Nama Kegiatan : Pembangunan Kawasan Pariwisata Pulau Morotai, Provinsi Maluku Utara
Lokasi : Pulau Morotai, Provinsi Maluku Utara
Tahun Anggaran : 2017/2018

PT. MINA FAJA

NO. URAIAN PEKERJAAN

I PEKERJAAN PERSIAPAN

II PEKERJAAN DERMAGA

III PEKERJAAN MCK PASAR LAMA

IV PEKERJAAN JALAN
A. Jalan Lingkungan
B. Jalan Pelabuhan

Jumlah

Pembulatan

PPN 10%

Jumlah Total
OREKSI ARITMATIKA

PT. MINA FAJAR ABADI


JUMLAH HARGA
(Rp.)

470,800,000.00

12,617,257,000.00

618,207,000.00

23,064,535,000.00
12,948,096,000.00
10,116,439,000.00

36,770,799,000.00

36,770,790,000.00

3,677,079,000.00

40,447,869,000.00
KOREKSI ARITMATIKA
Nama Kegiatan : Pembangunan Kawasan Pariwisata Pulau Morotai, Provinsi Maluku Utara
Lokasi : Pulau Morotai, Provinsi Maluku Utara
Tahun Anggaran : 2017/2018

PT. MINA FAJA


NO URAIAN PEKERJAAN SATUAN VOLUME
A PEKERJAAN PENDAHULUAN
1 Mobilisasi Peralatan
- Exavator Unt 1.00
- Buldoser Unt 1.00
2 Demobilisasi peralatan
- Exavator Unt 1.00
- Buldoser Unt 1.00
3 Dokumentasi dan Pelaporan Ls 1.00
Sub Total Pekerjaan Penda
B Pekerjaan SMK3
1 Penyiapan RK3K terdiri atas
Pembuatan Manual/Prosedur/instruksi kerja/ijin kerja set 1.00
2 Sosialisasi dan Promosi K3 terdiri atas
Spanduk Lembar 10.00
Poster Lembar 10.00
Papan Informasi K3 Lembar 5.00
3 Alat Pelindung Kerja terdiri atas
Tali Keselamatan Ls 1.00
Pagar Pengaman Ls 3.00
Pembatas Area Ls 3.00
4 Alat Pelindung Diri terdiri atas
A. Topi Pelindung Buah 50.00
B. Pelindung Mata Buah 20.00
C. Tameng Muka Buah 5.00
D. Sarung tangan Buah 50.00
E. Sepatu Keselamatan untuk staff Buah 15.00
F. Sepatu Keselamatan untuk Rubber Buah 50.00
G. Full Body Harnes Buah 10.00
H. Rompi Keselamatan Buah 50.00
5 Fasilitas sarana Kesehatan terdiri atas
Peralatan K3 Ls 1.00
Peralatan Pengasapan Buah 1.00
Obat Pengasapan Kali 18.00
6 Rambu - Rambu terdiri atas
Rambu Petunjuk Buah 5.00
Rambu Larangan Buah 5.00
Rambu Peringatan Buah 5.00
Rambu Kewajiban Buah 5.00
Rambu Informasi Buah 5.00
Rambu Pekerjaan sementara Buah 5.00
7 Lain - lain terkait pengendalian resiko K3
Alat Pemadan Api Ringan 10 Kg Buah 4.00
Sirine Buah 1.00
Bendera K3 Buah 2.00
Jalur Evakuasi Ls 1.00
Lampu Darurat Buah 4.00
Sub Total Pekerjaan Pekerjaan
TOTAL PEKERJAAN PERS
OREKSI ARITMATIKA

PT. MINA FAJAR ABADI


HARGA SATUAN JUMLAH HARGA

10,000,000.00 10,000,000.00
10,000,000.00 10,000,000.00

10,000,000.00 10,000,000.00
50,000,000.00 50,000,000.00
50,000,000.00 50,000,000.00
Sub Total Pekerjaan Pendahuluan 130,000,000.00

5,000,000.00 5,000,000.00

550,000.00 5,500,000.00
450,000.00 4,500,000.00
2,400,000.00 12,000,000.00

5,000,000.00 5,000,000.00
5,000,000.00 15,000,000.00
5,000,000.00 15,000,000.00

500,000.00 25,000,000.00
125,000.00 2,500,000.00
650,000.00 3,250,000.00
45,000.00 2,250,000.00
750,000.00 11,250,000.00
1,050,000.00 52,500,000.00
5,000,000.00 50,000,000.00
150,000.00 7,500,000.00

50,000,000.00 50,000,000.00
2,000,000.00 2,000,000.00
150,000.00 2,700,000.00

1,500,000.00 7,500,000.00
1,500,000.00 7,500,000.00
1,500,000.00 7,500,000.00
1,500,000.00 7,500,000.00
1,500,000.00 7,500,000.00
1,500,000.00 7,500,000.00

5,000,000.00 20,000,000.00
1,500,000.00 1,500,000.00
500,000.00 1,000,000.00
550,000.00 550,000.00
450,000.00 1,800,000.00
Sub Total Pekerjaan Pekerjaan SMK3 340,800,000.00
TOTAL PEKERJAAN PERSIAPAN 470,800,000.00
KOREKSI ARITMATIKA
Nama Kegiatan : Pembangunan Kawasan Pariwisata Pulau Morotai, Provinsi Maluku Utara
Lokasi : Pulau Morotai, Provinsi Maluku Utara
Tahun Anggaran : 2017/2018

PT. MINA FAJA

NO URAIAN PEKERJAAN SATUAN VOLUME


II PEKERJAAN DERMAGA
A Pekerjaan Struktur
1 Pek. Galian Tanah m3 3.74
2 Pek. Pasir Urug Bawah Pondasi m3 0.42
3 Pek. Pasangan Batu Kosong m3 0.83
4 Pek. Pondasi Setempat Batu Kali m3 0.62
5 Pek. Galian Sloof m3 2.96
6 Pek. Sloof m3 2.96
7 Pek. Pasir Urug m3 11.83
8 Pek. Rabat Beton m3 11.82
9 Pek. Plester + Acian m2 16.88
10 Pek. Kolom Utama m3 3.139
11 Pek. Finishing Cat Kolom Eksterior m2 12.56
12 Pek. Perbaikan Kolom Struktur di Dermaga m3 1.35
Sub.Total Pek. Stru
B Pekerjaan Penggantian Atap Onduline & Lantai WPC
1 Pek. Bongkar atap existing m2 689.92
2 Pek. Kuda-kuda Kayu 5/10 m3 1.54
3 Pek. Kaso Kayu 5/7 m3 3.15
4 Pek. Atap Onduline m2 414.00
5 Pek. Bubungan Atap m' 154.09
6 Pek. Ring Balok 15x25cm m3 5.63
7 Pek. Lapis Lantai WPC ( Wood Plastic Composite ) m2 110.00
Sub.Total Pek. Penggantian
C Pekerjaan Dermaga Apung
1 Ponton Walkway 2,5 meter dengan decking HDPE m 20.00
2 Konektor Ponton WWAY sampai 2,8 m buah 2.00
3 Gangway Aluminium lebar 1325 mm dengan decking HDPE m 20.00
4 Bracket Gangway buah 2.00
5 Sistem Penggabungan Gangway buah 2.00
6 Gangway Tanssition Plate buah 2.00
7 Aluminium Sheet 5 mm buah 4.00
8 Bantal Pelampung buah 8.00
9 Cleat Aluminium (Tempat Mengait Kapal di Dermaga Apung) buah 12.00
10 Rantai Galvanis 22 mm m 120.00
11 Bracket Anchor - ALUMINA buah 8.00
12 Logo Kementerian Untuk Gangway buah 4.00

