Analisa Box Culvert
Analisa Box Culvert
NO
K. Baru
1
2
A 02
A 04
3
4
A 05
A 07
5
6
C 01
C 02
7
8
C 04
D 01
9
10
D 02
D 03
11
12
13
D 06
D 08
14
15
D 10
D 11
D 12
16
17
D 13
D 14
URUGAN PASIR
PENGURUGAN DAN PEMADATAN DGN SIRTU (MENGGUNAKAN BURUH)
18
19
D 15
D 16
20
21
D 17
D 18
22
23
D 19
D 21
24
25
D 22
D 23
26
27
28
D 24
D 25
E 01
E 05
31
32
E 08
E 11
F 01
33
34
F 02
F 03
35
36
F 04
F 05
37
38
F 06
F 08
39
40
G 05
G 06
41
42
I 01
I 08
43
44
45
J 03
J 04
46
47
N 11
N 12
Q 01
48
49
Q 02
Q 03
50
51
Q 04
Q 05
52
53
Q 06
Q 07
54
55
Q 08
Q 09
56
57
Q 10
Q 11
29
30
PEKERJAAN
NO
K. Baru
PEKERJAAN
58
59
Q 12
Q 13
60
61
Q 14
R 14
62
63
R 14a
S 08
64
65
S 09
S 12
66
67
68
S 13
S 14
PASANGAN SULINGAN
PELUMURAN BESI DOWEL DENGAN OLI
1 BUAH PASANG PVC 1" untuk DOWEL
1 BUAH PASANG DOP PVC 1" untuk DOWEL
69
70
S 15
S 16
K.112
71
72
K.705
SNI-Bo
73
SNI-PD5
SATUAN
m
m2
27,540.00
500,360.00
m2
m
388,640.00
3,015.12
m3
m3
324,483.50
75,790.00
m3
m3
48,675.00
35,337.50
m3
m3
43,807.50
52,464.50
m3
m3
46,992.00
57,007.50
m3
m3
m3
15,455.00
10,224.50
26,675.00
m3
m3
208,120.00
331,466.67
m3
m3
168,666.67
148,206.67
m3
ARE
86,166.67
137,998.44
m3
m3
52,536.00
31,103.16
m3
m3
228,041.66
234,850.00
m3
m3
116,875.00
264,412.50
m3
m
920,068.60
123,745.88
m2
m3
m3
33,661.65
666,391.00
695,658.33
m3
m3
684,658.33
705,558.33
m3
m3
778,777.08
830,477.08
m3
m3
863,477.08
858,727.67
m2
m2
94,276.60
82,486.76
m2
m2
116,435.00
27,470.30
m2
m2
41,003.60
38,895.00
m2
m2
m3
16,665.00
23,122.00
246,345.00
m3
m3
284,450.83
263,092.50
m3
m3
246,345.00
1,982,307.12
m2
m2
44,336.13
76,990.00
m2
m2
15,395.06
3,545.31
m2
m2
75,654.19
73,817.33
SATUAN
m2
m2
111,610.13
2,970.00
m
kg
8,974.92
16,852.00
kg
m2
13,015.75
64,735.00
m2
ltr
19,357.12
3,325.13
bh
bh
4,310.74
3,399.00
m
m
m'
23,830.13
21,816.67
396,174.17
m3
m3
693,495.00
712,910.52
m3
653,802.00
BAHAN / MATERIAL
Abu Batu
Alat Bantu
KODE
SATUAN
HARGA SATUAN
m3
Rp
152,000.00
set
Rp
75,000.00
Ampelas Halus
lbr
Rp
3,000.00
Ampelas Kasar
lbr
Rp
3,000.00
Ampelas Sedang
lbr
Rp
3,000.00
Arang Kayu
kg
Rp
9,240.00
Aspal Bitumen
kg
Rp
11,000.00
ton
Rp
809,000.00
ltr
Rp
7,200.00
10
ton
Rp
900,000.00
11
ton
Rp
742,000.00
12
ltr
Rp
4,050.00
13
btg
Rp
16,000.00
14
btg
Rp
13,000.00
15
Bambu Gombong
btg
Rp
61,740.00
16
m2
Rp
47,900.00
17
m2
Rp
53,300.00
18
m2
Rp
62,300.00
19
m2
Rp
63,900.00
20
bh
Rp
300.00
21
bh
Rp
300.00
22
bh
Rp
1,000.00
23
Batako Besar 8 x 20 x 30
bh
Rp
2,415.00
24
Batako Kecil 8 x 10 x 20
bh
Rp
1,200.00
25
Batang Kelapa
btg
Rp
128,700.00
26
Batu Belah 10 - 15 cm
M. 020
m3
Rp
158,000.00
27
M. 020
m3
Rp
158,000.00
28
m3
Rp
131,000.00
29
m2
Rp
29,000.00
30
M. 026
Rp
168,000.00
31
Batu Pecah 1 - 2 cm
M. 025
m3
Rp
194,000.00
32
Batu Pecah 2 - 3 cm
M. 024
m3
Rp
189,000.00
33
Batu Pecah 3 - 5 cm
M. 023
m3
Rp
189,000.00
34
Batu Pecah 5 - 7 cm
M. 022
m3
Rp
158,000.00
35
M. 012
m3
Rp
158,000.00
36
M. 012
m3
Rp
158,000.00
37
M. 012
m3
Rp
158,000.00
m3
Rp
175,700.00
bh
Rp
8,610.00
m2
Rp
264,000.00
M. 170
M. 061
38
39
M. 163
40
41
kg
Rp
9,100.00
42
kg
Rp
12,200.00
43
btg
Rp
18,000.00
44
btg
Rp
40,000.00
45
btg
Rp
61,000.00
46
btg
Rp
84,000.00
M. 167
NO
BAHAN / MATERIAL
KODE
SATUAN
HARGA SATUAN
47
btg
Rp
48
kg
Rp
29,100.00
49
Rp
231,420.00
50
Besi Profil
kg
Rp
9,555.00
51
btg
Rp
44,000.00
52
btg
Rp
63,000.00
53
btg
Rp
95,000.00
54
lbr
Rp
92,505.00
55
lbr
Rp
64,785.00
56
Blast Bit
kg
Rp
40,000.00
57
Bensin Premium
ltr
Rp
4,500.00
58
Bondek
lbr
Rp
119,385.00
59
(Kwalitas 1)
m' (btg)
Rp
2,815,000.00
60
(Kwalitas 1)
m' (btg)
Rp
838,000.00
61
(Kwalitas 1)
m' (btg)
Rp
964,000.00
62
(Kwalitas 1)
m' (btg)
Rp
1,265,000.00
63
(Kwalitas 1)
m' (btg)
Rp
2,339,000.00
64
(Kwalitas 1)
bh
Rp
473,000.00
65
(Kwalitas 1)
bh
Rp
37,000.00
66
(Kwalitas 1)
bh
Rp
47,000.00
67
(Kwalitas 1)
bh
Rp
105,000.00
68
(Kwalitas 1)
bh
Rp
147,000.00
69
(Kwalitas 1)
bh
Rp
168,000.00
70
(Kwalitas 1)
bh
Rp
336,000.00
71
(Kwalitas 1)
bh
Rp
394,000.00
72
Cansteen 10.20.40
bh
Rp
4,000.00
73
Cansteen 15.25.40
bh
Rp
5,000.00
74
Cansteen 20.30.60
bh
Rp
7,000.00
75
kg
Rp
89,000.00
76
kg
Rp
49,000.00
77
Cat Bronze
kg
Rp
37,000.00
78
5 Kg
Rp
58,000.00
79
ltr
Rp
84,000.00
80
ltr
Rp
63,000.00
81
kg
Rp
50,000.00
82
Cat Menie
kg
Rp
21,000.00
83
Cat Minyak
kg
Rp
8,000.00
84
galon
Rp
1,258,000.00
85
galon
Rp
845,000.00
86
galon
Rp
58,600.00
87
galon
Rp
368,000.00
88
Cat Marka
89
90
91
92
93
94
Cover STU 50 Cm HD
95
96
m34
m17b
163,000.00
kg
Rp
75,900.00
bh
Rp
61,740.00
(Kwalitas 1)
btg
Rp
413,000.00
(Kwalitas 1)
btg
Rp
320,000.00
btg
Rp
140,000.00
btg
Rp
109,000.00
(Kwalitas 1)
btg
Rp
192,000.00
Cover STU 50 Cm LD
(Kwalitas 1)
btg
Rp
139,000.00
Cover STU 60 Cm HD
(Kwalitas 1)
btg
Rp
241,000.00
(Kwalitas 1)
(Kwalitas 1)
NO
BAHAN / MATERIAL
KODE
SATUAN
HARGA SATUAN
97
Cover STU 60 Cm LD
(Kwalitas 1)
btg
Rp
167,000.00
98
Cover STU 80 Cm HD
(Kwalitas 1)
btg
Rp
328,000.00
99
Cover STU 80 Cm LD
(Kwalitas 1)
btg
Rp
213,000.00
100
set
Rp
223,668,165.00
101
Dempul Duco
kg
Rp
25,000.00
102
kg
Rp
25,000.00
103
kg
Rp
42,000.00
104
Dempul Lilin
kg
Rp
5,000.00
105
Dempul Plastik
kg
Rp
25,000.00
106
Dempul Plitur
kg
Rp
5,000.00
107
Dolken 5 s/d 7
btg
Rp
7,000.00
108
Dolken 7 s/d 10
btg
Rp
12,000.00
109
Engsel Harmonika
Rp
32,000.00
110
pasang
Rp
21,000.00
111
Engsel Patrun
pasang
Rp
16,000.00
112
pasang
Rp
26,000.00
113
bh
Rp
38,535.00
114
Gembok
bh
Rp
21,000.00
115
Gergaji Besi
bh
Rp
31,600.00
116
bh
Rp
18,000.00
117
bh
Rp
16,000.00
118
bh
Rp
17,500.00
119
bh
Rp
13,000.00
120
bh
Rp
11,000.00
121
bh
Rp
21,000.00
122
bh
Rp
19,000.00
123
bh
Rp
26,000.00
124
bh
Rp
32,000.00
125
Grafel U 20 cm
Rp
29,400.00
126
Grafel U 30 cm
Rp
39,165.00
127
Grafel U 40 cm
Rp
48,930.00
128
Grendel 15 cm
bh
Rp
13,000.00
129
Grendel 5 cm
bh
Rp
11,000.00
130
Ijuk
ikat
Rp
25,000.00
131
Kape Kayu
bh
Rp
5,100.00
132
Kape Tembok
bh
Rp
5,100.00
133
m3/kg
Rp
77,175.00
134
Karet Elastomerik
bh
Rp
1,370,880.00
135
bh
Rp
464,415.00
136
bh
Rp
624,330.00
137
bh
Rp
198,975.00
138
bh
Rp
82,425.00
139
bh
Rp
121,275.00
140
Karung plastik 50 Kg
bh
Rp
6,195.00
141
Kawat BC (Tembaga)
kg
Rp
70,000.00
142
Kawat Beton
M. 167
kg
Rp
13,000.00
143
Kawat Bronjong
M. 162
kg
Rp
15,000.00
144
Kawat Harmonika 2 cm
m2
Rp
12,000.00
145
Kawat Harmonika 4 cm
m2
Rp
24,000.00
146
Kayu Bakar
m3
Rp
73,710.00
NO
BAHAN / MATERIAL
KODE
SATUAN
HARGA SATUAN
147
m3
Rp
2,100,000.00
148
m3
Rp
5,985,000.00
149
m3
Rp
5,040,000.00
150
m3
Rp
7,721,250.00
151
m3
Rp
3,465,000.00
152
m3
Rp
3,354,800.00
153
Rp
2,205,000.00
154
m3
Rp
1,470,000.00
155
m3
Rp
6,195,000.00
156
m3
Rp
5,145,000.00
157
m3
Rp
5,250,000.00
158
m3
Rp
1,103,000.00
159
m3
Rp
1,103,000.00
160
m3
Rp
1,103,000.00
161
Keramik 20 x 20
m2
Rp
56,000.00
162
Keramik 20 x 25
m2
Rp
40,000.00
163
Keramik 30 x 30
m2
Rp
59,000.00
164
bh
Rp
74,600.00
165
bh
Rp
74,600.00
166
bh
Rp
74,600.00
167
bh
Rp
74,600.00
168
bh
Rp
229,950.00
169
bh
Rp
275,625.00
170
bh
Rp
79,900.00
171
bh
Rp
47,900.00
172
bh
Rp
40,750.00
173
bh
Rp
257,985.00
174
Kwas 3 "
bh
Rp
8,000.00
175
m2
Rp
31,600.00
176
Lem Fox
kg
Rp
47,000.00
177
kg
Rp
63,000.00
178
kg
Rp
11,000.00
179
Lem Paralon
bh
Rp
7,000.00
180
Linggis
bh
Rp
53,000.00
181
bh
Rp
12,810.00
182
bh
Rp
22,575.00
183
bh
Rp
32,445.00
184
bh
Rp
11,235.00
185
bh
Rp
9,030.00
186
bh
Rp
4,515.00
187
bh
Rp
12,810.00
188
bh
Rp
19,005.00
189
bh
Rp
37,695.00
190
bh
Rp
26,355.00
191
bh
Rp
45,255.00
192
bh
Rp
5,880.00
193
bh
Rp
52,815.00
194
bh
Rp
9,300.00
195
bh
Rp
8,150.00
196
bh
Rp
6,300.00
NO
BAHAN / MATERIAL
KODE
SATUAN
HARGA SATUAN
197
bh
Rp
198
bh
Rp
2,900.00
199
bh
Rp
13,350.00
200
bh
Rp
4,050.00
201
kg
Rp
24,000.00
202
Minyak Cat
ltr
Rp
19,200.00
203
Minyak Tanah
ltr
Rp
13,000.00
204
lbr
Rp
137,000.00
M.065
4,650.00
NO
BAHAN / MATERIAL
KODE
SATUAN
HARGA SATUAN
205
lbr
Rp
210,000.00
206
lbr
Rp
90,000.00
207
bh
Rp
2,000.00
208
bh
Rp
4,000.00
209
bh
Rp
5,000.00
210
bh
Rp
5,000.00
211
bh
Rp
7,000.00
212
Mur/Baut 0,25"
bh
Rp
2,000.00
213
Mur/Baut 0,75"
bh
Rp
2,000.00
214
Mur/Baut 10 cm
bh
Rp
5,000.00
215
Oli (Drum)
Drum
Rp
24,500.00
216
m2
Rp
264,000.00
217
m2
Rp
393,330.00
218
Paku
kg
Rp
18,000.00
219
kg
Rp
18,000.00
220
Palu 0,5 Kg
kg
Rp
26,600.00
221
Papan 2/20 x 4
lbr
Rp
52,400.00
222
Pasir Beton
M. 041
m3
Rp
210,000.00
223
Pasir Pasang
M.042
m3
Rp
189,000.00
224
Pasir Tras
M. 041
m3
Rp
147,000.00
225
Pasir Urug
M. 040
m3
Rp
147,000.00
226
m2
Rp
88,200.00
227
m2
Rp
102,900.00
228
m2
Rp
100,800.00
229
m2
Rp
116,550.00
m'
Rp
512,900.00
231
m'
Rp
331,695.00
232
m'
Rp
467,355.00
233
m'
Rp
810,810.00
234
m'
Rp
1,282,575.00
235
btg
Rp
221,350.00
236
btg
Rp
203,850.00
237
btg
Rp
250,635.00
238
btg
Rp
137,130.00
239
btg
Rp
104,850.00
240
btg
Rp
412,020.00
241
btg
Rp
266,805.00
242
btg
Rp
379,890.00
243
btg
Rp
535,185.00
244
btg
Rp
104,850.00
245
btg
Rp
660,450.00
246
btg
Rp
1,345,995.00
247
btg
Rp
804,930.00
248
btg
Rp
964,110.00
249
btg
Rp
1,366,575.00
250
btg
Rp
1,284,990.00
251
bh
Rp
239,700.00
252
btg
Rp
35,595.00
253
btg
Rp
29,715.00
254
btg
Rp
27,300.00
M. 166
NO
BAHAN / MATERIAL
KODE
SATUAN
HARGA SATUAN
255
btg
Rp
15,435.00
256
btg
Rp
47,460.00
257
btg
Rp
41,580.00
258
btg
Rp
59,325.00
259
btg
Rp
19,005.00
260
btg
Rp
83,055.00
261
btg
Rp
32,000.00
262
btg
Rp
39,100.00
263
btg
Rp
56,600.00
264
btg
Rp
76,400.00
265
btg
Rp
99,600.00
266
btg
Rp
141,500.00
267
btg
Rp
182,300.00
268
btg
Rp
277,700.00
269
btg
Rp
429,400.00
270
btg
Rp
562,100.00
271
btg
Rp
844,000.00
272
