52,093.80 1,519,055.21
12.00 171.43
52,093.80 367,407.15
12.00 171.43
40,975.66 3,055,145.21
12.00 600.00
20,955.66 13,545,529.07
12.00 428.57
20,955.66 1,487,851.86
12.00 428.57
Rp 21,415,871.75
Rp 614,078,079.28
HARI
1.167 0.10
0.467 0.10
1.633 0.233
7.233 0.75
0.263 0.00
1.368 0.00
6.142 0.00
1.528 0.00
16.533 2.362
0.250 0.00
0.300 0.00
2.909 74250
2.450 0.00
2.042 0.00
0.175 0.00
0.043 0.00
8.169 1.167
1.224 0.00
7.311 0.00
2.448 0.00
14.622 0.00
12.016 0.00
0.707 0.00
0.234 0.00
38.562 5.509
1.624 0.00
1.097 0.00
0.243 0.00
1.389 0.00
1.635 0.00
4.026 238500
0.226 0.00
10.240 1.463
0.399 0.00
0.979 0.00
0.294 0.00
1.671 0.239
0.011 0.00
0.006 0.00
0.034 0.00
0.018 0.00
0.017
0.017
0.031
0.038
0.171 0.024
2.686 0.02
0.554 0.02
3.102 0.02
2.229 0.02
2.206 0.02
0.452 0.02
0.320 0.20
0.619 0.06
2.065
1.199
0.250
15.681 2.240
1.183
0.592
1.775 0.254
2.237 2.237
2.237 2.237
1.119 2.237
1.119 2.237
0.373 2.237
0.186 2.237
0.186 2.237
7.457 1.065
0.083
0.003
0.041
0.009
0.008 0.1
0.008 0.1
0.008 0.1
0.003
0.050
0.267
0.029
0.125
0.019
0.020
0.061 0.468
0.013
0.024
0.184
0.047
0.010 0.468
0.003
0.083
1.097 0.157
0.161
0.170
0.041
0.124
1.508
0.166
2.171 0.310
105.161 15.023
III DAFTAR ANALISA HARGA SATUAN PEKERJAAN 2016
A TENAGA
Pekerja L.01 OH 0.200 45,000.00
Tukang Kayu L.02 OH 0.400 57,000.00
Kepala Tukang L.03 OH 0.020 62,000.00
Mandor L.04 OH 0.020 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Dolken kayu Ǿ 8-10/400 cm Batang 1.250 25,000.00
Semen portland Kg 2.50 1,495.00
Seng gelombang Lbr 1.20 57,800.00
Pasir beton m 3
0.005 225,000.00
Koral beton m3 0.009 150,000.00
Kayu 5/7 kruing m3 0.072 6,730,000.00
Paku biasa 2” – 5” Kg 0.060 15,000.00
Meni besi Liter 0.45 28,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.10 45,000.00
Tukang Kayu L.02 OH 0.10 57,000.00
Kepala Tukang L.03 OH 0.01 62,000.00
Mandor L.04 OH 0.005 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu balok 5/7 kruing m3 0.012 6,730,000.00
Paku 2”-3” Kg 0.02 15,000.00
Kayu papan 3/20 sengon m3 0.007 2,150,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.10 45,000.00
Mandor L.04 OH 0.05 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.00 45,000.00
Tukang Kayu L.02 OH 2.00 57,000.00
Kepala Tukang L.03 OH 0.20 62,000.00
Mandor L.04 OH 0.05 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bambu diameter 6-8/600 cm Batang 1.25 13,000.00
Tali ijuk m 3
0.186 8,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D
E Overhead & Profit (Contoh 10 %) 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 13.334 45,000.00
Mandor L.04 0.666 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 6.667 45,000.00
Mandor L.04 0.333 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10 %) 10% x D
F Harga Satuan Pekerjaan (D+E)
A. TENAGA
Pekerja L.01 OH 0.750 45,000.00
Mandor L.04 OH 0.025 65,000.00
JUMLAH TENAGA KERJA
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A. TENAGA
Pekerja L.01 OH 0.900 45,000.00
Mandor L.01 OH 0.045 65,000.00
JUMLAH TENAGA KERJA
B. BAHAN
JUMLH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A. TENAGA
Pekerja L.01 OH 1.050 45,000.00
Mandor L.01 OH 0.067 65,000.00
JUMLAH TENAGA KERJA
B. BAHAN
JUMLH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A. TENAGA
Pekerja L.01 OH 1.000 45,000.00
Mandor L.04 OH 0.032 65,000.00
JUMLAH TENAGA KERJA
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A. TENAGA
Pekerja L.01 OH 1.500 45,000.00
Mandor L.04 OH 0.060 65,000.00
JUMLAH TENAGA KERJA
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A. TENAGA
Pekerja L.01 OH 1.200 45,000.00
Mandor L.04 OH 0.045 65,000.00
JUMLAH TENAGA KERJA
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A. TENAGA
Pekerja L.01 OH 0.050 45,000.00
Mandor L.04 OH 0.005 65,000.00
JUMLAH TENAGA KERJA
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A. TENAGA
Pekerja L.01 OH 0.330 45,000.00
Mandor L.04 OH 0.010 65,000.00
JUMLAH TENAGA KERJA
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A. TENAGA
Pekerja L.01 OH 0.500 45,000.00
Mandor L.04 OH 0.050 65,000.00
JUMLAH TENAGA KERJA
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A. TENAGA
Pekerja L.01 OH 0.500 45,000.00
Mandor L.04 OH 0.050 65,000.00
JUMLAH TENAGA KERJA
B. BAHAN
JUMLAH HARGA BAHAN
C. PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.300 45,000.00
Mandor L.04 OH 0.010 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pasir urug m3 1.200 130,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.800 45,000.00
Tukang L.02 OH 0.400 55,000.00
Kepala Tukang L.03 OH 0.040 62,000.00
Mandor L.04 OH 0.080 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kapur m3 0.135 270,000.00
Pasir Pasang m 3
0.400 210,000.00
Tanah Liat m3 0.948 65,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.150 45,000.00
Mandor L.04 OH 0.015 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Ijuk m3 6.000 8,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.250 45,000.00
Mandor L.04 OH 0.025 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Sirtu m3 1.200 145,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
C. PEKERJAAN PONDASI :
A TENAGA
Pekerja L.01 OH 1.500 45,000.00
Tukang Batu L.02 OH 0.750 55,000.00
Kepala Tukang L.03 OH 0.075 62,000.00
Mandor L.04 OH 0.075 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu belah m3 1.200 200,000.00
Semen Portlan Kg 202.000 1,495.00
Pasir Pasang m 3
0.485 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.500 45,000.00
Tukang Batu L.02 OH 0.750 55,000.00
Kepala Tukang L.03 OH 0.075 62,000.00
Mandor L.04 OH 0.075 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu belah m3 1.200 200,000.00
Semen Portlan Kg 163.000 1,495.00
Pasir Pasang m 3
0.520 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.500 45,000.00
Tukang Batu L.02 OH 0.750 55,000.00
Kepala Tukang L.03 OH 0.075 62,000.00
Mandor L.04 OH 0.075 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu belah m3 1.200 200,000.00
Semen Portlan Kg 136.000 1,495.00
Pasir Pasang m 3
0.544 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.500 45,000.00
Tukang Batu L.02 OH 0.750 55,000.00
Kepala Tukang L.03 OH 0.075 62,000.00
Mandor L.04 OH 0.075 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu belah m3 1.200 200,000.00
Semen Portlan Kg 117.000 1,495.00
Pasir Pasang m 3
0.561 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.3.2.1.4.a Pemasangan 1 m3 pondasi batu belah bahan lama, campuran 1SP : 6PP
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.500 45,000.00
Tukang Batu L.02 OH 0.750 55,000.00
Kepala Tukang L.03 OH 0.075 62,000.00
Mandor L.04 OH 0.075 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu belah m3 0.000 200,000.00
Semen Portlan Kg 117.000 1,495.00
Pasir Pasang m3 0.561 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.500 45,000.00
Tukang Batu L.02 OH 0.750 55,000.00
Kepala Tukang L.03 OH 0.075 62,000.00
Mandor L.04 OH 0.075 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu belah m3 1.200 200,000.00
Semen Portlan Kg 91.000 1,495.00
Pasir Pasang m3 0.584 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.500 45,000.00
Tukang Batu L.02 OH 0.750 55,000.00
Kepala Tukang L.03 OH 0.075 62,000.00
Mandor L.04 OH 0.075 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu belah m3 1.200 200,000.00
Kapur m3 0.170 270,000.00
Semen Portlan Kg 0.170 1,495.00
Pasir Pasang m3 0.340 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.500 45,000.00
Tukang Batu L.02 OH 0.750 55,000.00
Kepala Tukang L.03 OH 0.075 62,000.00
Mandor L.04 OH 0.075 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu belah m3 1.200 200,000.00
Semen Portlan Kg 61.000 1,495.00
Kapur m 3
0.147 270,000.00
Pasir Pasang m 3
0.492 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.3.2.1.8.Pemasangan 1 m3 pondasi batu belah campuran ¼ SP : 1 KP : 4PP
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.500 45,000.00
Tukang Batu L.02 OH 0.750 55,000.00
Kepala Tukang L.03 OH 0.075 62,000.00
Mandor L.04 OH 0.075 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu belah m3 1.200 200,000.00
Semen Portlan Kg 41.000 1,495.00
Kapur m3 0.131 270,000.00
Pasir Pasang m 3
0.523 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.780 45,000.00
Tukang Batu L.02 OH 0.390 55,000.00
Kepala Tukang L.03 OH 0.039 62,000.00
Mandor L.04 OH 0.039 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu belah m3 1.200 200,000.00
Pasir urug m3 0.432 130,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.3.2.1.10. Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2 PB : 3 Kr dan 40% batu belah
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 3.400 45,000.00
Tukang Batu L.02 OH 0.850 55,000.00
Kepala Tukang L.03 OH 0.085 62,000.00
Mandor L.04 OH 0.170 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu belah m3 0.480 200,000.00
Semen Portlan Kg 194.000 1,495.00
Pasir Beton m 3
0.312 225,000.00
Kerikil 2/3 m 3
0.468 240,000.00
Besi beton Kg 126.000 12,650.00
Kawat beton Kg 1.800 19,800.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 2.400 45,000.00
Tukang Batu L.02 OH 0.800 55,000.00
Kepala Tukang L.03 OH 0.080 62,000.00
Mandor L.04 OH 0.119 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu belah m3 0.450 200,000.00
Semen Portlan Kg 194.000 1,495.00
Pasir Beton m3 0.312 225,000.00
Kerikil 2/3 m3 0.468 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
G. PEKERJAAN BETON :
A.4.1.1.1 Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.650 45,000.00
Tukang Batu L.02 OH 0.275 55,000.00
Kepala Tukang L.03 OH 0.028 62,000.00
Mandor L.04 OH 0.083 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 247 1,495.00
Pasir Beton kg 869 160.71
Kerikil 2/3 kg 999 184.62
Air Liter 215 50.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.1.1.2 Membuat 1 m3 beton mutu f’c = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,78
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.650 45,000.00
Tukang Batu L.02 OH 0.275 55,000.00
Kepala Tukang L.03 OH 0.028 62,000.00
Mandor L.04 OH 0.083 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
1. Semen Portland kg 276.000 1,495.00
2. Pasir Beton kg 828 160.71
3. Kerikil 2/3 kg 1012 184.62
4. Air Liter 215 50.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.1.1.3 Membuat 1 m3 beton mutu f’c = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = 0,72
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.650 45,000.00
Tukang Batu L.02 OH 0.275 55,000.00
Kepala Tukang L.03 OH 0.028 62,000.00
Mandor L.04 OH 0.083 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 299.000 1,495.00
Pasir Beton kg 799 160.71
Kerikil 2/3 kg 1017 184.62
Air Liter 215 50.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
CATATAN
Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20 %
A.A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100) slump (3-6) cm, w/c = 0.87
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.200 45,000.00
Tukang Batu L.02 OH 0.200 55,000.00
Kepala Tukang L.03 OH 0.020 62,000.00
Mandor L.04 OH 0.060 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 230.000 1,495.00
Pasir Beton kg 893 160.71
Kerikil 2/3 kg 1027 184.62
Air Liter 200 50.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A. A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.650 45,000.00
Tukang Batu L.02 OH 0.275 55,000.00
Kepala Tukang L.03 OH 0.028 62,000.00
Mandor L.04 OH 0.083 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 326 1,495.00
Pasir Beton kg 760 160.71
Kerikil 2/3 kg 1029 184.62
Air Liter 215 50.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A. A.4.1.1.6 Membuat 1 m3 beton mutu f’c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,61
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.650 45,000.00
Tukang Batu L.02 OH 0.275 55,000.00
Kepala Tukang L.03 OH 0.028 62,000.00
Mandor L.04 OH 0.083 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 352 1,495.00
Pasir Beton kg 731 160.71
Kerikil 2/3 kg 1031 184.62
Air Liter 215 50.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.650 45,000.00
Tukang Batu L.02 OH 0.275 55,000.00
Kepala Tukang L.03 OH 0.028 62,000.00
Mandor L.04 OH 0.083 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 371.000 1,495.00
Pasir Beton kg 698 160.71
Kerikil 2/3 kg 1047 184.62
Air Liter 215 50.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.1.1.8. Membuat 1 m3 beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.650 45,000.00
Tukang Batu L.02 OH 0.275 55,000.00
Kepala Tukang L.03 OH 0.028 62,000.00
Mandor L.04 OH 0.083 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 384 1,495.00
Pasir Beton kg 692 160.71
Kerikil 2/3 kg 1039 184.62
Air Liter 215 50.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.1.1.9. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = 0,53
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.650 45,000.00
Tukang Batu L.02 OH 0.275 55,000.00
Kepala Tukang L.03 OH 0.028 62,000.00
Mandor L.04 OH 0.083 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 406.000 1,495.00
Pasir Beton kg 684 160.71
Kerikil 2/3 kg 1026 184.62
Air Liter 215 50.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.1.1.10. Membuat 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,52
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.650 45,000.00
Tukang Batu L.02 OH 0.275 62,000.00
Kepala Tukang L.03 OH 0.028 62,000.00
Mandor L.04 OH 0.083 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 413.000 1,495.00
Pasir Beton m3 681 160.71
Kerikil 2/3 m3 1021 184.62
Air Liter 215 50.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.1.1.11. Membuat 1 m3 beton mutu f’c = 28,8 MPa (K 325), slump (12 ± 2) cm, w/c = 0,49
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 2.100 45,000.00
Tukang Batu L.02 OH 0.350 55,000.00
Kepala Tukang L.03 OH 0.035 62,000.00
Mandor L.04 OH 0.105 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 439.000 1,495.00
Pasir Beton kg 670 160.71
Kerikil 2/3 kg 1006 184.62
Air Liter 215 50.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.1.1.12. Membuat 1 m3 beton mutu f’c = 31,2 MPa (K 350), slump (12 ± 2) cm, w/c = 0,48
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 2.100 45,000.00
Tukang Batu L.02 OH 0.350 55,000.00
Kepala Tukang L.03 OH 0.035 62,000.00
Mandor L.04 OH 0.105 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 448.000 1,495.00
Pasir Beton kg 667 160.71
Kerikil 2/3 kg 1000 184.62
Air Liter 215 50.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.070 45,000.00
Tukang Besi L.02 OH 0.070 57,000.00
Kepala Tukang L.03 OH 0.007 62,000.00
Mandor L.04 OH 0.004 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Besi beton (polos / ulir) kg 10.500 12,650.00
Kawat beton kg 0.150 19,800.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.025 45,000.00
Tukang Besi L.02 OH 0.025 57,000.00
Kepala Tukang L.03 OH 0.025 62,000.00
Mandor L.04 OH 0.001 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
1. Jaring kawat baja dilas kg 10.200 12,650.00
2. Kawat beton kg 0.050 19,800.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.520 45,000.00
Tukang Kayu L.02 OH 0.260 57,000.00
Kepala Tukang L.03 OH 0.026 62,000.00
Mandor L.04 OH 0.026 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Sengon m3 0.040 2,150,000.00
Paku 5 – 10 cm kg 0.300 15,000.00
Minyak bekisting Liter 0.100 9,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.520 45,000.00
Tukang Kayu L.02 OH 0.260 57,000.00
Kepala Tukang L.03 OH 0.026 62,000.00
Mandor L.04 OH 0.026 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu sengon m3 0.045 2,150,000.00
Paku 5 cm – 10 cm kg 0.300 15,000.00
Minyak bekisting Liter 0.100 9,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.660 45,000.00
Tukang Kayu L.02 OH 0.330 57,000.00
Kepala Tukang L.03 OH 0.033 62,000.00
Mandor L.04 OH 0.033 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Sengon m3 0.040 2,150,000.00
Paku 5 cm – 12 cm kg 0.400 15,000.00
Minyak bekisting Liter 0.200 9,000.00
Balok kayu Meranti m 3
0.015 5,700,000.00
Plywood tebal 9 mm Lbr 0.350 121,000.00
Bambu Batang 2.000 13,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.660 45,000.00
Tukang Kayu L.02 OH 0.330 57,000.00
Kepala Tukang L.03 OH 0.033 62,000.00
Mandor L.04 OH 0.033 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Sengon m3 0.040 2,150,000.00
Paku 5 cm – 12 cm kg 0.400 15,000.00
Minyak bekisting Liter 0.200 9,000.00
Balok kayu Meranti m 3
0.018 5,700,000.00
Plywood tebal 9 mm Lbr 0.350 121,000.00
Bambu Batang 2.000 13,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.660 45,000.00
Tukang Kayu L.02 OH 0.330 57,000.00
Kepala Tukang L.03 OH 0.033 62,000.00
Mandor L.04 OH 0.033 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Sengon m3 0.030 2,150,000.00
Paku 5 cm – 12 cm kg 0.400 15,000.00
Minyak bekisting Liter 0.200 9,000.00
Balok kayu Meranti m3 0.020 5,700,000.00
Plywood tebal 9 mm Lbr 0.350 121,000.00
Bambu Batang 3.000 13,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.660 45,000.00
Tukang Kayu L.02 OH 0.330 57,000.00
Kepala Tukang L.03 OH 0.033 62,000.00
Mandor L.04 OH 0.033 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Sengon m3 0.030 2,150,000.00
Paku 5 cm – 12 cm kg 0.400 15,000.00
Minyak bekisting Liter 0.150 9,000.00
Balok kayu Meranti m3 0.015 5,700,000.00
Plywood tebal 9 mm Lbr 0.350 121,000.00
Bambu Batang 2.000 13,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.150 45,000.00
Tukang Kayu L.02 OH 0.050 57,000.00
Kepala Tukang L.03 OH 0.005 62,000.00
Mandor L.04 OH 0.008 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Kruing (papan) m3 0.0264 7,500,000.00
Paku 5 cm – 12 cm kg 0.600 15,000.00
Bambu Batang 0.500 13,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 5.300 45,000.00
Tukang batu L.02 OH 0.275 55,000.00
Tukang kayu L.02 OH 1.300 57,000.00
Tukang besi L.02 OH 1.050 57,000.00
Kepala tukang L.03 OH 0.262 62,000.00
Mandor L.04 OH 0.265 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Sengon m3 0.200 2,150,000.00
Paku 5 cm – 12 cm kg 1.500 15,000.00
Minyak bekisting Liter 0.400 9,000.00
Besi beton polos kg 157.500 12,650.00
Kawat beton kg 2.250 19,800.00
Semen Portland kg 336.000 1,495.00
Pasir Beton m 3
0.540 225,000.00
Kerikil 2/3 m3 0.810 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 5,650
Pekerja L.01 OH 5.650 45,000.00
Tukang batu L.02 OH 0.275 55,000.00
Tukang kayu L.02 OH 1.560 57,000.00
Tukang besi L.02 OH 1.400 57,000.00
Kepala tukang L.03 OH 0.323 62,000.00
Mandor L.04 OH 0.283 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Sengon m3 0.270 2,150,000.00
Paku 5 cm – 12 cm kg 2.000 15,000.00
Minyak bekisting Liter 0.600 9,000.00
Besi beton polos kg 210.000 12,650.00
Kawat beton kg 3.000 19,800.00
Semen Portland kg 336.000 1,495.00
Pasir Beton m 3
0.540 225,000.00
Kerikil 2/3 m 3
0.810 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 7.050 45,000.00
Tukang batu L.02 OH 0.275 55,000.00
Tukang kayu L.02 OH 1.650 57,000.00
Tukang besi L.02 OH 2.100 57,000.00
Kepala tukang L.03 OH 0.403 62,000.00
Mandor L.04 OH 0.353 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Sengon m3 0.400 2,150,000.00
Paku 5 cm – 12cm kg 4.000 15,000.00
Minyak bekisting Liter 2.000 9,000.00
Besi beton polos kg 315.000 12,650.00
Kawat beton kg 4.500 19,800.00
Semen Portland kg 336.000 1,495.00
Pasir Beton m3 0.540 225,000.00
Kerikil 2/3 m3 0.810 240,000.00
Kayu Meranti balok M3 0.150 5,700,000.00
Plywood 9 mm Lbr 3.500 121,000.00
Bambu Batang 20.000 13,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 6.350 45,000.00
Tukang batu L.02 OH 0.275 55,000.00
Tukang kayu L.02 OH 1.650 57,000.00
Tukang besi L.02 OH 1.400 57,000.00
Kepala tukang L.03 OH 0.333 62,000.00
Mandor L.04 OH 0.318 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Sengon m3 0.320 2,150,000.00
Paku 5 cm – 12 cm kg 3.200 15,000.00
Minyak bekisting Liter 1.600 9,000.00
Besi beton polos kg 210.000 12,650.00
Kawat beton kg 3.000 19,800.00
Semen Portland kg 336.000 1,495.00
Pasir Beton m3 0.540 225,000.00
Kerikil 2/3 m3 0.810 240,000.00
Kayu Meranti balok m 3
0.140 5,700,000.00
Plywood 9 mm Lembar 2.800 121,000.00
Bambu Batang 16.000 13,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 5.300 45,000.00
Tukang batu L.02 OH 0.275 55,000.00
Tukang kayu L.02 OH 1.300 57,000.00
Tukang besi L.02 OH 1.050 57,000.00
Kepala tukang L.03 OH 0.265 62,000.00
Mandor L.04 OH 0.265 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Sengon m3 0.320 2,150,000.00
Paku 5 cm – 12 cm kg 3.200 15,000.00
Minyak bekisting Liter 1.600 9,000.00
Besi beton polos kg 157.500 12,650.00
Kawat beton kg 2.250 19,800.00
Semen Portland kg 336.000 1,495.00
Pasir Beton m3 0.540 225,000.00
Kerikil 2/3 m3 0.810 240,000.00
Kayu Meranti balok m 3
0.120 5,700,000.00
Plywood 9 mm Lembar 2.800 121,000.00
Bambu Batang 32.000 13,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 5.300 45,000.00
Tukang batu L.02 OH 0.275 55,000.00
Tukang kayu L.02 OH 1.300 57,000.00
Tukang besi L.02 OH 1.050 57,000.00
Kepala tukang L.03 OH 0.262 62,000.00
Mandor L.04 OH 0.265 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Sengon m3 0.240 2,150,000.00
Paku 5 cm – 12 cm kg 3.200 15,000.00
Minyak bekisting Liter 1.600 9,000.00
Besi beton polos kg 157.500 12,650.00
Kawat beton kg 2.250 19,800.00
Semen Portland kg 336.000 1,495.00
Pasir Beton m 3
0.540 225,000.00
Kerikil 2/3 m3 0.810 240,000.00
Kayu Meranti balok m 3
0.160 5,700,000.00
Plywood 9 mm Lembar 2.800 121,000.00
Bambu Batang 24.000 13,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 5.650 45,000.00
Tukang batu L.02 OH 0.275 55,000.00
Tukang kayu L.02 OH 1.560 57,000.00
Tukang besi L.02 OH 1.400 57,000.00
Kepala tukang L.03 OH 0.323 62,000.00
Mandor L.04 OH 0.283 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Sengon m3 0.250 2,150,000.00
Paku 5 cm – 12 cm kg 3.000 15,000.00
Minyak bekisting Liter 1.200 9,000.00
Besi beton polos kg 210.000 12,650.00
Kawat beton kg 3.000 19,800.00
Semen Portland kg 336.000 1,495.00
Pasir Beton m 3
0.540 225,000.00
Kerikil 2/3 m 3
0.810 240,000.00
Kayu Meranti balok m 3
0.105 5,700,000.00
Plywood 9 mm Lembar 2.500 121,000.00
Bambu Batang 14.000 13,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.180 45,000.00
Tukang batu L.02 OH 0.020 55,000.00
Tukang kayu L.02 OH 0.020 57,000.00
Tukang besi L.02 OH 0.020 57,000.00
Kepala tukang L.03 OH 0.006 62,000.00
Mandor L.04 OH 0.009 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Sengon m3 0.002 2,150,000.00
Paku 5 cm – 12 cm kg 0.010 15,000.00
Minyak bekisting Liter 0 9,000.00
Besi beton polos kg 3.000 12,650.00
Kawat beton kg 0.450 19,800.00
Semen Portland kg 4.000 1,495.00
Pasir Beton m3 0.006 225,000.00
Kerikil 2/3 m3 0.009 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.297 45,000.00
Tukang batu L.02 OH 0.033 55,000.00
Tukang kayu L.02 OH 0.033 57,000.00
Tukang besi L.02 OH 0.033 57,000.00
Kepala tukang L.03 OH 0.010 62,000.00
Mandor L.04 OH 0.015 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Sengon m3 0.003 2,150,000.00
Paku 5 cm – 12 cm kg 0.020 15,000.00
Minyak bekisting Liter 0 275,000.00
Besi beton polos kg 3.600 12,650.00
Kawat beton kg 0.050 19,800.00
Semen Portland kg 5.500 1,495.00
Pasir Beton m3 0.009 225,000.00
Kerikil 2/3 m3 0.015 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.060 45,000.00
Tukang Las Konstruksi L.03 OH 0.060 55,000.00
Kepala tukang L.03 OH 0.006 62,000.00
Mandor L.04 OH 0.003 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Besi Profil Kg 1.150 13,800.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.2.1.2. Pemasangan 1 kg rangka kuda-kuda baja IWF
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.060 45,000.00
Tukang Las Konstruksi L.03 OH 0.060 55,000.00
Kepala tukang L.03 OH 0.006 62,000.00
Mandor L.04 OH 0.003 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Besi Baja IWF Kg 1.150 13,800.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.100 45,000.00
Tukang Besi Konstruksi L.03 OH 0.100 57,000.00
Kepala tukang L.03 OH 0.001 62,000.00
Mandor L.04 OH 0.005 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Solar Liter 1.000 13,000.00
Minyak pelumas Liter 0.100 35,000.00
JUMLAH HARGA BAHAN
C PERALATAN
1. Sewa alat Jam 0.800 45,000.00
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.2.1.4. Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.050 45,000.00
Tukang Las Biasa L.03 OH 1.050 55,000.00
Kepala tukang L.03 OH 0.105 62,000.00
Mandor L.04 OH 0.052 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Besi siku L 30.30.3 Kg 15.000 13,800.00
Besi plat baja Kg 32.800 12,650.00
Kawat las Kg 0.05 65,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.040 45,000.00
Tukang Besi Konstruksi L.03 OH 0.020 57,000.00
Kepala tukang L.03 OH 0.002 62,000.00
Mandor L.04 OH 0.002 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kawat las listrik Kg 0.400 65,000.00
Solar Liter 0.300 13,000.00
Minyak pelumas Liter 0.040 35,000.00
JUMLAH HARGA BAHAN
C PERALATAN
Sewa alat Jam 0.170 45,000.00
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.2.1.8. Pemasangan 1 m2 pintu lipat (folding door) bahan plastik/PVC
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.440 45,000.00
Tukang L.03 OH 0.440 57,000.00
Kepala tukang L.03 OH 0.044 62,000.00
Mandor L.04 OH 0.022 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pintu lipat m2 1.000 385,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.000 45,000.00
Tukang Khusus Alumunium L.03 OH 1.000 57,000.00
Kepala tukang L.03 OH 0.100 62,000.00
Mandor L.04 OH 0.050 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Rolling dor alluminium m2 1.000 525,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.043 45,000.00
Tukang Khusus Alumunium L.03 OH 0.043 57,000.00
Kepala tukang L.03 OH 0.0043 62,000.00
Mandor L.04 OH 0.0021 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Profil alluminium m 1.100 80,000.00
Skrup fixer buah 2.000 700.00
Sealant Tube 0.060 75,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.085 45,000.00
Tukang Khusus Allumunium L.03 OH 0.085 57,000.00
Kepala tukang L.03 OH 0.0085 62,000.00
Mandor L.04 OH 0.0042 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Profil alluminium m 4.400 80,000.00
Alluminium strip m 14.600 5,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.085 45,000.00
Tukang Allumunium/Kaca L.03 OH 0.085 57,000.00
Kepala tukang L.03 OH 0.009 62,000.00
Mandor L.04 OH 0.005 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pintu alluminium m 4.400 80,000.00
Profil kaca m 4.500 8,000.00
Sealant Tube 0.270 75,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.350 45,000.00
Tukang L.03 OH 0.350 57,000.00
Kepala tukang L.03 OH 0.035 62,000.00
Mandor L.04 OH 0.018 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
1. Venetions blinds dan vertical blinds m2 1.000 113,850.00
(tirai)
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.670 45,000.00
Tukang Las L.03 OH 1.670 55,000.00
Kepala tukang L.03 OH 0.167 62,000.00
Mandor L.04 OH 0.083 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Besi strip kg 6.177 12,650.00
Pengelasan cm 27.080 4,635.84
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.100 45,000.00
Tukang L.03 OH 0.100 57,000.00
Kepala tukang L.03 OH 0.010 62,000.00
Mandor L.04 OH 0.005 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kawat nyamuk m2 1.100 35,000.00
Pengelasan cm 11.11 4,635.84
Baja strip (0,2 x 2) cm kg 1.716 12,650.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.200 45,000.00
Tukang L.03 OH 0.200 57,000.00
Kepala tukang L.03 OH 0.020 62,000.00
Mandor L.04 OH 0.001 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Jendela nako (rangka + kaca 5 mm) m2 1.100 37,500.00
Paku skrup 1 cm – 2,5 cm buah 10.000 150.00
Besi strip m 7.000 12,650.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.200 45,000.00
Tukang L.03 OH 0.200 57,000.00
Kepala tukang L.03 OH 0.020 62,000.00
Mandor L.04 OH 0.001 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Seng plat m 1.050 38,500.00
Paku 1 cm - 2,5 cm kg 0.015 20,000.00
Papan kayu kelas II atau III m 3
0.019 6,400,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.2.1.19 Pemasangan 1 m talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm
Harga Satuan
No Uraian Kode Satuan Koefisien
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.150 45,000.00
Tukang L.03 OH 0.300 57,000.00
Kepala tukang L.03 OH 0.030 62,000.00
Mandor L.04 OH 0.008 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Seng plat m 1.050 38,500.00
Paku 1 cm – 2,5 cm kg 0.010 20,000.00
Besi strip kg 0.500 12,650.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.2.1.20.Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.250 45,000.00
Tukang Besi L.02 OH 0.250 57,000.00
Kepala Tukang L.03 OH 0.025 62,000.00
Mandor L.04 OH 0.013 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Rangka metal hollow 40.40 M1 3.500 33,250
Assesoris (perkuatan, las dll) Ls 1 50,000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.350 45,000.00
Tukang Besi L.02 OH 0.350 57,000.00
Kepala Tukang L.03 OH 0.035 62,000.00
Mandor L.04 OH 0.018 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Rangka metal hollow 40.40 M1 4.000 38,000
Assesoris (perkuatan, las dll) Ls 1 50,000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
D. PEKERJAAN DINDING
A. 4.4.1.1. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 2PP
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.600 45,000.00
Tukang Batu L.02 OH 0.200 55,000.00
Kepala Tukang L.03 OH 0.020 62,000.00
Mandor L.04 OH 0.030 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh 140.000 700.00
Semen Portlan Kg 43.5 1,495.00
Pasir Pasang m3 0.08 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.600 45,000.00
Tukang Batu L.02 OH 0.200 55,000.00
Kepala Tukang L.03 OH 0.020 62,000.00
Mandor L.04 OH 0.030 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh 140.000 700.00
Semen Portlan Kg 32.950 1,495.00
Pasir Pasang m 3
0.091 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.600 45,000.00
Tukang Batu L.02 OH 0.200 55,000.00
Kepala Tukang L.03 OH 0.020 62,000.00
Mandor L.04 OH 0.030 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh 140.000 700.00
Semen Portlan Kg 26.550 1,495.00
Pasir Pasang m3 0.093 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.600 45,000.00
Tukang Batu L.02 OH 0.200 55,000.00
Kepala Tukang L.03 OH 0.020 62,000.00
Mandor L.04 OH 0.030 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh 140.000 700.00
Semen Portlan Kg 22.200 1,495.00
Pasir Pasang m 3
0.102 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.600 45,000
Tukang Batu L.02 OH 0.200 55,000
Kepala Tukang L.03 OH 0.020 62,000
Mandor L.04 OH 0.030 65,000
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh 140.000 700.00
Semen Portlan Kg 18.500 1,495.00
Pasir Pasang m 3
0.122 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A. 4.4.1.6 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3KP : 10PP
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.600 45,000.00
Tukang Batu L.02 OH 0.200 55,000.00
Kepala Tukang L.03 OH 0.020 62,000.00
Mandor L.04 OH 0.030 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh 140.000 700.00
Semen Portlan Kg 10.080 1,495.00
Kapur Padam m3 0.0275 270,000.00
Pasir Pasang m3 0.0925 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A. 4.4.1.7 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.300 45,000.00
Tukang Batu L.02 OH 0.100 55,000.00
Kepala Tukang L.03 OH 0.010 62,000.00
Mandor L.04 OH 0.015 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh 70.000 700.00
Semen Portlan Kg 18.950 1,495.00
Pasir Pasang m 3
0.038 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A. 4.4.1.8 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.300 45,000.00
Tukang Batu L.02 OH 0.100 55,000.00
Kepala Tukang L.03 OH 0.010 62,000.00
Mandor L.04 OH 0.015 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh 70.000 700.00
Semen Portlan Kg 14.370 1,495.00
Pasir Pasang m3 0.040 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.4.1.9 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.300 45,000.00
Tukang Batu L.02 OH 0.100 55,000.00
Kepala Tukang L.03 OH 0.010 62,000.00
Mandor L.04 OH 0.015 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh 70.000 700.00
Semen Portlan Kg 11.500 1,495.00
Pasir Pasang m3 0.043 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.300 45,000.00
Tukang Batu L.02 OH 0.100 55,000.00
Kepala Tukang L.03 OH 0.010 62,000.00
Mandor L.04 OH 0.015 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh 70.000 700.00
Semen Portlan Kg 9.680 1,495.00
Pasir Pasang m 3
0.045 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A. 4.4.1.11 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 6PP
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.300 45,000.00
Tukang Batu L.02 OH 0.100 55,000.00
Kepala Tukang L.03 OH 0.010 62,000.00
Mandor L.04 OH 0.015 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh 70.000 700.00
Semen Portland Kg 8.320 1,495.00
Pasir Pasang m3 0.049 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A. 4.4.1.12 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :8PP
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.300 45,000.00
Tukang Batu L.02 OH 0.100 55,000.00
Kepala Tukang L.03 OH 0.010 62,000.00
Mandor L.04 OH 0.015 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh 70.000 700.00
Semen Portland Kg 6.500 1,495.00
Pasir Pasang m 3
0.050 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A. 4.4.1.13 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 3KP :10PP
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.300 45,000.00
Tukang Batu L.02 OH 0.100 55,000.00
Kepala Tukang L.03 OH 0.010 62,000.00
Mandor L.04 OH 0.015 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh 70.000 700.00
Semen Portlan Kg 4.500 1,495.00
Kapur Padam m 3
0.015 270,000.00
Pasir Pasang m3 0.050 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A. 4.4.1.14 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SM : 1KP :1PP
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.300 45,000.00
Tukang Batu L.02 OH 0.100 55,000.00
Kepala Tukang L.03 OH 0.010 62,000.00
Mandor L.04 OH 0.015 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh 70.000 700.00
Semen Merah Kg 0.018 17,000.00
Kapur Padam m 3
0.018 270,000.00
Pasir Pasang m 3
0.018 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A. 4.4.1.15 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :2PP
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.300 45,000.00
Tukang Batu L.02 OH 0.100 55,000.00
Kepala Tukang L.03 OH 0.010 62,000.00
Mandor L.04 OH 0.015 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh 70.000 700.00
Semen Merah Kg 0.014 17,000.00
Kapur Padam m3 0.014 270,000.00
Pasir Pasang m3 0.028 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.300 45,000.00
Tukang Batu L.02 OH 0.100 55,000.00
Kepala Tukang L.03 OH 0.010 62,000.00
Mandor L.04 OH 0.015 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bataco bh 12.500 5,000.00
Semen Portland Kg 15.160 1,495.00
Pasir Pasang m 3
0.364 210,000.00
Besi angker dia 8 Kg 0.280 12,650.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.300 45,000.00
Tukang Batu L.02 OH 0.100 55,000.00
Kepala Tukang L.03 OH 0.010 62,000.00
Mandor L.04 OH 0.015 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bataco bh 12.500 5,000.00
Semen Portland Kg 12.130 1,495.00
Pasir Pasang m 3
0.388 210,000.00
Besi angker dia 8 Kg 0.280 12,650.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.300 45,000.00
Tukang Batu L.02 OH 0.100 55,000.00
Kepala Tukang L.03 OH 0.010 62,000.00
Mandor L.04 OH 0.015 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata rooster bh 30.000 10,000.00
Semen Portland Kg 11.000 1,495.00
Pasir Pasang m3 0.035 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.300 45,000.00
Tukang Batu L.02 OH 0.100 55,000.00
Kepala Tukang L.03 OH 0.010 62,000.00
Mandor L.04 OH 0.015 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata berongga bh 30.000 10,000.00
Semen Portland Kg 11.000 1,495.00
Pasir Pasang m 3
0.035 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A. 4.4.1.24 Pemasangan 1 m2 dinding bata berongga ekspose 12x11x24 campuran 1SP :3PP
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.300 45,000.00
Tukang Batu L.02 OH 0.150 55,000.00
Kepala Tukang L.03 OH 0.015 62,000.00
Mandor L.04 OH 0.015 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata berongga bh 70.000 10,000.00
Semen Portland Kg 14.000 1,495.00
Pasir Pasang m3 0.032 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
E. PEKERJAAN PLESTERAN :
Harga Satuan
No Uraian Kode Satuan Koefisien
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.300 45,000.00
Tukang Batu L.03 OH 0.150 55,000.00
Kepala Tukang L.03 OH 0.015 62,000.00
Mandor L.04 OH 0.015 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
1. PC Kg 15.504 1,495.00
2. PP m 3
0.016 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Satuan
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.300 45,000.00
Tukang Batu L.03 OH 0.150 55,000.00
Kepala Tukang L.03 OH 0.015 62,000.00
Mandor L.04 OH 0.015 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
1. PC Kg 10.224 1,495.00
2. PP m3 0.020 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.300 45,000.00
Tukang Batu L.03 OH 0.150 55,000.00
Kepala Tukang L.03 OH 0.015 62,000.00
Mandor L.04 OH 0.015 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
1. PC Kg 7.776 1,495.00
2. PP m3 0.023 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.300 45,000.00
Tukang Batu L.03 OH 0.150 55,000.00
Kepala Tukang L.03 OH 0.015 62,000.00
Mandor L.04 OH 0.015 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
1. PC Kg 6.240 1,495.00
2. PP m 3
0.024 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.300 45,000.00
Tukang Batu L.03 OH 0.150 55,000.00
Kepala Tukang L.03 OH 0.015 62,000.00
Mandor L.04 OH 0.015 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
1. PC Kg 5.184 1,495.00
2. PP m 3
0.026 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.300 45,000.00
Tukang Batu L.03 OH 0.150 55,000.00
Kepala Tukang L.03 OH 0.015 62,000.00
Mandor L.04 OH 0.015 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
1. PC Kg 4.416 1,495.00
2. PP m 3
0.027 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.300 45,000.00
Tukang Batu L.03 OH 0.150 55,000.00
Kepala Tukang L.03 OH 0.015 62,000.00
Mandor L.04 OH 0.015 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
1. PC Kg 3.936 1,495.00
2. PP m 3
0.028 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.300 45,000.00
Tukang Batu L.03 OH 0.150 55,000.00
Kepala Tukang L.03 OH 0.015 62,000.00
Mandor L.04 OH 0.015 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
1. PC Kg 3.456 1,495.00
2. PP m3 0.029 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.360 45,000.00
Tukang Batu L.03 OH 0.120 55,000.00
Kepala Tukang L.03 OH 0.012 62,000.00
Mandor L.04 OH 0.018 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
1. PC Kg 5.760 1,495.00
2. KP m3 0.003 270,000.00
3. PP m3 0.013 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.360 45,000.00
Tukang Batu L.03 OH 0.120 55,000.00
Kepala Tukang L.03 OH 0.012 62,000.00
Mandor L.04 OH 0.018 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
1. PC Kg 3.000 1,495.00
2. KP m3 0.005 270,000.00
3. PP m3 0.020 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.360 45,000.00
Tukang Batu L.03 OH 0.120 55,000.00
Kepala Tukang L.03 OH 0.012 62,000.00
Mandor L.04 OH 0.018 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
1. SM m3 0.009 185,000.00
2. KP m 3
0.009 270,000.00
3. PP m 3
0.009 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.360 45,000.00
Tukang Batu L.03 OH 0.120 55,000.00
Kepala Tukang L.03 OH 0.012 62,000.00
Mandor L.04 OH 0.018 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
1. SM m3 0.007 185,000.00
2. KP m 3
0.007 270,000.00
3. PP m 3
0.015 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.400 45,000.00
Tukang Batu L.03 OH 0.200 55,000.00
Kepala Tukang L.03 OH 0.020 62,000.00
Mandor L.04 OH 0.022 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
1. PC Kg 13.632 1,495.00
2. PP m 3
0.027 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.260 45,000.00
Tukang Batu L.03 OH 0.200 55,000.00
Kepala Tukang L.03 OH 0.020 62,000.00
Mandor L.04 OH 0.013 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
1. PC Kg 10.368 1,495.00
2. PP m 3
0.031 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.400 45,000.00
Tukang Batu L.03 OH 0.200 55,000.00
Kepala Tukang L.03 OH 0.020 62,000.00
Mandor L.04 OH 0.022 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
1. PC Kg 8.320 1,495.00
2. PP m 3
0.032 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.400 45,000.00
Tukang Batu L.03 OH 0.200 55,000.00
Kepala Tukang L.03 OH 0.020 62,000.00
Mandor L.04 OH 0.022 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
1. PC Kg 6.912 1,495.00
2. PP m3 0.035 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.400 45,000.00
Tukang Batu L.03 OH 0.200 55,000.00
Kepala Tukang L.03 OH 0.020 62,000.00
Mandor L.04 OH 0.022 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
1. PC Kg 5.888 1,495.00
2. PP m3 0.036 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.440 45,000.00
Tukang Batu L.03 OH 0.220 55,000.00
Kepala Tukang L.03 OH 0.022 62,000.00
Mandor L.04 OH 0.022 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
1. SM m3 0.009 185,000.00
2. KP m 3
0.009 270,000.00
3. PP m 3
0.018 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.150 45,000.00
Tukang Batu L.03 OH 0.075 55,000.00
Kepala Tukang L.03 OH 0.008 62,000.00
Mandor L.04 OH 0.008 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
PC Kg 5.184 1,495.00
PP m 3
0.026 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.080 45,000.00
Tukang Batu L.03 OH 0.400 55,000.00
Kepala Tukang L.03 OH 0.040 62,000.00
Mandor L.04 OH 0.004 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 0.500 1,495.00
Pasir pasang m 3
0.013 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.300 45,000.00
Tukang Batu L.03 OH 0.100 55,000.00
Kepala Tukang L.03 OH 0.010 62,000.00
Mandor L.04 OH 0.015 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 4.320 1,495.00
Pasir pasang Kg 0.006 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.150 45,000.00
Tukang Batu L.03 OH 0.075 55,000.00
Kepala Tukang L.03 OH 0.008 62,000.00
Mandor L.04 OH 0.008 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 3.108 1,495.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.070 45,000.00
Tukang Batu L.03 OH 0.035 55,000.00
Kepala Tukang L.03 OH 0.004 62,000.00
Mandor L.04 OH 0.004 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 1.600 1,495.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP.