13 Intalasi Dermaga Apung (termasuk penarikan dermaga apung paket 1.00


ke lokasi)
Sub. Dermaga A
D Pekerjaan Paving block
1 Mob demob alat ls 1.00
2 Pengukuran dan bowplank ls 1.00
3 Pek.Galian tanah m3 203.20
4 Pek.Levelling m3 287.45
5 Pek.Paving t. 8 cm, filler abu batu 1cm m2 1,916.31
6 Pek.Kansteen m' 500.00
7 Pek.Gutter m' 500.00
8 Pek.Finishing batu alam bibir tanggulan m2 477.09
Sub.Total Pek. P
II.1 PEKERJAAN BANGUNAN BARU ( Kantor Pengelola )
Struktur
1 struktur
a Pek.Galian Tanah m3 20.84
b Pek.Pasir urug bawah pondasi m3 3.79
c Pek.Lantai kerja m3 1.89
d Pek.Pemadatan Tanah m3 8.64
e Pek.Pondasi Batu Kali m3 10.10
f Pek.Sloof m3 1.89
g Pek.Pasangan Bata m2 233.15
h Pek.Kolom Praktis 15x15 m3 1.00
i Pek.Kolom Utama m3 0.13
j Pek.Ring Balok 15 x 20 m3 1.42
k Pek.Plat Beton 10 cm( Rabat ) m3 0.45
l Pek.Dak Beton Air Tandon (Tangki Air 550 ml ) m3 0.99
m Pek Pasangan Bata untuk tempat duduk m2 4.80
n Pek.Urugan Tanah Merah m3 1.92
2 Arsitektur
a Pek.Plester + Aci m2 921.61
b Pek.Cat Dinding m2 460.81
c Pek. Pintu Kusen Alumunium + Daun Pintu Unit 4.00
d Pek.Pintu Kusen Toilet + Daun Pintu Unit 4.00
e Pek.Boven ( Ventilasi ) Alumunium Atas kusen Unit 8.00
f Pek.Jendela Alumunium + Daun Pintu Unit 7.00
g Pek.Boven ( Ventilasi ) Alumunium Toilet Unit 8.00
h Pek.Plafond + list plafond + cat m2 144.00
i Pek. Keramik 30x30 untuk tempat duduk m2 6.40
Lantai
a Pek.Finishing Keramik 30 x 30 m2 54.00
b Pek.Lantai Finish Keramik 20 x 20 ( Toilet ) m2 18.00
Pekerjaan Atap
a Pek.Atap Kayu m2 2.95
b Pek.Genteng Spandek m2 181.87
3 Pek.Sanitary Toilet
a Pek.Closed Jongkkok bh 4.00
b Pek.Wastafel bh 4.00
c Pek.Uriner bh 3.00
d Pek.Kran Air bh 11.00
e Tangki Air 520 L Unit 1.00
Pekerjaan MEP
a Pek.Pipa Air Kotor Ttk 10.00
b Pek.Pipa Air Bersih Ttk 6.00
c Pek.Instalasi Listrik + Armateur Stop Kontak , Saklar dan Lamp Ttk 84.00
4 Pekerjaan Warung kopi ( 2 Unit )
a Pek.Galian Tanah m3 1.78
b Pek.Pasir urug bawah pondasi m3 0.44
c Pek.Lantai kerja m3 0.89
d Pek.Pondasi Batu Kali m3 1.78
e Pek.Sloof m3 0.46
f Pek.Pasangan Bata m2 24.73
g Pek.Kolom Praktis 15x15 m3 0.47
h Pek.Ring Balok 15 x 20 m3 0.34
i Pek. Kuda-kuda Kayu 5/10 m3 0.14
j Pek. Kaso Kayu 5/7 m3 0.10
k Pek. Atap Onduline m2 0.34
l Pek. Bubungan Atap m' 11.80
m Pek.Plat Beton 10 cm( Rabat ) m3 0.72
n Pek.Plester + Aci m3 140.96
o Pek.Cat Dinding m1 70.48
p Pek.Instalasi Listrik + Armateur Stop Kontak , Saklar dan Lamp ttk 10.00
A Pekerjaan Septictank
1 Pek.Galian Tanah m3 9.00
2 Pek.Pasangan Bata m2 4.65
3 Pek.Kolom Praktis m3 0.18
4 Pek.ring Balok 15 x 15 m3 0.18
5 Pek.Rabat Beton ( Plester aci ) m3 0.45
6 Pek.Plester Aci Dinding Bata m2 18.00
7 Pek.Plat Beton ( Penutup Septictank ) m3 0.45
8 Pek.Pipa 4" m1 6.00
9 Pipa Buangan 1.5 " m1 2.00
B Pekerjaan Resapan
1 Pek.Galian Tanah m3 3.30
2 Pek.Pasangan Bata m2 4.65
3 Pek.Kolom Praktis m3 0.07
4 Pek.Ring balok m3 0.18
5 Pek.Batu Kosong ( tanpa Adukan ) m3 1.65
6 Pek.Plat Beton ( Penutup Resapan ) m2 0.22
JUMLAH SUB TOTAL PEKERJAAN
II.2 Pekerjaan Taman area Bangunan
1 Galian tanah ( Diganti tanah Merah ) T.15cm m3 62.25
2 Pek.Urugan Tanah Merah m3 62.25
3 Pek.Tanam Rumput Gajah Mini m2 415.00
4 Pek.Tanam pohon Peneduh btg 11.00
5 Pek.Kansteen Keliling Taman m1 56.00
6 Pek. Tanam Pohon Palm Ekor Tupai btg 16.00
7 Pek. Mainan Anak Perosotan dari bata set 1.00
8 Pek. Mainan Anak Ayunan Gantung set 1.00
9 Pek. Mainan Anak bar set 1.00
10 Pek. Kursi Taman unit 4.00
11 Pek.Galian tanah m3 108.46
12 Pek. Pot bunga dan tempat duduk unit 10.00
13 Pek.Levelling (urugan pasir t=15cm) m3 81.35
14 Pek.Paving t. 8 cm, filler abu batu 1cm m2 542.30
JUMLAH SUB TOTAL PEKERJAAN TA
A Pekerjaan Amphitheater
1 Pek. Pondasi batu kali base tempat duduk m3 2.76
2 Pek. Dinding Batu bata tempat duduk m2 31.12
3 Pek. Urugan puing untuk mengisi Tempat duduk m3 14.94
4 Pek. Plesteran dan Acian m2 62.24
5 Pek. Lapis Lantai WPC ( Wood Plastic Composite ) m2 62.24
6 Pek. Dinding Batu bata area tangga dari bangunan2 ke arah amphi m2 9.31
7 Pek. Dinding Batu bata Anak tangga dari bangunan m2 0.96
8 Pek. Plesteran dan Acian anak Tangga m2 2.88
9 Pek. Batu Bata Anak Tangga ke Pedestrian m2 2.20
10 Pek. Plesteran dan Acian anak Tangga m2 1.92
11 Pek. Drainage dari Amphitheater ke laut pipa 4' m 20.00
12 Pek. Sub drainage ke kolektor pipa 3" m 15.00
JUMLAH SUB TOTAL PEKERJAAN AMPHITHE
B Pekerjaan Pot.Bunga
1 Pek.Galian Tanah m3 24.80
2 Pek.Pasangan Dinding Bata m2 7.02
3 Pek.Urugan Tanah Merah m3 9.13
4 Pek.Tanam Rumput m2 22.82
JUMLAH SUB TOTAL PEKERJAAN POT B
II.3 Pekerjaan Tanggulan Batu Kali ( Talud)
1 Pengukuran dan bowplank ls 1.00
2 Pekerjaan Talud Baru
a. Pek.Galian tanah m3 576.00
b. Pek.Pasangan batu kali m3 1,056.00
c. Pek.Plesteran + acian dalam Planter Box m2 87.50
d. Pek.Finish cat Bagian luar m1 800.00
3 Pekerjaan Talud Lama Yang Belum Terbangun
a. Pek.Galian tanah m3 360.00
b. Pek.Pasangan batu kali m3 660.00
D Pek. Planter Box
1 Pek.Rabat Beton m3 40.00
2 Pek.Urugan Tanah Merah m3 640.00
3 Pek.Tanaman Pohon waru Laut ; jarak 6 m; tinggi 1,5 - 2 m btg 134.00
4 Pek.Tanam Rumput m2 731.50
Sub.Total Pek. Tang
II.4 Pekerjaan Lain-lain
1 a Pek. Persiapan unit 74.00
b Pek Mechnikal Electrical
- Pek Pengadaan Lampu PJU Tenaga Surya 60 Watt unit 74.00
c Pekerjaan Pendukung
- Pengecoran Pondasi Tiang PJU unit 74.00
- Mendirikan Dan pasang tiang PJU unit 74.00
- Pasang dan set solar panel / PV unit 74.00
- Pasang dan set armature lampu LED unit 74.00
- Pasang dan set batery dan lighting controller unit 74.00
- Ongkos kirim sampai lokasi unit 74.00
- Testing Commisioning , pelatihan dan sosialisasi unit 74.00
2 Pek.Signage
a Pek.Galian Pondasi m3 0.36
b Pek.Pasangan Diinding Bata m2 1.37
c Pek.Dinding Fin.Batu Alam m2 2.74
d Pek.Huruf Stainless Steel " Welcome to wayabula " t. 1.5m bh 17.00
Sub.Total Pek. Lai
II.5 Pekerjaan Pelabuhan Ikan Besar
1 Pek. Galian Pondasi dalam 120 cm m3 5.62
2 Pek. Pondasi Batu kali m3 4.34
3 Pek Dinding Batukali m3 3.90
4 Pek Dinding Bata m2 6.96
5 Pek. Plesteran m2 3.60
6 Pek. Rabat Beton Tangga m3 0.36
7 Pek. Rabat Beton Jembatan m3 0.36
8 Pek. Tempat Duduk m3 0.40
9 Pek. Tambatan Kapal Cleat Aluminium (Tempat Mengait Kapal) buah 10.00
Total Pekerjaan Pelabuhan Ikan
II.6 Pekerjaan Pelabuhan Ikan kecil ( 4 pelabuhan kecil)
1 Pek. Galian Pondasi dalam 120 cm m3 11.66
2 Pek. Pondasi Batu kali m3 9.02
3 Pek Dinding Batukali m3 0.96
4 Pek Dinding Bata m2 2.16
5 Pek. Plesteran m2 1.20
6 Pek. Rabat Beton Tangga m3 0.16
7 Pek. Rabat Beton Jembatan m3 0.16
8 Pek. Tempat Duduk m3 0.16
9 Pek. Tambatan Kapal Cleat Aluminium (Tempat Mengait Kapal) buah 40.00
Total Pekerjaan Pelabuhan Ikan
II.7 Pekerjaan Perapihan Sumur Jepang
1 Pek. Paving Blok
Pek.Levelling m3 8.19
Pek.Paving t. 8 cm, filler abu batu 1cm m2 54.60
Pek.Kansteen m' 21.10
Pek.Gutter m' 21.10
Pek. Kursi unit 2.00
Pek Pot Bunga bh 6.00
Pek Perapihan Dinding Sumur Existing ls 1.00
Total Pekerjaan Perapihan Sumpur Je
JUMLAH SUB TOTAL PEKERJAAN KESELUR
Dibul
OREKSI ARITMATIKA

PT. MINA FAJAR ABADI

Harga Satuan (Rp) JML Harga (Rp)

95,000.00 355,680.00
350,000.00 145,600.00
65,000.00 54,080.00
850,000.00 530,400.00
75,000.00 221,625.00
3,500,000.00 10,342,500.00
310,000.00 3,666,990.00
1,450,000.00 17,139,000.00
215,000.00 3,628,125.00
8,500,000.00 26,679,375.00
175,000.00 2,197,125.00
3,500,000.00 4,725,000.00
Sub.Total Pek. Struktur : 69,685,500.00

145,000.00 100,038,400.00
4,500,000.00 6,912,000.00
4,500,000.00 14,175,000.00
550,000.00 227,700,000.00
450,000.00 69,340,500.00
4,500,000.00 25,312,500.00
450,000.00 49,500,000.00
Sub.Total Pek. Penggantian Atap : 492,978,400.00

150,000,000.00 3,000,000,000.00
10,000,000.00 20,000,000.00
25,000,000.00 500,000,000.00
10,000,000.00 20,000,000.00
150,000,000.00 300,000,000.00
950,000.00 1,900,000.00
550,000.00 2,200,000.00
1,050,000.00 8,400,000.00
35,000,000.00 420,000,000.00
3,000,000.00 360,000,000.00
105,000,000.00 840,000,000.00
2,500,000.00 10,000,000.00

450,000,000.00 450,000,000.00

Sub. Dermaga Apung : 5,932,500,000.00

15,000,000.00 15,000,000.00
450,000.00 450,000.00
56,000.00 11,379,200.00
95,000.00 27,307,353.38
550,000.00 1,053,968,025.00
215,000.00 107,500,000.00
195,000.00 97,500,000.00
750,000.00 357,815,700.00
Sub.Total Pek. Paving : 1,670,920,278.38
95,000.00 1,979,752.50
350,000.00 1,326,150.00
1,450,000.00 2,747,025.00
450,000.00 3,888,000.00
850,000.00 8,588,400.00
3,500,000.00 6,630,750.00
450,000.00 104,917,410.00
5,700,000.00 5,681,988.00
8,500,000.00 1,083,750.00
3,750,000.00 5,328,281.25
1,450,000.00 652,500.00
1,500,000.00 1,484,358.75
450,000.00 2,160,000.00
56,000.00 107,520.00

