PERHITUNGAN PONDASI

1. Data Perencanaan
H Kolom
B Kolom
c
H Pondasi
B Pondasi
t Pondasi
F'c
1
Fy (Ulir)
Dia Tulangan
As Tulangan
Dekking
d'
d
BJ Beton

=
=
=
=
=
=
=
=
=
=
=
=
=
=
=

450 mm
450 mm
1
2.5 m
2.5 m
0.5 m
30 MPa
0.85
400 MPa
19 mm
283.385 mm2
80 mm
108.5 mm
391.5 mm
2400 kg/m3

Data Tanah
c

33 kN/m2

tanah

FK
Z

=
=
=
=

18 kN/m3
26
2.5
2.5 m

2. Hasil Analisis Struktur


P
P
P
P

DL
LL
EX
EY

=
=
=
=

576.1083 kN
139.5702 kN
36.8708 kN
49.8669 kN

V
V
V
V

DL
LL
EX
EY

=
=
=
=

5.8256 kN
1.7941 kN
15.2397 kN
5.6052 kN

M
M
M
M

DL
LL
EX
EY

=
=
=
=

24.1761 kN.m
7.4455 kN.m
63.2448 kN.m
23.2616 kN.m

3. Desain Terhadap Geser


Menghitung Luasan Pondasi
A

=
=
=

B Pondasi x H Pondasi

e tan x tan2 (45 + /2)

=
=

e tan 26 x tan2 (45 + 26/2)


11.85

=
=
=

1,8 (Nq - 1) Tan


1,8 (Nq - 1) Tan 26
9.53

Nc

=
=
=

(Nq - 1)/Tan
(Nq - 1)/Tan 26
22.25

qu

=
=
=

(c x Nc) + ( x Z x Nq) + (B/2 x x N)


(c x Nc) + ( x Z x 11,85) + (B/2 x x N)

=
=
=

qu/FK
1493,04/2,5

6.25 m2

Menghitung Nq
Nq

Menghitung N

Menghitung Nc

Menghitung qu

qa

1481.925 kN/m2

592.77 kN/m2

Mencari Pu Berfaktor
Beban Mati
Dari Permodelan
Berat Slab
Berat Tanah
P DL

=
=
=
=

576.1083 kN
75 kN
272.1375 kN
923.2458 kN

Beban Hidup
P LL

139.5702 KN

Beban Gempa

=
=

p EX
p EY

P
KN
576.1083
139.5702
36.8708
49.8669

Gaya
DL
LL
AX
AY

36.8708 KN
49.8669 KN
V
KN
5.8256
1.7941
15.2397
5.6052

P
KN
806.5516
914.6423
+ 1,0 LL + (1 AX + 0,3 AY)
830.9002
+ 1,0 LL + (1 AX - 0,3 AY)
830.9002
+ 1,0 LL - (1 AX + 0,3 AY)
830.9002
+ 1,0 LL - (1 AX - 0,3 AY)830.9002
+ (1 AX + 0,3 AY)
691.33
+ (1 AX - 0,3 AY)
691.33
- (1 AX + 0,3 AY)
691.33
- (1 AX - 0,3 AY)
691.33
MAX
914.6423

Kombinasi Beban
1,4 DL
1,2 DL + 1,6 LL
(1,2 + 0,2 Sds) DL
(1,2 + 0,2 Sds) DL
(1,2 + 0,2 Sds) DL
(1,2 + 0,2 Sds) DL
(0,9 + 0,2 Sds) DL
(0,9 + 0,2 Sds) DL
(0,9 + 0,2 Sds) DL
(0,9 + 0,2 Sds) DL

Pu

M
KN.m
24.1761
7.4455
63.2448
23.2616
V
KN
8.15584
9.86128
8.78482
8.78482
8.78482
8.78482
6.99072
6.99072
6.99072
6.99072
9.86128

M
KN.m
33.84654
40.92412
36.45682
36.45682
36.45682
36.45682
29.01132
29.01132
29.01132
29.01132
40.92412

914.6423 KN

Mencari Tegangan Tanah Netto


Daya Dukung Tanah Netto
Berat Tanah Diatas Pondasi

43.542 KN/m2

Berat Slab Pondasi

12 KN/m2

55.542 KN/m2

Tegangan Tanah Netto


qa Net

M max
( )/+ ( )/(1/6
^2 )

219.0299328

=
=
=
=

qa - q
575,616 - 46,1775

qa Net

<

537.228 KN/m2
189.2895 KNm

537.228 KN/m2

OK

Kapasitas Geser Untuk Aksi Satu Arah

=
=
=

((B - H kol)/2)-d
(( 2 - 0,6 )/2) - 0,391
0.6335 m

A kritis

=
=
=

B x (x)

