Anda di halaman 1dari 27

Box Culvert

Beban Mati Talang 1 0.30


Dimensi Box Culvet 2 4.3
3 4.3
0.30 0.30 4 0.6
3 0.3

1 1.9

2 0.4
4 0.4
0.6 0.6 0.6
1.25 1.25
4.3
Pilar
4.1

1 0.4
2 0.2 1 0.6
3 3.2
4 1.1
3.2 2.2
3
W air di atas pelat talan
4 0.3 20.4
5 18.9
0.8 1.49

6.1
Box Culvert
W
1.9 2.5 3 11.5 49.163
0.4 2.5 1 11.5 49.45
0.3 2.5 1 11.5 37.088
0.4 2.5 3 11.5 20.7
156.4 t/m

4.1 1.0 2.5 1.0 6.2 t


0.6 2.2 2.5 1.0 3.3 t
6.1 3.0 2.5 1.0 20.1 t
29.6 t

W air di atas pelat talang


`

11.5 17.101

203.1
ISTIMASI KEBUTUHAN MINIPILE PADA TPT SEPANJANG 30 METER KM 24+000

L Data Sondir dia Luas Keliling Daya Dukung


tiang Tiang Tiang tiang Ijin Tiang
qc JHF
A O Qa
m kg/cm2 kg/cm2 cm cm2 cm kg/cm2 t/m2
6 200 475 40 1256.00 125.6 155275.09 155.28

L Wt H B Jarak min Istimasi Jumlah Tiang Jumlah


SPv/m dinding dinding Dinding Dinding Antar Tiang n arah n arah tiang
aktual
s=2.5*d Lebar memanjang rencana
ton m ton m m cm buah buah buah buah
404.41 1.00 404.41 1.0 1.00 100 3 1 1 1
terpakai 0 0 0
393.14 30 11794.2 9 3.1 37.5 275.93129 8.266667 80 661.33333
terpakai 7.266667 79 574.06667

300

4000

500

Lean concrete t 5 cm
Sand Beding t 5cm

L= 6000 mm Tiang Pancang Mini Pile Baja dia 15 cm


interval 450 arah lebar dan 500 arah memanjang TPT

dipancang hingga mencapai tanah keras


300 300
450 450

Lebar Tapak
1500
Berat Box Culvert 156.4 ton
Berat Pilar 29.58 ton
Berat Air 203.08 ton
Berat Pipa Sandaran 1.20 ton
Berat Tiang Sandaran 0.65 ton
Berat Trotoar 13.25 ton
Berat Orang 0.25 ton
Beban Vertikal 404.41 ton

manjang TPT
I. Analisa Pembebanan
1. Elemen bangunan atas/Beban mati super struktur (DL)
~ Berat gelagar induk = 5.( 0 . 45 . 2500 ) = 0.00 kg
~ Berat trotoar = 2 . ( 0.3 . 0.8 11.5 . 2400 ) = 13248.00 kg
~ Berat lantai kendaraan = 0.2 . 7. 11.5 . 2400 = 38640.00 kg
~ Berat lapisan aspal = 0.05 . 7. 11.5 . 2200 = 8855.00 kg
~ Berat air hujan = 0.05 . 7. 11.5 . 1000 = 4025.00 kg
Total = 64768.00 kg
Untuk satu abutment = 32384.00 kg
Jadi PND = 32.38 ton
Data Perencanaan Tiang Pancang
Nomor Tiang
Kedalaman Tiang
Jenis Tiang
Diameter Tiang

Dairta Sondir
h qc JHP Dari korelasi rasio qc dan SPT, dari grafi
(m) (kg/cm2) Kg/cm2 qc 60.00 kg/cm2
1.50 14.00 N SPT =
11.80 30.00
12.00 35.00 dengan qc/N
12.20 40.00
12.40 40.00 maka hasil ploting grafik dapat digolon
12.60 40.00
12.80 40.00
13.00 45.00 Daya Dukung Tiang, Pall
13.20 45.00 a Metoe Meyerhoff (1956)
13.40 45.00 elevasi 15.00
13.60 45.00
13.80 40.00 qcr dari kedalaman
14.00 45.00
14.20 50.00 Pult = qc*Ab + Sfs*As
14.40 55.00 2.0
14.60 55.00 Pall=Pult/FK
14.80 55.00
15.00 60.00 1555.00
15.20 60.00
15.40 65.00 b Metode Begemann (1965)
15.60 65.00
15.80 65.00 qcrhdari kedalaman
16.00 65.00 qcrb
16.20 65.00 qc
16.40 65.00
16.60 65.00

