Anda di halaman 1dari 257

DAFTAR ISI

Halaman
DAFTAR ISI ................................................................................................................... i
DAFTAR TABEL............................................................................................................ ii
DAFTAR GAMBAR ....................................................................................................... v
DAFTAR LAMPIRAN ................................................................................................... vi
LAPORAN HASIL PEMERIKSAAN ATAS LAPORAN KEUANGAN ..................... 1
LAPORAN KEUANGAN ............................................................................................... 3
1. LAPORAN REALISASI ANGGARAN ............................................................... 3
2. NERACA ............................................................................................................... 5
3. LAPORAN ARUS KAS ........................................................................................ 7
4. CATATAN ATAS LAPORAN KEUANGAN ..................................................... 9
GAMBARAN UMUM PEMERIKSAAN ....................................................................... 87
LAMPIRAN

BPK Perwakilan Provinsi Sumatera Selatan


i
DAFTAR TABEL
Halaman

Tabel 2.1 PDRB Kabupaten Banyuasin Menurut Lapangan Usaha atas Dasar
Harga Berlaku ......................................................................................... 14
Tabel 2.2 Laju Pertumbuhan Ekonomi Kabupaten Banyuasin Menurut Sektor
(%) 2009-2012 ........................................................................................ 14
Tabel 2.3 Anggaran dan Realisasi Belanja Masing-Masing SKPD Tahun 2013 .... 18
Tabel 4.1 Realisasi Pendapatan per Kelompok Pendapatan Kabupaten Banyuasin
Tahun Anggaran 2013............................................................................. 31
Tabel 4.2 Anggaran dan Realisasi PAD Kabupaten Banyuasin Tahun
2013. 32
Tabel 4.3 Rincian Pendapatan Pajak Daerah Kabupaten Banyuasin Tahun 2013 .. 32
Tabel 4.4 Rincian Pendapatan Retribusi Daerah Pemerintah Kabupaten
Banyuasin Tahun 2013. 34
Tabel 4.5 Rincian Retribusi Jasa Umum Pemerintah Kabupaten Banyuasin
Tahun 2013 ............................................................................................. 34
Tabel 4.6 Rincian Retribusi Jasa Usaha Pemerintah Kabupaten BanyuasinTahun
2013 ........................................................................................................ 35
Tabel 4.7 Rincian Pendapatan Retribusi Jasa Perizinan Tertentu Pemerintah
Kabupaten Banyuasin Tahun 2013 ......................................................... 35
Tabel 4.8 Rincian Lain-lain Pendapatan Asli Daerah yang Sah Pemerintah
Kabupaten Banyuasin Tahun 2013 ......................................................... 36
Tabel 4.9 Daftar Bunga Deposito ........................................................................... 37
Tabel 4.10 Pendapatan atas Bunga Deposito yang Ditangguhkan ............................ 37
Tabel 4.11 Rincian Penerimaan Lain-lain Pemerintah Kabupaten Banyuasin
Tahun 2013 ............................................................................................. 38
Tabel 4.12 Rincian Realisasi Pendapatan Lelang Lebak Lebung Tahun 2013 ......... 38
Tabel 4.13 Rincian Pendapatan Transfer - Dana Perimbangan Pemerintah
Kabupaten Banyuasin Tahun 2013 ......................................................... 39
Tabel 4.14 Rincian Pendapatan Transfer Pemerintah Pusat - Lainnya Dana 40
Penyesuaian Tahun 2013 ........................................................................
Tabel 4.15 Rincian Pendapatan Transfer Pemerintah Provinsi Dana Bagi Hasil 40
Pajak Tahun 2013 ...................................................................................
Tabel 4.16 Rincian Lain-lain Pendapatan yang Sah Tahun 2013 ............................. 41
Tabel 4.17 Rincian Belanja Daerah Pemerintah Kabupaten Banyuasin Tahun 2013 42
Tabel 4.18 Rincian Belanja Pegawai Pemerintah Kabupaten Banyuasin Tahun
2013 ........................................................................................................ 43
Tabel 4.19 Rincian Belanja Barang dan Jasa Pemerintah Kabupaten Banyuasin
Tahun 2013 ............................................................................................. 43
Tabel 4.20 Rincian Belanja Hibah PPKD Tahun 2013 ............................................. 44
Tabel 4.21 Rincian Belanja Hibah SKPD Tahun 2013 ............................................. 44
Tabel 4.22 Belanja Bantuan Sosial yang dikelola oleh PPKD.................................. 45
Tabel 4.23 Belanja Bantuan Sosial yang dikelola oleh SKPD Tahun 2013 ............. 46
Tabel 4.24 Rincian Belanja Bantuan Keuangan Tahun 2013 ................................... 46
Tabel 4.25 Rincian Belanja Bantuan Keuangan Partai Politik ................................. 47
Tabel 4.26 Daftar Belanja Modal menjadi Aset Tetap ............................................. 48

ii
BPK Perwakilan Provinsi Sumatera Selatan
Tabel 4.27 Rincian Belanja Modal Tanah Tahun 2013 ............................................ 50
Tabel 4.28 Rincian Belanja Modal Peralatan dan Mesin Tahun 2013 ...................... 51
Tabel 4.29 Rincian Belanja Modal Gedung dan Bangunan Tahun 2013 .................. 52
Tabel 4.30 Rincian Belanja Modal Jalan Irigasi dan Jaringan Tahun 2013.............. 53
Tabel 4.31 Rincian Belanja Modal Aset Tetap Lainnya Tahun 2013 ....................... 53
Tabel 4.32 Rincian Belanja Tak Terduga Tahun 2013 ............................................. 54
Tabel 4.33 Rincian Pengeluaran Pembiayaan Daerah Tahun 2013 .......................... 54
Tabel 4.34 Rincian SiLPA ........................................................................................ 55
Tabel 4.35 Rincian Aset Pemerintah Kabupaten Banyuasin .................................... 56
Tabel 4.36 Rincian Aset Lancar Pemerintah Kabupaten Banyuasin ........................ 57
Tabel 4.37 Rincian jumlah Kas danSetara Kas ......................................................... 57
Tabel 4.38 Rincian Kas di Kas Daerah Pemerintah Kabupaten Banyuasin .............. 57
Tabel 4.39 Rincian Kas di Bendahara Pengeluaran .................................................. 58
Tabel 4.40 Rincian Piutang Dana Perimbangan ....................................................... 60
Tabel 4.41 Rekapitulasi piutang terhadap anggota DPRD........................................ 60
Tabel 4.42 Rincian Piutang PFK............................................................................... 61
Tabel 4.43 Rincian Piutang Lainnya ......................................................................... 61
Tabel 4.44 Rincian Persediaan per Jenis Persediaan ................................................ 61
Tabel 4.45 Rincian Penyertaan Modal Pemerintah Kabupaten Banyuasin ............... 62
Tabel 4.46 Perhitungan Alokasi Kerugian atas Penyertaan pada PDAM Tirta
Betuah ...................................................................................................... 63
Tabel 4.47 Rincian Mutasi Aset Tetap Pemerintah Kabupaten Banyuasin .............. 63
Tabel 4.48 Rincian Mutasi Aset Tanah..................................................................... 63
Tabel 4.49 Rincian Mutasi Aset Peralatan dan Mesin .............................................. 64
Tabel 4.50 Rincian Mutasi Aset Gedung dan Bangunan .......................................... 65
Tabel 4.51 Rincian Mutasi Aset Jalan Irigasi dan Jaringan ...................................... 66
Tabel 4.52 Rincian Mutasi Aset Tetap Lainnya........................................................ 67
Tabel 4.53 Rincian Konstruksi dalam Pengerjaan .................................................... 67
Tabel 4.54 Rincian Aset Lainnya.............................................................................. 68
Tabel 4.55 Rincian Aset Lain-lain ............................................................................ 68
Tabel 4.56 Rincian Tagihan Kepada Anggota DPRD .............................................. 69
Tabel 4.57 Rincian Detail Engeneering Design (DED) Dinas PU Bina Marga ....... 70
Tabel 4.58 Rincian Detail Engeneering Design (DED) Dinas PU Cipta Karya ....... 70
Tabel 4.59 Rincian Detail Engeneering Design (DED) Dinas PU Pengairan .......... 71
Tabel 4.60 Rincian Detail Engeneering Design (DED) BAPPEDA ........................ 71
Tabel 4.61 Rincian Detail Engeneering Design (DED) Dinas Kebersihan,
Pertamanan dan Pemakaman ................................................................... 72
Tabel 4.62 Rincian Detail Engeneering Design (DED) Dinas Tenaga Kerja dan
Transmigrasi ............................................................................................ 72
Tabel 4.63 Rincian Detail Engeneering Design (DED) Dinas Pariwisata Seni, 73
Budaya, Pemuda dan Olahraga ................................................................
Tabel 4.64 Rincian Detail Engeneering Design (DED) Dinas Pelayanan Keluarga
Berencana ................................................................................................ 73
Tabel 4.65 Rincian Detail Engeneering Design (DED) Dinas Pertanian dan 73
Peternakan ...............................................................................................
Tabel 4.66 Rincian Detail Engeneering Design (DED) Badan Lingkungan Hidup .
74

iii
BPK Perwakilan Provinsi Sumatera Selatan
Tabel 4.67 Rincian Detail Engeneering Design (DED) Badan Perpustakaan dan
arsip daerah ............................................................................................. 74
Tabel 4.68 Rincian Barang Rusak/Penghapusan ...................................................... 74
Tabel 4.69 Aset yang belum ditemukan fisiknya ...................................................... 75
Tabel 4.70 Rincian Utang Perhitungan Fihak Ketiga (PFK) .................................... 76
Tabel 4.71 Rincian Ekuitas Dana Lancar.................................................................. 77
Tabel 4.72 Rincian Sisa Lebih Pembiayaan Anggaran (SiLPA) .............................. 77
Tabel 4.73 Rincian Ekuitas Dana Investasi .............................................................. 78
Tabel 4.74 Rincian Arus Kas dari Aktivitas Operasi ................................................ 80
Tabel 4.75 Arus Kas dari Aktivitas Investasi Aset Non Keuangan .......................... 81
Tabel 4.76 Arus Kas dari Aktivitas Pembiayaan ...................................................... 82
Tabel 4.77 Arus Kas dari Aktivitas Non Anggaran .................................................. 82
Tabel 4.78 Rincian Saldo Akhir Arus Kas ................................................................ 83

iv
BPK Perwakilan Provinsi Sumatera Selatan
DAFTAR GAMBAR

Halaman

Gambar 4.1 Perbandingan Realisasi Pendapatan Tahun 2013.................................. 31


Gambar 4.2 Perbandingan Realisasi Belanja Tahun 2013 ........................................ 42
Gambar 4.3 Perbandingan Realisasi Belanja Modal Tahun Anggaran 2013 ............ 47
Gambar 4.4 Perbandingan Komposisi Aset Pemerintah Kabupaten Banyuasin per
31 Desember 2013 ................................................................................ 56

BPK Perwakilan Provinsi Sumatera Selatan


v
DAFTAR LAMPIRAN

Lampiran 1 Realisasi Belanja Hibah TA 2013


Lampiran 2 Realisasi Belanja Bantuan Sosial TA 2013
Lampiran 3 Daftar Belanja Modal yang Menjadi Aset per SKPD per Jenis Aset
per 31 Desember 2013
Lampiran 4 Daftar Rekening Kas Daerah per 31 Desember 2013
Lampiran 5 Kas di Bendahara Pengeluaran per 31 Desember 2013
Lampiran 6.a Daftar Piutang TP/TGR per 31 Desember 2013
Lampiran 6.b TP/TGR (Kasus Kerugian Daerah yang Sedang Dalam Proses
Penetapan Pembebanan) per 31 Desember 2013
Lampiran 7 Daftar Rekapitulasi Penyelesaian Kerugian Daerah atas Kelebihan
Belanja pada Dewan Perwakilan Rakyat Daerah (DPRD) Kab.
Banyuasin Tahun Anggaran 2003 s.d. Tahun Anggaran 2008
Lampiran 8 Rekapitulasi Piutang Lainnya per 31 Desember 2013
Lampiran 9 Daftar Saldo Persediaan per 31 Desember 2013
Lampiran 10 Daftar Mutasi Aset per SKPD per Jenis Aset per 31 Desember 2013 -
Tanah
Lampiran 11 Daftar Mutasi Aset per SKPD per Jenis Aset per 31 Desember 2013
Peralatan dan Mesin
Lampiran 12 Daftar Mutasi Aset per SKPD per Jenis Aset per 31 Desember 2013
Gedung dan Bangunan
Lampiran 13 Daftar Mutasi Aset per SKPD per Jenis Aset per 31 Desember 2013
Jalan, Irigasi, dan Jaringan
Lampiran 14 Daftar Mutasi Aset per SKPD per Jenis Aset per 31 Desember 2013
Aset Tetap Lainnya
Lampiran 15 Daftar Mutasi Aset per SKPD per Jenis Aset per 31 Desember 2013
Konstruksi Dalam Pengerjaan
Lampiran 16.a Aset yang Akan Dihibahkan Dinas PU Cipta Karya
Lampiran 16.b Aset yang Akan Dihibahkan Badan Ketahanan Pangan
Lampiran 17 Daftar Utang Jamsoskes, Jampersal dan Jamkesmas per 31 Desember
2013
Lampiran 18 Daftar Utang Jangka Pendek Lainnya Kabupaten Banyuasin per 31
Desember 2013

BPK Perwakilan Provinsi Sumatera Selatan


vi
BADAN PEMERIKSA KEUANGAN
REPUBLIK INDONESIA

LAPORAN HASIL PEMERIKSAAN


ATAS LAPORAN KEUANGAN

Berdasarkan Undang-Undang Nomor 15 Tahun 2004 tentang Pemeriksaan Pengelolaan


dan Tanggung Jawab Keuangan Negara dan Undang-Undang Nomor 15 Tahun 2006
tentang Badan Pemeriksa Keuangan serta Undang-Undang terkait lainnya, BPK telah
memeriksa Laporan Realisasi Anggaran Pemerintah Kabupaten Banyuasin untuk tahun
yang berakhir sampai dengan 31 Desember 2013, Neraca Pemerintah Kabupaten
Banyuasin tanggal 31 Desember 2013 dan 2012, dan Laporan Arus Kas untuk tahun yang
berakhir pada tanggal-tanggal tersebut serta Catatan atas Laporan Keuangan. Laporan
keuangan adalah tanggung jawab Pemerintah Kabupaten Banyuasin. Tanggung jawab
BPK terletak pada pernyataan opini atas laporan keuangan berdasarkan pemeriksaan yang
telah dilakukan.

BPK melaksanakan pemeriksaan berdasarkan Standar Pemeriksaan Keuangan Negara.


Standar tersebut mengharuskan BPK merencanakan dan melaksanakan pemeriksaan agar
memperoleh keyakinan yang memadai bahwa laporan keuangan bebas dari salah saji
material. Suatu pemeriksaan meliputi pengujian bukti-bukti yang mendukung jumlah-
jumlah dan pengungkapan dalam laporan keuangan. Pemeriksaan juga meliputi penilaian
atas penerapan prinsip akuntansi yang digunakan dan estimasi signifikan yang dibuat oleh
Pemerintah Kabupaten Banyuasin, penilaian atas kepatuhan terhadap ketentuan peraturan
perundang-undangan, penilaian atas keandalan sistem pengendalian intern yang
berdampak material terhadap laporan keuangan, serta penilaian terhadap penyajian atas
laporan keuangan secara keseluruhan. BPK yakin bahwa pemeriksaan tersebut
memberikan dasar yang memadai untuk menyatakan opini.

Menurut opini BPK, laporan keuangan yang disebut di atas menyajikan secara wajar,
dalam semua hal yang material, Realisasi Anggaran dan posisi keuangan Pemerintah
Kabupaten Banyuasin tanggal 31 Desember 2013 dan 2012, serta Arus Kas untuk tahun
yang berakhir pada tanggal-tanggal tersebut sesuai dengan Standar Akuntansi
Pemerintahan.

BPK PerwakilanProvinsi Sumatera Selatan 1


Untuk memperoleh keyakinan yang memadai atas kewajaran laporan keuangan tersebut,
BPK juga melakukan pemeriksaan terhadap sistem pengendalian intern dan kepatuhan
terhadap ketentuan perundang-undangan. Laporan hasil pemeriksaan atas Sistem
Pengendalian Intern dan Laporan hasil pemeriksaan atas Kepatuhan Terhadap Ketentuan
Peraturan Perundang-undangan disajikan dalam Laporan Nomor
28.B/LHP/XVIII.PLG/05/2014 dan Nomor 28.C/LHP/XVIII.PLG/05/2014 tanggal 26
Mei 2014, yang merupakan bagian tidak terpisahkan dari laporan ini.

Palembang, 23 Mei 2014


BADAN PEMERIKSA KEUANGAN
REPUBLIK INDONESIA
PerwakilanProvinsi Sumatera Selatan,
PenanggungjawabPemeriksaan,

Novy G.A. Pelenkahu


Akuntan,Register Negara No.D-14827

BPK PerwakilanProvinsi Sumatera Selatan 2


LAPORAN KEUANGAN

1. LAPORAN REALISASI ANGGARAN

PEMERINTAH KABUPATEN BANYUASIN


LAPORAN REALISASI ANGGARAN PENDAPATAN DAN BELANJA
Untuk Tahun yang Berakhir sampai dengan 31 Desember 2013 dan 2012

(dalam rupiah)

NO URAIAN Ref ANGGARAN 2013 REALISASI 2013 % REALISASI 2012

1 PENDAPATAN 4.1.1
2 PENDAPATAN ASLI DAERAH 4.1.1.1
3 Pendapatan Pajak Daerah 4.1.1.1.1 19.053.055.123,10 31.068.706.961,50 163,06 25.771.804.113,50
4 Pendapatan Retribusi Daerah 4.1.1.1.2 27.829.108.900,00 30.834.820.843,10 110,80 24.074.875.998,77
5 Pendapatan Hasil Pengelolaan Kekayaan Daerah yang
4.1.1.1.3 817.451.610,00 1.891.776.235,73 231,42 2.809.634.764,67
Dipisahkan
6 Lain-lain Pendapatan Asli Daerah yang Sah 4.1.1.1.4 6.570.656.599,42 17.569.082.842,91 267,39 15.110.892.373,75
7 Jumlah Pendapatan Asli Daerah (3 s.d 6) 54.270.272.232,52 81.364.386.883,24 149,92 67.767.207.250,69
8 PENDAPATAN TRANSFER 4.1.1.2
9 Transfer dari Pemerintah Pusat Dana Perimbangan 4.1.1.2.1
10 Dana Bagi Hasil Pajak 4.1.1.2.1.1 169.641.690.439,00 164.445.668.681,00 96,94 150.904.713.706,00
11 Dana Bagi Hasil Sumber Daya Alam 4.1.1.2.1.2 207.673.789.312,92 210.745.575.432,00 101,48 216.033.376.450,00
12 Dana Alokasi Umum 4.1.1.2.1.3 772.464.315.000,00 772.464.315.000,00 100,00 651.357.692.000,00
13 Dana Alokasi Khusus 4.1.1.2.1.4 147.190.480.000,00 147.190.480.000,00 100,00 97.453.050.000,00
14 Jumlah Pendapatan Transfer Dana Perimbangan
1.296.970.274.751,92 1.294.846.039.113,00 99,84 1.115.748.832.156,00
(10 s.d 13)
15 Transfer dari Pemerintah Pusat Lainnya 4.1.1.2.2
16 Dana Otonomi Khusus 4.1.1.2.2.1 0,00 0,00 0,00 0,00
17 Dana Penyesuaian 4.1.1.2.2.2 170.389.389.500,00 168.721.797.000,00 99,02 148.274.598.709,00
18 Jumlah Pendapatan Transfer Pemerintah Pusat
170.389.389.500,00 168.721.797.000,00 99,02 148.274.598.709,00
Lainnya (16 s.d 17)
19 Transfer Pemerintah Provinsi 4.1.1.2.3
20 Pendapatan Bagi Hasil Pajak 4.1.1.2.3.1 28.711.914.400,00 6.568.401.600,00 22,88 29.096.882.836,27
21 Pendapatan Bagi Hasil Lainnya 4.1.1.2.3.2 0,00 0,00 0,00 0,00
22 Jumlah Pendapatan Transfer Pemerintah
28.711.914.400,00 6.568.401.600,00 22,88 29.096.882.836,27
Provinsi (20 s.d 21)
23 Jumlah Pendapatan Transfer (14+18+22) 1.496.071.578.651,92 1.470.136.237.713,00 98,27 1.293.120.313.701,27
24 LAIN-LAIN PENDAPATAN YANG SAH 4.1.1.3
25 Pendapatan Hibah 4.1.1.3.1 0,00 - 0,00 197.729.094,00
26 Pendapatan Dana Darurat 4.1.1.3.2 0,00 0,00 0,00 0,00
27 Pendapatan Lainnya 4.1.1.3.3 105.609.349.000,00 112.179.164.654,00 106,22 31.552.357.924,00
28 Jumlah Lain-lain Pendapatan yang Sah
105.609.349.000,00 112.179.164.654,00 106,22 31.750.087.018,00
(25 s.d 27)
29 JUMLAH PENDAPATAN (7+23+28) 1.655.951.199.884,44 1.663.679.789.250,24 100,47 1.392.637.607.969,96

30 BELANJA 4.1.2
31 BELANJA OPERASI 4.1.2.1
32 Belanja Pegawai 4.1.2.1.1 652.137.729.331,36 592.097.166.177,00 90,79 539.395.295.010,00
33 Belanja Barang 4.1.2.1.2 410.217.893.550,45 377.872.151.087,63 92,11 320.918.526.678,99
34 Belanja Bunga 4.1.2.1.3 0,00 0,00 0,00 0,00
35 Belanja Subsidi 4.1.2.1.4 0,00 0,00 0,00 408.000.000,00
36 Belanja Hibah 4.1.2.1.5 122.298.329.765,00 101.749.175.090,00 83,20 33.443.595.775,00
37 Belanja Bantuan Sosial 4.1.2.1.6 6.751.901.150,00 6.244.534.000,00 92,49 5.142.580.000,00
38 Belanja Bantuan Keuangan 4.1.2.1.7 29.343.760.000,00 29.158.727.525,00 99,37 29.298.154.525,00
39 Jumlah Belanja Operasi (32 s.d 38) 1.220.749.613.796,81 1.107.121.753.879,63 90,69 928.606.151.988,99
40 BELANJA MODAL 4.1.2.2
41 Belanja Tanah 4.1.2.2.1 10.388.211.410,00 6.209.266.322,00 59,77 7.016.917.912,83
42 Belanja Peralatan dan Mesin 4.1.2.2.2 113.281.823.835,00 106.884.769.126,00 94,35 57.277.278.559,00
43 Belanja Gedung dan Bangunan 4.1.2.2.3 107.220.486.235,00 103.380.603.400,00 96,42 123.141.646.175,00
44 Belanja Jalan, Irigasi dan Jaringan 4.1.2.2.4 331.804.014.643,00 319.532.260.175,00 96,30 140.221.582.232,50
45 Belanja Aset Tetap Lainnya 4.1.2.2.5 42.515.805.000,00 25.746.763.636,00 60,56 10.075.558.420,00
46 Belanja Aset Lainnya 4.1.2.2.6 0,00 0,00 0,00 0,00
47 Jumlah Belanja Modal (41 s.d 46) 605.210.341.123,00 561.753.662.659,00 92,82 337.732.983.299,33
48 BELANJA TAK TERDUGA 4.1.2.3
49 Belanja Tak Terduga 4.1.2.3.1 284.360.169,00 25.213.322,00 8,87 554.660.000,00
50 Jumlah Belanja Tidak Terduga (49) 284.360.169,00 25.213.322,00 8,87 554.660.000,00
51 JUMLAH BELANJA (39+47+50) 1.826.244.315.088,81 1.668.900.629.860,63 91,38 1.266.893.795.288,32
NO URAIAN Ref ANGGARAN 2013 REALISASI 2013 % REALISASI 2012

52 TRANSFER
53 TRANSFER BAGI HASIL KE KAB/KOTA
54 Bagi Hasil Pajak 0,00 0,00 0,00 0,00
55 Bagi Hasil Retribusi 0,00 0,00 0,00 0,00
56 Bagi Hasil Pendapatan Lainnya 0,00 0,00 0,00 0,00
57 Jumlah Transfer/Bagi Hasil ke Desa (54 s.d 56) 0,00 0,00 0,00 0,00
58 JUMLAH BELANJA DAN TRANSFER (51+57) 1.826.244.315.088,81 1.668.900.629.860,63 91,38 1.266.893.795.288,32
59 JUMLAH SURPLUS/DEFISIT (170.293.115.204,37) (5.220.840.610,39) 3,07 125.743.812.681,64
60 PEMBIAYAAN 4.1.3
61 PENERIMAAN PEMBIAYAAN 4.1.3.1
62 Penggunaan Sisa Lebih Perhitungan Anggaran (SILPA) 4.1.3.1.1 192.422.116.156,00 192.443.988.035,43 100,01 88.754.577.587,29
63 Penerimaan Piutang Daerah 4.1.3.1.2 0,00 14.638.602.897,00 0,00 55.253.836,00
64 Jumlah Penerimaan Pembiayaan (62 s.d 63) 192.422.116.156,00 207.082.590.932,43 107,62 88.809.831.423,29
65 PENGELUARAN PEMBIAYAAN 4.1.3.2
66 Pembentukan Dana Cadangan 4.1.3.2.1 0,00 0,00 0,00 0,00
67 Penyertaan Modal (Investasi) Pemerintah Daerah 4.1.3.2.2 5.000.000.000,00 5.000.000.000,00 100,00 5.000.000.000,00
68 Pembayaran Pokok Utang 4.1.3.2.3 17.129.000.951,63 11.447.334.963,50 66,83 17.109.656.069,50
69 Jumlah Pengeluaran Pembiayaan (66 s.d 68) 22.129.000.951,63 16.447.334.963,50 74,32 22.109.656.069,50
70 PEMBIAYAAN NETTO (64-69) 170.293.115.204,37 190.635.255.968,93 111,95 66.700.175.353,79
71 SISA LEBIH PEMBIAYAAN ANGGARAN (SiLPA) (59+70) 0,00 185.414.415.358,54 0,00 192.443.988.035,43
Catatan atas Laporan Keuangan merupakan bagian yang tidak terpisahkan dari Laporan Keuangan Pokok
2. NERACA

PEMERINTAH KABUPATEN BANYUASIN


NERACA
Per 31 Desember 2013 dan 2012

(dalam rupiah)

No Uraian Ref 2013 2012

1 ASET 4.2.1
2 ASET LANCAR 4.2.1.1
3 Kas di Kas Daerah 4.2.1.1.1 99.384.566.996,54 182.240.776.880,43
4 Kas di Bendahara Pengeluaran 4.2.1.1.2 5.994.378.732,00 198.882.083,00
5 Kas di Bendahara Penerimaan 4.2.1.1.3 90.221.300,00 6.145.000,00
6 Kas dan Setara Kas (Deposito) 4.2.1.1.4 80.344.128.953,60 10.232.596.863,00
8 Piutang Pajak 4.2.1.1.5 30.876.570.111,62 806.682.754,62
9 Piutang Retribusi 4.2.1.1.6 46.985.000,00 81.835.142,00
10 Piutang Dana Perimbangan 4.2.1.1.7 48.121.965.663,72 24.897.397.913,72
11 Bagian Lancar Tuntutan Ganti Rugi 4.2.1.1.8 42.100.000,00 471.157.660,61
12 Piutang PFK 4.2.1.1.9 35.469.630,00 6.269.805,00
13 Bagian Lancar Piutang Dewan 4.2.1.1.10 1.336.779.914,00 0,00
14 Piutang Lainnya 4.2.1.1.11 156.800.000,00 86.200.000,00
15 Persediaan 4.2.1.1.12 9.929.754.640,77 9.632.090.066,33
16 Jumlah Aset Lancar (3 s.d 15) 276.359.720.942,25 228.660.034.168,71

17 INVESTASI JANGKA PANJANG 4.2.1.2


18 Investasi Permanen
19 Penyertaan Modal Pemerintah Daerah 4.2.1.2.1 73.116.238.659,42 70.479.482.589,36
20 Investasi Permanen Lainnya 4.2.1.2.2 0,00 0,00
21 Jumlah Investasi Jangka Panjang (19 + 20) 73.116.238.659,42 70.479.482.589,36

22 ASET TETAP 4.2.1.3


23 Tanah 4.2.1.3.1 147.511.496.882,78 141.350.230.556,78
24 Peralatan dan Mesin 4.2.1.3.2 347.370.402.669,06 262.012.524.140,20
25 Gedung dan Bangunan 4.2.1.3.3 836.941.811.111,90 752.808.361.433,25
26 Jalan, Irigasi dan Jaringan 4.2.1.3.4 1.693.958.575.500,75 1.337.123.108.952,75
27 Aset Tetap Lainnya 4.2.1.3.5 49.290.739.886,07 18.338.112.536,50
28 Konstruksi Dalam Pengerjaan 4.2.1.3.6 6.658.784.000,00 26.799.742.000,00
29 Akumulasi Penyusutan Aset Tetap 4.2.1.3.7 0,00 0,00
30 Jumlah Aset Tetap ( 23 s.d 29) 3.081.731.810.050,56 2.538.432.079.619,48

31 ASET LAINNYA 4.2.1.4


32 Tuntutan Perbendaharaan 0,00 0,00
33 Tuntutan Ganti Rugi 4.2.1.4.1 27.814.525,00 27.814.525,00
34 Aset Lain - lain 4.2.1.4.2 39.314.033.039,00 44.332.445.475,00
35 Jumlah Aset Lainnya (32 s.d 34) 39.341.847.564,00 44.360.260.000,00
36 JUMLAH ASET (16+21+30+35) 3.470.549.617.216,23 2.881.931.856.377,55
No Uraian Ref 2013 2012

37 KEWAJIBAN 4.2.2
38 KEWAJIBAN JANGKA PENDEK 4.2.2.1
39 Utang Perhitungan Fihak Ketiga (PFK) 4.2.2.1.1 0,00 1.940.733,00
40 Utang kepada Pemerintah Provinsi 4.2.2.1.2 2.175.865.863,35 2.175.865.863,35
41 Utang Pihak Ketiga 4.2.2.1.3 31.191.989.332,70 14.436.544.381,13
42 Jumlah Kewajiban Jangka Pendek ( 39 s.d 41) 33.367.855.196,05 16.614.350.977,48

43 KEWAJIBAN JANGKA PANJANG 0,00 0,00


44 Jumlah Kewajiban Jangka Panjang 0,00 0,00
45 JUMLAH KEWAJIBAN (42+44) 33.367.855.196,05 16.614.350.977,48

46 EKUITAS DANA 4.2.3


47 EKUITAS DANA LANCAR 4.2.3.1
48 Sisa Lebih Pembiyaan Anggaran (SiLPA) 4.2.3.1.1 185.414.415.358,54 192.443.988.035,43
49 Pendapatan yang Ditangguhkan 4.2.3.1.2 434.350.253,60 238.741.863,00
50 Cadangan Piutang 4.2.3.1.3 80.581.200.689,34 26.343.273.470,95
51 Cadangan Persediaan 4.2.3.1.4 9.929.754.640,77 9.632.090.066,33
52 Dana yang Harus Disediakan untuk Pembayaran Utang
Jangka Pendek 4.2.3.1.5 (33.367.855.196,05) (16.612.410.244,48)
53 Jumlah Ekuitas Dana Lancar (48 s.d 52) 242.991.865.746,20 212.045.683.191,23

54 EKUITAS DANA INVESTASI 4.2.3.2


55 Diinvestasikan dalam Investasi Jangka Panjang 4.2.3.2.1 73.116.238.659,42 70.479.482.589,36
56 Diinvestasikan dalam Aset Tetap 4.2.3.2.2 3.081.731.810.050,56 2.538.432.079.619,48
57 Diinvestasikan dalam Aset Lainnya 4.2.3.2.3 39.341.847.564,00 44.360.260.000,00
58 Jumlah Ekuitas Dana Investasi (55 s.d 57) 3.194.189.896.273,98 2.653.271.822.208,84

59 EKUITAS DANA CADANGAN


60 Diinvestasikan dalam Dana Cadangan 0,00 0,00
61 Jumlah Ekuitas Dana Cadangan (60) 0,00 0,00
62 JUMLAH EKUITAS DANA (53+58+61) 3.437.181.762.020,18 2.865.317.505.400,07
63 JUMLAH KEWAJIBAN DAN EKUITAS DANA (45+62) 3.470.549.617.216,23 2.881.931.856.377,55
Catatan atas Laporan Keuangan merupakan bagian yang tidak terpisahkan dari Laporan Keuangan Pokok
3. LAPORAN ARUS KAS

LAPORAN ARUS KAS


PEMERINTAH KABUPATEN BANYUASIN
Untuk Tahun yang Berakhir sampai dengan 31 Desember 2013 dan 2012

(dalam rupiah)

No Uraian Ref 2013 2012

1 Arus Kas dari Aktivitas Operasi 4.3.1


2 Arus Masuk Kas
3 Pendapatan Pajak Daerah 31.068.706.961,50 25.771.804.113,50
4 Pendapatan Retribusi Daerah 28.388.447.843,10 24.074.875.998,77
5 Pendapatan Hasil Pengelolaan Kekayaan Daerah yang Dipisahkan 1.891.776.235,73 2.809.634.764,67
6 Lain-lain Pendapatan Asli Daerah yang Sah 17.364.820.715,91 15.110.892.373,75
7 Dana Bagi Hasil Pajak 164.445.668.681,00 150.904.713.706,00
8 Dana Bagi Hasil Bukan Pajak (Sumber Daya Alam) 210.745.575.432,00 216.033.376.450,00
9 Dana Alokasi Umum 772.464.315.000,00 651.357.692.000,00
10 Dana Alokasi Khusus 147.190.480.000,00 97.453.050.000,00
11 Dana Otonomi Khusus 0,00 0,00
12 Dana Penyesuaian 94.726.287.000,00 148.274.598.709,00
13 Pendapatan Bagi Hasil Pajak 6.568.401.600,00 29.096.882.836,27
14 Pendapatan Bagi Hasil Lainnya 0,00 0,00
15 Pendapatan Hibah 0,00 197.729.094,00
16 Pendapatan Dana Darurat 0,00 0,00
17 Pendapatan Lainnya 112.179.164.654,00 31.552.357.924,00
18 Jumlah Arus Masuk Kas (3 s.d 17) 1.587.033.644.123,24 1.392.637.607.969,96
19 Arus Keluar Kas
20 Belanja Pegawai 592.097.166.177,00 539.395.295.010,00
21 Belanja Barang 301.430.268.087,63 320.918.526.678,99
22 Belanja Bunga 0,00 0,00
23 Belanja Subsidi 0,00 408.000.000,00
24 Belanja Hibah 101.749.175.090,00 33.443.595.775,00
25 Bantuan Sosial 6.244.534.000,00 5.142.580.000,00
26 Belanja Bantuan Keuangan 29.158.727.525,00 29.298.154.525,00
27 Belanja Tak Terduga 25.213.322,00 554.660.000,00
28 Bagi Hasil Pajak 0,00 0,00
29 Bagi Hasil Retribusi 0,00 0,00
30 Bagi Hasil Pendapatan Lainnya 0,00 0,00
31 Jumlah Arus Keluar Kas (20 s.d 30) 1.030.705.084.201,63 929.160.811.988,99
32 Arus Kas Bersih dari Aktivitas Operasi (18-31) 556.328.559.921,61 463.476.795.980,97

33 Arus Kas dari Aktivitas Investasi Aset Non Keuangan 4.3.2


34 Arus Masuk Kas
35 Pendapatan Penjualan atas Tanah 0,00 0,00
36 Pendapatan Penjualan atas Peralatan dan Mesin 199.388.127,00 0,00
37 Pendapatan Penjualan atas Gedung dan Bangunan 0,00 0,00
38 Pendapatan Penjualan atas Jalan, Irigasi, dan Jaringan 0,00 0,00
39 Pendapatan dari Penjualan Aset Tetap Lainnya 0,00 0,00
40 Pendapatan dari Penjualan Aset Lainnya 4.874.000,00 0,00
41 Jumlah Arus Masuk Kas (35 s.d40) 204.262.127,00 0,00
42 Arus Keluar Kas
43 Belanja Tanah 6.209.266.322,00 7.016.917.912,83
44 Belanja Peralatan dan Mesin 106.884.769.126,00 57.277.278.559,00
45 Belanja Gedung dan Bangunan 103.380.603.400,00 123.141.646.175,00
46 Belanja Jalan, Irigasi dan Jaringan 319.532.260.175,00 140.221.582.232,50
47 Belanja Aset Tetap Lainnya 25.746.763.636,00 10.075.558.420,00
48 Belanja Aset Lainnya 0,00 0,00
49 Jumlah Arus Keluar Kas (43 s.d 48) 561.753.662.659,00 337.732.983.299,33
50 Arus Kas Bersih dari Aktivitas Investasi Non Keuangan (41-49) (561.549.400.532,00) (337.732.983.299,33)
No Uraian Ref 2013 2012

51 Arus Kas dari Aktivitas Pembiayaan 4.3.3


52 Arus Masuk Kas
53 Pencairan Dana Cadangan 0,00 0,00
54 Hasil Penjualan Kekayaan Daerah yang Dipisahkan 0,00 0,00
55 Penerimaan Pinjaman - Obligasi 0,00 0,00
56 Penerimaan Kembali Pinjaman 0,00 0,00
57 Penerimaan Piutang Daerah 14.638.602.897,00 55.253.836,00
58 Jumlah Arus Masuk Kas (53 s.d 57) 14.638.602.897,00 55.253.836,00
59 Arus Keluar Kas
60 Pembentukan Dana Cadangan 0,00 0,00
61 Penyertaan Modal Pemerintah Daerah 5.000.000.000,00 5.000.000.000,00
62 Pembayaran Pokok Utang 11.447.334.963,50 17.109.656.069,50
63 Pemberian Pinjaman 0,00 0,00
64 Jumlah Arus Keluar Kas (60 s.d 63) 16.447.334.963,50 22.109.656.069,50
65 Arus Kas Bersih dari Aktivitas Pembiayaan (58-64) (1.808.732.066,50) (22.054.402.233,50)

66 Arus Kas dari Aktivitas Non Anggaran 4.3.4


67 Arus Masuk Kas
68 Penerimaan Perhitungan Fihak Ketiga (PFK) 44.803.024.704,00 44.375.034.022,00
69 Jumlah Arus Masuk Kas (68) 44.803.024.704,00 44.375.034.022,00
70 Arus Keluar Kas
71 Pengeluaran Perhitungan Fihak Ketiga (PFK) 44.834.165.262,00 44.379.363.094,00
72 Jumlah Arus Keluar Kas (71) 44.834.165.262,00 44.379.363.094,00
73 Arus Kas Bersih dari Aktivitas Non Anggaran (69-72) (31.140.558,00) (4.329.072,00)

74 Kenaikan/(Penurunan) (32+50+65+73) (7.060.713.234,89) 103.685.081.376,14


75 Saldo Awal Kas di BUD 192.439.658.963,43 88.754.577.587,29
76 Saldo Akhir Kas di BUD 185.378.945.728,54 192.439.658.963,43

77 Saldo Akhir Kas di BUD 99.384.566.996,54 182.240.776.880,43


78 Saldo Akhir Kas di Bendahara Pengeluaran 5.994.378.732,00 198.882.083,00
79 Saldo Akhir Kas di Bendahara Penerimaan 90.221.300,00 6.145.000,00
80 Saldo Deposito 80.000.000.000,00 10.000.000.000,00
81 Saldo Bunga Deposito 344.128.953,60 232.596.863,00
82 Saldo Akhir Kas 185.813.295.982,14 192.678.400.826,43
Catatan atas Laporan Keuangan merupakan bagian yang tidak terpisahkan dari Laporan Keuangan Pokok
4. CATATAN ATAS LAPORAN KEUANGAN
I. PENDAHULUAN
1.1. Maksud dan Tujuan Penyusunan Laporan Keuangan
Laporan Keuangan pemerintah daerah disusun untuk menyediakan
informasi yang relevan mengenai posisi keuangan selama satu periode pelaporan.
Laporan Keuangan terutama digunakan untuk membandingkan realisasi
pendapatan, belanja, transfer dan pembiayaan dengan anggaran yang telah
ditetapkan, menilai kondisi keuangan, mengevaluasi efektivitas dan efisiensi suatu
entitas pelaporan, dan membantu menentukan ketaatannya terhadap peraturan
perundang-undangan.
Tujuan umum Laporan Keuangan adalah menyajikan informasi mengenai
posisi keuangan, realisasi anggaran, arus kas, dan kinerja keuangan suatu entitas
pelaporan yang bermanfaat bagi para pengguna dalam membuat dan mengevaluasi
keputusan mengenai alokasi sumber daya. Selain itu, Laporan Keuangan untuk
tujuan umum juga mempunyai peranan prediktif dan prospektif, menyediakan
informasi yang berguna untuk memprediksi besarnya sumber daya yang
dibutuhkan untuk operasi yang berkelanjutan, sumber daya yang dihasilkan dari
operasi yang berkelanjutan, serta resiko dan ketidakpastian yang terkait. Laporan
keuangan juga menyajikan informasi bagi pengguna mengenai:
1. Indikasi apakah sumber daya telah diperoleh dan digunakan sesuai dengan
anggaran; dan
2. Indikasi apakah sumber daya diperoleh dan digunakan sesuai dengan
ketentuan, termasuk batas anggaran yang ditetapkan oleh DPRD.
Untuk memenuhi tujuan umum ini, laporan keuangan menyediakan
informasi mengenai entitas pelaporan dalam hal:
1. Aset;
2. Kewajiban;
3. Ekuitas dana;
4. Pendapatan;
5. Belanja;
6. Transfer;
7. Pembiayaan; dan
8. Arus kas.
Secara spesifik, tujuan pelaporan keuangan pemerintah adalah untuk
menyajikan informasi yang bermanfaat bagi para pengguna laporan dalam menilai
akuntabilitas dan membuat keputusan baik keputusan ekonomi, sosial, maupun
politik dengan:
1. menyediakan informasi mengenai apakah penerimaan periode berjalan cukup
untuk membiayai seluruh pengeluaran;
2. menyediakan informasi mengenai apakah cara memperoleh sumber daya
ekonomi dan alokasinya telah sesuai dengan anggaran yang ditetapkan dan
peraturan perundang-undangan;
3. menyediakan informasi mengenai jumlah sumber daya ekonomi yang
digunakan dalam kegiatan pemerintah daerah serta hasil-hasil yang telah
dicapai;

9
4. menyediakan informasi mengenai bagaimana pemerintah daerah mendanai
seluruh kegiatannya dan mencukupi kebutuhan kasnya;
5. menyediakan informasi mengenai posisi keuangan dan kondisi pemerintah
daerah berkaitan dengan sumber-sumber penerimaannya, baik jangka pendek
maupun jangka panjang, termasuk yang berasal dari pungutan pajak dan
pinjaman;
6. menyediakan informasi mengenai perubahan posisi keuangan pemerintah
daerah, apakah mengalami kenaikan atau penurunan, sebagai akibat kegiatan
yang dilakukan selama periode pelaporan.

1.2. Landasan Hukum Penyusunan Laporan Keuangan


Dasar hukum penyusunan laporan keuangan, antara lain:
1. Undang-Undang Nomor 12 Tahun 2008 tentang Perubahan Kedua atas
Undang-Undang Nomor 32 Tahun 2004 tentang Pemerintah Daerah;
2. Undang-Undang Nomor 33 Tahun 2004 tentang Perimbangan Keuangan antara
Pemerintah Pusat dan Pemerintah Daerah;
3. Undang-Undang Nomor 28 Tahun 1999 tentang Penyelenggaraan Negara yang
Bersih dan Bebas dari Korupsi, Kolusi dan Nepotisme;
4. Undang-Undang Nomor 17 Tahun 2003 tentang Keuangan Negara;
5. Undang-Undang Nomor 1 Tahun 2004 tentang Perbendaharaan Negara;
6. Undang-Undang Nomor 15 Tahun 2004 tentang Pemeriksaan Pengelolaan dan
Tanggung Jawab Keuangan Negara;
7. Peraturan Pemerintah Nomor 105 Tahun 2000 tentang Pengelolaan dan
Pertanggungjawaban Keuangan Daerah (Lembaran Negara Nomor 202,
Tambahan Lembaran Negara Nomor 4022);
8. Peraturan Pemerintah Nomor 109 Tahun 2000 tentang Kedudukan Keuangan
Kepala Daerah dan Wakil Kepala Daerah;
9. Peraturan Pemerintah Nomor 110 Tahun 2000 tentang Kedudukan Keuangan
Dewan Perwakilan Rakyat Daerah dan Peraturan perubahannya;
10. Peraturan Pemerintah Nomor 2 Tahun 2001 tentang Pengalihan Barang
Milik/Kekayaan Negara dari Pemerintah Pusat kepada Pemerintah Daerah
Dalam Rangka Pelaksanaan Otonomi Daerah;
11. Peraturan Pemerintah Nomor 24 Tahun 2005 yang diubah terakhir dengan
Peraturan Pemerintah Nomor 71 Tahun 2010 tentang Standar Akuntansi
Pemerintahan;
12. Peraturan Pemerintah Nomor 30 Tahun 2011 tentang Pinjaman Daerah;
13. Peraturan Pemerintah Nomor 55 Tahun 2005 tentang Dana Perimbangan;
14. Peraturan Pemerintah Nomor 56 Tahun 2005 tentang Informasi Keuangan
Daerah;
15. Peraturan Pemerintah Nomor 58 Tahun 2005 tentang Pengelolaan Keuangan
Daerah;
16. Peraturan Pemerintah Nomor 6 Tahun 2006 tentang Pengelolaan Barang Milik
Negara/Daerah;
17. Peraturan Pemerintah Nomor 8 Tahun 2006 tentang Laporan Keuangan dan
Kinerja Instansi Pemerintah;
18. Peraturan Pemerintah Nomor 7 Tahun 2008 tentang Dekonsentrasi dan Tugas
Pembantuan;
19. Peraturan Pemerintah Nomor 2 Tahun 2012 tentang Hibah Daerah;

10
20. Peraturan Menteri Dalam Negeri Nomor 21 Tahun 2011 tentang Perubahan
Kedua Atas Peraturan Menteri Dalam Negeri Nomor 13 Tahun 2006 tentang
Pedoman Pengelolaan Keuangan Daerah;
21. Peraturan Menteri Dalam Negeri Nomor 17 Tahun 2007 tentang Pedoman
Teknis Pengelolaan Barang Milik Daerah;
22. Peraturan Menteri Dalam Negeri Nomor 4 Tahun 2008 tentang Pedoman
Pelaksanaan Reviu Laporan Keuangan;
23. Peraturan Menteri Dalam Negeri Nomor 32 Tahun 2011 tentang Pedoman
Pemberian Hibah dan Bantuan Sosial yang bersumber dari Anggaran
Pendapatan dan Belanja Daerah dan perubahannya;
24. Peraturan Daerah Nomor 27 Tahun 2006 tentang Pokok-Pokok Pengelolaan
Keuangan Daerah.
25. Peraturan Daerah Nomor 27 Tahun 2012 tentang Anggaran Pendapatan dan
Belanja Daerah Kabupaten Banyuasin Tahun 2013;
26. Peraturan Daerah Nomor 2 Tahun 2013 tentang Perubahan Anggaran
Pendapatan dan Belanja Daerah Kabupaten Banyuasin Tahun 2013;
27. Peraturan Bupati Banyuasin Nomor 911 Tahun 2012 tentang Kebijakan
Akuntansi Pemerintah Kabupaten Banyuasin.

1.3. Sistematika Penulisan Catatan Atas Laporan Keuangan


I. Pendahuluan
1.1. Maksud dan tujuan penyusunan laporan keuangan
1.2. Landasan hukum penyusunan laporan keuangan
1.3. Sistematika penulisan catatan atas laporan keuangan
II. Ekonomi Makro, Kebijakan Keuangan dan Ikhtisar Pencapaian
Kinerja Keuangan
2.1. Ekonomi Makro
2.2. Kebijakan Keuangan
2.3. Pendekatan Penyusunan Laporan Keuangan
2.4. Ikhtisar pencapaian kinerja keuangan
III. Kebijakan Akuntansi
3.1. Akuntansi Pendapatan
3.2. Akuntansi Belanja
3.3. Akuntansi Pembiayaan
3.4. Akuntansi Aset Tetap
IV. Penjelasan Pos-Pos Laporan Keuangan
4.1. Penjelasan Pos-Pos Laporan Realisasi Anggaran (LRA)
4.1.1. Pendapatan
4.1.2. Belanja
4.1.3. Pembiayaan
4.2. Penjelasan Pos-Pos Neraca
4.2.1. Aset
4.2.2. Kewajiban
4.2.3. Ekuitas Dana
4.3. Penjelasan Pos-Pos Laporan Arus Kas (LAK)
4.3.1. Aktivitas Operasi
4.3.2. Aktivitas Investasi Aset Non Keuangan
4.3.3. Aktivitas Pembiayaan

11
4.3.4. Aktivitas Non Anggaran
V. Penjelasan Atas Informasi-Informasi Non Keuangan
5.1. Informasi Tambahan
5.2. Pengungkapan Lainnya
5.2.1. Domisili
5.2.2. Ketentuan Perundang-undangan yang Menjadi Landasan
Kegiatan Operasional
5.2.3. Struktur Organisasi
VI. Penutup

12
II. EKONOMI MAKRO, KEBIJAKAN KEUANGAN DAN IKHTISAR
PENCAPAIAN KINERJA KEUANGAN
2.1. Ekonomi Makro
Visi Kabupaten Banyuasin Tahun 2009-2013 yaitu Banyuasin Sebagai
Kawasan Yang Mandiri dan Berdaya Saing. Dalam rangka mewujudkan visi
maka perlu disusun misi yang merupakan rumusan umum mengenai upaya-upaya
yang akan dilaksanakan untuk mewujudkan harapan di masa depan. Sesuai dengan
visi di atas maka dirumuskan Misi dalam pemerintahan Kabupaten Banyuasin
untuk periode 2009 2013, sebagai berikut.
1. Meningkatkan kualitas sumber daya manusia;
2. Meningkatkan pengelolaan sumber daya alam yang berwawasan lingkungan;
3. Mewujudkan tata kelola pemerintahan yang akuntabel;
4. Meningkatkan pemerataan dan pertumbuhan ekonomi daerah.
Kabupaten Banyuasin dibentuk karena adanya pertimbangan pesatnya
perkembangan pembangunan di Provinsi Sumatera Selatan umumnya dan
khususnya di Kabupaten Musi Banyuasin yang diperkuat oleh aspirasi masyarakat
untuk meningkatkan penyelenggaraan pemerintah, pelaksanaan pembangunan dan
pelayanan guna menjamin kesejahteraan masyarakat. Kabupaten Banyuasin
dibentuk atas dasar Undang-Undang Nomor 6 Tahun 2002 yang diresmikan tanggal
2 Juli 2002 oleh Menteri Dalam Negeri atas nama Presiden dengan ibukota
Pangkalan Balai.
Kabupaten Banyuasin mempunyai wilayah seluas 11.832,99 km2, dan
memiliki topografi 80% wilayah berupa lahan rawa pasang surut dan rawa lebak,
sedangkan 20% berupa lahan kering. Secara administratif Kabupaten Banyuasin
mempunyai batas-batas wilayah, sebagai berikut.
- Sebelah Utara: Berbatasan dengan Kabupaten Tanjung Jabung Timur Provinsi
Jambi dan Selat Bangka;
- Sebelah Timur: Berbatasan dengan Kecamatan Pampangan dan Air Sugihan
Kabupaten Ogan Komering Ilir;
- Sebelah Selatan: Berbatasan dengan Kecamatan Jejawi Kabupaten Ogan
Komering Ilir, Kota Palembang, Kecamatan Sungai Rotan dan Talang Ubi
Kabupaten Muara Enim;
- Sebelah Barat: Berbatasan dengan Kabupaten Musi Banyuasin.

Pertumbuhan Ekonomi
Pertumbuhan ekonomi pada suatu daerah menjadi parameter atau ukuran yang
menunjukkan sejauh mana aktivitas perekonomian terutama sektor ekonomi kreatif
yang dilakukan oleh berbagai stakeholder dapat menghasilkan tambahan pendapatan
bagi masyarakatnya. Keberhasilan pembangunan pada suatu daerah termasuk di
Kabupaten Banyuasin, salah satunya juga dicirikan dengan perbaikan pertumbuhan
ekonomi yang pada akhirnya akan memperbaiki kesejahteraan masyarakat
Kabupaten Banyuasin. Secara teoritis perekonomian mengalami pertumbuhan
apabila pendapatan riil masyarakat pada tahun tertentu lebih besar daripada
pendapatan riil masyarakat pada tahun sebelumnya.

13
Produk Domestik Regional Bruto (PDRB)
Indikator yang lazim digunakan untuk mengukur pertumbuhan ekonomi
adalah tingkat pertumbuhan Produk Domestik Regional Bruto (PDRB). PDRB
adalah jumlah nilai tambah yang dihasilkan oleh seluruh aktivitas produksi dalam
perekonomian. Peningkatan PDRB mencerminkan peningkatan balas jasa kepada
faktor produksi yang digunakan dalam aktivitas produksi tersebut.
PDRB Kabupaten Banyuasin didominasi oleh sektor pertanian, yaitu sebesar
30,35% pada Tahun 2012 lebih dari seperempat nilai PDRB Kabupaten Banyuasin.
Kemudian diikuti sektor industri pengolahan yang mempunyai peranan sebesar
24,89%. Sektor pertambangan dan penggalian menduduki peringkat ketiga dalam
memberikan kontribusinya terhadap PDRB Kabupaten Banyuasin, yakni
menyumbang 14,39%. Lalu di peringkat ke empat adalah sektor perdagangan, hotel
dan restoran sebesar 13,05%. Dibawahnya ada sektor bangunan sebesar 9,19%.
Sektor jasa-jasa ada di posisi ke enam yang pada Tahun 2012 sebesar 6,69%. Lalu
setelah itu ada sektor keuangan, persewaan dan jasa perusahaan sebesar 0,74%.
Sektor pengangkutan dan komunikasi ada di urutan dua dari yang terkecil di
sembilan sektor yaitu sebesar 0,66%. Dan yang mempunyai peranan terkecil berada
di sektor listrik, gas dan air bersih menyumbang sebesar 0,04%.

Tabel 2.1 PDRB Kabupaten Banyuasin Menurut Lapangan Usaha


Atas Dasar Harga Berlaku
(dalam juta rupiah)
Uraian 2009 2010 2011 2012

PDRB Menurut Lapangan Usaha


Pertanian, Peternakan, Perkebunan dan Perikanan 3.267.488 3.635.805 4.148.417 4.568.725
Industri Pengolahan 2.828.403 3.234.135 3.458.773 3.745.714
Pertambangan dan Penggalian 1.480.075 1.809.664 2.058.835 2.166.524
Perdagangan, Hotel dan Restoran 1.243.465 1.427.809 1.670.549 1.964.412
Bangunan 847.404 965.696 1.142.846 1.383.149
Jasa-jasa 588.150 694.325 819.648 1.005.665
Keuangan, Persewaan dan Jasa Perusahaan 77.496 86.682 97.233 112.086
Pengangkutan dan Komunikasi 59.712 69.517 82.335 99.085
Listrik, Gas dan Air Bersih 4.526 4.984 5.621 6.595

PDRB 10.396.719 11.928.617 13.484.257 15.051.955

Tabel 2.2 Laju Pertumbuhan Ekonomi Kabupaten Banyuasin


Menurut Sektor (%) 2009 2012

No. Lapangan Usaha 2009 2010 2011 2012

1 Pertanian 5,73 5,37 6,10 5,89


2 Pertambangan dan Penggalian 3,28 5,41 0,85 1,07
3 Industri Pengolahan 3,13 5,01 5,62 5,53
4 Listrik, Gas dan Air Bersih 6,08 6,90 9,74 9,87
5 Bangunan 11,39 8,74 10,42 11,17
6 Perdagangan, Hotel dan Restoran 5,14 7,22 8,25 8,33
7 Pengangkutan dan Komunikasi 15,13 11,86 12,90 13,01

14
No. Lapangan Usaha 2009 2010 2011 2012

8 Keuangan, Persewaan dan Jasa Perusahaan 7,47 7,74 7,79 7,95


9 Jasa-jasa 9,05 8,06 8,63 8,34

Jumlah 66,40 66,31 70,30 71,16

Laju Pertumbuhan Ekonomi (PDRB dengan Migas) 5,47 6,10 6,14 6,23
PDRB dengan migas 2012 = (71,16/70,30 x 100) - 100

Pada Tahun 2012 tingkat pertumbuhan riil sektor ekonomi di Kabupaten


Banyuasin sebesar 6,23% dengan migas. Pertumbuhan ekonomi Tahun 2012
mengalami percepatan dibandingkan dengan Tahun 2011 yang mencapai 6,14%.

2.2. Kebijakan Keuangan

1. Kebijakan Pendapatan
Pendapatan daerah merupakan faktor sangat penting berkaitan dengan
kemampuan daerah untuk menyelenggarakan pelayanan umum bagi masyarakat,
melaksanakan pembangunan disamping menyelenggarakan pemerintahan itu
sendiri di daerah. Pendapatan daerah terdiri dari tiga kelompok pendapatan, yaitu
Pendapatan Asli Daerah, Pendapatan Dana Perimbangan dan Lain-lain Pendapatan
yang Sah. Adapun jenis kelompok pendapatan tersebut, adalah sebagai berikut.
a. Pendapatan Asli Daerah, terdiri atas:
1) Hasil Pajak Daerah;
2) Hasil Retribusi Daerah;
3) Hasil Pengelolaan Kekayaan Daerah yang Dipisahkan;
4) Lain-lain Pendapatan Asli Daerah yang Sah.
b. Pendapatan Transfer, terdiri atas:
1) Transfer Pemerintah Pusat-Dana Perimbangan;
a) Dana Bagi Hasil Pajak;
b) Dana Bagi Hasil Sumber Daya Alam;
c) Dana Alokasi Umum;
d) Dana Alokasi Khusus.
2) Transfer Pemerintah Pusat Lainnya;
3) Transfer Pemerintah Provinsi.
c. Lain-lain Pendapatan yang Sah, terdiri atas:
1) Pendapatan Lain-lain;
2) Bantuan Keuangan Provinsi.
Terkait dengan upaya untuk mencapai target pendapatan daerah pada
Tahun Anggaran 2013, terdapat tiga kebijakan penting sebagaimana yang telah dan
akan terus dikembangkan di masa depan, yaitu:
a. Menumbuhkembangkan pemikiran kewirausahaan pada masing-masing SKPD
untuk tidak hanya berorientasi kepada belanja, tetapi sebaliknya juga
berorientasi kepada sikap/perilaku menghasilkan, termasuk pelayanan prima
yang pada akhirnya meningkatkan pendapatan daerah.
b. Menggalang potensi-potensi daerah yang dapat memperbesar skala ekonomi
masyarakat Banyuasin sehingga dapat bertambahnya objek-objek pajak dan
atau retribusi baru.

15
c. Melaksanakan secara kontinyu upaya intensifikasi pendapatan daerah, tanpa
menyebabkan pemberatan ekonomi masyarakat di daerah.
Disamping tiga hal di atas, terdapat dua kebijakan strategis yang akan tetap
dijalankan pemerintah daerah sebagaimana kebijakan yang dimuat dalam
Anggaran Pendapatan tahun sebelumnya, yaitu sebagai berikut.
a. Melakukan penyertaan modal daerah yang telah dilakukan mulai Tahun 2004
kepada unit-unit usaha komersial yang sehat (solvable) dan memiliki
rentabilitas usaha tinggi sebagimana penyertaan modal pada Bank
SumselBabel.
b. Mendorong dan memfasilitasi terjadinya kemitraan investasi antara Investor,
masyarakat dan pemerintah daerah dalam bidang usaha yang mampu
membesarkan skala perekonomian daerah. Pembesaran skala ekonomi daerah
akan berdampak sangat luas, bukan saja pendapatan daerah akan meningkat
melalui Bagi Hasil PBB, Bagi Hasil Pajak Orang Pribadi, akan tetapi lebih dari
itu akan terjadi efek ganda terhadap pendapatan keluarga karena banyak orang
bekerja yang otomatis akan membesarkan aktivitas perdagangan dan
penyediaan jasa-jasa dalam masyarakat.

2. Kebijakan Belanja Daerah


Belanja Daerah disusun untuk mendanai pelaksanaan urusan pemerintahan
daerah yang menjadi kewenangan pemerintah kabupaten, yang terdiri atas urusan
wajib dan urusan pilihan.
a. Belanja Tidak Langsung
Arah dan kebijakan umum belanja daerah Pemerintah Kabupaten Banyuasin
pada Tahun Anggaran 2013 tetap memprioritaskan Belanja Tidak Langsung
untuk pemenuhan kebutuhan yang sifatnya prinsipil dan menjadi skala
prioritas, diantaranya :
1) Belanja Pegawai
a) Memenuhi kebutuhan gaji pokok dan Tunjangan Pegawai Negeri Sipil
Daerah (PNSD) termasuk perhitungan rencana kenaikan gaji pokok
serta pemberian gaji ketiga belas;
b) Memenuhi kebutuhan kenaikan gaji berkala, kenaikan pangkat,
tunjangan keluarga dan mutasi pegawai termasuk penerimaan CPNS
Tahun 2013 dengan memperhitungkan acress yang besarnya
maksimum 2,5% dari jumlah gaji pokok dan tunjangan;
c) Penyediaan dana penyelenggaraan asuransi kesehatan;
d) Tunjangan sertifikasi dan non sertifikasi tenaga kependidikan;
e) Kekurangan pembayaran gaji Tahun 2012;
f) Tunjangan uang makan harian pegawai dalam bentuk tambahan
penghasilan berdasarkan pertimbangan objektif lainnya;
g) Tunjangan tambahan penghasilan pegawai terhadap SKPD yang
dipandang memiliki mobilitas beban kerja yang tinggi dalam
penyelenggaraan tugasnya dan ditetapkan dengan Keputusan Bupati
Banyuasin dalam bentuk Tambahan Penghasilan berdasarkan beban
kerja dan kondisi kerja yang besarannya disesuaikan dengan kondisi
keuangan daerah. Khusus untuk tenaga pendidik diberikan tunjangan
tambahan penghasilan berdasarkan lokasi kerja dan tunjangan profesi.

16
2) Belanja Subsidi
Dalam rangka pemenuhan kebutuhan dasar dan hajat hidup orang banyak
dilakukan subsidi terhadap produk tertentu agar harga jualnya terjangkau
oleh masyarakat yang daya belinya terbatas.
3) Belanja Hibah
Digunakan untuk menganggarkan pemberian hibah kepada masyarakat
dan organisasi kemasyarakatan yang secara spesifik telah ditetapkan
peruntukannya dan diberikan secara selektif dengan mempertimbangkan
kemampuan keuangan daerah, rasionalitas serta ditetapkan dengan
keputusan kepala daerah.
4) Belanja Tak Terduga
Digunakan untuk mendanai kegiatan yang sifatnya tidak biasa atau tidak
diharapkan terjadi berulang berupa kebutuhan tanggap darurat bencana,
penanggulangan bencana alam dan bencana sosial yang tidak tertampung
dalam bentuk program dan kegiatan pada Tahun Anggaran 2013.
b. Belanja Langsung
Kebijakan dan Prioritas Pembangunan Daerah Tahun 2013, yaitu sebagai
berikut.
1) Mewujudkan pertumbuhan ekonomi daerah minimum sebesar 6,00%
melalui peningkatan aktivitas sembilan sektor ekonomi.
2) Meningkatkan ketahanan pangan daerah melalui peningkatan produksi
gabah.
3) Menurunkan angka persentase kemiskinan penduduk.
4) Meningkatkan kualitas kehidupan sosial dalam masyarakat, melalui
perbaikan mutu pendidikan dan peningkatan derajat kesehatan
masyarakat.
5) Memantapkan jalannya penyelenggaraan pemerintahan tingkat
desa/kelurahan dan kecamatan.
c. Pembiayaan Daerah
1) Kebijakan Penerimaan Pembiayaan
Membuka perkiraan yang dimungkinkan pada sektor penerimaan
pembiayaan yaitu melakukan estimasi SiLPA dengan mempertimbangkan
perkiraan realisasi anggaran tahun lalu.
2) Kebijakan Pengeluaran Pembiayaan
Kebijakan pada sisi Pengeluaran Pembiayaan adalah memenuhi seluruh
komitmen daerah pada pihak ketiga yang telah jatuh tempo serta
penyertaan modal pada Bank SumselBabel.
2.3. Pendekatan Penyusunan Laporan Keuangan
Laporan Keuangan Pemerintah Kabupaten Banyuasin merupakan gabungan
keseluruhan laporan keuangan entitas akuntansi, sehingga tersaji sebagai satu
entitas tunggal. Proses penggabungan antara akun-akun yang diselenggarakan oleh
suatu entitas pelaporan dengan entitas akuntansi lainnya, dengan mengeliminasi
akun-akun timbal balik agar dapat disajikan sebagai satu entitas pelaporan
konsolidasian. Laporan keuangan konsolidasi terdiri dari Laporan Realisasi
Anggaran (LRA), Neraca, Laporan Arus Kas (LAK) dan Catatan atas Laporan
Keuangan (CaLK). Laporan keuangan konsolidasi disajikan untuk periode

17
pelaporan yang sama dengan periode pelaporan keuangan entitas akuntansi dan
disajikan secara komparatif dengan periode sebelumnya.

2.4. Ikhtisar PencapaianKinerja Keuangan


Anggaran Pendapatan dan Belanja Daerah (APBD) Kabupaten Banyuasin
Tahun 2013 berdasarkan urusan, program dan kegiatan dialokasikan kepada Satuan
Kerja Perangkat Daerah (SKPD) sesuai Struktur Organisasi dan Tata Kerja.
Realisasi Pendapatan Daerah yang diperoleh selama Tahun Anggaran 2013
sejak 1 Januari sampai dengan 31 Desember 2013 dalam rangka membiayai
penyelenggaraan pemerintahan dan pelaksanaan pembangunan mencapai sebesar
Rp1.663.679.789.250,24 atau 100,47% dari anggaran sebesar
Rp1.655.951.199.884,44.
Urusan pemerintahan dan organisasi pada Pemerintah Kabupaten
Banyuasin dilaksanakan oleh 54 SKPD yang dijabarkan melalui program dan
kegiatan dengan jumlah keseluruhan anggaran belanja sebesar
Rp1.826.244.315.088,81 dan terealisasi sebesar Rp1.668.900.629.860,63.

Tabel 2.3 Anggaran dan Realisasi Belanja Masing-Masing SKPD Tahun 2013
Kode SKPD Anggaran Realisasi Lebih/Kurang %
1 2 3 4 5 6

1.01.01 Dinas Pendidikan 642.102.110.197,01 582.155.174.548,00 59.946.935.649,01 90,66


1.02.01 Dinas Kesehatan 102.347.592.984,40 101.560.749.314,96 786.843.669,44 99,23
1.02.02 Rumah Sakit Umum Daerah (RSUD) Tipe D 20.719.899.020,00 16.892.770.128,67 3.827.128.891,33 81,53
1.03.01 Dinas Pekerjaan Umum Cipta Karya 145.164.501.050,00 140.795.836.083,00 4.368.664.967,00 96,99
1.03.02 Dinas Pekerjaan Umum Bina Marga 194.310.161.132,00 184.939.616.839,00 9.370.544.293,00 95,18
1.03.03 Dinas PU Pengairan 37.652.067.179,00 34.783.976.812,00 2.868.090.367,00 92,38
1.06.01 Bappeda 15.678.489.972,00 15.155.208.622,00 523.281.350,00 96,66
1.07.01 Dinas Perhubungan, Komunikasi dan Informatika 21.596.011.913,00 20.273.910.017,00 1.322.101.896,00 93,88
1.08.01 Badan Lingkungan Hidup 7.228.766.797,00 6.662.381.041,00 566.385.756,00 92,16
1.08.02 Dinas Kebersihan Pertamanan dan Pemakaman 10.924.532.543,00 10.263.117.050,00 661.415.493,00 93,95
1.10.01 Dinas Kependudukan dan Catatan Sipil 12.030.412.926,00 11.685.190.023,00 345.222.903,00 97,13
1.12.01 Badan P3A dan KB 14.415.594.853,00 13.594.853.213,00 820.741.640,00 94,31
1.13.01 Dinas Sosial 8.739.309.645,00 8.499.089.053,00 240.220.592,00 97,25
1.14.01 Dinas Tenaga Kerja dan Transmigrasi 13.532.319.494,00 12.910.392.434,00 621.927.060,00 95,40
1.15.01 Diskoperindag 17.790.139.200,00 17.271.166.105,00 518.973.095,00 97,08
1.19.01 BPBD Kesbangpol 24.371.481.500,00 21.957.816.616,00 2.413.664.884,00 90,10
1.19.02 Satuan Polisi Pamong Praja 5.348.795.756,00 5.000.934.345,00 347.861.411,00 93,50
1.20.01 DPRD 10.400.779.012,00 9.910.624.214,00 490.154.798,00 95,29
1.20.02 Bupati dan Wakil Bupati 913.354.000,00 736.995.754,00 176.358.246,00 80,69
1.20.03 Sekretariat Daerah 84.754.522.624,00 71.621.048.512,00 13.133.474.112,00 84,50
1.20.04 Sekretariat DPRD 56.616.337.024,00 47.907.867.838,00 8.708.469.186,00 84,62
1.20.05 Inspektorat Kabupaten 9.235.734.445,00 8.100.817.501,00 1.134.916.944,00 87,71
1.20.07 Badan Kepegawaian dan Diklat Daerah 14.607.242.548,00 13.844.021.798,00 763.220.750,00 94,78
1.20.08 Badan Perizinan Terpadu 6.591.768.250,00 6.394.767.838,00 197.000.412,00 97,01
1.20.09 DPPKAD 35.505.127.718,40 29.773.247.134,00 5.731.880.584,40 83,86
1.20.09 PPKD 116.778.441.734,00 98.335.693.348,00 18.442.748.386,00 84,21

18
Kode SKPD Anggaran Realisasi Lebih/Kurang %
1 2 3 4 5 6

1.20.10 Kecamatan Banyuasin I 3.443.771.344,00 2.947.054.468,00 496.716.876,00 85,58


1.20.11 Kecamatan Banyuasin III 4.504.842.849,00 3.873.814.539,00 631.028.310,00 85,99
1.20.12 Kecamatan Betung 2.304.244.698,00 2.023.135.533,00 281.109.165,00 87,80
1.20.13 Kecamatan Rantau Bayur 1.910.461.210,00 1.775.518.846,00 134.942.364,00 92,94
1.20.14 Kecamatan Pulau Rimau 2.189.523.420,00 1.991.886.100,00 197.637.320,00 90,97
1.20.15 Kecamatan Talang Kelapa 6.584.884.204,00 5.913.772.084,00 671.112.120,00 89,81
1.20.16 Kecamatan Rambutan 2.292.836.707,00 2.058.556.254,00 234.280.453,00 89,78
1.20.17 Kecamatan Tungkal Ilir 1.292.981.345,00 1.089.783.814,00 203.197.531,00 84,28
1.20.18 Kecamatan Tanjung Lago 1.561.515.804,00 1.413.405.328,00 148.110.476,00 90,51
1.20.19 Kecamatan Sembawa 1.588.825.246,00 1.303.084.890,00 285.740.356,00 82,02
1.20.20 Kecamatan Suak Tape 1.397.426.893,00 1.280.160.428,00 117.266.465,00 91,61
1.20.21 Kecamatan Banyuasin II 1.394.536.614,00 1.292.342.187,00 102.194.427,00 92,67
1.20.22 Kecamatan Makarti Jaya 1.556.432.809,00 1.304.205.108,00 252.227.701,00 83,79
1.20.23 Kecamatan Muara Padang 1.445.049.884,00 1.304.691.519,00 140.358.365,00 90,29
1.20.24 Kecamatan Muara Telang 1.550.530.957,00 1.322.810.387,00 227.720.570,00 85,31
1.20.25 Kecamatan Air Salek 1.809.800.813,00 1.364.163.118,00 445.637.695,00 75,38
1.20.26 Kecamatan Air Kumbang 1.166.158.393,00 1.108.963.647,00 57.194.746,00 95,10
1.20.27 Kecamatan Sumber Marga Telang 1.103.000.000,00 983.492.211,00 119.507.789,00 89,17
1.20.28 Kecamatan Air Kumbang 1.053.000.000,00 1.019.427.928,00 33.572.072,00 96,81
1.21.01 Badan Ketahanan Pangan 20.666.334.250,00 20.108.301.054,00 558.033.196,00 97,30
1.22.01 BPMD 23.519.067.411,00 22.749.914.883,00 769.152.528,00 96,73
1.26.01 Badan Perpustakaan, Arsip Daerah dan Dokumentasi 6.528.346.727,00 6.412.767.854,00 115.578.873,00 98,23
2.01.01 Dinas Pertanian dan Peternakan 26.249.231.804,00 21.323.410.107,00 4.925.821.697,00 81,23
2.01.02 BP4K 20.616.998.698,00 19.801.561.389,00 815.437.309,00 96,04
2.02.01 Dinas Kehutanan dan Perkebunan 18.273.868.035,00 16.505.220.398,00 1.768.647.637,00 90,32
2.03.01 Dinas Pertambangan dan Energi 12.834.294.963,00 11.116.587.122,00 1.717.707.841,00 86,62
2.04.01 Dinas Pariwisata, Seni, Budaya, Pemuda dan Olahraga 8.260.870.501,00 8.030.416.052,00 230.454.449,00 97,21
2.05.01 Dinas Perikanan dan Kelautan 12.338.262.146,00 9.214.384.627,00 3.123.877.519,00 74,68
2.06.01 Dinas Pengelolaan Pasar 7.451.723.847,00 7.240.531.804,00 211.192.043,00 97,17

Total 1.826.244.315.088,81 1.668.900.629.860,63 157.343.685.228,18 91,38

19
III. KEBIJAKAN AKUNTANSI
Basis akuntansi yang digunakan dalam pelaporan keuangan ini adalah basis kas
menuju akrual (cash towards accrual). Dalam basis kas menuju akrual, pendapatan dan
belanja serta pembiayaan dicatat berdasarkan basis kas, sedangkan aset, utang, dan
ekuitas dana dicatat berdasarkan basis akrual. Kebijakan akuntansi pokok yang
diterapkan dalam penyusunan Laporan Keuangan Pemerintah Kabupaten Banyuasin
Tahun 2013, sebagai berikut.

3.1 Akuntansi Pendapatan


Pendapatan adalah semua penerimaan Rekening Kas Umum Daerah yang
menambah ekuitas dana lancar dalam periode tahun anggaran yang bersangkutan yang
menjadi hak pemerintah, dan tidak perlu dibayar kembali oleh pemerintah.

Pengakuan
Pengakuan pendapatan, adalah sebagai berikut.
1. Pendapatan diakui pada saat diterima di Rekening Kas Umum Daerah.
2. Dengan mempertimbangkan Bendahara Penerimaan adalah pejabat fungsional yang
melaksanakan tugas kebendaharaan dalam rangka pelaksanaan anggaran pada SKPD,
yang secara fungsional bertanggung jawab atas pelaksanaan tugasnya pada PPKD
selaku BUD.
3. Dalam kriteria pengakuan pendapatan, konsep keterukuran dan ketersediaan
digunakan dalam pengertian derajat kepastian bahwa manfaat ekonomi masa depan
yang berkaitan dengan pos pendapatan tersebut akan mengalir ke pemerintah daerah
dalam periode tahun anggaran yang bersangkutan atau segera dapat digunakan untuk
membayar kewajiban pada periode anggaran yang bersangkutan. Konsep ini
diperlukan dalam menghadapi ketidakpastian lingkungan operasional pemerintah
daerah. Pengkajian atas keterukuran dan ketersediaan yang melekat dalam arus
manfaat ekonomi masa depan dilakukan atas dasar bukti yang dapat diperoleh pada
saat penyusunan laporan keuangan pemerintah daerah.
4. Pencatatan dari setiap jenis pendapatan dan masing-masing nilai pendapatannya
dicatat sampai dengan rincian obyek.
5. Pengembalian yang sifatnya normal dan berulang (recurring) atas penerimaan
pendapatan pada periode penerimaan maupun pada periode sebelumnya dibukukan
sebagai pengurang pendapatan.
6. Koreksi dan pengembalian yang sifatnya tidak berulang (non-recurring) atas
penerimaan pendapatan yang terjadi pada periode penerimaan pendapatan dibukukan
sebagai pengurang pendapatan pada periode yang sama.
7. Koreksi dan pengembalian yang sifatnya tidak berulang (non-recurring) atas
penerimaan pendapatan yang terjadi pada periode sebelumnya dibukukan sebagai
pengurang ekuitas dana lancar pada akun SiLPA pada periode ditemukannya koreksi
dan pengembalian tersebut.
8. Dalam hal Badan Layanan Umum Daerah, pendapatan diakui dengan mengacu pada
peraturan perundangan yang mengatur mengenai Badan Layanan Umum Daerah.
9. Akuntansi pendapatan disusun untuk memenuhi kebutuhan pertanggungjawaban
sesuai dengan ketentuan dan untuk keperluan pengendalian bagi manajemen
pemerintah daerah, baik yang dicatat oleh SKPD maupun PPKD.

20
10. Transaksi pendapatan dalam bentuk barang dan jasa harus dilaporkan dalam Neraca
dan Catatan atas Laporan Keuangan. Contoh transaksi berwujud barang dan jasa
adalah hibah dalam wujud barang, dan barang rampasan.
11. Biaya-biaya transaksi pendapatan dalam wujud barang dikapitalisasi ke dalam nilai
perolehan barang yang diperoleh.

Pengukuran
1. Pendapatan diukur dan dicatat berdasarkan azas bruto, yaitu dengan membukukan
penerimaan bruto, dan tidak mencatat jumlah netonya (setelah dikompensasikan
dengan pengeluaran).
2. a. Pengukuran pendapatan menggunakan mata uang Rupiah berdasarkan nilai
sekarang kas yang diterima.
b. Pendapatan dalam mata uang asing diukur dan dicatat pada tanggal transaksi
menggunakan kurs tengah Bank Indonesia.

Pengungkapan
Hal-hal yang harus diungkapkan dalam Catatan atas Laporan Keuangan terkait dengan
pendapatan adalah:
1. Penerimaan pendapatan tahun berkenaan setelah tanggal berakhirnya tahun
anggaran.
2. Penjelasan mengenai pendapatan yang pada tahun pelaporan yang bersangkutan
terjadi hal-hal yang bersifat khusus.
3. Penjelasan sebab-sebab tidak tercapainya target penerimaan pendapatan daerah.
4. Konversi yang dilakukan akibat perbedaan klasifikasi pendapatan berdasarkan
Permendagri Nomor 13 Tahun 2006 dan Permendagri Nomor 59 Tahun 2007
tentang perubahan atas Permendagri Nomor 13 Tahun 2006 tentang Pengelolaan
Keuangan Daerah, dengan PP Nomor 24 Tahun 2005 tentang Standar Akuntansi
Pemerintahan.
5. Informasi lainnya yang dianggap perlu.

3.2 Akuntansi Belanja


Belanja adalah semua pengeluaran dari Rekening Kas Umum Daerah yang
mengurangi ekuitas dana lancar dalam periode tahun anggaran bersangkutan yang tidak
akan diperoleh pembayarannya kembali oleh pemerintah.

Pengakuan
1. Belanja diakui pada saat terjadinya pengeluaran dari Rekening Kas Umum Daerah
untuk seluruh transaksi di SKPD dan PPKD setelah dilakukan pengesahan definitif
oleh BUD untuk masing-masing transaksi yang terjadi di SKPD dan PPKD.
2. Khusus pengeluaran melalui bendahara pengeluaran pengakuannya terjadi pada saat
pertanggungjawaban atas pengeluaran tersebut disahkan oleh pengguna anggaran.
3. Dalam hal badan layanan umum, belanja diakui dengan mengacu pada peraturan
perundangan yang mengatur mengenai badan layanan umum.
4. Realisasi anggaran belanja dilaporkan sesuai dengan klasifikasi yang ditetapkan
dalam dokumen anggaran.
5. Koreksi atas pengeluaran belanja (penerimaan kembali belanja) yang terjadi pada
periode pengeluaran belanja dibukukan sebagai pengurang belanja pada periode

21
yang sama. Apabila diterima pada periode berikutnya, koreksi atas pengeluaran
belanja dibukukan dalam lain-lain PAD yang sah.
6. Akuntansi belanja disusun selain untuk memenuhi kebutuhan pertanggungjawaban
sesuai dengan ketentuan, juga dapat dikembangkan untuk keperluan pengendalian
bagi manajemen dengan cara yang memungkinkan pengukuran kegiatan belanja
tersebut.
7. Suatu pengeluaran belanja akan diperlakukan sebagai belanja modal (nantinya akan
menjadi aset tetap) jika memenuhi seluruh kriteria berikut.
a. Manfaat ekonomi barang yang dibeli lebih dari 12 bulan;
b. Perolehan barang tersebut untuk operasional dan pelayanan, serta tidak untuk
dijual;
c. Nilai rupiah pembelian barang material atau pengeluaran untuk pembelian
barang tersebut melebihi batasan minimal kapitalisasi aset tetap yang telah
ditetapkan;
d. Barang yang dibeli merupakan objek pemeliharaan;
e. Perolehan barang tersebut untuk digunakan dan tidak untuk dijual/dihibahkan
disumbangkan/diserahkan kepada pihak ketiga.
8. Suatu pengeluaran belanja pemeliharaan akan diperlakukan sebagai belanja modal
(dikapitalisasi menjadi aset tetap) jika memenuhi seluruh kriteria berikut.
a. manfaat ekonomi atas barang/aset tetap yang dipelihara;
b. bertambah ekonomis/efisien, dan/atau;
c. bertambah umur ekonomis, dan/atau;
d. bertambah volume, dan/atau;
e. bertambah kapasitas produksi, dan/atau;
f. bertambah estetika/keindahan/kenyamanan;
g. nilai rupiah pengeluaran belanja atas pemeliharaan barang/aset tetap tersebut
material/melebihi batasan minimal kapitalisasi aset tetap yang telah ditetapkan.
9. Belanja hibah adalah pengeluaran anggaran untuk pemberian hibah dalam bentuk
uang, barang dan/atau jasa kepada pemerintah atau pemerintah daerah lainnya,
perusahaan daerah, masyarakat, dan organisasi kemasyarakatan yang secara spesifik
telah ditetapkan peruntukannya.
10. Belanja hibah diberikan secara selektif dengan mempertimbangkan kemampuan
keuangan daerah, rasionalitas dan ditetapkan dengan keputusan kepala daerah.
11. Pemberian hibah dalam bentuk uang atau dalam bentuk barang atau jasa dicatat dan
diakui sebesar nilai yang dikeluarkan dan dapat diberikan kepada pemerintah daerah
tertentu sepanjang ditetapkan dalam peratutan perundang-undangan.
12. Hibah kepada pemerintah daerah bertujuan untuk menunjang peningkatan
penyelenggaraan fungsi pemerintahan di daerah.
13. Hibah kepada pemerintah daerah lainnya bertujuan untuk menunjang peningkatan
penyelenggaraan pemerintah daerah dan layanan dasar umum.
14. Hibah kepada masyarakat dan organisasi kemasyarakatan bertujuan untuk
menunjang peningkatan partisipasi penyelenggaraan pembangunan daerah atau
secara fungsional terkait dengan dukungan penyelenggaraan pemerintah daerah.
15. Belanja bantuan sosial adalah pengeluaran anggaran untuk pemberian bantuan yang
bersifat sosial kemasyarakatan dalam bentuk uang dan/atau barang kepada
kelompok/anggota masyarakat, dan partai politik.
16. Pemberian bantuan sosial dalam bentuk uang atau dalam bentuk barang atau jasa
dicatat dan diakui sebagai belanja bantuan sosial sebesar nilai yang dikeluarkan.

22
17. Bantuan sosial tersebut diberikan secara selektif, tidak terus menerus/tidak mengikat
serta memiliki kejelasan peruntukan penggunaannya dengan mempertimbangkan
kemampuan keuangan daerah dan ditetapkan dengan keputusan kepala daerah.
18. Bantuan sosial yang diberikan secara tidak terus menerus/tidak mengikat diartikan
bahwa pemberian bantuan tersebut tidak wajib dan tidak harus diberikan setiap
tahun anggaran.
19. Khusus kepada partai politik, bantuan diberikan sesuai dengan ketentuan peraturan
perundang-undangan dianggarkan dalam bantuan keuangan.
20. Belanja bagi hasil dicatat dan diakui sebesar nilai yang dikeluarkan. Apabila pada
akhir tahun belum direalisasi, maka akan menjadi utang sebesar nilai yang harus
dibayar.
Kemudian di-reverse pada awal tahun berikutnya, dan pada saat realisasi belanja
bagi hasil, mekanismenya melalui belanja bagi hasil.
21. Bantuan keuangan dalam bentuk uang, barang dan jasa dicatat dan diakui sebagai
belanja bantuan keuangan sebesar nilai yang dikeluarkan.
22. Bantuan keuangan, baik bersifat umum atau khusus dari provinsi kepada
kabupaten/kota, pemerintah desa, dan pemerintah daerah lainnya atau dari
pemerintah kabupaten/kota kepada pemerintah desa, dan pemerintah daerah lainnya
dalam rangka pemerataan dan/atau peningkatan kemampuan keuangan.
23. Belanja tak terduga dicatat dan diakui sebagai belanja tak terduga sebesar nilai yang
dikeluarkan.
24. Kriteria untuk belanja tak terduga ialah belanja untuk kegiatan yang sifatnya tidak
biasa atau tidak diharapkan berulang, termasuk pengembalian atas kelebihan
penerimaan daerah tahun-tahun sebelumnya yang telah ditutup.

Pengukuran
Belanja diukur dan dicatat berdasarkan nilai sekarang kas yang dikeluarkan.

Pengungkapan
Hal-hal yang perlu diungkapkan sehubungan dengan belanja, antara lain:
1. Pengeluaran belanja tahun berkenaan setelah tanggal berakhirnya tahun anggaran.
2. Penjelasan sebab-sebab tidak terserapnya target realisasi belanja daerah.
3. Konversi yang dilakukan akibat perbedaan klasifikasi belanja berdasarkan
Permendagri Nomor 13 Tahun 2006 dan Permendagri Nomor 59 Tahun 2007
tentang perubahan atas Permendagri Nomor 13 Tahun 2006 tentang Pengelolaan
Keuangan Daerah, dengan PP Nomor 24 Tahun 2005 tentang Standar Akuntansi
Pemerintah.
4. Informasi lainnya yang dianggap perlu.

3.3 Akuntansi Pembiayaan


Pembiayaan (financing) adalah seluruh transaksi keuangan pemerintah, baik
penerimaan maupun pengeluaran, yang perlu dibayar atau akan diterima kembali dan/atau
pengeluaran yang akan diterima kembali, yang dalam penganggaran pemerintah daerah
terutama dimaksudkan untuk menutup defisit dan atau memanfaatkan surplus anggaran.

23
Pengakuan
1. Penerimaan pembiayaan diakui pada saat diterima pada Rekening Kas Umum
Daerah kecuali untuk SiLPA.
2. Pengeluaran pembiayaan diakui pada saat dikeluarkan dari Rekening Kas Umum
Daerah.

Pengukuran
1. Akuntansi penerimaan pembiayaan dilaksanakan berdasarkan azas bruto, yaitu
dengan membukukan penerimaan bruto, dan tidak mencatat jumlah nettonya (setelah
dikompensasikan dengan pengeluaran).
2. Akuntansi pengeluaran pembiayaan dilaksanakan berdasarkan azas bruto.
3. Pembiayaan netto adalah selisih antara penerimaan pembiayaan setelah dikurangi
pengeluaran pembiayaan dalam periode tahun anggaran tertentu. Selisih lebih/kurang
antara penerimaan dan pengeluaran pembiayaan selama satu periode pelaporan
dicatat dalam pos Pembiayaan Netto.
4. Sisa lebih/kurang pembiayaan anggaran adalah selisih lebih/kurang antara realisasi
penerimaan dan pengeluaran selama satu periode pelaporan. Selisih lebih/kurang
antara realisasi penerimaan dan pengeluaran selama satu periode pelaporan dicatat
dalam pos SiLPA/SiKPA.

Perlakuan Akuntansi atas Pembiayaan Dana Bergulir


1. Bantuan yang diberikan kepada kelompok masyarakat yang diniatkan akan
dipungut/ditarik kembali oleh pemerintah daerah apabila kegiatannya telah berhasil
dan selanjutnya akan digulirkan kembali kepada kelompok masyarakat lainnya
sebagai dana bergulir. Rencana pemberian bantuan untuk kelompok masyarakat di
atas dicantumkan di APBD dan dikelompokkan pada Pengeluaran Pembiayaan yaitu
pengeluaran investasi jangka panjang. Terhadap realisasi penerimaan kembali
pembiayaan juga dicatat dan disajikan sebagai Penerimaan Pembiayaan Investasi
Jangka Panjang. Dengan demikian, dana bergulir atau bantuan tersebut tidak
dimasukkan sebagai Belanja Bantuan Sosial karena pemerintah daerah mempunyai
niat untuk menarik kembali dana tersebut dan menggulirkannya kembali kepada
kelompok masyarakat lainnya. Pengeluaran dana tersebut mengakibatkan timbulnya
investasi jangka panjang yang bersifat non permanen dan disajikan di neraca sebagai
Investasi Jangka Panjang.
2. Bantuan yang diberikan kepada kelompok masyarakat dengan maksud agar
kehidupan kelompok masyarakat tersebut lebih baik tidak dimaksudkan untuk
diminta kembali lagi oleh pemerintah daerah maka rencana pemberian bantuan untuk
kelompok masyarakat tersebut dianggarkan di APBD sebagai belanja bantuan sosial.
Demikian juga realisasi pembayaran dana tersebut kepada kelompok masyarakat
tersebut dibukukan dan disajikan sebagai belanja bantuan sosial.
3. Dana Bergulir mempunyai karakteristik, sebagai berikut.
a. Merupakan bagian dari Keuangan Daerah;
b. Tercantum dalam APBD dan atau laporan keuangan;
c. Dikuasai, dimiliki dan/atau dikendalikan oleh pengguna anggaran/kuasa
pengguna anggaran;
d. Merupakan dana yang disalurkan kepada masyarakat, ditagih kembali dari
masyarakat dengan atau tanpa nilai tambah, selanjutnya dana disalurkan kembali
kepada masyarakat/kelompok masyarakat demikian seterusnya (bergulir); dan

24
e. Pemerintah dapat menarik kembali dana bergulir.
4. Dana Bergulir dalam APBD dianggarkan pada Pengeluaran Pembiayaan, untuk
pengembalian pokok Dana Bergulir dicatat pada Penerimaan Pembiayaan pos
Penerimaan Kembali Pinjaman dan bagi hasil jasa usaha Dana Bergulir dicatat pada
Pendapatan Asli Daerah-Lain-lain Pendapatan Asli Daerah yang Sah.
5. Alokasi anggaran Dana Bergulir berada di BUD tetapi pelaksanaan pengelolaannya
didelegasikan kepada SKPD yang membidangi.
6. Dana Bergulir disajikan dalam Laporan Realisasi Anggaran sebagai Pengeluaran
Pembiayaan sebesar jumlah kas yang dikeluarkan dalam rangka perolehan Dana
Bergulir.
7. Dana Bergulir disajikan di Neraca sebagai Investasi Jangka Panjang-Investasi Non
Permanen-Dana Bergulir. Pada saat perolehan dana bergulir dicatat sebesar harga
perolehan dana bergulir, tetapi secara periodik pemerintah daerah harus melakukan
penyesuaian terhadap Dana Bergulir, sehingga nilai Dana Bergulir yang tercatat di
Neraca menggambarkan nilai bersih yang dapat direalisasikan (Net realizable Value).
Penyesuaian tersebut berdasarkan data yang dilaporkan oleh SKPD yang membidangi
atas pencatatan penatausahaan dana bergulir.

Transaksi Dalam Mata Uang Asing


Transaksi dalam mata uang asing harus dibukukan dalam mata uang rupiah dengan
menjabarkan jumlah mata uang asing tersebut menurut kurs tengah bank sentral pada
tanggal transaksi.

Pengungkapan
Hal-hal yang perlu diungkapkan sehubungan dengan pembiayaan, antara lain:
1. Penerimaan dan pengeluaran pembiayaan tahun berkenaan setelah tanggal
berakhirnya tahun anggaran.
2. Penjelasan landasan hukum berkenaan dengan penerimaan/pemberian pinjaman,
pembentukan/pencairan dana cadangan, penjualan aset daerah yang dipisahkan,
penyertaan modal pemerintah daerah.
3. Konversi yang dilakukan akibat perbedaan klasifikasi pembiayaan berdasarkan
Permendagri Nomor 13 Tahun 2006 dan Permendagri Nomor 59 Tahun 2007 tentang
perubahan atas Permendagri Nomor 13 Tahun 2006 tentang Pengelolaan Keuangan
Daerah, dengan PP Nomor 24 Tahun 2005 tentang Standar Akuntansi Pemerintah.
4. Informasi lainnya yang dianggap perlu.

3.4 Akuntansi Aset Tetap


Aset adalah sumber daya ekonomi yang dikuasai dan/atau dimiliki oleh
pemerintah sebagai akibat dari peristiwa masa lalu dan dari mana manfaat ekonomi
dan/atau sosial di masa depan diharapkan dapat diperoleh oleh pemerintah daerah, serta
dapat diukur dalam satuan uang, termasuk sumber daya nonkeuangan yang diperlukan
untuk penyediaan jasa bagi masyarakat umum dan sumber-sumber daya yang dipelihara
karena alasan sejarah dan budaya.

25
Pengakuan Aset
Aset Tetap
Aset Tetap adalah aset berwujud yang mempunyai masa manfaat lebih dari 12 bulan
untuk digunakan dalam kegiatan pemerintah daerah atau dimanfaatkan oleh masyarakat
umum.
Aset Tetap, terdiri atas:
1. Tanah;
2. Peralatan dan Mesin;
3. Gedung dan Bangunan;
4. Jalan, Jaringan dan Instalasi;
5. Aset Tetap Lainnya;
6. Konstruksi Dalam Pengerjaan;
7. Akumulasi Penyusutan.

Aset Tetap Bernilai Kecil


Salah satu kriteria untuk dapat dikategorikan sebagai aset tetap adalah nilainya yang
besar. Aset tetap yang nilai per unitnya kecil dapat langsung dibebankan sebagai belanja
pada saat perolehan.
Pemerintah daerah perlu menetapkan batas untuk pengeluaran yang harus dikapitalisir
sebagai aset tetap dan pengeluaran yang harus dibebankan sebagai belanja yang diatur
sebagai berikut.
1. Pengeluaran yang dikapitalisir untuk per satuan peralatan dan mesin adalah yang
sama atau lebih dari Rp1.000.000,00 (satu juta rupiah);
2. Pengeluaran yang dikapitalisir untuk gedung dan bangunan adalah belanja rehab
berat, dengan kriteria menambah manfaat, daya, usia, volume dan pengeluaran untuk
pemeliharaan yang nilainya sama dengan atau lebih dari Rp30.000.000,00 (tiga puluh
juta rupiah).

Pengakuan Aset Tetap


Untuk dapat diakui sebagai aset tetap, suatu aset harus berwujud dan memenuhi kriteria:
1. Mempunyai masa manfaat lebih dari 12 bulan;
2. Biaya perolehan aset dapat diukur secara andal;
3. Tidak dimaksudkan untuk dijual dalam operasi normal entitas; dan
4. Diperoleh atau dibangun dengan maksud untuk digunakan.
5. Memenuhi batasan minimal nilai kapitalisasi aset tetap.

Tujuan utama dari perolehan aset tetap adalah untuk digunakan oleh pemerintah
daerah dalam mendukung kegiatan operasionalnya dan bukan dimaksudkan untuk dijual.
Pengakuan aset tetap akan sangat andal bila aset tetap telah diterima atau diserahkan hak
kepemilikannya dan atau pada saat penguasaannya berpindah.
Saat pengakuan aset akan lebih dapat diandalkan apabila terdapat bukti bahwa
telah terjadi perpindahan hak kepemilikan dan/atau penguasaan secara hukum, misalnya
sertifikat tanah dan bukti kepemilikan kendaraan bermotor. Apabila perolehan aset tetap
belum didukung dengan bukti secara hukum dikarenakan masih adanya suatu proses
administrasi yang diharuskan, seperti pembelian tanah yang masih harus diselesaikan
proses jual beli (akta) dan sertifikat kepemilikannya di instansi berwenang, maka aset
tetap tersebut harus diakui pada saat terdapat bukti bahwa penguasaan atas aset tetap

26
tersebut telah berpindah, misalnya telah terjadi pembayaran dan penguasaan atas
sertifikat tanah atas nama pemilik sebelumnya.

Pengukuran Aset Tetap


Aset tetap dinilai dengan biaya perolehan. Apabila penilaian aset tetap dengan
menggunakan biaya perolehan tidak memungkinkan maka nilai aset tetap didasarkan
pada nilai wajar pada saat perolehan.
Biaya perolehan adalah jumlah kas atau setara kas yang dibayarkan atau nilai
wajar imbalan lain yang diberikan untuk memperoleh suatu aset pada saat perolehan atau
konstruksi sampai dengan aset tersebut dalam kondisi dan tempat yang siap untuk
dipergunakan.
Biaya perolehan suatu aset tetap terdiri dari harga belinya atau konstruksinya,
termasuk bea impor dan setiap biaya yang dapat diatribusikan secara langsung dalam
membawa aset tersebut ke kondisi yang membuat aset tersebut dapat bekerja untuk
penggunaan yang dimaksudkan.
Contoh biaya yang dapat diatribusikan secara langsung, adalah:
1. biaya persiapan tempat;
2. biaya pengiriman awal (initial delivery) dan biaya simpan dan bongkar muat
(handling cost);
3. biaya pemasangan (installation cost);
4. biaya profesional seperti arsitek dan insinyur;
5. biaya konstruksi; dan
6. biaya kepanitiaan (honorarium panitia pengadaan barang dan jasa dan panitia
pemeriksa barang).
7. biaya dokumen/administrasi tender
8. biaya jasa pengumuman lelang/pemenang tender
9. biaya perjalanan dinas yang berkaitan dengan pengadaan aset tetap.
10. biaya sebagaimana dimaksud dalam angka 6 dihitung hanya satu kali yang
menambah/diatribusikan dalam nilai aset tetap. Pengulangan biaya dikarenakan
proses yang berulang seperti biaya yang disebabkan proses lelang ulang tidak
menambah aset tetap/tidak diperhitungkan dalam biaya perolehan.

Penilaian Awal Aset Tetap


Barang berwujud yang memenuhi kualifikasi untuk diakui sebagai suatu aset dan
dikelompokkan sebagai aset tetap, pada awalnya harus diukur berdasarkan biaya
perolehan.
Bila aset tetap diperoleh dengan tanpa nilai, biaya aset tersebut adalah sebesar
nilai wajar pada saat aset tersebut diperoleh.
Suatu aset tetap mungkin diterima pemerintah daerah sebagai hadiah atau donasi.
Sebagai contoh, tanah mungkin dihadiahkan ke pemerintah daerah oleh pengembang
(developer) dengan tanpa nilai yang memungkinkan pemerintah daerah untuk
membangun tempat parkir, jalan, ataupun untuk tempat pejalan kaki. Suatu aset juga
mungkin diperoleh tanpa nilai melalui pengimplementasian wewenang yang dimiliki
pemerintah. Sebagai contoh, dikarenakan wewenang dan peraturan yang ada, pemerintah
daerah melakukan penyitaan atas sebidang tanah dan bangunan yang kemudian akan
digunakan sebagai tempat operasi pemerintahan. Untuk kedua hal di atas aset tetap yang
diperoleh harus dinilai berdasarkan nilai wajar pada saat diperoleh.

27
Untuk keperluan penyusunan neraca awal suatu entitas, biaya perolehan aset
tetap yang digunakan adalah nilai wajar pada saat neraca awal tersebut disusun. Untuk
periode selanjutnya setelah tanggal neraca awal, atas perolehan aset tetap baru, suatu
entitas menggunakan biaya perolehan atau harga wajar bila biaya perolehan tidak ada.

Perolehan Secara Gabungan


Biaya perolehan dari masing-masing aset tetap yang diperoleh secara gabungan
ditentukan dengan mengalokasikan harga gabungan tersebut berdasarkan perbandingan
nilai wajar masing-masing aset yang bersangkutan.
Biaya perolehan dari masing-masing aset tetap yang diperoleh secara gabungan
(penganggarannya dalam satu dokumen pelaksanaan anggaran kegiatan/rincian kegiatan)
tidak akan dipisahkan harga perolehannya ke masing-masing aset tetap jika harga
perolehan salah satu aset tetap tertentu yang diperoleh secara gabungan nilainya
mencapai 80% dari keseluruhan nilai aset tetap yang diperoleh secara gabungan dan
pengakuan aset tetap tersebut akan diperlakukan sebagai aset tetap yang nilainya
mencapai 80% dari keseluruhan nilai perolehan gabungan.

Aset Donasi/Hibah
Aset tetap yang diperoleh dari sumbangan (donasi) harus dicatat sebesar nilai
yang dinyatakan oleh pemberi donasi/hibah atau nilai wajar pada saat perolehan.
Sumbangan aset tetap didefinisikan sebagai transfer tanpa persyaratan suatu aset
tetap ke suatu entitas, misalnya perusahaan nonpemerintah memberikan bangunan yang
dimilikinya untuk digunakan oleh satu unit pemerintah daerah tanpa persyaratan apapun.
Penyerahan aset tetap tersebut akan sangat andal bila didukung dengan bukti perpindahan
kepemilikannya secara hukum, seperti adanya akta hibah. Nilai penerimaan aset donasi
dari pihak ketiga meliputi nilai yang dinyatakan oleh pemberi hibah atau nlai taksir,
ditambah dengan biaya pengurusan.
Tidak termasuk aset donasi, apabila penyerahan aset tetap tersebut dihubungkan
dengan kewajiban entitas lain kepada pemerintah daerah. Sebagai contoh, satu
perusahaan swasta membangun aset tetap untuk pemerintah daerah dengan persyaratan
kewajibannya kepada pemerintah daerah telah dianggap selesai. Perolehan aset tetap
tersebut harus diperlakukan seperti perolehan aset tetap dengan pertukaran.
Apabila perolehan aset tetap memenuhi kriteria perolehan aset donasi, maka
perolehan tersebut dapat diakui sebagai pendapatan pemerintah daerah dan jumlah yang
sama juga diakui sebagai belanja modal dalam laporan realisasi anggaran atau disajikan
di Neraca sesuai dengan aset donasi yang diterima dengan penjelasan pada Catatan atas
Laporan Keuangan.

Aset dari Rampasan


Nilai penerimaan Aset Tetap dari rampasan meliputi nilai yang dicantumkan
dalam keputusan dalam pengadilan atau nilai taksiran harga pasar pada saat aset diperoleh
ditambah dengan biaya pengurusan kecuali untuk tanah, gedung dan bangunan meliputi
nilai taksiran atau harga pasar yang berlaku.

Pengeluaran Setelah Perolehan (Subsequent Expenditures)


Pengeluaran setelah perolehan awal suatu aset tetap yang memperpanjang masa
manfaat atau yang kemungkinan besar memberi manfaat ekonomis di masa yang akan

28
datang dalam bentuk kapasitas, mutu produksi, atau peningkatan standar kinerja, harus
ditambahkan pada nilai tercatat aset yang bersangkutan.
Setelah perolehan, masih terdapat biaya-biaya yang muncul selama penggunaan
aset tetap. Misalnya biaya pemeliharaan (maintenance), penambahan (additions),
penggantian (replacement) atau perbaikan (repairs).
Pada dasarnya, pengeluaran-pengeluaran untuk aset tetap setelah perolehan, dapat
dikategorikan menjadi belanja modal (capital expenditures) dan pengeluaran pendapatan
(revenue expenditures).
Belanja modal adalah pengeluaran-pengeluaran yang harus dicatat sebagai aset
(dikapitalisir). Pengeluaran-pengeluaran yang akan mendatangkan manfaat lebih dari satu
periode akuntansi termasuk dalam kategori ini, misalnya penambahan satu unit AC dalam
sebuah mobil atau penambahan teras pada gedung yang telah dimiliki, merupakan belanja
modal.
Demikian juga halnya dengan pengeluaran-pengeluaran yang akan menambah
efisiensi, memperpanjang umur aset atau meningkatkan kapasitas atau mutu produksi.
Contoh mengenai pengeluaran-pengeluaran yang akan memperpanjang umur aset atau
meningkatkan kapasitas produksi adalah pengeluaran untuk perbaikan besar-besaran.

Kapitalisasi Aset
Kapitalisasi aset tetap ditetapkan dalam kebijakan akuntansi ini berupa suatu
batasan jumlah biaya (capitalization thresholds) tertentu untuk dapat digunakan dalam
penentuan apakah suatu pengeluaran harus dikapitalisasi atau tidak.
Pengeluaran yang dikapitalisasikan dilakukan terhadap pengadaan tanah,
pembelian peralatan dan mesin sampai siap pakai, pembuatan peralatan, mesin dan
bangunan, pembangunan gedung dan bangunan, pembangunan jalan/irigasi/jaringan,
pembelian aset tetap lainnya sampai siap pakai.
Batasan jumlah pengeluaran yang dapat dikapitalisir sebagai aset, adalah sebagai berikut.
1. Pengeluaran untuk per satuan peralatan dan mesin, dan alat olah raga yang sama
dengan atau lebih dari Rp1.000.000,00 (satu juta rupiah).
2. Pengeluaran untuk gedung dan bangunan berupa rehab berat dengan kriteria
menambah manfaat, daya, usia, volume dan pengeluaran untuk pemeliharaan dengan
nilai yang sama dengan atau lebih dari Rp30.000.000,00 (tiga puluh juta rupiah).
3. Untuk aset tanah, jalan/irigasi/jaringan dan BMD lainnya berupa koleksi
perpustakaan dan barang bercorak kesenian dikecualikan dari nilai kapitalisasi point
(a) dan (b).
Pemeliharaan aset tetap yang bersifat rutin dan berkala tidak dikapitalisasi.
Rehabilitasi yang bersifat sedang dan berat dikapitalisasi atau menambah nilai aset tetap
tersebut, apabila memenuhi salah satu kriteria yaitu biaya pemeliharaan tersebut cukup
besar, menambah volume, menambah kapasitas, meningkatkan fungsi, meningkatkan
efisiensi dan/atau menambah masa manfaat.

Pengungkapan Aset Tetap


Laporan keuangan harus mengungkapkan untuk masing-masing jenis aset tetap, sebagai
berikut.
1. Dasar penilaian yang digunakan untuk menentukan nilai tercatat (carrying amount);
2. Rekonsiliasi jumlah tercatat pada awal dan akhir periode yang menunjukkan:
a. penambahan;
b. pelepasan;

29
c. akumulasi penyusutan dan perubahan nilai, jika ada;
d. mutasi aset tetap lainnya.
3. Informasi penyusutan (jika ada), meliputi:
a. nilai penyusutan;
b. metode penyusutan yang digunakan;
c. masa manfaat atau tarif penyusutan yang digunakan;
d. nilai tercatat bruto dan akumulasi penyusutan pada awal dan akhir periode.
Laporan keuangan juga harus mengungkapkan:
1. Eksistensi dan batasan hak milik atas aset tetap;
2. Kebijakan akuntansi untuk kapitalisasi yang berkaitan dengan aset tetap;
3. Jumlah pengeluaran pada pos aset tetap dalam konstruksi; dan
4. Jumlah komitmen untuk akuisisi aset tetap.
Jika aset tetap dicatat pada jumlah yang dinilai kembali, hal-hal berikut harus
diungkapkan:
1. Dasar peraturan untuk menilai kembali aset tetap;
2. Tanggal efektif penilaian kembali;
3. Jika ada, nama penilai independen;
4. Hakikat setiap petunjuk yang digunakan untuk menentukan biaya pengganti; dan
5. Nilai tercatat setiap jenis aset tetap.

30
IV. PENJELASAN POS-POS LAPORAN KEUANGAN
4.1 Penjelasan Pos-Pos Laporan Realisasi Anggaran (LRA)
4.1.1 Pendapatan
Jumlah anggaran pendapatan Tahun 2013 adalah sebesar
Rp1.655.951.199.884,44 sebagaimana tertuang dalam Peraturan Daerah Nomor 2
Tahun 2012 tentang Perubahan Anggaran Pendapatan dan Belanja Daerah
Kabupaten Banyuasin Tahun 2013. Pendapatan ini dapat dicapai sebesar
Rp1.663.679.789.250,24 atau 100,47% dari target yang ditetapkan. Komposisi
pencapaian realisasi pendapatan per kelompok pendapatan disajikan pada tabel di
bawah ini:
Tabel 4.1 Realisasi Pendapatan per Kelompok Pendapatan
Kabupaten Banyuasin Tahun Anggaran 2013
Kenaikan
Kelompok Pendapatan Anggaran (Rp) Realisasi (Rp) %
/(Penurunan)

Pendapatan Asli Daerah 54.270.272.232,52 81.364.386.883,24 27.094.114.650,72 149,92


Pendapatan Transfer 1.496.071.578.651,92 1.470.136.237.713,00 (25.935.340.938,92) 98,27
Lain-lain Pendapatan yang Sah 105.609.349.000,00 112.179.164.654,00 6.569.815.654,00 106,22

Jumlah 1.655.951.199.884,44 1.663.679.789.250,24 7.728.589.365,80 100,47

Berdasarkan realisasi pendapatan daerah di atas terlihat bahwa realisasi


Pendapatan Asli Daerah dan Lain-Lain Pendapatan yang Sah mencapai lebih dari
100%. Hal ini merupakan wujud keberhasilan strategi yang diterapkan dalam
rangka upaya peningkatan pendapatan daerah. Penyajian pendapatan secara
grafik dapat dilihat pada gambar di bawah ini :

Gambar 4.1 Perbandingan Realisasi Pendapatan Tahun 2013

Berdasarkan grafik di atas, terlihat bahwa Pemerintah Kabupaten


Banyuasin memiliki ketergantungan yang bersumber dari transfer Pemerintah
Pusat sesuai Undang-Undang Nomor 33 Tahun 2004 tentang Perimbangan
Keuangan Antara Pemerintah Pusat dan Pemerintah Daerah sebesar
Rp1.470.136.237.713,00 atau 88,37% dari keseluruhan pendapatan daerah
Pemerintah Kabupaten Banyuasin.

31
4.1.1.1. Pendapatan Asli Daerah
Realisasi Pendapatan Asli Daerah mencapai sebesar Rp81.364.386.883,24
lebih besar Rp27.094.114.650,72 atau 149,92% dari anggaran sebesar
Rp54.270.272.232,52. Pelampauan target Pendapatan Asli Daerah terjadi antara
lain karena optimalisasi implementasi kegiatan intensifikasi dan ekstensifikasi
pajak daerah dan retribusi daerah. Nilai realisasi Pendapatan Asli Daerah
memberikan kontribusi terhadap pendapatan daerah sebesar 4,89%. Berikut
realisasi komponen Pendapatan Asli Daerah Kabupaten Banyuasin Tahun 2013:

Tabel 4.2 Anggaran dan Realisasi PAD Kabupaten Banyuasin Tahun 2013
No. Jenis PAD Anggaran (Rp) Realisasi (Rp) Lebih/(kurang) (Rp) %

1 Pajak Daerah 19.053.055.123,10 31.068.706.961,50 12.015.651.838,40 163,06


2 Retribusi Daerah 27.829.108.900,00 30.834.820.843,10 3.005.711.943,10 110,80
Hasil Pengelolaan Kekayaan Daerah yang
3 817.451.610,00 1.891.776.235,73 1.074.324.625,73 231,42
Dipisahkan
4 Lain-lain Pendapatan Asli Daerah yang Sah 6.570.656.599,42 17.569.082.842,91 10.998.426.243,49 267,39

Jumlah 54.270.272.232,52 81.364.386.883,24 27.094.114.650,72 149,92

4.1.1.1.1. Pajak Daerah


Pendapatan Pajak Daerah dianggarkan sebesar Rp19.053.055.123,10
sedangkan realisasinya mencapai Rp31.068.706.961,50 atau 163,06% dengan
rincian pada tabel berikut.