=
=
=

qu x A kritis

=
=
=

Vu/0,75

=
=
=
=

(1/6) x f'c x b x d
(1/6) x 30 x 2000 x 391,5
893472.4 N
893.4724 KN

<

Vc
893.4724 KN

Vu

Vn

Vc

Vn
462.518208096

1.58375 m2

346.8887 KN

462.5182 KN

Kapasitas Geser Untuk Aksi Dua Arah

=
=
=

H Kolom + d

=
=
=

B Kolom + d

0.8415 m

0.8415 m

OK

A bo

A Kritis

Vu

Vn

bo

=
=
=

(x) x y

=
=
=

A Pondasi - A bo
6,25 - 0,626

=
=
=

qu x A kritis

=
=
=

Vu/0,75

=
=
=

( 2 x) + ( 2 y)
(2 x 0,79) + ( 2 x 0,79)
3.366 m

0.708122 m2

5.541878 m2

1213.837 KN

1618.449 KN

(1+2/) x ((^ ) )/6


=

Vc1

(1+2/1) x (30 3,166


=
391,5 )/6
=

3608.914 KN

(( )/+2) x (30 )/12


=

Vc2

= (( 391,5)/3,564+2) x (30
3,166 391,5)/12

Vc3

Vc pakai
Vn
1618.4494815578
4. Desain Terhadap Lentur

=
=

2799559 N
2799.559 KN

(1/3) x (^ ) x bo x d

(1/3) x (^ ) x bo x d

2405.943 KN

3608.914 KN

<

Vc
3608.914 OK

Perhitungan tiap 1m panjang

1000 mm

1/2 x q x L2 x b

=
=

1/2 x 610,93 x 12 x 2
273.7874 KN.m

=
=
=

Mu/0,8
610,93/0,8
342.2343 KN.m

Menghitung Momen Nominal


Mu

Mn

Menghitung Rasio Tulangan Maksimal


max

0.025

Menghitung Penulangan Minimum


As Min

(^ )/(4
=) x b x d

3350.522

As Min

1,4/ x b x
=
d

3425.625

3425.625

As min
Menghitung Rasio Tulangan Minimum
min

=
=
=

As min / (b x d )
1370,25/(1000x391,5)
0.00875

=
=
=

0,85 d
0,85 x 391,5
332.775 mm

Asumsi dengan Momen


(d - a/2)

Menghitung Penulangan Yang Diperlukan


As Pakai

As Pakai

>

2571.0635564571

/(
(/2))

As min
3425.625 TIDAK OKE

2571.064 mm2

Menghitung Rasio Tulangan Yang Ditentukan


perlu

=
=
=

As perlu / (b x d)
3613,755 / (1000 x 391,5)
0.006567

perlu

>

min
0.00875 Gunakan perlu

0.0065672121

Menghitung Kuat Momen Nominal


a

=
=
=

Mn

Mn ada
381.8901441213

( )/
(0,85 ^
)
(5737, 15
400)/(0,85
30 1000)
40.33041 mm

=
=
=

As x fy x (d - a/2)

>

Mn perlu
342.2343 OK

381.8901 KN.m

Menghitung Jumlah Tulangan Yang Diperlukan


n

=
=
=
=

As pakai / As tulangan
5737,15 / 283,38
9.072688 Buah
14 Buah

Menghitung Jarak Tulangan Yang Digunakan


S

Digunakan Tulangan / m

=
=
=
=

b / (n-1)
1000 / (21 -1)
76.92308 mm
14

=
D

5. Panjang Penjangkaran
Ag

=
=

B kolom x H kolom

70
19

202500 mm2

=
=

1012.5 mm2

4534.16 mm2

Luas Tulangan Jangkar Minimum


0,005 Ag

Digunakan Jangkar 16D19


As Jangkar

Panjang Penjakaran Ke Pondasi (Tulangan Tarik) Minimal


( )/(4
(^ ) )
=
Ldb

0,04 x db x fy

(22
= 400)/(4

30 )
=
346.891 >
Ldb

=
=
=

30 x db
30 x 19
570 mm

Ldb pakai

570 mm

<

0,7 ( 0,85 x F'c x Ag )

0,04 x 22 x 400
304

6. Daya Dukung Kolom


Pu
914.64228
914.64228

3614625 OK

7. Daya Dukung Pondasi


( Ap/ Ag ) ^

5.5555555556
5.5555555556

<
<
>

914.64228
914.64228

<
<
<

0,5

Pu

2
2
2

Gunakan

2 x 0,7 ( 0,85 x F'c x Ag )