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.300 45,000.00
Tukang Batu L.03 OH 0.150 55,000.00
Kepala Tukang L.03 OH 0.015 62,000.00
Mandor L.04 OH 0.015 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 6.340 1,495.00
Pasir pasang m 3
0.012 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.200 45,000.00
Tukang Batu L.03 OH 0.100 55,000.00
Kepala Tukang L.03 OH 0.010 62,000.00
Mandor L.04 OH 0.010 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 3 1,495.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.250 45,000.00
Tukang Batu L.02 OH 0.125 55,000.00
Kepala tukang L.03 OH 0.013 62,000.00
Mandor L.04 OH 0.013 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin abu-abu Bh 11.87 7,650.00
Semen Portlan kg 10.00 1,495.00
Pasir pasang M3 0.045 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.270 45,000.00
Tukang Batu L.02 OH 0.135 55,000.00
Kepala tukang L.03 OH 0.014 62,000.00
Mandor L.04 OH 0.014 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin abu-abu Bh 26.50 3,000.00
Semen Portlan kg 10.40 1,495.00
Pasir pasang M3 0.045 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.260 45,000.00
Tukang Batu L.02 OH 0.13 55,000.00
Kepala tukang L.03 OH 0.013 62,000.00
Mandor L.04 OH 0.013 65,000.00
JUMLAH
TENAGA
KERJA
B BAHAN
Ubin warna Bh 11.87 9,000.00
Semen Portlan kg 10.00 1,495.00
Semen warna Kg 1.50 17,000.00
Pasir pasang M3 0.045 210,000.00
JUMLAH
HARGA
BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.270 45,000.00
Tukang Batu L.02 OH 0.135 55,000.00
Kepala tukang L.03 OH 0.014 62,000.00
Mandor L.04 OH 0.014 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin warna Bh 26.50 3,600.00
Semen Portlan kg 10.40 1,495.00
Semen warna Kg 1.62 17,000.00
Pasir pasang M3 0.045 150.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.250 45,000.00
Tukang Batu L.02 OH 0.125 55,000.00
Kepala tukang L.03 OH 0.013 62,000.00
Mandor L.04 OH 0.013 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin granit Bh 6.63 32,800.00
Semen Portlan kg 9.80 1,495.00
Semen warna Kg 1.30 17,000.00
Pasir pasang M3 0.045 150.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.260 45,000.00
Tukang Batu L.02 OH 0.13 55,000.00
Kepala tukang L.03 OH 0.013 62,000.00
Mandor L.04 OH 0.013 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin granit Bh 11.87 22,500.00
Semen Portlan kg 10.00 1,495.00
Semen warna Kg 1.50 17,000.00
Pasir pasang M3 0.045 150.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.250 45,000.00
Tukang Batu L.02 OH 0.125 55,000.00
Kepala tukang L.03 OH 0.013 62,000.00
Mandor L.04 OH 0.013 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin teralux Bh 6.63 38,200.00
Semen Portlan kg 9.80 1,495.00
Semen warna Kg 1.30 17,000.00
Pasir pasang M3 0.045 150.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.24 45,000.00
Tukang Batu L.02 OH 0.12 55,000.00
Kepala tukang L.03 OH 0.012 62,000.00
Mandor L.04 OH 0.012 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Ubin teralux marmer Bh 3.10 95,400.00
Semen Portlan kg 9.60 1,495.00
Semen warna Kg 1.50 17,000.00
Pasir pasang M3 0.045 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.09 45,000.00
Tukang Batu L.02 OH 0.09 55,000.00
Kepala tukang L.03 OH 0.009 62,000.00
Mandor L.04 OH 0.005 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin PC Bh 5.30 8,000.00
Semen Portland kg 1.65 1,495.00
Pasir pasang M3 0.004 210,000.00
JUMLAH
HARGA
BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.09 45,000.00
Tukang Batu L.02 OH 0.09 55,000.00
Kepala tukang L.03 OH 0.009 62,000.00
Mandor L.04 OH 0.005 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin PC Bh 3.53 10,000.00
Semen Portland kg 1.24 1,495.00
Pasir pasang M3
0.003 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.09 45,000.00
Tukang Batu L.02 OH 0.09 55,000.00
Kepala tukang L.03 OH 0.009 62,000.00
Mandor L.04 OH 0.005 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin warna Bh 2.65 8,500.00
Semen Portlan kg 1.14 1,495.00
Semen warna Kg 0.10 17,000.00
Pasir pasang M3 0.003 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.09 45,000.00
Tukang Batu L.02 OH 0.09 55,000.00
Kepala tukang L.03 OH 0.009 62,000.00
Mandor L.04 OH 0.005 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin warna Bh 3.53 10,500.00
Semen Portlan kg 1.14 1,495.00
Semen warna Kg 0.10 17,000.00
Pasir pasang M3 0.003 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.09 45,000.00
Tukang Batu L.02 OH 0.09 55,000.00
Kepala tukang L.03 OH 0.009 62,000.00
Mandor L.04 OH 0.005 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin warna Bh 2.65 20,000.00
Semen Portlan kg 1.14 1,495.00
Semen warna Kg 0.10 17,000.00
Pasir pasang M3 0.003 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.4.3.32.Pemasangan 1m2 lantai keramik ukuran 10 cm x 20 cm
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.70 45,000
Tukang Batu L.02 OH 0.35 55,000
Kepala tukang L.03 OH 0.035 62,000
Mandor L.04 OH 0.035 65,000
JUMLAH TENAGA KERJA
B BAHAN
Ubin keramik Bh 10.00 2,650.00
Semen Portland Kg 8.19 1,495.00
Pasir pasang M3 0.045 210000
Semen warna Kg 1.62 17000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.70 45,000
Tukang Batu L.02 OH 0.35 55,000
Kepala tukang L.03 OH 0.035 62,000
Mandor L.04 OH 0.035 65,000
JUMLAH TENAGA KERJA
B BAHAN
Ubin keramik Bh 6.00 9,440.00
Semen Portland Kg 8.19 1,495.00
Pasir pasang M3 0.045 210,000.00
Semen warna Kg 1.62 17,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.4.3.35.Pemasangan 1m2 lantai keramik ukuran 30cm x 30cm
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.70 45,000
Tukang Batu L.02 OH 0.35 55,000
Kepala tukang L.03 OH 0.035 62,000
Mandor L.04 OH 0.035 65,000
JUMLAH TENAGA KERJA
B BAHAN
Ubin keramik Bh 11.87 4,050.00
Semen Portland Kg 10.00 1,495.00
Pasir pasang M3 0.045 210000
Semen warna Kg 1.50 17000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.70 45,000
Tukang Batu L.02 OH 0.35 55,000
Kepala tukang L.03 OH 0.035 62,000
Mandor L.04 OH 0.035 65,000
JUMLAH TENAGA KERJA
B BAHAN
Ubin keramik Bh 26.50 2,080.00
Semen Portlan Kg 10.40 1,495.00
Pasir pasang M3 0.045 210000
Semen warna Kg 1.62 17000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.05 45,000
Tukang Batu L.02 OH 0.525 55,000
Kepala tukang L.03 OH 0.053 62,000
Mandor L.04 OH 0.053 65,000
JUMLAH TENAGA KERJA
B BAHAN
Ubin keramik Bh 33.00 5,200
Semen Portlan Kg 9.80 1,495
Pasir pasang M3 0.045 210,000
Semen warna Kg 4.37 17,000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.09 45,000
Tukang Batu L.02 OH 0.09 55,000
Kepala tukang L.03 OH 0.035 62,000
Mandor L.04 OH 0.005 65,000
JUMLAH TENAGA KERJA
B BAHAN
Plint keramik Bh 5.30 2650
Semen Portlan Kg 1.14 1,495.00
Pasir pasang M3 0.003 210000
Semen warna Kg 0.025 17000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.09 45,000
Tukang Batu L.02 OH 0.09 55,000
Kepala tukang L.03 OH 0.035 62,000
Mandor L.04 OH 0.005 65,000
JUMLAH TENAGA KERJA
B BAHAN
Plint keramik Bh 10.60 5,250
Semen Portland Kg 1.14 1,495
Pasir pasang M3 0.003 210,000
Semen warna Kg 0.05 17,000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.09 45,000
Tukang Batu L.02 OH 0.09 55,000
Kepala tukang L.03 OH 0.035 62,000
Mandor L.04 OH 0.005 65,000
JUMLAH TENAGA KERJA
B BAHAN
Plint keramik Bh 5.30 5,200
Semen Portland Kg 0.57 1,495
Pasir pasang M3 0.0015 210,000
Semen warna Kg 0.013 17,000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.70 45,000
Tukang Batu L.02 OH 0.35 55,000
Kepala tukang L.03 OH 0.035 62,000
Mandor L.04 OH 0.035 65,000
JUMLAH TENAGA KERJA
B BAHAN
Marmer Bh 1.06 480000
Semen Portlan Kg 8.19 1,495.00
Pasir pasang M3 0.045 210000
Semen warna Kg 0.65 17000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.17 45,000
Tukang Kayu L.02 OH 0.17 57,000
Kepala tukang L.03 OH 0.017 62,000
Mandor L.04 OH 0.009 65,000
JUMLAH TENAGA KERJA
B BAHAN
Karpet m2 1.05 127500
Lem Kg 0.35 25000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.70 45,000
Tukang Kayu L.02 OH 0.35 57,000
Kepala tukang L.03 OH 0.035 62,000
Mandor L.04 OH 0.035 65,000
JUMLAH TENAGA KERJA
B BAHAN
Parquet m2 1.05 240,000.00
Lem Kg 0.60 25,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.90 45,000
Tukang Batu L.02 OH 0.45 55,000
Kepala tukang L.03 OH 0.045 62,000
Mandor L.04 OH 0.045 65,000
JUMLAH TENAGA KERJA
B BAHAN
Porselen Bh 86.00 500
Semen Portlan Kg 9.30 1,495.00
Semen warna Kg 2.75 17000
Pasir Pasang M3 0.02 210000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.90 45,000
Tukang Batu L.02 OH 0.45 55,000
Kepala tukang L.03 OH 0.045 62,000
Mandor L.04 OH 0.045 65,000
JUMLAH TENAGA KERJA
B BAHAN
Keramik artistik Bh 53.00 20,000.00
Semen Portlan Kg 9.30 1,495.00
Pasir Pasang M3 0.018 210,000.00
Semen warna Kg 2.75 17,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.90 45,000
Tukang Batu L.02 OH 0.45 55,000
Kepala tukang L.03 OH 0.045 62,000
Mandor L.04 OH 0.045 65,000
JUMLAH TENAGA KERJA
B BAHAN
Keramik artistik Bh 106.00 15000
Semen Portlan Kg 9.30 1,495.00
Pasir Pasang M3 0.018 210000
Semen warna Kg 2.90 17000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.4.3.53.Pemasangan 1 m2 dinding keramik 10cm x 20cm
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.90 45,000
Tukang Batu L.02 OH 0.45 55,000
Kepala tukang L.03 OH 0.045 62,000
Mandor L.04 OH 0.045 65,000
JUMLAH TENAGA KERJA
B BAHAN
Keramik Bh 53.00 2,650
Semen Portlan Kg 9.30 1,495
Pasir Pasang M3 0.018 210,000
Semen warna Kg 2.75 17,000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.4.3.54.Pemasangan 1 m2 dinding keramik 20cm x 20cm
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.90 45,000
Tukang Batu L.02 OH 0.45 55,000
Kepala tukang L.03 OH 0.045 62,000
Mandor L.04 OH 0.045 65,000
JUMLAH TENAGA KERJA
B BAHAN
Keramik Bh 26.50 2,080.00
Semen Portlan Kg 9.30 1,495.00
Pasir Pasang M3 0.018 210000
Semen warna Kg 1.94 17000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.4.3.55.Pemasangan 1 m2 dinding marmer 100cm x 100cm
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.30 45,000
Tukang Batu L.02 OH 0.65 55,000
Kepala tukang L.03 OH 0.065 62,000
Mandor L.04 OH 0.065 65,000
JUMLAH TENAGA KERJA
B BAHAN
Marmer Bh 1.06 480000
Semen Portlan Kg 12.44 1,495.00
Pasir Pasang M3 0.025 210000
Semen warna Kg 0.65 17000
Paku 12cm Bh 3.03 500
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.00 45,000
Tukang Batu L.02 OH 0.50 55,000
Kepala tukang L.03 OH 0.05 62,000
Mandor L.04 OH 0.05 65,000
JUMLAH TENAGA KERJA
B BAHAN
Bata pelapis Bh 63.00 700
Semen Portlan Kg 12.44 1,495.00
Pasir Pasang M3 0.025 210000
Semen warna Kg 2.75 17000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.70 45,000
Tukang Batu L.02 OH 0.35 55,000
Kepala tukang L.03 OH 0.035 62,000
Mandor L.04 OH 0.035 65,000
JUMLAH TENAGA KERJA
B BAHAN
Batu paras Bh 1.10 105000
Semen Portlan Kg 11.75 1,495.00
Pasir Pasang M3 0.035 210000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.70 45,000
Tukang Batu L.02 OH 0.35 55,000
Kepala tukang L.03 OH 0.035 62,000
Mandor L.04 OH 0.035 65,000
JUMLAH TENAGA KERJA
B BAHAN
Batu temple hitam Bh 1.10 92500
Semen Portlan Kg 11.75 1,495.00
Pasir Pasang M3 0.035 210000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.15 45,000
Tukang Batu L.02 OH 0.15 55,000
Kepala tukang L.03 OH 0.015 62,000
Mandor L.04 OH 0.008 65,000
JUMLAH TENAGA KERJA
B BAHAN
Vynil Bh 11.87 24,000
Lem Kg 0.35 25,000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.35 45,000
Tukang Batu L.02 OH 0.175 55,000
Kepala tukang L.03 OH 0.017 62,000
Mandor L.04 OH 0.002 65,000
JUMLAH TENAGA KERJA
B BAHAN
Wallpaper m 2.20 50,000
Lem Kg 0.25 25,000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.08 45,000
Tukang Batu L.02 OH 0.08 55,000
Kepala tukang L.03 OH 0.008 62,000
Mandor L.04 OH 0.004 65,000
JUMLAH TENAGA KERJA
B BAHAN
Vynil Bh 1.76 15,000
Lem Kg 0.08 25,000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.12 45,000
Tukang Batu L.02 OH 0.12 55,000
Kepala tukang L.03 OH 0.012 62,000
Mandor L.04 OH 0.006 65,000
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu kelas II M3 0.003 10,250,000
Paku/skrup 5cm Kg 0.05 700
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
I PEKERJAAN LANGIT-LANGIT
A TENAGA
Pekerja L.01 OH 0.030 45,000.00
Tukang kayu L.02 OH 0.070 57,000.00
Kepala tukang L.03 OH 0.007 62,000.00
Mandor L.04 OH 0.004 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes semen m2 1.100 20,000.00
Paku tripleks kg 0.010 20,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.120 45,000.00
Tukang kayu L.02 OH 0.120 57,000.00
Kepala tukang L.03 OH 0.012 62,000.00
Mandor L.04 OH 0.006 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Akustik Lembar 5.800 25,000.00
Paku tripleks kg 0.050 20,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.100 45,000.00
Tukang kayu L.02 OH 0.100 57,000.00
Kepala tukang L.03 OH 0.010 62,000.00
Mandor L.04 OH 0.005 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Akustik Lembar 1.500 38,000.00
Paku tripleks kg 0.050 20,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6 mm
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.100 45,000.00
Tukang kayu L.02 OH 0.100 57,000.00
Kepala tukang L.03 OH 0.010 62,000.00
Mandor L.04 OH 0.005 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Tripleks 9 (3 mm) Lembar 0.375 49,500.00
Paku tripleks kg 0.030 20,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.800 45,000.00
Tukang kayu L.02 OH 0.800 57,000.00
Kepala tukang L.03 OH 0.080 62,000.00
Mandor L.04 OH 0.040 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu papan (Bangkirai) m3 0.015 14,000,000.00
Paku tripleks kg 0.010 20,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.100 45,000.00
Tukang kayu L.02 OH 0.050 57,000.00
Kepala tukang L.03 OH 0.005 62,000.00
Mandor L.04 OH 0.005 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Gypsum board Lembar 0.364 75,000.00
Paku skrup kg 0.110 15,000.00
Rangka m' 0.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.5.1.8. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm berikut rangka alluminium
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.500 45,000.00
Tukang Besi L.02 OH 0.500 57,000.00
Kepala tukang L.03 OH 0.050 62,000.00
Mandor L.04 OH 0.025 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Profil Allum"T" m 3.600 6,500.00
Kawat dia 4 mm kg 0.150 16,000.00
Ramset Buah 1.050 22,000.00
Akustik60 x 120 Lembar 1.500 38,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.050 45,000.00
Tukang Kayu L.02 OH 0.050 57,000.00
Kepala tukang L.03 OH 0.005 62,000.00
Mandor L.04 OH 0.003 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
List kayu profil m 1.050 9,000.00
paku kg 0.010 20,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.15 45,000.00
Tukang Kayu L.03 OH 0.075 57,000.00
Kepala tukang L.11 OH 0.0075 62,000.00
Mandor L.15 OH 0.008 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Genteng palentong Bh 25.00 3,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.15 45,000
Tukang Kayu L.03 OH 0.075 57,000
Kepala tukang L.11 OH 0.008 62,000
Mandor L.15 OH 0.008 65,000
JUMLAH TENAGA KERJA
B BAHAN
Genteng kodok Bh 25.00 5,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.40 45,000.00
Tukang Kayu L.03 OH 0.20 57,000.00
Kepala tukang L.11 OH 0.02 62,000.00
Mandor L.15 OH 0.002 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Genteng bubung Bh 5.00 7,500.00
Semen Portlan Kg 8.00 1,495.00
Pasir pasang M3 0.032 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.40 45,000.00
Tukang Kayu L.03 OH 0.20 57,000.00
Kepala tukang L.11 OH 0.02 62,000.00
Mandor L.15 OH 0.002 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Genteng bubung Bh 5.00 8,500.00
Semen Portlan Kg 8.00 1,495.00
Pasir pasang M3 0.032 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.40 45,000.00
Tukang Kayu L.03 OH 0.20 57,000.00
Kepala tukang L.11 OH 0.02 62,000.00
Mandor L.15 OH 0.002 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Genteng bubung Bh 4.00 8,500.00
Semen Portlan Kg 8.00 1,495.00
Pasir pasang M3 0.032 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.140 45,000.00
Tukang Kayu L.03 OH 0.075 57,000.00
Kepala tukang L.11 OH 0.008 62,000.00
Mandor L.15 OH 0.008 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.50 125,000.00
Paku pancing 6x23 Kg 0.12 27,500.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.14 45,000.00
Tukang Kayu L.03 OH 0.075 57,000.00
Kepala tukang L.11 OH 0.008 62,000.00
Mandor L.15 OH 0.008 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.60 125,000.00
Paku pancing 6x23 Kg 0.12 27,500.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.14 45,000.00
Tukang Kayu L.03 OH 0.070 57,000.00
Kepala tukang L.11 OH 0.007 62,000.00
Mandor L.15 OH 0.007 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.60 125,000.00
Paku pancing 6x23 Kg 0.12 27,500.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.14 45,000.00
Tukang Kayu L.03 OH 0.070 57,000.00
Kepala tukang L.11 OH 0.007 62,000.00
Mandor L.15 OH 0.007 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.75 125,000.00
Paku pancing 6x23 Kg 0.12 27,500.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.14 45,000.00
Tukang Kayu L.03 OH 0.070 57,000.00
Kepala tukang L.11 OH 0.007 62,000.00
Mandor L.15 OH 0.007 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.35 125,000.00
Paku pancing 6x23 Kg 0.12 27,500.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.14 45,000.00
Tukang Kayu L.03 OH 0.070 57,000.00
Kepala tukang L.11 OH 0.007 62,000.00
Mandor L.15 OH 0.007 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.42 125,000.00
Paku pancing 6x23 Kg 0.12 27,500.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.14 45,000.00
Tukang Kayu L.03 OH 0.070 57,000.00
Kepala tukang L.11 OH 0.007 62,000.00
Mandor L.15 OH 0.007 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.44 125,000.00
Paku pancing 6x23 Kg 0.12 27,500.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.14 45,000.00
Tukang Kayu L.03 OH 0.070 57,000.00
Kepala tukang L.11 OH 0.007 62,000.00
Mandor L.15 OH 0.007 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.51 125,000.00
Paku pancing 6x23 Kg 0.12 27,500.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.14 45,000.00
Tukang Kayu L.03 OH 0.070 57,000.00
Kepala tukang L.11 OH 0.007 62,000.00
Mandor L.15 OH 0.007 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.80 125,000.00
Paku pancing 6x23 Kg 0.12 27,500.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.14 45,000.00
Tukang Kayu L.03 OH 0.070 57,000.00
Kepala tukang L.11 OH 0.007 62,000.00
Mandor L.15 OH 0.007 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.37 125,000.00
Paku pancing 6x23 Kg 0.12 27,500.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.14 45,000.00
Tukang Kayu L.03 OH 0.070 57,000.00
Kepala tukang L.11 OH 0.007 62,000.00
Mandor L.15 OH 0.007 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.38 125,000.00
Paku pancing 6x23 Kg 0.12 27,500.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.14 45,000.00
Tukang Kayu L.03 OH 0.070 57,000.00
Kepala tukang L.11 OH 0.007 62,000.00
Mandor L.15 OH 0.007 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.46 125,000.00
Paku pancing 6x23 Kg 0.12 27,500.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.14 45,000.00
Tukang Kayu L.03 OH 0.070 57,000.00
Kepala tukang L.11 OH 0.007 62,000.00
Mandor L.15 OH 0.007 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.49 125,000.00
Paku pancing 6x23 Kg 0.12 27,500.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.14 45,000.00
Tukang Kayu L.03 OH 0.070 57,000.00
Kepala tukang L.11 OH 0.007 62,000.00
Mandor L.15 OH 0.007 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92x250 Lbr 0.57 125,000.00
Paku pancing 6x23 Kg 0.12 27,500.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.084 45,000.00
Tukang Kayu L.03 OH 0.125 57,000.00
Kepala tukang L.11 OH 0.013 62,000.00
Mandor L.15 OH 0.004 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bubung stel gel. Lbr 2.40 58,000.00
Paku skrup 3,5” Bh 6.00 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.084 45,000.00
Tukang Kayu L.03 OH 0.125 57,000.00
Kepala tukang L.11 OH 0.013 62,000.00
Mandor L.15 OH 0.004 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bubung stel gel. Lbr 2.1 58,000.00
Paku skrup 3,5” Bh 6.00 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.084 45,000.00
Tukang Kayu L.03 OH 0.125 57,000.00
Kepala tukang L.11 OH 0.013 62,000.00
Mandor L.15 OH 0.004 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bubung stel gel. Lbr 2.05 58,000.00
Paku skrup 3,5” Bh 6.00 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.084 45,000.00
Tukang Kayu L.03 OH 0.125 57,000.00
Kepala tukang L.11 OH 0.013 62,000.00
Mandor L.15 OH 0.004 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Nok paten 92cm Lbr 1.20 75,000.00
Paku skrup 3,5” Bh 6.00 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.084 45,000.00
Tukang Kayu L.03 OH 0.125 57,000.00
Kepala tukang L.11 OH 0.013 62,000.00
Mandor L.15 OH 0.004 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Nok paten 92cm Lbr 1.20 75,000.00
Paku skrup 3,5” Bh 6.00 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.084 45,000.00
Tukang Kayu L.03 OH 0.125 57,000.00
Kepala tukang L.11 OH 0.013 62,000.00
Mandor L.15 OH 0.004 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Nok paten 92cm Lbr 1.20 75,000.00
Paku skrup 3,5” Bh 6.00 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.10 45,000.00
Tukang Kayu L.03 OH 0.15 57,000.00
Kepala tukang L.11 OH 0.013 62,000.00
Mandor L.15 OH 0.004 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Nok paten 92cm Lbr 1.10 75,000.00
Paku skrup 3,5” Bh 6.00 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.084 45,000.00
Tukang Kayu L.03 OH 0.125 57,000.00
Kepala tukang L.11 OH 0.013 62,000.00
Mandor L.15 OH 0.004 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Nok paten 92cm Lbr 1.10 75,000.00
Paku skrup 3,5” Bh 6.00 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.200 45,000.00
Tukang Kayu L.03 OH 0.100 57,000.00
Kepala tukang L.11 OH 0.010 62,000.00
Mandor L.15 OH 0.010 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Genteng beton Bh 11.00 9,500.00
Paku biasa 2”-5” Kg 0.03 20,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.200 45,000.00
Tukang Kayu L.03 OH 0.100 57,000.00
Kepala tukang L.11 OH 0.010 62,000.00
Mandor L.15 OH 0.001 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Genteng metal m2 1.02 229,500.00
Paku biasa ½”-1” Kg 0.20 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.166 45,000.00
Tukang Kayu L.03 OH 0.250 57,000.00
Kepala tukang L.11 OH 0.025 62,000.00
Mandor L.15 OH 0.008 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Sirap kayu Bh 30.00 1,900.00
Paku biasa ½”-1” Kg 0.20 20,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.400 45,000.00
Tukang Kayu L.03 OH 0.200 57,000.00
Kepala tukang L.11 OH 0.020 62,000.00
Mandor L.15 OH 0.020 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Nok genteng beton Bh 3.50 19,000.00
Paku biasa ½”-1” Kg 0.05 20,000.00
Semen PC Kg 10.80 1,495.00
Pasir pasang M3 0.032 210,000.00
Semen warna Kg 1.00 17,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.250 45,000
Tukang Kayu L.03 OH 0.150 57,000
Kepala tukang L.11 OH 0.015 62,000
Mandor L.15 OH 0.013 65,000
JUMLAH TENAGA KERJA
B BAHAN
Nok genteng metal Bh 1.10 45,000.00
Paku biasa ½”-1” Kg 0.05 20,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.125 45,000.00
Tukang Kayu L.03 OH 0.250 57,000.00
Kepala tukang L.11 OH 0.025 62,000.00
Mandor L.15 OH 0.006 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Seng plat 3 x 6” Lbr 0.40 38,500.00
Paku biasa ½”-1” Kg 0.05 20,000.00
Paku biasa 2”-5” Kg 0.05 20,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.120 45,000.00
Tukang Kayu L.03 OH 0.06 57,000.00
Kepala tukang L.11 OH 0.006 62,000.00
Mandor L.15 OH 0.006 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Seng gel 3”x6” Lbr 0.70 38,500.00
Paku biasa ½”-1” Kg 0.02 20,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
F. PEKERJAAN KAYU :
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 7.000 45,000.00
Tukang kayu L.03 OH 21.000 57,000.00
Kepala tukang L.03 OH 2.100 62,000.00
Mandor L.04 OH 0.350 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu Jati m3 1.100 22,500,000.00
Paku 10 cm Kg 1.250 15,000.00
Lem kayu Kg 1.000 25,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.6.1.2.Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II dan III (Kamfer)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 6.000 45,000.00
Tukang kayu L.03 OH 18.000 57,000.00
Kepala tukang L.03 OH 1.800 62,000.00
Mandor L.04 OH 0.300 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu Kamfer m3 1.200 9,100,000.00
Paku 10 cm Kg 1.250 15,000.00
Lem kayu Kg 1.000 25,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.6.1.3. Pembuatan dan pemasangan 1 m2 pintu klamp standar, kayu Kelas II (Kamfer)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.350 45,000.00
Tukang kayu L.03 OH 1.050 57,000.00
Kepala tukang L.03 OH 0.105 62,000.00
Mandor L.04 OH 0.018 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu Kamfer m3 0.040 10,250,000.00
Paku 5 – 7 cm Kg 0.050 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.6.1.4. Pembuatan dan pemasangan 1 m2 pintu klamp sederhana, kayu Kelas III (Meranti)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.350 45,000.00
Tukang kayu L.03 OH 1.050 57,000.00
Kepala tukang L.03 OH 0.105 62,000.00
Mandor L.04 OH 0.018 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu Meranti m3 0.040 6,400,000.00
Paku 5 – 7 cm Kg 0.050 20,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II (Jati)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.000 45,000.00
Tukang kayu L.03 OH 3.000 57,000.00
Kepala tukang L.03 OH 0.300 62,000.00
Mandor L.04 OH 0.050 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu Jati m3 0.040 25,000,000.00
Lem kayu Kg 0.500 25,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.800 45,000.00
Tukang kayu L.03 OH 2.400 57,000.00
Kepala tukang L.03 OH 0.240 62,000.00
Mandor L.04 OH 0.040 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu Jati m3 0.024 10,250,000.00
Lem kayu Kg 0.300 25,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 1.000 45,000.00
Tukang kayu L.03 OH 3.000 57,000.00
Kepala tukang L.03 OH 0.300 62,000.00
Mandor L.04 OH 0.050 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu jati m3 0.064 25,000,000.00
Lem kayu Kg 0.500 25,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.6.1.8. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II (Kamfer) (tertutup (lebar sampai
90 cm)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.700 45,000.00
Tukang kayu L.03 OH 2.100 57,000.00
Kepala tukang L.03 OH 0.210 62,000.00
Mandor L.04 OH 0.035 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu Kamfer m3 0.025 10,250,000.00
Paku 1 cm – 2,5 cm kg 0.030 20,000.00
Lem kayu kg 0.500 25,000.00
Plywood tebal 4 mm Ukuran (90 x 220) 62,700.00
Lembar 1.000
cm
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.6.1.9. Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II (Jati)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.800 45,000.00
Tukang kayu L.03 OH 2.400 57,000.00
Kepala tukang L.03 OH 0.240 62,000.00
Mandor L.04 OH 0.040 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu Jati m3 0.0256 25,000,000.00
Paku 1 cm – 2,5 cm kg 0.030 15,000.00
Lem kayu kg 0.500 25,000.00
Plywood 4 mm (90 x 220) cm Lembar 1.000 62,700.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.670 45,000.00
Tukang kayu L.03 OH 2.000 57,000.00
Kepala tukang L.03 OH 0.200 62,000.00
