700
203,100
78,300
95,100
270,800
195,800
195,800
473,800

72,900
72,900
67,300
72,900
203,500
78,500
95,300
271,400
196,200
196,200
474,900

72,900
72,900
67,300
72,900
203,500
78,500
95,300
271,400
196,200
196,200
474,900

m
m
m
m

77,000
77,000
60,500
65,000

78,100
78,100
61,400
66,000

78,200
78,200
61,500
66,100

78,400
78,400
61,600
66,200

78,300
78,300
61,500
66,100

78,500
78,500
61,700
66,300

78,500
78,500
61,700
66,300

m'
m'
m'

38,500
27,500
2,200

39,100
27,900
2,200

39,100
27,900
2,200

39,200
28,000
2,200

39,200
28,000
2,200

39,200
28,000
2,200

39,200
28,000
2,200

m
buah
buah

1,464,100
43,900
46,600

1,485,900
44,600
47,300

1,487,800
44,600
47,400

1,490,500
44,700
47,400

1,489,200
44,700
47,400

1,492,500
44,800
47,500

1,492,500
44,800
47,500

buah
buah
m
m
m

29,500
14,800
99,825
525,000
552,400

29,900
15,000
101,300
532,800
560,600

30,000
15,000
101,400
533,500
561,400

30,000
15,100
101,600
534,500
562,400

30,000
15,100
101,500
534,000
561,900

30,100
15,100
101,800
535,200
563,100

30,100
15,100
101,800
535,200
563,100

m
m
m
m

213,000
339,400
159,700
133,100

216,200
344,400
162,100
135,100

216,500
344,900
162,300
135,300

216,800
345,500
162,600
135,500

216,600
345,200
162,400
135,400

217,100
346,000
162,800
135,700

217,100
346,000
162,800
135,700

5,300
4,700
8,000
6,700

5,400
4,800
8,100
6,800

5,400
4,800
8,100
6,800

5,400
4,800
8,100
6,800

5,400
4,800
8,100
6,800

5,400
4,800
8,200
6,800

5,400
4,800
8,200
6,800

m
m

173,000
266,200

175,600
270,200

175,800
270,500

176,100
271,000

176,000
270,800

176,400
271,400

176,400
271,400

m
m
m
m
m
m
m
m

79,900
99,825
93,200
109,100
99,825
131,800
139,800
146,400

84,700
105,900
98,800
115,700
105,900
139,800
148,300
155,300

89,600
111,900
104,500
122,300
111,900
147,800
156,700
164,100

92,000
115,000
107,300
125,600
115,000
151,800
161,000
168,600

92,000
115,000
107,300
125,600
115,000
151,800
161,000
168,600

96,800
121,000
113,000
132,200
121,000
159,800
169,500
177,500

96,800
121,000
113,000
132,200
121,000
159,800
169,500
177,500

buah
buah
buah
buah
buah

86,500
66,550
33,275
16,000
20,000

91,700
70,600
35,300
17,000
21,200

97,000
74,600
37,300
17,900
22,400

99,600
76,600
38,300
18,400
23,000

99,600
76,600
38,300
18,400
23,000

104,800
80,700
40,300
19,400
24,200

104,800
80,700
40,300
19,400
24,200

buah
buah

51,900
58,600

55,000
62,200

58,200
65,700

59,800
67,500

59,800
67,500

62,900
71,000

62,900
71,000

buah
buah
buah
buah

10,000
13,300
55,000
44,000

10,600
14,100
58,300
46,700

11,200
14,900
61,700
49,300

11,500
15,300
63,300
50,700

11,500
15,300
63,300
50,700

12,100
16,100
66,700
53,300

12,100
16,100
66,700
53,300

buah
buah
buah
buah
buah
buah
buah
buah

5,300
7,400
9,300
4,000
4,700
4,700
7,300
9,800

6,100
8,500
10,700
4,600
5,400
5,400
8,400
11,200

6,100
8,600
10,800
4,600
5,500
5,500
8,500
11,400

6,200
8,700
10,900
4,700
5,500
5,500
8,500
11,500

6,300
8,700
11,000
4,700
5,500
5,500
8,600
11,600

6,300
8,800
11,100
4,800
5,600
5,600
8,700
11,700

6,400
8,900
11,200
4,800
5,600
5,600
8,800
11,800

buah
buah
buah
buah
buah
buah
buah

6,800
8,300
10,600
5,300
6,100
6,100
9,100

7,800
9,500
12,100
6,100
7,000
7,000
10,400

7,900
9,600
12,300
6,100
7,100
7,100
10,600

8,000
9,700
12,400
6,200
7,100
7,100
10,600

8,000
9,800
12,500
6,300
7,200
7,200
10,700

8,100
9,900
12,600
6,300
7,300
7,300
10,800

8,200
10,000
12,700
6,400
7,300
7,300
10,900

buah

2,300

2,600

2,700

2,700

2,700

2,700

2,800

m
m
m'
m'

372,680
598,950
272,250
163,350

427,100
686,300
312,000
187,200

432,400
694,900
315,800
189,500

436,000
700,700
318,500
191,100

439,700
706,600
321,200
192,700

443,300
712,500
323,800
194,300

447,000
718,300
326,500
195,900

lbr
lbr
lbr

64,950
40,700
40,700

73,500
45,500
45,500

74,500
46,700
46,700

75,800
47,500
47,500

77,700
48,700
48,700

78,300
49,100
49,100

79,000
49,500
49,500

lbr
lbr
lbr
lbr

52,500
25,000
18,750
15,000

58,700
27,900
21,000
16,800

60,200
28,700
21,500
17,200

61,200
29,200
21,900
17,500

62,800
29,900
27,500
17,900

63,300
30,200
22,600
18,100

63,800
30,400
22,800
18,200

lbr
lbr
lonjor
lbr
m'

57,500
119,800
115,000
119,800

66,100
137,700
128,800
137,700

66,700
138,900
132,300
138,900

67,300
140,200
134,600
140,200

67,800
141,300
138,000
141,300

68,400
142,500
139,200
142,500

69,100
143,900
140,300
143,900

lbr
lbr
lbr
buah

45,200
79,375
140,425
33,300

51,950
91,275
161,525
38,300

52,400
92,075
162,900
38,600

52,850
92,875
164,300
38,900

53,300
93,700
165,725
39,300

54,000
94,350
167,075
39,800

54,250
95,250
168,500
40,000

buah
buah
buah
buah

Page 135

244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297

298
299
300
301
302
303
304
305
306
307
308
309
344
345
346
347
348
303
304
305
306
307
308
309
310
311
312
313
314
315

316
317
318
319
320
321

322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346

Kelompok Cat / Minyak :


Bahan Cair
Ai r
Minyak Terpentin
Minyak Bekisting ( olie bekas )
Spirtus
Teer
Solar
Solar industri
Minyak tanah
Minyak pelumas
Bensin
Teak oil
Cat minyak
Cat Warna ( Kayu/besi ) 5 kg
Cat Warna ( Kayu/besi ).
Cat dasar ( meni kayu/besi ) 5 kg
Cat dasar ( meni kayu/besi )
Cat khusus atap
Cat khusus atap 5 kg
Vernis bening
Vernis warna
Politur
Pengencer
Tinner A spesial
Tinner A
Tinner B
Tinner khusus
Cat air
Cat tembok eksterior 5 kg (kwalitas sedang)
Cat tembok eksterior
Cat tembok interior 5 kg
Cat tembok interior (kwalitas sedang)
Cat tembok curah eksterior 5 kg
Cat tembok curah eksterior
Cat tembok curah interior 5 kg
Cat tembok curah interior
Plamur/dempul
Plamur Kayu 5 kg
Plamur Kayu
Plamur Tembok 5 kg
Plamur Tembok
Flincote
Amplas
Amplas kayu/besi
Amplas kayu/besi
Lain-lain
Batu kambang (batu apung)
Sirlak
Oker putih
Oker warna
Melamin
Kuas cat
Roll Cat
Residu / Soligium
Lem Kayu
Lem Kuning
Godler/residu
Wallpaper
Soda api
Sabun deterjen
Wood Filler
Kelompok Cement, Beton & Kaca:
Portland Cement ( PC )
Portland Cement ( PC ) 40 kg
Portland Cement ( PC ) 50 kg
Portland Cement ( PC )
Cement warna
Cement putih
Beton
Beton K 125 (ready mix)
Beton K 175 (ready mix)
Beton K 225 (ready mix)
Beton K 250 (ready mix)
Beton K 275 (ready mix)
Beton K 300 (ready mix)
Beton K 350 (ready mix)
Tiang Pancang
Tiang Pancang 20/20 K-450 + Joint (ex. Surabaya)
Tiang Pancang 25/25 K-500 + Joint (ex. Surabaya)
Tiang Pancang 30/30 K-500 + Joint (ex. Surabaya)
Tiang Pancang 35/35 K-500 + Joint (ex. Surabaya)
Tiang Pancang 40/40 K-500 + Joint (ex. Surabaya)
Kaca
Kaca bening tebal 3 mm
Kaca bening tebal 5 mm
Kaca rayban tebal 3 mm
Kaca rayban tebal 5 mm
Kaca Buram tebal 3 mm
Kaca Buram tebal 5 mm
Jendela nako
Kaca cermin 3 mm
Kaca cermin 5 mm
Kaca patri
Kaca grafir warna
Kaca sunblast
Glassblock
Kelompok Sanitary
Shower
Shower stainless
Shower stainless kualitas baik
Shower standar/biasa
Shower kualitas baik
Kran air
Kran air plastik
Kran air stainless
Seal Tape
Tangki air fiberglas
Tangki air fiberglas Isi : 250 ltr
Tangki air fiberglas Isi : 800 ltr
Tangki air fiberglas Isi : 1100 ltr
Tangki air fiberglas Isi : 1200 ltr
Tangki air fiberglas Isi : 2100 ltr
Tangki air fiberglas Isi : 2200 ltr
Tangki air stainless Steel
Tangki air stainless steel Isi : 250 ltr
Tangki air stainless steel Isi : 800 ltr
Tangki air stainless steel Isi : 1100 ltr
Tangki air stainless steel Isi : 1200 ltr
Tangki air stainless steel Isi : 2100 ltr
Tangki air stainless steel Isi : 2200 ltr
Bak mandi
Bak Mandi Fiberglass, volume 120 ltrr (sudut)
Bak Mandi Fiberglass, volume 120 ltrr (kotak)
Bak Mandi Fiberglass, volume 150 ltrr
Closet
Closet duduk
Closet duduk monoblock kwalitas prima
Kloset duduk / Monoblok Warna Putih standard
Kloset jongkok Porselin, warna tua
Kloset jongkok Porselin, warna muda
Kloset jongkok Traso dicat
Lain-lain
Urinoir
Floordrain (saringan buangan air KM/WC)
Badkeep Fibreglass
Wastafel

liter
kg
liter
liter
kg
liter
liter
liter
liter
liter
kg
kaleng
kg
kaleng
kg
kg
kaleng
ltr
ltr
kg

40
8,800
10,600
8,000
8,250
9,900
13,200
8,000
39,900
9,900
33,400
247,500
47,300 ###
110,000 ###
24,200 ###
115,500
115,500
41,800
49,500
47,300

41
9,400
11,300
8,500
8,800
9,900
13,200
8,700
39,900
9,900
33,400

41
10,000
12,000
9,100
9,400
10,010
13,300
9,300
40,300
10,010
33,800

###
10,600
12,700
9,600
9,900
10,120
13,500
9,300
40,800
10,120
34,100

41
10,600
12,700
9,600
9,900
10,230
13,600
9,300
41,200
10,230
34,500

41
11,700
14,100
10,700
11,000
10,900
14,500
10,700
43,900
10,900
36,700

42
11,700
14,100
10,700
11,000
9,900
13,200
8,000
42,350
9,900
33,400

251,800
48,100
111,900
24,600
117,500
117,500
42,500
50,400
48,100

253,100
48,400
112,500
24,700
118,100
118,100
42,700
50,600
48,400

253,100
48,400
112,500
24,700
118,100
118,100
42,700
50,600
48,400

253,100
48,400
112,500
24,700
118,100
118,100
42,700
50,600
48,400

253,700
48,500
112,800
24,800
118,400
118,400
42,800
50,700
48,500

255,500
48,800
113,600
25,000
119,300
119,300
43,200
51,100
48,800

kg
kg
kg
kg

29,700
25,300
23,100
19,800

30,200
25,700
23,500
20,100

30,400
25,900
23,600
20,200

30,400
25,900
23,600
20,200

41,800
25,900
41,800
20,200

30,400
25,900
23,700
20,300

30,700
26,100
23,900
20,400

kaleng
kg
kaleng
kg
kaleng
kg
kaleng
kg

115,500
23,100
110,000
22,000
71,500
14,300
66,000
13,200

117,500
23,500
111,900
22,400
72,800
14,600
67,200
13,400

118,100
23,600
112,500
22,500
73,100
14,600
67,500
13,500

118,100
23,600
112,500
22,500
73,100
14,600
67,500
13,500

118,100
23,600
112,500
22,500
73,100
14,600
67,500
13,500

118,400
23,700
112,800
22,600
73,300
14,700
67,700
13,500

119,300
23,900
113,600
22,700
73,800
14,800
68,100
13,600

kaleng
kg
kaleng
kg
kg

110,000
22,000
41,800
8,360
33,000

111,900
22,400
42,500
8,500
33,600

112,500
22,500
42,700
8,500
33,700

112,500
22,500
42,700
8,500
33,700

112,500
22,500
42,700
8,500
33,700

112,800
22,600
42,800
8,600
33,800

113,600
22,700
43,200
8,600
34,100

lbr
m

5,000
13,200

5,100
13,400

5,100
13,500

5,100
13,500

5,100
13,500

5,100
13,500

5,200
13,600

kg
kg
kg
kg
kg
buah
buah
ltr
kg
kg
kg
m2
kg
kg
kg

46,600
199,650
22,600
25,600
73,200
17,600
15,400
11,700
28,000
38,500
9,600
93,200
13,300
20,000
49,500

47,400
203,100
23,000
26,000
74,500
17,900
15,700
11,900
28,500
39,200
9,800
94,800
13,500
20,400
50,400

47,600
204,100
23,100
26,200
74,800
18,000
15,700
12,000
28,600
39,400
9,800
95,300
13,600
20,500
50,600

47,600
204,100
23,100
26,200
74,800
18,000
15,700
12,000
28,600
39,400
9,800
95,300
13,600
20,500
50,600

47,600
204,100
23,100
26,200
74,800
18,000
15,700
12,000
28,600
39,400
9,800
95,300
13,600
20,500
50,600

47,800
204,600
23,200
26,200
75,000
18,000
15,800
12,000
28,700
39,500
9,800
95,500
13,600
20,500
50,700

48,100
206,100
23,300
26,400
75,600
18,200
15,900
12,100
28,900
39,800
9,900
96,200
13,700
20,700
51,100

zak
zak
kg
kg
kg

72,800
87,800
1,820
16,500
4,400

89,600
115,000
2,240
17,600
4,700

89,600
115,000
2,240
19,100
5,100

96,100
115,900
2,403
19,100
5,100

90,000
113,700
2,250
21,300
5,700

112,560
140,700
2,814
22,500
6,000

104,500
122,700
2,613
19,100
5,100

m
m
m
m
m
m
m

1,120,500
1,171,300
1,228,150
1,276,550
1,333,400
1,500,400
1,524,600

1,379,100
1,441,600
1,511,600
1,571,100
1,641,100
1,846,600
1,876,400

1,357,500
1,419,100
1,488,000
1,546,600
1,615,500
1,817,800
1,847,100

1,479,600
1,546,700
1,621,800
1,685,700
1,760,800
1,981,300
2,013,300

1,450,900
1,516,700
1,590,300
1,653,000
1,726,600
1,942,800
1,974,200

1,795,700
1,877,100
1,968,200
2,045,800
2,136,900
2,404,500
2,443,300

1,565,800
1,636,800
1,716,300
1,783,900
1,863,300
2,096,700
2,130,500

m'
m'
m'
m'
m'

252,400
372,000
480,200
625,600
771,000

310,600
457,800
591,000
770,000
948,900

305,800
450,700
581,800
757,900
934,100

333,300
491,200
634,100
826,100
1,018,100

326,800
481,700
621,800
810,100
998,300

404,500
596,200
769,600
1,002,600
1,235,600

352,700
519,800
671,000
874,200
1,077,400

m
m
m
m
m
m
buah
m
m
m
m
m
buah

113,100
173,000
171,700
237,800
135,800
223,600
26,600
226,300
332,800
1,019,500
1,325,700
705,400
27,500

130,100
199,000
197,500
273,500
156,200
257,100
27,100
260,200
382,700
1,172,400
1,524,600
811,200
31,600

131,200
200,700
199,200
275,800
157,500
259,400
27,200
262,500
386,000
1,182,600
1,537,800
818,300
31,900

132,300
202,400
200,900
278,200
158,900
261,600
27,300
264,800
389,400
1,192,800
1,551,100
825,300
32,200

133,500
204,100
202,600
280,600
160,200
263,800
27,500
267,000
392,700
1,203,000
1,564,300
832,400
32,500

134,600
205,900
204,300
283,000
161,600
266,100
27,900
269,300
396,000
1,213,200
1,577,600
839,400
32,700

135,700
207,600
206,000
285,400
163,000
268,300
27,700
271,600
399,400
1,223,400
1,590,800
846,500
33,000

buah
buah
buah
buah

266,200
275,000
93,500
133,100

270,300
279,200
94,900
135,200

271,000
280,000
95,200
135,500

271,000
280,000
95,200
135,500

271,000
280,000
95,200
135,500

271,700
280,700
95,400
135,800

273,000
282,100
95,900
136,500

buah
buah
bh

11,000
88,000
3,000

11,200
89,400

11,200
89,600

11,200
89,600

11,200
89,600

11,200
89,800

11,300
90,300

unit
unit
unit
unit
unit
unit

465,850
1,100,000
1,400,000
1,600,000
2,700,000 ###
3,000,000

530,100
1,251,700
1,600,000
1,800,000
3,200,000
3,500,000

535,500
1,264,400
1,650,000
1,850,000
3,250,000
3,550,000

642,600
1,517,200
2,006,900
2,206,900
3,837,900
4,137,900

546,200
1,289,700
1,700,000
1,900,000
3,400,000
3,700,000

803,200
1,896,600
2,590,000
2,790,000
3,700,000
4,000,000

535,500
1,264,400
1,650,000
1,850,000
3,250,000
3,550,000

unit
unit
unit
unit
unit
unit

998,250
3,327,500
3,826,625
3,993,000
6,987,750
7,320,500

1,135,900
3,786,500
4,354,400
4,543,800
7,951,600
8,330,200

1,147,400
3,824,700
4,398,400
4,589,700
8,031,900
8,414,400

1,376,900
4,589,700
5,278,100
5,507,600
9,638,300
10,097,200

1,170,400
3,901,200
4,486,400
4,681,400
8,192,500
8,582,700

1,721,100
5,737,100
6,597,600
6,884,500
12,047,800
12,621,600

1,147,400
3,824,700
4,398,400
4,589,700
8,031,900
8,414,400

buah
buah
buah

385,000
385,000
500,000

390,900
390,900
507,700

391,900
391,900
509,000

391,900
391,900
509,000

391,900
391,900
509,000

392,900
392,900
510,300

394,900
394,900
512,900

buah
buah
Buah
Buah
Buah
Buah

137,500
2,090,000
1,650,000
239,775
239,775
106,480

139,600
2,122,300
1,675,500
243,500
243,500
108,100

140,000
2,127,700
1,679,700
244,100
244,100
108,400

140,000
2,127,700
1,679,700
244,100
244,100
108,400

140,000
2,127,700
1,679,700
244,100
244,100
108,400

140,300
2,133,000
1,684,000
244,700
244,700
108,700

141,000
2,143,700
1,692,400
245,900
245,900
109,200

buah
buah
buah
unit

2,462,350
39,930
552,400
1,375,000

2,500,400
40,500
560,900
1,396,200

2,506,700
40,600
562,400
1,399,800

2,506,700
40,600
562,400
1,399,800

2,506,700
40,600
562,400
1,399,800

2,513,100
40,800
563,800
1,403,300

2,525,700
41,000
566,600
1,410,400

Page 136

Bak cuci
347 Bak Cuci Stainless Steel ukuran kecil
348 Bak Cuci Stainless Steel ( 1,00 x 0,90 ) m
349 Bak Cuci Stainless Steel 80 Cm
Pipa