btg
Rp
1,276,400.00
273
Plamir tembok
kg
Rp
16,590.00
274
kg
Rp
10,290.00
275
btg
Rp
29,400.00
276
btg
Rp
39,165.00
277
lbr
Rp
262,100.00
278
m2
Rp
1,800.00
279
bh
Rp
5,800.00
280
bh
Rp
4,725.00
281
bh
Rp
4,650.00
282
bh
Rp
2,300.00
283
bh
Rp
7,650.00
284
bh
Rp
2,900.00
285
bh
Rp
6,950.00
286
bh
Rp
12,810.00
287
bh
Rp
22,575.00
288
bh
Rp
37,250.00
289
Dusaspun (L=2.45 m)
btg
Rp
218,000.00
290
Dusaspun
btg
Rp
396,000.00
291
Dusaspun
btg
Rp
590,000.00
292
Dusaspun
btg
Rp
89,000.00
293
Dusaspun
btg
Rp
1,159,000.00
294
Dusaspun
btg
Rp
1,466,000.00
295
Dusaspun
btg
Rp
1,811,000.00
296
Dusaspun
btg
Rp
2,210,000.00
297
Dusaspun
btg
Rp
2,625,000.00
298
Dusaspun
btg
Rp
3,294,000.00
299
Dusaspun
btg
Rp
4,172,000.00
300
Dusaspun
btg
Rp
4,753,000.00
301
Dusaspun
btg
Rp
5,264,000.00
302
Dusaspun
btg
Rp
5,808,000.00
303
Dusaspun
btg
Rp
8,412,000.00
304
Dusaspun
btg
Rp
6,421,000.00
NO
BAHAN / MATERIAL
KODE
SATUAN
HARGA SATUAN
305
Dusaspun
btg
Rp
7,680,000.00
306
Dusaspun
btg
Rp
18,008,000.00
307
Dusaspun (L=2.45 m)
btg
Rp
15,328,000.00
308
btg
Rp
372,000.00
Dusaspun
(L=2.5 m)
NO
BAHAN / MATERIAL
KODE
SATUAN
HARGA SATUAN
309
Dusaspun
(L=2.5 m)
btg
Rp
310
Dusaspun
(L=2.5 m)
btg
Rp
554,000.00
751,000.00
311
Dusaspun
(L=2.5 m)
btg
Rp
1,038,000.00
312
Dusaspun
(L=2.5 m)
btg
Rp
1,271,000.00
313
Dusaspun
(L=2.5 m)
btg
Rp
1,550,000.00
314
Dusaspun
(L=2.5 m)
btg
Rp
1,854,000.00
315
Dusaspun
(L=2.5 m)
btg
Rp
2,118,000.00
316
Dusaspun
(L=2.5 m)
btg
Rp
2,471,000.00
317
Dusaspun
(L=2.5 m)
btg
Rp
2,925,000.00
318
Dusaspun
(L=2.5 m)
btg
Rp
3,337,000.00
319
Dusaspun
(L=2.5 m)
btg
Rp
3,677,000.00
320
Dusaspun
(L=2.5 m)
btg
Rp
4,079,000.00
321
Dusaspun
(L=2.5 m)
btg
Rp
4,865,000.00
322
Dusaspun
(L=2.5 m)
btg
Rp
5,720,000.00
323
Dusaspun
(L=2.5 m)
btg
Rp
8,211,000.00
324
Witera (L=1.25 m)
btg
Rp
282,000.00
325
Witera (L=1.25 m)
btg
Rp
413,000.00
326
Witera (L=1.25 m)
btg
Rp
604,000.00
327
Witera (L=2.5 m)
btg
Rp
1,423,000.00
328
Witera (L=2.5 m)
btg
Rp
1,895,000.00
329
Witera (L=2.5 m)
btg
Rp
2,489,000.00
330
Witera (L=2.5 m)
btg
Rp
3,174,000.00
331
Witera (L=2.5 m)
btg
Rp
3,878,000.00
332
Witera (L=2.5 m)
btg
Rp
4,803,000.00
333
Witera (L=2.5 m)
btg
Rp
5,597,000.00
334
Witera (L=2.5 m)
btg
Rp
65,303,000.00
335
Witera (L=2.5 m)
btg
Rp
8,612,000.00
336
btg
Rp
277,000.00
337
btg
Rp
406,000.00
338
btg
Rp
596,000.00
339
btg
Rp
1,391,000.00
340
btg
Rp
1,853,000.00
341
btg
Rp
3,105,000.00
342
btg
Rp
3,799,000.00
343
btg
Rp
609,000.00
344
Rp
609,000.00
345
Rp
599,000.00
346
m3
Rp
618,000.00
347
m3
Rp
683,000.00
348
m3
Rp
730,000.00
349
Rp
760,000.00
350
bh
Rp
43,155.00
351
bh
Rp
69,900.00
352
bh
Rp
69,900.00
353
bh
Rp
15,435.00
354
unit
Rp
115,710.00
355
bh
Rp
88,200.00
356
bh
Rp
26,000.00
357
bh
Rp
20,000.00
358
bh
Rp
78,015.00
NO
BAHAN / MATERIAL
KODE
SATUAN
HARGA SATUAN
359
bh
Rp
40,750.00
360
unit
Rp
127,470.00
361
unit
Rp
161,385.00
362
unit
Rp
339,045.00
363
Sekrup
bh
Rp
2,153.00
364
Sealent
kg
Rp
32,000.00
365
366
367
368
bh
Rp
5,100.00
zak
Rp
61,000.00
lbr
Rp
63,000.00
lbr
Rp
302,000.00
369
lbr
Rp
74,000.00
370
lbr
Rp
23,000.00
371
lbr
Rp
47,000.00
372
lbr
Rp
65,000.00
373
lbr
Rp
98,000.00
374
M. 042
m3
Rp
158,000.00
375
Solar
M. 183
ltr
Rp
4,500.00
376
Solatip Leideng
bh
Rp
2,415.00
377
Stempet / Gemuk
kg
Rp
19,400.00
378
bh
Rp
111,825.00
379
bh
Rp
65,625.00
380
bh
Rp
19,950.00
381
bh
Rp
65,625.00
382
bh
Rp
176,925.00
383
bh
Rp
117,915.00
384
bh
Rp
510,300.00
385
bh
Rp
221,130.00
386
bh
Rp
578,640.00
387
bh
Rp
86,940.00
388
STU 100.100.120 Cm
bh
Rp
1,653,000.00
389
btg
Rp
2,498,950.00
390
STU 40.40.120 Cm
btg
Rp
363,000.00
391
btg
Rp
520,000.00
392
STU 40.50.120 Cm
btg
Rp
411,000.00
393
btg
Rp
586,000.00
394
STU 40.60.120 Cm
btg
Rp
457,000.00
395
btg
Rp
651,000.00
396
STU 50.50.120 Cm
btg
Rp
540,000.00
397
btg
Rp
772,000.00
398
STU 50.60.120 Cm
btg
Rp
604,000.00
399
btg
Rp
866,000.00
400
STU 50.70.120 Cm
btg
Rp
668,000.00
401
btg
Rp
953,000.00
402
STU 60.60.120 Cm
btg
Rp
641,000.00
403
btg
Rp
919,000.00
404
STU 60.70.120 Cm
btg
Rp
705,000.00
405
btg
Rp
1,006,000.00
406
STU 60.80.120 Cm
btg
Rp
768,000.00
407
btg
Rp
1,097,000.00
408
STU 80.100.120 Cm
btg
Rp
1,101,000.00
M. 080
(Kwalitas 1)
(Kwalitas 1)
(Kwalitas 1)
(Kwalitas 1)
(Kwalitas 1)
(Kwalitas 1)
(Kwalitas 1)
(Kwalitas 1)
(Kwalitas 1)
(Kwalitas 1)
(Kwalitas 1)
(Kwalitas 1)
(Kwalitas 1)
(Kwalitas 1)
(Kwalitas 1)
(Kwalitas 1)
(Kwalitas 1)
(Kwalitas 1)
(Kwalitas 1)
(Kwalitas 1)
(Kwalitas 1)
NO
BAHAN / MATERIAL
KODE
(Kwalitas 1)
SATUAN
HARGA SATUAN
409
410
STU 80.80.120 Cm
411
412
Tanah Urug
413
TB 32
414
TB 55
415
TB 110
416
417
lbr
Rp
87,350.00
418
lbr
Rp
122,300.00
419
lbr
Rp
104,850.00
420
Terpal Plastik
Rp
7,000.00
421
Thinner
m33
liter
Rp
17,000.00
422
Timah Hitam
kg
Rp
18,000.00
423
M. 050
m3
Rp
47,000.00
424
Triplek tb. 4 mm
lbr
Rp
63,000.00
425
lbr
Rp
47,000.00
426
lbr
Rp
63,000.00
427
lbr
Rp
47,000.00
428
lbr
Rp
89,000.00
429
lbr
Rp
137,000.00
430
Triplek 12 mm
lbr
Rp
210,000.00
431
Triplek 15 mm
lbr
Rp
247,000.00
432
Triplek 18 mm
lbr
Rp
289,000.00
433
bh
Rp
3,000.00
434
bh
Rp
4,000.00
435
bh
Rp
4,000.00
436
bh
Rp
5,000.00
437
bh
Rp
5,000.00
438
bh
Rp
6,000.00
439
bh
Rp
6,000.00
440
bh
Rp
7,000.00
441
bh
Rp
7,000.00
442
bh
Rp
8,000.00
443
bh
Rp
9,000.00
444
bh
Rp
10,000.00
445
bh
Rp
11,000.00
446
bh
Rp
12,000.00
447
bh
Rp
13,000.00
448
Wiremesh M6
batang
Rp
281,000.00
449
Wiremesh M8
batang
Rp
514,000.00
(Kwalitas 1)
(Kwalitas 1)
btg
Rp
btg
Rp
1,588,700.00
966,000.00
btg
Rp
1,400,500.00
m3
Rp
63,000.00
bh
Rp
671,000.00
bh
Rp
1,038,400.00
bh
Rp
1,730,600.00
lbr
Rp
110,650.00
1 set @ 3 alat
KET.
KET.
KET.
KET.
KET.
KET.
KET.
KET.
KET.
KET.
ALAT
KODE
KAPASITAS ALAT
HARGA SATUAN
BULLDOZER
E-001
110 Hp
Rp
188,000.00
MOTOR GRADER
E-010
110 Hp
Rp
188,000.00
CRUSHER/SCR 30 T/H
E-031
30 T/jam - 185 Hp
Rp
249,000.00
SCREENING PLANT
E-040
Rp
125,000.00
LOADER WHEELED
E-052
115.0 Hp
Rp
188,000.00
ROLLER, 3 WHEELED
E-080
6 - 8 Ton
Rp
75,900.00
ROLLER, TANDEM
E-081
6 - 8 Ton
Rp
113,000.00
E-082
Rp
125,000.00
ROLLER, PNEUMATIC
E-084
6 - 15 Ton
Rp
156,000.00
10
E-087
1 Ton
Rp
63,000.00
11
E-088
4 Hp
Rp
38,000.00
12
CONCRETE VIBRATOR
E-089
Rp
31,000.00
13
SPRAYER, SELFPROP
E-153
1,000.0 Liter
Rp
112,960.66
14
E-154
6.0 Ton
Rp
38,000.00
15
E-155
30 T/jam
Rp
400,000.00
16
ASPHALT FINISHER
E-157
1820 mm / 30 Hp
Rp
188,000.00
17
E-182
4,000.0 Liter
Rp
163,000.00
18
TRAILER, TOWED
E-191
10.0 Ton
Rp
438,000.00
19
E-211
3.5 Ton
Rp
163,000.00
20
DUMP TRUCK 5 T
E-212
5 Ton / 145 Hp
Rp
188,000.00
21
E-221
Rp
163,000.00
22
E-225
Rp
313,000.00
23
E-251
125 Liter
Rp
63,000.00
24
COMPRESSOR, AIR
E-301
210 M3/jam
Rp
81,000.00
25
E-341
30 M3/jam
Rp
63,000.00
26
E-252
250 Liter
Rp
38,000.00
27
E-253
500 Liter
28
BLOWER
29
E-
Rp
63,000.00
Rp
16,802.57
Jam/m
Rp
44,714.29
Harga dasar
Per Hari
KOMPONEN
UPAH / HARI
PEKERJA
40,000.00
40,000.00
PEKERJA TERAMPIL
50,000.00
TUKANG GALI
40,000.00
45,000.00
50,000.00
55,000.00
45,000.00
50,000.00
10
55,000.00
11
45,000.00
12
50,000.00
13
55,000.00
14
45,000.00
15
50,000.00
16
55,000.00
17
60,000.00
18
65,000.00
19
70,000.00
20
MANDOR
85,000.00
21
65,000.00
22
45,000.00
23
SUPIR TRUK
50,000.00
24
KENEK TRUK
35,000.00
25
PENJAGA MALAM
50,000.00
26
50,000.00
27
50,000.00
28
60,000.00
CATATAN :
*
**
OPERATOR YANG MENGOPERASIKAN JENIS PERALATAN UNTUK MELAYANI PEKERJAAN YANG AGAK RINGAN :
STEEL WHEELED ROLLER, STAMPER, MACHANICAL RAMMER,
MECHANICAL RAMMER CONCRETE MIXER/MESIN PENGADUK BETON
NO
A.
URAIAN PEKERJAAN
VOLUME
KODE
HARGA SAT.
JUMLAH
Supply Material
1 Keb. U - Ditch 40 X 40 + support
B.
SAT.
M'
1.00
Rp.
433,333.33
Rp.
M'
1.00
Ls
M3
0.04
D 21
Rp.
1,500.00
Rp.
Rp.
31,103.16
M3
0.05
D 13
Rp.
Rp.
208,120.00
M'
1.00
Rp.
Rp.
30,400.00
M3
0.32
Rp.
D 11
Rp.
10,224.50
M3
Rp.
0.32
D 21
Rp.
31,103.16
7 Pemberesan Lapangan
Ls
Rp.
1.00
Ls
Rp.
Pemasangan Material
Rp.
JUMLAH TOTAL :
PEMBULATAN
.
NO
A.
URAIAN PEKERJAAN
VOLUME
KODE
HARGA SAT.
JUMLAH
Supply Material
1 Keb. U - Ditch 50 X 50 + support
B.
SAT.
M'
1.00
Rp.
643,333.33
Rp.
M'
1.00
Ls
M3
0.06
D 21
Rp.
1,500.00
Rp.
Rp.
31,103.16
M3
0.06
D 13
Rp.
Rp.
208,120.00
M'
1.00
Rp.
Rp.
45,100.00
M3
0.32
Rp.
D 11
Rp.
10,224.50
M3
Rp.
0.32
D 21
Rp.
31,103.16
7 Pemberesan Lapangan
Ls
Rp.
1.00
Ls
Rp.
Pemasangan Material
JUMLAH TOTAL :
PEMBULATAN
Rp.
NO
URAIAN PEKERJAAN
A.
SAT.
VOLUME
KODE
HARGA SAT.
JUMLAH
Supply Material
1 Keb. U - Ditch 60 X 60 + support
M'
1.00
Ls
Rp.
M'
M3
1.00
Ls
0.08
D 21
M3
0.08
M'
B.
765,833.33
Rp.
Rp.
2,000.00
Rp.
Rp.
31,103.16
Rp.
D 13
Rp.
208,120.00
Rp.
1.00
Ls
Rp.
53,700.00
Rp.
M3
0.45
D 11
Rp.
10,224.50
Rp.
M3
0.45
D 21
Rp.
31,103.16
Rp.
Pemasangan Material
JUMLAH TOTAL :
PEMBULATAN
.
#REF!
JL. MARGONDA RAYA NO. 54 DEPOK
NO
A.
URAIAN PEKERJAAN
VOLUME
KODE
HARGA SAT.
JUMLAH
Supply Material
1 Keb. U - Ditch 80 X 80 + support
B.
SAT.
M'
1.00
Ls
Rp.
1,167,083.33
Rp.
M'
M3
1.00
Ls
0.10
D 21
Rp.
2,000.00
Rp.
Rp.
31,103.16
M3
0.10
Rp.
D 13
Rp.
208,120.00
M'
Rp.
1.00
Ls
Rp.
81,700.00
Rp.
M3
0.94
D 11
Rp.
10,224.50
Rp.
M3
0.94
D 21
Rp.
31,103.16
Rp.
7 Pemberesan Lapangan
Ls
1.00
Ls
Rp.
Pemasangan Material
Rp.
JUMLAH TOTAL :
PEMBULATAN :
.
NO
A.
URAIAN PEKERJAAN
VOLUME
KODE
HARGA SAT.
JUMLAH
Supply Material
1 Keb. U - Ditch 100 X 100 + support
B.
SAT.
M'
1.00
Rp.
2,082,458.33
Rp.
M'
1.00
Ls
M3
2.23
D 01
Rp.
2,000.00
Rp.
Rp.
35,337.50
M3
0.32
Rp.
D 21
Rp.
31,103.16
M3
Rp.
0.32
D 13
Rp.
208,120.00
Rp.
M'
1.00
Ls
Rp.