7229.25 OK

mm2
mm2
mm2

mm
70

,04 x db x fy

,04 x 22 x 400
mm

Eduar Saputra (1113030033)


Vidhi Nova Amanda (1113030025)

PROJECT WORK 1

PERHITUNGAN PONDASI

1. Data Perencanaan
H Kolom
B Kolom
c
H Pondasi
B Pondasi
t Pondasi
F'c
1
Fy (Ulir)
Dia Tulangan
As Tulangan
Dekking
d'
d
BJ Beton

=
=
=
=
=
=
=
=
=
=
=
=
=
=
=

450 mm
450 mm
1
2m
2m
0.5 m
30 MPa
0.85
400 MPa
19 mm
283.385 mm2
80 mm
108.5 mm
391.5 mm
2400 kg/m3

Data Tanah
c

33 kN/m2

tanah

FK
Z

=
=
=
=

18 kN/m3
26
2.5
2.5 m

2. Hasil Analisis Struktur


P
P
P
P

DL
LL
EX
EY

=
=
=
=

576.1083 kN
139.5702 kN
36.8708 kN
49.8669 kN

V
V
V
V

DL
LL
EX
EY

=
=
=
=

5.8256 kN
1.7941 kN
15.2397 kN
5.6052 kN

M
M
M
M

DL
LL
EX
EY

=
=
=
=

24.1761 kN.m
7.4455 kN.m
63.2448 kN.m
23.2616 kN.m

Teknik Sipil Teknik Konstruksi Gedung


Politeknik Negeri Jakarta

Eduar Saputra (1113030033)


Vidhi Nova Amanda (1113030025)

PROJECT WORK 1

3. Desain Terhadap Geser


Menghitung Luasan Pondasi
=
=
=

B Pondasi x H Pondasi

e tan x tan2 (45 + /2)

=
=

e tan 26 x tan2 (45 + 26/2)


11.85

=
=
=

1,8 (Nq - 1) Tan


1,8 (Nq - 1) Tan 26
9.53

Nc

=
=
=

(Nq - 1)/Tan
(Nq - 1)/Tan 26
22.25

qu

=
=
=

(c x Nc) + ( x Z x Nq) + (B/2 x x N)


(c x Nc) + ( x Z x 11,85) + (B/2 x x N)

=
=
=

qu/FK
1493,04/2,5

4 m2

Menghitung Nq
Nq

Menghitung N

Menghitung Nc

Menghitung qu

qa

1439.04 kN/m2

575.616 kN/m2

Mencari Pu Berfaktor
Beban Mati
Dari Permodelan
Berat Slab
Berat Tanah
P DL

=
=
=
=

576.1083 kN
48 kN
170.8875 kN
794.9958 kN

Beban Hidup
P LL

139.5702 KN

Beban Gempa
p EX

36.8708 KN

Teknik Sipil Teknik Konstruksi Gedung


Politeknik Negeri Jakarta

Eduar Saputra (1113030033)


Vidhi Nova Amanda (1113030025)

PROJECT WORK 1
=

p EY

P
KN
576.1083
139.5702
36.8708
49.8669

Gaya
DL
LL
AX
AY
Kombinasi Beban
1,4 DL
1,2 DL + 1,6 LL
(1,2 + 0,2 Sds) DL
(1,2 + 0,2 Sds) DL
(1,2 + 0,2 Sds) DL
(1,2 + 0,2 Sds) DL
(0,9 + 0,2 Sds) DL
(0,9 + 0,2 Sds) DL
(0,9 + 0,2 Sds) DL
(0,9 + 0,2 Sds) DL

+ 1,0 LL + (1 AX + 0,3 AY)


+ 1,0 LL + (1 AX - 0,3 AY)
+ 1,0 LL - (1 AX + 0,3 AY)
+ 1,0 LL - (1 AX - 0,3 AY)
+ (1 AX + 0,3 AY)
+ (1 AX - 0,3 AY)
- (1 AX + 0,3 AY)
- (1 AX - 0,3 AY)
MAX

49.8669 KN

V
KN
5.8256
1.7941
15.2397
5.6052

M
KN.m
24.1761
7.4455
63.2448
23.2616

P
KN
806.5516
914.6423
830.9002
830.9002
830.9002
830.9002
691.33
691.33
691.33
691.33
914.6423

V
KN
8.15584
9.86128
8.78482
8.78482
8.78482
8.78482
6.99072
6.99072
6.99072
6.99072
9.86128

914.6423 KN

Berat Tanah Diatas Pondasi

42.72188 KN/m2

Berat Slab Pondasi

12 KN/m2

54.72188 KN/m2

=
=
=
=

qa - q
575,616 - 54,7219

qa Net

Pu
Mencari Tegangan Tanah Netto
Daya Dukung Tanah Netto

Tegangan Tanah Netto


qa Net

M max
( )/+ ( )/(1/6
^2 )