Tabel 4.3 Rincian Pendapatan Pajak Daerah Kabupaten Banyuasin Tahun 2013
Lebih/Kurang
No. Jenis Pajak Anggaran (Rp) Realisasi (Rp) %
(Rp)

1 Pajak Hotel 39.674.600,00 541.002.063,00 501.327.463,00 1.363,60


2 Pajak Restoran 119.841.250,00 1.006.667.018,00 886.825.768,00 840,00
3 Pajak Hiburan 36.147.500,00 40.160.000,00 4.012.500,00 111,10
4 Pajak Reklame 185.552.392,95 229.227.187,50 43.674.794,55 123,54
5 Pajak Penerangan Jalan 5.467.730.862,40 9.498.653.100,00 4.030.922.237,60 173,72
6 Pajak Air Bawah Tanah 23.381.583,75 19.485.729,00 (3.895.854,75) 83,34
7 Pajak Sarang Burung Walet 18.145.000,00 8.037.500,00 (10.107.500,00) 44,30
8 Pajak Mineral Bukan Logam dan Batuan 151.445.250,00 469.326.275,00 317.881.025,00 309,90
9 BPHTB 13.011.136.684,00 19.256.148.089,00 6.245.011.405,00 148,00

Jumlah 19.053.055.123,10 31.068.706.961,50 12.015.651.838,40 163,06

Tabel diatas menggambarkan bahwa dari sembilan jenis Pendapatan Pajak


Daerah, sebanyak tujuh jenis pajak yang melebihi target yang dianggarkan dan
dua jenis pajak lainnya tidak memenuhi target yang dianggarkan.
1. Target Pajak Hotel sebesar Rp39.674.600,00 dicapai sebesar
Rp541.002.063,00 atau 1.363,60%. Sangat tingginya pencapaian ini
disebabkan masih adanya kegiatan pelatihan karyawan PT Pertamina
wilayah Sumatera pada wisma/penginapan Patra Jasa di Kecamatan

32
Banyuasin I, yang semula tidak diperhitungkan potensinya dalam
penganggaran Tahun 2013.
2. Anggaran Pajak Restoran sebesar Rp119.841.250,00 dicapai sebesar
Rp1.006.667.018,00 atau 840,00%. Tingginya pencapaian ini dikarenakan
adanya penambahan rumah makan dan restoran di wilayah Kabupaten
Banyuasin, serta adanya penyediaan jasa catering oleh pihak PT
Pertamina, dan juga adanya restoran siap saji CFC di Kecamatan
Rambutan yang masih beroperasi.
3. Anggaran Pajak Hiburan sebesar Rp36.147.500,00 berhasil dicapai
sebesar Rp40.160.000,00 atau 111,10%. Pencapaian ini berasal dari
Karaoke Clp yang terletak di Desa Gasing Kecamatan Talang Kelapa, dan
masih beroperasinya wisata danau yang terletak di Kelurahan Tanah Mas.
4. Pencapaian Pajak Reklame sebesar Rp229.227.187,50 atau 123,54% dari
anggaran sebesar Rp185.552.392,95. Pencapaian ini karena meningkatnya
jumlah reklame yang dipasang di Kabupaten Banyuasin.
5. Pencapaian Pajak Penerangan Jalan sebesar Rp9.498.653.100,00 atau
173,72% dari anggaran sebesar Rp5.467.730.862,40, hal ini seiring
dengan semakin banyaknya masyarakat yang sudah menikmati listrik.
6. Pencapaian realisasi Pajak Air Tanah sebesar Rp19.485.729,00 atau hanya
83,34% dari anggaran sebesar Rp23.381.583,75. Rendahnya pencapaian
ini disebabkan objek pajak air tanah tersebut hanya terdapat di Kecamatan
Talang Kelapa dan masih banyak pihak perorangan yang memiliki usaha
jual beli air yang belum memiliki izin.
7. Pencapaian realisasi Pajak Sarang Burung Walet sebesar Rp8.037.500,00
atau 44,30% dari anggaran sebesar Rp18.145.000,00. Rendahnya
pencapaian ini karena banyak Wajib Pajak Sarang Burung Walet yang
belum mempunyai izin dan sulitnya mengetahui saat panen serta harga
jual sarang burung walet di pasaran mengalami penurunan secara
permanen.
8. Pencapaian realisasi Pajak Mineral Bukan Logam dan Batuan sebesar
Rp469.326.275,00 atau 309,90% dari anggaran sebesar
Rp151.445.250,00. Pencapaian anggaran ini berasal dari lokasi kegiatan
pembangunan di Kabupaten Banyuasin.
9. Anggaran Bea Perolehan Hak atas Tanah dan Bangunan (BPHTB) sebesar
Rp13.011.136.684,00 tercapai sebesar Rp19.256.148.089,00 atau
148,00%. Pencapaian ini disebabkan adanya upaya intensifikasi BPHTB
melalui verifikasi lapangan.

4.1.1.1.2. Retribusi Daerah


Pendapatan Retribusi Daerah dianggarkan sebesar Rp27.829.108.900,00
dicapai sebesar Rp30.834.820.843,10 atau 110,80% dengan rincian sebagai
berikut.

33
Tabel 4.4 Rincian Pendapatan Retribusi Daerah
Pemerintah Kabupaten BanyuasinTahun 2013
Lebih/Kurang
No. Jenis Retribusi Anggaran (Rp) Realisasi (Rp) %
(Rp)

1 Retribusi Jasa Umum 21.804.074.900,00 23.163.211.698,10 1.359.136.798,10 106,23


2 Retribusi Jasa Usaha 3.131.772.000,00 1.555.270.440,00 (1.576.501.560,00) 49,66
3 Retribusi Perizinan Tertentu 2.893.262.000,00 6.116.338.705,00 3.223.076.705,00 211,40

Jumlah 27.829.108.900,00 30.834.820.843,10 3.005.711.943,10 110,80

1. Retribusi Jasa Umum


Rincian Retribusi Jasa Umum dapat lihat pada tabel berikut.

Tabel 4.5 Rincian Retribusi Jasa Umum


Pemerintah Kabupaten Banyuasin Tahun 2013
Lebih/Kurang
No. Jenis Retribusi Jasa Umum Anggaran (Rp) Realisasi (Rp) %
(Rp)

1 Retribusi Pelayanan Kesehatan 18.254.487.400,00 17.936.198.273,10 (318.289.126,90) 98,26


Retribusi Pelayanan
2 110.724.000,00 136.675.000,00 25.951.000,00 123,44
Persampahan/Kebersihan
Retribusi Penggantian Biaya KTP
3 469.514.500,00 1.734.217.000,00 1.264.702.500,00 369,36
dan Akte Catatan Sipil
Retribusi Pelayanan Parkir di Tepi
4 108.000.000,00 147.525.000,00 39.525.000,00 136,60
Jalan Umum
5 Retribusi Pelayanan Pasar 1.313.220.000,00 1.362.798.000,00 49.578.000,00 103,78
Retribusi Pengujian Kendaraan
6 130.500.000,00 140.130.000,00 9.630.000,00 107,38
Bermotor
Retribusi Pemeriksaan Alat
7 17.629.000,00 19.668.425,00 2.039.425,00 111,57
Pemadam Kebakaran
Retribusi Pengendalian Menara
8 1.400.000.000,00 1.686.000.000,00 286.000.000,00 120,43
Telekomunikasi

Jumlah 21.804.074.900,00 23.163.211.698,10 1.359.136.798,10 106,23

Tabel di atas menggambarkan dari delapan jenis pendapatan Retribusi Jasa


Umum, sebanyak tujuh jenis retribusi melebihi target anggaran dan satu
jenis retribusi tidak mencapai target anggaran, yaitu retribusi pelayanan
kesehatan baik dari Dinas Kesehatan maupun RSUD. Persentase realisasi
tertinggi untuk retribusi penggantian biaya cetak KTP sebesar 369,36%.

2. Retribusi Jasa Usaha


Rincian Retribusi Jasa Usaha dapat lihat pada tabel berikut.

34
Tabel 4.6 Rincian Retribusi Jasa Usaha
Pemerintah Kabupaten Banyuasin Tahun 2013
Lebih/Kurang
No. Jenis Retribusi Jasa Usaha Anggaran (Rp) Realisasi (Rp) %
(Rp)

1 Retribusi Pemakaian Kekayaan Daerah 13.000.000,00 16.665.000,00 3.665.000,00 128,19


2 Retribusi Terminal 382.523.000,00 408.470.000,00 25.947.000,00 106,78
3 Retribusi Rumah Potong Hewan 5.749.000,00 6.060.000,00 311.000,00 105,41
4 Retribusi Pelayanan Kepelabuhan 2.730.500.000,00 1.124.075.440,00 (1.606.424.560,00) 41,17

Jumlah 3.131.772.000,00 1.555.270.440,00 (1.576.501.560,00) 49,66

Tabel di atas menggambarkan bahwa dari empat jenis pendapatan Retribusi


Jasa Usaha, yang melebihi anggaran sebanyak tiga jenis retribusi, yaitu
Retribusi Pemakaian Kekayaan Daerah sebesar 128,19%, Retribusi Terminal
sebesar 106,78% dan Retribusi Rumah Potong Hewan sebesar 105,41%.
Sedangkan retribusi yang tidak memenuhi anggaran, yaitu Retribusi
Pelayanan Kepelabuhan sebesar 41,17%.
Realisasi tertinggi dicapai oleh Retribusi Pemakaian Kekayaan Daerah yang
merupakan retribusi pemakaian mobil derek dari Dinas Perhubungan
Komunikasi dan Informatika dari anggaran sebesar Rp8.000.000,00,
terealisasi sebesar Rp8.050.000,00 dan jasa analisis laboratorium lingkungan
dari target sebesar Rp5.000.000,00, terealisasi Rp8.615.000,00, sehingga
secara keseluruhan Retribusi Pemakaian Kekayaan Daerah terealisasi
Rp16.665.000,00 atau 128,19% dari anggaran sebesar Rp13.000.000,00.
Anggaran Retribusi Terminal sebesar Rp382.523.000,00 tercapai sebesar
Rp408.470.000,00 atau 106,78%. Anggaran Retribusi Rumah Potong Hewan
sebesar Rp5.749.000,00 tercapai sebesar Rp6.060.000,00 atau 105,41%.
Realisasi Retribusi Pelayanan Kepelabuhan mencapai sebesar
Rp1.124.075.440,00 atau 41,17% dari anggaran sebesar Rp2.730.500.000,00.
Jenis retribusi ini antara lain berupa Retribusi Terminal Khusus pengangkutan
batubara. Penurunan realisasi retribusi tersebut terjadi karena tidak dilakukan
lagi penarikan retribusi sesuai dengan Peraturan Gubernur Sumatera Selatan
Nomor 23 Tahun 2012 tentang Tata Cara Pengangkutan Batubara Melalui
Jalan Umum.

3. Retribusi Perizinan Tertentu


Rincian Retribusi Perizinan Tertentu dapat dilihat pada tabel berikut.

Tabel 4.7 Rincian Pendapatan Retribusi Jasa Perizinan Tertentu


Pemerintah Kabupaten Banyuasin Tahun 2013
Lebih/Kurang
No. Jenis Retribusi Perizinan Tertentu Anggaran (Rp) Realisasi (Rp) %
(Rp)

1 Retribusi Izin Mendirikan Bangunan 1.723.837.000,00 4.685.924.500,00 2.962.087.500,00 271,83


2 Retribusi Izin Gangguan/Keramaian 1.160.695.000,00 1.426.069.205,00 265.374.205,00 122,86
3 Retribusi Izin Trayek 8.730.000,00 4.345.000,00 (4.385.000,00) 49,77

Jumlah 2.893.262.000,00 6.116.338.705,00 3.223.076.705,00 211,40

35
Dari tiga jenis pendapatan Retribusi Perizinan Tertentu di atas, dua jenis
retribusi yaitu Retribusi Izin Mendirikan Bangunan (IMB) dan Izin
Gangguan/Keramaian, realisasinya melampaui anggaran, sedangkan Retribusi
Izin Trayek tidak mencapai anggaran. Retribusi IMB dan Izin
Gangguan/Keramaian realisasinya melampaui anggaran antara lain disebabkan
semakin pesatnya pembangunan dan perkembangan dunia usaha di Kabupaten
Banyuasin.
Retribusi Izin Trayek hanya terealisasi 49,77% atau sebesar Rp4.345.000,00
dari anggaran sebesar Rp8.730.000,00, dikarenakan kendaraan yang sudah
tidak layak jalan tidak lagi melakukan perpanjangan izin trayek sesuai dengan
Peraturan Daerah Nomor 30 Tahun 2009. Selain itu penyebab penurunan
realisasi Retribusi Izin Trayek adalah masih kurangnya kesadaran pemilik
kendaraan untuk membayar perpanjangan izin trayek.

4.1.1.1.3. Hasil Pengelolaan Kekayaan Daerah yang Dipisahkan


Pendapatan Hasil Pengelolaan Kekayaan Daerah yang Dipisahkan
dianggarkan sebesar Rp817.451.610,00 dengan realisasi sebesar
Rp1.891.776.235,73 atau 231,42%. Jumlah tersebut merupakan bagian laba
atas penyertaan modal pada Bank SumselBabel sesuai dengan surat Nomor
900/120/DPPKAD-PL/2014 tanggal 22Januari 2014, terdiri dari :
1. Penerimaan kekurangan deviden Tahun 2012 sebesar Rp39.084.301,16
yang diterima tanggal 28 Juni 2013.
2. Penerimaan persekot deviden Tahun 2013 sebesar Rp1.852.691.934,57
yang diterima tanggal 31 Desember 2013.

4.1.1.1.4. Lain-lain Pendapatan Asli Daerah yang Sah


Lain-lain Pendapatan Asli Daerah yang Sah dianggarkan sebesar
Rp6.570.656.599,42 dapat dicapai sebesar Rp17.569.082.842,91 atau
267,39% dengan rincian pada tabel berikut.

Tabel 4.8 Rincian Lain-lain Pendapatan Asli Daerah yang Sah


Pemerintah Kabupaten Banyuasin Tahun 2013
Lebih/Kurang
No. Uraian Anggaran (Rp) Realisasi (Rp) %
(Rp)

Hasil Penjualan Aset Daerah yang


1 0,00 204.262.127,00 204.262.127,00 0,00
Tidak Dipisahkan
2 Penerimaan Jasa Giro 2.060.891.930,00 3.366.263.132,00 1.305.371.202,00 163,34
3 Penerimaan Bunga Deposito 3.500.000.000,00 11.251.867.023,97 7.751.867.023,97 321,48
4 Tuntutan Ganti Kerugian Daerah 0,00 687.186.344,69 687.186.344,69 0,00
Pendapatan Denda Keterlambatan
5 0,00 3.423.000,00 3.423.000,00 0,00
Pelaksanaan Pekerjaan
6 Pendapatan Hasil Eksekusi Jaminan 0,00 17.582.400,00 17.582.400,00 0,00
7 Pendapatan dari Pengembalian 0,00 1.184.743.642,21 1.184.743.642,21 0,00
8 Kapitalisasi RJTP Askes 9.643.000,00 18.106.000,00 8.463.000,00 187,76
9 Penerimaan Lain-lain 1.000.121.669,42 835.649.173,04 (164.472.496,38) 83,55

Jumlah 6.570.656.599,42 17.569.082.842,91 10.998.426.243,49 267,39

36
1. Hasil penjualan aset yang tidak dipisahkan terealisasi sebesar
Rp204.262.127,00 terdiri dari hasil penjualan kendaraan dinas roda empat
sebesar Rp199.388.127,00 dan hasil penjualan aset daerah yang tidak
dipisahkan lainnya sebesar Rp4.874.000,00. Penjualan aset daerah ini
antara lain adalah hasil penjualan aset yang dihapuskan/rusak berat dari
inspektorat kabupaten, BKD dan Diklat, BPMD, Bappeda dan Penanaman
Modal, Dinas Pengelolaan Pasar, Badan Perpustakaan, Dinas Koperasi,
Dinas Sosial, Dinas PU CK, Dinas Kehutanan dan Perkebunan, Dinas PU
Pengairan, DPPKAD, Dinas Kesehatan dan Dinas Pertambangan.
2. Pendapatan Jasa Giro sebesar Rp3.366.263.132,00 merupakan jasa giro
dari Rekening Kas Umum Daerah.
3. Pendapatan Bunga Deposito dapat dilihat pada tabel di bawah ini:

Tabel 4.9 Daftar Bunga Deposito


No. Bank Jumlah

1 Bank Jawa Barat (BJB) 267.656.395,00


2 Bank BNI 653.128.995,00
3 Bank BRI 332.945.665,00
4 Bank Mandiri 447.576.200,98

5 Bank Muamalat 9.550.559.767,99

Jumlah 11.251.867.023,97

Dari penempatan Deposito Kabupaten Banyuasin sampai dengan 31


Desember 2013 terdapat deposito yang belum diterima di Kas Daerah
Pemerintah Kabupaten Banyuasin, yaitu Pendapatan Bunga atas
penempatan deposito pada Bank BNI dan Bank Mandiri, dengan rincian
sebagai berikut.

Tabel 4.10 Pendapatan atas Bunga Deposito yang ditangguhkan


Nominal Bunga
No. Bank Nomor Seri Deposito Ditangguhkan

1 Bank Mandiri AD 224309 10.000.000.000,00 32.054.794,52


AD 224310 10.000.000.000,00 32.054.794,52
AD 224311 10.000.000.000,00 32.054.794,52
AD 224312 10.000.000.000,00 32.054.794,52

AD 224313 10.000.000.000,00 32.054.794,52

2 Bank BNI DA 195278 10.000.000.000,00 183.854.981,00

Jumlah 344.128.953,60

4. Tuntutan Ganti Kerugian Uang Daerah terealisasi sebesar


Rp687.186.344,69 dan Tuntutan Ganti Kerugian Barang Daerah sebesar
Rp3.320.000,00 merupakan penerimaan atas angsuran Tuntutan
Perbendaharaan dan Tuntutan Ganti Rugi (TP-TGR) Barang Tahun 2013,
yang terdiri atas:

37
- Atas nama Hy Rp550.000,00
- Atas nama EAm Rp1.520.000,00
- Atas nama AA, S.Pd Rp1.250.000,00
5. Pendapatan Denda Keterlambatan pelaksanaan pekerjaan terealisasi
sebesar Rp3.432.000,00 merupakan denda keterlambatan atas pekerjaan
dengan SPK Nomor 027/23/PPK/BLH/2013 tanggal 13 September 2013
untuk pekerjaan pembangunan instalasi pengelolaan air limbah (IPAL)
Puskesmas Daya utama Kecamatan Muara Padang Kabupaten Banyuasin.
6. Pendapatan Hasil Eksekusi Jaminan terealisasi sebesar Rp17.582.400,00
merupakan uang jaminan penawaran dari pihak ketiga/rekanan yang
mengundurkan diri.
7. Pendapatan dari Pengembalian terealisasi sebesar Rp1.184.743.642,21,
terdiri dari pengembalian gaji dan tunjangan sebesar Rp899.803.073,00.
Termasuk di dalamnya adalah pengembalian dari PT Taspen sebesar
Rp774.831.758,00 yang merupakan penerimaan atas pengembalian
kelebihan pembayaran gaji dan tunjangan lainnya yang dipotong
langsung dari pembayaran pensiun pegawai.
Pendapatan dari pengembalian kelebihan pembayaran perjalanan dinas
sebesar Rp2.915.000,00 dan pendapatan pengembalian kelebihan bayar
dan tindak lanjut hasil pemeriksaan dan pengembaliannya sebesar
Rp282.025.569,21.
8. RJTP Askes terealisasi sebesar Rp18.106.000,00 dari anggaran sebesar
Rp9.643.000,00.
9. Penerimaan Lain-lain terealisasi sebesar Rp835.649.173,04 dari anggaran
sebesar Rp1.000.121.669,42 terdiri dari pendapatan dari Lelang Lebak
Lebung dan Penerimaan Lainnya. Adapun rincian dari penerimaan lain-
lain yang merupakan bagian dari Lain-Lain PAD yang Sah dapat dilihat
pada tabel berikut.

Tabel 4.11 Rincian Penerimaan Lain-lain


PemerintahKabupaten Banyuasin Tahun 2013
Lebih/Kurang
No. Uraian Anggaran (Rp) Realisasi (Rp) %
(Rp)
1 Lelang Lebak Lebung 280.650.000,00 685.653.000,00 405.003.000,00 244,31

2 Penerimaan Lainnya 719.471.669,42 149.996.173,04 (569.475.496,38) 20,85

Jumlah 1.000.121.669,42 835.649.173,04 (164.472.496,38) 83,55

a. Lelang Lebak Lebung dianggarkan sebesar Rp280.650.000,00 terealisasi


sebesar Rp685.653.000,00dengan rincian pada tabel berikut.

Tabel 4.12 Rincian Realisasi Pendapatan Lelang Lebak Lebung Tahun 2013
No. Lokasi Realisasi (Rp)

1 Kec. Banyuasin III 25.080.000,00

2 Kec. Pulau Rimau 30.742.000,00

3 Kec. Betung 39.812.600,00


4 Kec. Muara Telang 4.123.000,00

38
No. Lokasi Realisasi (Rp)

5 Kec. Tungkai Ilir 5.700.000,00


6 Kec. Banyuasin I 2.815.800,00
7 Kec. Sumber Marga Telang 14.155.000,00
8 Kec. Makarti Jaya 7.866.000,00
9 Kec. Talang Kelapa 2.394.000,00
10 Kec. Muara Sugihan 14.417.200,00
11 Kec. Rantau Bayur 288.868.400,00
12 Kec. Suak Tapeh 6.099.000,00
13 Kec. Banyuasin II 104.120.000,00
14 Kec. Rambutan 61.636.000,00

15 Kec. Tanjung Lago 77.824.000,00

Jumlah 685.653.000,00

b. Penerimaan Lainnya terealisasi sebesar Rp149.996.173,04 dari anggaran


sebesar Rp719.471.669,42 terdiri dari kelebihan setoran, kelebihan PFK
dan saldo dari penutupan rekening-rekening bendahara.

9.1.1.1. Pendapatan Transfer


Realisasi Pendapatan Transfer mencapai sebesar Rp1.470.136.237.713,00 atau
lebih kecil Rp25.935.340.938,92 atau 98,27% dari anggaran sebesar
Rp1.496.071.578.651,92. Pendapatan Transfer, terdiri atas:

9.1.1.1.1. Transfer dari Pemerintah Pusat Dana Perimbangan


Realisasi Pendapatan Transfer dari Pemerintah Pusat Dana Perimbangan
mencapai sebesar Rp1.294.846.039.113,00 atau kurang sebesar
Rp2.124.235.638,92 yaitu 99,84% dari anggaran sebesar
Rp1.296.970.274.751,92. Pendapatan Transfer Dana Perimbangan, terdiri
atas:

Tabel 4.13 Rincian Pendapatan Transfer Dana Perimbangan


Pemerintah Kabupaten Banyuasin Tahun 2013
Uraian Anggaran (Rp) Realisasi (Rp) Lebih/Kurang %

Dana Bagi Hasil Pajak 169.641.690.439,00 164.445.668.681,00 (5.196.021.758,00) 96,94


Bagi Hasil dari Pajak Bumi dan Bangunan 161.440.094.298,00 158.727.923.997,00 (2.712.170.301,00) 98,32
Bagi Hasil dari Pajak Penghasilan Orang
8.201.596.141,00 5.717.744.684,00 (2.483.851.457,00) 69,72
Pribadi

Dana Bagi Hasil Bukan Pajak 207.673.789.312,92 210.745.575.432,00 3.071.786.119,08 101,48


Bagi Hasil dari Provisi Sumber Daya
12.576.394.504,00 9.664.465.882,00 (2.911.928.622,00) 76,85
Hutan
Bagi Hasil dari Iuran Tetap (Land-Rent) 1.364.730.000,00 604.055.031,00 (760.674.969,00) 44,26
Bagi Hasil dari Iuran Eksplorasi dan Iuran
34.771.120.700,00 21.452.609.643,00 (13.318.511.057,00) 61,70
Eksploitasi (Royalti)
Bagi Hasil dari Pungutan Hasil Perikanan 289.738.431,00 347.408.873,00 57.670.442,00 119,90

39
Bagi Hasil dari Pertambangan Minyak
57.922.386.000,00 64.584.492.446,00 6.662.106.446,00 111,50
Bumi
Bagi Hasil dari Pertambangan Gas Bumi 100.632.558.009,47 114.029.543.863,00 13.396.985.853,53 113,31
Bagi Hasil dari Pertambangan Panas Bumi 15.075.565,00 18.471.620,00 3.396.055,00 122,53
Bagi Hasil dari Cukai Hasil Tembakau 101.786.103,45 44.528.074,00 (57.258.029,45) 43,75

Dana Alokasi Umum 772.464.315.000,00 772.464.315.000,00 0,00 100,00


Dana Alokasi Khusus 147.190.480.000,00 147.190.480.000,00 0,00 100,00

Jumlah 1.296.970.274.751,92 1.294.846.039.113,00 (2.124.235.638,92) 99,84

9.1.1.1.2. Transfer dari Pemerintah Pusat Lainnya


Realisasi Pendapatan Transfer dari Pemerintah Pusat Lainnya sebesar
Rp168.721.797.000,00 atau 99,02% lebih kecil Rp1.667.592.500,00 dari
anggaran sebesar Rp170.389.389.500,00 dengan kontribusi terhadap
Pendapatan Daerah sebesar 10,16%. Pendapatan Transfer dari Pemerintah
Pusat - Lainnya terdiri atas:

Tabel 4.14 Rincian Pendapatan Transfer Pemerintah Pusat - Lainnya


Dana Penyesuaian Tahun 2013
Uraian Anggaran (Rp) Realisasi (Rp) Lebih/Kurang %

Dana Tunjangan Profesi Guru PNSD 83.246.537.000,00 83.246.537.000,00 0,00 100,00


Dana Tunjangan Non Sertifikasi 9.479.750.000,00 9.479.750.000,00 0,00 100,00
Bantuan Operasional Sekolah (BOS)
75.663.102.500,00 73.995.510.000,00 (1.667.592.500,00) 97,80
SD/SMP Negeri
Dana Instentif Daerah (DID) 2.000.000.000,00 2.000.000.000,00 0,00 100,00

Jumlah 170.389.389.500,00 168.721.797.000,00 (1.667.592.500,00) 99,02

9.1.1.1.3. Transfer Pemerintah Provinsi


Realisasi Pendapatan Transfer Pemerintah Provinsi sebesar
Rp6.568.401.600,00 atau kurang sebesar Rp22.143.512,800,00 yaitu 22,88%
dari anggaran sebesar Rp28.711.914.400,00. Pendapatan Transfer Pemerintah
Provinsi terdiri atas:

Tabel 4.15 Rincian Pendapatan Transfer Pemerintah Provinsi


Dana Bagi Hasil Pajak Tahun 2013
Uraian Anggaran (Rp) Realisasi (Rp) Lebih/Kurang %

Bagi Hasil dari Pajak Kendaraan Bermotor 5.484.801.500,00 1.436.064.600,00 (4.048.736.900,00) 26,18
Bagi Hasil dari Pajak Kendaraan di Atas Air 2.597.600,00 0,00 (2.597.600,00) 0,00
Bagi Hasil dari Bea Balik Nama Kendaraan
8.480.866.100,00 2.072.192.100,00 (6.408.674.000,00) 24,43
Bermotor
Bagi Hasil dari Bea Balik Nama Kendaraan
329.800,00 0,00 (329.800,00) 0,00
di Atas Air
Bagi Hasil dari Pajak Bahan Bakar
14.616.953.000,00 3.060.144.900,00 (11.556.808.100,00) 20,94
Kendaraan Bermotor

40
Uraian Anggaran (Rp) Realisasi (Rp) Lebih/Kurang %

Bagi Hasil dari Pajak Pengambilan dan


126.366.400,00 0,00 (126.366.400,00) 0,00
Pemanfaatan Air Permukaan

Jumlah 28.711.914.400,00 6.568.401.600,00 (22.143.512.800,00) 22,88

Pendapatan Transfer Pemerintah Provinsi ini berasal dari dana bagi hasil pajak
provinsi bagian Kabupaten Banyuasin dari bulan Januari sampai dengan bulan
Februari Tahun 2013 sedangkan untuk bulan Maret sampai dengan Desember
2013 belum diterima dari Provinsi Sumatera Selatan sebesar
Rp29.193.935.680,53.

9.1.1.2. Lain-Lain Pendapatan yang Sah


Realisasi Lain-lain Pendapatan yang Sah sebesar Rp112.179.164.654,00 atau
106,22% dari anggaran sebesar Rp105.609.349.000,00 atau di atas anggaran
yang ditetapkan sebesar Rp6.569.815.654,00. Rincian Lain-lain Pendapatan
yang Sah, sebagai berikut.

Tabel 4.16 Rincian Lain-lain Pendapatan yang Sah Tahun 2013


Uraian Anggaran (Rp) Realisasi (Rp) Lebih/Kurang %

Bantuan Keuangan Provinsi


87.255.000.000,00 84.906.417.976,00 (2.348.582.024,00) 97,31
untuk Kabupaten
Bantuan Keuangan untuk
800.000.000,00 800.000.000,00 0,00 100,00
Kelurahan
Bantuan Sekolah Gratis 10.527.449.000,00 17.697.235.500,00 7.169.786.500,00 168,11
Bantuan Guru Non PNS SLB 143.900.000,00 142.010.000,00 (1.890.000,00) 98,69
Bantuan Berobat Gratis 6.883.000.000,00 8.633.501.178,00 1.750.501.178,00 125,43

Jumlah 105.609.349.000,00 112.179.164.654,00 6.569.815.654,00 106,22

Bantuan Keuangan Provinsi untuk Kabupaten Banyuasin terealisasi sebesar


Rp84.906.417.976,00 atau 97,31% dari anggaran sebesar Rp87.255.000.000,00.
Bantuan Keuangan ini antara lain merupakan bantuan untuk membiayai
infrastruktur daerah. Bantuan Keuangan untuk Kelurahan terealisasi sebesar
Rp800.000.000,00 atau 100% dari anggaran.
Bantuan Sekolah Gratis dari anggaran sebesar Rp10.527.449.000,00 terealisasi
sebesar Rp17.697.235.500,00 atau 168,11%. Bantuan Guru Non PNS SLB dari
anggaran sebesar Rp143.900.000,00 terealisasi sebesar Rp142.010.000,00 atau
98,69%. Bantuan Berobat Gratis dari anggaran sebesar Rp6.883.000.000,00
terealisasi sebesar Rp8.633.501.178,00 atau 125,43%.

4.1.1 Belanja
Dalam Tahun 2013, realisasi belanja daerah untuk membiayai penyelenggaraan
pemerintahan dan pelaksanaan pembangunan serta pelayanan masyarakat sebesar
Rp1.668.900.629.860,63 atau terdapat sisa anggaran sebesar
Rp157.343.685.228,18 yaitu 91,38% dari anggaran sebesar
Rp1.826.244.315.088,81, terdiri atas:

41
Tabel 4.17 Rincian Belanja Daerah Pemerintah Kabupaten Banyuasin Tahun 2013
Uraian Anggaran (Rp) Realisasi (Rp) Lebih/Kurang %

Belanja Operasi 1.220.749.613.796,81 1.107.121.753.879,63 (113.627.859.917,18) 90,69


Belanja Modal 605.210.341.123,00 561.753.662.659,00 (43.456.678.464,00) 92,82
Belanja Tak terduga 284.360.169,00 25.213.322,00 (259.146.847,00) 8,87

Jumlah 1.826.244.315.088,81 1.668.900.629.860,63 (157.343.685.228,18) 91,38

Berdasarkan tabel di atas, semua belanja terserap di bawah anggaran. Kondisi ini
menghasilkan sisa anggaran Pemerintah Kabupaten Banyuasin sebesar
Rp157.343.685.228,18 atau efisiensi 8,62%, karena adanya penghematan
pemakaian dana dari berbagai kegiatan.

Gambar 4.2 Perbandingan Realisasi Belanja Tahun 2013

Berdasarkan grafik di atas, belanja terbesar dialokasikan untuk Belanja Operasi


yaitu sebesar Rp1.107.121.753.879,63 atau 66,34% dari total belanja Pemerintah
Kabupaten Banyuasin secara keseluruhan.

4.1.2.1. Belanja Operasi


Realisasi Belanja Operasi mencapai sebesar Rp1.107.121.753.879,63 atau
90,69%, sehingga terdapat efisiensi sebesar Rp113.627.859.917,18 atau 9,31%
dari anggaran sebesar Rp1.220.749.613.796,81. Belanja Operasi, terdiri atas:
1. Belanja Pegawai sebesar Rp592.097.166.177,00;
2. Belanja Barang dan Jasa sebesar Rp377.872.151.087,63;
3. Belanja Subsidi sebesar Rp0,00;
4. Belanja Hibah sebesar Rp101.749.175.090,00;
5. Belanja Bantuan Sosial sebesar Rp6.244.534.000,00;
6. Belanja Bantuan Keuangan sebesar Rp29.158.727.525,00.

4.1.2.1.1. Belanja Pegawai


Realisasi Belanja Pegawai mencapai sebesar Rp592.097.166.177,00 atau
efisiensi sebesar Rp60.040.563.154,36 dari anggaran sebesar
Rp652.137.729.331,36. Realisasi Belanja pegawai menyerap dana 90,79%
dari anggaran yang tersedia, yang terdiri atas:

42
Tabel 4.18 Rincian Belanja Pegawai Pemerintah Kabupaten Banyuasin Tahun 2013
Uraian Anggaran (Rp) Realisasi (Rp) Lebih/Kurang %

Gaji dan Tunjangan 553.957.637.323,96 504.289.077.892,00 (49.668.559.431,96) 91,03


Tambahan Penghasilan PNS 35.800.170.249,00 30.870.794.653,00 (4.929.375.596,00) 86,23
Belanja Penerimaan Lainnya
4.215.170.900,00 4.152.783.870,00 (62.387.030,00) 98,52
Pimpinan dan Anggota DPRD
Biaya Pemungutan Pajak Daerah 9.698.855.858,40 7.845.202.642,00 (1.853.653.216,40) 80,89
Honorarium PNS 36.034.420.000,00 33.345.480.720,00 (2.688.939.280,00) 92,54
Honorarium Non PNS 11.868.831.000,00 11.068.695.400,00 (800.135.600,00) 93,26
Uang Lembur 562.644.000,00 525.131.000,00 (37.513.000,00) 93,33

Jumlah 652.137.729.331,36 592.097.166.177,00 (60.040.563.154,36) 90,79

4.1.2.1.2. Belanja Barang


Realisasi Belanja Barang mencapai sebesar Rp377.872.151.087,63 dari
anggaran sebesar Rp410.217.893.550,45. Rincian Belanja Barang sebagai
berikut.
Tabel 4.19 Rincian Belanja Barang dan Jasa
Pemerintah Kabupaten Banyuasin Tahun 2013
Uraian Anggaran (Rp) Realisasi (Rp) Lebih/Kurang %

Belanja Bahan Pakai Habis Kantor 113.198.389.340,08 109.589.623.467,00 (3.608.765.873,08) 96,81


Belanja Bahan/Material 21.969.829.953,80 20.315.805.805,00 (1.654.024.148,80) 92,47
Belanja Jasa Kantor 61.643.733.026,00 58.313.514.961,00 (3.330.218.065,00) 94,60
Belanja Premi Asuransi 34.335.764.800,00 34.478.968.042,63 143.203.242,63 100,42
Belanja Perawatan Kendaraan Bermotor 20.728.952.078,00 18.521.529.256,00 (2.207.422.822,00) 89,35
Belanja Cetak dan Penggandaan 13.189.937.653,57 12.382.697.858,00 (807.239.795,57) 93,88
Belanja Sewa Rumah/Gedung/Gudang/Parkir 5.484.475.000,00 4.948.661.300,00 (535.813.700,00) 90,23
Belanja Sewa Sarana Mobilitas 3.530.534.000,00 2.707.893.000,00 (822.641.000,00) 76,70
Belanja Sewa Alat Berat 113.800.000,00 113.420.000,00 (380.000,00) 99,67
Belanja Sewa Perlengkapan dan Peralatan Kantor 2.832.320.500,00 2.378.417.000,00 (453.903.500,00) 83,97
Belanja Makanan dan Minuman 20.897.032.900,00 17.235.366.841,00 (3.661.666.059,00) 82,48
Belanja Pakaian Dinas dan Atributnya 2.433.615.094,00 2.325.567.375,00 (108.047.719,00) 95,56
Belanja Pakaian Kerja 1.385.580.000,00 1.376.490.000,00 (9.090.000,00) 99,34
Belanja Pakaian Khusus dan Hari-hari Tertentu 1.813.058.800,00 1.634.819.100,00 (178.239.700,00) 90,17
Belanja Perjalanan Dinas 76.023.944.850,00 64.667.915.971,00 (11.356.028.879,00) 85,06
Belanja Beasiswa Pendidikan PNS 125.000.000,00 50.000.000,00 (75.000.000,00) 40,00
Belanja Kursus, Pelatihan, Sosialisasi dan
6.581.401.743,00 5.434.752.620,00 (1.146.649.123,00) 82,58
Bimbingan Teknis PNS
Belanja Pemulangan Pegawai 40.000.000,00 0,00 (40.000.000,00) 0,00
Belanja Pemeliharaan 16.618.727.512,00 14.563.809.491,00 (2.054.918.021,00) 87,63
Belanja Jasa Konsultansi 7.036.796.300,00 6.647.950.000,00 (388.846.300,00) 94,47
Belanja Pengadaan Barang NonKapitalisasi/
235.000.000,00 184.949.000,00 (50.051.000,00) 78,70
Kategori Aset Tetap atau Belanja Modal

Jumlah 410.217.893.550,45 377.872.151.087,63 (32.345.742.462,82) 92,11

43
Realisasi Belanja Barang sebesar Rp377.872.151.087,63 termasuk realisasi
belanja yang tidak melalui mekanisme penerimaan dan belanja dari kas daerah
yaitu premi asuransi kesehatan berupa realisasi belanja BOK pada Dinas
Kesehatan sebesar Rp2.446.373.000,00 dan realisasi belanja BOS pada Dinas
Pendidikan sebesar Rp73.995.510.000,00. Khusus belanja premi asuransi
terjadi pelampauan terhadap anggarannya sebesar Rp143.203.242,63
disebabkan adanya klaim yang terjadi setelah terbit APBD Perubahan Tahun
2013 seiring dengan penerimaan pendapatan premi tersebut.

4.1.2.1.4. Belanja Subsidi


Untuk Belanja Subsidi tidak dianggarkan dan tidak ada realisasinya pada
Tahun 2013.

4.1.2.1.5. Belanja Hibah


Mekanisme penyaluran Belanja Hibah berdasarkan Peraturan Bupati Nomor
871 Tahun 2011 tentang Pedoman Pengelolaan Hibah dan Bantuan Sosial
yang bersumber dari APBD Kabupaten Banyuasin. Anggaran Belanja Hibah
sebesar Rp122.298.329.765,00 dan terealisasi sebesar Rp101.749.175.090,00
atau 83,20% dari anggaran, terdiri dari Belanja Hibah berupa uang
direalisasikan oleh PPKD sebesar Rp64.876.052.501,00 dari anggaran sebesar
Rp82.375.671.565,00 dan Belanja Hibah pada SKPD sebesar
Rp36.873.122.589,00 dari anggaran sebesar Rp39.922.658.200,00. Rincian
belanja hibah PPKD, terdiri atas:

Tabel 4.20 Rincian Belanja Hibah PPKD Tahun 2013


Uraian Anggaran (Rp) Realisasi (Rp) Lebih/Kurang %

Belanja Hibah Kepada Pemerintah Pusat 47.227.967.165,00 45.621.717.001,00 (1.606.250.164,00) 96,60


Belanja Hibah Kepada Pemerintah Desa 927.600.000,00 665.100.000,00 (262.500.000,00) 71,70
Belanja Hibah Kepada Organisasi
7.750.930.000,00 6.093.500.000,00 (1.657.430.000,00) 78,62
Masyarakat
Belanja Hibah Kepada Kelompok
26.469.174.400,00 12.495.735.500,00 (13.973.438.900,00) 47,21
Masyarakat
Jumlah 82.375.671.565,00 64.876.052.501,00 (17.499.619.064,00) 78,76

Rincian Belanja Hibah PPKD sebagaimana terdapat pada Lampiran 1,


sedangkan rincian Belanja Hibah Barang dan Jasa pada SKPD, adalah sebagai
berikut.
Tabel 4.21 Rincian Belanja Hibah SKPD Tahun 2013
Uraian Anggaran (Rp) Realisasi (Rp) Lebih/Kurang %

Dinas Pendidikan 198.750.000,00 198.561.000,00 (189.000,00) 99,90


Dinas PU CK 875.000.000,00 871.477.000,00 (3.523.000,00) 99,60
Dinas Kebersihan, Pertamanan dan Pemakaman 75.000.000,00 73.150.000,00 (1.850.000,00) 97,53
Dinas Sosial 765.000.000,00 761.950.000,00 (3.050.000,00) 99,60
Dinas Koperindag 222.395.200,00 192.321.613,00 (30.073.587,00) 86,48
BPBD Kesbangpol 1.451.000.000,00 1.358.420.000,00 (92.580.000,00) 93,62
Sekretariat Daerah 4.499.750.000,00 4.474.980.000,00 (24.770.000,00) 99,45
Kecamatan Banyuasin I 95.000.000,00 95.000.000,00 0,00 100,00

44
Kecamatan Banyuasin III 237.500.000,00 237.500.000,00 0,00 100,00
Kecamatan Betung 95.000.000,00 95.000.000,00 0,00 100,00
Kecamatan Talang Kelapa 285.000.000,00 285.000.000,00 0,00 100,00
Kecamatan Makarti Jaya 47.500.000,00 47.500.000,00 0,00 100,00
BPMPD 13.495.000.000,00 13.394.500.000,00 (100.500.000,00) 99,26
Dinas Pertanian dan Peternakan 12.304.980.000,00 9.694.622.850,00 (2.610.357.150,00) 78,79
Dinas Kehutanan dan Perkebunan 3.079.033.000,00 2.982.188.000,00 (96.845.000,00) 96,85
Dinas Pariwisata, Seni Budaya, Pemuda dan
2.086.750.000,00 2.002.426.126,00 (84.323.874,00) 95,96
Olahraga
Dinas Perikanan dan Kelautan 110.000.000,00 108.526.000,00 (1.474.000,00) 98,66

Jumlah 39.922.658.200,00 36.873.122.589,00 (3.049.535.611,00) 92,36

Belanja Hibah tersebut di atas termasuk hibah kepada pemerintah desa berupa
uang sebesar Rp665.100.00 yang seharusnya dikelompokkan dalam Belanja
Bantuan Keuangan.

4.1.2.1.6. Belanja Bantuan Sosial


Pengelolaan Belanja Bantuan Sosial berdasarkan Peraturan Bupati Banyuasin
Nomor 871 Tahun 2011 tentang Pedoman Pengelolaan Hibah dan Bantuan
Sosial, sedangkan untuk besaran Belanja Bantuan Sosial dituangkan dalam
Keputusan Bupati Banyuasin Nomor 11/KPTS/VI/ 2013 tentang Penetapan
Daftar Penerima Bantuan Sosial.
Belanja Bantuan Sosial terealisasi sebesar Rp6.244.534.000,00 dari anggaran
sebesar Rp6.751.901.150,00, terdiri dari Belanja Bantuan Sosial yang dikelola
oleh PPKD dan yang dikelola oleh SKPD. Belanja Bantuan Sosial yang
dikelola oleh PPKD dari anggaran sebesar Rp4.774.650.000,00 realisasinya
mencapai sebesar Rp4.275.700.000,00 dengan efisiensi sebesar
Rp498.950.000,00, terdiri atas:

Tabel 4.22 Belanja Bantuan Sosial yang dikelola oleh PPKD


Uraian Anggaran (Rp) Realisasi (Rp) Lebih/Kurang %

Belanja Bantuan Sosial kepada Organisasi


342.150.000,00 54.000.000,00 (288.150.000,00) 15,78
Kemasyarakatan
Belanja Bantuan Sosial kepada Kelompok
4.104.000.000,00 3.937.200.000,00 (166.800.000,00) 95,94
Masyarakat dan/atau Masyarakat
Belanja Bantuan Sosial kepada Anggota
328.500.000,00 284.500.000,00 (44.000.000,00) 86,61
Masyarakat dengan Tujuan Jaminan Sosial

Jumlah 4.774.650.000,00 4.275.700.000,00 (498.950.000,00) 89,55

Rincian Belanja Bantuan Sosial yang dikelola oleh PPKD pada Lampiran 2,
sedangkan Belanja Bantuan Sosial yang disalurkan oleh SKPD yaitu Dinas
Sosial dari anggaran sebesar Rp1.977.251.150,00 terealisasi sebesar
Rp1.968.834.000,00, sebagai berikut.

45
Tabel 4.23 Belanja Bantuan Sosial yang dikelola oleh SKPD Tahun 2013
Uraian Anggaran (Rp) Realisasi (Rp) Lebih/Kurang

Bantuan Sosial Barang/Jasa kepada Organisasi


278.450.000,00 276.469.000,00 (1.981.000,00)
Kemasyarakatan Bidang Keagamaan
Bantuan Sosial Barang/Jasa kepada Organisasi
5.000.000,00 5.000.000,00 0,00
Kemasyarakatan Bidang Lainnya
Bantuan Sosial Barang/Jasa kepada Anggota/Kelompok
196.800.000,00 196.800.000,00 0,00
Masyarakat dengan Tujuan Rehabilitasi Sosial
Bantuan Sosial Barang/Jasa kepada Anggota/Kelompok
306.950.000,00 306.640.000,00 (310.000,00)
Masyarakat dengan Tujuan Perlindungan Sosial
Bantuan Sosial Barang/Jasa kepada Anggota/Kelompok
28.000.000,00 28.000.000,00 0,00
Masyarakat dengan Tujuan Pemberdayaan Sosial
Bantuan Sosial Barang/Jasa kepada Anggota/Kelompok
671.592.000,00 670.442.000,00 (1.150.000,00)
Masyarakat dengan Tujuan Penanggulangan Kemiskinan
Bantuan Sosial Barang/Jasa kepada Anggota/Kelompok
490.459.150,00 485.483.000,00 (4.976.150,00)
Masyarakat dengan Tujuan Penanggulangan Bencana

Jumlah 1.977.251.150,00 1.968.834.000,00 (8.417.150,00)

4.1.2.1.7. Belanja Bantuan Keuangan


Belanja Bantuan Keuangan dari anggaran sebesar Rp29.343.760.000,00 telah
terealisasi sebesar Rp29.158.727.525,00 atau 99,37%, terdiri atas:

Tabel 4.24 Rincian Belanja Bantuan Keuangan Tahun 2013


Uraian Anggaran (Rp) Realisasi (Rp) Lebih/Kurang %

Belanja Bantuan Kepada Desa 28.493.760.000,00 28.311.760.000,00 (182.000.000,00) 99,36


Belanja Bantuan Kepada Partai
850.000.000,00 846.967.525,00 (3.032.475,00) 99,64
Politik

Jumlah 29.343.760.000,00 29.158.727.525,00 (185.032.475,00) 99,37

Realisasi Belanja Bantuan Keuangan kepada Pemerintahan Desa sebesar


Rp28.311.760.000,00 digunakan untuk :
1. Dana Alokasi Desa (DAD)
Untuk besaran belanja DAD dituangkan dalam Keputusan Bupati
Banyuasin Nomor 1037/KPTS/PMPD/2013 tentang Penetapan dan
Pemetaan Dana Alokasi Desa dalam Kabupaten Banyuasin Tahun 2013,
terdiri dari:
a. BantuanTunjangan Aparatur Pemerintah Desa;
b. Bantuan Tunjangan Badan Permusyawaratan Desa;
c. Bantuan Operasional Penyelenggaraan Pemerintahan Desa;
d. Bantuan Pemberdayaan Masyarakat.
2. Tunjangan Kematian Bagi Kepala Desa yang Meninggal Dunia
berdasarkan Keputusan Bupati Nomor 148/KPTS/PMPD/2013.
3. Tunjangan/Santunan Bagi Mantan Kepala Desa berdasarkan Keputusan
Bupati Nomor 60/KPTS/PMPD/2013.
Realisasi Belanja Bantuan kepada Partai Politik sebesar Rp846.967.525,00
diberikan berdasarkan jumlah perolehan suara hasil Pemilihan Umum

46
Legislatif Tahun 2009 dikalikan dengan nilai bantuan persuara yaitu
Rp3.041,00 per suara, yang dikelola berdasarkan Peraturan Bupati Nomor 148
Tahun 2011 tentang Pedoman Tata Cara Perhitungan, Pengajuan, Penyaluran
dan Laporan Pertanggungjawaban Penggunaan Bantuan Keuangan Partai
Politik di Kabupaten Banyuasin, dengan rincian sebagai berikut.

Tabel 4.25 Rincian Belanja Bantuan Keuangan Partai Politik


Jumlah Bantuan
No. Partai Politik Penerima Bantuan
(Rp)

1 Partai Amanat Nasional (PAN) 66.068.766,00

2 Partai Bulan Bintang (PBB) 20.183.117,00

3 Partai Demokrat 118.769.665,00


4 Partai Demokrasi Indonesia Perjuangan (PDIP) 94.024.679,00
5 Partai Bintang Reformasi (PBR) 35.746.955,00
6 Partai Golongan Karya (Golkar) 190.868.365,00
7 Partai GERINDRA 46.098.519,00
8 Partai HANURA 73.835.480,00
9 Partai Persatuan Nasional Ummah Indonesia (PPNUI) 27.752.166,00
10 Partai Keadilan Sejahtera (PKS) 71.652.042,00
11 Partai Karya Peduli Bangsa (PKPB) 35.713.504,00
12 Partai Persatuan Pembangunan (PPP) 51.107.046,00
13 Partai Pemuda Indonesia 15.147.221,00

Jumlah 846.967.525,00

4.1.2.2. Belanja Modal


Realisasi Belanja Modal sebesar Rp561.753.662.659,00 atau efisiensi sebesar
Rp43.456.678.464,00 dari anggaran sebesar Rp605.210.341.123,00. Belanja
Modal menyerap dana sebesar 92,82% dari anggaran Belanja Modal atau 33,66%
dari total Belanja Kabupaten. Berikut ini disajikan grafik mengenai proporsi
realisasi masing-masing pos Belanja Modal untuk Tahun Anggaran 2013.

Gambar 4.3
Perbandingan Realisasi Belanja Modal Tahun Anggaran 2013

47
Dari total realisasi Belanja Modal Tahun 2013 sebesar Rp561.753.662.659,00
tidak seluruhnya diakui sebagai penambah aset tetap Tahun 2013. Berdasarkan
Standar Akuntansi Pemerintahan (SAP) dan kebijakan akuntansi sebagaimana
tertuang dalam Peraturan Bupati Banyuasin Nomor 911 Tahun 2012 tentang
Kebijakan Akuntansi Pemerintah Kabupaten Banyuasin. Belanja Modal harus
dikecualikan dari aset tetap jika diperuntukkan sebagai hibah ke masyarakat dan
atau secara nilai tidak dapat dikapitalisasi.
Rincian mutasi belanja modal yang dihibahkan/pakai habis dan yang tidak dapat
dikapitalisir karena kebijakan akuntansi (asset extracomptable) dan reklasifikasi
antar akun belanja, adalah sebagai berikut.

Tabel 4.26 Daftar Belanja Modal menjadi Aset Tetap


Reklasifikasi antar akun Belanja
Belanja Modal BM yg tidak Belanja Modal yang
No Jenis Belanja Modal Modal
2013 menjadi Aset menjadi Aset
Tambah Kurang

1 Tanah 6.209.266.322,00 597.275.495,00 - 48.000.000,00 5.563.990.827,00


2 Peralatan dan Mesin 106.884.769.126,00 13.401.996.664,14 393.700.000,00 6.816.049.500,00 87.060.422.961,86
3 Gedung dan Bangunan 103.380.603.400,00 11.104.644.162,35 1.076.285.500,00 1.185.933.864,00 92.166.310.873,65
4 Jalan, Irigasi dan Jaringan 319.532.260.175,00 - 3.011.873.864,00 199.100.000,00 322.345.034.039,00
5 Aset Tetap Lainnya 25.746.763.636,00 342.650.000,00 3.619.014.000,00 194.600.000,00 28.828.527.636,00
Konstruksi dalam
6 - - 342.810.000,00 - 342.810.000,00
Pengerjaan

Jumlah 561.753.662.659,00 25.446.566.321,49 8.443.683.364,00 8.443.683.364,00 536.307.096.337,51

1. Belanja Modal Tanah sebesar Rp6.209.266.322,00 yang menjadi aset hanya


sebesar Rp5.563.990.827,00 sedangkan belanja modal sebesar
Rp597.275.495,00 tidak diklasifikasikan sebagai aset tetap tanah karena
belanja modal itu merupakan pembayaran kepada penggarap di atas lahan
milik Pemerintah Kabupaten Banyuasin (ganti rugi tanam tumbuh) pada
SKPD Sekretariat Daerah. Mutasi kurang sebesar Rp48.000.000,00
merupakan pengadaan jaringan instalasi listrik gedung kantor yang seharusnya
diklasifikasikan ke aset tetap lainnya.
2. Belanja Modal Peralatan dan Mesin sebesar Rp106.884.769.126,00 yang
menjadi aset sebesar Rp87.060.422.961,86. Hal ini disebabkan:
Belanja modal Peralatan dan Mesin sebesar Rp4.491.956.754,16
merupakan belanja Peralatan dan Mesin pada SKPD Dinas Pendidikan
yang telah selesai dan dioperasionalkan penggunaannya pada sekolah
swasta yang ada di Kabupaten Banyuasin (dihibahkan).
Belanja modal peralatan dan mesin sebesar Rp8.910.039.909,98
merupakan aset yang dikategorikan extracomptable karena harga
satuanya tidak sesuai dengan kebijakan akuntansi (harga satuan perunit
dibawah Rp1.000.000,00).
Mutasi tambah belanja modal Peralatan dan Mesin sebesar
Rp393.700.000,00 merupakan reklasifikasi dari belanja modal jalan,
irigasi, dan jaringan sebesar Rp199.100.000,00 pada SKPD Dinas

48
Perhubungan dan belanja modal Aset Tetap Lainnya sebesar
Rp194.600.000,00 pada Dinas Pendidikan.
Mutasi kurang belanja modal Peralatan dan Mesin sebesar
Rp6.816.049.500,00 merupakan reklasifikasi ke:
- Belanja modal gedung dan bangunan sebesar Rp1.076.285.500,00
pada SKPD Dinas Pendidikan, Sekretariat DPRD, Dinas
Kependudukan dan Catatan Sipil, Badan Pelayanan Terpadu dan
Badan Kepegawaian Daerah, Dinas Perhubungan dan Kominfo,
Perpustakaan, Badan Perpustakaan dan Arsip Daerah;
- Belanja modal Jalan, Irigasi, dan Jaringan sebesar
Rp2.168.750.000,00 pada SKPD Dinas Perhubungan dan Kominfo;
- Belanja modal aset tetap lainnya sebesar Rp3.571.014.000,00.
3. Belanja Modal Gedung dan Bangunan sebesar Rp103.380.603.400,00 yang
menjadi aset sebesar Rp92.166.310.873,65. Hal ini disebabkan:
Belanja modal Gedung dan Bangunan sebesar Rp11.104.644.162,35 tidak
menjadi aset karena merupakan belanja:
- Hibah ke sekolah swasta sebesar Rp10.894.622.162,35 pada SKPD
Dinas Pendidikan;
- Hibah ke kelompok tani berupa bibit tanaman sebesar
Rp90.750.000,00 pada SKPD Dinas Kehutanan dan Perkebunan;
- Belanja Modal yang asetnya dikategorikan extracomptable sebesar
Rp103.272.000,00 pada SKPD Sekretariat DPRD.
- Belanja pemeliharaan gedung sebesar Rp16.000.000,00 pada SKPD
Badan Kepegawaian dan Diklat Daerah.
Mutasi tambah belanja modal Gedung dan Bangunan sebesar
Rp1.076.285.500,00 merupakan reklasifikasi dari belanja modal
Peralatan dan Mesin sebagaimana dimaksud pada angka 2 tersebut di
atas.
Mutasi kurang Belanja modal Gedung dan Bangunan sebesar
Rp1.185.933.864,00 merupakan reklasifikasi pada SKPD Dinas
Perikanan dan Kelautan Kabupaten Banyuasin, yaitu reklasifikasi ke
belanja modal Jalan, Irigasi, dan Jaringan sebesar Rp843.123.864,00 dan
sebesar Rp342.810.000,00 merupakan KDP.
4. Belanja Modal Jalan, Irigasi, dan Jaringan sebesar Rp319.532.260.175,00
yang diakui sebagai aset tetap adalah Rp322.345.034.039,00. Hal ini
disebabkan karena adanya mutasi tambah sebesar Rp3.011.873.864,00 yang
merupakan reklasifikasi dari belanja Peralatan dan Mesin sebesar
Rp2.168.750.000,00 sebagaimana dimaksud pada angka 2 tersebut di atas dan
sebesar Rp843.123.864,00 sebagaimana dimaksud pada angka 3, serta mutasi
kurang sebesar Rp199.100.000,00 yang merupakan reklasifikasi ke Belanja
Modal Peralatan dan Mesin pada Dinas Perhubungan dan Kominfo.
5. Belanja Modal Aset Tetap Lainnya sebesar Rp25.746.763.636,00 yang
menjadi aset sebesar Rp28.828.527.636,00. Terdapat belanja modal sebesar
Rp342.650.000,00 tidak menjadi aset tetap lainnya karena merupakan Barang
Habis pakai (Belanja Plakat pada Sekretariat Daerah sebesar
Rp146.150.000,00 dan belanja buku tabloid pada Sekretariat DPRD sebesar
Rp196.500.000,00). Mutasi tambah sebesar Rp3.619.014.000,00 merupakan
reklasifikasi dari belanja modal tanah sebesar Rp48.000.000,00 dan dari

49
belanja peralatan dan mesin sebesar Rp3.571.014.000,00 pada Dinas
Pendidikan. Mutasi kurang sebesar Rp194.600.000,00 merupakan reklasifikasi
ke peralatan dan mesin pada Dinas Pendidikan. Rincian Belanja Modal yang
diakui sebagai aset per SKPD disajikan dalam Lampiran 3.

4.1.2.2.1 Belanja Modal Tanah


Realisasi Belanja Modal Tanah sebesar Rp6.209.266.322,00 dari anggaran
sebesar Rp10.388.211.410,00 lebih rendah sebesar Rp4.178.945.088,00 atau
40,23%. Belanja Modal Tanah Tahun 2013 terdiri atas:

Tabel 4.27 Rincian Belanja Modal Tanah Tahun 2013


Uraian Anggaran (Rp) Realisasi (Rp) Lebih/Kurang %

Belanja Modal Tanah Bangunan Kantor


2.995.211.410,00 2.990.951.083,00 (4.260.327,00) 99,86
Pemerintah
Belanja Modal Tanah Bangunan Sarana
200.000.000,00 165.413.520,00 (34.586.480,00) 82,71
Pendidikan Menengah Lanjutan dan Kejuruan
Belanja Modal Tanah Bangunan Rumah Sakit 2.000.000.000,00 0,00 (2.000.000.000,00) 0,00
Belanja Modal Tanah Bangunan
48.000.000,00 48.000.000,00 0,00 100,00
Taman/Wisata/Rekreasi
Belanja Modal Tanah Bangunan Sarana Umum
375.000.000,00 197.600.000,00 (177.400.000,00) 52,69
Rumah Potong Hewan
Belanja Modal Tanah untuk Jalan Nasional 1.000.000.000,00 387.301.719,00 (612.698.281,00) 38,73
Belanja Modal Tanah untuk Jalan Kabupaten 1.350.000.000,00 0,00 (1.350.000.000,00) 0,00
Belanja Modal Tanah Kuburan 2.400.000.000,00 2.400.000.000,00 0,00 100,00
Belanja Modal Pematangan/Penyiapan Tanah 20.000.000,00 20.000.000,00 0,00 100,00

Jumlah 10.388.211.410,00 6.209.266.322,00 (4.178.945.088,00) 59,77

Masih rendahnya realisasi belanja modal Tanah Bangunan Sarana Rumah


Potong Hewan yang baru sebesar 52,69% dan tidak terealisasinya belanja
modal tanah bangunan rumah sakit serta belanja modal tanah untuk jalan
Kabupaten Banyuasin yang luasnya diatas 1 Ha disebabkan karena adanya
keterlambatan tahap persiapan pengadaan tanah oleh Pemerintah Provinsi
Sumatera Selatan sesuai dengan Undang-Undang Nomor 2 Tahun 2012 dan
Perpres Nomor 71 Tahun 2012 tentang Penyelenggaraan Pengadaan Tanah
Bagi Pembangunan Untuk Kepentingan Umum.
Selain kondisi tersebut di atas terkait dengan pengadaan tanah, dapat
dijelaskan sebagai berikut.
1. Belanja modal tanah untuk Jalan Nasional yang terealisasi baru mencapai
38,73%. Hal tersebut disebabkan masih adanya beberapa pemilik tanah
yang belum sepakat dengan harga tanah yang ditetapkan oleh pemerintah
daerah.
2. Nilai ganti rugi untuk tanah kuburan seluas + 56.126 m yang terletak di
Kelurahan Seterio Kecamatan Banyuasin III sebesar Rp3.875.074.345,00
dilaksanakan dalam dua tahap, yaitu
- Tahap pertama Tahun 2013 Rp2.400.000.000,00 dan
- Tahap kedua Tahun 2014 sebesar Rp1.475.074.345,00.

50
4.1.2.2.2 Belanja Modal Peralatan dan Mesin
Realisasi belanja modal Peralatan dan Mesin mencapai sebesar
Rp106.884.769.126,00 atau 94,35% dari anggaran sebesar
Rp113.281.823.835,00. Belanja Peralatan dan Mesin, terdiri atas:

Tabel 4.28 Rincian Belanja Modal Peralatan dan Mesin Tahun 2013
Uraian Anggaran (Rp) Realisasi (Rp) Lebih/Kurang %

Belanja Modal Pengadaan Alat-alat Berat 3.299.628.000,00 3.034.970.000,00 (264.658.000,00) 91,98


Belanja Modal Pengadaan Alat-alat
21.529.566.700,00 19.247.759.978,00 (2.281.806.722,00) 89,40
angkutan darat bermotor
Belanja Modal Pengadaan Alat-alat
49.000.000,00 49.000.000,00 0,00 100,00
angkutan darat tidak bermotor
Belanja Modal Pengadaan Alat-alat
190.000.000,00 188.350.000,00 (1.650.000,00) 99,13
angkutan diatas air bermotor
Belanja Modal Pengadaan Alat-Alat Bengkel 1.285.550.000,00 1.270.425.000,00 (15.125.000,00) 98,82
Belanja Modal Pengadaan Alat-Alat
9.950.500.000,00 9.858.340.000,00 (92.160.000,00) 99,07
Pengolahan Pertanian Dan Peternakan
Belanja Modal Pengadaan Peralatan Kantor 5.162.566.582,00 4.572.231.775,00 (590.334.807,00) 88,57
Belanja Modal Pengadaan Perlengkapan
3.643.532.254,00 3.405.469.750,00 (238.062.504,00) 93,47
Kantor
Belanja Modal Pengadaan Komputer 14.541.491.031,00 13.959.325.963,00 (582.165.068,00) 96,00
Belanja Modal Pengadaan Mebeulair 10.131.108.171,00 9.791.812.100,00 (339.296.071,00) 96,65
Belanja Modal Pengadaan Peralatan Dapur 470.713.071,00 456.317.800,00 (14.395.271,00) 96,94
Belanja Modal Pengadaan Penghias
4.312.194.000,00 3.836.111.595,00 (476.082.405,00) 88,96
Ruangan Rumah Tangga
Belanja Modal Pengadaan Alat-Alat Studio 2.363.233.036,00 2.073.072.438,00 (290.160.598,00) 87,72
Belanja Modal Pengadaan Alat-Alat
659.067.800,00 649.710.768,00 (9.357.032,00) 98,58
Komunikasi
Belanja Modal Pengadaan Alat-Alat Ukur 971.350.000,00 940.178.000,00 (31.172.000,00) 96,79
Belanja Modal Pengadaan Alat-Alat
1.658.038.390,00 1.565.116.824,00 (92.921.566,00) 94,40
Kedokteran
Belanja Modal Pengadaan Alat-Alat
32.964.014.800,00 31.886.642.135,00 (1.077.372.665,00) 96,73
Laboratorium/Praktek
Belanja Modal Pengadaan Alat-Alat
100.270.000,00 99.935.000,00 (335.000,00) 99,67
Persenjataan/Keamanan

Jumlah 113.281.823.835,00 106.884.769.126,00 (6.397.054.709,00) 94,35

4.1.2.2.3 Belanja Modal Gedung dan Bangunan


Realisasi Belanja Modal Gedung dan Bangunan sebesar
Rp103.380.603.400,00 atau 96,42% dari anggaran sebesar
Rp107.220.486.235,00. Belanja Modal Gedung dan Bangunan terdiri atas:

51
Tabel 4.29 Rincian Belanja Modal Gedung dan Bangunan Tahun 2013
Uraian Anggaran (Rp) Realisasi (Rp) Lebih/Kurang %

Belanja Modal Bangunan Kantor Pemerintah 14.730.971.250,00 13.626.685.100,00 (1.104.286.150,00) 92,50


Belanja Modal Bangunan Balai
3.905.000.000,00 3.860.115.000,00 (44.885.000,00) 98,85
Sidang/Pertemuan
Belanja Modal Bangunan Gedung Tempat
1.671.800.000,00 1.626.552.550,00 (45.247.450,00) 97,29
Kerja/Jasa Pemerintahan Umum Lainnya
BM Bangunan Sarana Pendidikan TK 980.000.000,00 935.173.000,00 (44.827.000,00) 95,43
Belanja Modal Bangunan Sarana Pendidikan
16.643.000.000,00 16.572.731.700,00 (70.268.300,00) 99,58
SD
Belanja Modal Bangunan Sarana Pendidikan
3.737.557.000,00 3.699.551.800,00 (38.005.200,00) 98,98
Menengah Umum dan Kejuruan
Belanja Modal Bangunan Sarana Pendidikan
25.028.846.000,00 25.028.326.000,00 (520.000,00) 100,00
Menengah Lanjutan dan Kejuruan
Belanja Modal Bangunan Rumah Sakit 1.300.000.000,00 1.286.400.000,00 (13.600.000,00) 98,95
Belanja Modal Bangunan
4.279.482.000,00 4.213.151.000,00 (66.331.000,00) 98,45
Puskesmas/Posyandu
Belanja Modal Bangunan Tempat Ibadah 107.000.000,00 106.200.000,00 (800.000,00) 99,25
Belanja Modal Bangunan Sarana Sosial
975.000.000,00 771.983.000,00 (203.017.000,00) 79,18
Keagamaan Lainnya
Belanja Modal Bangunan Dermaga 3.826.950.000,00 3.736.693.000,00 (90.257.000,00) 97,64
Belanja Modal Bangunan Terminal Darat 678.474.785,00 665.439.500,00 (13.035.285,00) 98,08
Belanja Modal Bangunan Sarana Umum
Tempat Pembuangan Akhir Sampah/Tempat 145.000.000,00 140.000.000,00 (5.000.000,00) 96,55
Pembuangan Sampah
Belanja Modal Bangunan-bangunan Pembibitan 2.496.226.000,00 1.610.205.000,00 (886.021.000,00) 64,51
Belanja Modal Bangunan Pos Jaga/Menara
194.000.000,00 193.000.000,00 (1.000.000,00) 99,48
Jaga
Belanja Modal Bangunan Olah Raga 500.000.000,00 489.333.000,00 (10.667.000,00) 97,87
Belanja Modal Bangunan
98.000.000,00 97.500.000,00 (500.000,00) 99,49
Taman/Wisata/Rekreasi
Belanja Modal Bangunan Tempat Kerja Lain-
206.750.000,00 206.250.000,00 (500.000,00) 99,76
lain
Belanja Modal Bangunan Pasar 5.168.889.000,00 5.117.370.000,00 (51.519.000,00) 99,00
Belanja Modal Bangunan Gudang 12.594.813.000,00 12.377.966.000,00 (216.847.000,00) 98,28
Belanja Modal Bangunan Gedung Industri 455.555.000,00 449.800.000,00 (5.755.000,00) 98,74
BM Bang. Rmh Fasilitas Tempat Tinggal
616.000.000,00 592.105.650,00 (23.894.350,00) 96,12
lainnya
Belanja Modal Lapangan Parkir 1.120.911.200,00 936.113.900,00 (184.797.300,00) 83,51
Belanja Modal Pembibitan Tanaman/Binatang 237.600.000,00 90.750.000,00 (146.850.000,00) 38,19
BM Lapangan Lainnya Dlm Lingk. Bangunan 1.062.500.000,00 994.710.000,00 (67.790.000,00) 93,62
Belanja Modal Bangunan Bukan Gedung
3.962.161.000,00 3.462.614.200,00 (499.546.800,00) 87,39
Lainnya
Belanja Modal Bangunan Menara
80.000.000,00 79.625.000,00 (375.000,00) 99,53
Telekomunikasi

52
Uraian Anggaran (Rp) Realisasi (Rp) Lebih/Kurang %

Belanja Modal Tugu/Tanda Batas Administrasi


18.000.000,00 17.635.000,00 (365.000,00) 97,97
Kabupaten
Belanja Modal Tugu/ Tanda Batas Administrasi
50.000.000,00 49.659.000,00 (341.000,00) 99,32
Desa
Belanja Modal Rambu Bersuar Lalu Lintas
350.000.000,00 346.965.000,00 (3.035.000,00) 99,13
Darat

Jumlah 107.220.486.235,00 103.380.603.400,00 (3.839.882.835,00) 96,42

4.1.2.2.4 Belanja Modal Jalan, Irigasi dan Jaringan


Realisasi Belanja Modal Jalan, Irigasi dan Jaringan sebesar
Rp319.532.260.175,00 atau 96,30% dari anggaran sebesar
Rp331.804.014.643,00. Belanja Jalan, Irigasi dan Jaringan terdiri atas:

Tabel 4.30 Rincian Belanja Modal Jalan Irigasi dan Jaringan Tahun 2013
Uraian Anggaran (Rp) Realisasi (Rp) Lebih/Kurang %

Belanja Modal Pengadaan Konstruksi Jalan 192.384.385.133,34 185.561.183.775,00 (6.823.201.358,34) 96,45


Belanja Modal Pengadaan Konstruksi
59.471.299.866,66 56.969.083.025,00 (2.502.216.841,66) 95,79
Jembatan
Belanja Modal Pengadaan Bangunan Air
26.233.100.000,00 24.841.070.000,00 (1.392.030.000,00) 94,69
/Irigasi
Belanja Modal Pengadaan Bangunan Instalasi 2.477.597.000,00 2.327.557.718,00 (150.039.282,00) 93,94
Belanja Modal Pengadaan Bangunan Jaringan 45.890.632.643,00 44.549.065.657,00 (1.341.566.986,00) 97,08
Belanja Modal Penerangan Jalan, Taman hutan
5.347.000.000,00 5.284.300.000,00 (62.700.000,00) 98,83
kota

Jumlah 331.804.014.643,00 319.532.260.175,00 (12.271.754.468,00) 96,30

4.1.2.2.5 Belanja Aset Tetap Lainnya


Realisasi Belanja Aset Tetap Lainnya sebesar Rp25.746.763.636,00 atau
60,56% dari anggaran sebesar Rp42.515.805.000,00. Belanja Aset Tetap
Lainnya terdiri atas:
Tabel 4.31 Rincian Belanja Modal Aset Tetap Lainnya Tahun 2013
Uraian Anggaran (Rp) Realisasi (Rp) Lebih/Kurang %

Belanja Modal Buku dan Kepustakaan 40.385.805.000,00 23.901.198.636,00 (16.484.606.364,00) 59,18


Belanja Modal Barang Bercorak Kesenian,
435.000.000,00 190.965.000,00 (244.035.000,00) 43,90
Kebudayaan
Belanja Modal Alat-alat Olahraga 1.500.000.000,00 1.460.500.000,00 (39.500.000,00) 97,37
Belanja Modal Hewan, Ternak dan Tanaman 195.000.000,00 194.100.000,00 (900.000,00) 99,54

Jumlah 42.515.805.000,00 25.746.763.636,00 (16.769.041.364,00) 60,56


4.1.2.3. Belanja Tak Terduga
Realisasi Belanja Tak Terduga sebesar Rp25.213.322,00 atau 8,87% dari
anggaran sebesar Rp284.360.169,00.

53
Tabel 4.32 Rincian Belanja Tak Terduga Tahun 2013
Uraian Jumlah

Belanja Tak terduga guna klaim dana RS untuk korban kecelakaan speed boat
10.213.322,00
pada bulan April 2013 sesuai SK Bupati No. 957/KPTS/KES/2013
Belanja Tak Terduga untuk korban kebakaran di Wilayah Kabupaten Banyuasin
15.000.000,00
sesuai SK Bupati No. 956/KPTS/DINSOS/2013

Jumlah 25.213.322,00

4.1.3. Pembiayaan
Pembiayaan (financing) adalah seluruh transaksi keuangan pemerintah, baik
penerimaan maupun pengeluaran, yang perlu dibayar atau akan diterima kembali,
yang dalam penganggaran pemerintah terutama dimaksudkan untuk menutup
defisit dan atau memanfaatkan surplus anggaran, yang terdiri atas:
1. Penerimaan Pembiayaan Daerah;
2. Pengeluaran Pembiayaan Daerah.

4.1.3.1. Penerimaan Pembiayaan Daerah


Realisasi Penerimaan Pembiayaan Daerah sebesar Rp207.082.590.932,43atau
lebih sebesar Rp14.660.474.776,43 yaitu 107,62% dari anggaran
Rp192.422.116.156,00. Penerimaan Pembiayaan Daerah diperoleh dari Sisa
Lebih Pembiayaan Anggaran (SiLPA) tahun sebelumnya sebesar
Rp192.443.988.035,43 dan Penerimaan Piutang Daerah Tahun 2012 yang terdiri
dari Piutang Pendapatan Pajak Daerah sebesar Rp14.556.791.255,00 serta
Piutang Pendapatan Retribusi sebesar Rp81.811.642,00.

4.1.3.2. Pengeluaran Pembiayaan Daerah


Realisasi pengeluaran pembiayaan daerah sebesar Rp16.447.334.963,50 atau
74,32% dari anggaran sebesar Rp22.129.000.951,63,00. Rincian Pengeluaran
Pembiayaan Daerah sebagai berikut.

Tabel 4.33 Rincian Pengeluaran Pembiayaan Daerah Tahun 2013


Uraian Anggaran (Rp) Realisasi (Rp) Lebih/Kurang %

Penyertaan Modal (Investasi)


5.000.000.000,00 5.000.000.000,00 0,00 100,00
Pemerintah Daerah
Pembayaran Hutang kepada
17.129.000.951,63 11.447.334.963,50 (5.681.665.988,13) 66,83
Penyedia Barang dan Jasa

Jumlah 22.129.000.951,63 16.447.334.963,50 (5.681.665.988,13) 74,32

Pembayaran Hutang kepada penyedia Barang dan Jasa sebesar


Rp11.447.334.963,50 merupakan pembayaran sisa termin atas jaminan
pemeliharaan tahun-tahun sebelumnya.

54
4.1.4. Sisa Lebih Pembiayaan Anggaran
Realisasi Sisa Lebih Pembiayaan Anggaran (SiLPA) dalam Tahun Anggaran
2013 sebesar Rp185.414.415.358,54 merupakan selisih lebih antara surplus dan
defisit dengan pembiayaan netto. SiLPA ini terdiri atas:

Tabel 4.34 Rincian SiLPA


Uraian Nilai (Rp)

Kas di Kas Daerah 99.384.566.996,54

Kas di Bendahara Pengeluaran 5.994.378.732,00

Kas dan Setara Kas (Deposito) 80.000.000.000,00

Piutang PFK 35.469.630,00

Jumlah 185.414.415.358,54

55
4.2 Penjelasan Pos-pos Neraca
Penjelasan pos-pos neraca ini menguraikan secara singkat mengenai posisi saldo
rekening neraca yang disajikan dengan rincian secara detail dalam daftar lampiran
yang merupakan bagian tidak terpisahkan dari Laporan Keuangan ini. Dalam
penjelasan pos-pos neraca ini diuraikan mengenai posisi neraca untuk tahun yang
berakhir pada tanggal 31 Desember 2013 dan 2012, dengan rincian sebagai berikut.

4.2.1. Aset
Penjelasan Aset di Neraca diuraikan dengan rincian sebagai berikut.

Tabel 4.35 Rincian Aset Pemerintah Kabupaten Banyuasin


Kenaikan/Penurunan
Uraian 2013 (Rp) 2012 (Rp) %
(Rp)

Aset lancar 276.359.720.942,25 228.660.034.168,71 47.699.686.773,54 20,86


Investasi Jangka Panjang 73.116.238.659,42 70.479.482.589,36 2.636.756.070,06 3,74
Aset Tetap 3.081.731.810.050,56 2.538.432.079.619,48 543.299.730.431,08 21,40

Aset Lainnya 39.341.847.564,00 44.360.260.000,00 -5.018.412.436,00 -11,31

Jumlah 3.470.549.617.216,23 2.881.931.856.377,55 588.617.760.838,68 20,42

Berdasarkan rincian pada tabel 4.35 di atas secara umum terjadi kenaikan aset
yang dimiliki oleh Pemerintah Kabupaten Banyuasin pada Tahun 2013
dibandingkan dengan Tahun 2012 sebesar Rp588.617.760.838,68 atau 20,42%.
Penyebab terjadinya kenaikan dan penurunan aset dijelaskan pada masing-masing
pos. Berikut adalah komposisi aset Kabupaten Banyuasin.

Gambar 4.4 Perbandingan Komposisi Aset


Pemerintah Kabupaten Banyuasin per 31 Desember 2013

4.2.1.1. Aset Lancar


Aset lancar terdiri dari kas dan setara kas, dan aset selain kas yang diharapkan
segera dapat direalisasikan, dipakai atau dimiliki untuk dijual kembali dalam
waktu 12 bulan sejak tanggal pelaporan. Aset lancar yang dimiliki oleh
Pemerintah Kabupaten Banyuasin per tanggal 31 Desember 2013, terdiri atas:

56
Tabel 4.36 Rincian Aset Lancar Pemerintah Kabupaten Banyuasin
Kenaikan/Penurunan
Uraian 2013 (Rp) 2012 (Rp) %
(Rp)

Kas dan Setara Kas 185.813.295.982,14 192.678.400.826,43 (6.865.104.844,29) -3,56


Piutang 80.616.670.319,34 26.349.543.275,95 54.267.127.043,39 205,95
Persediaan 9.929.754.640,77 9.632.090.066,33 297.664.574,44 3,09

Jumlah 276.359.720.942,25 228.660.034.168,71 47.699.686.773,54 20,86

Jumlah Kas dan Setara Kas adalah sebesar Rp185.813.295.982,14 dengan rincian
sebagai berikut.
Tabel 4.37 Rincian jumlah Kas dan Setara Kas
Kenaikan/Penurunan
Uraian 2013 (Rp) 2012 (Rp) %
(Rp)

Kas di Kas Daerah (BUD) 99.384.566.996,54 182.240.776.880,43 (82.856.209.883,89) -45,47


Kas di Bendahara
90.221.300,00 6.145.000,00 84.076.300,00 1.368,21
Penerimaan
Kas di Bendahara
5.994.378.732,00 198.882.083,00 5.795.496.649,00 2.914,04
Pengeluaran
Setara Kas 80.344.128.953,60 10.232.596.863,00 70.111.532.090,60 685,18

Jumlah 185.813.295.982,14 192.678.400.826,43 (6.865.104.844,29) -3,56

4.2.1.1.1 Kas di Kas Daerah


Kas adalah uang tunai dan saldo simpanan di bank yang setiap saat dapat
digunakan untuk membiayai kegiatan pemerintahan. Saldo Kas per 31
Desember 2013 sebesar Rp99.384.566.996,54 dengan rincian sebagai berikut.

Tabel 4.38 Rincian Kas di Kas Daerah Pemerintah Kabupaten Banyuasin


Uraian 2013 (Rp) 2012 (Rp)

Kas di Kas Daerah (BUD)


Rek 167300xxxx (Rekening Dana Rutin) 98.652.645.565,77 181.324.559.787,66
Rek 167300xxxx (Rekening DAU) 67.279.156,00 67.279.156,00
Rek 167300xxxx (Rekening Gaji) 276.071.398,00 465.532.692,00
Rek 167300xxxx (Rekening DAK Reboisasi) 12.262.535,00 12.246.743,00
Rek 167300xxxx (Rekening Bantuan Bencana) 376.308.341,77 371.158.501,77

Jumlah 99.384.566.996,54 182.240.776.880,43

Selain lima rekening kas daerah diatas, Pemerintah Kabupaten Banyuasin juga
memiliki rekening yang digunakan dalam transaksi penerimaan dan
pengeluaran yang setiap akhir hari akan di-overbooking (dipindahbukukan) ke
rekening kas daerah 167300xxxx (Rekening Dana Rutin), sehingga bersaldo
nol. Rincian terdapat pada Lampiran 4.

57
4.2.1.1.2 Kas di Bendahara Penerimaan
Kas di Bendahara Penerimaan sebesar Rp90.221.300,00 merupakan saldo kas
yang ada di bendahara penerimaan SKPD yaitu pada RSUD Kabupaten
Banyuasin.

4.2.1.1.3 Kas di Bendahara Pengeluaran


Kas di Bendahara Pengeluaran adalah saldo Kas di Bendahara Pengeluaran
sebesar Rp5.994.378.732,00 merupakan saldo kas di SKPD berupa sisa uang
yang belum disetorkan (UYHD) per 31 Desember 2013. Jumlah tersebut
belum termasuk jasa giro sebesar Rp167.303,00 dengan rincian sebagai
berikut.
Tabel 4.39 Rincian Kas di Bendahara Pengeluaran
Jasa Giro UYHD 2012 Jasa Giro
SKPD UYHD 2013 (Rp)
2013 (Rp) (Rp) 2012 (Rp)

Dinas Pendidikan 5.733.596.307,00 0,00 0,00 0,00


RSUD Tipe D 0,00 0,00 500,00 0,00
Dinas PU CK 13.999.668,00 0,00 29.663.304,00 733.901,00
Dinas PU BM 0,00 0,00 251.107,00 0,00
Dinas PU Pengairan 111.890,00 0,00 27.730,00 0,00
Badan Lingkungan Hidup 0,00 0,00 0,00 371.737,00

Disdukcapil 0,00 0,00 0,00 70.521,00


Dinas Sosial 100.000,00 0,00 0,00 0,00
BPBD Kesbangpol 925.000,00 0,00 0,00 0,00
Sekretariat Daerah 0,00 0,00 9.500.000,00 0,00
Sekretariat DPRD 110.068.300,00 0,00 10.205.116,00 0,00
DPPKAD 117.299.922,00 0,00 130.655.000,00 0,00
Kec. Banyuasin I 15.000,00 74.418,00 0,00 164.448,00
Kec. Banyuasin III 0,00 0,00 0,00 15.705,00
Kec. Betung 0,00 0,00 2.423.139,00 10.330,00
Kec. Rantau Bayur 0,00 0,00 54.000,00 13.704,00
Kec. Pulau Rimau 0,00 8.048,00 0,00 58.205,00
Kec. Talang Kelapa 0,00 0,00 339.549,00 72.180,00
Kec. Rambutan 0,00 0,00 0,00 15.952,00
Kec. Tungkal Ilir 157.500,00 0,00 0,00 12.646,00
Kec. Tanjung Lago 0,00 0,00 0,00 4.426,00
Kec. Sembawa 0,00 0,00 0,00 25.437,00
Kec. Suak Tapeh 0,00 0,00 4.391.636,00 25.463,00
Kec. Banyuasin II 99.982,00 42.786,00 0,00 49.419,00
Kec. Makarti Jaya 0,00 0,00 0,00 27.228,00
Kec. Muara Padang 0,00 42.051,00 0,00 32.761,00
Kec. Muara Sugihan 0,00 0,00 0,00 11.200,00
Kec. Muara Telang 0,00 0,00 0,00 33.183,00
Kec. Air Salek 0,00 0,00 0,00 14.985,00
Kec. Air Kumbang 17.969.100,00 0,00 0,00 0,00

58
Jasa Giro UYHD 2012 Jasa Giro
SKPD UYHD 2013 (Rp)
2013 (Rp) (Rp) 2012 (Rp)

BPMPD 63,00 0,00 1.002,00 0,00


Dinas Pertanian dan Peternakan 0,00 0,00 0,00 2.304.838,00
Dinas Kehutanan dan Perkebunan 0,00 0,00 11.370.000,00 0,00
Dinas Perikanan dan Kelautan 36.000,00 0,00 0,00 0,00

Jumlah 5.994.378.732,00 167.303,00 198.882.083,00 4.068.269,00

Rincian lebih lanjut saldo kas di Bendahara Pengeluaran pada Lampiran 5.

4.2.1.1.4 Setara Kas


Saldo Setara Kas per 31 Desember 2013 sebesar Rp80.344.128.953,60 berupa
DOC (Deposit on Call) pada Bank BRI sebesar Rp20.000.000.000,00,
Deposito satu bulanan pada Bank BNI sebesar Rp10.000.000.000,00, dan
Bank Mandiri sebesar Rp50.000.000.000,0 ditambah dengan akumulasi bunga
yang belum diterima di kas daerah sampai dengan 31 Desember 2013 sebesar
Rp344.128.953,60. Selain setara kas di atas terdapat dana titipan (rekening
bersama) yang ada pada Dinas Pertambangan dan Energi sebesar
Rp3.355.637.714,00, terdiri dari Jaminan Kesungguhan Kuasa Pertambangan
sebesar Rp2.751.780.000,00, Jaminan Reklamasi sebesar Rp32.000.000,00,
dan jasa gironya per 31 Desember 2012 sebesar Rp571.857.714,00.

4.2.1.1.5 Piutang Pajak


Piutang Pajak sebesar Rp30.876.570.111,62, terdiri dari Piutang Pajak PBB
sebesar Rp30.876.520.112,00 dan piutang Pajak Penerangan Jalan (PPJ) pada
PT PLN Palembang sebesar Rp49.999,62.
Piutang PBB merupakan pelimpahan piutang dari KPP Pratama Sekayu
kepada Pemerintah Kabupaten Banyuasin sesuai dengan Berita Acara Serah
Terima SK Menteri Keuangan, Data Piutang PBB P-2, dan Aset Sitaan Nomor
BA-135/WPJ.02/KP.12/2013 Tanggal 23 Desember 2013. Pelimpahan
tersebut terdiri dari piutang bruto sebesar Rp30.876.520.112,00, dikurangi
penyisihan piutang sebesar Rp13.740.751.620,00 sehingga piutang neto
sebesar Rp17.135.768.492,00. Terhadap keakuratan jumlah dan keberadaan
Wajib Pajaknya, sampai dengan penyusunan LKPD Tahun Anggaran 2013
belum dilakukan verifikasi.

4.2.1.1.6 Piutang Retribusi


Piutang Retribusi merupakan Piutang Retribusi Jasa Rawat Jalan dan Rawat
Inap RSUD Kabupaten Banyuasin sebesar Rp46.985.000,00.

4.2.1.1.7 Piutang Dana Perimbangan


Piutang Dana Bagi Hasil Pajak dari Provinsi sebesar Rp48.121.965.663,72
merupakan piutang dana bagi hasil pajak provinsi Tahun 2013 sesuai
Keputusan Gubernur Sumatera Selatan Nomor 226/KPTS/BPKAD/2014
bulan Maret 2014 tentang penetapan alokasi definitif, realisasi dan hutang
dana bagi hasil pajak Provinsi Sumatera Selatan kepada Pemerintah
Kabupaten/Kota se-Sumatera Selatan Tahun Anggaran 2013.

59
Tabel 4.40 Rincian Piutang Dana Perimbangan
Uraian 2012 (Rp) Tambah (Rp) Kurang (Rp 2013 (Rp)

PKB 2.461.609.052,08 9.893.441.400,00 1.436.064.700,00 10.918.985.752,08


BBN-KB 3.363.715.509,65 12.080.392.400,00 2.072.192.000,00 13.371.915.909,65
PBB-KB 5.090.510.001,99 21.442.302.900,00 3.060.144.900,00 23.472.668.001,99
PKAA 3.409.000,00 1.691.150,00 0,00 5.100.150,00
BBN-KAA 0,00 310.600,00 0,00 310.600,00

P3AP 227.995.850,00 124.989.400,00 0,00 352.985.250,00

Jumlah 11.147.239.413,72 43.543.127.850,00 6.568.401.600,00 48.121.965.663,72

4.2.1.1.8 Bagian Lancar Tuntutan Ganti Rugi


Bagain Lancar Tuntutan Ganti Rugi sebesar Rp42.100.000,00, terdiri dari
piutang TP/TGR kepada PNS bukan bendahara yang segera jatuh tempo
dalam waktu 12 bulan. Rincian pada Lampiran 6a dan 6b.

4.2.1.1.9 Bagian Lancar Piutang Dewan


Bagian lancar piutang terhadap anggota dewan sebesar Rp1.336.779.914,00
merupakan reklasifikasi dari aset lainnya atas piutang dewan yang telah
diangsur pada Tahun 2013 dan Tahun 2014. Jumlah anggota dewan yang telah
membayar angsuran sejumlah 29 orang, terdiri atas:

Tabel 4.41 Rekapitulasi piutang terhadap anggota DPRD


Uraian 2013 2012

Piutang kepada Anggota DPRD Tahun 2003 509.350.862,00 0,00


Piutang kepada Anggota DPRD Tahun 2004 594.873.372,00 0,00
Piutang kepada Anggota DPRD Tahun 2005 200.288.000,00 0,00
Piutang kepada Anggota DPRD Tahun 2006 217.500.000,00 0,00
Piutang kepada Anggota DPRD Tahun 2008 40.460.700,00 0,00
Pengurangan atas pembayaran piutang Tahun
(5.000.000,00) 0,00
2012
Jumlah saldo awal piutang kepada dewan 1.557.472.934,00 0,00
Pengurangan atas pembayaran piutang Tahun
(220.693.020,00) 0,00
2013

Saldo akhir piutang kepada dewan 1.336.779.914,00 0,00

Jumlah pembayaran atas piutang anggota dewan yang diterima pada Tahun
2014 sebesar Rp543.301.110,00 diperoleh berkat kerjasama berdasarkan nota
kesepahaman kerjasama antara Pemerintah Kabupaten Banyuasin dengan
Kejaksaan Negeri Pangkalan Balai tentang Penanganan masalah hukum
bidang perdata dan tata usaha negara nomor 164/VIII/11/2013 dan nomor
01/N.6.19.6/Gs.1/11/2013. Rincian lebih lanjut disajikan dalam Lampiran 7.

60
4.2.1.1.10 Piutang PFK (Perhitungan Fihak Ketiga)
Piutang PFK merupakan saldo per 31 Desember 2013 sebesar
Rp35.469.630,00, terdiri atas:
Tabel 4.42 Rincian Piutang PFK
Uraian 2013 2012 Kenaikan

Piutang Kelebihan PFK IWP 26.848.294,00 5.120.378,00 21.727.916,00


Piutang Kelebihan PFK Taperum 595.500,00 121.000,00 474.500,00
Piutang Kelebihan PFK Askes 5.407.775,00 1.028.427,00 4.379.348,00
Piutang Pajak PPh 21 2.618.061,00 0,00 2.618.061,00

Jumlah 35.469.630,00 6.269.805,00 29.199.825,00

Kelebihan PFK berupa IWP, Taperum, Askes dan PPh Pasal 21 terjadi karena
adanya pengembalian pembayaran gaji pegawai pada beberapa SKPD.
Terhadap kelebihan pembayaran tersebut akan diperhitungkan pada saat
rekonsiliasi antara Pemerintah Kabupaten Banyuasin dengan PT Taspen,
Bapertarum, dan PT Askes.

4.2.1.1.11 Piutang Lainnya


Piutang Lainnya sebesar Rp156.800.000,00 merupakan piutang kelebihan
pembayaran gaji pegawai, yaitu sisa atas kelebihan pembayaran gaji kepada
pegawai yang telah pensiun dan akan dipotong langsung melalui pembayaran
uang pensiunnya oleh PT Taspen. Hal ini terjadi karena adanya keterlambatan
penerbitan Surat Keputusan Pensiun oleh Badan Kepegawaian Nasional.
Mutasi Piutang Lainnya, sebagai berikut.
Tabel 4.43 Rincian Piutang Lainnya
Uraian 2013 (Rp) 2012 (Rp)

Saldo awal per 1 Januari 2013 86.200.000,00 86.200.000,00


Penambahan Piutang 221.400.000,00 0,00
Pengurangan Piutang 150.800.000,00 0,00
Saldo akhir per 31 Desember 2013 156.800.000,00 86.200.000,00

Rincian piutang lainnya terdapat pada Lampiran 8.

4.2.1.1.12 Persediaan
Persediaan adalah aset lancar dalam bentuk barang atau perlengkapan yang
dimaksudkan untuk mendukung kegiatan operasional pemerintahan, dan
barang-barang yang dimaksudkan untuk dijual dan/atau diserahkan dalam
rangka pelayanan kepada masyarakat, meliputi persediaan Alat Tulis Kantor,
barang cetakan, alat kebersihan, obat-obatan, Barang Habis Pakai (BHP) alat
kesehatan, bahan kimia/bibit, sebesar Rp9.929.754.640,77, dengan rincian
sebagai berikut.
Tabel 4.44 Rincian Persediaan per Jenis Persediaan
Jenis Persediaan 2013 (Rp) 2012 (Rp)

ATK 161.017.819,00 85.493.026,00


Alat Listrik 3.676.000,00 0,00

61
Jenis Persediaan 2013 (Rp) 2012 (Rp)

Barang Cetakan 314.662.260,00 716.829.570,00


Alat Kebersihan 2.162.000,00 5.548.500,00
Obat-obatan 8.828.853.061,77 7.433.598.970,33
BHP Alkes 43.722.000,00 0,00
Bahan Kimia/Bibit 575.661.500,00 1.390.620.000,00

Jumlah 9.929.754.640,77 9.632.090.066,33

Rincian lebih lanjut saldo persediaan per 31 Desember 2013 pada masing-
masing SKPD pada Lampiran 9.

4.2.1.2. Investasi Jangka Panjang


Investasi Jangka Panjang merupakan investasi permanen dengan tujuan tidak
dimaksudkan untuk diperjualbelikan, tetapi untuk mendapatkan deviden
dan/atau pengaruh yang signifikan dalam jangka panjang, yaitu terdiri dari
penyertaan modal pada Bank SumselBabel dan PDAM Tirta Betuah, serta PT
Basin Resources.

4.2.1.2.1. Penyertaan Modal Pemerintah Daerah


Investasi permanen berupa Penyertaan Modal Pemerintah Kabupaten
Banyuasin pada lembaga keuangan dan BUMD per 31 Desember 2013 sebesar
Rp73.116.238.659,42 dengan rincian sebagai berikut.

Tabel 4.45 Rincian Penyertaan Modal Pemerintah Kabupaten Banyuasin


Nama BUMD 2012 (Rp) Mutasi 2013 (Rp) 2013 (Rp)

Bank SumselBabel 16.000.752.000,00 5.000.000.000,00 21.000.752.000,00

PDAM Tirta Betuah 54.478.730.589,36 (2.363.243.929,94) 52.115.486.659,42

Jumlah 70.479.482.589,36 2.636.756.070,06 73.116.238.659,42

1. Penyertaan Modal pada Bank SumselBabel bertambah sebesar


Rp5.000.000.000,00 Tahun 2013 berdasarkan Keputusan Bupati Banyuasin
Nomor 120 Tahun 2013 tentang Penetapan Alokasi Penyertaan Modal
Investasi Pemerintah Kabupaten Banyuasin pada Bank SumselBabel.
Sampai dengan tanggal 31 Desember 2013 jumlah saham yang dimiliki
oleh Pemerintah Kabupaten Banyuasin sebanyak 14.443 lembar saham
(nilai nominal Rp1.000.000,00 per lembar saham) dengan nilai pasar per
lembar saham sebesar Rp1.454.000,00. Dengan demikian terdapat nilai
setoran investasi yang belum dijadikan saham sebesar Rp630.000,00.
2. Penyertaan Modal pada BUMD PDAM Tirta Betuah per 31 Desember
2012 adalah 88,95% atau sebesar Rp54.478.730.589,36 dalam bentuk aset
tetap. Pemerintah Kabupaten Banyuasin mencatat penyertaan modal
berdasarkan metode ekuitas sehingga per 31 Desember 2013 nilai
penyertaan menjadi Rp52.115.486.659,42 setelah dilakukan pengurangan
sebesar Rp2.363.243.929,94, terdiri dari nilai kerugian Tahun 2013 total
Rp2.326.463.519,18 (85,60% x Rp2.717.831.214,00) dan koreksi kerugian

62
Tahun 2012 sebesar Rp36.780.410,76 sesuai dengan Laporan Keuangan
PDAM Tirta Betuah (Unaudited) Tahun 2013.
Tabel 4.46 Perhitungan Alokasi Kerugian atas Penyertaan pada PDAM Tirta Betuah
Kerugian yang
Uraian Tahun Neraca PDAM % ditanggung
Pemkab

Koreksi kerugian Tahun 2012 2012 41.349.534,30 88,95 36.780.410,76


Laporan rugi laba tahun
2013 2.717.831.214,00 85,60 2.326.463.519,18
berjalan

Jumlah 2.363.243.929,94

4.2.1.3. Aset Tetap


Aset tetap adalah aset berwujud yang mempunyai kriteria sebagaimana diatur
dalam kebijakan akuntansi. Aset tetap per 31 Desember 2013 sebesar
Rp3.081.731.810.050,56, terdiri atas:
Tabel 4.47 Rincian Mutasi Aset Tetap Pemerintah Kabupaten Banyuasin
Jenis Aset Tetap Saldo per 2012 (Rp) Mutasi Tambah (Rp) Mutasi Kurang (Rp) Saldo per 2013 (Rp)

Tanah 141.350.230.556,78 6.209.266.326,00 (48.000.000,00) 147.511.496.882,78


Peralatan dan Mesin 262.012.524.140,20 110.641.586.696,00 (25.283.708.167,14) 347.370.402.669,06
Gedung dan Bangunan 752.808.361.433,25 113.808.275.762,00 (29.674.826.083,35) 836.941.811.111,90
Jalan, Irigasi dan Jaringan 1.337.123.108.952,75 366.978.534.048,00 (10.143.067.500,00) 1.693.958.575.500,75
Aset Tetap Lainnya 18.338.112.536,50 42.588.968.786,00 (11.636.341.436,43) 49.290.739.886,07

Konstruksi dalam Pengerjaan 26.799.742.000,00 6.658.784.000,00 (26.799.742.000,00) 6.658.784.000,00

Jumlah 2.538.432.079.619,48 646.885.415.618,00 (103.585.685.186,92) 3.081.731.810.050,56

4.2.1.3.1. Tanah
Saldo Tanah Tahun 2013 sebesar Rp147.511.496.882,78, dirinci sebagai
berikut.
Tabel 4.48 Rincian Mutasi Aset Tanah
Uraian Saldo 2013 (Rp) Saldo 2012 (Rp)
Saldo Awal 141.350.230.556,78 138.615.659.420,12
Muitasi Tambah 6.209.266.326,00 8.207.086.921,66
-Belanja Modal Tahun 2013 6.209.266.322,00 7.016.917.912,83
-Kapitalisasi - 10.500.000,83
-Hutang pembebasan tanah - -
-Penilaian tanah bernilai Rp0,00 - 1.179.669.008,00
-Hibah 1,00 -
-Koreksi Saldo Awal 3,00 -
Mutasi Kurang (48.000.000,00) (5.472.515.785,00)
-Belanja Modal dihibahkan/pakai habis/kebijakan akuntansi - (1.027.345.785,00)
-Tanah ex Dekonsentrasi/Tugas Pembantuan - (4.010.550.000,00)
-Reklasifikasi aset ke JIJ - (63.470.000,00)
-Reklasifikasi aset ke Aset Tetap Lainnya (48.000.000,00) -
-Hibah ke KPU dan Pengadilan Tinggi - (371.150.000,00)
Jumlah 147.511.496.882,78 141.350.230.556,78

63
Rincian lebih lanjut dijelaskan pada Lampiran 10.

Nilai aset tanah di atas terdiri dari 1.095 persil, sebanyak 1.053 persil belum
disertifikasi atas nama Pemerintah Kabupaten. Pencatatan aset tanah di atas
belum termasuk aset tanah Hutan Larangan/ ex Marga milik Pemerintah
Kabupaten Banyuasin seluas 751.533 m2. Dokumen pendukung atas
kepemilikan tanah Hutan Larangan/ ex Marga berupa Surat Keterangan Lurah
Kedondong Raye Nomor 593/26/KR/2008 tanggal 28 April 2008.
Selain nilai aset tanah tersebut di atas terdapat harga perolehan tanah atas jalan
sebesar Rp43.381.777.810,00 yang diperoleh dari penilaian link jalan di
Kecamatan Talang Kelapa dan Kecamatan Rambutan oleh tim yang dibentuk
Bupati Banyuasin berdasarkan Peraturan Menteri Dalam Negeri Nomor 17
Tahun 2007 tentang Pedoman Teknis Pengelolaan Barang Milik Daerah pasal
51 dan pasal 52 dan dituangkan dalam Keputusan Bupati Banyuasin Nomor
1051/KPTS/DPPKAD/2013 tentang Penilaian berupa Aset Tetap Link Jalan di
Lingkungan Pemerintah Kabupaten Banyuasin.

4.2.1.3.2. Peralatan dan Mesin


Saldo Peralatan dan Mesin Tahun 2013 sebesar Rp347.370.402.669,06, dapat
dirinci sebagai berikut.

Tabel 4.49 Rincian Mutasi Aset Peralatan dan Mesin


Uraian Saldo 2013 (Rp) Saldo 2012 (Rp)
Saldo Awal 262.012.524.140,20 222.669.753.318,00
Muitasi Tambah 110.641.586.696,00 65.161.408.789,00
-Belanja Modal Tahun 2013 106.884.769.126,00 57.277.278.559,00
-Kapitalisai 294.278.564,00 40.689.232,00
-Reklasifikasi dari Barang dan Jasa 65.430.016,00 551.903.078,00
-Reklasifikasi dari Aset Tetap Lainnya 194.600.000,00 6.794.728.220,00
-Hibah 2.172.420.103,00 -
-Reklasifikasi dari jalan, jaringan, dan irigasi 199.100.000,00 -
-Hutang 830.988.887,00 4.220.900,00
-Koreksi Extracomtable 2011 - 492.588.800,00
Mutasi Kurang (25.283.708.167,14) (25.818.637.966,80)
-Belanja Modal dihibahkan/pakai habis/kebijakan akuntansi (114.666.000,00) (3.514.843.802,80)
-Aset tetap dari Dekonsentrasi/Tugas Pembantuan (12.457.403.160,00)
-Kesalahan penganggaran -
-Reklasifikasi ke Aset Lain-lain (8.402.501.000,00)
-Reklasifikasi ke Aset Tetap Lainnya (3.571.014.000,00) (27.600.000,00)
-Reklasifikasi ke JIJ (2.168.750.000,00) (356.467.600,00)
-Reklasifikasi ke Gedung dan Bangunan (1.815.738.450,00) (184.904.500,00)
-Hibah (4.491.956.754,16) -
-Rusak (1.720.029.931,00) -
-Penghapusan (490.268.404,00)
-Pemeliharaan/Barang Jasa (87.307.817,00) -
-Kurang catat aset yang dihibahkan Tahun 2011 - (53.400.000,00)

64
Uraian Saldo 2013 (Rp) Saldo 2012 (Rp)
-Kurang penghapusan Tahun 2011 - (8.139.000,00)
-Kelebihan reklas barang dan jasa 2011 - (90.110.500,00)
-Kurang catat Hibah Tahun 2011 - (210.000.000,00)
-Kelebihan catat Tahun 2011 - (23.000.000,00)
-Koreksi LK 2012 (2.404.205.305,00) -
-Extracomptable (8.910.039.909,98) -
Jumlah 347.370.402.669,06 262.012.524.140,20

Rincian lebih lanjut dijelaskan dalam Lampiran 11.

4.2.1.3.3. Gedung dan Bangunan


Saldo Gedung dan Bangunan Tahun 2013 sebesar Rp836.941.811.111,90,
dapat dirinci sebagai berikut.

Tabel 4.50 Rincian Mutasi Aset Gedung dan Bangunan


Uraian Saldo 2013 (Rp) Saldo 2012 (Rp)
Saldo Awal 752.808.361.433,25 664.344.866.812,25
Muitasi Tambah 113.808.275.762,00 131.164.956.198,00
-Belanja Modal Tahun 2013 103.380.603.400,00 123.141.646.175,00
-Kapitalisai 4.198.925.129,00 2.336.608.608,00
-Hibah 1.564.645.000,00 -
-Reklasifikasi dari Barang 1.404.696.183,00 1.414.024.200,00
-Reklasifikasi dari Peralatan dan Mesin 1.815.738.450,00 52.500.000,00
-Reklasifikasi dari Jalan, Irigasi, dan Jaringan 277.699.000,00 -
-Hutang 1.165.968.600,00 3.482.187.215,00
-Koreksi penambahan DED Tahun 2011 85.990.000,00
-Koreksi kurang catat aset Gedung dan Bangunan Tahun 2011 652.000.000,00
Mutasi Kurang (29.674.826.083,35) (42.701.461.577,00)
-Belanja Modal dihibahkan/pakai habis/kebijakan akuntansi - (9.170.717.873,00)
-Ex Bangunan dari Dekonsentrasi dan Tugas Pembantuan - (24.229.170.890,00)
-Koreksi LK 2012 (10.086.998.620,00) -
-Hibah (11.328.299.162,35) -
-Reklasifikasi ke Jalan, Irigasi, dan Jaringan (7.321.620.301,00) -
-Extracomptable (103.272.000,00) -
-Kesalahan penganggaran - -
-Reklasifikasi ke Peralatan dan Mesin - (44.039.950,00)
-Reklasifikasi ke KDP (342.810.000,00)
-Penghapusan (475.826.000,00) (4.064.864,00)
-Reklasifikasi ke Aset Tetap Lainnya - (44.559.000,00)
-Pemeliharaan/Barang Jasa (16.000.000,00) (9.208.909.000,00)
Jumlah 836.941.811.111,90 752.808.361.433,25

Rincian lebih lanjut dijelaskan dalam Lampiran 12.

65
4.2.1.3.4. Jalan, Irigasi dan Jaringan
Saldo aset tetap Jalan, Irigasi dan Jaringan Tahun 2013 sebesar
Rp1.693.958.575.500,75, dirinci sebagai berikut.

Tabel 4.51 Rincian Mutasi Aset Jalan Irigasi dan Jaringan


Uraian Saldo 2013 (Rp) Saldo 2012 (Rp)
Saldo Awal 1.337.123.108.952,75 1.208.029.840.141,75
Muitasi Tambah 366.978.534.048,00 165.701.457.111,00
-Belanja Modal Tahun 2013 319.532.265.104,00 140.221.582.232,50
-Kapitalisai 8.822.422.140,00 3.688.532.186,00
-Reklasifikasi dari Barang 507.050.000,00 -
-Reklasifikasi antar Aset Tetap 62.177.500,00 2.111.830.050,00
-Reklasifikasi dari Peralatan dan Mesin 2.168.750.000,00 86.960.600,00
-Hibah 396.495.000,00 -
-Reklasifikasi dari Gedung dan Bangunan 7.321.620.304,00 -
-Reklasifikasi dari KDP 26.799.742.000,00 -
-Reklasifikasi dari aset tanah - 63.470.000,00
-Reklasifikasi KDP Tahun 2011 - 10.845.387.975,00
-Reklasifikasi DED Tahun 2011 - 798.870.000,00
-Koreksi kurang catat Tahun 2011 - 23.000.000,00
-Hutang 1.368.012.000,00 7.861.824.067,50
Mutasi Kurang (10.143.067.500,00) (36.608.188.300,00)
-Ex Bangunan dari Dekonsentrasi dan Tugas
- (9.342.456.300,00)
Pembantuan
-Reklasifikasi ke Peralatan dan Mesin (199.100.000,00) -
-Reklasifikasi ke aset Gedung dan Bangunan (277.699.000,00) (85.990.000,00)
-Reklasifikasi ke KDP (6.315.974.000,00) (26.799.742.000,00)
-Koreksi kurang dana aspirasi Tahun 2011 (380.000.000,00)
-Reklasifikasi antar Aset Tetap (62.177.500,00) -
-Rusak -
-Penghapusan (287.097.200,00) -
-Koreksi LK 2012 (2.493.501.800,00) -
-Hibah (507.518.000,00) -
Jumlah 1.693.958.575.500,75 1.337.123.108.952,75

Rincian lebih lanjut dijelaskan dalam Lampiran 13.

Nilai belanja modal TA 2013 sebesar Rp319.532.265.104,00 termasuk koreksi


tambah karena kurang catat aset pada Dinas Kesehatan sebesar Rp4.929,00
4.2.1.3.5. Aset Tetap Lainnya
Saldo Aset Tetap Lainnya Tahun 2013 sebesar Rp49.290.739.886,07, dirinci
sebagai berikut.

66
Tabel 4.52 Rincian Mutasi Aset Tetap Lainnya
Uraian Saldo 2013 (Rp) Saldo 2012 (Rp)
Saldo Awal 18.338.112.536,50 18.141.562.536,50
Muitasi Tambah 42.588.968.786,00 10.278.086.470,00
-Belanja Modal Tahun 2013 25.746.763.636,00 10.075.558.420,00
-Reklasifikasi dari Barang 60.000.000,00 170.169.000,00
-Reklasifikasi dari Peralatan dan Mesin 3.571.014.000,00 27.600.000,00
-Reklasifikasi dari tanah 48.000.000,00 -
-Hutang 13.163.191.150,00 4.759.050,00
Mutasi Kurang (11.636.341.436,43) (10.081.536.470,00)
-Belanja Modal dihibahkan/pakai habis/kebijakan akuntansi (342.650.000,00) (483.478.200,00)
-Ex Bangunan dari Dekonsentrasi dan Tugas Pembantuan (585.000.000,00)
-Reklasifikasi ke aset peralatan dan mesin (194.600.000,00) -
-Reklasifikasi ke aset JIJ (2.111.830.050,00)
-Pemeliharaan/Barang Jasa (2.753.148.591,00) -
-Koreksi LK 2012 (245.475.000,00) -
-Hibah (8.100.467.845,43) -
-Reklasifikasi ke aset lainnya (6.856.728.220,00)
-Reklasifikasi ke persediaan (44.500.000,00)
Jumlah 49.290.739.886,07 18.338.112.536,50

Rincian lebih lanjut dijelaskan dalam Lampiran 14.

4.2.1.3.6. Konstruksi dalam Pengerjaan


Saldo Konstruksi Dalam Pengerjaan per 31 Desember 2013 sebesar
Rp6.658.784.000,00, dengan rincian sebagai berikut.