145,800.00
Rp.
M3
1.20
D 11
Rp.
10,224.50
Rp.
M3
1.20
D 21
Rp.
31,103.16
Rp.
Pemasangan Material
JUMLAH TOTAL :
NO
A.
URAIAN PEKERJAAN
VOLUME
KODE
HARGA SAT.
JUMLAH
Supply Material
1 Keb. U - Ditch 40 X 60 + support
B.
SAT.
M'
1.00
Ls
Rp.
542,500.00
Rp.
M'
M3
1.00
Ls
0.06
D 21
Rp.
2,000.00
Rp.
Rp.
31,103.16
M3
0.06
Rp.
D 13
Rp.
208,120.00
M'
Rp.
1.00
Ls
Rp.
38,000.00
Rp.
M3
0.71
D 11
Rp.
10,224.50
Rp.
M3
0.71
D 21
Rp.
31,103.16
Rp.
M3
2.23
SNI-T8
Rp.
Rp.
Ls
1.00
Ls
Rp.
Rp.
Pemasangan Material
PEMBULATAN :
.
#REF!
JL. MARGONDA RAYA NO. 54 DEPOK
NO
A.
URAIAN PEKERJAAN
VOLUME
KODE
HARGA SAT.
JUMLAH
Supply Material
1 Keb. U - Ditch 50 X 70 + support
B.
SAT.
M'
1.00
Rp.
794,166.67
Rp.
M'
1.00
Ls
M3
0.06
D 21
Rp.
2,000.00
Rp.
Rp.
31,103.16
M3
0.06
Rp.
D 13
Rp.
208,120.00
M'
Rp.
1.00
Ls
Rp.
47,700.00
Rp.
M3
0.71
D 11
Rp.
10,224.50
Rp.
M3
0.71
D 21
Rp.
31,103.16
Rp.
M3
2.23
SNI-T8
Rp.
Rp.
Ls
1.00
Ls
Rp.
Rp.
Pemasangan Material
PEMBULATAN :
.
NO
A.
URAIAN PEKERJAAN
VOLUME
KODE
HARGA SAT.
JUMLAH
Supply Material
1 Keb. U - Ditch 60 X 70 + support
B.
SAT.
M'
1.00
Ls
Rp.
838,333.33
Rp.
M'
M3
1.00
Ls
0.13
D 21
Rp.
2,000.00
Rp.
Rp.
31,103.16
M3
0.13
Rp.
D 13
Rp.
208,120.00
M'
Rp.
1.00
Ls
Rp.
50,300.00
Rp.
M3
0.64
D 11
Rp.
10,224.50
Rp.
M3
0.64
D 21
Rp.
31,103.16
Rp.
M3
0.90
SNI-T8
Rp.
Rp.
Ls
1.00
Ls
Rp.
Rp.
Pemasangan Material
PEMBULATAN :
.
NO
URAIAN PEKERJAAN
A.
SAT.
VOLUME
KODE
HARGA SAT.
JUMLAH
Supply Material
1 Keb. U - Ditch 60 X 80 + support
M'
1.00
Ls
Rp.
M'
M3
1.00
Ls
0.14
D 21
M3
0.14
M'
B.
914,166.67
Rp.
Rp.
2,000.00
Rp.
Rp.
31,103.16
Rp.
D 13
Rp.
208,120.00
Rp.
1.00
Ls
Rp.
54,900.00
Rp.
M3
0.78
D 11
Rp.
10,224.50
Rp.
M3
0.78
D 21
Rp.
31,103.16
Rp.
M3
0.95
SNI-T8
Rp.
Rp.
Ls
1.00
Ls
Rp.
Rp.
Pemasangan Material
.
#REF!
JL. MARGONDA RAYA NO. 54 DEPOK
NO
A.
URAIAN PEKERJAAN
VOLUME
KODE
HARGA SAT.
JUMLAH
Supply Material
1 Keb. U - Ditch 40 X 40
B.
SAT.
M'
1.00
Rp.
302,500.00
Rp.
2,000.00
Rp.
Pemasangan Material
M'
1.00
Ls
Rp.
M3
0.61
D 01
Rp.
M3
0.05
D 21
Rp.
31,103.16
Rp.
M3
0.05
D 13
Rp.
208,120.00
Rp.
M'
1.00
Ls
Rp.
21,200.00
M3
0.32
D 11
Rp.
10,224.50
Rp.
M3
0.32
D 21
Rp.
31,103.16
Rp.
M3
0.61
D 10
Rp.
Rp.
Ls
1.00
Ls
Rp.
Rp.
Rp.
JUMLAH TOTAL :
PEMBULATAN
.
NO
A.
URAIAN PEKERJAAN
VOLUME
KODE
HARGA SAT.
JUMLAH
Supply Material
M'
1.00
Pemasangan Material
1 Pembersihan Lahan Lokasi Kerja
M'
M3
M3
M3
M'
M3
M3
M3
Ls
1.00
0.81
0.07
0.07
1.00
0.38
0.38
0.81
1.00
1 Keb. U - Ditch 50 X 50
B.
SAT.
Rp.
450,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Ls
Rp.
2,000.00
D 01
D 21
Rp.
Rp.
31,103.16
D 13
Ls
Rp.
Rp.
208,120.00
31,500.00
D 11
D 21
Rp.
Rp.
10,224.50
31,103.16
D 10
Ls
Rp.
Rp.
JUMLAH TOTAL :
PEMBULATAN
.
NO
A.
B.
URAIAN PEKERJAAN
Supply Material
1 Keb. U - Dicth 60 X 60
SAT.
VOLUME
M'
1.00
M'
M3
M3
M3
M'
M3
M3
M3
7 Pemberesan Lapangan
Ls
1.00
1.09
0.07
0.07
1.00
0.52
0.52
1.09
1.00
KODE
HARGA SAT.
JUMLAH
Rp.
534,166.67
Rp.
Ls
D 01
Rp.
Rp.
2,000.00
-
D 21
D 13
Rp.
Rp.
31,103.16
208,120.00
Ls
D 11
Rp.
Rp.
37,400.00
10,224.50
D 21
D 10
Rp.
Rp.
31,103.16
-
Ls
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Pemasangan Material
JUMLAH TOTAL :
PEMBULATAN
#REF!
JL. MARGONDA RAYA NO. 54 DEPOK
NO
A.
URAIAN PEKERJAAN
VOLUME
KODE
HARGA SAT.
JUMLAH
Supply Material
M'
1.00
Ls
Rp.
805,000.00
Rp.
M'
M3
Ls
D 01
Rp.
Rp.
2,500.00
-
M3
M3
D 21
D 13
Rp.
Rp.
31,103.16
208,120.00
M'
M3
Ls
D 11
Rp.
Rp.
56,400.00
10,224.50
M3
M3
D 21
D 10
Rp.
Rp.
31,103.16
-
7 Pemberesan Lapangan
Ls
1.00
1.57
0.10
0.10
1.00
0.94
0.94
1.57
1.00
Ls
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1 Keb. U - Ditch 80 X 80
B.
SAT.
Pemasangan Material
JUMLAH TOTAL :
PEMBULATAN
.
NO
A.
URAIAN PEKERJAAN
VOLUME
KODE
HARGA SAT.
JUMLAH
Supply Material
M'
1.00
Pemasangan Material
1 Pembersihan Lahan Lokasi Kerja
M'
M3
M3
M3
M'
M3
M3
M3
7 Pemberesan Lapangan
Ls
1.00
2.23
0.32
0.32
1.00
1.20
1.20
2.23
1.00
SAT.
Rp.
1,377,500.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Ls
Rp.
2,500.00
D 01
D 21
Rp.
Rp.
31,075.00
31,103.16
D 13
Ls
Rp.
Rp.
208,120.00
96,500.00
D 11
D 21
SNI-T8
Rp.
Rp.
Rp.
10,224.50
31,103.16
-
Ls
Rp.
JUMLAH TOTAL :
PEMBULATAN :
.
NO
A.
URAIAN PEKERJAAN
Supply Material
1 Keb. U - Ditch 40 X 60
SAT.
VOLUME
KODE
HARGA SAT.
JUMLAH
M'
1.00
Ls
Rp.
380,833.33
Rp.
M'
M3
M3
Ls
D 01
D 21
Rp.
Rp.
Rp.
2,000.00
31,103.16
M3
M'
D 13
Ls
Rp.
Rp.
208,120.00
26,700.00
M3
M3
D 11
D 21
Rp.
Rp.
10,224.50
31,103.16
M3
Ls
1.00
0.75
0.06
0.06
1.00
0.71
0.32
0.75
1.00
SNI-T8
Ls
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
B.
Pemasangan Material
JUMLAH TOTAL :
PEMBULATAN :
.
#REF!
JL. MARGONDA RAYA NO. 54 DEPOK
NO
A.
B.
URAIAN PEKERJAAN
Supply Material
1 Keb. U - Ditch 50 X 70
SAT.
VOLUME
M'
1.00
M'
M3
M3
M3
M'
M3
M3
M3
Ls
1.00
0.90
0.12
0.12
1.00
0.57
0.57
0.90
1.00
KODE
HARGA SAT.
JUMLAH
Rp.
556,666.67
Rp.
Ls
D 01
Rp.
Rp.
2,000.00
-
D 21
D 13
Rp.
Rp.
31,103.16
208,120.00
Ls
D 11
D 21
Rp.
Rp.
Rp.
39,000.00
10,224.50
31,103.16
SNI-T8
Ls
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Pemasangan Material
1 Pembersihan Lahan Lokasi Kerja
Pek. Galian Tanah
2 Pek. Pemadatan Tanah (dg alat)
3 Pas. Bedding Pasir tb. 10 Cm
4 Pek. Penempatan & Penyetelan U - Ditch
5 Pek. Urugan Tanah Sisi U - Ditch
6 Pek. Pemadatan Tanah Sisi U - Ditch (dg alat)
Buangan Tanah Sisa Galian
7 Pemberesan Lapangan
JUMLAH TOTAL :
PEMBULATAN :
NO
A.
B.
URAIAN PEKERJAAN
Supply Material
1 Keb. U - Ditch 60 X 70
SAT.
VOLUME
M'
1.00
M'
M3
M3
M3
M'
M3
M3
M3
Ls
1.00
0.90
0.13
0.13
1.00
0.64
0.64
0.90
1.00
KODE
HARGA SAT.
JUMLAH
Rp.
587,500.00
Rp.
Ls
D 01
D 21
Rp.
Rp.
Rp.
1,500.00
31,103.16
D 13
Ls
Rp.
Rp.
208,120.00
41,200.00
D 11
D 21
Rp.
Rp.
10,224.50
31,103.16
SNI-T8
Ls
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Pemasangan Material
1 Pembersihan Lahan Lokasi Kerja
Pek. Galian Tanah
2 Pek. Pemadatan Tanah (dg alat)
3 Pas. Bedding Pasir tb. 10 Cm
4 Pek. Penempatan & Penyetelan U - Ditch
5 Pek. Urugan Tanah Sisi U - Ditch
6 Pek. Pemadatan Tanah Sisi U - Ditch (dg alat)
Buangan Tanah Sisa Galian
7 Pemberesan Lapangan
JUMLAH TOTAL :
PEMBULATAN :
.
NO
A.
URAIAN PEKERJAAN
VOLUME
KODE
HARGA SAT.
JUMLAH
Supply Material
1 Keb. U - Ditch 60 X 80
B.
SAT.
Pemasangan Material
1 Pembersihan Lahan Lokasi Kerja
Pek. Galian Tanah
2 Pek. Pemadatan Tanah (dg alat)
3 Pas. Bedding Pasir tb. 10 Cm
4 Pek. Penempatan & Penyetelan U - Ditch
5 Pek. Urugan Tanah Sisi U - Ditch
6 Pek. Pemadatan Tanah Sisi U - Ditch (dg alat)
Buangan Tanah Sisa Galian
7 Pemberesan Lapangan
JUMLAH TOTAL :
PEMBULATAN :
M'
1.00
M'
M3
M3
M3
M'
M3
M3
M3
Ls
1.00
0.95
0.14
0.14
1.00
0.78
0.78
0.95
1.00
Rp.
640,000.00
Rp.
Ls
D 01
Rp.
Rp.
2,000.00
-
D 21
D 13
Rp.
Rp.
31,103.16
208,120.00
Ls
D 11
Rp.
Rp.
44,800.00
10,224.50
D 21
SNI-T8
Rp.
Rp.
31,103.16
-
Ls
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
#REF!
JL. MARGONDA RAYA NO. 54 DEPOK
NO
A.
B.
URAIAN PEKERJAAN
SAT.
VOLUME
KODE
HARGA SAT.
JUMLAH
Supply Material
1 Keb. Box Culvert 40 X 40 (heavy duty)
M'
1.00
Ls
Rp.
838,000.00
Rp.
Pemasangan Material
1 Pembersihan Lahan Lokasi Kerja
Pek. Galian Tanah
M'
M3
Ls
D 01
Rp.
Rp.
2,000.00
-
M3
M3
D 21
D 13
Rp.
Rp.
31,103.16
208,120.00
M'
M3
Ls
D 11
Rp.
Rp.
58,700.00
10,224.50
M3
M3
D 21
D 10
Rp.
Rp.
31,103.16
-
7 Pemberesan Lapangan
Ls
1.00
1.18
0.06
0.06
1.00
0.20
0.20
0.98
1.00
Ls
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
JUMLAH TOTAL :
PEMBULATAN :
NO
A.
B.
URAIAN PEKERJAAN
Supply Material
1 Keb. Box Culvert 50 X 50 (heavy duty)
SAT.
VOLUME
M'
1.00
Pemasangan Material
1 Pembersihan Lahan Lokasi Kerja
M'
M3
M3
M3
M'
M3
M3
M3
Ls
1.00
1.30
0.07
0.07
1.00
0.40
0.40
1.30
1.00
JUMLAH TOTAL :
PEMBULATAN :
KODE
HARGA SAT.
JUMLAH
Ls
Rp.
964,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Ls
Rp.
2,000.00
D 01
D 21
Rp.
Rp.
31,103.16
D 13
Ls
Rp.
Rp.
208,120.00
67,500.00
D 11
D 21
Rp.
Rp.
10,224.50
31,103.16
D 10
Ls
Rp.
Rp.
NO
A.
URAIAN PEKERJAAN
SAT.
Supply Material
1 Keb. Box Culvert 60 X 60 (heavy duty)
VOLUME
KODE
HARGA SAT.
JUMLAH
M'
1.00
Ls
Rp.
1,265,000.00
Rp.
M'
M3
M3
Ls
D 01
D 21
Rp.
Rp.
Rp.
2,000.00
31,103.16
M3
M'
D 13
Ls
Rp.
Rp.
208,120.00
88,600.00
M3
M3
D 11
D 21
Rp.
Rp.
10,224.50
31,103.16
M3
Ls
1.00
1.42
0.08
0.08
1.00
0.62
0.62
1.42
1.00
D 10
Ls
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
B.
Pemasangan Material
JUMLAH TOTAL :
PEMBULATAN :
#REF!
JL. MARGONDA RAYA NO. 54 DEPOK
NO
A.
B.
URAIAN PEKERJAAN
Supply Material
1 Keb. Box Culvert 80 X 80 (heavy duty)
SAT.
VOLUME
M'
1.00
Pemasangan Material
1 Pembersihan Lahan Lokasi Kerja
M'
M3
M3
M3
M'
M3
M3
M3
Ls
1.00
1.70
1.10
0.12
1.00
0.61
0.84
1.70
1.00
JUMLAH TOTAL :
PEMBULATAN :
KODE
HARGA SAT.
JUMLAH
Rp.
2,339,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Ls
Rp.
2,500.00
D 01
D 21
Rp.
Rp.
31,103.16
D 13
Ls
Rp.
Rp.
208,120.00
163,800.00
D 11
D 21
Rp.
Rp.
10,224.50
31,103.16
D 10
Ls
Rp.
Rp.
NO
A.
URAIAN PEKERJAAN
Supply Material
1 Keb. Box Culvert 100 X 100 (heavy duty)
SAT.
VOLUME
KODE
HARGA SAT.
JUMLAH
M'
1.00
Ls
Rp.
2,854,700.00
Rp.
M'
M3
M3
Ls
D 01
D 21
Rp.
Rp.
Rp.
2,500.00
31,075.00
31,103.16
M3
M'
D 13
Ls
Rp.
Rp.
208,120.00
199,900.00
M3
M3
D 11
D 21
Rp.
Rp.
10,224.50
31,103.16
M3
Ls
1.00
1.90
1.30
0.13
1.00
1.20
1.20
1.90
1.00
SNI-T8
Ls
Rp.
Rp.
633.62
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
B.
Pemasangan Material
JUMLAH TOTAL :
PEMBULATAN :
NO
URAIAN PEKERJAAN
SAT.
0.1666666667
VOLUME
KODE
HARGA SAT.
JUMLAH
1
2
3
4
5
M'
M'
M'
M'
M'
1.00
1.00
-
Ls
Ls
Ls
Ls
Rp.