215,000.00 198,146,150.00
105,000.00 48,384,525.00
4,500,000.00 18,000,000.00
3,500,000.00 14,000,000.00
2,050,000.00 16,400,000.00
1,850,000.00 12,950,000.00
1,500,000.00 12,000,000.00
95,000.00 13,680,000.00
125,000.00 800,000.00

65,000.00 3,510,000.00
65,000.00 1,170,000.00

1,500,000.00 4,417,713.00
215,500.00 39,193,416.00

1,510,000.00 6,040,000.00
1,450,000.00 5,800,000.00
1,650,000.00 4,950,000.00
150,000.00 1,650,000.00
5,000,000.00 5,000,000.00

125,000.00 1,250,000.00
250,000.00 1,500,000.00
95,000.00 7,980,000.00

65,000.00 115,440.00
350,000.00 155,400.00
1,450,000.00 1,287,600.00
850,000.00 1,509,600.00
3,500,000.00 1,596,000.00
450,000.00 11,130,210.00
5,700,000.00 2,685,042.00
3,750,000.00 1,282,500.00
4,500,000.00 616,500.00
4,500,000.00 448,560.00
550,000.00 188,100.00
450,000.00 5,310,000.00
1,450,000.00 1,046,900.00
215,000.00 30,305,952.80
105,000.00 7,400,290.80
95,000.00 950,000.00

65,000.00 585,000.00
450,000.00 2,092,500.00
5,700,000.00 1,026,000.00
3,750,000.00 675,000.00
215,000.00 96,750.00
215,000.00 3,870,000.00
1,100,000.00 495,000.00
210,000.00 1,260,000.00
175,000.00 350,000.00

65,000.00 214,500.00
450,000.00 2,092,500.00
5,700,000.00 384,750.00
3,750,000.00 675,000.00
450,000.00 742,500.00
1,100,000.00 242,000.00
JUMLAH SUB TOTAL PEKERJAAN BARU : 644,227,285.10
35,000.00 2,178,750.00
210,000.00 13,072,500.00
350,000.00 145,250,000.00
550,000.00 6,050,000.00
175,000.00 9,800,000.00
450,000.00 7,200,000.00
750,000.00 750,000.00
1,500,000.00 1,500,000.00
1,200,000.00 1,200,000.00
2,100,000.00 8,400,000.00
65,000.00 7,049,900.00
550,000.00 5,500,000.00
100,000.00 8,134,500.00
550,000.00 298,265,000.00
JUMLAH SUB TOTAL PEKERJAAN TAMAN : 514,350,650.00

455,000.00 1,255,800.00
95,000.00 2,956,400.00
35,000.00 522,900.00
215,000.00 13,381,600.00
750,000.00 46,680,000.00
125,000.00 1,164,000.00
145,000.00 139,200.00
215,000.00 619,200.00
135,000.00 297,000.00
215,000.00 412,800.00
550,000.00 11,000,000.00
125,000.00 1,875,000.00
JUMLAH SUB TOTAL PEKERJAAN AMPHITHEATER : 80,303,900.00

65,000.00 1,612,000.00
95,000.00 666,900.00
210,000.00 1,916,460.00
550,000.00 12,548,250.00
JUMLAH SUB TOTAL PEKERJAAN POT BUNGA : 16,743,610.00

450,000.00 450,000.00

65,000.00 37,440,000.00
850,000.00 897,600,000.00
215,000.00 18,812,500.00
125,000.00 100,000,000.00

65,000.00 23,400,000.00
850,000.00 561,000,000.00

1,450,000.00 58,000,000.00
210,000.00 134,400,000.00
654,000.00 87,636,000.00
550,000.00 402,325,000.00
Sub.Total Pek. Tanggulan : 2,321,063,500.00

10,500,000.00 777,000,000.00

-
-
-
-
-
-
-

155,000.00 55,800.00
95,000.00 130,245.00
235,000.00 644,370.00
215,000.00 3,655,000.00
Sub.Total Pek. Lain-lain : 781,485,415.00

215,000.00 1,207,440.00
650,000.00 2,822,976.00
350,000.00 1,365,000.00
95,000.00 661,200.00
95,000.00 342,000.00
1,450,000.00 522,000.00
1,450,000.00 526,350.00
5,000,000.00 1,980,000.00
350,000.00 3,500,000.00
Total Pekerjaan Pelabuhan Ikan Besar : 12,926,966.00

215,000.00 2,507,760.00
650,000.00 5,863,104.00
350,000.00 336,000.00
95,000.00 205,200.00
95,000.00 114,000.00
1,450,000.00 234,900.00
1,450,000.00 227,287.50
5,000,000.00 783,750.00
350,000.00 14,000,000.00
Total Pekerjaan Pelabuhan Ikan Kecil : 24,272,001.50

100,000.00 819,000.00
550,000.00 30,030,000.00
215,000.00 4,536,500.00
195,000.00 4,114,500.00
1,500,000.00 3,000,000.00
550,000.00 3,300,000.00
10,000,000.00 10,000,000.00
Total Pekerjaan Perapihan Sumpur Jepang : 55,800,000.00
JUMLAH SUB TOTAL PEKERJAAN KESELURUHAN : 12,617,257,505.98
Dibulatkan : 12,617,257,000.00
KOREKSI ARITMATIKA
Nama Kegiatan : Pembangunan Kawasan Pariwisata Pulau Morotai, Provinsi Maluku Utara
Lokasi : Pulau Morotai, Provinsi Maluku Utara
Tahun Anggaran : 2017/2018

PT. MINA FAJA

No. Uraian Pekerjaan Unit Vol.

III PEKERJAAN MCK PASAR LAMA


1 Struktur
a Pek.Galian Tanah m3 8.17
b Pek.Pasir urug bawah pondasi m3 1.01
c Pek.Lantai kerja m3 1.01
d Pek.Pemadatan Tanah m3 2.03
e Pek.Pondasi Batu Kali m3 3.60
f Pek.Sloof m3 0.68
g Pek.Pasangan Bata m2 63.00
h Pek.Kolom Praktis 15x15 m3 0.39
j Pek.Ring Balok 15 x 20 m3 2.03
k Plat Beton 10 cm( Rabat ) m3 2.03
l Pek.Dak Beton Air Tandon (Tangki Air 550 ml ) m3 0.99
2 Arsitektur
a Pek.Plester + Aci m2 63.00
b Pek.Cat Dinding m1 31.50
c Pek.Boven ( Ventilasi ) Alumunium Toilet Unit 4.00
d Plafond + list plafond + cat m2 40.50
Lantai
a Pek.Lantai Finish Keramik 20 x 20 ( Toilet ) m2 20.25
Pekerjaan Atap
a Pek.Atap Kayu m2 140.57
b Pek.Genteng Spandek m2 140.57
3 Pek.Sanitary Toilet
a Pek.Closed jongkok bh 5.00
b Pek.Wastafel bh 2.00
c Pek.Uriner bh 2.00
d Pek.Kran Air bh 7.00
e Tangki Air 520 L Unit 1.00
4 Pekerjaan MEP
a Pek.Pipa Air Kotor Ttk 9.00
b Pek.Pipa Air Bersih Ttk 4.00
c Pek.Instalasi Listrik + Armateur Saklar dan Lampu Ttk 6.00
A Pekerjaan Septictank
1 Pekerjaan biofilter aerob dan anaerob (termasuk pekerjaan sipi unit 1.00
A Pekerjaan Resapan
1 Pek.Galian Tanah m3 3.30
2 Pek.Pasangan Bata m2 4.65
3 Pek.Kolom Praktis m3 0.07
4 Pek.Ring balok m3 0.18
5 Pek.Batu Kosong ( tanpa Adukan ) m3 1.65
6 Pek.Plat Beton ( Penutup Resapan ) m2 0.22
JUMLAH SUB TOTAL PEKERJAAN MCK PASAR LAMA
Dibulatkan
OREKSI ARITMATIKA

PT. MINA FAJAR ABADI


Harga Satuan JML Harga
(Rp) (Rp)

95,000.00 775,912.50
350,000.00 354,375.00
1,450,000.00 1,468,125.00
450,000.00 911,250.00
850,000.00 3,060,000.00
3,500,000.00 2,362,500.00
450,000.00 28,350,000.00
5,700,000.00 2,244,375.00
3,750,000.00 7,593,750.00
1,450,000.00 2,936,250.00
25,000,000.00 24,739,312.50

215,000.00 13,545,000.00
105,000.00 3,307,500.00
4,500,000.00 18,000,000.00
1,445,000.00 58,522,500.00

315,000.00 6,378,750.00

1,500,000.00 210,850,500.00
215,500.00 30,292,188.50

3,000,000.00 15,000,000.00
2,500,000.00 5,000,000.00
3,100,000.00 6,200,000.00
450,000.00 3,150,000.00
10,000,000.00 10,000,000.00

250,000.00 2,250,000.00
450,000.00 1,800,000.00
750,000.00 4,500,000.00

150,000,000.00 150,000,000.00

95,000.00 313,500.00
450,000.00 2,092,500.00
5,700,000.00 384,750.00
3,750,000.00 675,000.00
550,000.00 907,500.00
1,100,000.00 242,000.00
618,207,538.50
618,207,000.00
KOREKSI ARITMATIKA
Nama Kegiatan : Pembangunan Kawasan Pariwisata Pulau Morotai, Provinsi Maluku Utara
Lokasi : Pulau Morotai, Provinsi Maluku Utara
Tahun Anggaran : 2017/2018

PT. MINA FAJA


Satuan VOLUME
No. Uraian Pekerjaan
1 2 3 4
IV. PEKERJAAN JALAN
IV.1 JALAN LINGKUNGAN
A. DRAINASE
A.1 Galian untuk Selokan Drainase dan Saluran Air M3 4,537.28
A.2 Pasangan Batu dengan Mortar M3
2,827.03
A.3 Beton K250 (fc 20) untuk struktur drainase beton minor M3 464.04
Total Dr
B. PEKERJAAN TANAH
B.1 Galian Biasa M3 5,589.63
B.2 Timbunan Biasa dari galian M3
2,165.52
B.3 Penyiapan Badan Jalan M2 2,694.50
B.4 Pembersihan dan Pengupasan Lahan M2
3,645.50
Total Pekerjaan
C. PELEBARAN PERKERASAN DAN BAHU JALAN
C.1 Lapis Pondasi Agregat Kelas S M3 1,353.45
TOTAL PEKERJAAN PELEBARAN PERKERASAN DAN BAHU
D. PERKERASAN BERBUTIR
D.1 Lapis Pondasi Agregat Kelas A M3 4,041.48
TOTAL PEKERJAAN PERKERASAN BER
E. PERKERASAN ASPAL
E.1 Lapis Resap Pengikat - Aspal Cair Liter 12,890.00
E.2 Lataston Lapis Pondasi (HRS-Base) (gradasi senjang/semi senjang) Ton 1,185.88
TOTAL PEKERJAAN PERKERASAN
Jumlah (A+B+C+D
Dibu
OREKSI ARITMATIKA