Buah
Buah
Buah

203,500
532,400
332,750

206,600
540,600
337,900

207,200
542,000
338,700

207,200
542,000
338,700

207,200
542,000
338,700

207,700
543,400
339,600

208,700
546,100
341,300

350
351
352
353
354
355
356
357

Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah

20,000
24,000
33,300
61,200
79,900
114,500
139,800
217,000

22,100
26,500
36,800
67,600
88,300
126,500
154,500
239,800

22,600
27,200
37,700
69,300
90,500
129,600
158,300
245,700

23,000
27,600
38,300
70,300
91,800
131,500
160,600
249,300

23,500
28,200
39,100
71,900
93,800
134,400
164,100
254,800

23,700
28,400
39,400
72,400
94,500
135,500
165,400
256,800

23,800
28,600
39,600
72,900
95,100
136,300
166,500
258,400

buah
buah
buah
buah
buah
buah
titik

6,100
12,100
7,600
13,600
6,100
12,100
366,000

6,200
12,300
7,700
13,800
6,200
12,300
371,000

6,200
12,300
7,700
13,800
6,200
12,300
371,900

6,200
12,300
7,700
13,800
6,200
12,300
372,500

6,200
12,300
7,700
13,900
6,200
12,300
373,100

6,200
12,400
7,800
13,900
6,200
12,400
373,600

6,300
12,400
7,800
13,900
6,300
12,400
375,100

buah
buah
buah
buah
buah
buah
buah
buah

6,100
7,600
8,700
9,100
11,300
22,700
51,400
59,000

6,200
7,700
8,800
9,200
11,500
23,000
52,100
59,800

6,200
7,700
8,800
9,200
11,500
23,100
52,200
59,900

6,200
7,700
8,900
9,300
11,500
23,100
52,300
60,000

6,200
7,700
8,900
9,300
11,500
23,100
52,400
60,100

6,200
7,800
8,900
9,300
11,500
23,200
52,500
60,200

6,300
7,800
8,900
9,300
11,600
23,300
52,700
60,500

buah
buah
buah
buah

8,000
10,600
13,300
16,000

8,100
10,700
13,500
16,200

8,100
10,800
13,500
16,300

8,100
10,800
13,500
16,300

8,200
10,800
13,600
16,300

8,200
10,800
13,600
16,300

8,200
10,900
13,600
16,400

buah
buah
buah

70,500
73,900
79,900

71,500
74,900
81,000

71,600
75,100
81,200

71,700
75,200
81,300

71,900
75,300
81,400

72,000
75,400
81,600

72,300
75,700
81,900

roll
roll

1,730,300
2,196,150

1,753,900
2,226,200

1,758,100
2,231,500

1,760,900
2,235,000

1,763,700
2,238,500

1,766,500
2,242,100

1,773,400
2,250,900

pcs
pcs

46,600
66,550

47,200
67,500

47,300
67,600

47,400
67,700

47,500
67,800

47,600
67,900

47,800
68,200

pcs
pcs

46,600
66,550

47,200
67,500

47,300
67,600

47,400
67,700

47,500
67,800

47,600
67,900

47,800
68,200

pcs
pcs

30,000
50,000

30,400
50,700

30,500
50,800

30,500
50,900

30,600
51,000

30,600
51,000

30,700
51,200

buah
buah
buah
buah

195,700
332,750
549,700
858,500

198,400
337,300
557,200
870,200

198,800
338,100
558,500
872,300

199,200
338,600
559,400
873,700

199,500
339,200
560,300
875,100

199,800
339,700
561,200
876,400

200,600
341,000
563,400
879,900

buah
buah

33,000
44,000

33,500
44,600

33,500
44,700

33,600
44,800

33,600
44,800

33,700
44,900

33,800
45,100

buah
buah
buah
buah

6,700
29,300
33,000
33,000

6,800
29,700
33,500
33,500

6,800
29,800
33,500
33,500

6,800
29,800
33,600
33,600

6,800
29,900
33,600
33,600

6,800
29,900
33,700
33,700

6,900
30,000
33,800
33,800

buah
buah
buah
buah

99,825
119,800
197,000
239,600

101,200
121,400
199,700
242,900

101,400
121,700
200,200
243,500

101,600
121,900
200,500
243,800

101,800
122,100
200,800
244,200

101,900
122,300
201,100
244,600

102,300
122,800
201,900
245,600

buah
buah
buah
buah

3,750
4,375
5,000
12,500

3,800
4,400
5,100
12,700

3,800
4,400
5,100
12,700

3,800
4,500
5,100
12,700

3,800
4,500
5,100
12,700

3,800
4,500
5,100
12,800

3,800
4,500
5,100
12,800

buah
buah

113,100
139,800

114,600
141,700

114,900
142,000

115,100
142,300

115,300
142,500

115,500
142,700

115,900
143,300

roll
roll
m'
m'

297,000
198,000
4,400
3,300

301,100
200,700
4,500
3,300

301,800
201,200
4,500
3,400

302,300
201,500
4,500
3,400

302,700
201,800
4,500
3,400

303,200
202,100
4,500
3,400

304,400
202,900
4,500
3,400

m1
m1
m1
m1
m1
m1

10,000
12,500
12,500
12,500
15,000
25,000

10,100
12,700
12,700
12,700
15,200
25,300

10,200
12,700
12,700
12,700
15,200
25,400

10,200
12,700
12,700
12,700
15,300
25,400

10,200
12,700
12,700
12,700
15,300
25,500

10,200
12,800
12,800
12,800
15,300
25,500

10,200
12,800
12,800
12,800
15,400
25,600

buah
buah
buah
buah
buah
buah

17,500
22,500
22,500
15,000
22,500
15,000

17,700
22,800
22,800
15,200
22,800
15,200

17,800
22,900
22,900
15,200
22,900
15,200

17,800
22,900
22,900
15,300
22,900
15,300

17,800
22,900
22,900
15,300
22,900
15,300

17,900
23,000
23,000
15,300
23,000
15,300

17,900
23,100
23,100
15,400
23,100
15,400

buah
buah
buah

25,000
25,000
25,000

25,300
25,300
25,300

25,400
25,400
25,400

25,400
25,400
25,400

25,500
25,500
25,500

25,500
25,500
25,500

25,600
25,600
25,600

buah
buah
buah

62,500
87,500
56,250

63,400
88,700
57,000

63,500
88,900
57,200

63,600
89,000
57,200

63,700
89,200
57,300

63,800
89,300
57,400

64,100
89,700
57,700

buah
buah
buah
buah

173,900
262,400
143,700
332,800

176,300
266,000
145,700
337,300

176,700
266,600
146,000
338,200

177,000
267,000
146,200
338,700

177,300
267,500
146,500
339,200

177,500
267,900
146,700
339,800

178,200
268,900
147,300
341,100

buah

958,320

971,400

973,700

975,300

976,800

978,300

982,200

buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
unit
unit

4,500
2,300
7,700

4,600
2,300
7,800
33,500
22,300
383,300
13,100
7,800
269,800
56,100

4,600
2,300
7,800
33,500
22,400
384,200
13,100
7,800
270,500
56,100

4,600
2,300
7,800
33,600
22,400
384,800
13,100
7,800
270,900
###

4,600
2,300
7,800
33,600
22,400
385,400
13,100
7,800
271,300
56,100

4,600
2,300
7,900
33,700
22,500
386,000
13,200
7,900
271,800
56,100

4,600
2,400
7,900
33,800
22,500
387,500
13,200
7,900
272,800
###

358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434

Pipa PVC 1/2 AW


Pipa PVC 3/4 AW
Pipa PVC 1 AW
Pipa PVC 1 1/2 AW
Pipa PVC 2 AW
Pipa PVC 2 1/2 AW
Pipa PVC 3 AW
Pipa PVC 4 AW
Kelompok Kelistrikan
Tusuk Kontak (Steker)
Tusuk kontak 2 kutup tanpa pembumian/arde
Tusuk kontak 2 kutup dengan pembumian/arde
Tusuk kontak 2 kutup tanpa pembumian (timbul)
Tusuk kontak 2 kutup dengan pembumian (timbul)
Tusuk kontak 2 kutup tanpa pembumian (tanam)
Tusuk kontak 2 kutup dengan pembumian (tanam)
Pasang instalasi / titik
Lampu pijar
Lampu pijar 5 watt
Lampu pijar 10 watt
Lampu pijar 25 watt/ 40 watt
Lampu pijar 60 watt / 75 watt
Lampu pijar 100 watt
Lampu softone 100 watt
Lampu pijar 150 watt
Lampu pijar 200 watt
Lampu TL
Lampu TL 10 watt
Lampu TL 15 watt
Lampu TL 18 watt
Lampu TL 36 watt
Lampu SLE
Lampu SLE 11 watt
Lampu SLE 15 watt
Lampu SLE 20 watt
Lampu Slang
Lampu Slang 2 jalur (sekualitas sinyoku), 1 roll 100
Lampu Slang 3 jalur (sekualitas sinyoku), 1 roll 100
Lampu Capsul
Lampu Capsul isi 100
Lampu Capsul isi 140
Lampu Anggur
Lampu Anggur isi 100
Lampu Anggur isi 140
Lampu Natal
Lampu Natal isi 50
Lampu Natal isi 100
Bolam Mercury
Bolam Mercury 80 watt
Bolam Mercury 125 watt
Bolam Mercury 250 watt
Bolam Mercury 400 watt
Bolam Halogin
Bolam Halogin 500 watt
Bolam Halogin 1000 watt
Starter & Travo
Starter TL 20/40 watt
Travo TL 10 watt
Travo TL 20 watt
Travo TL 40 watt
Balast Mercury
Balast Mercury 80 watt
Balast Mercury 125 watt
Balast Mercury 250 watt
Balast Mercury 400 watt
Fitting
Fitting Kecil Lampu 2,5 Watt
Fitting Plastik Hitam
Fitting Gantung plastik gantung
Fitting duduk
Kap Aluminium
Kap Alumunium E.27
Kap Alumunium E.40
Kabel Snoor & NYA
Kabel NYA 2,5 sqmm
Kabel NYA 1,5 sqmm
Kabel NYA 2,5 sqmm
Kabel NYA 1,5 sqmm
Kabel NYM
Kabel NYM 2 x 1,5 sqmm
Kabel NYM 2 x 2,5 sqmm
Kabel NYM 2 x 4 sqmm
Kabel NYM 3 x 1,5 sqmm
Kabel NYM 3 x 2,5 sqmm
Kabel NYM 3 x 4 sqmm
Saklar & Stop kontak
Skaklar seri OB
Skaklar seri IB
Skaklar engkel OB
Skaklar engkel IB
Stop kontak IB
Stop kontak OB
Kapasitor
Kapasitor 25 F
Kapasitor 20 F
Kapasitor 12,5 uF
MCB
MCB 25 Ampere / 16 Ampere
MCB 40 Ampere
MCB 6 Ampere
Box
Box Kwh Meter 25 x 35 x 20
Box panel 30 x 40 x 20
Box 25 x 25 x 20
Box 20 x 40 x 50
Timer
Timer Delay H3-BA (omron)
Lain-lain
Pilot Lamp
Kop sekering
Isolasi besar
Spot + F.MP
Tang Kombinasi
Obeng +/GZ 30 A
Multitester
Sekering
Mata lampu pijar 25 W -75 W
Stabilizer 300 A
Alat Bantu

435
436
437
438
438
439
440
440
441
442
443
444
Keterangan : Harga Satuan sudah termasuk PPN dan PPh

33,000
22,000
378,100
12,900
7,700
266,200
56,100 ###

Page 137

1
1
1
2.186858316
2.186858316

1
1

1
1

1
1

1
1
1 2.899383984
1 2.899383984

1 5.333333333
1
6.25

1
1 4.050925926
1 1.232032854 3.850102669
1 1.232032854 3.850102669

1.066666667
1 1.580246914
1 1.333333333 1.777777778
1.066666667
1 1.580246914
1 1.333333333 1.777777778
1
1 2.14480198
1 1.082920792 2.784653465
1
1 2.14480198
1 1.082920792 2.784653465
1
1 2.323319027
1
1
3.21888412
1.018382353 1.025735294 1.0294117647 1.033088235 1.049632353 1.045955882
1.018382353 1.025735294 1.0294117647 1.033088235 1.049632353 1.045955882
1.066666667
1 1.580246914
1 1.333333333 1.777777778
1.066666667
1 1.580246914
1 1.333333333 1.777777778
1
1
1

1 1.471938776 1.631377551 2.933673469 1.530612245


1 1.471938776 1.631377551 2.933673469 1.530612245
1 1.471938776 1.631377551 2.933673469 1.530612245

1
1
1
1

1
1
1
1

1.471938776
1.471938776
1.471938776
1.471938776

1.631377551
1.631377551
1.631377551
1.631377551

2.933673469
2.933673469
2.933673469
2.933673469

1.530612245
1.530612245
1.530612245
1.530612245

1.014456317
1.014456317
1.014456317
1.014456317
1.014456317

1.016027656
1.016027656
1.016027656
1.016027656
1.016027656

1.01822753
1.01822753
1.01822753
1.01822753
1.01822753

1.016760947
1.016760947
1.016760947
1.016760947
1.016760947

1.019170333
1.019170333
1.019170333
1.019170333
1.019170333

1.018646554
1.018646554
1.018646554
1.018646554
1.018646554

1.0625
1.0625
1.08
1.08

1.125
1.125
1.16
1.16

1.1875
1.1875
1.2
1.2

1.1875
1.1875
1.2
1.2

1.25
1.25
1.28
1.28

1.875
1.875
1.28
1.28

1.014528509 1.015076754
1.014528509 1.015076754
1.014528509 1.015076754

1.01754386 1.016447368 1.018914474 1.018914474


1.01754386 1.016447368 1.018914474 1.018914474
1.01754386 1.016447368 1.018914474 1.018914474

0.866666667
0.866666667
0.866666667
0.866666667
0.866666667

0.833333333
0.833333333
0.833333333
0.833333333
0.833333333

0.833333333
0.833333333
0.833333333
0.833333333
0.833333333

0.833333333
0.833333333
0.833333333
0.833333333
0.833333333

0.866666667
0.866666667
0.866666667
0.866666667
0.866666667

1.333333333
1.333333333
1.333333333
1.333333333
1.333333333

0.866666667
0.866666667
0.866666667
0.866666667
0.866666667
0.866666667
0.866666667
0.866666667

0.833333333
0.833333333
0.833333333
0.833333333
0.833333333
0.833333333
0.833333333
0.833333333

0.833333333
0.833333333
0.833333333
0.833333333
0.833333333
0.833333333
0.833333333
0.833333333

0.833333333
0.833333333
0.833333333
0.833333333
0.833333333
0.833333333
0.833333333
0.833333333

0.866666667
0.866666667
0.866666667
0.866666667
0.866666667
0.866666667
0.866666667
0.866666667

1.333333333
1.333333333
1.333333333
1.333333333
1.333333333
1.333333333
1.333333333
1.333333333

0.866666667
0.866666667
0.866666667
0.866666667

0.833333333
0.833333333
0.833333333
0.833333333

0.833333333
0.833333333
0.833333333
0.833333333

0.833333333
0.833333333
0.833333333
0.833333333

0.866666667
0.866666667
0.866666667
0.866666667

1.333333333
1.333333333
1.333333333
1.333333333

0.923076923
0.923076923
0.923076923
0.923076923
0.923076923
0.923076923
0.923076923

0.884615385
0.884615385
0.884615385
0.884615385
0.884615385
0.884615385
0.884615385

0.884615385
0.884615385
0.884615385
0.884615385
0.884615385
0.884615385
0.884615385

0.884615385
0.884615385
0.884615385
0.884615385
0.884615385
0.884615385
0.884615385

0.923076923
0.923076923
0.923076923
0.923076923
0.923076923
0.923076923
0.923076923

1.384615385
1.384615385
1.384615385
1.384615385
1.384615385
1.384615385
1.384615385

1
1
1
1
0.927272727
1
1
1.133333333
0.927272727

0.785714286
0.928571429
0.928571429
0.928571429
0.772727273
0.928571429
0.928571429
0.888888889
0.772727273

0.785714286
0.928571429
0.928571429
0.928571429
0.772727273
0.928571429
0.928571429
0.888888889
0.772727273

0.785714286
0.928571429
0.928571429
0.928571429
0.772727273
0.928571429
0.928571429
0.888888889
0.772727273

0.857142857
0.928571429
0.928571429
0.928571429
0.927272727
1
1
1.133333333
0.927272727

1.571428571
1.571428571
1.571428571
1.571428571
1
1.771428571
2.142857143
1.666666667
1

Page 138

0.909090909
0.909090909
0.909090909
0.909090909
0.909090909
0.909090909
0.909090909
0.909090909

0.863636364
0.863636364
0.863636364
0.863636364
0.863636364
0.863636364
0.863636364
0.863636364

0.863636364
0.863636364
0.863636364
0.863636364
0.863636364
0.863636364
0.863636364
0.863636364

0.863636364
0.863636364
0.863636364
0.863636364
0.863636364
0.863636364
0.863636364
0.863636364

0.909090909
0.909090909
0.909090909
0.909090909
0.909090909
0.909090909
0.909090909
0.909090909

1.454545455
1.454545455
1.454545455
1.454545455
1.454545455
1.454545455
1.454545455
1.454545455

1.014528509 1.015076754
1.014528509 1.015076754

1.01754386 1.016447368 1.018914474 1.018914474


1.01754386 1.016447368 1.018914474 1.018914474

1.014528509
1.014528509
1.014528509
1.014528509

1.01754386
1.01754386
1.01754386
1.01754386

1.015076754
1.015076754
1.015076754
1.015076754

1.016447368
1.016447368
1.016447368
1.016447368

1.018914474
1.018914474
1.018914474
1.018914474

1.018914474
1.018914474
1.018914474
1.018914474

1.014528509 1.015076754
1.014528509 1.015076754

1.01754386 1.016447368 1.018914474 1.018914474


1.01754386 1.016447368 1.018914474 1.018914474

1.014528509
1.014528509
1.014528509
1.014528509
1.014528509

1.01754386
1.01754386
1.01754386
1.01754386
1.01754386

1.015076754
1.015076754
1.015076754
1.015076754
1.015076754

1.014528509 1.015076754
1.014528509 1.015076754
1.014528509 1.015076754
1.015015015
1.015015015
1.015015015
1.015015015
1.015015015
1.015015015

1.021021021
1.021021021
1.021021021
1.021021021
1.021021021
1.021021021

1.016447368
1.016447368
1.016447368
1.016447368
1.016447368

1.018914474
1.018914474
1.018914474
1.018914474
1.018914474

1.018914474
1.018914474
1.018914474
1.018914474
1.018914474

1.01754386 1.016447368 1.018914474 1.018914474


1.01754386 1.016447368 1.018914474 1.018914474
1.01754386 1.016447368 1.018914474 1.018914474
1.018
1.018
1.018
1.018
1.018
1.018

1.021021021
1.021021021
1.021021021
1.021021021
1.021021021
1.021021021

1.021021021
1.021021021
1.021021021
1.021021021
1.021021021
1.021021021

1.027027027
1.027027027
1.027027027
1.027027027
1.027027027
1.027027027

1.016166282 1.020785219 1.025404157 1.025404157 1.051963048 1.066974596


1.02
1.013665595
1.018348624
1.018348624
1.013513514
1.013513514
1.013513514

1.04
1.08
1.04
1.12
1.08
1.01607717 1.017684887 1.017684887 1.019292605 1.0233118971
1.022518766 1.030025021 1.030025021 1.1109257715 1.018348624
1.022518766 1.030025021 1.030025021 1.1109257715 1.018348624
1.024774775 1.04954955 1.027027027 1.076576577 1.027027027
1.024774775 1.04954955 1.027027027 1.076576577 1.027027027
1.024774775 1.04954955 1.027027027 1.076576577 1.027027027

1.018181818
1.018181818
1.018181818
1.018181818
1.014514515
1.014514515
1.014514515
1.014514515
1.014514515
1.014514515
1.018181818
1.018181818
1.018181818
1.018181818

1.090909091
1.090909091
1.090909091
1.090909091
1.016016016
1.016016016
1.016016016
1.016016016
1.016016016
1.016016016
1.090909091
1.090909091
1.090909091
1.090909091

1.381818182
1.381818182
1.381818182
1.381818182
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.381818182
1.381818182
1.381818182
1.381818182