Mandor L.04 OH 0.335 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu Jati m3 0.060 25,000,000.00
Paku 1 – 2,5 cm kg 0.150 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.800 45,000.00
Tukang kayu L.03 OH 2.400 57,000.00
Kepala tukang L.03 OH 0.240 62,000.00
Mandor L.04 OH 0.040 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu (Jati) m3 0.025 25,000,000.00
Paku 1 – 2,5 cm kg 0.030 20,000.00
Lem kayu kg 0.300 25,000.00
Teakwood 4 mm 90 x 220 cm Lembar 1.000 62,700.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.6.1.12. Pemasangan 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas II (Kamfer)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
1. Pekerja L.01 OH 0.850 45,000.00
2. Tukang kayu L.03 OH 2.550 57,000.00
3. Kepala tukang L.03 OH 0.255 62,000.00
4. Mandor L.04 OH 0.043 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu Kamfer m3 0.025 10,250,000.00
Paku 1 – 2,5 cm kg 0.030 20,000.00
Lem kayu kg 0.800 25,000.00
Teakwood 4 mm 90 x 220 cm Lembar 1.000 62,700.00
Formika Lembar 0.500 75,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter (Jati)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 4.000 45,000.00
Tukang kayu L.03 OH 12.000 57,000.00
Kepala tukang L.03 OH 1.200 62,000.00
Mandor L.04 OH 0.200 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu (Jati) m3 1.100 22,500,000.00
Besi strip tebal 5mm kg 15.000 12,650.00
Paku 12 cm kg 5.600 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.6.1.13.a.Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter (BK)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 4.000 45,000.00
Tukang kayu L.03 OH 12.000 57,000.00
Kepala tukang L.03 OH 1.200 62,000.00
Mandor L.04 OH 0.200 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu (BK) m3 1.100 12,100,000.00
Besi strip tebal 5mm kg 15.000 12,650.00
Paku 12 cm kg 5.600 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 6.700 45,000
Tukang kayu L.03 OH 20.100 57,000
Kepala tukang L.03 OH 2.010 62,000
Mandor L.04 OH 0.335 65,000
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu Jati m3 1.200 22,500,000.00
Besi strip tebal 5mm kg 15.000 12,650.00
Paku 12 cm kg 5.600 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
1. Pekerja L.01 OH 0.100 45,000.00
2. Tukang kayu L.03 OH 0.100 57,000.00
3. Kepala tukang L.03 OH 0.010 62,000.00
4. Mandor L.04 OH 0.005 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kaso-kaso 5 x 7 cm (Kamfer) m3 0.014 9,100,000.00
Reng 2 x 3 cm (Kamfer) m 3
0.036 9,100,000.00
Paku 5 dan 10 cm kg 0.250 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
1. Pekerja L.01 OH 0.100 45,000.00
2. Tukang kayu L.03 OH 0.100 57,000.00
3. Kepala tukang L.03 OH 0.010 62,000.00
4. Mandor L.04 OH 0.005 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kaso-kaso 5 x 7 cm (Kruing) m3 0.014 6,730,000.00
Reng 2 x 3 cm (Jati) m 3
0.036 8,625,000.00
Paku 5 dan 10 cm kg 0.250 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.100 45,000.00
Tukang kayu L.03 OH 0.100 57,000.00
Kepala tukang L.03 OH 0.010 62,000.00
Mandor L.04 OH 0.005 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kaso-kaso 5 x 7cm (Kamfer) m3 0.014 9,100,000.00
Reng (3 x 4) cm (Kamfer) m3 0.057 9,100,000.00
Paku 5 dan 10 cm kg 0.250 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.100 45,000.00
Tukang kayu L.03 OH 0.100 57,000.00
Kepala tukang L.03 OH 0.010 62,000.00
Mandor L.04 OH 0.005 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kaso-kaso 5 x 7cm (Kruing) m3 0.014 6,730,000.00
Reng (3 x 4) cm (Kamfer) m 3
0.057 9,100,000.00
Paku 5 dan 10 cm kg 0.250 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.120 45,000.00
Tukang kayu L.03 OH 0.120 57,000.00
Kepala tukang L.03 OH 0.012 62,000.00
Mandor L.04 OH 0.006 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas II m3 0.014 9,100,000.00
Paku 5 - 10 cm m 3
0.057 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.120 45,000.00
Tukang kayu L.03 OH 0.120 57,000.00
Kepala tukang L.03 OH 0.012 62,000.00
Mandor L.04 OH 0.006 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas II kruing m3 0.014 6,730,000.00
Paku 5 - 10 cm m 3
0.057 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.6.1.19. Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III (Kamfer)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.150 45,000.00
Tukang kayu L.03 OH 0.300 57,000.00
Kepala tukang L.03 OH 0.030 62,000.00
Mandor L.04 OH 0.075 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kaso-kaso 5 x 7cm (kamfer) m3 0.0154 9,100,000.00
Paku 7 cm – 10 cm kg 0.200 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.6.1.19. a Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III (Kruing)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.150 45,000.00
Tukang kayu L.03 OH 0.300 57,000.00
Kepala tukang L.03 OH 0.030 62,000.00
Mandor L.04 OH 0.075 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kaso-kaso 5 x 7cm (Kruing) m3 0.0154 6,730,000.00
Paku 7 cm – 10 cm kg 0.200 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.6.1.20.Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III (Kamfer)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.200 45,000.00
Tukang kayu L.03 OH 0.300 57,000.00
Kepala tukang L.03 OH 0.030 62,000.00
Mandor L.04 OH 0.010 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kaso-kaso 5 x 7cm (Kamfer) m3 0.0163 9,100,000.00
Paku 7 – 10 cm kg 0.250 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.6.1.20.a Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III (Kruing)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.200 45,000.00
Tukang kayu L.03 OH 0.300 57,000.00
Kepala tukang L.03 OH 0.030 62,000.00
Mandor L.04 OH 0.010 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kaso-kaso 5 x 7cm (Kruing) m3 0.0163 6,730,000.00
Paku 7 – 10 cm kg 0.250 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.6.1.21. Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II (Kamfer)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.100 45,000.00
Tukang kayu L.03 OH 0.200 57,000.00
Kepala tukang L.03 OH 0.020 62,000.00
Mandor L.04 OH 0.005 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu (kamfer) m3 0.0108 9,100,000.00
Paku 5 dan 7 cm kg 0.100 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.6.1.22. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II (Kamfer)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.100 45,000.00
Tukang kayu L.03 OH 0.200 57,000.00
Kepala tukang L.03 OH 0.020 62,000.00
Mandor L.04 OH 0.005 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu (kamfer) m3 0.011 9,100,000.00
Paku 5 dan 7 cm kg 0.050 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.6.1.23. Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III (Kamfer)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.150 45,000.00
Tukang kayu L.03 OH 0.450 57,000.00
Kepala tukang L.03 OH 0.045 62,000.00
Mandor L.04 OH 0.008 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu (Kamfer) m3 0.028 9,100,000.00
Paku 5 dan 7 cm kg 0.150 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.6.1.23. a Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III (Kruing)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.150 45,000.00
Tukang kayu L.03 OH 0.450 57,000.00
Kepala tukang L.03 OH 0.045 62,000.00
Mandor L.04 OH 0.008 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu (Kruing) m3 0.028 6,730,000.00
Paku 5 dan 7 cm kg 0.150 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.6.1.24. Pemasangan 1 m2 dinding pemisah teakwood rangkap, rangka kayu kelas II (Kamfer)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.150 45,000
Tukang kayu L.03 OH 0.450 57,000
Kepala tukang L.03 OH 0.045 62,000
Mandor L.04 OH 0.008 65,000
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu, 6 x 12 (Kamfer) m3 0.028 9,100,000.00
Paku 5 dan 10 kg 0.150 15,000.00
Teakwood 4 mm, 120 x 240 Lembar 0.860 62,700.00
Lem kayu kg 0.560 25,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.6.1.24.a Pemasangan 1 m2 dinding pemisah teakwood rangkap, rangka kayu kelas II (Kruing)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.150 45,000
Tukang kayu L.03 OH 0.450 57,000
Kepala tukang L.03 OH 0.045 62,000
Mandor L.04 OH 0.008 65,000
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu, 6 x 12 (Kruing) m3 0.028 6,730,000
Paku 5 dan 10 kg 0.150 15,000
Teakwood 4 mm, 120 x 240 Lembar 0.860 62,700
Lem kayu kg 0.560 25,000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.6.1.25. Pemasangan 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas II (Kamfer)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.200 45,000.00
Tukang kayu L.03 OH 0.600 57,000.00
Kepala tukang L.03 OH 0.060 62,000.00
Mandor L.04 OH 0.010 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu, 6 x 12 (Kamfer) m3 0.028 9,100,000.00
Paku 5 dan 10 kg 0.150 25,000.00
Teakwood 4 mm, 120 x 240 Lembar 0.860 62,700.00
Lem kayu kg 0.560 25,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.6.1.25. a Pemasangan 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas II (Kruing)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.200 45,000.00
Tukang kayu L.03 OH 0.600 57,000.00
Kepala tukang L.03 OH 0.060 62,000.00
Mandor L.04 OH 0.010 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu, 6 x 12 (Kruing) m3 0.028 6,730,000.00
Paku 5 dan 10 kg 0.150 25,000.00
Teakwood 4 mm, 120 x 240 Lembar 0.860 62,700.00
Lem kayu kg 0.560 25,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.600 45,000.00
Tukang kayu L.03 OH 1.800 57,000.00
Kepala tukang L.03 OH 0.180 62,000.00
Mandor L.04 OH 0.030 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu Jati m3 0.007 25,000,000.00
Paku 5 dan 10 kg 0.100 15,000.00
Paku skrup 10 cm kg 0.150 15,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.025 45,000.00
Tukang kayu L.03 OH 0.075 57,000.00
Kepala tukang L.03 OH 0.008 62,000.00
Mandor L.04 OH 0.001 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Plywood 4 mm m3 0.400 62,700.00
Paku 1 dan 2,5 kg 0.050 20,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.6.1.28. Pemasangan 1 m2 dinding bilik, rangka kayu kelas III atau IV (Meranti)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
1. Pekerja L.01 OH 0.100 45,000.00
2. Tukang kayu L.03 OH 0.050 57,000.00
3. Kepala tukang L.03 OH 0.005 62,000.00
4. Mandor L.04 OH 0.005 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bilik bambu m2 1.500 22,000.00
Kaso-kaso 5 x 7 (Meranti) m 3
0.014 5,700,000.00
Paku kg 0.012 15,000.00
List kayu 2/4 m3 0.003 4,500.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA KERJA
Pekerja L.01 OH 0.01 45,000.00
Tukang kayu L.02 OH 0.50 57,000.00
Kepala tukang L.03 OH 0.05 62,000.00
Mandor L.04 OH 0.005 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kunci tanam biasa Bh 1.00 80,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA KERJA
Pekerja L.01 OH 0.005 45,000.00
Tukang kayu L.02 OH 0.50 57,000.00
Kepala tukang L.03 OH 0.05 62,000.00
Mandor L.04 OH 0.003 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kunci tanam KM Bh 1.00 67,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA KERJA
Pekerja L.01 OH 0.005 45,000.00
Tukang kayu L.02 OH 0.50 57,000.00
Kepala tukang L.03 OH 0.05 62,000.00
Mandor L.04 OH 0.003 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kunci silinder Bh 1.00 145,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.015 45,000.00
Tukang kayu L.02 OH 0.15 57,000.00
Kepala tukang L.03 OH 0.015 62,000.00
Mandor L.04 OH 0.0008 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Engsel pintu Bh 1.00 20,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.01 45,000.00
Tukang kayu L.02 OH 0.10 57,000.00
Kepala tukang L.03 OH 0.010 62,000.00
Mandor L.04 OH 0.0005 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Engsel kupu-kupu Bh 1.00 25,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.10 45,000.00
Tukang kayu L.02 0.20 57,000.00
Kepala tukang L.03 0.02 62,000.00
Mandor L.04 OH 0.0005 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Engsel angin Bh 1.00 20,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.015 45,000.00
Tukang kayu L.02 0.15 57,000.00
Kepala tukang L.03 0.015 62,000.00
Mandor L.04 OH 0.008 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kait angin Bh 1.00 16,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.05 45,000.00
Tukang kayu L.02 0.5 57,000.00
Kepala tukang L.03 0.05 62,000.00
Mandor L.04 OH 0.003 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Door closer set 1.00 350,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.02 45,000.00
Tukang kayu L.02 0.20 57,000.00
Kepala tukang L.03 0.02 62,000.00
Mandor L.04 OH 0.001 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kunci slot Bh 1.00 20,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.05 45,000.00
Tukang kayu L.02 0.5 57,000.00
Kepala tukang L.03 0.05 62,000.00
Mandor L.04 OH 0.003 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Door holder Bh 1.00 125,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.01 45,000.00
Tukang kayu L.02 0.10 57,000.00
Kepala tukang L.03 0.01 62,000.00
Mandor L.04 OH 0.01 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Door stop Bh 1.00 62,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.06 45,000.00
Tukang kayu L.02 0.6 57,000.00
Kepala tukang L.03 0.06 62,000.00
Mandor L.04 OH 0.003 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Rel pintu sorong Set 1.00 235,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.025 45,000.00
Tukang kayu L.02 0.25 57,000.00
Kepala tukang L.03 0.025 62,000.00
Mandor L.04 OH 0.0013 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kunci lemari Set 1.00 20,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.015 45,000.00
Tukang kayu L.02 OH 0.15 57,000.00
Kepala tukang L.03 OH 0.015 62,000.00
Mandor L.04 OH 0.0008 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kaca tebal 5 mm m2 1.10 115,000.00
SEalant Kg 0.05 75,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.017 45,000.00
Tukang kayu L.02 OH 0.17 57,000.00
Kepala tukang L.03 OH 0.017 62,000.00
Mandor L.04 OH 0.0009 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kaca tebal 8 mm m2 1.10 280,000.00
SEalant Kg 0.07 75,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.025 45,000.00
Tukang kayu L.02 OH 0.25 57,000.00
Kepala tukang L.03 OH 0.025 62,000.00
Mandor L.04 OH 0.0013 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kaca buram 5 mm m2 1.10 160,000.00
SEalant Kg 0.07 75,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.015 45,000.00
Tukang kayu L.02 OH 0.15 57,000.00
Kepala tukang L.03 OH 0.015 62,000.00
Mandor L.04 OH 0.008 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kaca cermin 5 mm m2 1.10 245,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.075 45,000.00
Tukang kayu L.02 OH 0.15 57,000.00
Kepala tukang L.03 OH 0.015 62,000.00
Mandor L.04 OH 0.004 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kaca patri 7 mm m2 1.10 2,750,000.00
Sealant Kg 0.05 75,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.15 45,000.00
Mandor L.04 OH 0.003 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Soda api Kg 0.05 12,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.15 45,000.00
Mandor L.04 OH 0.003 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Sabun Kg 0.05 12,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.15 45,000.00
Mandor L.04 OH 0.008 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Sabun Kg 0.050 12,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.7.1.4. 1 m2 Pengecatan bidang kayu lama (1 lapis plamuur, 1 lapis cat dasar, 1 lapis cat penutup)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.07 45,000.00
Tukang cat L.02 OH 0.009 55,000.00
Kepala tukang L.03 OH 0.006 62,000.00
Mandor L.04 OH 0.003 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
cat menie Kg 0.2 28,000.00
Plamuur Kg 0.15 28,000.00
Cat dasar Kg 0.17 36,000.00
Cat penutup Kg 0.26 59,000.00
Kuas Bh 0.01 14,000.00
Pengencer Kg 0.03 24,000.00
Ampelas Lbr 0.2 4,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.7.1.5. Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.07 45,000.00
Tukang cat L.02 OH 0.105 55,000.00
Kepala tukang L.03 OH 0.004 62,000.00
Mandor L.04 OH 0.003 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Cat menie Kg 0.20 28,000.00
Plamuur Kg 0.15 28,000.00
Cat dasar Kg 0.17 36,000.00
Cat penutup Kg 0.35 59,000.00
Kuas Bh 0.01 14,000.00
Pengencer Kg 0.03 16,000.00
Ampelas Lbr 0.2 4,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.04 45,000.00
Tukang cat L.02 OH 0.063 55,000.00
Kepala tukang L.03 OH 0.063 62,000.00
Mandor L.04 OH 0.003 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Teak oil L 0.36 38,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.04 45,000.00
Tukang cat L.02 OH 0.06 55,000.00
Kepala tukang L.03 OH 0.016 62,000.00
Mandor L.04 OH 0.003 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Politur L 0.15 38,000.00
Politur jadi L 0.372 63,000.00
Ampelas Lbr 2.00 4,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.10 45,000.00
Mandor L.04 OH 0.006 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Residu atau ter L 0.35 8,500.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.7.1.10. Pengecatan 1 m2 tembok baru luar tanpa plamir ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.02 45,000.00
Tukang cat L.02 OH 0.063 55,000.00
Kepala tukang L.03 OH 0.0063 62,000.00
Mandor L.04 OH 0.003 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Plamuur Kg 0.00 27,000
Cat dasar Kg 0.10 36,000
Cat penutup Kg 0.26 100,000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.7.1.11. Pengecatan 1 m2 tembok lama, luar tanpa plamir( 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.028 45,000.00
Tukang cat L.02 OH 0.042 55,000.00
Kepala tukang L.03 OH 0.0042 62,000.00
Mandor L.04 OH 0.003 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Cat dasar Kg 0.12 36,000.00
Cat penutup Kg 0.18 100,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.02 45,000.00
Tukang cat L.02 OH 0.2 55,000.00
Kepala tukang L.03 OH 0.02 62,000.00
Mandor L.04 OH 0.0025 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Wall paper m2 1.20 50,000.00
Lem Kg 0.20 25,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.02 45,000.00
Tukang cat L.02 OH 0.2 55,000.00
Kepala tukang L.03 OH 0.02 62,000.00
Mandor L.04 OH 0.0025 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Menie besi Kg 0.10 45,000.00
Kwas Bh 0.01 14,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.25 45,000.00
Tukang cat L.02 OH 0.225 55,000.00
Kepala tukang L.02 OH 0.0225 62,000.00
Mandor L.04 OH 0.0075 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Menie besi Kg 0.10 45,000.00
Pengencer L 0.01 16,000.00
Kwas Bh 0.01 14,000.00
Perancah kayu m 3
0.002 25,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.25 45,000.00
Tukang cat L.02 OH 0.25 55,000.00
Kepala tukang L.03 OH 0.025 62,000.00
Mandor L.04 OH 0.0013 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Menie A Kg 0.10 45,000.00
Menie B Kg 0.10 45,000.00
Cat Kg 0.08 52,000.00
Kwas Bh 0.01 14,000.00
Pengencer L 0.01 16,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.7.1.19. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.06 45,000.00
Tukang cat L.02 OH 0.06 55,000.00
Kepala tukang L.03 OH 0.012 62,000.00
Mandor L.04 OH 0.003 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Cat Kg 0.30 50,000.00
Kwas Bh 0.01 14,000.00
Pengencer L 0.01 16,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.40 45,000.00
Tukang cat L.02 OH 0.80 55,000.00
Kepala tukang L.03 OH 0.08 62,000.00
Mandor L.04 OH 0.02 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Cat dasar Kg 0.11 45,000.00
Cat antara Kg 0.17 52,000.00
Cat penutup Kg 0.08 50,000.00
Kwas Bh 0.01 14,000.00
Pengencer L 0.01 16,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.7.1.21. Pengecatan 1 m2 permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.40 45,000.00
Tukang cat L.02 OH 0.70 55,000.00
Kepala tukang L.03 OH 0.07 62,000.00
Mandor L.04 OH 0.02 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Cat dasar Kg 0.30 45,000.00
Pengencer L 0.01 16,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.7.1.22. Pengecatan 1 m2 tembok baru (luar) ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.02 45,000.00
Tukang cat L.02 OH 0.063 55,000.00
Kepala tukang L.03 OH 0.0063 62,000.00
Mandor L.04 OH 0.003 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Plamuur Kg 0.10 27,000
Cat dasar Kg 0.10 36,000
Cat penutup Kg 0.26 100,000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.7.1.23. Pengecatan 1 m2 tembok lama (luar) ( 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.028 45,000.00
Tukang cat L.02 OH 0.042 55,000.00
Kepala tukang L.03 OH 0.0042 62,000.00
Mandor L.04 OH 0.003 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Cat dasar Kg 0.12 36,000.00
Cat penutup Kg 0.18 100,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.7.1.24. Pengecatan 1 m2 tembok lama (luar) ( 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.028 45,000.00
Tukang cat L.02 OH 0.042 55,000.00
Kepala tukang L.03 OH 0.0042 62,000.00
Mandor L.04 OH 0.003 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Cat dasar Kg 0.12 36,000.00
Cat penutup Kg 0.18 100,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.4.7.1.22. Pengecatan 1 m2 tembok baru (dalam) ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.02 45,000.00
Tukang cat L.02 OH 0.063 55,000.00
Kepala tukang L.03 OH 0.0063 62,000.00
Mandor L.04 OH 0.003 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Plamuur Kg 0.10 27,000
Cat dasar Kg 0.10 36,000
Cat penutup Kg 0.26 30,000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
J. PEKERJAAN SANITASI :
A TENAGA
Pekerja L.01 OH 3.30 45,000.00
Tukang batu 1.10 55,000.00
Kepala tukang L.03 0.01 62,000.00
Mandor L.04 OH 0.16 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Closet duduk Unit 1.00 2,460,000.00
Perlengkapan Ls 6% x 147,600.00
closet
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.00 45,000.00
Tukang batu L.02 1.50 55,000.00
Kepala tukang L.03 0.15 62,000.00
Mandor L.04 OH 0.16 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Closet jongkok Unit 1.00 459,000.00
Semen Portland Kg 6.00 1,495.00
Pasir pasang M3 0.01 150.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.20 45,000.00
Tukang batu L.02 1.45 55,000.00
Kepala tukang L.03 0.15 62,000.00
Mandor L.04 OH 0.06 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Wastafel Unit 1.20 900,000.00
Semen Portland Kg 6.00 1,495.00
Pasir pasang M3 0.01 210,000.00
Perlengkapan % 12.00 1,080,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 3.00 45,000.00
Tukang batu L.02 4.50 55,000.00
Kepala tukang L.03 0.05 62,000.00
Mandor L.04 OH 0.90 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bak fibreglass Unit 1.00 275,000.00
Perlengkapan Ls 12%xbak 33,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 6.00 45,000.00
Tukang batu L.02 3.00 55,000.00
Kepala tukang L.03 0.30 62,000.00
Mandor L.04 OH 0.03 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah M3 150.00 700.00
Semen portlan Kg 120.00 1,495.00
Pasir pasang M3 0.30 210,000.00
Porselen 11x11 bh 360.00 450.00
Semen warna Kg 6.00 17,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.5.1.1 12. Pemasangan 1 buah bak cuci piring stainlessteel
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.03 45,000.00
Tukang batu L.02 0.30 55,000.00
Kepala tukang L.03 0.03 62,000.00
Mandor L.04 OH 0.015 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bak cuci piring Unit 1.00 250,000.00
Waterdrain Bh 1.00 55,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.01 45,000.00
Tukang batu L.02 0.10 55,000.00
Kepala tukang L.03 0.01 62,000.00
Mandor L.04 OH 0.005 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Floor drain Unit 1.00 40,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 2.16 45,000.00
Tukang batu L.02 OH 0.72 55,000.00
Kepala tukang L.03 OH 0.072 62,000.00
Mandor L.04 OH 0.011 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh 40.00 700.00
Semen portland Kg 44.00 1,495.00
Pasir pasang M3 0.07 210,000.00
Pasir beton M3 0.06 225,000.00
Kerikil 2/3 M3 0.07 240,000.00
Baja tulangan Kg 1.60 12,650.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.5.1.1 16. Pemasangan 1 buah bak kontrol pasangan bata 45cm x45cm tinggi 50 cm
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 3.2 45,000.00
Tukang batu L.02 OH 1.15 55,000.00
Kepala tukang L.03 OH 0.011 62,000.00
Mandor L.04 OH 0.016 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh 70.00 700.00
Semen portland Kg 77.00 1,495.00
Pasir pasang M3 0.13 210,000.00
Pasir beton M3 0.09 225,000.00
Kerikil 2/3 M3 0.02 240,000.00
Baja tulangan Kg 2.60 12,650.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.5.1.1 17. Pemasangan 1 buah bak kontrol pasangan bata 60cm x60cm tinggi 65 cm
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 3.2 45,000.00
Tukang batu L.02 1.15 55,000.00
Kepala tukang L.03 0.011 62,000.00
Mandor L.04 OH 0.016 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh 123.00 700.00
Semen portland Kg 114.00 1,495.00
Pasir pasang M3 0.184 210,000.00
Pasir beton M3 0.12 225,000.00
Kerikil 2/3 M3 0.033 240,000.00
Baja tulangan Kg 4.85 12,650.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.054 45,000
Tukang batu L.02 0.09 55,000
Kepala tukang L.03 0.009 62,000
Mandor L.04 OH 0.027 65,000
JUMLAH TENAGA KERJA
B BAHAN
Pipa galvanis ½” M 1.20 15,000.00
Perlengkapan Ls 35%xpipa 18,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA KERJA
Pekerja L.01 OH 0.01 45,000.00
Tukang batu L.02 0.4 55,000.00
Kepala tukang L.03 0.04 62,000.00
Mandor L.04 OH 0.005 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kran air M 1.00 70,000.00
Sealtape Buah 0.025 9,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.054 45,000
Tukang batu L.02 0.09 55,000
Kepala tukang L.03 0.009 62,000
Mandor L.04 OH 0.027 65,000
JUMLAH TENAGA KERJA
B BAHAN
Pipa galvanis 3/4” M 1.20 19,500.00
Perlengkapan % 35.00 23,400.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.054 45,000.00
Tukang batu L.02 0.09 55,000.00
Kepala tukang L.03 0.009 62,000.00
Mandor L.04 OH 0.027 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa galvanis 1” M 1.20 25,500.00
Perlengkapan % 35.00 30,600.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.108 45,000.00
Tukang batu L.02 0.18 55,000.00
Kepala tukang L.03 0.018 62,000.00
Mandor L.04 OH 0.005 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa galvanis 11/2” M 1.20 35,400.00
Perlengkapan % 35.00 42,480.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.036 45,000.00
Tukang batu L.02 0.06 55,000.00
Kepala tukang L.03 0.006 62,000.00
Mandor L.04 OH 0.002 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 1/2” M 1.20 5,625.00
Perlengkapan % 35.00 6,750.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.036 45,000.00
Tukang batu L.02 0.06 55,000.00
Kepala tukang L.03 0.006 62,000.00
Mandor L.04 OH 0.002 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 3/4” M 1.20 7,175.00
Perlengkapan % 35.00 8,610.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.036 45,000.00
Tukang batu L.02 0.06 55,000.00
Kepala tukang L.03 0.006 62,000.00
Mandor L.04 OH 0.002 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 1” M 1.20 9,800.00
Perlengkapan % 35.00 11,760.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.054 45,000.00
Tukang batu L.02 0.09 55,000.00
Kepala tukang L.03 0.009 62,000.00
Mandor L.04 OH 0.003 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 1 1/2” M 1.20 16,900.00