Rp.
Rp.
Rp.
Rp.
181,666.67
14,600.00
-
Rp.
Rp.
Rp.
Rp.
Rp.
1
2
3
4
5
M'
M'
M'
M'
M'
1.00
1.00
-
Ls
Ls
Ls
Ls
Rp.
Rp.
Rp.
Rp.
Rp.
233,333.33
18,700.00
-
Rp.
Rp.
Rp.
Rp.
Rp.
#REF!
JL. MARGONDA RAYA NO. 54 DEPOK
NO
URAIAN PEKERJAAN
SAT.
VOLUME
KODE
HARGA SAT.
JUMLAH
1
2
3
4
5
M'
M'
M'
M'
M'
1.00
1.00
-
Ls
Ls
Ls
Ls
Rp.
Rp.
Rp.
Rp.
Rp.
231,666.67
18,600.00
-
Rp.
Rp.
Rp.
Rp.
Rp.
1
2
3
4
5
M'
M'
M'
M'
M'
1.00
1.00
-
Ls
Ls
Ls
Ls
Rp.
Rp.
Rp.
Rp.
Rp.
320,000.00
25,600.00
-
Rp.
Rp.
Rp.
Rp.
Rp.
NO
URAIAN PEKERJAAN
SAT.
VOLUME
KODE
HARGA SAT.
JUMLAH
1
2
3
4
5
M'
M'
M'
M'
M'
1.00
1.00
-
Ls
Ls
Ls
Ls
Ls
Rp.
Rp.
Rp.
Rp.
Rp.
278,333.33
22,300.00
-
Rp.
Rp.
Rp.
Rp.
Rp.
1
2
3
4
5
M'
M'
M'
M'
M'
1.00
1.00
-
Ls
Ls
Ls
Ls
Ls
Rp.
Rp.
Rp.
Rp.
Rp.
401,666.67
32,200.00
-
Rp.
Rp.
Rp.
Rp.
Rp.
NO
URAIAN PEKERJAAN
SAT.
VOLUME
KODE
HARGA SAT.
JUMLAH
1
2
3
4
5
M'
M'
M'
M'
M'
1.00
1.00
-
Ls
Ls
Ls
Ls
Ls
Rp.
Rp.
Rp.
Rp.
Rp.
355,000.00
24,900.00
-
Rp.
Rp.
Rp.
Rp.
Rp.
1
2
3
4
5
M'
M'
M'
M'
M'
1.00
1.00
-
Ls
Ls
Ls
Ls
Ls
Rp.
Rp.
Rp.
Rp.
Rp.
546,666.67
38,300.00
-
Rp.
Rp.
Rp.
Rp.
Rp.
JUMLAH
SUB TOTAL
433,333.33
Rp.
433,333.33
Rp.
56,774.98
1,500.00
1,244.13
10,406.00
30,400.00
3,271.84
9,953.01
-
Rp.
490,108.31
Rp.
490,109.00
JUMLAH
SUB TOTAL
643,333.33
Rp.
643,333.33
Rp.
74,178.24
1,500.00
1,866.19
12,487.20
45,100.00
3,271.84
9,953.01
Rp.
717,511.57
Rp.
717,512.00
JUMLAH
SUB TOTAL
765,833.33
Rp.
765,833.33
Rp.
93,435.30
2,000.00
2,488.25
16,649.60
53,700.00
4,601.03
13,996.42
Rp.
859,268.63
Rp.
859,269.00
JUMLAH
SUB TOTAL
1,167,083.33
Rp.
1,167,083.33
Rp.
146,480.54
2,000.00
3,110.32
20,812.00
81,700.00
9,621.25
29,236.97
-
Rp.
Rp.
1,313,563.87
Rp.
1,313,564.00
JUMLAH
SUB TOTAL
2,082,458.33
Rp.
2,082,458.33
Rp.
2,435,793.31
2,000.00
78,625.94
9,953.01
66,598.40
145,800.00
12,269.40
37,323.79
JUMLAH
SUB TOTAL
542,500.00
Rp.
542,500.00
Rp.
83,696.03
2,000.00
1,866.19
12,487.20
38,000.00
7,259.40
22,083.24
-
Rp.
626,196.03
Rp.
626,197.00
JUMLAH
SUB TOTAL
794,166.67
Rp.
794,166.67
Rp.
93,396.03
2,000.00
1,866.19
12,487.20
47,700.00
7,259.40
22,083.24
Rp.
887,562.69
Rp.
887,563.00
JUMLAH
SUB TOTAL
838,333.33
Rp.
838,333.33
Rp.
110,805.61
2,000.00
4,167.82
27,888.08
50,300.00
6,543.68
19,906.02
-
Rp.
949,138.94
Rp.
949,139.00
JUMLAH
SUB TOTAL
914,166.67
Rp.
914,166.67
Rp.
122,626.82
Rp.
1,036,793.48
Rp.
1,036,794.00
2,000.00
4,354.44
29,136.80
54,900.00
7,975.11
24,260.46
-
JUMLAH
SUB TOTAL
302,500.00
Rp.
302,500.00
Rp.
48,386.01
2,000.00
1,555.16
10,406.00
21,200.00
3,271.84
9,953.01
-
Rp.
Rp.
350,886.01
Rp.
350,887.00
JUMLAH
450,000.00
2,000.00
2,177.22
14,568.40
31,500.00
3,885.31
11,819.20
-
SUB TOTAL
Rp.
450,000.00
Rp.
65,950.13
Rp.
Rp.
515,950.13
515,951.00
JUMLAH
534,166.67
2,000.00
2,301.63
15,400.88
37,400.00
5,316.74
16,173.64
-
SUB TOTAL
Rp.
534,166.67
Rp.
78,592.90
Rp.
Rp.
612,759.56
612,760.00
JUMLAH
805,000.00
2,500.00
3,110.32
20,812.00
56,400.00
9,621.25
29,236.97
-
SUB TOTAL
Rp.
805,000.00
Rp.
121,680.54
Rp.
Rp.
926,680.54
926,681.00
JUMLAH
1,377,500.00
2,500.00
69,141.88
9,953.01
66,598.40
96,500.00
12,269.40
37,323.79
-
SUB TOTAL
Rp.
1,377,500.00
Rp.
294,286.48
Rp.
Rp.
Rp.
1,671,786.48
1,671,787.00
JUMLAH
380,833.33
2,000.00
1,866.19
12,487.20
26,700.00
7,249.17
9,953.01
-
SUB TOTAL
Rp.
380,833.33
Rp.
60,255.57
Rp.
Rp.
Rp.
441,088.90
441,089.00
JUMLAH
556,666.67
2,000.00
3,732.38
25,806.88
39,000.00
5,827.97
17,728.80
-
SUB TOTAL
Rp.
556,666.67
Rp.
94,096.03
Rp.
Rp.
Rp.
650,762.69
650,763.00
JUMLAH
587,500.00
1,500.00
4,167.82
27,888.08
41,200.00
6,543.68
19,906.02
-
SUB TOTAL
Rp.
587,500.00
Rp.
101,205.61
Rp.
Rp.
688,705.61
688,706.00
JUMLAH
640,000.00
2,000.00
4,354.44
29,136.80
44,800.00
7,975.11
24,260.46
-
SUB TOTAL
Rp.
640,000.00
Rp.
112,526.82
Rp.
Rp.
752,526.82
752,527.00
JUMLAH
838,000.00
2,000.00
1,803.98
12,070.96
58,700.00
2,044.90
6,220.63
-
SUB TOTAL
Rp.
838,000.00
Rp.
82,840.48
Rp.
Rp.
920,840.48
920,841.00
JUMLAH
964,000.00
2,000.00
2,115.01
14,152.16
67,500.00
4,089.80
12,441.26
-
SUB TOTAL
Rp.
964,000.00
Rp.
102,298.24
Rp.
Rp.
1,066,298.24
1,066,299.00
JUMLAH
1,265,000.00
2,000.00
2,488.25
17,065.84
88,600.00
6,339.19
19,283.96
-
SUB TOTAL
Rp.
1,265,000.00
Rp.
135,777.24
Rp.
Rp.
1,400,777.24
1,400,778.00
JUMLAH
2,339,000.00
2,500.00
34,213.48
24,974.40
163,800.00
6,267.62
26,126.65
-
SUB TOTAL
Rp.
2,339,000.00
Rp.
257,882.15
Rp.
Rp.
2,596,882.15
2,596,883.00
JUMLAH
2,854,700.00
2,500.00
59,042.50
40,434.11
27,055.60
199,900.00
12,269.40
37,323.79
633.62
SUB TOTAL
Rp.
2,854,700.00
Rp.
378,525.40
Rp.
Rp.
3,233,225.40
3,233,226.00
JUMLAH
SUB TOTAL
181,666.67
14,600.00
-
Rp.
196,266.67
233,333.33
18,700.00
-
Rp.
252,033.33
Rp.
Rp.
196,266.67
252,033.33
JUMLAH
SUB TOTAL
231,666.67
18,600.00
-
Rp.
250,266.67
320,000.00
25,600.00
-
Rp.
345,600.00
Rp.
Rp.
250,266.67
345,600.00
JUMLAH
SUB TOTAL
278,333.33
22,300.00
-
Rp.
300,633.33
401,666.67
32,200.00
-
Rp.
433,866.67
Rp.
Rp.
300,633.33
433,866.67
JUMLAH
SUB TOTAL
355,000.00
24,900.00
-
Rp.
379,900.00
546,666.67
38,300.00
-
Rp.
584,966.67
Rp.
Rp.
379,900.00
584,966.67
NO
1
URAIAN
VOL.
SAT.
HARGA SAT.
Dibulatkan
C 01
6.6670
oh
40,000.00
Mandor
0.3330
oh
85,000.00
Pekerja
0.7500
oh
40,000.00
Mandor
0.0250
oh
85,000.00
Pekerja
0.9000
oh
40,000.00
Mandor
0.0450
oh
85,000.00
Pekerja
1.0500
oh
40,000.00
Mandor
0.0670
oh
85,000.00
Jumlah
Jasa 10%
Jumlah Total
Dibulatkan
D 01
Jumlah
Jasa 10%
Jumlah Total
Dibulatkan
D 02
Jumlah
Jasa 10%
Jumlah Total
Dibulatkan
D 03
Jumlah
Jasa 10%
Jumlah Total
Dibulatkan
NO
D 06
URAIAN
VOL.
SAT.
HARGA SAT.
1.0000
oh
40,000.00
Mandor
0.0320
oh
85,000.00
Pekerja
1.2000
oh
40,000.00
Mandor
0.0450
oh
85,000.00
Pekerja
0.3300
oh
40,000.00
Mandor
0.0100
oh
85,000.00
Pekerja
0.1920
oh
40,000.00
Mandor
0.0190
oh
85,000.00
Pekerja
0.5000
oh
40,000.00
Mandor
0.0500
oh
85,000.00
Jumlah
Jasa 10%
Jumlah Total
Dibulatkan
D 08
Jumlah
Jasa 10%
Jumlah Total
Dibulatkan
D 10
Jumlah
Jasa 10%
Jumlah Total
Dibulatkan
D 11
1 M3 PERATAAN TANAH
Jumlah
Jasa 10%
Jumlah Total
Dibulatkan
D 12
Jumlah
Jasa 10%
Jumlah Total
Dibulatkan
NO
D 13
URAIAN
VOL.
SAT.
HARGA SAT.
1 M3 URUGAN PASIR
Pasir urug
1.2000
m3
147,000.00
Pekerja
0.3000
oh
40,000.00
Mandor
0.0100
oh
80,000.00
158,000.00
Jumlah
Jasa 10%
Jumlah Total
Dibulatkan
SNI-PD5
1.2000
m3
Semen Portland
3.2600
Zak
61,000.00
Pasir pasang
0.5200
m3
189,000.00
Pekerja
1.5000
oh
40,000.00
0.7500
oh
50,000.00
Kepala Tukang
0.0750
oh
55,000.00
Mandor
0.0750
oh
80,000.00
Jumlah
Jasa 10%
Jumlah Total
Dibulatkan
E 11
1.1000
m3
Semen Portland
3.2600
zak
158,000.00
61,000.00
Pasir pasang
0.5200
m3
189,000.00
Pekerja
1.5000
oh
40,000.00
0.6000
oh
50,000.00
Kepala Tukang
0.0600
oh
55,000.00
Mandor
0.0750
oh
80,000.00
0.0500
oh
65,000.00
0.3200
jam
38,000.00
Waterpump 50 mm
0.3200
jam
63,000.00
Semen Portland
0.1555
Zak
61,000.00
Pasir pasang
0.0230
m3
189,000.00
Pekerja
0.3000
oh
40,000.00
0.1500
oh
50,000.00
Kepala Tukang
0.0150
oh
55,000.00
Mandor
0.0150
oh
80,000.00
Jumlah
Jasa 10%
Jumlah Total
J 04
Jumlah
Jasa 10%
Jumlah Total
Dibulatkan
JUMLAH
6=(3x5)
266,680.00
28,305.00
294,985.00
29,498.50
324,483.50
324,484.00
M
30,000.00
2,125.00
32,125.00
3,212.50
35,337.50
35,338.00
M
36,000.00
3,825.00
39,825.00
3,982.50
43,807.50
43,808.00
M
42,000.00
5,695.00
47,695.00
4,769.50
52,464.50
52,465.00
JUMLAH
1M
40,000.00
2,720.00
42,720.00
4,272.00
46,992.00
46,992.00
M1M
48,000.00
3,825.00
51,825.00
5,182.50
57,007.50
57,008.00
M
13,200.00
850.00
14,050.00
1,405.00
15,455.00
15,455.00
7,680.00
1,615.00
9,295.00
929.50
10,224.50
10,225.00
20,000.00
4,250.00
24,250.00
2,425.00
26,675.00
26,675.00
JUMLAH
176,400.00
12,000.00
800.00
189,200.00
18,920.00
208,120.00
208,120.00
PC : 4 PS
189,600.00
198,860.00
98,280.00
60,000.00
37,500.00
4,125.00
6,000.00
594,365.00
59,436.50
653,801.50
653,802.00
MM
9,486.72
4,347.00
12,000.00
7,500.00
825.00
1,200.00
35,358.72
3,535.87
38,894.59
38,895.00
NO
URAIAN
VOL.
SAT.
HARGA SAT.
A 02
A 04
0.1000
0.2500
1.1000
0.5000
0.1000
0.2500
70.0000
0.0200
0.1500
m
kg
lbr
lbr
zak
m
bh
lot
ls
2,100,000.00
18,000.00
74,000.00
47,000.00
61,000.00
189,000.00
300.00
353,359.50
360,426.69
0.1300
0.2500
1.0000
0.1250
0.1250
m
kg
ls
ls
ls
2,100,000.00
18,000.00
8,000.00
255,304.00
287,217.00
70.0000
0.4200
0.0540
0.4290
0.2140
0.0210
0.0110
bh
zak
m
org
org
org
org
300.00
61,000.00
189,000.00
40,000.00
45,000.00
55,000.00
85,000.00
70.0000
0.3354
0.0580
0.3218
0.1805
0.0158
0.0083
bh
zak
m
org
org
org
org
300.00
61,000.00
189,000.00
40,000.00
45,000.00
55,000.00
85,000.00
G 06
2,100,000.00
18,000.00
21,684.00
G 05
m3
kg
oh
A 05
0.0100
0.0380
0.1550
J 03
E 08
0.1600
0.0190
0.2860
0.2140
0.0210
0.0200
zak
m3
oh
oh
oh
oh
61,000.00
189,000.00
40,000.00
45,000.00
55,000.00
85,000.00
0.0085
m3
189,000.00
Semen Portland
0.1050
zak
61,000.00
Pekerja
0.3600
oh
40,000.00
0.1200
oh
50,000.00
Kepala Tukang
0.0120
oh
55,000.00
Mandor
0.0180
oh
85,000.00
1.0000
0.0500
oh
oh
40,000.00
85,000.00
Jumlah
Jasa 10%
Jumlah Total
C 04
JUMLAH
6=(3x5)
21,000.00
684.00
3,361.02
25,045.02
2,504.50
27,549.52
27,540.00
210,000.00
4,500.00
81,400.00
23,500.00
6,100.00
47,250.00
21,000.00
7,067.19
54,064.00
454,881.19
45,488.12
500,369.31
500,360.00
273,000.00
4,500.00
8,000.00
31,913.00
35,902.13
353,315.13
35,331.51
388,646.64
388,640.00
21,000.00
25,620.00
10,206.00
17,160.00
9,630.00
1,155.00
935.00
85,706.00
8,570.60
94,276.60
21,000.00
20,456.96
10,962.00
12,872.00
8,122.50
869.00
705.50
74,987.96
7,498.80
82,486.76
9,760.00
3,591.00
11,440.00
9,630.00
1,155.00
1,700.00
37,276.00
3,727.60
41,003.60
1,606.50
6,405.00
14,400.00
6,000.00
660.00
1,530.00
30,601.50
3,060.15
33,661.65
40,000.00
4,250.00
44,250.00
4,425.00
48,675.00
URAIAN
VOL.