1.236363636
1.236363636
1.236363636
1.236363636
1.016816817
1.016816817
1.016816817
1.016816817
1.016816817
1.016816817
1.236363636
1.236363636
1.236363636
1.236363636

1.454545455
1.454545455
1.454545455
1.454545455
1.019019019
1.019019019
1.019019019
1.019019019
1.019019019
1.019019019
1.454545455
1.454545455
1.454545455
1.454545455

1.381818182
1.381818182
1.381818182
1.381818182
1.018818819
1.018818819
1.018818819
1.018818819
1.018818819
1.018818819
1.381818182
1.381818182
1.381818182
1.381818182

1.018181818
1.018181818
1.018181818
1.018181818

1.090909091
1.090909091
1.090909091
1.090909091

1.381818182
1.381818182
1.381818182
1.381818182

1.236363636
1.236363636
1.236363636
1.236363636

1.454545455
1.454545455
1.454545455
1.454545455

1.381818182
1.381818182
1.381818182
1.381818182

1.15
1.15
1.15
1.15
1.148648649
1.15
1.15
1.15
1.15
1.15
1.15
1.01463964
1.01463964
1.01463964
1.01463964
1.01463964
1.01463964

1.16
1.16
1.16
1.16
1.153153153
1.16
1.16
1.16
1.16
1.16
1.16
1.016047297
1.016047297
1.016047297
1.016047297
1.016047297
1.016047297

1.17
1.17
1.17
1.17
1.585585586
1.17
1.17
1.17
1.17
1.17
1.17
1.017924174
1.017924174
1.017924174
1.017924174
1.017924174
1.017924174

1.18
1.18
1.18
1.18
1.774774775
1.18
1.18
1.18
1.18
1.18
1.18
1.016704204
1.016704204
1.016704204
1.016704204
1.016704204
1.016704204

1.2
1.2
1.2
1.2
2.027027027
1.2
1.2
1.2
1.2
1.2
1.2
1.019237988
1.019237988
1.019237988
1.019237988
1.019237988
1.019237988

1.16
1.16
1.16
1.16
1.153153153
1.16
1.16
1.16
1.16
1.16
1.16
1.018768769
1.018768769
1.018768769
1.018768769
1.018768769
1.018768769

1.15 1.160022523 1.170045045 1.180067568


1.15 1.160022523 1.170045045 1.180067568

1.19009009
1.19009009

1.2
1.2

1.15 1.160022523 1.170045045 1.180067568

1.19009009

1.2

1.15 1.160022523 1.170045045 1.180067568

1.19009009

1.2

1.15
1.15
1.15
1.15
1.15
1.15
1.15
1.15

1.160022523
1.160022523
1.160022523
1.160022523
1.160022523
1.160022523
1.160022523
1.160022523

1.170045045
1.170045045
1.170045045
1.170045045
1.170045045
1.170045045
1.170045045
1.170045045

1.180067568
1.180067568
1.180067568
1.180067568
1.180067568
1.180067568
1.180067568
1.180067568

1.19009009
1.19009009
1.19009009
1.19009009
1.19009009
1.19009009
1.19009009
1.19009009

1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2

1.15
1.15
1.15
1.15
1.15
1.15
1.15
1.15
1.15

1.160022523
1.160022523
1.160022523
1.160022523
1.160022523
1.160022523
1.160022523
1.160022523
1.160022523

1.170045045
1.170045045
1.170045045
1.170045045
1.170045045
1.170045045
1.170045045
1.170045045
1.170045045

1.180067568
1.180067568
1.180067568
1.180067568
1.180067568
1.180067568
1.180067568
1.180067568
1.180067568

1.19009009
1.19009009
1.19009009
1.19009009
1.19009009
1.19009009
1.19009009
1.19009009
1.19009009

1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2

1.019975031 1.024344569 1.025593009 1.031835206 1.047752809 1.053370787


1.019975031 1.024344569 1.025593009 1.031835206 1.047752809 1.053370787
1.019975031 1.024344569 1.025593009 1.031835206 1.047752809 1.053370787
1.019975031 1.024344569 1.025593009 1.031835206 1.047752809 1.053370787
1.019975031 1.024344569 1.025593009 1.031835206 1.047752809 1.053370787
1.019975031
1.019975031
1.019975031
1.019975031

1.024344569
1.024344569
1.024344569
1.024344569

1.025593009
1.025593009
1.025593009
1.025593009

1.031835206
1.031835206
1.031835206
1.031835206

1.047752809
1.047752809
1.047752809
1.047752809

1.053370787
1.053370787
1.053370787
1.053370787

1.019977758
1.019977758
1.019977758
1.019977758
1.019977758
1.019977758
1.019977758
1.019977758
1.019977758
1.019977758

1.023981397
1.023981397
1.023981397
1.023981397
1.023981397
1.023981397
1.023981397
1.023981397
1.023981397
1.023981397

1.026994237
1.026994237
1.026994237
1.026994237
1.026994237
1.026994237
1.026994237
1.026994237
1.026994237
1.026994237

1.031968456
1.031968456
1.031968456
1.031968456
1.031968456
1.031968456
1.031968456
1.031968456
1.031968456
1.031968456

1.048003235
1.048003235
1.048003235
1.048003235
1.048003235
1.048003235
1.048003235
1.048003235
1.048003235
1.048003235

1.043049237
1.043049237
1.043049237
1.043049237
1.043049237
1.043049237
1.043049237
1.043049237
1.043049237
1.043049237

Page 139

1.020015487
1.020015487
1.020015487
1.020015487

1.02400546
1.02400546
1.02400546
1.02400546

1.0270110643
1.0270110643
1.0270110643
1.0270110643

1.031985405
1.031985405
1.031985405
1.031985405

1.04798467
1.04798467
1.04798467
1.04798467

1.043010329
1.043010329
1.043010329
1.043010329

1.01998834
1.01998834
1.01998834
1.01998834

1.023944366
1.023944366
1.023944366
1.023944366

1.026983426
1.026983426
1.026983426
1.026983426

1.031981344
1.031981344
1.031981344
1.031981344

1.047888732
1.047888732
1.047888732
1.047888732

1.043016574
1.043016574
1.043016574
1.043016574

1.019986676 0.928047968 1.027048634 1.031912059 1.048034644 1.043037975


1.019986676 0.928047968 1.027048634 1.031912059 1.048034644 1.043037975
1.018302829 1.023294509 1.025790349 1.031613977 1.047420965 1.086522463
1.018302829 1.023294509 1.025790349 1.031613977 1.047420965 1.086522463
1.020049835 1.024048212 1.027003535 1.03198702 1.048096425 1.043054992
1.020066642 1.0239911144 1.02695298 1.032062199 1.047982229 1.0430211033
1.020027189 1.024006101 1.027023442 1.031963925 1.048012202 1.043005405
1.021021021 1.024024024 1.027027027 1.032432432 1.048048048 1.044444444
1.021021021 1.024024024 1.027027027 1.032432432 1.048048048 1.044444444
1.021021021 1.024024024 1.027027027 1.032432432 1.048048048 1.044444444

1.014864865
1.014864865
1.014864865
1.014864865
1.014864865
1.014864865
1.014864865
1.014864865
1.014864865
1.014864865
1.014864865
1.014864865
1.014864865
1.014864865
1.014864865
1.014864865
1.014864865

1.016216216
1.016216216
1.016216216
1.016216216
1.016216216
1.016216216
1.016216216
1.016216216
1.016216216
1.016216216
1.016216216
1.016216216
1.016216216
1.016216216
1.016216216
1.016216216
1.016216216

1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018

1.0171171171
1.0171171171
1.0171171171
1.0171171171
1.0171171171
1.0171171171
1.0171171171
1.0171171171
1.0171171171
1.0171171171
1.0171171171
1.0171171171
1.0171171171
1.0171171171
1.0171171171
1.0171171171
1.0171171171

1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369

1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369

1.014864865
1.014864865
1.014864865
1.014864865

1.016216216
1.016216216
1.016216216
1.016216216

1.018018018
1.018018018
1.018018018
1.018018018

1.0171171171
1.0171171171
1.0171171171
1.0171171171

1.019369369
1.019369369
1.019369369
1.019369369

1.019369369
1.019369369
1.019369369
1.019369369

1.014864865
1.014864865
1.014864865
1.014864865
1.014864865
1.014864865
1.014864865
1.014864865
1.014864865
1.014864865
1.014864865
1.014864865
1.014864865
1.014864865
1.014864865
1.014864865
1.014864865
1.014864865
1.014864865
1.014864865
1.014864865
1.014864865

1.016216216
1.016216216
1.016216216
1.016216216
1.016216216
1.016216216
1.016216216
1.016216216
1.016216216
1.016216216
1.016216216
1.016216216
1.016216216
1.016216216
1.016216216
1.016216216
1.016216216
1.016216216
1.016216216
1.016216216
1.016216216
1.016216216

1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018

1.0171171171
1.0171171171
1.0171171171
1.0171171171
1.0171171171
1.0171171171
1.0171171171
1.0171171171
1.0171171171
1.0171171171
1.0171171171
1.0171171171
1.0171171171
1.0171171171
1.0171171171
1.0171171171
1.0171171171
1.0171171171
1.0171171171
1.0171171171
1.0171171171
1.0171171171

1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369

1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369
1.019369369

1.060606061
1.060606061
1.060606061
1.060606061
1.060606061
1.060606061
1.060606061
1.060606061

1.121212121
1.121212121
1.121212121
1.121212121
1.121212121
1.121212121
1.121212121
1.121212121

1.151515152
1.151515152
1.151515152
1.151515152
1.151515152
1.151515152
1.151515152
1.151515152

1.151515152
1.151515152
1.151515152
1.151515152
1.151515152
1.151515152
1.151515152
1.151515152

1.212121212
1.212121212
1.212121212
1.212121212
1.212121212
1.212121212
1.212121212
1.212121212

1.212121212
1.212121212
1.212121212
1.212121212
1.212121212
1.212121212
1.212121212
1.212121212

1.060606061
1.060606061
1.060606061
1.060606061
1.060606061

1.121212121
1.121212121
1.121212121
1.121212121
1.121212121

1.151515152
1.151515152
1.151515152
1.151515152
1.151515152

1.151515152
1.151515152
1.151515152
1.151515152
1.151515152

1.212121212
1.212121212
1.212121212
1.212121212
1.212121212

1.212121212
1.212121212
1.212121212
1.212121212
1.212121212

1.060606061 1.121212121 1.151515152 1.151515152 1.212121212 1.212121212


1.060606061 1.121212121 1.151515152 1.151515152 1.212121212 1.212121212
1.060606061
1.060606061
1.060606061
1.060606061

1.121212121
1.121212121
1.121212121
1.121212121

1.151515152
1.151515152
1.151515152
1.151515152

1.151515152
1.151515152
1.151515152
1.151515152

1.212121212
1.212121212
1.212121212
1.212121212

1.212121212
1.212121212
1.212121212
1.212121212

1.145907473
1.145907473
1.145907473
1.145907473
1.145907473
1.145907473
1.145907473
1.145907473

1.160142349
1.160142349
1.160142349
1.160142349
1.160142349
1.160142349
1.160142349
1.160142349

1.169928826
1.169928826
1.169928826
1.169928826
1.169928826
1.169928826
1.169928826
1.169928826

1.179715302
1.179715302
1.179715302
1.179715302
1.179715302
1.179715302
1.179715302
1.179715302

1.189501779
1.189501779
1.189501779
1.189501779
1.189501779
1.189501779
1.189501779
1.189501779

1.199288256
1.199288256
1.199288256
1.199288256
1.199288256
1.199288256
1.199288256
1.199288256

1.145907473 1.160142349 1.169928826 1.179715302 1.189501779 1.199288256


1.145907473
1.145907473
1.145907473
1.145907473
1.145907473
1.145907473

1.160142349
1.160142349
1.160142349
1.160142349
1.160142349
1.160142349

1.169928826
1.169928826
1.169928826
1.169928826
1.169928826
1.169928826

1.179715302
1.179715302
1.179715302
1.179715302
1.179715302
1.179715302

1.189501779
1.189501779
1.189501779
1.189501779
1.189501779
1.189501779

1.199288256
1.199288256
1.199288256
1.199288256
1.199288256
1.199288256

1.145907473 1.160142349 1.169928826 1.179715302 1.189501779 1.199288256


1.145907473
1.145907473
1.145907473
1.145907473

1.160142349
1.160142349
1.160142349
1.160142349

1.169928826
1.169928826
1.169928826
1.169928826

1.179715302
1.179715302
1.179715302
1.179715302

1.189501779
1.189501779
1.189501779
1.189501779

1.199288256
1.199288256
1.199288256
1.199288256

1.1178097345 1.147123894 1.166482301 1.196349558


1.1178097345 1.147123894 1.166482301 1.196349558
1.1178097345 1.147123894 1.166482301 1.196349558

1.20630531 1.215707965
1.20630531 1.215707965
1.20630531 1.215707965

1.1178097345
1.1178097345
1.1178097345
1.1178097345

1.147123894
1.147123894
1.147123894
1.147123894

1.166482301
1.166482301
1.166482301
1.166482301

1.20630531
1.20630531
1.20630531
1.20630531

1.149825784
1.149825784
1.120031797
1.149825784

1.159407666
1.159407666
1.150238474
1.159407666

1.170296167
1.170296167
1.1701112878
1.170296167

1.179878049
1.18945993 1.201219512
1.179878049
1.18945993 1.201219512
1.200052994 1.210121887 1.220190779
1.179878049
1.18945993 1.201219512

1.149336283 1.159292035 1.169247788

1.17920354 1.194690265 1.200221239

1.149336283 1.159292035 1.169247788

1.17920354 1.194690265 1.200221239

1.196349558
1.196349558
1.196349558
1.196349558

Page 140

1.215707965
1.215707965
1.215707965
1.215707965

1.0175
1.066666667
1.066666667
1.066666667
1.066666667
1
1
1.083333333
1
1
1

1.0225
1.133333333
1.133333333
1.133333333
1.133333333
1.0111111111
1.0111111111
1.166666667
1.0111111111
1.0111111111
1.0111111111

1.0225
1.2
1.2
1.2
1.2
1.022222222
1.022222222
1.166666667
1.022222222
1.022222222
1.022222222

1.0225
1.2
1.2
1.2
1.2
1.033333333
1.033333333
1.166666667
1.033333333
1.033333333
1.033333333

1.025
1.333333333
1.333333333
1.333333333
1.333333333
1.1
1.1
1.333333333
1.1
1.1
1.1

1.0325
1.333333333
1.333333333
1.333333333
1.333333333
1
1
1 1
1
1
1

1.0175
1.0175
1.0175
1.0175
1.0175
1.0175
1.0175
1.0175
1.0175

1.0225
1.0225
1.0225
1.0225
1.0225
1.0225
1.0225
1.0225
1.0225

1.0225
1.0225
1.0225
1.0225
1.0225
1.0225
1.0225
1.0225
1.0225

1.0225
1.0225
1.0225
1.0225
1.0225
1.0225
1.0225
1.0225
1.0225

1.025
1.025
1.025
1.025
1.025
1.025
1.025
1.025
1.025

1.0325
1.0325
1.0325
1.0325
1.0325
1.0325
1.0325
1.0325
1.0325

1.0175
1.0175
1.0175
1.0175

1.0225
1.0225
1.0225
1.0225

1.0225
1.0225
1.0225
1.0225

1.0225
1.0225
1.0225
1.0225

1.025
1.025
1.025
1.025

1.0325
1.0325
1.0325
1.0325

1.0175
1.0175
1.0175
1.0175
1.0175
1.0175
1.0175
1.0175

1.0225
1.0225
1.0225
1.0225
1.0225
1.0225
1.0225
1.0225

1.0225
1.0225
1.0225
1.0225
1.0225
1.0225
1.0225
1.0225

1.0225
1.0225
1.0225
1.0225
1.0225
1.0225
1.0225
1.0225

1.025
1.025
1.025
1.025
1.025
1.025
1.025
1.025

1.0325
1.0325
1.0325
1.0325
1.0325
1.0325
1.0325
1.0325

1.0175
1.0175
1.0175
1.0175
1.0175

1.0225
1.0225
1.0225
1.0225
1.0225

1.0225
1.0225
1.0225
1.0225
1.0225

1.0225
1.0225
1.0225
1.0225
1.0225

1.025
1.025
1.025
1.025
1.025

1.0325
1.0325
1.0325
1.0325
1.0325

1.0175
1.0175

1.0225
1.0225

1.0225
1.0225

1.0225
1.0225

1.025
1.025

1.0325
1.0325

1.0175
1.0175
1.0175
1.0175
1.0175
1.0175
1.0175
1.0175
1.0175
1.0175
1.0175
1.0175
1.0175
1.0175
1.0175

1.0225
1.0225
1.0225
1.0225
1.0225
1.0225
1.0225
1.0225
1.0225
1.0225
1.0225
1.0225
1.0225
1.0225
1.0225

1.0225
1.0225
1.0225
1.0225
1.0225
1.0225
1.0225
1.0225
1.0225
1.0225
1.0225
1.0225
1.0225
1.0225
1.0225

1.0225
1.0225
1.0225
1.0225
1.0225
1.0225
1.0225
1.0225
1.0225
1.0225
1.0225
1.0225
1.0225
1.0225
1.0225

1.025
1.025
1.025
1.025
1.025
1.025
1.025
1.025
1.025
1.025
1.025
1.025
1.025
1.025
1.025

1.0325
1.0325
1.0325
1.0325
1.0325
1.0325
1.0325
1.0325
1.0325
1.0325
1.0325
1.0325
1.0325
1.0325
1.0325

1.230769231
1.230769231
1.231884058
1.068965517
1.068965517

1.2115384615
1.2115384615
1.217391304
1.155172414
1.155172414

1.320512821
1.320512821
1.289855072
1.155172414
1.155172414

1.294871795
1.294871795
1.289855072
1.293103448
1.293103448

1.602564103
1.602564103
1.594202899
1.362068966
1.362068966

1.397435897
1.397435897
1.391304348
1.155172414
1.155172414

1.230769231
1.230769231
1.230769231
1.230769231
1.230769231
1.230769231
1.230769231
1.230769231
1.230769231
1.230769231
1.230769231
1.230769231
1.230769231

1.2115384615
1.2115384615
1.2115384615
1.2115384615
1.2115384615
1.2115384615
1.2115384615
1.2115384615
1.2115384615
1.2115384615
1.2115384615
1.2115384615
1.2115384615

1.320512821
1.320512821
1.320512821
1.320512821
1.320512821
1.320512821
1.320512821
1.320512821
1.320512821
1.320512821
1.320512821
1.320512821
1.320512821

1.294871795
1.294871795
1.294871795
1.294871795
1.294871795
1.294871795
1.294871795
1.294871795
1.294871795
1.294871795
1.294871795
1.294871795
1.294871795

1.602564103
1.602564103
1.602564103
1.602564103
1.602564103
1.602564103
1.602564103
1.602564103
1.602564103
1.602564103
1.602564103
1.602564103
1.602564103

1.397435897
1.397435897
1.397435897
1.397435897
1.397435897
1.397435897
1.397435897
1.397435897
1.397435897
1.397435897
1.397435897
1.397435897
1.397435897

1.15
1.15
1.15
1.15
1.15
1.15
1.02006552
1.15
1.15
1.15
1.15
1.15
1.15

1.160003754
1.160003754
1.160003754
1.160003754
1.160003754
1.160003754
1.024160524
1.160003754
1.160003754
1.160003754
1.160003754
1.160003754
1.160003754

1.170007508
1.170007508
1.170007508
1.170007508
1.170007508
1.170007508
1.026818182
1.170007508
1.170007508
1.170007508
1.170007508
1.170007508
1.170007508

1.180001877
1.180001877
1.180001877
1.180001877
1.180001877
1.180001877
1.032350532
1.180001877
1.180001877
1.180001877
1.180001877
1.180001877
1.180001877

1.190005631
1.2
1.190005631
1.2
1.190005631
1.2
1.190005631
1.2
1.190005631
1.2
1.190005631
1.2
1.048321048 1.043202293
1.190005631
1.2
1.190005631
1.2
1.190005631
1.2
1.190005631
1.2
1.190005631
1.2
1.190005631
1.2

1.015444015
1.015444015
1.015444015
1.015444015
1.015444015
1.015444015
1.015444015