Tabel 4.53 Rincian Konstruksi dalam Pengerjaan


Uraian Saldo 2013 (Rp) Saldo 2012 (Rp)
Saldo Awal 26.799.742.000,00 8.430.150.000,00
Muitasi Tambah 6.658.784.000,00 29.214.979.975,00
-Koreksi PT BA - 2.415.237.975,00
-Reklasifikasi dari Gedung dan Bangunan 342.810.000,00 -
-Reklasifikasi dari aset JIJ 6.315.974.000,00 26.799.742.000,00
Mutasi Kurang (26.799.742.000,00) (10.845.387.975,00)
-Reklasifikasi ke aset JIJ (26.799.742.000,00) (10.845.387.975,00)
Jumlah 6.658.784.000,00 26.799.742.000,00

Koreksi tambah Tahun 2013 merupakan belanja modal Gedung dan Bangunan
serta Jalan, Irigasi, dan Jaringan atas pembangunan balai benih ikan pada
Dinas Perikanan dan Kelautan yang belum selesai dan belum bisa digunakan
sampai dengan 31 Desember 2013. Koreksi kurang merupakan reklasifikasi
Ke JIJ pada SKPD Dinas PU Bina Marga.
Selain Aset Tetap yang tercatat dalam Laporan Keuangan Pemerintah
Kabupaten Banyuasin terdapat aset yang dananya berasal dari Anggaran
Pendapatan dan Belanja Negara (APBN) yaitu aset dari dana Dekonsentrasi,

67
Tugas Pembantuan, dan Urusan Bersama sebesar Rp105.260.174.613,00 atau
terdapat penambahan sebesar Rp32.422.444.177,00 dibandingkan tahun
sebelumnya. Informasi tersebut disajikan pada Lampiran 15. Aset tersebut
tidak dimasukan dalam Laporan Keuangan Pemerintah Kabupaten Banyuasin
Tahun Anggaran 2013 karena belum ada penyerahan dari instansi vertikal
terkait.

4.2.1.3.7. Akumulasi Penyusutan Aset Tetap


Pemerintah Kabupaten Banyuasin belum menerapkan metode penyusutan
untuk aset-asetnya.

4.2.1.4. Aset Lainnya


Aset Lainnya per 31 Desember 2013 sebesar Rp39.341.847.564,00 terdiri atas:

Tabel 4.54 Rincian Aset Lainnya


Uraian 2013 (Rp) 2012 (Rp)

Tuntutan Ganti Rugi 27.814.525,00 27.814.525,00

Aset Lain-lain 39.314.033.039,00 44.332.445.475,00

Jumlah 39.341.847.564,00 44.360.260.000,00

4.2.1.4.1. Tuntutan Ganti Rugi (TP/TGR)


Merupakan Tuntutan Perbendaharaan dan Tuntutan Ganti Rugi yang
direklasifikasi ke Aset Lainnya karena pembayarannya melebihi satu periode
akuntansi dan belum ada pembayaran selama Tahun 2013 sebesar
Rp27.814.525,00.

4.2.1.4.2. Aset Lain-lain


Aset Lain-lain terdiri dari tagihan kepada anggota DPRD, DED (Detail
Engineering Design), barang rusak/penghapusan, aset yang diserahkan,
koreksi atas kehilangan barang dan investasi di BUMD dalam proses likuidasi,
rincian pada tabel berikut.

Tabel 4.55 Rincian Aset Lain-lain


No. Uraian 2013 (Rp) 2012 (Rp)

1 Tagihan kepada Anggota DPRD 6.197.029.331,00 7.754.502.265,00


2 Detail Engineering Design (DED) 24.749.174.010,00 16.949.453.410,00
Dinas PU BM 2.880.920.000,00 1.741.465.000,00
Dinas PU CK 4.799.399.000,00 3.187.169.000,00
Dinas PU Pengairan 5.427.502.500,00 3.756.552.500,00
Bappeda 7.232.532.510,00 5.987.099.910,00
Dinas Kebersihan, Pertamanan dan Pemakaman 793.468.000,00 793.468.000,00
Disnakertrans 1.121.651.000,00 1.121.651.000,00
Dinas Pariwisata Seni Budaya Pemuda & Olahraga 1.111.880.000,00 362.048.000,00
Badan PPPA & KB 63.763.000,00 0,00
Dinas Pertanian dan Peternakan 675.933.000,00 0,00

68
No. Uraian 2013 (Rp) 2012 (Rp)

Badan Lingkungan Hidup 48.400.000,00 0,00


Badan Perpustakaan, Arsip dan Dokumentasi Daerah 593.725.000,00 0,00
3 Aset yang akan diserahkan 0,00 17.393.001.000,00
4 Barang Rusak Berat/Penghapusan 6.261.891.898,00 129.551.000,00
Badan Perpustakaan, Arsip dan Dokumentasi Daerah 40.853.000,00 6.260.000,00
Badan Pelaksana Keluarga Berencana 220.324.000,00 123.291.000,00
Kehutanan Perkebunan 46.600.000,00 0,00
Kesbangpol 273.830.666,00 0,00
Badan Lingkungan Hidup 152.815.000,00 0,00
DPPKAD 13.393.200,00 0,00
Dinas Sosial 3.400.000,00 0,00
Disnakertrans 6.943.750,00 0,00
Dinas PU CK 5.469.385.282,00 0,00
Sekretariat DPRD 34.347.000,00 0,00
5 Kehilangan Barang dalam Proses TP-TGR 305.937.800,00 305.937.800,00
Dinas Pendidikan 119.927.300,00 119.927.300,00
Sekretariat Daerah 124.270.000,00 124.270.000,00
Dinas Pertanian dan Peternakan 61.740.500,00 61.740.500,00
6 Investasi di BUMD dalam Proses Likuidasi 1.800.000.000,00 1.800.000.000,00

Jumlah 39.314.033.039,00 44.332.445.475,00

1) Tagihan kepada Anggota DPRD sebesar Rp6.197.029.331,00


Saldo tersebut merupakan tagihan terhadap 55 orang anggota dan mantan
anggota dewan per 31 Desember 2013 dan 2012, dengan rincian sebagai
berikut.
Tabel 4.56 Rincian Tagihan Kepada Anggota DPRD
Uraian 2013 (Rp) 2012 (Rp)

Piutang kepada Anggota DPRD Tahun 2003 2.285.792.511,00 2.795.143.373,00


Piutang kepada Anggota DPRD Tahun 2004 3.125.715.320,00 3.720.588.692,00
Piutang kepada Anggota DPRD Tahun 2005 367.609.000,00 567.897.000,00
Piutang kepada Anggota DPRD Tahun 2006 352.500.000,00 570.000.000,00
Piutang kepada Anggota DPRD Tahun 2008 65.412.500,00 105.873.200,00
Pengurangan atas pembayaran piutang Tahun 2012 (5.000.000,00)

Jumlah 6.197.029.331,00 7.754.502.265,00

2) Detail Engeneering Design (DED)


Rincian DED Tahun 2013 sebesar Rp24.749.174.010,00, dapat
dijelaskan sebagai berikut.
a) Dinas PU Bina Marga sebesar Rp2.880.920.000,00, dengan rincian
sebagai berikut.

69
Tabel 4.57 Rincian Detail Engeneering Design (DED) Dinas PU Bina Marga
Tahun Uraian 2013 (Rp) 2012 (Rp)

Saldo Awal 1.741.465.000,00 2.540.335.000,00


2011 Perencanaan umum jalan/jembatan wilayah daratan 0,00 (106.711.000,00)
2011 Perencanaan umum jalan/jembatan wilayah perairan 0,00 (98.428.000,00)
Perencanaan teknis akses jalan menuju jembatan
2011 198.385.000,00 0,00
Sungai Kembang Air Salek
Perencanaan teknis jalan baru Muara Telang Sri
2011 198.770.000,00 0,00
Menanti Kecamatan Muara Telang
2011 Pemetaan jaringan jalan/jembatan Kabupaten 0,00 (396.616.000,00)
Perancanaan jembatan beton bentang 60m lebar 3
2011 0,00 (98.159.000,00)
Pulau Rimau
Perancanaan jembatan beton bentang 60m lebar 3
2011 0,00 (98.956.000,00)
Muara Sugihan
Jasa perencanaan lingkungan dan F5 jembatan tanah
2013 742.300.000,00 0,00
kering

Jumlah 2.880.920.000,00 1.741.465.000,00

b) Dinas PU Cipta Karya sebesar Rp4.799.399.000,00, dengan rincian


sebagai berikut.

Tabel 4.58 Rincian Detail Engeneering Design (DED) Dinas PU Cipta Karya
Tahun Uraian 2013 (Rp) 2012 (Rp)

Saldo Awal 3.187.169.000,00 0,00


Pengawasan dan supervisi pembangunan jaringan sistem air bersih
2010 827.910.000,00 0,00
unit betung lubuk lancang dan kenten
2011 Rencana induk studi kelayakan SPAM sugihan (lanjutan) 0,00 598.950.000,00
2011 Revisi rencana tata ruang wilayah kabupaten Banyuasin 0,00 549.175.000,00
2011 Rencana sistem drainase lingkungan kelurahan kedondong raye 0,00 199.875.000,00
2011 Rencana penyediaan sistem air bersih salek 0,00 119.750.000,00
2012 DED Tahun 2012 0,00 1.719.419.000,00
2013 DED agropolitan lokasi tanjung lago 99.340.000,00 0,00
2013 DED kantor BPT Kabupaten Banyuasin 122.400.000,00 0,00
2013 Perencanaan gedung kesenian dinas pariwisata 99.300.000,00 0,00
Perencanaan tribun dan fasilitasi umum lapangan olahra komplek
2013 49.750.000,00 0,00
perumahan dinas Pemkab Banyuasin
2013 DED gedung kantor DPPKAD Kabupaten Banyuasin 120.710.000,00 0,00
2013 Perencanaan stadion dan tribun Kec. Betung Kab. Banyuasin 96.390.000,00 0,00
2013 Perencanaan drainase/gorong-gorong Kecamatan Banyuasin III 96.850.000,00 0,00
2013 DED Kantor PDAM 49.770.000,00 0,00
2013 DED akses PDAM ke RSUD 49.810.000,00 0,00

Jumlah 4.799.399.000,00 3.187.169.000,00

70
c) Dinas PU Pengairan sebesar Rp5.427.502.500,00, dengan rincian
sebagai berikut.

Tabel 4.59 Rincian Detail Engeneering Design (DED) Dinas PU Pengairan


Tahun Uraian 2013 (Rp) 2012 (Rp)

Saldo Awal 3.756.552.500,00 3.227.377.000,00


Pemetaan lokasi monitoring iklim hidrologi daerah pasang surut dan
2011 0,00 79.980.000,00
analisis data
2011 Pengukuran tata jaringan Desa Suka Rela Kec. Rantau Bayur 0,00 90.500.000,00
2011 Pengukuran tata jaringan Desa Talang Kemang Kec. Rantau Bayur 0,00 91.740.000,00
2011 Review design tata jaringan Blok P8-P10 Telang I 0,00 91.740.000,00
2011 Review design tata jaringan Rawa Sebubus Kec. Rambutan 0,00 91.370.000,00
Kapitalisasi kegiatan perencanaan pembangunan jaringan irigasi
2011
terdiri atas:
(a) Belanja Pegawai 0,00 31.850.000,00
(b) Belanja Barang dan Jasa 0,00 51.995.500,00
2012 Design tanggul keliling DRR Upang (Tahap I) 199.400.000,00 0,00
2012 Pengukuran tata jaringan DRR Pulau Parang (Tahap I) 99.700.000,00 0,00
2012 DED tanggul penahan banjir DRR Air Salek (Tahap I) 149.300.000,00 0,00
DED tata jaringan Desa Eks Marga (10 Desa) Kecamatan Muara
2012 149.500.000,00 0,00
Telang (Tahap I)
2013 DED tata jaringan DRR Pulau Parang Kec. Rambutan (Lanjutan) 348.800.000,00 0,00
2013 DED tata jarungan eks Marga Telang 398.750.000,00 0,00
2013 Pemetaan topografi daerah irigasi Kesambi Kec. Banyuasin III 198.600.000,00 0,00
Penyusunan master tata jaringan areal reklamasi rawa pasang surut
2013 126.900.000,00 0,00
dan studi perubahan alih sungai lahan sawah di delta Sugihan Kiri

Jumlah 5.427.502.500,00 3.756.552.500,00

d) Badan Perencanaan Pembangunan dan Penanaman Modal sebesar


Rp7.232.532.510,00, dengan rincian sebagai berikut.

Tabel 4.60 Rincian Detail Engeneering Design (DED) BAPPEDA


Tahun Uraian 2013 (Rp) 2012 (Rp)

Saldo Awal 5.987.100.000,00 0,00


Kegiatan penyusunan pembuatan peta Kabupaten Banyuasin dengan
sistem GIS dan citra satelit (Landsat, Econoc), penyusunan rencana detail
2010 0,00 2.083.000.000,00
tata ruang (RDTR) kawasan Sukajadi Sukomoro (Kawasan Hinterland),
Kota Betung dan tapak kawasan industri Tanjung Api-Api
Kegiatan penyusunan sistem informasi database pembangunan
2010 0,00 599.200.000,00
Kabupaten Banyuasin
Kegiatan penyusunan rencana tata bangunan dan lingkungan (RTBL)
2010 kawasan Sungsang dan koridor jalan Tanjung Api-Api batas Palembang 0,00 1.132.550.000,00
menggunakan foto-foto udara
Penyusunan rencana tata bangunan dan lingkungan (RTBL) sepanjang
2010 0,00 701.100.000,00
jalan Pangkalan Balai

71
Tahun Uraian 2013 (Rp) 2012 (Rp)

2010 Penyusunan RDTR Jakabaring menggunakan Econos 0,00 291.000.000,00


Kegiatan penyusunan rencana detail tata ruang (RDTR) kawasan
2010 penyangga SEC de (Kenten Laut-Pangkalan Benteng) menggunakan 0,00 384.400.000,00
Econos di Kabupaten Banyuasin
Pembuatan sistem informasi pembangunan daerah (lanjutan) Kabupaten
2010 0,00 531.250.000,00
Banyuasin
2010 Pembuatan website Kabupaten Banyuasin 0,00 168.500.000,00
2012 DED kegiatan studi perencanaan umum pengembangan potensi investasi 0,00 96.100.000,00
2013 Penyusunan perencanaan pengembangan strategi dan cepat tumbuh 352.806.600,00 0,00
2013 Survey pemetaan 75.400.000,00 0,00
2013 Pengadaan citra satelit 1:5000 W Wordview 49.975.000,00 0,00
2013 Koordinasi penyusunan profil desa pesisir 107.173.000,00 0,00
2013 Koordinasi perencanaan air minum, drainase dan sanitasi perkotaan 84.732.400,00 0,00
2013 Program pembangunan percepatan sanitasi pemukiman (PPSP) 307.000.000,00 0,00
2013 Koordinasi penyusunan kajian lingkungan strategi 268.345.600,00 0,00

Jumlah 7.232.532.600,00 5.987.100.000,00

e) Dinas Kebersihan Pertamanan dan Pemakaman sebesar


Rp793.468.000,00, dengan rincian sebagai berikut.

Tabel 4.61 Rincian Detail Engeneering Design (DED)


Dinas Kebersihan, Pertamanan dan Pemakaman
Uraian 2013 (Rp) 2012 (Rp)

Saldo Awal 793.468.000,00 793.468.000,00


Mutasi Tambah
DED TPA regional sistem sanitari landfill di Talang Kelapa 0,00 0,00
DED TPA regional sistem sanitari landfill di BA III 0,00 0,00
Landscape pertamanan 0,00 0,00

Jumlah 793.468.000,00 793.468.000,00

f) Dinas Tenaga Kerja dan Transmigrasi sebesar Rp1.121.651.000,00,


dengan rincian sebagai berikut.

Tabel 4.62 Rincian Detail Engeneering Design (DED)


Dinas Tenaga Kerja dan Transmigrasi
Uraian 2013 (Rp) 2012 (Rp)

Saldo Awal 1.121.651.000,00 1.121.651.000,00


Mutasi Tambah
DED Tahun 2008 0,00 0,00
DED Tahun 2009 0,00 0,00

Jumlah 1.121.651.000,00 1.121.651.000,00

72
g) Dinas Pariwisata Seni, Budaya, Pemuda dan Olahraga sebesar
Rp1.111.880.000,00, dengan rincian sebagai berikut.

Tabel 4.63 Rincian Detail Engeneering Design (DED)


Dinas Pariwisata Seni, Budaya, Pemuda dan Olahraga
Tahun Uraian 2013 (Rp) 2012 (Rp)

Saldo Awal 362.048.000,00 0,00


2009 DED Gedung Olahraga 15.527.000,00 362.048.000,00
2010 DED Gedung Kantor Permanen 98.000.000,00 0,00
2010 DED Stadion Olahraga 323.356.000,00 0,00
2011 DED Museum Kebudayaan 144.314.000,00 0,00
2012 DED Tribun Lapangan Sepakbola 48.620.000,00 0,00
2012 DED Pembangunan Serba Guna 23.281.000,00 0,00
2013 DED Pembangunan Lapangan Muani Serumpun 48.400.000,00 0,00
2013 DED Pembangunan Lapangan Futsal 48.334.000,00 0,00

Jumlah 1.111.880.000,00 362.048.000,00

h) Dinas Pelayanan Keluarga Berencana Rp63.763.000,00, dengan


rincian sebagai berikut.

Tabel.4.64 Rincian Detail Engeneering Design (DED)


Dinas Pelayanan Keluarga Berencana
Tahun Uraian 2013 (Rp) 2012 (Rp)

Saldo Awal 0,00 0,00


Pembuatan DED Gedung Kantor Badan
2013 48.328.000,00 0,00
Keluarga Berencana
Pembuatan DED Gedung AKLON Badan
15.435.000,00 0,00
Keluarga Berencana

Jumlah 63.763.000,00 0,00

i) Dinas Pertanian dan Peternakan Rp675.933.000,00, dengan rincian


sebagai berikut.

Tabel.4.65 Rincian Detail Engeneering Design (DED)


Dinas Pertanian dan Peternakan
Tahun Uraian 2013 (Rp) 2012 (Rp)

Saldo Awal 0,00 0,00


Pembuatan jasa konsultasi SID Optimasi
2013 79.833.000,00 0,00
Pengembangan Lahan (OPL)
Pembuatan jasa konsultasi perencanaan survey
2012 596.100.000,00 0,00
investigasi desain percetakan sawah

Jumlah 675.933.000,00 0,00

73
j) Badan Lingkungan Hidup Rp48.400.000,00, dengan rincian sebagai
berikut.
Tabel.4.66 Rincian Detail Engeneering Design (DED)
Badan Lingkungan Hidup
Tahun Uraian 2013 (Rp) 2012 (Rp)

Saldo Awal 0,00 0,00


Pekerjaan perencanaan pembangunan gedung
2013 48.400.000,00 0,00
kantor

Jumlah 48.400.000,00 0,00

k) Badan Perpustakaan dan arsip daerah Rp593.725,00, dengan rincian


sebagai berikut.

Tabel.4.67 Rincian Detail Engeneering Design (DED)


Badan Perpustakaan dan arsip daerah
Tahun Uraian 2013 (Rp) 2012 (Rp)

Saldo Awal 0,00 0,00

2013 DED Pembangunan perpustakaan daerah 593.725.000,00 0,00

Jumlah 593.725.000,00 0,00

3) Aset Yang Akan diserahkan


Mutasi kurang atas aset yang akan diserahkan sebesar
Rp17.393.001.000,00 adalah aset pada Dinas PU Cipta Karya dan Badan
Ketahanan Pangan yang telah dihibahkan sesuai dengan keputusan Bupati
Banyuasin Nomor 1061/KPTS/PUCK/2013 tentang penetapan daftar
penerima hibah pembangunan/peningkatan infrastruktur Tahun 2012 dan
keputusan Bupati Banyuasin Nomor 1036/KPTS/BAKETPAN/2013
tentang penetapan penerima hibah bangunan lumbung pangan, lantai
jemur, bangunan alat mesin pertanian, box driyer dan penggilingan padi
Tahun 2013. Rincian lebih lanjut tersaji dalam Lampiran 16.a dan 16.b.

4) Barang Rusak/Penghapusan
Jumlah barang rusak berat yang belum dihapuskan sebesar
Rp6.261.891.898,00 merupakan aset rusak berat pada beberapa SKPD,
dengan rincian sebagai berikut.

Tabel 4.68 Rincian Barang Rusak/Penghapusan


Uraian 2013 (Rp) 2012 (Rp)

Saldo Awal 129.551.000,00 0,00


Mutasi Tambah
Badan Perpustakaan dan Arsip Daerah 34.593.000,00 6.260.000,00
Dinas Kehutanan dan Perkebunan 46.600.000,00
Badan Pelaksana KB 97.033.000,00 123.291.000,00
BPBD Kesbangpol 273.830.666,00

74
Uraian 2013 (Rp) 2012 (Rp)

Badan Lingkungan Hidup 152.815.000,00


DPPKAD 13.393.200,00
Dinas Sosial 3.400.000,00
Disnakertrans 6.943.750,00
Dinas PU CK 5.469.385.282,00
Sekretariat DPRD 34.347.000,00
Mutasi Tambah/(Kurang) 0,00 0,00
Penghapusan 0,00 0,00

Jumlah 6.261.891.898,00 129.551.000,00

5) Aset Tetap yang Belum Ditemukan


Merupakan saldo hasil audit BPK Tahun 2011 berupa Peralatan dan
Mesin (Laptop) yang tidak ditemukan fisiknya sebesar
Rp305.937.800,00.
Tabel 4.69 Aset yang belum ditemukan fisiknya
SKPD 2013 (Rp) 2012 (Rp)

Sekretariat Daerah
Saldo awal 124.270.000,00
Mutasi tambah 0,00
Mutasi kurang 0,00
Saldo akhir 124.270.000,00 124.270.000,00

Dinas Pendidikan
Saldo awal 119.927.300,00
Mutasi tambah 0,00
Mutasi kurang 0,00
Saldo akhir 119.927.300,00 119.927.300,00

Dinas Pertanian dan Peternakan


Saldo awal 61.740.500,00
Mutasi tambah 0,00
Mutasi kurang 0,00
Saldo akhir 61.740.500,00 61.740.500,00

Jumlah 305.937.800,00 305.937.800,00

6) Investasi di BUMD dalam Proses Likuidasi


Merupakan koreksi reklasifikasi dari Investasi Permanen Lainnya
(Penyertaan Modal pada PT Basin Resources) sebesar
Rp1.800.000.000,00, yang telah dibubarkan/dibekukan berdasarkan
Peraturan Daerah Kabupaten Banyuasin Nomor 25 Tahun 2012 tentang
Pembubaran Badan Usaha Milik Daerah Basin Resources tanggal 24
Oktober 2012. Likuidasi atas BUMD Basin Resources sebagai tindak

75
lanjut dari peraturan daerah sampai 31 Desember 2013 masih dalam
proses.

4.2.2. Kewajiban
Pos kewajiban per 31 Desember 2013 merupakan Kewajiban Jangka Pendek.

4.2.2.1. Kewajiban Jangka Pendek


Kewajiban Jangka Pendek adalah kewajiban Pemerintah Kabupaten Banyuasin
kepada pihak ketiga yang akan jatuh tempo tidak lebih dari satu periode
akuntansi atau satu periode anggaran. Saldo Kewajiban Jangka Pendek per 31
Desember 2013 sebesar Rp33.367.855.196,05 dengan rincian sebagai berikut.

4.2.2.1.1. Utang kepada Pemerintah Provinsi


Utang kepada Pemerintah Provinsi Sumatera Selatan sebesar
Rp2.175.865.863,35 merupakan utang dana sharing Jaminan Sosial Kesehatan
(Jamsoskes) Tahun 2009 s.d. Tahun 2011 berdasarkan surat Dinas Kesehatan
Provinsi Sumatera Selatan Nomor 900-440/379/Kes/XII/2013 tanggal 30
Januari 2013 perihal Laporan Hasil Rekonsiliasi Utang Piutang Jamsoskes
Kabupaten/Kota.
Selain nilai tersebut terdapat utang atas sharing Jaminan Sosial Kesehatan
(Jamsoskes) Tahun 2012 s.d. Tahun 2013 atas pelayanan Rumah Sakit BARI
Palembang dan Rumah Sakit Umum Muhammad Husein Palembang sebesar
Rp6.689.114.289,38 yang masih dalam proses rekonsiliasi dengan Provinsi
Sumatera Selatan.

4.2.2.1.2. Utang Pihak Ketiga


Utang kepada pihak ketiga per 31 Desember 2013 sebesar
Rp31.191.989.332,70. Rincian pada lampiran 17.

Tabel 4.70 Rincian Utang Pihak Ketiga


Uraian 2013 (Rp) 2012 (Rp)

a. Utang Retensi Jaminan Pemeliharaan


Saldo awal 14.436.544.381,13 14.447.215.574,00
Koreksi penambahan saldo awal 0,00 3.784.696.625,00
Mutasi tambah 22.334.946.864,00 12.142.704.230,50
Mutasi kurang (pelunasan) (12.556.975.287,13) (17.047.691.269,50)
Koreksi penghapusan (67.699.108,00) (21.102,50)
Saldo akhir 24.146.816.850,00 13.326.904.057,50

b. Utang Jaminan Sosial Kesehatan


Saldo awal 1.109.640.323,63 0,00
Mutasi tambah 7.045.172.482,70 1.109.640.323,63
Mutasi kurang (1.109.640.323,63) 0,00
Saldo akhir 7.045.172.482,70 1.109.640.323,63

Jumlah 31.191.989.332,70 14.436.544.381,13

76
Koreksi penghapusan hutang pihak ketiga sebesar Rp67.698.606,00
merupakan koreksi atas hutang yang sudah potong dengan denda pada SKPD
Dinas PU Cipta Karya dan Dinas PU Bina Marga. Sedangkan sisanya sebesar
Rp502,00 merupakan selisih pencatatan pada SKPD Sekretariat Daerah dan
Sekretariat DPRD.
Mutasi kurang atas utang Jaminan Sosial Kesehatan sebesar
Rp1.109.640.323,63 merupakan pembayaran hutang yang dilakukan dengan
mekanisme pembayaran melalui kegiatan pelayanan kesehatan penduduk
miskin di puskesmas dan jaringanya sesuai dengan SP2D Nomor
5825/TU/1.20.01.16.01/5.2/2013 tanggal 29 November 2013 berupa belanja
premi asuransi kesehatan.
Rincian lebih lanjut Utang pihak ketiga disajikan pada Lampiran 18.

4.2.3. Ekuitas Dana


Ekuitas Dana adalah kekayaan bersih Pemerintah Kabupaten Banyuasin yang
merupakan selisih antara aset dan kewajiban. Saldo Ekuitas Dana per 31
Desember 2013 sebesar Rp3.437.181.762.020,18 terdiri atas:

4.2.3.1. Ekuitas Dana Lancar


Saldo Ekuitas Dana Lancar per 31 Desember 2013 sebesar
Rp242.991.865.746,20, terdiri atas:

Tabel 4.71 Rincian Ekuitas Dana Lancar


Uraian 2013 (Rp) 2012 (Rp)

Sisa Lebih Pembiyaan Anggaran (SILPA) 185.414.415.358,54 192.443.988.035,43


Pendapatan yang Ditangguhkan 434.350.253,60 238.741.863,00
Cadangan Piutang 80.581.200.689,34 26.343.273.470,95
Cadangan Persediaan 9.929.754.640,77 9.632.090.066,33
Dana yang harus Disediakan Untuk Pembayaran Utang Jangka
(33.367.855.196,05) (16.612.410.244,48)
Pendek

Jumlah 242.991.865.746,20 212.045.683.191,23

4.2.3.1.1 Sisa Lebih Pembiayaan Anggaran (SiLPA)


Sisa Lebih Pembiayaan Anggaran (SiLPA) sebesar Rp185.414.415.358,54,
terdiri atas:
Tabel 4.72 Rincian Sisa Lebih Pembiayaan Anggaran (SiLPA)
Uraian Jumlah

Lebih pendapatan 7.728.589.365,80


Penghematan belanja 127.963.565.881,48
Lebih penerimaan pembiayaan 14.660.474.776,43
Penghematan pembiayaan 5.681.665.988,13
Penambahan utang Tahun 2013 29.380.119.346,70

Jumlah 185.414.415.358,54

77
4.2.3.1.2 Pendapatan yang Ditangguhkan
Saldo Pendapatan yang Ditangguhkan per 31 Desember 2013 sebesar
Rp434.350.253,60 merupakan saldo kas di Bendahara Penerimaan sebesar
Rp90.221.300,00 dan bunga deposito yang ditangguhkan pada Bank Mandiri
Rp160.273.972,60 dan pada Bank BNI sebesar Rp183.854.981,00.

4.2.3.1.3 Cadangan Piutang


Saldo Cadangan Piutang per 31 Desember 2013 sebesar Rp80.581.200.689,34
merupakan contra account dari piutang pajak, piutang retribusi, piutang dana
perimbangan, bagian lancar tuntutan ganti rugi, dan piutang lainnya, kecuali
Piutang PFK sebesar Rp35.469.630,00 karena piutang tersebut adalah
kelebihan pembayaran PFK yang akan dikompensasi pada penyetoran PFK
berikutnya.

4.2.3.1.4 Cadangan Persediaan


Saldo Cadangan Persediaan per 31 Desember 2013 sebesar
Rp9.929.754.640,77 merupakan contra account dari saldo Persediaan.

4.2.3.1.5 Dana yang Harus Disediakan untuk Pembayaran Utang Jangka Pendek
Saldo Dana yang Harus Disediakan untuk Pembayaran Utang Jangka Pendek
sebesar Rp33.367.855.196,05 merupakan contra account dari saldo Utang
Jangka Pendek yaitu utang kepada Pemerintah Provinsi sebesar
Rp2.175.865.863,35 dan Utang Pihak Ketiga sebesar Rp31.191.989.332,70.

4.2.3.2. Ekuitas Dana Investasi


Saldo Ekuitas Dana Investasi per 31 Desember 2012 sebesar
Rp3.194.189.896.273,98, terdiri atas:

Tabel 4.73 Rincian Ekuitas Dana Investasi


Uraian 2013 (Rp) 2012 (Rp)

Diinvestasikan dalam Investasi Jangka Panjang 73.116.238.659,42 70.479.482.589,36


Diinvestasikan dalam Aset Tetap 3.081.731.810.050,56 2.538.432.079.619,48
Diinvestasikan dalam Aset Lainnya 39.341.847.564,00 44.360.260.000,00

Jumlah 3.194.189.896.273,98 2.653.271.822.208,84

4.2.3.2.1. Diinvestasikan dalam Investasi Jangka Panjang


Saldo Dinvestasikan dalam Investasi Jangka Panjang per 31 Desember 2013
sebesar Rp73.116.238.659,42 merupakan contra account dari nilai Investasi
Jangka Panjang yang dimiliki oleh Pemerintah Kabupaten Banyuasin.

4.2.3.2.2. Dinvestasikan Dalam Aset Tetap


Saldo Dinvestasikan Dalam Aset Tetap per 31 Desember 2013 sebesar
Rp3.081.731.810.050,56 merupakan contra account dari nilai Aset Tetap
yang dimiliki oleh Pemerintah Kabupaten Banyuasin.

78
4.2.3.2.3. Diinvestasikan Dalam Aset Lainnya
Saldo Diinvestasikan Dalam Aset Lainnya per 31 Desember 2013 sebesar
Rp39.341.847.564,00 merupakan contra account dari nilai Aset Lainnya yang
dimiliki oleh Pemerintah Kabupaten Banyuasin.

Kejadian Dalam Tahun Periode Pelaporan


Dalam Tahun 2013 Kabupaten Banyuasin melaksanakan pemilihan umum kepala daerah
dengan hasil terpilihnya pasangan Bupati Yan Anton Ferdian, SH dan Wakil Bupati Ir.
SA Supriono MM yang dilantik pada tanggal 9 september 2013.

Kejadian Setelah Tanggal Neraca (Subsequent Event)


Pemerintah Kabupaten Banyuasin melakukan penilaian kinerja terhadap SKPD dengan
melakukan pergantian kepala SKPD guna meningkatkan kinerja, yaitu:
Dinas Sosial
Dinas Pendidikan
Badan Pemberdayaan Perempuan, Perlindungan Anak dan Keluarga Berencana
Dinas Pariwisata, Seni Budaya Pemuda dan Olahraga
Dinas Tenaga Kerja dan Transmigrasi
Dinas pengolaan Pasar
Badan Pemberdayaan Masyarakat desa
Badan Ketahanan Pangan
Dinas Kebersihan, Pertamanan dan Pemakaman
Dinas Pekerjaan Umum Cipta Karya
Dinas Pekerjaan Umum Pengairan
Dinas Perikanan dan Kelautan
Badan Lingkungan Hidup
Dinas Pertanian dan Peternakan
Dinas Pekerjaam Umum Bina Marga
Dinas Kesehatan
Dinas Koperasi, Perindustrian, Perdagangan, UKM dan Penanaman Modal
Badan Pelayanan Terpadu
Selanjutnya pada Tanggal 1 Februari 2014 Pemerintah Kabupaten Banyuasin
melaksanakan amanat Undang-Undang Nomor 24 Tahun 2013 Pasal 79A tentang
administrasi kependudukan yang dinyatakan bahwa pengurusan dan penertiban dokumen
kependudukan tidak dipungut biaya artinya per tanggal tersebut diatas tidak ada lagi
Retribusi Kependudukan dan Capil yang menjadi komponen pendapatan asli daerah.
Pemerintah Kabupaten Banyuasin melaksanakan sebagian misi pasangan Bupati dan
Wakil Bupati terpilih periode 2013 s.d. 2018 berupa program pemberdayaan masyarakat
desa dengan memberikan dana rata-rata sebesar Rp500.000.000,00 per desa/kelurahan
yang sebagian besar digunakan untuk pembangunan infrastruktur perdesaan.
Selanjutnya Pemerintah Kabupaten Banyuasin melakukan kesepakatan bersama antara
Badan Pemeriksa Keuangan beserta Bank SumselBabel tentang akses data transaksi
rekening Pemerintah Kabupaten Banyuasin secara online pada Bank SumselBabel dalam
rangka pemeriksaan pengelolaan dan tanggung jawab keuangan daerah.

79
4.3 Penjelasan Pos-Pos Laporan Arus Kas (LAK)
Laporan arus kas menyajikan informasi penerimaan dan pengeluaran kas selama
periode Tahun 2013 yang diklasifikasikan berdasarkan aktivitas operasi, investasi
aset non keuangan, pembiayaan, dan non anggaran.

4.3.1. Aktivitas Operasi


Arus kas bersih aktivitas operasi merupakan indikator yang menunjukkan
kemampuan operasi pemerintah dalam menghasilkan kas yang cukup untuk
membiayai aktivitas operasionalnya di masa yang akan datang tanpa
mengandalkan sumber pendanaan dari luar. Saldo Arus Kas bersih aktivitas
operasi per 31 Desember 2013 sebesar Rp556.328.559.921,61. Arus kas dari
aktivitas operasi, sebagai berikut.

Tabel 4.74 Rincian Arus Kas dari Aktivitas Operasi


Uraian Tahun 2013 Tahun 2012

Arus Kas dari Aktivitas Operasi


Arus Masuk Kas
Pendapatan Pajak Daerah 31.068.706.961,50 25.771.804.113,50
Pendapatan Retribusi Daerah 28.388.447.843,10 24.074.875.998,77
Pendapatan Hasil Pengelolaan Kekayaan Daerah yang Dipisahkan 1.891.776.235,73 2.809.634.764,67
Lain-lain Pendapatan Asli Daerah yang Sah 17.364.820.715,91 15.110.892.373,75
Dana Bagi Hasil Pajak 164.445.668.681,00 150.904.713.706,00
Dana Bagi Hasil Bukan Pajak (Sumber Daya Alam) 210.745.575.432,00 216.033.376.450,00
Dana Alokasi Umum 772.464.315.000,00 651.357.692.000,00
Dana Alokasi Khusus 147.190.480.000,00 97.453.050.000,00
Dana Otonomi Khusus 0,00 0,00
Dana Penyesuaian 94.726.287.000,00 148.274.598.709,00
Pendapatan Bagi Hasil Pajak 6.568.401.600,00 29.096.882.836,27
Pendapatan Bagi Hasil Lainnya 0,00 0,00
Pendapatan Hibah 0,00 197.729.094,00
Pendapatan Dana Darurat 0,00 0,00
Pendapatan Lainnya 112.179.164.654,00 31.552.357.924,00
Jumlah Arus Masuk Kas 1.587.033.644.123,24 1.392.637.607.969,96

Arus Keluar Kas


Belanja Pegawai 592.097.166.177,00 539.395.295.010,00
Belanja Barang 301.430.268.087,63 320.918.526.678,99
Belanja Bunga 0,00 0,00
Belanja Subsidi 0,00 408.000.000,00
Belanja Hibah 101.749.175.090,00 33.443.595.775,00
Bantuan Sosial 6.244.534.000,00 5.142.580.000,00
Belanja Bantuan Keuangan 29.158.727.525,00 29.298.154.525,00
Belanja Tak Terduga 25.213.322,00 554.660.000,00
Bagi Hasil Pajak 0,00 0,00

80
Uraian Tahun 2013 Tahun 2012

Bagi Hasil Retribusi 0,00 0,00


Bagi Hasil Pendapatan Lainnya 0,00 0,00
Jumlah Arus Keluar Kas 1.030.705.084.201,63 929.160.811.988,99

Arus Kas Bersih dari Aktivitas Operasi 556.328.559.921,61 463.476.795.980,97

4.3.2. Aktivitas Investasi Aset Non Keuangan


Arus kas dari aktivitas investasi aset non keuangan mencerminkan penerimaan
dan pengeluaran kas bruto dalam rangka perolehan dan pelepasan sumber daya
ekonomi yang bertujuan untuk meningkatkan dan mendukung pelayanan
pemerintah kepada masyarakat dimasa yang akan datang. Saldo Arus kas bersih
aktivitas investasi aset non keuangan per 31 Desember 2013 sebesar
(Rp561.549.400.532,00). Arus kas dari aktivitas investasi aset non keuangan,
sebagai berikut.
Tabel 4.75 Arus Kas dari Aktivitas Investasi Aset Non Keuangan
Uraian Tahun 2013 Tahun 2012

Arus Kas dari Aktivitas Investasi Aset Non Keuangan


Arus Masuk Kas
Pendapatan Penjualan atas Tanah 0,00 0,00
Pendapatan Penjualan atas Peralatan dan Mesin 199.388.127,00 0,00
Pendapatan Penjualan atas Gedung dan Bangunan 0,00 0,00
Pendapatan Penjualan atas Jalan, Irigasi, dan Jaringan 0,00 0,00
Pendapatan dari Penjualan Aset Tetap Lainnya 0,00 0,00
Pendapatan dari Penjualan Aset Lainnya 4.874.000,00 0,00
Jumlah Arus Masuk Kas 204.262.127,00 0,00

Arus Keluar Kas


Belanja Tanah 6.209.266.322,00 7.016.917.912,83
Belanja Peralatan dan Mesin 106.884.769.126,00 57.277.278.559,00
Belanja Gedung dan Bangunan 103.380.603.400,00 123.141.646.175,00
Belanja Jalan, Irigasi dan Jaringan 319.532.260.175,00 140.221.582.232,50
Belanja Aset Tetap Lainnya 25.746.763.636,00 10.075.558.420,00
Belanja Aset Lainnya 0,00 0,00
Jumlah Arus Keluar Kas 561.753.662.659,00 337.732.983.299,33

Arus Kas Bersih dari Aktivitas Investasi Non Keuangan (561.549.400.532,00) (337.732.983.299,33)

4.3.3. Aktivitas Pembiayaan


Arus kas dari aktivitas pembiayaan mencerminkan penerimaan dan pengeluaran
kas bruto sehubungan dengan pendanaan defisit atau penggunaan surplus
anggaran, yang bertujuan untuk memprediksi klaim pihak lain terhadap arus kas
pemerintah dan klaim pemerintah terhadap pihak lain di masa yang akan datang.

81
Saldo Arus kas bersih aktivitas pembiayaan per 31 Desember 2013 sebesar
(Rp1.808.732.066,50). Arus kas dari aktivitas pembiayaan, sebagai berikut.
Tabel 4.76 Arus Kas dari Aktivitas Pembiayaan
Uraian Tahun 2013 Tahun 2012

Arus Kas dari Aktivitas Pembiayaan


Arus Masuk Kas
Pencairan Dana Cadangan 0,00 0,00
Hasil Penjualan Kekayaan Daerah yang Dipisahkan 0,00 0,00
Penerimaan Pinjaman - Obligasi 0,00 0,00
Penerimaan Kembali Pinjaman 0,00 0,00
Penerimaan Piutang Daerah 14.638.602.897,00 55.253.836,00
Jumlah Arus Masuk Kas 14.638.602.897,00 55.253.836,00

Arus Keluar Kas


Pembentukan Dana Cadangan 0,00 0,00
Penyertaan Modal Pemerintah Daerah 5.000.000.000,00 5.000.000.000,00
Pembayaran Pokok Utang 11.447.334.963,50 17.109.656.069,50
Pemberian Pinjaman 0,00 0,00
Jumlah Arus Keluar Kas 16.447.334.963,50 22.109.656.069,50

Arus Kas Bersih dari Aktivitas Pembiayaan (1.808.732.066,50) (22.054.402.233,50)

4.3.4. Aktivitas Non Anggaran


Arus kas dari aktivitas non anggaran mencerminkan penerimaan dan pengeluaran
kas bruto yang tidak mempengaruhi anggaran pendapatan, belanja, dan
pembiayaan pemerintah. Arus kas dari aktivitas non anggaran antara lain
Perhitungan Fihak Ketiga (PFK) dan kiriman uang. PFK menggambarkan kas
yang berasal dari jumlah dana yang dipotong dari Surat Perintah Pengeluaran
Dana (SP2D) atau diterima secara tunai untuk pihak ketiga misalnya potongan
Taspen dan Askes. Saldo Arus kas bersih aktivitas non anggaran per 31
Desember 2013 sebesar (Rp31.140.558,00). Arus kas dari aktivitas non anggaran
dan rincian saldo akhir arus kas, sebagai berikut.
Tabel 4.77 Arus Kas dari Aktivitas Non Anggaran
Uraian Tahun 2013 Tahun 2012

Arus Kas dari Aktivitas Non Anggaran


Arus Masuk Kas
Penerimaan Perhitungan Fihak Ketiga (PFK) 44.803.024.704,00 44.375.034.022,00
Jumlah Arus Masuk Kas 44.803.024.704,00 44.375.034.022,00

Arus Keluar Kas


Pengeluaran Perhitungan Fihak Ketiga (PFK) 44.834.165.262,00 44.379.363.094,00
Jumlah Arus Keluar Kas 44.834.165.262,00 44.379.363.094,00

Arus Kas Bersih dari Aktivitas Non Anggaran (31.140.558,00) (4.329.072,00)

82
Tabel 4.78 Rincian Saldo Akhir Arus Kas
Uraian Tahun 2013 Tahun 2012

Kenaikan (Penurunan) Kas (7.060.713.234,89) 103.685.081.376,14


Saldo Awal Kas di BUD 192.439.658.963,43 88.754.577.587,29
Saldo Akhir Kas di BUD 185.378.945.728,54 192.439.658.963,43

Saldo Akhir Kas di BUD 99.384.566.996,54 182.240.776.880,43


Saldo Akhir Kas di Bendahara Pengeluaran 5.994.378.732,00 198.882.083,00
Saldo Akhir Kas di Bendahara Penerimaan 90.221.300,00 6.145.000,00
Saldo Deposito di BNI 80.000.000.000,00 10.000.000.000,00
Saldo Bunga Deposito di BNI 344.128.953,60 232.596.863,00
Saldo Akhir Kas 185.813.295.982,14 192.678.400.826,43

Dari penjumlahan arus kas bersih dari aktivitas operasi sebesar


Rp556.328.559.921,61, arus kas bersih dari aktivitas investasi aset non keuangan
sebesar (Rp561.549.400.532,00), arus kas bersih dari aktivitas pembiayaan
sebesar (Rp1.808.732.066,50) dan arus kas bersih dari aktivitas non anggaran
sebesar (Rp31.140.558,00) merupakan penurunan kas sebesar
Rp7.060.713.234,89, ditambah dengan saldo awal kas di BUD/SiLPA LRA
sebesar Rp192.439.658.963,43, sehingga saldo akhir Kas Daerah sebesar
Rp185.378.945.728,54.
Selisih angka SiLPA Neraca/LRA sebesar Rp185.414.415.358,54 dengan saldo
akhir kas pada Laporan Arus Kas sebesar Rp185.813.295.982,14 adalah sebesar
Rp398.880.623,60, merupakan kas di Bendahara Penerimaan, bunga deposito dan
kas bersih dari Aktivitas Non Anggaran.

V. PENJELASAN ATAS INFORMASI-INFORMASI NON KEUANGAN


5.1 Informasi Tambahan
Luas wilayah Kabupaten Banyuasin saat ini adalah 11.832,99 km2 terbagi
dalam 19 kecamatan, terdiri atas 272 desa dan 16 kelurahan. Jumlah desa
terbanyak berada di Kecamatan Banyuasin III, yaitu sebanyak 32 desa, dan
kecamatan yang memiliki desa paling sedikit adalah Kecamatan Talang Kelapa,
yaitu sebanyak lima desa.
Pemerintah Kabupaten Banyuasin memiliki dua Badan Usaha Milik
Daerah (BUMD), yaitu PDAM Tirta Betuah dan PT Basin Resources. Pada
Tahun 2012 PT Basin Resources berdasarkan Peraturan Daerah Nomor 25 Tahun
2012 telah dibubarkan karena sudah tidak beroperasi secara normal dan terdapat
kesangsian besar terhadap kelangsungan usahanya.

5.2 Pengungkapan Lainnya


5.2.1. Domisili
Kabupaten Banyuasin secara geografis, geoekonomi, dan geopolitik
terletak pada posisi yang sangat strategis baik pada masa kini maupun pada masa
yang akan datang, karena berada pada jalur Lintas Timur Pulau Sumatera, antar
Provinsi Sumatera Selatan dan Provinsi Jambi, berbatasan dengan Kota

83
Palembang sebagai pusat kegiatan industri, perdagangan, dan pusat kehidupan
modern.
Kabupaten Banyuasin dibentuk berdasarkan Undang-undang Nomor 6
Tahun 2002 tentang Pembentukan Pemerintah Kabupaten Banyuasin di Provinsi
Sumatera Selatan. Luas wilayah Kabupaten Banyuasin sekitar 11.832,99 km2
atau sekitar 12,18% luas Provinsi Sumatera Selatan, dan terletak antara 1,3 0-40
lintang selatan dan 1040 40- 1050 15 bujur timur.
Sedangkan secara administratif, Kabupaten Banyuasin mempunyai batas-
batas wilayah, sebagai berikut.
a. Sebelah Utara : Berbatasan dengan Kabupaten Tanjung Jabung
Timur Provinsi Jambi dan Selat Bangka.
b. Sebelah Timur : Berbatasan dengan Kecamatan Pampangan dan Air
Sugihan Kabupaten Ogan Komering Ilir.
c. Sebelah Selatan : Berbatasan dengan Kecamatan Jejawi Kabupaten
Ogan Komering Ilir, Kota Palembang, Kecamatan
Sungai Rotan, dan Kecamatan Talang Ubi
Kabupaten Muara Enim.
d. Sebelah Barat : Berbatasan dengan Kecamatan Sungai Lilin, Sungai
Lais, dan Bayung Lencir Kabupaten Musi
Banyuasin.
5.2.2. Ketentuan Perundang-undangan yang Menjadi Landasan Kegiatan
Operasional
a. Undang-Undang Nomor 6 Tahun 2002 tentang Pembentukan Kabupaten
Banyuasin di Provinsi Sumatera Selatan (Lembaran Negara Nomor 19
Tahun 2002, Tambahan Lembaran Negara Nomor 4181);
b. Peraturan Daerah Nomor 27 Tahun 2012 tentang Anggaran Pendapatan dan
Belanja Daerah Kabupaten Banyuasin Tahun 2013;
c. Peraturan Daerah Nomor 2 Tahun 2013 tentang Perubahan Anggaran dan
Belanja Daerah Kabupaten Banyuasin Tahun 2013.

5.2.3.Struktur Organisasi
Pemerintah Kabupaten Banyuasin dipimpin oleh Bupati/Wakil Bupati,
membawahi:
a. Sekretariat Daerah;
b. Sekretariat DPRD.
c. Berdasarkan Perda Nomor 14 Tahun 2008 dan perubahannya, Organisasi
Dinas Daerah Kabupaten Banyuasin terdiri atas 50 SKPD
Dinas/Badan/Kantor/Inspektorat/Kecamatan, yaitu:
1) Dinas Pendidikan;
2) Dinas Kesehatan;
3) Rumah Sakit Umum Daerah;
4) Dinas PU Cipta Karya;
5) Dinas PU Bina Marga;
6) Dinas PU Pengairan;
7) Bappeda dan Penanaman Modal;
8) Dinas Perhubungan;
9) Badan Lingkungan Hidup;
10) Dinas Kebersihan, Pertamanan dan Pemakaman;

84
11) Dinas Kependudukan dan Catatan Sipil;
12) Badan Pelaksana Keluarga Berencana;
13) Dinas Sosial;
14) Dinas Tenaga Kerja dan Transmigrasi;
15) Dinas Koperasi, Perindustrian, Perdagangan, UKM;
16) Kesbangpol;
17) Satuan Polisi Pamong Praja;
18) Inspektorat;
19) Dinas Pendapatan, PengelolaanKeuangandanAset Daerah;
20) Kecamatan Banyuasin I;
21) Kecamatan Banyuasin III;
22) Kecamatan Betung;
23) Kecamatan Rantau Bayur;
24) Kecamatan Pulau Rimau;
25) Kecamatan Talang Kelapa;
26) Kecamatan Rambutan;
27) Kecamatan Tungkal Ilir;
28) Kecamatan Tanjung Lago;
29) Kecamatan Sembawa;
30) Kecamatan Suak Tapeh;
31) Kecamatan Banyuasin II;
32) Kecamatan Makarti Jaya;
33) Kecamatan Muara Padang;
34) Kecamatan Muara Sugihan;
35) Kecamatan Muara Telang;
36) Kecamatan Air Salek;
37) Kecamatan Sumber Marga Telang.
38) Kecamatan Air Kumbang;
39) Badan Kepegawaian dan Diklat Daerah;
40) Badan Perizinan Terpadu;
41) Badan Ketahanan Pangan;
42) Badan Pemberdayaan Masyarakat dan Pemerintah Desa;
43) Badan Perpustakaan Arsip Daerah dan Dokumentasi;
44) Dinas Pertanian dan Peternakan;
45) Badan Pelaksana Penyuluhan Pertanian, Perikanan dan Kehutanan;
46) Dinas Kehutanan dan Perkebunan;
47) Dinas Pertambangan dan Energi;
48) Dinas Pariwisata Seni Budaya, Pemuda dan Olahraga;
49) Dinas Perikanan dan Kelautan;
50) Dinas Pengelola Pasar.

85
VI. PENUTUP
Laporan Keuangan Pemerintah Kabupaten Banyuasin Tahun Anggaran 2013
merupakan bentuk pelaksanaan peraturan perundang-undangan di bidang pengelolaan
keuangan dan peraturan terkait lainnya, untuk memberikan informasi yang lengkap dan
andal kepada pemangku kepentingan (stakeholder) guna meningkatkan good governance.
Demikian Catatan atas Laporan Keuangan (CALK) sebagai bagian yang tidak
terpisahkan dari Laporan Keuangan Kabupaten Banyuasin Tahun 2013 secara
keseluruhan.

86
GAMBARAN UMUM PEMERIKSAAN

1. Dasar Hukum Pemeriksaan


a. Undang-Undang Nomor 17 Tahun 2003 tentang Keuangan Negara;
b. Undang-Undang Nomor 1 Tahun 2004 tentang Perbendaharaan Negara;
c. Undang-Undang Nomor 15 Tahun 2004 tentang Pemeriksaan Pengelolaan dan
Tanggung Jawab Keuangan Negara;
d. Undang-Undang Nomor 15 Tahun 2006 tentang Badan Pemeriksa Keuangan.

2. Tujuan Pemeriksaan
Tujuan pemeriksaan LKPD Tahun Anggaran (TA) 2013 adalah untuk memberikan
opini atas tingkat kewajaran informasi keuangan yang disajikan dalam laporan
keuangan yang didasarkan pada kriteria:
a. Kesesuaian dengan Standar Akuntansi Pemerintahan (SAP);
b. Kecukupan pengungkapan (adequate disclosures);
c. Kepatuhan terhadap peraturan perundang-undangan;
d. Efektivitas sistem pengendalian intern.

3. Sasaran Pemeriksaan
Sasaran pemeriksaan LKPD TA 2013 meliputi pengujian atas:
a. Efektivitas desain dan implementasi sistem pengendalian intern termasuk
pertimbangan hasil pemeriksaan sebelumnya;
b. Kepatuhan terhadap peraturan perundang-undangan yang berlaku;
c. Penyajian saldo akun-akun dan transaksi-transaksi pada Laporan Realisasi
Anggaran (LRA) dan Laporan Arus Kas (LAK) TA 2013 sesuai dengan SAP;
d. Penyajian saldo akun-akun dalam Neraca per 31 Desember 2013;
e. Pengungkapan informasi keuangan pada Catatan atas Laporan Keuangan.

Pengujian atas Laporan Keuangan bertujuan untuk menguji semua pernyataan


manajemen (asersi manajemen) dalam informasi keuangan, efektivitas pengendalian
intern dan kepatuhan terhadap peraturan perundang-undangan yang berlaku meliputi:
a. Keberadaan dan keterjadian
Bahwa seluruh aset dan kewajiban yang disajikan dalam Neraca per 31 Desember
2013 dan seluruh transaksi penerimaan, belanja, dan pembiayaan disajikan dalam
LRA TA 2013 benar-benar ada dan terjadi selama periode tersebut serta telah
didukung dengan buktibukti yang memadai.
b. Kelengkapan
Bahwa seluruh aset, kewajiban, dan ekuitas dana yang dimiliki telah dicatat
dalam neraca dan seluruh transaksi penerimaan daerah, belanja daerah, dan
pembiayaan yang terjadi selama Tahun Anggaran 2013 telah dicatat dalam LRA.
c. Hak dan Kewajiban
Bahwa seluruh aset yang tercatat dalam neraca benar-benar dimiliki atau hak dari
pemerintah daerah dan utang yang tercatat merupakan kewajiban pemerintah
daerah pada tanggal pelaporan.
d. Penilaian dan Alokasi

BPK Perwakilan Provinsi Sumatera Selatan 87


Bahwa seluruh aset, utang, penerimaan dan belanja daerah, serta pembiayaan
telah disajikan dengan jumlah dan nilai semestinya, diklasifikasikan sesuai
dengan standar/ketentuan yang telah ditetapkan, dan merupakan alokasi
biaya/anggaran Tahun Anggaran 2013.
e. Penyajian dan Pengungkapan
Bahwa seluruh komponen laporan keuangan telah disajikan sesuai dengan
ketentuan dan telah diungkapkan secara memadai dalam Catatan atas Laporan
Keuangan.

4. Standar Pemeriksaan
Peraturan BPK Nomor 1 Tahun 2007 tentang Standar Pemeriksaan Keuangan
Negara (SPKN).

5. Metode Pemeriksaan
Metodologi pemeriksaan atas LKPD Tahun 2013 meliputi perencanaan, pelaksanaan,
dan pelaporan hasil pemeriksaan, yaitu sebagai berikut.
a. Perencanaan Pemeriksaan
1) Pemahaman Entitas dan Sistem Pengendalian Intern
Pemahaman atas entitas dan sistem pengendalian intern dapat diperoleh
dari laporan hasil pemeriksaan sebelumnya, laporan hasil pemeriksaan
pendahuluan, catatan atas laporan keuangan yang diperiksa, pemantauan
tindak lanjut, dan database yang telah dimiliki serta peraturan atau kebijakan
tertulis/formal kepala daerah terkait.
Pemahaman atas entitas tersebut meliputi pemahaman atas latar
belakang/dasar hukum pendirian pemerintah daerah, kegiatan utama entitas
termasuk sumber pendapatan daerah, lingkungan yang mempengaruhi, pejabat
terkait sampai dengan dua tingkat vertikal ke bawah di bawah kepala daerah,
dan kejadian luar biasa yang berpengaruh terhadap pengelolaan keuangan
daerah. Pemeriksa perlu mengidentifikasi kelemahan-kelemahan signifikan
atau area-area kritis yang memerlukan perhatian mendalam, sehingga
membantu Pemeriksa untuk (1) mengidentifikasi jenis potensi kesalahan, (2)
mempertimbangkan faktor-faktor yang mempengaruhi risiko salah saji yang
material, (3) mendesain pengujian sistem pengendalian intern (SPI), dan (4)
mendesain prosedur pengujian substantif.
2) Pertimbangan Hasil Pemeriksaan Sebelumnya
Pemeriksa harus mempertimbangkan hasil pemeriksaan dan tindak
lanjut hasil pemeriksaan sebelumnya. Pemeriksa harus meneliti pengaruh hasil
pemeriksaan sebelumnya dan tindak lanjutnya terhadap LKPD yang diperiksa,
terutama terkait dengan kemungkinan temuan-temuan pemeriksaan yang
berulang dan keyakinan pemeriksa atas saldo awal akun atau perkiraan pada
neraca yang diperiksa.
3) Penentuan Metode Uji Petik
Penentuan metode uji petik berdasarkan pertimbangan profesional
pemeriksa dengan memperhatikan beberapa aspek, antara lain:
a) Tingkat risiko;
b) Jika hasil pengujian SPI disimpulkan pengendalian intern suatu akun lemah

BPK Perwakilan Provinsi Sumatera Selatan 88


maka sampel untuk pengujian substantif atas akun tersebut harus lebih
besar. Jika akun-akun tertentu mempunyai risiko bawaan (inherent risk)
yang lebih tinggi dari akun-akun lainnya, maka sampel untuk pengujian
substantif untuk akun-akun tersebut harus lebih besar;
c) Tingkat materialitas yang telah ditentukan. Jika tingkat materialitas kecil,
maka sampel yang diambil harus lebih besar dan begitu juga sebaliknya;
Jumlah sampel tidak hanya didasarkan pada nilai saldo akun, tetapi
memperhatikan transaksi-transaksi yang membentuk saldo tersebut.
d) Saldo akun yang kecil bisa dibentuk dari transaksi-transaksi positif dan
negatif yang besar;
e) Cost and benefit, manfaat uji petik atas suatu transaksi atau saldo akun
harus lebih besar dari biaya pengujian tersebut.
b. Pelaksanaan Pemeriksaan
1) Pengujian Analitis
Pengujian analitis dalam pelaksanaan pemeriksaan dapat dilakukan
dengan analisa data serta analisa rasio dan tren, sesuai dengan area yang telah
ditetapkan sebagai uji petik. Pengujian analitis terinci ini diharapkan dapat
membantu pemeriksa untuk menemukan hubungan logis penyajian akun pada
LKPD dan menilai kecukupan pengungkapan atas setiap perubahan pada
pos/akun/unsur pada laporan keuangan yang diperiksa, serta membantu
menentukan area-area signifikan dalam pengujian sistem pengendalian intern
dan pengujian substantif atas transaksi dan saldo.
2) Pengujian Pengendalian
Petunjuk pengujian pengendalian meliputi pengujian yang dilakukan
pemeriksa terhadap efektivitas desain dan implementasi sistem pengendalian
intern dalam rangka pertanggungjawaban pelaksanaan APBD. Dalam
pengujian desain sistem pengendalian intern, pemeriksa mengevaluasi apakah
sistem pengendalian intern telah didesain secara memadai dan dapat
meminimalisasi secara relatif salah saji dan kecurangan. Sementara, pengujian
implementasi sistem pengendalian intern dilakukan dengan melihat
pelaksanaan pengendalian pada kegiatan atau transaksi yang dilakukan oleh
pemerintah daerah.
Pengujian sistem pengendalian intern merupakan dasar pengujian
substantif selanjutnya. Pengujian tersebut dilakukan baik pada saat
pemeriksaan interim, maupun pemeriksaan laporan keuangan.
3) Pengujian Substantif atas Transaksi dan Saldo
Pengujian substantif meliputi pengujian atas transaksi dan saldo-saldo
akun/perkiraan serta pengungkapannya dalam laporan keuangan yang
diperiksa. Pengujian tersebut dilakukan setelah pemeriksa memperoleh LKPD
(unaudited) dan dilakukan untuk meyakini asersi manajemen atas LKPD,
yaitu: (1) keberadaan dan keterjadian, (2) kelengkapan, (3) hak dan kewajiban,
(4) penilaian dan pengalokasian, serta (5) penyajian dan pengungkapan.
4) Penyelesaian Penugasan
Hal-hal yang terkait dengan pekerjaan dalam penyelesaian penugasan
beserta form-form pelaporan pemeriksaan (Daftar Koreksi, Form Risalah
Pembahasan TP, Form TP, Form Tanggapan).

BPK Perwakilan Provinsi Sumatera Selatan 89


c. Pelaporan
Setelah melakukan pengujian terinci di atas, pemeriksa menyimpulkan
hasil pemeriksaan dan dituangkan dalam laporan hasil pemeriksaan.

6. Waktu Pemeriksaan
Jangka waktu pemeriksaan adalah selama 32 hari (sejak tanggal 14 April s.d 15 Mei
2014).

7. Objek Pemeriksaan
Laporan Keuangan Pemerintah Daerah (LKPD) Kabupaten Banyuasin Tahun
Anggaran 2013, yang terdiri atas Laporan Realisasi Anggaran (LRA), Neraca per 31
Desember 2013, Laporan Arus Kas (LAK), dan Catatan atas Laporan Keuangan
(CaLK).

Badan Pemeriksa Keuangan


Republik Indonesia

BPK Perwakilan Provinsi Sumatera Selatan 90


RINCIAN BELANJA HIBAH TAHUN 2013 LAMPIRAN : 1

Uraian Jumlah Anggaran Realisasi Sisa %


1 2 3 4 5

Belanja Hibah 82.375.671.565 64.876.052.501 17.499.619.064 78,76


Belanja Hibah Kepada Pemerintah Pusat 47.227.967.165 45.621.717.001 1.606.250.164 96,60
Belanja Hibah Kepada Pemerintah Pusat 47.227.967.165 45.621.717.001 1.606.250.164 96,60
Hibah Kepada Pemerintah Pusat 47.227.967.165 45.621.717.001 1.606.250.164 96,60
- Belanja Pemilukada (KPU). 34.527.967.165 34.467.967.165 60.000.000 99,83
- Operasional Polres Banyuasin untuk Pemilukada 2013. 5.000.000.000 4.231.446.450 768.553.550 84,63
- Operasional Kodim 0401 Muba untuk Pemilukada 2013. 1.500.000.000 1.239.500.000 260.500.000 82,63
- Panwaslu Kepala Daerah Banyuasin. 6.100.000.000 5.582.803.386 517.196.614 91,52
- Bantuan Operasional Koramil 040102 Banyuasin III. 100.000.000 100.000.000 - 100,00

Belanja Hibah Kepada Pemerintah Desa 927.600.000 665.100.000 262.500.000 71,70


Belanja Hibah Kepada Pemerintah Desa 927.600.000 665.100.000 262.500.000 71,70
- Pembangunan Gedung Serba Guna Desa Durian Daun Kec. Suak Tapeh 75.000.000 75.000.000 - 100,00
- Pembangunan Pagar Beton Pemakaman Desa Parit Kec. Rambutan 10.000.000 - 10.000.000 -
- Pembangunan Pagar Tempat Pemakaman Umum Ds. Sukaraja Kec. Suak Tapeh. 5.500.000 5.500.000 - 100,00
- Rehab Lantai & Pembuatan WC Gedung Serbaguna Ds. Air Senggiris Kec. Suak Tapeh. 5.000.000 5.000.000 - 100,00
- Pembuatan Bung (Penampungan Air) Desa Talang Jaya Raya II Kec. Betung. 5.000.000 - 5.000.000 -
- Peringatan HUT RI ke-67 Tahun 2012 Ds. Sukaraja Kecamatan Suak Tapeh. 5.000.000 5.000.000 - 100,00
- Kebersihan Lingkungan dan Pos Kamling Desa Pelajau BA. III 5.000.000 5.000.000 - 100,00
- Program Air Bersih di Desa dalam Kecamatan Muara Telang dan Muara Padang. 10.000.000 - 10.000.000 -
- Pembelian Tedmond Dusun I dan II Desa Sukaraja Kec. Suak Tapeh 30.000.000 30.000.000 - 100,00
- Pembelian Tedmond Desa Pelajau Kec. Banyuasin III. 7.500.000 7.500.000 - 100,00
- Pembelian Tedmond Desa Tanjung Beringin Kec. Banyuasin III. 7.500.000 - 7.500.000 -
- Pembelian Tedmond Desa Air Senggiris Kec. Banyuasin III. 7.500.000 7.500.000 - 100,00
- Hibah Dusun III Desa Sungsang IV Kec Banyuasin II. 80.000.000 - 80.000.000 -
- Pembelian Speed Boat Desa Bangun Harjo Kecamatan Muara Sugihan (*R8) 50.000.000 50.000.000 - 100,00
- Pembelian Lahan untuk Pemakaman Kelurahan Betung Kec. Betung (*R20). 50.000.000 50.000.000 - 100,00
- Rehab. Balai Desa Purwosari Kecamatan Sembawa (*R26). 30.000.000 30.000.000 - 100,00
- Gedung Balai Dusun 4 Desa Srikaton Kec. Air Saleh (*R34). 5.000.000 - 5.000.000 -

Halaman 1 dari 33
Uraian Jumlah Anggaran Realisasi Sisa %
1 2 3 4 5
- Pembuatan Pagar Makam Dusun 2 Desa Saleh Agung Kecamatan Air Saleh (*R34). 10.000.000 - 10.000.000 -
- Desa Lubuk Karet Kec. Betung untuk Tiang Listrik (PR19). 40.000.000 - 40.000.000 -
- Desa Daya Kusuma Kec. Muara Sugihan untuk Lapangan Sepakbola (PR2). 10.000.000 - 10.000.000 -
- Dusun II Upang Jaya Kec. Muara Telang (PR4). 50.000.000 50.000.000 - 100,00
- Dusun III Upang Jaya Kec. Muara Telang (PR4). 25.000.000 25.000.000 - 100,00
- Desa Upang Karya Kec. Muara Telang (PR4). 50.000.000 50.000.000 - 100,00
- Desa Telang Makmur Kec. Muara Telang (PR4). 50.000.000 50.000.000 - 100,00
- Desa Sumber Mulya Kec. Muara Telang (PR4). 25.000.000 25.000.000 - 100,00
- Desa Marga Mulya Jalur 16 Kec. Muara Sugihan (PR10). 25.000.000 - 25.000.000 -
- Desa Tirta Harja Jalur 14 Kec. Muara Sugihan (PR10). 25.000.000 - 25.000.000 -
- Desa Terusan Muara Kec. Sumber Marga Telang (PR16). 10.000.000 - 10.000.000 -
- Desa Sumber Jaya Kec. Sumber Marga Telang (PR16). 10.000.000 - 10.000.000 -
- Desa Meranti Kec. Suak Tapeh (PR20). 15.000.000 - 15.000.000 -
- Desa Tanjung Tiga Kec. Rantau Bayur. (Pemindahan Sistem Listrik Curah ke PLN) 58.800.000 58.800.000 - 100,00
- Desa Tanjung Pasir Kec. Rantau Bayur. (Pemindahan Sistem Listrik Curah ke PLN) 135.800.000 135.800.000 - 100,00

Belanja Hibah Kepada Organisasi Masyarakat 7.750.930.000 6.093.500.000 1.657.430.000 78,62


Belanja Hibah Kepada Organisasi Kemasyarakatan 7.750.930.000 6.093.500.000 1.657.430.000 78,62
Hibah Kepada Ormas 7.750.930.000 6.093.500.000 1.657.430.000 78,62
- Badan Narkotika (BNK) Kabupaten Banyuasin. 500.000.000 500.000.000 - 100,00
- Palang Merah Indoonesia (PMI) Kab. Banyuasin. 300.000.000 300.000.000 - 100,00
- Komite Olaraga Nasional Indonesia (KONI) Kab. Banyuasin. 1.500.000.000 1.500.000.000 - 100,00
- Majelis Ulama Indonesia (MUI) Kab. Banyuasin. 75.000.000 75.000.000 - 100,00
- Dewan Masjid Indonesia (DMI) Kab. Banyuasin. 100.000.000 100.000.000 - 100,00
- Forum Komunikasi Umat Beragama (FKUB) Kab. Banyuasin. 100.000.000 100.000.000 - 100,00
- Pembina Adat Kabupaten Banyuasin. 200.000.000 200.000.000 - 100,00
- PKBI Kabupaten Banyuasin. 100.000.000 100.000.000 - 100,00
- Badan Amil Zakat (BAZ) Kabupaten Banyuasin. 100.000.000 100.000.000 - 100,00
- Komisi Penanggulangan HIV/AIDS Kab. Banyuasin. 75.000.000 75.000.000 - 100,00
- Dewan Kesenian Kabupaten Banyuasin. 250.000.000 250.000.000 - 100,00
- Karang Taruna Kabupaten Banyuasin. 150.000.000 150.000.000 - 100,00
- Lembaga Pembinaan Tilawatil Qur'an (LPTQ) Kab. Banyuasin. 100.000.000 100.000.000 - 100,00

Halaman 2 dari 33
Uraian Jumlah Anggaran Realisasi Sisa %
1 2 3 4 5
- Pramuka Kwartir Kabupaten Banyuasin. 400.000.000 400.000.000 - 100,00
- Komite Nasional Pemuda Indonesia (KNPI) Kab. Banyuasin. 300.000.000 300.000.000 - 100,00
- Komisi Penyuluh Pertanian Kab. Banyuasin. 100.000.000 100.000.000 - 100,00
- Kelompok Tani Nelayan Andalan (KTNA) Kab. Banyuasin. 50.000.000 50.000.000 - 100,00
- Muhammadiyah Kabupaten Banyuasin. 150.000.000 150.000.000 - 100,00
- Ikatan Cendekiawan Muslim Indonesia (ICMI) Kab. Banyuasin. 300.000.000 300.000.000 - 100,00
- DEKRANASDA Kab.Banyuasin 400.000.000 400.000.000 - 100,00
- Ikatan Bidan Indonesia (IBI) Kab. Banyuasin. 50.000.000 50.000.000 - 100,00
- Ikatan Dokter Indonesia (IDI) Kab. Banyuasin. 50.000.000 50.000.000 - 100,00
- BKPRMI Kabupaten Banyuasin. 75.000.000 75.000.000 - 100,00
- BKMT Kabupaten Banyuasin. 100.000.000 100.000.000 - 100,00
- Ikatan Mahasiswa Kabupaten Banyuasin (IMBAS) 30.000.000 - 30.000.000 -
- GMPI Kabupaten Banyuasin. 25.000.000 - 25.000.000 -
- Gerakab Pemuda Islam (GPI) Kabupaten Banyuasin. 15.000.000 - 15.000.000 -
- Gerakan Mahasiswa Kosgoro (GEMA KOSGORO) Kab. BA. 25.000.000 - 25.000.000 -
- Forum Pendamping Keluarga Harapan (FPKH) Kab. Banyuasin. 15.000.000 - 15.000.000 -
- Gerakan Pemuda Kebangkitan Bangsa (GARDA) Kab. Banyuasin 10.000.000 10.000.000 - 100,00
- Gerakan Pemuda Ansor Kabupaten Banyuasin. 15.000.000 - 15.000.000 -
- Persatuan Dokter Umum Indonesia (PDUI) Kabupaten Banyuasin. 25.000.000 25.000.000 - 100,00
- Angkatan Muda Ka'bah (AMK) Kabupaten Banyuasin. 20.000.000 - 20.000.000 -
- Ikatan Pelajar Nahdathul Ulama (IPNU) Kab. Banyuasin. 20.000.000 20.000.000 - 100,00
- Muslimat Nahdathul Ulama Kab. Banyuasin. 20.000.000 20.000.000 - 100,00
- Fatayat Nahdathul Ulama Kab. Banyuasin. 20.000.000 20.000.000 - 100,00
- Jam'iyyatul Qurra'wal Huffazh Kab. Banyuasin. 50.000.000 50.000.000 - 100,00
- Persatuan Wartawan Indonesia (PWI) Cabang Sumsel Pewakilan Kab. Banyuasin. 50.000.000 50.000.000 - 100,00
- Pengurus Wilayah Radio Antar Penduduk Indonesia Wilayah 13 Kab. Banyuasin. 5.000.000 - 5.000.000 -
- Forum Pengusaha Banyuasin (FPB). 10.000.000 10.000.000 - 100,00
- Komite Komunikasi Demokrasi Banyuasin (KKDB). 15.000.000 - 15.000.000 -
- Pengurus Forum Komunikasi Ikatan Masyarakat Lekipali (FKIM-LEKIPALI). 20.000.000 - 20.000.000 -
- Generasi Independen Bakti Anak Sriwijaya (GIBAS) Kabupaten Banyuasin. 10.000.000 10.000.000 - 100,00
- Dewan Komite Cabang Jaringan Pembaharuan Nusantara (DKC JPN) Kab. Banyuasin. 5.000.000 5.000.000 - 100,00
- Ikatan Masyarakat Banyuasin (IMB) Kabupaten Banyuasin. 10.000.000 10.000.000 - 100,00
- Majelis Sinergi Kalam icmi Orda Banyuasin (MASIKA Banyuasin). 15.000.000 - 15.000.000 -

Halaman 3 dari 33
Uraian Jumlah Anggaran Realisasi Sisa %
1 2 3 4 5
- Gerakan Muda Persatuan Banyuasin (GMP) Banyuasin. 20.000.000 - 20.000.000 -
- Generasi Muda Sriwijaya (GMS) Kabupaten Banyuasin. 25.000.000 25.000.000 - 100,00
- Forum Komunikasi Studi Mahasiswa Kekaryaan (FOSMAKER) 25.000.000 25.000.000 - 100,00
- Angkatan Muda Tarekhat Islam (AMTI). 25.000.000 25.000.000 - 100,00
- Karang Taruna ARMEAS Desa Sei Pinang Kecamatan Rantau Bayur (*R1) 50.000.000 50.000.000 - 100,00
- Karang Taruna Desa Tabuan Asri Kecamatan Pulau Rimau (*R6). 25.000.000 25.000.000 - 100,00
- Karang Taruna Desa Senda Mukti Kecamatan Pulau Rimau (*R6). 10.000.000 10.000.000 - 100,00
- Karang Taruna Ds Rawa Banda Kec. Pulau Rimau (*R6). (Organisasi Pemuda Mandiri) 10.000.000 10.000.000 - 100,00
- Karang Taruna Desa Suka Mulya Kec. Pulau Rimau (*R6). 5.000.000 -
- Perbaikan Lapangan Sepak Bola Karang Taruna Ds. Sribandung Kec. BA III (*R31). 10.000.000 - 10.000.000 -
- Karang Taruna Dusun I Desa Saleh Agung Kec. Air Saleh (*R34). 5.000.000 - 5.000.000 -
- Karang Taruna Dusun 2 Desa Saleh Agung Kec. Air Saleh (*R34). 5.000.000 - 5.000.000 -
- Karang Taruna Dusun 3 Desa Saleh Agung Kec. Air Saleh (*R34). 3.000.000 - 3.000.000 -
- Karang Taruna Dusun 4 Desa Saleh Agung Kec. Air Saleh (*R34). 5.000.000 - 5.000.000 -
- Karang Taruna Dusun I Desa Srimulyo Kec. Air Saleh (*R34). 4.000.000 - 4.000.000 -
- Karang Taruna Dusun 2 Desa Srimulyo Kec. Air Saleh (*R34). 3.000.000 - 3.000.000 -
- Karang Taruna Dusun 3 Desa Srimulyo Kec. Air Saleh (*R34). 3.000.000 - 3.000.000 -
- Karang Taruna Dusun 2 Desa Srikaton Kec. Air Saleh (*R34). 5.000.000 - 5.000.000 -
- Karang Taruna Dusun 1 Desa Enggal Rejo Kec. Air Saleh (*R34). 3.000.000 - 3.000.000 -
- Karang Taruna Dusun 2 Desa Enggal Rejo Kec. Air Saleh (*R34). 3.000.000 - 3.000.000 -
- Karang Taruna Dusun 3 Desa Enggal Rejo Kec. Air Saleh (*R34). 3.000.000 - 3.000.000 -
- Karang Taruna Dusun 4 Desa Enggal Rejo Kec. Air Saleh (*R34). 3.000.000 - 3.000.000 -
- Karang Taruna Dusun 5 Desa Enggal Rejo Kec. Air Saleh (*R34). 3.000.000 - 3.000.000 -
- Karang Taruna Dusun 6 Desa Enggal Rejo Kec. Air Saleh (*R34). 3.000.000 - 3.000.000 -
- Karang Taruna Dusun 1 Desa Bintaran Rejo Kec. Air Saleh (*R34). 5.000.000 - 5.000.000 -
- Karang Taruna Dusun 2 Desa Bintaran Rejo Kec. Air Saleh (*R34). 3.000.000 - 3.000.000 -
- Karang Taruna Dusun 4 Desa Bintaran Rejo Kec. Air Saleh (*R34). 3.000.000 - 3.000.000 -
- Karang Taruna Dusun 2 Desa Salek Mukti Kec. Air Saleh (*R34). 5.000.000 - 5.000.000 -
- Karang Taruna Dusun 3 Desa Salek Mukti Kec. Air Saleh (*R34). 5.000.000 - 5.000.000 -
- Karang Taruna Dusun 4 Desa Salek Mukti Kec. Air Saleh (*R34). 5.000.000 - 5.000.000 -
- Karang Taruna Dusun 2 Desa Damarwulan Kec. Air Saleh (*R34). 5.000.000 - 5.000.000 -
- Karang Taruna Dusun 3 Desa Damarwulan Kec. Air Saleh (*R34). 5.000.000 - 5.000.000 -
- Karang Taruna Dusun 4 Desa Damarwulan Kec. Air Saleh (*R34). 3.000.000 - 3.000.000 -

Halaman 4 dari 33
Uraian Jumlah Anggaran Realisasi Sisa %
1 2 3 4 5
- Karang Taruna Dusun 2 Ds. Salek Makmur Kec. Air Saleh (*R34). 3.000.000 - 3.000.000 -
- Karang Taruna Dusun 3 Ds. Salek Makmur Kec. Air Saleh (*R34). 3.000.000 - 3.000.000 -
- Karang Taruna Dusun 1 Desa Salek Jaya Kec. Air Saleh (*R34). 3.000.000 - 3.000.000 -
- Karang Taruna Dusun 2 Desa Salek Jaya Kec. Air Saleh (*R34). 3.000.000 - 3.000.000 -
- Karang Taruna Dusun 2 Desa Sidoharjo Kec. Air Saleh (*R34). 5.000.000 - 5.000.000 -
- Forum Silaturrahmi Pemuda, Agama, Pelajar dan Mahasiswa Kec. Muara Telang (*R39). 40.000.000 40.000.000 - 100,00
- LVRI Kabupaten Banyuasin 5.000.000 5.000.000 - 100,00
- PWRI Kabupaten Banyuasin 70.630.000 - 70.630.000 -
- Forum Persaudaraan Mantan Kepala Desa/FPMKD Kec. BA III 8.750.000 8.750.000 - 100,00
- Himpunan Mahasiswa Banyuasin (HIMBA) Kab. Banyuasin 10.000.000 10.000.000 - 100,00
- Perhimpunan Dokter Umum Indonesia Komisariat Banyuasin 25.000.000 - 25.000.000 -
- Karang Taruna Bantul Sari Desa Sumber jaya Jalur 13 Kec. Muara Sugihan 3.800.000 - 3.800.000 -
- PGRI Kabupaten Banyuasin 15.000.000 - 15.000.000 -
- Pencab PSSI Banyuasin Kec. Pangkalan Balai (PR10) 50.000.000 - 50.000.000 -
- Karang Taruna Desa Tanjung Kepayang Kec. Banyuasin III (PR17) 7.500.000 - 7.500.000 -
- Karang taruna Desa Suka Mulya Kec. Banyuasin III (PR17) 5.000.000 - 5.000.000 -
- Karang Taruna Desa Pagar Bulan Kec. Rantau Bayur (PR17) 5.000.000 - 5.000.000 -
- Karang Taruna Desa Lubuk Karet Kec. Betung (PR19) 10.000.000 - 10.000.000 -
- Lembaga Karya Usaha Muda (PR23) 100.000.000 - 100.000.000 -
- Pengcab PSSI Kab. Banyuasin (PR34) 100.000.000 - 100.000.000 -
- PSSI Kabupaten Banyuasin (PR42) 100.000.000 - 100.000.000 -
- Karang Taruna Desa Telang Rejo Kec. Muara Telang (PR16) 7.500.000 - 7.500.000 -
- Karang Taruna Desa Srikaton Kec. Air Saleh (PR16) 7.500.000 - 7.500.000 -
- Karang Taruna Desa Sumber Jaya Kec. Sumber Marga Telang (PR14) 10.000.000 - 10.000.000 -
- Karang Taruna Desa Marga Rahayu Kec. Muara Telang (PR14) 10.000.000 - 10.000.000 -
- Panitia rehab Jembatan Tanjung Menang (PR17) 7.500.000 - 7.500.000 -
- Pemuda karang Petai Pangkalan Balai (PR17) 5.000.000 - 5.000.000 -
- Karang Taruna Desa Enggal Rejo Kec. Air Salah (PR33) 10.000.000 - 10.000.000 -
- Karang Taruna Desa Salek Makmur (PR33) 10.000.000 - 10.000.000 -
- Karang Taruna Desa Bintaran Kec. Air Saleh (PR33) 10.000.000 - 10.000.000 -
- Karang Taruna Desa Margo Mulyo kec. Muara Sugihan (PR33) 10.000.000 - 10.000.000 -
- Karang Taruna Desa Cenana Kec. Muara Sugihan (PR33) 15.000.000 - 15.000.000 -
- Karang Taruna Desa Daya Kusuma Kec. Muara Sugihan (PR33) 30.000.000 - 30.000.000 -

Halaman 5 dari 33
Uraian Jumlah Anggaran Realisasi Sisa %
1 2 3 4 5
- Karang Taruna Desa Sungsang 4 Kec. Banyuasin II (PR11) 50.000.000 - 50.000.000 -
- Karang Taruna Kelurahan Air Batu Kec. Talang Kelapa (PR40) 50.000.000 - 50.000.000 -
- Karang Taruna Desa Rejodadi Kec. Sembawa (PR38) 35.000.000 - 35.000.000 -
- Gempur FC Desa Purwosari Kec. Sembawa (PR38) 60.000.000 - 60.000.000 -
- Forum Pemuda Sumber waras Desa Talang Kemang Kec. Rantau Bayur (PR38) 60.000.000 - 60.000.000 -
- Dewan Pengurus Cab. Perhimpunan Anak Transmigrasi RI (DPC PATRI) Kab. BA (PR17) 84.750.000 84.750.000 - 100,00
- Hibah Ormas Lainnya (PR38) 276.000.000 - 276.000.000 -
- Karang Taruna Desa Muara Damai Kec. Sembawa (PR25) 10.000.000 - 10.000.000 -
- Karang Taruna Desa Mainan Kec. Sembawa (PR25) "Karang Taruna Ardema" 10.000.000 10.000.000 - 100,00
- Karang Taruna Desa Pulau Kec. Sembawa (PR25) 10.000.000 10.000.000 - 100,00
- Muser Watch Banyuasin (PR25) 150.000.000 - 150.000.000 -

Belanja Hibah Kepada Kelompok Masyarakat 26.469.174.400 12.495.735.500 13.973.438.900 47,21


Hibah Kepada Kelompok Masy. dg Kegiatan Bidang Perekonomian 1.917.000.000 1.205.000.000 712.000.000 62,86
Hibah Kepada Kelompok Masy. dg Kegiatan Bidang Perekonomian 1.917.000.000 1.205.000.000 712.000.000 62,86
- Kelompok Pembudidayaan Ikan (Pokdakan) Ikhlas Ds. Plajau Kec. Rambutan. 25.000.000 - 25.000.000 -
- KUBE Nelayan Jaya Masyarakat Kecamatan Banyuasin II (*R2).. 40.000.000 40.000.000 - 100,00
- Pembelian Speed Boat Kelompok Nelayan 'Intan Berlian" Kecamatan Banyuasin II (*R2). 30.000.000 30.000.000 - 100,00
- Penangkaran Benih Ikan di Kelurahan Sukajadi Kecamatan Talang Kelapa (*R5). 100.000.000 100.000.000 - 100,00
- Penangkaran Bibit Karet Kelompok Tani Beringin Kel. Air Batu Kec. Tlg Kelapa (*R5). 100.000.000 100.000.000 - 100,00
- Penangkaran Bibit Karet Kelompok Tani Karya Jaya Kel. Air Batu Kec. Tl. Kelapa (*R5). 100.000.000 100.000.000 - 100,00
- Penangkaran Bibit Karet Kelompok Tani Maju Bersama Kel. Sukomoro Kec. Tl Kelapa (*R5). 100.000.000 100.000.000 - 100,00
- Penangkaran Bibit Karet Kelompok Tani Bina Tani Kel. Sukomoro Kec. Tl Kelapa (*R5). 100.000.000 100.000.000 - 100,00
- Koperasi/Kelompok Nelayan Karya Desa Desa Sungsang IV Kec. Banyuasin II (*R18). 100.000.000 100.000.000 - 100,00
- Bant. Speed Boat 40 PK Klmpk Perikanan air Tawar Ds. Durian Gadis Kec. Rambutan (*R24). 65.000.000 - 65.000.000 -
- Bantuan Karet Bibit Unggul Desa Durian Gadis Kecamatan Rambutan (*R24). 100.000.000 - 100.000.000 -
- Bantuan KUBE sebanyak 5 Kelompok Usaha Bersama Wilayah Kec. Tj. Lago (*R25). 150.000.000 150.000.000 - 100,00
- Kube Maju Jaya Ds. Lalang Kec. Sembawa (PR25) Kelompok Nyemat Atap Ds. Lalang S 25.000.000 25.000.000 - 100,00
- Bantuan Speed Boat 200 PK Kelompok Nelayan Desa Sungai Sembilang Kec. BA II (*R27). 200.000.000 200.000.000 - 100,00
- Pembelian Mesin Pompa Air Kelompok Tani Desa Lebung Kec. Rantau Bayur (*R31). 20.000.000 20.000.000 - 100,00
- Pembuatan Jembatan Hewan Dusun 5 Desa Sidoharjo Kec. Air Saleh (*R34). 12.000.000 - 12.000.000 -
- Pembuatan Jembatan Hewan Dusun 2 Ds Daya Kusuma Jalur 14 Kec. M. Sugihan (*R34). 10.000.000 - 10.000.000 -

Halaman 6 dari 33
Uraian Jumlah Anggaran Realisasi Sisa %
1 2 3 4 5
- Pembuatan Jembatan Hewan Dusun 3 Ds Daya Kusuma Jalur 14 Kec. M. Sugihan (*R34). 10.000.000 - 10.000.000 -
- Pembuatan Jembatan Hewan Desa Salek Mukti Kecamatan Air Saleh (*R34). 10.000.000 - 10.000.000 -
- Koperasi Serba Usaha Mitra Bersama Abadi Kec. Betung (*R41). 90.000.000 90.000.000 - 100,00
- Kebun Kelapa Sawit Kas Desa Kel. Tani Sumber Agung Tunas Baru Kec. P. Rimau (*R44). 125.000.000 - 125.000.000 -
- Kebun Kelapa Sawit Kas Desa Kel. Tani Wonodadi Jaya Ds Wono Dadi Kec. P. Rimau (*R44). 60.000.000 - 60.000.000 -
- Kelompok Tani Mekar Sari Ds Rimba Jaya Kec. Air Kumbang (Asp EC). 50.000.000 50.000.000 - 100,00
- Koperasi serba usaha betuah mandiri kel. Kedondong raye Kec. BA III. 50.000.000 - 50.000.000 -
- Kelompok Budi Daya Cacing Lumberikus Makmur Kec. Sembawa (PR17). 110.000.000 - 110.000.000 -
- Kelompok Tani "Mitra Tani" Desa Panca Mukti Kec. Muara Telang (PR14). 20.000.000 - 20.000.000 -
- Kelompok Tani "Tani Sejahtera" Desa Telang Rejo Kec. Muara Telang (PR14). 10.000.000 - 10.000.000 -
- Kelompok Tani Desa Margo Mulyo Kec. Muara Sugihan (PR33). 10.000.000 - 10.000.000 -
- Kelompok Tani Desa Daya Kesuma Kec. Muara Sugihan (PR33). 10.000.000 - 10.000.000 -
- Kelompok Karya Tani Desa Rejodadi Kec. Sembawa (PR38). 30.000.000 - 30.000.000 -
- Kelompok Usaha Kecil Penjahit Desa Mainan Kec. Sembawa (PR25). 5.000.000 - 5.000.000 -
- Kelompok Usaha Bersama Budidaya Jamur Tiram Kel. Sukamoro 50.000.000 - 50.000.000 -
Kec. Talang Kelapa (PR40)

Hibah Kpd Kel. Masyarakat dg Kegiatan Bidang Pendidikan 15.050.524.400 6.597.535.500 8.452.988.900 43,84
Sharing Sekolah Gratis 13.690.724.400 5.594.035.500 8.096.688.900 40,86
- Sharing Sekolah Gratis TW. IV (Oktober-Desember) 13.690.724.400 5.594.035.500 8.096.688.900 40,86

Hibah Bidang Pendidikan 1.359.800.000 1.003.500.000 356.300.000 73,80


- PAUD Harapan Bunda Desa Biyuku Kec. Suak Tapeh. 5.000.000 5.000.000 - 100,00
- Bantuan untuk IKPM Kab. Banyuasin di Yogyakarta. 60.000.000 60.000.000 - 100,00
- TK/TPA Masjid Muamalah Bitaqwa Desa Telang Jaya Kec. Muara Telang (*R7). 50.000.000 50.000.000 - 100,00
- TK/TPA Uswatun Hasanah Desa Telang Jaya Kecamatan Kec. Muara Telang (*R7). 50.000.000 50.000.000 - 100,00
- Madrasah Hidayarulmubtadin Desa Panca Mukti Kecamatan Muara Telang (*R7). 50.000.000 50.000.000 - 100,00
- Yayasan Pendidikan Miftahul Ulum SMP Islam Terpadu Ds.Mekar Mukti Kec. M. Telang (*R7+R39).200.000.000 200.000.000 - 100,00
- PAUD Melati Desa Sidoarjo Kec. Air Saleh (*R8). 100.000.000 100.000.000 - 100,00
- Madrasah Ibtidaiyah (MI) Ar-Riyadh Sungsang Kecamatan Banyuasin II (*R13). 35.000.000 35.000.000 - 100,00
- MTs Sungai Keladi Desa Rimau Sungsang Kecamatan Banyuasin II (*R18). 50.000.000 - 50.000.000 -

Halaman 7 dari 33
Uraian Jumlah Anggaran Realisasi Sisa %
1 2 3 4 5
- TK Dewa Dewi Kelurahan Air Batu Kec. Talang Kelapa (*R22). 150.000.000 150.000.000 - 100,00
- PAUD Tambatan Hati Desa Muara Damai Kecamatan Sembawa (*R26). 40.000.000 40.000.000 - 100,00
- Sekolah MI Hidayatullah Kecamatan Desa Terusan Muara Kec. Sumber Marga Telang (*R29). 50.000.000 50.000.000 - 100,00
- Gedung PAUD Kasih Bunda Awitan Desa Awitan Kecamatan Air Saleh (*R34). 5.000.000 - 5.000.000 -
- Gedung Yayasan Matholiuf Falakh Desa Mekar Jaya Kecamatan Air Saleh (*R34). 10.000.000 - 10.000.000 -
- Yayasan Lembaga Pendidikan Ma'arif Desa Sumber Mulyo Kec. Muara Telang (*R37). 50.000.000 50.000.000 - 100,00
- Yayasan Lembaga Pendidikan Al-Ansor Kecamatan Talang Kelapa (*R39). 50.000.000 50.000.000 - 100,00
- PAUD Tunas Harapan Desa Wana Mukti Kec. Pulau Rimau. 7.500.000 7.500.000 - 100,00
- PAUD Harapan Bangsa Desa Taja Mulya Kec. Betung. 7.000.000 7.000.000 - 100,00
- Madrasah Diniyah Al-Hidayah Betung Kec. Betung. 2.000.000 2.000.000 - 100,00
- SMA Bina Nusa Betung Kec. Betung. 2.000.000 - 2.000.000 -
- SMK PGRI Pangkalan Balai. 4.000.000 - 4.000.000 -
- Mts. As-Sanadiyah Desa tanjung Baru Kec. Muara padang 15.000.000 - 15.000.000 -
- Mts. Darussholihin Kec. Muara Sugihan. 15.000.000 - 15.000.000 -
- PAUD Mustika Dusun III Desa upang Kec. Air saleh. 5.000.000 5.000.000 - 100,00
- PAUD Mona kelurahan Kenten Kec. Talang kelapa. 5.000.000 5.000.000 - 100,00
- PAUD Kasih Ibu Rt.67 Kel. Sukajadi Kec. Talang kelapa (PR7). 20.000.000 - 20.000.000 -
- Yayasan Islam Kunia Ilahi. 7.300.000 7.000.000 300.000 95,89
- SMP Anugrah Desa Sukajaya SP 3 Mukut Kec. Tungkal Ilir (PR15) 10.000.000 - 10.000.000 -
- PAUD untuk 15 Desa Dalam Kec. Tanjung lago (PR18). 30.000.000 - 30.000.000 -
- TK Mentari Desa Lubuk Karet Kec. Betung (PR19). 30.000.000 - 30.000.000 -
- PAUD Kasih Ibu Kel. Sukajadi Kec. Talang Kelapa (PR41). 25.000.000 - 25.000.000 -
- Madrasah Miftahul Ulum Dusun I Rt. 04 Desa Mekar Mukti Kec. Muara Telang (PR16). 10.000.000 - 10.000.000 -
- Madrasah Hidayatullah Muktadin desa Panca Mukti Kec. Muara Telang (PR14). 10.000.000 - 10.000.000 -
- TPA Desa Sumber Mulyo Kec. Muara Sugihan (PR33). 20.000.000 - 20.000.000 -
- TK Desa Mekar jaya Kec. Muara Sugihan (PR33). 5.000.000 - 5.000.000 -
- PAUD/TK Tunas Kesuma Desa Daya Kesuma Jalur 14 Kec. Muara Sugihan (PR10). 25.000.000 - 25.000.000 -
- TPA Dusun IV Sei Sembilang Desa Sungsang IV Kec. Banyuasin II (PR34). 10.000.000 - 10.000.000 -
- TPA Dusun V Sei Sembilang Desa Sungsang IV Kec. Banyuasin II (PR34). 10.000.000 - 10.000.000 -
- TPA UPT Primer V Desa Jati Sari Kec. BA II (PR34). 5.000.000 - 5.000.000 -
- TPA UPT Primer VI Desa Tabala Jaya Kec. BA II (PR34). 5.000.000 - 5.000.000 -
- Rumah Tahfiz Qur'an Desa Teluk Payo Kec. BA II(PR34). 10.000.000 - 10.000.000 -
- PAUD Desa Tanah Pilih Kec. BA II (PR34). 10.000.000 - 10.000.000 -

Halaman 8 dari 33
Uraian Jumlah Anggaran Realisasi Sisa %
1 2 3 4 5
- TPA PAUD Masjid (PR42). 100.000.000 80.000.000 20.000.000 80,00
- Musholla Al-Barokah Kec. Tlg. Kelapa
- Masjid Al-Muhajirin Ds. Air Batu Kec. Tlg. Kelapa
- Masjid Al-Muhlisin Perum Griya Handayani Kec. Tlg. Kelapa
- Masjid Nurul Iman Ds. Muara Sugih
- Masjid Baitul Iman Kel. Sukomoro
- Masjid Baitul Makmur Ds. Saluran
- Masjid Al-Hidayah Lr. Sepakat Kel. Sukomoro

Hibah Kepada Kelompok Masyarakat dengan Kegiatan Bidang Keagamaan 8.268.100.000 4.309.600.000 3.958.500.000 52,12
Kecamatan Air Kumbang. 87.500.000 22.500.000 65.000.000 25,71
- Rehab. Gereja Desa Nusa Makmur Kec. Air Kumbang. 5.000.000 - 5.000.000 -
- Rehab. Masjid ................... Sp. 2 Desa Sido Makmur Kec. Air Kumbang (*R19). 50.000.000 - 50.000.000 -
- Pembangunan Masjid Jamiatul Muslimin Desa Sidomulyo Kec.Air Kumbang (PR34). 7.500.000 7.500.000 - 100,00
- Pembangunan Masjid Bustanul Ulum Desa Sidomulyo Kec. Air Kumbang. 15.000.000 15.000.000 - 100,00
- Pembangunan Pura Merta Sari desa Cintamanis Baru KM XI Kec. Air Kumbang. 10.000.000 - 10.000.000 -

Kecamatan Air Saleh. 256.000.000 30.000.000 226.000.000 11,72


- Rehab. Masjid Nurul Iman Dusun II Ds. Saleh Makmur Kecamatan Air Saleh. 5.000.000 - 5.000.000 -
- Pemb. Masjid Ponpes Salafiyah Asysyafiiyah Ds. Margo Sari Ds. Bintaran Kec. Air Saleh. 15.000.000 - 15.000.000 -
- Rehab. Mushollah Al-Muttaqien Ds. Saleh Mulya Kec. Air Saleh. 5.000.000 5.000.000 - 100,00
- Pembangunan Masjid Nurul Iman Ds. Saleh Makmur Kecamatan Air Saleh. 5.000.000 - 5.000.000 -
- Rehab. Masjid Nurul Jamik Desa Salek Mulya Kecamatan Air Saleh (*R32). 10.000.000 10.000.000 - 100,00
- Pembangunan Masjid Nurul Iman Desa Saleh Agung Kecamatan Air Saleh (*R34). 10.000.000 5.000.000 5.000.000 50,00
- Pembangunan Masjid Al-Falah Desa Saleh Agung Kecamatan Air Saleh (*R34). 20.000.000 - 20.000.000 -
- Pembangunan Masjid Al-Hidayatullah Desa Saleh Agung Kec. Air Saleh (*R34). 20.000.000 - 20.000.000 -
- Pembangunan Masjid Nurul Hidayah Desa Saleh Agung Kec. Air Saleh (*R34). 10.000.000 - 10.000.000 -
- Pembangunan Masjid Al-Taqwa Desa Srikaton Kecamatan Air Saleh (*R34). 5.000.000 - 5.000.000 -
- Pembangunan Masjid Nurul Ikhlas Desa Srikaton Kecamatan Air Saleh (*R34). 5.000.000 - 5.000.000 -
- Pembangunan Masjid Baiturrahman Desa Srimulyo Kecamatan Air Saleh (*R34). 5.000.000 - 5.000.000 -
- Pembangunan Masjid Al-Mutaqin Desa Enggal Rejo Kecamatan Air Saleh (*R34). 5.000.000 - 5.000.000 -

Halaman 9 dari 33
Uraian Jumlah Anggaran Realisasi Sisa %
1 2 3 4 5
- Pembangunan Masjid Nurul Huda Desa Enggal Rejo Kecamatan Air Saleh (*R34). 5.000.000 - 5.000.000 -
- Pembangunan Masjid Barokatul Huda Desa Enggal Rejo Kecamatan Air Saleh (*R34). 5.000.000 - 5.000.000 -
- Pembangunan Masjid Al-Taqwa Desa Salek Jaya Kecamatan Air Saleh (*R34). 5.000.000 - 5.000.000 -
- Pembangunan Masjid Takhul Huda Desa Salek Jaya Kecamatan Air Saleh (*R34). 5.000.000 - 5.000.000 -
- Pembangunan Masjid Nurul Huda Desa Salek Jaya Kecamatan Air Saleh (*R34). 5.000.000 - 5.000.000 -
- Pembangunan Masjid Al-Ikhlas Desa Salek Jaya Kecamatan Air Saleh (*R34). 5.000.000 - 5.000.000 -
- Pembangunan Masjid Nurul Iman Desa Salek Makmur Kecamatan Air Saleh (*R34). 5.000.000 - 5.000.000 -
- Pembangunan Masjid Baitul Mukminin Desa Salek Makmur Kec. Air Saleh (*R34). 5.000.000 - 5.000.000 -
- Pembangunan Masjid Baitul Muttaqin Desa Bintaran Kecamatan Air Saleh (*R34). 5.000.000 - 5.000.000 -
- Pembangunan Masjid Muhajirin Desa Bintaran Kecamatan Air Saleh (*R34). 5.000.000 - 5.000.000 -
- Pembangunan Masjid Al-Taqwa Desa Bintaran Kecamatan Air Saleh (*R34). 5.000.000 - 5.000.000 -
- Pembangunan Masjid Nurul Huda Desa Saleh Mukti Kecamatan Air Saleh (*R34). 5.000.000 - 5.000.000 -
- Pembangunan Masjid Baiturrohman Desa Saleh Mukti Kecamatan Air Saleh (*R34). 5.000.000 - 5.000.000 -
- Pembangunan Masjid Darussalam Desa Saleh Mukti Kecamatan Air Saleh (*R34). 5.000.000 - 5.000.000 -
- Pembangunan Masjid Baiturrahman Desa Sidoharjo Kecamatan Air Saleh (*R34). 5.000.000 - 5.000.000 -
- Pembangunan Masjid Darul Taqwa Desa Damarwulan Kecamatan Air Saleh (*R34). 5.000.000 - 5.000.000 -
- Pembangunan Masjid Al-Hijrah Desa Damarwulan Kecamatan Air Saleh (*R34). 5.000.000 - 5.000.000 -
- Rehab. Mushollah Nurul Huda Desa Sidoharjo Kecamatan Air Saleh (*R34). 3.000.000 - 3.000.000 -
- Rehab. Mushollah Baiturrohim Desa Srimutyo Kecamatan Air Saleh (*R34). 3.000.000 - 3.000.000 -
- Rehab. Mushollah Nurul Imam Dusun 2 Desa Damarwulan Kec. Air Saleh (*R34). 3.000.000 - 3.000.000 -
- Rehab. Mushollah Tanwirul Qulub Dusun I Desa Saleh Agung Kec. Air Saleh (*R34). 3.000.000 - 3.000.000 -
- Rehab. Mushollah Muthakbiin Dusun 2 Desa Saleh Agung Air Saleh (*R34). 3.000.000 - 3.000.000 -
- Rehab. Mushollah Al-Hikmah Dusun 1 Desa Srikaton Kecamatan Air Saleh (*R34). 2.000.000 - 2.000.000 -
- Rehab. Mushollah Darussalam Dusun 1 Desa Srikaton Kecamatan Air Saleh (*R34). 2.000.000 - 2.000.000 -
- Rehab. Mushollah Darul Hikmah Dusun 1 Desa Srikaton Kec. Air Saleh (*R34). 2.000.000 - 2.000.000 -
- Pembangunan Gereja Kristen Muria Indonesia (GKMI) Cakranegaran Desa Saleh 10.000.000 10.000.000 - 100,00
Mukti Kec Air Saleh.
- Mushola Desa Sidoharjo Kec. Air saleh (PR33) 10.000.000 - 10.000.000 -
- Masjid Desa Srikaton Kec. Air Saleh (PR33). 10.000.000 - 10.000.000 -

Halaman 10 dari 33
Uraian Jumlah Anggaran Realisasi Sisa %
1 2 3 4 5
Kecamatan Banyuasin I. 255.000.000 135.000.000 120.000.000 52,94
- Pembangunan Masjid Al-Mu'minin Kel. Mariana Kec. BA I. 5.000.000 5.000.000 - 100,00
- Renovasi Masjid At-Taqwa Ds. Cinta Manis Lama Kecamatan Banyuasin I. 15.000.000 15.000.000 - 100,00
- Renovasi Masjid Baitus Syahid Dusun II Ds. Sidomulyo Kec. Banyuasin I. 7.500.000 - 7.500.000 -
- Rehab. Masjid Al-Hidayah Dusun III Ds. Nusa Makmur Kecamatan Banyuasin I. 5.000.000 - 5.000.000 -
- Rehab. Masjid Al-Ikhlas Dusun II Ds. Nusa Makmur Kecamatan Banyuasin I. 5.000.000 - 5.000.000 -
- Rehab. Masjid Sabilil Mustaqim Dusun IV Desa Nusa Makmur Kecamatan Banyuasin I. 5.000.000 - 5.000.000 -
- Pembangunan Masjid Riyyadul Jannah Ds. Pulau Borang Kec. Banyuasin I. 7.500.000 - 7.500.000 -
- Pembangunan Pure Merta Sari Desa Cinta Manis Baru Kecamatan Banyuasin I. 5.000.000 - 5.000.000 -
- Pembangunan Masjid Taufiqurrahman Desa Pematang Palas Kecamatan Banyuasin I. 10.000.000 10.000.000 - 100,00
- Pembangunan Masjid Darul Muttaqin Desa Kumbang Padang Kecamatan Banyuasin I. 5.000.000 5.000.000 - 100,00
- Pembangunan Masjid Jami' Nurul Huda Ds. Tirto Sari Kecamatan Banyuasin I. 5.000.000 5.000.000 - 100,00
- Pembangunan Mushollah Al-Muhajirin Kelurahan Mariana Kec. Banyuasin I (*R8). 55.000.000 55.000.000 - 100,00
- Pembangunan Mushollah ................ . Lorong Vinus Kecamatan Banyuasin I (*R12). 25.000.000 - 25.000.000 -
- Pembangunan Masjid ................ . Desa Perambahan Kecamatan Banyuasin I (*R19). 25.000.000 - 25.000.000 -
- Pemb. Mushollah .............. Lrg. Selumar Kelurahan Maryana Ilir Kec. Banyuasin I (*R19). 25.000.000 - 25.000.000 -
- Pembangunan Masjid Al-Iman Desa Sidomulyo Kec. BA I. 5.000.000 5.000.000 - 100,00
- Pembangunan Musholla Hidayatullah Km.16 Dusun III Rimba Jaya Kec. BA I 5.000.000 5.000.000 - 100,00
- Pembangunan Pura Merta Sari Desa Cintamanis Baru KM XI Kec. BA I 10.000.000 - 10.000.000 -
- Pembangunan Masjid Sabilul Huda Jl. Dr. A. Rivai Abdullah Kel. Mariana Kec. BA I 5.000.000 5.000.000 - 100,00
- Pembangunan Masjid At-thohiri Jl. Sabar Jaya Kel. Mariana Kec. BA I 10.000.000 10.000.000 - 100,00
- Pembangunan Musholla Miftahul Huda Desa Sungai Gerong Kec. BA I 5.000.000 5.000.000 - 100,00
- Pembangunan Musholla Nurul Jannah Desa Merah Mata Kec. BA I 5.000.000 5.000.000 - 100,00
- Pembangunan Musholla Nurul Iman Kel. Mariana Ilir Kec. BA I. 5.000.000 5.000.000 - 100,00

Kecamatan Banyuasin II 57.500.000 5.000.000 52.500.000 8,70


- Pembangunan Masjid Darussalam Dusun I Parit 7 Ds. Muara Sungsang Kec. Banyuasin II. 5.000.000 5.000.000 - 100,00
- Pembangunan Masjid Baitul Ma'mur UPT Jatisari Ds. Jatisari Kecamatan Banyuasin II. 5.000.000 - 5.000.000 -
- Pembangunan Masjid Al-Ikhlas Ds. Sungai Jeruju Ds. Sungsang II Kec. Banyuasin II. 5.000.000 - 5.000.000 -
- Renovasi Masjid Al-Hijrah Desa Rimau Sungsang Kecamatan Banyuasin II. 5.000.000 - 5.000.000 -
- Pembangunan Masjid Baitul Haq desa Marga Sungsang Kec. BA II 10.000.000 - 10.000.000 -
- Pembangunan Musholla Taqwa Dusun III Teluk Macan Desa Sungsang I Kec. BA II 7.500.000 - 7.500.000 -

Halaman 11 dari 33
Uraian Jumlah Anggaran Realisasi Sisa %
1 2 3 4 5
- Pembangunan Masjid Al-ikhlas sungai Jeruji Desa Sungsang II Kec. BA II 10.000.000 - 10.000.000 -
- Masjid Al-Mukmin Desa Sungsang I Kec. BA II (PR44) 5.000.000 - 5.000.000 -
- Masjid At-taqwa Desa Muara Sungsang Kec. BA II (PR44) 5.000.000 - 5.000.000 -

Kecamatan Banyuasin III. 657.500.000 387.500.000 270.000.000 58,94


- Pembangunan Masjid Jumhuriyah Kota Pangkalan Balai Kec. Banyuasin III. 100.000.000 100.000.000 - 100,00
- Pembangunan Mushollah An-Nur Kel. Pangkalan Balai Kec. Banyuasin III. 10.000.000 10.000.000 - 100,00
- Pembangunan Masjid As-Sobar Ds. Lubuk Saung Kecamatan Banyuasin III. 5.000.000 - 5.000.000 -
- Pembangunan Masjid Miftahul Ubudiyah Ds. Pelajau Ilir Kec. Banyuasin III. 5.000.000 5.000.000 - 100,00
- Pembangunan Mushollah Ash-Sholihin Kelurahan Kedondong Raye Kec. Banyuasin III. 7.500.000 7.500.000 - 100,00
- Pembangunan Mushollah Haqqul Yakin Ds. Tanjung Kepayang Kec. Banyuasin III 10.000.000 10.000.000 - 100,00
- Pembangunan Mushollah SMA Negeri III Kec. Banyuasin III. 10.000.000 - 10.000.000 -
- Pembangunan Masjid Akmaliah Desa Sukaraja Kec. Banyuasin III 5.000.000 5.000.000 - 100,00
- Pembangunan Masjid Al-Jihad Kelurahan Kayuara Kuning Kec. Banyuasin III 5.000.000 - 5.000.000 -
- Pembangunan Masjid Al-Mukminin Dusun I Desa Regan Agung Kec. Banyuasin III. 15.000.000 15.000.000 - 100,00
- Pembangunan Masjid Al-Azhar Dusun I Desa Regan Agung Kecamatan Banyuasin III. 15.000.000 15.000.000 - 100,00
- Pembangunan Masjid Al-Iman Dusun 2 Desa Regan Agung Kecamatan Banyuasin III. 15.000.000 15.000.000 - 100,00
- Pembangunan Masjid Al-Hijriyah Kelurahan Kayuara Kuning Kecamatan Banyuasin III. 15.000.000 15.000.000 - 100,00
- Pembangunan Masjid Al-Makmun Kel. Kedondong Raye BA III 50.000.000 50.000.000 - 100,00
- Pembangunan Masjid Al-Jihad Desa Ujung Tanjung Kecamatan Banyuasin III (*R31). 100.000.000 - 100.000.000 -
- Pembangunan Mushollah Ar-Rahman Desa Lubuk Saung Kec. Banyuasin III (*R31). 25.000.000 25.000.000 - 100,00
- Pembangunan Masjid ........... Desa Terentang Kecamatan Banyuasin III (*R31). 5.000.000 - 5.000.000 -
- Pembangunan Masjid Istiqlal Desa Ujung Tanjung Kecamatan Banyuasin III (*R31). 5.000.000 - 5.000.000 -
- Pembangunan Masjid Al-Harom Desa Pangkalan Panji Kec. BA III. 10.000.000 - 10.000.000 -
- Pembangunan Masjid Nurul Ikhsan Kmpng Harapan/Remiling Kel. Pkl Balai Kec. BA III. 15.000.000 15.000.000 - 100,00
- Pembangunan Masjid Al-Hijriyah Kel. Kayuara Kuning Kec. BA III 25.000.000 - 25.000.000 -
- Pembangunan Masjid Al-Hikmah Desa Petaling Kec. BA III 10.000.000 10.000.000 - 100,00
- Pembangunan Masjid Al-Istifada Kel. Kayuara Kuning Kec. BA III 10.000.000 - 10.000.000 -
- Pembangunan Masjid Darussholihin Desa Tanjung Beringin Kec. BA III 10.000.000 10.000.000 - 100,00
- Pembangunan Masjid Istiqomah Desa Sri Bandung Kec. BA III 10.000.000 - 10.000.000 -
- Pembangunan Musholla Al-Hikmah Jl. Ketib Royal Kel. Seterio Kec. BA III 10.000.000 10.000.000 - 100,00
- Pembangunan Menara Masjid Al-Aziz Kel. Pangkalan Balai Kec. BA III 10.000.000 - 10.000.000 -