SAT.
HARGA SAT.
A 07
0.00002
m3
1,470,000.00
0.05000
kg
49,000.00
0.0020
oh
45,000.00
Pekerja
0.0020
oh
40,000.00
Mandor
0.0010
oh
85,000.00
Jumlah
Jasa 10%
Jumlah Total
C 02
1.3600
oh
40,000.00
Mandor
0.0600
oh
85,000.00
0.0800
oh
55,000.00
Jack Hammer
0.2800
jam
17,857.14
4.5000
btg
12,000.00
Pekerja
0.1000
oh
40,000.00
Mandor
0.0100
oh
85,000.00
Jumlah
Jasa 10%
Jumlah Total
S 08
Jumlah
Jasa 10%
Jumlah Total
NO
URAIAN
VOL.
SAT.
HARGA SAT.
D 21
0.2150
oh
40,000.00
Mandor
0.0690
oh
85,000.00
Operator Tamper
0.0430
jam
55,000.00
0.3012
jam
38,000.00
Jumlah
Jasa 10%
Jumlah Total
D 22
1.2000
m3
147,000.00
Pekerja
0.3000
oh
40,000.00
Mandor
0.0600
oh
85,000.00
Operator Tamper
0.0430
jam
55,000.00
0.3012
jam
38,000.00
1.1000
m3
158,000.00
Pekerja
0.5000
oh
40,000.00
Pekerja Terampil
0.4000
oh
45,000.00
Mandor
0.0200
oh
85,000.00
Jumlah
Jasa 10%
Jumlah Total
D 23
Jumlah
Jasa 10%
Jumlah Total
E 01
0.2790
m3
189,000.00
Semen Portland
2.1700
zak
61,000.00
130.0000
bh
2,415.00
Pekerja
4.5000
oh
40,000.00
1.5000
oh
50,000.00
Kepala Tukang
1.1500
oh
55,000.00
Mandor
0.2250
oh
85,000.00
0.2500
btg
41,580.00
Ijuk
0.2500
ikat
25,000.00
Pekerja
0.0238
oh
40,000.00
0.3333
btg
535,185.00
Pekerja
0.0670
oh
40,000.00
Kepala Tukang
0.0067
oh
55,000.00
7.0000
btg
12,000.00
Papan Kruing 2 x 20 x 4m
3.0000
lbr
92,800.00
Baud
7.0000
bh
8,610.00
Batang Kelapa
1.0000
btg
128,700.00
Pekerja
1.4000
oh
40,000.00
Kepala Tukang
0.4200
oh
55,000.00
Tukang Kayu
4.2000
oh
50,000.00
Mandor Lapangan
0.7000
oh
85,000.00
Batako PSPM
Jumlah
Jasa 10%
Jumlah Total
S 09
1 M2 PASANGAN SULINGAN
Jumlah
Jasa 10%
Jumlah Total
S 11
Jumlah
Jasa 10%
Jumlah Total
E 05
8 M PEKERJAAN STOOTWERK
OK
36.02
2,450.00
90.00
80.00
85.00
2,741.02
274.10
3,015.12
54,000.00
4,000.00
850.00
58,850.00
5,885.00
64,735.00
JUMLAH
6=(3x5)
AP 20 CM DENGAN ALAT
176,400.00
12,000.00
5,100.00
2,365.00
11,445.60
207,310.60
20,731.06
228,041.66
ONDASI
173,800.00
20,000.00
18,000.00
1,700.00
213,500.00
21,350.00
234,850.00
4
52,731.00
132,370.00
313,950.00
180,000.00
75,000.00
63,250.00
19,125.00
836,426.00
83,642.60
920,068.60
10,395.00
6,250.00
952.38
17,597.38
1,759.74
19,357.12
BARIS)
178,395.00
2,680.00
368.50
181,443.50
18,144.35
199,587.85
84,000.00
278,400.00
60,270.00
128,700.00
56,000.00
23,100.00
210,000.00
59,500.00
Propinsi :
Kota :
JAWA BARAT
DEPOK
Disiapkan Oleh :
Dec-99
Proses :
Anggapan :
No.
Pekerja
Vol.
Hari
Kode
Total Vol.
Upah
Org-hari
(Rp/Org/Hari)
Mandor
1.00
3.00
3.00
85,000.00
1.00
3.00
3.00
55,000.00
Tukang Batu
3.00
9.00
50,000.00
Pekerja
57.00
40,000.00
###
19.00
3.00
J U M LA H I
No
Material
Pasir Beton
Semen Portland
Batu Pecah 1 - 2 cm
Alat Bantu
Satuan
Kode
Total Vol.
Harga
(Rp/Unit)
17.92
m3
17.92
210,000.00
163.02
zak
163.02
61,000.00
13.19
13.19
194,000.00
3.00
Set
3.00
75,000.00
J U M LA H I I
No.
Peralatan
Jumlah
Hari Kerja
Kode
Jam Kerja
Harga
(Rp/jam)
2.00
3.00
E.251
36.00
38,000.00
1.00
3.00
E.341
6.00
63,000.00
J U M LA H I I I
BETON NON STRUKTUR Bo
VOLUME :
33.00
satuan m3
648,100.47
64,810.05
712,910.52
KODE
SNI-Bo
Tanggal :
#REF!
4. Adukan 1 m3 beton, dibutuhkan : semen : 247 kg/m3 ; Pasir Beton : 869 kg/m3 ;
Biaya
Sub Total
Rp
Rp
255,000.00
165,000.00
450,000.00
2,280,000.00
Pekerja
3,150,000.00
Biaya
Sub Total
(Rp)
(Rp)
3,763,856.25
9,944,220.00
2,558,239.20
225,000.00
Material
16,491,315.45
Biaya
Sub Total
(Rp)
(Rp)
1,368,000.00
378,000.00
Per m3
Per m3
Peralatan
1,746,000.00
Total (Rp)
21,387,315.45
Propinsi :
Kota :
JAWA BARAT
DEPOK
Disiapkan Oleh :
Dec-99
Proses :
Anggapan :
No.
Pekerja
Vol.
Hari
Kode
Total Vol.
Upah
Org-hari
(Rp/Org/Hari)
Mandor
1.00
3.00
3.00
85,000.00
1.00
3.00
3.00
55,000.00
Tukang Batu
3.00
9.00
50,000.00
Pekerja
57.00
40,000.00
###
19.00
3.00
J U M LA H I
No
Material
Pasir Beton
Semen Portland
Batu Pecah 1 - 2 cm
Alat Bantu
Satuan
Kode
Total Vol.
Harga
(Rp/Unit)
14.40
m3
14.40
210,000.00
244.86
zak
244.86
61,000.00
13.82
m3
13.82
194,000.00
3.00
Set
3.00
75,000.00
J U M LA H I I
No.
Peralatan
Jumlah
Hari Kerja
Kode
Jam Kerja
Harga
(Rp/jam)
2.00
3.00
E.251
36.00
38,000.00
1.00
3.00
E.341
6.00
63,000.00
J U M LA H I I I
BETON STRUKTUR K.225
VOLUME :
33.00
satuan m3
780,661.52
78,066.15
858,727.67
KODE
F 08
Tanggal :
#REF!
4. Adukan 1 m3 beton, dibutuhkan : semen : 371 kg/m3 ; Pasir Beton : 731 kg/m3 ;
Biaya
Sub Total
Rp
Rp
255,000.00
165,000.00
450,000.00
2,280,000.00
Pekerja
3,150,000.00
Biaya
Sub Total
(Rp)
(Rp)
3,023,212.50
14,936,460.00
2,681,157.60
225,000.00
Material
20,865,830.10
Biaya
Sub Total
(Rp)
(Rp)
1,368,000.00
378,000.00
Per m3
Per m3
Peralatan
1,746,000.00
Total (Rp)
25,761,830.10
(MENGGUNAKAN BURUH)
Propinsi :
Kota :
JAWA BARAT
DEPOK
Disiapkan Oleh :
Dec-99
Proses :
Anggapan :
2. Ukuran parit bagian dalam tebal rata-rata dinding 20 cm, tebal dasar 25 cm,
No.
Pekerja
Vol.
Hari
Kode
Total Vol.
Upah
Org-hari
(Rp/Org/Hari)
Mandor Lapangan
1.00
###
1.00
85,000.00
SUPIR TRUK
1.00
###
1.00
50,000.00
KENEK TRUK
1.00
###
1.00
35,000.00
Pekerja
36.00
40,000.00
36.00
1.00
J U M LA H I
No
Material
Alat Bantu
Vol.
Satuan
Kode
30.00
m3
K.705
1.44
Set
M.170
Hari Kerja
Kode
Total Vol.
30.00
Harga
(Rp/Unit)
630,450.00
75,000.00
J U M LA H I I
No.
Peralatan
Jumlah
1.00
1.00
Jam Kerja
E.221
6.00
Harga
(Rp/jam)
163,000.00
J U M LA H I I I
PASANGAN BATU PADA PARIT
VOLUME :
60.00
satuan m'
360,158.33
36,015.83
396,174.17
KODE
(MENGGUNAKAN BURUH)
K.112
Tanggal :
#REF!
2. Ukuran parit bagian dalam tebal rata-rata dinding 20 cm, tebal dasar 25 cm,
Biaya
Sub Total
Rp
Rp
85,000.00
50,000.00
35,000.00
1,440,000.00
Pekerja
1,610,000.00
Biaya
Sub Total
(Rp)
(Rp)
18,913,500.00
108,000.00
Material
19,021,500.00
Biaya
Sub Total
(Rp)
(Rp)
978,000.00
Per m'
Per m'
Peralatan
978,000.00
Total (Rp)
21,609,500.00
(MENGGUNAKAN BURUH)
Propinsi :
Kota :
JAWA BARAT
DEPOK
Disiapkan Oleh :
Dec-99
Proses :
Anggapan :
No.
Pekerja
Vol.
Hari
Mandor
1.00
Pekerja
30.00
Kode
Total Vol.
Upah
Org-hari
(Rp/Org/Hari)
###
1.00
1.00
85,000.00
30.00
40,000.00
J U M LA H I
No
Material
Alat Bantu
Satuan
Kode
Set
M.170
Hari Kerja
Kode
Total Vol.
Harga
(Rp/Unit)
1.20
75,000.00
J U M LA H I I
No.
Peralatan
Jumlah
Jam Kerja
Harga
(Rp/jam)
1
J U M LA H I I I
GALIAN TANAH UNTUK KONSTRUKSI
VOLUME :
40.00
satuan m3
34,375.00
3,437.50
37,812.50
KODE
(MENGGUNAKAN BURUH)
K.224
Tanggal :
#REF!
Biaya
Sub Total
Rp
Rp
85,000.00
1,200,000.00
Pekerja
1,285,000.00
Biaya
Sub Total
(Rp)
(Rp)
90,000.00
Material
90,000.00
Biaya
Sub Total
(Rp)
(Rp)
Peralatan
Total (Rp)
Per m3
Per m3
1,375,000.00
(MENGGUNAKAN BURUH)
Propinsi :
Kota :
JAWA BARAT
DEPOK
Disiapkan Oleh :
Dec-99
Proses :
Anggapan :
organik.
No.
Pekerja
Vol.
Hari
Kode
Total Vol.
Upah
Org-hari
(Rp/Org/Hari)
Mandor
1.00
1.00
85,000.00
Pekerja Terampil
3.00
###
1.00
3.00
50,000.00
Pekerja
10.00
1.00
10.00
40,000.00
J U M LA H I
No
Material
Alat Bantu
Total Vol.
Harga
Satuan
Kode
20.00
m3
M.042
20.00
158,000.00
0.40
set
M.170
0.40
75,000.00
Hari Kerja
Kode
(Rp/Unit)
J U M LA H I I
No.
Peralatan
Jumlah
Jam Kerja
Harga
(Rp/jam)
1.00
5.00
E.087
5.00
63,000.00
1.00
10.00
E.088
10.00
38,000.00
J U M LA H I I I
PENGURUGAN DAN PEMADATAN DGN SIRTU
VOLUME :
15.00
satuan m3
301,333.33
30,133.33
331,466.67
KODE
(MENGGUNAKAN BURUH)
D 14
Tanggal :
#REF!
Biaya
Sub Total
Rp
Rp
85,000.00
150,000.00
400,000.00
Pekerja
635,000.00
Biaya
Sub Total
(Rp)
(Rp)
3,160,000.00
30,000.00
Material
3,190,000.00
Biaya
Sub Total
(Rp)
(Rp)
315,000.00
380,000.00
Per m3
Per m3
Peralatan
695,000.00
Total (Rp)
4,520,000.00
(MENGGUNAKAN BURUH)
Propinsi :
Kota :
JAWA BARAT
DEPOK
Disiapkan Oleh :
Dec-99
Proses :
Anggapan :
organik
No.
Pekerja
Vol.
Hari
Kode
Total Vol.
Upah
Org-hari
(Rp/Org/Hari)
Mandor
1.00
1.00
85,000.00
Pekerja Terampil
3.00
###
1.00
3.00
50,000.00
Pekerja
10.00
1.00
10.00
40,000.00
J U M LA H I
No
Material
Alat Bantu
Total Vol.
Harga
Satuan
Kode
20.00
m3
M.050
20.00
47,000.00
0.40
set
M.170
0.40
75,000.00
Hari Kerja
Kode
(Rp/Unit)
J U M LA H I I
No.
Peralatan
Jumlah
Jam Kerja
Harga
(Rp/jam)
1.00
5.00
E.087
5.00
63,000.00
1.00
10.00
E.088
10.00
38,000.00
J U M LA H I I I
PENGURUGAN DAN PEMADATAN DGN TANAH PILIHAN
VOLUME :
15.00
satuan m3
153,333.33
15,333.33
168,666.67
KODE
(MENGGUNAKAN BURUH)
D 15
Tanggal :
#REF!
Biaya
Sub Total
Rp
Rp
85,000.00
150,000.00
400,000.00
Pekerja
635,000.00
Biaya
Sub Total
(Rp)
(Rp)
940,000.00
30,000.00
Material
970,000.00
Biaya
Sub Total
(Rp)
(Rp)
315,000.00
380,000.00
Per m3
Per m3
Peralatan
695,000.00
Total (Rp)
2,300,000.00
(MENGGUNAKAN BURUH)
Propinsi :
Kota :
JAWA BARAT
DEPOK
Disiapkan Oleh :
Dec-99
Proses :
Anggapan :
lapis 20 cm
No.
Pekerja
Vol.
Hari
Kode
Total Vol.
Upah
Org-hari
(Rp/Org/Hari)
Mandor
2.00
2.00
85,000.00
Operator Terlatih
1.00
###
1.00
1.00
65,000.00
Pembantu Operator
1.00
###
1.00
45,000.00
SUPIR TRUK
1.00
###
1.00
50,000.00
KENEK TRUK
1.00
###
1.00
35,000.00
Pekerja
60.00
40,000.00
60.00
1.00
J U M LA H I
No
Material
Satuan
Kode
Total Vol.
Harga
(Rp/Unit)
m3
M.050
72.00
47,000.00
Alat Bantu
Set
M.170
2.40
75,000.00
Hari Kerja
Kode
J U M LA H I I
No.
Peralatan
Jumlah
Jam Kerja
Harga
(Rp/jam)
1.00
1.00
E.084
5.00
163,000.00
1.00
1.00
E.182
5.00
188,000.00
J U M LA H I I I
PENIMBUNAN BADAN JALAN
VOLUME :
60.00
satuan m3
134,733.33
13,473.33
148,206.67
KODE
(MENGGUNAKAN BURUH)
D 16
Tanggal :
#REF!
Biaya
Sub Total
Rp
Rp
170,000.00
65,000.00
45,000.00
50,000.00
35,000.00
2,400,000.00
Pekerja
2,765,000.00
Biaya
Sub Total
(Rp)
(Rp)
3,384,000.00
180,000.00
Material
3,564,000.00
Biaya
Sub Total
(Rp)
(Rp)
815,000.00
940,000.00
Per m3
Per m3
Peralatan
1,755,000.00
Total (Rp)
8,084,000.00
(MENGGUNAKAN BURUH)
Propinsi :
Kota :
JAWA BARAT
DEPOK
Disiapkan Oleh :
Dec-99
Proses :
Anggapan :
lapis 20 Cm
No.
Pekerja
Vol.
Hari
Kode
Total Vol.
Upah
Org-hari
(Rp/Org/Hari)
Mandor
2.00
2.00
85,000.00
Operator Terlatih
1.00
###
1.00
1.00
65,000.00
Pembantu Operator
1.00
###
1.00
45,000.00
SUPIR TRUK
1.00
###
1.00
50,000.00
KENEK TRUK
1.00
###
1.00
35,000.00
Pekerja
60.00
40,000.00
60.00
1.00
J U M LA H I
No
Material
Alat Bantu
Satuan
Kode
set
M.170
Hari Kerja
Kode
Total Vol.