1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018

1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018

1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018

1.020592021
1.020592021
1.020592021
1.020592021
1.020592021
1.020592021
1.020592021

1.025714286
1.025714286
1.025714286
1.025714286
1.025714286
1.025714286
1.025714286

1.137931034
1.137931034
1.137931034
1.137931034
1.137931034
1.137931034

1.149425287
1.149425287
1.149425287
1.149425287
1.149425287
1.149425287

1.379310345
1.379310345
1.379310345
1.379310345
1.379310345
1.379310345

1.172413793
1.172413793
1.172413793
1.172413793
1.172413793
1.172413793

1.724137931
1.724137931
1.724137931
1.724137931
1.724137931
1.724137931

1.149425287
1.149425287
1.149425287
1.149425287
1.149425287
1.149425287

1.137931034
1.137931034
1.137931034
1.137931034
1.137931034
1.137931034

1.149425287
1.149425287
1.149425287
1.149425287
1.149425287
1.149425287

1.379310345
1.379310345
1.379310345
1.379310345
1.379310345
1.379310345

1.172413793
1.172413793
1.172413793
1.172413793
1.172413793
1.172413793

1.724137931
1.724137931
1.724137931
1.724137931
1.724137931
1.724137931

1.149425287
1.149425287
1.149425287
1.149425287
1.149425287
1.149425287

1.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.025714286


1.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.025714286
1.015444015 1.018018018 1.018018018 1.018018018 1.020592021 1.025714286
1.015444015
1.015444015
1.015444015
1.015444015
1.015444015
1.015444015
1.015444015
1.015444015
1.015444015
1.015444015
1.015444015

1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018

1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018

1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018
1.018018018

Page 141

1.020592021
1.020592021
1.020592021
1.020592021
1.020592021
1.020592021
1.020592021
1.020592021
1.020592021
1.020592021
1.020592021

1.025714286
1.025714286
1.025714286
1.025714286
1.025714286
1.025714286
1.025714286
1.025714286
1.025714286
1.025714286
1.025714286

1.015444015
1.015444015
1.015444015
1.015444015

1.018018018
1.018018018
1.018018018
1.018018018

1.018018018
1.018018018
1.018018018
1.018018018

1.018018018
1.018018018
1.018018018
1.018018018

1.020592021
1.020592021
1.020592021
1.020592021

1.025714286
1.025714286
1.025714286
1.025714286

1.105105105
1.105105105
1.105105105
1.105105105
1.105105105
1.105105105
1.105105105
1.105105105

1.132132132
1.132132132
1.132132132
1.132132132
1.132132132
1.132132132
1.132132132
1.132132132

1.148648649
1.148648649
1.148648649
1.148648649
1.148648649
1.148648649
1.148648649
1.148648649

1.174174174
1.174174174
1.174174174
1.174174174
1.174174174
1.174174174
1.174174174
1.174174174

1.183183183
1.183183183
1.183183183
1.183183183
1.183183183
1.183183183
1.183183183
1.183183183

1.190666667
1.190666667
1.190666667
1.190666667
1.190666667
1.190666667
1.190666667
1.190666667

1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595

1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717

1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887

1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605

1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322

1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614

1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595
1.013665595

1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717
1.01607717

1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887
1.017684887

1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605
1.019292605

1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322
1.020900322

1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614
1.024919614

Page 142

DAFTAR ANALISA
PERHITUNGAN UNIT PRICE
DAERAH KABUPATEN BULUNGAN
TAHUN ANGGARAN 2012

Page 143

ANALISA TG.SELOR DAN TG.PALAS 2011.xls

Page 144

ANALISA TG.SELOR DAN TG.PALAS 2011.xls

DAFTAR HARGA MATERIAL


DINAS PEKERJAAN UMUM KABUPATEN BULUNGAN
PROPINSI
KABUPATEN
TAHUN ANGGARAN

NO

: KALIMANTAN TIMUR
: BULUNGAN
: 2012

URAIAN

HARGA MATERIAL TAHUN 2012 ( Rp )


ZONA 1
SATUAN
TG.SELOR
TG. PALAS

KETERANGAN

BAHAN

Batu Gunung

M3

278,437.50 Harga Sudah termasuk PPN 10 %

Kerikil Sungai

M3

153,780.00

Batu Kali Bulat

M3

177,760.00

Batu Pecah 15 - 20 cm ( Ex Sekatak )

M3

431,200.00

Batu Pecah 5 - 7 cm ( Ex Sekatak )

M3

431,200.00

Batu Pecah 3 - 5 cm ( Ex Sekatak )

M3

431,200.00

Batu Pecah 2 - 3 cm ( Ex Sekatak )

M3

431,200.00

Batu Pecah 1 - 2 cm ( Ex Sekatak )

M3

431,200.00

Batu Pecah 0,5 - 1 cm ( Ex Sekatak )

M3

431,200.00

10

Abu Batu (ex. Sekatak)

M3

431,200.00

11

Pasir Urug / Timbunan

M3

95,040.00

12

Pasir Beton

M3

107,140.00

13

Kerikil Sungai Tak Disaring

M3

28,490.00

14

Timbunan Pilihan

M3

66,000.00

15

Timbunan Tanah

M3

61,875.00

16

Aspal

Kg

17,880.50

17

Batu Bata

bh

880.00

18

Bataco

bh

2,750.00

19

Minyak Tanah

Ltr

6,600.00

20

Minyak Disel / Solar

Lt

9,900.00

21

Minyak Premium

Lt

9,900.00

22

Minyak Pelumas

Lt

38,850.00

23

Tear /Residu

lt

8,250.00

24

Semen 40 Kg

Kg

1,725.00

25

Semen 40 Kg

Zak

68,640.00

26

Semen warna

Kg

15,950.00

27

Cat Jembatan Galvanis

Kg

38,850.00

28

Kawat Bronjong

Kg

21,450.00

Page 145

Harga Material 2011

NO

URAIAN

HARGA MATERIAL TAHUN 2012 ( Rp )


ZONA 1
SATUAN
TG.SELOR
TG. PALAS

29

Baut Baja

Kg

22,200.00

30
31

Baja Propil Tulangan Beton

Kg

15,125.00

Alat- alat bantu

Unit

56,100.00

32

Profil Tank 650 Lt

1 Unit

870,000.00

33

Profil Tank 1200 Lt

1 Unit

1,600,000.00

34

Profil Tank 2200 Lt

1 Unit

3,000,000.00

35

Kawat Baja ( Bindrat )

36

Beton Cetak ( Paving Blok )

37

Air Bersih

Ltrr

16.00

38

Koral Sikat

Zak

50,000.00

II

BAHAN ATAP

Genteng Mortir

2
3

Kg

22,200.00

Buah

3,630.00

KETERANGAN

Buah

9,800.00

Besi Strip 2 x 1cm

Lembar

30,525.00

Besi Plat

Lembar

18,300.00

Besi Plat Strif 1 x 1 cm

Lembar

30,525.00

Besi Strip 2 x 2 cm

Lembar

42,750.00

Besi Strip

Meter

3,900.00

Seng Plastik 0,90 x 1,80 cm

Lembar

45,200.00

Seng Gelombang Bjls. 30

Lembar

64,950.00

Seng Gelombang Bjls. 20

Lembar

51,625.00

10

Seng Plat Bjls. 30 L = 45 cm

1 M'

26,875.00

11

Seng Plat Bjls. 20 L = 45 cm

1 M'

21,650.00

12

Alumunim Foil

M2

12,225.00

13

Sakura Roof ( Ukuran standard 77 X 80 cm ).

Lembar

45,200.00

14

Surya Roof ( Ukuran standard 77 X 80 cm ).

Lembar

79,375.00

15

Multi Roof ( Ukuran standard 77 X 80 cm ) .

Lembar

140,425.00

16

Bubungan Sakura Roof ( Model C )

1 Buah

27,750.00

17

Bubungan Surya Roop( Model C )

1 Buah

33,300.00

18

Bubungan Multi Roop( Model C )

1 Buah

61,050.00

19

Genteng glazuur

1 Buah

28,100.00

20

Bubungan genteng glazuur

1 Buah

17,100.00

23

Atap fiber glass

1 Lembar

57,400.00

24

Talang U PVC

4 M'

94,350.00

25

Genteng Sirap

bh

530.00
-

Page 146

Harga Material 2011

NO

URAIAN

HARGA MATERIAL TAHUN 2012 ( Rp )


ZONA 1
SATUAN
TG.SELOR
TG. PALAS

III

BAHAN KACA

Kaca Polos T. 3 mm

1 M2

99,900.00

Kaca Polos T. 5 mm

1 M2

134,325.00

Kaca Buram T. 3 mm

1 M2

146,525.00

Kaca Buram T. 5 mm

1 M2

164,300.00

Kaca Riben T. 3 mm

1 M2

121,125.00

Kaca Riben T. 5 mm

1 M2

149,850.00

Kaca Riben T.8 mm

2 M2

178,575.00

Kaca Nako Polos T. 3 mm

1 M2

109,900.00

Kaca Nako Polos T. 5 mm

1 M2

121,000.00

10

Kaca patri warna ( lokal 100% )

1 M2

888,000.00

11

Kaca patri warna ( import 100% )

1 M2

2,664,000.00

12

Kaca cermin T.5 mm

1 M2

213,675.00

13

Glass Block

14 Jendela Nako

KETERANGAN

1 Buah

28,100.00

Bh

122,100.00
-

IV

ALAT PENGGANTUNG DAN PENGUNCI

Kunci Yale Itali

1 Buah

222,000.00

Kunci Yale Type I

1 Buah

138,750.00

Kunci Yale Type II

1 Buah

83,250.00

Kunci kuda terbang

1 Buah

83,250.00

Kunci Tanam Union

1 Buah

49,950.00

Kunci Yale Biasa

1 Buah

72,725.00

Kunci Cylindeer WINMA

1 Buah

128,775.00

Ensel Kupu - kupu

1 Buah

14,450.00

Handel Jendela

1 Buah

25,000.00

10

Hak Angin Biasa

1 Buah

4,450.00
22,000.00

11

Hak Angin Kualitas baik

1 Buah

12

Grendel Biasa

1 Buah

8,900.00

13

Grendel Kuningan

1 Buah

22,200.00

14

Engsel Kuningan

1 Ps

36,650.00

15

Engsel Kuningan Infra 5 Inchi

I Buah

36,650.00

16

Pegangan Pintu/door holder

1 Buah

187,050.00

17

Door closer

1 Buah

166,500.00

18

Door Stop

1Buah

125,000.00
-

Page 147

Harga Material 2011

NO

URAIAN

HARGA MATERIAL TAHUN 2012 ( Rp )


ZONA 1
SATUAN
TG.SELOR
TG. PALAS

KETERANGAN

BAHAN LANGIT - LANGIT

Gipsum Board

1 Lembar

91,200.00

Playwood 3 mm

1 Lembar

54,125.00

Playwood 6 mm

1 Lembar

109,900.00

Multi Playwood 10 mm

1 Lembar

194,250.00

Multi Playwood 18 mm

1 Lembar

270,575.00

Texwood

1 Lembar

122,100.00

Jabarwood

1 Lembar

55,500.00

Plywood Formica

1 Lembar

55,500.00

Milamin

1 Lembar

103,800.00

10

List Plafond Gipsim

30,000.00

11

Tepung Gipsum

kg

5,000.00
-

VI

BAHAN LANTAI

Keramik 60 x 60 cm

1 Ktk/M2

187,325.00

Keramik 40 x 40

1 Ktk/M2

74,925.00

Keramik 30 x 30

1 Ktk/M2

55,500.00

Keramik 20 x 25

1 Ktk/M2

55,500.00

Keramik 20 x 20 cm

1 Ktk/M2

53,300.00

Porselin 11 x 11 cm

1 Ktk/M2

49,950.00

Mozaik 20 x 20 cm

1 Ktk/M2

88,800.00

Mozaik 30 x 30 cm

1 Ktk/M2

91,575.00

Granite tile Esenza ( Standart )

1 Ktk/M2

271,950.00

10

Granite tile Esenza ( Motif Khusus )

1 Ktk/M2

371,850.00

11

Granite tile Inesa

1 Ktk/M2

323,575.00

12

Ubin marmer Bandung 40 x 40 x 2

M2

304,150.00

13

Ubin marmer Bandung 60 x 40 x 2

M2

329,675.00

14

Ubin marmer Bandung 30 x 30 x 2

M2

243,100.00

15

Ubin marmer Bandung 30 x 10 x 2

M2

186,500.00

16

Ubin PC abu-abu 20x20

bh

3,900.00

17

Ubin plint PC abu-abu 10/20

bh

3,500.00

18

Ubin PC warna 20x20

bh

5,500.00

19

Ubin plint PC warna 10/20

bh

3,500.00

20

Batu Palimanan

M2

238,650.00

21

Parquet jati 30 x 5 x 1,5 cm

M2

305,250.00

Page 148

Harga Material 2011

NO

URAIAN

HARGA MATERIAL TAHUN 2012 ( Rp )


ZONA 1
SATUAN
TG.SELOR
TG. PALAS

KETERANGAN

VII

BAHAN BESI
1

Besi Plat Tebal 3 mm - 12 m

Besi beton

Besi Plat tebal 2mm x 180cm x 240 cm

1 Lembar

266,400.00

kg

15,275.00

1 Lembar

499,500.00

Besi Strip 2 cm x 2 mm

1 lonjor

38,850.00

Besi Strip 1 cm x 1 mm

1 lonjor

27,750.00

Besi Baut Diameter 1/2 inch - 45 cm

Buah

22,200.00

Besi Klam " U "

Buah

20,550.00

Kawat Duri

Roll

184,000.00

Kawat Duri

Kg

17,775.00

10

Kawat Harmonika 4 x 4 cm

1 M2

34,200.00

11

Kawat Ayam

1 M2

24,975.00

12

Kawat Nyamuk Hitam

1 M2

18,325.00

13

Kawat Nyamuk Putih

1 M2

22,200.00

14

Besi plat strip

1 kg

22,200.00

15

Wiremaah

1kg

22,200.00
-

VIII

BAHAN FINISHING

Amplas Kayu / Besi

1 Lembar

5,000.00

Amplas Kayu / Besi

1 Meter

10,000.00

Kuas Cat

1 Buah

17,350.00

Meni Kayu / Besi 5 Kg

Kaleng

107,675.00

Meni Kayu / Besi

Dempul Plamir 5 Kg

7
8
9

1 Kg

41,625.00

Kaleng

108,225.00

Dempul Plamir

1 Kg

21,925.00

Teak Oil

1 Liter

24,425.00

Godler / Residu

1 Kg

8,325.00

1 Kaleng

36,075.00

1 Kg

7,225.00

10

Cat Air 5 Kg Aries

11

Cat Air Aries

12

Cat Air 5 kg Catylax

1 Kaleng

104,350.00

13

Cat Air Catylac

1 Kg

20,875.00

14

Cat Lencote interior

1 Kg

55,000.00

15

Cat Mowilex interior

1 kg

59,400.00

16

Cat Mowilex exterior

1 kg

85,800.00

17

Cat duluxe exterior

1 kg

104,500.00

Page 149

Harga Material 2011

NO

URAIAN

HARGA MATERIAL TAHUN 2012 ( Rp )


ZONA 1
SATUAN
TG.SELOR
TG. PALAS

18

Cat Alkali

1 kg

44,000.00

19

Cat Kilap Glotek

1 Kg

43,850.00

20

Tiner A Spesial

1 Kg

27,750.00

21

Tiner A Biasa

1 Kg

24,425.00

22

Cat Air 5 Kg Gamalek

1 Kaleng

30,525.00

23

Cat Air 5 Kg Gamalek

1 Kg

48,850.00

24

Vernis Clear

Lt

45,075.00

25

Vernis warna

Lt

46,900.00

26

Pelitur

Lt

41,625.00

27

Pelitur Pernis

Lt

47,750.00

28

Cat dasar

Kg

29,425.00

29

Cat khusus atap

1 Kg

102,125.00

30

Wallpaper kingston

M2

57,900.00

31

Soda Api

1 Kg

15,000.00

32

Sabun

1 Kg

16,500.00

33

Batu Apung

1 Kg

13,675.00

KETERANGAN

IX

BAHAN SANITAIR

Closed Jongkok Porselin

1 Buah

239,775.00

Closed Duduk Porselin

1 Buah

1,665,000.00

Wastapel Porselin

1 Buah

1,348,650.00

Bak Cuci Alumunium

1 Buah

636,050.00

Urinoir Porselin

1 Buah

271,950.00

Closed monoblok

1 Buah

1,615,050.00

Bath Knip Plastik / Fiber

1 Buah

757,025.00

Kran Air biasa

1 Buah

19,425.00

Kran Air Stanlis

1 Buah

66,600.00

10

Kran Air Kuningan

1 Buah

27,750.00

11

Bak mandi fiberglas Uk.70x70x66 cm

1 Buah

388,500.00

Bh

13,325.00

12 Floor Drain PVC


13 Floor Drain stanlis

Bh

75,000.00

14 Pipa PVC Type AW 1/2"

batang

16,650.00

15 Pipa PVC Type AW 3/4"

batang

19,100.00

16 Pipa PVC Type AW 1"

batang

30,875.00

17 Pipa PVC Type AW 1 1/2"

batang

51,512.50

18 Pipa PVC Type AW 2"

batang

72,150.00

Page 150

Harga Material 2011

NO

URAIAN

HARGA MATERIAL TAHUN 2012 ( Rp )


ZONA 1
SATUAN
TG.SELOR
TG. PALAS

19 Pipa PVC Type AW 2 1/2"

batang

102,675.00

20 Pipa PVC Type AW 3"

batang

133,200.00

21 Pipa PVC Type AW 4"

batang

199,800.00

22 seal tape

bh

KETERANGAN

3,000.00
-

BAHAN PAKU

Paku Biasa 1/2" - 1"

1 Kg

21,650.00

Paku Biasa 1,5" - 2"

1 Kg

21,650.00

Paku Biasa 4" - 5"

1 Kg

21,650.00

Paku Ulin 1", 2" , 4"

1 Kg

27,500.00

Paku Jembatan

Kg

20,900.00

Paku Besi Ukuran 1/2 "

Kg

31,100.00

Paku Besi Ukuran 3/4 "

Kg

31,100.00

Paku Besi Ukuran 1 "

Paku Besi Ukuran 1,50 "

Kg

31,100.00

Buah

3,615.00

10

Paku Gipsum

Kg

22,500.00

11

Paku Genteng Metal

bh

450.00

12

Skrub Fixer

bh

500.00
-

XI

BAHAN KAYU

Kayu Kapur 10x10 cm x 4M

1 M3

1,665,000.00

Kayu Meranti 10 x 10 cm x 4M

1 M3

1,443,000.00

Papan Kapur 2 x 20 cm x 4M

1 M3

1,887,000.00

Papan Meranti 2 x 20 cm x 4M

1 M3

1,443,000.00

Balok Meranti 5 x 7 cm x 4M

1 M3

1,443,000.00

Balok Meranti 5 x 5 cm x 4M

1 M3

1,443,000.00

Kayu Reng 2 x 3 cm x 4M

1 M3

1,443,000.00

Kayu Untuk Perancah

1M3

1,221,000.00

Kayu Untuk Perancah 4m'

1 Bh

15,960.78

10

Kayu Untuk Konstruksi Jembatan

1M3

1,443,000.00

11

Balok Ulin 10/10 cm x 4 m

1M3

3,850,000.00

12

Balok Ulin 12/12 cm x 4 m

1M3

3,850,000.00

13

Balok Ulin 15/15 cm x 4 m

1M3

3,850,000.00

14

Balok Ulin 20/20 cm x 4 m

1M3

6,050,000.00

15

Balok Ulin 5/10 cm x 4 m

1M3

3,850,000.00

16

Papan Ulin Tebal = 2,5 cm

1M3

3,850,000.00

Page 151

Harga Material 2011

NO

URAIAN

HARGA MATERIAL TAHUN 2012 ( Rp )


ZONA 1
SATUAN
TG.SELOR
TG. PALAS

17

Papan Ulin Tebal = 5 cm

1M3

3,850,000.00

18

Papan Ulin 9 / 25 cm x 4 m

1M3

4,950,000.00

19

Kayu Bakar

M3

49,500.00

20

Lem Kayu

Kg

33,300.00

21

List kayu profil

m'

8,325.00

KETERANGAN

XII

ALUMINIUM

Kusen aluminium 3" YKK ( Doff )

1M'