PT. MINA FAJAR ABADI


Harga Satuan Jumlah Harga
(Rupiah) (Rupiah)
5 6

95,000.00 431,041,600.00
850,000.00 2,402,979,580.00
2,500,000.00 1,160,100,000.00
Total Drainase 3,994,121,180.00

95,000.00 531,014,375.00
450,000.00 974,484,000.00
10,000.00 26,945,000.00
125,000.00 455,687,500.00
Total Pekerjaan Tanah 1,988,130,875.00

510,000.00 690,259,500.00
L PEKERJAAN PELEBARAN PERKERASAN DAN BAHU JALAN 690,260,672.77

610,000.00 2,465,299,750.00
TOTAL PEKERJAAN PERKERASAN BERBUTIR 2,465,299,750.00

15,000.00 193,350,000.00
3,050,000.00 3,616,934,000.00
TOTAL PEKERJAAN PERKERASAN ASPAL 3,810,284,000.00
Jumlah (A+B+C+D+E) = 12,948,096,477.77
Dibulatkan 12,948,096,000.00
KOREKSI ARITMATIKA
Nama Kegiatan : Pembangunan Kawasan Pariwisata Pulau Morotai, Provinsi Maluku Utara
Lokasi : Pulau Morotai, Provinsi Maluku Utara
Tahun Anggaran : 2017/2018

PT. MINA FAJA


Satuan VOLUME
No. Uraian Pekerjaan
1 2 3 4
IV. PEKERJAAN JALAN
IV.2 PEKERJAAN JALAN PELABUHAN
A DRAINASE
Galian untuk Selokan Drainase dan Saluran Air M3 2,214.1
Pasangan Batu dengan Mortar M3 1,379.5
Beton K250 (fc 20) untuk struktur drainase beton minor M 3
226.4
Total Pekerjaan Drainase

B PEKERJAAN TANAH
Galian Biasa M3 5,094.9
Timbunan Biasa dari galian M 3
1,006.4
Penyiapan Badan Jalan M 2
11,322.0
Pembersihan dan Pengupasan Lahan M2 15,096.0
Total Pekerjaan Tanah

C PELEBARAN PERKERASAN DAN BAHU JALAN


Lapis Pondasi Agregat Kelas S M3 377.4
Total Pekerjaan Pelebaran Perkerasan Bahu Jalan

D DIVISI 5. PERKERASAN BERBUTIR


Lapis Pondasi Agregat Kelas A M3 3,962.7
Total Pekerjaan Perkerasan Berbutir

E PERKERASAN ASPAL
Lapis Resap Pengikat - Aspal Cair Liter 8,806.0
Lapis Perekat - Aspal Cair Liter 1,320.9
Laston Lapis Aus (AC-WC) Ton 810.2
Laston Lapis Antara (AC-BC) Ton 1,215.2
Total Pekerjaan Perkerasan Aspal
REKAPITULASI PEKERJAAN
Dibu
OREKSI ARITMATIKA

PT. MINA FAJAR ABADI


Harga Satuan Jumlah Harga
(Rupiah) (Rupiah)
5 6

95,000.00 210,337,600
850,000.00 1,172,594,380
2,500,000.00 566,100,000
1,949,031,980

95,000.00 484,015,500
450,000.00 452,880,000
10,000.00 113,220,000
35,000.00 528,360,000
1,578,475,500

510,000.00 192,474,000
192,474,000

610,000.00 2,417,247,000
2,417,247,000

15,000.00 132,090,000
14,500.00 19,153,050
1,950,000.00 1,579,796,400
1,850,000.00 2,248,171,800
3,979,211,250
REKAPITULASI PEKERJAAN JALAN 10,116,439,730
Dibulatkan 10,116,439,000
KOREKSI ARITMATIKA
Nama Kegiatan : Pembangunan Kawasan Pariwisata Pulau Morotai, Provinsi Maluku Utara
Lokasi : Pulau Morotai, Provinsi Maluku Utara
Tahun Anggaran : 2017/2018

PT. MINA FAJA


Satuan VOLUME
No. Uraian Pekerjaan
1 2 3 4
III. PEKERJAAN PESISIR PANTAI
A Pekerjaan Beach Walk
1 Pekerjaan Galian Untuk Pasangan Bronjong M3 1,661.0
2 Pemasangan Bronjong Kawat Galvanis M3 2,334.3
3 Pemasangan Cerucuk Kayu Bandana Bh 6,204.0
4 Pasangan Batu Kosong M3 598.4
5 Pemasangan Beton K.250 M3 344.2
6 Pasangan Batu Kali M3 2,244.0
7 Pemasangan Wiremesh M8 Kg 11,114.9
8 Pasangan Batu Bata M3 1,753.0
9 Pasangan Batu Andesit M2 3,366.8
JUMLAH SUB TOTAL PEKERJAAN BEACH W

B Pekerjaan Plaza
1 Pemasangan Bronjong Kawat Galvanis M3 429.8
2 Pemasangan Beton K.250 M3 26.5
3 Pemasangan Wiremesh M8 Kg 1,982.9
5 Gazebo 78.6
6 Pemasangan Batu Andesit M2 176.8
JUMLAH SUB TOTAL PEKERJAAN BEACH W
IV. PEKERJAAN RTH DAN AMPHITHEATER
A Pekerjaan RTH
1 Galian tanah ( Diganti tanah Merah ) T.15cm m3 62.25
2 Pek.Urugan Tanah Merah m3 62.25
3 Pek.Tanam Rumput Gajah Mini m2 415.00
4 Pek.Tanam pohon Peneduh btg 11.00
5 Pek.Kansteen Keliling Taman m1 56.00
6 Pek. Tanam Pohon Palm Ekor Tupai btg 16.00
7 Pek. Mainan Anak Perosotan dari bata set 1.00
8 Pek. Mainan Anak Ayunan Gantung set 1.00
9 Pek. Mainan Anak bar set 1.00
10 Pek. Kursi Taman unit 4.00
11 Pek.Galian tanah m3 108.46
12 Pek. Pot bunga dan tempat duduk unit 10.00
13 Pek.Levelling (urugan pasir t=15cm) m3 81.35
14 Pek.Paving t. 8 cm, filler abu batu 1cm m2 542.30
JUMLAH SUB TOTAL PEKERJAAN TA
B Pekerjaan Amphitheater
1 Pek. Pondasi batu kali base tempat duduk m3 2.76
2 Pek. Dinding Batu bata tempat duduk m2 31.12
3 Pek. Urugan puing untuk mengisi Tempat duduk m3 14.94
4 Pek. Plesteran dan Acian m2 62.24
5 Pek. Lapis Lantai WPC ( Wood Plastic Composite ) m2 62.24
6 Pek. Dinding Batu bata area tangga dari bangunan2 ke arah amphi m2 9.31
7 Pek. Dinding Batu bata Anak tangga dari bangunan m2 0.96
8 Pek. Plesteran dan Acian anak Tangga m2 2.88
9 Pek. Batu Bata Anak Tangga ke Pedestrian m2 2.20
10 Pek. Plesteran dan Acian anak Tangga m2 1.92
11 Pek. Drainage dari Amphitheater ke laut pipa 4' m 20.00
12 Pek. Sub drainage ke kolektor pipa 3" m 15.00
JUMLAH SUB TOTAL PEKERJAAN AMPHITHE

V PEKERJAAN MCK PASAR LAMA


1 Struktur
a Pek.Galian Tanah m3 8.17
b Pek.Pasir urug bawah pondasi m3 1.01
c Pek.Lantai kerja m3 1.01
d Pek.Pemadatan Tanah m3 2.03
e Pek.Pondasi Batu Kali m3 3.60
f Pek.Sloof m3 0.68
g Pek.Pasangan Bata m2 63.00
h Pek.Kolom Praktis 15x15 m3 0.39
j Pek.Ring Balok 15 x 20 m3 2.03
k Plat Beton 10 cm( Rabat ) m3 2.03
l Pek.Dak Beton Air Tandon (Tangki Air 550 ml ) m3 0.99
2 Arsitektur
a Pek.Plester + Aci m2 63.00
b Pek.Cat Dinding m1 31.50
c Pek.Boven ( Ventilasi ) Alumunium Toilet Unit 4.00
d Plafond + list plafond + cat m2 40.50
Lantai
a Pek.Lantai Finish Keramik 20 x 20 ( Toilet ) m2 20.25
Pekerjaan Atap
a Pek.Atap Kayu m2 140.57
b Pek.Genteng Spandek m2 140.57
3 Pek.Sanitary Toilet
a Pek.Closed jongkok bh 5.00
b Pek.Wastafel bh 2.00
c Pek.Uriner bh 2.00
d Pek.Kran Air bh 7.00
e Tangki Air 520 L Unit 1.00
4 Pekerjaan MEP
a Pek.Pipa Air Kotor Ttk 9.00
b Pek.Pipa Air Bersih Ttk 4.00
c Pek.Instalasi Listrik + Armateur Saklar dan Lampu Ttk 6.00
A Pekerjaan Septictank
1 Pekerjaan biofilter aerob dan anaerob (termasuk pekerjaan sipi unit 1.00
B Pekerjaan Resapan
1 Pek.Galian Tanah m3 3.30
2 Pek.Pasangan Bata m2 4.65
3 Pek.Kolom Praktis m3 0.07
4 Pek.Ring balok m3 0.18
5 Pek.Batu Kosong ( tanpa Adukan ) m3 1.65
6 Pek.Plat Beton ( Penutup Resapan ) m2 0.22
JUMLAH SUB TOTAL PEKERJAAN MCK PASAR LAMA
OREKSI ARITMATIKA

PT. MINA FAJAR ABADI


Harga Satuan Jumlah Harga
(Rupiah) (Rupiah)
5 6

95,000.00 157,795,000
736,000.00 1,718,008,000
81,000.00 502,524,000
65,000.00 38,896,000
2,500,000.00 860,500,000
850,000.00 1,907,400,000
17,307.27 192,368,731
450,000.00 788,832,000
300,365.23 1,011,269,656
JUMLAH SUB TOTAL PEKERJAAN BEACH WALK : 7,177,593,387.31