2.40
Harga
(Rp/Unit)
75,000.00
J U M LA H I I
No.
Peralatan
Jumlah
Jam Kerja
Harga
(Rp/jam)
1.00
5.00
E.084
5.00
163,000.00
1.00
5.00
E.182
5.00
188,000.00
J U M LA H I I I
PEMADATAN BADAN JALAN
VOLUME :
60.00
satuan m3
78,333.33
7,833.33
86,166.67
KODE
(MENGGUNAKAN BURUH)
D 17
Tanggal :
#REF!
Biaya
Sub Total
Rp
Rp
170,000.00
65,000.00
45,000.00
50,000.00
35,000.00
2,400,000.00
Pekerja
2,765,000.00
Biaya
Sub Total
(Rp)
(Rp)
180,000.00
Material
180,000.00
Biaya
Sub Total
(Rp)
(Rp)
815,000.00
940,000.00
Per m3
Per m3
Peralatan
1,755,000.00
Total (Rp)
4,700,000.00
(MENGGUNAKAN BURUH)
Propinsi :
Kota :
JAWA BARAT
DEPOK
Disiapkan Oleh :
Dec-99
Proses :
Anggapan :
manusia
No.
Pekerja
Vol.
Hari
Kode
Total Vol.
Upah
Org-hari
(Rp/Org/Hari)
Mandor
1.00
###
1.00
85,000.00
Operator Terlatih
1.00
###
1.00
65,000.00
Pembantu Operator
1.00
###
1.00
45,000.00
Pekerja
80.00
40,000.00
80.00
1.00
J U M LA H I
No
Material
Alat Bantu
Satuan
Kode
Set
M.170
Hari Kerja
Kode
Total Vol.
3.20
Harga
(Rp/Unit)
75,000.00
J U M LA H I I
No.
Peralatan
Jumlah
1.00
1.00
Jam Kerja
E.080
5.00
Harga
(Rp/jam)
75,900.00
J U M LA H I I I
PENYIAPAN TANAH DASAR
VOLUME :
32.00
satuan ARE
125,453.13
12,545.31
137,998.44
KODE
(MENGGUNAKAN BURUH)
D 18
Tanggal :
#REF!
Biaya
Sub Total
Rp
Rp
85,000.00
65,000.00
45,000.00
3,200,000.00
Pekerja
3,395,000.00
Biaya
Sub Total
(Rp)
(Rp)
240,000.00
Material
240,000.00
Biaya
Sub Total
(Rp)
(Rp)
379,500.00
Per ARE
Per ARE
Peralatan
379,500.00
Total (Rp)
4,014,500.00
penyusunan DPAdan
Mengevaluasi Harga Penawaran
Propinsi :
Kota :
JAWA BARAT
DEPOK
Proses :
Anggapan :
1.
1.
2.
2.
No.
Pekerja
Disiapkan Oleh :
Dec-99
Vol.
Hari
Kode
Total Vol.
Upah
Org-hari
(Rp/Org/Hari)
Mandor
1.00
1.00
85,000.00
Operator Terlatih
2.00
###
1.00
2.00
65,000.00
Pembantu Operator
2.00
1.00
2.00
45,000.00
Pekerja
4.00
1.00
4.00
40,000.00
J U M LA H I
No
Material
Alat Bantu
Satuan
Kode
Set
M.170
Hari Kerja
Kode
Total Vol.
0.16
Harga
(Rp/Unit)
75,000.00
J U M LA H I I
No.
Peralatan
Jumlah
Jam Kerja
Harga
(Rp/jam)
Motor Grader
1.00
6.00
E.010
6.00
163,000.00
1.00
6.00
E.080
6.00
75,900.00
J U M LA H I I I
PENYIAPAN TANAH DASAR
VOLUME :
40.00
satuan m3
47,760.00
4,776.00
52,536.00
KODE
(MENGGUNAKAN ALAT)
D 19
Tanggal :
#REF!
Biaya
Sub Total
Rp
Rp
85,000.00
130,000.00
90,000.00
160,000.00
Pekerja
465,000.00
Biaya
Sub Total
(Rp)
(Rp)
12,000.00
Material
12,000.00
Biaya
Sub Total
(Rp)
(Rp)
978,000.00
455,400.00
Per m3
Per m3
Peralatan
1,433,400.00
Total (Rp)
1,910,400.00
(MENGGUNAKAN BURUH)
Propinsi :
Kota :
JAWA BARAT
DEPOK
Disiapkan Oleh :
Dec-99
Proses :
Anggapan :
1. Menggunakan tenaga orang (96 m3/hari, pemadatan 960 m' bahu jalan/hari)
yang kecil.
No.
Pekerja
Vol.
Hari
Mandor
3.00
Pekerja Terampil
1.00
Pekerja
Kode
Total Vol.
Upah
Org-hari
(Rp/Org/Hari)
1.00
###
96.00
1.00
3.00
85,000.00
1.00
50,000.00
96.00
40,000.00
J U M LA H I
No
Material
Satuan
Kode
Total Vol.
Harga
(Rp/Unit)
m3
M.050
116.00
47,000.00
Alat Bantu
Set
M.170
3.84
75,000.00
Hari Kerja
Kode
J U M LA H I I
No.
Peralatan
Jumlah
1.00
5.00
Jam Kerja
E.087
5.00
Harga
(Rp/jam)
63,000.00
J U M LA H I I I
PEMBENTUKAN BAHU JALAN
VOLUME :
96.00
satuan m3
106,250.00
10,625.00
116,875.00
KODE
(MENGGUNAKAN BURUH)
D 24
Tanggal :
#REF!
1. Menggunakan tenaga orang (96 m3/hari, pemadatan 960 m' bahu jalan/hari)
3. Material LPB yang termurah dikirim ke lokasi pekerjaan oleh pemasok
Biaya
Sub Total
Rp
Rp
255,000.00
50,000.00
3,840,000.00
Pekerja
4,145,000.00
Biaya
Sub Total
(Rp)
(Rp)
5,452,000.00
288,000.00
Material
5,740,000.00
Biaya
Sub Total
(Rp)
(Rp)
315,000.00
Per m3
Per m3
Peralatan
315,000.00
Total (Rp)
10,200,000.00
(MENGGUNAKAN BURUH)
Propinsi :
Kota :
JAWA BARAT
DEPOK
Disiapkan Oleh :
Dec-99
Proses :
Anggapan :
1. Menggunakan tenaga orang (96 m3/hari, pemadatan 960 m' bahu jalan/hari)
yang kecil.
No.
Pekerja
Vol.
Hari
Mandor
3.00
Pekerja Terampil
1.00
Pekerja
Kode
Total Vol.
Upah
Org-hari
(Rp/Org/Hari)
1.00
###
96.00
1.00
3.00
85,000.00
1.00
50,000.00
96.00
40,000.00
J U M LA H I
No
Material
Satuan
Kode
Total Vol.
Harga
(Rp/Unit)
m3
M. 022
116.00
158,000.00
Alat Bantu
Set
M.170
3.84
75,000.00
Hari Kerja
Kode
J U M LA H I I
No.
Peralatan
Jumlah
1.00
5.00
Jam Kerja
E.087
5.00
Harga
(Rp/jam)
63,000.00
J U M LA H I I I
PEMBENTUKAN BAHU JALAN (MATERIAL SPLIT 5 - 7)
VOLUME :
96.00
satuan m3
240,375.00
24,037.50
264,412.50
KODE
(MENGGUNAKAN BURUH)
D 25
Tanggal :
#REF!
1. Menggunakan tenaga orang (96 m3/hari, pemadatan 960 m' bahu jalan/hari)
3. Material Split yang termurah dikirim ke lokasi pekerjaan oleh pemasok
Biaya
Sub Total
Rp
Rp
255,000.00
50,000.00
3,840,000.00
Pekerja
4,145,000.00
Biaya
Sub Total
(Rp)
(Rp)
18,328,000.00
288,000.00
Material
18,616,000.00
Biaya
Sub Total
(Rp)
(Rp)
315,000.00
Per m3
Per m3
Peralatan
315,000.00
Total (Rp)
23,076,000.00
(MENGGUNAKAN ALAT)
Propinsi :
Kota :
JAWA BARAT
DEPOK
Disiapkan Oleh :
Dec-99
Proses :
Anggapan :
No.
Pekerja
Vol.
Hari
Kode
Total Vol.
Upah
Org-hari
(Rp/Org/Hari)
Mandor
1.00
1.00
85,000.00
Operator Terlatih
2.00
###
1.00
2.00
65,000.00
Pembantu Operator
2.00
1.00
2.00
45,000.00
SUPIR TRUK
1.00
###
1.00
50,000.00
KENEK TRUK
1.00
###
1.00
35,000.00
Pekerja
6.00
6.00
40,000.00
1.00
J U M LA H I
No
Material
Satuan
Kode
Total Vol.
Harga
(Rp/Unit)
m3
M.012
195.00
158,000.00
Alat Bantu
Set
M.170
0.24
75,000.00
Hari Kerja
Kode
J U M LA H I I
No.
Peralatan
Jumlah
Jam Kerja
Harga
(Rp/jam)
1.00
1.00
E.010
5.00
1.00
1.00
E.080
5.00
75,900.00
1.00
1.00
E.182
5.00
163,000.00
188,000.00
J U M LA H I I I
LAPIS PONDASI BAWAH KELAS A SIRTU TERSARING
VOLUME :
150.00
satuan m3
223,950.00
22,395.00
246,345.00
KODE
(MENGGUNAKAN ALAT)
Q 01
Tanggal :
#REF!
Biaya
Sub Total
Rp
Rp
85,000.00
130,000.00
90,000.00
50,000.00
35,000.00
240,000.00
Pekerja
630,000.00
Biaya
Sub Total
(Rp)
(Rp)
30,810,000.00
18,000.00
Material
30,828,000.00
Biaya
Sub Total
(Rp)
(Rp)
940,000.00
379,500.00
815,000.00
Per m3
Per m3
Peralatan
2,134,500.00
Total (Rp)
33,592,500.00
(MENGGUNAKAN BURUH)
Propinsi :
Kota :
JAWA BARAT
DEPOK
Disiapkan Oleh :
Dec-99
Proses :
Anggapan :
3. Dihampar dengan tenaga manusia dalam 2 lapis dan dipadatkan sampai tebal padat 10 cm
No.
Pekerja
Vol.
Hari
Kode
Total Vol.
Upah
Org-hari
(Rp/Org/Hari)
Mandor
2.00
2.00
85,000.00
Operator Terlatih
1.00
###
1.00
1.00
65,000.00
Pembantu Operator
1.00
###
1.00
45,000.00
SUPIR TRUK
1.00
###
1.00
50,000.00
KENEK TRUK
1.00
###
1.00
35,000.00
Pekerja
60.00
40,000.00
60.00
1.00
J U M LA H I
No
Material
Satuan
Kode
Total Vol.
Harga
(Rp/Unit)
m3
M.012
72.00
158,000.00
Alat Bantu
Set
M.170
2.40
75,000.00
Hari Kerja
Kode
J U M LA H I I
No.
Peralatan
Jumlah
Jam Kerja
Harga
(Rp/jam)
1.00
1.00
E.080
5.00
75,900.00
1.00
1.00
E.182
5.00
163,000.00
J U M LA H I I I
LAPIS PONDASI BAWAH KELAS C SIRTU TERSARING BERGRADASI
VOLUME :
60.00
satuan m3
258,591.67
25,859.17
284,450.83
KODE
(MENGGUNAKAN BURUH)
Q 02
Tanggal :
#REF!
3. Dihampar dengan tenaga manusia dalam 2 lapis dan dipadatkan sampai tebal padat 10 cm
Biaya
Sub Total
Rp
Rp
170,000.00
65,000.00
45,000.00
50,000.00
35,000.00
2,400,000.00
Pekerja
2,765,000.00
Biaya
Sub Total
(Rp)
(Rp)
11,376,000.00
180,000.00
Material
11,556,000.00
Biaya
Sub Total
(Rp)
(Rp)
379,500.00
815,000.00
Per m3
Per m3
Peralatan
1,194,500.00
Total (Rp)
15,515,500.00
Propinsi :
Kota :
JAWA BARAT
DEPOK
Disiapkan Oleh :
Dec-99
Proses :
Anggapan :
No.
Pekerja
Vol.
Hari
Kode
Total Vol.
Upah
Org-hari
(Rp/Org/Hari)
Mandor
1.00
###
1.00
85,000.00
Operator Terlatih
1.00
###
1.00
65,000.00
Pembantu Operator
1.00
###
1.00
45,000.00
SUPIR TRUK
1.00
###
1.00
50,000.00
KENEK TRUK
1.00
###
1.00
35,000.00
Pekerja
33.00
40,000.00
33.00
1.00
J U M LA H I
No
Material
Satuan
Kode
Total Vol.
Harga
(Rp/Unit)
m3
M.012
72.00
158,000.00
Alat Bantu
Set
M.170
2.40
75,000.00
Hari Kerja
Kode
J U M LA H I I
No.
Peralatan
Jumlah
Jam Kerja
Harga
(Rp/jam)
1.00
1.00
E.080
5.00
75,900.00
1.00
1.00
E.182
5.00
163,000.00
J U M LA H I I I
LAPIS PONDASI BAWAH KELAS C AGREGAT
VOLUME :
60.00
satuan m3
239,175.00
23,917.50
263,092.50
KODE
Q 03
Tanggal :
#REF!
Biaya
Sub Total
Rp
Rp
85,000.00
65,000.00
45,000.00
50,000.00
35,000.00
1,320,000.00
Pekerja
1,600,000.00
Biaya
Sub Total
(Rp)
(Rp)
11,376,000.00
180,000.00
Material
11,556,000.00
Biaya
Sub Total
(Rp)
(Rp)
379,500.00
815,000.00
Per m3
Per m3
Peralatan
1,194,500.00
Total (Rp)
14,350,500.00
Propinsi :
Kota :
JAWA BARAT
DEPOK
Disiapkan Oleh :
Dec-99
Proses :
Anggapan :
No.
Pekerja
Vol.
Hari
Kode
Total Vol.
Upah
Org-hari
(Rp/Org/Hari)
Mandor
1.00
1.00
85,000.00
Operator Terlatih
2.00
###
1.00
2.00
65,000.00
Pembantu Operator
2.00
1.00
2.00
45,000.00
SUPIR TRUK
1.00
###
1.00
50,000.00
KENEK TRUK
1.00
###
1.00
35,000.00
Pekerja
6.00
6.00
40,000.00
1.00
J U M LA H I
No
Material
Satuan
Kode
Total Vol.
Harga
(Rp/Unit)
m3
M.012
195.00
158,000.00
Alat Bantu
Set
M.170
0.24
75,000.00
Hari Kerja
Kode
J U M LA H I I
No.
Peralatan
Jumlah
Jam Kerja
Harga
(Rp/jam)
1.00
1.00
E.010
5.00
1.00
1.00
E.080
5.00
75,900.00
1.00
1.00
E.182
5.00
163,000.00
188,000.00
J U M LA H I I I
LAPIS PONDASI ATAS KELAS A AGREGAT
VOLUME :
150.00
satuan m3
223,950.00
22,395.00
246,345.00
KODE
Q 04
Tanggal :
#REF!
Biaya
Sub Total
Rp
Rp
85,000.00
130,000.00
90,000.00
50,000.00
35,000.00
240,000.00
Pekerja
630,000.00
Biaya
Sub Total
(Rp)
(Rp)
30,810,000.00
18,000.00
Material
30,828,000.00
Biaya
Sub Total
(Rp)
(Rp)
940,000.00
379,500.00
815,000.00
Per m3
Per m3
Peralatan
2,134,500.00
Total (Rp)
33,592,500.00
(MENGGUNAKAN ALAT)
Propinsi :
Kota :
JAWA BARAT
DEPOK
Disiapkan Oleh :
Dec-99
Proses :
Anggapan :
@ 0,5 ltr/m2
5. Sesuai Spesifikasi BM No. 03/PT/B/1983 & Rev. Spesifikasi Umum Maret 1989 -
Buku 3
No.
Pekerja
Vol.
Hari
Kode
Total Vol.
Upah
Org-hari
(Rp/Org/Hari)
Mandor Lapangan
1.00
1.00
85,000.00
Operator Terlatih
###
1.00
4.00
65,000.00
4.00
1.00
4.00
45,000.00
Pekerja Terampil
8.00
1.00
8.00
50,000.00
Pekerja
12.00
1.00
12.00
40,000.00
J U M LA H I
No
Material
Satuan
Kode
Total Vol.
Harga
(Rp/Unit)
Ton
100.00
742,000.00
Pasir Beton
m3
M.041
0.60
210,000.00
Aspal Bitumen
kg
M.061
180.00
11,000.00
lt
M.065
45.00
13,000.00
Alat Bantu
Set
M.170
0.48
75,000.00
Hari Kerja
Kode
J U M LA H I I
No.