80,100.00

Kusen aluminium 3" YKK ( Gloss )

1M'

143,315.00

Kusen aluminium 4" YKK ( Doff )

1M'

109,125.00

Kusen aluminium 4" YKK ( Gloss )

1M'

150,075.00

Frame Daun Pintu Alumunium

1M'

100,000.00

Frame Daun Jendela Alumunium

1M'

90,000.00

Pintu swing standard tanpa kaca ( uk.90x210)Doff,merk YKK

Bh

1,236,375.00

Pintu swing standard tanpa kaca ( uk.90x210)Gloss,merk YKK

Bh

1,492,175.00

Pintu swing dg spandel Gloss Grendel(uk.85x210),Doff,merk YKK

Bh

1,219,350.00

10

Pintu swing standard tanpa kaca ( uk.85x210)Gloss,merk YKK

Bh

1,407,000.00

11

Pintu sliding standard tanpa kaca ( uk.90x210)Gloss,merk YKK

Bh

1,028,425.00

12

Pintu Lipat Varia

M2

1,904,775.00

13

Pintu swing standard tanpa kaca ( uk.90x210)Doff,merk YKK

Bh

1,265,525.00

14

Jendela Casemen standard BV tanpa kaca (A 4,5m' )

Bh

600,350.00

15

Jendela Casemen standard BV tanpa kaca (A 4,5m' )

Bh

675,400.00

16

Jendela Casemen BV tanpa kaca (A 2,8m' )Gloss

Bh

469,050.00

17

Jendela Casemen BV tanpa kaca (A 2,8m' )Doff

Bh

515,875.00

18

Jendela Sliding ekonomi standard kaca ( A 4,5 m') Gloss

Bh

375,250.00

19

Jendela Sliding ekonomi standard kaca ( A 4,5 m') Doff

Bh

469,050.00

20

Louvre( Jalusi ) 7 cm,coklat,merk superex

1M'

30,050.00

21

Louvre( Jalusi ) 10 cm,coklat,merk superex

1M'

60,000.00

22

Plafon spandel,coklat,merk superex

1M2

431,425.00

23

Rangka curtain wall,coklat,merk superex

1M2

337,625.00

24

Spring Knip

Bh

95,250.00

25

Rell Pintu Dorong / 5m'

Bh

1,269,850.00

26

Sealent

Kg

22,200.00

27

Sealent

Tube

100,000.00

28

Profil Kaca

7,500.00

29

Sunscren Alumunium

M2

753,975.00

Page 152

Harga Material 2011

NO

URAIAN

HARGA MATERIAL TAHUN 2012 ( Rp )


ZONA 1
SATUAN
TG.SELOR
TG. PALAS

30

Rolling Door Alumunium

M2

1,269,850.00

31

Pintu Alumunium

M2

720,675.00

32

Rooling Door Besi

M2

990,000.00

33 Puzzdith - 100 XR

Ltr

41,625.00

34 Batu Granito Plasteran

Kg

13,600.00

35 Batu Traso Plasteran

Kg

13,600.00

36 Sabun

Kg

16,950.00

37 Batu Bata Bali

Bh

1,175.00

38 Pengadaan Rangka Baja

Kg

42,350.00

39 Assumsi Pengelasan

Cm

850.00

40 lempengan rumput biasa

m2

38,850.00

41 kawat las listrik

kg

27,750.00

KETERANGAN

42
43
-

Page 153

Harga Material 2011

NO

URAIAN

HARGA MATERIAL TAHUN 2012 ( Rp )


ZONA 1
SATUAN
TG.SELOR
TG. PALAS

XIII INSTALASI LISTRIK

1 Lampu Pijar 14 Watt

Bh

31,100

2 Saklar Tunggal

Bh

13,325

3 Saklar Ganda

Bh

16,650

4 Lampu TL

Bh

77,700

5 Lampu SL 14 watt

55,500

6 Lampu SL 24 Watt

Bh

65,000

7 Stop Kontak

Bh

16,650

8 MCB

Bh

44,400

9 Kabel NYA 2,5 mm

m'

271,950

bh

22,200

10 Fiting Lampu

KETERANGAN

XIV TANAMAN
1 Pupuk Kandang

Zak

20,000.00

2 Tanaman Glodok

Btg

250,000.00

3 Palem Kipas

Btg

562,000.00

4 Rumput Gajah

M2

50,000.00

5 Bunga Dadap Merah

Btg

300,000.00

Tanjung Selor,
Januari 2011
KEPALA DINAS PEKERJAAN UMUM
KABUPATEN BULUNGAN

H. ZAINAL ABIDIN, MD, ST, M.Si


NIP.19560106 197502 1 001

Page 154

Harga Material 2011

306281.25

278,437.50

169158

153,780.00

195536

177,760.00

474320

431,200.00

474320

431,200.00

474320

431,200.00

474320

431,200.00

474320

431,200.00

474320

431,200.00

474320

431,200.00

104544

95,040.00

117854

107,140.00

31339

28,490.00

72600

66,000.00

68062.5

61,875.00

19668.55

17,880.50

968

880.00

3025

2,750.00

7260

6,600.00

10890

9,900.00

10890

9,900.00

42735

38,850.00

9075

8,250.00

1897.5
75504

1,725.00
65000

68,640.00

17545

15,950.00

42735

38,850.00

23595

21,450.00

Page 155

Harga Material 2011

24420

22,200.00

16637.5

15,125.00

61710

56,100.00

957000

870,000.00

1760000

1,600,000.00

3300000

3,000,000.00

24420

22,200.00

3993

3,630.00

0
0
10780

9,800.00

33577.5

30,525.00

20130

18,300.00

33577.5

30,525.00

47025

42,750.00

4290

3,900.00

49720

45,200.00

71445

64,950.00

56787.5

51,625.00

29562.5

26,875.00

23815

21,650.00

13447.5

12,225.00

49720

45,200.00

87312.5

79,375.00

154467.5

140,425.00

30525

27,750.00

36630

33,300.00

67155

61,050.00

30910

28,100.00

18810

17,100.00

63140

57,400.00

103785

94,350.00

Page 156

Harga Material 2011

0
109890

99,900.00

147757.5

134,325.00

161177.5

146,525.00

180730

164,300.00

133237.5

121,125.00

164835

149,850.00

120890

109,900.00

133100

121,000.00

976800

888,000.00

2930400

2,664,000.00

235042.5

213,675.00

30910

28,100.00

134310

122,100.00

0
0
244200

222,000.00

152625

138,750.00

91575

83,250.00

91575

83,250.00

54945

49,950.00

79997.5

72,725.00

141652.5

128,775.00

15895

14,450.00

4895

4,450.00

9790

8,900.00

24420

22,200.00

40315

36,650.00

40315

36,650.00

205755

187,050.00

183150

166,500.00

137500

125,000.00

Page 157

Harga Material 2011

0
0
100320

91,200.00

59537.5

54,125.00

120890

109,900.00

213675

194,250.00

297632.5

270,575.00

134310

122,100.00

61050

55,500.00

61050

55,500.00

114180

103,800.00

33000

30,000.00

0
0
206057.5

187,325.00

82417.5

74,925.00

61050

55,500.00

61050

55,500.00

58630

53,300.00

54945

49,950.00

97680

88,800.00

100732.5

91,575.00

299145

271,950.00

409035

371,850.00

355932.5

323,575.00

334565

304,150.00

362642.5

329,675.00

267410

243,100.00

205150

186,500.00

4290

3,900.00

3850

3,500.00

6050

5,500.00

3850

3,500.00

262515

238,650.00

335775

305,250.00

Page 158

Harga Material 2011

0
0
293040

266,400.00

16802.5

15,275.00

549450

499,500.00

42735

38,850.00

30525

27,750.00

24420

22,200.00

22605

20,550.00

202400

184,000.00

19552.5

17,775.00

37620

34,200.00

27472.5

24,975.00

20157.5

18,325.00

24420

22,200.00

24420

22,200.00

24420
0
0
5500

5,000.00

11000

10,000.00

19085

17,350.00

118442.5

107,675.00

45787.5

41,625.00

119047.5

108,225.00

24117.5

21,925.00

26867.5

24,425.00

9157.5

8,325.00

39682.5

36,075.00

7947.5

7,225.00

114785

104,350.00

22962.5

20,875.00

Page 159

Harga Material 2011

48235

43,850.00

30525

27,750.00

26867.5

24,425.00

33577.5

30,525.00

53735

48,850.00

49582.5

45,075.00

51590

46,900.00

45787.5

41,625.00

52525

47,750.00

32367.5

29,425.00

112337.5

102,125.00

63690

57,900.00

16500

15,000.00

18150

16,500.00

15042.5

13,675.00

0
0
263752.5

239,775.00

1831500

1,665,000.00

1483515

1,348,650.00

699655

636,050.00

299145

271,950.00

1776555

1,615,050.00

832727.5

757,025.00

21367.5

19,425.00

73260

66,600.00

30525

27,750.00

427350

388,500.00

14657.5

13,325.00

18315

16,650.00

21010

19,100.00

33962.5

30,875.00

56663.75
79365

72,150.00

Page 160

Harga Material 2011

146520

133,200.00

219780

199,800.00

0
0
23815

21,650.00

23815

21,650.00

23815

21,650.00

30250

27,500.00

22990

20,900.00

34210

31,100.00

34210

31,100.00

34210

31,100.00

3976.5

3,615.00

24750

22,500.00

0
0
1831500

1,665,000.00

1587300

1,443,000.00

61.48

2075700

1,887,000.00

38.52

1587300

1,443,000.00

1587300

1,443,000.00

1587300

1,443,000.00

1587300

1,443,000.00

1343100

1,221,000.00

913500

(669,600.00)

17556.8627451

15,960.78

(0.22)

1587300

1,443,000.00

1888887

4235000

3,850,000.00

4235000

3,850,000.00

4235000

3,850,000.00

6655000

6,050,000.00

0.014

4235000

3,850,000.00

71.42857143

4235000

3,850,000.00

Page 161

Harga Material 2011

4235000

3,850,000.00

5445000

4,950,000.00

54450

49,500.00

36630 tp.tgh
9157.5

0.9140

33,300.00 tg plas timur


8,325.00

0.9171

peso hilir
0.9160

peso

bunyu
0.9180

0.9178

0
0
88110

80,100.00

157646.5

143,315.00

120037.5

109,125.00

165082.5

150,075.00

1360012.5

1,236,375.00

1641392.5

1,492,175.00

1341285

1,219,350.00

1547700

1,407,000.00

1131267.5

1,028,425.00

2095252.5

1,904,775.00

1392077.5

1,265,525.00

660385

600,350.00

742940

675,400.00

515955

469,050.00

567462.5

515,875.00

412775

375,250.00

515955

469,050.00

33055

30,050.00

66000

60,000.00

474567.5

431,425.00

371387.5

337,625.00

104775

95,250.00

1396835

1,269,850.00

24420

22,200.00

829372.5

753,975.00

Page 162

Harga Material 2011

1396835

1,269,850.00

792742.5

720,675.00

45787.5

41,625.00

14960

13,600.00

14960

13,600.00

18645

16,950.00

1292.5

1,175.00

46585

42,350.00

935

850.00

42735

38,850.00

30525

27,750.00

Page 163

Harga Material 2011

34210

31,100.00

14657.5

77,700.00

18315

55,500.00

85470

16,650.00

61050
71500

13,325.00

18315

55,500.00

48840

16,650.00

299145

271,950.00

24420

22,200

Tanjung Selor,
Januari 2011
KEPALA DINAS PEKERJAAN UMUM
KABUPATEN BULUNGAN

H. ZAINAL ABIDIN, MD, ST, M.Si


NIP.19560106 197502 1 001

Page 164

Harga Material 2011

HARGA SATUAN PIPA DAN ASSESORIES


KECAMATAN TANJUNG SELOR DAN TANJUNG PALAS 2012

HARGA SATUAN
BAHAN 2010
BAHAN 2012
NO

URAIAN

PIPA
300
200
150
100
75
50
40
25
20
12.5

SATUAN

ZONA 1
Kec.TG.Selor
/TG.Palas

KETERANGAN

GIP
12 "
8"
6"
4"
3"
2"
1.1/2 "
1"
3/4 "
1/2 "

Per Meter
Per Meter
Per Meter
Per Meter
Per Meter
Per Meter
Per Meter
Per Meter
Per Meter
Per Meter

789,579.50
732,325.00
628,468.00
419,422.50
362,634.03
151,125.25
84,017.65
39,279.25
34,752.15
22,262.68

PIPA
300
200
150
100
75
50
40
25

PVC RRJ S. 12,5


Per Meter
Per Meter
Per Meter
Per Meter
Per Meter
Per Meter
Per Meter
Per Meter

PIPA
300
200
150
100
75
50
40
25
20
12.5

PVC SC S. 12,5
Per Meter
Per Meter
Per Meter
Per Meter
Per Meter
Per Meter
Per Meter
Per Meter
Per Meter
Per Meter

Harga
Sudah
Termasuk
PPn 10 %

399,994.25
247,648.61
171,823.62
146,780.50
86,190.07
44,729.80
26,190.93
15,651.96
399,994.25
247,648.61
171,823.62
146,780.50
86,190.07
44,729.80
26,190.93
15,651.96
9,182.48
6,295.57

HARGA SATUAN
BAHAN
BAHAN 2010
2012
NO

URAIAN

PIPA
300
200
150
100
75
50
40
25
PIPA
300
200

SATUAN

PVC RRJ S. 10
Per Meter
Per Meter
Per Meter
Per Meter
Per Meter
Per Meter
Per Meter
Per Meter
PVC SC S. 10
Per Meter
Per Meter
Page 165

ZONA 1
Kec.TG.Selor
/TG.Palas

429,029.27
283,357.85
184,565.87
173,061.71
96,134.83
59,458.13
37,276.67
22,249.37
429,029.27
283,357.85

KETERANGAN

Harga
Sudah
Termasuk
PPn 10 %

Daftar Harga Pipa dan Assesories 2012

150
100
75
50
40
25
20
12.5

Per Meter
Per Meter
Per Meter
Per Meter
Per Meter
Per Meter
Per Meter
Per Meter

184,565.87
173,061.71
96,134.83
59,458.13
37,276.67
22,249.37
14,412.16
9,666.69
-

Page 166

Daftar Harga Pipa dan Assesories 2012

GATE VALVE
200
150
100
75
50

Per Buah
Per Buah
Per Buah
Per Buah
Per Buah

FLANGE SOCKED
200
150
100
75
50

Per Buah
Per Buah
Per Buah
Per Buah
Per Buah

FLANGE SPIGOTE
200
150

Per Buah
Per Buah

9,508,907.25
7,276,381.20
4,054,065.98
2,728,642.95
1,975,408.07
724,294.72
486,697.87
288,862.27
216,314.16
141,573.07
648,187.52
485,763.16

HARGA SATUAN
BAHAN
BAHAN 2010
2012
NO

URAIAN

SATUAN

100
75
50

Per Buah
Per Buah
Per Buah

FLANGE LAS
300
250
200
150
100
75
50

Per Buah
Per Buah
Per Buah
Per Buah
Per Buah
Per Buah
Per Buah

BLIND FLANGE
300
250
200
150
100
75
50

Per Buah
Per Buah
Per Buah
Per Buah
Per Buah
Per Buah
Per Buah

ALL SOCKET TEE


RRJ
200

X200
X150
X100
X75
X50

Per Buah
Per Buah
Per Buah
Per Buah
Per Buah

150

X150
X100
X75
X50

100

X100
X75
X50

Per Buah
Per Buah
Per Buah
Per Buah
Per Buah
Per Buah
Per Buah
Per Buah

Page 167

ZONA 1
Kec.TG.Selor
/TG.Palas
463,761.45
158,397.90
146,678.04
705,348.81
546,303.80
344,621.49
239,250.58
166,437.50
128,343.29
75,352.25
904,514.58
668,679.30
465,918.48
336,065.27
220,696.13
126,977.17
97,785.36
823,985.46
712,538.91
634,382.52
353,285.56
813,847.42
729,076.14
665,883.15
554,248.86
501,725.18
469,801.13
466,997.00

KETERANGAN

Harga
Sudah
Termasuk
PPn 10 %

Daftar Harga Pipa dan Assesories 2012

HARGA SATUAN
BAHAN
BAHAN 2010
2012
NO

URAIAN

75

SATUAN

X75
X50

Per Buah
Per Buah

50

X50

Per Buah

200

X200
X150
X100
X75
X50

Per Buah
Per Buah
Per Buah
Per Buah
Per Buah

150

X150
X100
X75
X50

Per Buah
Per Buah
Per Buah
Per Buah

100

X100
X75
X50

Per Buah
Per Buah
Per Buah

75

X75
X50

Per Buah
Per Buah

50

X50

Per Buah

ALL FLANGE TEE


CI
200

X200
X150
X100
X75
X50

Per Buah
Per Buah
Per Buah
Per Buah
Per Buah

150

X150
X100
X75
X50

Per Buah
Per Buah
Per Buah
Per Buah

ZONA 1
Kec.TG.Selor
/TG.Palas
437,769.24
405,953.05
169,398.76
756,074.97
644,412.71
583,440.66
169,398.76
756,074.97
644,412.71
583,440.66
169,398.76
409,835.70
284,620.11
284,620.11
215,703.00
156,456.58
105,135.24
1,233,533.56
1,011,934.67
888,480.66
866,407.05
862,495.64
841,241.70
776,530.80
830,456.55
737,344.76

KETERANGAN

Harga
Sudah
Termasuk
PPn 10 %

HARGA SATUAN
BAHAN
BAHAN 2010
2012
NO

URAIAN

100

SATUAN

X100
X75
X50

Per Buah
Per Buah
Per Buah

75

X75
X50

Per Buah
Per Buah

50

X50

Per Buah

ALL FLANGE TEE


GIV

Page 168

ZONA 1
Kec.TG.Selor
/TG.Palas
663,286.73
554,033.16
525,668.21
458,368.88
419,542.34
350,517.38
-

KETERANGAN

Harga
Sudah
Termasuk
PPn 10 %

Daftar Harga Pipa dan Assesories 2012

200

X200
X150
X100
X75
X50

Per Buah
Per Buah
Per Buah
Per Buah
Per Buah

150

X150
X100
X75
X50

Per Buah
Per Buah
Per Buah
Per Buah

100

X100
X75
X50

Per Buah
Per Buah
Per Buah

1,295,210.23
1,062,531.41
932,904.69
909,727.40
905,620.42
883,303.79
815,357.34
871,979.38
774,211.99
696,451.06
581,734.81
551,951.62

Page 169

Daftar Harga Pipa dan Assesories 2012

75

X75
X50

50

X50

Per Buah
Per Buah
Per Buah
Per Buah

x300
X200
X150
X100
X75
X50

Per Buah
Per Buah
Per Buah
Per Buah
Per Buah
Per Buah

BEND
90

RRJ

481,287.32
440,519.45
368,043.24
1,028,831.41
963,761.00
455,708.54
204,673.39
100,763.07
50,086.24

HARGA SATUAN
BAHAN
BAHAN 2010
2012
NO

URAIAN

45 ; 22,5

BEND
90

45 ; 22,5

BEND
90

45 ; 22,5

BEND
90

SATUAN

X200
X150
X100
X75
X50

Per Buah
Per Buah
Per Buah
Per Buah
Per Buah

x300
X200
X150
X100
X75
X50

Per Buah
Per Buah
Per Buah
Per Buah
Per Buah
Per Buah

X200
X150
X100
X75
X50

Per Buah
Per Buah
Per Buah
Per Buah
Per Buah

x300
X200
X150
X100
X75
X50
X200
X150
X100
X75
X50

Per Buah
Per Buah
Per Buah
Per Buah
Per Buah
Per Buah
Per Buah
Per Buah
Per Buah
Per Buah
Per Buah

x300
X200
X150
X100
X75
X50

Per Buah
Per Buah
Per Buah
Per Buah
Per Buah
Per Buah

SC

CI

GIP

Page 170

ZONA 1
Kec.TG.Selor
/TG.Palas
665,659.46
393,154.67
140,206.95
84,124.17
40,965.59
756,398.52
884,669.90
399,553.86
163,466.92
90,091.95
80,025.81
639,918.90
340,415.28
114,682.10
64,171.64
31,458.49
1,159,124.01
1,064,638.11
573,050.97
237,273.30
183,347.55
161,777.25
683,059.50
523,279.50
226,488.15
204,917.85
152,989.35
1,316,147.81
1,266,392.31
690,537.20
392,148.05
347,713.24
331,032.20