Halaman 12 dari 33
Uraian Jumlah Anggaran Realisasi Sisa %
1 2 3 4 5
- Masjid Al-Jihad Ujung Tanjung Kec. BA III 25.000.000 - 25.000.000 -
- Musholla Al-Furqon Pangkalan Panji Kec. BA III (PR25) 10.000.000 10.000.000 - 100,00
- Masjid Fatuljanah Desa Petaling Kec. BA III (PR20) 10.000.000 - 10.000.000 -
- Masjid Taqwa Desa Petaling Kec. BA III (PR20) 10.000.000 - 10.000.000 -
- Masjid Istiqomah Desa Petaling Kec. BA III (PR20) 10.000.000 - 10.000.000 -
- Langgar Al Hikmah Rt.08 Rw.03 Desa Petaling Kec. BA III (PR20) 20.000.000 - 20.000.000 -
- Musholla Ds. Bengkuang Desa Langkan Kec. BA III (PR25) Masjid Al-Furqon 10.000.000 10.000.000 - 100,00
- Masjid Nurussa'adah Seterio Kec. BA III (PR9) 10.000.000 10.000.000 - 100,00
- Masjid Syuhada Kel. Kedondong Raye Kec. BA III(PR9) 10.000.000 10.000.000 - 100,00
- Masjid Nurul Falah Desa Sidang Emas Kec. Ba III (PR9) 10.000.000 10.000.000 - 100,00
- Masjid Nurul Iman Desa Terlangu Kec. BA III (PR9) 10.000.000 10.000.000 - 100,00
- Masjid Al Amin Cangkring Kec. BA III (PR9) 10.000.000 10.000.000 - 100,00

Kecamatan Betung 382.500.000 165.000.000 217.500.000 43,14


- Pembangunan Mushollah Al-Falah Desa Lubuk Karet Kecamatan Betung. 7.500.000 - 7.500.000 -
- Pembangunan Masjid Nurul Hidayah Ds. Lubuk Karet Kecamatan Kecamatan Betung. 10.000.000 - 10.000.000 -
- Pemb. Masjid Daarul Mu'minin Komplek Griya Anugrah Kel. Rimba Asam Kec. Betung. 13.000.000 10.000.000 3.000.000 76,92
- Rehab. Masjid Al-Ikhlas Desa Sri Kembang Kec. Betung (*R11). 3.000.000 - 3.000.000 -
- Rehab. Masjid Al-Hidayah Desa Sri Kembang Kec. Betung (*R11). 3.000.000 - 3.000.000 -
- Rehab. Masjid Nurul Iman Desa Bukit Rt. 05 Kec. Betung (*R11). 10.000.000 10.000.000 - 100,00
- Rehab. Masjid Nurul Iman Tanjung Mulio Desa Bukit Kecamatan Betung (*R11). 3.000.000 - 3.000.000 -
- Rehab. Masjid Al-Muhajirin Jati Mulio Desa Bukit Kecamatan Betung (*R11). 3.000.000 - 3.000.000 -
- Rehab. Masjid Al-Huda Kampung Baru Desa Bukit Kecamatan Betung (*R11). 3.000.000 - 3.000.000 -
- Rehab. Masjid Nurul Jannah Dusun 2 Desa Bukit Kecamatan Betung (*R11). 3.000.000 - 3.000.000 -
- Rehab. Masjid ....................... Karang Rejo Desa Bukit Kec. Betung (*R11). 3.000.000 - 3.000.000 -
- Rehab. Masjid Al-Hidayah Dusun III Desa Suka Mulya Kecamatan Betung (*R11). 3.000.000 - 3.000.000 -
- Rehab. Masjid Al-Ikhlas Rt. 10 Depan Simpan Tebenan Kec. Betung (*R11). 3.000.000 - 3.000.000 -
- Rehab. Masjid Al-Hikmah Rt. 13 Desa Suka Mulya Kecamatan Betung (*R11). 23.000.000 23.000.000 - 100,00
- Rehab. Masjid Nurul Iman Rt. 03 Dusun I Desa Suka Mulya Kec. Betung (*R11). 3.000.000 - 3.000.000 -
- Rehab. Masjid Al-Barokah Rt. 02 Desa Suka Mulya Kecamatan Betung (*R11). 3.000.000 - 3.000.000 -
- Rehab. Mushollah Al-Mutahkim Desa Suka Mulya Kecamatan Betung (*R11). 3.000.000 - 3.000.000 -
- Rehab. Mushollah Nurul Iman Komplek Tebenan Desa Suka Mulya Kec. Betung (*R11). 3.000.000 - 3.000.000 -

Halaman 13 dari 33
Uraian Jumlah Anggaran Realisasi Sisa %
1 2 3 4 5
- Rehab. Masjid Al-Hidayah Purbolinggo Kelurahan Betung Kec. Betung (*R11). 3.000.000 - 3.000.000 -
- Rehab. Masjid Al-Hijrah Sedempo Kelurahan Betung Kecamatan Betung (*R11). 3.000.000 - 3.000.000 -
- Rehab. Masjid At-Taqwa Tebing Dayat Kelurahan Betung Kec. Betung (*R11). 3.000.000 - 3.000.000 -
- Rehab. Masjid Baitul Makmur Rt. 28/08 Lk. IV Kelurahan Betung Betung (*R11). 5.000.000 - 5.000.000 -
- Rehab. Masjid Al-Muhajirin Rt. 19/06 Lk. III Kel. Betung Kec. Betung (*R11). / Al-Muhajirin Keg. Safari
5.000.000
Jumat 5.000.000 - 100,00
- Rehab. Masjid An-Nurhikmah Jl. Talang Jaya Rt. 02/01 Lk. I Kel. Betung Kec. Betung (*R11). 35.000.000 35.000.000 - 100,00
- Rehab. Masjid Baitul Rahman Jl. Gtng Royong Rt. 03/01 Lk. I Kel. Betung Kec. Betung (*R11). 5.000.000 - 5.000.000 -
- Rehab. Masjid Al-Ikhtihad Bangun Rejo Rt. 13/04 Lk. II Kel. Betung Kec. Betung (*R11). 3.000.000 - 3.000.000 -
- Rehab. Masjid Al-Hidayah Talang Kayu Abang Rt. 53/14 Kel. Betung Kec. Betung (*R11). 3.000.000 - 3.000.000 -
- Rehab. Masjid Al-Hidayah Bangun Rejo Rt. 09/04 Lk. II Kel. Betung Kec. Betung (*R11). 3.000.000 - 3.000.000 -
- Rehab. Masjid An-Nur Jl. Kades Rt. 31/09 Lk. V Kel. Betung Kec. Betung (*R11). 3.000.000 - 3.000.000 -
- Rehab. Masjid Baitul Ikhsan Jl. SDN 3 Rt. 10/03 Lk. II Kel. Betung Kec. Betung (*R11). 3.000.000 - 3.000.000 -
- Rehab. Masjid Darul Fallah Jl. P2KT Rt. 28/08 Lk. IV Kel. Betung Kec. Betung (*R11). 3.000.000 - 3.000.000 -
- Rehab. Mushollah Al-Muttaqin h. Mashuri Kelurahan Betung Kec. Betung (*R11). 3.000.000 - 3.000.000 -
- Rehab. Mushollah SMPN 1 Kelurahan Betung Kec. Betung (*R11). 4.000.000 - 4.000.000 -
- Rehab. Masjid Al-Amin Lorong Kombet Kel. Rimba Asam Kec. Betung (*R11). 3.000.000 - 3.000.000 -
- Rehab. Masjid Nurul Iman Pasar Pagi Kel. Rimba Asam Kec. Betung (*R11) + (*R20). 13.000.000 13.000.000 - 100,00
- Rehab. Masjid Al-Huda, H. Nawawi Kel. Rimba Asam Kecamatan Betung (*R11). 3.000.000 - 3.000.000 -
- Rehab. Masjid Al-Muhajirin Kelurahan Rimba Asam Kecamatan Betung (*R11). 3.000.000 - 3.000.000 -
- Rehab. Masjidddarul Mukminin Perumnas Anugrah Kel. Rimba Asam Kec. Betung (*R11). 3.000.000 3.000.000 - 100,00
- Rehab. Masjid Nurul Huda Meranjat Kelurahan Rimba Asam Kecamatan Betung (*R11). 3.000.000 3.000.000 - 100,00
- Rehab. Masjid Al-Ikhsan Kampung Sawah Rt. 36, 38 Kel. Rimba Asam Kec. Betung (*R11). 4.000.000 - 4.000.000 -
- Rehab. Masjid Nurul Iman Dusun II Desa Lubuk Karet Kec. Betung (*R11) + (*R20) 20.000.000 20.000.000 - 100,00
- Rehab. Masjid Nurul Iman Dusun III Desa Lubuk Karet Kec. Betung (*R11). 3.000.000 - 3.000.000 -
- Rehab. Masjid Nurul Hidayah, Sedongkok Desa Lubuk Karet Kec. Betung (*R11). 3.000.000 - 3.000.000 -
- Rehab. Masjid Al-Ikhsan Desa Pulau Rajak Kec. Betung (*R11). 3.000.000 - 3.000.000 -
- Rehab. Masjid Jami'atutaqwa Desa Philip 2 Kec. Betung (*R11). 3.000.000 - 3.000.000 -
- Rehab. Mushollah Dusun II Desa Philip 2 Kec. Betung (*R11). 3.000.000 - 3.000.000 -
- Rehab. Masjid Al-Muhajirin Dusun I Desa Philip 3 Taja Raya 1 Kecamatan Betung (*R11). 3.000.000 - 3.000.000 -
- Rehab. Masjid Al-Ikhlas Dusun II Desa Philip 3 Taja Raya 1 Kecamatan Betung (*R11). 3.000.000 - 3.000.000 -
- Rehab. Masjid Darussalam Desa Philip 4 Taja Mulya Kecamatan Betung (*R11). 3.000.000 - 3.000.000 -
- Rehab. Masjid Bakti Desa Philip 4 Taja Mulya Kecamatan Betung (*R11). 3.000.000 - 3.000.000 -
- Rehab. Masjid Al-Amaliah Dusun II Blok A Desa Taja Indah Kec. Betung (*R11). 3.000.000 - 3.000.000 -

Halaman 14 dari 33
Uraian Jumlah Anggaran Realisasi Sisa %
1 2 3 4 5
- Rehab. Masjid Amal Bakti Dusun II Blok B Desa Taja Indah Kec. Betung (*R11). 3.000.000 - 3.000.000 -
- Rehab. Masjid Al-Muhajirin Dusun III Blok C Desa Taja Indah Kec. Betung (*R11). 3.000.000 - 3.000.000 -
- Rehab. Masjid Nurul Insan Blok A Desa Taja Indah Kecamatan Betung (*R11). 3.000.000 3.000.000 - 100,00
- Pemb. Masjid Baitul Makmur Jl. Plg-Jambi Pasar Pasar Lama Km. 67 Kec. Betung (*R20). 10.000.000 - 10.000.000 -
- Pemb. Masjid Nurul Huda Lk. I Meranjat No. 2 Rt. 2 Kel. Rimba Asam Kec. Betung (*R20). 10.000.000 10.000.000 - 100,00
- Pembangunan Masjid Amalia Dusun 1 Desa Taja Indah Kecamatan Betung (*R20). 10.000.000 10.000.000 - 100,00
- Pembangunan Masjid Nurussalam Dusun II Desa Taja Indah Kecamatan Betung (*R20). 10.000.000 - 10.000.000 -
- Pembangunan Mushollah Al-Fatah Perumnas Kel. Rimba Asam Kec. Betung (*R20). 10.000.000 - 10.000.000 -
- Pembangunan Musholla Al Falah Komp. Griya Mulya Kel. R. Asam Kec. Betung (PR20) 7.500.000 - 7.500.000 -
- Pembangunan Masjid Al Hikmah Km. 69 Kec. Betung. 10.000.000 - 10.000.000 -
- Pembangunan Masjid Nurul Huda LK. I Meranjat Kel. Rimba Asam Kec. Betung. 7.500.000 - 7.500.000 -
- Masjid Al Ikhlas Jl. Jambi KM 70 D2 Desa Bukit Kec. Betung (PR29) 20.000.000 20.000.000 - 100,00
- Masjid Al Ikhlas Desa Pulau Rajak Kec. Betung (PR20) 10.000.000 - 10.000.000 -

Kecamatan Makarti Jaya 150.000.000 45.000.000 105.000.000 30,00


- Pembangunan Masjid Al-Falah Ds. Tirta Kencana Kecamatan Makarti Jaya. 5.000.000 5.000.000 - 100,00
- Pembangunan Masjid Nurussalam Ds. Tirta Mulya Kecamatan Makarti Jaya. 5.000.000 5.000.000 - 100,00
- Pembangunan Mushollah Istiqomah Ds. Upang Marga Kec. Makarti Jaya. 10.000.000 - 10.000.000 -
- Pembangunan Masjid ...... Ds. Cendana Kecamatan Makarti Jaya. 15.000.000 - 15.000.000 -
- Pemb. Mushollah Khalid Bin Walid Kel. Makarti Jaya Kec. Makarti Jaya (*R8) +(*R9). 35.000.000 35.000.000 - 100,00
- Rehab. Masjid Nurul Hijroh lk. II Kec. Makarti Jaya (*R9). 10.000.000 - 10.000.000 -
- Rehab. Langgar Baitul Akbar Lk. II Kec. Makarti Jaya (*R9). 10.000.000 - 10.000.000 -
- Rehab. Masjid Nurul Hikmah Desa Upang Makmur Kecamatan Makarti Jaya (*R9). 10.000.000 - 10.000.000 -
- Rehab. Mushollah Al-Kausar Desa Upang Makmur Kecamatan Makarti Jaya (*R9). 10.000.000 - 10.000.000 -
- Rehab. Masjid Al-Ikhlas Rt. 12 Dusun 3 Desa Tirta Kencana Kec. Makarti Jaya (*R9). 10.000.000 - 10.000.000 -
- Rehab Masjid .................. Desa ................... Kecamatan Makarti Jaya (*R34). 25.000.000 - 25.000.000 -
- Pembangunan Masjid Al Fatehah Dusun I Seda Pendowo Harjo Kec. Makarti Jaya 5.000.000 -

Kecamatan Muara Padang 135.000.000 75.000.000 60.000.000 55,56


- Pembangunan Gereja GKAI Ds. Daya Utama Kec. Muara Padang 5.000.000 5.000.000 - 100,00
- Rehab. Masjid Baitul Rohman Desa Margo Mulyo Kec. Muara Padang (*R32). 10.000.000 10.000.000 - 100,00

Halaman 15 dari 33
Uraian Jumlah Anggaran Realisasi Sisa %
1 2 3 4 5
- Rehab. Mushollah Al-Amin Desa Purwosari Kecamatan Muara Padang (*R32). 10.000.000 10.000.000 - 100,00
- Rehab. Masjid Al-Ikhlas Desa Sumber Makmur Kecamatan Muara Padang (*R32). 10.000.000 10.000.000 - 100,00
- Rehab. Masjid Taqwa Desa Sido Mulyo 20 Kecamatan Muara Padang (*R32). 10.000.000 10.000.000 - 100,00
- Rehab. Masjid Raudul Huda Desa Air Gading Kecamatan Muara Padang (*R32). 10.000.000 10.000.000 - 100,00
- Rehab. Masjid Mamba'ul Ulum Desa Tirta Raharja Kec. Muara Padang (*R32). 10.000.000 10.000.000 - 100,00
- Rehab Masjid Al Imanu Darussalam Desa Tirto Raharjo Kec. Muara Padang (PR32) 10.000.000 10.000.000 - 100,00
- Rehab Mushollah ............ Desa Sidomulyo Kecamatan Muara Padang (*R34). 10.000.000 - 10.000.000 -
- Rehab. Masjid Mujahidin Jalur 18 Desa Sidorejo Kecamatan Muara Padang (*R34). 5.000.000 - 5.000.000 -
- Pembangunan Masjid At-Taqwa Desa Daya Makmur Jalur 18 Kec. Muara Padang 10.000.000 - 10.000.000 -
- Masjid Nur Hikmah Dusun 5 sungai Raden Desa Muara Padang Kec. M. Padang (PR20) 10.000.000 - 10.000.000 -
- Pembangunan Masjid Al Muhajirin Dusun Sungai Desa Kec. Muara Padang 25.000.000 - 25.000.000 -

Kecamatan Muara Sugihan 515.000.000 305.000.000 210.000.000 59,22


- Pembangunan Masjid At-Taqwa Ds. Mekar Jaya Kecamatan Muara Sugihan. 15.000.000 - 15.000.000 -
- Renovasi Masjid Al-Hidayah Dusun III Desa Rejodadi Kecamatan Muara Sugihan. 10.000.000 10.000.000 - 100,00
- Pembangunan Masjid ........................ Desa Margo Mulyo Kecamatan Muara Sugihan. 15.000.000 - 15.000.000 -
- Rehab. Masjid Baiturrohman Dusun 3 Rt. 4 Desa Daya Kusuma Kec. M Sugihan (*R9). 10.000.000 - 10.000.000 -
- Rehab. Masjid Nurul Huda Desa Jalur Mulya Kecamatan Muara Sugihan (*R15). 100.000.000 100.000.000 - 100,00
- Pemb. Teras dan Plafond Masjid Darus Salam Ds Cendana Kec. M. Sugihan (*R15). 150.000.000 150.000.000 - 100,00
- Pembangunan Masjid An Nur Desa Margo Rukun Jalur 14 Kec. M. Sugihan (*R29). 25.000.000 25.000.000 - 100,00
- Rehab. Mushollah Nurul Anwar Desa Jalur Mulyo Kec. Muara Sugihan (*R32). 10.000.000 10.000.000 - 100,00
- Rehab. Masjid Baitullah Desa Gilarang Kecamatan Muara Muara Sugihan (*R32). 10.000.000 - 10.000.000 -
- Rehab. Mushollah ................. Jalur 16 Desa Margo Mulyo Kec. Muara Sugihan (*R34). 5.000.000 - 5.000.000 -
- Pembangunan Gedung gereja Majelis Jemaat GKAI Margo Mulyo Kec. M. Sugihan 10.000.000 10.000.000 - 100,00
- Pembangunan Masjid Al-Hikmah Desa Argo Mulyo Kec. Muara Sugihan 15.000.000 - 15.000.000 -
- Pembangunan Masjid At Taqwa Desa Mekar Jaya Kec. Muara Sugihan 15.000.000 - 15.000.000 -
- Masjid Desa Sugi Waras Kec. Muara Sugihan (PR33) 20.000.000 - 20.000.000 -
- Masjid Desa Timbul Jaya Kec. Muara Sugihan (PR33) 10.000.000 - 10.000.000 -
- Masjid Arohman Desa Cendana Jalur 14 Kec. Muara Sugihan (PR10) 25.000.000 - 25.000.000 -
- Masjid Al Falaq Desa Cendana Jalur 14 Kec. Muara Sugihan (PR10) 25.000.000 - 25.000.000 -
- Masjid Sabilillah Desa Sugih Waras Jalur 16 Kec. Muara Sugihan (PR10) 25.000.000 - 25.000.000 -
- Masjid Nurul Iman Desa Kuala Sugihan Kec. Muara Sugihan 20.000.000 - 20.000.000 -

Halaman 16 dari 33
Uraian Jumlah Anggaran Realisasi Sisa %
1 2 3 4 5
Kecamatan Muara Telang 370.000.000 150.000.000 220.000.000 40,54
- Pembangunan Masjid Al-Hidayah Ds. Sumber Hidup Jalur 8 Kecamatan Muara Telang. 5.000.000 - 5.000.000 -
- Pembangunan Masjid An-Nur Desa Telang Kec. Muara Telang. 5.000.000 - 5.000.000 -
- Pembangunan Masjid Hidayatul Islam Desa Sumber Mulya Kec. Muara Telang. 5.000.000 - 5.000.000 -
- Pembangunan Masjid Al-Muhajirin Desa Telang Jaya Dusun I Kec. Muara Telang (*R7). 50.000.000 50.000.000 - 100,00
- Pembangunan Masjid Al-Amin Desa Telang Makmur Kecamatan Muara Telang (*R38). 25.000.000 25.000.000 - 100,00
- Pembangunan Masjid Al-Huda Desa Panca Mukti Kecamatan Muara Telang (*R39). 15.000.000 15.000.000 - 100,00
- Pembangunan Masjid Hidayatul Islam Dusun III Desa Sumber Mulya Kec. M. Telang (*R39). 15.000.000 15.000.000 - 100,00
- Pembangunan Masjid Hidayatullah Dusun IV Desa Sumber Mulya Kec. M. Telang (*R39). 15.000.000 15.000.000 - 100,00
- Pembangunan Masjid Al-Baitul Rahman Dusun II Ds Sumber Mulya Kec. M. Telang (*R39). 15.000.000 15.000.000 - 100,00
- Pembangunan Masjid Al-Muhajirin Dusun IIV Ds Sumber Mulya Kec. M. Telang (*R39). 15.000.000 15.000.000 - 100,00
- Masjid Al Amin Desa Telang Jaya Kec. Muara Telang 10.000.000 - 10.000.000 -
- Masjid Baitullah Blok 6 RT 13 Dusun I Desa Marga Rahayu Kec. Muara Telang (PR16) 10.000.000 - 10.000.000 -
- Masjid Sabillilah Dusun II Desa Telang Rejo Kec. Muara Telang (PR16) 10.000.000 - 10.000.000 -
- Masjid Al Falah Dusun III Desa Telang Rejo Kec. Muara Telang (PR16) 10.000.000 - 10.000.000 -
- Masjid Baitul Taqwa Dusun III Jembatan 7 Desa Telang Karya (PR16) 10.000.000 - 10.000.000 -
- Masjid Faturohman Dusun I Jembatan 6 Desa Telang Karya (PR16) 10.000.000 - 10.000.000 -
- Masjid Nurul Iman Desa Sumber Jaya Kec. Muara Telang (PR20) 25.000.000 - 25.000.000 -
- Masjid Al Hidayah Desa Mekar Mukti Kec. Muara Telang (PR20) 10.000.000 - 10.000.000 -
- Masjid Baitul Muttaqin Desa Telang Jaya RT 8 Dusun 2 Kec. Muara Telang (PR14) 10.000.000 - 10.000.000 -
- Masjid Al Ijtihad Desa Telang Jaya Rt 3 Dusun I Kec. Muara Telang (PR14) 20.000.000 - 20.000.000 -
- Masjid Nurul Rahmah Desa Telang Jaya Rt 3 Dusun II Kec. Muara Telang (PR14) 10.000.000 - 10.000.000 -
- Masjid Nurul Iman Desa Upang Jaya Rt 10 Dusun III Kec. Muara Telang (PR14) 10.000.000 - 10.000.000 -
- Masjid Al Muhajirin Desa Upang Jaya Rt 2 Dusun I Kec. Muara Telang (PR14) 10.000.000 - 10.000.000 -
- Masjid Nur Mulya Agung Desa Upang Jaya Rt 5 Dusun II Kec. Muara Telang (PR14) 10.000.000 - 10.000.000 -
- Musholla Cahaya Iman Desa Upang Jaya Rt 8 Dusun II Kec. Muara Telang (PR14) 10.000.000 - 10.000.000 -
- Masjid Al Hidayah Desa Telang Makmur Rt 15 Rw 8 Kec. Muara Telang (PR14) 10.000.000 - 10.000.000 -
- Musholla Nurul Iman Desa Telang indah Rt 4 Dusun II Kec. Muara Telang (PR14) 20.000.000 - 20.000.000 -

Kecamatan Pulau Rimau 495.000.000 230.000.000 265.000.000 46,46


- Pngdaan Msn Genset & Kipas Angin Masjid Baitul Rohman Ds Sumber Rezeki Kec. P. Rimau. 5.000.000 - 5.000.000 -
- Pembangunan Mushollah Baitul Muttaqin Ds. Wonosari Kec. Pulau Rimau. 5.000.000 5.000.000 - 100,00

Halaman 17 dari 33
Uraian Jumlah Anggaran Realisasi Sisa %
1 2 3 4 5
- Pembangunan Masjid Nurul Iman Ds. Senda Mukti Kecamatan Pulau Rimau. 15.000.000 - 15.000.000 -
- Pembangunan Masjid Darussalam Ds. Teluk Betung Kecamatan Pulau Rimau. 15.000.000 15.000.000 - 100,00
- Rehab. Masjid Al-Huda Ds. Dana Mulya Kec. Pulau Rimau. 5.000.000 - 5.000.000 -
- Rehab. Masjid Jami' Darusalam Ds. Wonosari Kec. Pulau Rimau 30.000.000 30.000.000 - 100,00
- Rehab. Mushollah Nurul Iman Desa Wonosari Kecamatan Pulau Rimau (*R6).. 5.000.000 5.000.000 - 100,00
- Rehab. Mushollah Al-Amin Desa Wonosari Kecamatan Pulau Rimau (*R6).. 5.000.000 5.000.000 - 100,00
- Rehab. Mushollah Baitul Rohim Desa Majatra Kecamatan Pulau Rimau (*R6).. 25.000.000 25.000.000 - 100,00
- Rehab. Masjid Al-Mutakin Desa Sumber Rejo Kecamatan Pulau Rimau (*R6).. 5.000.000 5.000.000 - 100,00
- Rehab. Masjid Baitul Rahman Desa Banjar Sari Kecamatan Pulau Rimau (*R6).. 5.000.000 - 5.000.000 -
- Rehab. Masjid Al-Ikhlas Desa Songo Makmur Kecamatan Pulau Rimau (*R6).. 5.000.000 5.000.000 - 100,00
- Rehab. Masjid Al-Mutaqin Desa Penuguan Kecamatan Pulau Rimau (*R6).. 5.000.000 - 5.000.000 -
- Rehab. Masjid Baitul Mustaqin Desa Wonosari Kecamatan Pulau Rimau (*R6).. 5.000.000 - 5.000.000 -
- Pembangunan Masjid Nurul Huda Desa Wono Dadi Kec. Pulau Rimau (*R44). 10.000.000 10.000.000 - 100,00
- Pembangunan Masjid Baiturrahman Desa wono Dadi Kec. Pulau Rimau (*R44). 10.000.000 10.000.000 - 100,00
- Pembangunan Masjid Miftahul Jannah Desa Sumber Agung Kec. Pulau Rimau (*R44). 10.000.000 10.000.000 - 100,00
- Pembangunan Masjid Baitul Muttaqin Desa Sumber Agung Kec. Pulau Rimau (*R44). 10.000.000 10.000.000 - 100,00
- Pembangunan Masjid Darussalam Desa Sumber Agung Kec. Pulau Rimau (*R44). 20.000.000 20.000.000 - 100,00
- Pembangunan Masjid Al-Muhajirin Desa Penuguan Kecamatan Pulau Rimau (*R44). 15.000.000 15.000.000 - 100,00
- Pembangunan Masjid Jami' Desa Sumber Mukti Kecamatan Pulau Rimau (*R44). 10.000.000 - 10.000.000 -
- Pembangunan Masjid Nurul Huda Desa Teluk Betung Kec. Pulau Rimau 40.000.000 40.000.000 - 100,00
- Pemb. Masjid Al-Ikhlas Desa Mekar Sari Kec. Pulau Rimau (Jami' Hidayatullah) 20.000.000 20.000.000 - 100,00
- Pembangunan Masjid Jumiriah Desa Wonosari Kec. Pulau Rimau 10.000.000 - 10.000.000 -
- Pembangunan Masjid Nurul Huda Desa Desa Teluk Betung Kecamatan Pulau Rimau 10.000.000 - 10.000.000 -
- Pembangunan Masjid Al Muhajirin Desa Buana Murti Kec. Pulau Rimau. 15.000.000 - 15.000.000 -
- Pembangunan Masjid Al Muhajirin Desa Bumi Rejo Kec. Pulau Rimau 10.000.000 - 10.000.000 -
- Masjid Al Hidayah Desa Rawa Banda Rt 01 Kec. Pulau Rimau (PR15) 25.000.000 - 25.000.000 -
- Masjid Al Muhajirin Desa Wana MuktiRt 01 Kec. Pulau Rimau (PR15) 10.000.000 - 10.000.000 -
- Masjid At Taqwa Desa Sumber Mulyo Rt 10 Kec. Pulau Rimau (PR15) 10.000.000 - 10.000.000 -
- Masjid Al Huda Desa Dana Mulyo Rt 12 Kec. Pulau Rimau (PR15) 10.000.000 - 10.000.000 -
- Masjid Baiturrahman Desa Sumber Rezeki Rt 10 Kec. Pulau Rimau (PR15) 10.000.000 - 10.000.000 -
- Masjid Mujahidin Desa Ponogoan Dusun 06 Kec. Pulau Rimau (PR15) 10.000.000 - 10.000.000 -
- Musholla Mambaul Qaryatin Islamiah Desa Kelapa Dua Kec. Pulau Rimau (PR15) 10.000.000 - 10.000.000 -
- Masjid Nurul Huda Desa Mekar Sari Kec. Pulau Rimau (PR15) 10.000.000 - 10.000.000 -

Halaman 18 dari 33
Uraian Jumlah Anggaran Realisasi Sisa %
1 2 3 4 5
- Masjid Al Muhajirin Desa Buana Murti Kec. Pulau Rimau (PR15) 15.000.000 - 15.000.000 -
- Masjid Al Muhajirin Desa Bandar Sari Kec. Pulau Rimau (PR15) 10.000.000 - 10.000.000 -
- Musholla Al Husna Desa Teluk Betung Rt 01 Kec. Pulau Rimau (PR15) 10.000.000 - 10.000.000 -
- Masjid Annahel Desa Tabuan Sari Kec. Pulau Rimau (PR15) 10.000.000 - 10.000.000 -
- Masjid Miftahul Falah Desa Ringin Harjo Kec. Pulau Rimau (PR15) 10.000.000 - 10.000.000 -
- Masjid Al Barokah Desa Karang Manunggal Kec. Pulau Rimau (PR15) 10.000.000 - 10.000.000 -
- Masjid Hidayatullah Desa Purwodadi Dusun I Kec. Pulau Rimau (PR15) 10.000.000 - 10.000.000 -

Kecamatan Rambutan 390.000.000 260.000.000 130.000.000 66,67


- Pembangunan Masjid Nuruddin Ds. Gelebak Dalam Kec. Rambutan 15.000.000 - 15.000.000 -
- Pembangunan Masjid Nurul Yakin Desa Tanjung Marbu Kec. Rambutan. + (*R19) 30.000.000 - 30.000.000 -
- Rehab. Masjid Al-Hidayah Desa Durian Gadis Kecamatan Rambutan (*R24). 100.000.000 100.000.000 - 100,00
- Rehab. Masjid Al-Muslimin Desa Kebon Sahang Kecamatan Rambutan (*R24). 50.000.000 50.000.000 - 100,00
- Rehab. Masjid Al-Istiqomah Desa Suka Pindah Kecamatan Rambutan (*R24). 25.000.000 25.000.000 - 100,00
- Rehab. Masjid Al-Huda Desa Tanah Lembak Kecamatan Rambutan (*R24). 20.000.000 20.000.000 - 100,00
- Rehab. Masjid Nurul Iman Desa Siju Kecamatan Rambutan (*R24). 20.000.000 20.000.000 - 100,00
- Rehab. Masjid Al-Huda Desa Teluk Bunyian/Menten Kecamatan Rambutan (*R24). 20.000.000 20.000.000 - 100,00
- Pembangunan Masjid Al Hidayah Kampung 2 Desa Kebun Sahang Kec. Rambutan 25.000.000 - 25.000.000 -
- Pembangunan Masjid Quba Desa Baru Kec. Rambutan (PR38) / Baiturrohim Keg Safari Jumat 20.000.000 5.000.000 15.000.000 25,00
- Pembangunan Masjid Al Umar Kampung I Desa Plaju . RambutanKe (PR38) 25.000.000 - 25.000.000 -
- Pembangunan Masjid Taqwa Desa Sungai Pinang Kec. Rambutan 15.000.000 10.000.000 5.000.000 66,67
- Pembangunan Masjid Ar Rahman Desa Rambutan Kec. Rambutan (PR38) 15.000.000 - 15.000.000 -
- Pembangunan Langgar A'imatussholihin Jl. Harapan Dusun II Desa Sungai 10.000.000 10.000.000 - 100,00
Pinang Kec. Rambutan

Kecamatan Rantau Bayur 362.500.000 260.000.000 102.500.000 71,72


- Pembangunan Masjid .............. Dusun III Ds. Sejayung Kec. Rantau Bayur. 5.000.000 - 5.000.000 -
- Pembangunan Masjid Rohmaniah II Dusun I Ds. Lebung Kec. Rantau Bayur. 7.500.000 - 7.500.000 -
- Rehab. Masjid Dusun 3, Desa Tanjung Parit Kecamatan Rantau Bayur (*R23). 20.000.000 - 20.000.000 -
- Rehab. Masjid At-Taqwa Kedombe Dusun III Desa Paldas Kec. Rantau Bayur (*R26). 45.000.000 45.000.000 - 100,00
- Pembangunan Masjid Al-Ikhlas Ds. Sungai Naik Kecamatan Rantau Bayur (*R26). 30.000.000 30.000.000 - 100,00

Halaman 19 dari 33
Uraian Jumlah Anggaran Realisasi Sisa %
1 2 3 4 5
- Pembangunan Masjid Jami'atul Khair Desa Rantau Bayur Kec. Rantau Bayur (*R27). 5.000.000 5.000.000 - 100,00
- Masjid Jami'atul khair Ds. Rantau Bayur Kec. Rantau Bayur 10.000.000 10.000.000 - 100,00
- Masjid Muttaqin Ds. Penandingan Kec. Rantau Bayur 10.000.000 10.000.000 - 100,00
- Masjid At-Tabiin Ds. Muara Abab Kec. Rantau Bayur 10.000.000 10.000.000 - 100,00
- Masjid Quba Ds. Paldas Dusun I Kec. Rantau Bayur 10.000.000 10.000.000 - 100,00
- Pembangunan Masjid Rohmaniah II Dusun I Ds. Lebung Kec. Rantau Bayur (*R27) 25.000.000 25.000.000 - 100,00
- Pembangunan Masjid Al-Muttaqin Ds. Srijaya/Pematang Mesra Kec. Rantau Bayur 25.000.000 25.000.000 - 100,00
- Pembangunan Masjid Nurussani Ds. Lubuk Rengas Ds. 3 Kec. Rantau Bayur 5.000.000 5.000.000 - 100,00
- Pembangunan Masjid Nurul Iman Desa Sejagung Ds. I Kec. Rantau Bayur 10.000.000 10.000.000 - 100,00
- Pembangunan Masjid Al-Ikhlas Ds. Reban Piles/Sungai Pinang Kec. R. Bayur 10.000.000 10.000.000 - 100,00
- Pembangunan Masjid Al-Yakin Desa Perasinan/Sungai Pinang Kec. Rantau Bayur 10.000.000 10.000.000 - 100,00
- Pembangunan Masjid Al-Jihad Ds Seberang Pengumbuk/Tebing Abang Kec. R. Bayur 10.000.000 10.000.000 - 100,00
- Pembangunan Masjid Jamiatul Insan Kemiri Ds. Kemiri Rantau Harapan Kec. R. Bayur 5.000.000 5.000.000 - 100,00
- Pembangunan Masjid Jami"atul Khair Desa Rantau Bayur Kec. Rantau Bayur 5.000.000 - 5.000.000 -
- Pembangunan Masjid Nurul Huda Desa Tanjung Menang Musi Kec. Rantau Bayur 10.000.000 - 10.000.000 -
- Pembangunan Masjid Bhakti Desa Talang Kemang Kec. Rantau 10.000.000 - 10.000.000 -
- Masjid Al Istiqomah Dusun 4 Desa Semuntul Kec. Rantau Bayur (PR12) 15.000.000 - 15.000.000 -
- Masjid Muhajirin Dusun 2 Desa Sukarela Kec. Rantau Bayur (PR12) 15.000.000 - 15.000.000 -
- Masjid Rohmaniah Kampung I Desa Lebung Laut Kec. Rantau bayur (PR20) 15.000.000 - 15.000.000 -
- Masjid Al Ikhlas Ds. Lubuk Rengas Kec. Rantau Bayur (PR9)/ Ar-Rahman Ds. Tj.Agung (srt Pernytn) 10.000.000 10.000.000 - 100,00
- Masjid Nurul Iman Desa Lubuk Rengas Kec. Rantau Bayur (PR9) 10.000.000 10.000.000 - 100,00
- Masjid Darussalam Gemampo Desa Rantau Harapan Kec. Rantau Bayur (PR9) 10.000.000 10.000.000 - 100,00
- Musholla Nurul Hidayah Desa Lebung Kec. Rantau bayur (PR9) 10.000.000 10.000.000 - 100,00

Kecamatan Sembawa 300.000.000 225.000.000 75.000.000 75,00


- Pembangunan Masjid ................. Ds. Muara Damai Kecamatan Sembawa. 5.000.000 - 5.000.000 -
- Rehab. Mushollah Babussalam Ds. Rejo Dadi Kec. Sembawa. 10.000.000 - 10.000.000 -
- Pembangunan Mushollah Babussalam Ds. Pulau Harapan Kecamatan Sembawa. 5.000.000 - 5.000.000 -
- Rehab. Masjid Babussalam Dusun II Ds. Pulau Harapan Kecamatan Sembawa (*R26). 30.000.000 30.000.000 - 100,00
- Rehab. Masjid Al-Muhajirin Senala Dusun III Desa Limau Kec. Sembawa (*R26). 30.000.000 30.000.000 - 100,00
- Rehab Masjid Ar Rahman Dusun III Desa Pulau Harapan Kec. Sembawa (PR26) 30.000.000 30.000.000 - 100,00
- Pembangunan Masjid Nurul Iman Dusun I Ds. Mainan Kecamatan Sembawa (*R26). 30.000.000 30.000.000 - 100,00

Halaman 20 dari 33
Uraian Jumlah Anggaran Realisasi Sisa %
1 2 3 4 5
- Rehab Musholla Al Ikhlas Dusun IV Sribangun Desa Mainan Kec. Sembawa (*R26) 30.000.000 30.000.000 - 100,00
- Pembangunan Musholla Nurul Iman Desa Rejodadi Kec. Sembawa 20.000.000 20.000.000 - 100,00
- Pembangunan Masjid Al Ikhlas Desa Muara Damai Dusun II Kec. Sembawa 10.000.000 - 10.000.000 -
- Pembangunan Musholla Nurul Amin Dsn I Lalang Sembawa Kec. Sembawa (PR17) 7.500.000 - 7.500.000 -
- Masjid Limbang Mulya Kec. Sembawa (PR17) 10.000.000 - 10.000.000 -
- Masjid Al Muhajirin Desa Limbang Mulya Kec. Sembawa (PR16) 20.000.000 - 20.000.000 -
- Musholla Nurul Iman Desa Rejodadi Kec. Sembawa (PR 38) 15.000.000 15.000.000 - 100,00
- Musholla Al Hidayah Musi Landas Desa Mainan Kec. Sembawa (PR25) 5.000.000 5.000.000 - 100,00
- Musholla Amali Rt 009 Ds. 2 Pulau Harapan Kec. Sembawa (PR 25) 5.000.000 5.000.000 - 100,00
- Musholla Shofa Marwa Ds. 2 Rt 08 Sri Mulia Desa Pulau Kec. Sembawa (PR25) 5.000.000 5.000.000 - 100,00
- Musholla Ds. Rejang Landas Desa Mainan Kec. Sembawa (PR25) / Nurul Iman 10.000.000 10.000.000 - 100,00
- Musholla Bahrul Amal Jl. Punjung Jaya Rt 05 Ds. 3 Desa Pulau Harapan Kec. 5.000.000 5.000.000 - 100,00
Sembawa (PR25)
- Masjid Al Hijrah Perum Sembawa Azhar Permai Kec. Sembawa (PR9) 10.000.000 10.000.000 - 100,00
- Masjid Al Ikhlas Dsn. Sribangun Desa Mainan Kec. Sembawa 7.500.000 - 7.500.000 -

Kecamatan Suak Tapeh 87.500.000 52.500.000 35.000.000 60,00


- Pembangunan Mushollah SDN 3 Ds.Durian Daun Kec.Suak Tapeh 10.000.000 - 10.000.000 -
- Pembangunan Pagar Masjid Bhakti Ds. Biyuku Kecamatan Suak Tapeh. + (*R20) 17.500.000 17.500.000 - 100,00
- Pembangunan Masjid Al-Havizh Dusun II Desa Talang Ipuh Kec. Suak Tapeh. 10.000.000 10.000.000 - 100,00
- Pembangunan Masjid Nurul Falah Desa Suka Raja Kecamatan Suak Tapeh (*R20). 15.000.000 15.000.000 - 100,00
- Pemb. Masjid Al-Muhajirin Rt. 02 Desa Air Senggirik Kec. Suak Tapeh (*R20). 5.000.000 5.000.000 - 100,00
- Pemb. Masjid Nurul Iman Ds. Penjahitan Desa Lbk Lancang Kec Suak Tapeh (*R20). 10.000.000 - 10.000.000 -
- Pemb. Masjid Sirotol Jana Ds. Tanjung Menare Desa Lbk Lancang Kec. S. Tapeh (*R20)./ Masjid At-Taqwa
5.000.000
Keg Safari Jumat 5.000.000 - 100,00
- Pembangunan Masjid Nurul Iman Ds. Pandan Desa Lubuk Lancang Kec. S. Tapeh (*R20). 5.000.000 - 5.000.000 -
- Masjid Al Hafids Desa Talang Ipuh Kec. Suak Tapeh (PR20) 10.000.000 - 10.000.000 -

Kecamatan Sumber Marga Telang 230.000.000 30.000.000 200.000.000 13,04


- Pemb. Masjid Nurul Iman Dusun 5 Ds Karang Baru Kec. Sumber Marga Telang (*R29). 25.000.000 25.000.000 - 100,00
- Pembangunan Masjid Nurul Qomar Desa Terusan Muara Kec. Sumber Marga Telang 5.000.000 5.000.000 - 100,00
- Rumah Thafizh Qur'an desa Sritiga Marga Telang 20.000.000 - 20.000.000 -

Halaman 21 dari 33
Uraian Jumlah Anggaran Realisasi Sisa %
1 2 3 4 5
- Masjid Aqi-Musholla Desa Karang Baru Kec. Sumber Marga Telang (PR16) 15.000.000 - 15.000.000 -
- Masjid Munawarotul Muttaqin Terusan Tengah Kec. Sumber Marga Telang (PR 16) 15.000.000 - 15.000.000 -
- Masjid Nurul Hikmah Dusun 4 Desa Sumber Jaya Kec. Sumber Marga Telang (PR16) 15.000.000 - 15.000.000 -
- Masjid Baithul Abdyadh Dusun 4 Desa Sumber Mulyo Kec. Sumber Marga Telang 10.000.000 - 10.000.000 -
- Musholla Insan Mutiara Desa Karang Baru Rt 7 Dusun II Kec. SM Telang (PR14) 10.000.000 - 10.000.000 -
- Masjid Nurul Komar Desa Terusan Muara Kec. Sumber Marga Telang (PR14) 10.000.000 - 10.000.000 -
- Masjid/Musholla Talang Lubuk Kec. Sumber Marga Telang (PR34) 10.000.000 - 10.000.000 -
- Masjid Istiqomah Desa Karang Anyar Kec. Sumber Marga Telang (PR38) 15.000.000 - 15.000.000 -
- Masjid Munawarotul Muttaqin Desa Terusan Kec. Sumber Marga Telang (PR20) 10.000.000 - 10.000.000 -
- Musholla Nurul Huda Desa Terusan Tengah Kec. Sumber Marga Telang 10.000.000 - 10.000.000 -
- Masjid di Desa Muara Telang Marga Kec. Sumber Marga Telang (PR20) 10.000.000 - 10.000.000 -
- Masjid Desa Sritiga Kec. Sumber Marga Telang (PR20) 10.000.000 - 10.000.000 -
- Masjid Desa Sri Menanti Kec. Sumber Marga Telang (PR20) 10.000.000 - 10.000.000 -
- Masjid Aqimushollah Dusun 4 Desa Karang Baru Kec. Sumber Marga Telang (PR20) 15.000.000 - 15.000.000 -
- Mushollah Al Fauzan Desa Karang Baru Rt 5 Kec. Sumber Marga Telang (PR20) 15.000.000 - 15.000.000 -

Kecamatan Talang Kelapa 502.500.000 170.000.000 332.500.000 33,83


- Sarana dan Prasarana Musholla Sabilul Muttaqien Kel.Tanah Mas Kec. Talang Kelapa. 5.000.000 5.000.000 - 100,00
- Pembangunan Masjid Darus Sa'adah Perum Kenten Sejahtera Kec. Talang Kelapa. 10.000.000 10.000.000 - 100,00
- Pembangunan Gedung TPA Sabilul Muttaqien Kel. Tanam Mas Kec. Talang Kelapa. 7.500.000 7.500.000 - 100,00
- Pembangunan Masjid Baitul Hamid Komp. Azhar Kel. Sukajadi Kec. Talang Kelapa. 5.000.000 - 5.000.000 -
- Pembangunan Masjid An-Nur Komp. Azhar Kel. Sukajadi Kec. Talang Kelapa. 5.000.000 - 5.000.000 -
- Pembangunan Masjid Al-Ilyaas Komp. Azhar Kel. Sukajadi Kec. Talang Kelapa. 5.000.000 - 5.000.000 -
- Pembangunan Masjid Amron Rasyid Komp. Azhar Kel. Sukajadi Kec. Talang Kelapa. 5.000.000 - 5.000.000 -
- Pembangunan Masjid Ali Akbar Desa Talang Keramat Kec. Talang Kelapa. 5.000.000 - 5.000.000 -
- Pembangunan Musholla Ainul Yakin Desa Talang Keramat Kec. Talang Kelapa. 5.000.000 - 5.000.000 -
- Pembangunan Masjid Amalia Desa Talang Jering Kel. Kenten Kec. Talang Kelapa. 5.000.000 - 5.000.000 -
- Pembangunan Masjid ......................Kel. Kenten Laut Kec. Talang Kelapa (*R33) 5.000.000 - 5.000.000 -
- Pembangunan Masjid Baitul Rahman Ds Tlng Jering Kel. Kenten Kec. Tlg Kelapa (*R33) 5.000.000 - 5.000.000 -
- Pembangunan Musholla Perumdam Kel. Tanah Mas Kec. Talang Kelapa (*R33) 5.000.000 - 5.000.000 -
- Pembangunan Masjid Griya Kel. Sukajadi Kec. Talang Kelapa (*R33) 5.000.000 - 5.000.000 -
- Pembangunan Musholla A. Fila Kel. Kenten Kec. Talang Kelapa (*R33) 5.000.000 - 5.000.000 -

Halaman 22 dari 33
Uraian Jumlah Anggaran Realisasi Sisa %
1 2 3 4 5
- Pembangunan Masjid Hidayatullah Komp. Al-Azhar Kec. Talang Kelapa (*R33) 5.000.000 - 5.000.000 -
- Pembangunan Masjid Al-Ambiya Kel. Tanah Mas Kec. Talang Kelapa (*R33) 5.000.000 - 5.000.000 -
- Pembangunan Masjid Attahibul Janna Perum Tanah Mas Kec.Talang Kelapa (*R33) Kec. Talang Kelapa.5.000.000 - 5.000.000 -
- Pembangunan Musholla Al-Azhar Perum Tanah Mas Kec. Talang Kelapa (*R33) 5.000.000 - 5.000.000 -
- Pembangunan Masjid Nurul Huda Suka Makmur Kel. Air Batu Kec. Talang Kelapa. 5.000.000 - 5.000.000 -
- Pembangunan Masjid Nurul Iman Suka Makmur Kel. Air Batu Kec. Talang Kelapa (*R33) 5.000.000 - 5.000.000 -
- Pembangunan Musholla At-Taubah Kel. Tanah Mas Kec. Talang Kelapa. 5.000.000 - 5.000.000 -
- Pembangunan Masjid Al-iklas Kel. Talang Keramat Kec. Talang Kelapa (*R33) 5.000.000 - 5.000.000 -
- Pembangunan Musholla Al-Salihin Kec. Talang Kelapa (*R33) 5.000.000 - 5.000.000 -
- Pembangunan Masjid Hikmatullah Desa Talang Buluh Kec. Talang Kelapa. 5.000.000 - 5.000.000 -
- Pembangunan Masjid Al-Ikhlas Perum Jadongan Kel. Tanah Mas Kec. Talang 5.000.000 - 5.000.000 -
- Pembangunan Masjid Baitul Jannah Perum Mega Asri Kel. Sukajadi Kec. Talang 5.000.000 - 5.000.000 -
- Pembangunan Musholla Al-AzharPrumdam Kel. Tanah Mas Kec. Talang Kelapa. 5.000.000 - 5.000.000 -
- Pembangunan Gereja HKBP Huria Sukamaju Kenten Kec. Tlg Kelapa 100.000.000 - 100.000.000 -
- Pembangunan Masjid Al-Hikmah Kel. Sukajadi Kec. Tlg Kelapa 20.000.000 - 20.000.000 -
- Pembangunan Masjid Hidayatullah Komp. Azhar KM. 14 Kel. Tanah Mas Kec. Tlg Kelapa 5.000.000 5.000.000 - 100,00
- Pembangunan Masjid Baitul Jannah Komp. RSS Griya Sukomoro Kel. T. Mas Kec. Tlg Klp 10.000.000 - 10.000.000 -
- Pembangunan Masjid Babusalam Griya Sukajadi Permai Kel. Sukajadi Kec. Tlg Klp 7.500.000 7.500.000 - 100,00
- Pembangunan Masjid Nur Hidayah Jl. Guru Harun Kec. Tlg Klp 7.500.000 7.500.000 - 100,00
- Pembangunan Musholla Al. Mubarok Komp. Griya Karya Sejahtera Kec. Tlg Klp 10.000.000 10.000.000 - 100,00
- Pembangunan Musholla Al. Hikmah Perumahan Griay Pasir Putih Kec. Tlg Klp 10.000.000 - 10.000.000 -
- Pembangunan Musholla Nurul Amal Desa Kenten Laut Kec. Tlg Klp 5.000.000 5.000.000 - 100,00
- Pembangunan Musholla Di lingkungan Kantor Lurah Sukajadi Kec. Tlg Klp 10.000.000 - 10.000.000 -
- Pembangunan Masjid Nurul Iman Jl. Kebon Jeruk Kel. Tlg Keramat Kec. Tlg Klp 10.000.000 10.000.000 - 100,00
- Pembangunan Masjid Baitussalam Komp. Griya Damai Indah Kec. Tlg Klp 10.000.000 10.000.000 - 100,00
- Pembangunan Masjid Al-Muhajirin Jl. Kebon Jeruk Kel. Tlg Keramat Kec. Tlg Klp 10.000.000 10.000.000 - 100,00
- Pembangunan Musholla Al-Ikhlas Jl. Rimba Asam Dsn. III Kenten Laut Kec. Tlg Klp 7.500.000 7.500.000 - 100,00
- Pembangunan Musholla Al-Badar Perum Kenten Azhar Permai Kec. Tlg Klp 10.000.000 10.000.000 - 100,00
- Pembangunan Musholla Nurul Hidayah Pemukiman HKTI Talang Keramat Kec. 10.000.000 10.000.000 - 100,00
- Pembangunan Musholla Aisyatun Amalia Kel. Tlg Keramat Kec. Tlg Kelapa 10.000.000 10.000.000 - 100,00
- Pembangunan Masjid Ash-Shaff Perumahan Puspasari Kel. Kenten Kec. 10.000.000 10.000.000 - 100,00
- Pembangunan Masjid Al-Azhar Komp. Azhar III Kel. Kenten Kec. Talang Kelapa (*R33) 15.000.000 15.000.000 - 100,00
- Pembangunan Masjid Al-Muhajirin Komp. Azhar Permai Lahan III Kel. Kenten Kec. 5.000.000 5.000.000 - 100,00

Halaman 23 dari 33
Uraian Jumlah Anggaran Realisasi Sisa %
1 2 3 4 5
- Pembangunan Musholla Amron Rasyid Kenten Azhar Permai Kec. Talang Kelapa 7.500.000 7.500.000 - 100,00
- Pembangunan Musholla Al-Mardiah Perumahan Griya Arisma Azhar Kenten Laut 7.500.000 - 7.500.000 -
- Pembangunan Langgar Nurul Mukmin Kel. Kenten Kec. Tlg Kelapa 7.500.000 7.500.000 - 100,00
- Masjid Assyfah Jl. Masjid Rt 11 Desa Gasing Kec. Talang Kelapa (PR12) 50.000.000 - 50.000.000 -

Kecamatan Tanjung Lago 232.500.000 115.000.000 117.500.000 49,46


- Pembangunan Masjid Baitussalam Ds. Telang Sari Kecamatan Tanjung Lago. 5.000.000 - 5.000.000 -
- Pembangunan Masjid Al-Amin Desa Suka Tani Kecamatan Tanjung Lago (*R33) 5.000.000 - 5.000.000 -
- Pembangunan Masjid Nurul Huda Desa Suka Damai Kec. Tanjung Lago (*R33) 5.000.000 - 5.000.000 -
- Pembangunan Masjid Darussalam Ds. Telang Sari Kecamatan Tanjung Lago (*R33) 5.000.000 - 5.000.000 -
- Pembangunan Musholla Hidayatullah Ds. Mulia Sari Kecamatan Tanjung Lago (*R33) 5.000.000 - 5.000.000 -
- Pembangunan Masjid Al-Muhajirin Ds. Sebalik Kec. Tanjung Lago (*R33) 5.000.000 - 5.000.000 -
- Pembangunan Masjid H. Inoed Desa Sri Menanti Kec. Tanjung Lago (*R33) 5.000.000 - 5.000.000 -
- Pembangunan Masjid At-Taqwa Desa Purwosari Kec. Tanjung Lago (*R33) 5.000.000 - 5.000.000 -
- Pembangunan Masjid Hayatul Iman Desa Bangun Sari Kec. Tanjung Lago (*R33) 5.000.000 - 5.000.000 -
- Pembangunan Masjid Nurul Islam Desa Sumber Mekar Mukti Kec. Tanjung Lago (*R33) 5.000.000 - 5.000.000 -
- Pembangunan Musholla Nur Hidayah Desa Kuala Puntian Kec. Tanjung Lago (*R33) 5.000.000 - 5.000.000 -
- Pembangunan Masjid Pastabiqul Hairot Desa Muara Sugih Kec. Tanjung Lago (*R33) 5.000.000 - 5.000.000 -
- Pembangunan Masjid Fajrul Islam Desa Tanjung Lago Kec. Tanjung Lago (*R33) 5.000.000 - 5.000.000 -
- Pembangunan Masjid Muftahul Jannah Desa Bunga Karang Kec. Tanjung Lago (*R33) 5.000.000 - 5.000.000 -
- Pembangunan Masjid Nurul Iman Desa Manggar Raya Ds.3 Kec. Tanjung Lago (*R33) 5.000.000 - 5.000.000 -
- Pembangunan Masjid At-Taqwa Desa Telang Sari Kec. Tanjung Lago (*R33) 5.000.000 - 5.000.000 -
- Pembangunan Masjid Nurul Amal Desa Tanjung Lago Kec. Tanjung Lago (*R33) 5.000.000 - 5.000.000 -
- Pembangunan Masjid Al-Barokah Desa Bangun Sari Kec. Tanjung Lago. 15.000.000 15.000.000 - 100,00
- Pembangunan Masjid Miftahul Koryah Desa Bangun Sari Kec. Tanjung Lago. 15.000.000 15.000.000 - 100,00
- Pembangunan Masjid Nurul Iman Desa Bangun Sari Kec. Tanjung Lago. 15.000.000 15.000.000 - 100,00
- Pembangunan Masjid Miftahussudur Desa Bangun Sari Kec. Tanjung Lago. 15.000.000 15.000.000 - 100,00
- Pembangunan Masjid Hayatul Iman Desa Bangun Sari Kec. Tanjung Lago. 15.000.000 15.000.000 - 100,00
- Perehaban Piasan Balai Pewedaan dan Balai Agung Pura Puseh Desa Bangun sari 20.000.000 20.000.000 - 100,00
- Pembangunan Masjid Syuhada Desa Mulia Sari Kec. Tanjung Lago. 10.000.000 10.000.000 - 100,00
- Pembangunan Masjid Fastabiqul Khairot Desa Muara Sugih Kec. Tanjung Lago. 10.000.000 10.000.000 - 100,00
- Pembangunan Masjid Nurul Huda Desa Mulia Sari Kec. Tanjung Lago. 10.000.000 - 10.000.000 -

Halaman 24 dari 33
Uraian Jumlah Anggaran Realisasi Sisa %
1 2 3 4 5
- Pembangunan Musholla Al-Ikhlas Desa Mulya Sari Kec. Tanjung Lago. 7.500.000 - 7.500.000 -
- Pembangunan Musholla Al-Ikhlas Desa Muara Sugih Kec. Tanjung Lago. 7.500.000 - 7.500.000 -
- Pembangunan Musholla Al-Choirun Desa Telang Sari Kec. Tanjung Lago. 7.500.000 - 7.500.000 -

Kecamatan Tungkal Ilir 392.500.000 10.000.000 382.500.000 2,55


- Pembangunan Masjid Baitus Salam Ds. Sido Mulyo Kecamatan Tungkal Ilir + (*R21). 15.000.000 - 15.000.000 -
- Pembangunan Masjid Nur Hidayah Ds. Suka Mulya Kecamatan Tungkal Ilir. 10.000.000 10.000.000 - 100,00
- Pembangunan Mushollah Miftahul Huda Desa Suka Mulya Kecamatan Tungkal Ilir. 5.000.000 - 5.000.000 -
- Rahab. Masjid Baitul Salam Desa Suka Karya Kec. Tungkal Ilir (*R6) + (*R21). 5.000.000 - 5.000.000 -
- Rahab. Masjid Miftahul Huda Desa Suka Karya Kec. Tungkal Ilir (*R6). 10.000.000 - 10.000.000 -
- Rahab. Masjid Nurul Huda Desa Karang Anyar Kec. Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Rahab. Masjid Al-Muttaqin Desa Karang Anyar Kec. Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Rahab. Masjid Baitur Rohman Desa Karang Anyar Kec. Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Rahab. Masjid Al-Hikmah Desa Karang Anyar Kec. Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Rahab. Masjid Baitur Rohman Desa Karang Mulya Kec. Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Rahab. Masjid Baitul Mukaromah Desa Karang Mulya Kec. Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Rahab. Masjid Attaqwa Desa Karang Mulya Kecamatan Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Rahab. Masjid Roudlotul Jannah Desa Sido Mulyo Kec. Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Rahab. Masjid Al-Istikomah Desa Sido Mulyo Kecamatan Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Rahab. Masjid Al-Muhajirin Desa Sido Mulyo Kecamatan Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Rahab. Masjid Nurul Huda Desa Suka Mulya Kecamatan Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Rahab. Masjid Nurul Iman Desa Suka Mulya Kecamatan Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Rahab. Masjid Miftahun Jannah Desa Suka Mulya Kec. Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Rahab. Masjid Al-Huda Desa Suka Raja Kecamatan Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Rahab. Masjid Al-Muttaqin Desa Suka Raja Kecamatan Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Rahab. Masjid Fathur Rohman Desa Suka Raja Kec. Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Rahab. Masjid Al-Taqwa Desa Suka Raja Kecamatan Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Rahab. Masjid Al-Mutadiin Desa Suka Raja Kecamatan Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Rahab. Masjid Al-Muhajirin Desa Suka Jaya Kecamatan Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Rahab. Masjid Al-Hijra Desa Panca Mulya Kecamatan Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Rahab. Masjid Al-Muttaqin Desa Bumi Serdang Kec. Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Rahab. Masjid Al-Hidayah Desa Bumi Serdang Kec. Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -

Halaman 25 dari 33
Uraian Jumlah Anggaran Realisasi Sisa %
1 2 3 4 5
- Rahab. Masjid Al-Mukmin Desa Bumi Serdang Kec. Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Rahab. Masjid Al-Fatah Desa Teluk Tenggulang Kec. Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Rahab. Masjid Al-Ikhlas Desa Teluk Tenggulang Kec. Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Rahab. Masjid Nurul Huda Desa Teluk Tenggulang Kec. Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Rahab. Masjid Nurul Iman Desa Teluk Tenggulang Kec. Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Rahab. Masjid Darus Salam Desa Keluang Kecamatan Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Rahab. Masjid Babus Salam Desa Keluang Kecamatan Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Rahab. Masjid Nurul Iman 1 Desa Keluang Kecamatan Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Rahab. Masjid Nurul Iman II Desa Keluang Kecamatan Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Rahab. Masjid As-Sholihin Desa Keluang Kecamatan Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Rahab. Masjid Al-Muttaqin I Desa Keluang Kecamatan Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Rahab. Masjid Al-Muttaqin II Desa Keluang Kecamatan Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Rahab. Masjid Al-Muhajirin Desa Keluang Kecamatan Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Rahab. Masjid Al-Hidayah Desa Keluang Kecamatan Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Rahab. Masjid Al-Taqwa Desa Keluang Kec. Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Rahab. Masjid Al-Hijran Desa Keluang Kec. Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Rahab. Masjid Miftahul Jannah Desa Keluang Kecamatan Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Rahab. Masjid Nurul Hidayah Desa Bentayan Kecamatan Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Rahab. Masjid Nurul Iman Desa Bentayan Kecamatan Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Rahab. Masjid At-Taqwa I Desa Bentayan Kecamatan Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Rahab. Masjid At-Taqwa II Desa Bentayan Kecamatan Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Rahab. Masjid Amal Bakti Desa Bentayan Kecamatan Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Rahab. Masjid Darus Salam Desa Bentayan Kecamatan Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Rahab. Masjid Al-Muttaqin Desa Bentayan Kecamatan Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Rahab. Masjid Al-Barokah Desa Bentayan Kecamatan Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Rahab. Masjid Nurul Huda Desa marga Rahayu Kec. Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Rahab. Masjid Al-Muhajirin Desa Marga Rahayu Kec. Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Rahab. Masjid At-Taqwa Desa Marga Rahayu Kecamatan Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Rahab. Masjid Baitus Solehah Desa Marga Rahayu Kec. Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Rahab. Masjid Al-Hidayah Desa Marga Rahayu Kec.Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Pembangunan Pure Bumi Asih Desa Teluk Tenggulang Kec. Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Pembangunan Pure Bumi Asih Desa bumi Serdang Kecamatan Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Pembangunan Pure Waha Linggga Amerta Ds Karang Asem Kec. Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -

Halaman 26 dari 33
Uraian Jumlah Anggaran Realisasi Sisa %
1 2 3 4 5
- Pembangunan Gereja GBI Desa Suka Jaya Kecamatan Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Pembangunan Gereja GKKI Desa Suka Raja Kecamatan Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Pembangunan Gereja Panti Kosta Desa Marga Rahayu Kec. Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Pembangunan Gereja Tri Tunggal Desa Bentayan Kecamatan Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Rehab. Masjid Al-Hidayah II Desa Keluang KecamatanTungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Pembangunan Masjid Al-Hijrah Desa Keluang Kec. Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Pembangunan Masjid Al-Hidayah Desa Bumi Serdang Kec. Tungkal Ilir (*R21). 15.000.000 - 15.000.000 -
- Pembangunan Musholla Miftahul Huda Desa Suka Mulya Kec. Tungkal Ilir (*R21). 7.500.000 - 7.500.000 -
- Masjid Baitul Muttaqin Desa Panca Mulya Kec. Tungkal Ilir (*R21). 10.000.000 - 10.000.000 -
- Masjid Baitul Mukarromah Desa Karang mulya Rt 13 Kec. Tungkal Ilir (PR15). 10.000.000 - 10.000.000 -

Pondok Pesantren : 1.410.000.000 865.000.000 545.000.000 61,35


- PP Darul Ulum Ds. Saleh Jaya Kec. Air Saleh (*R34). 75.000.000 75.000.000 - 100,00
- PP Salafiah Asysyafiiyah Ds. Margosari Ds. Bintaran Kecamatan Air Saleh. 25.000.000 25.000.000 - 100,00
- PP Hidayatus Salam Ds Damarwulan Kec. Air saleh. 25.000.000 25.000.000 - 100,00
- PP Al-Akbar Ds. Sidomulyo Kecamatan Banyuasin I. 25.000.000 25.000.000 - 100,00
- PP Nurul Hikmah Ds. I Cinta Manis Baru Kec. Air Kumbang. 25.000.000 25.000.000 - 100,00
- PP Babul Ulum Ds. Mariana Kec. Banyuasin I. 25.000.000 25.000.000 - 100,00
- PP Darul Ulum Kampung Permata III Kec. Banyuasin I. 25.000.000 25.000.000 - 100,00
- PP Miftahul Sa'adah ds. II Ds. Nusa Makmur Kec. Banyuasin I. 25.000.000 - 25.000.000 -
- PP Barokatul Kodiri Ds. Cinta Manis Baru Kec. Banyuasin I. 75.000.000 75.000.000 - 100,00
- PP Nurul Iman Ds. Ujung Tanjung Kec. Banyuasin III. 25.000.000 25.000.000 - 100,00
- PP Sabilul Hasanah Ds. Purwosari Kec. Banyuasin III. 25.000.000 - 25.000.000 -
- PP Qodratullah Ds. Langkan Kec. Banyuasin III (*R23). 25.000.000 25.000.000 - 100,00
- PP Arriyad Haddal Kel. Kayuara Kuning Kec. Banyuasin III. 25.000.000 25.000.000 - 100,00
- PP Al-Hikmah Jln. Palembang - Jambi Km. 69 Kec. Betung. 25.000.000 25.000.000 - 100,00
- PP Darudda'qah Wal Irsyad Pelita Ds. Tirta Kencana Kec. Makarti Jaya (*R17). 125.000.000 125.000.000 - 100,00
- PP Miftahul Ulum Ds. Makarti Jaya Kec. Makarti Jaya. 25.000.000 25.000.000 - 100,00
- PP Al-Abror Ds. Tirta Harja Kec. Muara Sugihan. 25.000.000 25.000.000 - 100,00
- PP Al-Khoiriyyah Ds. Timbul Jaya Kec. Muara Sugihan. 25.000.000 - 25.000.000 -
- PP Darul Ulumissyariyyah Ds. Telang Karya Kec. Muara Telang. 25.000.000 25.000.000 - 100,00
- PP Riyadul Tholibin Jalur 8 Telang Karta Kec. Muara Telang. 25.000.000 25.000.000 - 100,00

Halaman 27 dari 33
Uraian Jumlah Anggaran Realisasi Sisa %
1 2 3 4 5
- PP Darul Ulum Ds. Sumber Mulyo Kec. Pulau Rimau. 25.000.000 25.000.000 - 100,00
- PP Darul Muthaqin Ds. Dana Mulya Kec. Pulau Rimau. 25.000.000 25.000.000 - 100,00
- PP Hidayatullah Ds. Tanjung Marbu Kec. Rambutan. 25.000.000 25.000.000 - 100,00
- PP Inayatullah Jln. Tanjung Api-api Gasing Kec. Talang Kelapa. 45.000.000 45.000.000 - 100,00
- PP Hidayatullah Jln. Simpang PU No. 230 Kenten Laut Kec. Talang Kelapa. 25.000.000 25.000.000 - 100,00
- PP Nurul Muhajirin Tanjung Api-api Ds. Sukatani Kecamatan Tanjung Lago.Lago. 25.000.000 25.000.000 - 100,00
- PP Bachlul Ulum Tanjunga Api-api Ds. Muliasari Kecamatan Tanjung Lago. 25.000.000 25.000.000 - 100,00
- PP Hidayatul Muhtadin Ds. Sido Mulyo Kec. Tungkal Ilir. + (*R21). 30.000.000 25.000.000 5.000.000 83,33
- PP Nurul Wathan Ds. Muara Sungsang Kec. Banyuasin II. 20.000.000 20.000.000 - 100,00
- Yayasan Pondok Pesantren Al Muhibbin jalan Perumnas Anugrah Kel. Rimba Asam 80.000.000 - 80.000.000 -
- Pondok Pesantren Miftahul Jannah Desa Karang Sari Primer 10 Kec. BA II (PR16) 20.000.000 - 20.000.000 -
- Pondok Pesantren Bahrul Ulum Kec. Tanjung Lago (PR30) 360.000.000 - 360.000.000 -
- Pondok Pesantren Desa Margo Mulyo Kec. Muara Sugihan (PR33) 5.000.000 - 5.000.000 -

Kegiatan Safari Ramadhan dan Tarawih Keliling. 190.000.000 190.000.000 - 100,00


- Masjid di Kecamatan Air Kumbang. 10.000.000 10.000.000 - 100,00
- Masjid di Kecamatan Air Saleh. 10.000.000 10.000.000 - 100,00
- Masjid di Kecamatan Banyuasin I. 10.000.000 10.000.000 - 100,00
- Masjid di Kecamatan Banyuasin II. 10.000.000 10.000.000 - 100,00
- Masjid di Kecamatan Banyuasin III. 10.000.000 10.000.000 - 100,00
- Masjid di Kecamatan Betung. 10.000.000 10.000.000 - 100,00
- Masjid di Kecamatan Makarti Jaya. 10.000.000 10.000.000 - 100,00
- Masjid diKecamatan Muara Padang. 10.000.000 10.000.000 - 100,00
- Masjid di Kecamatan Muara Sugihan. 10.000.000 10.000.000 - 100,00
- Masjid di Kecamatan Muara Telang. 10.000.000 10.000.000 - 100,00
- Masjid di Kecamatan Pulau Rimau. 10.000.000 10.000.000 - 100,00
- Masjid di Kecamatan Rambutan. 10.000.000 10.000.000 - 100,00
- Masjid di Kecamatan Rantau Bayur. 10.000.000 10.000.000 - 100,00
- Masjid di Kecamatan Sembawa. 10.000.000 10.000.000 - 100,00
- Masjid di Kecamatan Suak Tapeh. 10.000.000 10.000.000 - 100,00
- Masjid di Kecamatan Sumber Marga Telang 10.000.000 10.000.000 - 100,00
- Masjid di Kecamatan Talang Kelapa. 10.000.000 10.000.000 - 100,00

Halaman 28 dari 33
Uraian Jumlah Anggaran Realisasi Sisa %
1 2 3 4 5
- Masjid di Kecamatan Tanjung Lago. 10.000.000 10.000.000 - 100,00
- Masjid di Kecamatan Tungkal Ilir. 10.000.000 10.000.000 - 100,00

Kegiatan Safari Jum'at 95.000.000 95.000.000 - 100,00


- Masjid di Kecamatan Air Kumbang (Masjid Al-Hidayah) 5.000.000 5.000.000 - 100,00
- Masjid di Kecamatan Air Saleh. (Masjid Nurul Huda) 5.000.000 5.000.000 - 100,00
- Masjid Darussalam Kel. Mariana Ilir Kecamatan Banyuasin I. 5.000.000 5.000.000 - 100,00
- Masjid Jamiatul Rahma Ds. Sungsang I Kecamatan Banyuasin II. 5.000.000 5.000.000 - 100,00
- Masjid Istiqomah Ds. Sribandung Kecamatan Banyuasin III. 5.000.000 5.000.000 - 100,00
- Masjid di Kec. Betung (Maulid Nabi di Ponpes Ar-rahma Kec. Betung)/Al-Muhajirin 5.000.000 5.000.000 - 100,00
- Masjid Nurul Hijroh Kel. M. Jaya di Kecamatan Makarti Jaya. 5.000.000 5.000.000 - 100,00
- Masjid di Kecamatan Muara Padang. (Masjid Sabilunajjah) 5.000.000 5.000.000 - 100,00
- Masjid di Kecamatan Muara Sugihan (Masjid Baitul Muttaqin) 5.000.000 5.000.000 - 100,00
- Masjid Jami' Fathul Jannah Ds. Telang Indah di Kecamatan Muara Telang. 5.000.000 5.000.000 - 100,00
- Masjid Al-Hilal Desa Penuguan Kecamatan Pulau Rimau. 5.000.000 5.000.000 - 100,00
- Masjid Nurul Yakin Desa Tanjung Merbu Kecamatan Rambutan. /Baiturrohim 5.000.000 5.000.000 - 100,00
- Masjid Nurul Huda Ds. Tj. Menang di Kecamatan Rantau Bayur. 5.000.000 5.000.000 - 100,00
- Masjid Al-Jihad Desa Muara Damai Kecamatan Sembawa. 5.000.000 5.000.000 - 100,00
- Masjid di Kec. Suak Tapeh (Majelis Taklim Al Mutaqin Ds. Durian Daun)/At-taqwa 5.000.000 5.000.000 - 100,00
- Masjid di Kecamatan Sumber Marga Telang (Masjid Sumber Jaya) 5.000.000 5.000.000 - 100,00
- Masjid Hidayatullah Kel. Tanah Mas Kecamatan Talang Kelapa. 5.000.000 5.000.000 - 100,00
- Masjid di Kecamatan Tanjung Lago. (Masjid Nurul Anwar) 5.000.000 5.000.000 - 100,00
- Masjid di Kecamatan Tungkal Ilir. (Masjid Al-Ikhlas) 5.000.000 5.000.000 - 100,00

Bidang Keagamaan lainnya : 609.600.000 407.100.000 202.500.000 66,78


- Majelis Taklim Pengajian Akbar Desa Biyuku Kec. Suak Tapeh. 5.000.000 5.000.000 - 100,00
- Majelis Tak'lim Ibu-ibu Kecamatan Betung. 2.500.000 - 2.500.000 -
- Majelis Tak'lim Miftahul Janah Desa Wonosari Kecamatan Pulau Rimau (*R6) 5.000.000 5.000.000 - 100,00
- Majelis Tak'lim Jamiatun Nisa Desa Wonosari Kecamatan Pulau Rimau (*R6) 5.000.000 5.000.000 - 100,00
- Majelis Tak'lim Janatul Ma'wa Desa Wonosari Kecamatan Pulau Rimau (*R6) 5.000.000 5.000.000 - 100,00
- Majelis Tak'lim Sabilul Mutakim Desa Majatra Kecamatan Pulau Rimau (*R6) 5.000.000 5.000.000 - 100,00

Halaman 29 dari 33
Uraian Jumlah Anggaran Realisasi Sisa %
1 2 3 4 5
- Majelis Tak'lim Hidayatul Mutakin Desa Majatra Kecamatan Pulau Rimau (*R6) 5.000.000 5.000.000 - 100,00
- Majelis Tak'lim Al-Hidayah Desa Sumber Rejo Kecamatan Pulau Rimau (*R6) 5.000.000 - 5.000.000 -
- Majelis Tak'lim Jami'ah Istiqomah Desa Suka Karya Kecamatan Tungkal Ilir (*R6) 5.000.000 5.000.000 - 100,00
- Majelis Tak'lim Al-Husna Desa Teluk Betung Kecamatan Pulau Rimau (*R6) 5.000.000 5.000.000 - 100,00
- Majelis Tak'lim Mijatul Jannah Desa Singo Makmur Kec. Pulau Rimau (*R6) 5.000.000 5.000.000 - 100,00
- Majelis Tak'lim Al-Hikmah Desa Bumi Rejo Kec. Pulau Rimau (*R6) 5.000.000 5.000.000 - 100,00
- Majelis Tak'lim ...................................... Desa Bumi Rejo Kec. Pulau Rimau (*R6) 5.000.000 - 5.000.000 -
- Majelis Tak'lim ...................................... Desa Kelapa Dua Kec. Pulau Rimau (*R6) 5.000.000 - 5.000.000 -
- Bantuan Speed Boat untuk P3N Desa Srijaya Kecamatan Banyuasin III (*R31). 50.000.000 - 50.000.000 -
- Pembinaan Majelis Taklim Al-Hidayah Kec. Sembawa (*R35). 40.000.000 40.000.000 - 100,00
- Bantuan Speed Boat untuk P3N Desa Teluk Tenggirik Kecamatan Banyuasin I (*R30). 50.000.000 - 50.000.000 -

Dewan Pengurus Daerah Forum Pondok Pesantren (DPD Forpes) Kab. BA /POSPEDA 241.350.000 241.350.000 - 100,00
- Panpel PHBI dan Perlombaan Al-Barzanji Desa Plajau Kec. Banyuasin III. 10.000.000 - 10.000.000 -
- Majlis Manaqib Syeh Abdul Qodir Jaelani R. A Desa Sidomulyo Air Kumbang. 15.000.000 - 15.000.000 -
- Bantuan Alat Rehab dan Busana Muslim Pengajian Akbar Desa Ujung Tanjung Kec. BA III. 10.750.000 10.750.000 - 100,00
- TPA Al-Hidayah Desa Pendowoharjo Kec. Makarti Jaya 5.000.000 - 5.000.000 -
- Pesekutuan Pemuda/i Gereja Kristen Al-Kitab Indonesia (GKAI) Desa Daya Utama 5.000.000 5.000.000 - 100,00
- Pengajian Akbar se-Kecamatan Talang kelapa di Lapangan Sepakbola Sukamoro 10.000.000 - 10.000.000 -
- Biaya Percetakan Buku Fiqhul Islam Jilid II dari KH. Balian 50.000.000 50.000.000 - 100,00
- Pengurus Amal Kematian/ PAK Jl. Guru Harun Kel. Tanah Mas Kec. Talang Kelapa 5.000.000 - 5.000.000 -
- Badan Kontak Majlis Taklim Jl. Jalur 8 Telang Jaya Kec. Muara Telang 5.000.000 - 5.000.000 -
- Bantan Dana Musik Gambus Al-Hikmah KM. 69 Kec. Betung 5.000.000 - 5.000.000 -
- Pembuatan tenda untuk kematian Rt 14 dan 15 Dusun Jatimulyo Desa Bukit Kec. Bukit 5.000.000 - 5.000.000 -
- TPA Musholla Nurul Hidayah Desa Pendowo Harjo Kec. Makarti jaya 5.000.000 - 5.000.000 -
- TPA Dusun Bantul Sari Desa Sumber Jaya Kec. Sumber Marga Telang 5.000.000 - 5.000.000 -
- TPA Masjid Al-Anshor Anwar Syarif Perumahan Azhar Permai Kel. Kenten Kec. Talang Kelapa 10.000.000 - 10.000.000 -
- Kelompok Pengajian Majelis Taklim Ibu2 Ds Mainan Kec. Sembawa (PR25)/Nurul Islam 5.000.000 5.000.000 - 100,00
- Kelompok Pengajian Majelis Taklim Ibu-ibu Pulau harapan Kec. Sembawa (PR25) 5.000.000 - 5.000.000 -
- Badan Komunikasi Majelis Taklim BKMT Desa Sungai Rebo Kec. BA I 5.000.000 5.000.000 - 100,00

Halaman 30 dari 33
Uraian Jumlah Anggaran Realisasi Sisa %
1 2 3 4 5
Pembinaan Bidang Keagamaan 105.000.000 80.000.000 25.000.000 76,19
- Bant Panpel Maulid Nabi M SAW Masjid Jami' Nurul Huda DS Tirtosari Kec. BA I. 10.000.000 10.000.000 - 100,00
- Bant Panpel Maulid Nabi M SWA Ponpes Nurul Wathan Desa Muara Sungsang Kec. BA II. 7.500.000 7.500.000 - 100,00
- Bant Panpel Maulid Nabi M SWA Masjid Jami'atul Rahma Ds Sungsang I Kec. BA II. 15.000.000 15.000.000 - 100,00
- Hibah Majelis Taklim Ibu-ibu Kel. Rimba Asam Kec. Betung 40.000.000 40.000.000 - 100,00
- Pengajian Akbar Majelis Ta'lim Ibu-ibu se-Kecamatan Betung. 7.500.000 7.500.000 - 100,00
- Pengajian Akbar Majelis Taqlim Ibu-ibu Al-Muttaqin Ds. Durian Daun Kec. Suak tapeh 5.000.000 - 5.000.000 -
- Bantuan Panpel Maulid Nabi Muhammad SAW Ponpes Al-Hikmah Kel. Betung Kec. Betung 5.000.000 - 5.000.000 -
- Kelompok Amal Kematian Ikhlas Beramal Dusun IV Desa Lebung Kec. Rantau Bayur (PR17) 15.000.000 - 15.000.000 -

Hibah Kepada Kepada Kelompok Masyarakat dengan Kegiatan Bidang Kesenian 1.088.550.000 248.600.000 839.950.000 22,84
Hibah Bidang Kesenian. 1.088.550.000 248.600.000 839.950.000 22,84
- Panpel Gebyar Festival Band Kab. Banyuasin. 5.000.000 - 5.000.000 -
- Bantuan dana kegiatan Pagelaran Kesenian Kuda Lumping Kec. Tl Kelapa & Sembawa. 35.000.000 35.000.000 - 100,00
- Group Kesenian Kuda Lumping Setia Budaya Desa Wonosari Kec. Kec. Pulau Rimau (*R6). 10.000.000 10.000.000 - 100,00
- Group Kesenian Kuda Lumping Umi Serdang Kecamatan Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Group Kesenian Jaranan Desa Teluk Tenggulang Kecamatan Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Group Kesenian Jaran Kepang Desa Sido Mulyo Kecamatan Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Group Kesenian Hadros Assaroya Desa Sido Mulyo Kecamatan Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Group Kesenian Campur Sari Al-Quroba Desa Suka Raja Kec.Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Paguyuban Seni Reog se Kecamatan Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Paguyuban Seni Sari Laras Desa Suka Mulya Kecamatan Tungkal Ilir (*R21). 5.000.000 - 5.000.000 -
- Group Kesenian Kuda Lumping "Mulyo Tenggoro" Musi Landas Ds II Ds Mainan Kec. Sembawa (*R26).
20.000.000 20.000.000 - 100,00
- Group Kesenian Kuda Lumping Taruno Sido Rukun Ds. Srimulyo Kec. Air Saleh (*R34). 15.000.000 - 15.000.000 -
- Group Kesenian Kuda Lumping Tri Rahayu Ds. Srimulyo Kec. Air Saleh (*R34). 5.000.000 - 5.000.000 -
- Group Kesenian Kuda Lumping Turonggo Ds. Salek Mukti Kec. Air Saleh (*R34). 10.000.000 - 10.000.000 -
- Group Kesenian Kuda Lumping Cahaya Muda Ds. Damarwulan Kec. Air Saleh (*R34). 10.000.000 - 10.000.000 -
- Kelompok Kesenian Kuda Lumping Sido Utomo Ds Sumber Mulya Kec. Air Saleh (*R34). 15.000.000 15.000.000 - 100,00
- Kelompok Kesenian Kuda Lumping Eko Budoyo Ds. Sumber Mulya Kec. M. Telang (*R39). 15.000.000 15.000.000 - 100,00
- Kelompok Kesenian Kuda Lumping Ponco Budoyo Desa Panca Mukti Kec. M.Telang (*R39). 15.000.000 15.000.000 - 100,00
- Kelompok Kesenian Kuda Lumping Tunggal Wuluh Ds Panca Mukti Kec. M.Telang (*R39). 15.000.000 15.000.000 - 100,00
- Kelompok Kesenian Kuda Lumping Turonggo Cipto Desa Panca Mukti Kec. M. Telang (*R39). 15.000.000 15.000.000 - 100,00

Halaman 31 dari 33
Uraian Jumlah Anggaran Realisasi Sisa %
1 2 3 4 5
- Kelompok Kesenian Kuda Lumping Wahyu Budoyo Ds Sumber Hidup Kec. M. Telang (*R39). 15.000.000 15.000.000 - 100,00
- Kelompok Kesenian Kuda Lumping Turonggo Siswo Budoyo Ds. Sumber Hidup Kec. M. Telang (*R39).
15.000.000 15.000.000 - 100,00
- Kelompok Kesenian Kuda Lumping Turonggo Mudo Ds Telang Makmur Kec. M. Telang (*R39). 15.000.000 15.000.000 - 100,00
- Kelompok Kesenian Kuda Lumping Turonggo Budoyo Ds Mukti Jaya Kec. M. Telang (*R39). 15.000.000 15.000.000 - 100,00
- Group Kesenian Tarling Desa Sumber Mukti Kec. Pulau Rimau (*R44). 5.000.000 - 5.000.000 -
- Group Kesenian Reok Desa Sumber Mukti Kecamatan Pulau Rimau (*R44). 10.000.000 10.000.000 - 100,00
- Group Kesenian Kuda Lumping Desa Sumber Mukti Kecamatan Pulau Rimau (*R44). 5.000.000 - 5.000.000 -
- Jaranan Campur Sari "Kencono Mukti" Desa KP Permata Kec. Air Kumbang. 8.100.000 - 8.100.000 -
- Group Qasidah Al-Hikmah Pangkalan Balai Kec. BA III. 3.600.000 3.600.000 - 100,00
- Sanggar Nerds dalam Rangka Kegiatan Pekan Kreasi Karya Sumsel Gemilang 3.150.000 - 3.150.000 -
- Kuda Lumping "Campur Sari" Desa Sumber Jaya Kec. Sumber Marga Telang 15.000.000 - 15.000.000 -
- Group Majelis Taklim Al-Ikhwan Rt 04 Mariana ilir Kec. BA I 3.700.000 - 3.700.000 -
- Group Rebana (Ledy) (Grup Rebana Darma Karya) 15.000.000 15.000.000 - 100,00
- Forum Paguyuban Kesenian (Kelompok Kesenian) Kec. Tanjung Lago (PR7) 50.000.000 - 50.000.000 -
- Kelompok Kesenian Tunas Muda Desa Lubuk Karet Kec. Betung (PR19) 100.000.000 - 100.000.000 -
- Group Band D'Orion's BA (PR23) 40.000.000 - 40.000.000 -
- Ikatan Pemuda Karya (Alat Kesenian) (PR42) 175.000.000 - 175.000.000 -
- Kesenian Kuda Lumping Turonggo Mudo Desa Telang Jaya Kec. Muara Telang (PR16) 10.000.000 - 10.000.000 -
- Kesenian Bali Desa Mukti Jaya Jalur 10 Kec. Muara Telang (PR16) 10.000.000 - 10.000.000 -
- Kesenian Kuda Lumping Wahyu Budoyo Desa Telang Rejo Kec. Muara Telang (PR16) 10.000.000 - 10.000.000 -
- Kesenian Kuda Lumping Krido Budoyo Jlr III Jmbtn I Dsn III Blok E Ds Sumber Jaya (PR16) 10.000.000 - 10.000.000 -
- Kesenian Kuda Lumping Tunggul Wulung Desa Panca Mukti Kec. Muara Telang (PR16) 10.000.000 - 10.000.000 -
- Kesenian Kuda Lumping Desa Telang Makmur Kec. Muara Telang (PR16) 10.000.000 - 10.000.000 -
- Kesenian Kuda Lumping Desa Telang Makmur RT 19 RW 8 Dusun IV Kec. Muara Telang (PR14) 10.000.000 - 10.000.000 -
- Kelompok Kuda Lumping Desa Enggal Rejo Kec. Air Saleh (PR33) 5.000.000 - 5.000.000 -
- Kesenian Kuda Lumping Desa Salek Jaya Kec. Air Saleh (PR33) 10.000.000 - 10.000.000 -
- Kelompok Kesenian Kelurahan Makarti Jaya Kec. Makarti Jaya (PR11) 100.000.000 - 100.000.000 -
- Kelompok Kesenian Kuda Lumping Krido Budaya Timbul Desa Tirta Kencana Kec. Makarti jaya 5.000.000 - 5.000.000 -
- Kelompok Kesenian Kuda Lumping Paguyuban Jaranan Kreasi Turonggo Dwipo Budoyo 5.000.000 - 5.000.000 -
- Kelompok Kesenian Kuda Lumping Bangun Trisno Desa Tirta Kencana Kec. Makarti 5.000.000 - 5.000.000 -
- Kelompok Kesenian Kuda Lumping Desa Sumber Hidup Kec. Muara Telang (PR34) 5.000.000 - 5.000.000 -
- Kelompok Kesenian Kuda Lumping Desa Telag Karya Kec. Muara Telang (PR34) 5.000.000 - 5.000.000 -
- Kelompok Kesenian Bali Panca Mukti Kec. Muara Telang (PR34) 10.000.000 - 10.000.000 -

Halaman 32 dari 33
Uraian Jumlah Anggaran Realisasi Sisa %
1 2 3 4 5
- Kelompok Kesenian Campur Sari Desa Sumber Rezeki Kec. BA II (PR34) 10.000.000 - 10.000.000 -
- Kelompok Kesenian Reog Ponorogo Desa Sriagung Kec. BA II (PR34) 10.000.000 - 10.000.000 -
- Komunitas Pemuda Band Indie Tungkal Ilir (KOPBITI) 10.000.000 - 10.000.000 -
- Kelompok Kesenian Kuda Lumping Turonggo Putro desa Lalang sembawa Kec. Sembawa (PR25) 5.000.000 - 5.000.000 -
- Kelompok Kesenian Wayang Kulit Hesti Budaya Desa Cintamanis Baru Kec. Air Kumbang 20.000.000 20.000.000 - 100,00
- Kelompok Kesenian Kuda Lumping Turonggo Krido Campur Aduk Kel. Air Batu 7.500.000 - 7.500.000 -
- Kelompok Kesenian Kuda LumpingTuronggo Krido Makmur Kel. Air Batu 5.500.000 - 5.500.000 -
- Kelompok Kesenian Kuda Lumping Turonggo Rista Budoyo Kel. Air Batu 5.500.000 - 5.500.000 -
- Kelompok Kesenian Kuda Lumping Rowo Kidul Kel. Air Batu Kec. Talang kelapa 5.500.000 - 5.500.000 -
- Kelompok Kesenian Kuda Lumping Turonggo seto Kel. Air Batu Kec. Talang Klp 5.500.000 - 5.500.000 -
- Kelompok Kesenian Kuda Lumping Turonggo sejati Kel. Air Batu Kec. Talang Klp 5.500.000 - 5.500.000 -
- Kelompok Kesenian Kuda Lumping Turonggo Budoyo Kel. Air Batu Kec. Talang Klp 5.500.000 - 5.500.000 -
- Kelompok Kesenian Kuda Lumping Turonggo Kel. Air Batu Kec. Talang Kelapa 5.500.000 - 5.500.000 -
- Kelompok Kesenian Kuda Lumping Tejo Asmoro Kel. Sukamoro Kec. Talang Kelapa 7.500.000 - 7.500.000 -
- Kelompok Kesenian Kuda Lumping Turonggo Rama Putro Kel. Sukamoro 7.500.000 - 7.500.000 -
- Kelompok Kesenian Kuda Lumping Laku Bugomudo Lestari Kel. Sukamoro 7.500.000 - 7.500.000 -
- Kelompok Kesenian Kuda Lumping Taruno Budoyo Desa talang Buluh 5.500.000 - 5.500.000 -
- Kelompok Kesenian Kuda Lumping Turonggo Cipto Budoyo Desa Talang buluh 5.500.000 - 5.500.000 -
- Kelompok Kesenian Kuda Lumping Srimudo Tunggal Sejati Desa Talang buluh 7.500.000 - 7.500.000 -
- Kelompok Kesenian Kuda Lumping Ngudi Rahayu Kel. Sukajadi Kec. Talang Klp 6.500.000 - 6.500.000 -
- Kelompok Kesenian Kuda Lumping Pandawa Jati Kel. Sukajadi Kec. Talang Klp 6.500.000 - 6.500.000 -

Belanja Hibah Kpd Kel Masy dgn keg Bid. Keolahragaan Non Profesional 145.000.000 135.000.000 10.000.000 93,10
Bidang Olah Raga 145.000.000 135.000.000 10.000.000 93,10
- Klub Bola Kaki Harapan jaya Desa Pulau Harapan Kec. Sembawa (PR17) 5.000.000 - 5.000.000 -
- Klub Bulu Tangkis Smash Agung Desa Tanjung agung 5.000.000 - 5.000.000 -
- Klub Sepak Bola Reno Vega Desa Sidomulyo Kec. Air kumbang 15.000.000 15.000.000 - 100,00
- Panitia Banyuasin Motor Comunity (Grass Track Open 2013) 60.000.000 60.000.000 - 100,00
- Banyuasin Racing Team 60.000.000 60.000.000 - 100,00

Halaman 33 dari 33
RINCIAN BELANJA BANSOS TAHUN 2013 LAMPIRAN : 2

Uraian Jumlah Anggaran Realisasi Sisa %

1 2 3 4 5

Belanja Bantuan Sosial 4.774.650.000 4.275.700.000 498.950.000 89,55


Belanja Bantuan Sosial Kepada Organisasi Kemasyarakatan 342.150.000 35.000.000 307.150.000 10,23
Belanja Bantuan Sosial Kpd Organisasi Kemasyarakatan Bidang Lainnya 342.150.000 35.000.000 307.150.000 10,23
Belanja Bantuan Sosial Lainnya 342.150.000 35.000.000 307.150.000 10,23
- Bantuan Sosial lainnya 307.150.000 - 307.150.000 -
- Bantuan 100 Orang anak yatim Piatu Masjid Nurul Huda Ds. Tirto Sari Kec. BA. I 10.000.000 10.000.000 - 100,00
- Bantuan Korban Tanah Longsor di Belitang Timur (Warga Air Kumbang an. NK cs) 25.000.000 25.000.000 - 100,00

Belanja Bantuan Sosial Kpd Kelompok Masyarakat dan/Masyarakat 4.104.000.000 3.937.700.000 166.300.000 95,95
Belanja Bansos kpd Kel. Masyarakat/Masyarakat dgn tujuan Rehabilitasi Sosial. 163.000.000 158.000.000 5.000.000 96,93
Bansos kpd Kel. Masyarakat/Masyarakat dgn tujuan Rehabilitasi Sosial. 163.000.000 158.000.000 5.000.000 96,93
- Persatuan Amal Kematian (PAK) Al-Azhar Perum Azhar Baru Kel. Kenten Kec. Tl Kelapa. 5.000.000 5.000.000 - 100,00
- Bantuan Korban Bencana Kebakaran di wilayah Kab. Banyuasin (an. TJ cs) 35.000.000 35.000.000 - 100,00
- Persatuan Amal Kematian (PAKAM) Al-Hikmah Desa Petaling Kec. BA III 5.000.000 5.000.000 - 100,00
- Bantuan uang Duka Korban Bencana Alam dalam wilayah Kab. Banyuasin 29.000.000 29.000.000 - 100,00
- Bantuan biaya santunan untuk korban bencana kebakaran dan rumah roboh 62.000.000 62.000.000 - 100,00
(a.n. Sbn dkk) - -
- Bantuan biaya santunan untuk korban bencana rumah roboh akibat angin puting 17.000.000 17.000.000 - 100,00
beliung , kebakaran dan kecelakaan di laut - -
- Bantuan biaya santunan untuk korban bencana kebakaran a.n. Srn 5.000.000 5.000.000 - 100,00
- Bantuan persatuan Amal Kematian Al-Ikhlas Jl. Pangeran Ayin Kel. Kenten 5.000.000 - 5.000.000 -
Kec. Talang Kelapa

Belanja Bansos kpd Kel. Masyarakat/Masyarakat dgn tujuan Pemberdayaan Sosial. 1.941.000.000 1.792.500.000 148.500.000 92,35
Bansos kpd Kel. Masyarakat/Masyarakat dgn tujuan Pemberdayaan Sosial. 1.893.500.000 1.745.000.000 148.500.000 92,16
- Sharing PNPM 1.869.000.000 1.740.000.000 129.000.000 93,10
- Kecamatan Sembawa
- Kecamatan Rambutan

Halaman 1 dari 6
Uraian Jumlah Anggaran Realisasi Sisa %

1 2 3 4 5
- Kecamatan Makarti Jaya
- Kecamatan Banyuasin III
- Kecamatan Rantau Bayur
- Kecamatan Banyuasin I
- Kecamatan Suak Tapeh
- Kecamatan Banyuasin II
- Kecamatan Pulau Rimau
- Kecamatan Muara Padang
- Kecamatan Muara Telang
- Kecamatan Talang Kelapa

- Peringatan Nuzulul Qur'an Masjid Nurul Ikhsan Ds. I Desa Taja Indah Kec. Betung. 2.000.000 - 2.000.000 -
- Kelompok Pengajian Baiturrahman Kel. Kedondong Raye Kec. Banyuasin III. 2.500.000 - 2.500.000 -
- Panitia Pelaksana Tausiyah dan Dialog Ramadahan Yayasan Tarbiyah Kab. BA. 2.500.000 - 2.500.000 -
- Gebyar Maulid Nabi M SAW TK/TPA Unit 117 Jami'atul Khair Kel. Sukajadi Kec. Tl Kelapa. 5.000.000 2.500.000 2.500.000 50,00
- Pembuatan Jalur2 Hijau & Bendungan oleh Himp. Klrg Petani Banyuasin (HKTNBA) 2.500.000 2.500.000 - 100,00
- Pengajian akbar ibu-ibu se-Kecamatan BA III di masjid As-Sobar Desa Lubuk 2.500.000 - 2.500.000 -
Saung Kec. BA III
- Panpel peringatan Maulid Nabi Muhammad SAW Masjid Nurul Islam desa 2.500.000 - 2.500.000 -
beringin Kec. BA III
- Panpel peringatan Maulid Nabi Muhammad SAW Masjid Nurul Iman desa 2.500.000 - 2.500.000 -
Terentang Kec. BA III
- Panpel peringatan Isro' Mi'raj Jamiyyah Yasin dan Tahlil Asy-syafaah desa 2.500.000 - 2.500.000 -
Tanjung Menang Kec. Rantau Bayur Terentang Kec. BA III

Kegiatan Safari Jum'at 47.500.000 47.500.000 - 100,00


- Pengajian Ibu-ibu Kecamatan Air Kumbang (Masjid Al Hidayah) 2.500.000 2.500.000 - 100,00
- Pengajian Ibu-ibu Kecamatan Air Saleh. (Masjid Nurul Huda) 2.500.000 2.500.000 - 100,00
- Pengajian Ibu-ibu Masjid Darussalam Kel.Mariana Ilir Kec. BA I. 2.500.000 2.500.000 - 100,00
- Pengajian Ibu-ibu Masjid Jami'atul Rahmah Ds. Sungsang I Kecamatan Banyuasin II. 2.500.000 2.500.000 - 100,00
- Pengajian Ibu-ibu Masjid Istiqomah Ds.Sribandung Kec.Banyuasin III 2.500.000 2.500.000 - 100,00
- Pengajian Ibu-ibu Kecamatan Betung (Masjid Al-Muhajirin) 2.500.000 2.500.000 - 100,00

Halaman 2 dari 6
Uraian Jumlah Anggaran Realisasi Sisa %

1 2 3 4 5
- Pengajian Ibu-ibu Masjid Al-Muttaqin Ds. Muara Baru Kec. Makarti Jaya (Darul Hijroh) 2.500.000 2.500.000 - 100,00
- Pengajian Ibu-ibu Kecamatan Muara Padang. (Masjid Sabilunajjah) 2.500.000 2.500.000 - 100,00
- Pengajian Ibu-ibu Kecamatan Muara Sugihan (Masjid Baitul Muttaqin) 2.500.000 2.500.000 - 100,00
- Pengajian Ibu-ibu Masjid Al Muhajirin Ds. Telang jaya Kec. M. Telang (Jami Fathul Jannah) 2.500.000 2.500.000 - 100,00
- Pengajian Ibu-ibu Masjid Al-Hilal Ds.Penuguan Kec. Pulau Rimau 2.500.000 2.500.000 - 100,00
- Pengajian Ibu-ibu Kecamatan Rambutan. (Baiturohim) 2.500.000 2.500.000 - 100,00
- Pengajian Ibu-ibu Masjid Nurul Huda Ds. Tanjung Menang Kecamatan Rantau Bayur. 2.500.000 2.500.000 - 100,00
- Pengajian Ibu-ibu Masjid Al-Jihad ds.Muara Damai Kec. Sembawa 2.500.000 2.500.000 - 100,00
- Pengajian Ibu-ibu Masjid At-Taqwa Ds. Rimba Terab Kec. Suak tapeh 2.500.000 2.500.000 - 100,00
- Pengajian Ibu-ibu Masjid Baiturrohim Ds. Sumber jaya Kec. Sumber Marga Telang 2.500.000 2.500.000 - 100,00
- Pengajian Ibu-ibu Masjid Hidayatullah Kel. Tanah Mas Kec. Talang Kelapa 2.500.000 2.500.000 - 100,00
- Pengajian Ibu-ibu Masjid Nurul Anwar D. Mulia Sari Kec. Tanjung lago 2.500.000 2.500.000 - 100,00
- Pengajian Ibu-ibu Masjid Al-Ikhlas Ds. Teluk Tenggulang Kec. Tungkal Ilir 2.500.000 2.500.000 - 100,00

Belanja Bansos kpd Kel. Masyarakat/Masyarakat dgn tujuan Jaminan Sosial. 2.000.000.000 1.987.200.000 12.800.000 99,36
Bansos kpd Kel. Masyarakat/Masyarakat dgn tujuan Jaminan Sosial. 2.000.000.000 1.987.200.000 12.800.000 99,36
- Ustadz/Ustazah/Guru TK/TPA 1.200.000.000 1.200.000.000 - 100,00
- P3N 700.000.000 687.600.000 12.400.000 98,23
- LVRI 100.000.000 99.600.000 400.000 99,60

Belanja Bantuan Sosial Kpd Anggota Masyarakat 328.500.000 303.000.000 25.500.000 92,24
Belanja Bantuan Sosial kpd Anggota Masyarakat dgn tujuan Jaminan Sosial. 328.500.000 303.000.000 25.500.000 92,24
Bantuan Sosial kpd Anggota Masyarakat dgn tujuan Jaminan Sosial. 233.500.000 208.000.000 25.500.000 89,08
- Biaya Pendidikan S2 a.n. KI (IAIN Raden Fatah Palembang). 2.000.000 2.000.000 - 100,00
- Biaya Pendidikan S1 a.n. Pn (Stisipol Candradimuka Palembang). 1.000.000 - 1.000.000 -
- Biaya Pendidikan S2 a.n. RAP (IAIN Raden Fatah Palembang). 1.500.000 1.500.000 - 100,00
- Biaya Pendidikan D2 a.n. MA (UPBJJ - UT Plg). 2.500.000 2.500.000 - 100,00
- Biaya Pendidikan S1 a.n. ME (IAIN Raden Fatah Plg). 2.000.000 2.000.000 - 100,00
- Biaya Pendidikan S1 a.n. HA (STIHPADA Palembang). 1.000.000 1.000.000 - 100,00
- Biaya Pendidikan s1 a.n. MT (PTIQ Jkt). 2.000.000 2.000.000 - 100,00
- Biaya Pendidikan S1 a.n. AS (UIN Syarif Hidayatullah Jakarta. 2.000.000 2.000.000 - 100,00
- Biaya Pendidikan D.IV a.n. ML (Univ. Kader Bangsa Plg). 2.000.000 2.000.000 - 100,00

Halaman 3 dari 6
Uraian Jumlah Anggaran Realisasi Sisa %

1 2 3 4 5
- Biaya Pendidikan S1 a.n. Nb (Univ. PGRI Palembang). 2.000.000 2.000.000 - 100,00
- Biaya Pendidikan S2 a.n. DPS (IAIN Raden Fatah Palembang). 2.000.000 2.000.000 - 100,00
- Biaya Pendidikan S2 a.n. YE (IAIN Raden Fatah Palembang). 2.000.000 2.000.000 - 100,00
- Biaya Pendidikan D.III a.n. RA (Akademi Kesehatan Lingkungan Palembang). 2.000.000 2.000.000 - 100,00
- Biaya Pendidikan S1 a.n. HG (STIM AMKOP Plg) 2.000.000 2.000.000 - 100,00
- Biaya Pendidikan S1 a.n. EOR (STISIPOL Candradimuka Palembang). 2.000.000 2.000.000 - 100,00
- Biaya Pendidikan S1 a.n. MAh (Univ. Tridinanti Palembang. 5.000.000 5.000.000 - 100,00
- Biaya Pendidikan S1 a.n. Kn (STIPADA Palembang). 2.500.000 2.500.000 - 100,00
- Biaya Pengobatan a.n. RJ (Istri Anggota LVRI Bpk. AMj). 10.000.000 10.000.000 - 100,00
- Biaya Pendidikan S1 a.n. NPy (Univ. Tridinanti Plg). 2.000.000 2.000.000 - 100,00
- Biaya Pendidikan S1 a.n. Syf (STISIPOL Plg). 2.000.000 2.000.000 - 100,00
- Biaya Pendidikan S1 a.n. EM ( Univ. Indo Global Mandiri Palembang). 2.000.000 2.000.000 - 100,00
- Biaya Pendidikan S1 a.n. MR (Sekolah Tinggi Satya Negara Palembang). 2.000.000 2.000.000 - 100,00
- Biaya Pendidikan S1 a.n. Sy (IAIN Raden Fatah Plg.) 2.000.000 2.000.000 - 100,00
- Biaya Pendidikan S1 a.n. AWy (IAIN Raden Fatah Plg). 2.000.000 2.000.000 - 100,00
- Biaya Pendidikan S1 a.n. AB (UNSRI Indralaya). 2.000.000 2.000.000 - 100,00
- Biaya Pendidikan S1 a.n. IAA (Stiper SRIWIGAMA Palembang). 2.500.000 2.500.000 - 100,00
- Biaya Pengobatan a.n. ARP Bin Waluyo. 7.500.000 7.500.000 - 100,00
- Biaya Pendidikan S1 a.n. MM (STIM-AMKOP Plg). 2.000.000 2.000.000 - 100,00
- Biaya Pendidikan S1 a.n. AND (STIM-AMKOP Plg) 2.000.000 2.000.000 - 100,00
- Biaya Pendidikan S1 a.n. MF (STIM-AMKOP Plg) 2.000.000 2.000.000 - 100,00
- Biaya Pendidikan S1 a.n. NPt (FKIP PGRI Palembang) 2.500.000 2.500.000 - 100,00
- Biaya Pendidikan S1 a.n. Ro (Universitas sriwijaya palembang) 3.000.000 3.000.000 - 100,00
- Biaya Pendidikan D3 a.n. GS (Sekolah Tinggi Ilmu Kesehatan Yayasan 2.000.000 2.000.000 - 100,00
Siti Khodijah Palembang)
- Biaya Pendidikan S1 a.n. SH (IAIN Raden Fatah Palembang) 2.500.000 - 2.500.000 -
- Biaya Pendidikan S1 a.n. NAM (IAIN Raden fatah Plg) 5.000.000 5.000.000 - 100,00
- Biaya Pendidikan S1 a.n. IP (IAIN raden fatah Plg) 3.000.000 3.000.000 - 100,00
- Biaya Pendidikan D3 a.n. OSR (Institut Pertanian bogor) 2.500.000 2.500.000 - 100,00
- Biaya Pendidikan S1 a.n. Sw (IAIN raden fatah palembang) 5.000.000 5.000.000 - 100,00
- Biaya Pendidikan S1 a.n. RW (STIM-AMKOP Plg) 2.500.000 2.500.000 - 100,00
- Biaya Pendidikan S1 a.n. JA (Stisipol Candradimuka Palembang) 2.500.000 2.500.000 - 100,00
- Biaya Pendidikan S1 a.n. KM (STAI Shalahudin Al-Ayyubi 2.500.000 2.500.000 - 100,00
jakarta Cabang Ponpes An-Nur Lempuing OKI)

Halaman 4 dari 6
Uraian Jumlah Anggaran Realisasi Sisa %

1 2 3 4 5
- Biaya Pendidikan a.n. AMd (Akademi kebidanan Nusantara palembang) 2.500.000 2.500.000 - 100,00
- Biaya Pendidikan S2 a.n. Lf (Universitas Sriwijaya) 2.500.000 - 2.500.000 -
- Biaya Pendidikan S1 a.n. RAJ (Universitas Muhammadiyah Palembang) 2.500.000 - 2.500.000 -
- Biaya Pendidikan S1 a.n. SN (STAI DarulKalam Tangerang) 2.500.000 2.500.000 - 100,00
- Biaya Pendidikan S1 a.n. St (Universitas Terbuka) 2.500.000 2.500.000 - 100,00
- Biaya Pendidikan S1 a.n. MAp (STISIPOL CHANDRADIMUKA Palembang) 2.500.000 2.500.000 - 100,00
- Biaya Pendidikan S1 a.n. Z (IAIN Raden fatah palembang) 2.500.000 - 2.500.000 -
- Biaya Pendidikan D3 a.n. OR (IAIN Raden Fatah palembang) 2.500.000 2.500.000 - 100,00
- Biaya Pendidikan S1 a.n. HSP (Stisipol Candradimuka Palembang) 2.500.000 2.500.000 - 100,00
- Biaya Pendidikan S2 a.n. WA (Universitas Utara Malaysia) 7.500.000 - 7.500.000 -
- Biaya Pendidikan a.n. Spy (STIM Amkop Palembang) 2.500.000 2.500.000 - 100,00
- Biaya Pendidikan a.n. AWd (STISIPOL CANDRADIMUKA Palembang) 2.500.000 2.500.000 - 100,00
- Biaya Pendidikan S1 a.n. JH (STISIPOL Candradimuka Palembang) 2.500.000 2.500.000 - 100,00
- Biaya Pendidikan a.n. MH (STISIPOL Candradimuka Palembang) 2.500.000 2.500.000 - 100,00
- Biaya Pendidikan a.n. Nd (STIM AMKOP Palembang) 2.500.000 2.500.000 - 100,00
- Biaya Pendidikan a.n. Jld (STISIPOL Candradimuka Palembang) 3.000.000 3.000.000 - 100,00
- Biaya Pendidikan a.n. SH (IAIN Raden Fatah palembang) 2.500.000 2.500.000 - 100,00
- Biaya Pendidikan a.n. Is (STIHPADA Palembang) 2.500.000 2.500.000 - 100,00
- Biaya Pendidikan a.n. EAO (STHIPADA Palembang) 2.500.000 2.500.000 - 100,00
- Biaya Pendidikan a.n. HW (Universitas PGRI Palembang) 2.500.000 - 2.500.000 -
- Biaya Pendidikan a.n. UH (STIK Siti Khadijah Palembang) 2.500.000 2.500.000 - 100,00
- Biaya Pendidikan a.n. AR (STHIPADA Palembang) 3.000.000 3.000.000 - 100,00
- Biaya Pendidikan a.n. MRs (Institut Pertanian Bogor) 2.500.000 - 2.500.000 -
- Biaya Pendidikan a.n. Rm (STIM AMKOP Palembang) 2.500.000 2.500.000 - 100,00
- Biaya Pendidikan a.n. Bd, S.Pd (Universitas Sriwijaya Palembang) 2.500.000 2.500.000 - 100,00
- Biaya Pendidikan S2 a.n. WP (Universitas sriwijaya palembang) 5.000.000 5.000.000 - 100,00
- Biaya Pendidikan a.n. MZ (IAIN Raden Fatah Palembang) 5.000.000 5.000.000 - 100,00
- Biaya Pendidikan a.n. IJ (IAIN Raden Fatah Palembang) 5.000.000 5.000.000 - 100,00
- Biaya Pendidikan a.n. AWb (Akademi Farmasi Harapan palembang) 3.000.000 3.000.000 - 100,00
- Biaya Pendidikan a.n. Alf (Universitas Tridinanti Palembang) 3.000.000 3.000.000 - 100,00
- Biaya Pendidikan a.n. MI (Universitas Stisipol Candradimuka Palembang) 3.000.000 3.000.000 - 100,00
- Biaya Pendidikan a.n. MP (Universitas Indo Global Mandiri Palembang) 3.000.000 3.000.000 - 100,00
- Biaya Pendidikan a.n. OT (Universitas PGRI palembang) 3.000.000 3.000.000 - 100,00
- Biaya Pendidikan a.n. KA (Universitas Muhammadiyah Palembang) 3.000.000 3.000.000 - 100,00