Perlengkapan % 35.00 20,280.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A.5.1.1 29. Pemasangan 1 m’ pipa PVC tipe AW diameter 2”
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.054 45,000.00
Tukang batu L.02 0.09 55,000.00
Kepala tukang L.03 0.009 62,000.00
Mandor L.04 OH 0.003 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 2” M 1.20 21,625.00
Perlengkapan % 35.00 25,950.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.081 45,000.00
Tukang batu L.02 0.135 55,000.00
Kepala tukang L.03 0.0135 62,000.00
Mandor L.04 OH 0.004 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 2 1/2” M 1.20 30,000.00
Perlengkapan % 35.00 36,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.081 45,000.00
Tukang batu L.02 0.135 55,000.00
Kepala tukang L.03 0.0135 62,000.00
Mandor L.04 OH 0.004 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 3” M 1.20 42,525.00
Perlengkapan % 35.00 51,030.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.081 45,000.00
Tukang batu L.02 0.135 55,000.00
Kepala tukang L.03 0.0135 62,000.00
Mandor L.04 OH 0.004 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 4” M 1.20 70,425.00
Perlengkapan % 35.00 84,510.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Galian tanah m³ 0.0300 35,375.00
Urug pasir m³ 0.0075 14,150.00
Pasang bata m² 0.3000 20,595.00
Plester m² 0.1500 23,655.00
JUMLAH TENAGA KERJA
B BAHAN
Urug pasir m³ 0.0075 156,000.00
Pasang bata m³ 0.3000 85,310.25
Plester m² 0.1500 19,484.88
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Galian tanah m³ 0.0300 35,375.00
Urug pasir m³ 0.0075 14,150.00
Pasang bata m² 0.3000 20,595.00
Plester m² 0.1500 23,655.00
JUMLAH TENAGA KERJA
B BAHAN
Urug pasir m³ 0.0075 156,000.00
Pasang bata m³ 0.3000 75,222.50
Plester m² 0.1500 14,368.80
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
O.3. 1 m' Pasang Got U - 20
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Galian tanah m3 0.0600 35,375.00
Urug pasir m3 0.0150 14,150.00
Pasang bata 1 : 4 m2 0.0180 20,595.00
JUMLAH TENAGA KERJA
B BAHAN
Pasangan bata 1 : 4 m3 0.0060 75,222.50
Got U - 20 m3 1.0000 45,000.00
JUMLAH
HARGA
BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Galian tanah m3 0.0600 35,375.00
Urug pasir m3 0.0150 14,150.00
Pasang bata 1 : 4 m2 0.0180 20,595.00
JUMLAH TENAGA KERJA
B BAHAN
Pasangan bata 1 : 4 m3 0.0060 75,222.50
Got U - 30 m3 1.0000 50,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
O.5. 1 m' Pasang Buis beton Ø 20 cm dengan Rolag Bata 1 : 4 (Rolag penuh)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Galian tanah : 0,70 x 0,90 x 1 35,375.00
Urug kembali : 1/3 x 0,7 x 0,9 x 1 25,750.00
Urug pasir : 0,10 x 0,70 x 0,90 12,875.00
Pas Bt 1 : 4 : 3,143 x 0,45 x 1 20,595.00
Buang tanah : 2/3 x 0,70 x 0,9 x1 28,325.00
JUMLAH TENAGA KERJA
B BAHAN
Pasir Urug : 0,10 x 0,70 x 1,00 156,000.00
Pas bata 1 : 4 : 3,143 x 0,45 x 1 75,222.50
Buis beton Ø 20 cm : 1 bh x 1,00 60,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
O.6. 1 m' Pasang Buis beton Ø 30 cm dengan Rolag Bata 1 : 4 (Rolag penuh)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Galian tanah : 0,80 x 1,00 x 1,0 35,375.00
Urug Kembali : 1/3 x 0,8 x 1,00 x 1 25,750.00
Urug pasir : 0,10 x 0,80 x 1,0 12,875.00
Pas bata 1 : 4 : 3,143 x 0,55 x 1 20,595.00
Buang tanah : 2/3 x 0,8 x 1, x 1 28,325.00
JUMLAH TENAGA KERJA
B BAHAN
Pasir Urug : 0,10 x 0,80 x 1,00 156,000.00
Pas bata 1 : 4 : 3,143 x 0,55 x 1 75,222.50
Buis beton Ø 30 cm : 1 bh x 1,00 65,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
O.7. 1 m' Pasang Buis beton Ø 40 cm dengan Rolag Bata 1 : 4 (Rolag penuh)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Galian tanah : 0,90 x 1,10 x 1,0 35,375.00
Urug Kembali : 1/3 x 0,9 x 1,10 x 1 25,750.00
Urug pasir : 0,10 x 0,90 x 1,0 12,875.00
Pas bata 1 : 4 : 3,143 x 0,65 x 1 20,595.00
Buang tanah : 2/3 x 0,9 x 1,00 x 1 28,325.00
JUMLAH TENAGA KERJA
B BAHAN
Pasir Urug : 0,10 x 0,90 x 1,00 156,000.00
Pas bata 1 : 4 : 3,143 x 0,65 x 1 75,222.50
Buis beton Ø 40 cm : 1 bh x 1,00 75,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
O.8. 1 m' Pasang Buis beton Ø 50 cm dengan Rolag Bata 1 : 4 (Rolag penuh)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Galian tanah : 1,00 x 1,20 x 1,0 35,375.00
Urug Kembali : 1/3 x 1 x 1,20 x 1 25,750.00
Urug pasir : 0,10 x 1 x 1,0 12,875.00
Pas bata 1 : 4 : 3,143 x 0,75 x 1 20,595.00
Buang tanah : 2/3 x 0,9 x 1,00 x 1 28,325.00
JUMLAH TENAGA KERJA
B BAHAN
Pasir Urug : 0,10 x 1,00 x 1,00 156,000.00
Pas bata 1 : 4 : 3,143 x 0,75 x 1 75,222.50
Buis beton Ø 50 cm : 1 bh x 1,00 95,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
O.9. 1 m' Pasang Buis beton Ø 60 cm dengan Rolag Bata 1 : 4 (Rolag penuh)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Galian tanah : 1,10 x 1,30 x 1,0 35,375.00
Urug Kembali : 1/3 x 1,10 x 1,30 x 1 25,750.00
Urug pasir : 0,10 x 1,10 x 1,0 12,875.00
Pas bata 1 : 4 : 3,143 x 0,85 x 1 20,595.00
Buang tanah : 2/3 x 1,10 x 1,30 x 1 28,325.00
JUMLAH TENAGA KERJA
B BAHAN
Pasir Urug : 0,10 x 1,10 x 1,00 156,000.00
Pas bata 1 : 4 : 3,143 x 0,85 x 1 75,222.50
Buis beton Ø 60 cm : 1 bh x 1,00 106,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
O.10.1 m' Pasang Buis beton Ø 80 cm dengan Rolag Bata 1 : 4 (Rolag penuh)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Galian tanah : 1,30 x 1,40 x 1,0 35,375.00
Urug Kembali : 1/3 x 1,30 x 1,40 x 1 25,750.00
Urug pasir : 0,10 x 1,30 x 1,0 12,875.00
Pas bata 1 : 4 : 3,143 x 1,05 x 1 20,595.00
Buang tanah : 2/3 x 1,30 x 1,40 x 1 28,325.00
JUMLAH TENAGA KERJA
B BAHAN
Pasir Urug : 0,10 x 1,30 x 1,00 156,000.00
Pasangan bata 1 : 4 : 3,143 x 1,05 x 1 75,222.50
Buis beton Ø 80 cm : 1 bh x 1,00 110,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Galian tanah : 0,60 x 0,70 x 1 x 35,375.00
Urug Kembali : 1/3 x 0,6 x 0,7 x 1 x 25,750.00
Urug pasir : 0,10 x 0,60 x 1 12,875.00
Pas bata 1 : 4 : 3,143 x 0,45 x 0,30 x 1 20,595.00
Buang tanah : 2/3 x 0,60 x 0,7 x 1 28,325.00
JUMLAH TENAGA KERJA
B BAHAN
Pasir Urug : 0,10 x 0,60 x 1,00 156,000.00
Pas bata 1 : 4 : 3,143 x 0,45 x 0,3 75,222.50
Buis beton Ø 20 cm : 1 bh x 1,00 60,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
O.12
1 m' Pasang Buis beton Ø 30 cm dengan Cincin bata 1 : 4
.
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Galian tanah : 0,70 x 0,80 x 1 x 35,375.00
Urug Kembali : 1/3 x 0,6 x 0,7 x 1 x 25,750.00
Urug pasir : 0,10 x 0,70 x 1 12,875.00
Pas bata 1 : 4 : 3,143 x 0,55 x 0,30 x 1 20,595.00
Buang tanah : 2/3 x 0,70 x 0,8 x 1 28,325.00
JUMLAH TENAGA KERJA
B BAHAN
Pasir Urug : 0,10 x 0,70 x 1,00 156,000.00
Pas bata 1 : 4 : 3,143 x 0,55 x 0,3 75,222.50
Buis beton Ø 30 cm : 1 bh x 1,00 65,000.00
JUMLAH
HARGA
BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Galian tanah : 0,80 x 0,90 x 1 x 35,375.00
Urug Kembali : 1/3 x 0,80 x 0,90 x 1 x 25,750.00
Urug pasir : 0,10 x 0,80 x 1,0 12,875.00
Pas bata 1 : 4 : 3,143 x 0,65 x 0,30 x 1 20,595.00
Buang tanah : 2/3 x 0,80 x 0,9 x 1 28,325.00
JUMLAH TENAGA KERJA
B BAHAN
Pasir Urug : 0,10 x 0,80 x 1,00 156,000.00
Pas bata 1 : 4 : 3,143 x 0,65 x 0,3 75,222.50
Buis beton Ø 40 cm : 1 bh x 1,00 75,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Galian tanah : 0,90 x 1,00 x 1,0 x 35,375.00
Urug Kembali : 1/3 x 0,90 x 1,00 x 1 x 25,750.00
Urug pasir : 0,10 x 0,90 x 1,0 x 1 12,875.00
Pas bata 1 : 4 : 3,143 x 0,75 x 0,3 x 1 20,595.00
Buang tanah : 2/3 x 0,90 x 1 x 1 28,325.00
JUMLAH TENAGA KERJA
B BAHAN
Pasir Urug : 0,10 x 0,90 x 1,00 156,000.00
Pas bata 1 : 4 : 3,143 x 0,75 x 0,3 75,222.50
Buis beton Ø 50 cm : 1 bh x 1,00 95,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Galian tanah : 1,00 x 1,10 x 1,0 x 35,375
Urug Kembali : 1/3 x 1,00 x 1,10 x 1 x 25,750
Urug pasir : 0,10 x 1,00 x 1,00 x 1 12,875
Pas bata 1 : 4 : 3,143 x 0,85 x 0,3 x 1 20,595
Buang tanah : 2/3 x 1 x 1,10 x 1 28,325
JUMLAH TENAGA KERJA
B BAHAN
Pasir Urug : 0,10 x 1,00 x 1,00 156,000.00
Pas bata 1 : 4 : 3,143 x 0,85 x 0,3 75,222.50
Buis beton Ø 60 cm : 1 bh x 1,00 106,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Galian tanah : 0,60 x 0,40 x 1 x 35,375
Urug Kembali : 1/3 x 0,60 x 0,40 x 1 x 25,750
Urug pasir : 0,10 x 0,60 x 1,0 x 1 12,875
Pas bata 1 : 4 : 1,58 x 0,45 x 0,3 x 75,223
Buang tanah : 2/3 x 0,60 x 0,40 x 1 28,325
JUMLAH TENAGA KERJA
B BAHAN
Pasir Urug : 0,10 x 0,60 x 1,00 156,000.00
Pas bata 1 : 4 : 1,58 x 0,45 x 0,3 75,222.50
Buis beton U 20 cm : 1 bh x 1,00 45,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Galian tanah : 0,70 x 0,45 x 1 x 35,375
Urug Kembali : 1/3 x 0,70 x 0,45 x 1 x 25,750
Urug pasir : 0,10 x 0,70 x 1,0 x 1 12,875
Pas bata 1 : 4 : 1,58 x 0,55 x 0,15 x 0,3 75,223
Buang tanah : 2/3 x 0,70 x 0,45 x 1 28,325
JUMLAH TENAGA KERJA
B BAHAN
Pasir Urug : 0,10 x 0,70 x 1,00 156,000.00
Pas bata 1 : 4 : 1,58 x 0,55 x 0,3 75,222.50
Buis beton U 30 cm : 1 bh x 1,00 50,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja OH 0.2400 45,000.00
Tukang batu OH 0.0800 55,000.00
Kepala Tukang OH 0.0080 62,000.00
Mandor OH 0.0120 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Paving kawung t 6 cm m2 1.0500 72,400.00
Pasir Pasang m3 0.1200 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja OH 0.2400 45,000.00
Tukang batu OH 0.0800 55,000.00
Kepala Tukang OH 0.0080 62,000.00
Mandor OH 0.0120 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Paving kawung t 8 cm m2 1.0500 98,500.00
Pasir Pasang m3 0.1200 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja OH 0.2400 45,000.00
Tukang batu OH 0.0800 55,000.00
Kepala Tukang OH 0.0080 62,000.00
Mandor OH 0.0120 65,000.00
JUMLAH TENAGA KERJA
B BAHAN
Paving kawung SNI m2 1.0500 139,700.00
Pasir Pasang m3 0.1200 210,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
a). Kistdam pasir/tanah dibungkus plastik bagor (sebesar karung beras 25 kg) uk. 43 cm x 65 cm (1 buah)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.04 -
Mandor L.04 OH 0.004 Kg
JUMLAH TENAGA KERJA
B BAHAN
Karung plastik/bagor bh 1.00 1,500.00
Tali rapia/plastik m 2.00 500.00
Pasir m 3
0.12 130,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
4). Betuk I, Tipe D Bronjong Kawat uk. L=2,0m x B=1,0 x T= 0,5m berisi batu kali/belah
(a) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 2,70 mm, kawat sisi 3,40 mm dan kawat
pengikat 2,0 mm, ukuran lubang heksagonal 80 x 100 mm;
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja Penganyam L.01 OH 2.28 -
Tukang Penganyam L.02 OH 0.76 -
Pekerja Pengisi Batu L.03 OH 0.7 -
Mandor L.04 OH 0.298 Kg
JUMLAH TENAGA KERJA
B BAHAN
Batu Belah m3 1.4 200,000.00
Kawat Bronjong Kg 15.10 16,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
(b) Kawat bronjong galvanis dengan kawat anyaman tiga lilitan ukuran 3,0 mm, kawat sisi 4,0 mm dan kawat
pengikat 2,0 mm, ukuran lubang heksagonal 100 x 120 mm;
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja Penganyam L.01 OH 2.34 -
Tukang Penganyam L.02 OH 0.78 -
Pekerja Pengisi Batu L.01 OH 0.7 -
Mandor L.04 OH 0.234 Kg
JUMLAH TENAGA KERJA
B BAHAN
Batu Belah m3 1.4 200,000.00
Kawat Bronjong Kg 15.51 16,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
P.07 Cerucuk
a). 1 m panjang cerucuk kayu/dolken diameter 8cm - 10cm
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.03 -
Tukang Batu L.02 OH 0.005 -
Mandor L.04 OH 0.003 Kg
JUMLAH TENAGA KERJA
B BAHAN
Kayu Dolken 8cm - 10cm m 1.05 8,333.33
JUMLAH HARGA BAHAN
C PERALATAN
ls 1 6,500.00
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.04 -
Tukang Batu L.02 OH 0.006 -
Mandor L.04 OH 0.004 Kg
JUMLAH TENAGA KERJA
B BAHAN
Bambu dia 8cm - 10cm m 1.05 4,333.33
JUMLAH HARGA BAHAN
C PERALATAN
ls 1 6,500.00
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.24 -
Tukang batu L.02 OH 0.12 -
Kepala tukang L.03 OH 0.012 Batang
Mandor L.04 OH 0.024 Kg
JUMLAH TENAGA KERJA
B BAHAN
Batu muka M2 1.250 32,000.00
Pasir Pasang m3 0.025 210,000.00
Portlan cement kg 5.000 1,495.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
b). Pasangan batu candi (1 m2)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.24 -
Tukang batu L.02 OH 0.12 -
Kepala tukang L.03 OH 0.012 Batang
Mandor L.04 OH 0.024 Kg
JUMLAH TENAGA KERJA
B BAHAN
Batu candi M2 1.20 120,000.00
Pasir Pasang m3 0.03 210,000.00
Portlan cement kg 5.00 1,495.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.10 -
Tukang batu L.02 OH 0.02 -
Mandor L.04 OH 0.01 Kg
JUMLAH TENAGA KERJA
B BAHAN
Geotekstil m2 1.05 40,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.20 -
Tukang kayu L.02 OH 0.60 -
Kepala tukang L.03 OH 0.06 Batang
Mandor L.04 OH 0.02 Kg
JUMLAH TENAGA KERJA
B BAHAN
Multiflex 12 mm lbr 0.35 155,000.00
Kaso 5/7 kayu meranti m3 0.02 5,700,000.00
Paku 5 cm dan 7 cm kg 0.25 20,000.00
Minyak bekisting ltr 0.2 9,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
B.21. 1 m2 bekisting untuk permukaan beton biasa dengan papan ukuran 3/20 cm (tanpa perancah)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.01 OH 0.22 -
Tukang kayu L.02 OH 0.66 -
Kepala tukang L.03 OH 0.066 Batang
Mandor L.04 OH 0.022 Kg
JUMLAH TENAGA KERJA
B BAHAN
Papan 3/20 cm kayu sengon bh 0.04 2,150,000.00
Kaso 5/7 kayu meranti m3 0.02 5,700,000.00
Paku 5 cm dan 7 cm kg 0.4 20,000.00
Minyak bekisting ltr 0.2 9,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D. Jumlah (A+B+C)
E. Overhead & Profit (Contoh 10 %) 10% x D
F. Harga Satuan Pekerjaan (D+E)
PEKERJAAN :
UNIVERSITAS SEBELAS MARET SURAKARTA
LOKASI : KENTINGAN SURAKARTA
TAHUN ANGGARAN : 2015
PEKERJAAN TANAH
1 M3 GALIAN TANAH BIASA SEDALAM 1 METER SNI 2-6.1
Upah
Pekerja 0.400 O/H x Rp 45,000.00
Mandor 0.040 O/H x Rp 65,000.00
Upah
Pekerja 0.300 O/H x Rp 45,000.00
Mandor 0.010 O/H x Rp 65,000.00
Upah
Pekerja 0.250 O/H x Rp 45,000.00
Mandor 0.025 O/H x Rp 65,000.00
1 m3 Urugan Tanah padas (dari luar) + diratakan dan dipadatan SNI 2-6.10 (Pendekatan)
Bahan
tanah biasa 1.200 M3 x Rp 65,000.00
Upah
Pekerja 0.500 O/H x Rp 45,000.00
Mandor 0.050 O/H x Rp 65,000.00
1 m 3 Urugan Tanah biasa hasil galian dan dipadatan SNI 2-6.10 (Pendekatan)
Upah
Pekerja 0.500 O/H x Rp 45,000.00
Mandor 0.050 O/H x Rp 65,000.00
Jumlah Upah
Jumlah Upah
Jumlah Upah
Jumlah Upah
Jumlah Upah
Jumlah Upah
Jumlah Upah
Jumlah Upah
1 m 2 Bongkaran dinding partisi SNI
Upah
Pekerja 0.133 O/H x Rp 45,000.00
Mandor 0.003 O/H x Rp 65,000.00
Jumlah Upah
Jumlah Upah
Jumlah Upah
Jumlah Upah
Upah
0.78 O/H Pekerja X Rp 45,000.00
0.039 O/H Mandor X Rp 65,000.00
0.39 O/H Tukang batu X Rp 55,000.00
0.039 O/H Kep. Tukang batu X Rp 62,000.00
Tenaga
Pekerja 1.5000 Oh x Rp 45,000.00
Tukang batu 0.6000 Oh x Rp 55,000.00
Kepala tukang 0.0600 Oh x Rp 62,000.00
Mandor 0.0750 Oh x Rp 65,000.00
Tenaga
Pekerja 1.5000 Oh x Rp 45,000.00
Tukang batu 0.6000 Oh x Rp 55,000.00
Kepala tukang 0.0600 Oh x Rp 62,000.00
Mandor 0.0750 Oh x Rp 65,000.00
Tenaga
Pekerja 1.5000 Oh x Rp 45,000.00
Tukang batu 0.6000 Oh x Rp 55,000.00
Kepala tukang 0.0600 Oh x Rp 62,000.00
Mandor 0.0750 Oh x Rp 65,000.00
Tenaga
Pekerja 1.5000 Oh x Rp 45,000.00
Tukang batu 0.6000 Oh x Rp 55,000.00
Kepala tukang 0.0600 Oh x Rp 62,000.00
Mandor 0.0750 Oh x Rp 65,000.00
Tenaga
Pekerja 1.5000 Oh x Rp 45,000.00
Tukang batu 0.6000 Oh x Rp 55,000.00
Kepala tukang 0.0600 Oh x Rp 62,000.00
Mandor 0.0750 Oh x Rp 65,000.00
Tenaga
Pekerja 1.5000 Oh x Rp 45,000.00
Tukang batu 0.6000 Oh x Rp 55,000.00
Kepala tukang 0.0600 Oh x Rp 62,000.00
Mandor 0.0750 Oh x Rp 65,000.00
Upah
Pekerja 0.320 Oh x Rp 45,000.00
Mandor 0.015 Oh x Rp 65,000.00
Tukang batu 0.100 Oh x Rp 55,000.00
Kep. Tukang batu 0.010 Oh x Rp 62,000.00
Upah
Pekerja 0.300 Oh x Rp 45,000.00
Mandor 0.015 Oh x Rp 65,000.00
Tukang batu 0.100 Oh x Rp 55,000.00
Kep. Tukang batu 0.010 Oh x Rp 62,000.00
Upah
Pekerja 0.320 O/H x Rp 45,000.00
Mandor 0.015 O/H x Rp 65,000.00
Tukang batu 0.100 O/H x Rp 55,000.00
Kep. Tukang batu 0.010 O/H x Rp 62,000.00
Upah
Pekerja 0.320 Oh x Rp 45,000.00
Mandor 0.015 Oh x Rp 65,000.00
Tukang batu 0.100 Oh x Rp 55,000.00
Kep. Tukang batu 0.010 Oh x Rp 62,000.00
1 M2 PLESTERAN sawut
Bahan
Semen Portland 9.000 kg x Rp 1,495.00
Pasir pasang 0.030 M3 x Rp 210,000.00
Upah
Pekerja 0.250 Oh x Rp 45,000.00
Mandor 0.100 Oh x Rp 65,000.00
Tukang batu 0.010 Oh x Rp 55,000.00
Kep. Tukang batu 0.002 Oh x Rp 62,000.00
1 M2 PLESTERAN 1 : 3 : 10 TEBAL 15 MM
Bahan
Semen Portland 1.840 kg x Rp 1,495.00
Pasir pasang 0.014 M3 x Rp 210,000.00
Kapur pasang 0.006 M3 x Rp 270,000.00
Upah
Pekerja 0.200 O/H x Rp 45,000.00
Mandor 0.010 O/H x Rp 65,000.00
Tukang batu 0.150 O/H x Rp 55,000.00
Kep. Tukang batu 0.015 O/H x Rp 62,000.00
1 M2 PLESTERAN 1 : 3 TEBAL 15 MM
Bahan
Semen Portland 6.480 kg x Rp 1,495.00
Pasir pasang 0.019 M3 x Rp 210,000.00
Upah
Pekerja 0.200 O/H x Rp 45,000.00
Mandor 0.010 O/H x Rp 65,000.00
Tukang batu 0.150 O/H x Rp 55,000.00
Kep. Tukang batu 0.015 O/H x Rp 62,000.00
Upah
Pekerja 0.200 Oh x Rp 45,000.00
Upah
Galian tanah 0.04 m3 x Rp 20,600.00
upah meletakkan 0.400 100kg x Rp 30,245.00
Upah
Pekerja 0.300 O/H x Rp 45,000.00
Mandor 0.015 O/H x Rp 65,000.00
Tukang batu 0.150 O/H x Rp 55,000.00
Kep. Tukang batu 0.015 O/H x Rp 62,000.00
Upah
Pekerja 0.300 O/H x Rp 45,000.00
Mandor 0.015 O/H x Rp 65,000.00
Tukang batu 0.150 O/H x Rp 55,000.00
Kep. Tukang batu 0.015 O/H x Rp 62,000.00
Upah
Pekerja 0.200 O/H x Rp 45,000.00
Mandor 0.010 O/H x Rp 65,000.00
Tukang batu 0.100 O/H x Rp 55,000.00
Kep. Tukang batu 0.010 O/H x Rp 62,000.00
Upah
Pekerja 0.080 O/H x Rp 45,000.00
Mandor 0.004 O/H x Rp 65,000.00
Tukang batu 0.040 O/H x Rp 55,000.00
Kep. Tukang batu 0.040 O/H x Rp 62,000.00
Upah
Pekerja O/H x Rp 45,000.00
Tenaga
Pekerja 0.150 Oh x Rp 45,000.00
Tukang batu 0.070 Oh x Rp 55,000.00
Kepala tukang 0.007 Oh x Rp 62,000.00
Mandor 0.008 Oh x Rp 65,000.00
Tenaga
Pekerja 1.578 Oh x Rp 45,000.00
Tukang besi 1.578 Oh x Rp 57,000.00
Tukang Cat 0.826 Oh x Rp 55,000.00
Kepala tukang 0.158 Oh x Rp 62,000.00
Mandor 0.078 Oh x Rp 65,000.00
1 M' Pasang Buis beton dia 80 cm cincin bata 1:4 pendekatan BOW S-3
Bahan
Pasir Pasang 0.122 m3 x 210,000.000
pasir urug m3 x 130,000.000
Batu Bata Merah 30 bh x 700.000
Semen Abu-abu (PC) 20.6 kg x 1,495.000
Buis beton O-80 1.100 m' x 110,000.000
Tenaga
Pekerja 0.540 Oh x 45,000.000
Tukang batu 0.285 Oh x 55,000.000
Kepala tukang 0.029 Oh x 62,000.000
Mandor 0.029 Oh x 65,000.000
1 M' Pasang Buis beton dia 40 cm cincin bata 1:4 pendekatan BOW S-3
Bahan
Pasir Pasang 0.061 m3 x 210,000.000
pasir urug m3 x 130,000.000
Batu Bata Merah 15 bh x 700.000
Semen Abu-abu (PC) 10.3 kg x 1,495.000
Buis beton O-40 1.100 m' x 75,000.000
Tenaga
Pekerja 0.360 Oh x 45,000.000
Tukang batu 0.190 Oh x 55,000.000
Kepala tukang 0.019 Oh x 62,000.000
Mandor 0.019 Oh x 65,000.000
Tenaga
Pekerja 0.200 Oh x Rp 45,000.00
Tukang batu 0.100 Oh x Rp 55,000.00
Kepala tukang 0.010 Oh x Rp 62,000.00
Mandor 0.010 Oh x Rp 65,000.00
1 M2 PLESTERAN sawut
Bahan
Semen Portland 9.000 kg x Rp 1,495.00
Pasir pasang 0.030 M3 x Rp 210,000.00
Upah
Pekerja 0.250 Oh x Rp 45,000.00
Mandor 0.100 Oh x Rp 65,000.00
Tukang batu 0.010 Oh x Rp 55,000.00
Kep. Tukang batu 0.002 Oh x Rp 62,000.00
Tenaga
Pekerja 1.000 Oh x Rp 45,000.00
Tenaga
Pekerja 2.160 Oh x Rp 45,000.00
Mandor 0.108 Oh x Rp 65,000.00
Tukang batu 0.720 Oh x Rp 55,000.00
tukang gali 0.100 Oh x Rp 45,000.00
Kep. Tukang batu 0.072 Oh x Rp 62,000.00
Tenaga
Pekerja 1.420 Oh x Rp 45,000.00
Mandor 0.071 Oh x Rp 65,000.00
Tukang batu 0.473 Oh x Rp 55,000.00
Kep. Tukang batu 0.047 Oh x Rp 62,000.00
Tenaga
Pekerja 3.200 Oh x Rp 45,000.00
Mandor 0.016 Oh x Rp 65,000.00
Tukang batu 0.015 Oh x Rp 55,000.00
Kep. Tukang batu 0.002 Oh x Rp 62,000.00
1 M2 LANTAI KERAMIK 30 x 30 SNI penutup lantai.6.35
Bahan
Keramik 30 x 30 1.000 m2 x Rp 45,000.00
Semen Portland 9.800 kg x Rp 1,495.00
Pasir pasang 0.045 M3 x Rp 210,000.00
Semen putih 1.300 kg x Rp 2,312.50
Upah
Pekerja 0.250 Org/Hr x Rp 45,000.00
Mandor 0.013 Org/Hr x Rp 65,000.00
Tukang batu 0.125 Org/Hr x Rp 55,000.00
Kep. Tukang batu 0.013 Org/Hr x Rp 62,000.00
Upah
Pekerja 0.620 Org/Hr x Rp 45,000.00
Mandor 0.030 Org/Hr x Rp 65,000.00
Tukang batu 0.350 Org/Hr x Rp 55,000.00
Kep. Tukang batu 0.035 Org/Hr x Rp 62,000.00
Upah
Pekerja 0.700 Org/Hr x Rp 45,000.00
Mandor 0.035 Org/Hr x Rp 65,000.00
Tukang batu 0.350 Org/Hr x Rp 55,000.00
Kep. Tukang batu 0.035 Org/Hr x Rp 62,000.00
1 M2 LANTAI KERAMIK 20 x 20
Bahan
Keramik 20 x 20 1.000 m2 x Rp 45,000.00
Semen Portland 10.000 kg x Rp 1,495.00
Pasir pasang 0.045 M3 x Rp 210,000.00
Semen Warna 1.500 kg x Rp 2,312.50
Upah
Pekerja 0.260 Org/Hr x Rp 45,000.00
Mandor 0.013 Org/Hr x Rp 65,000.00
Tukang batu 0.130 Org/Hr x Rp 55,000.00
Kep. Tukang batu 0.013 Org/Hr x Rp 62,000.00
Upah
Pekerja 0.600 Org/Hr x Rp 45,000.00
Mandor 0.030 Org/Hr x Rp 65,000.00
Tukang batu 0.450 Org/Hr x Rp 55,000.00
Kep. Tukang batu 0.045 Org/Hr x Rp 62,000.00
Upah
Pekerja 0.600 Org/Hr x Rp 45,000.00
Mandor 0.030 Org/Hr x Rp 65,000.00
Tukang batu 0.350 Org/Hr x Rp 55,000.00
Kep. Tukang batu 0.035 Org/Hr x Rp 62,000.00
Jumlah Upah dan Bahan
Upah
Pekerja 0.620 Org/Hr x Rp 45,000.00
Mandor 0.030 Org/Hr x Rp 65,000.00
Tukang batu 0.350 Org/Hr x Rp 55,000.00
Kep. Tukang batu 0.035 Org/Hr x Rp 62,000.00
Upah
Pekerja 1.000 Org/Hr x Rp 45,000.00
Mandor 0.050 Org/Hr x Rp 65,000.00
Tukang batu 0.550 Org/Hr x Rp 55,000.00
Kep. Tukang batu 0.055 Org/Hr x Rp 62,000.00
Upah
Pekerja 0.090 Org/Hr x Rp 45,000.00
Mandor 0.0050 Org/Hr x Rp 65,000.00
Tukang batu 0.0900 Org/Hr x Rp 55,000.00
Kep. Tukang batu 0.0090 Org/Hr x Rp 62,000.00
Upah
Pekerja 0.063 Org/Hr x Rp 45,000.00
Mandor 0.0032 Org/Hr x Rp 65,000.00
Tukang batu 0.006 Org/Hr x Rp 55,000.00
Kep. Tukang batu 0.006 Org/Hr x Rp 62,000.00
Upah
Pekerja 0.063 Org/Hr x Rp 45,000.00
Mandor 0.0032 Org/Hr x Rp 65,000.00
Tukang batu 0.006 Org/Hr x Rp 55,000.00
Kep. Tukang batu 0.006 Org/Hr x Rp 62,000.00
Jumlah Upah dan Bahan
Upah
Pekerja 0.270 Org/Hr x Rp 45,000.00
Mandor 0.014 Org/Hr x Rp 65,000.00
Tukang batu 0.135 Org/Hr x Rp 55,000.00
Kep. Tukang batu 0.014 Org/Hr x Rp 62,000.00
Upah
Pekerja 0.150 Org/Hr x Rp 45,000.00
Mandor 0.015 Org/Hr x Rp 65,000.00
Tukang batu 0.080 Org/Hr x Rp 55,000.00
Kep. Tukang batu 0.008 Org/Hr x Rp 62,000.00
Upah
Pekerja 0.150 Org/Hr x Rp 45,000.00
Mandor 0.015 Org/Hr x Rp 65,000.00
Tukang batu 0.080 Org/Hr x Rp 55,000.00
Kep. Tukang batu 0.008 Org/Hr x Rp 62,000.00
Upah
Pekerja 0.150 Org/Hr x Rp 45,000.00
Mandor 0.015 Org/Hr x Rp 65,000.00
Tukang batu 0.080 Org/Hr x Rp 55,000.00
Kep. Tukang batu 0.008 Org/Hr x Rp 62,000.00
1 m2 Pasang Paving segi enam tebal 6 cm k-225 ( diluar pasir urug) Pendekatan
Bahan
Paving segi enam , merah, K 225 produk Diamond 1.050 M2 x Rp 109,125.00
Upah
Pekerja 0.240 Org/Hr x Rp 45,000.00
Mandor 0.012 Org/Hr x Rp 65,000.00
Tukang batu 0.080 Org/Hr x Rp 55,000.00
Kep. Tukang batu 0.008 Org/Hr x Rp 62,000.00
1 m2 Pasang Paving segi enam tebal 6 cm k-225 ( diluar pasir urug) Pendekatan
Bahan
Paving segi enam , kuning, K 225 produk Diamond 1.050 M2 x Rp 136,125.00
Upah
Pekerja 0.240 Org/Hr x Rp 45,000.00
Mandor 0.012 Org/Hr x Rp 65,000.00
Tukang batu 0.080 Org/Hr x Rp 55,000.00
Kep. Tukang batu 0.008 Org/Hr x Rp 62,000.00
Upah
Pekerja 0.150 Org/Hr x Rp 45,000.00
Mandor 0.014 Org/Hr x Rp 65,000.00
Tukang batu 0.080 Org/Hr x Rp 55,000.00
Kep. Tukang batu 0.008 Org/Hr x Rp 62,000.00
Upah
Pekerja 0.240 Org/Hr x 45,000.00
Mandor 0.120 Org/Hr x 65,000.00
Tukang batu 0.080 Org/Hr x 55,000.00
Kep. Tukang batu 0.008 Org/Hr x 62,000.00
Upah
Mandor 0.120 Org/Hr x 45,000.00
Tukang batu 0.060 Org/Hr x 65,000.00
Kep. Tukang batu 0.040 Org/Hr x 55,000.00
0 0.004 Org/Hr x 62,000.00
Upah
Tukang batu 0.120 Org/Hr x 45,000.00
Kep. Tukang batu 0.060 Org/Hr x 65,000.00
0 0.040 Org/Hr x 55,000.00
0 0.004 Org/Hr x 62,000.00
Upah
Pekerja 0.501 Org/Hr x Rp 45,000.00
Mandor 0.025 Org/Hr x Rp 65,000.00
Tukang cat 0.168 Org/Hr x Rp 55,000.00
Tukang besi 0.501 Org/Hr x Rp 57,000.00
Kepala Tukang 0.050 Org/Hr x Rp 62,000.00
Upah
Pekerja 0.100 Org/Hr x Rp 45,000.00
Mandor 0.010 Org/Hr x Rp 65,000.00
Tukang batu 0.080 Org/Hr x Rp 55,000.00
Kep. Tukang batu 0.008 Org/Hr x Rp 62,000.00
PEKERJAAN BETON
1 m3 Membuat Lantai Kerja / Rabat Beton
Bahan :
218.000 kg Semen portland @ Rp 1,495.00
0.520 m3 Pasir beton @ Rp 225,000.00
0.870 m3 Split 2/3 cm @ Rp 210,000.00
Upah :
1.650 Oh Pekerja @ Rp 45,000.00
0.250 Oh Tukang batu @ Rp 55,000.00
0.025 Oh Kepala Tukang @ Rp 62,000.00
0.080 Oh Mandor @ Rp 65,000.00
Jumlah Bahan + Upa
Upah :
1.150 Oh Pekerja @ Rp 45,000.00
0.020 Oh Tukang batu @ Rp 55,000.00
0.002 Oh Kepala Tukang @ Rp 62,000.00
0.006 Oh Mandor @ Rp 65,000.00
Upah :
Pekerja 1.650 Oh Rp 45,000.00
Tukang batu 0.250 Oh Rp 55,000.00
Kepala Tukang 0.025 Oh Rp 62,000.00
Mandor 0.080 Oh Rp 65,000.00
Upah :
1.650 Oh Pekerja @ Rp 45,000.00
0.250 Oh Tukang batu @ Rp 55,000.00
0.025 Oh Kepala Tukang @ Rp 62,000.00
0.080 Oh Mandor @ Rp 65,000.00
Upah :
6.000 Oh Pekerja @ Rp 45,000.00
1.000 Oh Tukang batu @ Rp 55,000.00
0.100 Oh Kepala Tukang @ Rp 62,000.00
0.300 Oh Mandor @ Rp 65,000.00
Upah :
6.000 Oh Pekerja @ Rp 45,000.00
1.000 Oh Tukang batu @ Rp 55,000.00
0.100 Oh Kepala Tukang @ Rp 62,000.00
0.300 Oh Mandor @ Rp 65,000.00
Upah :
6.000 Oh Pekerja @ Rp 45,000.00
1.000 Oh Tukang batu @ Rp 55,000.00
0.100 Oh Kepala Tukang @ Rp 62,000.00
0.300 Oh Mandor @ Rp 65,000.00
Upah :
Pekerja 0.070 Oh Rp 45,000.00
Tukang besi 0.070 Oh Rp 55,000.00
Kepala Tukang 0.0070 Oh Rp 62,000.00
Mandor 0.0040 Oh Rp 65,000.00
Upah :
Pekerja 0.070 Oh Rp 45,000.00
Tukang besi 0.070 Oh Rp 55,000.00
Kepala Tukang 0.0070 Oh Rp 62,000.00
Mandor 0.0040 Oh Rp 65,000.00
Upah :
0.300 Oh Pekerja @ Rp 45,000.00
0.260 Oh Tukang kayu @ Rp 57,000.00
0.026 Oh Kepala Tukang @ Rp 62,000.00
0.005 Oh Mandor @ Rp 65,000.00
Upah :
Pekerja 0.300 Oh Rp 45,000.00
Tukang kayu 0.260 Oh Rp 57,000.00
Kepala Tukang 0.026 Oh Rp 62,000.00
Mandor 0.005 Oh Rp 65,000.00
Upah :
Pekerja 0.300 Oh Rp 45,000.00
Tukang kayu 0.260 Oh Rp 57,000.00
Kepala Tukang 0.026 Oh Rp 62,000.00
Mandor 0.005 Oh Rp 65,000.00
Jumlah Bahan + Upa
Upah :
0.300 Oh Pekerja @ Rp 45,000.00
0.330 Oh Tukang kayu @ Rp 57,000.00
0.033 Oh Kepala Tukang @ Rp 62,000.00
0.006 Oh Mandor @ Rp 65,000.00
Upah :
0.320 Oh Pekerja @ Rp 45,000.00
0.330 Oh Tukang kayu @ Rp 57,000.00
0.033 Oh Kepala Tukang @ Rp 62,000.00
0.006 Oh Mandor @ Rp 65,000.00
Upah :
0.320 Oh Pekerja @ Rp 45,000.00
0.330 Oh Tukang kayu @ Rp 57,000.00
0.033 Oh Kepala Tukang @ Rp 62,000.00
0.006 Oh Mandor @ Rp 65,000.00
Upah :
0.320 Oh Pekerja @ Rp 45,000.00
0.330 Oh Tukang kayu @ Rp 57,000.00
0.033 Oh Kepala Tukang @ Rp 62,000.00
0.006 Oh Mandor @ Rp 65,000.00
1 m3 Kolom beton 1 2 3
1.000 m3 Analisa pekerjaan beton K-225 @ Rp 858,435.00
140.000 kg Analisa pembesian besi polos @ Rp 14,348.90
kg Analisa pembesian besi ulir @ Rp 14,348.90
5.000 m2 Analisa Bekisting kolom @ Rp 100,157.00
Upah
Pekerja 1.650 O/H x Rp 45,000.00
Mandor 0.080 O/H x Rp 65,000.00
Tukang batu 0.250 O/H x Rp 55,000.00
Kep. Tukang batu 0.025 O/H x Rp 62,000.00
Upah
Pekerja 1.650 0 x Rp 45,000.00
Mandor 0.080 0 x Rp 65,000.00
Tukang batu 0.250 0 x Rp 55,000.00
Kep. Tukang batu 0.025 0 x Rp 62,000.00
Upah
Pekerja 1.650 O/H x Rp 45,000.00
Mandor 0.080 O/H x Rp 65,000.00
Tukang batu 0.250 O/H x Rp 55,000.00
Kep. Tukang batu 0.025 O/H x Rp 62,000.00
Upah
Pekerja 6.000 O/H x Rp 45,000.00
Tukang batu 1.000 O/H x Rp 65,000.00
Kep. Tukang batu 0.100 O/H x Rp 55,000.00
Mandor 0.300 O/H x Rp 62,000.00
Upah
Pekerja 6.000 O/H x Rp 45,000.00
Tukang batu 1.000 O/H x Rp 65,000.00
Kep. Tukang batu 0.100 O/H x Rp 55,000.00
Mandor 0.300 O/H x Rp 62,000.00
Upah
Pekerja 6.000 O/H x Rp 45,000.00
Tukang batu 1.000 O/H x Rp 65,000.00
Kep. Tukang batu 0.100 O/H x Rp 55,000.00
Mandor 0.300 O/H x Rp 62,000.00
Upah
Pekerja 0.0070 O/H x Rp 45,000.00
