No
JENIS PEKERJAAN
PEKERJAAN PERSIAPAN
II
PEKERJAAN TANAH
III
IV
PEKERJAAN BETON 1 : 5
PEKERJAAN PLESTERAN
VI
PEKERJAAN FINISHING
Renc
Real
Jul-13
MASA
PEMELIHARAAN
Oct-13
KET.
Renc
Real
Renc
Real
Renc
Real
Renc
Real
Renc
Real
Renc
Real
-
__________________
Kabupaten
: Halmahera
Selatan
Kecamatan
Desa
: Bacan Timur
: WAYAMIGA
Jenis
Prasarana
Take Of Sheet
: Jalan Rabat
Beton
: Ds. WAYAMIGA
456
m
Lokasi
Volume
=
=
=
456 m
0.50 m
0.25 m
Volume
=
=
PXLxT
57 m3
Volume
total
( Luas Total ) x P
Volume
total
2 Meter
2. PEK. PAS. BATU KALI 1 : 5
0.10 M
Panjang Pondasi =
456 m
Luas I
0.04
Luas II
0.04 M2
Luas Total
=
=
=
36.48 m3
2M
456 M
1.8 M
0.1 M
Tanggal survey :
0. 25 M
0.08 M2
3. PEK. BETON 1 : 3 : 5
Panjang
Lebar
Tebal
0.30 M
0.1
Volume =
82.08 M3
Volume =
77.52 M3
Dibuat Oleh :
:
:
:
:
URAIAN
BAHAN
Semen
Batu
Pasir
Koral Beton
Balok
Papan
Besi dia 10 mm
Kawat Beton
Paku Campur
ALAT
Sekop
Cangkul
Tropol
Ember Cor
Benang Katun
UPAH
Tukang
Pekerja
MALUKU UTARA
HALMAHERA SELATAN
BACAN TIMUR
WAYAMIGA
SATUAN
Sak
M3
M3
M3
M3
M3
Staff
Kg
Kg
HARGA SATUAN
KETERANGAN
95,000
250,000
250,000
250,000
2,000,000
2,000,000
90,000
30,000
25,000
Sampai ke Lokasi
Sampai ke Lokasi
Sampai ke Lokasi
Sampai ke Lokasi
Sampai ke Lokasi
Sampai ke Lokasi
Sampai ke Lokasi
Sampai ke Lokasi
Sampai ke Lokasi
Bh
Bh
Bh
Bh
Bh
100,000
80,000
50,000
20,000
20,000
Sampai ke Lokasi
Sampai ke Lokasi
Sampai ke Lokasi
Sampai ke Lokasi
Sampai ke Lokasi
HOK
HOK
150,000
105,000
Di Desa
Di Desa
Dibuat
TPK
NARJU H. ABU
(..)
:
:
:
:
URAIAN
I.
1
2
3
4
5
6
7
8
9
II.
1
2
3
4
5
6
7
III.
1
2
3
MALUKU UTARA
HALMAHERA SELATAN
BACAN TIMUR
WAYAMIGA
TOTAL
BAHAN
Semen
457.00
Batu
44.00
Pasir
140.00
Koral Beton
71.00
Balok
1.00
Papan
1.00
Paku Campur
7.00
Prasasti
1.00
Papan Proyek
1.00
Sub Total 1
ALAT
Sekop
2.00
Cangkul
5.00
Tropol
2.00
Ember Cor
20.00
Hammer
2.00
Argo
1.00
Benang Katun
3.00
Sub Total 2
UPAH
Tukang
42
Pekerja
213
Honorium TPK
5
NO. RAB
:
Program
: Dana Desa
Jenis Kegiatan : JALAN RABAT BETON
Ukuran/Dimensi : ( 456 x 2 ) M
VOLUME
Dari
Dari
Swadaya Dana Desa
457.00
44.00
140.00
71.00
1.00
1.00
7.00
1.00
1.00
2
5
2
20
2
1
3
Satuan
Kategori
Biaya
Harga Satuan
Rp.