736,000.00 316,322,286
2,500,000.00 66,294,643
17,307.27 34,318,603
3,000,000.00 235,714,286
300,365.23 53,100,282
JUMLAH SUB TOTAL PEKERJAAN BEACH WALK : 705,750,098.71

35,000.00 2,178,750.00
210,000.00 13,072,500.00
350,000.00 145,250,000.00
550,000.00 6,050,000.00
175,000.00 9,800,000.00
450,000.00 7,200,000.00
750,000.00 750,000.00
1,500,000.00 1,500,000.00
1,200,000.00 1,200,000.00
2,100,000.00 8,400,000.00
65,000.00 7,049,900.00
550,000.00 5,500,000.00
100,000.00 8,134,500.00
550,000.00 298,265,000.00
JUMLAH SUB TOTAL PEKERJAAN TAMAN : 514,350,650.00

455,000.00 1,255,800.00
95,000.00 2,956,400.00
35,000.00 522,900.00
215,000.00 13,381,600.00
750,000.00 46,680,000.00
125,000.00 1,164,000.00
145,000.00 139,200.00
215,000.00 619,200.00
135,000.00 297,000.00
215,000.00 412,800.00
550,000.00 11,000,000.00
125,000.00 1,875,000.00
JUMLAH SUB TOTAL PEKERJAAN AMPHITHEATER : 80,303,900.00

95,000.00 775,912.50
350,000.00 354,375.00
1,450,000.00 1,468,125.00
450,000.00 911,250.00
850,000.00 3,060,000.00
3,500,000.00 2,362,500.00
450,000.00 28,350,000.00
5,700,000.00 2,244,375.00
3,750,000.00 7,593,750.00
1,450,000.00 2,936,250.00
25,000,000.00 24,739,312.50

215,000.00 13,545,000.00
105,000.00 3,307,500.00
4,500,000.00 18,000,000.00
1,445,000.00 58,522,500.00

315,000.00 6,378,750.00

1,500,000.00 210,850,500.00
215,500.00 30,292,188.50

3,000,000.00 15,000,000.00
2,500,000.00 5,000,000.00
3,100,000.00 6,200,000.00
450,000.00 3,150,000.00
10,000,000.00 10,000,000.00

250,000.00 2,250,000.00
450,000.00 1,800,000.00
750,000.00 4,500,000.00

150,000,000.00 150,000,000.00

95,000.00 313,500.00
450,000.00 2,092,500.00
5,700,000.00 384,750.00
3,750,000.00 675,000.00
550,000.00 907,500.00
1,100,000.00 242,000.00
618,207,538.50
KOREKSI ARITMATIKA
Nama Kegiatan : Pembangunan Kawasan Pariwisata Pulau Morotai, Provinsi Maluku Utara
Lokasi : Pulau Morotai, Provinsi Maluku Utara
Tahun Anggaran : 2017/2018

PT. MINA FAJA

NO. URAIAN PEKERJAAN

I PEKERJAAN PERSIAPAN

II PEKERJAAN DERMAGA

III PEKERJAAN PESISIR PANTAI


A. BEACH WALK
B. PLAZA

IV PEKERJAAN RTH
A. PEKERJAAN RTH
B. PEKERJAAN AMPHITHEATER

V PEKERJAAN MCK PASAR LAMA

Jumlah

Pembulatan

PPN 10%

Jumlah Total
OREKSI ARITMATIKA

PT. MINA FAJAR ABADI


JUMLAH HARGA
(Rp.)

470,800,000.00

1,551,200,000.00

7,177,593,387.31
705,750,098.71

514,350,650.00
80,303,900.00

618,207,538.50

11,118,205,574.53

11,118,200,000.00

1,111,820,000.00

12,230,020,000.00
ACTION PLAN PELAKSANAAN KSPN MOROTAI TAHUN 2017
Nama Kegiatan : Pembangunan Kawasan Pariwisata Pulau Morotai, Provinsi Maluku Utara
Lokasi : Pulau Morotai, Provinsi Maluku Utara
Tahun Anggaran : 2017/2018

OKTOBER'17 NOVEMBER'17 DESEMBER'17


No. Uraian Pekerjaan Satuan VOLUME
I II III IV I II III IV I II III IV
A Pekerjaan Beach Walk
1 Pekerjaan Galian Untuk Pasangan Bronjong M3 1,661.0
2 Pemasangan Bronjong Kawat Galvanis M3 2,334.3
3 Pemasangan Cerucuk Kayu Bandana Bh 6,204.0
4 Pasangan Batu Kosong M3 598.4
5 Pemasangan Beton K.250 M3 344.2
6 Pasangan Batu Kali M3 2,244.0
7 Pemasangan Wiremesh M8 Kg 11,114.9
8 Pasangan Batu Bata M3 1,753.0
9 Pasangan Batu Andesit M2 3,366.8

B Pekerjaan Plaza
1 Pemasangan Bronjong Kawat Galvanis M3 429.8
2 Pemasangan Beton K.250 M3 26.5
3 Pemasangan Wiremesh M8 Kg 1,982.9
5 Gazebo 78.6
6 Pemasangan Batu Andesit M2 176.8
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT

DIREKTORAT JENDERAL
PENGEMBANGAN KAWASAN CIPTA KARYA
PERMUKIMAN
Jalan Cipaku V. No. 01 Kebayoran Baru, Jakarta Se
BACK UP OF QUANTITY
Nama Kegiatan : Pembangunan Kawasan Pariwisata Pulau Morotai, Provinsi Maluku Utara
Lokasi : Pulau Morotai, Provinsi Maluku Utara
Tahun Anggaran : 2017/2018

ITEM PEKERJAAN GALIAN

No STATION PANJANG LEBAR TINGGI VOLUME KET


(M) (M) (M) (M3)

1 0+000 - 0+227 227.00 3.40 0.50 385.90


2 0+463 - 0+786 323.00 3.40 0.50 549.10
3 0+227 - 0+463 236.00 4.00 0.50 472.00
4 0+786 - 0+913 127.00 4.00 0.50 254.00

TOTAL 1,661.00
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT

ERJalan DIREKTORAT JENDERAL


PENGEMBANGAN KAWASAN CIPTA KARYA S
PERMUKIMAN
Cipaku V. No. 01 Kebayoran Baru, Jakarta Selat
BACK UP OF QUANTITY
Nama Kegiatan : Pembangunan Kawasan Pariwisata Pulau Morotai, Provinsi Maluku Utara
Lokasi : Pulau Morotai, Provinsi Maluku Utara
Tahun Anggaran : 2017/2018

ITEM PEKERJAAN BRONJONG

No STATION PANJANG LEBAR TINGGI LUAS VOLUME KET


(M) (M) (M) (M2) (M3)

BEACH WALK
0+000 - 0+913 913.00 2.00 0.50 913.00
0+000 - 0+913 913.00 1.50 0.50 684.75
0+000 - 0+913 913.00 1.00 0.50 456.50

0+913 - 0+953 40.00 5.00 0.50 100.00


0+913 - 0+953 40.00 4.00 0.50 80.00
0+913 - 0+953 40.00 3.00 0.50 60.00
0+913 - 0+953 40.00 2.00 0.50 40.00

TOTAL 2,334.25

PLAZA
Plaza Besar Diameter
Bronjong A 18.00 0.50 254.57 127.29
Bronjong B 17.00 0.50 227.07 113.54
Bronjong C 16.00 0.50 201.14 100.57
Bronjong D 15.00 0.50 176.79 88.39

TOTAL 429.79
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT

TKER Jalan DIREKTORAT JENDERAL


PENGEMBANGAN KAWASAN CIPTA KARYA ST
PERMUKIMAN
Cipaku V. No. 01 Kebayoran Baru, Jakarta Selatan
BACK UP OF QUANTITY
Nama Kegiatan : Pembangunan Kawasan Pariwisata Pulau Morotai, Provinsi Maluku Utara
Lokasi : Pulau Morotai, Provinsi Maluku Utara
Tahun Anggaran : 2017/2018

ITEM PEKERJAAN CERUCUK KAYU DOLKEN

No STATION PANJANG LEBAR JUMLAH JUMLAH TINGGI VOLUME KET


(M) (M) (Panjang) (Lebar) (M) (BH)

0+000 - 0+227 227 1.40 454.00 3.00 2.00 1,362


0+463 - 0+786 323 1.40 646.00 3.00 2.00 1,938

0+227 - 0+463 236 2.00 472.00 4.00 2.00 1,888


0+786 - 0+913 127 2.00 254.00 4.00 2.00 1,016

Total Jalan Pelabuhan 6,204.00


KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT

DIREKTORAT
PENGEMBANGAN JENDERAL CIPTA KARYA
Jalan Cipaku V. No. 01KAWASAN
Kebayoran PERMUKIMAN
Baru, Jakarta Se
BACK UP OF QUANTITY
Nama Kegiatan : Pembangunan Kawasan Pariwisata Pulau Morotai, Provinsi Maluku Utara
Lokasi : Pulau Morotai, Provinsi Maluku Utara
Tahun Anggaran : 2017/2018

ITEM PEKERJAAN PASANGAN BATU KOSONG

No STATION PANJANG LEBAR TINGGI VOLUME KET


(M) (M) (M) (M3)

0+000 - 0+227 227 1.40 0.40 127


0+463 - 0+786 323 1.40 0.40 181

0+227 - 0+463 236 2.00 0.40 189


0+786 - 0+913 127 2.00 0.40 102

TOTAL 598.40
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT

ERJalan DIREKTORAT JENDERAL


PENGEMBANGAN KAWASAN CIPTA KARYA S
PERMUKIMAN
Cipaku V. No. 01 Kebayoran Baru, Jakarta Selat
BACK UP OF QUANTITY
Nama Kegiatan : Pembangunan Kawasan Pariwisata Pulau Morotai, Provinsi Maluku Utara
Lokasi : Pulau Morotai, Provinsi Maluku Utara
Tahun Anggaran : 2017/2018

ITEM PEKERJAAN BETON K.250

No STATION PANJANG LEBAR TINGGI LUAS VOLUME KET


(M) (M) (M) (M2) (M3)

BEACH WALK
Lantai Kerja
0+000 - 0+227 227 1.40 0.10 31.78
0+463 - 0+786 323 1.40 0.10 45.22