KETERANGAN

Harga
Sudah
Termasuk
PPn 10 %

Daftar Harga Pipa dan Assesories 2012

HARGA SATUAN
BAHAN
BAHAN 2010
2012
NO

URAIAN

45 ; 22,5

X200
X150
X100
X75
X50

SATUAN

Per Buah
Per Buah
Per Buah
Per Buah
Per Buah

Page 171

ZONA 1
Kec.TG.Selor
/TG.Palas
1,047,669.47
828,011.92
511,216.11
496,116.90
288,323.01

KETERANGAN

Harga
Sudah
Termasuk
PPn 10 %

Daftar Harga Pipa dan Assesories 2012

10

11

13

DOP
200
150
100
75
50
25

Per Buah
Per Buah
Per Buah
Per Buah
Per Buah
Per Buah

CLAMB SADLE
75
X 1/2
50
X 1/2

Per Buah
Per Buah

WATER METER INDUK


500
20"
400
16"
300
12"
250
10"
200
8"
150
6"
100
4"
75
3"
50
2"
40
1. 1/2"
30/32
1. 3/4"
25
1"
20
3/4"
15
1/2"

Per Buah
Per Buah
Per Buah
Per Buah
Per Buah
Per Buah
Per Buah
Per Buah
Per Buah
Per Buah
Per Buah
Per Buah
Per Buah
Per Buah

REDUCER
200 X 150
X 100
150 X 100
X 75

Per Buah
Per Buah
Per Buah
Per Buah

RRJ

122,231.70
107,851.50
79,091.10
58,958.82
48,533.18
18,334.76
54,644.76
45,297.63
156,093,115.81
103,294,550.64
74,457,639.83
27,762,803.24
19,454,208.79
15,493,918.81
9,979,083.72
8,383,892.66
7,230,944.60
4,213,166.80
3,060,276.76
2,544,692.96
952,457.99
270,703.80
333,368.99
324,633.02
281,600.27
281,600.27

HARGA SATUAN
BAHAN
BAHAN 2010
2012
NO

URAIAN

SATUAN

100 X 75
X 50
75 X 50
50 X 32
50 X 25
25 X 3/4
3/4 X 1/2

Per Buah
Per Buah
Per Buah
Per Buah
Per Buah
Per Buah
Per Buah

REDUCER
200 X 150
X 100
150 X 100
X 75
100 X 75
X 50
75 X 50
50 X 32
50 X 25
25 X 3/4
3/4 X 1/2

Per Buah
Per Buah
Per Buah
Per Buah
Per Buah
Per Buah
Per Buah
Per Buah
Per Buah
Per Buah
Per Buah

REDUCER
200 X 150
X 100

Per Buah
Per Buah

GIP

Page 172

ZONA 1
Kec.TG.Selor
/TG.Palas
193,773.20
193,773.20
104,220.50
85,022.93
75,402.58
53,997.65
34,152.98
323,734.25
310,432.57
237,956.36
209,483.56
176,013.65
129,421.80
94,909.32
82,470.45
71,541.50
50,977.81
32,247.60
1,022,432.22
931,836.96

KETERANGAN

Harga
Sudah
Termasuk
PPn 10 %

Daftar Harga Pipa dan Assesories 2012

150 X 100
X 75
100 X 75
X 50
75 X 50
50 X 32
50 X 25
25 X 3/4
3/4 X 1/2
REDUCER
200 X 150
X 100
150 X 100
X 75

Per Buah
Per Buah
Per Buah
Per Buah
Per Buah
Per Buah
Per Buah
Per Buah
Per Buah
FLANGE / CI
Per Buah
Per Buah
Per Buah
Per Buah

Page 173

683,059.50
554,284.81
366,695.10
323,554.50
266,033.70
194,815.76
110,727.54
108,211.01
104,615.96
553,206.29
485,475.55
410,842.31
338,509.91

Daftar Harga Pipa dan Assesories 2012

HARGA SATUAN
BAHAN
BAHAN 2010
2012
NO

14

15

16

17

URAIAN

100 X 75
X 50
75 X 50
50 X 32
50 X 25
25 X 3/4
3/4 X 1/2

Per Buah
Per Buah
Per Buah
Per Buah
Per Buah
Per Buah
Per Buah

KARET PACKING
300
250
200
150
100
75
50

Per Buah
Per Buah
Per Buah
Per Buah
Per Buah
Per Buah
Per Buah

GIBOULT JOINT
200
150
100
75
50

Per Buah
Per Buah
Per Buah
Per Buah
Per Buah

PUDDLE PIPE GIV


300
250
200
150
100

Per Buah
Per Buah
Per Buah
Per Buah
Per Buah

BAUT
3/4 ' - 7.5 CM
5/8 ' - 7.5 CM

18

SATUAN

STREET BOX

Per Buah
Per Buah
Per Buah

ZONA 1
Kec.TG.Selor
/TG.Palas
269,628.75
238,279.91
136,611.90
125,826.75
102,710.58
79,450.61
71,541.50
119,930.87
113,459.78
79,091.10
67,586.94
49,611.69
41,271.17
27,897.59
698,158.71
540,192.21
353,321.51
266,752.71
252,516.31
1,078,515.00
682,196.69
438,236.60
426,660.53
395,455.50
9,490.93
7,909.11
186,942.60
-

KETERANGAN

Harga
Sudah
Termasuk
PPn 10 %

HARGA SATUAN
BAHAN
BAHAN 2010
2012
NO

19

URAIAN

STOP KRAN
50
40
25

SATUAN

Per Buah
Per Buah
Per Buah

20

Dresser Joint 75 mm CI Per Buah


Dresser Joint 100 mm CI Per Buah

21

Flexible Joint 50 mm CI Per Buah


Flexible Joint 75 mm CI Per Buah

22

Pasir Silika

ZONA 1
Kec.TG.Selor
/TG.Palas

179,752.50
115,041.60
50,330.70
347,012.20
444,887.44
252,696.06
293,625.71
6,471.09

Per Kilogramm

Page 174

KETERANGAN

Harga
Sudah
Termasuk
PPn 10 %

Daftar Harga Pipa dan Assesories 2012

23

Nosel

Per Buah

Bahan Kimia

Gramm

35,950.50
30,787.50

Tanjung Selor,
2012
KEPALA DINAS PEKERJAAN UMUM
KABUPATEN BULUNGAN

H. ZAINAL ABIDIN, MD, ST, M.Si


NIP. 195601061975021001

Page 175

Daftar Harga Pipa dan Assesories 2012

ZONA I

KOEFISIEN

TANJUNG SELOR
KM 9
KM 12
TANJUNG BUKA-TRANS
TANJUNG PALAS
TERAS
SALIM BATU

ZONA I

KOEFISIEN

1.15

KLUBIR
PIMPING
KARANG AGUNG
SEPATUNG ( PANCA AGUNG )
ARDIMULYO
MENTADAU
RUHUI RAHAYU
TANJUNG AGUNG
WONOMULYO
SAJAU PUNGIT
SAJAU TENGAH
SAJAU HILIR
BINAI

Page 176

Daftar Harga Pipa dan Assesories 2012

1
2

ZONA 1
KECAMATAN TANJUNG SELOR
KECAMATAN TANJUNG PALAS

ZONA 2
KECAMATAN TANJUNG PALAS TENGAH

KECAMATAN TANJUNG PALAS UTARA

ZONA 3
KECAMATAN SEKATAK

ZONA 4
KECAMATAN TANJUNG PALAS BARAT

KECAMATAN PESO HILIR

ZONA 5
KECAMATAN PESO

Page 177

Daftar Harga Pipa dan Assesories 2012

ZONA 6
KECAMATAN TANJUNG PALAS TIMUR

ZONA 7
KECAMATAN BUNYU

Page 178

Daftar Harga Pipa dan Assesories 2012

90,000.00
75,000.00

7,500.00
90,000.00
6,250.00
75,000.00

Page 179

Daftar Harga Pipa dan Assesories 2012

Page 180

Daftar Harga Pipa dan Assesories 2012

Page 181

Daftar Harga Pipa dan Assesories 2012

Page 182

Daftar Harga Pipa dan Assesories 2012

Page 183

Daftar Harga Pipa dan Assesories 2012

Page 184

Daftar Harga Pipa dan Assesories 2012

Page 185

Daftar Harga Pipa dan Assesories 2012

Page 186

Daftar Harga Pipa dan Assesories 2012

Page 187

Daftar Harga Pipa dan Assesories 2012

Page 188

Daftar Harga Pipa dan Assesories 2012

Page 189

Daftar Harga Pipa dan Assesories 2012

Page 190

Daftar Harga Pipa dan Assesories 2012

Page 191

Daftar Harga Pipa dan Assesories 2012

Page 192

Daftar Harga Pipa dan Assesories 2012

Page 193

Daftar Harga Pipa dan Assesories 2012

Page 194

Daftar Harga Pipa dan Assesories 2012

DAFTAR HARGA UPAH TAHUN 2014


DINAS PEKERJAAN UMUM KABUPATEN BULUNGAN
PROPINSI
: KALIMANTAN TIMUR
KABUPATEN
: BULUNGAN
TAHUN ANGGARAN
: 2014

DAFTAR UPAH TAHUN 2012 ( Rp )

NO

URAIAN

SATUAN

ZONA 1

KETERANGAN

TG.SELOR
TG. PALAS

10

1 Mandor Lapangan

Hari

77,000.00

2 Mekanik
3 Pembantu Mekanik

Hari
Hari

71,500.00
49,500.00

4 Tukang
5 Kepala Tukang

Hari
Hari

60,500.00
71,500.00

6 Operator Terlatih
7 Operator Kurang Terlatih

Hari
Hari

66,000.00
55,000.00

8 Pembantu Operator
9 Sopir Truk

Hari
Hari

49,500.00
66,000.00

10 Sopir Personil
11 Pembantu Sopir / Kernek

Hari
Hari

66,000.00
49,500.00

12 Buruh Lapangan Terlatih


13 Buruh Lapangan Agak Terlatih

Hari
Hari

49,500.00
46,750.00

14 Buruh Lapangan Tidak Terlatih

Hari

44,000.00

Tanjung Selor,
Januari 2011
KEPALA DINAS PEKERJAAN UMUM
KABUPATEN BULUNGAN

H. ZAINAL ABIDIN, MD, ST, M.Si


NIP.19560106 197502 1 001

PEMERINTAH KABUPATEN BULUNGAN

DINAS PEKERJAAN UMUM


Jalan Teratai Telepon (0552) 21020 Tanjung Selor

PERHITUNGAN VOLUME
KEGIATAN
PEKERJAAN
LOKASI
TAHUN ANGGARAN

:
:
:
:

PEMBANGUNAN GEDUNG KANTOR


PEMBANGUNAN MARKAS PEMADAMAN KEBAKARAN
TANJUNG SELOR
2012

NO

URAIAN PEKERJAAN

VOLUME

SATUAN

1
I

II

PEKERJAAN PERSIAPAN
1 Pembuatan papan nama proyek
2 Pembongkaran dan pembersihan bangunan lama
3 Pasang pagar seng gelombang (pengaman proyek)
4 Pengukuran dan pasang bowplank
5 Pembuatan direksikeet dan perlengkapannya
6 Pelaporan Kegiatan dan Asbuilt drawing

1.00
1.00
200.00
135.60
24.00
1.00

Bh
Ls
M1
M1
M2
Ls

868.14

M3

246.38

M3

226.80

M3

94.64
97.58

M3
M3

4,664.00

M1

4,664.00
636.00
4.51
75.13
173.20
173.20
9,062.63
61.60

M1
cm
M3
M3
M2
M2
Kg
M3

164.26

M3

PEKERJAAN BETON
A LANTAI 1
1 Sloof S 30/40 ( K.225 )
- Pasang begisting
- Bongkar begisting
- Besi beton ulir 19
- Besi beton polos 12

48.14
320.96
320.96
8,946.76
3,341.37

M3
M2
M2
Kg
Kg

2 Sloof S1 20/30 (K.225 )


- Pasang begisting
- Bongkar begisting
- Besi beton ulir 13
- Besi beton polos 10

4.58
45.84
45.84
397.28
314.88

M3
M2
M2
Kg
Kg

PEKERJAAN TANAH DAN URUGAN


1 Urugan tanah peninggian peil lantai
Luas Bangunan
Tinggi timbunan
2 Galian tanah pondasi menerus
Panjang Gali

667.80
1.30
memanjang
melintang
Total panjang

Lebar galian
Tinggi galian
3 Galian tanah pondasi setempat
Jumlah poorplate
Luas Poorplate
tinggi galian
4 Urugan tanah kembali
5 Urugan pasir bawah pondasi dan lantai, tebal 10 cm
Tebal Urugan

III

IV

PEKERJAAN PONDASI
1 Pengadaan tiang pancang beton pre cast 25/25 K 500
Jumlah Pancang isi 5
jumlah Pancang isi 4
kedalaman pancang
2 Pemancangan tiang pancang beton 25/25
3 Penyambungan tiang pancang
4 Beton lantai kerja bawah pile cap, t = 3 cm (1:3:5)
5 Beton pile cap (K.225 )
- Pasang begisting
- bongkar begisting
- Besi beton ulir 19
5 Aanstampeng batu gunung tinggi 20 cm
Luas
6 Pasangan Batu gunung cam 1:4
Luas

m2
m

177.20
165.00
342.20
0.90
0.80

m
m
m
m
m

50 bh
3.24 M2
1.4 M

0.1 m

60 bh
152 bh
22 m

0.18 m2
0.48 m2

3 Balok Gantung 15/30


- Pasang begisting
- Bongkar begisting
- Besi beton polos 12
- Besi beton polos 10

0.36
6.00
6.00
42.82
30.17

M3
M2
M2
Kg
Kg

12.04
101.07
88.40
88.40
###

M3
M3
M2
M2
Kg

6 Beton Kolom K1 40/60 ( K.225 )


- Pasang begisting
- Bongkar begisting
- Besi beton ulir 19
- Besi beton polos 12

19.68
164.00
164.00
2,560.04
975.25

M3
M2
M2
Kg
Kg

7 Beton Kolom K2 40/40 ( K.225 )


- Pasang begisting
- Bongkar begisting
- Besi beton ulir 19
- Besi beton polos 12

19.01
190.08
190.08
3,179.09
1,130.34

M3
M2
M2
Kg
Kg

8 Beton Kolom K3 40/40 ( K.225 )


- Pasang begisting
- Bongkar begisting
- Besi beton ulir 19
- Besi beton polos 12

21.15
211.52
211.52
3,537.67
1,257.84

M3
M2
M2
Kg
Kg

9 Beton Kolom K6 30/80 ( K.225 )


- Pasang begisting
- Bongkar begisting
- Besi beton ulir 19
- Besi beton polos 12

3.98
36.52
36.52
666.32
217.17

M3
M2
M2
Kg
Kg

###Kolom K4 10/20 ( 1:2:3 )


- Pasang begisting
- Bongkar begisting
- Besi beton polos 12
- Besi beton polos 8

1.29
25.76
25.76
344.67
67.83

m3
M2
M2
Kg
Kg

###Kolom K5 15/50 ( 1:2:3 )


- Pasang begisting
- Bongkar begisting
- Besi beton polos 12
- Besi beton polos 10

1.38
23.92
23.92
164.13
62.99

m3
M2
M2
Kg
Kg

###Plat kanopi t = 10 cm ( 1:2:3 )


- Pasang begisting
- Bongkar begisting
- Besi beton polos 12

1.44
18.00
18.00
214.08

M3
M2
M2
Kg

###Beton Tangga Utama ( K.225 )


- Pasang begisting
- Bongkar begisting
- Besi beton ulir 13

3.25
21.65
21.65
600.29

M3
M2
M2
Kg

###Beton Tangga Darurat ( K.225 )


- Pasang begisting
- Bongkar begisting
- Besi beton ulir 13

1.20
7.99
7.99
221.64

M3
M2
M2
Kg

0.68
11.70
11.70
96.34
38.24

M3
M2
M2
Kg
Kg

15.18
193.20
193.20
1,016.88

M3
M2
M2
Kg

1.66

M3

4 Beton Bo lantai kerja bawah sloof, t = 3 cm ( 1:3:5 )


5 Beton bertulang plat lantai dasar, t = 15 cm ( K.225 )
- Pasang begisting
- Bongkar begisting
- Besi beton polos 12

###Balok Latei 15/25 ( 1:2:3 )


- Pasang begisting
- Bongkar begisting
- Besi beton polos 12
- Besi beton polos 8

###Beton parit keliling bangunan ( 1:2:3)


- Pasang begisting
- Bongkar begisting
- Besi beton polos 12
###Beton lantai kerja (Bo) parit keliling bangunan

B LANTAI 2
1 Plat lantai 2, t = 12 cm ( K.225 )
- Pasang begisting
- Bongkar begisting
- Besi beton polos 12

10.80
90.00
90.00
2,140.80

M3
M2
M2
Kg

2 Balok Lantai B1 30/60 ( K.225 )


- Pasang begisting
- Bongkar begisting
- Besi beton ulir 19
- Besi beton polos 12

24.30
202.50
202.50
4,816.80
1,446.65

M3
M2
M2
Kg
Kg

3 Balok Lantai B2 30/50 ( K.225 )


- Pasang begisting
- Bongkar begisting
- Besi beton ulir 19
- Besi beton polos 12

3.75
32.50
32.50
836.25
239.29

M3
M2
M2
Kg
Kg

4 Balok Lantai B3 25/40 ( K.225 )


- Pasang begisting
- Bongkar begisting
- Besi beton ulir 19
- Besi beton polos 12

1.50
15.75
15.75
401.40
117.12

M3
M2
M2
Kg
Kg

5 Balok Lantai BA 25/35 ( K.225 )


- Pasang begisting
- Bongkar begisting
- Besi beton ulir 19
- Besi beton polos 12

1.58
17.10
17.10
240.84
129.52

M3
M2
M2
Kg
Kg

6 Balok Gantung 15/30 ( 1 : 2 3 )


- Pasang begisting
- Bongkar begisting
- Besi beton polos 12
- Besi beton polos 10

0.36
6.00
6.00
57.09
30.17

M3
M2
M2
Kg
Kg

7 Beton Kolom K1 40/60 ( K.225 )


- Pasang begisting
- Bongkar begisting
- Besi beton ulir 19
- Besi beton polos 12

3.22
26.80
26.80
418.35
159.37

M3
M2
M2
Kg
Kg

8 Beton Kolom K2 40/40 ( K.225 )


- Pasang begisting
- Bongkar begisting
- Besi beton ulir 19
- Besi beton polos 12

5.36
53.60
53.60
896.46
333.01

M3
M2
M2
Kg
Kg

9 Beton Kolom K3 40/40 ( K.225 )


- Pasang begisting
- Bongkar begisting
- Besi beton ulir 19
- Besi beton polos 12

10.72
107.20
107.20
1,792.92
666.03

M3
M2
M2
Kg
Kg

###Beton Kolom K4 10/20 ( 1:2:3 )


- Pasang begisting
- Bongkar begisting
- Besi beton polos 12
- Besi beton polos 8

0.94
28.14
28.14
167.34
206.45

M3
M2
M2
Kg
Kg

###Kolom K5 15/50 ( 1:2:3 )


- Pasang begisting
- Bongkar begisting
- Besi beton polos 12
- Besi beton polos 10

1.01
17.42
17.42
119.53
71.65

m3
M2
M2
Kg
Kg

0.06

M3

###Ringbalk pagar void 10/10 ( 1:2:3 )

Pasang begisting
Bongkar begisting
Besi beton polos 12
Besi beton polos 8

1.20
1.20
21.41
6.48

M2
M2
Kg
Kg

###Plat kanopi t = 10 cm ( 1:2:3 )


- Pasang begisting
- Bongkar begisting
- Besi beton polos 12

8.05
100.60
100.60
1,196.47

M3
M2
M2
Kg

###Beton Tangga Utama ( K.225 )


- Pasang begisting
- Bongkar begisting
- Besi beton ulir 13

3.25
21.65
21.65
600.29

M3
M2
M2
Kg

###Beton Tangga Darurat ( K.225 )


- Pasang begisting
- Bongkar begisting
- Besi beton ulir 13

1.20
7.99
7.99
221.64

M3
M2
M2
Kg

0.23
3.90
3.90
32.11
12.96

M3
M2
M2
Kg
Kg

81.94
682.80
682.80
###

M3
M2
M2
Kg

2 Balok Lantai B1 30/60 ( K.225 )


- Pasang begisting
- Bongkar begisting
- Besi beton ulir 19
- Besi beton polos 12