Halaman 5 dari 6
Uraian Jumlah Anggaran Realisasi Sisa %

1 2 3 4 5
- Biaya Pendidikan a.n. NIN (Universitas Muhammadiyah Palembang) 2.500.000 2.500.000 - 100,00
- Biaya Pendidikan S1 a.n. SP (Universitas Muhammadiyah Palembang) 2.500.000 2.500.000 - 100,00
- Biaya Pendidikan S1 a.n. AL (STIA Satya Negara Palembang) 2.500.000 2.500.000 - 100,00
- Biaya Pendidikan S1 a.n. Spr (STIE Abdi Nusa Palembang) 1.500.000 1.500.000 - 100,00
- Biaya Pendidikan S1 a.n. RFV (Universitas PGRI Palembang) 1.500.000 1.500.000 - 100,00
- Biaya Berobat a.n. EAh (Kades Pelajau Kec. BA III) 11.000.000 11.000.000 - 100,00
- Tambahan Modal Usaha a.n. NF (Kel. Kedondong Raye Kec. BA III) 2.000.000 - 2.000.000 -

Belanja Bansos kpd Anggota Masyarakat dgn tujuan Jamsos pd Keg. Safari Ramadhan 95.000.000 95.000.000 - 100,00
- Bansos Kpd Angt Masy. Dg tujuan Jamsos kpd Anak Yatim Piatu di 19 Kec @5.000.000 95.000.000 95.000.000 - 100,00

Halaman 6 dari 6
LAMPIRAN : 3
DAFTAR BELANJA MODAL YANG MENJADI ASET PER SKPD PER JENIS ASET PER 31 DESEMBER 2013
A. TANAH
TANAH
No SKPD BELANJA MODAL YANG TIDAK MENJADI ASSET BELANJA MODAL YANG MENJADI
BELANJA MODAL REKLAS TAMBAH REKLAS KURANG
HIBAH BARANG/JASA EXTRACOMTABLE ASSET
(1) (2) (3) (4) (5) (6) (7) (8) (9)=(3)-(4)-(5)-(6)+(7)-(8)

1 DIKNAS 165.413.520,00 165.413.520,00


2 KESEHATAN - -
3 RSUD - -
4 PUCK - -
5 PUBM 387.301.719,00 387.301.719,00
6 PU AIR - -
7 BAPPEDA DAN PM - -
8 DISHUB 25.050.000,00 25.050.000,00
9 BLH - -
10 KEBERSIHAN 2.420.000.000,00 2.420.000.000,00
11 CAPIL - -
12 BAPEL KB - -
13 DINSOS - -
14 DISNAKER - -
15 KOPERINDAG - -
16 KESBANG - -
17 SATPOL - -
18 SEKDA 2.965.901.083,00 597.275.495,00 2.368.625.588,00
19 SETWAN - -
20 INSPEKTORAT - -
21 DPPKAD - -
22 BKD - -
23 BPT 48.000.000,00 48.000.000,00 -
24 BAKETPAN - -
25 BPMPD - -
26 PERPUSTAKAAN - -
27 PERTANIAN 197.600.000,00 197.600.000,00
28 BP4K - -
29 DISHUTBUN - -
30 DISTAMBEN - -
31 PARIWISATA -
32 PERIKANAN - -
33 PASAR - -
34 TANJUNG LAGO - -
35 AIR SALEH - -
36 TUNGKAL ILIR - -
37 BANYUASIN I - -
38 MUARA SUGIHAN - -
39 BANYUASIN II - -
40 BANYUASIN III - -
41 BETUNG - -
42 MUARA TELANG - -
43 MUARA PADANG - -
44 MAKARTI JAYA - -
45 PULAU RIMAU - -
46 RAMBUTAN - -
47 RANTAU BAYUR - -
48 SUAK TAPEH - -
49 SEMBAWA - -
50 SUMBER MARGA TELANG - -
51 AIR KUMBANG - -
52 TALANG KELAPA - -
-
JUMLAH 6.209.266.322,00 - 597.275.495,00 - - 48.000.000,00 5.563.990.827,00

Halaman 1 dari 7
DAFTAR BELANJA MODAL YANG MENJADI ASET PER SKPD PER JENIS ASET PER 31 DESEMBER 2013
B. PERALATAN DAN MESIN
PERALATAN DAN MESIN
No SKPD BELANJA MODAL YANG TIDAK MENJADI ASSET BELANJA MODAL YANG MENJADI
BELANJA MODAL REKLAS TAMBAH REKLAS KURANG
HIBAH BARANG/JASA EXTRACOMTABLE ASSET
(1) (2) (3) (4) (5) (6) (7) (8) (9)=(3)-(4)-(5)-(6)+(7)-(8)

1 DIKNAS 41.002.539.935,00 4.491.956.754,16 7.433.541.900,98 194.600.000,00 3.766.814.000,00 25.504.827.279,86


2 KESEHATAN 3.718.305.000,00 15.280.000,00 3.703.025.000,00
3 RSUD 962.095.824,00 962.095.824,00
4 PUCK 658.642.000,00 19.842.900,00 638.799.100,00
5 PUBM 546.360.000,00 8.175.000,00 538.185.000,00
6 PU AIR 2.055.440.095,00 27.725.000,00 2.027.715.095,00
7 BAPPEDA DAN PM 569.646.500,00 569.646.500,00
8 DISHUB 4.847.040.000,00 11.010.600,00 199.100.000,00 2.168.750.000,00 2.866.379.400,00
9 BLH 1.939.535.000,00 2.039.500,00 1.937.495.500,00
10 KEBERSIHAN 822.842.000,00 10.000.000,00 812.842.000,00
11 CAPIL 2.526.514.060,00 100.566.500,00 391.920.000,00 2.034.027.560,00
12 BAPEL KB 726.765.000,00 5.000.000,00 721.765.000,00
13 DINSOS 164.350.000,00 15.450.000,00 148.900.000,00
14 DISNAKER 1.396.789.600,00 47.960.000,00 1.348.829.600,00
15 KOPERINDAG 200.675.000,00 17.250.000,00 183.425.000,00
16 KESBANG 3.724.616.528,00 103.276.609,00 3.621.339.919,00
17 SATPOL 60.420.000,00 9.110.700,00 51.309.300,00
18 SEKDA 11.294.114.160,00 371.278.560,00 10.922.835.600,00
19 SETWAN 5.225.046.000,00 273.339.000,00 277.142.000,00 4.674.565.000,00
20 INSPEKTORAT 647.966.280,00 44.890.000,00 603.076.280,00
21 DPPKAD 4.147.246.551,00 33.465.000,00 4.113.781.551,00
22 BKD 591.160.000,00 21.000.000,00 103.243.500,00 466.916.500,00
23 BPT 1.158.105.900,00 759.000,00 84.465.000,00 1.072.881.900,00
24 BAKETPAN 9.425.056.993,00 9.425.056.993,00
25 BPMPD 403.764.000,00 403.764.000,00
26 PERPUSTAKAAN 297.053.650,00 4.730.000,00 23.715.000,00 268.608.650,00
27 PERTANIAN 1.055.202.545,00 1.055.202.545,00
28 BP4K 3.265.674.800,00 18.860.000,00 3.246.814.800,00
29 DISHUTBUN 929.924.200,00 27.635.000,00 902.289.200,00
30 DISTAMBEN 718.675.000,00 1.500.000,00 717.175.000,00
31 PARIWISATA 180.918.000,00 180.918.000,00
32 PERIKANAN 294.607.500,00 107.987.500,00 186.620.000,00
33 PASAR 291.200.000,00 3.891.400,00 287.308.600,00
34 TANJUNG LAGO 32.500.000,00 700.000,00 31.800.000,00
35 AIR SALEH 75.009.000,00 1.595.000,00 73.414.000,00
36 TUNGKAL ILIR 64.234.680,00 4.845.500,00 59.389.180,00
37 BANYUASIN I 3.000.000,00 3.000.000,00
38 MUARA SUGIHAN 16.450.000,00 16.450.000,00
39 BANYUASIN II 76.260.000,00 12.980.000,00 63.280.000,00
40 BANYUASIN III 63.690.000,00 23.550.000,00 40.140.000,00
41 BETUNG - -
42 MUARA TELANG 75.000.000,00 6.800.000,00 68.200.000,00
43 MUARA PADANG 80.980.000,00 44.480.000,00 36.500.000,00
44 MAKARTI JAYA 79.000.100,00 79.000.100,00
45 PULAU RIMAU 38.000.000,00 38.000.000,00
46 RAMBUTAN - -
47 RANTAU BAYUR 14.600.000,00 14.600.000,00
48 SUAK TAPEH 67.213.000,00 7.500.000,00 59.713.000,00
49 SEMBAWA 10.000.000,00 21.115.240,00 (11.115.240,00)
50 SUMBER MARGA TELANG 92.225.225,00 5.070.000,00 87.155.225,00
51 AIR KUMBANG 202.715.000,00 45.840.000,00 156.875.000,00
52 TALANG KELAPA 45.600.000,00 45.600.000,00

JUMLAH 106.884.769.126,00 4.491.956.754,16 - 8.910.039.909,98 393.700.000,00 6.816.049.500,00 87.060.422.961,86

Halaman 2 dari 7
DAFTAR BELANJA MODAL YANG MENJADI ASET PER SKPD PER JENIS ASET PER 31 DESEMBER 2013
C. GEDUNG DAN BANGUNAN
GEDUNG DAN BANGUNAN
No SKPD BELANJA MODAL YANG TIDAK MENJADI ASSET BELANJA MODAL YANG MENJADI
BELANJA MODAL REKLAS TAMBAH REKLAS KURANG
HIBAH BARANG/JASA EXTRACOMTABLE ASSET
(1) (2) (3) (4) (5) (6) (7) (8) (9)=(3)-(4)-(5)-(6)+(7)-(8)

1 DIKNAS 46.212.400.700,00 10.894.622.162,35 195.800.000,00 35.513.578.537,65


2 KESEHATAN 4.450.551.000,00 4.450.551.000,00
3 RSUD 1.286.400.000,00 1.286.400.000,00
4 PUCK 19.133.317.200,00 19.133.317.200,00
5 PUBM - -
6 PU AIR 149.600.000,00 149.600.000,00
7 BAPPEDA DAN PM 24.500.000,00 24.500.000,00
8 DISHUB 4.919.950.600,00 4.919.950.600,00
9 BLH 49.430.000,00 49.430.000,00
10 KEBERSIHAN 140.000.000,00 140.000.000,00
11 CAPIL 558.800.000,00 391.920.000,00 950.720.000,00
12 BAPEL KB 961.510.000,00 961.510.000,00
13 DINSOS 199.500.000,00 199.500.000,00
14 DISNAKER - -
15 KOPERINDAG 11.269.870.000,00 11.269.870.000,00
16 KESBANG 325.060.000,00 325.060.000,00
17 SATPOL - -
18 SEKDA - -
19 SETWAN 347.260.000,00 103.272.000,00 277.142.000,00 521.130.000,00
20 INSPEKTORAT 186.391.000,00 186.391.000,00
21 DPPKAD 27.720.000,00 27.720.000,00
22 BKD 16.000.000,00 16.000.000,00 103.243.500,00 103.243.500,00
23 BPT - 84.465.000,00 84.465.000,00
24 BAKETPAN 5.124.716.000,00 5.124.716.000,00
25 BPMPD - -
26 PERPUSTAKAAN 193.900.000,00 23.715.000,00 217.615.000,00
27 PERTANIAN 205.961.500,00 205.961.500,00
28 BP4K 3.351.280.000,00 3.351.280.000,00
29 DISHUTBUN 283.750.000,00 90.750.000,00 193.000.000,00
30 DISTAMBEN 75.000.000,00 75.000.000,00
31 PARIWISATA - -
32 PERIKANAN 2.237.185.400,00 1.185.933.864,00 1.051.251.536,00
33 PASAR 1.650.550.000,00 1.650.550.000,00
34 TANJUNG LAGO - -
35 AIR SALEH - -
36 TUNGKAL ILIR - -
37 BANYUASIN I - -
38 MUARA SUGIHAN - -
39 BANYUASIN II - -
40 BANYUASIN III - -
41 BETUNG - -
42 MUARA TELANG - -
43 MUARA PADANG - -
44 MAKARTI JAYA - -
45 PULAU RIMAU - -
46 RAMBUTAN - -
47 RANTAU BAYUR - -
48 SUAK TAPEH - -
49 SEMBAWA - -
50 SUMBER MARGA TELANG - -
51 AIR KUMBANG - -
52 TALANG KELAPA - -

JUMLAH 103.380.603.400,00 10.985.372.162,35 16.000.000,00 103.272.000,00 1.076.285.500,00 1.185.933.864,00 92.166.310.873,65

Halaman 3 dari 7
DAFTAR BELANJA MODAL YANG MENJADI ASET PER SKPD PER JENIS ASET PER 31 DESEMBER 2013
D. JALAN, JARINGAN DAN IRIGASI
JALAN, JARINGAN DAN IRIGASI
No SKPD BELANJA MODAL YANG TIDAK MENJADI ASSET BELANJA MODAL YANG MENJADI
BELANJA MODAL REKLAS TAMBAH REKLAS KURANG
HIBAH BARANG/JASA EXTRACOMTABLE ASSET
(1) (2) (3) (4) (5) (6) (7) (8) (9)=(3)-(4)-(5)-(6)+(7)-(8)

1 DIKNAS 79.917.000,00 79.917.000,00


2 KESEHATAN 104.800.000,00 104.800.000,00
3 RSUD - -
4 PUCK 111.606.973.000,00 111.606.973.000,00
5 PUBM 175.042.224.300,00 175.042.224.300,00
6 PU AIR 24.193.401.000,00 24.193.401.000,00
7 BAPPEDA DAN PM - -
8 DISHUB 199.100.000,00 2.168.750.000,00 199.100.000,00 2.168.750.000,00
9 BLH 344.533.818,00 - 344.533.818,00
10 KEBERSIHAN - -
11 CAPIL - -
12 BAPEL KB - -
13 DINSOS - -
14 DISNAKER 130.979.000,00 130.979.000,00
15 KOPERINDAG 18.566.000,00 18.566.000,00
16 KESBANG - -
17 SATPOL - -
18 SEKDA 19.600.000,00 19.600.000,00
19 SETWAN 201.980.000,00 201.980.000,00
20 INSPEKTORAT - -
21 DPPKAD 199.000.000,00 199.000.000,00
22 BKD - -
23 BPT - -
24 BAKETPAN - -
25 BPMPD - -
26 PERPUSTAKAAN - -
27 PERTANIAN 51.262.500,00 51.262.500,00
28 BP4K - -
29 DISHUTBUN 934.835.500,00 934.835.500,00
30 DISTAMBEN 5.704.300.000,00 5.704.300.000,00
31 PARIWISATA - -
32 PERIKANAN 575.888.500,00 843.123.864,00 1.419.012.364,00
33 PASAR 18.676.000,00 18.676.000,00
34 TANJUNG LAGO - -
35 AIR SALEH - -
36 TUNGKAL ILIR - -
37 BANYUASIN I - -
38 MUARA SUGIHAN - -
39 BANYUASIN II - -
40 BANYUASIN III - -
41 BETUNG - -
42 MUARA TELANG - -
43 MUARA PADANG - -
44 MAKARTI JAYA - -
45 PULAU RIMAU - -
46 RAMBUTAN - -
47 RANTAU BAYUR - -
48 SUAK TAPEH 31.586.200,00 31.586.200,00
49 SEMBAWA 15.000.000,00 15.000.000,00
50 SUMBER MARGA TELANG 34.991.457,00 34.991.457,00
51 AIR KUMBANG 24.645.900,00 24.645.900,00
52 TALANG KELAPA - -

JUMLAH 319.532.260.175,00 - - - 3.011.873.864,00 199.100.000,00 322.345.034.039,00

Halaman 4 dari 7
DAFTAR BELANJA MODAL YANG MENJADI ASET PER SKPD PER JENIS ASET PER 31 DESEMBER 2013
E. ASET TETAP LAINNYA
ASET TETAP LAINNYA
No SKPD BELANJA MODAL YANG TIDAK MENJADI ASSET BELANJA MODAL YANG MENJADI
BELANJA MODAL REKLAS TAMBAH REKLAS KURANG
HIBAH BARANG/JASA EXTRACOMTABLE ASSET
(1) (2) (3) (4) (5) (6) (7) (8) (9)=(3)-(4)-(5)-(6)+(7)-(8)

1 DIKNAS 24.741.763.136,00 3.571.014.000,00 194.600.000,00 28.118.177.136,00


2 KESEHATAN - -
3 RSUD - -
4 PUCK - -
5 PUBM - -
6 PU AIR - -
7 BAPPEDA DAN PM 118.333.000,00 118.333.000,00
8 DISHUB - -
9 BLH - -
10 KEBERSIHAN - -
11 CAPIL - -
12 BAPEL KB - -
13 DINSOS - -
14 DISNAKER - -
15 KOPERINDAG - -
16 KESBANG - -
17 SATPOL - -
18 SEKDA 190.965.000,00 342.650.000,00 (151.685.000,00)
19 SETWAN 325.002.500,00 325.002.500,00
20 INSPEKTORAT - -
21 DPPKAD 5.500.000,00 5.500.000,00
22 BKD - -
23 BPT - 48.000.000,00 48.000.000,00
24 BAKETPAN - -
25 BPMPD - -
26 PERPUSTAKAAN 170.100.000,00 170.100.000,00
27 PERTANIAN 1.000.000,00 1.000.000,00
28 BP4K - -
29 DISHUTBUN -
30 DISTAMBEN - -
31 PARIWISATA - -
32 PERIKANAN 194.100.000,00 194.100.000,00
33 PASAR - -
34 TANJUNG LAGO - -
35 AIR SALEH - -
36 TUNGKAL ILIR - -
37 BANYUASIN I - -
38 MUARA SUGIHAN - -
39 BANYUASIN II - -
40 BANYUASIN III - -
41 BETUNG - -
42 MUARA TELANG - -
43 MUARA PADANG - -
44 MAKARTI JAYA - -
45 PULAU RIMAU - -
46 RAMBUTAN - -
47 RANTAU BAYUR - -
48 SUAK TAPEH - -
49 SEMBAWA - -
50 SUMBER MARGA TELANG - -
51 AIR KUMBANG - -
52 TALANG KELAPA - -

JUMLAH 25.746.763.636,00 - 342.650.000,00 - 3.619.014.000,00 194.600.000,00 28.828.527.636,00

Halaman 5 dari 7
DAFTAR BELANJA MODAL YANG MENJADI ASET PER SKPD PER JENIS ASET PER 31 DESEMBER 2013
F. KONSTRUKSI DALAM PEKERJAAN
KONSTRUKSI DALAM PENGERJAAN
No SKPD BELANJA MODAL YANG TIDAK MENJADI ASSET BELANJA MODAL YANG MENJADI
BELANJA MODAL REKLAS TAMBAH REKLAS KURANG
HIBAH BARANG/JASA EXTRACOMTABLE ASSET
(1) (2) (3) (4) (5) (6) (7) (8) (9)=(3)-(4)-(5)-(6)+(7)-(8)

1 DIKNAS - -
2 KESEHATAN - -
3 RSUD - -
4 PUCK - -
5 PUBM - -
6 PU AIR - -
7 BAPPEDA DAN PM - -
8 DISHUB - -
9 BLH - -
10 KEBERSIHAN - -
11 CAPIL - -
12 BAPEL KB - -
13 DINSOS - -
14 DISNAKER - -
15 KOPERINDAG - -
16 KESBANG - -
17 SATPOL - -
18 SEKDA - -
19 SETWAN - -
20 INSPEKTORAT - -
21 DPPKAD - -
22 BKD - -
23 BPT - -
24 BAKETPAN - -
25 BPMPD - -
26 PERPUSTAKAAN - -
27 PERTANIAN - -
28 BP4K - -
29 DISHUTBUN - -
30 DISTAMBEN - -
31 PARIWISATA - 342.810.000,00 342.810.000,00
32 PERIKANAN - -
33 PASAR - -
34 TANJUNG LAGO - -
35 AIR SALEH - -
36 TUNGKAL ILIR - -
37 BANYUASIN I - -
38 MUARA SUGIHAN - -
39 BANYUASIN II - -
40 BANYUASIN III - -
41 BETUNG - -
42 MUARA TELANG - -
43 MUARA PADANG - -
44 MAKARTI JAYA - -
45 PULAU RIMAU - -
46 RAMBUTAN - -
47 RANTAU BAYUR - -
48 SUAK TAPEH - -
49 SEMBAWA - -
50 SUMBER MARGA TELANG - -
51 AIR KUMBANG - -
52 TALANG KELAPA - -
-
JUMLAH - - - - 342.810.000,00 - 342.810.000,00

Halaman 6 dari 7
total
No uraian BELANJA MODAL YANG TIDAK MENJADI ASSET BELANJA MODAL YANG MENJADI
BELANJA MODAL REKLAS TAMBAH REKLAS KURANG
HIBAH BARANG/JASA EXTRACOMTABLE ASSET
(1) (2) (3) (4) (5) (6) (7) (8) (9)=(3)-(4)-(5)-(6)+(7)-(8)

TOTAL 561.753.662.659,00 15.477.328.916,51 955.925.495,00 9.013.311.909,98 8.443.683.364,00 8.443.683.364,00 536.307.096.337,51

Halaman 7 dari 7
DAFTAR REKENING KAS DAERAH
LAMPIRAN : 4
Per 31 Desember 2013
NO. SALDO AKHIR
NO NAMA REKENING DEBIT KREDIT
REKENING 31/12/13

1 167-30-0xxxx REK. KAS UMUM DAERAH 35.962.706.641,00 4.114.375.819,57 98.652.645.565,77


2 167-30-0xxxx BEND PEMDA BA (DAU) 34.114,00 34.114,00 67.279.156,00
3 167-30-0xxxx BEND PEMDA BA (GAJI) 851.609,00 851.609,00 276.071.398,00
4 167-30-0xxxx BEND PEMDA BA (DAK) 0,00 0,00 0,00
5 167-30-0xxxx DANA DAK REBOISASI 0,00 0,00 12.262.535,00
6 167-30-0xxxx DANA BANTUAN BENCANA ALAM 0,00 476.227,00 376.308.341,77
7 167-30-0xxxx BO III PBB 0,00 0,00 0,00
8 167-30-0xxxx BO III BPHTB 0,00 0,00 0,00
9 167-30-0xxxx DAK BID. PENDIDIKAN 0,00 0,00 0,00
10 167-30-0xxxx IURAN WAJIB PEGAWAI 0,00 0,00 0,00
11 167-30-0xxxx PPH PASAL 21 0,00 0,00 0,00
12 167-30-0xxxx IURAN ASKES 0,00 0,00 0,00
13 167-30-0xxxx TAPERUM PNS 0,00 0,00 0,00
14 167-30-0xxxx DANA STIMULAN BANTUAN DAERAH 0,00 0,00 0,00
15 167-30-0xxxx HASIL PENJUALAN ASET DAERAH 0,00 0,00 0,00
16 167-30-0xxxx TGR/TPTGR 0,00 0,00 0,00
17 167-30-0xxxx PEND. DENDA KETERLAMBATAN PEKERJAAN 5.085.000,00 5.085.000,00 0,00
18 167-30-0xxxx PEND. DARI PENGEMBALIAN 0,00 0,00 0,00
19 167-30-0xxxx KAPITALISASI RJTP ASKES & LEBAK LEBUNG 0,00 0,00 0,00
20 167-30-0xxxx PAJAK DAERAH NON PBB & BPHTB 9.355.000,00 9.355.000,00 0,00
21 167-30-0xxxx RETRIBUSI DAERAH 4.870.000,00 4.870.000,00 0,00
22 167-30-0xxxx SETORAN TU/UP/GU 1.195.695.258,00 1.195.695.258,00 0,00
23 167-30-0xxxx PENDAPATAN DARI PENGEMBALIAN LAINNYA 0,00 0,00 0,00
24 167-30-0xxxx BPHTB KAB. BANYUASIN 9.000.000,00 9.000.000,00 0,00
25 167-30-0xxxx PENDAPATAN ASLI DAERAH 4.822.056,00 4.822.056,00 0,00

37.192.419.678,00 5.344.565.083,57 99.384.566.996,54


KAS DI BENDAHARA PENGELUARAN
Per 31 Desember 2013 LAMPIRAN : 5

KAS DI BENDAHARA
SISA KAS TAHUN UYHD 2013 UYHD 2013 SISA BELUM
KODE SKPD PENGELUARAN PER
2013 DISETOR 2013 31 DESEMBER 2013
DISETOR 2014 SETOR

1 2 3 4 5 6 7 = 5-6
1.01.01 1.Dinas Pendidikan 6.255.895.573,00 522.299.266,00 5.733.596.307,00 5.733.596.307,00 -
1.02.01 2.Dinas Kesehatan 477.077.390,74 477.077.390,74 - - -
1.02.02 3.Rumah Sakit Umum Daerah (RSUD) Tipe D 44.011.461,43 44.011.461,43 - - -
1.03.01 4.Dinas Pekerjaan Umum Cipta Karya 32.703.370,00 18.703.702,00 13.999.668,00 13.999.668,00 -
1.03.02 5.Dinas Pekerjaan Umum Bina Marga 104.166.565,00 104.166.565,00 - - -
1.03.03 6.Dinas PU Pengairan 42.742.140,00 42.630.250,00 111.890,00 111.890,00 -
1.06.01 7.Badan Perencanaan Pembangunan Daerah dan Penanaman Modal 185.313.022,00 185.313.022,00 - - -
1.07.01 8.Dinas Perhubungan Komunikasi dan Informatika 11.946.819,00 11.946.819,00 - - -
1.08.01 9.Badan Lingkungan Hidup 166.423.785,00 166.423.785,00 - - -
1.08.02 10.Dinas Kebersihan, Pertamanan dan Pemakaman 49.417.976,00 49.417.976,00 - - -
1.10.01 11.Dinas Kependudukan dan Catatan Sipil 66.833.261,00 66.833.261,00 - - -
1.12.01 12.Badan Pemberdayaan Perempuan, Perlindungan Anak dan KB 133.700.129,00 133.700.129,00 - - -
1.13.01 13.Dinas Sosial 170.851.776,00 170.751.776,00 100.000,00 100.000,00 -
1.14.01 14.Dinas Tenaga Kerja dan Transmigrasi 5.826.235,00 5.826.235,00 - - -
1.15.01 15.Dinas Koperasi, Usaha Kecil Menengah, Perindustrian dan Perdagangan 131.410.651,00 131.410.651,00 - - -
1.19.01 16.Badan Kesatuan Bangsa dan Politik 1.964.080.366,00 1.963.155.366,00 925.000,00 925.000,00 -
1.19.02 17.Satuan Polisi Pamong Praja 36.493.831,00 36.493.831,00 - - -
1.20.01 18.Dewan Perwakilan Rakyat - - - - -
1.20.02 19.Bupati dan Wakil Bupati - - - - -
1.20.03 20.Sekretariat Daerah 1.710.469.984,00 1.710.469.984,00 - - -
1.20.04 21.Sekretariat DPRD 1.372.752.888,00 1.262.684.588,00 110.068.300,00 110.068.300,00 -
1.20.05 22.Inspektorat Kabupaten 521.280.398,00 521.280.398,00 - - -
1.20.07 23.Badan Kepegawaian dan Diklat Daerah 534.288.848,00 534.288.848,00 - - -
1.20.08 24.Badan Perizinan Terpadu 11.100.198,00 11.100.198,00 - - -
1.20.09 25.Dinas Pendapatan, Pengelolaan Keuangan dan Aset Daerah 927.225.629,00 809.925.707,00 117.299.922,00 117.299.922,00 -
1.20.09 25.Dinas Pendapatan, Pengelolaan Keuangan dan Aset Daerah (PPKD) 490.376.664,00 490.376.664,00 - - -
1.20.10 26. Kecamatan Banyuasin I 17.551.960,00 17.536.960,00 15.000,00 15.000,00 -
1.20.11 27. Kecamatan Banyuasin III 19.115.703,00 19.115.703,00 - - -
1.20.12 28. Kecamatan Betung 5.005.702,00 5.005.702,00 - - -
1.20.13 29. Kecamatan Rantau Bayur - - - - -
1.20.14 30. Kecamatan Pulau Rimau - - - - -
Halaman 1 dari 2
KAS DI BENDAHARA
SISA KAS TAHUN UYHD 2013 UYHD 2013 SISA BELUM
KODE SKPD PENGELUARAN PER
2013 DISETOR 2013 31 DESEMBER 2013
DISETOR 2014 SETOR

1 2 3 4 5 6 7 = 5-6
1.20.15 31. Kecamatan Talang Kelapa 42.529.977,00 42.529.977,00 - - -
1.20.16 32. Kecamatan Rambutan 4.754.000,00 4.754.000,00 - - -
1.20.17 33. Kecamatan Tungkal Ilir 181.125,00 23.625,00 157.500,00 157.500,00 -
1.20.18 34. Kecamatan Tanjung Lago 1.948.611,00 1.948.611,00 - - -
1.20.19 35. Kecamatan Sembawa 285.637,00 285.637,00 - - -
1.20.20 36. Kecamatan Suak Tape 41.906.500,00 41.906.500,00 - - -
1.20.21 37. Kecamatan Banyuasin II 99.982,00 - 99.982,00 99.982,00 -
1.20.22 38. Kecamatan Makarti Jaya 14.545.124,00 14.545.124,00 - - -
1.20.23 39. Kecamatan Muara Padang - - - - -
1.20.24 40. Kecamatan Muara Sugihan - - - - -
1.20.25 41. Kecamatan Muara Telang 42.298.266,00 42.298.266,00 - - -
1.20.26 42. Kecamatan Air Salek 1.197,00 1.197,00 - - -
1.20.27 43. Kecamatan Sumber Marga Telang 527.915,00 527.915,00 - - -
1.20.28 44. Kecamatan Air Kumbang 17.969.100,00 - 17.969.100,00 17.969.100,00 -
1.21.01 45.Badan Ketahanan Pangan 59.097.248,00 59.097.248,00 - - -
1.22.01 46.Badan Pemberdayaan Masyarakat dan Pemerintahan Desa. 208.120.834,00 208.120.771,00 63,00 63,00 -
1.26.01 47.Badan Perpustakaan, Arsip Daerah dan Dokumentasi 10.596.422,00 10.596.422,00 - - -
2.01.01 48.Dinas Pertanian dan Peternakan 18.655.867,00 18.655.867,00 - - -
2.01.02 49.Badan Pelaksana Penyuluhan Pertanian, Perikanan dan Kehutanan 26.550.529,00 26.550.529,00 - - -
2.02.01 50.Dinas Kehutanan dan Perkebunan 109.347.343,00 109.347.343,00 - - -
2.03.01 51.Dinas Pertambangan dan Energi 4.618.111,00 4.618.111,00 - - -
2.04.01 52.Dinas Pariwisata, Seni, Budaya, Pemuda dan Olahraga 69.051.082,00 69.051.082,00 - - -
2.05.01 53.Dinas Perikanan dan Kelautan 48.465.100,00 48.429.100,00 36.000,00 36.000,00 -
2.06.01 54.Dinas Pengelolaan Pasar 1.186.711,00 1.186.711,00 - - -
TOTAL 16.210.799.006,17 10.216.420.274,17 5.994.378.732,00 5.994.378.732,00 -

Halaman 2 dari 2
DAFTAR PIUTANG TP/TGR LAMPIRAN : 6.a
Per 31 Desember 2013
(dalam rupiah)
Jenis Kasus
No. Nama SKPD Jumlah Kerugian Angsuran Sisa
(tahun)

A. TP
- - - - - -
Sub Jumlah TP NIHIL

B. TGR
1. Ed BAPEDDA TGR-2012 9.500.000,00 6.400.000,00 3.100.000,00
2. AS DPPKAD TGR-2012 14.800.000,00 9.920.000,00 4.880.000,00
3. AA, S.Pd Penyuluh KB TGR-2012 6.000.000,00 1.250.000,00 4.750.000,00
4. Hy Disnakertrans TGR-2011 13.200.000,00 550.000,00 12.650.000,00
5. EAm Dishutbun TGR-2012 18.240.000,00 1.520.000,00 16.720.000,00
- - - - - -
Sub Jumlah/TGR 61.740.000,00 19.640.000,00 42.100.000,00
Sub Jumlah TP/TGR 61.740.000,00 19.640.000,00 42.100.000,00

Catatan :
TGR a.n. Ed, AS, AA, S.Pd, Hy, dan EAm seluruhnya dimasukan ke piutang TP/TGR (lancar) karena :
1 SKTJM a.n Ed tertanggal 1 Juni 2012 menyebutkan bahwa jumlah kerugian/kekurangan tersebut diganti dalam jangka
waktu 24 (dua puluh empat) bulan tmt bulan Juli 2012 s.d. bulan Juni 2014.
2 SKTJM a.n AS tertanggal 1 Juni 2012 menyebutkan bahwa jumlah kerugian/kekurangan tersebut diganti dalam jangka
waktu 24 (dua puluh empat) bulan tmt bulan Juli 2012 s.d. bulan Juni 2014.
3 SKTJM a.n AA, S.Pd tertanggal 26 April 2013 menyebutkan bahwa jumlah kerugian/kekurangan tersebut diganti dalam
jangka waktu 24 (dua puluh empat) bulan tmt bulan Juli 2013 s.d. bulan Juni 2015.
4 SKTJM a.n Hy tertanggal 17 Juli 2013 menyebutkan bahwa jumlah kerugian/kekurangan tersebut diganti dalam jangka
waktu 24 (dua puluh empat) bulan tmt bulan Agustus 2013 s.d. bulan September 2015.
5 SKTJM a.n EAm tertanggal 17 Juli 2013 menyebutkan bahwa jumlah kerugian/kekurangan tersebut diganti dalam
jangka waktu 24 (dua puluh empat) bulan tmt bulan Agustus 2013 s.d. bulan Juli 2015.
6 Karena masa pengembalian tersebut hanya menyebutkan jangka waktu pengembalian, maka piutang tersebut selalu ada
kemungkinan dapat diselesaikan selama setahun, dan oleh karenanya dalam neraca disajikan sebagai piutang lancar.
LAMPIRAN : 6.b

TP/TGR (KASUS KERUGIAN DAERAH YANG SEDANG DALAM PROSES PENETAPAN


PEMBEBANAN) Per 31 DESEMBER 2013

NO NAMA SKPD TP/TGR JUMLAH (Rp) PENJELASAN


1 M Dinas Pendidikan TGR 2004 12.769.500,00 Pembayaran gaji
kepada pegawai yang
tidak melaksanakan
tugas, yaitu pegawai
a.n. Pa.
2 H.M.U Kecamatan Betung TGR-2004 - Kehilangan motor
dinas merk Honda win
100cc
3 AM Lurah Makarti Jaya TGR 2005 - Kehilangan motor
dinas Yamaha RXS,
BG 8491 BZ, Tahun
2002, tanggal 20
Februari 2008
4 PPJ TNI AD TGR 2008 15.000.000,00 Kehilangan motor
dinas Honda Mega Pro
BG 5372 JZ
5 S Staf BPMPD TGR 2011 - Kehilangan Motor
Dinas Yamaha Jupiter
Z Tahun 2009 No. Pol
BG 5833 JZ pada hari
Rabu Tanggal 4 Mei
2011

6 MD, ST Badan Pemberdayaan TGR 2013 - Kehilangan Kendaraan


Perempuan, Dinas Roda 2 Merek
Perlindungan Anak dan Honda Revo No. Pol.
KB (Kasubbag. Umum BG 5882 JZ pada hari
dan Kepegawaian) Selasa Tgl. 01 Oktober
2013

7 Dra. SPM Penyuluhan KB Kec. TGR 2013 - Kehilangan Sepeda


Rambutan Kab. Motor Operasional
Banyuasin Merek Yamaha Jupiter
MX No. Pol BG 5795
JZ pada hari Selasa
Tanggal 22 Oktober
2013
Jumlah 27.769.500,00
DAFTAR REKAPITULASI PENYELESAIAN KERUGIAN DAERAH
ATAS KELEBIHAN BELANJA PADA DEWAN PERWAKILAN RAKYAT DAERAH (DPRD) KAB. BANYUASIN
TAHUN ANGGARAN 2003 S.D. TAHUN ANGGARAN 2008 LAMPIRAN : 7
TOTAL PIUTANG ANGSURAN 2012 ANGSURAN 2013 Saldo per 31 ANGSURAN S/D JAN 2014
No. Nama SALDO KET
Thn. 2003 Thn. 2004 Thn. 2005 Thn. 2006 Thn. 2008 Jumlah Jumlah Tgl. Setor Jumlah Tgl. Setor Desember 2013 Jumlah Tgl. Setor
1 Drs. H. ZM 83.090.805 82.131.692 165.222.497 165.222.497 14.000.000 05-03-2014 151.222.497
2 LAD, SH 5.552.995 97.635.960 17.990.000 15.000.000 2.276.400 138.455.355 138.455.355 2.016.400 10-01-2014 260.000
15.000.000 10-01-2014
17.990.000 10-01-2014
2.115.000 10-01-2014
95.520.960 10-01-2014
5.552.995 10-01-2014
3 Drs. NW 10.177.805 58.788.960 14.920.000 12.000.000 1.762.000 97.648.765 5.000.000 23-07-2012 92.648.765 92.648.765 13-01-2014 -
4 Ir. AAM, M.Sc 93.402.217 87.460.420 180.862.637 180.862.637 1.000.000 Tgl tdk jelas 178.862.637
1.000.000 Tgl tdk jelas
5 IS, SH 53.215.615 75.997.420 11.190.000 10.000.000 1.771.300 152.174.335 5.000.000 24-04-2013 21.101.915 1.771.300 08-01-2014 5.000.000
5.000.000 24-04-2013 1.115.000 08-01-2014
2.000.000 24-05-2013 13.215.615 08-01-2014
11.190.000 24-04-2013
1.000.000 21-05-2013
66.882.420 25-11-2013
40.000.000 22-11-2013
6 RzR 86.020.805 86.020.805 86.020.805 2.000.000 17-02-2014 82.020.805
2.000.000 13-03-2014
7 AMs 88.393.805 95.885.960 184.279.765 184.279.765 500.000 tdk ada tgl 183.779.765
8 STE 89.496.815 94.857.960 184.354.775 3.100.000 21-05-2013 181.254.775 181.254.775 07-01-2014 -
9 DRS. AM 2.115.000 19.390.000 15.000.000 36.505.000 36.505.000 2.000.000 03-03-2014 34.505.000
koreksi
10 Ar. MD 22.004.000 21.000.000 43.004.000 2.000.000 09-04-2013 - Rp.4000
21.000.000 09-04-2013
20.000.000 03-04-2013
11 JA 13.000.000 14.000.000 2.070.900 29.070.900 29.070.900 29.070.900 -
12 And, S.KOM 15.000.000 13.000.000 954.100 28.954.100 28.954.100 954.100 09-01-2014 -
13.000.000 09-01-2014
15.000.000 09-01-2014 -
13 H.A. GP 17.000.000 15.000.000 2.251.000 34.251.000 34.251.000 4.251.000 04-03-2014 30.000.000
14 HJ. F, SE 15.000.000 15.000.000 1.949.400 31.949.400 31.949.400 3.920.000 06-02-2014 28.029.400
15 LR 19.000.000 15.000.000 2.053.200 36.053.200 36.053.200 5.000.000 06-03-2014 31.053.200
16 NH, SH 18.390.000 14.000.000 2.620.500 35.010.500 2.620.500 20-06-2013 - -
14.000.000 20-06-2013
15.290.000 20-06-2013
3.100.000 21-05-2013

Halaman 1 dari 3
TOTAL PIUTANG ANGSURAN 2012 ANGSURAN 2013 Saldo per 31 ANGSURAN S/D JAN 2014
No. Nama SALDO KET
Thn. 2003 Thn. 2004 Thn. 2005 Thn. 2006 Thn. 2008 Jumlah Jumlah Tgl. Setor Jumlah Tgl. Setor Desember 2013 Jumlah Tgl. Setor
17 H. HH 17.600.000 15.000.000 3.435.800 36.035.800 36.035.800 3.000.000 04-02-2014 33.035.800
18 SSS 13.500.000 4.107.000 17.607.000 4.107.000 04-11-2013 13.500.000 13.500.000
19 AK. AR 15.000.000 15.000.000 15.000.000 1.500.000 10-03-2014 13.500.000
20 Jf 15.000.000 2.905.700 17.905.700 17.905.700 2.905.700 27-01-2014 8.905.700
6.094.300 27-01-2014
21 Adn, S.Sos 732.700 732.700 732.700 06-05-2013 - - PNS
22 Drs. Nz 220.400 220.400 220.400 06-05-2013 - - PNS
23 FS, SH 515.500 515.500 515.500 515.500 23-01-2014 - PNS
24 GS 723.400 723.400 723.400 723.400 07-01-2014 - PNS
25 H. AS 2.298.500 2.298.500 2.298.500 28-03-2013 - -
26 H. M. BDA 815.600 815.600 815.600 28-03-2013 - -
27 Ir. WK, MM 331.900 331.900 331.900 11-11-2013 - -
28 H. HZ, S. Ag 3.911.600 3.911.600 3.911.600 3.911.600 28-01-2014 -
29 Hrw 565.500 565.500 565.500 565.500 22-01-2014 -
30 IH , S. Hut 2.188.300 2.188.300 2.188.300 2.188.300 14-02-2014 -
Koreksi tahun 2005 (196.000) (196.000) (196.000) (196.000)
509.350.862 594.873.372 200.288.000 217.500.000 40.460.700 1.562.472.934 5.000.000 220.689.020 1.336.779.914 543.301.110 793.478.804

1 ZBH 95.228.347 95.544.520 190.772.867 190.772.867 190.772.867


2 Letkol (CHB) M, ST., MM 92.007.555 22.172.520 114.180.075 114.180.075 114.180.075
meninggal
3 MH 89.103.205 95.391.520 184.494.725 184.494.725 184.494.725 dunia
4 RA 84.604.375 95.842.520 180.446.895 180.446.895 180.446.895
5 AAG 89.881.379 95.776.520 185.657.899 185.657.899 185.657.899
6 Hyt, A.Md 84.428.805 97.362.420 10.390.000 15.000.000 207.181.225 207.181.225 207.181.225
7 DH 17.428.805 97.362.420 15.000.000 15.000.000 144.791.225 144.791.225 144.791.225
8 ARJ 89.428.805 96.053.420 185.482.225 185.482.225 185.482.225
9 Drs. BEA 89.183.455 95.283.420 184.466.875 184.466.875 184.466.875
10 H. NH 89.325.455 95.722.420 185.047.875 185.047.875 185.047.875
11 AMf 84.517.995 95.507.420 180.025.415 180.025.415 180.025.415
12 MHr, SH 89.377.145 94.542.420 183.919.565 183.919.565 183.919.565
13 H. MB, SH., MM 90.312.329 95.791.960 186.104.289 186.104.289 186.104.289
meninggal
14 HM. RY 84.428.805 95.410.420 179.839.225 179.839.225 179.839.225 dunia
15 Amr, S.Ip 88.606.995 95.887.960 184.494.955 184.494.955 184.494.955
16 MS 89.215.615 95.379.420 184.595.035 184.595.035 184.595.035
17 AADM 88.580.217 88.580.217 88.580.217 88.580.217
18 Sg, SE 92.358.805 28.912.420 15.000.000 15.000.000 1.154.000 152.425.225 152.425.225 152.425.225
19 AS, SH 88.261.139 95.929.960 184.191.099 184.191.099 184.191.099
20 Gnr 92.054.805 95.885.420 187.940.225 187.940.225 187.940.225
21 AH, SH 92.921.981 96.097.960 189.019.941 189.019.941 189.019.941
meninggal
22 Bhn HN 87.304.805 95.611.420 2.014.400 184.930.625 184.930.625 184.930.625 dunia
Halaman 2 dari 3
TOTAL PIUTANG ANGSURAN 2012 ANGSURAN 2013 Saldo per 31 ANGSURAN S/D JAN 2014
No. Nama SALDO KET
Thn. 2003 Thn. 2004 Thn. 2005 Thn. 2006 Thn. 2008 Jumlah Jumlah Tgl. Setor Jumlah Tgl. Setor Desember 2013 Jumlah Tgl. Setor
meninggal
23 Drs. H. S.AS 45.538.895 95.519.520 13.769.000 15.000.000 169.827.415 169.827.415 169.827.415 dunia
24 Kapt. Inf. Ts 87.993.789 95.943.420 183.937.209 183.937.209 183.937.209
25 Kapt. (Sus) AA, S.Ag., S.Sos 92.309.115 95.485.960 187.795.075 187.795.075 187.795.075
26 Dmd 89.271.955 95.655.420 184.927.375 184.927.375 184.927.375
meninggal
27 Np, BA 6.492.250 6.492.250 6.492.250 6.492.250 dunia
meninggal
28 Drs. AHY 75.625.685 75.625.685 75.625.685 75.625.685 dunia
29 Hs HM 89.783.520 15.000.000 15.000.000 4.196.400 123.979.920 123.979.920 123.979.920
30 Jn 95.684.520 15.000.000 15.000.000 2.710.000 128.394.520 128.394.520 128.394.520
31 BS 96.918.420 19.000.000 15.000.000 130.918.420 130.918.420 130.918.420
32 DA 2.115.000 19.250.000 15.000.000 4.875.800 41.240.800 41.240.800 41.240.800
33 DR.(HC) SHAJ 75.064.420 15.000.000 15.000.000 1.800.800 106.865.220 106.865.220 106.865.220
34 Rdy 2.115.000 19.000.000 15.000.000 2.708.300 38.823.300 38.823.300 38.823.300
35 DRS. RH 97.853.420 17.000.000 15.000.000 2.880.600 132.734.020 132.734.020 132.734.020
36 ND 95.237.960 17.000.000 15.000.000 5.144.800 132.382.760 132.382.760 132.382.760
37 Spd, SH 2.115.000 19.000.000 15.000.000 36.115.000 36.115.000 36.115.000
38 Kyn 2.115.000 16.450.000 15.000.000 4.051.800 37.616.800 37.616.800 37.616.800
39 TP 2.115.000 21.390.000 15.000.000 1.659.500 40.164.500 40.164.500 40.164.500
40 RjR 96.088.420 96.088.420 96.088.420 96.088.420
41 AWN 50.603.420 50.603.420 50.603.420 50.603.420
42 AH. DM 96.520.420 96.520.420 96.520.420 96.520.420
43 YTSD, ST 67.313.000 67.313.000 67.313.000 67.313.000
44 AMl 15.990.000 15.000.000 4.989.500 35.979.500 35.979.500 35.979.500
45 DAR 17.000.000 15.000.000 2.793.000 34.793.000 34.793.000 34.793.000
46 Ans, SH 19.600.000 15.000.000 5.438.300 40.038.300 40.038.300 40.038.300
47 DTK 17.000.000 15.000.000 3.450.600 35.450.600 35.450.600 35.450.600
48 Jmd 17.390.000 15.000.000 4.524.000 36.914.000 36.914.000 36.914.000
49 BB 15.990.000 15.000.000 30.990.000 30.990.000 30.990.000
50 Srj 17.390.000 15.000.000 3.319.000 35.709.000 35.709.000 35.709.000
51 SSH/SK 15.000.000 15.000.000 15.000.000 15.000.000
52 RHR 7.500.000 2.103.700 9.603.700 9.603.700 9.603.700
PNS/
Meningal
53 AY 2.793.000 2.793.000 2.793.000 2.793.000 Dunia
54 ARS 2.805.000 2.805.000 2.805.000 2.805.000 PNS
2.285.792.511 3.125.715.320 367.609.000 352.500.000 65.412.500 6.197.029.331 - - - - 6.197.029.331 - - 6.197.029.331

JUMLAH 2.795.143.373 3.720.588.692 567.897.000 570.000.000 105.873.200 7.759.502.265 5.000.000 - 220.689.020 - 7.533.809.245 543.301.110 - 6.990.508.135 -

Halaman 3 dari 3
REKAPITULASI PIUTANG LAINNYA
per 31 Desember 2013 LAMPIRAN : 8

BULAN DAN TAHUN SALDO AWAL PENAMBAHAN PENGURANGAN SALDO AKHIR


NO NAMA
PENSIUN PIUTANG PIUTANG PIUTANG PIUTANG
1 AS TAHUN 2012 10.500.000,00 0,00 9.000.000,00 1.500.000,00
2 AN TAHUN 2012 8.500.000,00 0,00 6.000.000,00 2.500.000,00
3 US SY TAHUN 2012 8.000.000,00 0,00 6.000.000,00 2.000.000,00
4 Shr TAHUN 2012 6.750.000,00 0,00 6.750.000,00 -
5 HBTJ TAHUN 2012 2.000.000,00 0,00 2.000.000,00 -
6 Ar TAHUN 2012 500.000,00 0,00 500.000,00 -
7 Msk TAHUN 2012 10.400.000,00 0,00 4.200.000,00 6.200.000,00
8 ES TAHUN 2012 1.000.000,00 0,00 1.000.000,00 -
9 Syfd TAHUN 2012 12.500.000,00 0,00 6.000.000,00 6.500.000,00
10 MS TAHUN 2012 1.000.000,00 0,00 1.000.000,00 -
11 Drs.H. Sd TAHUN 2012 5.800.000,00 0,00 5.800.000,00 -
12 Drs. H. IYF TAHUN 2012 3.500.000,00 0,00 3.500.000,00 -
13 LI TAHUN 2012 4.000.000,00 0,00 2.400.000,00 1.600.000,00
14 R.M. IHS TAHUN 2012 11.750.000,00 0,00 3.000.000,00 8.750.000,00
15 SS JANUARI 2013 - 2.000.000,00 2.000.000,00 -
16 SI JANUARI 2013 - 1.000.000,00 1.000.000,00 -
17 Drs.H.A. A, Msi JANUARI 2013 - 15.000.000,00 11.000.000,00 4.000.000,00
18 Stm JANUARI 2013 - 0,00 - -
19 BS JANUARI 2013 - 1.000.000,00 1.000.000,00 -
20 Pd FEBRUARI 2013 - 0,00 - -
21 SH FEBRUARI 2013 - 0,00 - -
22 SABTA FEBRUARI 2013 - 0,00 - -
23 Mk SH FEBRUARI 2013 - 3.500.000,00 3.500.000,00 -
24 SB FEBRUARI 2013 - 0,00 - -
25 Stn, SP FEBRUARI 2013 - 1.200.000,00 1.200.000,00 -
26 Yh MARET 2013 - 14.000.000,00 14.000.000,00 -
27 Spy MARET 2013 - 0,00 - -
28 ZA APRIL_2013 - 1.000.000,00 1.000.000,00 -
29 Drn APRIL_2013 - 1.000.000,00 1.000.000,00 -
30 Awl APRIL_2013 - 35.000.000,00 4.000.000,00 31.000.000,00
31 DS, SE APRIL_2013 - 1.500.000,00 1.500.000,00 -
32 AKy APRIL_2013 - 0,00 - -
33 SW, BA APRIL_2013 - 4.000.000,00 4.000.000,00 -
34 DRS. MM APRIL_2013 - 28.500.000,00 6.000.000,00 22.500.000,00
35 Ir. M. ZH, M.si MEI 2013 - 8.000.000,00 5.600.000,00 2.400.000,00
36 KS MEI 2013 - 0,00 - -
37 Sdm MEI 2013 - 2.000.000,00 2.000.000,00 -
38 RS MEI 2013 - 1.000.000,00 1.000.000,00 -
39 ADS SH.M.Hum JUNI 2013 - 3.000.000,00 3.000.000,00 -
40 TS JUNI 2013 - 2.500.000,00 2.500.000,00 -
41 FR JUNI 2013 - 1.000.000,00 1.000.000,00 -
42 AL JULI 2013 - 2.000.000,00 1.000.000,00 1.000.000,00
43 AZ JULI 2013 - 0,00 - -
44 Skr JULI 2013 - 4.000.000,00 4.000.000,00 -
45 Jn JULI 2013 - 2.000.000,00 - 2.000.000,00
46 B HZ JULI 2013 - 11.000.000,00 2.750.000,00 8.250.000,00
47 EY AGUSTUS 2013 - 0,00 - -
48 Skw SEPTEMBER_2013 - 15.000.000,00 1.500.000,00 13.500.000,00
49 AFT SH SEPTEMBER_2013 - 2.000.000,00 1.500.000,00 500.000,00
50 MA SEPTEMBER_2013 10.000.000,00 10.000.000,00 -
51 ACHS SEPTEMBER_2013 1.200.000,00 1.200.000,00 -
52 Hlm OKTOBER_2013 0,00 - -
53 Afg OKTOBER_2013 40.000.000,00 2.000.000,00 38.000.000,00

Halaman 1 dari 2
BULAN DAN TAHUN SALDO AWAL PENAMBAHAN PENGURANGAN SALDO AKHIR
NO NAMA
PENSIUN PIUTANG PIUTANG PIUTANG PIUTANG
54 Syf, SH OKTOBER_2013 3.000.000,00 2.000.000,00 1.000.000,00
55 AsN NOVEMBER_2013 2.000.000,00 1.000.000,00 1.000.000,00
56 ZH NOVEMBER_2013 2.000.000,00 400.000,00 1.600.000,00
57 M. SH DESEMBER 2013 0,00 - -
58 M. Zn DESEMBER 2013 1.000.000,00 - 1.000.000,00
59 YPS DESEMBER 2013 0,00 - -
TOTAL 86.200.000,00 221.400.000,00 150.800.000,00 156.800.000,00

Halaman 2 dari 2
DAFTAR SALDO PERSEDIAAN
Per 31 Desember 2013 LAMPIRAN : 9

Jenis Persediaan
No. Unit Kerja Bahan Jumlah
Alat
ATK Alat Listrik Barang Cetakan Obat-obatan BHP Alkes Kimia/bibit/BB
Kebersihan
M/Makanan

1 Dinas Pendidikan 315.000,00 0,00 0,00 0,00 0,00 0,00 100.000,00 415.000,00
2 Dinas Kesehatan 5.357.300,00 0,00 0,00 0,00 8.334.970.930,77 0,00 0,00 8.340.328.230,77
3 RSUD Tipe D 17.632.240,00 0,00 0,00 0,00 493.882.131,00 0,00 0,00 511.514.371,00
4 DPU Cipta Karya 338.250,00 0,00 0,00 0,00 0,00 0,00 0,00 338.250,00
5 DPU Bina Marga 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
6 DPU Pengairan 4.017.000,00 0,00 500.000,00 918.000,00 0,00 0,00 141.875.000,00 147.310.000,00
7 BAPPEDA dan PM 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
8 Dishub Kominfo 865.250,00 0,00 0,00 0,00 0,00 0,00 0,00 865.250,00
9 B Lingkungan Hidup 1.100.000,00 0,00 0,00 0,00 0,00 0,00 0,00 1.100.000,00
10 Dinas Kebersihan, PP 192.000,00 0,00 0,00 0,00 0,00 0,00 0,00 192.000,00
11 Disduk dan Capil 924.400,00 87.000,00 290.072.910,00 144.000,00 0,00 0,00 0,00 291.228.310,00
12 BP Keluarga Berencana 474.400,00 0,00 0,00 0,00 0,00 0,00 0,00 474.400,00
13 Dinas Kesos 1.785.300,00 0,00 0,00 0,00 0,00 43.722.000,00 1.020.000,00 46.527.300,00
14 Dinas Nakertrans 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
15 Dinas Koperindag 1.292.000,00 0,00 0,00 0,00 0,00 0,00 0,00 1.292.000,00
16 Badan Kesbangpol 98.700,00 0,00 0,00 0,00 0,00 0,00 0,00 98.700,00
17 Satuan Polisi Pamong Praja 1.742.800,00 0,00 0,00 0,00 0,00 0,00 0,00 1.742.800,00
18 Kepala Daerah dan WKD 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
19 Sekretariat Daerah 47.477.475,00 0,00 0,00 0,00 0,00 0,00 0,00 47.477.475,00
20 DPRD 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
21 Sekretariat DPRD 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
22 Inspektorat Kabupaten 2.113.000,00 0,00 0,00 0,00 0,00 0,00 0,00 2.113.000,00
23 Dinas PPKAD 41.420.154,00 0,00 21.157.050,00 0,00 0,00 0,00 0,00 62.577.204,00
24 BKD 974.400,00 0,00 1.010.000,00 0,00 0,00 0,00 0,00 1.984.400,00
25 BPT 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
26 Baketpan 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
27 BPMPD 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
28 BPAD 4.683.400,00 741.000,00 670.000,00 1.100.000,00 0,00 0,00 0,00 7.194.400,00
29 Dinas Pertanak 2.788.750,00 0,00 0,00 0,00 0,00 0,00 369.002.500,00 371.791.250,00
30 BPPPPK 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
31 Dinas Hutbun 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
32 Dispertamben 386.800,00 0,00 187.500,00 0,00 0,00 0,00 0,00 574.300,00
33 Dis Parsosbud 263.000,00 0,00 0,00 0,00 0,00 0,00 0,00 263.000,00
34 Diskanlat 19.125.850,00 2.848.000,00 0,00 0,00 0,00 0,00 63.664.000,00 85.637.850,00
35 Dinas Pasar 618.800,00 0,00 726.550,00 0,00 0,00 0,00 0,00 1.345.350,00
36 Kecamatan Banyuasin I 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
37 Kecamatan Banyuasin III 1.375.000,00 0,00 0,00 0,00 0,00 0,00 0,00 1.375.000,00
38 Kecamatan Betung 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
39 Kecamatan Rantau Bayur 3.383.000,00 0,00 0,00 0,00 0,00 0,00 0,00 3.383.000,00
40 Kecamatan Pulau Rimau 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
41 Kecamatan Talang Kelapa 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
42 Kecamatan Rambutan 611.800,00 0,00 0,00 0,00 0,00 0,00 0,00 611.800,00
43 Kecamatan Tungkal Ilir 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
44 Kecamatan Tanjung lago 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
45 Kecamatan Sembawa 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
46 Kecamatan Suak Tapeh 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
47 Kecamatan Banyuasin II 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
48 Kecamatan Makarti Jaya 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
49 Kecamatan Muara Padang 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
50 Kecamatan Muara Sugihan 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
51 Kecamatan Muara Telang 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
52 Kecamatan Air Saleh 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
53 Kecamatan SM Telang 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
54 Kecamatan Air Kumbang 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
Jumlah 161.356.069,00 3.676.000,00 314.324.010,00 2.162.000,00 8.828.853.061,77 43.722.000,00 575.661.500,00 9.929.754.640,77
DAFTAR MUTASI ASET PER SKPD PER JENIS ASET PER 31 DESEMBER 2013 LAMPIRAN : 10
A. TANAH

Saldo 31 Desember 2012 Mutasi Tambah


No SKPD
(AUDITED)
Belanja Modal Kapitalisasi Hibah Reklas BBJ Reklas antar aset tetap Hutang Pindah SKPD

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

1 DIKNAS 27.536.476.500,00 165.413.520,00 - - - - -


2 KESEHATAN 4.857.208.750,00 - - - - - -
3 RSUD - - - - - - -
4 PUCK 542.600.000,00 - - - - - -
5 PUBM 13.733.606.946,78 387.301.719,00 - - - - -
6 PU AIR 563.000.000,00 - - - - - -
7 BAPPEDA DAN PM 490.000.000,00 - - - - - -
8 DISHUB 8.471.804.810,00 25.050.000,00 - - - - -
9 BLH - - - - - - -
10 KEBERSIHAN 2.997.000.375,00 2.420.000.000,00 - - - - -
11 CAPIL 552.000.000,00 - - - - - -
12 BAPEL KB - - - - - - -
13 DINSOS - - - - - - -
14 DISNAKER 2.346.332.071,00 - - - - - -
15 KOPERINDAG 525.000.000,00 - - - - - -
16 KESBANG 551.000.000,00 - - - - - -
17 SATPOL - - - - - - -
18 SEKDA 64.489.357.515,00 2.965.901.083,00 - - - - -
19 SETWAN 3.670.000.000,00 - - - - - -
20 INSPEKTORAT 541.000.000,00 - - - - - -
21 DPPKAD 583.200.000,00 - - - - - -
22 BKD 552.000.000,00 - - - - - -
23 BPT - 48.000.000,00 - - - - -
24 BAKETPAN 551.000.000,00 - - - - - -
25 BPMPD 538.000.000,00 - - - - - -
26 PERPUSTAKAAN 569.000.000,00 - - - - - -
27 PERTANIAN 1.397.036.530,00 197.600.000,00 - - - - -
28 BP4K 787.242.632,00 - - - - - -
29 DISHUTBUN 863.044.000,00 - - - - - -
30 DISTAMBEN 540.000.000,00 - - - - - -
31 PARIWISATA - - - - - -
32 PERIKANAN 714.420.427,00 - - 1,00 - - -
33 PASAR 2.388.900.000,00 - - - - - -
34 TANJUNG LAGO - - - - - - -
35 AIR SALEH - - - - - - -
36 TUNGKAL ILIR - - - - - - -
37 BANYUASIN I - - - - - - -
38 MUARA SUGIHAN - - - - - - -
39 BANYUASIN II - - - - - - -
40 BANYUASIN III - - - - - - -
41 BETUNG - - - - - - -
42 MUARA TELANG - - - - - - -
43 MUARA PADANG - - - - - - -
44 MAKARTI JAYA - - - - - - -
45 PULAU RIMAU - - - - - - -
46 RAMBUTAN - - - - - - -
47 RANTAU BAYUR - - - - - - -
48 SUAK TAPEH - - - - - - -
49 SEMBAWA - - - - - - -
50 SUMBER MARGA TELANG - - - - - - -
51 AIR KUMBANG - - - - - - -
52 TALANG KELAPA - - - - - - -

JUMLAH 141.350.230.556,78 6.209.266.322,00 - 1,00 - - -


TOTAL MUTASI TAMBAH 6.209.266.323,00

Halaman 1 dari 2
DAFTAR MUTASI ASET PER SKPD PER JENIS ASET PER 31 DESEMBER 2013 LAMPIRAN : 10
A. TANAH

Mutasi Kurang
Saldo 31 Desember 2012 Saldo 31 Desember
No SKPD
(AUDITED) Reklas ke Reklas ke Aset Lainnya 2013
Reklas ke BJ Rusak Salah Anggaran Ekstracomptabel Hibah Penghapusan Koreksi LK 2012
Persediaan / Antar Aset Tetap
(1) (2) (3) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20)

1 DIKNAS 27.536.476.500,00 - - - - - - - - 27.701.890.020,00


2 KESEHATAN 4.857.208.750,00 - - - - - - - - 4.857.208.750,00
3 RSUD - - - - - - - - - -
4 PUCK 542.600.000,00 - - - - - - - - 542.600.000,00
5 PUBM 13.733.606.946,78 - - - - - - - - 14.120.908.665,78
6 PU AIR 563.000.000,00 - - - - - - - - 563.000.000,00
7 BAPPEDA DAN PM 490.000.000,00 - - - - - - - - 490.000.000,00
8 DISHUB 8.471.804.810,00 - - - - - - - - 8.496.854.810,00
9 BLH - - - - - - - - - -
10 KEBERSIHAN 2.997.000.375,00 - - - - - - - - 5.417.000.375,00
11 CAPIL 552.000.000,00 - - - - - - - - 552.000.000,00
12 BAPEL KB - - - - - - - - - -
13 DINSOS - - - - - - - - - -
14 DISNAKER 2.346.332.071,00 - - - - - - - - 2.346.332.071,00
15 KOPERINDAG 525.000.000,00 - - - - - - - - 525.000.000,00
16 KESBANG 551.000.000,00 - - - - - - - - 551.000.000,00
17 SATPOL - - - - - - - - - -
18 SEKDA 64.489.357.515,00 - - - - - - - - 67.455.258.598,00
19 SETWAN 3.670.000.000,00 - - - - - - - - 3.670.000.000,00
20 INSPEKTORAT 541.000.000,00 - - - - - - - - 541.000.000,00
21 DPPKAD 583.200.000,00 - - - - - - - - 583.200.000,00
22 BKD 552.000.000,00 - - - - - - - - 552.000.000,00
23 BPT - - (48.000.000,00) - - - - - - -
24 BAKETPAN 551.000.000,00 - - - - - - - - 551.000.000,00
25 BPMPD 538.000.000,00 - - - - - - - - 538.000.000,00
26 PERPUSTAKAAN 569.000.000,00 - - - - - - - - 569.000.000,00
27 PERTANIAN 1.397.036.530,00 - - - - - - - - 1.594.636.530,00
28 BP4K 787.242.632,00 - - - - - - - - 787.242.632,00
29 DISHUTBUN 863.044.000,00 - - - - - - - - 863.044.000,00
30 DISTAMBEN 540.000.000,00 - - - - - - - - 540.000.000,00
31 PARIWISATA - - - - - - - - - -
32 PERIKANAN 714.420.427,00 - - - - - - - - 714.420.428,00
33 PASAR 2.388.900.000,00 - - - - - - - 3,00 2.388.900.003,00
34 TANJUNG LAGO - - - - - - - - - -
35 AIR SALEH - - - - - - - - - -
36 TUNGKAL ILIR - - - - - - - - - -
37 BANYUASIN I - - - - - - - - - -
38 MUARA SUGIHAN - - - - - - - - - -
39 BANYUASIN II - - - - - - - - - -
40 BANYUASIN III - - - - - - - - - -
41 BETUNG - - - - - - - - - -
42 MUARA TELANG - - - - - - - - - -
43 MUARA PADANG - - - - - - - - - -
44 MAKARTI JAYA - - - - - - - - - -
45 PULAU RIMAU - - - - - - - - - -
46 RAMBUTAN - - - - - - - - - -
47 RANTAU BAYUR - - - - - - - - - -
48 SUAK TAPEH - - - - - - - - - -
49 SEMBAWA - - - - - - - - - -
50 SUMBER MARGA TELANG - - - - - - - - - -
51 AIR KUMBANG - - - - - - - - - -
52 TALANG KELAPA - - - - - - - - - -

JUMLAH 141.350.230.556,78 - - (48.000.000,00) - - - - - 3,00 147.511.496.882,78


TOTAL MUTASI TAMBAH TOTAL MUTASI KURANG (47.999.997,00)

Halaman 2 dari 2
DAFTAR MUTASI ASET PER SKPD PER JENIS ASET PER 31 DESEMBER 2013 LAMPIRAN : 11
B. PERALATAN DAN MESIN

Saldo 31 Desember 2012 Mutasi Tambah


No SKPD
(AUDITED)
Belanja Modal Kapitalisasi Hibah Reklas BBJ Reklas antar aset tetap Hutang Pindah SKPD
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 DIKNAS 33.178.559.067,00 41.002.539.935,00 - - 194.600.000,00 - -
2 KESEHATAN 34.567.349.409,00 3.718.305.000,00 29.700.000,00 151.299.505,00 - - -
3 RSUD 7.736.788.988,00 962.095.824,00 89.900.000,00 - - -
4 PUCK 7.275.420.809,00 658.642.000,00 - - - - -
5 PUBM 9.868.061.756,00 546.360.000,00 - - - - -
6 PU AIR 5.389.199.500,00 2.055.440.095,00 - - - - -
7 BAPPEDA DAN PM 4.264.584.236,00 569.646.500,00 - - - - -
8 DISHUB 9.963.284.134,00 4.847.040.000,00 320.000.000,00 199.100.000,00 182.657.950,00 -
9 BLH 5.852.173.700,00 1.939.535.000,00 - - - - -
10 KEBERSIHAN 3.469.845.000,00 822.842.000,00 - - - - 575.092.026,00
11 CAPIL 3.466.531.647,20 2.526.514.060,00 28.250.000,00 - - - -
12 BAPEL KB 4.801.998.900,00 726.765.000,00 - - - - -
13 DINSOS 1.529.630.000,00 164.350.000,00 - - - - -
14 DISNAKER 3.190.301.000,00 1.396.789.600,00 - - - - -
15 KOPERINDAG 2.599.709.868,00 200.675.000,00 8.000.000,00 53.304.991,00 - - -
16 KESBANG 3.689.573.922,00 3.724.616.528,00 25.560.000,00 1.276.243.107,00 - - -
17 SATPOL 1.132.464.000,00 60.420.000,00 - - - - -
18 SEKDA 48.672.550.758,00 11.294.114.160,00 - - - 229.368.437,00 -
19 SETWAN 23.137.382.905,00 5.225.046.000,00 - - - - - -
20 INSPEKTORAT 2.957.764.995,00 647.966.280,00 110.557.000,00 - - - -
21 DPPKAD 4.809.473.659,00 4.147.246.551,00 - - - - -
22 BKD 2.157.108.660,00 591.160.000,00 - - - - -
23 BPT 2.281.571.575,00 1.158.105.900,00 - 21.433.500,00 - - -
24 BAKETPAN 2.890.745.393,00 9.425.056.993,00 - - - - -
25 BPMPD 1.829.399.366,00 403.764.000,00 - - - - -
26 PERPUSTAKAAN 3.760.068.080,00 297.053.650,00 - - - - -
27 PERTANIAN 10.911.122.992,00 1.055.202.545,00 - - - - -
28 BP4K 1.673.717.900,00 3.265.674.800,00 - - - - -
29 DISHUTBUN 3.458.386.281,00 929.924.200,00 - - - - -
30 DISTAMBEN 2.959.752.850,00 718.675.000,00 - - - - -
31 PARIWISATA 2.011.793.937,00 180.918.000,00 - - - - -
32 PERIKANAN 3.381.183.460,00 294.607.500,00 2.311.564,00 350.139.000,00 65.430.016,00 - 418.962.500,00 -
33 PASAR 2.577.596.025,00 291.200.000,00 - - - - (575.092.026,00)
34 TANJUNG LAGO 3.600.000,00 32.500.000,00 - - - - -
35 AIR SALEH 35.600.000,00 75.009.000,00 - - - - -
36 TUNGKAL ILIR - 64.234.680,00 - - - - -
37 BANYUASIN I 24.000.000,00 3.000.000,00 - - - - -
38 MUARA SUGIHAN 24.000.000,00 16.450.000,00 - - - - -
39 BANYUASIN II 26.300.000,00 76.260.000,00 - - - - -
40 BANYUASIN III 70.095.000,00 63.690.000,00 - - - - -
41 BETUNG 7.461.368,00 - - - - - -
42 MUARA TELANG - 75.000.000,00 - - - - -
43 MUARA PADANG - 80.980.000,00 - - - - -
44 MAKARTI JAYA 31.000.000,00 79.000.100,00 - - - - -
45 PULAU RIMAU - 38.000.000,00 - - - - -
46 RAMBUTAN 46.960.000,00 - - - - - -
47 RANTAU BAYUR 30.400.000,00 14.600.000,00 - - - - -
48 SUAK TAPEH 38.400.000,00 67.213.000,00 - - - - -
49 SEMBAWA 184.613.000,00 10.000.000,00 - - - - -
50 SUMBER MARGA TELANG - 92.225.225,00 - - - - -
51 AIR KUMBANG - 202.715.000,00 - - - - -
52 TALANG KELAPA 45.000.000,00 45.600.000,00 - - - - -

JUMLAH 262.012.524.140,20 106.884.769.126,00 294.278.564,00 2.172.420.103,00 65.430.016,00 393.700.000,00 830.988.887,00 -


TOTAL MUTASI TAMBAH 110.641.586.696,00

Halaman 1 dari 2
LAMPIRAN : 11
DAFTAR MUTASI ASET PER SKPD PER JENIS ASET PER 31 DESEMBER 2013
B. PERALATAN DAN MESIN

Mutasi Kurang
Saldo 31 Desember 2012 Saldo 31 Desember
No SKPD
(AUDITED) Reklas ke Reklas ke Aset Lainnya 2013
Reklas ke BJ Rusak Salah Anggaran Ekstracomptabel Hibah Penghapusan Koreksi LK 2012
Persediaan / Antar Aset Tetap
(1) (2) (3) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20)
1 DIKNAS 33.178.559.067,00 - (3.766.814.000,00) - - (7.433.541.900,98) (4.491.956.754,16) - - 58.683.386.346,86
2 KESEHATAN 34.567.349.409,00 - - (243.638.875,00) - (15.280.000,00) - - - 38.207.735.039,00
3 RSUD 7.736.788.988,00 - - - - - - (92.720.640,00) 8.696.064.172,00
4 PUCK 7.275.420.809,00 - - - - (19.842.900,00) - - (428.268.430,00) 7.485.951.479,00
5 PUBM 9.868.061.756,00 - - - - (8.175.000,00) - - - 10.406.246.756,00
6 PU AIR 5.389.199.500,00 - - - - (27.725.000,00) - - - 7.416.914.595,00
7 BAPPEDA DAN PM 4.264.584.236,00 - - (399.609.690,00) - - - - - 4.434.621.046,00
8 DISHUB 9.963.284.134,00 - (2.908.202.950,00) - - (11.010.600,00) - - - 12.592.868.534,00
9 BLH 5.852.173.700,00 - - (152.815.000,00) - (2.039.500,00) - - (2.796.800,00) 7.634.057.400,00
10 KEBERSIHAN 3.469.845.000,00 - - - - (10.000.000,00) - - - 4.857.779.026,00
11 CAPIL 3.466.531.647,20 - (391.920.000,00) - - (100.566.500,00) - - (451.406.700,00) 5.077.402.507,20
12 BAPEL KB 4.801.998.900,00 - - 2.700.000,00 - (5.000.000,00) - - (150.626.000,00) 5.375.837.900,00
13 DINSOS 1.529.630.000,00 - - (3.400.000,00) - (15.450.000,00) - - - 1.675.130.000,00
14 DISNAKER 3.190.301.000,00 - - (95.936.700,00) - (47.960.000,00) - - 4.443.193.900,00
15 KOPERINDAG 2.599.709.868,00 - - - - (17.250.000,00) - - - 2.844.439.859,00
16 KESBANG 3.689.573.922,00 - - (324.805.666,00) - (103.276.609,00) - - (30.645.652,00) 8.257.265.630,00
17 SATPOL 1.132.464.000,00 - - - - (9.110.700,00) - - - 1.183.773.300,00
18 SEKDA 48.672.550.758,00 (114.666.000,00) - - - (371.278.560,00) - - (25.770.000,00) 59.684.318.795,00
19 SETWAN 23.137.382.905,00 - (277.142.000,00) - - (273.339.000,00) - - (1.074.702.200,00) 26.737.245.705,00
20 INSPEKTORAT 2.957.764.995,00 - - (502.524.000,00) - (44.890.000,00) - - - 3.168.874.275,00
21 DPPKAD 4.809.473.659,00 - - - - (33.465.000,00) - - (10.783.452,00) 8.912.471.758,00
22 BKD 2.157.108.660,00 - (103.243.500,00) - - (21.000.000,00) - - 92.728.100 2.716.753.260,00
23 BPT 2.281.571.575,00 - (84.465.000,00) - - (759.000,00) - - - 3.375.886.975,00
24 BAKETPAN 2.890.745.393,00 - - - - - - (156.331.001,00) 12.159.471.385,00
25 BPMPD 1.829.399.366,00 - - - - - - - (36.800.030,00) 2.196.363.336,00
26 PERPUSTAKAAN 3.760.068.080,00 - (68.250.000,00) (23.715.000,00) - - (4.730.000,00) - - - 3.960.426.730,00
27 PERTANIAN 10.911.122.992,00 - - - - - - - (643.500,00) 11.965.682.037,00
28 BP4K 1.673.717.900,00 - - - - (18.860.000,00) - - - 4.920.532.700,00
29 DISHUTBUN 3.458.386.281,00 - - - - (27.635.000,00) - - (13.000.000,00) 4.347.675.481,00
30 DISTAMBEN 2.959.752.850,00 - - - - (1.500.000,00) - - (4.734.000,00) 3.672.193.850,00
31 PARIWISATA 2.011.793.937,00 - - - - - - - - 2.192.711.937,00
32 PERIKANAN 3.381.183.460,00 - (19.057.817,00) - - - (107.987.500,00) - - - 4.385.588.723,00
33 PASAR 2.577.596.025,00 - - - - (3.891.400,00) - - - 2.289.812.599,00
34 TANJUNG LAGO 3.600.000,00 - - - - (700.000,00) - - - 35.400.000,00
35 AIR SALEH 35.600.000,00 - - - - (1.595.000,00) - - (3.600.000,00) 105.414.000,00
36 TUNGKAL ILIR - - - - - (4.845.500,00) - - - 59.389.180,00
37 BANYUASIN I 24.000.000,00 - - - - - - - - 27.000.000,00
38 MUARA SUGIHAN 24.000.000,00 - - - - - - - - 40.450.000,00
39 BANYUASIN II 26.300.000,00 - - - - (12.980.000,00) - - - 89.580.000,00
40 BANYUASIN III 70.095.000,00 - - - - (23.550.000,00) - - (5.545.000,00) 104.690.000,00
41 BETUNG 7.461.368,00 - - - - - - - - 7.461.368,00
42 MUARA TELANG - - - - - (6.800.000,00) - - - 68.200.000,00
43 MUARA PADANG - - - - - (44.480.000,00) - - - 36.500.000,00
44 MAKARTI JAYA 31.000.000,00 - - - - - - - (800.000,00) 109.200.100,00
45 PULAU RIMAU - - - - - - - - - 38.000.000,00
46 RAMBUTAN 46.960.000,00 - - - - - - - (4.660.000,00) 42.300.000,00
47 RANTAU BAYUR 30.400.000,00 - - - - - - - - 45.000.000,00
48 SUAK TAPEH 38.400.000,00 - - - - (7.500.000,00) - - (3.100.000,00) 95.013.000,00
49 SEMBAWA 184.613.000,00 - - - - (21.115.240,00) - - - 173.497.760,00
50 SUMBER MARGA TELANG - - - - - (5.070.000,00) - - - 87.155.225,00
51 AIR KUMBANG - - - - - (45.840.000,00) - - - 156.875.000,00
52 TALANG KELAPA 45.000.000,00 - - - - - - - - 90.600.000,00

JUMLAH 262.012.524.140,20 (114.666.000,00) (87.307.817,00) (7.555.502.450,00) (1.720.029.931,00) - (8.910.039.909,98) (4.491.956.754,16) - (2.404.205.305,00) 347.370.402.669,06
TOTAL MUTASI TAMBAH TOTAL MUTASI KURANG (25.283.708.167,14)

Halaman 2 dari 2
LAMPIRAN : 12
DAFTAR MUTASI ASET PER SKPD PER JENIS ASET PER 31 DESEMBER 2013
C. GEDUNG DAN BANGUNAN

Saldo 31 Desember 2012 Mutasi Tambah


No SKPD
(AUDITED)
Belanja Modal Kapitalisasi Hibah Reklas BBJ Reklas antar aset tetap Hutang Pindah SKPD
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 DIKNAS 365.315.872.513,00 46.212.400.700,00 1.404.193.000,00 - 74.690.000,00 195.800.000,00 127.120.300,00 -
2 KESEHATAN 63.705.868.749,00 4.450.551.000,00 2.324.750.000,00 - - - -
3 RSUD 3.168.395.000,00 1.286.400.000,00 98.832.500,00 - - - -
4 PUCK 51.224.517.400,00 19.133.317.200,00 - - 99.519.000,00 549.830.800,00 -
5 PUBM 5.135.572.500,00 - - - - - -
6 PU AIR 4.554.596.085,00 149.600.000,00 - - - - -
7 BAPPEDA DAN PM 3.842.780.000,00 24.500.000,00 - - - - -
8 DISHUB 15.999.994.817,00 4.919.950.600,00 - - 739.452.950,00 - -
9 BLH 3.135.541.500,00 49.430.000,00 - - - - -
10 KEBERSIHAN 3.422.216.950,00 140.000.000,00 - - - 5.000.000,00 -
11 CAPIL 3.645.021.000,00 558.800.000,00 - - 90.370.000,00 391.920.000,00 - -
12 BAPEL KB 570.055.000,00 961.510.000,00 - - - - -
13 DINSOS 196.995.000,00 199.500.000,00 - 591.209.000,00 - - -
14 DISNAKER 5.647.415.000,00 - - - - - -
15 KOPERINDAG 8.135.736.675,00 11.269.870.000,00 - - - - -
16 KESBANG 6.775.340.000,00 325.060.000,00 2.780.000,00 - - - -
17 SATPOL 55.425.500,00 - - - - - -
18 SEKDA 83.484.484.916,00 - - - 106.150.000,00 - - -
19 SETWAN 44.603.581.180,00 347.260.000,00 - - 49.673.000,00 455.322.000,00 - -
20 INSPEKTORAT 3.701.253.500,00 186.391.000,00 - 140.059.000,00 - - -
21 DPPKAD 4.999.039.000,00 27.720.000,00 343.925.000,00 - - - -
22 BKD 3.754.481.900,00 16.000.000,00 - - 348.394.015,00 103.243.500,00 - -
23 BPT 210.854.000,00 - - - 84.465.000,00 - -
24 BAKETPAN 16.131.913.400,00 5.124.716.000,00 - - - - -
25 BPMPD 2.629.293.000,00 - - - - - -
26 PERPUSTAKAAN 8.398.644.000,00 193.900.000,00 5.000.000,00 - 23.715.000,00 - -
27 PERTANIAN 7.760.365.700,00 205.961.500,00 - - - - -
28 BP4K 2.898.211.000,00 3.351.280.000,00 - - - - -
29 DISHUTBUN 4.995.434.323,25 283.750.000,00 - 427.528.000,00 - - -
30 DISTAMBEN 4.343.714.000,00 75.000.000,00 - - 74.800.000,00 - - -
31 PARIWISATA 1.823.314.000,00 - - 833.377.000,00 - - -
32 PERIKANAN 10.567.447.825,00 2.237.185.400,00 19.444.629,00 - 189.091.168,00 484.017.500,00 -
33 PASAR 7.974.986.000,00 1.650.550.000,00 - - 44.000.000,00 - - -
34 TANJUNG LAGO - - - - - - -
35 AIR SALEH - - - - - - -
36 TUNGKAL ILIR - - - - - - -
37 BANYUASIN I - - - - - - -
38 MUARA SUGIHAN - - - - - - -
39 BANYUASIN II - - - - - - -
40 BANYUASIN III - - - - - - -
41 BETUNG - - - - - - -
42 MUARA TELANG - - - - - - -
43 MUARA PADANG - - - - - - -
44 MAKARTI JAYA - - - - - - -
45 PULAU RIMAU - - - - - - -
46 RAMBUTAN - - - - - - -
47 RANTAU BAYUR - - - - - - -
48 SUAK TAPEH - - - - - - -
49 SEMBAWA - - - - - - -
50 SUMBER MARGA TELANG - - - - - - -
51 AIR KUMBANG - - - - - - -
52 TALANG KELAPA - - - - - - -

JUMLAH 752.808.361.433,25 103.380.603.400,00 4.198.925.129,00 1.564.645.000,00 1.404.696.183,00 2.093.437.450,00 1.165.968.600,00 -


TOTAL MUTASI TAMBAH 113.808.275.762,00
103.380.603.400,00 -

(1.052.570.500,00)
1.040.866.950,00
(2.093.437.450,00)
Halaman 1 dari 2
LAMPIRAN : 12
DAFTAR MUTASI ASET PER SKPD PER JENIS ASET PER 31 DESEMBER 2013
C. GEDUNG DAN BANGUNAN

Mutasi Kurang
Saldo 31 Desember 2012 Saldo 31 Desember
No SKPD
(AUDITED) Reklas ke Reklas ke Aset Lainnya 2013
Reklas ke BJ Rusak Salah Anggaran Ekstracomptabel Hibah Penghapusan Koreksi LK 2012
Persediaan / Antar Aset Tetap
(1) (2) (3) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20)
1 DIKNAS 365.315.872.513,00 - - - - (10.894.622.162,35) - - 402.435.454.350,65
2 KESEHATAN 63.705.868.749,00 - - - - - - - - 70.481.169.749,00
3 RSUD 3.168.395.000,00 - - - - - - - - 4.553.627.500,00
4 PUCK 51.224.517.400,00 - - - - - - - 2.339.213.700,00 73.346.398.100,00
5 PUBM 5.135.572.500,00 - - - - - - - - 5.135.572.500,00
6 PU AIR 4.554.596.085,00 - - - - - - - - 4.704.196.085,00
7 BAPPEDA DAN PM 3.842.780.000,00 - - - - - - - - 3.867.280.000,00
8 DISHUB 15.999.994.817,00 - (6.478.496.437,00) - - - - - - 15.180.901.930,00
9 BLH 3.135.541.500,00 - - - - - - - - 3.184.971.500,00
10 KEBERSIHAN 3.422.216.950,00 - - - - - - - - 3.567.216.950,00
11 CAPIL 3.645.021.000,00 - - - - - - - - 4.686.111.000,00
12 BAPEL KB 570.055.000,00 - - - - - - - - 1.531.565.000,00
13 DINSOS 196.995.000,00 - - - - - - - - 987.704.000,00
14 DISNAKER 5.647.415.000,00 - - - - - - - - 5.647.415.000,00
15 KOPERINDAG 8.135.736.675,00 - - - - - - - 87.998.825,00 19.493.605.500,00
16 KESBANG 6.775.340.000,00 - - - - - - - - 7.103.180.000,00
17 SATPOL 55.425.500,00 - - - - - - - - 55.425.500,00
18 SEKDA 83.484.484.916,00 - - - - - - - - 83.590.634.916,00
19 SETWAN 44.603.581.180,00 - - - (103.272.000,00) - - - 45.352.564.180,00
20 INSPEKTORAT 3.701.253.500,00 - - - - - - - - 4.027.703.500,00
21 DPPKAD 4.999.039.000,00 - - - - - - - - 5.370.684.000,00
22 BKD 3.754.481.900,00 - - - (16.000.000,00) - - - 228.253.255 4.434.372.670,00
23 BPT 210.854.000,00 - - - - - - 295.319.000,00
24 BAKETPAN 16.131.913.400,00 - - - - - - (12.605.364.400,00) 8.651.265.000,00
25 BPMPD 2.629.293.000,00 - - - - - - - - 2.629.293.000,00
26 PERPUSTAKAAN 8.398.644.000,00 - - - - - - - - - 8.621.259.000,00
27 PERTANIAN 7.760.365.700,00 - - - - - - - - 7.966.327.200,00
28 BP4K 2.898.211.000,00 - - - - - - - - 6.249.491.000,00
29 DISHUTBUN 4.995.434.323,25 - - - - (90.750.000,00) - (34.100.000,00) 5.581.862.323,25
30 DISTAMBEN 4.343.714.000,00 - - - - - - - - 4.493.514.000,00
31 PARIWISATA 1.823.314.000,00 - - - - - (342.927.000,00) - (98.000.000,00) 2.215.764.000,00
32 PERIKANAN 10.567.447.825,00 - (1.185.933.864,00) - - - - - (5.000.000,00) 12.306.252.658,00
33 PASAR 7.974.986.000,00 - - - - - - (475.826.000,00) - 9.193.710.000,00
34 TANJUNG LAGO - - - - - - - - - -
35 AIR SALEH - - - - - - - - - -
36 TUNGKAL ILIR - - - - - - - - - -
37 BANYUASIN I - - - - - - - - - -
38 MUARA SUGIHAN - - - - - - - - - -
39 BANYUASIN II - - - - - - - - - -
40 BANYUASIN III - - - - - - - - - -
41 BETUNG - - - - - - - - - -
42 MUARA TELANG - - - - - - - - - -
43 MUARA PADANG - - - - - - - - - -
44 MAKARTI JAYA - - - - - - - - - -
45 PULAU RIMAU - - - - - - - - - -
46 RAMBUTAN - - - - - - - - - -
47 RANTAU BAYUR - - - - - - - - - -
48 SUAK TAPEH - - - - - - - - - -
49 SEMBAWA - - - - - - - - - -
50 SUMBER MARGA TELANG - - - - - - - - - -
51 AIR KUMBANG - - - - - - - - - -
52 TALANG KELAPA - - - - - - - - - -

JUMLAH 752.808.361.433,25 - - (7.664.430.301,00) - (16.000.000,00) (103.272.000,00) (11.328.299.162,35) (475.826.000,00) (10.086.998.620,00) 836.941.811.111,90


TOTAL MUTASI TAMBAH TOTAL MUTASI KURANG (29.674.826.083,35)

Halaman 2 dari 2
DAFTAR MUTASI ASET PER SKPD PER JENIS ASET PER 31 DESEMBER 2013 LAMPIRAN : 13
D. JALAN, IRIGASI DAN JARINGAN

Saldo 31 Desember 2012 Mutasi Tambah


No SKPD
(AUDITED)
Belanja Modal Kapitalisasi Hibah Reklas BBJ Reklas antar aset tetap Hutang Pindah SKPD
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

1 DIKNAS 100.279.000,00 79.921.929,00 - - - - -


2 KESEHATAN 4.444.548.000,00 104.800.000,00 197.800.000,00 - - - 676.610.000,00
3 RSUD 869.826.000,00 - - - - - -
4 PUCK 135.729.605.719,75 111.606.973.000,00 - - - 1.034.003.000,00 -
5 PUBM 899.913.740.403,00 175.042.224.300,00 8.425.461.700,00 5.250.000,00 26.799.742.000,00
6 PU AIR 264.893.969.415,00 24.193.401.000,00 - - 331.509.000,00 -
7 BAPPEDA DAN PM 66.678.564,00 - - - - - -
8 DISHUB 3.644.382.898,00 199.100.000,00 - - 8.647.246.440,00 - -
9 BLH 811.934.000,00 344.533.818,00 - - - - (676.610.000,00)
10 KEBERSIHAN 27.796.218,00 - - - - - -
11 CAPIL 192.457.500,00 - 197.500.000,00 - - - -
12 BAPEL KB - - - - - - -
13 DINSOS 73.628.600,00 - - - - - -
14 DISNAKER 1.497.236.450,00 130.979.000,00 - - - - -
15 KOPERINDAG 71.633.685,00 18.566.000,00 - - - - -
16 KESBANG 81.134.100,00 - - - - - -
17 SATPOL - - - - - - -
18 SEKDA 3.216.722.000,00 19.600.000,00 - - - - -
19 SETWAN 690.035.000,00 201.980.000,00 - - - - -
20 INSPEKTORAT 49.767.000,00 - - - - - -
21 DPPKAD 300.279.811,00 199.000.000,00 - - - - -
22 BKD 10.000.000,00 - - - 4.100.000,00 - - -
23 BPT 63.470.000,00 - - - - -
24 BAKETPAN 84.203.000,00 - - - - - -
25 BPMPD 36.000.000,00 - - - - - -
26 PERPUSTAKAAN 53.751.176,00 - - - - - -
27 PERTANIAN 6.385.641.115,00 51.262.500,00 - - - - -
28 BP4K 70.803.425,00 - - - - - -
29 DISHUTBUN 256.831.801,00 934.835.500,00 - - - -
30 DISTAMBEN 6.490.220.000,00 5.704.300.000,00 - - 497.700.000,00 - - -
31 PARIWISATA - - - - - - -
32 PERIKANAN 6.431.714.872,00 575.888.500,00 1.660.440,00 396.495.000,00 905.301.364,00 2.500.000,00 -
33 PASAR 564.819.200,00 18.676.000,00 - - - -
34 TANJUNG LAGO - - - - - - -
35 AIR SALEH - - - - - - -
36 TUNGKAL ILIR - - - - - - -
37 BANYUASIN I - - - - - - -
38 MUARA SUGIHAN - - - - - - -
39 BANYUASIN II - - - - - - -
40 BANYUASIN III - - - - - - -
41 BETUNG - - - - - - -
42 MUARA TELANG - - - - - - -
43 MUARA PADANG - - - - - - -
44 MAKARTI JAYA - - - - - - -
45 PULAU RIMAU - - - - - - -
46 RAMBUTAN - - - - - - -
47 RANTAU BAYUR - - - - - - -
48 SUAK TAPEH - 31.586.200,00 - - - - -
49 SEMBAWA - 15.000.000,00 - - - - -
50 SUMBER MARGA TELANG - 34.991.457,00 - - - - -
51 AIR KUMBANG - 24.645.900,00 - - - - -
52 TALANG KELAPA - - - - - - -

JUMLAH 1.337.123.108.952,75 319.532.265.104,00 8.822.422.140,00 396.495.000,00 507.050.000,00 36.352.289.804,00 1.368.012.000,00 -


TOTAL MUTASI TAMBAH 366.978.534.048,00
319.532.260.175,00 4.929,00 7.383.797.804,00

Halaman 1 dari 2
LAMPIRAN : 13
DAFTAR MUTASI ASET PER SKPD PER JENIS ASET PER 31 DESEMBER 2013
D. JALAN, IRIGASI DAN JARINGAN

Mutasi Kurang
Saldo 31 Desember 2012 Saldo 31 Desember
No SKPD
(AUDITED) Reklas ke Reklas ke Aset Lainnya 2013
Reklas ke BJ Rusak Salah Anggaran Ekstracomptabel Hibah Penghapusan Koreksi LK 2012
Persediaan / Antar Aset Tetap
(1) (2) (3) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20)

1 DIKNAS 100.279.000,00 - - - - - - - - 180.200.929,00


2 KESEHATAN 4.444.548.000,00 - - - - - - - - 5.423.758.000,00
3 RSUD 869.826.000,00 - - - - - - - - 869.826.000,00
4 PUCK 135.729.605.719,75 - (99.519.000,00) - - - - - (2.339.213.700,00) 245.931.849.019,75
5 PUBM 899.913.740.403,00 (5.879.513.000,00) 1.104.306.905.403,00
6 PU AIR 264.893.969.415,00 - - - - - - - - 289.418.879.415,00
7 BAPPEDA DAN PM 66.678.564,00 - - - - - - - - 66.678.564,00
8 DISHUB 3.644.382.898,00 - (199.100.000,00) - - - - - - 12.291.629.338,00
9 BLH 811.934.000,00 - - - - - - - 479.857.818,00
10 KEBERSIHAN 27.796.218,00 - - - - - - - - 27.796.218,00
11 CAPIL 192.457.500,00 - - - - - - - - 389.957.500,00
12 BAPEL KB - - - - - - - - - -
13 DINSOS 73.628.600,00 - - - - - - - - 73.628.600,00
14 DISNAKER 1.497.236.450,00 - - - - - - - - 1.628.215.450,00
15 KOPERINDAG 71.633.685,00 - - - - - - - - 90.199.685,00
16 KESBANG 81.134.100,00 - - - - - - - - 81.134.100,00
17 SATPOL - - - - - - - - - -
18 SEKDA 3.216.722.000,00 - - - - - - - - 3.236.322.000,00
19 SETWAN 690.035.000,00 - (178.180.000,00) - - - - - - 713.835.000,00
20 INSPEKTORAT 49.767.000,00 - - - - - - - - 49.767.000,00
21 DPPKAD 300.279.811,00 - - - - - - - - 499.279.811,00
22 BKD 10.000.000,00 - - - - - - - - 14.100.000,00
23 BPT 63.470.000,00 - - - - - - - - 63.470.000,00
24 BAKETPAN 84.203.000,00 - - - - - - - - 84.203.000,00
25 BPMPD 36.000.000,00 - - - - - - - - 36.000.000,00
26 PERPUSTAKAAN 53.751.176,00 - - - - - - - - 53.751.176,00
27 PERTANIAN 6.385.641.115,00 - - - - - - - - 6.436.903.615,00
28 BP4K 70.803.425,00 - - - - - - - - 70.803.425,00
29 DISHUTBUN 256.831.801,00 - - - - (507.518.000,00) (287.097.200,00) - 397.052.101,00
30 DISTAMBEN 6.490.220.000,00 - - - - - - - - 12.692.220.000,00
31 PARIWISATA - - - - - - - - - -
32 PERIKANAN 6.431.714.872,00 - (498.638.500,00) - - - - - (154.288.100) 7.660.633.576,00
33 PASAR 564.819.200,00 - - - - - - - - 583.495.200,00
34 TANJUNG LAGO - - - - - - - - - -
35 AIR SALEH - - - - - - - - - -
36 TUNGKAL ILIR - - - - - - - - - -
37 BANYUASIN I - - - - - - - - - -
38 MUARA SUGIHAN - - - - - - - - - -
39 BANYUASIN II - - - - - - - - - -
40 BANYUASIN III - - - - - - - - - -
41 BETUNG - - - - - - - - - -
42 MUARA TELANG - - - - - - - - - -
43 MUARA PADANG - - - - - - - - - -
44 MAKARTI JAYA - - - - - - - - - -
45 PULAU RIMAU - - - - - - - - - -
46 RAMBUTAN - - - - - - - - - -
47 RANTAU BAYUR - - - - - - - - - -
48 SUAK TAPEH - - - - - - - - - 31.586.200,00
49 SEMBAWA - - - - - - - - - 15.000.000,00
50 SUMBER MARGA TELANG - - - - - - - - - 34.991.457,00
51 AIR KUMBANG - - - - - - - - - 24.645.900,00
52 TALANG KELAPA - - - - - - - - - -

JUMLAH 1.337.123.108.952,75 - - (6.854.950.500,00) - - - (507.518.000,00) (287.097.200,00) (2.493.501.800,00) 1.693.958.575.500,75


TOTAL MUTASI TAMBAH TOTAL MUTASI KURANG (10.143.067.500,00)
=
776.337.500,00
(6.078.613.000,00)

Halaman 2 dari 2
DAFTAR MUTASI ASET PER SKPD PER JENIS ASET PER 31 DESEMBER 2013 LAMPIRAN : 14
E. ASET TETAP LAINNYA

Saldo 31 Desember 2012 Mutasi Tambah


No SKPD
(AUDITED)
Belanja Modal Kapitalisasi Hibah Reklas BBJ Reklas antar aset tetap Hutang Pindah SKPD
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

1 DIKNAS 10.074.062.000,00 24.741.763.136,00 - 3.571.014.000,00 13.163.191.150,00 -


2 KESEHATAN - - - - - - -
3 RSUD 146.490.000,00 - - - - - -
4 PUCK 2.636.155.900,00 - - - - - -
5 PUBM 155.332.000,00 - - - - - -
6 PU AIR - - - - - - -
7 BAPPEDA DAN PM 4.977.200,00 118.333.000,00 - - - - -
8 DISHUB - - - - - - -
9 BLH 147.740.000,00 - - - - - (95.181.000,00)
10 KEBERSIHAN 1.175.608.000,00 - - - - - -
11 CAPIL - - - - - - -
12 BAPEL KB - - - - - - -
13 DINSOS - - - - - - -
14 DISNAKER - - - - - - 95.181.000,00
15 KOPERINDAG - - - - - - -
16 KESBANG 951.925.000,00 - - - - - -
17 SATPOL - - - - - - -
18 SEKDA 231.516.000,00 190.965.000,00 - - - - -
19 SETWAN 751.990.600,00 325.002.500,00 - - - - -
20 INSPEKTORAT 74.000.000,00 - - - - - -
21 DPPKAD 8.510.000,00 5.500.000,00 - - - - -
22 BKD - - - - - - -
23 BPT - - - - 48.000.000,00 - -
24 BAKETPAN - - - - - - -
25 BPMPD 77.705.836,50 - - - - - -
26 PERPUSTAKAAN 1.381.038.000,00 170.100.000,00 - - - - -
27 PERTANIAN 76.890.000,00 1.000.000,00 - - - - -
28 BP4K - - - - - - -
29 DISHUTBUN 27.600.000,00 - - - - -
30 DISTAMBEN 19.000.000,00 - - - 60.000.000,00 - - -
31 PARIWISATA 397.572.000,00 - - - - - -
32 PERIKANAN - 194.100.000,00 - - - - -
33 PASAR - - - - - - -
34 TANJUNG LAGO - - - - - - -
35 AIR SALEH - - - - - - -
36 TUNGKAL ILIR - - - - - - -
37 BANYUASIN I - - - - - - -
38 MUARA SUGIHAN - - - - - - -
39 BANYUASIN II - - - - - - -
40 BANYUASIN III - - - - - - -
41 BETUNG - - - - - - -
42 MUARA TELANG - - - - - - -
43 MUARA PADANG - - - - - - -
44 MAKARTI JAYA - - - - - - -
45 PULAU RIMAU - - - - - - -
46 RAMBUTAN - - - - - - -
47 RANTAU BAYUR - - - - - - -
48 SUAK TAPEH - - - - - - -
49 SEMBAWA - - - - - - -
50 SUMBER MARGA TELANG - - - - - - -
51 AIR KUMBANG - - - - - - -
52 TALANG KELAPA - - - - - - -

JUMLAH 18.338.112.536,50 25.746.763.636,00 - - 60.000.000,00 3.619.014.000,00 13.163.191.150,00 -


TOTAL MUTASI TAMBAH 42.588.968.786,00

Halaman 1 dari 2
LAMPIRAN : 14
DAFTAR MUTASI ASET PER SKPD PER JENIS ASET PER 31 DESEMBER 2013
E. ASET TETAP LAINNYA

Mutasi Kurang
Saldo 31 Desember 2012 Saldo 31 Desember
No SKPD
(AUDITED) Reklas ke Reklas ke Aset Lainnya 2013
Reklas ke BJ Rusak Salah Anggaran Ekstracomptabel Hibah Penghapusan Koreksi LK 2012
Persediaan / Antar Aset Tetap
(1) (2) (3) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20)

1 DIKNAS 10.074.062.000,00 - (2.753.148.591,00) (194.600.000,00) - - - (8.100.467.845,43) - - 40.501.813.849,57


2 KESEHATAN - - - - - - - - - -
3 RSUD 146.490.000,00 - - - - - - - - 146.490.000,00
4 PUCK 2.636.155.900,00 - - - - - - - - 2.636.155.900,00
5 PUBM 155.332.000,00 - - - - - - - - 155.332.000,00
6 PU AIR - - - - - - - - - -
7 BAPPEDA DAN PM 4.977.200,00 - - - - - - - - 123.310.200,00
8 DISHUB - - - - - - - - - -
9 BLH 147.740.000,00 - - - - - - - - 52.559.000,00
10 KEBERSIHAN 1.175.608.000,00 - - - - - - - - 1.175.608.000,00
11 CAPIL - - - - - - - - - -
12 BAPEL KB - - - - - - - - - -
13 DINSOS - - - - - - - - - -
14 DISNAKER - - - - - - - - - 95.181.000,00
15 KOPERINDAG - - - - - - - - - -
16 KESBANG 951.925.000,00 - - - - - - - - 951.925.000,00
17 SATPOL - - - - - - - - - -
18 SEKDA 231.516.000,00 (146.150.000,00) - - - - - - - 276.331.000,00
19 SETWAN 751.990.600,00 (196.500.000,00) - - - - - (245.475.000,00) 635.018.100,00
20 INSPEKTORAT 74.000.000,00 - - - - - - - - 74.000.000,00
21 DPPKAD 8.510.000,00 - - - - - - - - 14.010.000,00
22 BKD - - - - - - - - - -
23 BPT - - - - - - - - - 48.000.000,00
24 BAKETPAN - - - - - - - - - -
25 BPMPD 77.705.836,50 - - - - - - - - 77.705.836,50
26 PERPUSTAKAAN 1.381.038.000,00 - - - - - - - - 1.551.138.000,00
27 PERTANIAN 76.890.000,00 - - - - - - - - 77.890.000,00
28 BP4K - - - - - - - - - -
29 DISHUTBUN 27.600.000,00 - - - - - - - - 27.600.000,00
30 DISTAMBEN 19.000.000,00 - - - - - - - - 79.000.000,00
31 PARIWISATA 397.572.000,00 - - - - - - - - 397.572.000,00
32 PERIKANAN - - - - - - - - - 194.100.000,00
33 PASAR - - - - - - - - - -
34 TANJUNG LAGO - - - - - - - - - -
35 AIR SALEH - - - - - - - - - -
36 TUNGKAL ILIR - - - - - - - - - -
37 BANYUASIN I - - - - - - - - - -
38 MUARA SUGIHAN - - - - - - - - - -
39 BANYUASIN II - - - - - - - - - -
40 BANYUASIN III - - - - - - - - - -
41 BETUNG - - - - - - - - - -
42 MUARA TELANG - - - - - - - - - -
43 MUARA PADANG - - - - - - - - - -
44 MAKARTI JAYA - - - - - - - - - -
45 PULAU RIMAU - - - - - - - - - -
46 RAMBUTAN - - - - - - - - - -
47 RANTAU BAYUR - - - - - - - - - -
48 SUAK TAPEH - - - - - - - - - -
49 SEMBAWA - - - - - - - - - -
50 SUMBER MARGA TELANG - - - - - - - - - -
51 AIR KUMBANG - - - - - - - - - -
52 TALANG KELAPA - - - - - - - - - -

JUMLAH 18.338.112.536,50 (342.650.000,00) (2.753.148.591,00) (194.600.000,00) - - - (8.100.467.845,43) - (245.475.000,00) 49.290.739.886,07


TOTAL MUTASI TAMBAH TOTAL MUTASI KURANG (11.636.341.436,43)

Halaman 2 dari 2
DAFTAR MUTASI ASET PER SKPD PER JENIS ASET PER 31 DESEMBER 2013 LAMPIRAN : 15
F. KONSTRUKSI DALAM PENGERJAAN

Saldo 31 Desember 2012 Mutasi Tambah


No SKPD
(AUDITED)
Belanja Modal Kapitalisasi Hibah Reklas BBJ Reklas antar aset tetap Hutang Pindah SKPD
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

1 DIKNAS - - - - - - -
2 KESEHATAN - - - - - - -
3 RSUD - - - - - - -
4 PUCK - - - - - -
5 PUBM 26.799.742.000,00 - - - 5.879.513.000,00 - -
6 PU AIR - - - - - - -
7 BAPPEDA DAN PM - - - - - - -
8 DISHUB - - - - - - -
9 BLH - - - - - - -
10 KEBERSIHAN - - - - - - -
11 CAPIL - - - - - - -
12 BAPEL KB - - - - - - -
13 DINSOS - - - - - - -
14 DISNAKER - - - - - - -
15 KOPERINDAG - - - - - - -
16 KESBANG - - - - - - -
17 SATPOL - - - - - - -
18 SEKDA - - - - - - -
19 SETWAN - - - - - - -
20 INSPEKTORAT - - - - - - -
21 DPPKAD - - - - - - -
22 BKD - - - - - - -
23 BPT - - - - - - -
24 BAKETPAN - - - - - - -
25 BPMPD - - - - - - -
26 PERPUSTAKAAN - - - - - - -
27 PERTANIAN - - - - - - -
28 BP4K - - - - - - -
29 DISHUTBUN - - - - - - -
30 DISTAMBEN - - - - - - -
31 PARIWISATA - - - - - - -
32 PERIKANAN - - - - 779.271.000,00 - -
33 PASAR - - - - - - -
34 TANJUNG LAGO - - - - - - -
35 AIR SALEH - - - - - - -
36 TUNGKAL ILIR - - - - - - -
37 BANYUASIN I - - - - - - -
38 MUARA SUGIHAN - - - - - - -
39 BANYUASIN II - - - - - - -
40 BANYUASIN III - - - - - - -
41 BETUNG - - - - - - -
42 MUARA TELANG - - - - - - -
43 MUARA PADANG - - - - - - -
44 MAKARTI JAYA - - - - - - -
45 PULAU RIMAU - - - - - - -
46 RAMBUTAN - - - - - - -
47 RANTAU BAYUR - - - - - - -
48 SUAK TAPEH - - - - - - -
49 SEMBAWA - - - - - - -
50 SUMBER MARGA TELANG - -
51 AIR KUMBANG - - - - - - -
52 TALANG KELAPA - - - - - - -

JUMLAH 26.799.742.000,00 - - - 6.658.784.000,00 - -


TOTAL MUTASI TAMBAH 6.658.784.000,00

Halaman 1 dari 2
LAMPIRAN : 15
DAFTAR MUTASI ASET PER SKPD PER JENIS ASET PER 31 DESEMBER 2013
F. KONSTRUKSI DALAM PENGERJAAN

Mutasi Kurang
Saldo 31 Desember 2012 Saldo 31 Desember
No SKPD
(AUDITED) Reklas ke Reklas ke Aset Lainnya 2013
Reklas ke BJ Rusak Salah Anggaran Ekstracomptabel Hibah Penghapusan Koreksi LK 2012
Persediaan / Antar Aset Tetap
(1) (2) (3) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20)

1 DIKNAS - - - - - - - - - -
2 KESEHATAN - - - - - - - - - -
3 RSUD - - - - - - - - - -
4 PUCK - - - - - - - - - -
5 PUBM 26.799.742.000,00 - (26.799.742.000,00) - - - - - - 5.879.513.000,00
6 PU AIR - - - - - - - - - -
7 BAPPEDA DAN PM - - - - - - - - - -
8 DISHUB - - - - - - - - - -
9 BLH - - - - - - - - - -
10 KEBERSIHAN - - - - - - - - - -
11 CAPIL - - - - - - - - - -
12 BAPEL KB - - - - - - - - - -
13 DINSOS - - - - - - - - - -
14 DISNAKER - - - - - - - - - -
15 KOPERINDAG - - - - - - - - - -
16 KESBANG - - - - - - - - - -
17 SATPOL - - - - - - - - - -
18 SEKDA - - - - - - - - - -
19 SETWAN - - - - - - - - - -
20 INSPEKTORAT - - - - - - - - - -
21 DPPKAD - - - - - - - - - -
22 BKD - - - - - - - - - -
23 BPT - - - - - - - - - -
24 BAKETPAN - - - - - - - - - -
25 BPMPD - - - - - - - - - -
26 PERPUSTAKAAN - - - - - - - - - -
27 PERTANIAN - - - - - - - - - -
28 BP4K - - - - - - - - - -
29 DISHUTBUN - - - - - - - - - -
30 DISTAMBEN - - - - - - - - - -
31 PARIWISATA - - - - - - - - - -
32 PERIKANAN - - - - - - - - 779.271.000,00
33 PASAR - - - - - - - - - -
34 TANJUNG LAGO - - - - - - - - - -
35 AIR SALEH - - - - - - - - - -
36 TUNGKAL ILIR - - - - - - - - - -
37 BANYUASIN I - - - - - - - - - -
38 MUARA SUGIHAN - - - - - - - - - -
39 BANYUASIN II - - - - - - - - - -
40 BANYUASIN III - - - - - - - - - -
41 BETUNG - - - - - - - - - -
42 MUARA TELANG - - - - - - - - - -
43 MUARA PADANG - - - - - - - - - -
44 MAKARTI JAYA - - - - - - - - - -
45 PULAU RIMAU - - - - - - - - - -
46 RAMBUTAN - - - - - - - - - -
47 RANTAU BAYUR - - - - - - - - - -
48 SUAK TAPEH - - - - - - - - - -
49 SEMBAWA - - - - - - - - - -
50 SUMBER MARGA TELANG - -
51 AIR KUMBANG - - - - - - - - - -
52 TALANG KELAPA - - - - - - - - - -

JUMLAH 26.799.742.000,00 - (26.799.742.000,00) - - - - - - 6.658.784.000,00


TOTAL MUTASI TAMBAH TOTAL MUTASI KURANG (26.799.742.000,00)

Halaman 2 dari 2
ASET YANG AKAN DIHIBAHKAN
DINAS PU CIPTA KARYA LAMPIRAN : 16.a

Kontrak/SPK
No. Nama Pekerjaan/Kegiatan
Nilai (Rp) Nomor/Tgl
1 2 3 4
1 Pembuatan Papan Nama SPPN Sembawa 84.418.000 11/02/SPK/PPK-P3L.I/PUCK/2012 Tanggal 12
September 2012
2 Pembangunan Gedung Serbaguna Kec. Muara Telang (Tahap I) 173.672.000 01/03/SPK/PPK-OP.II/PUCK/2012 Tanggal 13
September 2012
3 Pembangunan Gedung Serbaguna Desa Taja Indah Kec. Betung 293.991.000 10/03/PPK-P3L.II/PU.CK/2012 Tanggal 27 Agustus
2012
4 Pembangunan Gedung Serbaguna Desa Lubuk Lancang Kec. 195.985.000
Suak Tapeh 03/12/PPK/PUCK/2012 Tanggal 27 Agustus 2012