0+227 - 0+463 236 2.00 0.10 47.20


0+786 - 0+913 127 2.00 0.10 25.40

Plat Lantai
0+000 - 0+913 913 2.00 0.10 182.60
0+913 - 0+953 40 2.00 0.15 12.00

TOTAL 344.20

PLAZA Diameter
Plaza Besar 15.00 0.15 176.79 26.52

TOTAL 26.52
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT

DIREKTORAT
PENGEMBANGAN JENDERAL CIPTA KARYA
Jalan Cipaku V. No. 01KAWASAN
Kebayoran PERMUKIMAN
Baru, Jakarta Se
BACK UP OF QUANTITY
Nama Kegiatan : Pembangunan Kawasan Pariwisata Pulau Morotai, Provinsi Maluku Utara
Lokasi : Pulau Morotai, Provinsi Maluku Utara
Tahun Anggaran : 2017/2018

ITEM PEKERJAAN PASANGAN BATU KALI

No STATION PANJANG LEBAR TINGGI VOLUME KET


(M) (M) (M) (M3)

0+000 - 0+227 227 1.40 1.50 477


0+463 - 0+786 323 1.40 1.50 678

0+227 - 0+463 236 2.00 1.50 708


0+786 - 0+913 127 2.00 1.50 381

Total Jalan Pelabuhan 2,244.00


KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT

SATKERJalan DIREKTORAT JENDERAL


PENGEMBANGAN KAWASAN CIPTA KARYA STRATEGIS
PERMUKIMAN
Cipaku V. No. 01 Kebayoran Baru, Jakarta Selatan
BACK UP OF QUANTITY
Nama Kegiatan : Pembangunan Kawasan Pariwisata Pulau Morotai, Provinsi Maluku Utara
Lokasi : Pulau Morotai, Provinsi Maluku Utara
Tahun Anggaran : 2017/2018

ITEM PEKERJAAN PEMASANGAN WIREMESH M8

No STATION UNIT PANJANG LEBAR JUMLAH JUMLAH KELILING LUAS TUL VOLUME BJ VOLUME KET
(BH) (M) (M) (Panjang) (Lebar) (M) (M2) (M3) (KG/M3) (KG)

PEKERJAAN BEACH WALK


1 0+000 - 0+913 1 913 2.00 6,088.00 15.00 25,871.00 0.00005 1.30 7,854.00 10,217.60
2 0+913 - 0+953 2 40 2.00 268.00 15.00 1,136.00 0.00005 0.11 7,854.00 897.31

Total Jalan Pelabuhan 11,114.91

PEKERJAAN PLAZA Diameter Luas Tebal Volume Kg/m3


Plaza Besar 15.00 176.79 0.15 26.52 74.78 1,982.90

Total Jalan Pelabuhan 1,982.90


KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT

ERJalan DIREKTORAT JENDERAL


PENGEMBANGAN KAWASAN CIPTA KARYA S
PERMUKIMAN
Cipaku V. No. 01 Kebayoran Baru, Jakarta Selat
BACK UP OF QUANTITY
Nama Kegiatan : Pembangunan Kawasan Pariwisata Pulau Morotai, Provinsi Maluku Utara
Lokasi : Pulau Morotai, Provinsi Maluku Utara
Tahun Anggaran : 2017/2018

ITEM PEKERJAAN PASANGAN BATU BATA

No STATION L/R PANJANG LEBAR TINGGI VOLUME KET


(M) (M) (M) (M3)

Beach Walk
0+000 - 0+913 913 0.24 0.80 175.30

Total Jalan Pelabuhan 175.30


KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT

DIREKTORAT JENDERAL
PENGEMBANGAN KAWASAN CIPTA KARYA
PERMUKIMAN
Jalan Cipaku V. No. 01 Kebayoran Baru, Jakarta Se
BACK UP OF QUANTITY
Nama Kegiatan : Pembangunan Kawasan Pariwisata Pulau Morotai, Provinsi Maluku Utara
Lokasi : Pulau Morotai, Provinsi Maluku Utara
Tahun Anggaran : 2017/2018

ITEM PEKERJAAN PASANGAN BATU ANDESIT

No STATION PANJANG LEBAR TINGGI VOLUME KET


(M) (M) (M) (M2)

Beach Walk
1 0+000 - 0+913 913.00 1.70 1,552.10
913.00 1.90 1,734.70
2 0+913 - 0+953 40.00 2.00 80.00

TOTAL 3,366.80

Plaza Diameter Kel Tinggi


Plaza Besar 15.00 176.79

TOTAL 176.79
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT

KERJalan DIREKTORAT JENDERAL


PENGEMBANGAN KAWASAN CIPTA KARYA STR
PERMUKIMAN
Cipaku V. No. 01 Kebayoran Baru, Jakarta Selatan
BACK UP OF QUANTITY
Nama Kegiatan : Pembangunan Kawasan Pariwisata Pulau Morotai, Provinsi Maluku Utara
Lokasi : Pulau Morotai, Provinsi Maluku Utara
Tahun Anggaran : 2017/2018

ITEM PEKERJAAN : DIV. II, 2.1 Galian untuk Selokan Drainase dan Saluran Air

No STATION L/R PANJANG LEBAR TINGGI VOLUME KET


(M) (M) (M) (M3)

Jalan Lingkungan

Segmen A
0+000 - 0+259 2 259 1.10 0.80 456
0+259 - 0+277 2 18 1.10 0.80 32

Segmen B
0+000 - 0+179 2 179 1.10 0.80 315
0+179 - 0+267 2 88 1.10 0.80 155

Segmen C
0+000 - 0+130 2 130 1.10 0.80 229
0+130 - 0+167 2 37 1.10 0.80 65

Segmen D (Jalan Baru)


0+000 - 0+335 2 335 1.10 0.80 590

Segmen E (Jalan Baru)


0+000 - 0+486 2 486 1.10 0.80 855

Segmen F
0+000 - 0+164 2 164 1.10 0.80 289
0+164 - 0+167 2 3 1.10 0.80 5

Segmen H
0+000 - 0+215 2 215 1.10 0.80 378
0+215 - 0+386 2 171 1.10 0.80 301

Segmen I (Jalan Baru)


0+000 - 0+150 2 150 1.10 0.80 264

Segmen J (Jalan Baru)


0+000 - 0+343 2 343 1.10 0.80 604

Total Jalan Lingkungan 2,578 4,537.28

Jalan Pelabuhan
Segmen G (Jalan Baru)
0+000 - 0+833 2 833 1.10 0.80 1,466

Segmen K (Jalan Baru)


0+000 - 0+425 2 425 1.10 0.80 748

Total Jalan Pelabuhan 1,258 2,214.08


KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT

SATKERJalan DIREKTORAT JENDERAL


PENGEMBANGAN KAWASAN CIPTA KARYA STRATEGIS
PERMUKIMAN
Cipaku V. No. 01 Kebayoran Baru, Jakarta Selatan
BACK UP OF QUANTITY
Nama Kegiatan : Pembangunan Kawasan Pariwisata Pulau Morotai, Provinsi Maluku Utara
Lokasi : Pulau Morotai, Provinsi Maluku Utara
Tahun Anggaran : 2017/2018

ITEM PEKERJAAN : DIV. II, 2.2.(1) PASANGAN BATU DENGAN MORTAR


STATION DIMENSI LUAS
LUAS 1 LUAS 2 VOLUME
No L/R PANJANG a1 a2 b1 b2 TOTAL KETERANGAN
DARI KE
(m) (m) (m) (m) (m) (m) (m) (m2) (m3)
Jalan Lingkungan

Segmen A
0+000 - 0+259 2 259 0.548 284.02
0+259 - 0+277 2 18 0.548 19.74

Segmen B
0+000 - 0+179 2 179 0.548 196.29
0+179 - 0+267 2 88 0.548 96.50

Segmen C
0+000 - 0+130 2 130 0.548 142.56
0+130 - 0+167 2 37 0.548 40.57

Segmen D (Jalan Baru)


0+000 - 0+335 2 335 0.548 367.36

Segmen E (Jalan Baru)


0+000 - 0+486 2 486 0.548 532.95

Segmen F
0+000 - 0+164 2 164 0.548 179.84
0+164 - 0+167 2 3 0.548 3.29

Segmen H
0+000 - 0+215 2 215 0.548 235.77
0+215 - 0+386 2 171 0.548 187.52

Segmen I (Jalan Baru)


0+000 - 0+150 2 150 0.548 164.49

Segmen J (Jalan Baru)


0+000 - 0+343 2 343 0.548 376.13

Total Jalan Lingkungan 2,827.03

Jalan Pelabuhan
Segmen G (Jalan Baru)
0+000 - 0+833 2 833 0.548 913.47

Segmen K (Jalan Baru)


0+000 - 0+425 2 425 0.548 466.06

Total Jalan Pelabuhan 1,379.52


KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT

SATKERJalan DIREKTORAT JENDERAL


PENGEMBANGAN CIPTA KARYA STRATEGIS
Cipaku V. No. 01KAWASAN
Kebayoran PERMUKIMAN
Baru, Jakarta Selatan
BACK UP OF QUANTITY
Nama Kegiatan : Pembangunan Kawasan Pariwisata Pulau Morotai, Provinsi Maluku Utara
Lokasi : Pulau Morotai, Provinsi Maluku Utara
Tahun Anggaran : 2017/2018

ITEM PEKERJAAN : DIV. II, 2.2.(1) PASANGAN BATU DENGAN MORTAR


STATION DIMENSI LUAS
LUAS 1 LUAS 2 VOLUME
No L/R PANJANG a1 a2 b1 b2 TOTAL KETERANGAN
DARI KE
(m) (m) (m) (m) (m) (m) (m) (m2) (m3)
Jalan Lingkungan

Segmen A
0+000 - 0+259 2 259 0.10 0.90 46.62
0+259 - 0+277 2 18 0.10 0.90 3.24

Segmen B
0+000 - 0+179 2 179 0.10 0.90 32.22
0+179 - 0+267 2 88 0.10 0.90 15.84

Segmen C
0+000 - 0+130 2 130 0.10 0.90 23.40
0+130 - 0+167 2 37 0.10 0.90 6.66

Segmen D (Jalan Baru)


0+000 - 0+335 2 335 0.10 0.90 60.30

Segmen E (Jalan Baru)


0+000 - 0+486 2 486 0.10 0.90 87.48

Segmen F
0+000 - 0+164 2 164 0.10 0.90 29.52
0+164 - 0+167 2 3 0.10 0.90 0.54

Segmen H
0+000 - 0+215 2 215 0.10 0.90 38.70
0+215 - 0+386 2 171 0.10 0.90 30.78

Segmen I (Jalan Baru)


