1 1.9
2 0.4
4 0.4
0.6 0.6 0.6
1.25 1.25
4.3
Pilar
4.1
1 0.4
2 0.2 1 0.6
3 3.2
4 1.1
3.2 2.2
3
W air di atas pelat talan
4 0.3 20.4
5 18.9
0.8 1.49
6.1
Box Culvert
W
1.9 2.5 3 11.5 49.163
0.4 2.5 1 11.5 49.45
0.3 2.5 1 11.5 37.088
0.4 2.5 3 11.5 20.7
156.4 t/m
11.5 17.101
203.1
ISTIMASI KEBUTUHAN MINIPILE PADA TPT SEPANJANG 30 METER KM 24+000
300
4000
500
Lean concrete t 5 cm
Sand Beding t 5cm
Lebar Tapak
1500
Berat Box Culvert 156.4 ton
Berat Pilar 29.58 ton
Berat Air 203.08 ton
Berat Pipa Sandaran 1.20 ton
Berat Tiang Sandaran 0.65 ton
Berat Trotoar 13.25 ton
Berat Orang 0.25 ton
Beban Vertikal 404.41 ton
manjang TPT
I. Analisa Pembebanan
1. Elemen bangunan atas/Beban mati super struktur (DL)
~ Berat gelagar induk = 5.( 0 . 45 . 2500 ) = 0.00 kg
~ Berat trotoar = 2 . ( 0.3 . 0.8 11.5 . 2400 ) = 13248.00 kg
~ Berat lantai kendaraan = 0.2 . 7. 11.5 . 2400 = 38640.00 kg
~ Berat lapisan aspal = 0.05 . 7. 11.5 . 2200 = 8855.00 kg
~ Berat air hujan = 0.05 . 7. 11.5 . 1000 = 4025.00 kg
Total = 64768.00 kg
Untuk satu abutment = 32384.00 kg
Jadi PND = 32.38 ton
Data Perencanaan Tiang Pancang
Nomor Tiang
Kedalaman Tiang
Jenis Tiang
Diameter Tiang
Dairta Sondir
h qc JHP Dari korelasi rasio qc dan SPT, dari grafi
(m) (kg/cm2) Kg/cm2 qc 60.00 kg/cm2
1.50 14.00 N SPT =
11.80 30.00
12.00 35.00 dengan qc/N
12.20 40.00
12.40 40.00 maka hasil ploting grafik dapat digolon
12.60 40.00
12.80 40.00
13.00 45.00 Daya Dukung Tiang, Pall
13.20 45.00 a Metoe Meyerhoff (1956)
13.40 45.00 elevasi 15.00
13.60 45.00
13.80 40.00 qcr dari kedalaman
14.00 45.00
14.20 50.00 Pult = qc*Ab + Sfs*As
14.40 55.00 2.0
14.60 55.00 Pall=Pult/FK
14.80 55.00
15.00 60.00 1555.00
15.20 60.00
15.40 65.00 b Metode Begemann (1965)
15.60 65.00
15.80 65.00 qcrhdari kedalaman
16.00 65.00 qcrb
16.20 65.00 qc
16.40 65.00
16.60 65.00
Pall=Pult/FK
c Metode Umum
kb = 0.75
ks = 0.5
FK = 2.5
Pult = [kb*qc*Ab + ks*JHP*O]/KF
d Metode Trofimankove
Pall=[kb*qc*A + (JHP/D)*O]/FK
D = 1.5
si rasio qc dan SPT, dari grafik Robertson 1983 pada kedalaman tersebut
= 39 bar
= 28 blow/f
= 2.14286
ng Tiang, Pall
Meyerhoff (1956)
m maka fs qc/200 = 0.3
FK = 2.5 = 222841.73 kg
222.84 ton
de Begemann (1965)
de Trofimankove
LEBAR SISI ( S ) : 30 cm
POINT NO :
DIAMETER TIANG : 30 cm
POINT NO :
Bangun 10
Luas 7.7 m2
Teba 0.3 m
butment = 32592### Kg
