JUDUL TUGAS AKHIR : OPTIMASI BIAYA DAN PRODUKTIFITAS ALAT BERAT

DALAM PEKERJAAN TIMBUNAN PADA PROYEK JALAN TOL SOLO KERTOSONO


STA 90+250 98+700
METODE :
1. OPTIMASI
PANJANG JALAN : 8,45 KM
DATA PENDUKUNG :
1. SOFT DRAWING (CROSS SECTION & LONG SECTION)
ALAT-ALAT BERAT :
1. DUMP TRUCK
2. EXCAVATOR
3. BULLDOZER
4. TRUCK TANGKI AIR
5. VIBRO ROLLER
SPEK VOLUME PEKERJAAN