Tukang besi 0.0070 O/H x Rp 55,000.00
Kep. Tukang besi 0.0007 O/H x Rp 62,000.00
Mandor 0.0003 O/H x Rp 65,000.00
Upah
Pekerja 0.3000 O/H x Rp 45,000.00
Tukang Kayu 0.2600 O/H x Rp 57,000.00
Kepala Tukang 0.0260 O/H x Rp 62,000.00
Mandor 0.0050 O/H x Rp 65,000.00
Upah
Pekerja 0.0200 O/H x Rp 45,000.00
Tukang Kayu 0.0700 O/H x Rp 57,000.00
Kepala Tukang 0.0070 O/H x Rp 62,000.00
Mandor 0.0010 O/H x Rp 65,000.00
1 M2 Pasang Perancah
Bahan
Bambu 4.0000 bt x Rp 13,000.00
Paku 0.1000 Kg x Rp 15,000.00
Upah
Pekerja 0.0200 O/H x Rp 45,000.00
Tukang Kayu 0.0700 O/H x Rp 57,000.00
Kepala Tukang 0.0070 O/H x Rp 62,000.00
Mandor 0.0010 O/H x Rp 65,000.00
Upah
Pekerja 0.050 Org/Hr x Rp 45,000.00
Mandor 0.020 Org/Hr x Rp 65,000.00
Tukang cat 0.050 Org/Hr x Rp 55,000.00
Tukang besi 0.100 Org/Hr x Rp 57,000.00
Kepala Tukang 0.010 Org/Hr x Rp 62,000.00
Upah
Pekerja 0.015 Org/Hr x Rp 45,000.00
Mandor 0.006 Org/Hr x Rp 65,000.00
Tukang cat 0.015 Org/Hr x Rp 55,000.00
Tukang besi 0.030 Org/Hr x Rp 57,000.00
Kepala Tukang 0.003 Org/Hr x Rp 62,000.00
Jumlah Upah dan Bahan
Upah
Pekerja 0.100 Org/Hr x Rp 45,000.00
Mandor 0.005 Org/Hr x Rp 65,000.00
Tukang Kayu 0.100 Org/Hr x Rp 57,000.00
Kepala Tukang Kayu 0.010 Org/Hr x Rp 62,000.00
Upah
Pekerja 0.067 Org/Hr x Rp 45,000.00
Mandor 0.003 Org/Hr x Rp 65,000.00
Tukang Kayu 0.067 Org/Hr x Rp 57,000.00
Kepala Tukang Kayu 0.007 Org/Hr x Rp 62,000.00
Upah
Pekerja 4.000 Org/Hr x Rp 45,000.00
Mandor 0.200 Org/Hr x Rp 65,000.00
Tukang Kayu 12.000 Org/Hr x Rp 57,000.00
Kepala Tukang Kayu 1.200 Org/Hr x Rp 62,000.00
Upah
Pekerja 0.040 Org/Hr x Rp 45,000.00
Mandor 0.001 Org/Hr x Rp 65,000.00
Tukang Kayu 0.400 Org/Hr x Rp 57,000.00
Kepala Tukang Kayu 0.025 Org/Hr x Rp 62,000.00
Upah
Pekerja 0.008 Org/Hr x Rp 45,000.00
Mandor 0.001 Org/Hr x Rp 65,000.00
Tukang Kayu 0.080 Org/Hr x Rp 57,000.00
Kepala Tukang Kayu 0.013 Org/Hr x Rp 62,000.00
Upah
Pekerja 0.100 Org/Hr x Rp 45,000.00
Mandor 0.005 Org/Hr x Rp 65,000.00
Tukang Kayu 0.100 Org/Hr x Rp 57,000.00
Kepala Tukang Kayu 0.010 Org/Hr x Rp 62,000.00
Upah
Pekerja 0.200 Org/Hr x Rp 45,000.00
Mandor 0.010 Org/Hr x Rp 65,000.00
Tukang Kayu 0.400 Org/Hr x Rp 57,000.00
Kepala Tukang Kayu 0.025 Org/Hr x Rp 62,000.00
1 M2 PASANG genteng
Bahan
genteng 20.0000 bh x Rp 4,500.00
Upah
Pekerja 0.150 Org/Hr x Rp 45,000.00
Mandor 0.008 Org/Hr x Rp 65,000.00
Tukang Kayu 0.075 Org/Hr x Rp 57,000.00
Kepala Tukang Kayu 0.008 Org/Hr x Rp 62,000.00
Upah
Pekerja 0.180 Org/Hr x Rp 45,000.00
Mandor 0.010 Org/Hr x Rp 65,000.00
Tukang Kayu 0.090 Org/Hr x Rp 57,000.00
Kepala Tukang Kayu 0.009 Org/Hr x Rp 62,000.00
1 M kerpus genteng
Bahan
kerpus 5.0000 bh x Rp 7,500.00
pc semen 5.0000 kg x Rp 1,495.00
pasir pasang 0.0320 m3 x Rp 210,000.00
Upah
Pekerja 0.400 Org/Hr x Rp 45,000.00
Mandor 0.002 Org/Hr x Rp 65,000.00
Tukang Kayu 0.200 Org/Hr x Rp 57,000.00
Kepala Tukang Kayu 0.020 Org/Hr x Rp 62,000.00
Upah
Pekerja 0.200 Org/Hr x Rp 45,000.00
Mandor 0.0020 Org/Hr x Rp 65,000.00
Tukang Kayu 0.150 Org/Hr x Rp 57,000.00
Kepala Tukang Kayu 0.020 Org/Hr x Rp 62,000.00
Upah
Pekerja 0.200 Org/Hr x Rp 45,000.00
Mandor 0.0020 Org/Hr x Rp 65,000.00
Tukang Kayu 0.100 Org/Hr x Rp 57,000.00
Kepala Tukang Kayu 0.010 Org/Hr x Rp 62,000.00
Upah
Tukang Kayu 5.800 Org/Hr x Rp 57,000.00
Kepala Tukang Kayu 0.580 Org/Hr x Rp 62,000.00
Pekerja 1.940 Org/Hr x Rp 45,000.00
Mandor 0.097 Org/Hr x Rp 65,000.00
Upah
Pekerja 0.080 Org/Hr x Rp 45,000.00
Mandor 0.005 Org/Hr x Rp 65,000.00
Tukang 0.091 Org/Hr x Rp 57,000.00
Kepala Tukang 0.010 Org/Hr x Rp 62,000.00
Upah
Pekerja 0.150 Org/Hr x Rp 45,000.00
Mandor 0.075 Org/Hr x Rp 65,000.00
Tukang Kayu 0.250 Org/Hr x Rp 57,000.00
Kepala Tukang Kayu 0.025 Org/Hr x Rp 62,000.00
Upah
Pekerja 0.030 Org/Hr x Rp 45,000.00
Mandor 0.0015 Org/Hr x Rp 65,000.00
Tukang Kayu 0.070 Org/Hr x Rp 57,000.00
Kepala Tukang Kayu 0.007 Org/Hr x Rp 62,000.00
Upah
Tukang 0.4500 Oh Rp 57,000.00
Kepala Tukang 0.0540 Oh Rp 62,000.00
Pekerja 0.4500 Oh Rp 45,000.00
Mandor 0.0250 Oh Rp 65,000.00
Upah
Tukang 0.4500 Oh Rp 57,000.00
Kepala Tukang 0.0540 Oh Rp 62,000.00
Pekerja 0.4500 Oh Rp 45,000.00
Mandor 0.0250 Oh Rp 65,000.00
Upah
Tukang 0.4500 Oh Rp 57,000.00
Kepala Tukang 0.0540 Oh Rp 62,000.00
Pekerja 0.4500 Oh Rp 45,000.00
Mandor 0.0250 Oh Rp 65,000.00
1 m2 Langit - langit GRC board 120x240 cm tebal 4 mm, Rangka hollow galvalum 4X4 cm, tebal 0,6 mm
Bahan
Rangka hollow galvalum 0.5500 btg Rp 40,000.00
Paku 0.0150 kg Rp 20,000.00
GRC board 4 mm 0.3750 lbr Rp 55,000.00
Skrup gypsum 15.0000 bh Rp 50.00
Paper tape 76 m / rol 0.0290 rol Rp 20,000.00
Kawat penggantung dia 4mm 0.295788 kg Rp 12,650.00
Compound gypsum 0.0160 zak Rp 60,000.00
Amplas 0.1000 lbr Rp 4,000.00
Upah
Tukang 0.4600 Oh Rp 57,000.00
Kepala Tukang 0.0550 Oh Rp 62,000.00
Pekerja 0.4600 Oh Rp 45,000.00
Mandor 0.0260 Oh Rp 65,000.00
Upah
Pekerja 0.060 Org/Hr Rp 45,000.00
Mandor 0.0030 Org/Hr Rp 65,000.00
Tukang 0.060 Org/Hr Rp 57,000.00
Kepala Tukang Gipsum 0.006 Org/Hr Rp 62,000.00
Upah
Pekerja 0.0500 Org/Hr x Rp 45,000.00
Mandor 0.0030 Org/Hr x Rp 65,000.00
Tukang Kayu 0.0500 Org/Hr x Rp 57,000.00
Kepala Tukang Kayu 0.0050 Org/Hr x Rp 62,000.00
Upah
Pekerja 0.100 Org/Hr x Rp 45,000.00
Mandor 0.005 Org/Hr x Rp 65,000.00
Tukang Kayu 0.200 Org/Hr x Rp 57,000.00
Kepala Tukang Kayu 0.020 Org/Hr x Rp 62,000.00
Upah per m2
Pekerja 0.600 Org/Hr Rp 45,000.00
Mandor 0.060 Org/Hr Rp 65,000.00
Tukang Kayu 0.600 Org/Hr Rp 57,000.00
Kepala Tukang Kayu 0.060 Org/Hr Rp 62,000.00
Upah per m2
Pekerja 0.6000 Org/Hr Rp 45,000.00
Mandor 0.0600 Org/Hr Rp 65,000.00
Tukang Kayu 0.6000 Org/Hr Rp 57,000.00
Kepala Tukang Kayu 0.0600 Org/Hr Rp 62,000.00
Upah
Pekerja 0.100 Org/Hr x Rp 45,000.00
Mandor 0.005 Org/Hr x Rp 65,000.00
Tukang Kayu 0.200 Org/Hr x Rp 57,000.00
Kepala Tukang Kayu 0.020 Org/Hr x Rp 62,000.00
Upah
Pekerja 0.100 Org/Hr x Rp 45,000.00
Mandor 0.005 Org/Hr x Rp 65,000.00
Tukang Kayu 0.200 Org/Hr x Rp 57,000.00
Kepala Tukang Kayu 0.020 Org/Hr x Rp 62,000.00
Upah
Pekerja 0.028 Org/Hr x Rp 45,000.00
Mandor 0.001 Org/Hr x Rp 65,000.00
Tukang Kayu 0.080 Org/Hr x Rp 57,000.00
Kepala Tukang Kayu 0.008 Org/Hr x Rp 62,000.00
Upah
Pekerja 0.0600 O/h x Rp 45,000.00
Tukang besi 0.0600 O/h x Rp 57,000.00
Kepala tukang besi 0.0060 O/h x Rp 62,000.00
Mandor 0.0030 O/h x Rp 65,000.00
Upah
Pekerja 0.0600 O/h x Rp 45,000.00
Tukang besi 0.0600 O/h x Rp 57,000.00
Kepala tukang besi 0.0060 O/h x Rp 62,000.00
Mandor 0.0030 O/h x Rp 65,000.00
Upah
Pekerja 0.0500 O/h x Rp 45,000.00
Tukang besi 0.0500 O/h x Rp 57,000.00
Kepala tukang besi 0.0050 O/h x Rp 62,000.00
Mandor 0.0025 O/h x Rp 65,000.00
Upah
Pekerja 0.0600 O/h x Rp 45,000.00
Tukang besi 0.0600 O/h x Rp 57,000.00
Kepala tukang besi 0.0060 O/h x Rp 62,000.00
Mandor 0.0030 O/h x Rp 65,000.00
Upah
Pekerja 0.0600 O/h x Rp 45,000.00
Tukang besi 0.0600 O/h x Rp 57,000.00
Kepala tukang besi 0.0060 O/h x Rp 62,000.00
Mandor 0.0030 O/h x Rp 65,000.00
Jumlah Upah dan Bahan
Upah
Pekerja 0.0600 O/h x Rp 45,000.00
Tukang besi 0.0600 O/h x Rp 57,000.00
Kepala tukang besi 0.0060 O/h x Rp 62,000.00
Mandor 0.0030 O/h x Rp 65,000.00
Upah
Tukang 0.1 Org/Hr Rp 57,000.00
Kepala tukang 0.01 Org/Hr Rp 62,000.00
Pekerja 0.1 Org/Hr Rp 45,000.00
Mandor 0.001 Org/Hr Rp 65,000.00
Upah
Tukang 0.05 Org/Hr Rp 57,000.00
Kepala tukang 0.005 Org/Hr Rp 62,000.00
Pekerja 0.04 Org/Hr Rp 45,000.00
Mandor 0.0025 Org/Hr Rp 65,000.00
Upah
Tukang 0.1600 Org/Hr Rp 57,000.00
Kepala tukang 0.0160 Org/Hr Rp 62,000.00
Pekerja 0.1600 Org/Hr Rp 45,000.00
Mandor 0.0080 Org/Hr Rp 65,000.00
Upah
Tukang 0.1600 Org/Hr Rp 57,000.00
Kepala tukang 0.0160 Org/Hr Rp 62,000.00
Pekerja 0.1600 Org/Hr Rp 45,000.00
Mandor 0.0080 Org/Hr Rp 65,000.00
1 M2 KACA ES 5 MM pendekatan
Bahan
Kaca es 5 mm 1.1000 M2 Rp 160,000.00
Upah
Tukang 0.1500 Org/Hr Rp 57,000.00
Kepala tukang 0.0150 Org/Hr Rp 62,000.00
Pekerja 0.0150 Org/Hr Rp 45,000.00
Mandor 0.00075 Org/Hr Rp 65,000.00
Upah
Tukang 0.1600 Org/Hr Rp 57,000.00
Kepala tukang 0.0160 Org/Hr Rp 62,000.00
Pekerja 0.1600 Org/Hr Rp 45,000.00
Mandor 0.0080 Org/Hr Rp 65,000.00
Upah
Tukang 0.1500 Org/Hr x Rp 57,000.00
Kepala tukang 0.0150 Org/Hr x Rp 62,000.00
Pekerja 0.0150 Org/Hr x Rp 45,000.00
Mandor 0.00075 Org/Hr x Rp 65,000.00
Upah
Tukang 0.4500 Org/Hr x Rp 57,000.00
Kepala tukang 0.0450 Org/Hr x Rp 62,000.00
Pekerja 0.0450 Org/Hr x Rp 45,000.00
Mandor 0.0023 Org/Hr x Rp 65,000.00
Upah
Tukang 1.0500 Org/Hr x Rp 57,000.00
Kepala tukang 0.0750 Org/Hr x Rp 62,000.00
Pekerja 0.0750 Org/Hr x Rp 45,000.00
Mandor 0.0038 Org/Hr x Rp 65,000.00
Upah
Tukang 0.2500 Org/Hr x Rp 57,000.00
Kepala tukang 0.0250 Org/Hr x Rp 62,000.00
Pekerja 0.0250 Org/Hr x Rp 45,000.00
Mandor 0.0010 Org/Hr x Rp 65,000.00
Upah
Tukang 0.1500 Org/Hr Rp 57,000.00
Kepala tukang 0.0150 Org/Hr Rp 62,000.00
Pekerja 0.0150 Org/Hr Rp 45,000.00
Mandor 0.00075 Org/Hr Rp 65,000.00
Upah
Tukang 0.3000 Org/Hr x Rp 57,000.00
Kepala tukang 0.0300 Org/Hr x Rp 62,000.00
Pekerja 0.0300 Org/Hr x Rp 45,000.00
Mandor 0.00200 Org/Hr x Rp 65,000.00
Upah
Tukang 0.1200 Org/Hr x Rp 57,000.00
Kepala tukang 0.0100 Org/Hr x Rp 62,000.00
Pekerja 0.0100 Org/Hr x Rp 45,000.00
Mandor 0.00100 Org/Hr x Rp 65,000.00
Upah
Pekerja 0.120 Org/Hr x Rp 45,000.00
Mandor 0.0060 Org/Hr x Rp 65,000.00
Tukang kayu 0.120 Org/Hr x Rp 57,000.00
Kepala Tukang kayu 0.012 Org/Hr x Rp 62,000.00
backdrop 1 unit
Bahan per m2
Hollow besi 4x4 2mm 8.1600 m' x Rp 28,750.00
Triplek 9mm (120x240) 0.347 lbr x Rp 127,500.00
Triplek Megatek 3mm (122x244) 0.347 lbr x Rp 80,000.00
Plamir Kayu merk pedang/avian 0.075 kg x Rp 82,500.00
Politur Jadi/ mowilex air 0.355 ltr x Rp 26,900.00
Paku 0.150 KG x Rp 15,000.00
Upah per m2
Pekerja 0.600 Org/Hr x Rp 45,000.00
Mandor 0.060 Org/Hr x Rp 65,000.00
Tukang Kayu 0.600 Org/Hr x Rp 57,000.00
Kepala Tukang Kayu 0.060 Org/Hr x Rp 62,000.00
1 M' LISPLANK
Bahan
woodplank 1.1000 m x Rp 22,500.00
Paku 0.050 KG x Rp 15,000.00
Upah
Pekerja 0.100 Org/Hr x Rp 45,000.00
Mandor 0.005 Org/Hr x Rp 65,000.00
Tukang Kayu 0.200 Org/Hr x Rp 57,000.00
Kepala Tukang Kayu 0.020 Org/Hr x Rp 62,000.00
Upah
Tukang 0.7000 org/hr x Rp 55,000.00
Kepala Tukang 0.0800 org/hr x Rp 62,000.00
Pekerja 0.7500 org/hr x Rp 45,000.00
Mandor 0.0550 org/hr x Rp 65,000.00
Upah
Pasang Kusen Alluminium 4" Silver #REF! m x Err:509
Pasang Partisi Double #REF! m2 x Err:509
Tukang 0.4000 Oh x Rp 57,000.00
Kepala Tukang 0.0500 Oh x Rp 62,000.00
Pekerja 0.4000 Oh x Rp 45,000.00
Mandor 0.0200 Oh x Rp 65,000.00
Upah
Pekerja 0.500 Org/Hr x Rp 45,000.00
Mandor 0.050 Org/Hr x Rp 65,000.00
Tukang Kayu 0.500 Org/Hr x Rp 57,000.00
Kepala Tukang Kayu 0.050 Org/Hr x Rp 62,000.00
Upah
Pekerja 0.500 Org/Hr x Rp 45,000.00
Mandor 0.050 Org/Hr x Rp 65,000.00
Tukang Kayu 0.500 Org/Hr x Rp 57,000.00
Kepala Tukang Kayu 0.050 Org/Hr x Rp 62,000.00
TOTAL JUMLAH
pintu sliding
Bahan
Alumunium 3" Alexindo Silver 5.8000 m' x Rp 60,000.00
engsel pintu sliding 3.4000 m' x Rp 125,000.00
Upah
Tukang 2.0000 Org/Hr x Rp 55,000.00
Kepala tukang 0.2000 Org/Hr x Rp 62,000.00
Pekerja 1.0000 Org/Hr x Rp 45,000.00
Mandor 0.0500 Org/Hr x Rp 65,000.00
Upah
Pek Galian tanah keras 0.12 m3 x Rp 32,155.00
beton 1:2:3 0.12 x Rp 912,970.00
Pasangan bata dudukan tiang 1 unit x Rp 100,000.00
Pekerja 3.000 Org/Hr x Rp 45,000.00
Mandor 1.000 Org/Hr x Rp 65,000.00
Tukang cat 0.900 Org/Hr x Rp 55,000.00
Tukang Listrik 2.000 Org/Hr x Rp 55,000.00
Tukang besi 1.200 Org/Hr x Rp 57,000.00
Kepala Tukang 0.500 Org/Hr x Rp 62,000.00
Upah
Pekerja 2.000 Org/Hr x Rp 45,000.00
Mandor 1.500 Org/Hr x Rp 65,000.00
Tukang 4.000 Org/Hr x Rp 57,000.00
Kepala Tukang Kayu 1.500 Org/Hr x Rp 62,000.00
Upah
Tukang 3.6500 Org/Hr x Rp 55,000.00
Kepala tukang 0.3650 Org/Hr x Rp 62,000.00
Pekerja 2.1600 Org/Hr x Rp 45,000.00
Mandor 0.3650 Org/Hr x Rp 65,000.00
Upah
Tukang 2.6000 Org/Hr x Rp 55,000.00
Kepala tukang 0.2600 Org/Hr x Rp 62,000.00
Pekerja 1.0600 Org/Hr x Rp 45,000.00
Mandor 0.0600 Org/Hr x Rp 65,000.00
Upah
Tukang 3.6500 Org/Hr x Rp 55,000.00
Kepala tukang 0.3650 Org/Hr x Rp 62,000.00
Pekerja 2.1600 Org/Hr x Rp 45,000.00
Mandor 0.3650 Org/Hr x Rp 65,000.00
1 unit DAUN PINTU RANGKA ALUMUNIUM PANEL KACA decolux 5 MM, (0,7x2,1) lt.4
Bahan
kusen 5.6000 m x Rp 76,885.00
asesoris 1.0000 set x Rp 140,855.10
pasang kaca decolux 1.4700 m2 x Rp 380,832.00
Upah
Tukang 3.6500 Org/Hr x Rp 55,000.00
Kepala tukang 0.3650 Org/Hr x Rp 62,000.00
Pekerja 2.1600 Org/Hr x Rp 45,000.00
Mandor 0.3650 Org/Hr x Rp 65,000.00
1 unit DAUN JENDELA RANGKA ALUMUNIUM PANEL KACA BENING 5 MM, (0,8x1,8)
Bahan
kusen 5.2000 m x Rp 76,885.00
asesoris 1.0000 set x Rp 116,776.02
pasang kaca bening 1.4400 m2 x Rp 127,832.00
Upah
Tukang 3.3000 Org/Hr x Rp 55,000.00
Kepala tukang 0.3300 Org/Hr x Rp 62,000.00
Pekerja 1.9000 Org/Hr x Rp 45,000.00
Mandor 0.3300 Org/Hr x Rp 65,000.00
1 unit DAUN JENDELA RANGKA ALUMUNIUM PANEL KACA BENING 5 MM, (0,8x1,6)
Bahan
kusen 4.8000 m x Rp 76,885.00
asesoris 1.0000 set x Rp 106,534.59
pasang kaca bening 1.2800 m2 x Rp 127,832.00
Upah
Tukang 3.2000 Org/Hr x Rp 55,000.00
Kepala tukang 0.3200 Org/Hr x Rp 62,000.00
Pekerja 1.8000 Org/Hr x Rp 45,000.00
Mandor 0.3200 Org/Hr x Rp 65,000.00
1 unit DAUN JENDELA RANGKA ALUMUNIUM PANEL KACA BENING 5 MM, (0,8x1,2)
Bahan
kusen 4.0000 m x Rp 76,885.00
asesoris 1.0000 set x Rp 86,051.74
pasang kaca bening 0.9600 m2 x Rp 127,832.00
Upah
Tukang 3.0000 Org/Hr x Rp 55,000.00
Kepala tukang 0.3000 Org/Hr x Rp 62,000.00
Pekerja 1.7000 Org/Hr x Rp 45,000.00
Mandor 0.3000 Org/Hr x Rp 65,000.00
1 unit DAUN JENDELA RANGKA ALUMUNIUM PANEL KACA BENING 5 MM, (0,8x0,6)
Bahan
kusen 2.8000 m x Rp 76,885.00
asesoris 1.0000 set x Rp 55,327.47
pasang kaca bening 0.4800 m2 x Rp 127,832.00
Upah
Tukang 2.8000 Org/Hr x Rp 55,000.00
Kepala tukang 0.2800 Org/Hr x Rp 62,000.00
Pekerja 1.6000 Org/Hr x Rp 45,000.00
Mandor 0.2800 Org/Hr x Rp 65,000.00
1 unit DAUN PINTU SHAFT RANGKA ALUMUNIUM PANEL KACA es5 MM, (0,8x1,15)
Bahan
kusen 3.9000 m x Rp 76,885.00
asesoris 1.0000 set x Rp 94,231.79
pasang kaca es 0.9200 m2 x Rp 186,203.75
Upah
Tukang 3.0000 Org/Hr x Rp 55,000.00
Kepala tukang 0.3000 Org/Hr x Rp 62,000.00
Pekerja 2.0000 Org/Hr x Rp 45,000.00
Mandor 0.3000 Org/Hr x Rp 65,000.00
1 unit DAUN PINTU SHAFT RANGKA ALUMUNIUM PANEL KACA es5 MM, (0,7x1.0)
Bahan
kusen 3.4000 m x Rp 76,885.00
asesoris 1.0000 set x Rp 86,543.29
pasang kaca es 0.9200 m2 x Rp 186,203.75
Upah
Tukang 3.0000 Org/Hr x Rp 55,000.00
Kepala tukang 0.3000 Org/Hr x Rp 62,000.00
Pekerja 2.0000 Org/Hr x Rp 45,000.00
Mandor 0.3000 Org/Hr x Rp 65,000.00
Upah
Tukang 3.9000 Org/Hr x Rp 55,000.00
Kepala tukang 0.3900 Org/Hr x Rp 62,000.00
Pekerja 1.5900 Org/Hr x Rp 45,000.00
Mandor 0.0900 Org/Hr x Rp 65,000.00
Upah
Tukang 2.6000 Org/Hr x Rp 55,000.00
Kepala tukang 0.2600 Org/Hr x Rp 62,000.00
Pekerja 1.0600 Org/Hr x Rp 45,000.00
Mandor 0.0600 Org/Hr x Rp 65,000.00
Jumlah Upah dan Bahan
Upah
Tukang 2.6000 Org/Hr x Rp 55,000.00
Kepala tukang 0.2600 Org/Hr x Rp 62,000.00
Pekerja 1.0600 Org/Hr x Rp 45,000.00
Mandor 0.0600 Org/Hr x Rp 65,000.00
Upah
Tukang 2.6000 Org/Hr x Rp 55,000.00
Kepala tukang 0.2600 Org/Hr x Rp 62,000.00
Pekerja 1.0600 Org/Hr x Rp 45,000.00
Mandor 0.0600 Org/Hr x Rp 65,000.00
Upah
Tukang 1.8500 Org/Hr x Rp 55,000.00
Kepala tukang 0.1000 Org/Hr x Rp 62,000.00
Pekerja 1.8000 Org/Hr x Rp 45,000.00
Mandor 0.0850 Org/Hr x Rp 65,000.00
Upah
Tukang 1.8200 Org/Hr x Rp 55,000.00
Kepala tukang 0.0900 Org/Hr x Rp 62,000.00
Pekerja 1.7000 Org/Hr x Rp 45,000.00
Mandor 0.0850 Org/Hr x Rp 65,000.00
Upah
Tukang 1.8000 Org/Hr x Rp 55,000.00
Kepala tukang 0.0800 Org/Hr x Rp 62,000.00
Pekerja 1.5000 Org/Hr x Rp 45,000.00
Mandor 0.0850 Org/Hr x Rp 65,000.00
Upah
Tukang 1.2100 Org/Hr x Rp 55,000.00
Kepala tukang 0.2600 Org/Hr x Rp 62,000.00
Pekerja 0.5000 Org/Hr x Rp 45,000.00
Mandor 0.0600 Org/Hr x Rp 65,000.00
Upah
Tukang 2.0000 Org/Hr x Rp 55,000.00
Kepala tukang 0.3000 Org/Hr x Rp 62,000.00
Pekerja 1.1000 Org/Hr x Rp 45,000.00
Mandor 0.0800 Org/Hr x Rp 65,000.00
Err:509
Analisa
Pasang Kusen ALUMUNIUM #REF! m' x Rp 76,885.00
DAUN PINTU KACA ES 5 MM, (0,8x2,1) #REF! bh x Rp 1,254,811.36
DAUN BV KACA BENING 5 MM (0,4x0,8) #REF! bh x Rp 464,991.29
Jumlah
Err:509
Analisa
Pasang Kusen ALUMUNIUM #REF! m' x Rp 76,885.00
DAUN PINTU KACA ES 5 MM, (0,8x2,1) #REF! bh x Rp 1,254,811.36
DAUN BV KACA BENING 5 MM (0,4x0,8) #REF! bh x Rp 464,991.29
Jumlah
Err:509
Analisa
Pasang Kusen ALUMUNIUM #REF! m' x Rp 76,885.00
DAUN PINTU KACA decolux 5 MM, (0,7x2,1) #REF! bh x Rp 1,475,539.14
DAUN BV KACA BENING 5 MM (0,4x0,7) #REF! bh x Rp 433,632.95
Jumlah
Jumlah
Pasang Pintu Jendela Type PJ(lengkap)
Analisa
Pasang Kusen ALUMUNIUM #REF! m' x Rp 76,885.00
DAUN PINTU KACA ES 5 MM, (0,8x2,1) #REF! bh x Rp 1,254,811.36
DAUN JENDELA BENING 5 MM, (0,8x1,8) #REF! bh x Rp 1,009,566.10
DAUN BV KACA BENING 5 MM (0,4x0,8) #REF! bh x Rp 464,991.29
Jumlah
Jumlah
Jumlah
Err:509
Analisa
Pasang Kusen ALUMUNIUM #REF! m' x Rp 76,885.00
DAUN PINTU SHAFT ES 5 MM, #REF! bh x Rp 858,490.74
Jumlah
Err:509
Analisa
Pasang Kusen ALUMUNIUM 3.9000 m' x Rp 76,885.00
DAUN PINTU SHAFT ES 5 MM, 1.0000 bh x Rp 812,359.74
Jumlah
Err:509
Analisa
Pasang Kusen ALUMUNIUM #REF! m' x Rp 76,885.00
DAUN JENDELA BENING 5 MM, (0,8x0,6) #REF! bh x Rp 593,524.83
PASANG KACA MATI BENING 5 MM #REF! M2 x Rp 127,832.00
DAUN BV KACA BENING 5 MM (0,4x0,8) #REF! bh x Rp 464,991.29
Jumlah
Err:509
Analisa
Pasang Kusen ALUMUNIUM #REF! m' x Rp 76,885.00
DAUN JENDELA BENING 5 MM, (0,8x1,2) #REF! bh x Rp 795,910.46
PASANG KACA MATI BENING 5 MM #REF! M2 x Rp 127,832.00
DAUN BV KACA BENING 5 MM (0,4x0,8) #REF! bh x Rp 464,991.29
Jumlah
Jumlah
Err:509
Analisa
Pasang Kusen ALUMUNIUM #REF! m' x Rp 76,885.00
DAUN BV KACA BENING 5 MM (0,4x0,6) #REF! bh x Rp 398,324.62
Jumlah
Jumlah
Jumlah
Jumlah
Upah
Pekerja 0.322 Org/Hr x Rp 45,000.00
Mandor 0.080 Org/Hr x Rp 65,000.00
Tukang cat 0.069 Org/Hr x Rp 55,000.00
Tukang besi 0.322 Org/Hr x Rp 57,000.00
Kepala Tukang 0.080 Org/Hr x Rp 62,000.00
Upah
Pekerja 0.050 Org/Hr x Rp 45,000.00
Mandor 0.005 Org/Hr x Rp 65,000.00
Tukang Kayu 0.050 Org/Hr x Rp 57,000.00
Kepala Tukang Kayu 0.005 Org/Hr x Rp 62,000.00
Upah
Pekerja 0.120 Org/Hr x Rp 45,000.00
Mandor 0.006 Org/Hr x Rp 65,000.00
Tukang Kayu 0.060 Org/Hr x Rp 57,000.00
Kepala Tukang Kayu 0.006 Org/Hr x Rp 62,000.00
PEKERJAAN CAT-CATAN
1 M2 Cat tembok bidang baru SNI 13-6.14
Bahan
Cat dasar Catylax 0.1000 kg Rp 30,000.00
Cat Penutup Catylax 0.2600 kg Rp 30,000.00
Plamur Tembok 0.1000 kg Rp 27,000.00
Upah
Tukang Cat 0.0630 Org/Hr Rp 55,000.00
KepalaTukang Cat 0.0063 Org/Hr Rp 62,000.00
Pekerja 0.0200 Org/Hr Rp 45,000.00
Mandor 0.0025 Org/Hr Rp 65,000.00
Upah
Tukang Cat 0.0420 Org/Hr Rp 55,000.00
KepalaTukang Cat 0.0042 Org/Hr Rp 62,000.00
Pekerja 0.0280 Org/Hr Rp 45,000.00
Mandor 0.0025 Org/Hr Rp 65,000.00
1 M2 Cat genteng
Bahan
Cat dasar genteng 0.1000 kg Rp 74,000.00
Cat Penutup genteng 0.2600 kg Rp 74,000.00
Upah
Tukang Cat 0.0420 Org/Hr Rp 55,000.00
KepalaTukang Cat 0.0042 Org/Hr Rp 62,000.00
Pekerja 0.0280 Org/Hr Rp 45,000.00
Mandor 0.0025 Org/Hr Rp 65,000.00
Upah
Tukang Cat 0.0630 Org/Hr x Rp 55,000.00
KepalaTukang Cat 0.0063 Org/Hr x Rp 62,000.00
Pekerja 0.0200 Org/Hr x Rp 45,000.00
Mandor 0.0025 Org/Hr x Rp 65,000.00
Upah
Pekerja 0.070 Org/Hr x Rp 45,000.00
Mandor 0.0025 Org/Hr x Rp 65,000.00
Tukang cat 0.0090 Org/Hr x Rp 55,000.00
Kepala Tukang Cat 0.0060 Org/Hr x Rp 62,000.00
Upah
Pekerja 0.105 Org/Hr x Rp 45,000.00
Mandor 0.0038 Org/Hr x Rp 65,000.00
Tukang cat 0.0135 Org/Hr x Rp 55,000.00
Kepala Tukang Cat 0.0090 Org/Hr x Rp 62,000.00
Jumlah Upah dan Bahan
Upah
Pekerja 0.054 Org/Hr Rp 45,000.00
Mandor 0.0027 Org/Hr Rp 65,000.00
Tukang kayu 0.0900 Org/Hr Rp 57,000.00
Kepala Tukang kayu 0.0090 Org/Hr Rp 62,000.00
Upah
Pekerja 0.010 Org/Hr x Rp 45,000.00
Mandor 0.0010 Org/Hr x Rp 65,000.00
Tukang batu 0.0100 Org/Hr x Rp 57,000.00
Kepala Tukang batu 0.0010 Org/Hr x Rp 62,000.00
Upah
Pekerja 0.081 Org/Hr Rp 45,000.00
Mandor 0.0041 Org/Hr Rp 65,000.00
Tukang kayu 0.1350 Org/Hr Rp 57,000.00
Kepala Tukang kayu 0.1350 Org/Hr Rp 62,000.00
Upah
Pekerja 0.081 0 x Rp 45,000.00
Mandor 0.0041 0 x Rp 65,000.00
Tukang batu 0.1350 0 x Rp 57,000.00
Kepala Tukang batu 0.0135 0 x Rp 62,000.00
Upah
Pekerja 4.000 Org/Hr x Rp 45,000.00
Mandor 1.0000 Org/Hr x Rp 65,000.00
Tukang besi 4.0000 Org/Hr x Rp 57,000.00
Kepala Tukang 2.0000 Org/Hr x Rp 62,000.00
Upah
Pekerja 0.036 Org/Hr x Rp 45,000.00
Mandor 0.0018 Org/Hr x Rp 65,000.00
Tukang batu 0.0060 Org/Hr x Rp 57,000.00
Kepala Tukang batu 0.0060 Org/Hr x Rp 62,000.00
Upah
Tukang batu 1.100 Org/Hr Rp 55,000.00
Kepala tk. batu 0.001 Org/Hr Rp 62,000.00
Pekerja 3.300 Org/Hr Rp 45,000.00
Mandor 0.160 Org/Hr Rp 65,000.00
Upah
Pekerja 6.000 Org/Hr x Rp 55,000.00
Mandor 0.3000 Org/Hr x Rp 62,000.00
Tukang batu 3.0000 Org/Hr x Rp 45,000.00
Kepala Tukang batu 0.3000 Org/Hr x Rp 65,000.00
Upah
Pekerja 3.000 Org/Hr x 55,000.00
Mandor 0.1500 Org/Hr x 62,000.00
Tukang batu 1.5000 Org/Hr x 45,000.00
Kepala Tukang batu 0.1500 Org/Hr x 65,000.00
Upah
Tukang batu 1.000 Org/Hr x Rp 55,000.00
Kepala tk. batu 0.100 Org/Hr x Rp 62,000.00
Pekerja 1.000 Org/Hr x Rp 45,000.00
Mandor 0.100 Org/Hr x Rp 65,000.00
Upah
Tukang batu 1.500 Org/Hr x Rp 55,000.00
Kepala tk. batu 0.150 Org/Hr x Rp 62,000.00
Pekerja 1.000 Org/Hr x Rp 45,000.00
Mandor 0.160 Org/Hr x Rp 65,000.00
Upah
Pekerja 3.000 Org/Hr x Rp 55,000.00
Mandor 0.300 Org/Hr x Rp 62,000.00
Tukang batu 3.500 Org/Hr x Rp 45,000.00
Kepala Tukang batu 0.350 Org/Hr x Rp 65,000.00
Upah
Pekerja 2.000 Org/Hr x Rp 55,000.00
Mandor 0.200 Org/Hr x Rp 62,000.00
Tukang batu 1.000 Org/Hr x Rp 45,000.00
Kepala Tukang batu 0.100 Org/Hr x Rp 65,000.00
Upah
Pekerja 0.400 Org/Hr x Rp 45,000.00
Mandor 0.040 Org/Hr x Rp 65,000.00
Tukang cat 0.050 Org/Hr x Rp 55,000.00
Tukang Kayu 0.060 Org/Hr x Rp 57,000.00
Tukang besi 0.650 Org/Hr x Rp 57,000.00
Kepala Tukang 0.050 Org/Hr x Rp 62,000.00
Alat
Three Wheel Roller Kap 8 ton 0.003 jam Rp 295,000.00
Upah
Buruh Terlatih 0.260 Org/Hr Rp 45,000.00
Mandor 0.0080 Org/Hr Rp 65,000.00
Operator Terampil 0.011 Org/Hr Rp 60,000.00
Sopir Org/Hr Rp 55,000.00
Alat
Three Wheel Roller Kap 8 ton 0.003 jam Rp 295,000.00
Upah
Buruh Terlatih 0.230 Org/Hr Rp 45,000.00
Mandor 0.0080 Org/Hr Rp 65,000.00
Operator Terampil 0.010 Org/Hr Rp 60,000.00
Sopir Org/Hr Rp 55,000.00
Alat
Three Wheel Roller Kap 8 ton 0.010 jam Rp 295,000.00
Aspal Sprayer 0.010 jam Rp 60,000.00
Truck Bak terbuka 0.010 jam Rp 75,000.00
Upah
Buruh Terlatih 0.300 Org/Hr Rp 45,000.00
Mandor 0.040 Org/Hr Rp 65,000.00
Operator Terampil 0.020 Org/Hr Rp 60,000.00
Sopir 0.020 Org/Hr Rp 55,000.00
Jumlah Upah dan Bahan
Alat
Three Wheel Roller Kap 8 ton 0.015 jam Rp 295,000.00
Aspal Sprayer 0.010 jam Rp 60,000.00
Truck Bak terbuka 0.013 jam Rp 75,000.00
Upah
Buruh Terlatih 0.350 Org/Hr Rp 45,000.00
Mandor 0.045 Org/Hr Rp 65,000.00
Operator Terampil 0.025 Org/Hr Rp 60,000.00
Sopir 0.020 Org/Hr Rp 55,000.00
Alat
Bulldozer 0.005 jam Rp 300,000.00
Excavator 0.006 jam Rp 350,000.00
Dump truck 0.033 jam Rp 85,000.00
Upah
Buruh Terlatih 0.014 Org/Hr Rp 45,000.00
Mandor 0.002 Org/Hr Rp 65,000.00
Operator Terampil 0.004 Org/Hr Rp 60,000.00
Sopir 0.014 Org/Hr Rp 55,000.00
Upah
Buruh Terlatih 0.022 Org/Hr Rp 45,000.00
Mandor 0.004 Org/Hr Rp 65,000.00
Operator Terampil 0.003 Org/Hr Rp 60,000.00
Sopir 0.021 Org/Hr Rp 55,000.00
A. Tenaga
1 Pekerja hari 144.000 18,000.00
2 Mandor hari 24.000 27,500.00
3 Operator hari 39.329 50,000.00
4 Pembantu Operator hari 0.000 25,000.00
5 Sopir hari 142.857 25,000.00
6 Pembantu Sopir hari 0.000 25,000.00
B. Bahan
1
2
3
4
C. Peralatan
1 Buldozer Jam 119.050 160,000.00
2 Excavator 80 - 140 hp Jam 156.250 172,000.00
3 Dump Truck Jam 1,000.000 38,000.00
4
5
A. Tenaga
1 Pekerja hari 4.400 18,000.00
2 Mandor hari 0.031 27,500.00
3 Operator terampil hari 0.022 50,000.00
4 Pembantu Operator hari 0.015 25,000.00
5
B. Bahan
1 Alat Bantu set 0.100 30,000.00
2
3
4
5
C. Peralatan
1 Buldozer Jam 0.156 160,000.00
2
3
4
D. Jumlah (termasuk biaya umum dan keuntungan )
E. Harga Pekerjaan ( di luar PPN ) per 100 m2
E'. Harga Satuan Pekerjaan ( di luar PPN ) per m2
F. Jumlah Dibulatkan
A. Tenaga
1 Pekerja hari 0.023 18,000.00
2 Mandor hari 0.004 27,500.00
3 Operator hari 0.005 50,000.00
4 Pembantu Operator hari 0.000 25,000.00
5 Sopir hari 0.003 25,000.00
6 Pembantu Sopir hari 0.000 25,000.00
B. Bahan
1 Tanah Urug m3 1.200 12,500.00
2 Alat Bantu set 0.050 30,000.00
3
4
C. Peralatan
1 Motor Grader Jam 0.019 165,000.00
2 Vibrator Roller Jam 0.018 110,000.00
3 Truck Tanki Air Jam 0.024 50,000.00
4
5
A. Tenaga
1 Pekerja hari 0.023 18,000.00
2 Mandor hari 0.004 27,500.00
3 Operator hari 0.006 50,000.00
4 Pembantu Operator hari 0.000 25,000.00
5 Sopir hari 0.004 25,000.00
6 Pembantu Sopir hari 0.000 25,000.00
B. Bahan
1 Urugan Pilihan ( padas ) m3 1.200 27,000.00
2 Alat Bantu set 0.050 30,000.00
3
4
5
C. Peralatan
1 Motor Grader Jam 0.019 165,000.00
2 Vibrator Roller Jam 0.023 110,000.00
3 Truck Tanki Air Jam 0.030 50,000.00
4
5
A. Tenaga
1 Pekerja hari 0.100 18,000.00
2 Mandor hari 0.010 27,500.00
3 Operator hari 0.050 50,000.00
4 Pembantu Operator hari 0.020 25,000.00
5 Sopir hari 0.050 25,000.00
6 Pembantu Sopir hari 0.000 25,000.00
B. Bahan
1 Urugan Pilihan ( sirtu ) m3 1.200 60,000.00
2 Alat Bantu set 0.050 30,000.00
3
4
5
C. Peralatan
1 Buldozer Jam 0.019 160,000.00
2 Mesin Gilas Tiga Roda 6-8 ton Jam 0.023 70,000.00
3 Truck Tanki Air Jam 0.030 50,000.00
4
5
A. Tenaga
1 Pekerja hari 0.667 18,000.00
2 Tukang (Pekrja Terampil) hari 0.200 25,000.00
3 Mandor hari 0.067 27,500.00
B. Bahan
1 Sirtu m3 1.200 60,000.00
2 Alat Bantu set 0.030 7,000.00
3
4
5
C. Peralatan
1 Pemadat dng. Penggetar Jam 1.000 8,000.00
2
3
4
5
A. Tenaga
1 Pekerja hari 0.300 18,000.00
2 Mandor hari 0.010 27,500.00
3
4
5
6
B. Bahan
1 Urugan Pilihan ( pasir urug ) m3 1.200 40,000.00
2
3
4
5
C. Peralatan
1
2
3
4
5
A. Tenaga
1 Pekerja hari 0.050 18,000.00
2 Mandor hari 0.013 27,500.00
3 Operator Terampil hari 0.006 50,000.00
4 Pembantu Operator hari 0.000 25,000.00
5 0.007
6 0.007
B. Bahan
1 Alat Bantu set 0.040 30,000.00
2
3
C. Peralatan
1 Mesin Gilas Tandem 6 - 10 t Jam 0.042 70,000.00
2 Buldozer Jam 0.007 160,000.00
3 Tangki Air Jam 0.010 50,000.00
B. Bahan
1 Alat Bantu set 0.025 30,000.00
2
3
4
5
C. Peralatan
1 Excavator Jam 0.022 172,000.00
2 Dump Truck Jam 0.149 38,000.00
3
4
5
A. Tenaga
1 Pekerja hari 0.032 18,000.00
2 Mandor hari 0.006 27,500.00
3 Operator hari 0.004 50,000.00
4 Pembantu Operator hari 0.000 25,000.00
5 Sopir hari 0.021 25,000.00
6 Pembantu Sopir hari 0.000 25,000.00
B. Bahan
1 Alat Bantu set 0.025 30,000.00
2
3
C. Peralatan
1 Excavator Jam 0.032 172,000.00
2 Dump Truck Jam 0.150 38,000.00
3
A. Tenaga
1 Pekerja hari 0.039 18,000.00
2 Mandor hari 0.008 27,500.00
3 Operator hari 0.005 50,000.00
4 Pembantu Operator hari 0.000 25,000.00
5 Sopir hari 0.021 25,000.00
6 Pembantu Sopir hari 0.000 25,000.00
B. Bahan
1 Alat Bantu set 0.025 30,000.00
2
C. Peralatan
1 Excavator Jam 0.039 172,000.00
2 Dump Truck Jam 0.234 38,000.00
A. Tenaga
1 Pekerja hari 0.040 18,000.00
2 Mandor hari 0.008 27,500.00
3 Operator hari 0.006 50,000.00
4 Pembantu Operator hari 0.000 25,000.00
5 Sopir hari 0.036 25,000.00
6 Pembantu Sopir hari 0.000 25,000.00
B. Bahan
1 Alat Bantu set 0.025 30,000.00
2
C. Peralatan
1 Excavator Jam 0.042 172,000.00
2 Dump Truck Jam 0.250 38,000.00
A. Tenaga
1 Pekerja hari 0.750 18,000.00
2 Tukang hari - 25,000.00
3 Mandor hari 0.025 27,500.00
B. Bahan
1 Alat Bantu set 0.024 30,000.00
2
C. Peralatan
1
2
A. Tenaga
1 Pekerja hari 0.512 18,000.00
2 Pekerja Terampil hari 0.256 25,000.00
3 Mandor hari 0.055 27,500.00
4 Sopir hari 0.048 25,000.00
5 Pembantu Sopir hari 0.000 25,000.00