2 Trotoar
Luas 0.3 m2
Panj 20 m
3 Pelat Lantai
Tebal0.4 m
Panj 20 m
Leba 13 m
6 Tembok
Juml 4 bh
Panj 3 m
Tingg1.3 m
Leba 0.5 m
7 Concrete Parapet
Panj 20 m
Tingg0.7 m
Leba 0.5 m
8 Aspal
Panj 20 m
Leba 11 m
Teba 0.1 m
9 Air
Panj 20 m
Leba 13 m
Teba 0 m
B. BEBAN HIDUP
10 BebaBeban hidup
Truk 10 ton/m2
Manu0.3 ton/m2
Juml 10 ton/m2
p p
I = . D4 - d4 = . 7.62
64 64
p p
W = . D3 - d3 = . 7.62
32 32
Perhitungan pembebanan :
- Berat sendiri = 4.193 kg/m
- Beban luar (beban orang) = 100 kg/m
qv = 104.19 kg/m
H = 100 kg/m H =
45 cm
I I
cm
65
16 cm 100 cm
Direncanakan :
- Ukuran tiang sandaran = 10 . 16 cm2
- Jarak antar tiang = 1.4 m
- gbeton = 2.5 t/m3
a. Beban vertikal
- Berat sendiri pipa sandaran = 2. 4.193
- Berat sendiri tiang sandaran = 0.1 . 0.16
inci 7.62
kg/m3
Berat isi baja tuang
7850 = 4.19340271 kg/m
Panjang
11.5 1198.2
100 kg/m
Pot. I - I
Pip
h = 16 cm
b= 10 cm
4.193 . 2.0 = 16.7736109 kg
0.16 . 1.0 2500 = 40 kg
N = 56.77 kg
L= 11.5 652.90
Perencanaan Tiang Pancang
Data - data perencanaan
~ Abutment I kedalaman
Elevasi Sondir = + 87.5 m nilai qc
Elevasi Kaki poer = + 80.5 m nilai JHF
Elevasi tanah keras = + 87.5 - 20 = 67.5 m
Direncanakan panjang tiang pancang = 20 - 7 = 13 15 m
Data sondir : qc = 200 kg/cm2
STf = 475 kg/cm
~ Abutment II
Elevasi Sondir = + 85.2 m
Elevasi Kaki poer = + 78.2 m
Elevasi tanah keras = + 85.2 - 15 = 70.2 m
Direncanakan panjang tiang pancang = 15 - 7 = 8 10 m
Data sondir : qc = 150 kg/cm2
STf = 800 kg/cm
~ Abutment I
qc . A STf . K A = 1/4 p d2
Q = +
3 5 = 1/4 . 3,14 . 40 2
= 1256 cm2
= 95.66 ton
~ Abutment II
qc . A STf . K A = 1/4 p d2
Q = +
3 5 = 1/4 . 3,14 . 40 2
= 1256 cm2
= 103.829 ton
0.50
1.25
1.25
0.50
S 3
Sn = 150 cm dan Sm = 125 cm
P1
P0
P2
X2 X3 P3
P4
X1 X4
M = 2 P1.X1 + P2.X2 + 2 P3.X3 + 3 P0. 0 + 2 P4.X4 + P5.X5 + 2 P6.X6
Analogi :
P2 : P1 = X1 : X2 P4 = P1. (X4/X1)
M. X1
P1 =
(2X1 + X2 + 2X32 + 2 X42 + X52 + 2 X62)
2 2
DIMANA :
M = 521.788 - 289.58 = 232.20
X1 = 4.5 m X4 = 1.5 m
X2 = 3.0 m X5 = 3.0 m
X3 = 1.5 m X6 = 4.5 m
232.20 x 4.50
PM =
( 2. 4.5 ^2 + 3.0 ^2 + 2. 1.5 ^2 + 2. 1.5 ^2 + 3.0 ^2 + 2. 4.5 ^2)
1044.91192
PM = = 9.675 Ton
108.00
V
PMAKS = + PM
n
793.8549
PMAKS = + 9.675
10
Dimana : 40
q = Arc Tan = 17.7447 0
125
m = 2
n = 6
17.7 6- 1 2+ 2- 1 6
SFf . N = 1 - . = 0.74
90 2. 6
= 92.5224 ton
= 98.55 ton
6
2.5 40 100
1.25 4 5