5 Pembangunan Gedung Serbaguna Desa Durian Daun Kec. Suak 146.998.000


03/14/PPK/PUCK/2012, Tanggal 27 Agustus 2012
Tapeh (Lanjutan)
6 Pembangunan Gedung Serbaguna Desa Talang Ipuh Kec. Suak 74.457.000 13/03/SPK/PPK/PUCK/2012 Tanggal 10 September
Tapeh (Lanjutan) 2012
7 Pembangunan Gedung Pertemuan (40 x 20 m) Desa Sako 124.330.000 10/03/PPK-P3L.I/PUCK/2012, Tanggal 14 Oktober
Kecamatan Rambutan 2012
8 Pembangunan Gedung Pertemuan Desa Rimba Terap Kec. 109.284.000 07/03/SPK/PPK-P3L.II/PUCK/2012 Tanggal 15
Suak Tapeh Oktober 2012
9 Pembangunan Aula/Gedung Pembinaan/Pelatihan Mental Kab. 747.997.000 11/03/SPPJB/PPK-PP.V/PU.CK/2012 Tanggal 29
Banyuasin Oktober 2012,
10 Pembangunan Balai Desa Dusun IV Desa Srikaton Kec. Air 9.842.000 04/03/SPK/PPK-OP.I/PUCK/2012 Tanggal 15
Saleh Oktober 2012
11 Rehab Balai Desa Serbaguna Desa Pulau Harapan Kec. 199.211.000 02/03/SPK/PPK-P3L/PUCK/2012 Tanggal 15
Sembawa Oktober 2012
12 Pembangunan Tempat Wudhu dalam Desa Suka Pindah Kec. 99.317.000 03/03/SPK/PPK-PP.III/PUCK/2012 Tanggal 17
Rambutan September 2012
13 Pembangunan Asrama Santri Putra Ponpes Darul Ulum Kec. 197.336.000 12/03/SPK/PPK-P3L.I/PUCK/2012 Tanggal 12
Pulau Rimau Oktober 2012
14 Pembangunan Gedung Narkoba Type 46 198.419.000 02/03/SPPBJ/PPK-TRTB.II/PUCK/2012 Tanggal 15
Oktober 2012
15 Pembangunan Gedung KPU Kabupaten Banyuasin (Tahap I) 198.760.000 10/03/SPK/PPK-PP.V/PUCK/2012 Tanggal 15
Oktober 2012
16 Pembangunan TK Adyaksa IV Sukajadi Kec. Talang Kelapa 196.731.000 04/03//PPK/TRTB.II/PUCK/2012 Tanggal 29
(Lanjutan) Agustus 2012
17 Rahabilitasi Sarana dan Prasarana Balai Serba guna Kantor 198.750.000 01/03./SPK/PPK-P3L.III/PUCK/2012 Tanggal 15
Camat Tl. Kelapa Oktober 2012
18 Pembangunan Mako Pos Polair upang T. 170 Kecamatan 296.090.000 12/02/PPK-TRTB.II/PUCK/2012 Tanggal 01 Oktober
Makarti Jaya (Tahap II) 2012
19 Pembangunan Gedung PAUD Desa Rejodadi Kec. Sembawa 49.293.000 12/03/PPK/PPLi-P3L.I/PUCK/2012, Tanggal 25
Oktober 2012
20 Pembangunan Los Pasar/Kalangan Desa Telang Karya Kec. 197.380.000 04/03/SPK/PPK-OP.II/PUCK/2012 Tanggal 13
Muara Telang September 2012
21 Pembangunan Pasar Desa Mukti Jaya Kecamatan Pulau Rimau 99.249.000 08/03/SPK/PPK-TRTB.II/PUCK/2012, Tanggal 15
Oktober 2012
22 Pembangunan Rumah Jabatan Komandan Kodim Kel. 371.200.000 16/03/SPK/PPK-PP.III/PUCK/2012 Tanggal 27
Pangkalan Balai Kec. Banyuasin III Agustus 2012
23 Pembangunan Rumah Dinas Perwira Polres Banyuasin 392.076.000 11/03/PPK-TRTB.II/PUCK/2012 Tanggal 29 Agustus
2012
24 Pemasangan Conblock lapangan Gedung Serbaguna lubuk 74.278.000 12/03/SPK/PPK-OP.III/PUCK/2012, Tanggal 12
Karet Kec. Suak Tapeh September 2012
25 Penataan Halaman dan Pembuatan Papan Nama Gedung 99.330.000 05/03/PPK-TRTB.II/PUCK/2012 Tanggal 15 Oktober
Kuartir Cabang Pramuka Kabupaten Banyuasin 2012
26 Pembangunan Pelantaran Halaman Ujian SIM A dan C 99.302.000 06/03/SPPBJ/PPK-TRTB.II/PUCK/2012 Tanggal 15
Oktober 2012
27 Pembangunan Kamar Mandi Triboaton Kec. Rantau Bayur 74.616.000 01/03/SPK/PPK-OP/PUCK/2012 Tanggal 15
Oktober 2012
28 Pembangunan MCK dalam Desa Suka Pindah Kec. Rambutan 194.464.000 01/03/SPK/PPK-PP.II/PUCK/2012 Tanggal 24
September 2012
29 Pembangunan MCK dalam Desa Sungai Naik Kec. Rantau Bayur 74.396.000 02/03/SPK/PPK-PP.II/PUCK/2012 Tanggal 24
September 2012
30 Pembangunan MCK dalam Desa Sejagung Kec. Rantau Bayur 74.385.000 03/03/SPK/PPK-PP.II/PUCK/2012 Tanggal 24
September 2012

JUMLAH I 5.345.557.000

Halaman 1 dari 2
ASET YANG AKAN DIHIBAHKAN
BADAN KETAHANAN PANGAN LAMPIRAN : 16.b

Neraca / KIB
No Jenis Aset Rincian Keterangan
Nilai (Rp)
1 Peralatan Alat Penggiling Padi 6.994.174.000,00 Hibah ke masyarakat/desa
dan Mesin
Alat Pengering 1.105.500.000,00 Hibah ke masyarakat/desa
(KIB B)
2 Gedung dan Bangunan Gudang Tertutup
198.420.000,00 Hibah ke masyarakat/desa
Bangunan (Alsintan)
(KIB C) Bangunan Gudang Tertutup
198.360.000,00 Hibah ke masyarakat/desa
(Alsintan)
Bangunan Gudang Tertutup
198.320.000,00 Hibah ke masyarakat/desa
(Alsintan)
Bangunan Gudang Tertutup
198.360.000,00 Hibah ke masyarakat/desa
(Alsintan)
Bangunan Gudang Tertutup
198.560.000,00 Hibah ke masyarakat/desa
(Alsintan)
Bangunan Gudang Tertutup
193.360.000,00 Hibah ke masyarakat/desa
(Alsintan)
Bangunan Gudang Tertutup
198.540.000,00 Hibah ke masyarakat/desa
(Alsintan)
Bangunan Gudang Tertutup
198.500.000,00 Hibah ke masyarakat/desa
(Alsintan)
Bangunan Gudang Tertutup
198.300.000,00 Hibah ke masyarakat/desa
(Alsintan)
Bangunan Gudang Tertutup
198.640.000,00 Hibah ke masyarakat/desa
(Alsintan)
Bangunan Gudang Tertutup
193.440.000,00 Hibah ke masyarakat/desa
(Alsintan)
Bangunan Gudang Tertutup
198.500.000,00 Hibah ke masyarakat/desa
(Alsintan)
Bangunan Gudang Tertutup
198.230.000,00 Hibah ke masyarakat/desa
(Alsintan)
Bangunan Gudang Tertutup
193.400.000,00 Hibah ke masyarakat/desa
(Alsintan)
Bangunan Gudang Tertutup
198.440.000,00 Hibah ke masyarakat/desa
(Alsintan)
Bangunan Gudang Tertutup
198.280.000,00 Hibah ke masyarakat/desa
(Alsintan)
Bangunan Gudang Tertutup
198.280.000,00 Hibah ke masyarakat/desa
(Alsintan)
Bangunan Gudang Tertutup
198.440.000,00 Hibah ke masyarakat/desa
(Alsintan)
Bangunan Gudang Tertutup
193.100.000,00 Hibah ke masyarakat/desa
(Alsintan)
Bangunan Gudang Tertutup
198.300.000,00 Hibah ke masyarakat/desa
(Alsintan)
JUMLAH II 12.047.444.000,00

JUMLAH I + II 17.393.001.000,00

Halaman 2 dari 2
DAFTAR UTANG JAMSOSKES, JAMPERSAL DAN JAMKESMAS
Per 31 Desember 2013
LAMPIRAN : 17

Jamsoskes Jampersal
No Nama Jamsoskes RSUD Jamkesmas Jumlah
Puskesmas Puskesmas

1 RS. Muhammadiyah Plg 96.469.614,57 - - 96.469.614,57


2 RSUD SEKAYU 16.782.368,99 - - 16.782.368,99
3 RSUD Banyuasin 565.392.197,27 - - 565.392.197,27
4 RS Kusta 3.134.421.268,66 - - 3.134.421.268,66
5 RS Khodijah Palembang 59.015.033,21 - - 59.015.033,21

6 Pangkalan Balai - 40.027.000,00 57.780.000,00 3.232.000,00 101.039.000,00


7 Sembawa - 52.787.000,00 55.640.000,00 33.373.000,00 141.800.000,00
8 Petaling - 38.991.000,00 33.780.000,00 53.676.000,00 126.447.000,00
9 Sukajadi - 46.388.000,00 62.800.000,00 14.190.000,00 123.378.000,00
10 Kenten Laut - 44.816.000,00 31.700.000,00 29.294.000,00 105.810.000,00
11 Gasing - 6.271.000,00 1.180.000,00 1.073.000,00 8.524.000,00
12 Tanjung Lago - 16.843.000,00 15.080.000,00 15.274.000,00 47.197.000,00
13 Mariana - 36.802.000,00 36.960.000,00 11.670.000,00 85.432.000,00
14 Cinta Manis - 15.816.000,00 30.310.000,00 11.184.000,00 57.310.000,00
15 Pengumbuk - 32.336.000,00 24.940.000,00 19.535.000,00 76.811.000,00
16 Sementul - 54.181.000,00 31.060.000,00 64.701.000,00 149.942.000,00
17 Betung Kota - 42.653.000,00 105.080.000,00 25.360.000,00 173.093.000,00
18 Talang Jaya Betung - 42.396.000,00 30.260.000,00 29.512.000,00 102.168.000,00
19 Makarti Jaya - 24.992.000,00 21.140.000,00 15.605.000,00 61.737.000,00
20 Muara Telang - 64.262.000,00 56.180.000,00 97.905.000,00 218.347.000,00
21 Telang Jaya Telang - 53.011.000,00 57.400.000,00 55.862.000,00 166.273.000,00
22 Srikaton - 41.621.000,00 38.060.000,00 55.835.000,00 135.516.000,00
23 Daya Utama - 53.106.000,00 65.800.000,00 74.157.000,00 193.063.000,00
24 Margo Mulyo - 30.532.000,00 20.650.000,00 30.855.000,00 82.037.000,00
25 Tirta Harja - 52.262.000,00 21.980.000,00 85.390.000,00 159.632.000,00
26 Dana Mulya - 53.655.000,00 29.660.000,00 68.183.000,00 151.498.000,00
27 Teluk Betung - 45.786.000,00 12.730.000,00 51.532.000,00 110.048.000,00
28 Karang Manunggal - 49.301.000,00 10.640.000,00 58.175.000,00 118.116.000,00
29 Mekarsari - 50.053.000,00 19.700.000,00 94.519.000,00 164.272.000,00
30 Sukaraja - 21.929.000,00 24.710.000,00 4.937.000,00 51.576.000,00
31 Sungsang - 27.178.000,00 29.820.000,00 48.455.000,00 105.453.000,00
32 Karang Agung Ilir - 18.069.000,00 22.300.000,00 16.308.000,00 56.677.000,00
33 Simpang Rambutan - 11.569.000,00 22.750.000,00 15.039.000,00 49.358.000,00
34 Sungai Dua - 15.052.000,00 14.170.000,00 16.496.000,00 45.718.000,00
35 BPM ED - - 4.820.000,00 - 4.820.000,00

3.872.080.482,70 1.082.685.000,00 989.080.000,00 1.101.327.000,00 7.045.172.482,70


DAFTAR UTANG JANGKA PENDEK LAINNYA
KABUPATEN BANYUASIN
PER 31 DESEMBER 2013 LAMPIRAN : 18

Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
DINAS PENDIDIKAN

1 1.01.01 CV. Li REHABILITASI KANTOR UPT TALANG 425/29/Pendidika 190.691.000,00 - - 9.534.550,00 9.534.550,00
KELAPA (SUKAJADI) n/2013
2 1.01.01 CV. LS REHABILITASI KANTOR UPT RANTAU 425/20/Pendidika 137.773.000,00 - - 6.888.650,00 6.888.650,00
BAYUR (PENGUMBUK) n/2013
3 1.01.01 CV. KY REHABILITASI KANTOR UPT 425/44/Pendidika 183.805.000,00 - - 9.190.250,00 9.190.250,00
BANYUASIN I (MARIANA) n/2013
4 1.01.01 CV. MPN PEMBANGUNAN RUANG KELAS 425/72Pendidika 176.967.000,00 - - 8.848.350,00 8.848.350,00
BARU (RKB) SDN 32 TALANG KELAPA n/2013

5 1.01.01 CV. RK PEMBANGUNAN RUANG KELAS 425/58/Pendidika 177.106.000,00 - - 8.855.300,00 8.855.300,00


BARU (RKB) SDN 34 BANYUASIN III n/2013
6 1.01.01 CV. MJ PEMBANGUNAN RUANG KELAS 425/65/Pendidika 177.948.000,00 - - 8.897.400,00 8.897.400,00
BARU (RKB) SDN 9 SUAK TAPEH n/2013
7 1.01.01 CV. RF PEMBANGUNAN RUANG KELAS 425/108/Pendidik 187.043.000,00 - - 9.352.150,00 9.352.150,00
BARU (RKB) SDN 37 RANTAU BAYUR an/2013

8 1.01.01 CV. APP PEMBANGUNAN TAMBAHAN RUANG 425/80/Pendidika 193.074.000,00 - - 9.653.700,00 9.653.700,00
KELAS (TRK) SMP NAHDATUL ISLAM n/2013
(DESA SRITIGA KEC. SUMBER
MARGA TELANG)
9 1.01.01 CV. ASa PEMBANGUNAN TAMBAHAN RUANG 425/87/Pendidika 191.712.000,00 - - 9.585.600,00 9.585.600,00
KELAS (TRK) PONPES DARUL ULUM n/2013
PULAU RIMAU (KEC. PULAU RIMAU)

10 1.01.01 CV. Ri PEMBANGUNAN TAMBAHAN RUANG 425/94/Pendidika 190.998.000,00 - - 9.549.900,00 9.549.900,00


KELAS (TRK) PONPES BAHRUL ULUM n/2013
TANJUNG LAGO (KEC. TANJUNG
LAGO)
11 1.01.01 CV. MPN PEMBANGUNAN TAMBAHAN RUANG 425/101/Pend/20 168.485.000,00 - - 8.424.250,00 8.424.250,00
KELAS (TRK) SDN 16 BANYUASIN III 13

12 1.01.01 CV. SmJ PEMBANGUNAN TAMBAHAN RUANG 425/115/Pendidik 169.297.000,00 - - 8.464.850,00 8.464.850,00
KELAS (TRK) SDN 10 BANYUASIN III an/2013

13 1.01.01 CV. MB PEMBANGUAN RUMAH DINAS 425/22/Pendidika 198.571.000,00 - - 9.928.550,00 9.928.550,00


KEPSEK SMA NEGERI 2 BANYUASIN II n/2013
(KEC. BANYUASIN II)
14 1.01.01 CV. TRJ PEMBANGUAN RUMAH DINAS 425/36/Pend/201 198.936.000,00 - - 9.946.800,00 9.946.800,00
KEPSEK SMP NEGERI 3 BANYUASIN II 3
(KEC. BANYUASIN II)

Halaman 1 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
15 1.01.01 CV. IPr Pengadaan Buku Refrensi dan Panduan 425/15/SP/PPK- 3.542.252.600,00 - - 3.542.252.600,00 3.542.252.600,00
Pendidik Sekolah Dasar (SD) pada Dinas Dikdas/Pendidika
Pendidikan Kabupaten Banyuasin n/2013

16 1.01.01 CV. Gns Pengadaan Buku Pengayaan Tingkat 420/20/PP/Pendid 7.168.000.000,00 - - 7.168.000.000,00 7.168.000.000,00
SMA/SMK pada Dinas Pendidikan ikan/2013
Kabupaten Banyuasin
17 1.01.01 CV. PKC Pengadaan Buku Refrensi dan Buku 420/17/PP/Pendid 1.905.837.750,00 - - 1.905.837.750,00 1.905.837.750,00
Panduan Pendidik Tingkat SMA/SMK pada ikan/2013
Dinas Pendidikan Kabupaten Banyuasin

18 1.01.01 CV. CP Pengadaan Buku Untuk Guru TK/PAUD 420/29/PP/Pendid 547.100.800,00 - - 547.100.800,00 547.100.800,00
pada Dinas Pendidikan Kabupaten ikan/2013
Banyuasin
19 1.01.01 PT. FF Pembangunan Unit Sekolah Baru (USB) 425/095/SP/Pendi 758.895.000,00 37.944.750,00 2509/LS/1.20 37.944.750,00 - -
SMAN 3 Pulau Rimau di Desa teluk Betung dikan/2012 .09.02.00/6.2/
2013
20 1.01.01 CV. BMF Pembangunan Unit Sekolah Baru (USB) 425/096/SP/Pendi 860.584.000,00 43.029.200,00 2981/LS/1.20 43.029.200,00 - -
SMAN 2 Banyuasin II di Desa Jati sari dikan/2012 .09.02.00/5.1/
2013
21 1.01.01 CV. DM Pembangunan Unit Sekolah Baru (USB) 425/097/SP/Pendi 834.334.000,00 41.716.700,00 2505/LS/1.20 41.716.700,00 - -
SMAN 1 Air Saleh di Jalur 8 Air Saleh dikan/2012 .09.02.00/6.2/
2013
22 1.01.01 CV. PL Pembangunan Unit Sekolah Baru (USB) 425/098/SP/Pendi 761.055.000,00 38.052.750,00 3945/LS/1.20 38.052.750,00 - -
SMAN 2 Banyuasin I dikan/2012 .09.02.00/6.2/
2013
23 1.01.01 CV. AS Pembangunan Unit Sekolah Baru (USB) 425/99/SP/Pendid 859.722.000,00 42.986.100,00 2135/LS/1.20 42.986.100,00 - -
SMAN 2 Tungkal Ilir ikan/2012 .09.02.00/6.2/
2013
24 1.01.01 PT. MW Pembangunan Ruang Kelas Baru (RKB) 425/108/SP/Pendi 478.700.000,00 23.935.000,00 3027/LS/1.20 23.935.000,00 - -
SMAN 3 Banyuasin III di Pangkalan Panji dikan/2012 .09.02.00/6.2/
2013
25 1.01.01 CV. Ds Pembangunan Ruang kelas Baru (RKB) 425/100/SP/Pendi 158.958.000,00 7.947.900,00 2881/LS/1.20 7.947.900,00 - -
SMA Bina Mandiri Talang Kelapa dikan/2012 .09.02.00/6.2/
2013
26 1.01.01 CV. LB Pembangunan Ruang kelas Baru (RKB) 425/101/SP/Pendi 158.674.000,00 7.933.700,00 3195/LS/1.20 7.933.700,00 - -
SMA Al-Ikhsan Tanjung Lago dikan/2012 .09.02.00/6.2/
2013
27 1.01.01 CV. IP Pembangunan Ruang kelas Baru (RKB) 425/102/SP/Pendi 159.126.000,00 7.956.300,00 4272/LS/1.20 7.956.300,00 - -
MA Bahrul Ulum Mulia Sari Tanjung Lago dikan/2012 .09.02.00/6.2/
2013
28 1.01.01 CV. MB Pembangunan Ruang kelas Baru (RKB) 425/103/SP/Pendi 159.640.000,00 7.982.000,00 3595/LS/1.20 7.982.000,00 - -
MA Darul Ulum Pulau Rimau dikan/2012 .09.02.00/6.2/
2013
29 1.01.01 CV. MPN Rehap Kantor dan Ruang Guru SMPN 3 425/092/SP/Pendi 478.200.000,00 23.910.000,00 1810/LS/1.20 23.910.000,00 - -
Muara Sugihan dikan/2012 .09.02.00/6.2/
2013

Halaman 2 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
30 1.01.01 CV. MB Pembangunan Ruang Kelas Baru (RKB) 425/057/SP/Pendi 159.010.000,00 7.950.500,00 3596/LS/1.20 7.950.500,00 - -
SMP Muhammadiyah Muara Padang dikan/2012 .09.02.00/6.2/
2013
31 1.01.01 CV. GM Pembangunan Lanjutan SMKN 1 Suak 425/056/SP/Pendi 692.692.000,00 34.634.600,00 2513/LS/1.20 34.634.600,00 - -
Tapeh (Tahap 5) dikan/2012 .09.02.00/6.2/
2013
32 1.01.01 CV. APN Pembangunan Lanjutan SMKN 1 Tanjung 425/055/SP/Pendi 694.138.000,00 34.706.900,00 4336/LS/1.20 34.706.900,00 - -
lago (Tahap 4) dikan/2012 .09.02.00/6.2/
2013
33 1.01.01 CV. BJ Pembangunan Lanjutan SMKN 1 425/93/SP/Pendid 693.250.000,00 34.662.500,00 3296/LS/1.20 34.662.500,00 - -
Banyuasin I (Tahap 2) ikan/2012 .09.02.00/6.2/
2013
34 1.01.01 CV. TW Rehap Laboratorium dan Perpustakaan 425/094/SP/Pendi 130.820.000,00 6.541.000,00 7223/LS/1.20 6.541.000,00 - -
SMPN 1 Banyuasin III dikan/2012 .09.02.00/6.2/
2013
35 1.01.01 CV. DM Pembangunan Gedung UPTD Kecamatan 425/104/SP/Pend/ 351.982.000,00 17.599.100,00 2464/LS/1.20 17.599.100,00 - -
Air Saleh 12 .09.02.00/6.2/
2013
36 1.01.01 CV. RK Pembangunan Gedung UPTD Kecamatan 425/088/SP/Pend/ 342.080.000,00 17.104.000,00 2514/LS/1.20 17.104.000,00 - -
Muara Sugihan 12 .09.02.00/6.2/
2013
37 1.01.01 CV. MTJ Pembangunan Gedung UPTD Kecamatan 425/085/SP/Pend/ 346.480.000,00 17.324.000,00 3592/LS/1.20 17.324.000,00 - -
BA III 12 .09.02.00/6.2/
2013
38 1.01.01 CV. Ri Pembangunan Gedung UPTD Kecamatan 425/059/SP/Pend/ 340.975.000,00 17.048.750,00 2243/LS/1.20 17.048.750,00 - -
Muara Padang 12 .09.02.00/6.2/
2013
39 1.01.01 CV. MJ Pembangunan Gedung UPTD Kecamatan 425/089/SP/Pend/ 341.185.000,00 17.059.250,00 2098/LS/1.20 17.059.250,00 - -
Makarti Jaya 12 .09.02.00/6.2/
2013
40 1.01.01 CV. AB Pembangunan Gedung UPTD Kecamatan 425/090/SP/Pend/ 342.366.000,00 17.118.300,00 3297/LS/1.20 17.118.300,00 - -
Banyuasin II 12 .09.02.00/6.2/
2013
41 1.01.01 CV. KB Pembangunan Gedung UPTD Kecamatan 425/086/SP/Pend/ 346.755.000,00 17.337.750,00 3452/LS/1.20 17.337.750,00 - -
Rambutan 12 .09.02.00/6.2/
2013
42 1.01.01 CV. MB Pembangunan Gedung UPTD Kecamatan 425/058/SP/Pend/ 346.480.000,00 17.324.000,00 3033/LS/1.20 17.324.000,00 - -
Sembawa 12 .09.02.00/6.2/
2013
43 1.01.01 CV. Si Pembangunan Gedung UPTD Kecamatan 425/087/SP/Pend/ 345.200.000,00 17.260.000,00 1947/LS/1.20 17.260.000,00 - -
Suak Tapeh 12 .09.02.00/6.2/
2013
44 1.01.01 CV. CJP Pembangunan Gedung Korwas dan Gudang 425/091/SP/Pend/ 691.472.000,00 34.573.600,00 2615/LS/1.20 34.573.600,00 - -
12 .09.02.00/6.2/
2013
45 1.01.01 CV. Ha Rehabilitasi 3 Ruang Kelas SDN 33 Rantau 425/113/SP/APB 401.495.000,00 20.074.750,00 2081/LS/1.20 20.074.750,00 - -
Bayur D.SD/Pend/2012 .09.02.00/6.2/
2013

Halaman 3 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
46 1.01.01 CV. IK Pembangunan 1 Unit Kantor SDN 12 425/108/SP/APB 268.520.000,00 13.426.000,00 2080/LS/1.20 13.426.000,00 - -
Sembawa D.SD/Pend/2012 .09.02.00/6.2/
2013
47 1.01.01 CV. Li Pembangunan 1 USB Rambutan 425/106/SP/APB 691.750.000,00 34.587.500,00 1879/LS/1.20 34.587.500,00 - -
D.SD/Pend/2012 .09.02.00/6.2/
2013
48 1.01.01 CV. BMF Pembangunan 1 USB Muara Telang 425/107/SP/APB 693.840.000,00 34.692.000,00 2942/LS/1.20 34.692.000,00 - -
D.SD/Pend/2012 .09.02.00/6.2/
2013
49 1.01.01 CV. KY Rehabilitasi 3 Ruang Kelas SDN 10 Muara 425/105/SP/APB 405.700.000,00 20.285.000,00 3034/LS/1.20 20.285.000,00 - -
Padang D.SD/Pend/2012 .09.02.00/6.2/
2013
50 1.01.01 CV. DC Rehabilitasi 3 Ruang Kelas SDN 9 Talang 425/115/SP/APB 219.500.000,00 10.975.000,00 2085/LS/1.20 10.975.000,00 - -
Kelapa D.SD/Pend/2012 .09.02.00/6.2/
2013
51 1.01.01 CV. RK Pembangunan 1 Unit Kantor MI/Ponpes 425/111/SP/APB 266.938.000,00 13.346.900,00 2510/LS/1.20 13.346.900,00 - -
Nurul Iman Ujung Tanjung D.SD/Pend/2012 .09.02.00/6.2/
2013
52 1.01.01 CV. LS Pembanguna 1 Unit Kantor SDN 26 Talang 425/112/SP/APB 267.018.000,00 13.350.900,00 2822/LS/1.20 13.350.900,00 - -
Kelapa D.SD/Pend/2012 .09.02.00/6.2/
2013
53 1.01.01 CV. Ca Pembanguna 1 Unit Kantor SDN 07 Talang 425/109/SP/APB 268.520.000,00 13.426.000,00 1948/LS/1.20 13.426.000,00 - -
Kelapa D.SD/Pend/2012 .09.02.00/6.2/
2013
54 1.01.01 CV. HR Pembanguna 1 Unit Kantor SDN 08 Rantau 425/110/SP/APB 269.315.000,00 13.465.750,00 3476/LS/1.20 13.465.750,00 - -
Bayur D.SD/Pend/2012 .09.02.00/6.2/
2013
55 1.01.01 CV. JB Rehabilitasi 3 Ruang Kelas SDN 14 Talang 425/102/SP/APB 332.000.000,00 16.600.000,00 2622/LS/1.20 16.600.000,00 - -
Kelapa D.SD/Pend/2012 .09.02.00/6.2/
2013
56 1.01.01 CV. SJ Rehabilitasi 1 Ruang Kelas SDN 16 Talang 425/15/SP/APBD 111.386.900,00 5.569.345,00 3003/LS/1.20 5.569.345,00 - -
Kelapa .SD/Pend/2012 .09.02.00/6.2/
2013
57 1.01.01 CV. MPN Rehab 2 lokal SMPN 4 Muara Telang 425/56/DAK- 152.400.000,00 7.620.000,00 1811/LS/1.20 7.620.000,00 - -
SMP/PEND/2012 .09.02.00/6.2/
2013
58 1.01.01 CV. GMs Rehab 3 lokal SMPN 1 Muara Sugihan 425/58/DAK- 271.500.000,00 13.575.000,00 - - 13.575.000,00
SMP/PEND/2012

59 1.01.01 CV. La RKB 2 lokal SMPN 6 Banyuasin I 425/47/DAK- 298.000.000,00 14.900.000,00 2378/LS/1.20 14.900.000,00 - -
SMP/PEND/2012 .09.02.00/6.2/
2013
60 1.01.01 CV. Ro RKB 1 lokal SMPN 3 Air Saleh 425/57/DAK- 151.900.000,00 7.595.000,00 3756/LS/1.20 7.595.000,00 - -
SMP/PEND/2012 .09.02.00/6.2/
2013
61 1.01.01 CV. PB Rehab 2 lokal SMPN 1 Rambutan 425/62/DAK- 181.000.000,00 9.050.000,00 1725/LS/1.20 9.050.000,00 - -
SMP/PEND/2012 .09.02.00/6.2/
2013

Halaman 4 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
62 1.01.01 CV. MTJ Rehab.S 2 lokal SMPN 2 Rambutan 425/63/DAK- 148.300.000,00 7.415.000,00 4278/LS/1.20 7.415.000,00 - -
SMP/PEND/2012 .09.02.00/6.2/
2013
63 1.01.01 CV. NP RKB 2 lokal SMPN 4 Betung/2 S. Tapeh 425/51/DAK- 296.110.000,00 14.805.500,00 4281/LS/1.20 14.805.500,00 - -
SMP/PEND/2012 .09.02.00/6.2/
2013
64 1.01.01 CV. La RKB 2 lokal SMPN 2 Tanjung Lago 425/55/DAK- 295.990.000,00 14.799.500,00 2353/LS/1.20 14.799.500,00 - -
SMP/PEND/2012 .09.02.00/6.2/
2013
65 1.01.01 CV. La Rehab 2 lokal SMPN 2 Sugihan 425/59/DAK- 181.105.000,00 9.055.250,00 2893/LS/1.20 9.055.250,00 - -
SMP/PEND/2012 .09.02.00/6.2/
2013
66 1.01.01 CV. AP RKB 1 lokal SMPN 3 Tanjung Lago 425/54/DAK- 149.045.000,00 7.452.250,00 4208/LS/1.20 7.452.250,00 - -
SMP/PEND/2012 .09.02.00/6.2/
2013
67 1.01.01 CV. JU RKB 1 lokal SMPN 6 Banyuasin III 425/49/DAK- 146.860.000,00 7.343.000,00 1982/LS/1.20 7.343.000,00 - -
SMP/PEND/2012 .09.02.00/6.2/
2013
68 1.01.01 CV. MTJ Rehab 6 lokal SMPN 2 Betung/1 S.Tapeh 425/52/DAK- 298.555.000,00 14.927.750,00 4277/LS/1.20 14.927.750,00 - -
SMP/PEND/2012 .09.02.00/6.2/
2013
69 1.01.01 CV. ASa Rehab 2 lokal SMPN 1 Makarti Jaya 425/60/DAK- 180.790.000,00 9.039.500,00 2663/LS/1.20 9.039.500,00 - -
SMP/PEND/2012 .09.02.00/6.2/
2013
70 1.01.01 CV. BU RKB 3 lokal SMP TMB 7 BA I 425/64/DAK- 445.000.000,00 22.250.000,00 2096/LS/1.20 22.250.000,00 - -
SMP/PEND/2012 .09.02.00/6.2/
2013
71 1.01.01 CV. BK RKB 1 lokal SMPN 4 Banyuasin I 425/46/DAK- 147.600.000,00 7.380.000,00 6372/LS/1.20 7.380.000,00 - -
SMP/PEND/2012 .09.02.00/6.2/
2013
72 1.01.01 CV. SK Rehab 3 lokal SMPN 2 Pulau Rimau 425/61/DAK- 147.500.000,00 7.375.000,00 2016/LS/1.20 7.375.000,00 - -
SMP/PEND/2012 .09.02.00/6.2/
2013
73 1.01.01 CV. NPM Rehab 2 lokal SMPN 3 Betung 425/53/DAK- 180.200.000,00 9.010.000,00 4207/LS/1.20 9.010.000,00 - -
SMP/PEND/2012 .09.02.00/6.2/
2013
74 1.01.01 CV. Fa RKB 1 lokal SMP Ar-Rahma Tj. Lago 425/65/DAK- 147.170.000,00 7.358.500,00 - - 7.358.500,00
SMP/PEND/2012

75 1.01.01 CV. ASa RKB 3 lokal SMPN 4 Banyuasin II 425/40/DAK- 307.500.000,00 15.375.000,00 2664/LS/1.20 15.375.000,00 - -
SMP/PEND/2012 .09.02.00/6.2/
2013
76 1.01.01 CV. AJ Rehab 2 lokal SMPN 3 Banyuasin III 425/50/DAK- 180.500.000,00 9.025.000,00 3681/LS/1.20 9.025.000,00 - -
SMP/PEND/2012 .09.02.00/6.2/
2013
77 1.01.01 CV. Si Pembangunan 2 (dua) Ruang Kelas Baru 425/38/SP/DAK. 318.880.000,00 15.944.000,00 2083/LS/1.20 15.944.000,00 - -
SDN 11 Muara Padang Kec. Muara Padang SD/Pend/2012 .09.02.00/6.2/
2013

Halaman 5 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
78 1.01.01 CV. Ca Rehab Berat 2 (dua) Ruang Kelas SDN 9 425/40/SP/DAK. 288.900.000,00 14.445.000,00 2084/LS/1.20 14.445.000,00 - -
Muara Padang Kec. Muara Padang SD/Pend/2012 .09.02.00/6.2/
2013
79 1.01.01 CV. AJ Pembangunan 1 (satu) Ruang Kelas Baru 425/41/SP/DAK. 154.380.000,00 7.719.000,00 3004/LS/1.20 7.719.000,00 - -
SDN 10 Muara Padang Kec. Muara Padang SD/Pend/2012 .09.02.00/6.2/
2013
80 1.01.01 CV. CA Rehab Berat 4 (empat) Ruang Kelas SDN 425/42/SP/DAK. 298.400.000,00 14.882.000,00 1623/LS/1.20 14.882.000,00 - -
26 Pulau Rimau Kec. Pulau Rimau SD/Pend/2012 .09.02.00/6.2/
2013
81 1.01.01 CV. PL Pembangunan Gedung Perpustakaan SDN 425/43/SP/DAK. 144.378.000,00 7.218.900,00 1875/LS/1.20 7.218.900,00 - -
24 Banyuasin III Kec. Banyuasin III SD/Pend/2012 .09.02.00/6.2/
2013
82 1.01.01 CV. BJ Pembangunan 2 (dua) Ruang Kelas Baru 425/44/SP/DAK. 304.298.000,00 15.214.900,00 3715/LS/1.20 15.214.900,00 - -
SDN 16 Muara Telang Kec. Muara Telang SD/Pend/2012 .09.02.00/6.2/
2013
83 1.01.01 CV. MB Pembangunan 2 (dua) Ruang Kelas Baru 425/45/SP/DAK. 293.820.000,00 14.691.000,00 2396/LS/1.20 14.691.000,00 - -
SDN 37 Banyuasin I Kec. Banyuasin I SD/Pend/2012 .09.02.00/6.2/
2013
84 1.01.01 CV. KJ Pembangunan 2 (dua) Ruang Kelas Baru 425/46/SP/DAK. 346.130.000,00 17.306.500,00 3513/LS/1.20 17.306.500,00 - -
SDN 26 Muara Telang Kec. Muara Telang SD/Pend/2012 .09.02.00/6.2/
2013
85 1.01.01 CV. ST Pembangunan 2 (dua) Ruang Kelas Baru 425/47/SP/DAK. 348.300.000,00 17.415.000,00 2466/LS/1.20 17.415.000,00 - -
SDN 6 Banyuasin II Kec. Banyuasin II SD/Pend/2012 .09.02.00/6.2/
2013
86 1.01.01 CV. CZ Rehab Berat 2 (dua) Ruang Kelas SDN 20 425/48/SP/DAK. 189.297.000,00 9.464.850,00 - - 9.464.850,00
Banyuasin I Kec. Banyuasin I SD/Pend/2012
87 1.01.01 CV. TS Pembangunan 2 (dua) Ruang Kelas Baru 425/49/SP/DAK. 304.119.000,00 15.205.950,00 2218/LS/1.20 15.205.950,00 - -
SDN 20 Muara Telang Kec. Muara Telang SD/Pend/2012 .09.02.00/6.2/
2013
88 1.01.01 CV. AiP Pembangunan 2 (dua) Ruang Kelas Baru 425/50/SP/DAK. 348.800.000,00 17.440.000,00 4204/LS/1.20 17.440.000,00 - -
SDN 2 Tanjung Lago Kec. Tanjung Lago SD/Pend/2012 .09.02.00/6.2/
2013
89 1.01.01 CV. GMs Pembangunan 2 (dua) Ruang Kelas Baru 425/51/SP/DAK. 348.600.000,00 17.430.000,00 1836/LS/1.20 17.430.000,00 - -
SDN 1 Air Saleh Kec. Air Saleh SD/Pend/2012 .09.02.00/6.2/
2013
90 1.01.01 CV. IqP Pembangunan 2 (dua) Ruang Kelas Baru 425/52/SP/DAK. 304.361.000,00 15.218.050,00 1649/LS/1.20 15.218.050,00 - -
SDN 16 Muara Sugihan Kec. Muara SD/Pend/2012 .09.02.00/6.2/
Sugihan 2013
91 1.01.01 CV. NP Pembangunan Gedung Perpustakaan SDN 8 425/53/SP/DAK. 144.200.000,00 7.210.000,00 2367/LS/1.20 7.210.000,00 - -
Suak Tapeh Kec. Suak Tapeh SD/Pend/2012 .09.02.00/6.2/
2013
92 1.01.01 CV. JB Pembangunan 3 (tiga) Ruang Kelas Baru 425/54/SP/DAK. 507.500.000,00 25.375.000,00 2014/LS/1.20 25.375.000,00 - -
SDN 1 Makarti Jaya Kec. Makarti Jaya SD/Pend/2012 .09.02.00/6.2/
2013
93 1.01.01 CV. IK Pembangunan 2 (dua) Ruang Kelas Baru 425/55/SP/DAK. 348.620.000,00 17.431.000,00 2012/LS/1.20 17.431.000,00 - -
SDN 23 Rantau Bayur Kec. Rantau Bayur SD/Pend/2012 .09.02.00/6.2/
2013

Halaman 6 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
94 1.01.01 CV. MPN Pembangunan Gedung Perpustakaan SDN 425/56/SP/DAK. 144.160.000,00 7.208.000,00 1814/LS/1.20 7.208.000,00 - -
36 Banyuasin I Kec. Banyuasin I SD/Pend/2012 .09.02.00/6.2/
2013
95 1.01.01 CV. MJ Pembangunan 2 (dua) Ruang Kelas Baru 425/57/SP/DAK. 319.106.000,00 15.955.300,00 2371/LS/1.20 15.955.300,00 - -
SDN 12 Tungkal Ilir Kec. Tungkal Ilir SD/Pend/2012 .09.02.00/6.2/
2013
96 1.01.01 PT.T & R Pembangunan 2 (dua) Ruang Kelas Baru 425/58/SP/DAK. 294.100.000,00 14.705.000,00 2088/LS/1.20 14.705.000,00 - -
SDN 35 Banyuasin I Kec. Banyuasin I SD/Pend/2012 .09.02.00/6.2/
2013
97 1.01.01 CV. Ro Pembangunan 2 (dua) Ruang Kelas Baru 425/59/SP/DAK. 294.088.000,00 14.704.400,00 2587/LS/1.20 14.704.400,00 - -
SDN 25 Banyuasin I Kec. Banyuasin I SD/Pend/2012 .09.02.00/6.2/
2013
98 1.01.01 CV. RJ Pembangunan 2 (dua) Ruang Kelas Baru 425/60/SP/DAK. 294.334.000,00 14.716.700,00 1816/LS/1.20 14.716.700,00 - -
SDN 11 Rambutan Kec. Rambutan SD/Pend/2012 .09.02.00/6.2/
2013
99 1.01.01 CV. BU Pembangunan Gedung Perpustakaan SDN 425/61/SP/DAK. 149.250.000,00 7.462.500,00 1813/LS/1.20 7.462.500,00 - -
15 Tanjung Lago Kec. Tanjung Lago SD/Pend/2012 .09.02.00/6.2/
2013
100 1.01.01 CV. Bgn Rehab Berat 4 (empat) Ruang Kelas SDN 425/62/SP/DAK. 329.068.000,00 16.453.400,00 2392/LS/1.20 16.453.400,00 - -
13 Talang Kelapa Kec. Talang Kelapa SD/Pend/2012 .09.02.00/6.2/
2013
101 1.01.01 CV. Kh Rehab Berat 2 (dua) Ruang Kelas SDN 8 425/37/SP/DAK. 179.200.000,00 8.960.000,00 2393/LS/1.20 8.960.000,00 - -
Talang Kelapa Kec. Talang Kelapa SD/Pend/2012 .09.02.00/6.2/
2013
102 1.01.01 CV. TB Pembangunan 2 (dua) Ruang Kelas Baru 425/39/SP/DAK. 293.810.000,00 14.690.500,00 1818/LS/1.20 14.690.500,00 - -
SDN 22 Sembawa Kec. Sembawa SD/Pend/2012 .09.02.00/6.2/
2013
103 1.01.01 CV. LS Rehabilitasi 3 (tiga) Ruang Kelas + 425/104/SP/DAK 226.400.000,00 11.320.000,00 3955/LS/1.20 11.320.000,00 - -
KM/WC SDN 23 Banyuasin I Kecamatan .SD/Pend/2012 .09.02.00/6.2/
Banyuasin I 2013
104 1.01.01 CV. IB Rehabilitasi 4 (empat) Ruang Kelas SDN 28 425/105/SP/DAK 274.900.000,00 13.745.000,00 - - 13.745.000,00
Banyuasin I Kecamatan Banyuasin I .SD/Pend/2012
105 1.01.01 PT. PRa Rehabilitasi 2 (dua) Ruang Kelas SDN 2 425/106/SP/DAK 146.700.000,00 7.335.000,00 2369/LS/1.20 7.335.000,00 - -
Banyuasin I Kecamatan Banyuasin I .SD/Pend/2012 .09.02.00/6.2/
2013
106 1.01.01 CV. RAP Rehabilitasi 2 (dua) Ruang Kelas SDN 22 425/107/SP/DAK 186.570.000,00 9.328.500,00 1815/LS/1.20 9.328.500,00 - -
Banyuasin I Kecamatan Banyuasin I .SD/Pend/2012 .09.02.00/6.2/
2013
107 1.01.01 CV. GB Pembangunan 2 (dua) Ruang Kelas Baru 425/108/SP/DAK 289.200.000,00 14.460.000,00 2802/LS/1.20 14.460.000,00 - -
(RKB) SDN 38 Banyuasin I Kecamatan .SD/Pend/2012 .09.02.00/6.2/
Banyuasin I 2013
108 1.01.01 CV. DI Rehabilitasi 3 (tiga) Ruang Kelas SDN 11 425/109/SP/DAK 281.815.000,00 14.090.750,00 2465/LS/1.20 14.090.750,00 - -
Banyuasin II Kecamatan Banyuasin II .SD/Pend/2012 .09.02.00/6.2/
2013
109 1.01.01 CV. LaBe Pembangunan 1 (satu) Ruang Kelas Baru 425/110/SP/DAK 177.230.000,00 8.861.500,00 2467/LS/1.20 8.861.500,00 - -
(RKB) SDN 9 Banyuasin II Kec. Banyuasin .SD/Pend/2012 .09.02.00/6.2/
II 2013

Halaman 7 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
110 1.01.01 Cv. AILS Pembangunan Gedung Perpustakaan SDN 3 425/111/SP/DAK 177.374.000,00 8.868.700,00 - - 8.868.700,00
Banyuasin II Kecamatan Banyuasin II .SD/Pend/2012

111 1.01.01 CV. RMK Rehabilitasi 4 (empat) Ruang Kelas SDN 7 425/112/SP/DAK 315.565.000,00 15.778.250,00 2391/LS/1.20 15.778.250,00 - -
Banyuasin III Kecamatan Banyuasin III .SD/Pend/2012 .09.02.00/6.2/
2013
112 1.01.01 CV. RF Rehabilitasi 3 (tiga) Ruang Kelas SDN 3 425/113/SP/DAK 256.510.000,00 12.825.500,00 1824/LS/1.20 12.825.500,00 - -
Banyuasin III Kecamatan Banyuasin III .SD/Pend/2012 .09.02.00/6.2/
2013
113 1.01.01 Cv. RJ Rehabilitasi 3 (tiga) Ruang Kelas SDN 11 425/114/SP/DAK 280.155.000,00 14.007.750,00 1825/LS/1.20 14.007.750,00 - -
Banyuasin III Kecamatan Banyuasin III .SD/Pend/2012 .09.02.00/6.2/
2013
114 1.01.01 CV. TP Rehabilitasi 2 (dua) Ruang Kelas SDN 16 425/115/SP/DAK 186.700.000,00 9.335.000,00 2076/LS/1.20 9.335.000,00 - -
Banyuasin III Kecamatan Banyuasin III .SD/Pend/2012 .09.02.00/6.2/
2013
115 1.01.01 CV. AJy Pembangunan 2 (dua) Ruang Kelas Baru 425/116/SP/DAK 300.159.000,00 15.007.950,00 1648/LS/1.20 15.007.950,00 - -
(RKB) SDN 09 Muara Sugihan Kec. Muara .SD/Pend/2012 .09.02.00/6.2/
Sugihan 2013
116 1.01.01 CV. PK Pembangunan 2 (dua) Ruang Kelas Baru 425/117/SP/DAK 290.700.000,00 14.535.000,00 4848/LS/1.20 14.535.000,00 - -
(RKB) SDN 22 Banyuasin III Kecamatan .SD/Pend/2012 .09.02.00/6.2/
Banyuasin III 2013
117 1.01.01 CV. PP Pembangunan 1 (satu) Ruang Kelas Baru 425/118/SP/DAK 147.863.000,00 7.393.150,00 1877/LS/1.20 7.393.150,00 - -
(RKB) SDN 30 Banyuasin III Kec. .SD/Pend/2012 .09.02.00/6.2/
Banyuasin III 2013
118 1.01.01 CV. PL Pembangunan Gedung Perpustakaan SDN 425/119/SP/DAK 143.321.000,00 7.166.050,00 1622/LS/1.20 7.166.050,00 - -
27 Banyuasin III Kecamatan Banyuasin III .SD/Pend/2012 .09.02.00/6.2/
2013
119 1.01.01 CV. TP Rehabilitasi 4 (empat) Ruang Kelas SDN 23 425/120/SP/DAK 316.000.000,00 15.800.000,00 2077/LS/1.20 15.800.000,00 - -
Banyuasin III Kecamatan Banyuasin III .SD/Pend/2012 .09.02.00/6.2/
2013
120 1.01.01 CV. CA Pembangunan Gedung Perpustakaan SDN 425/121/SP/DAK 141.600.000,00 7.080.000,00 1878/LS/1.20 7.080.000,00 - -
01 Betung Kecamatan Betung .SD/Pend/2012 .09.02.00/6.2/
2013
121 1.01.01 CV. CE Rehabilitasi 4 (empat) Ruang Kelas SDN 25 425/122/SP/DAK 281.189.000,00 14.059.450,00 3607/LS/1.20 14.059.450,00 - -
Muara Sugihan Kecamatan Muara Sugihan .SD/Pend/2012 .09.02.00/6.2/
2013
122 1.01.01 CV. Do Pembangunan Gedung Perpustakaan SDN 425/123/SP/DAK 153.200.000,00 7.660.000,00 - - 7.660.000,00
10 Muara Sugihan Kecamatan Muara .SD/Pend/2012
Sugihan
123 1.01.01 CV. CE Pembangunan Gedung Perpustakaan SDN 425/124/SP/DAK 153.205.000,00 7.660.250,00 3606/LS/1.20 7.660.250,00 - -
12 Muara Sugihan Kecamatan Muara .SD/Pend/2012 .09.02.00/6.2/
Sugihan 2013
124 1.01.01 CV. AP Pembangunan 2 (dua) Ruang Kelas Baru 425/125/SP/DAK 300.474.000,00 15.023.700,00 3477/LS/1.20 15.023.700,00 - -
(RKB) SDN 24 Muara Telang Kec. Muara .SD/Pend/2012 .09.02.00/6.2/
Telang 2013
125 1.01.01 CV. JU Pembangunan 2 (dua) Ruang Kelas Baru 425/126/SP/DAK 293.210.000,00 14.660.500,00 1981/LS/1.20 14.660.500,00 - -
(RKB) SDN 24 Rantau Bayur Kec. Rantau .SD/Pend/2012 .09.02.00/6.2/
Bayur 2013

Halaman 8 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
126 1.01.01 CV. NP Pembanguan Gedung Perpustakaan SDN 25 425/127/SP/DAK 177.400.000,00 8.870.000,00 2366/LS/1.20 8.870.000,00 - -
Rantau Bayur Kecamatan Rantau Bayur .SD/Pend/2012 .09.02.00/6.2/
2013
127 1.01.01 CV. HR Pembanguan Gedung Perpustakaan SDN 32 425/128/SP/DAK 177.400.000,00 8.870.000,00 - - 8.870.000,00
Rantau Bayur Kecamatan Rantau Bayur .SD/Pend/2012

128 1.01.01 CV. CSP Rehabilitasi 4 (empat) Ruang Kelas SDN 18 425/129/SP/DAK 294.600.000,00 14.730.000,00 1823/LS/1.20 14.730.000,00 - -
Pulau Rimau Kecamatan Pulau Rimau .SD/Pend/2012 .09.02.00/6.2/
2013
129 1.01.01 CV. CHP Pembangunan 2 (dua) Ruang Kelas Baru 425/130/SP/DAK 299.500.000,00 14.975.000,00 1812/LS/1.20 14.975.000,00 - -
(RKB) SDN 15 Pulau Rimau Kecamatan .SD/Pend/2012 .09.02.00/6.2/
Pulau Rimau 2013
130 1.01.01 CV. PA Pembangunan Gedung Perpustakaan SDN 1 425/131/SP/DAK 176.400.000,00 8.820.000,00 2511/LS/1.20 8.820.000,00 - -
Pulau Rimau Kecamatan Pulau Rimau .SD/Pend/2012 .09.02.00/6.2/
2013
131 1.01.01 CV. Di Pembangunan Gedung Perpustakaan SDN 425/132/SP/DAK 152.000.000,00 7.600.000,00 - - 7.600.000,00
25 Pulau Rimau Kecamatan Pulau Rimau .SD/Pend/2012

132 1.01.01 CV. TW Pembangunan Gedung Perpustakaan SDN 425/133/SP/DAK 142.000.000,00 7.100.000,00 - - 7.100.000,00
17 Rambutan Kecamatan Rambutan .SD/Pend/2012

133 1.01.01 CV. BU Pembangunan 3 (tiga) Ruang Kelas Baru 425/134/SP/DAK 318.480.000,00 15.924.000,00 1946/LS/1.20 15.924.000,00 - -
(RKB) SDN 13 Makarti Jaya Kecamatan .SD/Pend/2012 .09.02.00/6.2/
Makarti Jaya 2013
134 1.01.01 CV. RFg Pembangunan Gedung Perpustakaan SDN 3 425/135/SP/DAK 151.800.000,00 7.590.000,00 3437/LS/1.20 7.590.000,00 - -
Tungkal Ilir Kecamatan Tungkal Ilir .SD/Pend/2012 .09.02.00/6.2/
2013
135 1.01.01 CV. PK Pembangunan 3 (tiga) Ruang Kelas Baru 425/136/SP/DAK 392.217.000,00 19.610.950,00 4847/LS/1.20 19.610.950,00 - -
(RKB) SDN 28 Talang Kelapa Kec. Talang .SD/Pend/2012 .09.02.00/6.2/
Kelapa 2013
136 1.01.01 CV. MU Rehabilitasi 4 (empat) Ruang Kelas SDN 14 425/137/SP/DAK 327.674.000,00 16.383.700,00 - - 16.383.700,00
Air Saleh Kecamatan Air Saleh .SD/Pend/2012
137 1.01.01 CV. Ro Pembangunan Gedung Perpustakaan SDN 9 425/138/SP/DAK 151.392.000,00 7.569.600,00 2588/LS/1.20 7.569.600,00 - -
Air Saleh Kecamatan Air Saleh .SD/Pend/2012 .09.02.00/6.2/
2013
138 1.01.01 CV. CPM Pembangunan Gedung Perpustakaan SDN 425/139/SP/DAK 152.665.000,00 7.633.250,00 2414/LS/1.20 7.633.250,00 - -
19 Muara Padang Kecamatan Muara .SD/Pend/2012 .09.02.00/6.2/
Padang 2013
139 1.01.01 CV. Si Pembangunan 3 (tiga) Ruang Kelas Baru 425/140/SP/DAK 403.400.000,00 20.170.000,00 2082/LS/1.20 20.170.000,00 - -
(RKB) SDN 07 Tanjung Lago Kec. Tanjung .SD/Pend/2012 .09.02.00/6.2/
Lago 2013
140 1.01.01 CV. Be Pembangunan 1 (satu) Ruang Kelas Baru 425/141/SP/DAK 151.580.000,00 7.579.000,00 4699/LS/1.20 7.579.000,00 - -
(RKB) SDN 17 Tanjung Lago Kec. Tanjung .SD/Pend/2012 .09.02.00/6.2/
Lago 2013
141 1.01.01 CV. AiP Pembangunan 2 (dua) Ruang Kelas Baru 425/101/SP/DAK 289.100.000,00 14.455.000,00 4168/LS/1.20 14.455.000,00 - -
(RKB) SDN 20 Betung Kecamatan Betung .SD/Pend/2012 .09.02.00/6.2/
2013

Halaman 9 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
142 1.01.01 CV. Be Pembangunan Gedung Perpustakaan SDN 425/143/SP/DAK 142.440.000,00 7.122.000,00 5135//LS/1.2 7.122.000,00 - -
20 Talang Kelapa Kecamatan Talang .SD/Pend/2012 0.09.02.00/6.
Kelapa 2/2013
143 1.01.01 CV. PI Pembangunan Gedung Perpustakaan SDN 7 425/144/SP/DAK 151.265.000,00 7.563.250,00 2413/LS/1.20 7.563.250,00 - -
Tungkal Ilir Kecamtan Tungkal Ilir .SD/Pend/2012 .09.02.00/6.2/
2013
144 1.01.01 CV. RJ Rehabilitasi 3 Ruang Kelas SDN 10 425/153/SP/DAK 236.500.000,00 11.825.000,00 1820/LS/1.20 11.825.000,00 - -
Sembawa Kec. Sembawa .SD/Pend/2012 .09.02.00/6.2/
2013
145 1.01.01 CV. PL Reahabilitasi 3 Ruang Kelas SDN 20 425/154/SP/DAK 237.500.000,00 11.875.000,00 1876/LS/1.20 11.875.000,00 - -
Sembawa Kec. Sembawa .SD/Pend/2012 .09.02.00/6.2/
2013
146 1.01.01 CV APe Pembangunan 2 Ruang Kelas Baru ( RKB ) 425/155/SP/DAK 292.700.000,00 14.635.000,00 3324/LS/1.20 14.635.000,00 - -
SDN 27 Betung Kec. Betung .SD/Pend/2012 .09.02.00/6.2/
2013
147 1.01.01 CV. SB Rehabilitasi 4 Ruang Kelas SDN 2 Muara 425/156/SP/DAK 281.200.000,00 14.060.000,00 1650/LS/1.20 14.060.000,00 - -
Sugihan Kec. Muara Sugihan .SD/Pend/2012 .09.02.00/6.2/
2013
148 1.01.01 CV. HA. P Pembangunan 2 Ruang Kelas ( RKB) SDN 425/157/SP/DAK 291.800.000,00 14.590.000,00 6153/LS/1.20 14.590.000,00 - -
18 Rantau Bayur Kec. Rantau Bayur .SD/Pend/2012 .09.02.00/6.2/
2013
149 1.01.01 CV. MJ Rehabilitasi 4 Ruang Kelas SDN 24 425/158/SP/DAK 226.800.000,00 11.340.000,00 2219/LS/1.20 11.340.000,00 - -
Rambutan Kec. Rambutan .SD/Pend/2012 .09.02.00/6.2/
2013
150 1.01.01 CV. KY Reahabilitasi 3 Ruang Kelas SDN 9 425/159/SP/DAK 237.000.000,00 11.850.000,00 2375/LS/1.20 11.850.000,00 - -
Tungkal Ilir Kec. Tungkal Ilir .SD/Pend/2012 .09.02.00/6.2/
2013
151 1.01.01 CV. RJ Rehabilitasi 4 Ruang Kelas SDN 7 Suak 425/160/SP/DAK 279.335.000,00 13.966.750,00 1822/LS/1.20 13.966.750,00 - -
Tapeh Kec. Suak Tapeh .SD/Pend/2012 .09.02.00/6.2/
2013
152 1.01.01 PT. T& R Pembangunan Gedung Perpustakaan SDN 425/161/SP/DAK 154.200.000,00 7.710.000,00 2087/LS/1.20 7.710.000,00 - -
16 Banyuasin II Kecamayan Banyuasin II .SD/Pend/2012 .09.02.00/6.2/
2013
153 1.01.01 PT. T& R Rehabilitasi 1 (satu) Ruang Kelas SDN 11 425/162/SP/DAK 94.500.000,00 4.725.000,00 2086/LS/1.20 4.725.000,00 - -
Banyuasin I Kecamatan Banyuasin I .SD/Pend/2012 .09.02.00/6.2/
2013
154 1.01.01 CV. RJ Rehabilitasi 2 (dua) Ruang Kelas SDN 07 425/163/SP/DAK 189.000.000,00 9.450.000,00 1742/LS/1.20 9.450.000,00 - -
Betung Kecamatan Betung .SD/Pend/2012 .09.02.00/6.2/
2013
155 1.01.01 CV. CJP Rehabilitasi 2 (dua) Ruang Kelas SDN 11 425/164/SP/DAK 188.700.000,00 9.435.000,00 2079/LS/1.20 9.435.000,00 - -
Suak Tapeh Kecamatan Suak Tapeh .SD/Pend/2012 .09.02.00/6.2/
2013
156 1.01.01 CV. MPN Pembangunan Gedung Perpustakaan SDN 425/165/SP/DAK 154.300.000,00 7.715.000,00 1846/LS/1.20 7.715.000,00 - -
11 Muara Telang Kecamatan Muara Telang .SD/Pend/2012 .09.02.00/6.2/
2013
157 1.01.01 CV. SmJ Pembangunan Gedung Perpustakaan SDN 425/166/SP/DAK 154.200.000,00 7.710.000,00 3716/LS/1.20 7.710.000,00 - -
09 Muara Telang Kecamatan Muara Telang .SD/Pend/2012 .09.02.00/6.2/
2013

Halaman 10 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
158 1.01.01 CV. LB Pembangunan 1 (satu) Ruang Kelas SDN 425/167/SP/DAK 149.295.000,00 149.295.000,00 0384/LS/1.20 149.295.000,00 - -
18 Rambuatan Kecamatan Rambuatan .SD/Pend/2012 .09.02.00/6.2/
2013 &
3082/LS/1.
20.09.02.00/6
.2/2013
159 1.01.01 CV. KY Pembangunan Gedung Perpustakaan SDN 425/168/SP/DAK 144.310.000,00 7.215.500,00 2397/LS/1.20 7.215.500,00 - -
22 Rambuatan Kecamatan Rambuatan .SD/Pend/2012 .09.02.00/6.2/
2013
160 1.01.01 CV. LiBe Pembangunan Gedung Perpustakaan SDN 425/169/SP/DAK 154.250.000,00 7.712.500,00 4004/LS/1.20 7.712.500,00 - -
02 Makarti Jaya Kecamatan Makarti Jaya .SD/Pend/2012 .09.02.00/6.2/
2013
161 1.01.01 CV. LiBe Pembangunan Gedung Perpustakaan SDN 425/170/SP/DAK 154.150.000,00 7.707.500,00 4005/LS/1.20 7.707.500,00 - -
06 Makarti Jaya Kecamatan Makarti Jaya .SD/Pend/2012 .09.02.00/6.2/
2013
162 1.01.01 CV. AgSe Pembangunan Gedung Perpustakaan SDN 425/171/SP/DAK 144.402.000,00 7.220.100,00 2361/LS/1.20 7.220.100,00 - -
16 Talang Kelapa Kecamatan Talang .SD/Pend/2012 .09.02.00/6.2/
Kelapa 2013
163 1.01.01 CV. GMs Pembangunan Gedung Perpustakaan SDN 425/172/SP/DAK 154.255.000,00 7.712.750,00 1835/LS/1.20 7.712.750,00 - -
15 Air Saleh Kecamatan Air Saleh .SD/Pend/2012 .09.02.00/6.2/
2013
164 1.01.01 CV. KJ Pembangunan Gedung Perpustakaan SDN 425/173/SP/DAK 154.100.000,00 7.705.000,00 4167/LS/1.20 7.705.000,00 - -
12 Muara Padang Kecamatan Muara .SD/Pend/2012 .09.02.00/6.2/
Padang 2013
165 1.01.01 CV. KPM Pembangunan Gedung Perpustakaan SDN 425/174/SP/DAK 149.180.000,00 7.459.000,00 2377/LS/1.20 7.459.000,00 - -
08 Tanjung Lago Kecamatan Tanjung Lago .SD/Pend/2012 .09.02.00/6.2/
2013
166 1.01.01 CV.GMJ Perencanaan Pembangunan Unit Sekolah 02/02/PPK- 24.820.000,00 24.820.000,00 1573/LS/1.20 24.820.000,00 - -
Baru (USB) SMAN berupa Gambar,RAB, PL.JK/Pend/2012 .09.02.00/6.2/
dan RKS 2013

Jumlah 56.949.327.050,00 2.227.557.845,00 2.126.932.095,00 13.290.311.450,00 13.390.937.200,00


RSUD

167 1.02.02 CV. HJ Keg. Pengadaan Alat-Alat Kesehatan 445/431/SPK/RS 76.324.000,00 - - 76.324.000,00 76.324.000,00
Rumah Sakit Tahun Anggaran 2013 UD/2013
168 1.02.02 CV. IK Keg. Pembangunan Gedung Unit Gawat 445/129/PPK/RS 1.442.900.000,00 72.145.000,00 2568/LS/1.20 72.145.000,00 - -
Darurat (UGD) RSUD Kab. Banyuasin UD/2012 .09.02.00/6.2/
2013

Jumlah 1.519.224.000,00 72.145.000,00 72.145.000,00 76.324.000,00 76.324.000,00


DINAS PU CIPTA KARYA

169 1.03.01 KSM Tpd Pembangunan Sanitas Lingkungan Berbasis .02/01/PPK 145.943.600,00 - - 43.783.080,00 43.783.080,00
Masyarakat / MCK Plus Desa Salek Jaya SLBM/PUCK/20
Kec. Air Salek 13 Tgl 08 Juli
2013

Halaman 11 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
170 1.03.01 KSM. MB Pembangunan Sanitas Lingkungan Berbasis 02/02/PPK 145.943.600,00 - - 43.783.080,00 43.783.080,00
Masyarakat / MCK Plus Desa Saleh Mulya SLBM/PUCK/20
Kec. Air Saleh 13 Tgl 08 Juli
2013
171 1.03.01 KSM M Pembangunan Sanitas Lingkungan Berbasis 02/03/PPK 145.943.600,00 - - 43.783.080,00 43.783.080,00
Masyarakat / MCK Plus Desa Sido Harjo SLBM/PUCK/20
Kec. Air Saleh 13 Tgl 08 Juli
2013
172 1.03.01 KSM. Abd Pembangunan Sanitas Lingkungan Berbasis 02/04/PPK 145.943.600,00 - - 43.783.080,00 43.783.080,00
Masyarakat / MCK Plus Desa Teluk SLBM/PUCK/20
Tenggulang Kec. Tungkal Ilir 13 Tgl 08 Juli
2013
173 1.03.01 KSM Se Pembangunan Sanitas Lingkungan Berbasis 02/05/PPK 145.943.600,00 - - 43.783.080,00 43.783.080,00
Masyarakat / MCK Plus Desa Bentayan SLBM/PUCK/20
Kec. Tungkal Ilir 13 Tgl 08 Juli
2013
174 1.03.01 KSM. Tld Pembangunan Sanitas Lingkungan Berbasis 02/06/PPK 145.943.600,00 - - 43.783.080,00 43.783.080,00
Masyarakat / MCK Plus Desa Karang Anyar SLBM/PUCK/20
Kec. Tungkal Ilir 13 Tgl 08 Juli
2013
175 1.03.01 KSM. Mng Pembangunan Sanitas Lingkungan Berbasis 02/07/PPK 145.943.600,00 - - 43.783.080,00 43.783.080,00
Masyarakat / MCK Plus Desa Karang Asem SLBM/PUCK/20
Kec. Tungkal Ilir 13, Tgl 08 Juli
2013
176 1.03.01 KSM Se Pembangunan Sanitas Lingkungan Berbasis 02/08/PPK 145.943.600,00 - - 43.783.080,00 43.783.080,00
Masyarakat / MCK Plus Desa Indra Pura SLBM/PUCK/20
Kec. Muara Sugihan 13 Tgl 08 Juli
2013
177 1.03.01 KSM. RS Pembangunan Sanitas Lingkungan Berbasis 02/09/PPK 145.943.600,00 - - 43.783.080,00 43.783.080,00
Masyarakat / MCK Plus Desa Margo Rukun SLBM/PUCK/20
Kec. Muara Sugihan 13 Tgl 08 Juli
2013
178 1.03.01 KSM SJ Pembangunan Sanitas Lingkungan Berbasis 02/10/PPK 145.943.600,00 - - 43.783.080,00 43.783.080,00
Masyarakat / MCK Plus Desa Rejo Sari SLBM/PUCK/20
Kec. Muara Sugihan 13 Tgl 08 Juli
2013
179 1.03.01 CV. YMM Perbaikan Pipa PDAM Jalan Pangeran Ayin 06/SPK/APBD 199.570.000,00 - - 199.570.000,00 199.570.000,00
Simpang Talang Keramat Kec. Talang Kelapa P/PPK
19/PUCK/2013
180 1.03.01 CV. YMM Perbaikan Pipa PDAM Komplek Azhar, 07/SPK/APBD- 199.540.000,00 - - 199.540.000,00 199.540.000,00
Griya Damai, Sunter, Avila dan Bank P/PPK-
Sumsel Kec. Talang Kelapa 19/PUCK/2013
Tgl 04 Nov 2013
181 1.03.01 CV. CZ Pengecoran Jalan Lingkungan Putra Buana 34/SPK/PPK 174.415.000,00 - - 174.415.000,00 174.415.000,00
Darat Desa Sungsang III Kec. Banyuasin II 17/PUCK/2013
Tgl 28 Agustus
2013

Halaman 12 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
182 1.03.01 CV. AS Pengecoran Jalan Lingkungan Dalam Desa 18/SPK/PPK 112.073.000,00 - - 112.073.000,00 112.073.000,00
Suka Karya Kec. Tungkal Ilir 06/PUCK/2013
Tgl 06 Maret
2013
183 1.03.01 CV. SmJ Pengecoran Jalan Lingkungan Desa Sumber 09/SPK/APBD- 99.461.000,00 - - 99.461.000,00 99.461.000,00
Mulya Jalur 6 Jembatan 3 Kec. Muara Telang P/PPK-
11/PUCK/2013
Tgl 18 Nov 2013
184 1.03.01 CV. HBS Pengecoran Halaman Kantor Desa Karang 05/SPK/APBD 112.000.000,00 - - 112.000.000,00 112.000.000,00
Asem Kec. Tungkal Ilir P/PPK
07/PUCK/2013
Tgl 18 Nov 2013
185 1.03.01 CV. LaBe Pembangunan Jembatan Penghubung Di 06/SPK/APBD 124.472.000,00 - - 124.472.000,00 124.472.000,00
Desa Tirto Harjo Kec. Muara Padang P/PPK
18/PUCK/2013
Tgl 04 Nov 2013
186 1.03.01 CV. DPS Pembangunan Jembatan Penghubung Desa 07/SPK/APBD 124.472.000,00 - - 124.472.000,00 124.472.000,00
Daya Makmur Kec. Muara Padang P/PPK-
18/PUCK/2013
04 Nov 2013
187 1.03.01 CV. CGP DED Kantor PDAM Kabupaten Banyuasin 13/SPK/APBD- 49.770.000,00 - - 49.770.000,00 49.770.000,00
P/PPK-
01/PUCK/2013
18 Nov 2013
188 1.03.01 CV. PCt DED Akses PDAM ke RSUD Kabupaten 12/SPK/APBD- 49.810.000,00 - - 49.810.000,00 49.810.000,00
Banyuasin P/PPK-
01/PUCK/2013
18 Nov 2013
189 1.03.01 ID Pelanggan Tagihan Listrik PDAM IKK Merah Mata 231.292.281,00 - - 231.292.281,00 231.292.281,00
14.110.2556 (Bulan Desember 2013)
82.7

169 1.03.01 CV. EC Pembuatan Papan Nama SPPN Sembawa 11/02/SPK/PPK- 84.418.000,00 4.220.900,00 7230/LS/1.20 4.220.900,00 - -
P3L.I/PUCK/201 .09.02.00/6.2/
2 TGL. 12-09-12 2013
170 1.03.01 CV. RK Pembangunan Gedung Serbaguna Kec. 01/03/SPK/PPK- 173.672.000,00 8.683.600,00 5404/LS/1.20 8.683.600,00 - -
Muara Telang (Tahap I) OP.II/PUCK/201 .09.02.00/6.2/
2 Tgl 13-09-2012 2013
171 1.03.01 CV. EJ Pembangunan Gedung Serbaguna desa Taja 10/03/PPK- 293.991.000,00 14.699.550,00 1717/LS/1.20 14.699.550,00 - -
Indah Kec. Betung (* P3L.II/PU.CK/20 .09.02.00/6.2/
12 Tgl 27 2013
Agustus 2012
172 1.03.01 CV. RM Pembangunan Gedung Serbaguna Desa 03/12/PPK/PUC 195.985.000,00 9.799.250,00 5473/LS/1.20 9.799.250,00 - -
Lubuk Lancang Kec. Suak Tapeh K/2012 Tgl 27 .09.02.00/6.2/
Agustus 2012 2013
173 1.03.01 CV. HR Pembangunan Gedung Serbaguna Desa 03/14/PPK/PUC 146.998.000,00 7.349.900,00 4958/LS/1.20 7.349.900,00 - -
Durian Daun Kec. Suak Tapeh (lanjutan) K/2012, Tgl. 27- .09.02.00/6.2/
08-2012 2013

Halaman 13 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
174 1.03.01 CV. JP Pembangunan Gedung Serbaguna Desa 13/03/SPK/PPK/ 74.457.000,00 3.722.850,00 1974/LS/1.20 3.722.850,00 - -
Talang Ipuh Kec. Suak Tapeh (Lanjutan) PUCK/2012 Tgl .09.02.00/6.2/
10 September 2013
2012
175 1.03.01 CV. CM Rehabilitasi Gedung Serbaguna Kec. Muara 06/03/PPK- 293.787.000,00 14.689.350,00 5081/LS/1.20 14.689.350,00 - -
Padang P3L.III/PUCK/20 .09.02.00/6.2/
12 Tgl 27/8/ 2012 2013

176 1.03.01 CV. CG Pembangunan Gedung Pertemuan Desa 07/03/SPK/PPK- 109.284.000,00 5.464.200,00 3551/LS/1.20 5.464.200,00 - -
Rimba Terap Kec. Suak Tapeh P3L.II/PUCK/201 .09.02.00/6.2/
2 Tgl 15 Okt 2013
2012
177 1.03.01 CV. CG Rehab Balai Desa Serbaguna Desa Pulau 02/03/SPK/PPK- 199.211.000,00 9.960.550,00 3586/LS/1.20 9.960.550,00 - -
Harapan Kec. Sembawa P3L/PUCK/2012, .09.02.00/6.2/
15 Oktober 2012 2013

178 1.03.01 CV. BPD Pembangunan Tempat Wudhu dalam Desa 03/03/SPK/PPK- 99.317.000,00 4.965.850,00 4296/LS/1.20 4.965.850,00 - -
Suka Pindah Kec. Rambutan PP.III/PUCK/201 .09.02.00/6.2/
2 TGL. 17-09-12 2013

179 1.03.01 CV. NPM Pembangunan Asrama Santri Putra Ponpes 12/03/SPK/PPK- 197.336.000,00 9.866.800,00 2665/LS/1.20 9.866.800,00 - -
Darul Ulum Kec. Pulau Rimau P3L.I/PUCK/201 .09.02.00/6.2/
2 Tgl 12-10-2012 2013
180 1.03.01 CV. SIT Pembangunan Gedung Badan Pelayanan 03/16/PPK/PUC 1.960.522.000,00 98.026.100,00 3323/LS/1.20 98.026.100,00 - -
Terpadu (BPT) Kabupaten Banyuasin K/2012 Tgl 27-8- .09.02.00/6.2/
(tahap I) 2012 2013
181 1.03.01 CV. AS Pembangunan Kantor Kelurahan Seterio 28/03/PPK- 146.989.000,00 7.349.450,00 4579/LS/1.20 7.349.450,00 - -
Kecamatan Banyuasin III (tahap I) P3L.III/PUCK/20 .09.02.00/6.2/
12 Tgl 27-08- 2013
2012
182 1.03.01 CV. Ha Penambahan Ruang Gedung DPPKAD 03/15/PPK/PUC 734.226.000,00 36.711.300,00 2422/LS/1.20 36.711.300,00 - -
Kabupaten Banyuasin K/2012 Tanggal .09.02.00/6.2/
27 Agustus 2012 2013

183 1.03.01 CV. BP Renovasi Ruang KM/WC Kantor 03/02/SPK/PPK- 99.318.000,00 4.965.900,00 3872/LS/1.20 4.965.900,00 - -
BAPPEDA Kabupaten Banyuasin TRTB.I/PUCK/20 .09.02.00/6.2/
12 Tgl 02 Juli 2013
2012
184 1.03.01 CV. EC Rehabilitasi Atap Kantor Bupati 30/03/PPK- 297.971.000,00 14.898.550,00 7231/LS/1.20 14.898.550,00 - -
P3L.III/PUCK/20 .09.02.00/6.2/
12 TGL. 29-10- 2013
12
185 1.03.01 CV. BP Penambahan WC dan Rehab Ruang Rapat 01/03/SPK/PPK- 148.889.000,00 7.444.450,00 7170/LS/1.20 7.444.450,00 - -
Kantor BAPPEDA dan Penanaman Modal TRTB.II/PUCK/2 .09.02.00/6.2/
Kabupaten Banyuasin 012 TGL 19-10- 2013
12

Halaman 14 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
186 1.03.01 CV. MB Pembangunan Gedung Narkoba Type 46 02/03/SPPBJ/PP 198.419.000,00 9.920.950,00 2688/LS/1.20 9.920.950,00 - -
K- .09.02.00/6.2/
TRTB.II/PUCK/2 2013
012 Tgl 15
Oktober 2012
187 1.03.01 CV. KY Pembangunan Gedung KPU Kabupaten 10/03/SPK/PPK- 198.760.000,00 9.938.000,00 2684/LS/1.20 9.938.000,00 - -
Banyuasin (Tahap I) PP.V/PUCK/2012 .09.02.00/6.2/
Tgl 15 Oktober 2013
2012
188 1.03.01 CV. KSD S Rehabilitasi Ruang Asissten II 07/03/PPK- 199.156.000,00 9.957.800,00 7216/LS/1.20 9.957.800,00 - -
TRTB.II/PUCK/2 .09.02.00/6.2/
012 TGL 12-10- 2013
12
189 1.03.01 CV. EC Rehab Plapon dan Pembuatan Pintu Masuk 12/03/PPK- 197.060.000,00 9.853.000,00 7212/LS/1.20 9.853.000,00 - -
Kantor Bupati Banyuasin PP.V/PUCK/2012 .09.02.00/6.2/
TGL. 12-10-12 2013
190 1.03.01 CV. EC Pemasangan Paving Blok Rumah Dinas 14/03/PPK- 147.010.000,00 7.350.500,00 7226/LS/1.20 7.350.500,00 - -
Sekda Kabupaten Banyuasin PP.V/PUCK/2012 .09.02.00/6.2/
TGL. 12-10-12 2013
191 1.03.01 Fa. KLR Rehabilitasi TK Darmawanita Pangkalan 13/03/SPK/PPK- 198.365.000,00 9.918.250,00 2778/LS/1.20 9.918.250,00 - -
Balai Kec. Banyuasin III PP.V/PUCK/2012 .09.02.00/6.2/
Tgl 15 Oktober 2013
2012
192 1.03.01 CV. AS Rehabilitasi Sarana dan Prasaran Kantor 03/10/PPK/PUC 146.988.000,00 7.349.400,00 4578/LS/1.20 7.349.400,00 - -
Camat Talang Kelapa Kec. Talang Kelapa K/2012 TGL 27- .09.02.00/6.2/
08-2012 2013
193 1.03.01 CV. EC Pembangunan TK Adyaksa IV Sukajadi 04/03//PPK/TRT 196.731.000,00 9.836.550,00 7214/LS/1.20 9.836.550,00 - -
Kec. Talang Kelapa (lanjutan) B.II/PUCK/2012, .09.02.00/6.2/
Tgl. 29-08-2012 2013
194 1.03.01 CV. AS Rehabilitasi Sarana dan Prasaran Kantor 01/03./SPK/PPK- 198.770.000,00 9.938.500,00 4583/LS/1.20 9.938.500,00 - -
Camat Talang Kelapa Kec. Talang Kelapa P3L.III/PUCK/20 .09.02.00/6.2/
(Lanjutan) 12, Tgl. 15-10- 2013
2012
195 1.03.01 CV. AS Rahabilitasi Sarana dan Prasarana Balai 01/03./SPK/PPK- 198.750.000,00 9.937.500,00 4615/LS/1.20 9.937.500,00 - -
Serba guna Kantor Camat Tl. Kelapa P3L.III/PUCK/20 .09.02.00/6.2/
12, Tgl. 15-10- 2013
2012
196 1.03.01 CV. LK Pembangunan Mako Pos Polair upang T. 12/02/PPK- 296.090.000,00 14.804.500,00 2799/LS/1.20 14.804.500,00 - -
170 Kecamatan Makarti Jaya (Tahap II) TRTB.II/PUCK/2 .09.02.00/6.2/
012 Tanggal 01 2013
Oktober 2012
197 1.03.01 PT. SPK Pembangunan Prasarana Pemerintahan 03/07/PPK/PUC 1.618.560.000,00 80.928.000,00 2415/LS/1.20 80.928.000,00 - -
Daerah Kecamatan Sembawa K/2012 Tanggal .09.02.00/6.2/
26 Juli 2012 2013
198 1.03.01 CV. CG Pembangunan Gedung PAUD Desa 12/03/PPK/PPLi- 49.293.000,00 2.464.650,00 3557/LS/1.20 2.464.650,00 - -
Rejodadi Kec. Sembawa P3L.I/PUCK/201 .09.02.00/6.2/
2, 25 Oktober 2013
2012

Halaman 15 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
199 1.03.01 CV. PT Pembangunan Prasarana Pemerintahan 1.614.720.000,00 80.736.000,00 1932/LS/1.20 80.736.000,00 - -
Daerah Kecamatan Suak Tapeh 03/08/PPK/PUC .09.02.00/6.2/
K/2012 tanggal 2013
27 Juli 2012
200 1.03.01 CV. Su Pembangunan Prasarana dan Sarana 03/09/PPK/PUC 1.844.725.000,00 92.236.250,00 2416/LS/1.20 92.236.250,00 - -
Pemerintahan Kantor Kecamatan Muara K/2012 Tanggal .09.02.00/6.2/
Padang 26 Juli 2012 2013
201 1.03.01 CV. CG Rehabilitasi Sarana dan Prasarana Kantor 12/03/SPK/PPK- 199.825.000,00 9.991.250,00 3553/LS/1.20 9.991.250,00 - -
Camat Betung P3L.IV/PUCK/20 .09.02.00/6.2/
12 Tgl 15 2013
Oktober 2012
202 1.03.01 CV. JIL Pembangunan Los Pasar/Kalangan Desa 04/03/SPK/PPK- 197.380.000,00 9.869.000,00 3214/LS/1.20 9.869.000,00 - -
Telang Karya Kec. Muara Telang OP.II/PUCK/201 .09.02.00/6.2/
2 Tgl 13 2013
September 2012
203 1.03.01 CV. NPM Pembangunan Rumah Jabatan Komendan 16/03/SPK/PPK- 371.200.000,00 18.560.000,00 2666/LS/1.20 18.560.000,00 - -
Kodim Kel. Pangkalan Balai Kec. PP.III/PUCK/201 .09.02.00/6.2/
Banyuasin III 2 Tgl. 27-08-2012 2013

204 1.03.01 CV. CZ Rehab Komplek Rumah Jabatan Kejaksaan 01/03/SPK/PPK- 195.958.000,00 9.797.900,00 7215/LS/1.20 9.797.900,00 - -
Negeri Pangkalan Balai TRTB.II/PUCK/2 .09.02.00/6.2/
012 TGL. 17-09- 2013
12
205 1.03.01 CV. KB Pembangunan Rumah Dinas Perwira Polres 11/03/PPK- 392.076.000,00 19.603.800,00 - - 19.603.800,00
Banyuasin TRTB.II/PUCK/2
012 Tgl 29-08-
2012
206 1.03.01 CV. Ds Pemasangan Conblock lapangan Gedung 12/03/SPK/PPK- 74.278.000,00 3.713.900,00 3000/LS/1.20 3.713.900,00 - -
Serbaguna lubuk Karet Kec. Suak Tapeh OP.III/PUCK/201 .09.02.00/6.2/
2, Tgl. 12-09- 2013
2012
207 1.03.01 CV. CG Pengecoran Halaman Puskesmas Betung 13/03/SPK/PPK- 49.935.000,00 2.496.750,00 3558/LS/1.20 2.496.750,00 - -
Kota Kelurahan Betung P3L.IV/PUCK/20 .09.02.00/6.2/
12, Tgl. 15-10- 2013
2012
208 1.03.01 CV. NPM Penataan Halaman dan Pembuatan Papan No.05/03/PPK- 99.330.000,00 4.966.500,00 2561/LS/!.20. 4.966.500,00 - -
Nama Gedung Kuartir Cabang Pramuka TRTB.II/PUCK/2 09.02.00/6.2/
Kabupaten Banyuasin 012 Tgl 15-10- 2013
2012
209 1.03.01 CV. MB Pembangunan Pelantaran Halaman Ujian 06/03/SPPBJ/PP 99.302.000,00 4.965.100,00 2681/LS/1.20 4.965.100,00 - -
SIM A dan C K- .09.02.00/6.2/
TRTB.II/PUCK/2 2013
012 Tgl 15
Oktober 2012
210 1.03.01 CV. IP Pembangunan Pagar Pemakaman Umum 05/03/PPK.TRTB 49.396.000,00 2.469.800,00 4166/LS/1.20 2.469.800,00 - -
Ds. Tebing Abang Kec. Rantau Bayur .II/PUCK/2012, .09.02.00/6.2/
Tgl. 17-09-2012 2013

Halaman 16 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
211 1.03.01 CV. AS Pembangan Pagar Kantor Lurah Talang 14/03/SPK/PPK- 49.415.000,00 2.470.750,00 4617/LS/1.20 2.470.750,00 - -
Keramat Kec. Talang Kelapa OP.III/PUCK/201 .09.02.00/6.2/
2 Tgl 14-09-2012 2013

212 1.03.01 CV. BP Rehabilitasi Siring dan Penataan Halaman 15/03/SPK/PPK- 99.546.000,00 4.977.300,00 3873/LS/1.20 4.977.300,00 - -
Parkir Dinas Pekerjaan Umum Cipta Karya PP.V/PUCK/2012 .09.02.00/6.2/
Tgl 15-10-2012 2013
213 1.03.01 CV. NP Pembuatan Tugu batas dusun dalam Desa 15/03/SPK/PPK- 49.437.000,00 2.471.850,00 - - 2.471.850,00
Mulia Sari Kecamatan Tanjung Lago (* OP.III/PUCK/201
2, Tgl. 14-09-
2012
214 1.03.01 CV. AS Pembangunan Gerbang Batas Desa Antara 31/03/SPK/PPK- 49.470.000,00 2.473.500,00 4584/LS/1.20 2.473.500,00 - -
Desa Sukaraja dengan Desa Lubuk Lancang P3L.III/PUCK/20 .09.02.00/6.2/
Kec. Suak Tapeh 12 Tgl 10 2013
September 2012
215 1.03.01 CV. BH Pembangunan MCK dalam Desa Suka 01/03/SPK/PPK- 194.464.000,00 9.723.200,00 2508/LS/1.20 9.723.200,00 - -
Pindah Kec. Rambutan (* PP.II/PUCK/2012 .09.02.00/6.2/
Tgl 24-09-2012 2013
216 1.03.01 CV. IP Pembangunan MCK dalam Desa Sungai 02/03/SPK/PPK- 74.396.000,00 3.719.800,00 3663/LS/1.20 3.719.800,00 - -
Naik Kec. Rantau Bayur (* PP.II/PUCK/2012 .09.02.00/6.2/
Tgl 24-09-2012 2013
217 1.03.01 CV. IP Pembangunan MCK dalam Desa Sejagung 03/03/SPK/PPK- 74.385.000,00 3.719.250,00 3625/LS/1.20 3.719.250,00 - -
Kec. Rantau Bayur (* PP.II/PUCK/2012 .09.02.00/6.2/
TGL 24-09-12 2013
218 1.03.01 PT. PDR Optimaliasi Sarana Air Bersih IKK 3.429.775.000,00 171.488.750,00 2217/LS/1.20 171.488.750,00 - -
Pangkalan Balai, Lokasi Lubuk Saung, 02/01/PPK/PUC .09.02.00/6.2/
Regan Agung, Plajau Ilir, Talang Bayas, K/2012, 26 Juli 2013
Talang Gebang, Talang Siring dan Lebung 2012

219 1.03.01 PT. DU Optimaliasi Sarana Air Bersih IKK Talang 03/01/PPK/PUC 4.997.685.000,00 249.884.250,00 5369/LS/1.20 249.884.250,00 - -
Kelapa, Lokasi Kenten dan Merah Mata K/2012 tgl. 26-07- .09.02.00/6.2/
2012,ADD 2013
03/01.A/PPK/PU
CK/2012 tgl 24-
09-2012
220 1.03.01 PT. TJC Optimaliasi Sarana Air Bersih IKK Betung, 03/02/PPK/PUC 3.135.772.000,00 156.788.600,00 2417/LS/1.20 156.788.600,00 - -
Lokasi Betung K/2012 tgl 26 Juli .09.02.00/6.2/
20 2013
221 1.03.01 PT. MJA Optimaliasi Sarana Air Bersih IKK 01/03/PPK- 1.372.600.000,00 68.630.000,00 2398/LS/1.20 68.630.000,00 - -
Mariana, Lokasi Sungai Rebo OP.I/PUCK/2012 .09.02.00/6.2/
tanggal 27 2013
Agustus 2012
222 1.03.01 CV. IM Optimaliasi Sarana Air Bersih IKK Makarti 03/03/PPK- 341.934.000,00 17.096.700,00 2861/LS/1.20 17.096.700,00 - -
Jaya Lokasi Makarti Jaya OP.I/PUCK/2012, .09.02.00/6.2/
Tgl. 27-08-2012 2013

Halaman 17 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
223 1.03.01 CV. AS Optimaliasi Sarana Air Bersih IKK Tungkal 05/03/PPK- 342.820.000,00 17.141.000,00 4582/LS/1.20 17.141.000,00 - -
Ilir, Lokasi Tungkal Ilir OP.I/PUCK/2012 .09.02.00/6.2/
TGL 27-08-12 2013
224 1.03.01 CV. AJM Penambahan Bak Resevoar IKK Rambutan 02/03/PPK- 843.171.000,00 42.158.550,00 5635/LS/1.20 42.158.550,00 - -
Lokasi Sungai Pinang OP.I/PU.CK/2012 .09.02.00/6.2/
tgl. 27-08-2012 2013
225 1.03.01 CV. TPP Pembangunan Pipa Distribusi Air Bersih 26/03/PPK- 1.994.000.000,00 99.700.000,00 2394/LS/1.20 99.700.000,00 - -
Lokasi Suak Tapeh P3L.III/PUCK/20 .09.02.00/6.2/
12 TGL 26-10-12 2013

226 1.03.01 CV. CZ Pengecoran Jalan Lingkungan Dalam Desa 23/03/PPK- 244.994.000,00 12.249.700,00 2745/LS/1.20 12.249.700,00 - -
Lubuk Saung Regan Agung Kec. Banyuasin P3L.III/PUCK/20 .09.02.00/6.2/
III(* 12 TGL. 27-09- 2013
12
227 1.03.01 CV. APe Pengecoran Jalan Lingkungan dalam Desa 29/03/PPK-P3L 243.995.000,00 12.199.750,00 2743/LS/1.20 12.199.750,00 - -
Sidang Mas Kec. Banyuasin III (* III/PUCK/2012 .09.02.00/6.2/
Tgl 25 Oktober 2013
2012
228 1.03.01 CV. APe Pengecoran Jalan Lingkungan dalam Desa 25.a/03/SPK/PPK- 147.651.000,00 7.382.550,00 2744/LS/1.20 7.382.550,00 - -
Rimba Alai Kec. Banyuasin III (* P3L.III/PUCK/20 .09.02.00/6.2/
12 Tgl 10-10- 2013
2012

229 1.03.01 CV. BU Pengecoran Jalan Lingkungan dalam Desa 09/03/PPK- 149.328.000,00 7.466.400,00 1617/LS/1.20 7.466.400,00 - -
Plajau Ulu menuju SD Kec. Banyuasin III TRTB.III/PUCK/ .09.02.00/6.2/
(* 2012 Tgl 03 Sept 2013
2012
230 1.03.01 CV. PI Pengecoran Jalan Lingkungan dalam Desa 28/03/SPK/PPK- 50.512.000,00 2.525.600,00 - - 2.525.600,00
Plajau Ilir menuju SD Kec. Banyuasin III (* P3L.III/PUCK/20
12, Tgl. 15-10-
2012
231 1.03.01 CV. BT Pengecoran Lorong Inpres Desa Ujung 29/03/SPK/PPK- 147.743.000,00 7.387.150,00 5639/LS/1.20 7.387.150,00 - -
Tanjung Kec. Banyuasin III P3L/PUCK/2012, .09.02.00/6.2/
Tgl. 03-09-2012 2013
232 1.03.01 CV. RMK Pengecoran Lorong Assholihin Kel. 01/03/SPK/PPK- 99.318.000,00 4.965.900,00 0549/LS/1.20 4.965.900,00 - -
Kedondong Raye Kec. Banyuasin III TRTB.III/PUCK/ .09.02.00/6.2/
(Lanjutan) 2012 tanggal 15 2013
Juni
233 1.03.01 CV. LS Pengecoran Jalan Bukit Indah Lorong H. 18/03/SPK/PPK- 197.120.000,00 9.856.000,00 2389/LS/1.20 9.856.000,00 - -
Sa'ari Kec. Banyuasin III (* P3L.III/PUCK/20 .09.02.00/6.2/
12 Tgl 10 Sep 2013
2012
234 1.03.01 CV. LS Pengecoran Jalan Lingkungan dalam 19/03/PPK- 198.576.000,00 9.928.800,00 6184/LS/1.20 9.928.800,00 - -
Kelurahan Mulya Agung Kec. Banyuasin III P3L.III/PUCK/20 .09.02.00/6.2/
(* 12, Tgl. 03-09- 2013
2012

Halaman 18 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
235 1.03.01 CV. CZ Pengecoran Jalan menuju SMK Kelurahan 20/03/SPK/PPK- 195.600.000,00 9.780.000,00 7211/LS/1.20 9.780.000,00 - -
Seterio Kec. Banyuasin III (* P3L.III/PUCK/20 .09.02.00/6.2/
12 TGL 03-09-12 2013

236 1.03.01 CV. BU Pengecoran Lorong Tenang Kelurahan 04/03/PPK- 199.361.000,00 9.968.050,00 1619/LS/1.20 9.968.050,00 - -
Seterio Kec. Banyuasin III (* TRTB.III/PUCK/ .09.02.00/6.2/
2012 Tgl 03 Sept 2013
2012
237 1.03.01 CV. CZ Pengecoran Jalan Lingkungan Fathul Mu'in 22/03/SPK/PPK- 195.933.000,00 9.796.650,00 7210/LS/1.20 9.796.650,00 - -
Tanjung Agung Kec. Banyuasin III(* P3L- .09.02.00/6.2/
III/PUCK/2012 2013
TGL 03-09-12
238 1.03.01 CV. NP Pengecoran Jalan Lingkungan Kom. Makam 14/03/PPK- 244.996.000,00 12.249.800,00 3550/LS/1.20 12.249.800,00 - -
Pedado Kel. Pkl. Balai Kec. Banyuasin III PP.III/PUCK/201 .09.02.00/6.2/
(* 2, Tgl. 08-10-12 2013
239 1.03.01 CV. NP Pengecoran Lrg H. Badri Mamak Rt.13, 15/03/PPK- 244.236.000,00 12.211.800,00 3549/LS/1.20 12.211.800,00 - -
Rt.14 Kel. Kedondong Raye Kec. PP.III/PUCK/201 .09.02.00/6.2/
Banyuasin III (* 2 Tg. 08-10-12 2013
240 1.03.01 CV. CBI Pengecoran Jalan Lingkungan RT. 09 RW. 03/03/PPK- 99.456.000,00 4.972.800,00 - - 4.972.800,00
03 Kel. Seterio Kec. Banyuasin III TRTB.II/PUCK/2
012, Tgl. 19-10-
2012
241 1.03.01 CV. CBI Pengecoran jalan Lingkungan Dalam Desa 04/03/PPK- 149.338.000,00 7.466.900,00 3571/LS/1.20 7.466.900,00 - -
Regan Agung Kec. Banyuasin III TRTB.II/PUCK/2 .09.02.00/6.2/
012 Tgl 19-10- 2013
2012
242 1.03.01 CV. CG Pengecoran Jalan Lingkungan dalam Desa 587.984.000,00 29.399.200,00 3556/LS/1.20 29.399.200,00 - -
Rejodadi Kec. Sembawa (* 03/03/PPK/PUC .09.02.00/6.2/
K/2012, Tgl. 03- 2013
09-2012
243 1.03.01 CV. Du Pengecoran Lorong dalam Desa Muara 03/05/PPK/PUC 195.989.000,00 9.799.450,00 3555/LS/1.20 9.799.450,00 - -
Damai Kec. Sembawa (* K/2012, Tgl. 3-09- .09.02.00/6.2/
3012 2013
244 1.03.01 CV. PP Pengecoran Lorong dalam Desa Purwosari 03/04/PPK/PUC 147.097.000,00 7.354.850,00 2092/LS/1.20 7.354.850,00 - -
Kec. Sembawa (* K/2012 Tanggal .09.02.00/6.2/
03 September 2013
2012
245 1.03.01 CV. CG Pengecoran Jalan Lingkungan dalam Desa 03/06/PPK/PUC 440.872.000,00 22.043.600,00 3552/LS/1.20 22.043.600,00 - -
Santan Sari Kec. Sembawa (* K/2012, Tgl 03- .09.02.00/6.2/
09-2012 2013
246 1.03.01 CV. LK Pengecoran Jalan Lingkungan Dalam Dsn. I 01/03/SPK/PPK- 59.530.000,00 2.976.500,00 2857/LS/1.20 2.976.500,00 - -
Desa Pulau Harapan Kec. Sembawa P3L.II/PUCK/201 .09.02.00/6.2/
2 Tgl 15 Okt 2013
2012
247 1.03.01 CV. TS Pengecoran Jalan Lingkungan Dalam Desa 18/03/SPK/PPK- 99.450.000,00 4.972.500,00 6106/LS/1.20 4.972.500,00 - -
Purwosari Kec. Sembawa PP.IV/PUCK/201 .09.02.00/6.2/
2, Tgl. 15-10- 2013
2012

Halaman 19 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
248 1.03.01 CV. DJ Pengecoran Jalan Sri Menanti Desa 04/03/SPK/PPK- 99.460.000,00 4.973.000,00 6096/LS/1.20 4.973.000,00 - -
Rejodadi Kec. Sembawa P3L.II/PUCK/201 .09.02.00/6.2/
2, 15 Oktober 2013
2012
249 1.03.01 CV. DP Pengecoran Jalan Lingkungan Dalam Desa 05/03/SPK/PPK- 99.430.000,00 4.971.500,00 2817/LS/1.20 4.971.500,00 - -
Muara Damai Kec. Sembawa P3L.II/PUCK/201 .09.02.00/6.2/
2 Tgl 15 Okt 2013
2012
250 1.03.01 CV. BrPs Pengecoran Jalan Lingkungan Perumahan 01/03/SPK/PPK- 99.319.000,00 4.965.950,00 2562/LS/1.20 4.965.950,00 - -
Komplek Tri Dharma Permai Kec. Talang OP.III/PUCK/201 .09.02.00/6.2/
Kelapa 2 tgl 15 Juni 2012 2013

251 1.03.01 CV. SmJ Pengecoran Jalan Lingkungan Dalam Desa 13/03/SPK/PPK- 98.594.000,00 4.929.700,00 4580/LS/1.20 4.929.700,00 - -
Kenten Laut Kec. Talang Kelapa OP.III/PUCK/201 .09.02.00/6.2/
2 TGL 14-09-12 2013
252 1.03.01 CV. HR Pengecoran Jalan Lingkungan I Kel. Air 11/02/PPK/PUC 197.325.000,00 9.866.250,00 4957/LS/1.20 9.866.250,00 - -
Batu Kec. Talang Kelapa (* K/2012 Tgl 03-09- .09.02.00/6.2/
2012 2013
253 1.03.01 CV. MB Pengecoran Lorong Barokah Kelurahan 08/03/SPK/PPK- 99.310.000,00 4.965.500,00 2687/LS/1.20 4.965.500,00 - -
Sukajadi Kec. Talang Kelapa (* OP.III/PUCK/201 .09.02.00/6.2/
2 Tgl 09/7/2012 2013
amandemen
No.08/03/SPK-
ADD/PPK-
OP.III/PUCK/201
2 tgl 16/7/12
254 1.03.01 CV. SK Pengecoran Lorong Bukit Indah Rt. 30 / 02 09/03/SPK/PPK- 98.332.000,00 4.916.600,00 2368/LS/1.20 4.916.600,00 - -
Kel. Tanah Mas Kec. Talang Kelapa (* OP.III/PUCK/201 .09.02.00/6.2/
2 Tgl 06 2013
September 2012.
255 1.03.01 CV. KY Pengecoran Jalan Tembus Lrg. Pinang Rt. 10/03/PPK.PP.III/ 244.260.000,00 12.213.000,00 2683/LS/1.20 12.213.000,00 - -
57/20 Kel. Sukajadi Kec. Talang Kelapa (* PUCK/2012 .09.02.00/6.2/
Tanggal 25 2013
September 2012
256 1.03.01 CV. MB Pengecoran Jalan Lingkungan Permhn Afik 11/03/PPK- 244.997.000,00 12.249.850,00 2685/LS/1.20 12.249.850,00 - -
Permai Rt. 12 Kenten Laut Kec. Talang PP.III/PUCK/201 .09.02.00/6.2/
Kelapa (* 2 Tanggal 25 2013
September 2012
257 1.03.01 CV. MB Pengecoran Lorong Balai Rt. 06/07 12/03/PPK.PP.III/ 244.878.000,00 12.243.900,00 2682/LS/1.20 12.243.900,00 - -
Kelurahan Air Batu Kec. Talang Kelapa (* PUCK/2012 Tgl .09.02.00/6.2/
25 September 2013
2012
258 1.03.01 CV. KY Pengecoran Lorong Tika Rt. 05 Kelurahan 13/03/PPK- 244.869.000,00 12.243.450,00 2686/LS/1.20 12.243.450,00 - -
Air Batu Kec. Talang Kelapa (* OP.III/PUCK/201 .09.02.00/6.2/
2 tgl 25/9/2012 2013

Halaman 20 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
259 1.03.01 CV. NPM Pengecoran Jalan Belakang Balai Desa RT. 04/03/SPK/PPK- 99.256.000,00 4.962.800,00 2667/LS/1.20 4.962.800,00 - -
13 Dusun1 Desa Kenten Laut Kec. Talang P3L.III/PUCK/20 .09.02.00/6.2/
Kelapa 12 Tgl 15-10- 2013
2012
260 1.03.01 CV. NPM Pengecoran Jalan Lingkungan Dalam 05/03/SPK/PPK- 99.409.000,00 4.970.450,00 2563/LS/1.20 4.970.450,00 - -
Kelurahan Talang Kelapa Komplek Gria P3L.III/PUCK/20 .09.02.00/6.2/
Damai Indah 12 Tgl 15-10- 2013
2012
261 1.03.01 CV. SP Pengecoran Jalan Lingkungan Perum. Bulu 06/03/SPK/PPK- 99.507.000,00 4.975.350,00 3577/LS/1.20 4.975.350,00 - -
Jadongan Rt.33 Rw.09 Kelurahan Talang P3L.III/PUCK/20 .09.02.00/6.2/
Kelapa 12 Tgl 15 Okt 2013
2012
262 1.03.01 CV. SP Pengecoran Jalan Masjid RT. II Desa 07/03/SPK/PPK- 149.242.000,00 7.462.100,00 3573/LS/1.20 7.462.100,00 - -
Gasing Kec. Talang Kelapa P3L.III/PUCK/20 .09.02.00/6.2/
12 Tgl 15 2013
Oktober 2012

263 1.03.01 CV. SP Pengecoran Lorong RT. 15 Desa Kenten 08/03/SPK/PPK- 99.453.000,00 4.972.650,00 3576/LS/1.20 4.972.650,00 - -
Laut Kecamatan Talang Kelapa P3L.III/PUCK/20 .09.02.00/6.2/
12 TGL 15-10-12 2013

264 1.03.01 CV. RS Pengecoran Jalan Lingkungan Dalam 13/03/SPK/PPK- 99.290.000,00 4.964.500,00 3874/LS/1.20 4.964.500,00 - -
Kelurahan Talang Keramat Kec. Talang P3L.III/PUCK/20 .09.02.00/6.2/
Kelapa 12, Tgl. 15-10- 2013
2012
265 1.03.01 CV. RS Pengecoran Jalan Lingkungan Dalam 11/03/SPK/PPK- 99.262.000,00 4.963.100,00 3875/LS/1.20 4.963.100,00 - -
Kelurahan Sukomoro Kec. Talang Kelapa P3L.III/PUCK/20 .09.02.00/6.2/
12, Tgl. 15-10- 2013
2012
266 1.03.01 CV. HR Pengecoran Jalan Lingkungan Dalam Desa 31/03/SPK/PPK- 59.010.000,00 2.950.500,00 5261/LS/1.20 2.950.500,00 - -
Dusun Pulau Desa Kenten Laut Kec. Talang P3L.I/PUCK/201 .09.02.00/6.2/
Kelapa 2 TGL 15-10-12 2013
267 1.03.01 PT. BP Pengecoran Jalan Lingkungan Desa Cinta 11/03/PPK- 293.930.000,00 14.696.500,00 3519/LS/1.20 14.696.500,00 - -
Manis Lama Kec. Banyuasin I PP.I/PUCK/2012, .09.02.00/6.2/
Tgl. 03-09-2012 2013
268 1.03.01 PT. BP Pengecoran Jalan Lingkungan Desa Panca 12/03/PPK- 294.242.000,00 14.712.100,00 3455/LS/1.20 14.712.100,00 - -
Desa Kec. Banyuasin I PP.I/PUCK/2012, .09.02.00/6.2/
Tgl. 03-09-2012 2013
269 1.03.01 PT. BP Pengecoran Jalan Lingkungan Dalam Desa 03/17/PPK/PUC 979.546.000,00 48.977.300,00 3457/LS/1.20 48.977.300,00 - -
Sido Mulyo Kec. Banyuasin I (* K/2012 Tgl 03 .09.02.00/6.2/
September 2012 2013
270 1.03.01 PT. PRa Pengecoran Jalan Lingkungan Dalam Desa 979.458.000,00 48.972.900,00 1710/LS/1.20 48.972.900,00 - -
Tirto Sari Kec. Banyuasin I (* 03/18/PPK/PUC .09.02.00/6.2/
K/2012 Tgl 03 2013
Sept 2012

Halaman 21 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
271 1.03.01 CV. IMr Pengecoran Lrg. Jarak I Rt. 05 Kel. Mariana 15/02/SPK/PPK- 99.333.000,00 4.966.650,00 - - 4.966.650,00
Ilir Kecamatan Banyuasin I (* P3L.I/PUCK/201
2 Tgl 07 Sep
2012
272 1.03.01 CV. NJP Pengecoran Lrg. Gerunggang Rt. 07 Kel. 16/02/SPK/PPK- 99.344.000,00 4.967.200,00 1963/LS/1.20 4.967.200,00 - -
Mariana Ilir Kec. Banyuasin I (* P3L.I/PUCK/201 .09.02.00/6.2/
2 Tgl 07 sep 2012 2013

273 1.03.01 CV. IMr Pengecoran Lrg. PDAM Kel. Marianan Ilir 17/02/SPK/PPK- 99.332.000,00 4.966.600,00 - - 4.966.600,00
Kec. Banyuasin I (* P3L.I/PUCK/201
2 Tanggal 07
September 2012
274 1.03.01 CV. BaPe Pengecoran Lrg. Cakur Dusun III Desa 15/03/PPK- 198.010.000,00 9.900.500,00 1964/LS/1.20 9.900.500,00 - -
Perajen Kecamatan Banyuasin I (* P3L.III/PUCK/20 .09.02.00/6.2/
12 tgl. 03 2013
September 2012
275 1.03.01 CV. NJP Pengecoran Lorong Jelutung Mariana Rt. 16 18/02/SPK/PPK- 98.973.000,00 4.948.650,00 1962/LS/1.20 4.948.650,00 - -
Kec. Banyuasin I (* P3L.I/PUCK/201 .09.02.00/6.2/
2, Tanggal 07 2013
September 2012
276 1.03.01 PT. BRL Pengecoran Jalang Lingkungan desa Sambi 16/03/SPK/PPK- 488.994.000,00 24.449.700,00 - - 24.449.700,00
Rejo Rt. 22 dan 21 Kel. Mariana Kec. BA I P3L.III/PUCK/20
(* 12 Tgl 03 Sept
2012
277 1.03.01 CV. SmJ Pengecoran Lrg. Masjid menuju Lrg. 19/02/SPK/PPK- 118.850.000,00 5.942.500,00 5399/LS/1.20 5.942.500,00 - -
Kacang Desa Tirto Sari Kecamatan P3L.I/PUCK/201 .09.02.00/6.2/
Banyuasin I 2, Tgl. 07-09- 2013
2012
278 1.03.01 PT. BP Pengecoran Jalan Lingkungan Dalam Desa 01/03/SPK/PPK- 199.469.000,00 9.973.450,00 3341/LS/1.20 9.973.450,00 - -
Rimba Jaya RT. 08 KM. 15 Kec. Banyuasin PP.I/PUCK/2012 .09.02.00/6.2/
I Tgl 15 Oktober 2013
2012
279 1.03.01 CV. SJ Pembangunan Jalan Desa Rimba Jaya Kec. 01/03/SPK/PPK- 74.920.000,00 3.746.000,00 - - 3.746.000,00
Banyuasin I (** P3L.IV/PUCK/20
12, Tgl. 15 Okt
2012
280 1.03.01 CV. HCL Pemindahan Utilitas PDAM untuk 27/03/PPK- 2.491.400.000,00 124.570.000,00 2418/LS/1.20 124.570.000,00 - -
Pelabaran Jalan Lokasi Sungai Pinang P3L.III/PUCK/20 .09.02.00/6.2/
12 TGL 26-10-12 2013

281 1.03.01 CV. SJ Pengecoran Lorong Swadaya Desa Merah 02/03/SPK/PPK- 99.815.000,00 4.990.750,00 3720/LS/1.20 4.990.750,00 - -
Mata Kec. Banyuasin I P3L.IV/PUCK/20 .09.02.00/6.2/
12, Tgl. 15-10- 2013
2012
282 1.03.01 CV. SJ Pengecoran Jalan Lingkungan Dalam Desa 03/03/SPK/PPK- 99.815.000,00 4.990.750,00 5555/LS/1.20 4.990.750,00 - -
Muara Baru Kec. Banyuasin I P3L.IV/PUCK/20 .09.02.00/6.2/
12 Tgl 15-10- 2013
2012

Halaman 22 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
283 1.03.01 CV. SJ Pengecoran Jalan Lingkungan Dalam Desa 04/03/SPK/PPK- 99.815.000,00 99.815.000,00 0326/LS/1.20 99.815.000,00 - -
Duren Ijo Kec. Banyuasin I P3L.IV/PUCK/20 .09.02.00/6.2/
12 Tgl 15-10- 2013 dan
2012 6150/LS/1.20
.09.02.00/6.2/
2013
284 1.03.01 CV. SJ Pengecoran Jalan Lingkungan Dalam Desa 05/03/SPK/PPK- 99.810.000,00 4.990.500,00 4306/LS/1.20 4.990.500,00 - -
Merah Mata Kec. Banyuasin I P3L.IV/PUCK/20 .09.02.00/6.2/
12, Tgl. 15 Okt 2013
2012
285 1.03.01 CV. TaSa Pengecoran Jalan Lingkungan Dalam Desa 08/03/SPK/PPK- 99.825.000,00 99.825.000,00 0325/LS/1.20 99.825.000,00 - -
Padang Rejo Kecamatan Banyuasin I P3L.I/PUCK/201 .09.02.00/6.2/
2, Tgl. 14-10- 2013 dan
2012 6151/LS/1.20
.09.02.00/6.2/
2013
286 1.03.01 CV. TS Pengecoran Jalan Lingkungan Dalam Desa 07/03/SPK/PPK- 99.825.000,00 4.991.250,00 3724/LS/1.20 4.991.250,00 - -
Budi Mulya Kecamatan Banyuasin I P3L.IV/PUCK/20 .09.02.00/6.2/
12, Tgl. 15 Okt 2013
2012
287 1.03.01 CV. TS Pengecoran Jalan Lingkungan Dalam Desa 09/03/SPK/PPK- 99.815.000,00 4.990.750,00 3725/LS/1.20 4.990.750,00 - -
Cinta Manis Lama Kecamatan Banyuasin I P3L.IV/PUCK/20 .09.02.00/6.2/
12 Tgl 15-10- 2013
2012
288 1.03.01 CV. TS Pengecoran Jalan Lingkungan Dalam Desa 10/03/SPK/PPK- 99.815.000,00 4.990.750,00 - - 4.990.750,00
Panca Mulya Kecamatan Banyuasin I PP.IV/PUCK/201
2 TGL 15-10-12
289 1.03.01 CV. TS Pengecoran Jalan Lingkungan Dalam Desa 11/03/SPK/PPK- 99.815.000,00 4.990.750,00 3869/LS/1.20 4.990.750,00 - -
Tirta Makmur Banyuasin I P3L.IV/PUCK/20 .09.02.00/6.2/
12 TGL 15-10-12 2013