B. Bahan
1
2
3
C. Peralatan
1 Dump Truck Jam 0.336 38,000.00
2 Compressor Jam 0.691 30,000.00
3 Jack Hammer Jam 0.829 35,000.00
4
A. Tenaga
1 Pekerja hari 0.384 18,000.00
2 Pekerja Terampil hari 0.192 25,000.00
3 Mandor hari 0.044 27,500.00
4 Sopir hari 0.038 25,000.00
5 Pembantu Sopir hari 0.038 25,000.00
B. Bahan
1
2
3
C. Peralatan
1 Dump Truck Jam 0.269 38,000.00
2 Compressor Jam 0.492 30,000.00
3 Jack Hammer Jam 0.664 35,000.00
4
A. Tenaga
1 Pekerja hari 0.031 18,000.00
2 Mandor hari 0.005 27,500.00
3 Operator hari 0.010 50,000.00
4 Pembantu Operator hari 0.000 25,000.00
5 Sopir hari 0.015 25,000.00
6 Pembantu Sopir hari 0.000 25,000.00
B. Bahan
1 Agregat Kasar m3 0.768 117,000.00
2 Agregat Halus m3 0.432 60,000.00
0.00
0.00
0.00
C. Peralatan
1 Dump Truck Jam 0.086 38,000.00
2 Truck Tanki Air Jam 0.019 50,000.00
3 Vibratory Roller Jam 0.017 110,000.00
4 Motor Grader Jam 0.016 165,000.00
5 Wheel Loader Jam 0.035 140,000.00
A. Tenaga
1 Pekerja hari 0.031 18,000.00
2 Mandor hari 0.005 27,500.00
3 Operator hari 0.010 50,000.00
4 Pembantu Operator hari 0.000 25,000.00
5 Sopir hari 0.015 25,000.00
6 Pembantu Sopir hari 0.000 25,000.00
B. Bahan
1 Agregat Kasar m3 0.708 117,000.00
2 Agregat Halus m3 0.492 60,000.00
0.00
0.00
0.00
C. Peralatan
1 Dump Truck Jam 0.086 38,000.00
2 Truck Tanki Air Jam 0.019 50,000.00
3 Vibratory Roller Jam 0.017 110,000.00
4 Motor Grader Jam 0.016 165,000.00
5 Wheel Loader Jam 0.035 140,000.00
A. Tenaga
1 Pekerja hari 0.031 18,000.00
2 Mandor hari 0.005 27,500.00
3 Operator hari 0.012 50,000.00
4 Pembantu Operator hari 0.000 25,000.00
5 Sopir hari 0.015 25,000.00
6 Pembantu Sopir hari 0.000 25,000.00
B. Bahan
1 Agregat Kasar m3 0.768 117,000.00
2 Agregat Halus m3 0.432 60,000.00
C. Peralatan
1 Dump Truck Jam 0.086 38,000.00
2 Truck Tanki Air Jam 0.019 50,000.00
3 Vibratory Roller Jam 0.019 110,000.00
4 Motor Grader Jam 0.032 165,000.00
5 Wheel Loader Jam 0.035 140,000.00
A. Tenaga
1 Pekerja hari 0.031 18,000.00
2 Mandor hari 0.005 27,500.00
3 Operator hari 0.010 50,000.00
4 Pembantu Operator hari 0.000 25,000.00
5 Sopir hari 0.015 25,000.00
6 Pembantu Sopir hari 0.000 25,000.00
B. Bahan
1 Agregat Kasar m3 0.708 117,000.00
2 Agregat Halus m3 0.492 60,000.00
0.00
0.00
0.00
C. Peralatan
1 Dump Truck Jam 0.086 38,000.00
2 Truck Tanki Air Jam 0.019 50,000.00
3 Vibratory Roller Jam 0.019 110,000.00
4 Motor Grader Jam 0.032 165,000.00
5 Wheel Loader Jam 0.035 140,000.00
B. Bahan
1 Agregat Kasar m3 0.768 117,000.00
2 Agregat Halus m3 0.432 60,000.00
0.00
C. Peralatan
1 Mesin Gilas Tandem 6 - 10 t Jam 0.083 70,000.00
2 Truk Tangki Air Jam 0.083 50,000.00
3
4
A. Tenaga
1 Pekerja hari 0.750 18,000.00
2 Mandor hari 0.033 27,500.00
3 Operator Terampil hari 0.012 50,000.00
4 Pembantu Operator hari 0.000 25,000.00
5 Sopir hari 0.012 25,000.00
6 Pembantu Sopir hari 0.000 25,000.00
B. Bahan
1 Agregat Kasar m3 0.708 117,000.00
2 Agregat Halus m3 0.492 60,000.00
0.00
C. Peralatan
1 Mesin Gilas Tandem 6 - 10 t Jam 0.083 70,000.00
2 Truk Tangki Air Jam 0.083 50,000.00
3
A. Tenaga
1 Mandor hari 0.010 27,500.00
2 Operator Terampil hari 0.011 50,000.00
3 Pembantu Operator hari 0.000 25,000.00
4 Sopir Terampil hari 0.000 50,000.00
5 Pembantu Sopir hari 0.000 18,000.00
6 Pekerja hari 0.350 18,000.00
7 Pekerja Terampil (Tukang) hari 0.000 25,000.00
B. Bahan
1 Batu Pecah 15 - 20 cm m3 0.180 80,000.00
2 Batu Pecah 5 - 7 cm m3 0.036 90,000.00
3 Batu Pecah 3 - 5 cm m3 0.030 100,000.00
4 Pasir Urug m3 0.012 40,000.00
5 Alat Bantu set 0.070 30,000.00
C. Peralatan
1 Mesin Gilas 3 Roda 6-8 ton Jam 0.003 70,000.00
2
3
4
D. Jumlah (termasuk biaya umum dan keuntungan )
E. Harga Satuan Pekerjaan ( di luar PPN )
F. Jumlah Dibulatkan
A. Tenaga
1 Mandor hari 0.086 27,500.00
2 Operator Terampil hari 0.031 50,000.00
3 Pembantu Operator hari 0.000 25,000.00
4 Sopir Terampil hari 0.031 25,000.00
5 Pembantu Sopir hari 0.000 25,000.00
6 Pekerja hari 2.643 18,000.00
7 Pekerja Terampil (Tukang) hari 0.086 25,000.00
B. Bahan
1 Batu Pecah 3/5 cm m3 0.874 100,000.00
2 Batu Pecah 2/3 cm m3 0.244 117,000.00
3 Batu Pecah 1/2 cm m3 0.184 145,000.00
4 Pasir Ayak m3 0.143 72,000.00
5 Aspal drum kg 85.200 3,600.00
6 Minyak Bakar ltr 5.964 1,000.00
7 Alat Bantu set 0.123 30,000.00
C. Peralatan
1 Mesin Gilas 3 Roda 6-8 ton Jam 0.214 70,000.00
2 Aspal Sprayer Jam 0.214 30,000.00
3 Truk Bak terbuka Jam 0.214 60,000.00
4
A. Tenaga
1 Mandor hari 0.004 27,500.00
2 Operator Terampil hari 0.002 50,000.00
3 Pembantu Operator hari 0.000 25,000.00
4 Sopir Terampil hari 0.002 25,000.00
5 Pembantu Sopir hari 0.000 25,000.00
6 Pekerja hari 0.141 18,000.00
7 Pekerja Terampil (Tukang) hari 0.004 25,000.00
B. Bahan
1 Batu Pecah 3 - 5 cm m3 0.033 100,000.00
2 Batu Pecah 2 - 3 cm m3 0.016 117,000.00
3 Batu Pecah 1 - 2 cm m3 0.012 145,000.00
4 Batu Pecah 1/2 cm (chip) m3 0.005 145,000.00
5 Aspal drum kg 4.400 3,600.00
6 Minyak Bakar ltr 0.321 1,000.00
7 Alat Bantu set 0.006 30,000.00
C. Peralatan
1 Mesin Gilas 3 Roda 6-8 ton Jam 0.011 50,000.00
2 Aspal Sprayer Jam 0.011 30,000.00
3 Truk Bak terbuka Jam 0.011 60,000.00
4
A. Tenaga
1 Pekerja hari 0.185 18,000.00
2 Mandor hari 0.026 27,500.00
3 Operator hari 0.050 50,000.00
4 Pembantu Operator hari 0.000 25,000.00
5 Sopir hari 0.049 25,000.00
6 Pembantu Sopir hari 0.000 25,000.00
B. Bahan
1 Bahan Pengisi kg 139.200 700.00
2 A s p a l curah kg 135.000 3,400.00
3 Agregat Kasar ( 1 / 2 cm ) m3 0.703 145,000.00
4 Agregat Halus m3 0.534 72,000.00
5 Alat Bantu set 0.500 30,000.00
C. Peralatan
1 Wheel Loader Jam 0.120 140,000.00
2 AMP Jam 0.096 1,200,000.00
3 Asphalt Finisher Jam 0.044 140,000.00
4 Tire Roller Jam 0.042 200,000.00
5 Tandem Roller Jam 0.051 70,000.00
6 Water Tank Truck Jam 0.056 50,000.00
7 Dump Truck Jam 0.284 38,000.00
D. Jumlah (termasuk biaya umum dan keuntungan )
E. Harga Satuan Pekerjaan ( di luar PPN )
F. Jumlah Dibulatkan
F'. Untuk ATBL (Berat Jenis = 2.3), Harga Satuan per Ton =
A. Tenaga
1 Pekerja hari 0.127 18,000.00
2 Mandor hari 0.016 27,500.00
3 Operator hari 0.002 50,000.00
4 Pembantu Operator hari 0.000 25,000.00
5 Sopir hari 0.027 25,000.00
6 Pembantu Sopir hari 0.000 25,000.00
B. Bahan
1 Bahan Pengisi kg 48.000 700.00
2 A s p a l curah kg 55.000 3,400.00
3 Agregat Kasar ( 1 / 2 cm ) m3 0.355 130,000.00
4 Agregat Halus m3 0.145 72,000.00
5 Alat Bantu set 0.125 30,000.00
C. Peralatan
1 Wheel Loader Jam 0.048 140,000.00
2 AMP Jam 0.038 1,200,000.00
3 Asphalt Finisher Jam 0.027 140,000.00
4 Tire Roller Jam 0.025 200,000.00
5 Tandem Roller Jam 0.030 70,000.00
6 Water Tank Truck Jam 0.022 50,000.00
7 Dump Truck Jam 0.169 38,000.00
D. Jumlah (termasuk biaya umum dan keuntungan )
E. Harga Pekerjaan ( di luar PPN ) per 10 m2
E'. Harga Satuan Pekerjaan ( di luar PPN ) per m2
F. Jumlah Dibulatkan
Untuk AC 5 cm , Harga Satuan Pekerjaan per m2 =
A. Tenaga
1 Pekerja hari 0.127 18,000.00
2 Mandor hari 0.016 27,500.00
3 Operator hari 0.019 50,000.00
4 Pembantu Operator hari 0.000 25,000.00
5 Sopir hari 0.021 25,000.00
6 Pembantu Sopir hari 0.000 25,000.00
B. Bahan
1 Bahan Pengisi kg 48.000 700.00
2 A s p a l curah kg 53.000 3,400.00
3 Agregat Kasar ( 1 / 2 cm ) m3 0.120 130,000.00
4 Agregat Halus m3 0.230 72,000.00
5 Alat Bantu set 0.125 30,000.00
C. Peralatan
1 Wheel Loader Jam 0.036 140,000.00
2 AMP Jam 0.029 1,200,000.00
3 Asphalt Finisher Jam 0.027 140,000.00
4 Tyre Roller Jam 0.019 200,000.00
5 Tandem Roller Jam 0.023 70,000.00
6 Water Tank Truck Jam 0.017 50,000.00
7 Dump Truck Jam 0.127 38,000.00
D. Jumlah (termasuk biaya umum dan keuntungan )
E. Harga Pekerjaan ( di luar PPN ) per 10 m2
E'. Harga Satuan Pekerjaan ( di luar PPN ) per m2
F. Jumlah Dibulatkan
A. Tenaga
1 Pekerja hari 0.010 18,000.00
2 Pekerja Terampil hari 0.002 25,000.00
3 Mandor hari 0.002 27,500.00
4 Sopir hari 0.002 25,000.00
B. Bahan
1 Asphalt curah kg 0.642 3,400.00
2 Minyak Tanah liter 0.489 1,000.00
3 Alat Bantu set 0.004 30,000.00
4
5
C. Peralatan
1 Air Compressor Jam 0.002 30,000.00
2 Aspal Sprayer Jam 0.012 30,000.00
3 Pick Up Jam 0.012 30,000.00
4
5
A. Tenaga
1 Pekerja hari 0.010 18,000.00
2 Pekerja Terampil hari 0.002 25,000.00
3 Mandor hari 0.002 27,500.00
4 Sopir hari 0.002 25,000.00
B. Bahan
1 Asphalt curah kg 0.888 3,400.00
2 Minyak Tanah liter 0.254 1,000.00
3 Alat Bantu set 0.004 30,000.00
4
5
C. Peralatan
1 Air Compressor Jam 0.003 30,000.00
2 Aspal Sprayer Jam 0.012 30,000.00
3 Pick Up Jam 0.012 30,000.00
4
5
A. Tenaga
1 Pekerja hari 0.185 18,000.00
2 Mandor hari 0.026 27,500.00
3 Operator hari 0.056 50,000.00
4 Pembantu Operator hari 0.000 25,000.00
5 Sopir hari 0.049 25,000.00
6 Pembantu Sopir hari 0.000 25,000.00
B. Bahan
1 Bahan Pengisi kg 139.200 700.00
2 A s p a l curah kg 135.000 3,400.00
3 Agregat Kasar ( 1 / 2 cm ) m3 0.703 145,000.00
4 Agregat Halus m3 0.534 72,000.00
5 Alat Bantu set 0.500 30,000.00
C. Peralatan
1 Wheel Loader Jam 0.120 140,000.00
2 AMP Jam 0.096 1,200,000.00
3 Asphalt Finisher Jam 0.069 140,000.00
4 Tire Roller Jam 0.059 200,000.00
5 Tandem Roller Jam 0.051 70,000.00
6 Water Tank Truck Jam 0.056 50,000.00
7 Dump Truck Jam 0.284 38,000.00
D. Jumlah (termasuk biaya umum dan keuntungan )
E. Harga Satuan Pekerjaan ( di luar PPN )
F. Jumlah Dibulatkan
Jumlah
Harga
(Rp)
9,000.00
22,800.00
1,240.00
1,300.00
34,340.00
31,250.00
3,737.50
69,360.00
1,125.00
1,350.00
484,560.00
900.00
12,600.00
604,882.50
639,222.50
63,922.25
703,144.75
Jumlah
Harga
(Rp)
4,500.00
5,700.00
620.00
325.00
11,145.00
80,760.00
300.00
15,050.00
96,110.00
107,255.00
10,725.50
117,980.50
Jumlah
Harga
(Rp)
4,500.00
3,250.00
7,750.00
7,750.00
775.00
8,525.00
Jumlah
Harga
(Rp)
45,000.00
114,000.00
12,400.00
3,250.00
174,650.00
16,250.00
1,488.00
17,738.00
-
192,388.00
19,238.80
211,626.80
Jumlah
Harga
(Rp)
600,030.00
43,290.00
643,320.00
643,320.00
64,332.00
707,652.00
Jumlah
Harga
(Rp)
300,015.00
21,645.00
321,660.00
321,660.00
32,166.00
353,826.00
Jumlah
Harga
(Rp)
33,750.00
1,625.00
35,375.00
35,375.00
3,537.50
38,912.50
Jumlah
Harga
(Rp)
40,500.00
2,925.00
43,425.00
43,425.00
4,342.50
47,767.50
Jumlah
Harga
(Rp)
47,250.00
4,355.00
51,605.00
-
-
51,605.00
5,160.50
56,765.50
Jumlah
Harga
(Rp)
45,000.00
2,080.00
47,080.000
47,080.00
4,708.00
51,788.00
Jumlah
Harga
(Rp)
67,500.00
3,900.00
71,400.00
71,400.00
7,140.00
78,540.00
Jumlah
Harga
(Rp)
54,000.00
2,925.00
56,925.00
56,925.00
5,692.50
62,617.50
Jumlah
Harga
(Rp)
2,250.00
325.00
2,575.00
2,575.00
257.50
2,832.50
Jumlah
Harga
(Rp)
14,850.00
650.00
15,500.00
-
-
15,500.00
1,550.00
17,050.00
Jumlah
Harga
(Rp)
22,500.00
3,250.00
25,750.00
25,750.00
2,575.00
28,325.00
Jumlah
Harga
(Rp)
22,500.00
3,250.00
25,750.00
25,750.00
2,575.00
28,325.00
Jumlah
Harga
(Rp)
13,500.00
650.00
14,150.00
156,000.00
156,000.00
170,150.00
17,015.00
187,165.00
Jumlah
Harga
(Rp)
36,000.00
22,000.00
2,480.00
5,200.00
65,680.00
36,450.00
84,000.00
61,620.00
182,070.00
247,750.00
24,775.00
272,525.00
Jumlah
Harga
(Rp)
6,750.00
975.00
7,725.00
48,000.00
48,000.00
55,725.00
5,572.50
61,297.50
Jumlah
Harga
(Rp)
11,250.00
1,625.00
12,875.00
174,000.00
174,000.00
186,875.00
18,687.50
205,562.50
Jumlah
Harga
(Rp)
67,500.00
41,250.00
4,650.00
4,875.00
118,275.00
240,000.00
301,990.00
101,850.00
643,840.00
0.00
762,115.00
76,211.50
838,326.50
Jumlah
Harga
(Rp)
67,500.00
41,250.00
4,650.00
4,875.00
118,275.00
240,000.00
243,685.00
109,200.00
592,885.00
0.00
711,160.00
71,116.00
782,276.00
Jumlah
Harga
(Rp)
67,500.00
41,250.00
4,650.00
4,875.00
118,275.00
240,000.00
203,320.00
114,240.00
557,560.00
0.00
675,835.00
67,583.50
743,418.50
Jumlah
Harga
(Rp)
67,500.00
41,250.00
4,650.00
4,875.00
118,275.00
240,000.00
174,915.00
117,810.00
532,725.00
0.00
651,000.00
65,100.00
716,100.00
Jumlah
Harga
(Rp)
67,500.00
41,250.00
4,650.00
4,875.00
118,275.00
-
174,915.00
117,810.00
292,725.00
0.00
411,000.00
41,100.00
452,100.00
Jumlah
Harga
(Rp)
67,500.00
41,250.00
4,650.00
4,875.00
118,275.00
240,000.00
136,045.00
122,640.00
498,685.00
0.00
616,960.00
61,696.00
678,656.00
Jumlah
Harga
(Rp)
67,500.00
41,250.00
4,650.00
4,875.00
118,275.00
240,000.00
45,900.00
254.15
71,400.00
357,554.15
0.00
475,829.15
47,582.92
523,412.07
Jumlah
Harga
(Rp)
67,500.00
41,250.00
4,650.00
4,875.00
118,275.00
240,000.00
91,195.00
39,690.00
103,320.00
474,205.00
0.00
592,480.00
59,248.00
651,728.00
Jumlah
Harga
(Rp)
67,500.00
41,250.00
4,650.00
4,875.00
118,275.00
240,000.00
61,295.00
35,370.00
109,830.00
446,495.00
0.00
564,770.00
56,477.00
621,247.00
Jumlah
Harga
(Rp)
35,100.00
21,450.00
2,418.00
2,535.00
61,503.00
240,000.00
56,160.00
296,160.00
0.00
357,663.00
35,766.30
393,429.30
Kr dan 40% batu belah
Jumlah
Harga
(Rp)
153,000.00
46,750.00
5,270.00
11,050.00
216,070.00
96,000.00
290,030.00
70,200.00
112,320.00
1,593,900.00
35,640.00
2,198,090.00
0.00
2,414,160.00
241,416.00
2,655,576.00
Jumlah
Harga
(Rp)
108,000.00
44,000.00
4,960.00
7,735.00
164,695.00
90,000.00
290,030.00
70,200.00
112,320.00
562,550.00
0.00
727,245.00
72,724.50
799,969.50
Jumlah
Harga
(Rp)
74,250.00
15,125.00
1,736.00
5,395.00
96,506.00
369,265.00
139,660.71
184,430.77
10,750.00
704,106.48
800,612.48
80,061.25
880,673.73
Jumlah
Harga
(Rp)
74,250.00
15,125.00
1,736.00
5,395.00
96,506.00
412,620.00
133,071.43
186,830.77
10,750.00
743,272.20
839,778.20
83,977.82
923,756.02
Jumlah
Harga
(Rp)
74,250.00
15,125.00
1,736.00
5,395.00
96,506.00
447,005.00
128,410.71
187,753.85
10,750.00
773,919.56
870,425.56
87,042.56
957,468.12
r = 20 %
slump (3-6) cm, w/c = 0.87
Jumlah
Harga
(Rp)
54,000.00
11,000.00
1,240.00
3,900.00
70,140.00
343,850.00
143,517.86
189,600.00
10,000.00
686,967.86
757,107.86
75,710.79
832,818.64
, w/c = 0,66
Jumlah
Harga
(Rp)
74,250.00
15,125.00
1,736.00
5,395.00
96,506.00
487,370.00
122,142.86
189,969.23
10,750.00
810,232.09
906,738.09
90,673.81
997,411.90
w/c = 0,61
Jumlah
Harga
(Rp)
74,250.00
15,125.00
1,736.00
5,395.00
96,506.00
526,240.00
117,482.14
190,338.46
10,750.00
844,810.60
941,316.60
94,131.66
1,035,448.26
Jumlah
Harga
(Rp)
74,250.00
15,125.00
1,736.00
5,395.00
96,506.00
554,645.00
112,178.57
193,292.31
10,750.00
870,865.88
967,371.88
96,737.19
1,064,109.07
Jumlah
Harga
(Rp)
74,250.00
15,125.00
1,736.00
5,395.00
96,506.00
574,080.00
111,214.29
191,815.38
10,750.00
887,859.67
984,365.67
98,436.57
1,082,802.24
Jumlah
Harga
(Rp)
74,250.00
15,125.00
1,736.00
5,395.00
96,506.00
606,970.00
109,928.57
189,415.38
10,750.00
917,063.96
1,013,569.96
101,357.00
1,114,926.95
Jumlah
Harga
(Rp)
74,250.00
17,050.00
1,736.00
5,395.00
98,431.00
617,435.00
109,446.43
188,492.31
10,750.00
926,123.74
1,024,554.74
102,455.47
1,127,010.21
Jumlah
Harga
(Rp)
94,500.00
19,250.00
2,170.00
6,825.00
122,745.00
656,305.00
107,678.57
185,723.08
10,750.00
960,456.65
-
1,083,201.65
108,320.16
1,191,521.81
Jumlah
Harga
(Rp)
94,500.00
19,250.00
2,170.00
6,825.00
122,745.00
669,760.00
107,196.43
184,615.38
10,750.00
972,321.81
1,095,066.81
109,506.68
1,204,573.49
Jumlah
Harga
(Rp)
3,150.00
3,990.00
434.00
260.00
7,834.00
132,825.00
2,970.00
135,795.00
143,629.00
14,362.90
157,991.90
Jumlah
Harga
(Rp)
1,125.00
1,425.00
1,550.00
65.00
4,165.00
129,030.00
990.00
130,020.00
134,185.00
13,418.50
147,603.50
Jumlah
Harga
(Rp)
23,400.00
14,820.00
1,612.00
1,690.00
41,522.00
86,000.00
4,500.00
900.00
91,400.00
132,922.00
13,292.20
146,214.20
Jumlah
Harga
(Rp)
23,400.00
14,820.00
1,612.00
1,690.00
41,522.00
96,750.00
4,500.00
900.00
102,150.00
143,672.00
14,367.20
158,039.20
Jumlah
Harga
(Rp)
29,700.00
18,810.00
2,046.00
2,145.00
52,701.00
86,000.00
6,000.00
1,800.00
85,500.00
42,350.00
26,000.00
247,650.00
300,351.00
30,035.10
330,386.10
Jumlah
Harga
(Rp)
29,700.00
18,810.00
2,046.00
2,145.00
52,701.00
86,000.00
6,000.00
1,800.00
102,600.00
42,350.00
26,000.00
264,750.00
317,451.00
31,745.10
349,196.10
Jumlah
Harga
(Rp)
29,700.00
18,810.00
2,046.00
2,145.00
52,701.00
86,000.00
6,000.00
1,800.00
85,500.00
42,350.00
78,000.00
299,650.00
352,351.00
35,235.10
387,586.10
Jumlah
Harga
(Rp)
29,700.00
18,810.00
2,046.00
2,145.00
52,701.00
64,500.00
6,000.00
1,800.00
114,000.00
42,350.00
39,000.00
267,650.00
320,351.00
32,035.10
352,386.10
Jumlah
Harga
(Rp)
29,700.00
18,810.00
2,046.00
2,145.00
52,701.00
64,500.00
6,000.00
1,350.00
85,500.00
42,350.00
26,000.00
225,700.00
278,401.00
27,840.10
306,241.10
Jumlah
Harga
(Rp)
6,750.00
2,850.00
310.00
520.00
10,430.00
198,000.00
9,000.00
6,500.00
213,500.00
-
223,930.00
22,393.00
246,323.00
Jumlah
Harga
(Rp)
238,500.00
15,125.00
74,100.00
59,850.00
16,244.00
17,225.00
421,044.00
430,000.00
22,500.00
3,600.00
1,992,375.00
44,550.00
502,320.00
121,500.00
194,400.00
3,311,245.00
3,732,289.00
373,228.90
4,105,517.90
Jumlah
Harga
(Rp)
254,250.00
15,125.00
88,920.00
79,800.00
20,026.00
18,395.00
476,516.00
580,500.00
30,000.00
5,400.00
2,656,500.00
59,400.00
502,320.00
121,500.00
194,400.00
4,150,020.00
4,626,536.00
462,653.60
5,089,189.60
Jumlah
Harga
(Rp)
317,250.00
15,125.00
94,050.00
119,700.00
24,986.00
22,945.00
594,056.00
860,000.00
60,000.00
18,000.00
3,984,750.00
89,100.00
502,320.00
121,500.00
194,400.00
855,000.00
423,500.00
260,000.00
7,368,570.00
7,962,626.00
796,262.60
8,758,888.60
Jumlah
Harga
(Rp)
285,750.00
15,125.00
94,050.00
79,800.00
20,646.00
20,670.00
516,041.00
688,000.00
48,000.00
14,400.00
2,656,500.00
59,400.00
502,320.00
121,500.00
194,400.00
798,000.00
338,800.00
208,000.00
5,629,320.00
6,145,361.00
614,536.10
6,759,897.10
Jumlah
Harga
(Rp)
238,500.00
15,125.00
74,100.00
59,850.00
16,430.00
17,225.00
421,230.00
688,000.00
48,000.00
14,400.00
1,992,375.00
44,550.00
502,320.00
121,500.00
194,400.00
684,000.00
338,800.00
416,000.00
5,044,345.00
5,465,575.00
546,557.50
6,012,132.50
Jumlah
Harga
(Rp)
238,500.00
15,125.00
74,100.00
59,850.00
16,244.00
17,225.00
421,044.00
516,000.00
48,000.00
14,400.00
1,992,375.00
44,550.00
502,320.00
121,500.00
194,400.00
912,000.00
338,800.00
312,000.00
4,996,345.00
5,417,389.00
541,738.90
5,959,127.90
Jumlah
Harga
(Rp)
254,250.00
15,125.00
88,920.00
79,800.00
20,026.00
18,395.00
476,516.00
537,500.00
45,000.00
10,800.00
2,656,500.00
59,400.00
502,320.00
121,500.00
194,400.00
598,500.00
302,500.00
182,000.00
5,210,420.00
-
5,686,936.00
568,693.60
6,255,629.60
Jumlah
Harga
(Rp)
8,100.00
1,100.00
1,140.00
1,140.00
372.00
585.00
12,437.00
4,300.00
150.00
-
37,950.00
8,910.00
5,980.00
1,350.00
2,160.00
60,800.00
73,237.00
7,323.70
80,560.70
Jumlah
Harga
(Rp)
13,365.00
1,815.00
1,881.00
1,881.00
620.00
975.00
20,537.00
6,450.00
300.00
-
45,540.00
990.00
8,222.50
2,025.00
3,600.00
67,127.50
87,664.50
8,766.45
96,430.95
Jumlah
Harga
(Rp)
2,700.00
3,300.00
372.00
195.00
6,567.00
15,870.00
15,870.00
0.00
22,437.00
2,243.70
24,680.70
Jumlah
Harga
(Rp)
2,700.00
3,300.00
372.00
195.00
6,567.00
15,870.00
15,870.00
0.00
22,437.00
2,243.70
24,680.70
Jumlah
Harga
(Rp)
4,500.00
5,700.00
62.00
325.00
10,587.00
13,000.00
3,500.00
16,500.00
36,000.00
36,000.00
63,087.00
6,308.70
69,395.70
Jumlah
Harga
(Rp)
47,250.00
57,750.00
6,510.00
3,380.00
114,890.00
207,000.00
414,920.00
3,250.00
625,170.00
0.00
740,060.00
74,006.00
814,066.00
Jumlah
Harga
(Rp)
1,800.00
1,140.00
124.00
130.00
3,194.00
26,000.00
3,900.00
1,400.00
31,300.00
7,650.00
7,650.00
42,144.00
4,214.40
46,358.40
Jumlah
Harga
(Rp)
19,800.00
25,080.00
2,728.00
1,430.00
49,038.00
385,000.00
385,000.00
0.00
434,038.00
43,403.80
477,441.80
Jumlah
Harga
(Rp)
45,000.00
57,000.00
6,200.00
3,250.00
111,450.00
525,000.00
525,000.00
0.00
636,450.00
63,645.00
700,095.00
Jumlah
Harga
(Rp)
1,935.00
2,451.00
266.60
136.50
4,789.10
88,000.00
1,400.00
4,500.00
93,900.00
0.00
98,689.10
9,868.91
108,558.01
Jumlah
Harga
(Rp)
3,825.00
4,845.00
527.00
273.00
9,470.00
352,000.00
73,000.00
425,000.00
0.00
434,470.00
43,447.00
477,917.00
Jumlah
Harga
(Rp)
3,825.00
4,845.00
558.00
325.00
9,553.00
352,000.00
36,000.00
20,250.00
408,250.00
0.00
417,803.00
41,780.30
459,583.30
Jumlah
Harga
(Rp)
15,750.00
19,950.00
2,170.00
1,170.00
39,040.00
113,850.00
113,850.00
0.00
152,890.00
15,289.00
168,179.00
Jumlah
Harga
(Rp)
75,150.00
91,850.00
10,354.00
5,395.00
182,749.00
78,139.05
125,538.55
203,677.60
0.00
386,426.60
38,642.66
425,069.26
Jumlah
Harga
(Rp)
4,500.00
5,700.00
620.00
325.00
11,145.00
38,500.00
51,504.18
21,707.40
111,711.58
0.00
122,856.58
12,285.66
135,142.24
Jumlah
Harga
(Rp)
9,000.00
11,400.00
1,240.00
65.00
21,705.00
41,250.00
1,500.00
88,550.00
131,300.00
0.00
153,005.00
15,300.50
168,305.50
Jumlah
Harga
(Rp)
9,000.00
11,400.00
1,240.00
65.00
21,705.00
40,425.00
300.00
121,600.00
162,325.00
0.00
184,030.00
18,403.00
202,433.00
Jumlah
Harga
(Rp)
6,750.00
17,100.00
1,860.00
520.00
26,230.00
40,425.00
200.00
6,325.00
46,950.00
0.00
73,180.00
7,318.00
80,498.00
m, dinding partisi
Jumlah
Harga
(Rp)
11,250.00
14,250.00
1,550.00
845.00
27,895.00
116,375.00
50,000.00
166,375.00
0.00
194,270.00
19,427.00
213,697.00
Jumlah
Harga
(Rp)
15,750.00
19,950.00
2,170.00
1,170.00
39,040.00
152,000.00
50,000.00
202,000.00
0.00
241,040.00
24,104.00
265,144.00
27,000.00
11,000.00
1,240.00
1,950.00
41,190.00
98,000.00
65,032.50
16,800.00
179,832.50
0.00
221,022.50
22,102.25
243,124.75
Jumlah
Harga
(Rp)
27,000.00
11,000.00
1,240.00
1,950.00
41,190.00
98,000.00
49,260.25
19,110.00
166,370.25
0.00
207,560.25
20,756.03
228,316.28
Jumlah
Harga
(Rp)
27,000.00
11,000.00
1,240.00
1,950.00
41,190.00
98,000.00
39,692.25
19,530.00
157,222.25
0.00
198,412.25
19,841.23
218,253.48
Jumlah
Harga
(Rp)
27,000.00
11,000.00
1,240.00
1,950.00
41,190.00
98,000.00
33,189.00
21,420.00
152,609.00
0.00
193,799.00
19,379.90
213,178.90
Jumlah
Harga
(Rp)
27,000.00
11,000.00
1,240.00
1,950.00
41,190.00
98,000.00
27,657.50
25,620.00
151,277.50
0.00
192,467.50
19,246.75
211,714.25
27,000.00
11,000.00
1,240.00
1,950.00
41,190.00
98,000.00
15,069.60
7,425.00
19,425.00
139,919.60
0.00
181,109.60
18,110.96
199,220.56
13,500.00
5,500.00
620.00
975.00
20,595.00
49,000.00
28,330.25
7,980.00
85,310.25
0.00
105,905.25
10,590.53
116,495.78
13,500.00
5,500.00
620.00
975.00
20,595.00
49,000.00
21,483.15
8,400.00
78,883.15
0.00
99,478.15
9,947.82
109,425.97
13,500.00
5,500.00
620.00
975.00
20,595.00
49,000.00
17,192.50
9,030.00
75,222.50
0.00
95,817.50
9,581.75
105,399.25
Jumlah
Harga
(Rp)
13,500.00
5,500.00
620.00
975.00
20,595.00
49,000.00
14,471.60
9,450.00
72,921.60
0.00
93,516.60
9,351.66
102,868.26
13,500.00
5,500.00
620.00
975.00
20,595.00
49,000.00
12,438.40
10,290.00
71,728.40
0.00
92,323.40
9,232.34
101,555.74
13,500.00
5,500.00
620.00
975.00
20,595.00
49,000.00
9,717.50
10,500.00
69,217.50
0.00
89,812.50
8,981.25
98,793.75
Jumlah
Harga
(Rp)
13,500.00
5,500.00
620.00
975.00
20,595.00
49,000.00
6,727.50
4,050.00
10,500.00
70,277.50
0.00
90,872.50
9,087.25
99,959.75
13,500.00
5,500.00
620.00
975.00
20,595.00
49,000.00
306.00
4,860.00
3,780.00
57,946.00
0.00
78,541.00
7,854.10
86,395.10
13,500.00
5,500.00
620.00
975.00
20,595.00
49,000.00
238.00
3,780.00
5,880.00
58,898.00
0.00
79,493.00
7,949.30
87,442.30
Jumlah
Harga
(Rp)
13,500.00
5,500.00
620.00
975.00
20,595.00
62,500.00
22,664.20
76,440.00
3,542.00
165,146.20
0.00
185,741.20
18,574.12
204,315.32
Jumlah
Harga
(Rp)
13,500.00
5,500.00
620.00
975.00
20,595.00
62,500.00
18,134.35
81,480.00
3,542.00
165,656.35
0.00
186,251.35
18,625.14
204,876.49
Jumlah
Harga
(Rp)
13,500.00
5,500.00
620.00
975.00
20,595.00
300,000.00
16,445.00
7,350.00
323,795.00
0.00
344,390.00
34,439.00
378,829.00
Jumlah
Harga
(Rp)
13,500.00
5,500.00
620.00
975.00
20,595.00
300,000.00
16,445.00
7,350.00
323,795.00
0.00
344,390.00
34,439.00
378,829.00
Jumlah
Harga
(Rp)
13,500.00
8,250.00
930.00
975.00
23,655.00
700,000.00
20,930.00
6,720.00
727,650.00
0.00
751,305.00
75,130.50
826,435.50
Jumlah
Harga
(Rp)
13,500.00
8,250.00
930.00
975.00
23,655.00
23,178.48
3,360.00
26,538.48
0.00
50,193.48
5,019.35
55,212.83
Jumlah
Harga
(Rp)
13,500.00
8,250.00
930.00
975.00
23,655.00
15,284.88
4,200.00
19,484.88
0.00
43,139.88
4,313.99
47,453.87
Jumlah
Harga
(Rp)
13,500.00
8,250.00
930.00
975.00
23,655.00
11,625.12
4,830.00
16,455.12
0.00
40,110.12
4,011.01
44,121.13
Jumlah
Harga
(Rp)
13,500.00
8,250.00
930.00
975.00
23,655.00
9,328.80
5,040.00
14,368.80
0.00
38,023.80
3,802.38
41,826.18
Jumlah
Harga
(Rp)
13,500.00
8,250.00
930.00
975.00
23,655.00
7,750.08
5,460.00
13,210.08
0.00
36,865.08
3,686.51
40,551.59
Jumlah
Harga
(Rp)
13,500.00
8,250.00
930.00
975.00
23,655.00
6,601.92
5,670.00
12,271.92
0.00
35,926.92
3,592.69
39,519.61
Jumlah
Harga
(Rp)
13,500.00
8,250.00
930.00
975.00
23,655.00
5,884.32
5,880.00
11,764.32
0.00
35,419.32
3,541.93
38,961.25
Jumlah
Harga
(Rp)
13,500.00
8,250.00
930.00
975.00
23,655.00
5,166.72
6,090.00
11,256.72
0.00
34,911.72
3,491.17
38,402.89
Jumlah
Harga
(Rp)
16,200.00
6,600.00
744.00
1,170.00
24,714.00
8,611.20
810.00
2,730.00
12,151.20
0.00
36,865.20
3,686.52
40,551.72
Jumlah
Harga
(Rp)
16,200.00
6,600.00
744.00
1,170.00
24,714.00
4,485.00
1,350.00
4,200.00
10,035.00
0.00
34,749.00
3,474.90
38,223.90
Jumlah
Harga
(Rp)
16,200.00
6,600.00
744.00
1,170.00
24,714.00
1,665.00
2,430.00
1,890.00
5,985.00
0.00
30,699.00
3,069.90
33,768.90
Jumlah
Harga
(Rp)
16,200.00
6,600.00
744.00
1,170.00
24,714.00
1,295.00
1,890.00
3,150.00
6,335.00
0.00
31,049.00
3,104.90
34,153.90
Jumlah
Harga
(Rp)
18,000.00
11,000.00
1,240.00
1,430.00
31,670.00
20,379.84
5,670.00
26,049.84
0.00
57,719.84
5,771.98
63,491.82
Jumlah
Harga
(Rp)
11,700.00
11,000.00
1,240.00
845.00
24,785.00
15,500.16
6,510.00
22,010.16
0.00
46,795.16
4,679.52
51,474.68
Jumlah
Harga
(Rp)
18,000.00
11,000.00
1,240.00
1,430.00
31,670.00
12,438.40
6,720.00
19,158.40
0.00
50,828.40
5,082.84
55,911.24
Jumlah
Harga
(Rp)
18,000.00
11,000.00
1,240.00
1,430.00
31,670.00
10,333.44
7,350.00
17,683.44
0.00
49,353.44
4,935.34
54,288.78
Jumlah
Harga
(Rp)
18,000.00
11,000.00
1,240.00
1,430.00
31,670.000
8,802.56
7,560.00
16,362.56
0.00
48,032.56
4,803.26
52,835.82
Jumlah
Harga
(Rp)
19,800.00
12,100.00
1,364.00
1,430.00
34,694.00
1,665.00
2,430.00
3,780.00
7,875.00
0.00
42,569.00
4,256.90
46,825.90
Jumlah
Harga
(Rp)
6,750.00
4,125.00
496.00
520.00
11,891.00
7,750.08
5,460.00
13210.08
0.00
25,101.08
2,510.11
27,611.19
Jumlah
Harga
(Rp)
3,600.00
22,000.00
2,480.00
260.00
28,340.00
747.50
2,730.00
3,477.50
0.00
31,817.50
3,181.75
34,999.25
Jumlah
Harga
(Rp)
13,500.00
5,500.00
620.00
975.00
20,595.00
6,458.40
1,260.00
7,718.40
0.00
28,313.40
2,831.34
31,144.74
Jumlah
Harga
(Rp)
6,750.00
4,125.00
496.00
520.00
11,891.00
4,646.46
4,646.46
0.00
16,537.46
1,653.75
18,191.21
Jumlah
Harga
(Rp)
3,150.00
1,925.00
248.00
260.00
5,583.00
2,392.00
2,392.00
0.00
7,975.00
797.50
8,772.50
Jumlah
Harga
(Rp)
13,500.00
8,250.00
930.00
975.00
23,655.00
9,478.30
2,520.00
11,998.30
0.00
35,653.30
3,565.33
39,218.63
Jumlah
Harga
(Rp)
9,000.00
5,500.00
620.00
650.00
15,770.00
4,858.75
4,858.75
0.00
20,628.75
2,062.88
22,691.63
Jumlah
Harga
(Rp)
11,250.00
6,875.00
806.00
845.00
19,776.00
90,805.50
14,950.00
9,450.00
115,205.50
134,981.50
13,498.15
148,479.65
Jumlah
Harga
(Rp)
12,150.00
7,425.00
868.00
910.00
21,353.00
79,500.00
15,548.00
9,450.00
104,498.00
-
125,851.00
12,585.10
138,436.10
Jumlah
Harga
(Rp)
11,700.00
7,150.00
806.00
845.00
20,501.00
106,830.00
14,950.00
25,500.00
9,450.00
156,730.00
177,231.00
17,723.10
194,954.10
Jumlah
Harga
(Rp)
12,150.00
7,425.00
868.00
910.00
21,353.00
95,400.00
15,548.00
27,540.00
6.75
138,494.75
159,847.75
15,984.78
175,832.53
Jumlah
Harga
(Rp)
11,250.00
6,875.00
806.00
845.00
19,776.00
217,464.00
14,651.00
22,100.00
6.75
254,221.75
273,997.75
27,399.78
301,397.53
Jumlah
Harga
(Rp)
11,700.00
7,150.00
806.00
845.00
20,501.00
267,075.00
14,950.00
25,500.00
6.75
307,531.75
328,032.75
32,803.28
360,836.03
Jumlah
Harga
(Rp)
11,250.00
6,875.00
806.00
845.00
19,776.00
253,266.00
14,651.00
22,100.00
6.75