Peralatan
Jumlah
Jam Kerja
Harga
(Rp/jam)
5.00
1.00
E.080
5.00
75,900.00
5.00
1.00
E.084
5.00
156,000.00
3.00
1.00
E.153
3.00
112,960.66
5.00
1.00
E.157
5.00
188,000.00
4.00
1.00
E.301
4.00
81,000.00
J U M LA H I I I
PASANGAN LAPIS ATB
VOLUME :
45.00
satuan m3
1,802,097.38
180,209.74
1,982,307.12
KODE
(MENGGUNAKAN ALAT)
Q 05
Tanggal :
#REF!
5. Sesuai Spesifikasi BM No. 03/PT/B/1983 & Rev. Spesifikasi Umum Maret 1989 -
Biaya
Sub Total
Rp
Rp
85,000.00
260,000.00
180,000.00
400,000.00
480,000.00
Pekerja
1,405,000.00
Biaya
Sub Total
(Rp)
(Rp)
74,200,000.00
126,000.00
1,980,000.00
585,000.00
36,000.00
Material
76,927,000.00
Biaya
Sub Total
(Rp)
(Rp)
379,500.00
780,000.00
338,881.98
940,000.00
324,000.00
Per M3
Per M3
Peralatan
2,762,381.98
Total (Rp)
81,094,381.98
(MENGGUNAKAN ALAT)
Propinsi :
Kota :
JAWA BARAT
DEPOK
Disiapkan Oleh :
Dec-99
Proses :
Anggapan :
4. Permukaan yang akan diaspal telah selesai dipadatkan dan terikat dengan binder
5. Lapis seal/penutup menggunakan aspal catback @ 1,5 kg/m2 dan 1,2 kg/m2
6. Agregat ukuran 19 mm dan 9,5 mm dihampar dari dumptruck penghampar
@ 55 m2/m3 dan 120 m/m3
No.
Pekerja
Vol.
Hari
Kode
Total Vol.
Upah
Org-hari
(Rp/Org/Hari)
Mandor Lapangan
1.00
3.00
3.00
85,000.00
Operator Terlatih
2.00
3.00
6.00
65,000.00
Pembantu Operator
2.00
3.00
6.00
45,000.00
Sopir
1.00
3.00
3.00
50,000.00
Pembantu Sopir
1.00
3.00
3.00
35,000.00
Pekerja Terampil
2.00
3.00
6.00
50,000.00
Pekerja
12.00
3.00
36.00
40,000.00
J U M LA H I
No
Material
Satuan
Kode
Total Vol.
Harga
(Rp/Unit)
Batu Pecah 1 - 2 cm
m3
M.025
33.00
194,000.00
m3
M.026
15.00
168,000.00
Aspal Bitumen
kg
M.061
4,958.00
11,000.00
Alat Bantu
Set
M.170
1.44
75,000.00
Hari Kerja
Kode
J U M LA H I I
No.
Peralatan
Jumlah
Jam Kerja
Harga
(Rp/jam)
1.00
3.00
E.084
15.00
2.00
3.00
E.154
30.00
38,000.00
Dump Truck 3 - 5 T
1.00
3.00
E.211
15.00
156,000.00
Blower
1.00
3.00
15.00
16,802.57
156,000.00
J U M LA H I I I
LABUR ASPAL DUA LAPIS (BURDA)
VOLUME :
1,800.00
satuan m2
40,305.58
4,030.56
44,336.13
KODE
(MENGGUNAKAN ALAT)
Q 06
Tanggal :
#REF!
4. Permukaan yang akan diaspal telah selesai dipadatkan dan terikat dengan binder
5. Lapis seal/penutup menggunakan aspal catback @ 1,5 kg/m2 dan 1,2 kg/m2
6. Agregat ukuran 19 mm dan 9,5 mm dihampar dari dumptruck penghampar
Biaya
Sub Total
Rp
Rp
255,000.00
390,000.00
270,000.00
150,000.00
105,000.00
300,000.00
1,440,000.00
Pekerja
2,910,000.00
Biaya
Sub Total
(Rp)
(Rp)
6,402,000.00
2,520,000.00
54,538,000.00
108,000.00
Material
63,568,000.00
Biaya
Sub Total
(Rp)
(Rp)
2,340,000.00
1,140,000.00
2,340,000.00
252,038.55
Per m2
Per m2
Peralatan
6,072,038.55
Total (Rp)
72,550,038.55
(MENGGUNAKAN BURUH)
Propinsi :
Kota :
JAWA BARAT
DEPOK
Disiapkan Oleh :
Dec-99
Proses :
Anggapan :
No.
Pekerja
Vol.
Hari
Kode
Total Vol.
Upah
Org-hari
(Rp/Org/Hari)
Mandor
2.00
3.00
6.00
85,000.00
Operator Terlatih
2.00
3.00
6.00
65,000.00
Pembantu Operator
2.00
3.00
6.00
45,000.00
SUPIR TRUK
1.00
3.00
3.00
50,000.00
KENEK TRUK
1.00
3.00
3.00
35,000.00
Pekerja Terampil
2.00
3.00
6.00
50,000.00
Pekerja
66.00
3.00
198.00
40,000.00
J U M LA H I
No
Material
Satuan
Kode
Total Vol.
Harga
(Rp/Unit)
Batu Pecah 3 - 5 cm
m3
M.023
71.40
189,000.00
Batu Pecah 1 - 2 cm
M.025
22.31
194,000.00
m3
M.026
12.50
168,000.00
Aspal Bitumen
Kg
M.061
5,712.00
11,000.00
Alat Bantu
Set
M.170
8.16
75,000.00
Hari Kerja
Kode
J U M LA H I I
No.
Peralatan
Jumlah
Jam Kerja
Harga
(Rp/jam)
1.00
3.00
E.080
15.00
2.00
3.00
E.154
30.00
38,000.00
1.00
3.00
E.211
15.00
163,000.00
Blower
1.00
3.00
15.00
16,802.57
75,900.00
J U M LA H I I I
LAPIS PENETRASI/PERMUKAAN MAKADAM 50 MM LAPEN
VOLUME :
1,400.00
satuan m2
69,990.91
6,999.09
76,990.00
KODE
(MENGGUNAKAN BURUH)
Q 07
Tanggal :
#REF!
Biaya
Sub Total
Rp
Rp
510,000.00
390,000.00
270,000.00
150,000.00
105,000.00
300,000.00
7,920,000.00
Pekerja
9,645,000.00
Biaya
Sub Total
(Rp)
(Rp)
13,494,600.00
4,328,140.00
2,100,000.00
62,832,000.00
612,000.00
Material
83,366,740.00
Biaya
Sub Total
(Rp)
(Rp)
1,138,500.00
1,140,000.00
2,445,000.00
252,038.55
Per m2
Per m2
Peralatan
4,975,538.55
Total (Rp)
97,987,278.55
(PRIME COAT)
Propinsi :
Kota :
JAWA BARAT
DEPOK
Disiapkan Oleh :
Dec-99
Proses :
Anggapan :
2. Perbandingan aspal dengan minyak tanah = 100 bagian aspal : 100 bagian minyak tanah
berdasarkan berat
Maret 1992
No.
Pekerja
Vol.
Hari
Kode
0.50
Total Vol.
Upah
Org-hari
(Rp/Org/Hari)
Mandor
1.00
L.061
0.50
85,000.00
Operator Terlatih
1.00
###
L.081
1.00
65,000.00
Pembantu Operator
1.00
###
L.083
1.00
45,000.00
Pekerja
4.00
L.101
4.00
40,000.00
1.00
J U M LA H I
No
Material
Satuan
Kode
Total Vol.
Harga
(Rp/Unit)
Aspal Bitumen
510.00
kg
M.061
510.00
Minyak Tanah
599.00
lt
M.065
599.00
13,000.00
Alat Bantu
Set
M.170
0.16
75,000.00
Hari Kerja
Kode
0.16
11,000.00
J U M LA H I I
No.
Peralatan
Jumlah
1.00
1.00
Blower
1.00
1.00
Jam Kerja
E.154
Harga
(Rp/jam)
5.00
38,000.00
5.00
16,802.57
J U M LA H I I I
LAPIS ASPAL RESAP PELEKAT (Prime Coat)
VOLUME :
1,000.00
satuan M2
13,995.51
1,399.55
15,395.06
KODE
(PRIME COAT)
Q 08
Tanggal :
#REF!
2. Perbandingan aspal dengan minyak tanah = 100 bagian aspal : 100 bagian minyak tanah
Biaya
Sub Total
Rp
Rp
42,500.00
65,000.00
45,000.00
160,000.00
Pekerja
312,500.00
Biaya
Sub Total
(Rp)
(Rp)
5,610,000.00
7,787,000.00
12,000.00
Material
13,409,000.00
Biaya
Sub Total
(Rp)
(Rp)
190,000.00
84,012.85
per M2
per M2
Peralatan
274,012.85
Total (Rp)
13,995,512.85
(TACK COAT)
Propinsi :
Kota :
JAWA BARAT
DEPOK
Disiapkan Oleh :
Dec-99
Proses :
Anggapan :
2. Perbandingan aspal dengan minyak tanah = 100 bagian aspal : 25 bagian minyak tanah
berdasarkan berat
Maret 1992
No.
Pekerja
Vol.
Hari
Kode
Total Vol.
Upah
Org-hari
(Rp/Org/Hari)
Mandor
1.00
0.50
0.50
85,000.00
Operator Terlatih
2.00
1.00
1.00
65,000.00
Pembantu Operator
2.00
1.00
1.00
45,000.00
Pekerja
4.00
1.00
2.00
40,000.00
J U M LA H I
No
Material
Satuan
Kode
Total Vol.
Harga
(Rp/Unit)
Aspal Bitumen
kg
M.061
98.00
11,000.00
Minyak Tanah
lt
M.065
29.00
13,000.00
Alat Bantu
Set
M.170
0.08
75,000.00
Hari Kerja
Kode
J U M LA H I I
No.
Peralatan
Jumlah
Jam Kerja
Harga
(Rp/jam)
1.00
1.00
E.154
3.00
38,000.00
1.00
1.00
E.301
1.00
75,900.00
Blower
1.00
1.00
3.00
16,802.57
J U M LA H I I I
LAPIS ASPAL PELEKAT (Tack Coat)
VOLUME :
600.00 Satuan M2
3,223.01
322.30
3,545.31
KODE
(TACK COAT)
Q 09
Tanggal :
#REF!
2. Perbandingan aspal dengan minyak tanah = 100 bagian aspal : 25 bagian minyak tanah
Biaya
Sub Total
Rp
Rp
42,500.00
65,000.00
45,000.00
80,000.00
Pekerja
232,500.00
Biaya
Sub Total
(Rp)
(Rp)
1,078,000.00
377,000.00
6,000.00
Material
1,461,000.00
Biaya
Sub Total
(Rp)
(Rp)
114,000.00
75,900.00
50,407.71
Per M2
Per M2
Peralatan
240,307.71
Total (Rp)
1,933,807.71
(MENGGUNAKAN ALAT)
Propinsi :
Kota :
JAWA BARAT
DEPOK
Disiapkan Oleh :
Dec-99
Proses :
Anggapan :
2. Hot Roller Sheet (Lataston) dikirim kelokasi oleh pemasok dari AMP
Maret 1992
No.
5. Sesuai spek B.M No. 12/PT/B/1983 (tabel 3.3) dan rev. Spek Umum B.M. Maret 89 buku 3
Pekerja
Vol.
Hari
Kode
Total Vol.
Upah
Org-hari
(Rp/Org/Hari)
Mandor
1.00
1.00
85,000.00
Operator Terlatih
4.00
###
1.00
4.00
65,000.00
Pembantu Operator
4.00
1.00
4.00
45,000.00
Pekerja Terampil
8.00
1.00
8.00
50,000.00
Pekerja
12.00
1.00
12.00
40,000.00
J U M LA H I
No
Material
Satuan
Kode
Total Vol.
Harga
(Rp/Unit)
HRS (LATASTON)
Ton
100.00
900,000.00
Aspal Bitumen
kg
M.061
600.00
11,000.00
Minyak Tanah
lt
M.065
150.00
13,000.00
Alat Bantu
Set
M.170
0.48
75,000.00
Hari Kerja
Kode
J U M LA H I I
No.
Peralatan
Jumlah
Jam Kerja
Harga
(Rp/jam)
1.00
1.00
E.081
5.00
113,000.00
1.00
1.00
E.084
5.00
156,000.00
1.00
1.00
E.153
5.00
112,960.66
1.00
1.00
E.157
5.00
188,000.00
1.00
1.00
E.301
4.00
81,000.00
J U M LA H I I I
PENGHAMPARAN LAPIS TIPIS ASPAL BETON - LATASTON
VOLUME :
1,500.00
satuan m2
68,776.54
6,877.65
75,654.19
KODE
(MENGGUNAKAN ALAT)
Q 10
Tanggal :
#REF!
5. Sesuai spek B.M No. 12/PT/B/1983 (tabel 3.3) dan rev. Spek Umum B.M. Maret 89 buku 3
Biaya
Sub Total
Rp
Rp
85,000.00
260,000.00
180,000.00
400,000.00
480,000.00
Pekerja
1,405,000.00
Biaya
Sub Total
(Rp)
(Rp)
90,000,000.00
6,600,000.00
1,950,000.00
36,000.00
Material
98,586,000.00
Biaya
Sub Total
(Rp)
(Rp)
565,000.00
780,000.00
564,803.30
940,000.00
324,000.00
Per m2
Per m2
Peralatan
3,173,803.30
Total (Rp)
103,164,803.30
Propinsi :
Kota :
JAWA BARAT
DEPOK
Disiapkan Oleh :
Dec-99
Proses :
Anggapan :
2. Hot Roller Sheet (Lataston) dikirim kelokasi oleh pemasok dari AMP
Maret 1992
No.
5. Sesuai spek B.M No. 12/PT/B/1983 (tabel 3.3) dan rev. Spek Umum B.M. Maret 89 buku 3
Pekerja
Vol.
Hari
Kode
Total Vol.
Upah
Org-hari
(Rp/Org/Hari)
Mandor
1.00
1.00
85,000.00
Operator Terlatih
2.00
###
1.00
2.00
65,000.00
Pembantu Operator
2.00
1.00
2.00
45,000.00
Pekerja Terampil
8.00
1.00
8.00
50,000.00
Pekerja
12.00
1.00
12.00
40,000.00
J U M LA H I
No
Material
Satuan
Kode
Total Vol.
Harga
(Rp/Unit)
HRS (LATASTON)
Ton
100.00
900,000.00
Aspal Bitumen
kg
M.061
600.00
11,000.00
Minyak Tanah
lt
M.065
150.00
13,000.00
Alat Bantu
Set
M.170
0.48
75,000.00
Hari Kerja
Kode
J U M LA H I I
No.
Peralatan
Jumlah
Jam Kerja
Harga
(Rp/jam)
1.00
1.00
E.081
5.00
113,000.00
1.00
E.084
156,000.00
1.00
E.153
112,960.66
1.00
E.157
188,000.00
1.00
1.00
E.301
4.00
81,000.00
J U M LA H I I I
PENGHAMPARAN LAPIS TIPIS ASPAL BETON
VOLUME :
1,500.00
satuan m2
67,106.67
6,710.67
73,817.33
KODE
Q 11
Tanggal :
#REF!
5. Sesuai spek B.M No. 12/PT/B/1983 (tabel 3.3) dan rev. Spek Umum B.M. Maret 89 buku 3
Biaya
Sub Total
Rp
Rp
85,000.00
130,000.00
90,000.00
400,000.00
480,000.00
Pekerja
1,185,000.00
Biaya
Sub Total
(Rp)
(Rp)
90,000,000.00
6,600,000.00
1,950,000.00
36,000.00
Material
98,586,000.00
Biaya
Sub Total
(Rp)
(Rp)
565,000.00
324,000.00
Per m2
Per m2
Peralatan
889,000.00
Total (Rp)
100,660,000.00
(MENGGUNAKAN ALAT)
Propinsi :
Kota :
JAWA BARAT
DEPOK
Disiapkan Oleh :
Dec-99
Proses :
Anggapan :
dari pemasok
5. Sesuai spek B.M No. 12/PT/B/1983 (tabel 3.3) dan rev. Spek Umum B.M. Maret 89 buku 3
6. Lapis tack/pengikat aspal cutback dihampar @ 0,5 ltr/m2
No.
Pekerja
Vol.
Hari
Kode
Total Vol.
Upah
Org-hari
(Rp/Org/Hari)
Mandor
1.00
1.00
85,000.00
Operator Terlatih
5.00
###
1.00
5.00
65,000.00
Pembantu Operator
5.00
1.00
5.00
45,000.00
Pekerja Terampil
10.00
1.00
10.00
50,000.00
Pekerja
15.00
1.00
15.00
40,000.00
J U M LA H I
No
Material
Satuan
Kode
Total Vol.
Harga
(Rp/Unit)
LASTON AC
Ton
100.00
809,000.00
Pasir Beton
m3
M.041
0.90
210,000.00
Aspal Bitumen
kg
M.061
360.00
11,000.00
lt
M.065
90.00
13,000.00
Alat Bantu
Set
M.170
0.48
75,000.00
Hari Kerja
Kode
J U M LA H I I
No.