Pult = qc*Ab + Sfs*As

Pall=Pult/FK
c Metode Umum
kb = 0.75
ks = 0.5
FK = 2.5
Pult = [kb*qc*Ab + ks*JHP*O]/KF

d Metode Trofimankove

Pall=[kb*qc*A + (JHP/D)*O]/FK
D = 1.5

a Metoe Meyerhoff (1956)


b Metode Begemann (1965)
c Metode Umum
d Metode Trofimankove
canaan Tiang Pancang
= K-3116
= 15 cm Luas tiang Ab 7853.98 cm2
= Tiang Beton Keliling tiang As 314.16 cm2
= 100 cm

si rasio qc dan SPT, dari grafik Robertson 1983 pada kedalaman tersebut
= 39 bar
= 28 blow/f

= 2.14286

ploting grafik dapat digolongkan kedalam jenis tanah kelempungan berpasir

ng Tiang, Pall
Meyerhoff (1956)
m maka fs qc/200 = 0.3

ari kedalaman 13.40 hingga 15.40 = 52.27

qc*Ab + Sfs*As = 410549 + 146555 = 557,104 kg

FK = 2.5 = 222841.73 kg
222.84 ton

de Begemann (1965)

ari kedalaman 1.50 hingga 15.00 = 43.28


15.00 hingga 16.60 = 64.38
= 53.83

= 422751 + 488518 = 238620.69 kg


qc*Ab + Sfs*As
3 5
= 238620.69 kg
238.62 ton
0.75 qc = 60.00 kg/m2
0.5 JHP = 1555.00 kg/m2
2.5
[kb*qc*Ab + ks*JHP*O]/KF 451132.71 kg
451.13 ton

de Trofimankove

kb*qc*A + (JHP/D)*O]/FK 271643 kg


1.5 271.64 ton

Metoe Meyerhoff (1956) 222.84 ton


Metode Begemann (1965) 238.62 ton
Metode Umum 451.13 ton
Metode Trofimankove 271.64 ton
Qa min 222.84 ton
Qa max 451.13 ton
Qa rerata 296.06 ton
###
###
###
LEBAR SISI ( S ) : 30 cm
POINT NO :

S= 0.3 m (lebar sisi) segi tiga


Keliling = 0.9000 m (Keliling)
Ap = 0.0390 m2 (Luas Penampang)
SF = 3 (Faktor Keamanan)

LEBAR SISI ( S ) : 30 cm
POINT NO :

S= 0.3 m (lebar sisi) persegi


Keliling = 1.2000 m (Keliling)
Ap = 0.0900 m2 (Luas Penampang)
SF = 3 (Faktor Keamanan)

DIAMETER TIANG : 30 cm
POINT NO :

D= 0.3 m (diameter) lingkaran


Keliling = 0.9425 m (Keliling)
Ap = 0.0707 m2 (Luas Penampang)
SF = 3 (Faktor Keamanan)
Lua
A. BEBAN MATI J
tment = 14 m
tment = 2.5 m
1 Abut
Dimensi
Dimensi
(m) Luas
(m)
Bang 0.2 0.6 0.1 m2
Bang 0.4 0.5 0.2 m2
Bang 0.3 0.6 0.2 m2
Bang 1.5 0.3 0.5 m2
Bang 1.9 0.3 0.6 m2
Bang 1.9 0.8 0.4 m2
Bang 0.8 0.6 0.5 m2
Bang 2.5 0.8 0.5 m2
Bang 2.5 0.8 2 m2
Juml 4.9 m2
Total Berat = ### Kg