290 1.03.01 CV. VIP Pengecoran Lorong Famili Desa Sungai 08/03/SPK/PPK- 79.352.000,00 3.967.600,00 - - 3.967.600,00
Pinang Kec. Rambutan PP.III/PUCK/201
2, Tgl. 15 Juni
2012
291 1.03.01 CV. LK Pengecoran Jalan Lingkungan Lebung 08/03/PPK- 119.334.000,00 5.966.700,00 2803/LS/1.20 5.966.700,00 - -
Barangan Ds. Sungai Pinang Kec. PP.I/PUCK/2012 .09.02.00/6.2/
Rambutan Tgl 03 Sep 2012 2013
292 1.03.01 CV. IB Pengecoran Jalan Lingkungan Dalam Desa 01/03/PPK- 99.317.000,00 4.965.850,00 0923/LS/1.20 4.965.850,00 - -
Sako Rt. 02 dan 04 Kecamatan Rambutan PP.I/PUCK/2012 .09.02.00/6.2/
(* Tanggal 02 2013
Agustus 2012
293 1.03.01 CV. IB Pengecoran Jalan Lingkungan dalam Desa 02/03/PPK- 99.119.000,00 4.955.950,00 5139/LS/1.20 4.955.950,00 - -
Gelebak Dalam Tlg Sekuncit Kec. PP.I/PUCK/2012 .09.02.00/6.2/
Rambutan (* Tanggal 03 2013
Agustus 2012

Halaman 23 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
294 1.03.01 CV. BPD Pengecoran Jalan Lingkungan Dalam Desa 03/03/SPK/PPK- 58.664.000,00 2.933.200,00 4298/LS/1.20 2.933.200,00 - -
Durian Gadis menuju SDN / Pemakaman (* PP.I/PUCK/2012 .09.02.00/6.2/
TGL 10-09-12 2013
295 1.03.01 CV. AP Pengecoran Jalan Lingkungan dalam Desa 04/03/PPK- 490.237.000,00 24.511.850,00 4484/LS/1.20 24.511.850,00 - -
Siju Kec. Rambuatan (* PP.I/PUCK/2012 .09.02.00/6.2/
Tgl. 07-09- 2012 2013
296 1.03.01 CV. AS Pengecoran Jalan Lingkungan dalam Desa 05/03/PPK- 79.350.000,00 3.967.500,00 4616/LS/1.20 3.967.500,00 - -
Menten Kec. Rambuatan (lanjutan) PP.I/PUCK/2012, .09.02.00/6.2/
Tgl. 03-09-2012 2013
297 1.03.01 CV. KY Pengecoran Jalan Lingkungan dalam desa 05/03/SPK/PPK- 89.520.000,00 4.476.000,00 2680/LS/1.20 4.476.000,00 - -
Baru Kec. Rambutan PP.III/PUCK/201 .09.02.00/6.2/
2 Tgl 05 Sept 2013
2012
298 1.03.01 CV. Na Pengecoran Lrg. Dalam Dusun I Desa 05/03/SPK/PPK- 89.356.000,00 4.467.800,00 - - 4.467.800,00
Sungai Pinang kec. Rambuatan PP.III/PUCK/201
2 Tgl 05 Sept
2012
299 1.03.01 CV. AS Pengecoran Jalan Lingkungan Menuju 06/03/SPK- 89.344.000,00 4.467.200,00 6111/LS/1.20 4.467.200,00 - -
Kalangan Desa Siju Kec. Rambutan PP.III/PUCK/201 .09.02.00/6.2/
(Lanjutan) 2, Tgl. 25-09- 2013
2012
300 1.03.01 CV. BT Pengecoran Jalan Lingkungan Dalam Dsn 10/03/PPK- 198.278.000,00 9.913.900,00 1513//LS/1.2 9.913.900,00 - -
IV Ds. Sungai Pinang Kec. Rambutan (* PP.1/PUCK/2012 0.09.02.00/6.
Tanggal 03 2/2013
September 2012
301 1.03.01 CV. TS Pengecoran Lorong Dalam Dusun II Ds. 04/03/SPK/PPK- 198.297.000,00 9.914.850,00 1509/LS/1.20 9.914.850,00 - -
Sungai Dua Kec. Rambutan (* PP.III/PUCK/201 .09.02.00/6.2/
2 Tanggal 05 2013
September 2012
302 1.03.01 CV. NSI Pengecoran Jalan Meritai Dalam Desa 02/03/SPK/PPK- 79.486.000,00 3.974.300,00 4487/LS/1.20 3.974.300,00 - -
Sungai Pinang PP.I/PUCK/2012, .09.02.00/6.2/
Tanggal 05 2013
September 2012
303 1.03.01 CV. DJ Pengecoran Jalan Menuju SD 1 dan 2 Desa 03/03/SPK/PPK- 99.430.000,00 4.971.500,00 2860/LS/1.20 4.971.500,00 - -
Sungai Dua PP.I/PUCK/2012 .09.02.00/6.2/
Tgl 15 Okt 2012 2013
304 1.03.01 CV. LK Pengecoran Lorong Dedek Desa Sungai 04/03/SPK/PPK- 77.350.000,00 3.867.500,00 3293/LS/1.20 3.867.500,00 - -
Pinang Kec. Rambutan PP.I/PUCK/2012 .09.02.00/6.2/
Tgl. 15-10- 2012 2013
305 1.03.01 CV. DJ Pengecoran Lorong RT. 09 Desa Sako 05/03/SPK/PPK- 99.440.000,00 4.972.000,00 2812/LS/1.20 4.972.000,00 - -
Kecamatan Rambutan PP.I/PUCK/2012 .09.02.00/6.2/
Tgl 15 Oktober 2013
2012
306 1.03.01 CV. Zu Pengecoran Jalan Lingkungan dalam Desa 14/03/SPK/PPK- 197.509.000,00 9.875.450,00 - - 9.875.450,00
Ringin Harjo Kec. Pulau Rimau (* P3L.I/PUCK/201
2 Tgl 12-09-12

Halaman 24 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
307 1.03.01 CV. NPM Pengecoran Jalan Lingkungan Dalam Desa 03/02/SPK/PPK- 99.488.000,00 4.974.400,00 4305/LS/1.20 4.974.400,00 - -
Wana Mukti Kec. Pulau Rimau OP.II/PUCK/201 .09.02.00/6.2/
2 Tgl 16-10-2012 2013
308 1.03.01 CV. NPM Pengecoran Jalan Lingk. Dlm Desa Tabuan 03/05/SPK/PPK- 99.465.000,00 4.973.250,00 4302/LS/1.20 4.973.250,00 - -
Asri Kec. Pulau Rimau OP.II/PUCK/201 .09.02.00/6.2/
2, Tgl. 16-10- 2013
2012
309 1.03.01 CV. HR Pengecoran Lorong menuju SDN 27 Rantau 10/02/SPK/PPK- 45.000.000,00 2.250.000,00 5262/LS/1.20 2.250.000,00 - -
Bayur Kec. Rantau Bayur TRTB.II/PUCK/2 .09.02.00/6.2/
012 Tgl 10-09- 13
2012
310 1.03.01 CV. APe Pengecoran Jalan Lingkungan dalam Desa 08/03/PPK- 147.398.000,00 7.369.900,00 3514/LS/1.20 7.369.900,00 - -
Srijaya Kec. Rantau Bayur (* TRTB.II/PUCK/2 .09.02.00/6.2/
012 Tgl 30-10- 2013
2012
311 1.03.01 CV. IP Pengecoran Jalan Lingkungan dalam Desa 06/03/PPK- 197.298.000,00 9.864.900,00 3527/LS/1.20 9.864.900,00 - -
Sungai Naik Kec. Rantau Bayur (* TRTB.I/PUCK/20 .09.02.00/6.2/
12 TGL 10-09-12 2013

312 1.03.01 CV. IP Pengecoran Jalan Lingkungan dalam Desa 07/03/PPK/TRTB 391.991.000,00 19.599.550,00 3662/LS/1.20 19.599.550,00 - -
Penandingan Kec. Rantau Bayur (* .II/PUCK/2012 .09.02.00/6.2/
Tgl 01Oktober 2013
2012
313 1.03.01 CV. EJ Pengecoran Jalan Menuju SD 4 Srijaya Kec. 03/03/SPK/PPK- 99.460.000,00 4.973.000,00 1817/LS/1.20 4.973.000,00 - -
Rantau Bayur OP/PUCK/2012, .09.02.00/6.2/
Tgl. 15-10-2012 2013
314 1.03.01 CV. RMK Pengecoran Jalan Lingkungan Dsn Sungai 04/03/PPK- 123.862.000,00 6.193.100,00 2360/LS/1.20 6.193.100,00 - -
Keladi Ds Rimau Sungsang Kec. Banyuasin PP.II/PUCK/2012 .09.02.00/6.2/
II (* Tgl. 24-09- 2012 2013

315 1.03.01 Pengecoran Jalan Lingkungan Dsn Sungai 05/03/SPK/PPK- 122.314.000,00 6.115.700,00 - - 6.115.700,00 audit BPK CV.
Bungin Ds Rimau Sungsang Kec. PP.II/PUCK/2012 RMK
CV. VIP
Banyuasin II (* , Tgl. 24 Sept
2012
316 1.03.01 CV. PL Pengecoran Jalan Lingkungan dalam Desa 06/03/SPK/PPK- 198.201.000,00 9.910.050,00 6575/LS/1.20 9.910.050,00 - -
Karang Sari Kec. Banyuasin II (* PP.II/PUCK/2012 .09.02.00/6.2/
Tgl 24-09-2012 2013
317 1.03.01 CV. LS Pengecoran Jalan Lingkungan dalam Desa 07/03/SPK/PPK- 99.345.000,00 4.967.250,00 6576/LS/1.20 4.967.250,00 - -
Mekar Sari Kec. Banyuasin II (* PP.II/PUCK/2012 .09.02.00/6.2/
Tgl 24-09-2012 2013
318 1.03.01 CV. CM Pengecoran Jalan Lingkungan dalam Desa 09/03/PPK- 588.944.000,00 29.447.200,00 5079/LS/1.20 29.447.200,00 - -
Indra Pura Kec. Muara Sugihan (* P3L.III/PUCK/20 .09.02.00/6.2/
12 Tgl 03 2013
September 2012
319 1.03.01 CV. Su Pengecoran Jalan Lingkungan dalam desa 11/03/PPK- 491.164.000,00 24.558.200,00 2376/LS/1.20 24.558.200,00 - -
Cendana Kec. Muara Sugihan (* P3L.III/PUCK/20 .09.02.00/6.2/
12 Tanggal 03 2013
September 2012

Halaman 25 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
320 1.03.01 CV. JS Pengecoran Jalan Lingkungan dalam Desa 12/03/PPK- 393.393.000,00 19.669.650,00 4424/LS/1.20 19.669.650,00 - -
Margo Mulyo Kec. Muara Sugihan (* P3L.III/PUCK/20 .09.02.00/6.2/
12 Tanggal 03 2013
September 2012
321 1.03.01 CV. KJ Pengecoran Jalan Dalam Desa Sugi Waras 01/03/SPK/PPK- 198.763.000,00 9.938.150,00 4481/LS/1.20 9.938.150,00 - -
Kec. Muara Sugihan (** P3L.III/PUCK/20 .09.02.00/6.2/
12 Tgl 15 Okt 2013
2012
322 1.03.01 CV. PC Pengecoran Jalan Lingkungan dalam Desa 01/03/SPK/PPK- 149.262.000,00 7.463.100,00 - - 7.463.100,00
Bukit Kec. Betung (* P3L.I/PUCK/201
2 TGL 12-09-12
323 1.03.01 CV. AP Pengecoran Jalan Lingkungan dalam Dusun 02/03/SPK/PPK- 99.208.000,00 4.960.400,00 4284/LS/1.20 4.960.400,00 - -
II Desa Bukit Kec. Betung (* P3L.I/PUCK/201 .09.02.00/6.2/
2, Tgl. 12-09- 2013
2012
324 1.03.01 CV. APe Pengecoran Jalan Lingkungan dalam Desa 03/01/PPK- 293.997.000,00 14.699.850,00 3688/LS/1.20 14.699.850,00 - -
Taja Mulya Kec. Betung (* P3L/PUCK/2012 .09.02.00/6.2/
Tgl 01 Oktober 2013
2012
325 1.03.01 CV. AP Pengecoran Jalan Lingkungan dalam Desa 04/03/SPK- 148.595.000,00 7.429.750,00 4479/LS/1.20 7.429.750,00 - -
Suka Mulya I Kec. Betung (* P3L.I/PUCK/201 .09.02.00/6.2/
2 Tgl 07 Sept 2013
2012
326 1.03.01 CV. AP Pengecoran Jalan Lingkungan Kelurahan 05/03/SPK/PPK- 197.159.000,00 9.857.950,00 4483/LS/1.20 9.857.950,00 - -
Betung Kec. Betung (* P3L.I/PUCK/201 .09.02.00/6.2/
2 Tgl. 07-09- 2013
2012
327 1.03.01 CV. AP Pengecoran Jalan Lingkungan Kelurahan 06/01/PPK- 293.997.000,00 14.699.850,00 4482/LS/1.20 14.699.850,00 - -
Rimba Asam Kec. Betung (* P3L.I/PUCK/201 .09.02.00/6.2/
2 Tgl 01 Oktober 2013
2012
328 1.03.01 CV. APe Pengecoran Jalan Lingkungan dalam desa 07/03/SPK/PPK- 99.325.000,00 4.966.250,00 2859/LS/1.20 4.966.250,00 - -
Taja Raya I Kecamatan Betung (* P3L.I/PUCK/201 .09.02.00/6.2/
2 Tgl 12 2013
September 2012

329 1.03.01 CV. RM Pengecoran Jalan Lingkungan dalam Desa 08/03/SPK/PPK- 98.730.000,00 4.936.500,00 4485/LS/1.20 4.936.500,00 - -
Sri Kembang Kecamatan Betung (* P3L.I/PUCK/201 .09.02.00/6.2/
2 Tgl 07 Sept 2013
2012

330 1.03.01 CV. VAA Pengecoran Jalan Lingkungan dalam Desa 01/03/SPK/PPK- 147.383.000,00 7.369.150,00 - - 7.369.150,00
Suka Mulya II Kec. Betung (* P3L.II/PUCK/201
2 Tgl 13
September 2012

Halaman 26 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
331 1.03.01 CV. DM Pengecoran Lorong Gotong Royong 02/03/SPK/PPK- 197.483.000,00 9.874.150,00 - - 9.874.150,00
Kelurahan Betung Kec. Betung (* P3L.II/PUCK/201
2 Tgl 13-09-12

332 1.03.01 CV. IB Pengecoran Lorong Musholla Keurahan 03/03/SPK/PPK- 74.376.000,00 3.718.800,00 - - 3.718.800,00
Betung Kecamatan Betung (* P3L.II/PUCK/201
2 Tgl 12
September 2012

333 1.03.01 CV. PK Pengecoran Lrg Swadaya Bersama 04/03/SPK/PPK- 146.988.000,00 7.349.400,00 5636/LS/1.20 7.349.400,00 - -
Lingkungan Kel. Rimba Asam Kec. Betung P3L.II/PUCK/201 .09.02.00/6.2/
(* 2, Tgl. 05-09- 2013
2012

334 1.03.01 CV. AM Pengecoran jalan Lingkungan dalam Desa 06/03/SPK/PPK- 147.385.000,00 7.369.250,00 1620/LS/1.20 7.369.250,00 - -
Sri Kembang Kec. Betung (* P3L.II/PUCK/201 .09.02.00/6.2/
2, Tgl 13-09-2012 2013

335 1.03.01 CV. EJ Pengecoran Lorong Dusun III Desa Taja 07/03/PPK- 293.985.000,00 14.699.250,00 1715/LS/1.20 14.699.250,00 - -
Indah Kecamatan Betung (* P3L.II/PUCK/201 .09.02.00/6.2/
2, Tgl. 27-09- 2013
2012
336 1.03.01 CV. CD Pengecoran Jalan Lingkungan dalam Desa 08/03/SPK/PPK- 196.270.000,00 9.813.500,00 2074/LS/1.20 9.813.500,00 - -
Suka Mulya / Kpg Asute Kec. Betung (* P3L.II .09.02.00/6.2/
/PUCK/2012, 2013
Tgl. 13-09-2012

337 1.03.01 CV. CD Pengecoran Jalan Lingkungan Dusun I Desa 09/03/SPK/PPK- 196.216.000,00 9.810.800,00 2078/LS/1.20 9.810.800,00 - -
Taja Raya II Kec. Betung (* P3L.II/PUCK/201 .09.02.00/6.2/
2, Tgl. 13-09- 2013
2012

338 1.03.01 CV. LaBe Pengecoran Jalan Lingk. Rt. 29 Dalam 14/03/SPK/PPK- 99.825.000,00 4.991.250,00 3722/LS/1.20 4.991.250,00 - -
Kelurahan Betung Kec. Betung P3L.IV/PUCK/20 .09.02.00/6.2/
12 TGL 15-10-12 2013

339 1.03.01 CV. LaBe Pengecoran Jalan Menuju Masjid Al. Amin 15/03/SPK/PPK- 44.935.000,00 2.246.750,00 - - 2.246.750,00
Rt. 24 Kelurahan Rimba Asam Kec. Betung P3L.IV/PUCK/20
12, Tgl. 15-10-
2012

340 1.03.01 CV. LaBe Pengecoran Jalan Lingk. Rt. 01 Ds. I Desa 16/03/SPK/PPK- 99.825.000,00 4.991.250,00 - - 4.991.250,00
Suka Mulya Kec. Betung P3L.IV/PUCK/20
12 Tgl 15-10-
2012

Halaman 27 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
341 1.03.01 CV. LaBe Pengecoran Jalan Lingk. Rt. 02 Menuju 17/03/SPK/PPK- 79.910.000,00 79.910.000,00 0327/LS/1.20 79.910.000,00 - -
TPU Sedongkok Kec. Betung P3L.IV/PUCK/20 .09.02.00/6.2/
12, Tgl. 15-10- 2013 &
2012 3865/LS/1.20
.09.02.00/6.2/
2013
342 1.03.01 CV. LaBe Pengecoran Lorong Lubis/Telkom RT. 31 18/03/SPK/PPK- 99.825.000,00 4.991.250,00 3721/LS/1.20 4.991.250,00 - -
RW. 09 Kelurahan Betung Kec. Betung P3L.IV/PUCK/20 .09.02.00/6.2/
12 TGL 15-10-12 2013

343 1.03.01 CV. JP Pengecoran Jalan Perumnas Kec. Betung 23/03/SPK/P3L.I 99.825.000,00 4.991.250,00 1973/LS/1.20 4.991.250,00 - -
V/PUCK/2012, .09.02.00/6.2/
Tgl. 15-10-2012 2013
344 1.03.01 CV. EJ Pengecoran Jalan SD 3 JM Desa Bukit 21/03/SPK/PPK- 99.825.000,00 4.991.250,00 1716/LS/1.20 4.991.250,00 - -
Kecamatan Betung P3L.IV/PU.CK/2 .09.02.00/6.2/
012 Tgl 15 2013
Oktober 2012
345 1.03.01 CV. PuPr Penimbunan Jalan Desa Lubuk Karet Dusun 17/03/SPK/PPK- 74.348.000,00 3.717.400,00 2661/LS/1.20 3.717.400,00 - -
II Kec. Suak Tapeh (* OP.III/PUCK/201 .09.02.00/6.2/
2 Tgl 15 Oktober 2013
2012
346 1.03.01 CV. APe Pengecoran Jalan Lingkungan dalam Desa 16/03/SPK.PPK. 147.306.000,00 7.365.300,00 2906/LS/1.20 7.365.300,00 - -
Lubuk Lancang Kecamatan Suak Tapeh (* OP.III/PUCK/201 .09.02.00/6.2/
2 Tgl 13/9/12 2013
347 1.03.01 CV. PuPr Pengecoran Jalan Lingkungan dalam Desa 10/03/SPK/PPK- 147.808.000,00 7.390.400,00 2662/LS/1.20 7.390.400,00 - -
Bengkuang Kec. Suak tapeh (* OP.III/PUCK/201 .09.02.00/6.2/
2 Tgl 13-09-2012 2013

348 1.03.01 CV. PP Pengerasan Jalan Menuju TPA Dalam Desa 07/03/SPK/PPK- 99.300.000,00 4.965.000,00 2586/LS/1.20 4.965.000,00 - -
Lubuk Karet KM 1,5 (* OP.III/PUCK/201 .09.02.00/6.2/
2 Tanggal 04 Juli 2013
2012
349 1.03.01 CV. TAJ Pengecoran Jalan Lingkungan dalam Desa 11/03/SPK/PPK- 147.254.000,00 7.362.700,00 1618/LS/1.20 7.362.700,00 - -
Bukit kampung Karang rejo Kec. Suak OP.III/PUCK/201 .09.02.00/6.2/
Tapeh (* 2, Tgl 13-09-2012 2013

350 1.03.01 CV. PeP Pengecoran Jalan Lingkungan dalam Desa 08/03/SPK/PPK- 149.139.000,00 7.456.950,00 2091/LS/1.20 7.456.950,00 - -
Sukaraja Kec. Suak Tapeh (* P3L.II/PUCK/201 .09.02.00/6.2/
2 Tgl 15 Oktober 2013
2012
351 1.03.01 CV. RA Pengecoran Jalan Lingkungan dalam desa 02/03/SPK/PPK- 197.264.000,00 9.863.200,00 3210/LS/1.20 9.863.200,00 - -
Terusan Tengah Kec. Muara Telang (* OP.II/PUCK/201 .09.02.00/6.2/
2 Tgl 13 Sept 2013
2012

Halaman 28 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
352 1.03.01 CV. RA Pengecoran Jalan Lingkungan dalam Desa 03/03/SPK/PPK- 215.590.000,00 10.779.500,00 3211/LS/1.20 10.779.500,00 - -
Mukti Jaya Kec. Muara Telang (* OP.II/PUCK/201 .09.02.00/6.2/
2 Tgl 25 2013
September 2012
353 1.03.01 CV. MU Pengecoran Jalan Lingkungan Dalam Desa 01/03/SPK/PPK- 99.332.000,00 99.332.000,00 2840/LS/1.20 94.365.400,00 - 4.966.600,00
Muara Telang Kec. Muara Telang PP.III/PUCK/201 .09.02.00/6.2/
2 TGL 15-1012 2013
354 1.03.01 CV. MU Pengecoran Jalan Lingkungan Dalam Desa 02/03/SPK/PPK- 99.445.000,00 4.972.250,00 - - 4.972.250,00
Terusan Muara Kec. Muara Telang PP.III/PUCK/201
2 Tgl 15 Oktober
2012
355 1.03.01 CV. MU Pengecoran Jalan Lingkungan Dalam Desa 03/03/SPK/PPK- 99.420.000,00 4.971.000,00 - - 4.971.000,00
Terusan Tengah Kec. Muara Telang PP.III/PUCK/201
2 Tgl 15 Oktober
2012
356 1.03.01 CV. PU Pengecoran Jalan Lingkungan Dalam Desa 04/03/SPK/PPK- 99.425.000,00 99.425.000,00 2749/LS/1.20 94.453.750,00 - 4.971.250,00
Terusan Dalam Kec. Muara Telang PP. .09.02.00/6.2/
III/PU.CK/2012 2013
TGL 15-10-12
357 1.03.01 CV. PU Pengecoran Jalan Lingkungan Dalam Desa 05/03/SPK/PPK- 99.430.000,00 4.971.500,00 - - 4.971.500,00
Telang Lubuk Kec. Muara Telang PP.III/PUCK/201
2 Tgl 15-10-2012

358 1.03.01 CV. SK Pengecoran Jalan Lingkungan dalam Desa 08/03/PPK- 485.850.000,00 24.292.500,00 1837/LS/1.20 24.292.500,00 - -
Margo Mulyo 20 Kec. Muara Padang (* P3L.III/PUCK/20 .09.02.00/6.2/
12 Tgl 03 Sept 2013
2012
359 1.03.01 CV. SK Pengecoran Jalan Desa Daya Utama Ke Ds. 25/03/PPK- 391.979.000,00 19.598.950,00 2980/LS/1.20 19.598.950,00 - -
Margo Mulyo Kec. Muara Padang (* P3L.III/PUCK/20 .09.02.00/6.2/
12, Tanggal 29 2013
Oktober 2012
360 1.03.01 CV. RK Pengecoran Jalan Lingkungan Dalam Desa 20/03/SPK/PPK- 99.380.000,00 4.969.000,00 5360/LS/1.20 4.969.000,00 - -
Tanjung Baru Kec. Muara Padang P3L.III/PUCK/20 .09.02.00/6.2/
12 Tgl 15-10- 2013
2012
361 1.03.01 CV. SmJ Pengecoran Jalan Lingkungan Dalam Desa 21/03/SPK/PPK- 99.336.000,00 4.966.800,00 5401/LS/1.20 4.966.800,00 - -
Karang Anyar Kec. Muara Padang P3L.III/PUCK/20 .09.02.00/6.2/
12 TGL 15-10-12 2013

362 1.03.01 CV. BJ Pengecoran Jalan Lingkungan Dalam Desa 22/03/SPK/PPK- 99.400.000,00 4.970.000,00 6109/LS/1.20 4.970.000,00 - -
Muara Padang Kec. Muara Padang P3L.III/PUCK/20 .09.02.00/6.2/
12, Tgl. 15-10- 2013
2012
363 1.03.01 CV. SmJ Pengecoran Jalan Lingkungan Dalam Desa 23/03/SPK/PPK- 99.490.000,00 4.974.500,00 5400/LS/1.20 4.974.500,00 - -
Daya Makmur Kec. Muara Padang P3L.III/PUCK/20 .09.02.00/6.2/
12 Tgl 15 Okt 2013
2012

Halaman 29 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
364 1.03.01 CV. SmJ Pengecoran Jalan Lingkungan Dalam Desa 24/03/SPK/PPK- 99.400.000,00 4.970.000,00 5403/LS/1.20 4.970.000,00 - -
Sumber Makmur Kec. Muara Padang P3L.III/PUCK/20 .09.02.00/6.2/
12 TGL 15-10-12 2013

365 1.03.01 CV. HBS Pengecoran Jalan Lingkungan Dalam Desa 02/03/SPK/PPK- 99.403.000,00 4.970.150,00 3718/LS/1.20 4.970.150,00 - -
Sukaraja Kec. Tungkal Ilir PP.IV/PUCK/201 .09.02.00/6.2/
2 TGL 15-10-12 2013
366 1.03.01 CV. HBS Pengecoran Jalan Lingkungan Dalam Desa 03/03/SPK/PPK- 99.323.000,00 4.966.150,00 3717/LS/1.20 4.966.150,00 - -
Suka Mulya Kec. Tungkal Ilir PP.IV/PUCK/201 .09.02.00/6.2/
2 TGL 15-10-12 2013
367 1.03.01 CV. HBS Pengecoran Jalan Lingkungan Dalam Desa 04/03/SPK/PPK- 99.341.000,00 4.967.050,00 - - 4.967.050,00
Karang Asem Kec. Tungkal Ilir PP.IV/PUCK/201
2 Tgl 15 Oktober
2012
368 1.03.01 CV. HBS Pengecoran Jalan Lingkungan Dalam Desa 05/03/SPK/PPK- 99.341.000,00 4.967.050,00 4695/LS/1.20 4.967.050,00 - -
Karang Mulya Kec. Tungkal Ilir PP.IV/PUCK/201 .09.02.00/6.2/
2, Tgl. 15-10- 2013
2012
369 1.03.01 CV. HBS Pengecoran Jalan Lingkungan Dalam Desa 06/03/SPK/PPK- 99.341.000,00 99.341.000,00 0324/LS/1.20 94.373.950,00 - 4.967.050,00
Karang Anyar Kec. Tungkal Ilir PP.IV/PUCK/201 .09.02.00/6.2/
2 Tgl 15 Okt 2013
2012
370 1.03.01 CV. Dih Pengecoran Jalan Lingkungan Dalam Desa 07/03/SPK/PPK- 99.333.000,00 4.966.650,00 3726/LS/1.20 4.966.650,00 - -
Marga Rahayu Kec. Tungkal Ilir PP.IV/PUCK/201 .09.02.00/6.2/
2 TGL 15-10-12 2013
371 1.03.01 CV. Dih Pengecoran Jalan Lingkungan Dalam Desa 08/03/SPK/PPK- 99.362.000,00 4.968.100,00 3753/LS/1.20 4.968.100,00 - -
Teluk Tenggulang Kec. Tungkal Ilir PP.IV/PUCK/201 .09.02.00/6.2/
2 Tgl 15 Oktober 2013
2012
372 1.03.01 CV. Dih Pengecoran Jalan Lingkungan Dalam Desa 09/03/SPK/PPK- 99.356.000,00 4.967.800,00 3866/LS/1.20 4.967.800,00 - -
Suka Karya Kec. Tungkal Ilir PP.IV/PUCK/201 .09.02.00/6.2/
2 Tgl 15 Oktober 2013
2012
373 1.03.01 CV. Dih Pengecoran Jalan Lingkungan Dalam Desa 10/03/SPK/PPK- 99.345.000,00 4.967.250,00 3867/LS/1.20 4.967.250,00 - -
Panca Mulya Kec. Tungkal Ilir PP.IV/PUCK/201 .09.02.00/6.2/
2 TGL 15-10-12 2013
374 1.03.01 CV. Dih Pengecoran Jalan Lingkungan Dalam Desa 11/03/SPK/PPK- 99.336.000,00 99.336.000,00 0316/LS/1.20 94.369.200,00 - 4.966.800,00
Bentayan Kec. Tungkal Ilir PP.IV/PUCK/201 .09.02.00/6.2/
2 Tgl 15 Okt 2013
2012
375 1.03.01 CV. SIT Pengecoran Jalan Lingkungan Dalam Desa 12/03/SPK/PPK- 99.237.000,00 4.961.850,00 3719/LS/1.20 4.961.850,00 - -
Bumi Serdang Kec. Tungkal Ilir PP.IV/PUCK/201 .09.02.00/6.2/
2, Tgl. 15-10- 2013
2012
376 1.03.01 CV. SIT Pengecoran Jalan Lingkungan Dalam Desa 13/03/SPK/PPK- 99.292.000,00 4.964.600,00 5753/LS/1.20 4.964.600,00 - -
Keluang Kec. Tungkal Ilir PP.IV/PUCK/201 .09.02.00/6.2/
2 Tgl 15 Okt 2013
2012

Halaman 30 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
377 1.03.01 CV. SIT Pengecoran Jalan Lingkungan Dalam Desa 14/03/SPK/PPK- 99.356.000,00 4.967.800,00 4691/LS/1.20 4.967.800,00 - -
Sukajaya Pertak III Kec. Tungkal Ilir PP.IV/PUCK/201 .09.02.00/6.2/
2 15-10-12 2013
378 1.03.01 CV. SIT Pengecoran Jalan Lingkungan Dalam Desa 15/03/SPK/PPK- 99.237.000,00 99.237.000,00 0315/LS/1.20 99.237.000,00 - -
Sido Mulyo Kec. Tungkal Ilir PP.IV/PUCK/201 .09.02.00/6.2/
2 Tgl 15-10-12 2013 dan
6152/LS/1.20
.09.02.00/6.2/
2013
379 1.03.01 CV. TS Pengecoran Jalan Lingkungan Dalam Desa 16/03/SPK/PPK- 99.415.000,00 4.970.750,00 1741/LS/1.20 4.970.750,00 - -
Suka Damai Kec. Tanjung Lago PP.IV/PUCK/201 .09.02.00/6.2/
2, Tgl. 15-10- 2013
2012
380 1.03.01 CV. TS Pengecoran Jalan Lingkungan Dalam Desa 17/03/SPK/PPK- 99.425.000,00 4.971.250,00 1738/LS/1.20 4.971.250,00 - -
Muara Sugih Kec. Tanjung Lago PP.IV/PUCK/201 .09.02.00/6.2/
2, Tgl. 15-10- 2013
2012
381 1.03.01 CV. TS Pengecoran Jalan Lingkungan Dalam Desa 18/03/SPK/PPK- 99.426.000,00 4.971.300,00 1737/LS/1.20 4.971.300,00 - -
Purwosari Kec. Tanjung Lago PP.IV/PUCK/201 .09.02.00/6.2/
2, Tgl. 15-10- 2013
2012
382 1.03.01 CV. PT Pengecoran Jalan Lingkungan Dalam Desa 19/03/SPK/PPK- 99.428.000,00 4.971.400,00 1734/LS/1.20 4.971.400,00 - -
Mulya Sari Kec. Tanjung Lago IV/PUCK/2012 .09.02.00/6.2/
Tgl 15 Oktober 2013
2012
383 1.03.01 CV. PT Pengecoran Jalan Lingkungan Dalam Desa 20/03/SPK/PPK- 99.418.000,00 4.970.900,00 1789/LS/1.20 4.970.900,00 - -
Telang Sari Kec. Tanjung Lago PP.IV/PUCK/201 .09.02.00/6.2/
2, Tgl. 15-10- 2013
2012
384 1.03.01 CV. BT Pengecoran Jalan Lingkungan Dalam Desa 21/03/SPK/PPK- 99.432.000,00 4.971.600,00 1790/LS/1.20 4.971.600,00 - -
Sumber Mekar Mukti Kec. Tanjung Lago PP.IV/PUCK/201 .09.02.00/6.2/
2, Tgl. 15-10 2013
385 1.03.01 CV. PT Pengecoran Jalan Lingkungan Dalam Desa 22/03/SPK/PPK- 99.438.000,00 4.971.900,00 1788/LS/1.20 4.971.900,00 - -
Banyu Urip Kec. Tanjung Lago PP.IV/2012, Tgl. .09.02.00/6.2/
15-10-2012 2013

386 1.03.01 CV. BT Pengecoran Jalan Lingkungan Dalam Desa 23/03/SPK/PPK- 99.430.000,00 4.971.500,00 1730/LS/1.20 4.971.500,00 - -
Manggaraya Kec. Tanjung Lago PP.IV/PUCK/201 .09.02.00/6.2/
2, Tgl. 15-10- 2013
2012
387 1.03.01 CV. BT Pengecoran Jalan Lingkungan Dalam Desa 24/03/SPK/PPK- 99.410.000,00 4.970.500,00 1729/LS/1.20 4.970.500,00 - -
Tanjung Lago Kec. Tanjung Lago PP.IV/PUCK/201 .09.02.00/6.2/
2, Tgl. 15-10- 2013
2012
388 1.03.01 CV. BT Pengecoran Jalan Lingkungan Dalam Desa 25/03/SPK/PPK- 99.455.000,00 4.972.750,00 1733/LS/1.20 4.972.750,00 - -
Kuala Puntian Kec. Tanjung Lago PP.IV/PUCK/201 .09.02.00/6.2/
2, Tgl. 15-10- 2013
2012

Halaman 31 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
389 1.03.01 CV. PT Pengecoran Jalan Lingkungan Dalam Desa 26/03/SPK/PPK- 99.400.000,00 4.970.000,00 1735/LS/1.20 4.970.000,00 - -
Suka Tani Kec. Tanjung Lago PP.IV/PUCK/201 .09.02.00/6.2/
2, Tgl. 15-10- 2013
2012
390 1.03.01 CV. BT Pengecoran Jalan Lingkungan Dalam Desa 27/03/SPK/PPK- 99.465.000,00 4.973.250,00 1731/LS/1.20 4.973.250,00 - -
Sri Menanti Kec. Tanjung Lago PP.IV/PUCK/201 .09.02.00/6.2/
2 2013
391 1.03.01 CV. TS Pengecoran Jalan Lingkungan Dalam Desa 28/03/SPK/PPK- 99.465.000,00 4.973.250,00 1740/LS/1.20 4.973.250,00 - -
Bunga Karang Kec. Tanjung Lago PP.IV/PUCK/201 .09.02.00/6.2/
2, Tgl. 15-10- 2013
2012
392 1.03.01 CV. TS Pengecoran Jalan Lingkungan Dalam Desa 29/03/SPK/PPK- 99.405.000,00 4.970.250,00 1739/LS/1.20 4.970.250,00 - -
Bangun Sari Kec. Tanjung Lago PP.IV/PUCK/201 .09.02.00/6.2/
2, Tgl. 15-10- 2013
2012
393 1.03.01 CV. HBS Pengecoran Jalan Lingkungan Rt.11 Rw.06 14/03/SPK/PPK- 99.237.000,00 4.961.850,00 4295/LS/1.20 4.961.850,00 - -
LK.II Kel. Makarti Jaya P3L.III/PUCK/20 .09.02.00/6.2/
12 07 September 2013
2012
394 1.03.01 CV. HBS Pengecoran Jalan Lingk. Rt. 07 dan Rt. 08 15/03/SPK/PPK- 99.237.000,00 4.961.850,00 3863/LS/1.20 4.961.850,00 - -
Rw.04 LK.III Kel. Makarti Jaya P3L.III/PUCK/20 .09.02.00/6.2/
12, Tgl. 15-10- 2013
2012
395 1.03.01 CV. HBS Pengecoran Lorong Manggar Rt. 02 dan Rt. 16/03/SPK/PPK- 99.292.000,00 99.292.000,00 0323/LS/1.20 99.292.000,00 - -
04 Kel. Makarti Jaya P3L.III/PUCK/20 .09.02.00/6.2/
12, Tgl. 15-10- 2013 dan
2012 3763/LS/1.20
.09.02.00/6.2/
2013
396 1.03.01 CV. Dih Pengecoran Jalan Lingkungan 1 Kelurahan 02/03/SPK/PPK- 99.351.000,00 4.967.550,00 - - 4.967.550,00
Makarti Jaya TRTB.I/PUCK/20
12 Tgl 15
Oktober 2012
397 1.03.01 CV. HBS Pengecoran Jalan Lingkungan Dalam 17/03/SPK/PPK- 99.121.000,00 4.956.050,00 3864/LS/1.20 4.956.050,00 - -
Kelurahan Makarti Jaya Kec. Makarti Jaya P3L.III/PUCK/20 .09.02.00/6.2/
12 Tgl 15 2013
OKtober 2012
398 1.03.01 CV. KJ Pengecoran Jalan Dalam Desa Upang Ceria 18/03/SPK/PPK- 199.247.000,00 9.962.350,00 4480/LS/1.20 9.962.350,00 - -
Kec. Makarti Jaya (** P3L- .09.02.00/6.2/
III/PUCK/2012 2013
Tgl 15 Okt 2012
399 1.03.01 CV. LS Pengecoran Jalan Lingkungan I Kel. 19/03/SPK/PPK- 199.367.000,00 9.968.350,00 2374/LS/1.20 9.968.350,00 - -
Makarti Jaya Kec. Makarti Jaya P3L.III/PUCK/20 .09.02.00/6.2/
12 2013
400 1.03.01 CV. Dih Pengecoran Lorong Garuda LK. III Kel. 03/03/SPK/PPK- 99.351.000,00 4.967.550,00 - - 4.967.550,00
Makarti Jaya Kec. Makarti Jaya TRTB.I/PUCK/20
12, Tgl. 15-10-
2012

Halaman 32 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
401 1.03.01 PT. PRa Pembangunan Jerambah Titian dalam Desa 03/19/PPK/PUC 636.959.000,00 31.847.950,00 1709/LS/1.20 31.847.950,00 - -
Sungai Rebo Kec. Banyuasin I K/2012 Tgl 03 .09.02.00/6.2/
Sept 2012 2013
402 1.03.01 PT. PRa Pembangunan Jerambah Cuci mandi Lrg. 13/03/PPK- 293.990.000,00 14.699.500,00 5136/LS/1.20 14.699.500,00 - -
Selumar Rt. 12/02 Kel. Mariana Ilir Kec. PP.I/PUCK/2012 .09.02.00/6.2/
BA I (* Tgl 03 Sept 2012 2013
403 1.03.01 CV. TS Pembangunan Jerambah Titian Sei Batang 13/03/PPK- 99.300.000,00 4.965.000,00 0921/LS/1.20 4.965.000,00 - -
Rt 10 Desa P. Borang Kec. Banyuasin I (* P3L.III/PUCK/20 .09.02.00/6.2/
12 Tanggal 02 2013
Agustus 2012
404 1.03.01 CV. IB Pembangunan Jerambah Titian Lrg Karet 14/03/PPK- 99.310.000,00 4.965.500,00 0922/LS/1.20 4.965.500,00 - -
Desa Merah Mata Kec. Banyuasin I (* P3L.III/PUCK/20 .09.02.00/6.2/
12 Tanggal 02 2013
Agustus 2012
405 1.03.01 CV. TS Pembangunan Jerambah Titian RT. 12, 13 06/03/SPK/PPK- 99.825.000,00 4.991.250,00 5556/LS/1.20 4.991.250,00 - -
dan 14 Desa Pulau Borang Kec. Banyuasin P3L.IV/PUCK/20 .09.02.00/6.2/
I 12 Tgl 15 2013
Oktober 2012
406 1.03.01 CV. AgSe Pembangunan Jerambah Titian Lrg. H. 07/03/SPK/PPK- 99.300.000,00 4.965.000,00 1231/LS/1.20 4.965.000,00 - -
Sani Desa Sungai Dua dsn. IV Kec. PP.III/PUCK/201 .09.02.00/6.2/
Rambutan 2 Tgl 06 Agustus 2013
20
407 1.03.01 CV. IB Pembangunan Jerambah Titian Desa 01/03/SPK/PPK- 99.332.000,00 4.966.600,00 5141/LS/1.20 4.966.600,00 - -
Pangkalan Gelebek Kec. Rambuatan (* PP.III/PUCK/201 .09.02.00/6.2/
2, Tgl. 05-09- 2013
2012
408 1.03.01 CV. RFg Pembangunan Jerambah Titian Tanjung .02/03/PPK- 244.999.000,00 12.249.950,00 3515/LS/1.20 12.249.950,00 - -
Macan Desa Tjg Kerang Kec. Rambutan PP.III/PUCK/201 .09.02.00/6.2/
(lanjutan) (* 2 Tgl 03-Sep- 2013
2012 Adendum
02.A/03/PPK-
PP.III/PUCK/201
2,28-09-2012
409 1.03.01 CV. DP Pembangunan Jerambah Desa Upang Marga 12/03/SPK/PPK- 99.350.000,00 4.967.500,00 2814/LS/1.20 4.967.500,00 - -
Kec. Makarti Jaya OP.II/PUCK/201 .09.02.00/6.2/
2 Tgl 07 2013
September 2012
410 1.03.01 CV. PL Pembangunan Jembatan Desa Dusun I dan 11/03/SPK/PPK- 147.480.000,00 7.374.000,00 2410/LS/1.20 7.374.000,00 - -
Dusun II Desa Tirta Mulya Kec. Makati OP.II/PUCK/201 .09.02.00/6.2/
Jaya (* 2 Tgl 13 2013
September 2012
411 1.03.01 CV. DP Pembangunan Jembatan Desa Salek Jaya 08/03/SPK/PPK- 99.310.000,00 4.965.500,00 3037/LS/1.20 4.965.500,00 - -
Kec. Air Saleh OP.II/PUCK/201 .09.02.00/6.2/
2 Tgl 07 Sept 2013
2012

Halaman 33 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
412 1.03.01 CV. BI Pembangunan Jembatan Desa Sido Enggal 09/03/SPK/PPK- 99.383.000,00 4.969.150,00 - - 4.969.150,00
Rejo Kec. Air Saleh OP.II/PUCK/201
2 Tgl 13
September 2012
413 1.03.01 CV. RK Pembangunan Jerambah Desa Saleh Agung 10/03/SPK/PPK- 81.342.000,00 4.067.100,00 5402/LS/1.20 4.067.100,00 - -
Kec. Air Saleh OP.II/PUCK/201 .09.02.00/6.2/
2 Tgl 07 2013
September 2012
414 1.03.01 CV. AJU Pembangunan Jerambah penghubung Desa 05/03/SPK/PPK- 69.336.000,00 3.466.800,00 3282/LS/1.20 3.466.800,00 - -
Terusan Tengah Kec. Muara Telang (* OP.II/PUCK/201 .09.02.00/6.2/
2 Tgl 07 Sept 2013
2012
415 1.03.01 CV. JIL Pembangunan Jerambah penghubung Desa 06/03/SPK/PPK- 69.308.000,00 3.465.400,00 3213/LS/1.20 3.465.400,00 - -
Terusan Dalam Kec. Muara Telang (* OP.II/PUCK/201 .09.02.00/6.2/
2 Tgl 07 Sept 2013
2012
416 1.03.01 CV. RA Pembangunan Jerambah penghubung Desa 07/03/SPK/PPK- 59.340.000,00 2.967.000,00 3212/LS/.1.2 2.967.000,00 - -
Telang Marga Kec. Muara Telang (* OP.II/PUCK/201 0.09.02.00/6.
2 Tgl 07 Sept 2/2013
2012
417 1.03.01 CV. JS Pembangunan Jembatan Penghubung Desa 12/03/SPK/PPK- 99.428.000,00 4.971.400,00 4423/LS/1.20 4.971.400,00 - -
Tirta Harja Kec. Muara Sugihan (* P3L.III/PUCK/20 .09.02.00/6.2/
12 Tgl 15-09- 2013
2012
418 1.03.01 CV. LS Pembangunan Jerambah Titian Desa 03/03/SPK/PPK- 99.444.000,00 4.972.200,00 6603/LS/1.20 4.972.200,00 - -
Sungsang I Kec. Banyuasin II*) OP.I/PUCK/2012 .09.02.00/6.2/
Tgl 15 Okt 2012 2013

419 1.03.01 CV. EJ Pengecoran Oprit Jembatan Penghubung 20/03/SPK/PPK- 39.935.000,00 1.996.750,00 1821/LS/1.20 1.996.750,00 - -
Antara RT. 19 ke RT. 32 Menuju Pasar Pagi P3L.IV/PUCK/20 .09.02.00/6.2/
Kelurahan Rimba Asam Kecamatan Betung 12 Tgl 15 2013
Oktober 2012
420 1.03.01 CV. IP Pembangunan Drainase/Gorong-gorong 06/03/PPK- 186.200.000,00 9.310.000,00 3516/LS/1.20 9.310.000,00 - -
dalam Desa Suka Pindah Kec. Rambutan (* PP.I/PU.CK/2012 .09.02.00/6.2/
Tgl 03 September 2013
2012
421 1.03.01 CV. BH Pembangunan Drainase/Gorong-gorong 07/03/PPK- 195.998.000,00 9.799.900,00 2507/LS/1.20 9.799.900,00 - -
dalam Desa Plajau Kec. Rambutan (* PP.II/PUCK/2012 .09.02.00/6.2/
Tgl 03 September 2013
2012
422 1.03.01 CV. DP Pembangunan Drainase Dsn I Rt. 03 dan Rt. 06/03/SPK/PPK- 99.470.000,00 4.973.500,00 2805/LS/1.20 4.973.500,00 - -
04 Dlm Desa Mainan Kec. Sembawa P3L/PUCK/2012, .09.02.00/6.2/
Tgl. 15-10-2012 2013

Halaman 34 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
423 1.03.01 CV. CG Pembangunan Drainase Dlm Desa Sri 19/03/SPK/PPK- 74.930.000,00 3.746.500,00 3554/LS/1.20 3.746.500,00 - -
Kembang Kec. Betung P3L.IV/PUCK/20 .09.02.00/6.2/
12, Tgl. 15-10- 2013
2012
424 1.03.01 CV. SP Pembangunan Drainase Koramil Talang 09/03/SPK/PPK- 99.405.000,00 4.970.250,00 3572/LS/1.20 4.970.250,00 - -
Kelapa Kec. Talang Kelapa P3L.III/PUCK/20 .09.02.00/6.2/
12 Tgl 15-10- 2013
2012
425 1.03.01 PT. CU Pemasangan Listrik Desa Sukarela Kec. 04/03/PPK- 249.153.000,00 12.457.650,00 3623/LS/1.20 12.457.650,00 - -
Rantau Bayur PO/PUCK/2012 .09.02.00/6.2/
Tgl 19-11-2012 2013
426 1.03.01 CV. LK Pembangunan WTP Mini Desa Saleh 01/03/PPK- 243.552.000,00 12.177.600,00 2779/LS/1.20 12.177.600,00 - -
Agung Kecamatan Air Saleh P3L.III/PU.CK/20 .09.02.00/6.2/
12 tgl. 27-09- 2013
2012
427 1.03.01 CV. DP Pembangunan WTP Mini Desa Tanjung 03/03/PPK- 246.464.000,00 12.323.200,00 3339/LS/1.20 12.323.200,00 - -
Baru Kecamatan Muara Padang P3L.III/PU.CK/20 .09.02.00/6.2/
12 tgl. 27-09- 2013
2012
428 1.03.01 CV. RK Pembangunan WTP Mini Desa Margo 10/01/PPK- 244.957.000,00 12.247.850,00 4577/LS/1.20 12.247.850,00 - -
Rahayu Kecamatan Tungkal Ilir P3L/PUCK/2012 .09.02.00/6.2/
Tgl 01-10-2012 2013
429 1.03.01 CV. AILS Pembangunan WTP Mini Desa Marga 05/03/PPK- 245.151.000,00 12.257.550,00 3209/LS/1.20 12.257.550,00 - -
Sungsang Kecamatan Banyuasin II P3L.III/PU.CK/20 .09.02.00/6.2/
12 tgl. 27-09- 2013
2012
430 1.03.01 CV. AJy Pembangunan WTP Mini Desa Taja Mulya 09/01/PPK- 218.381.000,00 10.919.050,00 - - 10.919.050,00
Kecamatan Betung P3L/PUCK/2012
tgl. 01-10-2012
431 1.03.01 CV. RK Pembangunan WTP Mini Desa Sidomulyo 04/03/PPK- 218.720.000,00 10.936.000,00 4581/LS/1.20 10.936.000,00 - -
Kecamatan Banyuasin I P3L.III/PU.CK/20 .09.02.00/6.2/
12 tgl. 27-09- 2013
2012
432 1.03.01 CV. RK Pembangunan WTP Mini Desa Durian 02/03/PPK- 218.520.000,00 10.926.000,00 5361/LS/1.20 10.926.000,00 - -
Gadis Kecamatan Rambutan P3L.III/PU.CK/20 .09.02.00/6.2/
12 tgl. 27-09- 2013
2012
433 1.03.01 CV. JS Pembagunan WTP Mini Engkel Desa Tirta 05/03/SPK/PPK- 99.494.000,00 4.974.700,00 4425/LS/1.20 4.974.700,00 - -
Mulya Kec. Makarti Jaya TRTB.I/PUCK/20 .09.02.00/6.2/
12 Tgl 15-10- 2013
2012

Halaman 35 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
434 1.03.01 CV. Su Pembangunan WTP Mini dan Kolam 02/03/SPK/PPK- 198.540.000,00 9.927.000,00 2381/LS/1.20 9.927.000,00 - -
Retensi Desa Tirta Mulya Kec. Muara OP.I/PUCK/2012 .09.02.00/6.2/
Sugihan Tgl 15-10- 2012 2013

435 1.03.01 PT. IP Pembuatan Taman dan Pembuatan Lampu 191.300.000,00 191.300.000,00 - - 191.300.000,00
Jalan Paket I
436 1.03.01 PT. IP Pembuatan Taman dan Pembuatan Lampu 290.800.000,00 290.800.000,00 - - 290.800.000,00
Jalan Paket I
437 1.03.01 CV. RM Pembangunan MCK Desa Tirta Mulya Kec. 05/14/PPK- 88.950.000,00 4.447.500,00 - - 4.447.500,00
Makrti Jaya PL/PUCK/2010,
tgl 07 Oktober
2010
438 1.03.01 CV. KBn Pengecoran Jalan Lingkungan Desa 03/04/PPK- 157.856.000,00 7.892.800,00 - - 7.892.800,00
Penuguan Kec. Pulau Rimau TRTB.III/PUCK/
2011
439 1.03.01 CV. BJC Pengecoran Lrg. Karet Desa Merah Mata 03/03/PPK- 146.867.000,00 7.343.350,00 - - 7.343.350,00
Kec. Banyuasin II TRTB.1/PUCK/2
011
440 1.03.01 CV. KBn Pengecoran Jalan Lingkungan Dalam Desa 03/13/PPK- 117.566.000,00 5.878.300,00 - - 5.878.300,00
Regan Agung Kec. Banyuasin III P2L.I/PUCK/201
1
441 1.03.01 CV. PU Pengecoran Jalan Lingkungan Dalam Desa 02/02/PPK- 99.386.000,00 4.969.300,00 - - 4.969.300,00
Muara Abab Kec. Rantau Bayur OP/11/PUCK/201
1
442 1.03.01 CV. Mu `z Pengecoran Lorong Lukman Ds. III Rt. 9 02/01/PPK- 99.719.000,00 4.985.950,00 - - 4.985.950,00
Desa Tirtosari Kec. Banyuasin TRTB.1/11/PUC
K/2011
443 1.03.01 PT. MPC Kegiatan Pengembangan sistem Air Bersih 1. KONTRAK - 200.000.000,00 7171/LS/1.20 79.556.896,00 - 80.045.450,00 Sisa Hutang
PT. PKS (Rp. 79.556.896 dan Rp. 80.045.450) 06/01/PPK- .09.02.00/6.2/ sebesar
FAB/PUCK/2010 2013 Rp.80.045.450
tgl. 12-8-10 disebabkan
2. KONTRAK terdapat koreksi
06/03/PPK- saldo awal utang
FAB/PUCK/2010 menjadi sebesar
tgl. 12-8-2010 Rp.159.602.346,00

Jumlah 71.040.624.281,00 4.894.948.000,00 4.058.527.396,00 1.914.706.081,00 2.710.729.031,00


DINAS PU BINA MARGA

444 1.03.02 CV. AS Pembuatan Box Culvert Type Single (2x2) NOMOR : 97.900.000,00 - - 97.900.000,00 97.900.000,00
Desa Rawa Banda Kec. Pulau Rimau 02/BOX-
RB/SPK/PPK/PU
BM/2013
TANGGAL : 1
MEI 2013

Halaman 36 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
445 1.03.02 CV. AS Pembuatan Box Culvert Type Single (2x2) NOMOR : 97.904.000,00 - - 97.904.000,00 97.904.000,00
Desa Nunggal Sari Kec. Pulau Rimau 02/BOX-
NS/SPK/PPK/PU
BM/2013
TANGGAL : 1
MEI 2013
446 1.03.02 CV. AS Pembuatan Box Culvert Type Single (2x2) NOMOR : 97.900.000,00 - - 97.900.000,00 97.900.000,00
Desa Dana Mulya Kec. Pulau Rimau 02/BOX-
DM/SPK/PPK/P
UBM/2013
TANGGAL : 1
MEI 2013
447 1.03.02 CV. RK Pembuatan Box Culvert Type Single (2x2) NOMOR : 97.902.000,00 - - 97.902.000,00 97.902.000,00
Desa Majatra Kec. Pulau Rimau 02/BOX-
MJTRA/SPK/PP
K/PUBM/2013
TANGGAL : 1
MEI 2013
448 1.03.02 CV. RK Pembuatan Box Culvert Type Single (2x2) NOMOR : 195.567.000,00 - - 195.567.000,00 195.567.000,00
Desa Sumber Agung Kec. Pulau Rimau 02/SMB-
AG/SPK/PPK/PU
BM/2013
TANGGAL : 1
MEI 2013
449 1.03.02 CV. RK Pembuatan Box Culvert Type Single (2x2) NOMOR : 195.622.000,00 - - 195.622.000,00 195.622.000,00
Desa Sumber Rejo Kec. Pulau Rimau 02/SMB-REJO
/SPK/PPK/PUBM
/2013
TANGGAL : 1
MEI 2013
450 1.03.02 CV. APe Pembuatan Box Culvert Kubu I Desa NOMOR : 142.517.000,00 - - 71.258.500,00 71.258.500,00
Keluang Kec. Tungkal Ilir 02/KLUANG/SP
K/PPK/APBDP/P
UBM/2013
TANGGAL : 12
NOPEMBER
2013
451 1.03.02 CV. Se Pengecoran Jalan Sripanji Desa Pangkalan Nomor : 293.669.000,00 - - 14.683.450,00 14.683.450,00
Panji Kec. Banyuasin III 06/08/PPK/KON
TRAK/PUBM/20
13 TANGGAL 20
MARET 2013
452 1.03.02 PT. KUBN Perkerasan Jalan Pulau Rimau Nomor : 14.624.578.000,00 - - 3.473.337.275,00 3.473.337.275,00
06/56/PPK/KON
TRAK/PUBM/20
13 TANGGAL 8
ARIL 2013

Halaman 37 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
453 1.03.02 CV. WM Pembangunan jembatan Desa parit 12 Dsn NOMOR : 118.625.000,00 - - 118.625.000,00 118.625.000,00
3 Desa Muara Baru Kec. Makarti Jaya 02/12DSN3/PJ/A
PBDP/PUBM/20
13 TANGGAL :
12 NOPEMBER
2013

454 1.03.02 CV. ISe Pembangunan Jembatan Sungai Pinang Nomor : 256.906.000,00 - - 73.860.475,00 73.860.475,00
Desa Karang Baru Kec. Sumber Marga 06/109/PPK/KO
Telang NTRAK/PUBM/2
013 TANGGAL
30 MEI 2013

455 1.03.02 CV. KJ Pembangunan Jembatan Desa Kuala NOMOR : 02/KL- 94.995.000,00 - - 94.995.000,00 94.995.000,00
Puntian Kec. Tanjung Lago PTN/SPK/PPK/A
PBDP/PUBM/20
13 TANGGAL :
12 NOPEMBER
2013

456 1.03.02 CV. NPM Pengecoran Jalan Desa Tanjung Menang 05/TM/PPK- 391.119.000,00 19.555.950,00 2364/LS/1.20 19.555.950,00 - -
Kec. Banyuasin III KONTRAK/PUB .09.02.00/6.2/
M/2012 Tgl. 10 2013
Oktober 2012
457 1.03.02 CV. HBS Pengecoran Jalan Sp. Regan Agung - Regan 05/RA/PPK- 684.515.000,00 34.225.750,00 3030/LS/1.20 34.225.750,00 - -
Agung Kec. Banyuasin III (Tahap III) KONTRAK/PUB .09.02.00/6.2/
M/2012 Tgl. 10 2013
Oktober 2012
458 1.03.02 CV. EC Pengecoran Jalan Pasar Pangkalan Balai 02/PBB/SPK/PP 196.230.000,00 9.811.500,00 7204/LS/1.20 9.811.500,00 - -
Kec. Banyuasin III (Tahap II) K/PUBM/2012 .09.02.00/6.2/
Tgl. 17 2013
September 2012
459 1.03.02 CV. TJ Pengecoran Jalan Taman Baru Kelurahan 02/TBKS/SPK/PP 196.126.000,00 9.806.300,00 3605/LS/1.20 9.806.300,00 - -
Seterio Kec. Banyuasin III K/PUBM/2012 .09.02.00/6.2/
Tgl. 12 Oktober 2013
2012
460 1.03.02 CV. RJ Rehabilitasi Jalan Lingkar Mulya Agung - 01/SETERIO/SP 98.288.000,00 4.914.400,00 1042/LS/1.20 4.914.400,00 - -
Seterio K/PPK/PUBM/20 .09.02.00/6.2/
12 Tgl. 20 Maret 2013
2012

461 1.03.02 CV. EC Pengecoran Jalan Menuju Rumah Staf 02/RSK/SPK/PP 196.196.000,00 9.809.800,00 7174/LS/1.20 9.809.800,00 - -
Kajari Pangkalan Balai Kec. Banyuasin III K/PUBM/2012 .09.02.00/6.2/
Tgl. 17 2013
September 2012

Halaman 38 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
462 1.03.02 CV. HBS Pembangunan Jembatan Penghubung Dsn. I 02/J- 146.904.000,00 7.345.200,00 3005/LS/1.20 7.345.200,00 - -
Ke Dsn. II Desa Tanjung Menang Musi TMM/SPK/PPK/ .09.02.00/6.2/
Kec. Rantau Bayur PUBM/2012 Tgl. 2013
17 Oktober 2012

463 1.03.02 CV. IP Pengecoran Jalan Desa Tanjung Menang 02/DTMM/SPK/P 73.404.000,00 3.670.200,00 4631/LS/1.20 3.670.200,00 - -
Musi Kec. Rantau Bayur PK/PUBM/2012 .09.02.00/6.2/
Tgl. 17 Oktober 2013
2012
464 1.03.02 CV. RFg Pengecoran Jalan Sidang Mas Kec. 02/S- 122.300.000,00 6.115.000,00 4612/LS/1.20 6.115.000,00 - -
Banyuasin III MAS/SPK/PPK/P .09.02.00/6.2/
UBM/2012 Tgl. 2013
12 Oktober 2012

465 1.03.02 CV. IP Pengecoran Jalan Rimba Balai Kec. 02/RB/SPK/PPK/ 121.906.000,00 6.095.300,00 4632/LS/1.20 6.095.300,00 - -
Banyuasin III PUBM/2012 Tgl. .09.02.00/6.2/
17 Oktober 2012 2013

466 1.03.02 PT. BAP Pengecoran Jalan Menuju Pondok Pesantren 05/SH/PPK- 293.577.000,00 14.678.850,00 2095/LS/1.20 14.678.850,00 - -
Sabilul Hasanah Kec. Sembawa KONTRAK/PUB .09.02.00/6.2/
M/2012 Tgl. 25 2013
September 2012
467 1.03.02 CV. PU Pengecoran Jalan Desa Limau Kec. 05/DL/PPK- 293.365.000,00 14.668.250,00 - - 14.668.250,00
Sembawa KONTRAK/PUB
M/2012 Tgl. 10
Oktober 2012
468 1.03.02 CV. Se Pembangunan Jembatan Desa dari dsn 3 ke 02/PH/SPK/PPK/ 195.904.000,00 9.795.200,00 - - 9.795.200,00
dsn 2 Desa Pulau Harapan Kec. Sembawa PUBM/2012 Tgl.
12 Oktober 2012

469 1.03.02 CV. AILS Pengecoran Jalan Perintis Menuju SMA 02/PERINTIS/SP 195.741.000,00 9.787.050,00 7221/LS/1.20 9.787.050,00 - -
Kel. Sukamoro Kec. Talang Kelapa (Tahap K/PPK/PUBM/20 .09.02.00/6.2/
II) 12 Tgl. 17 2013
September 2012
470 1.03.02 CV. LK Pengecoran Jalan Swadaya Kelurahan 02/SWDY/SPK/P 195.451.000,00 9.772.550,00 2800/LS/1.20 9.772.550,00 - -
Sukajadi Kec. Talang Kelapa PK/PUBM/2012 .09.02.00/6.2/
Tgl. 17 2013
September 2012
471 1.03.02 CV. DP Pengecoran Jalan A. Yani Kec. Talang 02/A.YANI/SPK/ 195.603.000,00 9.780.150,00 2806/LS/1.20 9.780.150,00 - -
Kelapa PPK/PUBM/2012 .09.02.00/6.2/
Tgl. 17 2013
September 2012
472 1.03.02 CV. DAc Pengecoran Jalan Desa Kenten Laut Kec. 02/KL/SPK/PPK/ 97.870.000,00 4.893.500,00 3649/LS/1.20 4.893.500,00 - -
Talang Kelapa PUBM/2012 Tgl. .09.02.00/6.2/
17 September 2013
2012

Halaman 39 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
473 1.03.02 CV. AnSe Pengecoran Jalan Dalam Rt. 04 Desa 02/KL/SPK/PPK/ 97.926.000,00 4.896.300,00 3650/LS/1.20 4.896.300,00 - -
Gasing Kec. Talang Kelapa PUBM/2012 Tgl. .09.02.00/6.2/
17 September 2013
2012
474 1.03.02 CV. AnSe Pengecoran Jalan Dalam Rt. 08 Desa 02/RT.08/SPK/PP 97.954.000,00 4.897.700,00 3648/LS/1.20 4.897.700,00 - -
Gasing Kec. Talang Kelapa K/PUBM/2012 .09.02.00/6.2/
Tgl. 17 2013
September 2012
475 1.03.02 CV. RAP Pengecoran Jalan Masjid RT. 11 Ds. Gasing 02/RT.11/SPK/PP 98.066.000,00 4.903.300,00 3520/LS/1.20 4.903.300,00 - -
Kec. Talang Kelapa K/PUBM/2012 .09.02.00/6.2/
Tgl.12 Oktober 2013
2012
476 1.03.02 CV. DAc Pengecoran Jalan dalam Rt. 02 Rw. 01 02/TK/SPK/PPK/ 195.390.000,00 9.769.500,00 4216/LS/1.20 9.769.500,00 - -
Kel.Talang Keramat Kec. Talang Kelapa PUBM/2012 Tgl. .09.02.00/6.2/
17 September 2013
2012
477 1.03.02 CV. JU Pengecoran Jalan/Lrg Puncak Permai III 02/PP- 97.901.000,00 4.895.050,00 3454/LS/1.20 4.895.050,00 - -
Rt. 02 kelurahan Tanah Mas Kec. Talang TM/SPK/PPK/PU .09.02.00/6.2/
Kelapa (Menuju Masjid Nur Hidayah) BM/2012 Tgl. 17 2013
September 2012

478 1.03.02 CV. NJ Pengecoran Jalan Tanah Mas Kec. Talang 05/T-MAS/PPK- 293.659.000,00 14.682.950,00 3036/LS/1.20 14.682.950,00 - -
Kelapa KONTRAK/ .09.02.00/6.2/
PUBM/2012 Tgl. 2013
10 Oktober 2012

479 1.03.02 CV. KY Pengerasan Jln Chandradimuka Kelurahan 02/CNDR/SPK/P 195.609.000,00 9.780.450,00 3568/LS/1.20 9.780.450,00 - -
Sukamoro Kec. Talang Kelapa PK/PUBM/2012 .09.02.00/6.2/
Tgl. 17 2013
September 2012
480 1.03.02 CV. An Pengecoran Jalan Dalam Komplek Dana 02/DPS/SPK/PPK 97.957.000,00 4.897.850,00 2801/LS/1.20 4.897.850,00 - -
Puspa Sari Kenten Kec. Talang Kelapa /PUBM/2012 Tgl. .09.02.00/6.2/
17 September 2013
2012
481 1.03.02 CV. An Pengecoran Jalan Depan Kantor Camat 02/KC/SPK/PPK/ 98.007.000,00 4.900.350,00 2819/LS/1.20 4.900.350,00 - -
Talang Kelapa PUBM/2012 Tgl. .09.02.00/6.2/
17 September 2013
2012
482 1.03.02 CV. LK Pengecoran Jalan Pangkalan Benteng Kec. 05/PB/PPK- 293.334.000,00 14.666.700,00 2816/LS/1.20 14.666.700,00 - -
Talang Kelapa KONTRAK/ .09.02.00/6.2/
PUBM/2012 Tgl. 2013
10 Oktober 2012

483 1.03.02 CV. DP Pengecoran Jalan Dalam Komplek 02/PI/SPK/PPK/P 195.654.000,00 9.782.700,00 2820/LS/1.20 9.782.700,00 - -
Pesantren Inayatullah UBM/2012 Tgl. .09.02.00/6.2/
17 September 2013
2012

Halaman 40 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
484 1.03.02 CV. DP Pengecoran Jalan Komplek Kenten Azhar 05/KA/PPK- 293.393.000,00 14.669.650,00 2818/LS/1.20 14.669.650,00 - -
Kec. Talang kelapa KONTRAK/ .09.02.00/6.2/
PUBM/2012 Tgl. 2013
10 Oktober 2012

485 1.03.02 CV. JB Pengerasan Ruas Jalan Tanjung Api-api - 05/KP/PPK- 245.334.000,00 12.266.700,00 1140/LS/1.20 12.266.700,00 - -
Kuala Puntian Kec. Tanjung Lago (Tahap KONTRAK/PUB .09.02.00/6.2/
II) M/2012 Tgl. 25 2013
September 2012
486 1.03.02 CV. PKM Pengecoran Jalan Tanjung Api-api ke Dsn I 02/TAA- 195.641.000,00 9.782.050,00 4802/LS/1.20 9.782.050,00 - -
Desa Sukatani Kec. Tanjung Lago DS/SPK/PPK/PU .09.02.00/6.2/
BM/2012 Tgl. 12 2013
Oktober 2012
487 1.03.02 CV. RMK Pembuatan Box Culvert Type Single (3x3) 02/BKP- 195.711.000,00 9.785.550,00 3201/LS/1.20 9.785.550,00 - -
Ruas Jalan Tanjung Api-api - Kuala Puntian 1/SPK/PPK/PUB .09.02.00/6.2/
Kec. Tanjung Lago - Box No. 01 M/2012 Tgl. 17 2013
September 2012
488 1.03.02 CV. RMK Pembuatan Box Culvert Type Single (3x3) 02/BKP- 195.707.000,00 9.785.350,00 3199/LS/1.20 9.785.350,00 - -
Ruas Jalan Tanjung Api-api - Kuala Puntian 2/SPK/PPK/PUB .09.02.00/6.2/
Kec. Tanjung Lago - Box No. 02 M/2012 Tgl. 17 2013
September 2012
489 1.03.02 CV. PP Pembuatan Box Culvert Type Single (2x2) 02/BOX- 97.610.000,00 4.880.500,00 2265/LS/1.20 4.880.500,00 - -
Desa Kuala Puntian Kec. Tanjung Lago KP/SPK/PPK/PU .09.02.00/6.2/
BM/2012 Tgl. 17 2013
September 2012

490 1.03.02 CV. RMK Penimbunan dengan Galian Tanah 05/DII-S/PPK- 391.642.000,00 19.582.100,00 3200/LS/1.20 19.582.100,00 - -
Setempat Dsn II Desa Sukatani Kec. KONTRAK/ .09.02.00/6.2/
Tanjung Lago PUBM/2012 Tgl. 2013
10 Oktober 2012

491 1.03.02 CV. NP Pengerasan Jalan Dsn IV dan V Desa 02/BS/SPK/PPK/ 195.586.000,00 9.779.300,00 5249/LS/1.20 9.779.300,00 - -
Bangun Sari Kec. Tanjung Lago PUBM/2012 Tgl. .09.02.00/6.2/
17 September 2013
2012
492 1.03.02 CV. NP Pembangunan Jembatan Rt. 04 Desa Mulya 02/MS/SPK/PPK/ 97.705.000,00 4.885.250,00 6148/LS/1.20 4.885.250,00 - -
Sari Kec. Tanjung Lago PUBM/2012 Tgl. .09.02.00/6.2/
17 September 2013
2012
493 1.03.02 PT. SCP Pembangunan Jembatan Beton Desa Panca 05/PD/PPK/KON 981.769.000,00 49.088.450,00 5252/LS/1.20 49.088.450,00 - -
Desa Kec. Banyuasin I TRAK/PUBM/20 .09.02.00/6.2/
12 Tgl. 9 Juli 2013
2012
494 1.03.02 PT. Ar Pengecoran Jalan Talang Andong Kec. 05/TA/PPK- 831.256.000,00 41.562.800,00 2137/LS/1.20 41.562.800,00 - -
Banyuasin I (Tahap III) KONTRAK/PUB .09.02.00/6.2/
M/2012 Tgl. 10 2013
Oktober 2012

Halaman 41 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
495 1.03.02 PT. Ar Pengecoran Jalan Desa Duren Ijo Kec. 05/DI/PPK- 831.003.000,00 41.550.150,00 2136/LS/1.20 41.550.150,00 - -
Banyuasin I (Tahap II) KONTRAK/PUB .09.02.00/6.2/
M/2012 Tgl. 10 2013
Oktober 2012
496 1.03.02 CV. IB Pembangunan Jembatan Penghubung Rt. 1 02/PR/SPK/PPK/ 98.218.000,00 4.910.900,00 - - 4.910.900,00
dan 2 Desa Padang Rejo SP 1 A Kec. BA I PUBM/2012 Tgl.
17 September
2012
497 1.03.02 CV. IB Pembangunan Jembatan Penghubung Rt. 15 02/JP- 98.218.000,00 4.910.900,00 - - 4.910.900,00
SP 2 Desa Sido Makmur Kec. Banyuasin I SM/SPK/PPK/PU
BM/2012 Tgl. 17
September 2012

498 1.03.02 CV. IB Pembangunan Jembatan Penghubung Rt. 10 02/AKP/SPK/PP 98.218.000,00 4.910.900,00 - - 4.910.900,00
SP 3 AKP K/PUBM/2012
Tgl. 17
September 2012
499 1.03.02 CV. CJP Pembuatan Box Culvert Rt. 16 Kelurahan 02/KMI/SPK/PP 97.964.000,00 4.898.200,00 3338/LS/1.20 4.898.200,00 - -
Mariana Ilir Laut Kec. BA I K/PUBM/2012 .09.02.00/6.2/
Tgl. 12 Oktober 2013
2012
500 1.03.02 CV. KJ Pembangunan Jembatan Desa Panca Desa 02/PD/SPK/PPK/ 196.039.000,00 9.801.950,00 4486/LS/1.20 9.801.950,00 - -
Kec. Banyuasin I PUBM/2012 Tgl. .09.02.00/6.2/
17 September 2013
2012
501 1.03.02 CV. RJK Pembuatan Box Culvert Jln Maulana Kec. 02/BJM/SPK/PP 48.940.000,00 2.447.000,00 4630/LS/1.20 2.447.000,00 - -
Banyuasin III K/PUBM/2012, .09.02.00/6.2/
Tgl. 17 Oktober 2013
2012
502 1.03.02 CV. RMK Pembentukan Badan Jalan menuju 02/NIUT/SPK/PP 97.277.000,00 4.863.850,00 3198/LS/1.20 4.863.850,00 - -
Pesantren Nurul Iman Desa Ujung Tanjung K/PUBM/2012, .09.02.00/6.2/
Kec. Banyuasin III Tgl. 17 Oktober 2013
2012
503 1.03.02 PT. MM Pembangunan Jembatan Sungai Tapa Kec. 05/ST/PPK/KON 1.471.233.000,00 73.561.650,00 2233/LS/1.20 73.561.650,00 - -
Rambutan TRAK/PUBM/20 .09.02.00/6.2/
12 Tgl. 9 Juli 2013
2012
504 1.03.02 CV. CZ Penimbunan dengan Tanah Pilihan Jalan 05/DS-SP3/PPK- 391.529.000,00 19.576.450,00 7228/LS/1.20 19.576.450,00 - -
Desa Sebokor - SP. 3 Kec. Rambutan KONTRAK/ .09.02.00/6.2/
PUBM/2012 Tgl. 2013
10 Oktober 2012

505 1.03.02 CV. WJ Pengecoran Jalan Meritai - Sungai Pinang 02/MSP/SPK/PP 196.218.000,00 9.810.900,00 - - 9.810.900,00
Kec. Rambutan K/PUBM/2012
Tgl. 17
September 2012

Halaman 42 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
506 1.03.02 CV. KSD S Pengecoran Jalan Desa Gelebak Dalam Kec. 02/GD/SPK/PPK/ 196.231.000,00 9.811.550,00 7222/LS/1.20 9.811.550,00 - -
Rambutan PUBM/2012 Tgl. .09.02.00/6.2/
17 September 2013
2012
507 1.03.02 CV. PPe Pengerasan Jalan Desa Menten Menuju 02/DM- 98.062.000,00 4.903.100,00 3295/LS/1.20 4.903.100,00 - -
Dusun Selpa Kec. Rambutan DS/SPK/PPK/PU .09.02.00/6.2/
BM/2012 Tgl. 17 2013
September 2012

508 1.03.02 CV. AP Penimbunan dengan Galian Tanah 02/DG/SPK/PPK/ 48.903.000,00 2.445.150,00 - - 2.445.150,00
Setempat Desa Durian Gadis kec. PUBM/2012 Tgl.
Rambutan 29 Oktober 2012

509 1.03.02 CV. Lg Penimbunan dan Pembuatan Tembok 02/TPDP/SPK/PP 196.162.000,00 9.808.100,00 4786/LS/1.20 9.808.100,00 - -
Penahan Jalan Desa Parit Kec. Rambutan K/PUBM/2012 .09.02.00/6.2/
Tgl. 12 Oktober 2013
2012
510 1.03.02 CV. BH Pembuatan Tembok Penahan Jalan Lintas 05/DP/PPK- 244.595.000,00 12.229.750,00 2592/LS/1.20 12.229.750,00 - -
Ds. Plaju Kec. Rambutan KONTRAK/PUB .09.02.00/6.2/
M/2012 Tgl. 10 2013
Oktober 2012
511 1.03.02 CV. CMAP Pembuatan Siring Pasangan Desa Siju Kec. 02/SIJU/SPK/PP 97.904.000,00 4.895.200,00 - - 4.895.200,00
Rambutan (Tahap II) K/PUBM/2012
Tgl. 29 Oktober
2012
512 1.03.02 CV. ArG Pembuatan Box Culvert Ruas Jalan Meritai - 02/MSP- 78.009.000,00 3.900.450,00 4009/LS/1.20 3.900.450,00 - -
Sungai Pinang Kec. Rambutan - Box 01/SPK/PPK/PU .09.02.00/6.2/
Culvert No. 01 BM/2012 2013
Tgl. 29 Oktober
2012
513 1.03.02 CV. ArG Pembuatan Box Culvert Ruas Jalan Meritai - 02/MSP- 78.009.000,00 3.900.450,00 4010/LS/1.20 3.900.450,00 - -
Sungai Pinang Kec. Rambutan - Box 02/SPK/PPK/PU .09.02.00/6.2/
Culvert No. 02 BM/2012 2013
Tgl. 29 Oktober
2012
514 1.03.02 CV. ArG Pembuatan Box Culvert Ruas Jalan Meritai - 02/MSP- 78.009.000,00 3.900.450,00 4008/LS/1.20 3.900.450,00 - -
Sungai Pinang Kec. Rambutan - Box 03/SPK/PPK/PU .09.02.00/6.2/
Culvert No. 03 BM/2012 2013
Tgl. 29 Oktober
2012
515 1.03.02 CV. IB Penimbunan dengan Tanah Galian 02/PG/SPK/PPK/ 98.061.000,00 4.903.050,00 - - 4.903.050,00
Setempat Desa Pangkalan Gelebak Kec. PUBM/2012 Tgl.
Rambutan 17 September
2012
516 1.03.02 CV. KSD S Penimbunan Jalan dengan Tanah Pilihan 02/DB/SPK/PPK/ 196.194.000,00 9.809.700,00 7229/LS/1.20 9.809.700,00 - -
Desa Baru Kec. Rambutan PUBM/2012 Tgl. .09.02.00/6.2/
17 September 2013
2012

Halaman 43 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
517 1.03.02 CV. RFg Pengecoran Jalan Menuju Pelabuhan Lama 02/PL/SPK/PPK/ 196.002.000,00 9.800.100,00 4562/LS/1.20 9.800.100,00 - -
Desa Tanjung Kerang Kec. Rambutan PUBM/2012 Tgl. .09.02.00/6.2/
17 September 2013
2012
518 1.03.02 CV. BT Pembangunan Jembatan Beton Desa 05/PH/PPK/KON 1.080.005.000,00 54.000.250,00 1732/LS/1.20 54.000.250,00 - -
Pendowo Harjo Kec. Makarti Jaya TRAK/PUBM/20 .09.02.00/6.2/
12 Tgl. 9 Juli 2013
2012
519 1.03.02 CV. RS Pengecoran Jalan dari Parit I ke Parit IV Lk. 02/P1- 196.175.000,00 9.808.750,00 4614/LS/1.20 9.808.750,00 - -
2 Makarti Jaya Kec. Makarti Jaya P4/SPK/PPK/PU .09.02.00/6.2/
BM/2012 Tgl. 17 2013
September 2012
520 1.03.02 CV. JB Pengecoran Jalan Dalam Desa Pendowo 02/DPH/SPK/PP 195.900.000,00 9.795.000,00 3269/LS/1.20 9.795.000,00 - -
Harjo Kec. Makarti Jaya (Tahap II) K/PUBM/2012 .09.02.00/6.2/
Tgl. 29 Oktober 2013
2012
521 1.03.02 CV. JB Pembangunan Jembatan Penghubung dalam 02/DU/SPK/PPK/ 146.799.000,00 7.339.950,00 3182/LS/1.20 7.339.950,00 - -
Desa Delta Upang Kec. Makarti Jaya PUBM/2012 Tgl. .09.02.00/6.2/
17 September 2013
2012
522 1.03.02 CV. GB Pembangunan Jembatan Parit 5 Desa Upang 02/UC/SPK/PPK/ 146.799.000,00 7.339.950,00 3194/LS/1.20 7.339.950,00 - -
Ceria Kec. Makarti Jaya PUBM/2012 Tgl. .09.02.00/6.2/
17 September 2013
2012
523 1.03.02 CV. GB Pembangunan Jembatan Parit I Lk. III Kec. 02/P1- 146.799.000,00 7.339.950,00 3180/LS/1.20 7.339.950,00 - -
Makarti Jaya L3/SPK/PPK/PU .09.02.00/6.2/
BM/2012 Tgl. 17 2013
September 2012
524 1.03.02 CV. GB Pembangunan Jembatan Penghubung Desa 02/DTK/SPK/PP 146.799.000,00 7.339.950,00 3205/LS/1.20 7.339.950,00 - -
Tirta kencana Kec. Makarti Jaya K/PUBM/2012 .09.02.00/6.2/
Tgl. 17 2013
September 2012
525 1.03.02 CV. MU Pembangunan Jembatan Beton Desa 05/MR/PPK/KO 783.404.000,00 39.170.200,00 - - 39.170.200,00
Margarahayu Kec. Tungkal Ilir NTRAK/PUBM/2
012 Tgl. 9 Juli
2012
526 1.03.02 CV. AnSe Pembangunan Jembatan Sungai Priok Belah 02/SPB/SPK/PPK 127.031.000,00 6.351.550,00 3646/LS/1.20 6.351.550,00 - -
Ruas Jalan Desa Sukaraja - Ds Teluk /PUBM/2012 Tgl. .09.02.00/6.2/
Tenggulang Kec. Tungkal Ilir 17 Oktober 2012 2013

527 1.03.02 CV. TP Rehabilitasi Lantai Jembatan Desa Sido 02/JSM/SPK/PP 127.001.000,00 6.350.050,00 2412/LS/1.20 6.350.050,00 - -
Mulyo Kecamatan Tungkal Ilir K/PUBM/2012 .09.02.00/6.2/
Tgl. 12 Oktober 2013
2012

Halaman 44 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
528 1.03.02 CV. VIP Pengerasan Jalan Desa Bumi Serdang 05/DBS/PPK/KO 356.537.000,00 17.826.850,00 4092/LS/1.20 17.826.850,00 - -
Kecamatan Tungkal Ilir NTRAK/ .09.02.00/6.2/
PUBM/2012 Tgl. 2013
2 Nopember 2012

529 1.03.02 CV. GB Rehabilitasi / Pemeliharaan Jembatan 01/TNH- 98.503.000,00 4.925.150,00 2236/LS/1.20 4.925.150,00 - -
Tanah Kering Kec. Pulau Rimau KRNG/SPK/PPK/ .09.02.00/6.2/
PUBM/ 2012 Tgl. 2013
20 Maret 2012

530 1.03.02 CV. Bi Pengerasan Jalan Desa Dana Mulya Kec. 05/DM/PPK/KO 587.033.000,00 29.351.650,00 3583/LS/1.20 29.351.650,00 - -
Pulau Rimau NTRAK/PUBM/2 .09.02.00/6.2/
012 Tgl. 9 Juli 2013
2012
531 1.03.02 CV. HBS Pengerasan Jalan Desa Sumber Mulyo - 05/SM/PPK- 587.361.000,00 29.368.050,00 3032/LS/1.20 29.368.050,00 - -
Tanah Kering Kec. Pulau Rimau KONTRAK/PUB .09.02.00/6.2/
M/2012 Tgl. 25 2013
September 2012
532 1.03.02 CV. BrPs Pengerasan Jalan Penghubung Desa Rukun 05/RM-DM/PPK- 489.651.000,00 24.482.550,00 1643/LS/1.20 24.482.550,00 - -
Makmur Menuju Desa Majatra Kec. Pulau KONTRAK/ .09.02.00/6.2/
Rimau PUBM/2012 Tgl. 2013
10 Oktober 2012

533 1.03.02 CV. NPM Pengerasan Jalan Desa Rawa Banda Kec. 05/RB/PPK- 783.743.000,00 39.187.150,00 1642/LS/1.20 39.187.150,00 - -
Pulau Rimau KONTRAK/PUB .09.02.00/6.2/
M/2012 Tgl. 25 2013
September 2012
534 1.03.02 CV. APe Penimbunan dan Pengerasan Jalan Desa 05/DSA/PPK- 294.084.000,00 14.704.200,00 3929/LS/1.20 14.704.200,00 - -
Sumber Agung Kec. Pulau Rimau KONTRAK/ .09.02.00/6.2/
PUBM/2012 Tgl. 2013
10 Oktober 2012

535 1.03.02 CV. Zu Penyiapan Badan Jalan Penghubung 02/NSRB/SPK/P 195.900.000,00 9.795.000,00 - - 9.795.000,00
Nunggal Sari Menuju Rawa Banda Kec. PK/PUBM/2012
Pulau Rimau Tgl. 17 Oktober
2012
536 1.03.02 PT. PDR Pembangunan Jembatan Sungai Kumbang 05/SK/PPK/KON 4.014.375.000,00 200.718.750,00 2238/LS/1.20 200.718.750,00 - -
Kec. Air Saleh (Tahap III) TRAK/PUBM/20 .09.02.00/6.2/
12 Tgl. 9 Juli 2013
2012
537 1.03.02 PT. TCA Pembangunan Jembatan Sungai Kumbang 05/SK-V/PPK- 8.798.338.000,00 439.916.900,00 2237/LS/1.20 439.916.900,00 - -
(Tahap V) KONTRAK/ .09.02.00/6.2/
PUBM/2012 Tgl. 2013
17 Oktober 2012

Halaman 45 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
538 1.03.02 CV. Te Pembuatan Badan Jalan dengan Galian 02/GJSK/SPK/PP 195.900.000,00 9.795.000,00 2468/LS/1.20 9.795.000,00 - -
Tanah Setempat Menuju Jembatan Sungai K/PUBM/2012 .09.02.00/6.2/
Kumbang Tgl. 17 Oktober 2013
2012
539 1.03.02 CV. APG Pengecoran Jalan Dalam Desa Saleh Agung 02/SA/SPK/PPK/ 195.478.000,00 9.773.900,00 4981/LS/1.20 9.773.900,00 - -
Kec. Air Saleh (Tahap II) PUBM/2012 Tgl. .09.02.00/6.2/
17 September 2013
2012
540 1.03.02 CV. NPM Pengecoran Jalan Dalam Desa Damar 02/DDW/SPK/PP 195.271.000,00 9.763.550,00 2365/LS/1.20 9.763.550,00 - -
Wulan Kec. Air Saleh K/PUBM/2012 .09.02.00/6.2/
Tgl. 29 Oktober 2013
2012
541 1.03.02 CV. BrPs Penimbunan Jalan Desa Salek Makmur 02/DSM/SPK/PP 97.815.000,00 4.890.750,00 1645/LS/1.20 4.890.750,00 - -
Kec. Air Saleh K/PUBM/2012 .09.02.00/6.2/
Tgl. 29 Oktober 2013
2012
542 1.03.02 CV. BrPs Penimbunan Jalan Desa Awitan Ke Muara 02/AWITAN/SP 97.790.000,00 4.889.500,00 1644/LS/1.20 4.889.500,00 - -
Kec. Air Saleh K/PPK/PUBM/20 .09.02.00/6.2/
12 Tgl. 29 2013
Oktober 2012
543 1.03.02 CV. KJ Rehabilitasi Jembatan Desa Salek Mukti 02/JSM/SPK/PP 73.248.000,00 3.662.400,00 - - 3.662.400,00
Kec. Air Saleh K/PUBM/2012
Tgl. 17 Oktober
2012
544 1.03.02 CV. KJ Rehabilitasi Jembatan Desa Damar Wulan 02/JDW/SPK/PP 73.248.000,00 3.662.400,00 - - 3.662.400,00
Kec. Air Saleh K/PUBM/2012
Tgl. 17 Oktober
2012
545 1.03.02 CV. EJ Rehabilitasi Tembok Penahan Oprit Box 02/OBTR/SPK/P 58.657.000,00 2.932.850,00 2263/LS/1.20 2.932.850,00 - -
Desa Taja Raya Kec. Betung PK/PUBM/2012 .09.02.00/6.2/
Tgl. 17 Oktober 2013
2012
546 1.03.02 CV. KJ Pembangunan Jembatan Desa Sidoarjo Kec. 02/SDJO/SPK/PP 146.451.000,00 7.322.550,00 - - 7.322.550,00
Air Saleh K/PUBM/2012
Tgl. 17
September 2012
547 1.03.02 PT. SSM Pembangunan Jembatan Penghubung Desa 02/J- 146.461.000,00 7.323.050,00 5266/LS/1.20 7.323.050,00 - -
Awitan Kec. Air Saleh DA/SPK/PPK/PU .09.02.00/6.2/
BM/2012 Tgl. 29 2013
Oktober 2012
548 1.03.02 PT. SSM Pembangunan Jembatan Penghubung Desa 02/J- 146.511.000,00 7.325.550,00 5268/LS/1.20 7.325.550,00 - -
Salek Mulya Kec. Air Saleh DSM/SPK/PPK/P .09.02.00/6.2/
UBM/2012 Tgl. 2013
29 Oktober 2012

Halaman 46 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
549 1.03.02 PT. SCP Pembangunan Jembatan Penghubung Beton 02/JB- 146.608.000,00 7.330.400,00 5250/LS/1.20 7.330.400,00 - -
Desa Salek Makmur Kec. Air Saleh DSM/SPK/PPK/P .09.02.00/6.2/
UBM/2012 Tgl. 2013
29 Oktober 2012

550 1.03.02 PT. SCP Penimbunan Jalan Desa Solok Batu Kec. 02/DSB/SPK/PP 98.001.000,00 4.900.050,00 5251/LS/1.20 4.900.050,00 - -
Air Saleh K/PUBM/2012 .09.02.00/6.2/
Tgl. 29 Oktober 2013
2012
551 1.03.02 PT. MM Rehabilitasi / Pemeliharaan Jembatan 05/MP/PPK/KON 488.178.000,00 24.408.900,00 2234/LS/1.20 24.408.900,00 - -
Muara Padang TRAK/PUBM/20 .09.02.00/6.2/
12 Tgl. 9 Juli 2013
2012
552 1.03.02 CV. Ha Pengecoran Jalan Desa Purwodadi Kec. 02/PWDD/SPK/P 195.208.000,00 9.760.400,00 3181/LS/1.20 9.760.400,00 - -
Muara Padang PK/PUBM/2012 .09.02.00/6.2/
Tgl. 17 2013
September 2012
553 1.03.02 CV. RJK Penimbunan Jalan dengan Galian Tanah 02/GDU/SPK/PP 97.858.000,00 4.892.900,00 3203/LS/1.20 4.892.900,00 - -
Setempat Desa Daya Utama Kec. Muara K/PUBM/2012 .09.02.00/6.2/
Padang Tgl. 17 2013
September 2012
554 1.03.02 CV. RJK Penimbunan Jalan dengan Galian Tanah 02/GDM/SPK/PP 97.858.000,00 4.892.900,00 3202/LS/1.20 4.892.900,00 - -
Setempat Desa Daya Makmur Kec. Muara K/PUBM/2012 .09.02.00/6.2/
Padang Tgl. 17 2013
September 2012
555 1.03.02 CV. LS Penimbunan Jalan dengan Galian Tanah 02/DTJ/SPK/PPK 97.848.000,00 4.892.400,00 4700/LS/1.20 4.892.400,00 - -
Setempat Desa Tirta Jaya Kec. Muara /PUBM/2012 Tgl. .09.02.00/6.2/
Padang 29 Oktober 2012 2013

556 1.03.02 CV. RJ Pembangunan Jembatan Desa Ruas Jalan 02/DM- 97.851.000,00 4.892.550,00 1838/LS/1.20 4.892.550,00 - -
Desa Daya Makmur - Desa Sidomulyo Kec. SM/SPK/PPK/PU .09.02.00/6.2/
Muara Padang BM/2012 Tgl. 29 2013
Oktober 2012
557 1.03.02 CV. ArP Pembangunan Jembatan Desa Ruas Jalan 02/TJ- 97.298.000,00 4.864.900,00 - - 4.864.900,00
Desa Tirta Jaya - Daya Utama Kec. Muara DU/SPK/PPK/PU
Padang BM/2012 Tgl. 24
Oktober 2012
558 1.03.02 CV. PC Pembangunan Jembatan Desa Air Gading 02/J- 97.715.000,00 4.885.750,00 - - 4.885.750,00
Kec. Muara Padang AG/SPK/PPK/PU
BM/2012 Tgl. 29
Oktober 2012
559 1.03.02 CV. SaKo Pengecoran Jalan Dsn I Desa Tanah Pilih 02/DI- 97.896.000,00 4.894.800,00 3655/LS/1.20 4.894.800,00 - -
Kec. Banyuasin II TP/SPK/PPK/PU .09.02.00/6.2/
BM/2012 Tgl. 12 2013
Oktober 2012

Halaman 47 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
560 1.03.02 CV. LS Pengecoran Jalan Dsn 2 Desa Sei Semut 02/D2- 97.634.000,00 4.881.700,00 3754/LS/1.20 4.881.700,00 - -
Kec. Banyuasin II SS/SPK/PPK/PU .09.02.00/6.2/
BM/2012 Tgl. 12 2013
Oktober 2012
561 1.03.02 CV. SaKo Pembangunan Jerambah Lr. Muslimin KH. 02/LM/SPK/PPK/ 160.457.000,00 8.022.850,00 3653/LS/1.20 8.022.850,00 - -
Mesir Desa Sungsang IV Kec. BA II PUBM/2012, Tgl. .09.02.00/6.2/
17 Oktober 2012 2013

562 1.03.02 CV. TBJ Penimbunan dengan Galian Tanah 02/LY/SPK/PPK/ 97.843.000,00 4.892.150,00 3654/LS/1.20 4.892.150,00 - -
Setempat Jalan Lorong Yunan Sungsang IV PUBM/2012 Tgl. .09.02.00/6.2/
Menuju Jalan Tanjung Api-api Kec. 17 September 2013
Banyuasin II 2012
563 1.03.02 CV. SaKo Penimbunan Jalan dengan Galian Tanah 02/LB/SPK/PPK/ 97.816.000,00 4.890.800,00 3581/LS/1.20 4.890.800,00 - -
Setempat Lr. Buyut Desa Sungsang I PUBM/2012 Tgl. .09.02.00/6.2/
Menuju Jalan Tanjung Api-api Kec. 17 September 2013
Banyuasin II 2012
564 1.03.02 CV. Dih Pembangunan Jerambah Lrg Mawar 02/LM/SPK/PPK/ 195.496.000,00 9.774.800,00 3031/LS/1.20 9.774.800,00 - -
Sungsang III Kec. Banyuasin II PUBM/2012 Tgl. .09.02.00/6.2/
17 September 2013
2012
565 1.03.02 CV. Dih Pembangunan Jerambah Lrg Taruna Darat 02/JTD/SPK/PPK 97.811.000,00 4.890.550,00 3035/LS/1.20 4.890.550,00 - -
Desa Sungsang III Kec. BA II /PUBM/2012 Tgl. .09.02.00/6.2/
17 September 2013
2012
566 1.03.02 CV. TBJ Pembangunan Jerambah Lorong Kencana 02/LK/SPK/PPK/ 195.682.000,00 9.784.100,00 3651/LS/1.20 9.784.100,00 - -
Sungsang IV Kec. Banyuasin II PUBM/2012 Tgl. .09.02.00/6.2/
12 Oktober 2012 2013

567 1.03.02 CV. TBJ Pembangunan Jerambah Lr. Ratna Maida 02/RM- 98.503.000,00 5.748.800,00 3755/LS/1.20 5.748.800,00 - -
Darat Desa Sungsang I Kec. BA II DS/SPK/PPK/PU .09.02.00/6.2/
BM/2012 Tgl. 17 2013
September 2012

568 1.03.02 CV. MB Pembangunan Jembatan Penghubung Dsn 02/SRIAGUNG/S 122.188.000,00 6.109.400,00 3673/LS/1.20 6.109.400,00 - -
III - Dsn IV Desa Sriagung Kec. Banyuasin PK/PPK/PUBM/2 .09.02.00/6.2/
II 012 Tgl. 12 2013
Oktober 2012
569 1.03.02 CV. MB Pembangunan Jembatan Penghubung Dsn 02/DSR/SPK/PP 122.283.000,00 6.114.150,00 3674/LS/1.20 6.114.150,00 - -
III - Dsn IV Desa Sumber Rejeki Kec. K/PUBM/2012 .09.02.00/6.2/
Banyuasin II Tgl. 17 Oktober 2013
2012
570 1.03.02 CV. NPM Pembangunan Jembatan Desa Muara Baru 02/DMB/SPK/PP 122.228.000,00 6.111.400,00 - - 6.111.400,00
Kec. Banyuasin II K/PUBM/2012
Tgl. 17 Oktober
2012

Halaman 48 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
571 1.03.02 CV. MPS Penimbunan dengan Tanah Setempat Jalan 02/KAI/SPK/PPK 195.574.000,00 9.778.700,00 2897/LS/1.20 9.778.700,00 - -
Poros Karang Agung Ilir Desa Karang Sari /PUBM/2012 Tgl. .09.02.00/6.2/
Ke Sumber Rezeki Kec. BA II 12 Oktober 2012 2013

572 1.03.02 CV. SaKo Penimbunan Jalan dengan Galian Tanah Nomor : 02/PL- 97.833.000,00 4.891.650,00 3686/LS/1.20 4.891.650,00 - -
Setempat Parit Halaman Lama - Parit Ladok TP/SPK/PPK/PU .09.02.00/6.2/
Desa Teluk Payo Kec. Banyuasin II BM/2012 tanggal 2013
17 September
2012
573 1.03.02 CV. TBJ Pengecoran Jalan Desa Tanjung Baru Kec. Nomor : 97.653.000,00 4.882.650,00 3687/LS/1.20 4.882.650,00 - -
Banyuasin II 02/TB/SPK/PPK/ .09.02.00/6.2/
PUBM/2012 2013
tanggal 17
September 2012
574 1.03.02 CV. BrPs Penimbunan dengan Galian Tanah Nomor : 02/LM- 97.743.000,00 4.887.150,00 - - 4.887.150,00
Setempat Lr. Mawar Menuju Jalan TAA TAA/SPK/PPK/P
Desa Sungsang III Kec. Banyuasin II UBM/2012
tanggal 12
Oktober 2012
575 1.03.02 CV. NPM Penimbunan Jalan Keliling dengan Galian Nomor : 97.844.000,00 4.892.200,00 - - 4.892.200,00
Tanah Setempat di Komplek Pondok 02/PPNW/SPK/P
Pesantren Nurul Wathan Desa Muara PK/PUBM/2012
Sungsang Kec. Banyuasin II tanggal 12
Oktober 2012
576 1.03.02 CV. Ra Perkerasan Jalan Desa Nusa Makmur Kec. NOMOR : 195.717.000,00 9.785.850,00 2497/LS/1.20 9.785.850,00 - -
Banyuasin I 02/DNM/SPK/PP .09.02.00/6.2/
K/PUBM/2012, 2013
TANGGAL : 17
OKTOBER 2012
577 1.03.02 PT. SSM Pengecoran Jalan Desa Telang Jaya antara Nomor : 220.084.000,00 11.004.200,00 5267/LS/1.20 11.004.200,00 - -
Jembatan 2 - Jembatan 1 Kec. Muara 05/TJ/PPK- .09.02.00/6.2/
Telang KONTRAK/PUB 2013
M/2012 tanggal
10 Oktober 2012

578 1.03.02 PT. SSM Penimbunan dengan tanah setempat jalan Nomor : 02/J4- 195.620.000,00 9.781.000,00 5265/LS/1.20 9.781.000,00 - -
dari jembatan 4 ke jembatan 2 Jalur 8 Kec. J2/SPK/PPK/PUB .09.02.00/6.2/
Muara Telang M/2012 tanggal 2013
17 September
2012
579 1.03.02 PT. SCP Pembangunan Jembatan Desa Terusan Nomor : 183.021.000,00 9.151.050,00 5253/LS/1.20 9.151.050,00 - -
Muara Kec. Muara Telang 02/JTM/SPK/PP .09.02.00/6.2/
K/PUBM/2012 2013
tanggal 17
September 2012

Halaman 49 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
580 1.03.02 PT. SCP Pembangunan Jembatan Desa Muara Nomor : 220.267.000,00 11.013.350,00 5264/LS/1.20 11.013.350,00 - -
Telang Kec. Muara Telang 05/JMT/PPK- .09.02.00/6.2/
KONTRAK/PUB 2013
M/2012 tanggal
10 Oktober 2012

581 1.03.02 PT. SCP Pembangunan Jembatan Desa Margarahayu Nomor : 171.077.000,00 8.553.850,00 5254/LS/1.20 8.553.850,00 - -
Kec. Muara Telang 02/JDM/SPK/PP .09.02.00/6.2/
K/PUBM/2012 2013
tanggal 17
September 2012
582 1.03.02 CV. MUB Pengecoran Jalan Ruas Jalan Desa Telang Nomor : 05/TR- 489.444.000,00 24.472.200,00 5263/LS/1.20 24.472.200,00 - -
Rejo Menuju Desa Telang Karya Kec. TK/PPK- .09.02.00/6.2/
Muara Telang KONTRAK/ 2013
PUBM/2012
tanggal 10
Oktober 2012
583 1.03.02 CV. MB Pengecoran Ruas Jalan Desa Sumber Hidup Nomor : 05/SH- 489.332.000,00 24.466.600,00 5269/LS/1.20 24.466.600,00 - -
Menuju Desa Telang Rejo Kec. Muara TR/PPK- .09.02.00/6.2/
Telang KONTRAK/ 2013
PUBM/2012
tanggal 10
Oktober 2012
584 1.03.02 CV. SJ Pengecoran Jalan Desa Telang Makmur Nomor : 05/TM- 687.421.000,00 34.371.050,00 2463/LS/1.20 34.371.050,00 - -
Menuju Desa Sumber Hidup Kec. Muara SH/PPK- .09.02.00/6.2/
Telang KONTRAK/ 2013
PUBM/2012
tanggal 10
Oktober 2012
585 1.03.02 CV. SK Pengecoran Jalan Poros Desa Sumber Nomor : 489.209.000,00 24.460.450,00 2863/LS/1.20 24.460.450,00 - -
Mulya Jalur 6 Jembatan 2 Kec. Muara 05/SM/PPK- .09.02.00/6.2/
Telang KONTRAK/ 2013
PUBM/2012
tanggal 10
Oktober 2012
586 1.03.02 CV. KSK Penimbunan dengan Galian tanah setempat Nomor : 244.786.000,00 12.239.300,00 3480/LS/1.20 12.239.300,00 - -
jalan dari desa Marga Rahayu ke sumber 05/DSM/PPK/KO .09.02.00/6.2/
jaya kec. Muara Telang NTRAK/ 2013
PUBM/2012
tanggal 2
Nopember 2012
587 1.03.02 CV. RA Pembangunan Jembatan Desa Telang Nomor : 116.875.000,00 5.843.750,00 4828/LS/1.20 5.843.750,00 - -
Makmur (Menuju Pemakaman) Kec. Muara 02/JDTM/SPK/P .09.02.00/6.2/
Telang PK/PUBM/2012 2013
tanggal 12
Oktober 2012

Halaman 50 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
588 1.03.02 CV. AJU Penimbunan dengan tanah setempat jalan Nomor : 02/KA- 195.598.000,00 9.779.900,00 4966/LS/1.20 9.779.900,00 - -
dari Desa Karang Anyar Menuju Desa TM/SPK/PPK/PU .09.02.00/6.2/
Muara Telang Marga Kec. Muara Telang BM/2012 tanggal 2013
12 Oktober 2012

589 1.03.02 CV. AJU Penimbunan dengan tanah setempat jalan NOMOR : 02/JI- 156.413.000,00 7.820.650,00 4967/LS/1.20 7.820.650,00 - -
dari Jembatan I ke Jembatan II Jalur 6 Desa JII/SPK/PPK/PU .09.02.00/6.2/
Sumber Mulya Kec. Muara Telang BM/2012, 2013
TANGGAL : 12
OKTOBER 2012
590 1.03.02 CV. RA Pengecoran Jalan Desa Mekar Mukti Kec. Nomor : 489.096.000,00 24.454.800,00 4826/LS/1.20 24.454.800,00 - -
Muara Telang 05/MM/PPK- .09.02.00/6.2/
KONTRAK/ 2013
PUBM/2012
tanggal 10
Oktober 2012
591 1.03.02 CV. RA Pembangunan Jembatan Desa Sumber Nomor : 195.567.000,00 9.778.350,00 4827/LS/1.20 9.778.350,00 - -
Hidup Kec. Muara Telang 02/JDSH/SPK/PP .09.02.00/6.2/
K/PUBM/2012 2013
tanggal 12
Oktober 2012
592 1.03.02 CV. KSK Pengecoran Jalan Dalam Desa Ganesha Nomor : 220.168.000,00 11.008.400,00 3002/LS/1.20 11.008.400,00 - -
Mukti Kec. Muara Sugihan 05/GM/PPK- .09.02.00/6.2/
KONTRAK/PUB 2013
M/2012 tanggal
25 September
2012
593 1.03.02 CV. KSK Pengecoran Jalan Dalam Desa Margo Nomor : 220.198.000,00 11.009.900,00 2875/LS/1.20 11.009.900,00 - -
Rukun Kec. Muara sugihan 05/MR/PPK- .09.02.00/6.2/
KONTRAK/PUB 2013
M/2012 tanggal
25 September
2012
594 1.03.02 CV. PI Pengecoran Jalan Dalam Desa Tirta Mulya Nomor : 195.650.000,00 9.782.500,00 3337/LS/1.20 9.782.500,00 - -
Kec. Muara Sugihan 02/DTM/SPK/PP .09.02.00/6.2/
K/PUBM/2012 2013
tanggal 29
Oktober 2012
595 1.03.02 CV. BIh Pengecoran Jalan Dalam Desa Daya AZHAR SAMIRI 97.807.000,00 4.890.350,00 - - 4.890.350,00
Kusuma Kec. Muara sugihan CV. BUKIT
INDAH
Jl. R. Sukamto
No. 63A Kec.
Kemuning Kel.
Pipa Reja
Palembang

Halaman 51 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
596 1.03.02 CV. KSK Pembangunan Jembatan Penghubung Desa Nomor : 220.271.000,00 11.013.550,00 2874/LS/1.20 11.013.550,00 - -
Margo Mulyo Kec. Muara Sugihan 05/MM/PPK- .09.02.00/6.2/
KONTRAK/PUB 2013
M/2012 tanggal
25 September
2012
597 1.03.02 CV. BIh Pembangunan Jembatan Penghubung Desa Nomor : 02/JBT- 97.736.000,00 4.886.800,00 - - 4.886.800,00
Daya Kusuma Kec. Muara Sugihan DK/SPK/PPK/PU
BM/2012 tanggal
17 September
2012
598 1.03.02 CV. MU Pengecoran Jalan Serong - Semuntul Kec. Nomor : 220.003.000,00 11.000.150,00 - - 11.000.150,00
Rantau Bayur (Tahap III) 05/SS/PPK-
KONTRAK/
PUBM/2012
tanggal 10
Oktober 2012
599 1.03.02 CV. KY Pengecoran Jalan Dalam Desa Talang Nomor : 196.208.000,00 9.810.400,00 3647/LS/1.20 9.810.400,00 - -
kemang Kec. Rantau Bayur 02/TK/SPK/PPK/ .09.02.00/6.2/
PUBM/2012 2013
tanggal 17
September 2012
600 1.03.02 CV. ArP Pengecoran Jalan Sukarela - Pulokerto Kec. Nomor : 220.007.000,00 11.000.350,00 - - 11.000.350,00
Rantau Bayur (Tahap III) 05/SP/PPK-
KONTRAK/
PUBM/2012
tanggal 10
Oktober 2012
601 1.03.02 CV. RJ Pengecoran Jalan Dalam Desa Rantau Nomor : 196.194.000,00 9.809.700,00 1819/LS/1.20 9.809.700,00 - -
Harapan Kec. Rantau Bayur 02/RH/SPK/PPK/ .09.02.00/6.2/
PUBM/2012 2013
tanggal 12
Oktober 2012
602 1.03.02 CV. HR Pengecoran Jalan Tebing Abang - Nomor : 05/TA- 220.139.000,00 11.006.950,00 3207/LS/1.20 11.006.950,00 - -
Pengumbuk kec. Rantau Bayur (Tahap III) P/PPK- .09.02.00/6.2/
KONTRAK/ 2013
PUBM/2012
tanggal 10
Oktober 2012
603 1.03.02 CV. GB Pembangunan Jembatan Desa Semuntul NOMOR : 196.260.000,00 9.813.000,00 2235/LS/1.20 9.813.000,00 - -
Kec. Rantau Bayur 02/JDS/SPK/PPK .09.02.00/6.2/
/PUBM/2012, 2013
TANGGAL : 17
OKTOBER 2012

Halaman 52 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
604 1.03.02 CV. GPA Pembangunan Jembatan Penghubung dsn. 1 Nomor : 97.958.000,00 4.897.900,00 3318/LS/1.20 4.897.900,00 - -
- dsn III Perasinan Desa Sungai Pinang Kec. 02/PSP/SPK/PPK .09.02.00/6.2/
Rantau Bayur /PUBM/2012 2013
tanggal 17
Oktober 2012
605 1.03.02 CV. RS Pembangunan Jembatan Dsn 2 Desa Nomor : 183.006.000,00 9.150.300,00 4613/LS/1.20 9.150.300,00 - -
Sukarela Kec. Rantau Bayur 02/J2DS/SPK/PP .09.02.00/6.2/
K/PUBM/2012 2013
tanggal 17
September 2012
606 1.03.02 CV. APe Pengecoran Jalan Desa Tanjung Pasir Kec. Nomor : 586.888.000,00 29.344.400,00 3294/LS/1.20 29.344.400,00 - -
Rantau Bayur 05/TP/PPK- .09.02.00/6.2/
KONTRAK/PUB 2013
M/2012 tanggal
10 Oktober 2012

607 1.03.02 CV. MPS Pengecoran Jalan Desa Muara Abab Kec. Nomor : 196.194.000,00 9.809.700,00 2895/LS/1.20 9.809.700,00 - -
Rantau Bayur 05/PL.12/PPK.K .09.02.00/6.2/
ONTRAK/E.PRO 2013
C/PUBM/2011
tanggal 2
Nopember 2011
608 1.03.02 CV. AiP Pengecoran Jalan Desa Penandingan Kec. Nomor : 196.194.000,00 9.809.700,00 2899/LS/1.20 9.809.700,00 - -
Rantau Bayur 02/DP/SPK/PPK/ .09.02.00/6.2/
PUBM/2012 2013
tanggal 17
September 2012
609 1.03.02 Cv. AILS Penimbunan Jalan Penghubung Desa Nomor : 05/RB- 392.810.000,00 19.640.500,00 - - 19.640.500,00
Rantau Bayur - Tebing Abang Kec. Rantau TA/PPK-
Bayur KONTRAK/
PUBM/2012
tanggal 10
Oktober 2012
610 1.03.02 CV. HR Rehabilitasi Jembatan Sei Guntung Kec. Nomor : 73.204.000,00 3.660.200,00 7219/LS/1.20 3.660.200,00 - -
Rantau Bayur 02/SG/SPK/PPK/ .09.02.00/6.2/
PUBM/2012 2013
tanggal 17
September 2012
611 1.03.02 CV. IP Pengecoran Jalan Desa Sejagung Kec. Nomor : 244.482.000,00 12.224.100,00 4446/LS/1.20 12.224.100,00 - -
Rantau Bayur 05/DS/PPK- .09.02.00/6.2/
KONTRAK/PUB 2013
M/2012 tanggal
10 Oktober 2012