Peralatan
Jumlah
Jam Kerja
Harga
(Rp/jam)
1.00
1.00
E.080
5.00
75,900.00
1.00
1.00
E.081
5.00
113,000.00
1.00
1.00
E.084
5.00
156,000.00
1.00
1.00
E.153
3.00
112,960.66
1.00
1.00
E.157
5.00
188,000.00
1.00
1.00
E.301
4.00
81,000.00
J U M LA H I I I
PENGHAMPARAN LAPIS ASPAL BETON-LASTON AC
VOLUME :
900.00
satuan m2
101,463.76
10,146.38
111,610.13
KODE
(MENGGUNAKAN ALAT)
Q 12
Tanggal :
#REF!
5. Sesuai spek B.M No. 12/PT/B/1983 (tabel 3.3) dan rev. Spek Umum B.M. Maret 89 buku 3
Biaya
Sub Total
Rp
Rp
85,000.00
325,000.00
225,000.00
500,000.00
600,000.00
Pekerja
1,735,000.00
Biaya
Sub Total
(Rp)
(Rp)
80,900,000.00
189,000.00
3,960,000.00
1,170,000.00
36,000.00
Material
86,255,000.00
Biaya
Sub Total
(Rp)
(Rp)
379,500.00
565,000.00
780,000.00
338,881.98
940,000.00
324,000.00
Per m2
Per m2
Peralatan
3,327,381.98
Total (Rp)
91,317,381.98
(MENGGUNAKAN BURUH)
Propinsi :
Kota :
JAWA BARAT
DEPOK
Disiapkan Oleh :
Dec-99
Proses :
Anggapan :
oleh pemasok
4. Biaya alat bantu tambahan sudah termasuk biaya kira-kira ekivalen dari
No.
Pekerja
Vol.
Hari
Kode
Total Vol.
Upah
Org-hari
(Rp/Org/Hari)
1.00
1.00
55,000.00
4.00
###
1.00
4.00
50,000.00
Pekerja
12.00
1.00
12.00
40,000.00
J U M LA H I
No
Material
Satuan
Kode
Batu Belah 10 - 15 cm
m3
M.020
Pasir Pasang
Semen Portland
zak
Alat Bantu
Total Vol.
Harga
(Rp/Unit)
6.00
158,000.00
M.042
1.00
189,000.00
M.080
18.00
61,000.00
Set
M.170
0.75
75,000.00
Hari Kerja
Kode
J U M LA H I I
No.
Peralatan
Jumlah
1.00
1.00
Jam Kerja
E.341
2.00
Harga
(Rp/jam)
63,000.00
J U M LA H I I I
KONSTRUKSI PASANGAN BATU ADUKAN 1 : 5
VOLUME :
5.00
satuan m3
630,450.00
63,045.00
693,495.00
KODE
(MENGGUNAKAN BURUH)
K.705
Tanggal :
#REF!
4. Biaya alat bantu tambahan sudah termasuk biaya kira-kira ekivalen dari
Biaya
Sub Total
Rp
Rp
55,000.00
200,000.00
480,000.00
Pekerja
735,000.00
Biaya
Sub Total
(Rp)
(Rp)
948,000.00
189,000.00
1,098,000.00
56,250.00
Material
2,291,250.00
Biaya
Sub Total
(Rp)
(Rp)
126,000.00
Per m3
Per m3
Peralatan
126,000.00
Total (Rp)
3,152,250.00
Propinsi :
Kota :
JAWA BARAT
DEPOK
Disiapkan Oleh :
Dec-99
Proses :
Anggapan :
acuan
No.
Pekerja
Vol.
Hari
Kode
Total Vol.
Upah
Org-hari
(Rp/Org/Hari)
1.00
1.00
50,000.00
Tukang Kayu
4.00
###
1.00
4.00
50,000.00
Pekerja Terampil
3.00
1.00
3.00
50,000.00
Pekerja
7.00
1.00
7.00
40,000.00
J U M LA H I
No
Material
Satuan
Kode
Total Vol.
Harga
(Rp/Unit)
m3
M.180
0.60
Paku
kg
M.166
4.00
18,000.00
Alat Bantu
Set
M.170
0.56
75,000.00
Hari Kerja
Kode
2,205,000.00
J U M LA H I I
No.
Peralatan
Jumlah
Jam Kerja
Harga
(Rp/jam)
1
J U M LA H I I I
BEKISTING
VOLUME :
20.00
satuan m2
105,850.00
10,585.00
116,435.00
KODE
I 01
Tanggal :
#REF!
Biaya
Sub Total
Rp
Rp
50,000.00
200,000.00
150,000.00
280,000.00
Pekerja
680,000.00
Biaya
Sub Total
(Rp)
(Rp)
1,323,000.00
72,000.00
42,000.00
Material
Biaya
Sub Total
(Rp)
(Rp)
Peralatan
Total (Rp)
Per m2
Per m2
1,437,000.00
2,117,000.00
Propinsi :
Kota :
JAWA BARAT
DEPOK
Disiapkan Oleh :
Dec-99
Proses :
Anggapan :
No.
Pekerja
Vol.
Hari
Kode
Total Vol.
Upah
Org-hari
(Rp/Org/Hari)
Mandor
1.00
###
1.00
85,000.00
1.00
###
1.00
55,000.00
Pekerja Terampil
1.00
###
1.00
50,000.00
Pekerja
3.00
3.00
40,000.00
1.00
J U M LA H I
No
Material
Satuan
Kode
Total Vol.
Harga
(Rp/Unit)
Besi Beton U - 32
Kg
M.167
225.00
12,200.00
Alat Bantu
Set
M.170
0.12
75,000.00
Hari Kerja
Kode
J U M LA H I I
No.
Peralatan
Jumlah
Jam Kerja
Harga
(Rp/jam)
1
J U M LA H I I I
PENULANGAN BETON
VOLUME :
200.00
satuan kg
15,320.00
1,532.00
16,852.00
KODE
R 14
Tanggal :
#REF!
Biaya
Sub Total
Rp
Rp
85,000.00
55,000.00
50,000.00
120,000.00
Pekerja
310,000.00
Biaya
Sub Total
(Rp)
(Rp)
2,745,000.00
9,000.00
Material
Biaya
Sub Total
(Rp)
(Rp)
Peralatan
Total (Rp)
Per kg
Per kg
2,754,000.00
3,064,000.00
Propinsi :
Kota :
JAWA BARAT
DEPOK
Disiapkan Oleh :
Dec-99
Proses :
Anggapan :
No.
Pekerja
Vol.
Hari
Kode
Total Vol.
Upah
Org-hari
(Rp/Org/Hari)
Mandor
1.00
###
L.061
1.00
85,000.00
1.00
###
L.073
1.00
55,000.00
Pekerja Terampil
1.00
###
L.106
1.00
50,000.00
Pekerja
3.00
L.101
3.00
40,000.00
1.00
J U M LA H I
No
Material
Satuan
Kode
Total Vol.
Harga
(Rp/Unit)
Besi Beton U - 24
Kg
M.167
225.00
9,100.00
Alat Bantu
Set
M.170
0.12
75,000.00
Hari Kerja
Kode
J U M LA H I I
No.
Peralatan
Jumlah
Jam Kerja
Harga
(Rp/jam)
1
J U M LA H I I I
PENULANGAN BETON
VOLUME :
200.00
satuan kg
11,832.50
1,183.25
13,015.75
KODE
R 14a
Tanggal :
#REF!
Biaya
Sub Total
Rp
Rp
85,000.00
55,000.00
50,000.00
120,000.00
Pekerja
310,000.00
Biaya
Sub Total
(Rp)
(Rp)
2,047,500.00
9,000.00
Material
Biaya
Sub Total
(Rp)
(Rp)
Peralatan
Total (Rp)
Per kg
Per kg
2,056,500.00
2,366,500.00
Provinsi :
Kota :
JAWA BARAT
DEPOK
Disiapkan Oleh :
Dec-99
Proses :
Anggapan :
1. Tidak termasuk acuan dan tulangan besi beton yang sudah dipasang
No.
PEKERJA
Vol.
Hari
Kode
Total Vol.
Upah
Org-hari
(Rp/Org/Hari)
Mandor
1.00
###
1.00
85,000.00
Pekerja Terampil
1.00
###
1.00
50,000.00
Pekerja
12.00
40,000.00
12.00
1.00
J U M LA H I
No
MATERIAL
Satuan
Kode
Total Vol.
Harga
(Rp/Unit)
m3
M.041
48.00
609,000.00
Alat Bantu
Set
M.170
1.00
75,000.00
Jam Kerja
Kode
J U M LA H I I
No.
PERALATAN
Jumlah
2.00
7.00
Jam Kerja
E.089
14.00
Harga
(Rp/jam)
31,000.00
J U M LA H I I I
BETON NON STRUKTUR / RABAT KELAS Bo
VOLUME :
48.00
satuan m3
632,416.67
63,241.67
695,658.33
KODE
F 01
Tanggal :
#REF!
Biaya
Sub Total
Rp
Rp
85,000.00
50,000.00
480,000.00
Pekerja
615,000.00
Biaya
Sub Total
(Rp)
(Rp)
29,232,000.00
75,000.00
Material
29,307,000.00
Biaya
Sub Total
(Rp)
(Rp)
434,000.00
Per m3
Per m3
Peralatan
434,000.00
Total (Rp)
30,356,000.00
Provinsi :
Kota :
JAWA BARAT
DEPOK
Disiapkan Oleh :
Dec-99
Proses :
Anggapan :
1. Tidak termasuk acuan dan tulangan besi beton yang sudah dipasang
No.
Pekerja
Vol.
Hari
Kode
Total Vol.
Upah
Org-hari
(Rp/Org/Hari)
Mandor
1.00
###
1.00
85,000.00
Pekerja Terampil
1.00
###
1.00
50,000.00
Pekerja
12.00
40,000.00
12.00
1.00
J U M LA H I
No
Material
Satuan
Kode
Total Vol.
Harga
(Rp/Unit)
m3
M.041
48.00
599,000.00
Alat Bantu
Set
M.170
1.00
75,000.00
Jam Kerja
Kode
J U M LA H I I
No.
Peralatan
Jumlah
2.00
7.00
Jam Kerja
E.089
14.00
Harga
(Rp/jam)
31,000.00
J U M LA H I I I
BETON STRUKTUR K.125
VOLUME :
48.00
satuan m3
622,416.67
62,241.67
684,658.33
KODE
F 02
Tanggal :
#REF!
Biaya
Sub Total
Rp
Rp
85,000.00
50,000.00
480,000.00
Pekerja
615,000.00
Biaya
Sub Total
(Rp)
(Rp)
28,752,000.00
75,000.00
Material
28,827,000.00
Biaya
Sub Total
(Rp)
(Rp)
434,000.00
Per m3
Per m3
Peralatan
434,000.00
Total (Rp)
29,876,000.00
Provinsi :
Kota :
JAWA BARAT
DEPOK
Disiapkan Oleh :
Dec-99
Proses :
Anggapan :
1. Tidak termasuk acuan dan tulangan besi beton yang sudah dipasang
No.
Pekerja
Vol.
Hari
Kode
Total Vol.
Upah
Org-hari
(Rp/Org/Hari)
Mandor
1.00
###
1.00
85,000.00
Pekerja Terampil
1.00
###
1.00
50,000.00
Pekerja
12.00
40,000.00
12.00
1.00
J U M LA H I
No
Material
Satuan
Kode
Total Vol.
Harga
(Rp/Unit)
m3
M.041
48.00
618,000.00
Alat Bantu
Set
M.170
1.00
75,000.00
Jam Kerja
Kode
J U M LA H I I
No.
Peralatan
Jumlah
2.00
7.00
Jam Kerja
E.089
14.00
Harga
(Rp/jam)
31,000.00
J U M LA H I I I
BETON STRUKTUR K.175
VOLUME :
48.00
satuan m3
641,416.67
64,141.67
705,558.33
KODE
F 03
Tanggal :
#REF!
Biaya
Sub Total
Rp
Rp
85,000.00
50,000.00
480,000.00
Pekerja
615,000.00
Biaya
Sub Total
(Rp)
(Rp)
29,664,000.00
75,000.00
Material
29,739,000.00
Biaya
Sub Total
(Rp)
(Rp)
434,000.00
Per m3
Per m3
Peralatan
434,000.00
Total (Rp)
30,788,000.00
Provinsi :
Kota :
JAWA BARAT
DEPOK
Disiapkan Oleh :
Dec-99
Proses :
Anggapan :
1. Tidak termasuk acuan dan tulangan besi beton yang sudah dipasang
No.
Pekerja
Vol.
Hari
Kode
Total Vol.
Upah
Org-hari
(Rp/Org/Hari)
Mandor
1.00
###
1.00
85,000.00
Pekerja Terampil
1.00
###
1.00
50,000.00
Pekerja
12.00
40,000.00
12.00
1.00
J U M LA H I
No
Material
Satuan
Kode
Total Vol.
Harga
(Rp/Unit)
m3
M.041
48.00
683,000.00
Alat Bantu
Set
M.170
2.00
75,000.00
Jam Kerja
Kode
J U M LA H I I
No.
Peralatan
Jumlah
2.00
7.00
Jam Kerja
E.089
14.00
Harga
(Rp/jam)
31,000.00
J U M LA H I I I
BETON STRUKTUR K.225
VOLUME :
48.00
satuan m3
707,979.17
70,797.92
778,777.08
KODE
F 04
Tanggal :
#REF!
Biaya
Sub Total
Rp
Rp
85,000.00
50,000.00
480,000.00
Pekerja
615,000.00
Biaya
Sub Total
(Rp)
(Rp)
32,784,000.00
150,000.00
Material
32,934,000.00
Biaya
Sub Total
(Rp)
(Rp)
434,000.00
Per m3
Per m3
Peralatan
434,000.00
Total (Rp)
33,983,000.00
Provinsi :
Kota :
JAWA BARAT
DEPOK
Disiapkan Oleh :
Dec-99
Proses :
Anggapan :
1. Tidak termasuk acuan dan tulangan besi beton yang sudah dipasang
No.
Pekerja
Vol.
Hari
Kode
Total Vol.
Upah
Org-hari
(Rp/Org/Hari)
Mandor
1.00
###
1.00
85,000.00
Pekerja Terampil
1.00
###
1.00
50,000.00
Pekerja
12.00
40,000.00
12.00
1.00
J U M LA H I
No
Material
Satuan
Kode
Total Vol.
Harga
(Rp/Unit)
m3
M.041
48.00
730,000.00
Alat Bantu
Set
M.170
2.00
75,000.00
Jam Kerja
Kode
J U M LA H I I
No.
Peralatan
Jumlah
2.00
7.00
Jam Kerja
E.089
14.00
Harga
(Rp/jam)
31,000.00
J U M LA H I I I
BETON STRUKTUR K.225
VOLUME :
48.00
satuan m3
754,979.17
75,497.92
830,477.08
KODE
F 04
Tanggal :
#REF!
Biaya
Sub Total
Rp
Rp
85,000.00
50,000.00
480,000.00
Pekerja
615,000.00
Biaya
Sub Total
(Rp)
(Rp)
35,040,000.00
150,000.00
Material
35,190,000.00
Biaya
Sub Total
(Rp)
(Rp)
434,000.00
Per m3
Per m3
Peralatan
434,000.00
Total (Rp)
36,239,000.00
Provinsi :
Kota :
JAWA BARAT
DEPOK
Disiapkan Oleh :
Dec-99
Proses :
Anggapan :
1. Tidak termasuk acuan dan tulangan besi beton yang sudah dipasang
No.
Pekerja
Vol.
Hari
Kode
Total Vol.
Upah
Org-hari
(Rp/Org/Hari)
Mandor
1.00
###
1.00
85,000.00
Pekerja Terampil
1.00
###
1.00
50,000.00
Pekerja
12.00
40,000.00
12.00
1.00
J U M LA H I
No
Material
Satuan
Kode
Total Vol.
Harga
(Rp/Unit)
m3
M.041
48.00
760,000.00
Alat Bantu
Set
M.170
2.00
75,000.00
Jam Kerja
Kode
J U M LA H I I
No.
Peralatan
Jumlah
2.00
7.00
Jam Kerja
E.089
14.00
Harga
(Rp/jam)
31,000.00
J U M LA H I I I
BETON STRUKTUR K.350
VOLUME :
48.00
satuan m3
784,979.17
78,497.92
863,477.08
KODE
F 05
Tanggal :
#REF!
Biaya
Sub Total
Rp
Rp
85,000.00
50,000.00
480,000.00
Pekerja
615,000.00
Biaya
Sub Total
(Rp)
(Rp)
36,480,000.00
150,000.00
Material
36,630,000.00
Biaya
Sub Total
(Rp)
(Rp)
434,000.00
Per m3
Per m3
Peralatan
434,000.00
Total (Rp)
37,679,000.00