35.82
298.50
298.50
7,100.32
2,131.70

M3
M2
M2
Kg
Kg

3 Balok Lantai B2 30/50 ( K.225 )


- Pasang begisting
- Bongkar begisting
- Besi beton ulir 19
- Besi beton polos 12

25.98
225.16
225.16
5,793.54
1,649.37

M3
M2
M2
Kg
Kg

4 Balok Lantai B3 25/40 ( K.225 )


- Pasang begisting
- Bongkar begisting
- Besi beton ulir 19
- Besi beton polos 12

18.06
189.63
189.63
4,832.86
1,397.32

M3
M2
M2
Kg
Kg

5 Balok Lantai BA 25/35 ( K.225 )


- Pasang begisting
- Bongkar begisting
- Besi beton ulir 19
- Besi beton polos 12

0.70
7.60
7.60
107.04
58.16

M3
M2
M2
Kg
Kg

5 Balok Gantung 15/30 ( 1 : 2 3 )


- Pasang begisting
- Bongkar begisting
- Besi beton polos 12
- Besi beton polos 10

0.72
12.00
12.00
114.18
59.79

M3
M2
M2
Kg
Kg

###Balok Latei 15/25 ( 1:2:3 )


- Pasang begisting
- Bongkar begisting
- Besi beton polos 12
- Besi beton polos 8

C LANTAI 3
1 Plat lantai 3, t = 12 cm ( K.225 )
- Pasang begisting
- Bongkar begisting
- Besi beton polos 12

6 Beton Kolom K1 40/60 ( K.225 )


- Pasang begisting
- Bongkar begisting
- Besi beton ulir 19
- Besi beton polos 12

13.44
112.00
112.00
1,748.32
666.03

M3
M2
M2
Kg
Kg

7 Beton Kolom K2 & K3 40/40 ( K.225 )


- Pasang begisting
- Bongkar begisting
- Besi beton ulir 19
- Besi beton polos 12

24.32
243.20
243.20
4,067.52
1,594.24

M3
M2
M2
Kg
Kg

8 Beton Kolom K4 10/20


- Pasang begisting
- Bongkar begisting
- Besi beton polos 12
- Besi beton polos 8

5.20
156.00
156.00
927.68
426.21

M3
M2
M2
Kg
Kg

9 Kolom K5 15/50 ( 1:2:3 )


- Pasang begisting
- Bongkar begisting
- Besi beton polos 12
- Besi beton polos 10

1.20
20.80
20.80
142.72
54.77

m3
M2
M2
Kg
Kg

11.38
273.00
273.00
1,623.44
749.71

M3
M2
M2
Kg
Kg

0.04
0.80
0.80
14.27
4.37

M3
M2
M2
Kg
Kg

3.77
65.39
65.39
538.41
212.25

M3
M2
M2
Kg
Kg

###Plat kanopi t = 10 cm ( 1:2:3 )


- Pasang begisting
- Bongkar begisting
- Besi beton polos 12

10.06
100.60
100.60
1,196.47

M3
M2
M2
Kg

###Beton Tangga Utama ( K.225 )


- Pasang begisting
- Bongkar begisting
- Besi beton ulir 13

3.81
25.40
25.40
704.40

M3
M2
M2
Kg

0.24
3.96
3.96
21.17

M3
M2
M2
Kg

80.14
667.80
667.80
###

M3
M2
M2
Kg

2 Balok Lantai B1 30/60 ( K.225 )


- Pasang begisting
- Bongkar begisting
- Besi beton ulir 19
- Besi beton polos 12

33.66
280.50
280.50
6,672.16
2,003.25

M3
M2
M2
Kg
Kg

3 Balok Lantai B2 30/50 ( K.225 )


- Pasang begisting
- Bongkar begisting
- Besi beton ulir 19
- Besi beton polos 12

25.23
218.66
218.66
5,626.29
1,601.79

M3
M2
M2
Kg
Kg

###Kolom Sirip 10/50 ( 1:2:3 )


- Pasang begisting
- Bongkar begisting
- Besi beton polos 12
- Besi beton polos 8
###Ringbalk pagar void 10/10 ( 1:2:3 )
- Pasang begisting
- Bongkar begisting
- Besi beton polos 12
- Besi beton polos 8
###Balok Latei 15/25 ( 1:2:3 )
- Pasang begisting
- Bongkar begisting
- Besi beton polos 12
- Besi beton polos 8

###Beton meja pantri, t = 7 cm ( 1:2:3 )


- Pasang begisting
- Bongkar begisting
- Besi beton polos 12
D DAK (LANTAI 4)
1 Plat lantai 4, t = 12 cm ( K.225 )
- Pasang begisting
- Bongkar begisting
- Besi beton polos 12

4 Balok Lantai B3 25/40 ( K.225 )


- Pasang begisting
- Bongkar begisting
- Besi beton ulir 19
- Besi beton polos 12

18.06
189.63
189.63
4,832.86
1,397.32

M3
M2
M2
Kg
Kg

5 Balok Lantai BA 25/35 ( K.225 )


- Pasang begisting
- Bongkar begisting
- Besi beton ulir 19
- Besi beton polos 12

0.70
7.60
7.60
107.04
58.16

M3
M2
M2
Kg
Kg

6 Beton Kolom K1 40/60 ( K.225 )


- Pasang begisting
- Bongkar begisting
- Besi beton ulir 19
- Besi beton polos 12

2.16
18.00
18.00
280.98
107.04

M3
M2
M2
Kg
Kg

7 Beton Kolom K2 40/40 ( K.225 )


- Pasang begisting
- Bongkar begisting
- Besi beton ulir 19
- Besi beton polos 12

3.68
36.80
36.80
615.48
218.84

M3
M2
M2
Kg
Kg

8 Beton Kolom K4"20/20 ( K.225 )


- Pasang begisting
- Bongkar begisting
- Besi beton ulir 12
- Besi beton polos 8

2.44
48.80
48.80
652.94
128.51

M3
M2
M2
Kg
Kg

0.32
9.60
9.60
57.09
26.23

M3
M2
M2
Kg
Kg

###Beton Kolom Praktis 10/10


- Pasang begisting
- Bongkar begisting
- Besi beton polos 12
- Besi beton polos 8

0.30
12.00
12.00
107.04
34.76

M3
M2
M2
Kg
Kg

###Balok 20/35 ( 1:2:3 )


- Pasang begisting
- Bongkar begisting
- Besi beton polos 12
- Besi beton polos 8

3.57
35.70
35.70
272.95
148.16

M3
M2
M2
Kg
Kg

###Ringbalk 15/20 ( 1:2:3 )


- Pasang begisting
- Bongkar begisting
- Besi beton polos 12
- Besi beton polos 8

4.34
57.84
57.84
773.90
266.82

M3
M2
M2
Kg
Kg

13.20
132.00
132.00
1,569.92

M3
M2
M2
kg

9 Beton Kolom K4 10/20


- Pasang begisting
- Bongkar begisting
- Besi beton polos 12
- Besi beton polos 8

###Beton plat dak teras atap t = 10 cm ( K.225 )


- Pasang begisting
- Bongkar begisting
- Besi beton polos 12

Jumlah IV (A+B+C+D)
V

PEKERJAAN DINDING & PLESTERAN


A LANTAI 1
1 Pasangan bata merah 1 : 2
2 Pasangan bata merah 1 : 4
3 Plesteran 1 : 2 tebal 15 cm
4 Plesteran 1 : 4 tebal 15 cm
5 Plesteran beton 1 : 2
6 Benangan sudut

49.60
472.15
99.20
944.31
1,324.28
351.20

M2
M2
M2
M2
M2
M'

B LANTAI 2
1 Pasangan bata merah 1 : 4
2 Plesteran 1 : 4
3 Plesteran Beton 1 : 2
4 Benangan sudut

C LANTAI 3
1 Pasangan bata merah 1 : 4
2 Plesteran 1 : 4
3 Plesteran Beton 1 : 2
3 Benangan sudut

154.41
308.82
9.60

M2
M2
M2
M'

958.61
1,917.22
114.00
196.00

M2
M2
M2
M'

D DAK ATAP (LANTAI 4)


1 Pasangan bata merah 1 : 4
2 Plesteran 1 : 4
3 Plesteranbeton 1:2
4 Benangan sudut

VI

PEKERJAAN KERAMIK
A LANTAI 1
1 Keramik lantai 40/40
2 Keramik lantai KM/WC 20/20
3 Keramik dinding KM/WC 20/25
4 Plint dinding Keramik 10/20
5 Pasang Batu alam motif garis

B LANTAI 2
1 Keramik lantai 40/40

240.09
480.17
776.75
550.00

M2
M2
M2
M'

229.17
13.50
16.67
24.00
129.60

M2
M2
M2
M'
m2

75.49

M2

VII

C LANTAI 3
1 Keramik lantai 40/40
2 Keramik lantai 20/20
3 Keramik dinding KM/WC 20/25
4 Plint dinding Keramik 10/20
5 Pasang Batu alam motif garis

540.22
27.86
88.50
59.00
84.60

M2
M2
M2
M'
m2

D LANTAI 4
1 Keramik lantai 40/40
2 Pasang Batu alam motif garis

88.07
25.60

M2
m2

0.00

M1

2.00
2.00
2.00
0.00

Bh
Bh
Bh
M2

4.00
4.00

Bh
Bh

2.00
2.00

Bh
Bh

2.00
2.00

Bh
Bh

4.00
4.00
0.00
0.00

Bh
Bh
M2
M2

4.00

Bh

12.00
1.00
2.00
4.00
30.00
12.00
6.00
12.00
60.00
60.00
2.00
8.00
4.00
12.02
5.47

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
m2
m2

0.00

M1

2.00
2.00

Bh
Bh

4.00
0.00

Bh
m2

PEKERJAAN KUSEN PINTU DAN JENDELA & RAILLING


A LANTAI 1
1 Kusen Pintu, Jendela Dan Bouvenlist Alumunium + sealent
2 Pekerjaan Pintu
a
Pintu Type PJ1 Jumlah 1 Buah
Daun Pintu Double Kaca Ryben t. 5 mm, Rangka Aluminium Uk.0.85x2.30
Daun Jendela Kaca Ryben 5 mm, Rangka Aluminium Uk.0.85x1.46
Daun Ventilasi Kaca Ryben 5 mm, Rangka Aluminium Uk.0.85x0.54
Kaca Mati Ryben t. 5 mm
b
Pintu Type P1 Jumlah 2 Buah
Daun Pintu Double Teakwood + finil , Rangka Aluminium Uk.0.77x2.10
Daun Ventilasi Kaca Ryben 5 mm, Rangka Aluminium Uk.0.75x0.54
c
Pintu Type P2 Jumlah 2 Buah
Daun Pintu Double Teakwood+ finil , Rangka Aluminium Uk.0.80x2.10
Daun Ventilasi Kaca Ryben 5 mm, Rangka Aluminium Uk.0.80x0.54
d
Pintu Type P3 Jumlah 2 Buah
Daun Pintu Double Teakwood + Finil , Rangka Aluminium )Uk.0.70x2.10
Daun Ventilasi Kaca Ryben 5 mm, Rangka Aluminium Uk.0.70x0.54
3 Pekerjaan Jendela
a
Jendela Type J1 Jumlah 2 Buah
Daun jendela Kaca Ryben 5 mm, Rangka Aluminium Uk.0.65x1.40
Daun Ventilasi Kaca Ryben 5 mm, Rangka Aluminium Uk.0.65x0.54
Kaca Mati Ryben t. 5 mm
b
Kaca Mati Ryben t 5 mm Jendela Sudut
4 Pekerjaan Bovenlist
a
Bouvenlist 1 ( BV1 ), jumlah 2 buah
Daun Bouvenlist kaca Ryben 5 mm, rangka Aluminium Uk.0.50x0.50
b
Bouvenlist 2 ( BV2), jumlah 4 buah
Daun Bouvenlist kaca Ryben 5 mm, rangka Aluminium Uk.0.69x0.69
5 Kunci Pintu Ganda Utama + Kelengkapannya Terpasang
6 Kunci Pintu Ganda+ Kelengkapannya Terpasang
7 Kunci Pintu Tunggal + Kelengkapan Terpasang
8 Engsel Pintu 4 "
9 Engsel Jendela 3"
###Grandel Jendela /Spring Knipe
###Hak Angin Jendela
###Engsel Ventilasi 3 "
###Hak Angin Ventilasi
###Door Holder
###Door Closer
###Door Stop
###Railling tangga utama dari pipa Kotak
###Railling tangga darurat dari pipa Kotak

B LANTAI 2
1 Kusen Pintu, Jendela Dan Bouvenlist Alumunium + sealent
2 Pekerjaan Pintu
a
Pintu Type P2 Jumlah 2 Buah
Daun Pintu Double Teakwood+ finil , Rangka Aluminium Uk.0.80x2.10
Daun Ventilasi Kaca Ryben 5 mm, Rangka Aluminium Uk.0.80x0.54
3 Pekerjaan Jendela
a
Jendela Type J8 Jumlah 2 Buah
Daun jendela Kaca Ryben 5 mm, Rangka Aluminium Uk.0.65x1.40
b
Kaca Mati Ryben t 5 mm jendela sudut

4 Kunci Pintu Tunggal + Kelengkapan Terpasang


5 Engsel Pintu 4 "
6 Engsel Jendela 3"
7 Grandel Jendela /Spring Knipe
8 Hak Angin Jendela
9 Engsel Ventilasi 3 "
###Hak Angin Ventilasi
###Door Closer
###Railling tangga utama dari pipa Kotak
###Railling tangga darurat dari pipa Kotak
###Railling pagar Void dari pipa kotak

C LANTAI 3
1 Kusen Pintu, Jendela Dan Bouvenlist Alumunium + sealent
2 Pekerjaan Pintu
a
Pintu Type P1 Jumlah 6 Buah
Daun Pintu Double Teakwood + finil , Rangka Aluminium Uk.0.77x2.10
Daun Ventilasi Kaca Ryben 5 mm, Rangka Aluminium Uk.0.75x0.54
b
Pintu Type P2 Jumlah 1 Buah
Daun Pintu Double Teakwood+ finil , Rangka Aluminium Uk.0.80x2.10
Daun Ventilasi Kaca Ryben 5 mm, Rangka Aluminium Uk.0.80x0.54
c
Pintu Type P3 Jumlah 6 Buah
Daun Pintu Double Teakwood + Finil , Rangka Aluminium )Uk.0.70x2.10
Daun Ventilasi Kaca Ryben 5 mm, Rangka Aluminium Uk.0.70x0.54
3 Pekerjaan Jendela
a
Jendela Type J2 Jumlah 8 Buah
Daun jendela Kaca Ryben 5 mm, Rangka Aluminium Uk.0.65x0.65
Daun Ventilasi Kaca Ryben 5 mm, Rangka Aluminium ( lengkap )Uk.0.65x0.54
Kaca Mati Ryben t. 5 mm
b
Jendela Type J3 Jumlah 12 Buah
Daun jendela Kaca Ryben 5 mm, Rangka Aluminium Uk.0.65x0.65
Daun Ventilasi Kaca Ryben 5 mm, Rangka Aluminium Uk.0.65x0.54
c
Jendela Type J4 Jumlah 1 Buah
Daun jendela Kaca Ryben 5 mm, Rangka Aluminium Uk.0.65x1.40
Daun Ventilasi Kaca Ryben 5 mm, Rangka Aluminium Uk.0.65x0.54
d
Jendela Type J5 Jumlah 48 Buah
Daun jendela Kaca Ryben 5 mm, Rangka Aluminium Uk.0.6x1.70
Daun Ventilasi Kaca Ryben 5 mm, Rangka Aluminium Uk.0.65x0.69
e
Jendela Type J7 Jumlah 6 Buah
Kaca Mati Ryben 5mm
f
Kaca Mati Ryben t 5 mm Jendela sudut
4 Pekerjaan Bovenlist
a
Bouvenlist 1 ( BV1 ), jumlah 7 buah
Daun Bouvenlist kaca Ryben 5 mm, rangka Aluminium Uk.0.50x0.50
5 Kunci Pintu Ganda+ Kelengkapannya Terpasang
6 Kunci Pintu Tunggal + Kelengkapan Terpasang
7 Engsel Pintu 4 "
8 Engsel Jendela 3"
9 Grandel Jendela /Spring Knipe
###Hak Angin Jendela
###Engsel Ventilasi 3 "
###Hak Angin Ventilasi
###Door Closer
###Door Stop
###Railling tangga utama dari pipa Kotak
###Railling pagar Void dari pipa kotak
###Pasang pipa seluncur stainlist steel

D LANTAI 4
1 Kusen Pintu, Jendela Dan Bouvenlist Alumunium + sealent
2 Pekerjaan Pintu
a
Pintu Type P1 Jumlah 1 Buah
Daun Pintu Double Teakwood + finil , Rangka Aluminium Uk.0.77x2.10
Daun Ventilasi Kaca Ryben 5 mm, Rangka Aluminium Uk.0.75x0.54
3 Pekerjaan Jendela
a
Jendela Type J1 Jumlah 2 Buah
Daun jendela Kaca Ryben 5 mm, Rangka Aluminium Uk.0.65x1.40
Daun Ventilasi Kaca Ryben 5 mm, Rangka Aluminium Uk.0.65x0.54
Kaca Mati Ryben t. 5 mm
b
Jendela Type J6 Jumlah 2 Buah
Daun jendela Kaca Ryben 5 mm, Rangka Aluminium Uk.0.65x1.40
Daun Ventilasi Kaca Ryben 5 mm, Rangka Aluminium Uk.0.65x0.54
4 Pekerjaan Bovenlist
a
Bouvenlist 3 ( BV3), jumlah 4 buah
Kaca Mati Ryben 5 mm

2.00
6.00
8.00
4.00
8.00
8.00
8.00
2.00
12.70
7.87
28.73

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
m2
m2
m2

0.00

M1

12.00
12.00

Bh
Bh

1.00
1.00

Bh
Bh

6.00
6.00

Bh
Bh

16.00
16.00
0.00

Bh
Bh
m2

12.00
12.00

Bh
Bh

2.00
2.00

Bh
Bh

48.00
48.00

Bh
Bh

0.00
0.00

m2
m2

14.00
6.00
7.00
57.00
156.00
78.00
156.00
222.00
111.00
13.00
7.00
16.32
9.12
11.10

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
m2
m2
M'

107.34

M1

2.00
2.00

Bh
Bh

4.00
4.00
2.13

Bh
Bh
M2

2.00
2.00

Bh
Bh

11.43

M2

Jumlah VII (A+B+C+D)


VIII PEKERJAAN PLAFOND
A PLAFOND LANTAI 1
1 Pasang rangka dan plafond gypsum 9 mm

127.50

M2

2 Pasang plafond gypsum 9 mm


3 Pasang list plafond gypsum

127.50
100.00

m'

B PLAFOND LANTAI 2
1 Pasang rangka dan plafond gypsum 9 mm
2 Pasang plafond gypsum 9 mm
3 Pasang list plafond gypsum

60.00
60.00
56.00

M2

C PLAFOND LANTAI 3
1 Pasang rangka dan plafond gypsum 9 mm
2 Pasang plafond gypsum 9 mm
3 Pasang list plafond gypsum

609.21
609.21
430.88

M2

D PLAFOND DAK ATAP (LANTAI 4)


1 Pasang rangka dan plafond gypsum 9 mm
2 Pasang plafond gypsum 9 mm
3 Pasang list plafond gypsum

75.00
75.00
58.00

M2

M'

M'

M'

Jumlah VIII (A+B+C+D)