0+000 - 0+150 2 150 0.10 0.90 27.00

Segmen J (Jalan Baru)


0+000 - 0+343 2 343 0.10 0.90 61.74

Total Jalan Lingkungan 464.04

Jalan Pelabuhan
Segmen G (Jalan Baru)
0+000 - 0+833 2 833 0.10 0.90 149.94

Segmen K (Jalan Baru)


0+000 - 0+425 2 425 0.10 0.90 76.50

Total Jalan Pelabuhan 226.44


KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT

RJalan DIREKTORAT
PENGEMBANGAN JENDERAL CIPTA
Cipaku V. No. 01KAWASAN
Kebayoran PERM
Baru,
BACK UP OF QUANTITY
Nama Kegiatan : Pembangunan Kawasan Pariwisata Pulau Morotai, Provinsi Maluku U
Lokasi : Pulau Morotai, Provinsi Maluku Utara
Tahun Anggaran : 2017/2018

ITEM PEKERJAAN : GALIAN BIASA

No STATION L/R PANJANG LEBAR TINGGI JUMLAH


(M) (M) (M) (BH)

Jalan Lingkungan

Segmen A
0+000 - 0+259 L+R 259 2.50 0.15 2.00
0+259 - 0+277 L+R 18 8.50 0.35 1.00

Segmen B
0+000 - 0+179 L+R 179 2.50 0.15 2.00
0+179 - 0+267 L+R 88 8.50 0.35 1.00

Segmen C
0+000 - 0+130 L+R 130 2.25 0.15 2.00
0+130 - 0+167 L+R 37 8.50 0.35 1.00

Segmen D (Jalan Baru)


0+000 - 0+335 L+R 335 8.50 0.35 1.00

Segmen E (Jalan Baru)


0+000 - 0+486 L+R 486 8.50 0.35 1.00

Segmen F
0+000 - 0+164 L+R 164 3.25 0.15 2.00
0+164 - 0+167 L+R 3 8.50 0.35 1.00

Segmen H
0+000 - 0+215 L+R 215 2.50 0.15 2.00
0+215 - 0+386 L+R 171 8.50 0.35 1.00

Segmen I (Jalan Baru)


0+000 - 0+150 L+R 150 8.50 0.35 1.00

Segmen J (Jalan Baru)


0+000 - 0+343 L+R 343 8.50 0.35 1.00

Total Jalan Lingkungan 2,578

Jalan Pelabuhan
Segmen G (Jalan Baru)
0+000 - 0+833 L+R 833 9.00 0.45 1.00

Segmen K (Jalan Baru)


0+000 - 0+425 L+R 425 9.00 0.45 1.00

Total Jalan Pelabuhan 1,258


AHAN RAKYAT

L CIPTA KARYA
N PERMUKIMAN STRATEGIS
an Baru, Jakarta Selatan
ANTITY
ai, Provinsi Maluku Utara

VOLUME KET
(M3)

194.25 L = 3.5M
53.55 Jalan Baru

134.25 L = 3.5M
261.80 Jalan Baru

87.75 L = 4M
110.08 Jalan Baru

996.63

1,445.85

159.90 L = 2M
8.93 Jalan Baru
161.25 L = 3.5M
508.73 Jalan Baru

446.25

1,020.43

5,589.63

3,373.65

1,721.25

5,094.90
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT

RJalan DIREKTORAT
PENGEMBANGAN JENDERAL CIPTA
Cipaku V. No. 01KAWASAN
Kebayoran PERM
Baru,
BACK UP OF QUANTITY
Nama Kegiatan : Pembangunan Kawasan Pariwisata Pulau Morotai, Provinsi Maluku U
Lokasi : Pulau Morotai, Provinsi Maluku Utara
Tahun Anggaran : 2017/2018

ITEM PEKERJAAN : TIMBUNAN PILIHAN DARI SUMBER GALIAN

No STATION L/R PANJANG LEBAR TINGGI JUMLAH


(M) (M) (M) (BH)

Jalan Lingkungan

Segmen A
0+000 - 0+259 L+R 259 1.750 0.24 2.00
0+259 - 0+277 L+R 18 1.750 0.24 2.00

Segmen B
0+000 - 0+179 L+R 179 1.750 0.24 2.00
0+179 - 0+267 L+R 88 1.750 0.24 2.00

Segmen C
0+000 - 0+130 L+R 130 1.750 0.24 2.00
0+130 - 0+167 L+R 37 1.750 0.24 2.00

Segmen D (Jalan Baru)


0+000 - 0+335 L+R 335 1.750 0.24 2.00

Segmen E (Jalan Baru)


0+000 - 0+486 L+R 486 1.750 0.24 2.00

Segmen F
0+000 - 0+164 L+R 164 1.750 0.24 2.00
0+164 - 0+167 L+R 3 1.750 0.24 2.00

Segmen H
0+000 - 0+215 L+R 215 1.750 0.24 2.00
0+215 - 0+386 L+R 171 1.750 0.24 2.00

Segmen I (Jalan Baru)


0+000 - 0+150 L+R 150 1.750 0.24 2.00

Segmen J (Jalan Baru)


0+000 - 0+343 L+R 343 1.750 0.24 2.00

Total Jalan Lingkungan 2,578

Jalan Pelabuhan
Segmen G (Jalan Baru)
0+000 - 0+833 L+R 833 1.00 0.40 2.00

Segmen K (Jalan Baru)


0+000 - 0+425 L+R 425 1.00 0.40 2.00

Total Jalan Pelabuhan 1,258


MAHAN RAKYAT

AL
AN CIPTA KARYA
an PERMUKIMAN STRATEGIS
Baru, Jakarta Selatan
ANTITY
ai, Provinsi Maluku Utara

MBER GALIAN

VOLUME KET
(M3)

217.56 L = 3.5M
15.12 Jalan Baru

150.36 L = 3.5M
73.92 Jalan Baru

109.20 L = 4M
31.08 Jalan Baru

281.40

408.24

137.76 L = 2M
2.52 Jalan Baru
180.60 L = 3.5M
143.64 Jalan Baru

126.00

288.12

2,165.52

666.40

340.00

1,006.40
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT

KERJalan DIREKTORAT JENDERAL


PENGEMBANGAN KAWASAN CIPTA KARYA S
PERMUKIMAN
Cipaku V. No. 01 Kebayoran Baru, Jakarta Sela
BACK UP OF QUANTITY
Nama Kegiatan : Pembangunan Kawasan Pariwisata Pulau Morotai, Provinsi Maluku Utara
Lokasi : Pulau Morotai, Provinsi Maluku Utara
Tahun Anggaran : 2017/2018

ITEM PEKERJAAN : PENYIAPAN BADAN JALAN

No STATION L/R PANJANG LEBAR TINGGI LUAS KET


(M) (M) (M) (M2)

Jalan Lingkungan

Segmen A
0+000 - 0+259 L = 3.5M
0+259 - 0+277 18 8.50 153.00 Jalan Baru

Segmen B
0+000 - 0+179 L = 3.5M
0+179 - 0+267 88 8.50 748.00 Jalan Baru

Segmen C
0+000 - 0+130 L = 4M
0+130 - 0+167 37 8.50 314.50 Jalan Baru

Segmen D (Jalan Baru)


0+000 - 0+335

Segmen E (Jalan Baru)


0+000 - 0+486

Segmen F
0+000 - 0+164 L = 2M
0+164 - 0+167 3 8.50 25.50 Jalan Baru

Segmen H
0+000 - 0+215 L = 3.5M
0+215 - 0+386 171 8.50 1,453.50 Jalan Baru

Segmen I (Jalan Baru)


0+000 - 0+150

Segmen J (Jalan Baru)


0+000 - 0+343

Total Jalan Lingkungan 317 2,694.50

Jalan Pelabuhan
Segmen G (Jalan Baru)
0+000 - 0+833 833 9.00 7,497.00

Segmen K (Jalan Baru)


0+000 - 0+425 425 9.00 3,825.00

Total Jalan Pelabuhan 1,258 11,322.00


KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT

KERJalan DIREKTORAT JENDERAL


PENGEMBANGAN KAWASAN CIPTA KARYA S
PERMUKIMAN
Cipaku V. No. 01 Kebayoran Baru, Jakarta Sela
BACK UP OF QUANTITY
Nama Kegiatan : Pembangunan Kawasan Pariwisata Pulau Morotai, Provinsi Maluku Utara
Lokasi : Pulau Morotai, Provinsi Maluku Utara
Tahun Anggaran : 2017/2018

ITEM PEKERJAAN : PENYIAPAN BADAN JALAN

No STATION L/R PANJANG LEBAR TINGGI LUAS KET


(M) (M) (M) (M2)

Jalan Lingkungan

Segmen A
0+000 - 0+259 L = 3.5M
0+259 - 0+277 18 11.50 207.00 Jalan Baru

Segmen B
0+000 - 0+179 L = 3.5M
0+179 - 0+267 88 11.50 1,012.00 Jalan Baru

Segmen C
0+000 - 0+130 L = 4M
0+130 - 0+167 37 11.50 425.50 Jalan Baru

Segmen D (Jalan Baru)


0+000 - 0+335

Segmen E (Jalan Baru)


0+000 - 0+486

Segmen F
0+000 - 0+164 L = 2M
0+164 - 0+167 3 11.50 34.50 Jalan Baru

Segmen H
0+000 - 0+215 L = 3.5M
0+215 - 0+386 171 11.50 1,966.50 Jalan Baru

Segmen I (Jalan Baru)


0+000 - 0+150

Segmen J (Jalan Baru)


0+000 - 0+343

Total Jalan Lingkungan 317 3,645.50

Jalan Pelabuhan
Segmen G (Jalan Baru)
0+000 - 0+833 833 12.00 9,996.00

Segmen K (Jalan Baru)


0+000 - 0+425 425 12.00 5,100.00

Total Jalan Pelabuhan 1,258 15,096.00


PERHITUNGAN KUANTITAS PEKERJAAN
Nama Kegiatan : Pembangunan Kawasan Pariwisata Pulau Morotai, Provinsi Maluku Utara
Lokasi : Pulau Morotai, Provinsi Maluku Utara
Tahun Anggaran : 2017/2018

ITEM PERKERJAAN LAPIS PONDASI AGREGAT KELAS A


STA SISI Panjang Lebar Tebal Volume KETERANGAN
(m) (m) (m) (m3)
Jalan Lingkungan ###
###
Segmen A
0+000 - 0+259 2 259.00 0.75 0.15 58.28 L = 3.5M
259.00 5.00 0.20 259.00