Bangun 10
Luas 7.7 m2
Teba 0.3 m

Berat = 4*0.3 ### Kg

butment = 32592### Kg

2 Trotoar
Luas 0.3 m2
Panj 20 m

Jadi Total Berat T ### Kg

3 Pelat Lantai
Tebal0.4 m
Panj 20 m
Leba 13 m

Jadi Total Berat P ### Kg

4 Balok Sandaran Jembatan


Juml 4 bh
Panj 39 m
Diam 3 in
Bera 7.1 kg/m

Jadi Total Berat B ### Kg

5 Tiang Sandaran 10/16


Juml 22 bh
Tingg0.5 m
Panj 12 m
Bera 7.1 kg/m

Jadi Total Berat S ### Kg

6 Tembok
Juml 4 bh
Panj 3 m
Tingg1.3 m
Leba 0.5 m

Jadi Total berat ### Kg

7 Concrete Parapet
Panj 20 m
Tingg0.7 m
Leba 0.5 m

Jadi Total Berat Concrete Pa ### Kg

8 Aspal
Panj 20 m
Leba 11 m
Teba 0.1 m

Jadi Total Berat A ### Kg

9 Air
Panj 20 m
Leba 13 m
Teba 0 m

Jadi Total Berat A ### Kg

10 Profil PCI girder


Luas 0.3
Panj 20
Juml 7

Jadi Total Berat P ### Kg

Beban Mati (BM) = ### Kg


### ton

B. BEBAN HIDUP
10 BebaBeban hidup
Truk 10 ton/m2
Manu0.3 ton/m2
Juml 10 ton/m2

Jadi Total Beban h ### ton

C. KOMBINASI BEBAN MATI DAN BEBAN HIDUP


1,2 * BM + 1,6 * B ### ton

Jadi Beban untuk 1 Abutment = ### ton

Profil Gelagar yang di pakai


3

4. 1. Perhitungan Pipa Sandaran

Pipa sandaran direncanakan :


- Pipa bulat f (D) = 76.2 mm Diameter lubang (d) =
- Tebal pipa (t) = 2.3 mm
- Jarak antar tiang = 2m

Sifat-sifat penampang pipa :


(A) = LD - Ld = 1/4 . p . D2 - 1/4 . p . d2 = 1/4 . p 7.62

p p
I = . D4 - d4 = . 7.62
64 64

p p
W = . D3 - d3 = . 7.62
32 32

Untuk 1 meter panjang pipa :


Berat isi baja tuang = 7.85 t/m3 = 7850 kg/m3
Berat pipa sandaran = A x 1x Berat isi baja tuang
= 0.0005341914 . 1. 7850

Perhitungan pembebanan :
- Berat sendiri = 4.193 kg/m
- Beban luar (beban orang) = 100 kg/m
qv = 104.19 kg/m

4.2 Perhitungan Tiang Sandaran

H = 100 kg/m H =

45 cm
I I

cm
65

16 cm 100 cm
Direncanakan :
- Ukuran tiang sandaran = 10 . 16 cm2
- Jarak antar tiang = 1.4 m
- gbeton = 2.5 t/m3

Beban-beban yang bekerja pada tiang sandaran :

a. Beban vertikal
- Berat sendiri pipa sandaran = 2. 4.193
- Berat sendiri tiang sandaran = 0.1 . 0.16
inci 7.62

76.2 - 2. 2.3 = 7.16 cm

7.62 2 - 7.16 2 = 5.34191429 cm2

4 - 7.16 4 = 36.5019681 cm4

3 - 7.16 3 = 7.40427993 cm4

kg/m3
Berat isi baja tuang
7850 = 4.19340271 kg/m

Panjang
11.5 1198.2

100 kg/m

Pot. I - I
Pip

h = 16 cm

b= 10 cm
4.193 . 2.0 = 16.7736109 kg
0.16 . 1.0 2500 = 40 kg
N = 56.77 kg

L= 11.5 652.90
Perencanaan Tiang Pancang
Data - data perencanaan
~ Abutment I kedalaman
Elevasi Sondir = + 87.5 m nilai qc
Elevasi Kaki poer = + 80.5 m nilai JHF
Elevasi tanah keras = + 87.5 - 20 = 67.5 m
Direncanakan panjang tiang pancang = 20 - 7 = 13 15 m
Data sondir : qc = 200 kg/cm2
STf = 475 kg/cm

