Anda di halaman 1dari 12

Eduar Saputra (1113030033)

Vidhi Nova Amanda (1113030025)

PROJECT WORK 1
PERHITUNGAN PELAT LANTAI

DATA :
H Plat
B Plat
F'c
Fy

BJ Beton
Berat Keramik
Berat Spesi (1 cm)
Berat Plafond
Berat Penggantung
Berat Utilitas
Beban Hidup

=
=
=
=
=
=
=
=
=
=
=
=

150 mm
1000 mm
30 Mpa
400 Mpa
0.85
24 KN/m3
0.24 KN/m2
0.21 KN/m2
0.11 KN/m2
0.07 KN/m2
0.13 KN/m2
2.5 KN/m2

1. Pembebanan
- Akibat Bebabn Mati (DL)
Berat Sendiri Beton

Berat
Berat
Berat
Berat
Berat

keramik
spesi (2 cm)
plafonfd
penggantung
instalasi
wDL total

=
=
=
=
=
=
=
=
=

Berat Jenis Beton x H Plat


24 x 0,15
3.6 KN/m2
0.24 KN/m2
0.42 KN/m2
0.11 KN/m2
0.07 KN/m2
0.13 KN/m2
+
4.57 KN/m2

2.5 KN/m2
2.5 KN/m2

=
=
=

(1,2 x Wdl) + (1,6 x Wll)


(1,2 x 4,57) + (1,6 x 2,5)
9.484 KN/m2

- Akibat Bebabn Hidup (LL)


Beban hidup (perkantoran) =
wLL total
- Beban Ultimate (Wu)
Wu

2. Tinggi Efektif
Tebal Plat Lantai (H)
Selimut Beton (p)
Asumsi D Tulangan

=
=
=

Teknik Sipil Teknik Konstruksi Gedung


Politeknik Negeri Jakarta

150 mm
20 mm
10 mm

Eduar Saputra (1113030033)


Vidhi Nova Amanda (1113030025)

PROJECT WORK 1

- Tinggi Efektif Arah - X


dx

H - p - ( 1 /2 x D )
150 - 20 - ( 1/2 x 10 )
125

- Tinggi Efektif Arah - Y


dy

H - p - D - (1/2 x D)
150 - 20 - 10 - ( 1/2 x 10 )
115

=
=

( dx + dy ) / 2
( 125 + 115 ) / 2
120

- Tinggi Efektif Arah Total


d

3. Rasio Tulangan
bal

= ( 0,85 ^ )/
(600/(600+))
= (0,85 0,85 30)/240
(600/(600+240))
=

max

=
=

min

0.032513
75 % x bal
75 % x 0.06451
0.024384
0.0018

4. Batas Gaya Dalam Plat


As min

min x b x d
0,0018 x 1000 x 120
216 mm2

As max

max x b x d
0,04838 x 1000 x 120
2926.125

min

Teknik Sipil Teknik Konstruksi Gedung


Politeknik Negeri Jakarta

( min
)/(0,85
^ )

Eduar Saputra (1113030033)


Vidhi Nova Amanda (1113030025)

PROJECT WORK 1
(216 240)/
(0,85 30
1000)

=
max

3.388235 mm
( max
)/(0,85
^ )

(5805,8
240)/(0,85
30 1000)

=
Mn min

45.9 mm

min ( (
)/2)

216 240 (120


2,0329/2)

=
Mn max

10.22163 KN.m
max ( (
)/2)
5805,8 240 (120 54,6429/2)

113.5922 KN.m

Mu min

=
=
=

0,8 x Mn min
0,8 x 6,17
8.177303 KN.m

Mu max

=
=
=

0,8 x Mn max
0,8 x 129,138
90.87374 KN.m

Tabulasi Gaya Dalam Plat

As
mm2

mm

Mn
KN.m

Min
0.0018
216 3.388235 10.22163
Max
0.024384375 2926.125
45.9 113.5922
5. GAYA DALAM PLAT DAN TULANGAN
Plat A (type III)