Halaman 53 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
612 1.03.02 CV. EJ Pengecoran Jalan Desa Lubuk Karet - Pulau Nomor : 391.478.000,00 19.573.900,00 1139/LS/1.20 19.573.900,00 - -
Rajak Kec. Betung 05/PR/PPK- .09.02.00/6.2/
KONTRAK/PUB 2013
M/2012 tanggal
25 September
2012
613 1.03.02 PT. T & R Pengecoran Jalan Kampung Sawah kec. Nomor : 244.629.000,00 12.231.450,00 3206/LS/1.20 12.231.450,00 - -
Betung 05/KS/PPK- .09.02.00/6.2/
KONTRAK/PUB 2013
M/2012 tanggal
25 September
2012
614 1.03.02 CV. TBJ Pengecoran Jalan Lintas Desa Taja Indah Nomor : 244.721.000,00 12.236.050,00 - - 12.236.050,00
kec. Betung 05/KS/PPK-
KONTRAK/PUB
M/2012 tanggal
25 September
2012
615 1.03.02 CV. BT Pembangunan jembatan Desa Regan Agung NOMOR : 58.700.000,00 2.935.000,00 1793/LS/1.20 2.935.000,00 - -
Kec. BA III (Menuju Pemakaman) 02/DRA/SPK/PP .09.02.00/6.2/
K/PUBM/2012, 2013
TANGGAL : 17
OKTOBER 2012
616 1.03.02 CV. BrPs Pengecoran Jalan Seterio - Sedang Kec. Nomor : 196.220.000,00 9.811.000,00 2370/LS/1.20 9.811.000,00 - -
Soak Tape 02/SS/SPK/PPK/ .09.02.00/6.2/
PUBM/2012 2013
tanggal 17
September 2012
617 1.03.02 CV. AiP Pengecoran Jalan dalam Desa Sukaraja Kec. Nomor : 196.218.000,00 9.810.900,00 2896/LS/1.20 9.810.900,00 - -
Soak Tape 02/DS/SPK/PPK/ .09.02.00/6.2/
PUBM/2012 2013
tanggal 17
September 2012
618 1.03.02 CV. MPS Pengecoran Jalan Desa Air Senggiris - Nomor : 02/AS- 196.024.000,00 9.801.200,00 2898/LS/1.20 9.801.200,00 - -
Talang Ipuh Kec. Soak Tape TI/SPK/PPK/PU .09.02.00/6.2/
BM/2012 tanggal 2013
17 September
2012
619 1.03.02 CV. PP Pengecoran Jalan Dalam Desa Lubuk NOMOR : 196.254.000,00 9.812.700,00 2264/LS/1.20 9.812.700,00 - -
Lancang Menuju SMP 02/LL/SPK/PPK/ .09.02.00/6.2/
PUBM/2012 2013
TANGGAL : 17
SEPTEMBER
2012

Halaman 54 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
620 1.03.02 CV. LK Pengecoran Jalan Alternatif KM 12 NOMOR : 244.635.000,00 12.231.750,00 2804/LS/1.20 12.231.750,00 - -
Kelurahan Tanah Mas Kec. Talang Kelapa 05/KTM/PPK/KO .09.02.00/6.2/
NTRAK/PUBM/2 2013
012, tanggal 2
Nopember 2012

621 1.03.02 CV. Te Pemasangan Portal Ruas Jalan Sungai NOMOR : 48.939.000,00 2.446.950,00 2469/LS/1.20 2.446.950,00 - -
Gerong - Prajen 02/PSGP/SPK/PP .09.02.00/6.2/
K/PUBM/2012, 2013
TANGGAL : 17
OKTOBER 2012
622 1.03.02 CV. Te Rehabilitasi /Pemeliharaan Tugu Ketahanan NOMOR : 146.600.000,00 7.330.000,00 7169/LS/1.20 7.330.000,00 - -
Pangan 02/TKP/SPK/PP .09.02.00/6.2/
K/PUBM/2012, 2013
TANGGAL : 17
OKTOBER 2012
623 1.03.02 CV. Te Pemasangan Conblok Lapangan Upacara NOMOR : 117.283.000,00 5.864.150,00 7168/LS/1.20 5.864.150,00 - -
Komplek Perkantoran 02/CLU/SPK/PP .09.02.00/6.2/
K/PUBM/2012, 2013
TANGGAL : 17
OKTOBER 2012
624 1.03.02 CV. S & CO Pembangunan Jembatan Sungai Sili Kec. NOMOR : 196.121.000,00 9.806.050,00 2373/LS/1.20 9.806.050,00 - -
Banyuasin I 02/JSS/SPK/PPK/ .09.02.00/6.2/
PUBM/2012 , 2013
TANGGAL : 17
OKTOBER 2012
625 1.03.02 CV. NJ Pengecoran Jalan dalam Komplek Kenten NOMOR : 245.007.000,00 12.250.350,00 3057/LS/1.20 12.250.350,00 - -
Azhar Kelurahan Kenten 05/KKA/PPK/KO .09.02.00/6.2/
NTRAK/PUBM/2 2013
012 TANGGAL 2
NOPEMBER
2012

626 1.03.02 CV. BH Penimbunan dengan galian tanah setempat NOMOR : 02/DP- 97.721.000,00 4.886.050,00 2593/LS/1.20 4.886.050,00 - -
Dsa Plaju menuju Dsa Tanah Lembak Kec. TL/SPK/PPK/PU .09.02.00/6.2/
Rambutan BM/2012 2013
TANGGAL : 17
OKTOBER 2012

627 1.03.02 CV. BT Pembangunan Oprit Jembatan Pendowo NOMOR : 97.907.000,00 4.895.350,00 1792/LS/1.20 4.895.350,00 - -
Harjo Kec. Makarti Jaya 02/OJPH/SPK/PP .09.02.00/6.2/
K/PUBM/2012 2013
TANGGAL : 17
OKTOBER 2012

Halaman 55 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
628 1.03.02 PT. AKT Pembangunan Jalan Jati Kelurahan Mariana NOMOR : 771.140.000,00 38.557.000,00 3894/LS/1.20 38.557.000,00 - -
Kec, Banyuasin I 05/JKM/PPK/KO .09.02.00/6.2/
NTRAK/PUBM/2 2013
012 TANGGAL 2
NOPEMBER
2012

629 1.03.02 CV. GB Penggantian Relling dan Pengencangan NOMOR : 98.005.000,00 4.900.250,00 2239/LS/1.20 4.900.250,00 - -
Baut Jembatan Tanah Kering Kec. Pulau 02/PBTK/SPK/PP .09.02.00/6.2/
Rimau K/PUBM/2012 2013
TANGGAL : 17
OKTOBER 2012
630 1.03.02 CV. KSK Pembangunan Jalan Desa Saleh Agung Kec. NOMOR : 195.524.000,00 56.213.150,00 0246/LS/1.20 56.213.150,00 - -
Air Saleh 02/DSA/SPK/PP .09.02.00/6.2/
K/PUBM/2012 2013
TANGGAL : 17
OKTOBER 2012
631 1.03.02 CV. CM Pembangunan Jalan Desa Margo Sugian NOMOR : 195.421.000,00 56.183.537,50 0241/LS/1.20 56.183.537,50 - -
Kec. Muara Padang 02/DMS/SPK/PP .09.02.00/6.2/
K/PUBM/2012 2013
TANGGAL : 17
OKTOBER 2012
632 1.03.02 CV. CM Pembangunan Jalan Desa Salek Jaya Kec. NOMOR : 195.557.000,00 56.222.637,50 0247/LS/1.20 56.222.637,50 - -
Air Saleh 02/DSJ/SPK/PPK .09.02.00/6.2/
/PUBM/2012 2013
TANGGAL : 17
OKTOBER 2012
633 1.03.02 CV. MB Pembangunan Jembatan Penghubung NOMOR : 02/J- 97.651.000,00 4.882.550,00 3567/LS/1.20 4.882.550,00 - -
Dusun IV Desa Sumber Rejeki Kec. DSR/SPK/PPK/P .09.02.00/6.2/
Banyuasin II UBM/2012 2013
TANGGAL : 12
OKTOBER 2012
634 1.03.02 CV. KJ Pengecoran Jalan Desa Marga Rahayu Kec. NOMOR : 244.695.000,00 12.234.750,00 - - 12.234.750,00
Muara Telang 05/DMR/PPK/K
ONTRAK/PUBM
/2012
TANGGAL 2
NOPEMBER
2012
635 1.03.02 CV. IK Pengerasan Jalan Dalam Desa SidoMulyo NOMOR : 481.541.000,00 24.077.050,00 2395/LS/1.20 24.077.050,00 - -
Kec. Tungkal Ilir 05/DSM/PPK/KO .09.02.00/6.2/
NTRAK/PUBM/2 2013
012 TANGGAL 2
NOPEMBER
2012

Halaman 56 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
636 1.03.02 CV. AP Pengecoran Jalan Desa Meranti Kec. Soak NOMOR : 196.214.000,00 9.810.700,00 3862/LS/1.20 9.810.700,00 - -
Tape (Tahap II) 02/MERANTI/SP .09.02.00/6.2/
K/PPK/PUBM/20 2013
12 TANGGAL :
17 OKTOBER
2012
637 1.03.02 CV. Zu Pembangunan Jalan Desa Budi Asih Kec. NOMOR : 195.391.000,00 56.174.912,50 0245/LS/1.20 56.174.912,50 - -
Pulau Rimau 02/DBA/SPK/PP .09.02.00/6.2/
K/PUBM/2012 2013
TANGGAL : 17
OKTOBER 2012
638 1.03.02 CV. Zu Pembangunan Jalan Desa Air Gading Kec. NOMOR : 195.696.000,00 56.262.600,00 0244/LS/1.20 56.262.600,00 - -
Muara Padang 02/DAG/SPK/PP .09.02.00/6.2/
K/PUBM/2012 2012
TANGGAL : 17
OKTOBER 2012
639 1.03.02 CV. KSK Pembangunan Jalan Desa Salek Mulia Kec. Nomor : 195.356.000,00 56.164.850,00 0243/LS/1.20 56.164.850,00 - -
Air Saleh 02/JDSM/SPK/P .09.02.00/6.2/
PK/PUBM/2012 2013
TANGGAL : 17
OKTOBER 2012
640 1.03.02 CV. Ra Pengecatan Kanstin Jalan Lingkar Mulia NOMOR : 440.160.000,00 22.008.000,00 7227/LS/1.20 22.008.000,00 - -
Agung-Seterio 05/LMA- .09.02.00/6.2/
S/PPK/KONTRA 2013
K/PUBM/2012
TANGGAL 2
NOPEMBER
2012
641 1.03.02 CV. RFg Pembangunan Jalan Desa Lebung NOMOR : 146.863.000,00 7.343.150,00 - - 7.343.150,00
02/LEBUNG/SP
K/PPK/PUBM/20
12 TANGGAL :
17 OKTOBER
2012
642 1.03.02 CV. HR Pengecoran Jalan Utama Perumahan Griya NOMOR : 97.730.000,00 4.886.500,00 7220/LS/1.20 4.886.500,00 - -
Citra Sukamoro RT. 042 Kelurahan 02/GCS/SPK/PP .09.02.00/6.2/
Sukamoro Kecamatan Talang Kelapa K/PUBM/2012 2013
TANGGAL : 17
OKTOBER 2012
643 1.03.02 CV. PT Pembuatan Tembok Penahan Desa Plajau NOMOR : 02/PI- 97.906.000,00 4.895.300,00 1791/LS/1.20 4.895.300,00 - -
Ilir - Rimba Alai RA/SPK/PPK/PU .09.02.00/6.2/
BM/2012 2013
TANGGAL : 17
OKTOBER 2012
644 1.03.02 CV. BPM Pengecoran Jalan Desa Durian Gadis 02/DDG/SPK/PP 195.899.000,00 9.794.950,00 - - 9.794.950,00
Kecamatan Rambutan K/PUBM/2012
Tgl. 17 Oktober
2012

Halaman 57 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
645 1.03.02 CV. BPM Pengecoran Jalan/Lorong Tembusan Desa 02/DR/SPK/PPK/ 97.924.000,00 4.896.200,00 - - 4.896.200,00
Rambutan Kecamatan Rambutan PUBM/2012 Tgl.
17 Oktober 2012

646 1.03.02 CV. BPM Pengecoran Jalan/Lorong Vinus Desa 02/VDM/SPK/PP 97.933.000,00 4.896.650,00 - - 4.896.650,00
Mariana Kecamatan Banyuasin I K/PUBM/2012
Tgl. 17 Oktober
2012
647 1.03.02 CV. PT Pembangunan Jerambah Desa Tj. Beringin NOMOR : 146.903.000,00 7.345.150,00 1736/LS/1.20 7.345.150,00 - -
Kec. BA III 02/DTB/SPK/PP .09.02.00/6.2/
K/PUBM/2012 2013
TANGGAL : 17
OKTOBER 2012
648 1.03.02 CV. Zu Pembangunan Jembatan Desa Indrapura 02/J- 195.436.000,00 139.736.740,00 0229/LS/1.20 139.736.740,00 - -
Kec. Muara Sugihan DI/SPK/PPK/PU .09.02.00/6.2/
BM/2012 Tgl. 17 2013
Oktober 2012
649 1.03.02 CV. Zu Pembangunan Jembatan Desa Sidoharjo 02/J- 195.576.000,00 139.836.840,00 0230/LS/1.20 139.836.840,00 - -
Kec. Air Saleh DS/SPK/PPK/PU .09.02.00/6.2/
BM/2012 Tgl. 17 2013
Oktober 2012
650 1.03.02 CV. HBS Pembangunan Jembatan Rantau Harapan 02/JRH/SPK/PPK 97.902.000,00 4.895.100,00 3007/LS/1.20 4.895.100,00 - -
Lebung /PUBM/2012, .09.02.00/6.2/
Tgl. 17 Oktober 2013
2012
651 1.03.02 CV. NJ Pembuatan Box Culvert Desa Tanah 02/BTL/SPK/PP 97.714.000,00 4.885.700,00 4611/LS/1.20 4.885.700,00 - -
Lembak Kecamatan Rambutan K/PUBM/2012, .09.02.00/6.2/
Tgl. 17 Oktober 2013
2012
652 1.03.02 CV. GK Rehabilitasi Ruas Jalan Sp. Lubuk Lancang - 02/LL- 97.907.000,00 4.895.350,00 3578/LS/1.20 4.895.350,00 - -
Tanah Kering Kec. Pulau Rimau TK/SPK/PPK/PU .09.02.00/6.2/
BM/2012, Tgl. 17 2013
Oktober 2012
653 1.03.02 CV. GK Rehabilitasi Jalan Desa Lubuk Rengas - 02/LR- 97.600.000,00 4.880.000,00 3580/LS/1.20 4.880.000,00 - -
Desa Lebung Kec. Rantau Bayur DL/SPK/PPK/PU .09.02.00/6.2/
BM/2012, Tgl. 17 2013
Oktober 2012
654 1.03.02 CV. TW Rehabilitasi Setempat-setempat Jalan 02/LMAS/SPK/P 195.905.000,00 9.795.250,00 7207/LS/1.20 9.795.250,00 - -
Lingkar Mulya Agung - Seterio (Tahap II) PK/PUBM/2012, .09.02.00/6.2/
Tgl. 17 Oktober 2013
2012
655 1.03.02 CV. GK Rehabilitasi/Pemeliharaan Jalan Desa 02/DM/SPK/PPK 97.907.000,00 4.895.350,00 3579/LS/1.20 4.895.350,00 - -
Mukud - Dana Mulya Kec. Pulau Rimau /PUBM/2012, .09.02.00/6.2/
Tgl. 17 Oktober 2013
2012

Halaman 58 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
656 1.03.02 CV. APe Rehabilitasi Tembok Penahan Jalan Desa 02/TPDP/SPK/PP 97.773.000,00 4.888.650,00 3752/LS/1.20 4.888.650,00 - -
Petaling K/PUBM/2012, .09.02.00/6.2/
Tgl. 17 Oktober 2013
2012
657 1.03.02 CV. Ra Penimbunan dengan Timbunan Tanah 02/S- 195.669.000,00 9.783.450,00 2498/LS/1.20 9.783.450,00 - -
Pilihan Ruas Jalan Sambirejo - Petaling P/SPK/PPK/PUB .09.02.00/6.2/
Kec. Banyuasin I M/2012, Tgl. 17 2013
Oktober 2012
658 1.03.02 CV. BrPs Penimbunan Dengan Tanah Setempat Ruas 02/TJ- 195.611.000,00 9.780.550,00 - - 9.780.550,00
Jalan Desa Tabala Jaya-Majuria Karang M/SPK/PPK/PUB
Agung Ulu Kec. BA II M/2012 Tgl. 17
Oktober 2012
659 1.03.02 CV. MB Pembangunan Jembatan Sriagung 02/SRIAGUNG/S 97.778.000,00 4.888.900,00 - - 4.888.900,00
PK/PPK/PUBM/2
012 Tgl. 12
Oktober 2012
660 1.03.02 PT. ReKo Pengaspalan Jalan dengan Aspal Hotmix 04/003/PPK/KO 1.494.666.000,00 74.733.300,00 - - 74.733.300,00
Ruas Jalan Sp. Sidang Mas - Sidang Mas NTRAK/PUBM/2
Kec. Banyuasin III 008 Tanggal 31
Juli 2008
661 1.03.02 CV. KaKo Pengecoran Jalan Dalam Kota Kecamatan 979.782.000,00 12.247.275,00 - - 12.247.275,00
Betung - Jl. Gotong Royong dan Pangeran 04/044/PPK/KO
Dulkurdi NTRAK/PUBM/2
008 Tanggal 31
Juli 2008
662 1.03.02 CV. SePu Pengecoran Jalan Bima Sakti (BPDS) Kec. 04/046/PPK/KO 977.671.000,00 12.220.887,00 - - 12.220.887,00
Betung NTRAK/PUBM/2
008 Tanggal 31
Juli 2008
663 1.03.02 CV. CC Pengecoran Jalan Desa Gelebak Dalam Kec. 04/061/PPK/KO 783.145.000,00 9.789.312,00 - - 9.789.312,00
Rambutan NTRAK/PUBM/2
008 Tanggal 31
Juli 2008
664 1.03.02 CV. DP Pengecoran Jalan Dalam Kota Kecamatan 04/062/PPK/KO 195.389.000,00 9.769.450,00 - - 9.769.450,00
Betung - Jl. M. Roib NTRAK/PUBM/2
008 Tanggal 31
Juli 2008
665 1.03.02 CV. MK Pembangunan Jembatan Desa Bintaran 04/105/PPK/KO 113.327.000,00 5.666.350,50 - - 5.666.350,50
(Jembatan No. 1) Kec. Air Salek NTRAK/PUBM/2
008 Tanggal 31
Juli 2008
666 1.03.02 CV. JB Pembangunan Jembatan Desa Bintaran 04/106/PPK/KO 113.199.000,00 5.659.950,50 - - 5.659.950,50
(Jembatan No. 2) Kec. Air Salek NTRAK/PUBM/2
008 Tanggal 31
Juli 2008

Halaman 59 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
667 1.03.02 CV. MK Pembangunan Jembatan Desa Parit 1 Ruas 04/107/PPK/KO 205.494.000,00 10.274.700,00 - - 10.274.700,00
Jalan Makarti Jaya - Pangestu Kec. Makarti NTRAK/PUBM/2
Jaya 008 Tanggal 31
Juli 2008
668 1.03.02 PT. RAPra Pembangunan Jembatan Desa Damar 05/05/PPK- 99.581.000,00 4.979.050,00 - - 4.979.050,00
Wulan Menuju Dermaga - Jembatan SDU PL/KONTRAK/P
VII Primer 6 Kec. Air Salek UBM/2008
Tanggal 17
Oktober 2008
669 1.03.02 PT. HMa Pengecoran Jalan Cinta Manis Lama Kec. 05/06/PPK- 99.597.000,00 4.979.850,00 - - 4.979.850,00
Banyuasin I PL/KONTRAK/P
UBM/2008
Tanggal 17
Oktober 2008
670 1.03.02 CV. KR Pembuatan Box Culvert Type Single (2x2) 05/17/PPK- 99.568.000,00 4.978.400,00 - - 4.978.400,00
Desa Bengkuang Kec. Betung PL/KONTRAK/P
UBM/2008
Tanggal 17
Oktober 2008
671 1.03.02 CV. JB Pembuatan Box Culvert Type Single (2x2) 05/18/PPK- 99.541.000,00 4.977.050,00 - - 4.977.050,00
Desa Mukut Kec. Pulau Rimau PL/KONTRAK/P
UBM/2008
Tanggal 17
Oktober 2008
672 1.03.02 CV. LUM Pengecoran Jalan Menuju Desa Tanjung 07/43/PPK- 99.490.000,00 4.974.500,00 - - 4.974.500,00
Laga KONTRAK/PUB
M/IX/2006
Tanggal 14
September 2006
673 1.03.02 CV. Dr Pembangunan Jembatan Desa dari 07/44/PPK- 99.502.000,00 4.975.100,00 - - 4.975.100,00
Jembatan I - Muara Jalur VIII Desa Karang KONTRAK/PUB
Baru Jembatan Desa SPD I M/IX/2006
Tanggal 14
September 2006
674 1.03.02 CV. TK Penimbunan Jalan Tanjung Api-api - Sungsang 07/09/PPK- 1.950.068.000,00 27.300.952,00 - - - Tidak di tagih lagi
KONTRAK/PUBM
/IX/2006 tanggal
14 September 2006

675 1.03.02 CV. JB Pembangunan Box Culvert Taja Raya II 07/PPK- 99.000.000,00 2.475.000,00 - - 2.475.000,00
Type Single 1/1 KONTRAK/PUB
M/IX/2006
tanggal 28
November 2006

Halaman 60 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
676 1.03.02 CV. LiJa Penimbunan Oprit Box Culvert Jalan Baru 05/PPK- - 94.500.000,00 - - 94.500.000,00 Nilai Kontrak
Talang Andong - Sungai Dua Kec. PL/TASD/KONT Rp. 94.500.000
Rambutan RAK/PUBM/201
0 tanggal 11
November 2010
677 1.03.02 CV. SeJa Pembangunan Box Culvert Type Single Uk. 05/PPK-PL/DB- - 4.977.500,00 - - 4.977.500,00 Nilai Kontrak
(3x3) Jalan Desa Baru Kec. Rambutan - 1/KONTRAK/PU Rp. 99.550.000
Box Culvert No. 01 BM/2010
Tanggal 22
September 2010
678 1.03.02 CV. Ra Perkuatan Jembatan Beton Air Gading Kec. 05/GADING/PPK- - 4.950.000,00 - - 4.950.000,00 Nilai Kontrak
Muara Padang PL/KONTRAK/P Rp. 99.000.000
UBM/2010
Tanggal 01 April
2010

679 1.03.02 CV. Ra Perbaikan Tembok Penahan Tanah 05/PENAHAN/P - 4.950.000,00 - - 4.950.000,00 Nilai Kontrak
Jembatan Muara Padang Kec. Muara PK- Rp. 99.000.000
Padang PL/KONTRAK/P
UBM/2010
Tanggal 01 April
2010
680 1.03.02 CV. AAA pengawasan kegiatan rehabilitasi / penataan 03/02/PPK/PENG - 2.480.500,00 - - 2.480.500,00 Nilai Kontrak
bundaran tugu ketahanan pangan dan jalan /KONTRAK/PU Rp. 49.610.000
sekitar tugu dengan aspal hotmix kecamatan BM/ 2010
banyuasin III Tanggal 01 April
2010
681 1.03.02 CV. RMK Pengecoran Jalan Dalam Ibukota 05/PU-55/PPK- 568.412.000,00 28.420.600,00 5638/LS/1.20 28.420.600,00 - -
Kecamatan Muara Telang (Tahap II) KONTRAK/PUB .09.02.00/6.2/
M/2011 2013
tanggal 3 Agustus
2011
682 1.03.02 CV. DMM Pengecoran Jalan Desa Banyu Urip Kec. 05/02/PM- 196.993.000,00 9.849.650,00 - - 9.849.650,00
Tanjung Lago L/PPK/KONTRA
K/ PUBM/2011
tanggal 8 Juni
2011
683 1.03.02 CV. ASI Pengecoran Jalan Serasi I Kec. Talang 01/SI/SPK/PPK/P 98.751.000,00 4.937.550,00 - - 4.937.550,00
Kelapa UBM/2011
tanggal 29
September 2011

Halaman 61 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
684 1.03.02 CV. IqP Pengecoran Halaman Rumah Dinas Kajari 01/HRDK/SPK/P 49.277.000,00 2.463.850,00 - - 2.463.850,00
Banyuasin PK/PUBM/2011
tanggal 22
Nopember 2011
685 1.03.02 CV. R- D Pembangunan Box Culvert Type Single Uk. Nomor : tanggal 197.230.000,00 9.861.500,00 - - 9.861.500,00
(2x2) Desa Sungai Gerong Kec. Banyuasin 8 Juni 2011
I
686 1.03.02 CV. JU Pembuatan Box Culvert Type Single Uk. 49.257.000,00 2.462.850,00 - - 2.462.850,00
(1x1) Jl. Thalib Wali Pangkalan Balai 01/TW/SPK/PPK/
PUBM/2011
tanggal 22
Nopember 2011

Jumlah 81.702.955.000,00 3.745.272.694,50 3.135.844.417,50 4.629.554.700,00 5.211.682.025,00


DINAS PU PENGAIRAN

687 1.03.03 CV. PL Rehabilitasi Jaringan Pengairan Sekunder 02/SPK/PPK- 199.380.000,00 - - 9.969.000,00 9.969.000,00
Desa Sumber Mulyo Kecamatan Pulau PB/PU-
Rimau PENG/2013 Tgl.
5 Februari 2013
688 1.03.03 CV. KS Rehabilitasi Saluran di Desa Tabuan Asri 03/34/PPK- 321.540.000,00 - - 321.540.000,00 321.540.000,00
Kec. Pulau Rimau OP.I/PU.PENG/2
013 Tgl. 8
Nopember 2013
(Addendum)
03.a/34/ASP/PPK-
OP.I/PU.PENG/2
013 Tgl. 20
Desember 2013

689 1.03.03 CV. HS Pengadaan dan Pemasangan Genset 11,6 600/129/GEN/PU 197.786.000,00 9.889.300,00 4692/LS/1.20 9.889.300,00 - -
KVA, 3 Phese, Silent/ATS-MF + Perbaikan .PENG/2012 Tgl. .09.02.00/6.2/
Instalasi Gedung Kantor 8 Juni 2012 2013
690 1.03.03 CV. PL Rehabilitasi Jaringan Pengairan Sekunder 03/01/PPK- 294.330.000,00 14.716.500,00 1555/LS/1.20 14.716.500,00 - -
Desa Sumber Mulyo Kecamatan Pulau PB/PU.PENG/20 .09.02.00/6.2/
Rimau 12 Tgl. 5 Juli 2013
2012
691 1.03.03 CV. PL Rehabiliatsi Jaringan Pengairan Desa 03/02/PPK- 342.520.000,00 17.126.000,00 0943/LS/1.20 17.126.000,00 - -
Penuguan Kecamatan Pulau Rimau PB/PU.PENG/20 .09.02.00/6.2/
12 Tgl. 05 Juli 2013
2012

Halaman 62 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
692 1.03.03 CV. BT Normalisasi Sungai Anak Pancur Desa Taja 03/03/PPK- 292.880.000,00 14.644.000,00 1551/LS/1.20 14.644.000,00 - -
Raya Kecamatan Betung PB/PU.PENG/20 .09.02.00/6.2/
12 Tgl. 05 Juli 2013
2012
(Addendum)
03.a/03/ASP/PPK-
PB/PU.PENG/20
693 1.03.03 CV. GB Normalisasi Sungai Desa Ujung Tanjung 12 Tgl 24 Juli
03/04/PPK- 495.870.000,00 24.793.500,00 0927/LS/1.20 24.793.500,00 - -
Kec. Banyuasin III PB/PU.PENG/20 .09.02.00/6.2/
12 Tgl. 05 Juli 2013
2012(Addendum)
036.1/04/PPK-
PB/PU.PENG/20
12 Tgl 03
Oktober 2012

694 1.03.03 CV. KS Rehabilitasi Jaringan Pengairan Desa 03/05/PPK- 346.410.000,00 17.320.500,00 0920/LS/1.20 17.320.500,00 - -
Limbang Mulya Kecamatan Sembawa PB/PU.PENG/20 .09.02.00/6.2/
12 Tgl. 05 Juli 2013
2012
(Addendum)
03.a/05/ASP/PPK-
PB/PU.PENG/20
12 Tgl. 25 Juli
2012

695 1.03.03 CV. TS Rehabilitasi Jaringan Pengairan Desa 03/06/PPK- 337.760.000,00 16.888.000,00 1514/LS/1.20 16.888.000,00 - -
Talang Kemang Kecamatan Rantau Bayur PB/PU.PENG/20 .09.02.00/6.2/
12 Tgl. 05 Juli 2013
2012
(Addendum)
03/06/ASP/PPK-
PB/PU.PENG/20
12 Tgl. 24 Juli
2012
696 1.03.03 CV. GMs Peningkatan Jaringan Pengairan Desa 03/07/PPK- 198.760.000,00 9.938.000,00 0878/LS/1.20 9.938.000,00 - -
Sejagung Kecamatan Rantau Bayur PB/PU.PENG/20 .09.02.00/6.2/
12 tgl. 05 Juli 2013
2012
697 1.03.03 CV. LS Pembangunan Tanggul Banjir Parit 1 Dusun 03/08/PPK- 341.600.000,00 17.080.000,00 2573/LS/1.20 17.080.000,00 - -
3 Upang Makmur Kecamatan Makarti Jaya PP.III/PU.PENG/ .09.02.00/6.2/
2012 Tgl. 05 Juli 2013
2012

Halaman 63 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
698 1.03.03 CV. APe Rehabilitasi Jaringan Pengairan Desa 03/09/PPK- 386.440.000,00 19.322.000,00 5625/LS/1.20 19.322.000,00 - -
Upang Makmur Kecamatan Makarti Jaya PP.III/PU.PENG/ .09.02.00/6.2/
2012 Tgl. 05 Juli 2013
2012
(Addendum)
012/09/ASP/PPK-
PP.III/PU.PENG/
2012 Tgl. 18 Juli
2012

699 1.03.03 CV. RK Peningkatan Jaringan Pengairan Desa 03/10/PPK- 197.170.000,00 9.858.500,00 5255/LS/1.20 9.858.500,00 - -
Upang Cemara Kecamatan Makarti Jaya PP.III/PU.PENG/ .09.02.00/6.2/
2012 Tgl 05 Juli 2013
2012
700 1.03.03 CV. DP Pembangunan Tanggul di Desa Merah Mata 03/12/PPK- 343.710.000,00 17.185.500,00 2813/LS/1.20 17.185.500,00 - -
Kec. Banyuasin I PP.I/PU.PENG/2 .09.02.00/6.2/
012 Tgl. 05 Juli 2013
2012
(Addendum)
40/12/ASP/PPK-
PP.I/PU.PENG/2
012 Tgl 20 Juli
2012
701 1.03.03 CV. BJ Normalisasi Sungai Rebo Kecamatan 03/13/PPK- 795.730.000,00 39.786.500,00 1769/LS/1.20 39.786.500,00 - -
Banyuasin I PP.I/PU.PENG/2 .09.02.00/6.2/
012 Tgl. 05 Juli 2013
2012
702 1.03.03 CV. LS Normalisasi Sungai Wimpe Kecamatan 03/14/PPK- 783.080.000,00 39.154.000,00 3085/LS/1.20 39.154.000,00 - -
Banyuasin I PP.I/PU.PENG/2 .09.02.00/6.2/
012 Tgl. 05 Juli 2013
2012
(Addendum)
35.1/14/ASP/PPK-
PP.I/PU.PENG/2
012 Tgl. 18 Juli
2012

703 1.03.03 CV. DP Peningkatan Jaringan Pengairan Desa 03/15/PPK- 355.590.000,00 17.779.500,00 2894/LS/1.20 17.779.500,00 - -
Padang Rejo Kecamatan Banyuasin I PP.I/PU.PENG/2 .09.02.00/6.2/
012 Tgl. 05 Juli 2013
2012
704 1.03.03 CV. EC Peningkatan Jaringan Pengairan Desa Air 03/16/PPK- 366.100.000,00 18.305.000,00 7208/LS/1.20 18.305.000,00 - -
Kumbang Bakti Kecamatan Banyuasin I PP.I/PU.PENG/2 .09.02.00/6.2/
012 Tgl. 05 Juli 2013
2012

Halaman 64 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
705 1.03.03 CV. BT Peningkatan Jaringan Pengairan Desa 03/17/PPK- 196.560.000,00 9.828.000,00 1554/LS/1.20 9.828.000,00 - -
Rantau Bayur Kecamatan Rantau Bayur PB/PU.PENG/20 .09.02.00/6.2/
12 Tgl. 05 Juli 2013
2012
706 1.03.03 CV. LK Pembangunan Jaringan Pengairan Desa 03/18/PPK- 195.970.000,00 9.798.500,00 2900/LS/1.20 9.798.500,00 - -
Baru Kecamatan Rambutan PP.I/PU.PENG/2 .09.02.00/6.2/
012 Tgl. 05 Juli 2013
2012
707 1.03.03 CV. APe Pembangunan Jaringan Pengairan Desa 03/19/PPK- 197.080.000,00 9.854.000,00 4945/LS/1.20 9.854.000,00 - -
Durian Gadis Kecamatan Rambutan PP.I/PU.PENG/2 .09.02.00/6.2/
012 Tgl. 05 Juli 2013
2012
708 1.03.03 CV. MI Peningkatan Jaringan Pengairan Parit 4 dan 03/20/PPK- 693.280.000,00 34.664.000,00 2027/LS/1.20 34.664.000,00 - -
Parit 6 Desa Upang Makmur Kecamatan PP.III/PU.PENG/ .09.02.00/6.2/
Makarti Jaya 2012 Tgl. 05 Juli 2013
2012
(Addendum)
012/20/ASP/PPK-
PP.III/PU.PENG/
2012 Tgl. 16 Juli
2012

709 1.03.03 CV. EC Peningkatan Jaringan Pengairan Desa 03/21/PPK- 356.770.000,00 17.838.500,00 7209/LS/1.20 17.838.500,00 - -
Upang Ceria Kecamatan Makarti Jaya PP.III/PU.PENG/ .09.02.00/6.2/
2012 Tgl. 05 Juli 2013
2012
(Addendum)
012/21/ASP/PPK-
PP.III/PU.PENG/
2012 Tgl. 18 Juli
2012

710 1.03.03 CV. BJ Peningkatan Jaringan Pengairan Desa Suka 03/22/PPK- 277.130.000,00 13.856.500,00 4007/LS/1.20 13.856.500,00 - -
Tani Kecamatan Tanjung Lago PP.III/PU.PENG/ .09.02.00/6.2/
2012 Tgl. 05 Juli 2013
2012
711 1.03.03 CV. JIL Peningkatan Jaringan Pengairan Desa 03/23/PPK- 395.630.000,00 19.781.500,00 2090/LS/1.20 19.781.500,00 - -
Muara Sungsang Kecamatan Banyuasin II PP.II/PU.PENG/2 .09.02.00/6.2/
012 Tgl. 05 Juli 2013
2012
712 1.03.03 CV. HBS Peningkatan Jaringan Pengairan Sungai 03/24/PPK- 714.290.000,00 35.714.500,00 2746//LS/1.2 35.714.500,00 - -
Teluk Macan Kecamatan Banyuasin II PP.II/PU.PENG/2 0.09.02.00/6.
012 Tgl. 05 Juli 2/2013
2012

Halaman 65 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
713 1.03.03 CV. TBJ Rehabilitasi Jaringan Pengairan Parit 2 03/25/PPK- 198.120.000,00 9.906.000,00 2094/LS/1.20 9.906.000,00 - -
Desa Marga Sungsang Kecamatan PP.II/PU.PENG/2 .09.02.00/6.2/
Banyuasin II 012 tgl. 05 Juli 2013
2012
(Addendum)
03.a/25/ASP/PPK-
PP.II/PU.PENG/2
012 Tgl. 19 Juli
2012

714 1.03.03 CV. RK Normalisasi Parit Sam Desa Karang Baru 03/26/PPK- 298.780.000,00 14.939.000,00 2093/LS/1.20 14.939.000,00 - -
Kecamatan Muara Telang PP.II/PU.PENG/2 .09.02.00/6.2/
012 Tgl. 05 Juli 2013
2012
715 1.03.03 CV. TS Pembangunan Tanggul Desa Mekar Sari 03/27/PPK- 356.280.000,00 17.814.000,00 5362/LS/1.20 17.814.000,00 - -
Kecamatan Muara Telang PP.II/PU.PENG/2 .09.02.00/6.2/
012 Tgl. 05 Juli 2013
2012
(Addendum)
03.a/27/ASP/PPK-
PP.II/PU.PENG/2
012 Tgl. 23 Juli
2012

716 1.03.03 CV. PT Rehabilitasi Jaringan Pengairan Desa Tirta 03/28/PPK- 396.190.000,00 19.809.500,00 1510/LS/1.20 19.809.500,00 - -
Jaya Kecamatan Muara Padang OP/PU.PENG/20 .09.02.00/6.2/
12 Tgl. 05 Juli 2013
2012
717 1.03.03 CV. NPM Rehabilitasi Jaringan Pengairan Desa 03/29/PPK- 395.750.000,00 19.787.500,00 3925/LS/1.20 19.787.500,00 - -
Sumber Rejeki Kecamatan Pulau Rimau OP/PU.PENG/20 .09.02.00/6.2/
12 Tgl. 05 Juli 2013
2012
718 1.03.03 CV. AP Rehabilitasi Jaringan Pengairan Pengairan 03/30/PPK- 394.130.000,00 19.706.500,00 7178/LS/1.20 19.706.500,00 - -
Desa Suka Jaya Kecamatan Tungkal Ilir OP/PU.PENG/20 .09.02.00/6.2/
12 Tgl. 05 Juli 2013
2012
719 1.03.03 CV. LK Rehabilitasi Jaringan Pengairan Desa Budi 03/31/PPK- 786.570.000,00 39.328.500,00 3892/LS/1.20 39.328.500,00 - -
Mulya Kecamatan Banyuasin I OP/PU.PENG/20 .09.02.00/6.2/
12 Tgl. 05 Juli 2013
2012
(Addendum)
03.a/31/ASP/PPK-
OP/PU.PENG/20
12 Tgl. 03
September 2012

Halaman 66 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
720 1.03.03 Cv. AILS Rehabilitasi Jaringan Pengairan Desa Mukti 03/32/PPK- 395.550.000,00 19.777.500,00 3868/LS/1.20 19.777.500,00 - -
Jaya Kecamatan Muara Telang OP/PU.PENG/20 .09.02.00/6.2/
12 Tgl 05 Juli 2013
2012
721 1.03.03 CV. BJ Rehabilitasi Jaringan Pengairan Desa 03/33/PPK- 396.680.000,00 19.834.000,00 5370/LS/1.20 19.834.000,00 - -
Sumber Jaya Kecamatan Muara Telang OP/PU.PENG/20 .09.02.00/6.2/
12 Tgl. 05 Juli 2013
2012
722 1.03.03 CV. BJ Rehabilitasi Jaringan Pengairan Desa 03/34/PPK- 397.280.000,00 19.864.000,00 4006/LS/1.20 19.864.000,00 - -
Telang Karya Kecamatan Muara Telang OP/PU.PENG/20 .09.02.00/6.2/
12 Tgl. 05 Juli 2013
2012
723 1.03.03 CV. GMs Pembangunan Tanggul Jalur 6 Desa Sumber 03/35/PPK- 394.960.000,00 19.748.000,00 4693/LS/1.20 19.748.000,00 - -
Mulya Kecamatan Muara Telang PP.II/PU.PENG/2 .09.02.00/6.2/
012 Tgl. 05 Juli 2013
2012
724 1.03.03 CV. AP Rehabilitasi Jaringan Pengairan Desa Purwo 03/36/PPK- 395.330.000,00 19.766.500,00 4944/LS/1.20 19.766.500,00 - -
Sari Kecamatan Tanjung Lago PP.III/PU.PENG/ .09.02.00/6.2/
2012 Tgl. 05 Juli 2013
2012
725 1.03.03 CV. RK Normalisasi Sungai Bungin Desa Rimau 03/37/PPK- 355.650.000,00 17.782.500,00 2089/LS/1.20 17.782.500,00 - -
Sungsang Kecamatan Banyuasin II PP.II/PU.PENG/2 .09.02.00/6.2/
012 Tgl. 05 Juli 2013
2012
726 1.03.03 CV. AiP Pembangunan Sal Penanggulangan Banjir 03/38/PPK- 444.590.000,00 22.229.500,00 4205/LS/1.20 22.229.500,00 - -
di Komp. Azhar Kenten & Pembersihan PP.III/PU.PENG/ .09.02.00/6.2/
Sal. Penanggulangan Banjir di Komp.Griya 2012 Tgl. 24 2013
Damai Indah Kec. Talang Kelapa Oktober 2012
(Addendum)
012/38/ASP/PPK-
PP.III/PU.PENG/
2012 Tgl 07
November 2012

727 1.03.03 CV. KS Normalisasi Sungai Kesambi (lanjutan) 03/39/PPK- 496.090.000,00 24.804.500,00 1603/LS/1.20 24.804.500,00 - -
Kecamatan Banyuasin III / Rantau Bayur PB/PU.PENG/20 .09.02.00/6.2/
12 Tgl 24 2013
Oktober 2012
728 1.03.03 CV. MI Pembangunan dan Peningkatan Jaringan 02/40/SPK/PPK- 198.700.000,00 9.935.000,00 5359/LS/1.20 9.935.000,00 - -
Pengairan Desa Tanjung Kerang Kecamatan PP.I/PU.PENG/2 .09.02.00/6.2/
Rambutan 012 Tgl. 01 2013
November 2012
729 1.03.03 CV. KBn Pembangunan dan Peningkatan Jaringan di 04/SP/KBP/PU.P 396.653.000,00 19.832.650,00 - - 19.832.650,00
Desa Tanjung Mas eng/2011
730 1.03.03 CV. KR Rehabilitasi Saluran Primer 19 Telang II 07/SP/KBP/PU.P 462.226.000,00 23.111.300,00 - - 23.111.300,00
Kec. Tanjung Lago eng/2011

Jumlah 16.782.895.000,00 813.098.750,00 770.154.800,00 331.509.000,00 374.452.950,00

Halaman 67 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
DINAS KEBERSIHAN, PERTAMANAN DAN

731 1.08.02 CV. PhB Kegiatan Pembangunan Tempat 027/97/PPK/SPK/ 100.000.000,00 - - 5.000.000,00 5.000.000,00
Pembuangan Sampah Sementara TPS/DKPP/2013
14 Nopember
2013
732 1.08.02 CV. BMF Pekerjaan Pemeliharaan Berkala/Rutin 012/PPK/SPK/TU 78.000.000,00 3.900.000,00 - - 3.900.000,00
Gedung Kantor .PGK/DKPP/201
2 Tgl. 2 Juli 2012

733 1.08.02 CV. CBI Kegiatan Pembangunan Tempat 016/PPK/SPK/TP 100.000.000,00 5.000.000,00 4165/LS/1.20 5.000.000,00 - -
Pembuangan Sampah Sementara S/DKPP/2012 .09.02.00/6.2/
Tgl. 16 Okt 2012 2013
734 1.08.02 CV. SA Kegiatan Pembangunan Pos Jaga Tempat 010/PPK/SPK/TP 295.714.000,00 14.785.700,00 4093/LS/1.20 14.785.700,00 - -
Pemerosesan Akhir sampah (TPA) Terlangu A-PJ/DKPP/2012 .09.02.00/6.2/
Tgl. 9 Okt 2012 2013

735 1.08.02 CV. LiBe Pengadaan Pembuatan Pagar Tempat 020/01/PPK- 99.175.000,00 4.958.750,00 - - 4.958.750,00
Pemakaman Umum Pedade Kab. Banyuasin PL/SPK/DKPP/2
012 Tgl. 8 Okt
2012
736 1.08.02 CV. KJ Pemeliharaan Gedung Kantor 36.596.000,00 1.829.800,00 - - 1.829.800,00
737 1.08.02 CV. RM Landkling Tempat Pembuangan Sampah 726.004.000,00 36.300.200,00 - - 36.300.200,00

Jumlah 1.435.489.000,00 66.774.450,00 19.785.700,00 5.000.000,00 51.988.750,00


SEKRETARIAT DAERAH

738 1.20.03 CV. KSL Pengadaan Kendaraan Dinas Operasional 027/306/SPK/VII 2.199.980.000,00 - - 98.595.000,00 98.595.000,00
Kepala Daerah Kabupaten Banyuasin I/2013 Tgl, 06
Des 2013
739 1.20.03 CV. JU Pekerjaan Rehab Ruang Kerja 027/178/SPK/VII 106.150.000,00 - - 5.307.500,00 5.307.500,00
Bendaharawan Pembantu Urusan Gaji I/2013 Tgl, 23
Bagian Umum Setda Kabupaten Banyuasin Sept 2013

740 1.20.03 CV. EA Pengadaan Panggung dan Interior Gedung 027/266/VIII/201 295.000.000,00 14.750.000,00 - - 14.750.000,00
Graha Sedulang Setudung Kab. Banyuasin 2 Tgl. 23
Nopember 2012
741 1.20.03 CV. Ra Pekerjaan Penambahan WC VIP di Graha 027/241/VIII/201 98.170.000,00 4.908.500,00 - - 4.908.500,00
Sedulang Setudung Kab. Banyuasin 2 Tgl. 06
Nopember 2012
742 1.20.03 CV. TS Pengecatan dan Interior Ruang Kerja, 027/239/VIII/201 98.026.000,00 4.901.300,00 - - 4.901.300,00
Rapat, Asisten II pada Bagian umum Setda 2 Tgl. 31 Oktober
Kab. Banyuasin 2012
743 1.20.03 CV. AS Pengecatan Ruang Dinas Jabatan Bupati 027/224/SPK/VII 99.859.530,00 4.992.977,00 2028/LS/1.20 4.992.976,00 - -
Banyuasin pada Bagian Umum Setda Kab. I/2012 Tgl 19 .09.02.00/6.2/
Banyuasin Oktober 2012 2013

Halaman 68 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
744 1.20.03 CV. RK Pengecatan Jendela, Kusen dan Pintu 027/218/SPK/VII 99.838.470,00 4.991.924,00 2015/LS/1.20 4.991.923,00 - -
Rumah Dinas Bupati dan Guest House pada I/2012 Tgl. 10 .09.02.00/6.2/
Bagian Umum Setda Kab. Banyuasin Oktober 2012 2013

745 1.20.03 CV. RK Pemeliharaan/Perbaikan Selasar/Teras 027/182/SPK/VII 94.803.720,00 4.740.186,00 2011/LS/1.20 4.740.186,00 - -
Kantor Setda Kabupaten Banyuasin pada I/2012 Tgl. 26 .09.02.00/6.2/
Bagian Umum Kab. Banyuasin September 2012 2013

746 1.20.03 CV. AS Pemeliharaan Rumah Dinas Jabatan Bupati 027/150/SPK/VII 99.756.000,00 4.987.800,00 2013/LS/1.20 4.987.800,00 - -
Banyuasin pada Bagian Umum Setda Kab. I/2012 Tgl. 24 .09.02.00/6.2/
Banyuasin Agustus 2012 2013
747 1.20.03 CV. KSD S Pengadaan Lain-lain Penghias Ruangan 027/228/SPK/V/2 742.100.000,00 37.105.000,00 6439/LS/1.20 37.105.000,00 - -
rumah Tangga pada Bagian Administrasi 012 Tgl. 19 .09.02.00/6.2/
Pembangunan Setda Kab. Banyuasin September 2012 2013

748 1.20.03 CV. TS Rehabilitasi Lantai Dasar (Loby) Ruang 027/250/SPK/V/2 592.200.000,00 29.610.000,00 6436/LS/1.20 29.610.000,00 - -
rapat Bupati pada bagian Administrasi 012 Tgl. 14 .09.02.00/6.2/
Pembangunan Setda Kab. Banyuasin Nopember 2012 2013
749 1.20.03 CV. TW Rehabilitasi Sanitasi Kantor Pemerintah 027/260/SPK/V/2 198.115.000,00 9.905.750,00 6438/LS/1.20 9.905.750,00 - -
Kab. Banyuasin pada Bagian Administrasi 012 Tgl. 12 .09.02.00/6.2/
Pembangunan Nopember 2012 2013
750 1.20.03 CV. EC Rehabilitasi Ruang pada Bagian 027/264/SPK/V/2 197.600.000,00 9.880.000,00 6437/LS/1.20 9.880.000,00 - -
Administrasi Pembangunan Setda Kab. 012 Tgl. 12 .09.02.00/6.2/
Banyuasin Nopember 2012 2013

Jumlah 4.921.598.720,00 130.773.437,00 106.213.635,00 103.902.500,00 128.462.300,00


SEKRETARIAT DPRD

751 1.20.04 CV. NPM Pengadaan LED TV, Plasma TV dan DVD 027/135/PPK- 108.300.000,00 - - 108.300.000,00 108.300.000,00
Player Kegiatan Pengadaan Peralatan UMUM/SPK/SE
Gedung Kantor pada Sekretariat DPRD TWAN/2013
Kabupaten Banyuasin
752 1.20.04 CV. AK Pengadaan Kamera Keg. Penyusunan 027/147/PPK- 16.000.000,00 - - 16.000.000,00 16.000.000,00
Rencana Strategis SKPD KEU/SPK/SETW
AN/2013
753 1.20.04 CV. LS Pengadaan Almari Arsip Bagian 027/170/PPK- 96.000.000,00 - - 96.000.000,00 96.000.000,00
Persidangan dan Bagian Keuangan UMUM/SPK/SE
Kegiatan Rapat-rapat Paripurna pada TWAN/2013
Bagian Persidangan dan Humas pada
Sekretariat DPRD Kab. Banyuasin
754 1.20.04 CV. GB Pekerjaan Lanjutan Gedung Fraksi DPRD 027/110/PPK- 1.987.400.000,00 99.370.000,00 2496/LS/1.20 99.370.000,00 - -
Kabupaten Banyuasin Keg. Pembangunan UMUM/SPK/SE .09.02.00/6.2/
Gedung Kantor TWAN/2012 2013
755 1.20.04 CV. TJ Pekerjaan Pembuatan Rolling Door Garasi 027/086/PPK- 48.437.500,00 2.421.875,00 - - 2.421.875,00
Mobil Pool Keg. Pembangunan Gedung UMUM/SPK/SE
Kantor Setwan Kab. Banyuasin TWAN/2012

Halaman 69 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
756 1.20.04 CV. SDS Pekerjaan Lanjutan Pembangunan Jalan 027/118/PPK- 196.080.000,00 9.804.000,00 - - 9.804.000,00
Lingkar Belakang Gedung Fraksi UMUM/SPK/SE
TWAN/2012
757 1.20.04 CV. HR Pekerjaan Pembuatan Rumah-Rumahan 601/107/PPK/SP 59.310.000,00 2.965.500,00 - - 2.965.500,00
Genset untuk Rumah Dinas Wakil Ketua I, K-
II dan III UMUM/SETWA
N/2012
758 1.20.04 CV. LS Pekerjaan Pembangunan Parit Halaman 601/128/PPK/SP 149.400.000,00 7.470.000,00 2359/LS/1.20 7.470.000,00 - -
Rumah Dinas Ketua DPRD Kab. Banyuasin K- .09.02.00/6.2/
UMUM/SETWA 2013
N/2012
759 1.20.04 CV. PL Pekerjaan Pembangunan Tambahan Gedung 601/130/PPK/SP 98.900.000,00 4.945.000,00 2575/LS/1.20 4.945.000,00 - -
Rumah Dinas Ketua DPRD Kab. Banyuasin K- .09.02.00/6.2/
UMUM/SETWA 2013
N/2012

760 1.20.04 CV. JIL Pemeliharaan Pembuatan Peralatan Jemuran 601/135/PPK/SP 25.800.000,00 1.290.000,00 - - 1.290.000,00
Beton Rumah Dinas Wakil Ketua I K-
UMUM/SETWA
N/2012
761 1.20.04 CV. AP Pekerjaan Rumah Joglo di Belakang Rumah 601/136/PPK/SP 118.400.000,00 5.920.000,00 3495/LS/1.20 5.920.000,00 - -
Dinas & Renovasi Kamar Tidur Pembantu K- .09.02.00/6.2/
dan Gudang Menjadi Kamar Tidur Rumdin UMUM/SETWA 2013
Wakil Ketua II N/2012

762 1.20.04 CV. Ds Pekerjaan Pemasangan Conblok Rumah 601/131/PPK/SP 99.560.000,00 4.978.000,00 2574/LS/1.20 4.978.000,00 - -
Dinas Ketua DPRD Kab. Banyuasin K- .09.02.00/6.2/
UMUM/SETWA 2013
N/2012
763 1.20.04 CV. PL Pekerjaan Tambahan Ruang Balkon Kantor 601/138/PPK/SP 148.790.000,00 7.439.500,00 2572/LS/1.20 7.439.500,00 - -
DPRD K- .09.02.00/6.2/
UMUM/SETWA 2013
N/2012
764 1.20.04 CV. Ha Pekerjaan Pembangunan Tambahan Ruang 601/140/PPK/SP 149.774.000,00 7.488.700,00 2495/LS/1.20 7.488.700,00 - -
Gudang K- .09.02.00/6.2/
UMUM/SETWA 2013
N/2012
765 1.20.04 CV. AiP Pekerjaan Pembangunan Garasi Mobil dan 601/134/PPK/SP 98.990.000,00 4.949.500,00 3498/LS/1.20 4.949.500,00 - -
Gudang Rumah Dinas Wakil Ketua II K- .09.02.00/6.2/
UMUM/SETWA 2013
N/2012

Halaman 70 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
766 1.20.04 CV. TJ Pekerjaan Pembuatan Pagar Steinless dalam
601/202/PPK/SP 53.950.000,00 2.424.500,00 - - 2.424.500,00
Ruang Rapat Paripurna & Pemasangan K-
Wallpaper Ruang Tunggu Bupati di Gedung
UMUM/SETWA
Paripurna N/2012
767 1.20.04 CV. TP Pekerjaan Pembangunan Gedung Fraksi 601/150/PPK/SP 149.670.000,00 7.483.500,00 2504/LS/1.20 7.483.500,00 - -
DPRD Kab. Banyuasin (Interior Ruangan)K- .09.02.00/6.2/
UMUM/SETWA 2013
N/2012
768 1.20.04 CV. LS Pekerjaan Pembuatan Pot Kembang & 601/139/PPK/SP 158.880.000,00 7.944.000,00 2362/LS/1.20 7.944.000,00 - -
Penanaman Pohon Halaman Kantor DPRD K- .09.02.00/6.2/
& Gedung Paripurna UMUM/SETWA 2013
N/2012
769 1.20.04 CV. PL Pekerjaan Pembuatan Rumah-Rumahan 601/142/PPK/SP 19.890.000,00 995.000,00 2382/LS/1.20 994.500,00 - -
Genset Rumah Dinas Ketua DPRD Kab. K- .09.02.00/6.2/
Banyuasin UMUM/SETWA 2013
N/2012
770 1.20.04 CV. LS Pekerjaan Pemeliharaan Rumah Dinas 027/129/PPK/SP 73.920.000,00 3.696.000,00 2363/LS/1.20 3.696.000,00 - -
Ketua DPRD Kab. Banyuasin K- .09.02.00/6.2/
UMUM/SETWA 2013
N/2012
771 1.20.04 CV. AP Pekerjaan Pemeliharaan Rumah Dinas 601/164/PPK/SP 49.400.000,00 2.470.000,00 3481/LS/1.20 2.470.000,00 - -
Wakil Ketua II DPRD K- .09.02.00/6.2/
UMUM/SETWA 2013
N/2012
772 1.20.04 CV. JIL Pekerjaan Pemeliharaan Rumah Dinas 601/163/PPK/SP 51.000.000,00 2.550.000,00 - - 2.550.000,00
Wakil Ketua I DPRD Kab. Banyuasin K-
UMUM/SETWA
N/2012
773 1.20.04 CV. IP Pekerjaan Pemeliharaan Rumah Dinas 601/162/PPK/SP 49.120.000,00 2.456.000,00 5132/LS/1.20 2.456.000,00 - -
wakil Ketua III DPRD Kab. Banyuasin K- .09.02.00/6.2/
UMUM/SETWA 2013
N/2012
774 1.20.04 CV. AEC Pekerjaan Pemeliharaan Kantor Sekretariat 601/167/PPK/SP 79.400.000,00 3.970.000,00 - - 3.970.000,00
DPRD K-
UMUM/SETWA
N/2012
775 1.20.04 CV. KJ Pekerjaan Rehab dan Pelebaran Ruang 601/133/PPK/SP 59.040.000,00 2.952.000,00 3496/LS/1.20 2.952.000,00 - -
Tamu Rumdin Wakil Ketua II DPRD Kab. K- .09.02.00/6.2/
Banyuasin UMUM/SETWA 2013
N/2012
776 1.20.04 CV. AP Pekerjaan Renovasi Garasi Mobil Menjadi 601/137/PPK/SP 59.814.000,00 2.990.700,00 3497LS/1.20. 2.990.700,00 - -
Kamar Tidur Tamu & KM/WC Rumdin K- 09.02.00/6.2/
Wakil Ketua II UMUM/SETWA 2013
N/2012

Halaman 71 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
777 1.20.04 CV. RA Pekerjaan Rehab Ringan Rumdin Wakil 601/141/PPK/SP 74.457.000,00 3.722.850,00 - - 3.722.850,00
Ketua I K-
UMUM/SETWA
N/2012
778 1.20.04 CV. AC Pekerjaan Renovasi Ruang Kerja Wakil 601/168/PPK/SP 158.740.000,00 7.937.000,00 - - 7.937.000,00
Ketua II DPRD K-
UMUM/SETWA
N/2012
779 1.20.04 CV. EJ Pekerjaan Rehab Lantai Loby & KM/WC 601/182/PPK/SP 99.200.000,00 4.960.000,00 2240/LS/1.20 4.960.000,00 - -
Ruang Paripurna K- .09.02.00/6.2/
UMUM/SETWA 2013
N/2012
780 1.20.04 CV. APe Pemeliharaan Rumah dinas Wakil Ketua II 027/102/SPK/SE 19.900.000,00 995.000,00 - - 995.000,00
DPRD TWAN/2011

Jumlah 4.557.522.500,00 216.588.625,00 178.507.400,00 220.300.000,00 258.380.725,00


BADAN PERPUSTAKAAN, ARSIP DAN

781 1.26.01 CV. DSU Pembangunan Rumah Baca di Kec. Muara 027/16/SPK/BPA 188.720.000,00 9.436.000,00 2506/LS/1.20 9.436.000,00 - -
Sugihan Keg. Penyediaan Bantuan D/2012 Tgl. 4 .09.02.00/6.2/
Pengembangan Perpustakaan dan Minat September 2012 2013
Baca di Daerah

Jumlah 188.720.000,00 9.436.000,00 9.436.000,00 - -


DINAS KEHUTANAN DAN PERKEBUNAN

782 2.02.01 CV. MPU Konstruksi Pembuatan Embung 522/184- 199.976.000,00 9.998.800,00 0752/LS/1.20 9.998.800,00 - -
III/HUTBUN/201 .09.02.00/6.2/
2 Tgl. 17 2013
September 2012

Jumlah 199.976.000,00 9.998.800,00 9.998.800,00 - -


DINAS PERIKANAN DAN KELAUTAN

783 1.02.01 CV. ArG Pembuatan Lampu Penerangan BBI 027/05/LAMPU/ 65.450.000,00 - - 3.272.500,00 3.272.500,00
PPK/BBI/VI/201
3
784 1.02.01 CV. ArG Pembuatan Hatchery BBI 027/05/HACT/PP 129.200.000,00 - - 6.460.000,00 6.460.000,00
K/BBI/IV/2013
785 1.02.01 CV. Pjy Pembuatan Bak-bak Perbenihan 027/05/HACT/PP 134.000.000,00 - - 6.700.000,00 6.700.000,00
K/BAK-
BBI/IV/2013
786 1.02.01 CV. MKC Pembuatan Hatchery Skala Rumah Tangga 027/05/HSRT- 189.200.000,00 - - 9.460.000,00 9.460.000,00
TJLG/PPK/BBI/I
V/2013

Halaman 72 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
787 1.02.01 CV. CTP Pembuatan Hatchery Skala Rumah Tangga 027/05/HSRT- 109.200.000,00 - - 5.460.000,00 5.460.000,00
SBW/PPK/BBI/I
V/2013
788 1.02.01 CV. ArG Pembuatan Gapura, Papan Nama BBI dan 027/05/GPR/PPK 102.000.000,00 - - 5.100.000,00 5.100.000,00
Pos Jaga /BBI/VIII/2013
789 1.02.01 CV. SCo Pengadaan Jasa Konsultan Pengawas 027/03/PPK/PWS- 45.000.000,00 - - 45.000.000,00 45.000.000,00
BBI/IV/2013
790 1.02.01 CV. Se Penyelesaian Pembuatan Pagar Keliling 027/05/PPK/PAG 159.000.000,00 - - 159.000.000,00 159.000.000,00
AR-BBI/IX/2013

791 1.02.01 CV. KSr Pembangunan Mess 027/03/MESS/PP 342.900.000,00 - - 240.030.000,00 240.030.000,00
K/BBI/VII/2013

792 1.02.01 CV. MKC Pengadaan Peralatan dan Perlengkapan 027/03/ALAT- 415.690.000,00 - - 415.690.000,00 415.690.000,00
Perbenihan BENIH/PPK/BBI/
VII/2013
793 1.02.01 CV. TW Penyelesaian Plester Dinding Kolam dan 027/02/PPK/PLS- 772.500.000,00 - - 38.625.000,00 38.625.000,00
Saluran BBI/VIII/2013
794 1.02.01 CV. PI Penyelesaian Pintu Air 027/05/PTA/PPK 50.000.000,00 - - 2.500.000,00 2.500.000,00
/BBI/IX/2013
795 1.02.01 CV. DPM Penyelesaian Pembangunan Laboratorium 027/05/LAB/PPK 50.000.000,00 - - 9.910.000,00 9.910.000,00
/BBI/IV/2013
796 2.05.01 CV. DAc Pembangunan Menara Tangki Air 027/25/PPK/BBI/ 39.748.000,00 1.987.400,00 - - 1.987.400,00
X/2012
797 2.05.01 CV. PHP Gedung Pertemuan dan Pagar Keliling 027/02/GP/PPK/ 492.849.000,00 24.642.450,00 4476/LS/1.20 24.642.450,00 - -
BBI/IX/2012 .09.02.00/6.2/
2013
798 2.05.01 CV. RF Pembangunan Mushola BBI 027/02/MUS/PP 196.726.000,00 9.836.300,00 4343/LS/1.20 9.836.300,00 - -
K/BBI/IX/2012 .09.02.00/6.2/
2013
799 2.05.01 CV. LK Pembangunan Jalan Produksi Masuk BBI 027/02/JP/PPK/B 407.996.000,00 20.399.800,00 - - 20.399.800,00
BI/IX/2012
800 2.05.01 CV. LS Pembuatan Jalan Lingkungan BBI 027/02/JL/PPK/B 107.141.000,00 5.357.050,00 4129/LS/1.20 5.357.050,00 - -
BI/IX/2012 .09.02.00/6.2/
2013
801 2.05.01 CV. ASI Pembangunan Jembatan BBI 027/14/PPK- 99.551.000,00 4.977.550,00 4829/LS/1.20 4.977.550,00 - -
BBI/2012 .09.02.00/6.2/
2013
802 2.05.01 CV. DM Pembangunan Kolam Penampungan Air 027/02/KPAB/PP 106.325.000,00 5.316.250,00 - - 5.316.250,00
Bersih BBI K/BBI/IX/2012
803 2.05.01 CV. LK Pembangunan Saluran Pembuangan Air 027/02/SPAK/PP 186.467.000,00 9.323.350,00 - - 9.323.350,00
Kotor BBI K/BBI/IX/2012
804 2.05.01 CV. Se Pemasangan Gorong-gorong 027/23/GRG- 82.020.000,00 4.101.000,00 4399/LS/1.20 4.101.000,00 - -
BBI/IX/2012 .09.02.00/6.2/
2013

Halaman 73 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
805 2.05.01 CV. KA Konstruksi Ponton Apung TPI 523/02/SP/TANG 959.252.000,00 47.962.600,00 - - 47.962.600,00
KAP/PERIK/201
2

Jumlah 5.242.215.000,00 133.903.750,00 48.914.350,00 947.207.500,00 1.032.196.900,00


DINAS PENGELOLAAN PASAR

806 2.06.01 CV. SJ Pembangunan Pasar Marga Sungsang 640/035/PPK- 98.200.000,00 4.910.000,00 1512/LS/1.20 4.910.000,00 - -
PPP/PASAR/V/2 .09.02.00/6.2/
012 tgl.7-7-12 2013

807 2.06.01 CV. BH Pembangunan Pasar Sukapindah 640/030/PPK- 95.800.000,00 4.790.000,00 5133/LS/1.20 4.790.000,00 - -
PPP/PASAR/V/2 .09.02.00/6.2/
012 2013

Jumlah 194.000.000,00 9.700.000,00 9.700.000,00 - -


DINAS KOPERASI, UKM, PERINDUSTRIAN DAN

808 1.15.01 CV. DP Penataan Tempat Berusaha Bagi Pedagang 03/PPK/KOPER 1.138.510.000,00 56.925.500,00 3569/LS/1.20 56.925.500,00 - -
Kakilima dan Asongan ASI,UKM&PERI .09.02.00/6.2/
NDAG/VII/12 2013
809 1.15.01 CV. AS Penyediaan sarana Maupun Prasarana 027/043/INDST- 121.558.000,00 6.077.900,00 3893/LS/1.20 6.077.900,00 - -
Klaster Industri KOP,UKM&PER ..09.02.00/6.2
INDAG/X/2012 /2013
810 1.15.01 CV. RK Penyediaan Sarana Maupun Prasarana 027/025/INDST- 145.118.000,00 7.255.900,00 3747/LS/1.20 7.255.900,00 - -
Klaster Industri KOP,UKM&PER .09.02.00/6.2/
INDAG/X/2012 2013
811 1.15.01 CV. AS Penataan Tempat Berusaha Bagi Pedagang 027/PPK/KOPER 354.790.500,00 17.739.525,00 3723/LS/1.20 17.739.525,00 - -
Kakilima dan Asongan ASI,UKM&PERI .09.02.00/6.2/
NDAG/2012 2013

Jumlah 1.759.976.500,00 87.998.825,00 87.998.825,00 - -


DINAS KESEHATAN

807 1.02.01 RS MP Hutang Klaim Jamsoskes Desember 2013 96.469.614,57 96.469.614,57

808 1.02.01 RSUD Sky Hutang Klaim Jamsoskes Desember 2013 16.782.368,99 16.782.368,99

809 1.02.01 RSUD BA Hutang Klaim Jamsoskes Desember 2013 565.392.197,27 565.392.197,27

810 1.02.01 RS Kst Hutang Klaim Jamsoskes Desember 2013 3.134.421.268,66 3.134.421.268,66

811 1.02.01 RSI SK Hutang Klaim Jamsoskes Desember 2013 59.015.033,21 59.015.033,21

Halaman 74 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
812 1.02.01 Puskesmas Hutang Klaim Jamsoskes Desember 2013 1.082.685.000,00 1.082.685.000,00

813 1.02.01 Puskesmas Jamkesmas 1.101.327.000,00 1.101.327.000,00

814 1.02.01 Puskesmas Jampersal 989.080.000,00 989.080.000,00

815 1.02.01 CV. Ha Pekerjaan Pembangunan Poskesdes Lubuk 027/1243/SPK/K 162.459.000,00 8.122.950,00 2097/LS/1.20 8.122.950,00 - -
Keranji Kec. Banyuasin III Kab. Banyuasin ES/2012 Tgl. .09.02.00/6.2/
Tahun Anggaran 2012 27/09/2012 2013
816 1.02.01 CV. HR Pekerjaan Pembangunan Poskesdes Sumber 027/1238/SPK/K 169.600.000,00 8.484.211,00 3479/LS/1.20 8.480.000,00 - 4.211,00
Mulya Kec. Muara Telang Kab. Banyuasin ES/2012 Tgl. .09.02.00/6.2/
Tahun Anggaran 2012 27/09/2012 2013
817 1.02.01 CV. JB Pekerjaan Pembangunan Poskesdes Tabuan 027/1239/SPK/K 169.670.000,00 8.483.500,00 2134/LS/1.20 8.483.500,00 - -
Asri Kec. Muara Telang Kab. Banyuasin ES/2012 Tgl. .09.02.00/6.2/
Tahun Anggaran 2012 03/12/2012 2013
818 1.02.01 CV. MPN Pekerjaan Pembangunan Poskesdes Salek 027/1240/SPK/K 169.640.000,00 8.482.000,00 2119/LS/1.20 8.482.000,00 - -
Makmur Kec. Air Salek Kab. Banyuasin ES/2012 Tgl. .09.02.00/6.2/
Tahun Anggaran 2012 27/09/2012 2013
819 1.02.01 CV. ASa Pekerjaan Pembangunan Poskesdes Sumber 027/1241/PPK/K 169.700.000,00 8.485.000,00 4094/LS/1.20 8.485.000,00 - -
Mekar Mukti Kec. Tanjung Lago Kab. ES/2012 Tgl. .09.02.00/6.2/
Banyuasin Tahun Anggaran 2012 27/09/2012 2013

820 1.02.01 CV. TJ Pekerjaan Pembangunan Poskesdes Mekar 027/1242/SPK/K 169.600.000,00 8.480.000,00 3322/LS/1.20 8.480.000,00 - -
Sari Kec. Banyuasin II Kab. Banyuasin ES/2012 Tgl. .09.02.00/6.2/
Tahun Anggaran 2012 27/12/2012 2013
821 1.02.01 CV. AS Pekerjaan Pembangunan Poskesdes Telang 027/1243/SPK/K 162.698.500,00 8.134.925,00 - - 8.134.925,00
Jaya Betung Kec. Betung Kab. Banyuasin ES/2012 Tgl.
Tahun Anggaran 2012 27/09/2012
822 1.02.01 CV. MJ Pekerjaan Pembangunan Poskesdes Muara 027/1244/PPK/K 169.630.000,00 8.481.500,00 2111/LS/1.20 8.481.500,00 - -
Telang Marga Kec. Muara Telang Kab. ES/2012 Tgl. .09.02.00/6.2/
Banyuasin Tahun Anggaran 2012 27/09/2012 2013

823 1.02.01 CV. RK Pekerjaan Pembangunan Poskesdes 027/1245/SPK/K 169.800.000,00 8.490.000,00 - - 8.490.000,00
Rejosari Jalur 14 Kec. Muara Sugihan Kab. ES/2012 Tgl.
Banyuasin Tahun Anggaran 2012 27/09/2012
824 1.02.01 CV. CMAP Pekerjaan Rehab Gedung Puskesmas 027/1245/SPK/K 89.600.000,00 4.480.000,00 3453/LS/1.20 4.480.000,00 - -
Telang Jaya Telang Kec. Muara Telang ES/2012 Tgl. .09.02.00/6.2/
Kab. Banyuasin Tahun Anggaran 2012 27/09/2012 2013
825 1.02.01 CV. AP Pekerjaan Rehab Bangunan Kantor Dinas 027/1245/SPK/K 145.600.000,00 7.280.000,00 - - 7.280.000,00
Kesehatan Kab. Banyuasin Tahun Anggaran ES/2012 Tgl.
2012 27/09/2012
826 1.02.01 RS MP Klaim Jamsoskes Rumah Sakit - 399.373.080,33 399.373.080,33 - - Sudah Terealisasi
dari Dinas
Kesehatan
827 1.02.01 RSK dr RAPKlaim Jamsoskes Rumah Sakit - 593.973.308,46 593.973.308,46 - - Sudah Terealisasi
dari Dinas
Kesehatan

Halaman 75 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
828 1.02.01 RSUD BP Klaim Jamsoskes Rumah Sakit - 91.594.750,00 91.594.750,00 - - Sudah Terealisasi
dari Dinas
Kesehatan
829 1.02.01 RSI SK Klaim Jamsoskes Rumah Sakit - 22.613.958,91 22.613.958,91 - - Sudah Terealisasi
dari Dinas
Kesehatan
830 1.02.01 RSUD KA Klaim Jamsoskes Rumah Sakit - 770.875,93 770.875,93 - - Sudah Terealisasi
dari Dinas
Kesehatan
831 1.02.01 RSUD KP Klaim Jamsoskes Rumah Sakit - 1.314.350,00 1.314.350,00 - - Sudah Terealisasi
dari Dinas
Kesehatan
832 1.02.01 CV. EPe Pembangunan Poskesdes Tanah Pilih Kec. 900/867/SPP/KE 199.000.000,00 9.950.000,00 - - 9.950.000,00
Banyuasin II S/VII/2011
833 1.02.01 CV. AEP Pembangunan Rumah Paramedis Mekar 900/995/SPP/KE 94.171.000,00 4.708.550,00 1515/LS/1.20 4.708.550,00 - -
Sari Kec. Pulau Rimau S/VII/2011 .09.02.00/6.2/
2013

Jumlah 2.041.168.500,00 1.211.702.959,63 1.177.843.823,63 7.045.172.482,70 7.079.031.618,70


DINAS TENAGA KERJA DAN TRANSMIGRASI

834 1.02.02 CV. PK Pengadaan Pembangunan Gedung 059/1485/Nakertr 439.710.000,00 21.985.500,00 3562/LS/1.20 21.985.500,00 - -
Workshop 1 Unit di UPTD BLK ans/2012 Tgl. 19 .09.02.00/6.2/
Disnakertrans Keg. Pembangunan Balai Juli 2012 2013
Latihan Kerja (BLK)

Jumlah 439.710.000,00 21.985.500,00 21.985.500,00 - -


DINAS PERTAMBANGAN DAN ENERGI

835 2.03.01 PT. PuCi Pemeliharaan bangunan jaringan untuk 027/98- 89.850.000,00 4.492.500,00 4256/LS/1.20 4.492.500,00 - -
pemeliharaan LPJU di Kecamatan IV/Tamben/2012 .09.02.00/6.2/
Banyuasin III Kabupaten Banyuasin Tanggal 25 April 2013
2012
836 2.03.01 PT. CIA Pemeliharaan bangunan jaringan untuk 027/110- 30.960.000,00 1.548.000,00 4231/LS/1.20 1.548.000,00 - -
pemeliharaan LPJU di Kecamatan Sembawa IV/Tamben/2012 .09.02.00/6.2/
Kabupaten Banyuasin Tanggal. 27 April 2013
2012
837 2.03.01 CV. TrTe Pemeliharaan Bangunan Jaringan untuk 027/108- 74.870.000,00 3.743.500,00 4228/LS/1.20 3.743.500,00 - -
Pemeliharaan LPJU di Kecamatan Talang IV/Tamben/2012 .09.02.00/6.2/
Kelapa Kabupaten Banyuasin Tanggal 27 April 2013
2012
838 2.03.01 CV. TJ Pemeliharaan Bangunan Jaringan Untuk 027/121- 24.400.000,00 1.220.000,00 4232/LS/1.20 1.220.000,00 - -
Pemeliharaan LPJU di Kecamatan Rantau IV/Tamben/2012 .09.02.00/6.2/
Bayur Kabupaten Banyuasin Tanggal 03 Mei 2013
2012

Halaman 76 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
839 2.03.01 CV. TJ Pemeliharaan Bangunan Jaringan Untuk 027/121.b- 29.460.000,00 1.473.000,00 4235/LS/1.20 1.473.000,00 - -
Pemeliharaan LPJU di Kecamatan Tanjung IV/Tamben/2012 .09.02.00/6.2/
Lago Kabupaten Banyuasin Tanggal 03 Mei 2013
2012
840 2.03.01 CV. HS Pemeliharaan Bangunan Jaringan Untuk 027/119- 74.390.000,00 3.719.500,00 4303/LS/1.20 3.719.500,00 - -
Pemeliharaan LPJU di Kecamatan Betung IV/Tamben/2012 .09.20.00/6.2/
Kabupaten Banyuasin Tanggal 01 Mei 2013
2012
841 2.03.01 CV. HS Pemeliharaan Bangunan Jaringan Untuk 027/119.b- 29.960.000,00 1.498.000,00 4304/LS/1.20 1.498.000,00 - -
Pemeliharaan LPJU di Kecamatan Betung IV/Tamben/2012 .09.02.00/6.2/
Kabupaten Banyuasin Tanggal 01 Mei 2013
2012
842 2.03.01 PT. CU Pengadaan dan Pemasangan Lampu 027/282- 169.200.000,00 8.460.000,00 4255/LS/1.20 8.460.000,00 - -
Penerangan Jalan Umum di Desa Air Batu IV/Tamben/2012 .09.02.00/6.2/
Kecamatan Talang Kelapa Kabupaten Tanggal 14 2013
Banyuasin Agustus 2012
843 2.03.01 CV. AgP Pengadaan dan Pemasangan Lampu Jalan 027/283- 198.000.000,00 9.900.000,00 4297/LS/1.20 9.900.000,00 - -
Umum di Desa Sungai Rebo Kecamatan IV/Tamben/2012 .09.02.00/6.2/
Banyuasin I Kabupaten Banyuasin Tanggal 14 2013
Agustus 2012
844 2.03.01 PT. PuCi Pengadaan dan Pemasangan Lampu 027/284- 198.900.000,00 9.945.000,00 4234/LS/1.20 9.945.000,00 - -
Penerangan Jalan Umum di Kelurahan IV/Tamben/2012 .09.02.00/6.2/
Kenten Kecamatan Talang Kelapa Tanggal 14 2013
Kabupaten Banyuasin Agustus 2012
845 2.03.01 PT. DPA Pengadaan dan Pemasangan Lampu 027/285- 198.300.000,00 9.915.000,00 4299/LS/1.20 9.915.000,00 - -
Penerangan Jalan Umum di Desa Suka IV/Tamben/2012 .09.02.00/6.2/
Mulya Kecamatan Betung Kabupaten Tanggal 14 2013
Banyuasin Agustus 2012
846 2.03.01 PT. DPCU Pengadaan dan Pemasangan Lampu 027/286- 198.500.000,00 9.925.000,00 4254/LS/1.20 9.925.000,00 - -
Penerangan Jalan Umum di Kelurahan IV/Tamben/2012 .09.02.00/6.2/
Talang Keramat Kecamatan Talang Kelapa Tanggal 14 2013
Kabupaten Banyuasin Agustus 2012
847 2.03.01 CV. PJL Pengadaan dan Pemasangan Lampu 027/288- 94.179.000,00 4.708.950,00 4230/LS/1.20 4.708.950,00 - -
Penerangan Jalan Umum di Kecamatan IV/Tamben/2012 .09.02.00/6.2/
Makarti Jaya Kabupaten Banyuasin Tanggal 14 2013
Agustus 2012
848 2.03.01 PT. CU Pengadaan dan Pemasangan Trafo di 027/292- 836.400.000,00 41.820.000,00 4335/LS/1.20 41.820.000,00 - -
Kecamatan Banyuasin III dan Kecamatan IV/Tamben/2012 .09.02.00/6.2/
Sembawa Kabupaten Banyuasin Tanggal 15 2013
Agustus 2012
849 2.03.01 PT. RaMa Pengadaan dan Pemasangan Lampu 027/293- 229.800.000,00 11.490.000,00 4238/LS/1.20 11.490.000,00 - -
Penerangan Jalan Umum di Batalyon Zeni IV/Tamben/2012 .09.02.00/6.2/
Konstruksi Kecamatan Banyuasin III Tanggal 15 2013
Kabupaten Banyuasin Agustus 2012

Halaman 77 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
850 2.03.01 PT. PuCi Pengadaan dan Pemasangan Lampu Jalan 027/520- 99.700.000,00 4.985.000,00 4233/LS/1.20 4.985.000,00 - -
Umum di desa Pengumbuk Kecamatan IV/Tamben/2012 .09.02.00/6.2/
Rantau Bayur Kabupaten Banyuasin Tanggal 16 2013
Oktober 2012
851 2.03.01 CV. TrTe Pengadaan Pembangkit Listrik Tenaga 027/287- 173.800.000,00 8.690.000,00 4229/LS/1.20 8.690.000,00 - -
Diesel (PLTD) di desa Pulau Parang IV/Tamben/2012 .09.02.00/6.2/
Kecamatan Rambutan kabupaten Banyuasin Tanggal 14 2013
Agustus 2012
852 2.03.01 PT. CU Pengadaaan dan Pemasangan Tiang Beton 027/517- 251.500.000,00 12.575.000,00 4237/LS/1.20 12.575.000,00 - -
Tegangan Menengah di Dusun IV desa IV/Tamben/2012 .09.02.00/6.2/
Teluk Betung Kecamatan Pulau Rimau Tanggal 16 2013
Kabupaten Banyuasin Agustus 2012

Jumlah 3.002.169.000,00 150.108.450,00 150.108.450,00 - -


DINAS PERTANIAN DAN PETERNAKAN

853 2.01.01 CV. Tlm Konstruksi (JUT) paket XVIII sepanjang 2 46/SPK/Pertanak- 196.632.000,00 - - 9.831.600,00 9.831.600,00
km di Desa Sumber Mukti Kec. Pulau Sapras/2013
Rimau tanggal 14 Juni
2013
854 2.01.01 CV. GJ Konstruksi (JUT) paket XIX sepanjang 2 47/SPK/Pertanak- 196.632.000,00 - - 9.831.600,00 9.831.600,00
km di Desa Wonosari Kec. Pulau Rimau Sapras/2013
tanggal 14 Juni
2013
855 2.01.01 CV. SeJa Konstruksi (JUT) paket XIII sepanjang 2 26/SPK/Pertanak- 196.632.000,00 - - 9.831.600,00 9.831.600,00
km di Desa Daya Murni Kec. Muara Sapras/2013
Sugihan tanggal 27 Mei
2013
856 2.01.01 CV. DM Konstruksi (JUT) paket XXIV sepanjang 2 28/SPK/Pertanak- 196.632.000,00 - - 9.831.600,00 9.831.600,00
km di Desa Daya Utama Kec. Muara Sapras/2013
Padang tanggal 27 Mei
2013
857 2.01.01 CV. RiP Konstruksi (JUT) paket XXVII sepanjang 2 30/SPK/Pertanak- 196.632.000,00 - - 9.831.600,00 9.831.600,00
km di Desa Tirta Jaya Kec. Muara Padang Sapras/2013
tanggal 27 Mei
2013
858 2.01.01 CV. ArPa Konstruksi (JUT) paket IX sepanjang 2 km 21/SPK/Pertanak- 196.632.000,00 - - 9.831.600,00 9.831.600,00
di Desa Margo Rukun Kec. Muara Sugihan Sapras/2013
tanggal 27 Mei
2013
859 2.01.01 CV. SmJ Konstruksi (JUT) paket VIII sepanjang 2 22/SPK/Pertanak- 196.632.000,00 - - 9.831.600,00 9.831.600,00
km di Desa Gilirang Kec. Muara Sugihan Sapras/2013
tanggal 27 Mei
2013
860 2.01.01 CV. MIn Konstruksi (JUT) paket IV sepanjang 2 km 18/SPK/Pertanak- 196.632.000,00 - - 9.831.600,00 9.831.600,00
di Desa Bangun Harjo Kec. Muara Sugihan Sapras/2013
tanggal 27 Mei
2013

Halaman 78 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
861 2.01.01 Cv. MBK Konstruksi (JUT) paket V sepanjang 2 km 19/SPK/Pertanak- 196.632.000,00 - - 9.831.600,00 9.831.600,00
di Desa Sugi Waras Kec. Muara Sugihan Sapras/2013
tanggal 27 Mei
2013
862 2.01.01 CV. MBg Konstruksi (JUT) paket XII sepanjang 2 km 25/SPK/Pertanak- 196.632.000,00 - - 9.831.600,00 9.831.600,00
di Desa Tirta Harja Kec. Muara Sugihan Sapras/2013
tanggal 27 Mei
2013
863 2.01.01 CV. MbJ Konstruksi (JUT) paket XII sepanjang 2 km 24/SPK/Pertanak- 196.632.000,00 - - 9.831.600,00 9.831.600,00
di Desa Beringin Agung Kec. Muara Sapras/2013
Sugihan tanggal 27 Mei
2013
864 2.01.01 Cv. TSu Konstruksi (JUT) paket X sepanjang 2 km 23/SPK/Pertanak- 196.632.000,00 - - 9.831.600,00 9.831.600,00
di Desa Jalur Mulyo Kec. Muara Sugihan Sapras/2013
tanggal 27 Mei
2013
865 2.01.01 CV. BJ Konstruksi (JUT) paket VII sepanjang 2 km 20/SPK/Pertanak- 196.632.000,00 - - 9.831.600,00 9.831.600,00
di Desa Daya Kusuma Kec. Muara Sugihan Sapras/2013
tanggal 27 Mei
2013
866 2.01.01 CV. NN Konstruksi (JUT) paket XXV sepanjang 1 29/SPK/Pertanak- 89.397.000,00 - - 4.469.850,00 4.469.850,00
km di Desa Daya Makmur Kec. Muara Sapras/2013
Padang tanggal 27 Mei
2013
867 2.01.01 CV. Apr Konstruksi (JUT) paket XXV sepanjang 2 27/SPK/Pertanak- 196.632.000,00 - - 9.831.600,00 9.831.600,00
km di Desa Rejo Sari Kec. Muara Sugihan Sapras/2013
tanggal 27 Mei
2013
868 2.01.01 CV. MIn Konstruksi (JUT) sepanjang 5 km di Desa 63/SP/Pertanak- 486.321.000,00 - - 76.255.133,00 76.255.133,00 Realisasi Rp.
Tirto Harjo Kec. Muara Padang (Realisasi Sapras/VIII/2013 145.896.300 sisa
Pekerjaan 45,68%) tanggal 15 Rp. 340.424.700
Agustus 2013 dan tetapi dari laporan
107.c/SP/Pertana SKPD dikarenakan
k- pembayaran
Sapras/VIII/2013 dilakukan sesuai
tanggal 22 fisik dilapangan
Oktober 2013 sehingga Hutang
menjadi
Rp. 76.255.133
terdiri dari (Rp.
65.147.561 dan
pemeliharaan Rp.
11.107.572)

Halaman 79 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
869 2.01.01 CV. ArPa Konstruksi (JUT) sepanjang 3 km di Desa 67/SP/Pertanak- 295.069.000,00 - - 14.753.450,00 14.753.450,00
Sido Makmur Kec. Muara Sugihan Sapras/VIII/2013
tanggal 15
Agustus 2013

870 2.01.01 CV. VAA Konstruksi (JUT) sepanjang 2 km di Desa 52/SPK/Pertanak- 196.632.000,00 - - 9.831.600,00 9.831.600,00
Suka Mulya Kec. Tungkal Ilir Sapras/2013
tanggal 08 Juli
2013

871 2.01.01 CV. TDM Konstruksi (JUT) sepanjang 6,6 km di 62/SPK/Pertanak- 644.127.000,00 - - 32.206.350,00 32.206.350,00
Desa Teluk Tenggulang Kec. Tungkal Ilir Sapras/VIII/2013
tanggal 15
Agustus 2013

872 2.01.01 CV. JU Konstruksi (JUT) sepanjang 3,6 km di 73/SP/Pertanak- 353.913.000,00 - - 17.695.650,00 17.695.650,00
Desa Sri Menanti Kec. Tanjung Lago Sapras/VIII/2013
tanggal 15
Agustus 2013

873 2.01.01 CV. KuSu Konstruksi (JUT) sepanjang 5 km di Desa 72/SP/Pertanak- 483.861.000,00 - - 24.193.050,00 24.193.050,00
Purwosari Kec. Tanjung Lago Sapras/VIII/2013
tanggal 15
Agustus 2013
874 2.01.01 CV. KSK Konstruksi (JUT) sepanjang 3,5 km di 71/SP/Pertanak- 343.612.000,00 - - 17.180.600,00 17.180.600,00
Desa Mulya Sari Kec. Tanjung Lago Sapras/VIII/2013
tanggal 15
Agustus 2013
875 2.01.01 CV. PI Konstruksi (JUT) sepanjang 3,0 km di 61/SP/Pertanak- 292.968.000,00 - - 14.648.400,00 14.648.400,00
Desa Muara Baru Kec. Makartijaya Sapras/VIII/2013
tanggal 15
Agustus 2013
876 2.01.01 C, SH CV. Pembuatan tempat parkir mobil dan motor 83.c/SPK/Pertana 58.284.000,00 - - 2.914.200,00 2.914.200,00
GDP k-Sekret/2013
tanggal 30 Sept
2013
877 2.01.01 CV. KuSu Pekerjaan cor peninggian halaman kantor 83.a/SPK/Pertana 144.886.000,00 - - 7.244.300,00 7.244.300,00
k-Sekret/2013
tanggal 30 Sept
2013
878 2.01.01 CV. BH Pembuatan kandang ternak ayam di Kec 524/105.b/SPK/P 59.450.000,00 - - 2.972.500,00 2.972.500,00
Rambutan ertanak-PP/2013
tanggal 21
Oktober 2013

Halaman 80 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
879 2.01.01 CV. ANh Konstruksi (JUT) sepanjang 3,0 km di 68/SP/Pertanak- 294.045.000,00 - - 14.702.250,00 14.702.250,00
Desa Karang Sari Kec. Banyuasin II Sapras/VIII/2013
tanggal 15
Agustus 2013
880 2.01.01 CV. ANh Konstruksi (JUT) sepanjang 3,0 km di 65/SP/Pertanak- 291.691.000,00 - - 14.584.550,00 14.584.550,00
Desa Sri Agung Kec. Banyuasin II Sapras/VIII/2013
tanggal 15
Agustus 2013
881 2.01.01 CV. ANh Konstruksi (JUT) sepanjang 3,0 km di 70/SP/Pertanak- 292.157.000,00 - - 14.607.850,00 14.607.850,00
Desa Mekar Sari Kec. Banyuasin II Sapras/VIII/2013
tanggal 15
Agustus 2013
882 2.01.01 CV. DSk Konstruksi (JUT) sepanjang 3,0 km di 69/SP/Pertanak- 292.732.000,00 - - 14.636.600,00 14.636.600,00
Desa Jati Sari Kec. Banyuasin II Sapras/VIII/2013
tanggal 15
Agustus 2013
883 2.01.01 SkJ Konstruksi (JUT) sepanjang 3,0 km di 66/SP/Pertanak- 293.089.000,00 - - 14.654.450,00 14.654.450,00
Desa Upang Makmur Sapras/VIII/2013
tanggal 15
Agustus 2013
884 2.01.01 CV. JU Pekerjaan cor jalan masuk ke gedung dinas 83.b/SPK/Pertana 41.150.000,00 - - 2.057.500,00 2.057.500,00
k-Sekret/2013
tanggal 30 Sept
2013
885 2.01.01 CV. TJy Konstruksi (JUT) sepanjang 5,0 km di 64/SP/Pertanak- 485.450.000,00 - - 24.272.500,00 24.272.500,00
Desa Sri Katon Kec. Air Saleh Sapras/VIII/2013
tanggal 15
Agustus 2013
886 2.01.01 CV. Tlm Konstruksi (JUT) sepanjang 2,3 km di 60/SP/Pertanak- 184.352.000,00 - - 9.217.600,00 9.217.600,00
Desa Upang Mulya Kec. Makartijaya Sapras/VIII/2013
tanggal 15
Agustus 2013
887 2.01.01 CV. WC Pembangunan Mushollah Tahap II Kegiatan 521/25/SPK/Peta 36.653.000,00 1.832.650,00 - - 1.832.650,00
Pembangunan Gedung Kantor nak-Sekret/2012
Tgl. 25 Juni 2012

888 2.01.01 CV. ArPa Pengadaan Konstruksi JUT sepanjang 8 km 08/SP/Pertanak/I 196.374.000,00 9.818.700,00 0633/LS/1.20 9.818.700,00 - -
di Kec. Muara Sugihan X/2012 Tgl. 10 .09.02.00/6.2/
Sept 2012 2013
889 2.01.01 CV. MIn Pengadaan Konstruksi Bangunan Jaringan 09/SP/Pertanak/I 1.115.275.000,00 55.763.750,00 0634/LS/1.20 55.763.750,00 - -
Optimasi Lahan (OPL) seluas 450 Ha di X/2012 Tgl. 10 .09.02.00/6.2/
Kec. Muara Sugihan Sept 2012 2013
890 2.01.01 CV. AP Pembuatan Saluran/Parit Halaman Kantor 520/21/SPK/Perta 98.602.000,00 4.930.100,00 - 4.930.100,00
pada Dinas Pendidikan dan Peternakan nak-Sekret/2012
Keg. Pembangunan Gedung Kantor Tgl. 13 Juli 2012

Halaman 81 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
891 2.01.01 CV. SK Pembangunan Gedung UPTD pada Dinas 520/32/SPK/Perta 99.331.000,00 4.966.550,00 2858/LS/1.20 4.966.550,00 - -
Pertanian dan Peternakan Keg. nak-Sekret/2012 .09.02.00/6.2/
Pembangunan Gedung Kantor Tgl. 27 Agustus 2013
2012

892 2.01.01 PT. GIP Pengadaan Konstruksi Bangunan Jaringan 11/SP/Pertanak/2 373.884.000,00 18.694.200,00 1621/LS/1.20 18.694.200,00 - -
Optimasi Lahan (OPL) seluas 150 Ha di 012 Tgl. 12 sept .09.02.00/6.2/
Desa Sebubus Kec. Banyuasin I Keg. 2012 2013
Pengolahan Lahan dan Air

893 2.01.01 CV. BH Pembuatan Kandang Ternak Ayam di 521/53.b/SPK/Per 66.850.000,00 3.342.500,00 5134/LS/1.20 3.342.500,00 - -
kelompoktani Bina Bersama di Kec. tanak-PP/2012 .09.02.00/6.2/
Rambutan Keg. Pengembangan Agribisnis Tgl. 15 Oktober 2013
Peternakan 2012
894 2.01.01 CV. PI Pembuatan Kandang Ternak Ayam di 521/53.c/SPK/Per 66.850.000,00 3.342.500,00 3871/LS/1.20 3.342.500,00 - -
kelompoktani Mekar Sari di Kec. Betung tanak-PP/2012 .09.02.00/6.2/
Keg. Pengembangan Agribisnis Peternakan Tgl. 15 Oktober 2013
2012
895 2.01.01 CV. NB Pengadaan Konstruksi Jalan Usahatani 07/SA/Pertanak/I 171.553.000,00 8.577.650,00 - - 8.577.650,00
(JUT) Sepanjang 7 KM di Desa Borang X/2012 Tgl. 10
Kec. BA I Keg. Pengolahan Lahan dan Air Sept 2012

896 2.01.01 CV. JU Pembuatan Kandang Ternak Kambing di 524/247/SPK/Pert 40.000.000,00 2.000.000,00 - - 2.000.000,00
Kec. Tungkal Ilir Keg. Pengembangan anak-PP/2012
Agribisnis Peternakan Tgl. 05 Nov 2012

897 2.01.01 CV. NSI Pengadaan Konstruksi Jalan Usahatani 10/SP/Pertanak/I 122.466.000,00 6.123.300,00 - - 6.123.300,00
(JUT) sepanjang 5 KM di Kec. Rambutan X/2012 Tgl. 12
Keg. Pengolahan Lahan dan Air Sept 2012

Jumlah 10.763.872.000,00 119.391.900,00 95.928.200,00 470.740.783,00 494.204.483,00


BADAN KETAHANAN PANGAN

843 1.21.01 CV. AiP Pembangunan Gedung Alsintan (Ds. 027/616.2/Baketp 198.420.000,00 9.921.000,00 7188/LS/1.20 9.921.000,00 - -
Sumber Mulya Kec. Muara Telang) an-II/2012 .09.02.00/6.2/
2013
844 1.21.01 CV. APe Pembangunan Gedung Alsintan (Ds. Mukti 027/616.1/Baketp 198.360.000,00 9.918.000,00 - - 9.918.000,00
Jaya Kec. Muara Telang) an-II/2012

845 1.21.01 CV. APK Pembangunan Gedung Alsintan (Ds. Rejo 027/615.1/Baketp 198.320.000,00 9.916.000,00 4162/LS/1.20 9.916.000,00 - -
Sari Kec. Muara Sugihan) an-II/2012 .09.02.00/6.2/
2013

Halaman 82 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
846 1.21.01 CV. BH Pembangunan Gedung Alsintan (Ds. Indra 027/615.6/Baketp 198.360.000,00 9.918.000,00 - - 9.918.000,00
Pura Kec. Muara Sugihan) an-II/2012
847 1.21.01 CV. BA Pembangunan Gedung Alsintan (Ds. Daya 027/616.4/Baketp 198.560.000,00 9.928.000,00 3928/LS/1.20 9.928.000,00 - -
Murni Kec. Muara Sugihan) an-II/2012 .09.02.00/6.2/
2013

848 1.21.01 CV. CZ Pembangunan Gedung Alsintan (Ds. Teluk 027/615.5/Baketp 193.360.000,00 9.668.000,00 7206/LS/1.20 9.668.000,00 - -
Tenggirik Kec. Banyuasin I) an-II/2012 .09.02.00/6.2/
2013

849 1.21.01 CV. CM Pembangunan Gedung Alsintan (Ds. Argo 027/615.3/Baketp 198.540.000,00 9.887.000,00 5137/LS/1.20.0 9.925.000,00 - (38.000,00) APBD Rp.
Mulyo Kec. Muara Sugihan) an-II/2012 9.02.00/6.2/20 9.887.000 Setelah
13 APBDP Rp.
9.925.000
(Keg.Penanganan
Pasca Panen dan
Pengolahan)

850 1.21.01 CV. CM Pembangunan Gedung Alsintan (Ds. Tirta 027/615.2/Baketp 198.500.000,00 9.965.000,00 5138/LS/1.20.0 9.927.000,00 - 38.000,00 APBD Rp.
Harja Kec. Muara Sugihan) an-II/2012 9.02.00/6.2/20 9.965.000 Setelah
13 APBDP
Rp.9.927.000
Kontrak No.
027/615.3/Baketpan-
II/12 (Keg.
Penanganan Pasca
Panen & Pengolahan)

851 1.21.01 CV. CJP Pembangunan Gedung Alsintan (Ds. 027/615.7/Baketp 198.300.000,00 9.915.000,00 3178/LS/1.20 9.915.000,00 - -
Sidoharjo Kec. Air Saleh) an-II/2012 .09.02.00/6.2/
2013
852 1.21.01 CV. Da Pembangunan Gedung Alsintan (Ds. 027/616.5/Baketp 198.640.000,00 9.932.000,00 3927/LS/1.20 9.932.000,00 - -
Ganesha Mukti Kec. Muara Sugihan) an-II/2012 .09.02.00/6.2/
2013

853 1.21.01 CV. HR Pembangunan Gedung Alsintan (Ds. 027/615/Baketpa 193.440.000,00 9.672.000,00 3611/LS/1.20 9.672.000,00 - -
Kelapa Dua Kec. Pulau Rimau) n-II/2012 .09.02.00/6.2/
2013
854 1.21.01 CV. KSD S Pembangunan Gedung Alsintan (Ds. 027/615.4/Baketp 198.500.000,00 9.925.000,00 7200/LS/1.20 9.925.000,00 - -
Timbul Jaya Kec. Muara Sugihan) an-II/2012 .09.02.00/6.2/
2013
855 1.21.01 CV. PL Pembangunan Gedung Alsintan (Kel. 027/615.9/Baketp 198.230.000,00 9.911.500,00 3069/LS/.1.2 9.911.500,00 - -
Makarti Jaya Kec. Makarti Jaya) an-II/2012 0.09.02.00/6.
2/2013
856 1.21.01 PT. PiKa Pembangunan Gedung Alsintan (Ds. Bayu 027/616.7/Baketp 193.400.000,00 9.670.000,00 3029/LS/1.20 9.670.000,00 - -
Urip Kec. Tanjung Lago) an-II/2012 .09.02.00/6.2/
2013

Halaman 83 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
857 1.21.01 CV. PK Pembangunan Gedung Alsintan (Ds. Sido 027/616/Baketpa 198.440.000,00 9.922.000,00 4469/LS/1.20 9.922.000,00 - -
Makmur Kec. Muara Sugihan) n-II/2012 .09.02.00/6.2/
2013
858 1.21.01 CV. RJK Pembangunan Gedung Alsintan (Ds. 027/616.8/Baketp 198.280.000,00 9.914.000,00 3458/LS/1.20 9.914.000,00 - -
Rimau Sungsang Banyuasin II) an-II/2012 .09.02.00/6.2/
2013
859 1.21.01 CV. RJK Pembangunan Gedung Alsintan (Ds. Jati 027/616.9/Baketp 198.280.000,00 9.914.000,00 3456/LS/1.20 9.914.000,00 - -
Sari Kec. Banyuasin II) an-II/2012 .09.02.00/6.2/
2013
860 1.21.01 CV. RiK Pembangunan Gedung Alsintan (Ds. 027/616.3/Baketp 198.440.000,00 9.922.000,00 3926/LS/1.20 9.922.000,00 - -
Margo Mulyo Kec. Muara Sugihan) an-II/2012 .09.02.00/6.2/
2013
861 1.21.01 CV. UM Pembangunan Gedung Alsintan (Ds. 027/616.6/Baketp 193.100.000,00 9.655.000,00 3028/LS/1.20 9.655.000,00 - -
Bangun Sari Kec. Tanjung Lago) an-II/2012 .09.02.00/6.2/
2013
862 1.21.01 CV. PI Pembangunan Gedung Alsintan (Ds. 027/615.8/Baketp 198.300.000,00 9.915.000,00 3870/LS/1.20 9.915.000,00 - -
Bintaran Kec. Air Saleh) an-II/2012 .09.02.00/6.2/
2013

Jumlah 3.947.770.000,00 197.388.500,00 177.552.500,00 - 19.836.000,00


DINAS PARIWISATA, SENI, BUDAYA, PEMUDA
863 2.04.01 CV. LaBe Pekerjaan Pembangunan Gelangang Remaja 027.a/933/SPK/P 490.450.000,00 - - 24.522.500,00 24.522.500,00
arsenpor-
OR/2013

864 2.04.01 CV. HBS Pekerjaan Pembangunan Lapangan Sepak 027/932/Parsenpo 342.927.000,00 - - 17.146.350,00 17.146.350,00
Bola Kampung Sawah Betung r-OR/2013

865 2.04.01 CV. SRM Pembangunan Lapangan Basket di 027/1145/Parsenp 367.450.000,00 18.372.500,00 - - 18.372.500,00
Lingkungan Komplek Rumah Dinas or-OR/2012

Jumlah 1.200.827.000,00 18.372.500,00 - 41.668.850,00 60.041.350,00


DINAS PERHUBUNGAN KOMUNIKASI DAN

866 1.07.01 CV. BrPs Pembangunan Dermaga Sungai Pasar Suka 050.2/02/PDS1/D 269.162.000,00 13.458.100,00 2755/LS/1.20 13.458.100,00 - -
Mulya Kec. Tungkal Ilir ISHUBKOMINF .09.02.00/6.2/
O 2013
867 1.07.01 CV. CJP Pembangunan Dermaga Penghubung Desa 050.2/02/PDS2/D 371.600.000,00 18.580.000,00 3621/LS/1.20 18.580.000,00 - -
Banyu Urip Kec. Tanjung Lago ISHUBKOMINF .09.02.00/6.2/
O 2013
868 1.07.01 CV. AiP Pembangunan Dermaga Sungai Jalur 19 050.2/02/PDS3/D 269.892.000,00 13.494.600,00 3561//LS/1.2 13.494.600,00 - -
Kec. Tanjung Lago ISHUBKOMINF 0.09.02.00/6.
O 2/2013

Halaman 84 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
869 1.07.01 CV. AP Pembangunan Dermaga Sungai Upang 050.2/02/PDS4/D 269.442.000,00 13.472.100,00 4111/LS/1.20 13.472.100,00 - -
Karya Jalur 10 ISHUBKOMINF .09.02.00/6.2/
O 2013
870 1.07.01 CV. SK Pembangunan Dermaga Sungai Pasar Daya 050.2/02/PDS5/D 269.556.000,00 13.477.800,00 2815/LS/1.20 13.477.800,00 - -
Utama Kec. Muara Padang ISHUBKOMINF .09.02.00/6.2/
O 2013
871 1.07.01 CV. BrPs Pembangunan Dermaga Sungai Pasar Tirto 050.2/02/PDS6/D 269.468.000,00 13.473.400,00 2754/LS/1.20 13.473.400,00 - -
Mulyo ISHUBKOMINF .09.02.00/6.2/
O 2013
872 1.07.01 CV. LiSe Pembangunan Dermaga Sungai Pasar Teluk 050.2/02/PDS7/D 269.110.000,00 13.176.200,00 3685/LS/1.20 13.176.200,00 - -
Betung Kec. Pulau Rimau ISHUBKOMINF .09.02.00/6.2/
O 2013
873 1.07.01 CV. AP Kelanjutan Pembangunan Dermaga Sungai 050.2/02/LPDSB/ 72.830.000,00 3.641.500,00 4112/LS/1.20 3.641.500,00 - -
Bungin DISHUBKOMIN .09.02.00/6.2/
FO 2013
874 1.07.01 CV. GN Kelanjutan Pembangunan Dermaga Merah 050.2/02/LPDM 103.750.000,00 5.187.500,00 1919/LS/1.20 5.187.500,00 - -
Mata Tahap III M/DISHUBKOM .09.02.00/6.2/
INFO 2013
875 1.07.01 CV. PJ Rehabilitas Terminal Betung 050.2/02/PRTB/ 1.294.975.000,00 64.748.750,00 2623/LS/1.20 64.748.750,00 - -
DISHUBKOMIN .09.02.00/6.2/
FO 2013
876 1.07.01 CV. AP Lanjutan Pembangunan Terminal Tipe C di 050.2/02/LPTTC/ 198.960.000,00 9.948.000,00 3563/LS/1.20 9.948.000,00 - -
Simpang Lubuk Lancang DISHUBKOMIN .09.02.00/6.2/
FO 2013

Jumlah 3.658.745.000,00 182.657.950,00 182.657.950,00 - -


DINAS KESEJAHTERAAN SOSIAL

877 1.13.01 CV. CG Pembangunan Gedung Gudang Buffer 027/240/PPK/Din 150.000.000,00 7.354.500,00 2753/LS/1.20 7.354.500,00 - -
Stock sos/2012 Tgl. 2 .09.02.00/6.2/
Sept 2012 2013

Jumlah 150.000.000,00 7.354.500,00 7.354.500,00 - -


BADAN LINGKUNGAN HIDUP

875 1.08.01 CV. SiB Taman Hijau di Kolam KTM Telang 027/159/PPK/BL 95.181.000,00 4.759.050,00 1945/LS/1.20 4.759.050,00 - -
Kecamatan Tanjung Lago Kab. Banyuasin H/2012 Tgl. 26 .09.02.00/6.2/
September 2012 2013
876 1.08.01 CV. API Kontruksi Keg. Pembangunan IPAL 027/150/PPK/BL 676.610.000,00 33.830.500,00 3204/LS/1.20 33.830.500,00 - -
Puskesmas Kec. Talang Kelapa dan H/2012 Tgl. 03 .09.02.00/6.2/
Puskesmas Kec. Makarti Jaya September 2012 2013

Jumlah 771.791.000,00 38.589.550,00 38.589.550,00 - -


BADAN PELAKSANA KELUARGA BERENCANA

Halaman 85 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013
877 1.12.01 CV. GMs Pembangunan Balai Penyuluh KB 027/46/SPK/BAP 338.050.000,00 16.902.500,00 3666/LS/1.20 16.902.500,00 - -
Kecamatan Darat EL-KB/2012 Tgl. .09.02.00/6.2/
09 Oktober 2012 2013
878 1.12.01 CV. SB Pembangunan Balai Penyuluh KB 027/44/SPK/BAP 227.350.000,00 11.367.500,00 3667/LS/1.20 11.367.500,00 - -
Kecamatan Perairan EL-KB/2012 Tgl. .09.02.00/6.2/
09 Oktober 2012 2013
879 1.12.01 CV. SB Pembangunan Papan Nama Beton dan WC 027/58.2/SPK/B 33.500.000,00 1.675.000,00 3622/LS/1.20 1.675.000,00 - -
Balai Penyuluh Kecamatan Perairan APEL-KB/2012 .09.02.00/6.2/
Tgl. 22 November 2013
2012
880 1.12.01 CV. GMs Pembangunan Papan Nama Beton dan WC 027/58.1/SPK/B 59.600.000,00 2.980.000,00 3620/LS/1.20 2.980.000,00 - -
Balai Penyuluh Kecamatan Darat APEL-KB/2012 .09.02.00/6.2/
Tgl. 22 2013
Nopember 2012

Jumlah 658.500.000,00 32.925.000,00 32.925.000,00 - -


BADAN PEMBERDAYAAN MASYARAKAT DAN

881 1.22.01 CV. PPM Kegiatan Pengadaan Taman dan 027/921/BPMPD. 174.000.000,00 - - 174.000.000,00 174.000.000,00
Pengecoran Halaman Parkir Gedung Kantor Set/2013
BPMPD Kabupaten Banyuasin Tahun
Anggaran 2013
882 1.22.01 CV. HS Penambahan Daya Listrik P1/2300- 027/864.1/BPMP 29.222.000,00 - - 29.222.000,00 29.222.000,00
33000VA D.Set/2013

883 1.22.01 Swakelola Pembangunan Kantor Kepala Desa Sebokor 460/018/BPMPD. 165.000.000,00 - - 49.500.000,00 49.500.000,00
Kepala Kec. Air Kumbang Set/2013
Desa
884 1.22.01 Swakelola Pembangunan Kantor Kepala Desa Karang 460/063/BPMPD. 170.000.000,00 - - 51.000.000,00 51.000.000,00
Kepala Anyar Kec. Muara Padang Set/2013
Desa
881 1.22.01 CV. LS Pembangunan Balai Desa Panca Mukti Kec. 027/769.1/BPMP 199.650.000,00 9.982.500,00 2207/LS/1.20 9.982.500,00 - -
Muara Telang D-SET/2012 Tgl .09.02.00/6.2/
18 Oktober 2012 2013
882 1.22.01 CV. PL Pembangunan Rehab Balai Desa Srikaton 027/768.2/BPMP 149.725.000,00 7.486.250,00 2208/LS/1.20 7.486.250,00 - -
Kec. Air Saleh D-SET/2012 Tgl. .09.02.00/6.2/
18 Oktober 2012 2013

Jumlah 887.597.000,00 17.468.750,00 17.468.750,00 303.722.000,00 303.722.000,00


DINAS PENDAPATAN, PENGELOLAAN

883 1.20.09 CV. SM Pemeliharaan Rutin dan Berkala Gedung PPK/19/SPK/DPP 194.000.000,00 9.700.000,00 3208/LS/1.20 9.700.000,00 - -
Kantor KAD/2012 Tgl. .09.02.00/6.2/
22 Oktober 2012 2013

Halaman 86 dari 87
Kd Nama Saldo Awal 2013 Pembayaran Tahun Penambahan Saldo Akhir per 31
No. Pekerjaan No. Kontrak Nilai Kontrak No. SP2D KOREKSI KET
SKPD Rekanan (Hasil Audit BPK) 2013 Hutang Tahun 2013 Desember 2013

Jumlah 194.000.000,00 9.700.000,00 9.700.000,00 - -


BADAN KEPEGAWAIAN DAERAH

884 1.20.07 CV. PR Pemeliharaan Jalan 027/17/SPK/BKD- 44.322.900,00 2.216.145,00 1206/LS/1.20 2.216.145,00 - -
SEKR/2012 .09.02.00/6.2/
2013
885 1.20.07 CV. BuRa Pengadaan lain-lain Penghias Barang 027/18/SPK/BKD 169.730.000,00 8.486.500,00 1207/LS/1.20 8.486.500,00 - -
Rumah Tangga /2012 .09.02.00/6.2/
2013

Jumlah 214.052.900,00 10.702.645,00 10.702.645,00 - -

TOTAL 274.424.725.451,00 14.436.544.381,13 12.556.975.287,13 29.380.119.346,70 31.191.989.332,70

Halaman 87 dari 87

Anda mungkin juga menyukai