0+259 - 0+277 18.00 5.00 0.35 31.50 Jalan Baru

Segmen B
0+000 - 0+179 2 179.00 0.75 0.15 40.28 L = 3.5M
179.00 5.00 0.20 179.00

0+179 - 0+267 88.00 5.00 0.35 154.00 Jalan Baru

Segmen C
0+000 - 0+130 2 130.00 0.50 0.15 19.50 L = 4M
130.00 5.00 0.20 130.00

0+130 - 0+167 37.00 5.00 0.35 64.75 Jalan Baru

Segmen D (Jalan Baru)


0+000 - 0+335 335.00 5.00 0.35 586.25

Segmen E (Jalan Baru)


0+000 - 0+486 486.00 5.00 0.35 850.50

Segmen F
0+000 - 0+164 2 164.00 1.50 0.15 73.80 L = 2M
164.00 5.00 0.20 164.00

0+164 - 0+167 3.00 5.00 0.35 5.25 Jalan Baru

Segmen H
0+000 - 0+215 2 215.00 0.75 0.15 48.38 L = 3.5M
215.00 5.00 0.20 215.00

0+215 - 0+386 171.00 5.00 0.35 299.25 Jalan Baru

Segmen I (Jalan Baru)


0+000 - 0+150 150.00 5.00 0.35 262.50

Segmen J (Jalan Baru)


0+000 - 0+343 343.00 5.00 0.35 600.25

Total Jalan Lingkungan 4,041.48

Jalan Pelabuhan
Segmen G (Jalan Baru)
0+000 - 0+833 833.00 7.00 0.45 2,623.95

Segmen K (Jalan Baru)


0+000 - 0+425 425.00 7.00 0.45 1,338.75

Total Jalan Pelabuhan 3,962.70


PERHITUNGAN KUANTITAS PEKERJAAN
Nama Kegiatan : Pembangunan Kawasan Pariwisata Pulau Morotai, Provinsi Maluku Utara
Lokasi : Pulau Morotai, Provinsi Maluku Utara
Tahun Anggaran : 2017/2018

ITEM PERKERJAAN AGREGAT KELAS S


STA SISI Panjang Lebar Tebal Volume KETERANGAN
(m) (m) (m) (m3)
Jalan Lingkungan ###
###
Segmen A
0+000 - 0+259 2 259.00 1.75 0.15 135.98 L = 3.5M
0+259 - 0+277 2 18.00 1.75 0.15 9.45 Jalan Baru

Segmen B
0+000 - 0+179 2 179.00 1.75 0.15 93.98 L = 3.5M
0+179 - 0+267 2 88.00 1.75 0.15 46.20 Jalan Baru

Segmen C
0+000 - 0+130 2 130.00 1.75 0.15 68.25 L = 4M
0+130 - 0+167 2 37.00 1.75 0.15 19.43 Jalan Baru

Segmen D (Jalan Baru)


0+000 - 0+335 2 335.00 1.75 0.15 175.88

Segmen E (Jalan Baru)


0+000 - 0+486 2 486.00 1.75 0.15 255.15

Segmen F
0+000 - 0+164 2 164.00 1.75 0.15 86.10 L = 2M
0+164 - 0+167 2 3.00 1.75 0.15 1.58 Jalan Baru

Segmen H
0+000 - 0+215 2 215.00 1.75 0.15 112.88 L = 3.5M
0+215 - 0+386 2 171.00 1.75 0.15 89.78 Jalan Baru

Segmen I (Jalan Baru)


0+000 - 0+150 2 150.00 1.75 0.15 78.75

Segmen J (Jalan Baru)


0+000 - 0+343 2 343.00 1.75 0.15 180.08

Total Jalan Lingkungan 1,353.45

Jalan Pelabuhan
Segmen G (Jalan Baru)
0+000 - 0+833 2 833.00 1.00 0.15 249.90

Segmen K (Jalan Baru)


0+000 - 0+425 2 425.00 1.00 0.15 127.50

Total Jalan Pelabuhan 377.40


PERHITUNGAN KUANTITAS PEKERJAAN
Nama Kegiatan : Pembangunan Kawasan Pariwisata Pulau Morotai, Provinsi Maluku Utara
Lokasi : Pulau Morotai, Provinsi Maluku Utara
Tahun Anggaran : 2017/2018

ITEM PERKERJAAN LAPIS RESAP PENGIKAT


Sisi Panjang
Sta - Sta Keterangan
Ki/Ka (m) Lebar Tebal Volume-T
(m) (liter/m2) (liter)
Jalan Lingkungan

Segmen A
0+000 - 0+259 259 5.00 1.00 1,295.00 L = 3.5M
0+259 - 0+277 18 5.00 1.00 90.00 Jalan Baru

Segmen B
0+000 - 0+179 179 5.00 1.00 895.00 L = 3.5M
0+179 - 0+267 88 5.00 1.00 440.00 Jalan Baru

Segmen C
0+000 - 0+130 130 5.00 1.00 650.00 L = 4M
0+130 - 0+167 37 5.00 1.00 185.00 Jalan Baru

Segmen D (Jalan Baru)


0+000 - 0+335 335 5.00 1.00 1,675.00

Segmen E (Jalan Baru)


0+000 - 0+486 486 5.00 1.00 2,430.00

Segmen F
0+000 - 0+164 164 5.00 1.00 820.00 L = 2M
0+164 - 0+167 3 5.00 1.00 15.00 Jalan Baru

Segmen H
0+000 - 0+215 215 5.00 1.00 1,075.00 L = 3.5M
0+215 - 0+386 171 5.00 1.00 855.00 Jalan Baru

Segmen I (Jalan Baru)


0+000 - 0+150 150 5.00 1.00 750.00

Segmen J (Jalan Baru)


0+000 - 0+343 343 5.00 1.00 1,715.00

Total Jalan Lingkungan 12,890.00

Jalan Pelabuhan
Segmen G (Jalan Baru)
0+000 - 0+833 833 7.00 1.00 5,831.00

Segmen K (Jalan Baru)


0+000 - 0+425 425 7.00 1.00 2,975.00

Total Jalan Lingkungan 8,806.00


PERHITUNGAN KUANTITAS PEKERJAAN
Nama Kegiatan : Pembangunan Kawasan Pariwisata Pulau Morotai, Provinsi Maluku Utara
Lokasi : Pulau Morotai, Provinsi Maluku Utara
Tahun Anggaran : 2017/2018

ITEM PERKERJAAN HRS BASE

LOKASI DIMENSI
L/R Volume BJ Aspal K e t.
Berat (Ton)
Tebal ( m3 ) (Ton/m3)
Panjang Lebar (t
( STA. ~ STA ) = 4 cm )
b c d e g h i= (h x 2,30) p
Jalan Lingkungan

Segmen A
0+000 - 0+259 259.00 5.00 0.040 51.80 2.30 119.14
0+259 - 0+277 18.00 5.00 0.040 3.60 2.30 8.28

Segmen B
0+000 - 0+179 179.00 5.00 0.040 35.80 2.30 82.34
0+179 - 0+267 88.00 5.00 0.040 17.60 2.30 40.48

Segmen C
0+000 - 0+130 130.00 5.00 0.040 26.00 2.30 59.80
0+130 - 0+167 37.00 5.00 0.040 7.40 2.30 17.02

Segmen D (Jalan Baru)


0+000 - 0+335 335.00 5.00 0.040 67.00 2.30 154.10

Segmen E (Jalan Baru)


0+000 - 0+486 486.00 5.00 0.040 97.20 2.30 223.56

Segmen F
0+000 - 0+164 164.00 5.00 0.040 32.80 2.30 75.44
0+164 - 0+167 3.00 5.00 0.040 0.60 2.30 1.38

Segmen H
0+000 - 0+215 215.00 5.00 0.040 43.00 2.30 98.90
0+215 - 0+386 171.00 5.00 0.040 34.20 2.30 78.66

Segmen I (Jalan Baru)


0+000 - 0+150 150.00 5.00 0.040 30.00 2.30 69.00

Segmen J (Jalan Baru)


0+000 - 0+343 343.00 5.00 0.040 68.60 2.30 157.78

Total 2,578 1,185.88


PERHITUNGAN KUANTITAS PEKERJAAN
Nama Kegiatan : Pembangunan Kawasan Pariwisata Pulau Morotai, Provinsi Maluku Utara
Lokasi : Pulau Morotai, Provinsi Maluku Utara
Tahun Anggaran : 2017/2018

ITEM PERKERJAAN AC-BC

LOKASI DIMENSI
L/R Volume BJ Aspal K e t.
Berat (Ton)
Tebal ( m3 ) (Ton/m3)
Panjang Lebar (t
( STA. ~ STA ) = 6 cm )
b c d e g h i= (h x 2,30) p
Jalan Pelabuhan
Segmen G (Jalan Baru)
0+000 - 0+833 833.00 7.00 0.060 349.86 2.30 804.68

Segmen K (Jalan Baru)


0+000 - 0+425 425.00 7.00 0.060 178.50 2.30 410.55

Total 1,258 1,215.23


PERHITUNGAN KUANTITAS PEKERJAAN
Nama Kegiatan : Pembangunan Kawasan Pariwisata Pulau Morotai, Provinsi Maluku Utara
Lokasi : Pulau Morotai, Provinsi Maluku Utara
Tahun Anggaran : 2017/2018 Km

Disain

L/R Panjang Diatas AC-BC


Sta - Sta Keterangan
1/2 (m) Lebar Tebal Volume
(m) (liter/m2) (liter)

Jalan Pelabuhan
Segmen G (Jalan Baru)
0+000 - 0+833 833.00 7.00 0.15 874.65

Segmen K (Jalan Baru)


0+000 - 0+425 425.00 7.00 0.15 446.25

1,258.00 1,320.90
PERHITUNGAN KUANTITAS PEKERJAAN
Nama Kegiatan : Pembangunan Kawasan Pariwisata Pulau Morotai, Provinsi Maluku Utara
Lokasi : Pulau Morotai, Provinsi Maluku Utara
Tahun Anggaran : 2017/2018

ITEM PERKERJAAN AC-WC

LOKASI DIMENSI
L/R Volume BJ Aspal K e t.
Berat (Ton)
( m3 ) (Ton/m3)
Tebal
Panjang Lebar (t
( STA. ~ STA ) = 4 cm )
b c d e g h i= (h x 2,30) p
Jalan Pelabuhan
Segmen G (Jalan Baru)
0+000 - 0+833 833.00 7.00 0.040 233.24 2.30 536.45

Segmen K (Jalan Baru)


0+000 - 0+425 425.00 7.00 0.040 119.00 2.30 273.70

Total 1,258 810.15