A
Teknik Sipil Teknik Konstruksi Gedung
Politeknik Negeri Jakarta

(6000 x 4500) Plat Dua Arah

Eduar Saputra (1113030033)


Vidhi Nova Amanda (1113030025)

PROJECT WORK 1

Lx
Ly

=
=
=
=
=
=
=

Ly/Lx
WuLx^2
b
max
min

4.5 m
6m
1.333
192.051
0.0325
0.0244
0.0018

<

MLx
Mly
Mtx
Mty
48.33
24.33
92.67
76.00
9.28
4.67
17.80
14.60
11.60
5.84
22.25
18.24
268.59
216.00
514.95
422.33
0.0021
0.0018
0.0040
0.0032
4.21
3.39
8.08
6.62
12.66599 10.22163 23.88575 19.71247
OK
OK
OK
OK
D8 - 200 D8 - 200 D8 - 75 D8 - 75

Koefisien
Mu
Mn perlu = Mu/
As = (Mn.1000000)/(fy.0,9.d)

used
a = (As.fy)/(0,85.f'c.b)
Mn = (As.fy.(d-(a/2)))/1000000

Mn > Mn perlu
tul.terpasang

Plat B (type VI A)

(6000 x 4500) Plat Dua Arah

Lx
Ly
Ly/Lx
WuLx^2
b
max
min

Koefisien
Mu
Mn perlu = Mu/
As = (Mn.1000000)/(fy.0,9.d)

used
a = (As.fy)/(0,85.f'c.b)
Mn = (As.fy.(d-(a/2)))/1000000

Mn > Mn perlu
tul.terpasang

=
=
=
=
=
=
=

4.5 m
6m
1.333
192.051
0.032513
0.024384
0.0018

<

MLx
Mly
Mtx
Mty
43.33
24.33
82.67
72.33
8.32
4.67
15.88
13.89
10.40
5.84
19.85
17.36
240.80
216.00
459.38
401.96
0.0019
0.0018
0.0035
0.0031
3.78
3.39
7.21
6.31
11.37671 10.22163 21.38824 18.78712
OK
OK
OK
OK
D8 - 200 D8 - 200 D8 - 100 D8 - 100

Teknik Sipil Teknik Konstruksi Gedung


Politeknik Negeri Jakarta

Eduar Saputra (1113030033)


Vidhi Nova Amanda (1113030025)

PROJECT WORK 1

Plat C (type II)

(6000 x 4500) Plat Dua Arah

Lx
Ly
Ly/Lx
WuLx^2
b
max
min

=
=
=
=
=
=
=

4.5 m
6m
1.333
192.051
0.032513
0.024384
0.0018
MLx
39.33
7.55
9.44
216.00
0.0018
3.39
10.22163
OK
D8 - 200

Koefisien
Mu
Mn perlu = Mu/
As = (Mn.1000000)/(fy.0,9.d)

used
a = (As.fy)/(0,85.f'c.b)
Mn = (As.fy.(d-(a/2)))/1000000

Mn > Mn perlu
tul.terpasang

Plat D (type VI B)

<

Mly
Mtx
Mty
19.33
69.00
54.67
3.71
13.25
10.50
4.64
16.56
13.12
216.00
383.44
303.78
0.0018
0.0029
0.0023
3.39
6.01
4.77
10.22163 17.94364 14.29213
OK
OK
OK
D8 - 200 D8 - 125 D8 - 125

(6000 x 4500) Plat Dua Arah

Lx
Ly
Ly/Lx
WuLx^2
b
max
min

Koefisien
Mu
Mn perlu = Mu/
As = (Mn.1000000)/(fy.0,9.d)

used
a = (As.fy)/(0,85.f'c.b)

=
=
=
=
=
=
=

4.5 m
6m
1.333
192.051
0.032513
0.024384
0.0018
MLx
42.33
8.13
10.16
235.25
0.0018
3.69