~ Abutment II
Elevasi Sondir = + 85.2 m
Elevasi Kaki poer = + 78.2 m
Elevasi tanah keras = + 85.2 - 15 = 70.2 m
Direncanakan panjang tiang pancang = 15 - 7 = 8 10 m
Data sondir : qc = 150 kg/cm2
STf = 800 kg/cm

~ Abutment I

qc . A STf . K A = 1/4 p d2
Q = +
3 5 = 1/4 . 3,14 . 40 2
= 1256 cm2

200 . 1256 475 . ( p . 40)


Q = + = 95657.0 kg
3 5

= 95.66 ton

~ Abutment II

qc . A STf . K A = 1/4 p d2
Q = +
3 5 = 1/4 . 3,14 . 40 2
= 1256 cm2

200 . 1256 800 . ( p . 40)


Q = + = 103829 kg
3 5

= 103.829 ton

Jumlah tiang pancang


V 404.41
n = = = 3.89 10 buah
Q 103.829

0.50

1.25

1.25

0.50

1.00 1.50 1.50 1.50 1.50 1.50 1.50 1.00

Syarat S < 2,5 D


S 3,0 D (min 0,60 m dan maks 2,00 m)

S 3
Sn = 150 cm dan Sm = 125 cm

Menentukan Beban Akibat Momen Yang Dipikul Tiang Tengah

P1
P0
P2

X2 X3 P3

P4

X1 X4
M = 2 P1.X1 + P2.X2 + 2 P3.X3 + 3 P0. 0 + 2 P4.X4 + P5.X5 + 2 P6.X6

Analogi :
P2 : P1 = X1 : X2 P4 = P1. (X4/X1)

P2 = P1. (X2/X1) P3 = P1. (X3/X1)

M = 2 P1.X1 + P1.(X22/X1) + 2 P1.(X32/X1) + 0 + 2 P1.(X42/X1) + P1.(X52/X1)


+ 2 P1.(X62/X1)

M = (P1/X1) (2X12 + X22 + 2X32 + 2 X42 + X52 + 2 X62)

M. X1
P1 =
(2X1 + X2 + 2X32 + 2 X42 + X52 + 2 X62)
2 2

DIMANA :
M = 521.788 - 289.58 = 232.20

X1 = 4.5 m X4 = 1.5 m
X2 = 3.0 m X5 = 3.0 m
X3 = 1.5 m X6 = 4.5 m

232.20 x 4.50
PM =
( 2. 4.5 ^2 + 3.0 ^2 + 2. 1.5 ^2 + 2. 1.5 ^2 + 3.0 ^2 + 2. 4.5 ^2)

1044.91192
PM = = 9.675 Ton
108.00

V
PMAKS = + PM
n

793.8549
PMAKS = + 9.675
10

PMAKS = 89.061 < QTanah ( 103.829 ) Oke .!

Effisiensi Kelompok Tiang Pancang

2. Metode Converse Labone Formulae


q (n - 1) m + (m - 1) n
SFf . N = 1 - .
90 m .n

Dimana : 40
q = Arc Tan = 17.7447 0
125
m = 2
n = 6
17.7 6- 1 2+ 2- 1 6
SFf . N = 1 - . = 0.74
90 2. 6

Karena tiang juga mengandalkan friction, maka :

200 . 1256 475 . ( p . 40)


Q = + 0.74 = 92522 kg
3 5

= 92.5224 ton

200 . 1256 800 . ( p . 40)


Q = + 0.74 = 98546 kg
3 5

= 98.55 ton

Q > Q ( 89.06 ton ) Oke .!


Titik Sondir
1 2 3 4
kedalaman 10 9.2 11 5.2
nilai qc 200 160 200 190
nilai JHF 475 921 642 388

6
2.5 40 100

1.25 4 5

Anda mungkin juga menyukai