370.627695

Teknik Sipil Teknik Konstruksi Gedung


Politeknik Negeri Jakarta

<

520.8941 KN/m2
189.2895 KNm

520.8941 KN/m2

M
KN.m
33.84654
40.92412
36.45682
36.45682
36.45682
36.45682
29.01132
29.01132
29.01132
29.01132
40.92412

Eduar Saputra (1113030033)


Vidhi Nova Amanda (1113030025)

PROJECT WORK 1

Kapasitas Geser Untuk Aksi Satu Arah

2500

Teknik Sipil Teknik Konstruksi Gedung


Politeknik Negeri Jakarta

2500

450

450

Eduar Saputra (1113030033)


Vidhi Nova Amanda (1113030025)

PROJECT WORK 1

=
=
=

((B - H kol)/2)-d
(( 2 - 0,45 )/2) - 0,3915
0.3835 m

A kritis

=
=
=

B x (x)
2 x 0,3835

Vu

=
=
=

qu x A kritis
370,628 x 0,767
284.2714 KN

Vn

=
=
=

Vu/0,75
284,271/0,75
379.0286 KN

Vc

=
=
=
=

(1/6) x f'c x b x d
(1/6) x 30 x 2000 x 391,5
714777.9 N
714.7779 KN

Vn
379.02858942

<

Vc
714.7779 KN

=
=
=

H Kolom + d
(450/1000) + (391,5/1000)
0.8415 m

=
=
=

B Kolom + d
(450/1000) + (391,5/1000)
0.8415 m

A bo

(x) x y

0.767 m2

Kapasitas Geser Untuk Aksi Dua Arah

Teknik Sipil Teknik Konstruksi Gedung


Politeknik Negeri Jakarta

Eduar Saputra (1113030033)


Vidhi Nova Amanda (1113030025)

PROJECT WORK 1
=
=

0,8415 x 0,8415

=
=
=

A Pondasi - A bo
4 - 0,70812

Vu

=
=
=

qu x A kritis
370,628 x 3,29188
1220.061 KN

Vn

=
=
=
=
=
=

Vu/0,75
1220,06/0,75
1626.748 KN
( 2 x) + ( 2 y)
(2 x 0,8415) + ( 2 x 0,8415)
3.366 m

A Kritis

bo

Vc1

Vc2

Vc pakai
Vn
1626.7480836057

3.291878 m2

(1+2/) x ((^ ) )/6

(1+2/1) x (30 3,366


391,5 )/6

3608.914 KN

(( )/+2) x (30 )/12

Vc3

0.708122 m2

(( 391,5)/3,366+2) x (30
3,366 391,5)/12

=
=

2799559 N
2799.559 KN

(1/3) x (^ ) x bo x d

(1/3) x 30 x 3,366 x 391,5

2405.943 KN

3608.914 KN

<

Vc
3608.914 OK

4. Desain Terhadap Lentur


Perhitungan tiap 1m panjang
Menghitung Momen Nominal

Teknik Sipil Teknik Konstruksi Gedung


Politeknik Negeri Jakarta

1000 mm

Eduar Saputra (1113030033)


Vidhi Nova Amanda (1113030025)
Mu

Mn

PROJECT WORK 1
=

1/2 x q x L2 x b

=
=

1/2 x 370,628 x 12 x 2
370.6277 KN.m

=
=
=

Mu/0,8
370,628/0,8
463.2846 KN.m

0.025

Menghitung Rasio Tulangan Maksimal


max
Menghitung Penulangan Minimum
As Min
As Min

(^ )/(4
) x b x d

1,4/ x b x
d

As min

Menghitung Rasio Tulangan Minimum


min

=
=
=

As min / (b x d )
2740,5/(1000 x 391,5)
0.007

(d - a/2)

=
=
=

0,85 d
0,85 x 391,5
332.775 mm

Asumsi dengan Momen

Menghitung Penulangan Yang Diperlukan


As Pakai

As Pakai
3480.464418526

>

/(
(/2))

3480.464

As min
2740.5 OK

Menghitung Rasio Tulangan Yang Ditentukan


perlu

Teknik Sipil Teknik Konstruksi Gedung


Politeknik Negeri Jakarta

=
=
=

As perlu / (b x d)
3480,46 / (1000 x 391,5)
0.00889

Eduar Saputra (1113030033)