290,023.75
309,799.75
30,979.98
340,779.73
Jumlah
Harga
(Rp)
10,800.00
6,600.00
744.00
780.00
18,924.00
295,740.00
14,352.00
25,500.00
9,450.00
345,042.00
363,966.00
36,396.60
400,362.60
Jumlah
Harga
(Rp)
4,050.00
4,950.00
558.00
325.00
9,883.00
42,400.00
2,466.75
840.00
45,706.75
55,589.75
5,558.98
61,148.73
Jumlah
Harga
(Rp)
4,050.00
4,950.00
558.00
325.00
9,883.00
35,300.00
1,853.80
630.00
37,783.80
47,666.80
4,766.68
52,433.48
Jumlah
Harga
(Rp)
4,050.00
4,950.00
558.00
325.00
9,883.00
22,525.00
1,704.30
1,700.00
630.00
26,559.30
36,442.30
3,644.23
40,086.53
Jumlah
Harga
(Rp)
4,050.00
4,950.00
558.00
325.00
9,883.00
37,065.00
1,704.30
1,700.00
630.00
41,099.30
50,982.30
5,098.23
56,080.53
Jumlah
Harga
(Rp)
4,050.00
4,950.00
558.00
325.00
9,883.00
53,000.00
1,704.30
1,700.00
630.00
57,034.30
66,917.30
6,691.73
73,609.03
Jumlah
Harga
(Rp)
31,500.00
19,250.00
2,170.00
2,275.00
55,195.00
26,500.00
12,244.05
9,450.00
27,540.00
75,734.05
130,929.05
13,092.91
144,021.96
Jumlah
Harga
(Rp)
31,500.00
19,250.00
2,170.00
2,275.00
55,195.00
56,640.00
12,244.05
9,450.00
27,540.00
105,874.05
161,069.05
16,106.91
177,175.96
Jumlah
Harga
(Rp)
31,500.00
19,250.00
2,170.00
2,275.00
55,195.00
48,073.50
14,950.00
9,450.00
25,500.00
97,973.50
153,168.50
15,316.85
168,485.35
Jumlah
Harga
(Rp)
31,500.00
19,250.00
2,170.00
2,275.00
55,195.00
55,120.00
15,548.00
9,450.00
27,540.00
107,658.00
162,853.00
16,285.30
179,138.30
Jumlah
Harga
(Rp)
47,250.00
28,875.00
3,286.00
3,445.00
82,856.00
171,600.00
14,651.00
9,450.00
74,290.00
269,991.00
352,847.00
35,284.70
388,131.70
Jumlah
Harga
(Rp)
4,050.00
4,950.00
2,170.00
325.00
11,495.00
14,045.00
1,704.30
630.00
425.00
16,804.30
-
28,299.30
2,829.93
31,129.23
Jumlah
Harga
(Rp)
4,050.00
4,950.00
2,170.00
325.00
11,495.00
55,650.00
1,704.30
630.00
850.00
58,834.30
70,329.30
7,032.93
77,362.23
Jumlah
Harga
(Rp)
4,050.00
4,950.00
2,170.00
325.00
11,495.00
27,560.00
852.15
315.00
221.00
28,948.15
40,443.15
4,044.32
44,487.47
Jumlah
Harga
(Rp)
31,500.00
19,250.00
2,170.00
2,275.00
55,195.00
508,800.00
12,244.05
9,450.00
11,050.00
541,544.05
596,739.05
59,673.91
656,412.96
Jumlah
Harga
(Rp)
7,650.00
9,690.00
1,054.00
585.00
18,979.00
133,875.00
8,750.00
142,625.00
161,604.00
16,160.40
177,764.40
Jumlah
Harga
(Rp)
31,500.00
19,950.00
2,170.00
2,275.00
55,895.00
252,000.00
15,000.00
267,000.00
322,895.00
32,289.50
355,184.50
Jumlah
Harga
(Rp)
40,500.00
24,750.00
2,790.00
2,925.00
70,965.00
43,000.00
13,903.50
46,750.00
3,780.00
107,433.50
178,398.50
17,839.85
196,238.35
Jumlah
Harga
(Rp)
40,500.00
24,750.00
2,790.00
2,925.00
70,965.00
1,060,000.00
13,903.50
3,780.00
46,750.00
1,124,433.50
1,195,398.50
119,539.85
1,314,938.35
Jumlah
Harga
(Rp)
40,500.00
24,750.00
2,790.00
2,925.00
70,965.00
1,590,000.00
13,903.50
3,780.00
49,300.00
1,656,983.50
1,727,948.50
172,794.85
1,900,743.35
Jumlah
Harga
(Rp)
40,500.00
24,750.00
2,790.00
2,925.00
70,965.00
140,450.00
13,903.50
3,780.00
46,750.00
204,883.50
275,848.50
27,584.85
303,433.35
Jumlah
Harga
(Rp)
40,500.00
24,750.00
2,790.00
2,925.00
70,965.00
55,120.00
13,903.50
3,780.00
32,980.00
105,783.50
176,748.50
17,674.85
194,423.35
Jumlah
Harga
(Rp)
58,500.00
35,750.00
4,030.00
4,225.00
102,505.00
508,800.00
18,597.80
5,250.00
11,050.00
1,515.00
545,212.80
647,717.80
64,771.78
712,489.58
Jumlah
Harga
(Rp)
45,000.00
27,500.00
3,100.00
3,250.00
78,850.00
44,100.00
18,597.80
5,250.00
46,750.00
114,697.80
193,547.80
19,354.78
212,902.58
Jumlah
Harga
(Rp)
31,500.00
19,250.00
2,170.00
2,275.00
55,195.00
115,500.00
17,566.25
7,350.00
140,416.25
195,611.25
19,561.13
215,172.38
Jumlah
Harga
(Rp)
31,500.00
19,250.00
2,170.00
2,275.00
55,195.00
101,750.00
17,566.25
7,350.00
126,666.25
181,861.25
18,186.13
200,047.38
Jumlah
Harga
(Rp)
6,750.00
8,250.00
930.00
520.00
16,450.00
284,880.00
8,750.00
293,630.00
310,080.00
31,008.00
341,088.00
Jumlah
Harga
(Rp)
15,750.00
9,625.00
1,054.00
130.00
26,559.00
110,000.00
6,250.00
116,250.00
142,809.00
14,280.90
157,089.90
Jumlah
Harga
(Rp)
3,600.00
4,400.00
496.00
260.00
8,756.00
26,400.00
2,000.00
28,400.00
37,156.00
3,715.60
40,871.60
Jumlah
Harga
(Rp)
5,400.00
6,600.00
744.00
390.00
13,134.00
30,750.00
35.00
30,785.00
43,919.00
4,391.90
48,310.90
Jumlah
Harga
(Rp)
1,350.00
3,990.00
434.00
260.00
6,034.00
22,000.00
200.00
22,200.00
0.00
28,234.00
2,823.40
31,057.40
Jumlah
Harga
(Rp)
5,400.00
6,840.00
744.00
390.00
13,374.00
240,000.00
1,000.00
241,000.00
0.00
254,374.00
25,437.40
279,811.40
Jumlah
Harga
(Rp)
5,400.00
6,840.00
744.00
390.00
13,374.00
145,000.00
1,000.00
146,000.00
0.00
159,374.00
15,937.40
175,311.40
Jumlah
Harga
(Rp)
4,500.00
5,700.00
620.00
325.00
11,145.00
57,000.00
1,000.00
58,000.00
0.00
69,145.00
6,914.50
76,059.50
m, 4 mm & 6 mm
Jumlah
Harga
(Rp)
4,500.00
5,700.00
620.00
325.00
11,145.00
18,562.50
600.00
19,162.50
0.00
30,307.50
3,030.75
33,338.25
Jumlah
Harga
(Rp)
36,000.00
45,600.00
4,960.00
2,600.00
89,160.00
210,000.00
200.00
210,200.00
0.00
299,360.00
29,936.00
329,296.00
Jumlah
Harga
(Rp)
4,500.00
2,850.00
310.00
325.00
7,985.00
27,300.00
1,650.00
-
28,950.00
0.00
36,935.00
3,693.50
40,628.50
gka alluminium
Jumlah
Harga
(Rp)
22,500.00
28,500.00
3,100.00
1,625.00
55,725.00
23,400.00
2,400.00
23,100.00
57,000.00
105,900.00
0.00
161,625.00
16,162.50
177,787.50
Jumlah
Harga
(Rp)
2,250.00
2,850.00
310.00
195.00
5,605.00
9,450.00
200.00
9,650.00
0.00
15,255.00
1,525.50
16,780.50
Jumlah
Harga
(Rp)
6,750.00
4,275.00
465.00
520.00
12,010.00
75,000.00
75,000.00
0.00
87,010.00
8,701.00
95,711.00
Jumlah
Harga
(Rp)
6,750.00
4,275.00
496.00
520.00
12,041.00
125,000.00
125,000.00
0.00
137,041.00
13,704.10
150,745.10
Jumlah
Harga
(Rp)
6,750.00
4,275.00
496.00
520.00
12,041.00
54,000.00
54,000.00
0.00
66,041.00
6,604.10
72,645.10
Jumlah
Harga
(Rp)
18,000.00
11,400.00
1,240.00
130.00
30,770.00
37,500.00
11,960.00
6,720.00
56,180.00
0.00
86,950.00
8,695.00
95,645.00
Jumlah
Harga
(Rp)
18,000.00
11,400.00
1,240.00
130.00
30,770.00
42,500.00
11,960.00
6,720.00
61,180.00
0.00
91,950.00
9,195.00
101,145.00
Jumlah
Harga
(Rp)
18,000.00
11,400.00
1,240.00
130.00
30,770.00
34,000.00
11,960.00
6,720.00
52,680.00
0.00
83,450.00
8,345.00
91,795.00
Jumlah
Harga
(Rp)
6,300.00
4,275.00
496.00
520.00
11,591.00
62,500.00
3,300.00
65,800.00
0.00
77,391.00
7,739.10
85,130.10
Jumlah
Harga
(Rp)
6,300.00
4,275.00
496.00
520.00
11,591.00
75,000.00
3,300.00
78,300.00
0.00
89,891.00
8,989.10
98,880.10
Jumlah
Harga
(Rp)
6,300.00
3,990.00
434.00
455.00
11,179.00
75,000.00
3,300.00
78,300.00
0.00
89,479.00
8,947.90
98,426.90
Jumlah
Harga
(Rp)
6,300.00
3,990.00
434.00
455.00
11,179.00
93,750.00
3,300.00
97,050.00
0.00
108,229.00
10,822.90
119,051.90
Jumlah
Harga
(Rp)
6,300.00
3,990.00
434.00
455.00
11,179.00
43,750.00
3,300.00
47,050.00
0.00
58,229.00
5,822.90
64,051.90
Jumlah
Harga
(Rp)
6,300.00
3,990.00
434.00
455.00
11,179.00
52,500.00
3,300.00
55,800.00
0.00
66,979.00
6,697.90
73,676.90
Jumlah
Harga
(Rp)
6,300.00
3,990.00
434.00
455.00
11,179.00
55,000.00
3,300.00
58,300.00
0.00
69,479.00
6,947.90
76,426.90
Jumlah
Harga
(Rp)
6,300.00
3,990.00
434.00
455.00
11,179.00
63,750.00
3,300.00
67,050.00
0.00
78,229.00
7,822.90
86,051.90
Jumlah
Harga
(Rp)
6,300.00
3,990.00
434.00
455.00
11,179.00
100,000.00
3,300.00
103,300.00
0.00
114,479.00
11,447.90
125,926.90
Jumlah
Harga
(Rp)
6,300.00
3,990.00
434.00
455.00
11,179.00
46,250.00
3,300.00
49,550.00
0.00
60,729.00
6,072.90
66,801.90
Jumlah
Harga
(Rp)
6,300.00
3,990.00
434.00
455.00
11,179.00
47,500.00
3,300.00
50,800.00
0.00
61,979.00
6,197.90
68,176.90
Jumlah
Harga
(Rp)
6,300.00
3,990.00
434.00
455.00
11,179.00
57,500.00
3,300.00
60,800.00
0.00
71,979.00
7,197.90
79,176.90
Jumlah
Harga
(Rp)
6,300.00
3,990.00
434.00
455.00
11,179.00
61,250.00
3,300.00
64,550.00
0.00
75,729.00
7,572.90
83,301.90
Jumlah
Harga
(Rp)
6,300.00
3,990.00
434.00
455.00
11,179.00
71,250.00
3,300.00
74,550.00
0.00
85,729.00
8,572.90
94,301.90
Jumlah
Harga
(Rp)
3,780.00
7,125.00
806.00
260.00
11,971.00
139,200.00
90,000.00
229,200.00
0.00
241,171.00
24,117.10
265,288.10
Jumlah
Harga
(Rp)
3,780.00
7,125.00
806.00
260.00
11,971.00
121,800.00
90,000.00
211,800.00
0.00
223,771.00
22,377.10
246,148.10
Jumlah
Harga
(Rp)
3,780.00
7,125.00
806.00
260.00
11,971.00
118,900.00
90,000.00
208,900.00
0.00
220,871.00
22,087.10
242,958.10
Jumlah
Harga
(Rp)
3,780.00
7,125.00
806.00
260.00
11,971.00
90,000.00
90,000.00
180,000.00
0.00
191,971.00
19,197.10
211,168.10
Jumlah
Harga
(Rp)
3,780.00
7,125.00
806.00
260.00
11,971.00
90,000.00
90,000.00
180,000.00
0.00
191,971.00
19,197.10
211,168.10
Jumlah
Harga
(Rp)
3,780.00
7,125.00
806.00
260.00
11,971.00
90,000.00
90,000.00
180,000.00
0.00
191,971.00
19,197.10
211,168.10
Jumlah
Harga
(Rp)
4,500.00
8,550.00
806.00
260.00
14,116.00
82,500.00
90,000.00
172,500.00
0.00
186,616.00
18,661.60
205,277.60
Jumlah
Harga
(Rp)
3,780.00
7,125.00
806.00
260.00
11,971.00
82,500.00
90,000.00
172,500.00
0.00
184,471.00
18,447.10
202,918.10
Jumlah
Harga
(Rp)
9,000.00
5,700.00
620.00
650.00
15,970.00
104,500.00
600.00
105,100.00
0.00
121,070.00
12,107.00
133,177.00
Jumlah
Harga
(Rp)
9,000.00
5,700.00
620.00
65.00
15,385.00
234,090.00
3,000.00
237,090.00
0.00
252,475.00
25,247.50
277,722.50
Jumlah
Harga
(Rp)
7,470.00
14,250.00
1,550.00
520.00
23,790.00
57,000.00
4,000.00
61,000.00
0.00
84,790.00
8,479.00
93,269.00
Jumlah
Harga
(Rp)
18,000.00
11,400.00
1,240.00
1,300.00
31,940.00
66,500.00
1,000.00
16,146.00
6,720.00
17,000.00
107,366.00
0.00
139,306.00
13,930.60
153,236.60
Jumlah
Harga
(Rp)
11,250.00
8,550.00
930.00
845.00
21,575.00
49,500.00
1,000.00
50,500.00
0.00
72,075.00
7,207.50
79,282.50
Jumlah
Harga
(Rp)
5,625.00
14,250.00
1,550.00
390.00
21,815.00
15,400.00
1,000.00
1,000.00
17,400.00
0.00
39,215.00
3,921.50
43,136.50
Jumlah
Harga
(Rp)
5,400.00
3,420.00
372.00
390.00
9,582.00
26,950.00
400.00
27,350.00
0.00
36,932.00
3,693.20
40,625.20
Jumlah
Harga
(Rp)
6,750.00
3,990.00
434.00
390.00
11,564.00
11,550.00
800.00
12,350.00
0.00
23,914.00
2,391.40
26,305.40
Jumlah
Harga
(Rp)
315,000.00
1,197,000.00
130,200.00
22,750.00
1,664,950.00
24,750,000.00
18,750.00
25,000.00
24,793,750.00
0.00
26,458,700.00
2,645,870.00
29,104,570.00
270,000.00
1,026,000.00
111,600.00
19,500.00
1,427,100.00
10,920,000.00
18,750.00
25,000.00
10,963,750.00
0.00
12,390,850.00
1,239,085.00
13,629,935.00
Jumlah
Harga
(Rp)
15,750.00
59,850.00
6,510.00
1,170.00
83,280.00
410,000.00
750.00
410,750.00
0.00
494,030.00
49,403.00
543,433.00
Jumlah
Harga
(Rp)
15,750.00
59,850.00
6,510.00
1,170.00
83,280.00
256,000.00
1,000.00
257,000.00
0.00
340,280.00
34,028.00
374,308.00
Jumlah
Harga
(Rp)
45,000.00
171,000.00
18,600.00
3,250.00
237,850.00
1,000,000.00
12,500.00
1,012,500.00
0.00
1,250,350.00
125,035.00
1,375,385.00
Jumlah
Harga
(Rp)
36,000.00
136,800.00
14,880.00
2,600.00
190,280.00
246,000.00
7,500.00
253,500.00
0.00
443,780.00
44,378.00
488,158.00
Jumlah
Harga
(Rp)
45,000.00
171,000.00
18,600.00
3,250.00
237,850.00
1,600,000.00
12,500.00
1,612,500.00
0.00
1,850,350.00
185,035.00
2,035,385.00
Jumlah
Harga
(Rp)
31,500.00
119,700.00
13,020.00
2,275.00
166,495.00
256,250.00
600.00
12,500.00
62,700.00
332,050.00
0.00
498,545.00
49,854.50
548,399.50
Jumlah
Harga
(Rp)
36,000.00
136,800.00
14,880.00
2,600.00
190,280.00
640,000.00
450.00
12,500.00
62,700.00
715,650.00
0.00
905,930.00
90,593.00
996,523.00
Jumlah
Harga
(Rp)
30,159.00
114,000.00
12,400.00
21,775.00
178,334.00
1,500,000.00
2,250.00
1,502,250.00
0.00
1,680,584.00
168,058.40
1,848,642.40
Jumlah
Harga
(Rp)
36,000.00
136,800.00
14,880.00
2,600.00
190,280.00
625,000.00
600.00
7,500.00
62,700.00
695,800.00
0.00
886,080.00
88,608.00
974,688.00
u kelas II (Kamfer)
Jumlah
Harga
(Rp)
38,250.00
145,350.00
15,810.00
2,795.00
202,205.00
256,250.00
600.00
20,000.00
62,700.00
37,500.00
377,050.00
0.00
579,255.00
57,925.50
637,180.50
180,000.00
684,000.00
74,400.00
13,000.00
951,400.00
24,750,000.00
189,750.00
84,000.00
25,023,750.00
0.00
25,975,150.00
2,597,515.00
28,572,665.00
180,000.00
684,000.00
74,400.00
13,000.00
951,400.00
13,310,000.00
189,750.00
84,000.00
13,583,750.00
0.00
14,535,150.00
1,453,515.00
15,988,665.00
Jumlah
Harga
(Rp)
301,500.00
1,145,700.00
124,620.00
21,775.00
1,593,595.00
27,000,000.00
189,750.00
84,000.00
27,273,750.00
0.00
28,867,345.00
2,886,734.50
31,754,079.50
Jumlah
Harga
(Rp)
301,500.00
1,145,700.00
124,620.00
21,775.00
1,593,595.00
10,010,000.00
189,750.00
45,000.00
10,244,750.00
0.00
11,838,345.00
1,183,834.50
13,022,179.50
Jumlah
Harga
(Rp)
301,500.00
1,145,700.00
124,620.00
21,775.00
1,593,595.00
7,403,000.00
189,750.00
45,000.00
7,637,750.00
0.00
9,231,345.00
923,134.50
10,154,479.50
Jumlah
Harga
(Rp)
4,500.00
5,700.00
620.00
325.00
11,145.00
127,400.00
327,600.00
3,750.00
458,750.00
0.00
469,895.00
46,989.50
516,884.50
Jumlah
Harga
(Rp)
4,500.00
5,700.00
620.00
325.00
11,145.00
94,220.00
310,500.00
3,750.00
408,470.00
0.00
419,615.00
41,961.50
461,576.50
Jumlah
Harga
(Rp)
4,500.00
5,700.00
620.00
325.00
11,145.00
127,400.00
518,700.00
3,750.00
649,850.00
0.00
660,995.00
66,099.50
727,094.50
Jumlah
Harga
(Rp)
4,500.00
5,700.00
620.00
325.00
11,145.00
94,220.00
518,700.00
3,750.00
616,670.00
0.00
627,815.00
62,781.50
690,596.50
Jumlah
Harga
(Rp)
5,400.00
6,840.00
744.00
390.00
13,374.00
127,400.00
855.00
128,255.00
0.00
141,629.00
14,162.90
155,791.90
Jumlah
Harga
(Rp)
5,400.00
6,840.00
744.00
390.00
13,374.00
94,220.00
855.00
95,075.00
0.00
108,449.00
10,844.90
119,293.90
6,750.00
17,100.00
1,860.00
4,875.00
30,585.00
140,140.00
3,000.00
143,140.00
0.00
173,725.00
17,372.50
191,097.50
6,750.00
17,100.00
1,860.00
4,875.00
30,585.00
103,642.00
3,000.00
106,642.00
0.00
137,227.00
13,722.70
150,949.70
u III (Kamfer)
Jumlah
Harga
(Rp)
9,000.00
17,100.00
1,860.00
650.00
28,610.00
148,330.00
3,750.00
152,080.00
0.00
180,690.00
18,069.00
198,759.00
9,000.00
17,100.00
1,860.00
650.00
28,610.00
109,699.00
3,750.00
113,449.00
0.00
142,059.00
14,205.90
156,264.90
I (Kamfer)
Jumlah
Harga
(Rp)
4,500.00
11,400.00
1,240.00
325.00
17,465.00
98,280.00
1,500.00
99,780.00
0.00
117,245.00
11,724.50
128,969.50
Jumlah
Harga
(Rp)
4,500.00
11,400.00
1,240.00
325.00
17,465.00
100,100.00
750.00
100,850.00
0.00
118,315.00
11,831.50
130,146.50
6,750.00
25,650.00
2,790.00
520.00
35,710.00
254,800.00
2,250.00
257,050.00
0.00
292,760.00
29,276.00
322,036.00
6,750.00
25,650.00
2,790.00
520.00
35,710.00
188,440.00
2,250.00
190,690.00
0.00
226,400.00
22,640.00
249,040.00
as II (Kamfer)
Jumlah
Harga
(Rp)
6,750.00
25,650.00
2,790.00
520.00
35,710.00
254,800.00
2,250.00
53,922.00
14,000.00
324,972.00
0.00
360,682.00
36,068.20
396,750.20
elas II (Kruing)
Jumlah
Harga
(Rp)
6,750.00
25,650.00
2,790.00
520.00
35,710.00
188,440.00
2,250.00
53,922.00
14,000.00
258,612.00
0.00
294,322.00
29,432.20
323,754.20
s II (Kamfer)
Jumlah
Harga
(Rp)
9,000.00
34,200.00
3,720.00
650.00
47,570.00
254,800.00
3,750.00
53,922.00
14,000.00
326,472.00
0.00
374,042.00
37,404.20
411,446.20
as II (Kruing)
Jumlah
Harga
(Rp)
9,000.00
34,200.00
3,720.00
650.00
47,570.00
188,440.00
3,750.00
53,922.00
14,000.00
260,112.00
0.00
307,682.00
30,768.20
338,450.20
Jumlah
Harga
(Rp)
27,000.00
102,600.00
11,160.00
1,950.00
142,710.00
175,000.00
1,500.00
2,250.00
178,750.00
321,460.00
32,146.00
353,606.00
Jumlah
Harga
(Rp)
1,125.00
4,275.00
496.00
65.00
5,961.00
25,080.00
1,000.00
26,080.00
0.00
32,041.00
3,204.10
35,245.10
Jumlah
Harga
(Rp)
4,500.00
2,850.00
310.00
325.00
7,985.00
33,000.00
79,800.00
180.00
13.50
112,993.50
0.00
120,978.50
12,097.85
133,076.35
Jumlah
Harga
(Rp)
450.00
28,500.00
3,100.00
325.00
32,375.00
80,000.00
80,000.00
0.00
112,375.00
11,237.50
123,612.50
Jumlah
Harga
(Rp)
225.00
28,500.00
3,100.00
195.00
32,020.00
67,000.00
67,000.00
0.00
99,020.00
9,902.00
108,922.00
Jumlah
Harga
(Rp)
225.00
28,500.00
3,100.00
195.00
32,020.00
145,000.00
145,000.00
0.00
177,020.00
17,702.00
194,722.00
Jumlah
Harga
(Rp)
675.00
8,550.00
930.00
52.00
10,207.00
20,000.00
20,000.00
0.00
30,207.00
3,020.70
33,227.70
Jumlah
Harga
(Rp)
450.00
5,700.00
620.00
32.50
6,802.50
25,000.00
25,000.00
0.00
31,802.50
3,180.25
34,982.75
Jumlah
Harga
(Rp)
4,500.00
11,400.00
1,240.00
32.50
17,172.50
20,000.00
20,000.00
0.00
37,172.50
3,717.25
40,889.75
Jumlah
Harga
(Rp)
675.00
8,550.00
930.00
520.00
10,675.00
16,000.00
16,000.00
0.00
26,675.00
2,667.50
29,342.50
Jumlah
Harga
(Rp)
2,250.00
28,500.00
3,100.00
195.00
34,045.00
350,000.00
350,000.00
0.00
384,045.00
38,404.50
422,449.50
Jumlah
Harga
(Rp)
900.00
11,400.00
1,240.00
65.00
13,605.00
20,000.00
20,000.00
0.00
33,605.00
3,360.50
36,965.50
Jumlah
Harga
(Rp)
2,250.00
28,500.00
3,100.00
195.00
34,045.00
125,000.00
125,000.00
0.00
159,045.00
15,904.50
174,949.50
Jumlah
Harga
(Rp)
450.00
5,700.00
620.00
325.00
7,095.00
62,000.00
62,000.00
0.00
69,095.00
6,909.50
76,004.50
Jumlah
Harga
(Rp)
2,700.00
34,200.00
3,720.00
195.00
40,815.00
235,000.00
235,000.00
0.00
275,815.00
27,581.50
303,396.50
Jumlah
Harga
(Rp)
1,125.00
14,250.00
1,550.00
84.50
17,009.50
20,000.00
20,000.00
0.00
37,009.50
3,700.95
40,710.45
Jumlah
Harga
(Rp)
675.00
8,550.00
930.00
52.00
10,207.00
126,500.00
3,750.00
130,250.00
0.00
140,457.00
14,045.70
154,502.70
Jumlah
Harga
(Rp)
765.00
9,690.00
1,054.00
58.50
11,567.50
308,000.00
5,250.00
313,250.00
0.00
324,817.50
32,481.75
357,299.25
Jumlah
Harga
(Rp)
1,125.00
14,250.00
1,550.00
84.50
17,009.50
176,000.00
5,250.00
181,250.00
0.00
198,259.50
19,825.95
218,085.45
Jumlah
Harga
(Rp)
675.00
8,550.00
930.00
520.00
10,675.00
269,500.00
269,500.00
0.00
280,175.00
28,017.50
308,192.50
Jumlah
Harga
(Rp)
3,375.00
8,550.00
930.00
260.00
13,115.00
3,025,000.00
3,750.00
3,028,750.00
0.00
3,041,865.00
304,186.50
3,346,051.50
Jumlah
Harga
(Rp)
6,750.00
195.00
6,945.00
600.00
600.00
0.00
7,545.00
754.50
8,299.50
Jumlah
Harga
(Rp)
6,750.00
195.00
6,945.00
600.00
600.00
0.00
7,545.00
754.50
8,299.50
Jumlah
Harga
(Rp)
6,750.00
520.00
7,270.00
600.00
600.00
0.00
7,870.00
787.00
8,657.00
3,150.00
495.00
372.00
195.00
4,212.00
5,600.00
4,200.00
6,120.00
15,340.00
140.00
720.00
800.00
32,920.00
0.00
37,132.00
3,713.20
40,845.20
3,150.00
5,775.00
248.00
195.00
9,368.00
5,600.00
4,200.00
6,120.00
20,650.00
140.00
480.00
800.00
37,990.00
0.00
47,358.00
4,735.80
52,093.80
Jumlah
Harga
(Rp)
1,800.00
3,465.00
3,906.00
195.00
9,366.00
13,680.00
13,680.00
0.00
23,046.00
2,304.60
25,350.60
Jumlah
Harga
(Rp)
1,800.00
3,300.00
992.00
195.00
6,287.00
5,700.00
23,436.00
8,000.00
37,136.00
0.00
43,423.00
4,342.30
47,765.30
Jumlah
Harga
(Rp)
4,500.00
390.00
4,890.00
2,975.00
2,975.00
0.00
7,865.00
786.50
8,651.50
900.00
3,465.00
390.60
195.00
4,950.60
-
3,600.00
26,000.00
29,600.00
0.00
34,550.60
3,455.06
38,005.66
1,260.00
2,310.00
260.40
195.00
4,025.40
4,320.00
18,000.00
22,320.00
0.00
26,345.40
2,634.54
28,979.94
Jumlah
Harga
(Rp)
900.00
11,000.00
1,240.00
162.50
13,302.50
60,000.00
5,000.00
65,000.00
0.00
78,302.50
7,830.25
86,132.75
Jumlah
Harga
(Rp)
900.00
11,000.00
1,240.00
162.50
13,302.50
4,500.00
140.00
4,640.00
0.00
17,942.50
1,794.25
19,736.75
Jumlah
Harga
(Rp)
11,250.00
12,375.00
1,395.00
487.50
25,507.50
4,500.00
160.00
140.00
50.00
4,850.00
0.00
30,357.50
3,035.75
33,393.25
Jumlah
Harga
(Rp)
11,250.00
13,750.00
1,550.00
84.50
26,634.50
4,500.00
4,500.00
4,160.00
140.00
160.00
13,460.00
0.00
40,094.50
4,009.45
44,103.95
is cat mutakhir
Jumlah
Harga
(Rp)
2,700.00
3,300.00
744.00
195.00
6,939.00
15,000.00
140.00
160.00
15,300.00
0.00
22,239.00
2,223.90
24,462.90
Jumlah
Harga
(Rp)
18,000.00
44,000.00
4,960.00
1,300.00
68,260.00
4,950.00
8,840.00
4,000.00
140.00
160.00
18,090.00
0.00
86,350.00
8,635.00
94,985.00
18,000.00
38,500.00
4,340.00
1,300.00
62,140.00
13,500.00
160.00
13,660.00
0.00
75,800.00
7,580.00
83,380.00
900.00
3,465.00
390.60
195.00
4,950.60
2,700.00
3,600.00
26,000.00
32,300.00
0.00
37,250.60
3,725.06
40,975.66
Jumlah
Harga
(Rp)
1,260.00
2,310.00
260.40
195.00
4,025.40
4,320.00
18,000.00
22,320.00
0.00
26,345.40
2,634.54
28,979.94
Jumlah
Harga
(Rp)
1,260.00
2,310.00
260.40
195.00
4,025.40
4,320.00
18,000.00
22,320.00
0.00
26,345.40
2,634.54
28,979.94
900.00
3,465.00
390.60
195.00
4,950.60
2,700.00
3,600.00
7,800.00
14,100.00
0.00
19,050.60
1,905.06
20,955.66
Jumlah
Harga
(Rp)
148,500.00
60,500.00
620.00
10,400.00
220,020.00
2,460,000.00
147,600.00
2,607,600.00
0.00
2,827,620.00
282,762.00
3,110,382.00
Jumlah
Harga
(Rp)
45,000.00
82,500.00
9,300.00
10,400.00
147,200.00
459,000.00
8,970.00
1.50
467,971.50
0.00
615,171.50
61,517.15
676,688.65
Jumlah
Harga
(Rp)
45,000.00
55,000.00
6,200.00
3,250.00
109,450.00
1,800,000.00
8,970.00
2,100.00
540,000.00
2,351,070.00
0.00
2,460,520.00
246,052.00
2,706,572.00
Jumlah
Harga
(Rp)
54,000.00
79,750.00
9,300.00
3,900.00
146,950.00
1,080,000.00
8,970.00
2,100.00
129,600.00
1,220,670.00
0.00
1,367,620.00
136,762.00
1,504,382.00
Jumlah
Harga
(Rp)
135,000.00
247,500.00
3,100.00
58,500.00
444,100.00
275,000.00
33,000.00
308,000.00
0.00
752,100.00
75,210.00
827,310.00
Jumlah
Harga
(Rp)
270,000.00
165,000.00
18,600.00
1,950.00
455,550.00
105,000.00
179,400.00
63,000.00
162,000.00
102,000.00
611,400.00
0.00
1,066,950.00
106,695.00
1,173,645.00
Jumlah
Harga
(Rp)
1,350.00
16,500.00
1,860.00
975.00
20,685.00
250,000.00
55,000.00
305,000.00
0.00
325,685.00
32,568.50
358,253.50
Jumlah
Harga
(Rp)
450.00
5,500.00
620.00
325.00
6,895.00
40,000.00
40,000.00
0.00
46,895.00
4,689.50
51,584.50
Jumlah
Harga
(Rp)
97,200.00
39,600.00
4,464.00
715.00
141,979.00
28,000.00
65,780.00
14,700.00
13,500.00
16,800.00
20,240.00
159,020.00
0.00
300,999.00
30,099.90
331,098.90
Jumlah
Harga
(Rp)
144,000.00
63,250.00
682.00
1,040.00
208,972.00
49,000.00
115,115.00
27,300.00
20,250.00
4,800.00
32,890.00
249,355.00
0.00
458,327.00
45,832.70
504,159.70
Jumlah
Harga
(Rp)
144,000.00
63,250.00
682.00
1,040.00
208,972.00
86,100.00
170,430.00
38,640.00
27,000.00
7,920.00
61,352.50
391,442.50
0.00
600,414.50
60,041.45
660,455.95
Jumlah
Harga
(Rp)
2,430.00
4,950.00
558.00
1,755.00
9,693.00
18,000.00
6,300.00
24,300.00
0.00
33,993.00
3,399.30
37,392.30
Jumlah
Harga
(Rp)
450.00
22,000.00
2,480.00
325.00
25,255.00
70,000.00
225.00
70,225.00
0.00
95,480.00
9,548.00
105,028.00
Jumlah
Harga
(Rp)
2,430.00
4,950.00
558.00
1,755.00
9,693.00
23,400.00
8,190.00
31,590.00
0.00
41,283.00
4,128.30
45,411.30
Jumlah
Harga
(Rp)
2,430.00
4,950.00
558.00
1,755.00
9,693.00
30,600.00
10,710.00
41,310.00
0.00
51,003.00
5,100.30
56,103.30
Jumlah
Harga
(Rp)
4,860.00
9,900.00
1,116.00
325.00
16,201.00
42,480.00
14,868.00
57,348.00
0.00
73,549.00
7,354.90
80,903.90
Jumlah
Harga
(Rp)
1,620.00
3,300.00
372.00
130.00
5,422.00
6,750.00
2,362.50
9,112.50
0.00
14,534.50
1,453.45
15,987.95
Jumlah
Harga
(Rp)
1,620.00
3,300.00
372.00
130.00
5,422.00
8,610.00
3,013.50
11,623.50
0.00
17,045.50
1,704.55
18,750.05
Jumlah
Harga
(Rp)
1,620.00
3,300.00
372.00
130.00
5,422.00
11,760.00
4,116.00
15,876.00
0.00
21,298.00
2,129.80
23,427.80
Jumlah
Harga
(Rp)
2,430.00
4,950.00
558.00
195.00
8,133.00
20,280.00
7,098.00
27,378.00
0.00
35,511.00
3,551.10
39,062.10
Jumlah
Harga
(Rp)
2,430.00
4,950.00
558.00
195.00
8,133.00
25,950.00
9,082.50
35,032.50
0.00
43,165.50
4,316.55
47,482.05
Jumlah
Harga
(Rp)
3,645.00
7,425.00
837.00
260.00
12,167.00
36,000.00
12,600.00
48,600.00
0.00
60,767.00
6,076.70
66,843.70
Jumlah
Harga
(Rp)
3,645.00
7,425.00
837.00
260.00
12,167.00
51,030.00
17,860.50
68,890.50
0.00
81,057.50
8,105.75
89,163.25
Jumlah
Harga
(Rp)
3,645.00
7,425.00
837.00
260.00
12,167.00
84,510.00
29,578.50
114,088.50
0.00
126,255.50
12,625.55
138,881.05
Jumlah
Harga
(Rp)
35,375.00
106.13
6,178.50
3,548.25
45,207.88
1,170.00
25,593.08
2,922.73
29,685.81
0.00
74,893.68
7,489.37
82,383.05
Jumlah
Harga
(Rp)
1,061.25
106.13
6,178.50
3,548.25
10,894.13
1,170.00
22,566.75
2,155.32
25,892.07
0.00
36,786.20
3,678.62
40,464.81
Jumlah
Harga
(Rp)
2,122.50
212.25
370.71
2,705.46
451.34
45,000.00
45,451.34
0.00
48,156.80
4,815.68
52,972.47
Jumlah
Harga
(Rp)
2,122.50
212.25
370.71
2,705.46
451.34
50,000.00
50,451.34
0.00
53,156.80
5,315.68
58,472.47
Jumlah
Harga
(Rp)
22,286.25
16,222.50
811.13
29,128.54
16,995.00
68,448.41
10,920.00
106,390.94
60,000.00
177,310.94
0.00
245,759.36
24,575.94
270,335.29
Jumlah
Harga
(Rp)
28,300.00
6,866.67
1,030.00
35,601.55
15,106.67
86,904.88
12,480.00
130,033.37
65,000.00
207,513.37
0.00
294,418.25
29,441.83
323,860.08
Jumlah
Harga
(Rp)
35,021.25
8,497.50
1,158.75
42,074.56
16,995.00
103,747.06
14,040.00
153,675.81
75,000.00
242,715.81
0.00
346,462.86
34,646.29
381,109.15
Jumlah
Harga
(Rp)
42,450.00
10,300.00
1,287.50
48,547.56
16,995.00
119,580.06
15,600.00
177,318.24
95,000.00
287,918.24
0.00
407,498.30
40,749.83
448,248.13
Jumlah
Harga
(Rp)
50,586.25
12,274.17
1,416.25
55,020.57
27,003.17
146,300.41
17,160.00
200,960.67
106,000.00
324,120.67
0.00
470,421.08
47,042.11
517,463.18
Jumlah
Harga
(Rp)
64,382.50
15,621.67
1,673.75
90,622.12
34,367.67
206,667.70
20,280.00
248,245.53
110,000.00
378,525.53
0.00
585,193.24
58,519.32
643,712.56
Jumlah
Harga
(Rp)
14,857.50
3,605.00
772.50
8,738.56
7,931.00
35,904.56
9,360.00
31,917.28
60,000.00
101,277.28
0.00
137,181.84
13,718.18
150,900.03
Jumlah
Harga
(Rp)
19,810.00
3,605.00
901.25
10,680.46
10,574.67
45,571.38
10,920.00
39,010.01
65,000.00
114,930.01
0.00
160,501.39
16,050.14
176,551.53
Jumlah
Harga
(Rp)
25,470.00
6,180.00
1,030.00
12,622.37
13,596.00
58,898.37
12,480.00
46,102.74
75,000.00
133,582.74
0.00
192,481.11
19,248.11
211,729.22
Jumlah
Harga
(Rp)
31,837.50
7,725.00
1,158.75
14,564.27
16,995.00
72,280.52
14,040.00
53,195.47
95,000.00
162,235.47
0.00
234,515.99
23,451.60
257,967.59
Jumlah
Harga
(Rp)
38,912.50
9,441.67
1,287.50
16,506.17
20,771.67
86,919.51
15,600.00
60,288.20
106,000.00
181,888.20
0.00
268,807.71
26,880.77
295,688.48
Jumlah
Harga
(Rp)
8,490.00
2,060.00
772.50
16,044.96
4,532.00
31,899.46
9,360.00
16,044.96
45,000.00
70,404.96
0.00
102,304.42
10,230.44
112,534.86
Jumlah
Harga
(Rp)
11,143.13
6,008.33
901.25
2,941.58
5,948.25
26,942.53
10,920.00
19,610.51
50,000.00
80,530.51
0.00
107,473.04
10,747.30
118,220.34
Jumlah
Harga
(Rp)
10,800.00
4,400.00
496.00
780.00
16,476.00
76,020.00
25,200.00
101,220.00
0.00
117,696.00
11,769.60
129,465.60
Jumlah
Harga
(Rp)
10,800.00
4,400.00
496.00
780.00
16,476.00
103,425.00
25,200.00
128,625.00
0.00
145,101.00
14,510.10
159,611.10
Jumlah
Harga
(Rp)
10,800.00
4,400.00
496.00
780.00
16,476.00
104,580.00
25,200.00
129,780.00
0.00
146,256.00
14,625.60
160,881.60
Jumlah
Harga
(Rp)
10,800.00
4,400.00
496.00
780.00
16,476.00
146,685.00
25,200.00
171,885.00
0.00
188,361.00
18,836.10
207,197.10
43 cm x 65 cm (1 buah)
Jumlah
Harga
(Rp)
-
#VALUE!
#VALUE!
1,500.00
1,000.00
15,600.00
18,100.00
0.00
#VALUE!
#VALUE!
#VALUE!
Jumlah
Harga
(Rp)
-
-
-
#VALUE!
#VALUE!
280,000.00
241,600.00
521,600.00
0.00
#VALUE!
#VALUE!
#VALUE!
wat sisi 4,0 mm dan kawat
Jumlah
Harga
(Rp)
-
-
-
#VALUE!
#VALUE!
280,000.00
248,160.00
528,160.00
0.00
#VALUE!
#VALUE!
#VALUE!
Jumlah
Harga
(Rp)
-
-
#VALUE!
#VALUE!
8,750.00
8,750.00
6,500.00
6,500.00
#VALUE!
#VALUE!
#VALUE!
Jumlah
Harga
(Rp)
-
-
#VALUE!
#VALUE!
4,550.00
4,550.00
6,500.00
6,500.00
#VALUE!
#VALUE!
#VALUE!
Jumlah
Harga
(Rp)
-
-
#VALUE!
#VALUE!
#VALUE!
40,000.00
5,250.00
7,475.00
52,725.00
0.00
#VALUE!
#VALUE!
#VALUE!
Jumlah
Harga
(Rp)
-
-
#VALUE!
#VALUE!
#VALUE!
144,000.00
5,250.00
7,475.00
156,725.00
0.00
#VALUE!
#VALUE!
#VALUE!
Jumlah
Harga
(Rp)
-
-
#VALUE!
#VALUE!
42,000.00
42,000.00
0.00
#VALUE!
#VALUE!
#VALUE!
Jumlah
Harga
(Rp)
-
-
#VALUE!
#VALUE!
#VALUE!
54,250.00
114,000.00
5,000.00
1,800.00
175,050.00
0.00
#VALUE!
#VALUE!
#VALUE!
(tanpa perancah)
Jumlah
Harga
(Rp)
-
-
#VALUE!
#VALUE!
#VALUE!
86,000.00
114,000.00
8,000.00
1,800.00
209,800.00
0.00
#VALUE!
#VALUE!
#VALUE!