Jumlah Total ( Rp )
Dari
Dari
Swadaya
Dana Desa
Sak
M3
M3
M3
M3
M3
Kg
Bh
Bh
95,000
250,000
250,000
250,000
2,000,000
2,000,000
25,000
1,500,000
150,000
43,415,000
11,000,000
35,000,000
17,750,000
2,000,000
2,000,000
175,000
1,500,000
150,000
112,990,000
Bh
Bh
Bh
Bh
bh
bh
Bh
100,000
80,000
50,000
20,000
50,000
600,000
20,000
200,000
400,000
100,000
400,000
100,000
600,000
60,000
1,860,000
150,000
105,000
300,000
6,300,000
22,365,000
1,500,000
42
213
5
Sub Total 3
Sumber Dana
30,165,000
145,015,000
145,015,000
Diketahui
KADES
NARJU H. ABU
Dibuat
Ketua TPK
_________________
Pekerja
57
Satuan
M3
b. Tenaga
-
Pekerja
Mandor
a.
-
0.400
0.040
Oh
Oh
x
x
22.80 HOK
Volume
36.48
Batu Belah 15 / 20 cm
Semen Portland
Pasir pasang
1.200
136
0.544
M3
Kg
M3
x
x
x
43.78 M3
99.23 Sak
19.85 M3
Volume
36.48
Pekerja
Tukang Batu
Kepala Tukang
Mandor
1.500
0.600
0.060
0.075
Oh
Oh
Oh
Oh
x
x
x
x
Satuan
Bahan
82.08
Satuan
M3
Bahan
Semen Portland
Pasir Beton
Koral Beton
###
0.520
0.870
Kg
M3
M3
x
x
x
Pekerja
Tukang Batu
Kepala Tukang
Mandor
357.87 Sak
42.6816 M3
71.410 M3
Volume
Pekerja
82.080
b. Tenaga
-
Pekerja
54.72 HOK
21.89 HOK
2.19 HOK
Volume
Satuan
Bahan
b. Tenaga
a.
Bahan
1.650
0.250
0.025
0.080
Oh
Oh
Oh
Oh
x
x
x
x
Satuan
135.432 HOK
20.520 HOK
KEBUTUHAN BAHAN
DESA WAYAMIGA
I.
BAHAN
1
2
3
4
5
Semen
Batu Kali
Pasir
Koral Beton
Balok Kls III
6
7
8
9
II.
PEKERJA
1 Pekerja
2 Tukang Batu
VOLUME
VOL.
DIBULATKAN
457.09
43.78
140.05
71.410
1.00
457.00
44.00
140.00
71.00
1.00
1.00
2.00
2.00
7.00
1.00
2.00
2.00
7.00
HOK
212.95
42.41
HOK
DIBULATKAN
SATUAN
KET.
Sak
M3
M3
M3
M3
Ditaksir
M3
Staff
Kg
Kg
Ditaksir
Ditaksir
Ditaksir
Ditaksir
SATUAN
213.00 HOK
42 HOK
KET.
Form.25
PNPM - Mandiri Perdesaan
Halmahera Barat
: Taba Campaka
Dibuat Oleh
: Mariani H Muhammad
Jabatan
Tanggal diserahkan:
8. Volume sesuai
9. Harga wajar
James W. Lores
Fastekab
: Halmahera Selatan
Propinsi
: Maluku Utara
Kegiatan
NO.
URAIAN
I.
BAHAN
II.
Ukuran
Jumlah
No. RAB
Dana Desa
:
:
TOTAL DANA
112,990,000
112,990,000
77.92
ALAT
1,860,000
1,860,000
1.28
III. UPAH
30,165,000
30,165,000
20.80
145,015,000
145,015,000
30,165,000
145,015,000
145,015,000
100.00
100.00
JUMLAH
JUMLAH TOTAL
Jumlah Biaya Upah
Diketahui
KADES
NARJU H. ABU
Dibuat
TPK
__________________