Vidhi Nova Amanda (1113030025)
perlu
0.0088900751

PROJECT WORK 1

>

min
0.007 Gunakan perlu

Menghitung Kuat Momen Nominal


a

=
=
=

Mn

Mn ada
507.0371747847

( )/
(0,85 ^
)
(3480, 46
400)/(0,85
30 1000)
54.59552 mm

=
=
=

As x fy x (d - a/2)

>

Mn perlu
463.2846 OK

507.0372 KN.m

Menghitung Jumlah Tulangan Yang Diperlukan


n

=
=
=
=

As pakai / As tulangan
3480,46 / 283,385
12.28175 Buah
13 Buah

Menghitung Jarak Tulangan Yang Digunakan


S

Digunakan Tulangan / m

=
=
=
=

b / (n-1)
1000 / (13 -1)
83.33333 mm

=
D

5. Panjang Penjangkaran
Ag

=
=
=

B kolom x H kolom
450 x 450

=
=

0,005 x 202500

202500 mm2

Luas Tulangan Jangkar Minimum


0,005 Ag

Teknik Sipil Teknik Konstruksi Gedung


Politeknik Negeri Jakarta

1012.5 mm2

19

Eduar Saputra (1113030033)


Vidhi Nova Amanda (1113030025)

PROJECT WORK 1

Digunakan Jangkar 16D19


As Jangkar

4534.16 mm2

Panjang Penjakaran Ke Pondasi (Tulangan Tarik) Minimal


=

Ldb

=
=

( )/(4
(^ ) )

(19
400)/(4
30 )
346.891

Ldb

=
=
=

30 x db
30 x 19
570 mm

Ldb pakai

570 mm

>

6. Daya Dukung Kolom


Pu
914.64228
914.64228
7. Daya Dukung Pondasi
( Ap/ Ag ) ^

<

4.4444444444
4.4444444444

<
<
>

914.64228
914.64228

<
<
<

0,5

Pu

Teknik Sipil Teknik Konstruksi Gedung


Politeknik Negeri Jakarta

0,7 ( 0,85 x F'c x Ag )


0,7 (0,85 x 30 x 202500)
3614.625 OK

2
2
2

digunakan

2 x 0,7 ( 0,85 x F'c x Ag )


2 x 0,7 (0,85 x 30 x 202500)
7229.25 OK

Eduar Saputra (1113030033)


Vidhi Nova Amanda (1113030025)

Teknik Sipil Teknik Konstruksi Gedung


Politeknik Negeri Jakarta

PROJECT WORK 1

Eduar Saputra (1113030033)


Vidhi Nova Amanda (1113030025)

+ (B/2 x x N)
5) + (B/2 x x N)

Teknik Sipil Teknik Konstruksi Gedung


Politeknik Negeri Jakarta

PROJECT WORK 1

Eduar Saputra (1113030033)


Vidhi Nova Amanda (1113030025)

OK

Teknik Sipil Teknik Konstruksi Gedung


Politeknik Negeri Jakarta

PROJECT WORK 1

Eduar Saputra (1113030033)


Vidhi Nova Amanda (1113030025)

Teknik Sipil Teknik Konstruksi Gedung


Politeknik Negeri Jakarta

PROJECT WORK 1

Eduar Saputra (1113030033)


Vidhi Nova Amanda (1113030025)

OK

Teknik Sipil Teknik Konstruksi Gedung


Politeknik Negeri Jakarta

PROJECT WORK 1

Eduar Saputra (1113030033)


Vidhi Nova Amanda (1113030025)

Teknik Sipil Teknik Konstruksi Gedung


Politeknik Negeri Jakarta

PROJECT WORK 1

Eduar Saputra (1113030033)


Vidhi Nova Amanda (1113030025)

2680.417 mm2
2740.5 mm2
2740.5 mm2

mm2

Teknik Sipil Teknik Konstruksi Gedung


Politeknik Negeri Jakarta

PROJECT WORK 1

Eduar Saputra (1113030033)


Vidhi Nova Amanda (1113030025)

80 mm
-

80

Teknik Sipil Teknik Konstruksi Gedung


Politeknik Negeri Jakarta

PROJECT WORK 1

Eduar Saputra (1113030033)


Vidhi Nova Amanda (1113030025)

0,04 x db x fy
0,04 x 19 x 400
304 mm

Teknik Sipil Teknik Konstruksi Gedung


Politeknik Negeri Jakarta

PROJECT WORK 1