Teknik Sipil Teknik Konstruksi Gedung


Politeknik Negeri Jakarta

Mly
19.67
3.78
4.72
216.00
0.0018
3.39

<

Mtx
74.00
14.21
17.76
411.22
0.0032
6.45

Mty
55.00
10.56
13.20
305.64
0.0024
4.79

Eduar Saputra (1113030033)


Vidhi Nova Amanda (1113030025)
Mn = (As.fy.(d-(a/2)))/1000000

Mn > Mn perlu
tul.terpasang

11.11827
OK
D8 - 200

10.22163 19.20806 14.37750


OK
OK
OK
D8 - 200 D8 - 100 D8 - 100

Tabel Momen & Interpolasi


Koefisien
Mlx
Mly
Mtx
Mty
1.20
41
27
84
74
1.33 48.33333333 24.33333 92.66667
76
1.40
52
23
97
77
1.20
36
27
72
69
1.33 43.33333333 24.33333 82.66667 72.33333
1.40
47
23
88
74
1.20
34
22
63
54
1.33 39.33333333 19.33333
69 54.66667
1.40
42
18
72
55
1.20
37
21
70
55
1.33 42.33333333 19.66667
74
55
1.40
45
19
76
55

Tipe Plat
III

VI A

II

VI B

DIA
P8
P10
P12

PROJECT WORK 1

[}

50
50
79
113

Teknik Sipil Teknik Konstruksi Gedung


Politeknik Negeri Jakarta

Tulangan Tersedia
75
100
125
1005
870
503
1571
1047
785
2262
1508
1131

402
628
905

Eduar Saputra (1113030033)


Vidhi Nova Amanda (1113030025)

Teknik Sipil Teknik Konstruksi Gedung


Politeknik Negeri Jakarta

PROJECT WORK 1

Eduar Saputra (1113030033)


Vidhi Nova Amanda (1113030025)

Teknik Sipil Teknik Konstruksi Gedung


Politeknik Negeri Jakarta

PROJECT WORK 1

Eduar Saputra (1113030033)


Vidhi Nova Amanda (1113030025)

Mu
KN.m
8.177303
90.87374

Teknik Sipil Teknik Konstruksi Gedung


Politeknik Negeri Jakarta

PROJECT WORK 1

Eduar Saputra (1113030033)


Vidhi Nova Amanda (1113030025)

(plat 2 arah)

Mtix

Mtiy

8.90
7.30
11.12
9.12
257.48
216.00
0.0020
0.0018
4.04
3.39
12.15086 10.22163
OK
OK
D8 - 200 D8 - 200

(2 arah)

Mtix

Mtiy

7.94
6.95
9.92
8.68
229.69
216.00
0.0018
0.0018
3.60
3.39
10.85964 10.22163
OK
OK
D8 - 200 D8 - 200

Teknik Sipil Teknik Konstruksi Gedung


Politeknik Negeri Jakarta

PROJECT WORK 1

Eduar Saputra (1113030033)


Vidhi Nova Amanda (1113030025)

(2 arah)

Mtix

Mtiy

6.63
5.25
8.28
6.56
216.00
216.00
0.0018
0.0018
3.39
3.39
10.22163 10.22163
OK
OK
D8 - 200 D8 - 200

(2 arah)

Mtix

Mtiy

7.11
8.88
216.00
0.0018
3.39

5.28
6.60
216.00
0.0018
3.39

Teknik Sipil Teknik Konstruksi Gedung


Politeknik Negeri Jakarta

PROJECT WORK 1

Eduar Saputra (1113030033)


Vidhi Nova Amanda (1113030025)
10.22163 10.22163
OK
OK
D8 - 200 D8 - 200

150

200
335
524
754

287
449
646

Teknik Sipil Teknik Konstruksi Gedung


Politeknik Negeri Jakarta

PROJECT WORK 1

Anda mungkin juga menyukai