IX

XI

PEKERJAAN ATAP & SUNSCREEN


1 Rangka atap kantilever baja INP (5x 8) m2 (lengkap)
2 Atap kantilever polycarbonate
3 Grill besi siku + plat strip 5 cm
4 Kuda kuda kayu lembasung 6/12
5 Gording kayu lembasung 5/10
6 Rangka atap kasau/reng kayu lembasung
7 Penutup atap genteng metal
8 Bubungan atap genteng metal
PEKERJAAN SANITAIR & PLUMBING
1 Biaya penyambungan air PDAM
2 Pasang jaringan air bersih dalam gedung
Pasang Pipa 1/2 "
Pasang Pipa 3/4 "
3 Pasang jaringan air kotor
Pasang Pipa 4 "
Pasang Pipa 2 "
4 Pasang pipa pvc 4" untuk air hujan
5 Pasang closed duduk porselin (lengkap)
6 Hand shower (lengkap dengan kran air)
7 Pasang floor drain 2"
8 Kran air 1/2"
9 Wastafel Porselin (lengkap)
###Bak cuci alumunium 2 lubang
###Pembuatan septictank + sumur resapan
###Pompa air listrik sanyo
###Waterproofing
- Lantai KM/WC
- Atap dak beton
PEKERJAAN INSTALASI LISTRIK & LAMPU
1 Penyambungan baru listrik
2 Pasang jaringan titik lampu LT. 1
- Pasang lampu down light SL 18 watt
- Pasang lampu SL 14 watt
- Pasang Stop Kontak & Instalasi
- Saklar tunggal
- Saklar ganda
- Penghisap ruangan
3 Pasang jaringan titik lampu LT. 2
- Pasang lampu down light SL 18 watt
- Pasang lampu SL 14 watt
- Pasang lampu spotlight halogen 100 watt
- Pasang Stop Kontak & Instalasi
- Saklar tunggal
- Saklar ganda
- Penghisap ruangan
4 Pasang jaringan titik lampu LT. 3
- Pasang lampu down light SL 18 watt

1.00
40.00
41.40
0.48
0.52
65.00
65.00
16.00
Jumlah IX
1.00
31.00
84.00

Unit
M2
M2
M3
M3
M2
M2
M1

Paket
m
m

67.00
66.80
234.00
8.00
8.00
8.00
10.00
1.00
1.00
2.00
1.00

m
m
M'
Unit
Bh
Bh
Bh
Unit
Bh
Unit
Unit

53.75
618.48
Jumlah X

M2
M2

1.00
27.00
24.00
3.00
5.00
5.00
6.00
3.00
47.00
11.00
3.00
33.00
4.00
3.00
12.00
2.00

Bh
Titik
Titik
Titik
Titik
Titik
Titik
Titik
Titik
Titik
Titik
Titik
Titik
Titik
Titik
Titik

67.00
46.00

Titik
Titik

Pasang lampu SL 14 watt


Pasang lampu spotlight halogen 100 watt
Pasang Lampu TL 2 x 40 watt
Pasang Lampu TL 1 x 40 watt
Pasang Stop Kontak & Instalasi
Saklar tunggal
Saklar ganda
Penghisap ruangan

NO
1

XII

7.00
2.00
8.00
4.00
34.00
5.00
28.00
16.00

Titik
Titik
Titik
Titik
Titik
Titik
Titik
Titik

URAIAN PEKERJAAN

VOLUME

SATUAN

4
Titik
Titik
Titik
Titik
Titik

5 Pasang jaringan titik lampu dak atap


- Pasang lampu spotlight halogen 100 watt
- Saklar ganda
6 Pasang panel box 10 Amphere
7 Pasang Instalasi penangkal petir

7.00
7.00
3.00
3.00
1.00
Jumlah XI

PEKERJAAN CAT
A LANTAI 1
1 Cat dinding dalam (cat air)
2 Cat dinding luar (cat wheatersield)
3 Cat plafond & beton expose (cat air)
4 Cat kilap
B LANTAI 2
1 Cat dinding (cat air)
2 Cat dinding luar (cat wheatersield)
3 Cat plafond & beton expose (cat air)
4 Cat kilap
C LANTAI 3
1 Cat dinding (cat air)
2
3 Cat plafond & beton expose (cat air)
4 Cat kilap
D DAK ATAP
1 Cat dinding (cat air)
2
3 Cat plafond & beton expose (cat air)
4 Cat kilap

1,020.53

M2

212.28
11.27

M2
M2

1,427.79

M2

801.08
3.70

M2
M2

1,497.84

M2

714.38
59.02

M2
M2

551.33

M2

714.38
0.88

M2
M2

Jumlah XII (A+B+C+D)


XIII PEKERJAAN PLUMBING TANDON AIR ATAS
A Pengadaan Dan Pemasangan Pipa & Aksesoris
1 Pipa PVC 1,5"
2 Stop Kran 1,5"
3 Elbow 1,5"
4 TEE 1,5"
5 Aksesoris pipa PVC 1.5"
6 Stop Kran / Hidran
7 Profil Tank 2200 lt

NO
1

92.00
4.00
4.00
4.00
1.00
24.00
4.00

M'
Bh
Bh
Bh
Pkt
Bh
Bh

URAIAN PEKERJAAN

VOLUME

SATUAN

B Pekerjaan lain - lain


1 Plat persegi 5cm gantungan pipa
2 Clam pipa
3 Pengecatan pipa dan Aksesoris

1.00
1.00
1.00

Ls
Ls
Ls

Jumlah XIII (A+B)


XIV PEKERJAAN BAK AIR BAWAH 3MX10M X2
A Pekerjaan Tanah dan Pancang
1 Galian tanah
2 Urugan bekas galian
3 Urug pasir bawah plat coor
4 Pancang ulin 10/10 - 2m
5 Galian tanah/bongkar beton untuk pipa tandon air

162.00
7.50
3.00
44.00
200.00

M3
M3
M3
Titik
M3

B Pekerjaan Beton
1 Lantai Kerja 5cm
2 Beton lantai tebal 15cm
- Coor beton 1:2:3
- Besi beton polos 12
3 Beton dinding tebal 15 cm
- Coor beton 1:2:3
- Pasang begisting
- Pasang begisting
- Besi beton polos 12
4 Beton balok 15/30
- Coor beton 1:2:3
- Pasang begisting
- Pasang begisting
- Besi beton polos 12 (Tulangan)
- Besi beton polos 10(begel)
5 Beton daak tebal 15 cm
- Coor beton 1:2:3
- Pasang begisting
- Pasang begisting
- Besi beton polos (Tulangan)

1.50

M3

4.50
358.45

M3
kg

21.06
140.40
140.40
1,855.38

M3
M2
M2
Kg

0.41
26.00
26.00
80.25
39.22

M3
M2
M2
Kg
Kg

4.50
30.00
30.00
358.45

M3
M2
M2
Kg

30.00
46.8
60.00

M2
M2
M2

PengadaanDPipa & Aksesoris


1 Pipa GIP 2"
2 Gate Valve 2"
3 Flange Socket 2"
4 Flange Spigot 2"
6 Flange las 2"
7 Stop Kran / Hidran

200.00
2.00
2.00
2.00
7.00
1.00

M'
Bh
Bh
Bh
Bh
Bh

Pemasangan
E Pipa & Aksesoris
1 Pipa GIP 2"
2 Gate Valve 2"
3 Flange Socket 2"
4 Flange Spigot 2"
5 Flange las 2"
6 Stop Kran / Hidran
7 Pengetesan pipa

200.00
2.00
2.00
2.00
7.00
1.00
200.00

M'
Bh
Bh
Bh
Bh
Bh
M'

Pekerjaan
F lain - lain
1 Plat penutup 6mm
2 Tangga reservoar

1.00
1.00

Bh
Bh

C Pekerjaan Plesteran
1 Plester & Acian lantai 1:2
2 Plester & Acian dinding 1:2
3 Plester & Acian lantai atas 1:2

Jumlah XIV (A+B+C+D+E+F)


Jumlah XIV x 2 Buah Reservoar

XV

PEKERJAAN PAGAR
A Pekerjaan tanah dan pancang
1 Galian tanah pondasi
2 Urugan bekas galian
3 Urug pasir bawah pondasi
4 Pancang ulin 10/10 - 2m
5 Sunduk kayu ulin 5/10 - 50cm
6 Kalang kayu ulin 5/20 - 4m
B Pekerjaan pasangan & beton
1 Pas. Anstampang 20cm
2 Pasangan batu gunung 1:2
3 Beton sloof 15/30
- Coor beton 1:2:3
- Pasang begesting
- Bongkar begesting
- Besi beton polos 10
- Besi begel 8
4 Beton kolom 20/20
- Coor beton 1:2:3
- Pasang begesting
- Bongkar begesting
- Besi beton polos 10
- Besi begel 8
5 Beton ring 10/20
- Coor beton 1:2:3
- Pasang begesting
- Bongkar begesting
- Besi beton polos 10
- Besi begel 8
6 Pasangan batu bata 1:4

136.00
27.20
14.88
142.00
1.06
1.06

m3
m3
m3
ttk
m3
m3

35.2
154.00

m3
m3

9.56
127.50
127.50
786.68
503.63

m3
m2
m2
kg
kg

5.80
116.00
116.00
536.79
229.10

m3
m2
m2
kg
kg

4.25
85.00
85.00
524.45
251.81
42.50

m3
m2
m2
kg
kg
m3

7 Plesteran & acian 1:4


8 Pek. pengecatan , 1xplamir 1xcat dasar, 2xcat penutup

1,062.50
1,062.50

m2
m2

Jumlah XV (A+B)

NO

URAIAN PEKERJAAN

1
2
XVI PEKERJAAN LANSDCAPE
A Perkerasan jalan dan halaman coor beton bertulang
1 Urugan tanah peningian peil t=60cm
2 Urug pasir 10 cm
3 Beton coor tebal 15 cm
- Coor beton 1:2:3
- Pasang begesting
- Bongkar begesting
- Besi beton polos 12
4 Plester finishing koral sikat
B Pekerjaan Media taman
1 Media taman 1 (depan)
- Galian tanah
- Pasangan batu bata 1:4
- Plester dan acian 1:4
- Benangan sudut
- Pek. pengecatan , 1xplamir 1xcat dasar, 2xcat penutup
2 Pengadaan bunga dan penanaman
- Pupuk kadang
- Tanaman glodok
- Palem kipas
- Rumput gajah
3 Media taman 2 (Samping)
- Galian tanah
- Pasangan batu bata 1:4
- Plester dan acian 1:4
- Benangan sudut
- Pek. pengecatan , 1xplamir 1xcat dasar, 2xcat penutup
4 Pengadaan bunga dan penanaman
- Pupuk kadang
- Tanaman glodok
- Palem kipas
- Rumput gajah
3 Media taman 3 (Belakang)
- Galian tanah
- Pasangan batu bata 1:4
- Plester dan acian 1:4
- Benangan sudut
- Pek. pengecatan , 1xplamir 1xcat dasar, 2xcat penutup
4 Pengadaan bunga dan penanaman
- Pupuk kadang
- Palem kipas
- Bunga dadap merah
- Rumput gajah

VOLUME

SATUAN

750.00
227.22

M3
M3

225.00
150.00

M3
M2

150.00
16,050.00
1,500.00

M2
Kg
M2

3.20
0.30
24.00
35.00
75.00

M3
M3
M2
M'
M2

20.00
2.00
4.00
25.00

Zak
Btg
Btg
M2

6.00
1.50
150.00
70.00
140.00

M3
M3
M2
M'
M2

112.00
28.00
2.00
30.00

Zak
Btg
Btg
M2

3.08
3.85
77.00
124.00
96.25

M3
M3
M2
M'
M2

170.00
12.00
12.00
360.00

Zak
Btg
Btg
M2

Jumlah XVI (A+B)

A N A L I S A HARGA SATUAN PEKERJAAN


PEKERJAAN PINTU DAN JENDELA
(SNI)
KEGIATAN

: PEMBANGUNAN GEDUNG KANTOR

PEKERJAAN

: PEMBANGUNAN MARKAS PEMADAM KEBAKARAN

LOKASI

: TANJUNG SELOR KABUPATEN BULUNGAN

NO /
KODE

D E S C R I P T I O N

UNIT

A
1

PEKERJAAN PINTU JENDELA BANGUNAN PMK


Pintu Type PJ1 Per Buah
Daun Pintu
3.9100
m2
Daun pintu panel
2.8000
m2
Kaca ryben 5 mm
1.0000
set
Lockset (Lokcset, Cylinder, Handle) Pintu
6.0000
bh
Hinges
2.0000
bh
door closer
2.0000
bh
door holder
Daun Jendela
2.4800
1.8800
2.0000
2.0000
2.0000
4.0000

m2
m2
bh
bh
bh
bh

Kaca Mati Ryben 5mm


3.0200
m2

Daun jendela
Kaca ryben 5 mm
handel jendela
grandel
whindak
engsel

Harga Satuan
5

1,076,392.20
281,485.00
291,370.00
56,905.00
203,850.00
396,350.00

841,175.33
281,485.00
25,000.00
43,040.00
39,705.00
35,270.00

kaca ryben 5 mm

281,485.00

Upah
6

TOTAL PRICE
Bahan/Alat

JUMLAH
7

4,208,693.50
788,158.00
291,370.00
341,430.00
407,700.00
792,700.00
6,830,051.50

6,830,051.50

2,086,114.81
529,191.80
50,000.00
86,080.00
79,410.00
141,080.00
2,971,876.61

2,971,876.61

850,084.70
850,084.70

850,084.70

Total Harga Satuan PJ 1


2

Pintu Type P1 / bh
3.3600
m2
2.2200
m2
0.7800
m2
1.0000
set
6.0000
bh
2.0000
bh

Pintu Type P2 / bh
1.6800
m2
1.1100
m2
0.4000
m2
1.0000
set
3.0000
bh
1.0000
bh

ANAL kusen

10,652,012.81

Daun pintu panel


Double teakwood + vinil
Kaca Mati Ryben 5 mm
Lockset (Lokcset, Cylinder, Handle) Pintu
Hinges
door closer

Daun pintu panel


Double teakwood + vinil
Kaca Mati Ryben 5 mm
Lockset (Lokcset, Cylinder, Handle) Pintu
Hinges
door closer

318679864.xls

1,076,392.20
250,000.00
281,485.00
291,370.00
56,905.00
203,850.00

1,076,392.20
250,000.00
281,485.00
291,370.00
56,905.00
203,850.00

3,616,677.79
555,000.00
219,558.30
291,370.00
341,430.00
407,700.00
5,431,736.09

5,431,736.09

1,808,338.90
277,500.00
291,370.00
170,715.00
203,850.00
2,751,773.90

2,751,773.90

Page_211_Of_214

A N A L I S A HARGA SATUAN PEKERJAAN


PEKERJAAN PINTU DAN JENDELA
(SNI)
KEGIATAN

: PEMBANGUNAN GEDUNG KANTOR

PEKERJAAN

: PEMBANGUNAN MARKAS PEMADAM KEBAKARAN

LOKASI

: TANJUNG SELOR KABUPATEN BULUNGAN

NO /
KODE

D E S C R I P T I O N

UNIT

Pintu Type P3 / bh
1.4700
m2
1.1100
m2
1.0000
set
3.0000
bh
1.0000
bh

Jendela Type J1 / bh
1.8200
m2
3.0100
m2
2.0000
bh
2.0000
bh
2.0000
bh
4.0000
bh

Jendela Type J2 / bh
0.8400
m2
1.8100
m2
2.0000
bh
2.0000
bh
2.0000
bh
4.0000
bh

Jendela Type J3/ bh


0.4200
m2
0.5900
m2
1.0000
bh
1.0000
bh
1.0000
bh
2.0000
bh

Jendela Type J4/ bh


1.8200
m2
1.9400
m2
2.0000
bh

ANAL kusen

Daun pintu panel


Double teakwood + vinil
Lockset (Lokcset, Cylinder, Handle) Pintu
Hinges
door closer

Daun jendela
Kaca ryben 5 mm
handel jendela
grandel
whindak
engsel

Harga Satuan
5

1,076,392.20
250,000.00
291,370.00
56,905.00
203,850.00

841,175.33
281,485.00
25,000.00
43,040.00
39,705.00
35,270.00

Daun jendela
Kaca ryben 5 mm
handel jendela
grandel
whindak
engsel

841,175.33
281,485.00
25,000.00
43,040.00
39,705.00
35,270.00

Daun jendela
Kaca ryben 5 mm
handel jendela
grandel
whindak
engsel

841,175.33
281,485.00
25,000.00
43,040.00
39,705.00
35,270.00

Daun jendela
Kaca ryben 5 mm
handel jendela

841,175.33
281,485.00
25,000.00
318679864.xls

Upah
6

TOTAL PRICE
Bahan/Alat

JUMLAH
7

1,582,296.53
277,500.00
291,370.00
170,715.00
203,850.00
2,525,731.53

2,525,731.53

1,530,939.09
847,269.85
50,000.00
86,080.00
79,410.00
141,080.00
2,734,778.94

2,734,778.94

706,587.27
509,487.85
50,000.00
86,080.00
79,410.00
141,080.00
1,572,645.12

1,572,645.12

353,293.64
166,076.15
25,000.00
43,040.00
39,705.00
70,540.00
697,654.79

697,654.79

1,530,939.09
546,080.90
50,000.00
Page_212_Of_214

A N A L I S A HARGA SATUAN PEKERJAAN


PEKERJAAN PINTU DAN JENDELA
(SNI)
KEGIATAN

: PEMBANGUNAN GEDUNG KANTOR

PEKERJAAN

: PEMBANGUNAN MARKAS PEMADAM KEBAKARAN

LOKASI

: TANJUNG SELOR KABUPATEN BULUNGAN

NO /
KODE

D E S C R I P T I O N

UNIT

2.0000
2.0000
4.0000

10

11

12

13

bh
bh
bh

Jendela Type J5/ bh


1.4900
m2
1.0300
m2
2.0000
bh
2.0000
bh
2.0000
bh
4.0000
bh

Jendela Type J6/ bh


0.9100
m2
0.9700
m2
1.0000
bh
1.0000
bh
1.0000
bh
2.0000
bh

Jendela Type J8/ bh


1.8200
m2
1.2800
m2
2.0000
bh
2.0000
bh
2.0000
bh
4.0000
bh

Bouvenlist Type BV1/ bh


0.5000
m2
0.2200
m2
2.0000
bh
2.0000
bh
2.0000
bh
4.0000
bh

grandel
whindak
engsel

Harga Satuan
5
43,040.00
39,705.00
35,270.00

Daun jendela
Kaca ryben 5 mm
handel jendela
grandel
whindak
engsel

841,175.33
281,485.00
25,000.00
43,040.00
39,705.00
35,270.00

Daun jendela
Kaca ryben 5 mm
handel jendela
grandel
whindak
engsel

841,175.33
281,485.00
25,000.00
43,040.00
39,705.00
35,270.00

Daun jendela
Kaca ryben 5 mm
handel jendela
grandel
whindak
engsel

841,175.33
281,485.00
25,000.00
43,040.00
39,705.00
35,270.00

Daun jendela
Kaca ryben 5 mm
handel jendela
grandel
whindak
engsel

841,175.33
281,485.00
25,000.00
43,040.00
39,705.00
35,270.00

Upah
6

TOTAL PRICE
Bahan/Alat

JUMLAH
7

86,080.00
79,410.00
141,080.00
2,433,589.99

2,433,589.99

1,253,351.23
289,929.55
50,000.00
86,080.00
79,410.00
141,080.00
1,899,850.78

1,899,850.78

765,469.55
273,040.45
25,000.00
43,040.00
39,705.00
70,540.00
1,216,795.00

1,216,795.00

1,530,939.09
360,300.80
50,000.00
86,080.00
79,410.00
141,080.00
2,247,809.89

2,247,809.89

420,587.66
61,926.70
50,000.00
86,080.00
79,410.00
141,080.00
839,084.36

839,084.36

Bouvenlist Type BV2/ bh

ANAL kusen

318679864.xls

Page_213_Of_214

A N A L I S A HARGA SATUAN PEKERJAAN


PEKERJAAN PINTU DAN JENDELA
(SNI)
KEGIATAN

: PEMBANGUNAN GEDUNG KANTOR

PEKERJAAN

: PEMBANGUNAN MARKAS PEMADAM KEBAKARAN

LOKASI

: TANJUNG SELOR KABUPATEN BULUNGAN

NO /
KODE

D E S C R I P T I O N

UNIT

0.7500
0.3300
3.0000
3.0000
3.0000
6.0000

ANAL kusen

m2
m2
bh
bh
bh
bh

Daun jendela
Kaca ryben 5 mm
handel jendela
grandel
whindak
engsel

Harga Satuan
5
841,175.33
281,485.00
25,000.00
43,040.00
39,705.00
35,270.00

318679864.xls

Upah
6

TOTAL PRICE
Bahan/Alat

JUMLAH
7

630,881.49
92,890.05
75,000.00
129,120.00
119,115.00
211,620.00
1,258,626.54

1,258,626.54

Page_214_Of_214