Rp 18,000.00
Rp 2,600.00
Jumlah Upah Rp 20,600.00
Rp 7,740.00
Rp 1,083.33
Jumlah Upah Rp 8,823.33
Rp 28,125.00
Rp 4,030.00
Jumlah Upah Rp 32,155.00
Rp 23,625.00
Rp 3,380.00
Jumlah Upah Rp 27,005.00
Rp 8,640.00
Rp 1,248.00
Jumlah Upah Rp 9,888.00
Rp 156,000.00
Jumlah bahan Rp 156,000.00
Rp 13,500.00
Rp 650.00
Jumlah Upah Rp 14,150.00
pah dan Bahan Rp 170,150.00
Rp 174,000.00
Jumlah bahan Rp 174,000.00
Rp 11,250.00
Rp 1,625.00
Jumlah Upah Rp 12,875.00
pah dan Bahan Rp 186,875.00
Rp 78,000.00
Jumlah bahan Rp 78,000.00
Rp 22,500.00
Rp 3,250.00
Jumlah Upah Rp 25,750.00
pah dan Bahan Rp 103,750.00
+ Profit 10% Rp 114,125.00
Rp 22,500.00
Rp 3,250.00
Jumlah Upah Rp 25,750.00
Rp 25,750.00
Rp 4,500.00
Rp 3,250.00
Jumlah Upah Rp 7,750.00
Rp 7,750.00
Rp 300,015.00
Rp 21,645.00
Jumlah Upah Rp 321,660.00
untuk 1 m3 Rp 321,660.00
Rp 6,000.30
Rp 171.60
Jumlah Upah Rp 6,171.90
Rp 6,171.90
Rp 4,500.00
Rp 65.00
Jumlah Upah Rp 4,565.00
Rp 4,565.00
Rp 120,006.00
Rp 1,716.00
Jumlah Upah Rp 121,722.00
Rp 121,722.00
+ Profit 10% Rp 133,894.20
Rp 240,012.00
Rp 2,145.00
Jumlah Upah Rp 242,157.00
Rp 242,157.00
Rp 300,015.00
Rp 21,645.00
Jumlah Upah Rp 321,660.00
Rp 321,660.00
Rp 300,015.00
Rp 21,645.00
Jumlah Upah Rp 321,660.00
Rp 321,660.00
Rp 6,000.30
Rp 171.60
Jumlah Upah Rp 6,171.90
``
Rp 7,650.00
Rp 130.00
Jumlah Upah Rp 7,780.00
Rp 7,780.00
Rp 9,375.47
Rp 1,560.00
Jumlah Upah Rp 10,935.47
Rp 10,935.47
+ Profit 10% Rp 12,029.02
Rp 18,750.94
Rp 1,608.75
Jumlah Upah Rp 20,359.69
Rp 20,359.69
+ Profit 10% Rp 22,395.66
Rp 240,000.00
Jumlah Bahan Rp 240,000.00
Rp 35,100.00
Rp 2,535.00
Rp 21,450.00
Rp 2,418.00
Jumlah Upah Rp 61,503.00
Rp 301,503.00
Rp 220,000.00
Rp 91,195.00
Rp 39,690.00
Rp 103,320.00
Jumlah bahan Rp 454,205.00
Rp 67,500.00
Rp 33,000.00
Rp 3,720.00
Rp 4,875.00
Jumlah Upah Rp 109,095.00
pah dan Bahan Rp 563,300.00
Rp -
Rp 91,195.00
Rp 39,690.00
Rp 103,320.00
Jumlah bahan Rp 234,205.00
Rp 67,500.00
Rp 33,000.00
Rp 3,720.00
Rp 4,875.00
Jumlah Upah Rp 109,095.00
pah dan Bahan Rp 343,300.00
Rp 220,000.00
Rp 203,320.00
Rp 114,240.00
Jumlah bahan Rp 537,560.00
Rp 67,500.00
Rp 33,000.00
Rp 3,720.00
Rp 4,875.00
Jumlah Upah Rp 109,095.00
pah dan Bahan Rp 646,655.00
Rp 220,000.00
Rp 174,915.00
Rp 117,810.00
Jumlah bahan Rp 512,725.00
Rp 67,500.00
Rp 33,000.00
Rp 3,720.00
Rp 4,875.00
Jumlah Upah Rp 109,095.00
pah dan Bahan Rp 621,820.00
Rp 203,320.00
Rp 114,240.00
Jumlah bahan Rp 317,560.00
Rp 67,500.00
Rp 33,000.00
Rp 3,720.00
Rp 4,875.00
Jumlah Upah Rp 109,095.00
pah dan Bahan Rp 426,655.00
Rp 174,915.00
Rp 117,810.00
Jumlah bahan Rp 292,725.00
Rp 67,500.00
Rp 33,000.00
Rp 3,720.00
Rp 4,875.00
Jumlah Upah Rp 109,095.00
pah dan Bahan Rp 401,820.00
Rp 49,000.00
Rp 21,483.15
Rp 8,400.00
Jumlah Bahan Rp 78,883.15
Rp 14,400.00
Rp 975.00
Rp 5,500.00
Rp 620.00
Jumlah Upah Rp 21,495.00
pah dan Bahan Rp 100,378.15
Rp 49,000.00
Rp 12,438.40
Rp 10,290.00
Jumlah Bahan Rp 71,728.40
Rp 13,500.00
Rp 975.00
Rp 5,500.00
Rp 620.00
Jumlah Upah Rp 20,595.00
pah dan Bahan Rp 92,323.40
Rp 49,000.00
Rp 6,727.50
Rp 10,500.00
Rp 4,050.00
Jumlah Bahan Rp 70,277.50
Rp 8,464.00
Rp 595.13
Rp 3,507.50
Rp 408.25
Jumlah Upah Rp 12,974.88
pah dan Bahan Rp 83,252.38
Rp 29,543.49
Rp 11,496.61
Rp 9,765.89
Rp 48,070.00
Jumlah Bahan Rp 98,875.99
Rp 14,400.00
Rp 975.00
Rp 5,500.00
Rp 620.00
Jumlah Upah Rp 21,495.00
pah dan Bahan Rp 120,370.99
Rp 13,455.00
Rp 6,300.00
Jumlah Bahan Rp 19,755.00
Rp 11,250.00
Rp 6,500.00
Rp 550.00
Rp 93.00
Jumlah Upah Rp 18,393.00
pah dan Bahan Rp 38,148.00
Rp 2,750.80
Rp 2,940.00
Rp 1,620.00
Jumlah Bahan Rp 7,310.80
Rp 9,000.00
Rp 650.00
Rp 8,250.00
Rp 930.00
Jumlah Upah Rp 18,830.00
pah dan Bahan Rp 26,140.80
Rp 9,687.60
Rp 3,990.00
Jumlah Bahan Rp 13,677.60
Rp 9,000.00
Rp 650.00
Rp 8,250.00
Rp 930.00
Jumlah Upah Rp 18,830.00
pah dan Bahan Rp 32,507.60
Rp 412.00
Rp 510.45
Rp 44,787.60
Rp 6,125.70
Jumlah Bahan Rp 51,835.75
Rp 9,000.00
Jumlah Upah Rp 9,000.00
pah dan Bahan Rp 60,835.75
Rp 154.50
Rp 3,062.85
Jumlah Bahan Rp 3,217.35
Rp 824.00
Rp 12,098.00
Jumlah Upah Rp 12,922.00
pah dan Bahan Rp 16,139.35
Rp 6,601.92
Rp 5,670.00
Jumlah Bahan Rp 12,271.92
Rp 13,500.00
Rp 975.00
Rp 8,250.00
Rp 930.00
Jumlah Upah Rp 23,655.00
pah dan Bahan Rp 35,926.92
Rp 11,625.12
Rp 4,830.00
Jumlah Bahan Rp 16,455.12
Rp 13,500.00
Rp 975.00
Rp 8,250.00
Rp 930.00
Jumlah Upah Rp 23,655.00
pah dan Bahan Rp 40,110.12
Rp 4,485.00
Jumlah Bahan Rp 4,485.00
Rp 9,000.00
Rp 650.00
Rp 5,500.00
Rp 620.00
Jumlah Upah Rp 15,770.00
pah dan Bahan Rp 20,255.00
Rp 747.50
Rp 2,730.00
Jumlah Bahan Rp 3,477.50
Rp 3,600.00
Rp 260.00
Rp 2,200.00
Rp 2,480.00
Jumlah Upah Rp 8,540.00
Rp 12,017.50
Rp 60,933.44
Rp 47,423.53
Rp 463.50
Rp 15,127.56
Rp 36,052.50
Jumlah Bahan Rp 160,000.54
Rp -
Jumlah Upah Rp -
Rp 160,000.54
Rp 6,458.40
Rp 3,360.00
Jumlah Bahan Rp 9,818.40
Rp 6,750.00
Rp 3,850.00
Rp 434.00
Rp 520.00
Jumlah Upah Rp 11,554.00
Rp 21,372.40
Rp 854,583.33
Rp 850,000.00
Rp 84,000.00
Rp 38,062.50
Rp 45,000.00
Rp 129,030.00
Rp 15,000.00
Jumlah Bahan Rp 2,015,675.83
Rp 70,988.40
Rp 89,918.64
Rp 45,447.60
Rp 9,780.62
Rp 5,078.11
Jumlah Upah Rp 221,213.38
Rp 2,236,889.21
3.13 M2
PER M Rp 787,385.00
Rp 25,620.00
Rp -
Rp 21,000.00
Rp 30,797.00
Rp 121,000.00
Jumlah Bahan Rp 198,417.00
Rp 24,300.00
Rp 15,675.00
Rp 1,767.00
Rp 1,852.50
Jumlah Upah Rp 43,594.50
Rp 242,011.50
Rp 12,810.00
Rp -
Rp 10,500.00
Rp 15,398.50
Rp 82,500.00
Jumlah Bahan Rp 121,208.50
Rp 16,200.00
Rp 10,450.00
Rp 1,178.00
Rp 1,235.00
Jumlah Upah Rp 29,063.00
Rp 150,271.50
Rp 22,500.00
Rp 5,500.00
Rp 620.00
Rp 1,625.00
Jumlah Upah Rp 30,245.00
Rp 2,100.00
Rp 3,500.00
Rp 1,121.25
Rp 21,500.00
Jumlah Bahan Rp 28,221.25
Rp 9,000.00
Rp 5,500.00
Rp 620.00
Rp 650.00
Jumlah Upah Rp 9,000.00
Rp 37,221.25
Rp 13,455.00
Rp 6,300.00
Jumlah Bahan Rp 19,755.00
Rp 11,250.00
Rp 6,500.00
Rp 550.00
Rp 93.00
Jumlah Upah Rp 18,393.00
pah dan Bahan Rp 38,148.00
Rp 4,200.00
Rp 64,626.38
Rp 35,926.92
Rp 1,121.25
Rp 3,500.00
Rp 22,575.00
Jumlah Bahan Rp 131,949.55
Rp 45,000.00
Jumlah Upah Rp 45,000.00
Rp 176,949.55
Rp 38,640.00
Rp 170,430.00
Rp 70,560.00
Rp 7,920.00
Rp 61,352.50
Rp 27,000.00
Jumlah Bahan Rp 375,902.50
Rp 97,200.00
Rp 7,020.00
Rp 39,600.00
Rp 4,500.00
Rp 4,464.00
Jumlah Upah Rp 152,784.00
Rp 528,686.50
Rp 27,300.00
Rp 115,115.00
Rp 44,100.00
Rp 4,800.00
Rp 32,890.00
Rp 20,250.00
Jumlah Bahan Rp 244,455.00
Rp 63,900.00
Rp 4,615.00
Rp 26,015.00
Rp 2,914.00
Jumlah Upah Rp 97,444.00
Rp 341,899.00
Rp 14,700.00
Rp 65,780.00
Rp 20,580.00
Rp 2,400.00
Rp 20,240.00
Rp 13,500.00
Jumlah Bahan Rp 137,200.00
Rp 144,000.00
Rp 1,040.00
Rp 825.00
Rp 93.00
Jumlah Upah Rp 145,958.00
Rp 283,158.00
Rp 45,000.00
Rp 14,651.00
Rp 9,450.00
Rp 3,006.25
Jumlah Bahan Rp 72,107.25
Rp 11,250.00
Rp 845.00
Rp 6,875.00
Rp 775.00
Jumlah Upah Rp 19,745.00
pah dan Bahan Rp 91,852.25
Rp 125,000.00
Rp 17,013.10
Rp 8,820.00
Rp 3,468.75
Jumlah Bahan Rp 154,301.85
Rp 27,900.00
Rp 1,950.00
Rp 19,250.00
Rp 2,170.00
Jumlah Upah Rp 51,270.00
pah dan Bahan Rp 205,571.85
Rp 51,041.67
Rp 14,950.00
Rp 9,450.00
Rp 3,468.75
Jumlah Bahan Rp 78,910.42
Rp 31,500.00
Rp 2,275.00
Rp 19,250.00
Rp 2,170.00
Jumlah Upah Rp 55,195.00
pah dan Bahan Rp 134,105.42
Rp 45,000.00
Rp 14,950.00
Rp 9,450.00
Rp 3,468.75
Rp 72,868.75
Rp 11,700.00
Rp 845.00
Rp 7,150.00
Rp 806.00
Rp 20,501.00
pah dan Bahan Rp 93,369.75
Rp 117,500.00
Rp 13,903.50
Rp 3,780.00
Rp 3,468.75
Jumlah Bahan Rp 138,652.25
Rp 27,000.00
Rp 1,950.00
Rp 24,750.00
Rp 2,790.00
Jumlah Upah Rp 56,490.00
pah dan Bahan Rp 195,142.25
Rp 39,100.00
Rp 13,903.50
Rp 3,780.00
Rp 3,468.75
Jumlah Bahan Rp 60,252.25
Rp 27,000.00
Rp 1,950.00
Rp 19,250.00
Rp 2,170.00
Jumlah Upah Rp 50,370.00
pah dan Bahan Rp 110,622.25
Rp 122,400.00
Rp 13,903.50
Rp 3,780.00
Rp 27,900.00
Rp 1,950.00
Rp 19,250.00
Rp 2,170.00
Jumlah Upah Rp 51,270.00
pah dan Bahan Rp 191,353.50
Rp 49,500.00
Rp 22,574.50
Rp 4,200.00
Jumlah Bahan Rp 76,274.50
Rp 45,000.00
Rp 3,250.00
Rp 30,250.00
Rp 3,410.00
Jumlah Upah Rp 81,910.00
pah dan Bahan Rp 158,184.50
Rp 6,221.98
Rp 1,704.30
Rp 630.00
Rp 231.25
Jumlah Bahan Rp 8,787.53
Rp 4,050.00
Rp 325.00
Rp 4,950.00
Rp 558.00
Jumlah Upah Rp 9,883.00
pah dan Bahan Rp 18,670.53
Rp 50,000.00
Rp 1,193.01
Rp 441.00
Rp 161.88
Jumlah Bahan Rp 51,795.89
Rp 2,835.00
Rp 204.75
Rp 346.50
Rp 390.60
Jumlah Upah Rp 3,776.85
pah dan Bahan Rp 55,572.74
Rp 32,500.00
Rp 778.60
Rp 211.68
Rp 194.25
Jumlah Bahan Rp 33,684.53
Rp 2,835.00
Rp 204.75
Rp 346.50
Rp 390.60
Jumlah Upah Rp 3,776.85
pah dan Bahan Rp 37,461.38
Rp 47,700.00
Rp 15,548.00
Rp 9,450.00
Rp 3,746.25
Jumlah Bahan Rp 76,444.25
Rp 12,150.00
Rp 910.00
Rp 7,425.00
Rp 868.00
Jumlah Upah Rp 21,353.00
pah dan Bahan Rp 97,797.25
Rp 114,581.25
Jumlah Bahan Rp 114,581.25
Rp 6,750.00
Rp 975.00
Rp 4,400.00
Rp 496.00
Jumlah Upah Rp 12,621.00
pah dan Bahan Rp 127,202.25
+ Profit 10% Rp 139,922.48
Rp -
Jumlah Bahan Rp -
Rp 6,750.00
Rp 975.00
Rp 4,400.00
Rp 496.00
Jumlah Upah Rp 12,621.00
pah dan Bahan Rp 12,621.00
+ Profit 10% Rp 13,883.10
Rp 126,000.00
Jumlah Bahan Rp 126,000.00
Rp 6,750.00
Rp 975.00
Rp 4,400.00
Rp 496.00
Jumlah Upah Rp 12,621.00
pah dan Bahan Rp 138,621.00
Rp 114,581.25
Jumlah Bahan Rp 114,581.25
Rp 10,800.00
Rp 780.00
Rp 4,400.00
Rp 496.00
Jumlah Upah Rp 16,476.00
pah dan Bahan Rp 131,057.25
Rp 142,931.25
Jumlah Bahan Rp 142,931.25
Rp 10,800.00
Rp 780.00
Rp 4,400.00
Rp 496.00
Jumlah Upah Rp 16,476.00
pah dan Bahan Rp 159,407.25
Rp 74,340.00
Jumlah Bahan Rp 74,340.00
Rp 6,750.00
Rp 910.00
Rp 4,400.00
Rp 496.00
Jumlah Upah Rp 12,556.00
pah dan Bahan Rp 86,896.00
Rp -
Rp 15,600.00
Jumlah Bahan Rp 15,600.00
Rp 10,800.00
Rp 7,800.00
Rp 4,400.00
Rp 496.00
Jumlah Upah Rp 23,496.00
pah dan Bahan Rp 39,096.00
+ Profit 10% Rp 43,005.60
Rp -
Rp -
Jumlah Bahan Rp -
Rp 5,400.00
Rp 3,900.00
Rp 2,200.00
Rp 248.00
Jumlah Upah Rp 11,748.00
pah dan Bahan Rp 11,748.00
+ Profit 10% Rp 12,922.80
Rp -
Rp 15,600.00
Jumlah Bahan Rp 15,600.00
Rp 5,400.00
Rp 3,900.00
Rp 2,200.00
Rp 248.00
Jumlah Upah Rp 11,748.00
pah dan Bahan Rp 27,348.00
+ Profit 10% Rp 30,082.80
Rp 117,925.60
Rp 188,255.01
Rp 8,221.50
Jumlah Bahan Rp 314,402.11
Rp 22,545.00
Rp 1,618.50
Rp 9,240.00
Rp 28,557.00
Rp 3,106.20
Jumlah Upah Rp 65,066.70
pah dan Bahan Rp 379,468.81
Rp 129,030.00
Jumlah Bahan Rp 129,030.00
Rp 4,500.00
Rp 650.00
Rp 4,400.00
Rp 496.00
Jumlah Upah Rp 10,046.00
pah dan Bahan Rp 139,076.00
Rp 325,910.00
Rp 117,000.00
Rp 182,700.00
Jumlah Bahan = Rp 625,610.00
Rp 74,250.00
Rp 13,750.00
Rp 1,550.00
Rp 5,200.00
Jumlah Upah = Rp 94,750.00
Jumlah Bahan + Upah = Rp 720,360.00
Rp 14,950.00
Rp 5,850.00
Rp 9,240.00
Jumlah Bahan = Rp 30,040.00
Rp 51,750.00
Rp 1,100.00
Rp 124.00
Rp 390.00
Jumlah Upah = Rp 53,364.00
Rp 482,885.00
Rp 117,000.00
Rp 163,800.00
Jumlah Bahan = Rp 763,685.00
Rp 74,250.00
Rp 13,750.00
Rp 1,550.00
Rp 5,200.00
Jumlah Upah = Rp 94,750.00
Rp 74,750.00
Rp 146,250.00
Rp 84,000.00
Jumlah Bahan = Rp 305,000.00
Rp 74,250.00
Rp 13,750.00
Rp 1,550.00
Rp 5,200.00
Jumlah Upah = Rp 94,750.00
Rp 478,400.00
Rp 117,000.00
Rp 163,800.00
Jumlah Bahan = Rp 759,200.00
Rp 270,000.00
Rp 55,000.00
Rp 6,200.00
Rp 19,500.00
Jumlah Upah = Rp 350,700.00
Rp 589,030.00
Rp 94,500.00
Rp 132,300.00
Jumlah Bahan = Rp 815,830.00
Rp 270,000.00
Rp 55,000.00
Rp 6,200.00
Rp 19,500.00
Jumlah Upah = Rp 350,700.00
Rp 598,000.00
Rp 94,500.00
Rp 132,300.00
Jumlah Bahan = Rp 824,800.00
Rp 270,000.00
Rp 55,000.00
Rp 6,200.00
Rp 19,500.00
Jumlah Upah = Rp 350,700.00
Rp 132,825.00
Rp 2,970.00
Jumlah Bahan = Rp 135,795.00
Rp 3,150.00
Rp 3,850.00
Rp 434.00
Rp 260.00
Jumlah Upah = Rp 7,694.00
Rp 143,489.00
Jumlah Bahan + Upah = Rp 14,348.90
per 1kg = Rp 14,348.90
Rp 132,825.00
Rp 2,970.00
Jumlah Bahan = Rp 135,795.00
Rp 3,150.00
Rp 3,850.00
Rp 434.00
Rp 260.00
Jumlah Upah = Rp 7,694.00
Rp 143,489.00
Jumlah Bahan + Upah = Rp 14,348.90
per 1kg = Rp 14,348.90
Rp 86,000.00
Rp 4,500.00
Rp 900.00
Jumlah Bahan = Rp 91,400.00
Rp 13,500.00
Rp 14,820.00
Rp 1,612.00
Rp 325.00
Jumlah Upah = Rp 30,257.00
Rp 64,500.00
Rp 4,500.00
Rp 900.00
Jumlah Bahan = Rp 69,900.00
Rp 13,500.00
Rp 14,820.00
Rp 1,612.00
Rp 325.00
Jumlah Upah = Rp 30,257.00
Rp 86,000.00
Rp 4,500.00
Rp 900.00
Jumlah Bahan = Rp 91,400.00
Rp 13,500.00
Rp 14,820.00
Rp 1,612.00
Rp 325.00
Jumlah Upah = Rp 30,257.00
Rp -
Rp 6,000.00
Rp 1,800.00
Rp 152,500.00
Rp 44,770.00
Rp 13,000.00
Jumlah Bahan = Rp 218,070.00
Rp 13,500.00
Rp 18,810.00
Rp 2,046.00
Rp 390.00
Jumlah Upah = Rp 34,746.00
Rp -
Rp 6,000.00
Rp 1,800.00
Rp 152,500.00
Rp 43,560.00
Rp 26,000.00
Jumlah Bahan = Rp 229,860.00
Rp 14,400.00
Rp 18,810.00
Rp 2,046.00
Rp 390.00
Jumlah Upah = Rp 35,646.00
Rp 14,400.00
Rp 18,810.00
Rp 2,046.00
Rp 390.00
Jumlah Upah = Rp 35,646.00
Rp 64,500.00
Rp 6,000.00
Rp 1,350.00
Rp 91,500.00
Rp 42,350.00
Rp 26,000.00
Jumlah Bahan = Rp 231,700.00
Rp 14,400.00
Rp 18,810.00
Rp 2,046.00
Rp 390.00
Jumlah Upah = Rp 35,646.00
Rp 1,166,530.00
Rp 1,793,612.50
Rp 256,120.00
Jumlah = Rp 3,216,262.50
Rp 858,435.00
Rp -
Rp 1,793,612.50
Rp 278,073.14
Jumlah = Rp 2,930,120.64
Rp 858,435.00
Rp -
Rp 717,445.00
Rp 69,518.29
Jumlah = Rp 1,645,398.29
Rp 858,435.00
Rp -
Rp 932,678.50
Rp 69,518.29
Jumlah = Rp 1,860,631.79
Rp 858,435.00
Rp 1,793,612.50
Rp 162,209.33
Jumlah = Rp 2,814,256.83
Rp 1,166,530.00
Rp 430,467.00
Rp 1,291,401.00
Rp 400,628.00
Jumlah = Rp 3,289,026.00
Rp 1,166,530.00
Rp 430,467.00
Rp 1,650,123.50
Rp 801,256.00
Jumlah = Rp 4,048,376.50
Rp 858,435.00
Rp 1,578,379.00
Rp -
Rp 500,785.00
Jumlah = Rp 2,937,599.00
Rp 1,166,530.00
Rp 573,956.00
Rp 2,224,079.50
Rp 617,994.67
Jumlah = Rp 4,582,560.17
Rp 1,166,530.00
Rp 573,956.00
Rp 2,152,335.00
Rp 702,266.67
Jumlah = Rp 4,595,087.67
Rp 1,166,530.00
Rp 545,258.20
Rp 1,937,101.50
Rp 842,720.00
Jumlah = Rp 4,491,609.70
Rp 1,166,530.00
Rp 573,956.00
Rp 2,008,846.00
Rp 842,720.00
Jumlah = Rp 4,592,052.00
Rp 858,435.00
Rp 2,008,846.00
Rp -
Rp 500,785.00
Jumlah = Rp 3,368,066.00
Rp 858,435.00
Rp 2,295,824.00
Rp -
Rp 375,588.75
Jumlah = Rp 3,529,847.75
Rp 95,940.00
Rp -
Rp -
Rp 540,207.39
Jumlah = Rp 636,147.39
Rp 115,128.00
Rp -
Rp -
Rp 540,207.39
Jumlah = Rp 655,335.39
Rp 51,168.00
Rp -
Rp -
Rp 258,280.20
Jumlah = Rp 309,448.20
Rp 7,995.00
Rp -
Rp -
Rp 90,685.05
Jumlah = Rp 98,680.05
Rp -
Rp 6,800.00
Rp 4,400.00
Rp 537,222.82
Jumlah = Rp 548,422.82
Rp 858,435.00
Rp 1,793,612.50
Rp -
Rp 445,142.22
Jumlah = Rp 3,097,189.72
+ Profit 10% Rp 3,406,908.69
Rp 1,166,530.00
Rp 544,574.55
Rp 1,746,553.69
Rp 1,106,275.00
Jumlah = Rp 4,563,933.24
Rp 1,166,530.00
Rp 860,934.00
Rp 1,721,868.00
Rp 938,121.20
Jumlah = Rp 4,687,453.20
Rp 1,166,530.00
Rp 860,934.00
Rp 2,008,846.00
Rp 938,121.20
Jumlah = Rp 4,974,431.20
Rp 1,166,530.00
Rp 789,189.50
Rp 1,865,357.00
Rp 1,261,153.50
Jumlah = Rp 5,082,230.00
Rp 1,166,530.00
Rp 502,211.50
Rp 2,224,079.50
Rp 1,239,028.00
Jumlah = Rp 5,131,849.00
Rp 1,166,530.00
Rp 573,956.00
Rp 2,295,824.00
Rp 730,141.50
Jumlah = Rp 4,766,451.50
Rp 1,166,530.00
Rp 860,934.00
Rp 1,865,357.00
Rp 944,021.33
Jumlah = Rp 4,836,842.33
Rp 858,435.00
Rp 717,445.00
Rp 1,004,423.00
Rp 634,264.33
Jumlah = Rp 3,214,567.33
+ Profit 10% Rp 3,536,024.07
Rp 1,166,530.00
Rp 941,988.07
Rp 1,416,523.41
Rp 1,659,412.50
Jumlah = Rp 5,184,453.97
Rp 858,435.00
Rp 2,152,335.00
Rp -
Rp 1,115,189.17
Jumlah = Rp 4,125,959.17
Rp 1,166,530.00
Rp 885,327.13
Rp 2,814,363.60
Jumlah = Rp 4,866,220.73
Rp 858,435.00
Rp 2,726,291.00
Rp -
Rp 567,732.67
Jumlah = Rp 4,152,458.67
Rp 858,435.00
Rp 2,726,291.00
Rp -
Rp 378,488.44
Jumlah = Rp 3,963,214.44
Rp 1,166,530.00
Rp -
Rp 2,224,079.50
Rp 1,327,530.00
Jumlah = Rp 4,718,139.50
Rp 1,166,530.00
Rp 573,956.00
Rp 2,367,568.50
Rp 929,271.00
Jumlah = Rp 5,037,325.50
Rp 1,166,530.00
Rp 573,956.00
Rp 2,582,802.00
Rp 791,412.12
Jumlah = Rp 5,114,700.12
Rp 1,166,530.00
Rp 645,700.50
Rp 2,224,079.50
Rp 991,222.40
Jumlah = Rp 5,027,532.40
Rp 1,166,530.00
Rp 430,467.00
Rp 2,869,780.00
Rp 927,163.81
Jumlah = Rp 5,393,940.81
Rp 858,435.00
Rp 1,865,357.00
Rp -
Rp 1,458,065.33
Jumlah = Rp 4,181,857.33
Rp 858,435.00
Rp 1,062,392.56
Rp 1,284,157.22
Jumlah = Rp 3,204,984.78
Rp 858,435.00
Rp 1,793,612.50
Rp 1,031,650.00
Jumlah = Rp 3,683,697.50
Rp 1,166,530.00
Rp 1,937,101.50
Rp 1,237,980.00
Jumlah = Rp 4,341,611.50
Rp 1,166,530.00
Rp 2,654,546.50
Rp 594,102.22
Jumlah = Rp 4,415,178.72
Rp 858,435.00
Rp 1,291,401.00
Rp 1,509,156.57
Jumlah = Rp 3,658,992.57
Rp 1,166,530.00
Rp 1,793,612.50
Rp 1,650,640.00
Jumlah = Rp 4,610,782.50
Rp 776,920.00
Rp 2,869,780.00
Rp 1,113,941.67
Jumlah = Rp 4,760,641.67
Rp 858,435.00
Rp 2,080,590.50
Rp 515,825.00
Jumlah = Rp 3,454,850.50
Rp 325,910.00
Rp 208,800.00
Rp 117,000.00
Jumlah Bahan Rp 651,710.00
Rp 74,250.00
Rp 5,200.00
Rp 13,750.00
Rp 1,550.00
Jumlah Upah Rp 94,750.00
pah dan Bahan Rp 746,460.00
Rp 294,515.00
Rp 208,800.00
Rp 105,750.00
Jumlah Bahan Rp 609,065.00
Rp 74,250.00
Rp 5,200.00
Rp 13,750.00
Rp 1,550.00
Jumlah Upah Rp 94,750.00
pah dan Bahan Rp 703,815.00
Rp 502,320.00
Rp 194,400.00
Rp 121,500.00
Jumlah Bahan Rp 818,220.00
Rp 74,250.00
Rp 5,200.00
Rp 13,750.00
Rp 1,550.00
Jumlah Upah Rp 94,750.00
pah dan Bahan Rp 912,970.00
Rp 580,060.00
Rp 156,000.00
Rp 146,250.00
Jumlah Bahan Rp 882,310.00
Rp 270,000.00
Rp 65,000.00
Rp 5,500.00
Rp 18,600.00
Jumlah Upah Rp 359,100.00
pah dan Bahan Rp 1,241,410.00
Rp 589,030.00
Rp 156,000.00
Rp 146,250.00
Jumlah Bahan Rp 891,280.00
Rp 270,000.00
Rp 65,000.00
Rp 5,500.00
Rp 18,600.00
Jumlah Upah Rp 359,100.00
pah dan Bahan Rp 1,250,380.00
Rp 598,000.00
Rp 196,800.00
Rp 90,000.00
Jumlah Bahan Rp 884,800.00
Rp 270,000.00
Rp 65,000.00
Rp 5,500.00
Rp 18,600.00
Jumlah Upah Rp 359,100.00
pah dan Bahan Rp 1,243,900.00
Rp 13,282.50
Rp 297.00
Jumlah Bahan Rp 13,579.50
Rp 315.00
Rp 385.00
Rp 43.40
Rp 19.50
Jumlah Upah Rp 762.90
pah dan Bahan Rp 14,342.40
pendekatan
Rp 28,750.00
Rp 2,250.00
Jumlah Bahan Rp 31,000.00
Rp 13,500.00
Rp 14,820.00
Rp 1,612.00
Rp 325.00
Jumlah Upah Rp 30,257.00
pah dan Bahan Rp 61,257.00
Rp 26,000.00
Rp 1,500.00
Jumlah Bahan Rp 27,500.00
Rp 900.00
Rp 3,990.00
Rp 434.00
Rp 65.00
Jumlah Upah Rp 5,389.00
pah dan Bahan Rp 32,889.00
Rp 52,000.00
Rp 1,500.00
Jumlah Bahan Rp 53,500.00
Rp 900.00
Rp 3,990.00
Rp 434.00
Rp 65.00
Jumlah Upah Rp 5,389.00
pah dan Bahan Rp 58,889.00
SNI pendekatan
Rp 1,166,530.00
Rp 2,682,028.80
Rp 544,506.67
1 m3 beton Rp 4,393,065.47
SNI pendekatan
Rp 1,166,530.00
Rp 2,682,028.80
Rp 408,380.00
1 m3 beton Rp 4,256,938.80
Rp 912,970.00
Rp 2,151,360.00
Rp 1,225,140.00
1 m3 beton Rp 4,289,470.00
Rp 1,166,530.00
Rp 2,674,140.48
Rp -
Rp 309,167.25
1 m3 beton Rp 4,149,837.73
Rp 1,166,530.00
Rp 3,212,697.60
Rp 408,380.00
Rp 392,593.33
1 m3 beton Rp 5,180,200.93
Rp 1,166,530.00
Rp 3,011,904.00
Rp 408,380.00
Rp 392,593.33
1 m3 beton Rp 4,979,407.33
Rp 1,250,380.00
Rp 1,434,240.00
Rp 857,598.00
Rp 824,446.00
1 m3 beton Rp 4,366,664.00
Rp 858,435.00
Rp 1,075,680.00
Rp 857,598.00
Rp 206,111.50
1 m3 beton Rp 2,997,824.50
Rp 1,166,530.00
Rp 1,577,664.00
Rp 510,270.81
Rp 490,545.37
1 m3 beton Rp 3,745,010.18
SNI pendekatan
Rp 858,435.00
Rp 1,577,664.00
Rp 255,237.50
1 m3 beton Rp 2,691,336.50
SNI pendekatan
Rp 858,435.00
Rp 1,577,664.00
Rp 382,778.50
Rp 398,170.50
1 m3 beton Rp 3,217,048.00
Rp 912,970.00
Rp 2,661,949.44
Rp 653,408.00
1 m3 beton Rp 4,228,327.44
Rp 912,970.00
Rp 2,093,990.40
Rp 561,522.50
Rp 539,815.83
1 m3 beton Rp 4,108,298.73
Rp 912,970.00
Rp 2,811,110.40
Rp 643,198.50
Rp 539,815.83
1 m3 beton Rp 4,907,094.73
Rp 912,970.00
Rp 2,395,180.80
Rp 643,198.50
Rp 539,815.83
1 m3 beton Rp 4,491,165.13
SNI pendekatan
Rp 858,435.00
Rp 731,462.40
Rp 73,508.40
1 m3 beton Rp 1,663,405.80
SNI pendekatan
Rp 1,166,530.00
Rp 2,151,360.00
Rp 408,380.00
1 m3 beton Rp 3,726,270.00
SNI pendekatan
Rp 1,166,530.00
Rp 2,868,480.00
Rp 204,190.00
1 m3 beton Rp 4,239,200.00
SNI pendekatan
Rp 912,970.00
Rp 2,323,468.80
Rp 272,253.33
1 m3 beton Rp 3,508,692.13
pendekatan
Rp 16,795.35
Rp 7,762.50
Rp 130,812.50
Jumlah Bahan Rp 155,370.35
Rp 2,250.00
Rp 1,300.00
Rp 2,750.00
Rp 5,700.00
Rp 620.00
Jumlah Upah Rp 12,620.00
pah dan Bahan Rp 167,990.35
Rp 75,697.60
Rp 145,225.29
Rp 4,590.00
Jumlah Bahan Rp 225,512.89
Rp 675.00
Rp 390.00
Rp 825.00
Rp 1,710.00
Rp 186.00
Jumlah Upah Rp 3,786.00
pah dan Bahan Rp 229,298.89
Rp 116,160.00
Rp 31,050.00
Rp 2,250.00
Jumlah Bahan Rp 149,460.00
Rp 4,500.00
Rp 325.00
Rp 5,700.00
Rp 620.00
Jumlah Upah Rp 11,145.00
pah dan Bahan Rp 160,605.00
Rp 116,160.00
Rp 1,500.00
Jumlah Bahan Rp 117,660.00
Rp 3,000.00
Rp 216.67
Rp 3,800.00
Rp 413.33
Jumlah Upah Rp 7,430.00
pah dan Bahan Rp 125,090.00
Rp 13,310,000.00
Rp 207,000.00
Rp 2,250.00
Jumlah Bahan Rp 13,519,250.00
Rp 180,000.00
Rp 13,000.00
Rp 684,000.00
Rp 74,400.00
Jumlah Upah Rp 951,400.00
pah dan Bahan Rp 14,470,650.00
Rp 47,250.00
Rp 75,000.00
Rp 4,567.50
Rp 225.00
Jumlah Bahan Rp 127,042.50
Rp 1,800.00
Rp 81.25
Rp 22,800.00
Rp 1,550.00
Jumlah Upah Rp 26,231.25
pah dan Bahan Rp 153,273.75
Rp 45,885.00
Rp 4,567.50
Rp 225.00
Jumlah Bahan Rp 50,677.50
Rp 360.00
Rp 81.25
Rp 4,560.00
Rp 775.00
Jumlah Upah Rp 5,776.25
pah dan Bahan Rp 56,453.75
Rp 31,050.00
Rp 2,250.00
Jumlah Bahan Rp 33,300.00
Rp 4,500.00
Rp 325.00
Rp 5,700.00
Rp 620.00
Jumlah Upah Rp 11,145.00
pah dan Bahan Rp 44,445.00
Rp 54,625.00
Rp 225.00
Jumlah Bahan Rp 54,850.00
Rp 9,000.00
Rp 650.00
Rp 22,800.00
Rp 1,550.00
Jumlah Upah Rp 34,000.00
pah dan Bahan Rp 88,850.00
Rp 90,000.00
Jumlah Bahan Rp 90,000.00
Rp 6,750.00
Rp 520.00
Rp 4,275.00
Rp 465.00
Jumlah Upah Rp 12,010.00
pah dan Bahan Rp 102,010.00
Rp -
Jumlah Bahan Rp -
Rp 8,100.00
Rp 624.00
Rp 5,130.00
Rp 558.00
Jumlah Upah Rp 14,412.00
pah dan Bahan Rp 14,412.00
Rp 37,500.00
Rp 7,475.00
Rp 6,720.00
Jumlah Bahan Rp 51,695.00
Rp 18,000.00
Rp 130.00
Rp 11,400.00
Rp 1,240.00
Jumlah Upah Rp 30,770.00
pah dan Bahan Rp 82,465.00
Rp 115,000.00
Rp 5,000.00
Jumlah Bahan Rp 120,000.00
Rp 9,000.00
Rp 130.00
Rp 8,550.00
Rp 1,240.00
Jumlah Upah Rp 18,920.00
pah dan Bahan Rp 138,920.00
Rp 51,136.36
Rp 2,500.00
Jumlah Bahan Rp 53,636.36
Rp 9,000.00
Rp 130.00
Rp 5,700.00
Rp 620.00
Jumlah Upah Rp 15,450.00
pah dan Bahan Rp 69,086.36
Rp 13,310,000.00
Rp 33,000.00
Jumlah Bahan Rp 13,343,000.00
Rp 330,600.00
Rp 35,960.00
Rp 87,300.00
Rp 6,305.00
Jumlah Upah Rp 460,165.00
pah dan Bahan Rp 13,803,165.00
Rp 28,437.50
Rp 36,750.00
Rp 3,750.00
Jumlah Bahan Rp 68,937.50
Rp 3,600.00
Rp 325.00
Rp 5,187.00
Rp 620.00
Jumlah Upah Rp 9,732.00
pah dan Bahan Rp 78,669.50
Rp 73,200.00
Rp 1,500.00
Jumlah Bahan Rp 74,700.00
Rp 6,750.00
Rp 4,875.00
Rp 14,250.00
Rp 1,550.00
Jumlah Upah Rp 27,425.00
pah dan Bahan Rp 102,125.00
Rp 22,000.00
Rp 150.00
Jumlah Bahan Rp 22,150.00
Rp 1,350.00
Rp 97.50
Rp 3,990.00
Rp 434.00
Jumlah Upah Rp 5,871.50
pah dan Bahan Rp 28,021.50
Rp 22,000.00
Rp 300.00
Rp 22,856.25
Rp 750.00
Rp 580.00
Rp 3,741.72
Rp 960.00
Rp 400.00
Jumlah Bahan Rp 51,587.97
Rp 25,650.00
Rp 3,348.00
Rp 20,250.00
Rp 1,625.00
Jumlah Upah Rp 50,873.00
pah dan Bahan Rp 102,460.97
Rp 28,000.00
Rp 300.00
Rp 22,856.25
Rp 750.00
Rp 580.00
Rp 3,741.72
Rp 960.00
Rp 400.00
Jumlah Bahan Rp 57,587.97
Rp 25,650.00
Rp 3,348.00
Rp 20,250.00
Rp 1,625.00
Jumlah Upah Rp 50,873.00
pah dan Bahan Rp 108,460.97
Rp 22,000.00
Rp 300.00
Rp 22,856.25
Rp 750.00
Rp 580.00
Rp -
Rp 960.00
Rp 400.00
Jumlah Bahan Rp 47,846.25
Rp 25,650.00
Rp 3,348.00
Rp 20,250.00
Rp 1,625.00
Jumlah Upah Rp 50,873.00
pah dan Bahan Rp 98,719.25
Rp 22,000.00
Rp 300.00
Rp 20,625.00
Rp 750.00
Rp 580.00
Rp 3,741.72
Rp 960.00
Rp 400.00
Jumlah Bahan Rp 49,356.72
Rp 26,220.00
Rp 3,410.00
Rp 20,700.00
Rp 1,690.00
Jumlah Upah Rp 52,020.00
pah dan Bahan Rp 101,376.72
Rp 450.00
Rp 15,093.75
Jumlah Bahan Rp 15,543.75
Rp 2,700.00
Rp 195.00
Rp 3,420.00
Rp 372.00
Jumlah Upah Rp 6,687.00
pah dan Bahan Rp 22,230.75
Rp 16,500.00
Rp 150.00
Jumlah Bahan Rp 16,650.00
Rp 2,250.00
Rp 195.00
Rp 2,850.00
Rp 310.00
Jumlah Upah Rp 5,605.00
pah dan Bahan Rp 22,255.00
Rp 90,750.00
Rp 750.00
Jumlah Bahan Rp 91,500.00
Rp 4,500.00
Rp 325.00
Rp 11,400.00
Rp 1,240.00
Jumlah Upah Rp 17,465.00
pah dan Bahan Rp 108,965.00
Rp 117,390.00
Rp 42,013.89
Rp 98,958.33
Rp 3,018.75
Rp 2,475.00
Rp 3,000.00
Jumlah Bahan Rp 266,855.97
Rp 27,000.00
Rp 3,900.00
Rp 34,200.00
Rp 3,720.00
Jumlah Upah Rp 68,820.00
pah dan Bahan Rp 335,675.97
Err:509
dibulatkan Err:509
Rp 144,690.00
Rp 42,013.89
Rp 98,958.33
Rp 3,018.75
Rp 2,475.00
Rp 3,000.00
Jumlah Bahan Rp 294,155.97
Rp 27,000.00
Rp 3,900.00
Rp 34,200.00
Rp 3,720.00
Jumlah Upah Rp 68,820.00
pah dan Bahan Rp 362,975.97
Err:509
dibulatkan Err:509
Rp 96,800.00
Rp 750.00
Jumlah Bahan Rp 97,550.00
Rp 4,500.00
Rp 325.00
Rp 11,400.00
Rp 1,240.00
Jumlah Upah Rp 17,465.00
pah dan Bahan Rp 115,015.00
Rp 72,600.00
Rp 750.00
Jumlah Bahan Rp 73,350.00
Rp 4,500.00
Rp 325.00
Rp 11,400.00
Rp 1,240.00
Jumlah Upah Rp 17,465.00
pah dan Bahan Rp 90,815.00
Rp 84,000.00
Rp 300.00
Jumlah Bahan Rp 84,300.00
Rp 1,260.00
Rp 91.00
Rp 4,560.00
Rp 496.00
Jumlah Upah Rp 6,407.00
pah dan Bahan Rp 90,707.00
Rp 14,076.00
Rp 609.00
Jumlah Bahan Rp 14,685.00
Rp 2,700.00
Rp 3,420.00
Rp 372.00
Rp 195.00
Jumlah Upah Rp 6,687.00
pah dan Bahan Rp 21,372.00
Rp 13,800.00
Rp 609.00
Jumlah Bahan Rp 14,409.00
Rp 2,700.00
Rp 3,420.00
Rp 372.00
Rp 195.00
Jumlah Upah Rp 6,687.00
pah dan Bahan Rp 21,096.00
Rp 14,145.00
Rp 609.00
Jumlah Bahan Rp 14,754.00
Rp 2,475.00
Rp 3,135.00
Rp 341.00
Rp 175.50
Jumlah Upah Rp 6,126.50
pah dan Bahan Rp 20,880.50
Rp 15,180.00
Jumlah Bahan Rp 15,180.00
Rp 2,250.00
Rp 2,850.00
Rp 310.00
Rp 162.50
Jumlah Upah Rp 5,572.50
pah dan Bahan Rp 20,752.50
Rp 13,915.00
Rp 609.00
Jumlah Bahan Rp 14,524.00
Rp 2,700.00
Rp 3,420.00
Rp 372.00
Rp 195.00
Jumlah Upah Rp 6,687.00
pah dan Bahan Rp 21,211.00
Rp 14,490.00
Rp 609.00
Jumlah Bahan Rp 15,099.00
Rp 2,700.00
Rp 3,420.00
Rp 372.00
Rp 195.00
Jumlah Upah Rp 6,687.00
pah dan Bahan Rp 21,786.00
Rp 13,915.00
Rp 609.00
Jumlah Bahan Rp 14,524.00
Rp 2,700.00
Rp 3,420.00
Rp 372.00
Rp 195.00
Jumlah Upah Rp 6,687.00
pah dan Bahan Rp 21,211.00
Rp 66,000.00
Jumlah Bahan Rp 66,000.00
Rp 5,700.00
Rp 620.00
Rp 4,500.00
Rp 65.00
Jumlah Upah Rp 10,885.00
pah dan Bahan Rp 76,885.00
Rp 6,840.00
Rp 744.00
Rp 5,400.00
Rp 78.00
Jumlah Upah Rp 13,062.00
pah dan Bahan Rp 13,062.00
Rp 41,000.00
Jumlah Bahan Rp 41,000.00
Rp 2,850.00
Rp 310.00
Rp 1,800.00
Rp 162.50
Jumlah Upah Rp 5,122.50
pah dan Bahan Rp 46,122.50
Rp 110,000.00
Jumlah Bahan Rp 110,000.00
Rp 9,120.00
Rp 992.00
Rp 7,200.00
Rp 520.00
Jumlah Upah Rp 17,832.00
pah dan Bahan Rp 127,832.00
Rp 12,825.00
Rp 1,395.00
Rp 1,012.50
Rp 73.13
Jumlah Upah Rp 15,305.63
pah dan Bahan Rp 15,305.63
Rp 308,000.00
Jumlah Bahan Rp 308,000.00
Rp 9,120.00
Rp 992.00
Rp 7,200.00
Rp 520.00
Jumlah Upah Rp 17,832.00
pah dan Bahan Rp 325,832.00
Rp 176,000.00
Jumlah Bahan Rp 176,000.00
Rp 8,550.00
Rp 930.00
Rp 675.00
Rp 48.75
Jumlah Upah Rp 10,203.75
pah dan Bahan Rp 186,203.75
Rp 363,000.00
Jumlah Bahan Rp 363,000.00
Rp 9,120.00
Rp 992.00
Rp 7,200.00
Rp 520.00
Jumlah Upah Rp 17,832.00
pah dan Bahan Rp 380,832.00
Rp 60,000.00
Rp 88,200.00
Jumlah Bahan Rp 148,200.00
Rp 8,550.00
Rp 930.00
Rp 675.00
Rp 48.75
Jumlah Upah Rp 10,203.75
pah dan Bahan Rp 158,403.75
Rp 13,680.00
Rp 1,488.00
Rp 1,080.00
Rp 78.00
Jumlah Upah Rp 16,326.00
pah dan Bahan Rp 16,326.00
Rp 396,750.00
Jumlah Bahan Rp 396,750.00
Rp 25,650.00
Rp 2,790.00
Rp 2,025.00
Rp 146.25
Jumlah Upah Rp 30,611.25
pah dan Bahan Rp 427,361.25
Rp 750,000.00
Jumlah Bahan Rp 750,000.00
Rp 59,850.00
Rp 4,650.00
Rp 3,375.00
Rp 243.75
Jumlah Upah Rp 68,118.75
pah dan Bahan Rp 818,118.75
Rp 137,500.00
Rp 137,500.00
Jumlah Bahan Rp 275,000.00
Rp 14,250.00
Rp 1,550.00
Rp 1,125.00
Rp 65.00
Jumlah Upah Rp 16,990.00
pah dan Bahan Rp 291,990.00
Rp 115,500.00
Jumlah Bahan Rp 115,500.00
Rp 8,550.00
Rp 930.00
Rp 675.00
Rp 48.75
Jumlah Upah Rp 10,203.75
pah dan Bahan Rp 125,703.75
Rp 165,000.00
Jumlah Bahan Rp 165,000.00
Rp 17,100.00
Rp 1,860.00
Rp 1,350.00
Rp 130.00
Jumlah Upah Rp 20,440.00
pah dan Bahan Rp 185,440.00
Rp 50,000.00
Rp 8,050.00
Jumlah Bahan Rp 58,050.00
Rp 6,840.00
Rp 620.00
Rp 450.00
Rp 65.00
Jumlah Upah Rp 7,975.00
pah dan Bahan Rp 66,025.00
Rp 200.00
Rp 400.00
Rp 218.50
Rp 1,012.00
Rp 20,500.00
Jumlah Bahan Rp 22,330.50
Rp 5,400.00
Rp 390.00
Rp 6,840.00
Rp 744.00
Jumlah Upah Rp 13,374.00
pah dan Bahan Rp 35,704.50
Rp 234,600.00
Rp 44,270.83
Rp 27,777.78
Rp 6,187.50
Rp 9,549.50
Rp 2,250.00
Jumlah Bahan Rp 324,635.61
Rp 27,000.00
Rp 3,900.00
Rp 34,200.00
Rp 3,720.00
Jumlah Upah Rp 68,820.00
pah dan Bahan Rp 393,455.61
Err:509
dibulatkan Err:509
Rp 24,750.00
Rp 750.00
Jumlah Bahan Rp 25,500.00
Rp 4,500.00
Rp 325.00
Rp 11,400.00
Rp 1,240.00
Jumlah Upah Rp 17,465.00
pah dan Bahan Rp 42,965.00
Rp 33,600.00
Rp 58,604.00
Rp 1,500.00
Rp 1,160.00
Rp 800.00
Rp 450.00
Rp 1,920.00
Jumlah Bahan Rp 98,034.00
Rp 38,500.00
Rp 4,960.00
Rp 33,750.00
Rp 3,575.00
Jumlah Upah Rp 80,785.00
pah dan Bahan Rp 178,819.00
#REF!
Rp 300.00
Rp 300,000.00
Jumlah Bahan #REF!
Err:509
Err:509
Rp 22,800.00
Rp 3,100.00
Rp 18,000.00
Rp 1,300.00
Jumlah Upah Err:509
pah dan Bahan Err:509
SNI 2-6.1
Rp 138,000.00
Rp 35,416.67
Rp 22,222.22
Rp 3,093.75
Rp 7,185.20
Rp 1,125.00
Jumlah Bahan Rp 207,042.84
Rp 22,500.00
Rp 3,250.00
Rp 28,500.00
Rp 3,100.00
Jumlah Upah Rp 57,350.00
pah dan Bahan Rp 264,392.84
Rp 264,392.84 Rp 1,586,357.03
Rp 264,392.84 Rp 1,335,183.84
SNI 2-6.1
Rp 92,000.00
Rp 17,708.33
Rp 11,111.11
Rp 1,546.88
Rp 7,185.20
Rp 1,125.00
Jumlah Bahan Rp 130,676.52
Rp 22,500.00
Rp 3,250.00
Rp 28,500.00
Rp 3,100.00
Jumlah Upah Rp 57,350.00
pah dan Bahan Rp 188,026.52
Rp 188,026.52 Rp 1,128,159.12
Rp 625,866.50
Rp 1,754,025.62
Rp 348,000.00
Rp 425,000.00
Jumlah Bahan Rp 773,000.00
Rp 110,000.00
Rp 12,400.00
Rp 45,000.00
Rp 3,250.00
Jumlah Upah Rp 170,650.00
pah dan Bahan Rp 943,650.00
SNI 2-6.1
Err:509
Rp 79,062.50
Rp 725,000.00
Rp 50,000.00
Rp 8,500.00
Rp 20,700.00
Jumlah Bahan Err:509
Rp 3,858.60
Rp 109,556.40
Rp 100,000.00
Rp 135,000.00
Rp 65,000.00
Rp 49,500.00
Rp 110,000.00
Rp 68,400.00
Rp 31,000.00
Jumlah Upah Rp 672,315.00
pah dan Bahan Err:509
Err:509
SNI 2-6.1
Rp 138,000.00
Rp 216,311.11
Rp 402,777.78
Jumlah Bahan Rp 757,088.89
Rp 90,000.00
Rp 97,500.00
Rp 228,000.00
Rp 93,000.00
Jumlah Upah Rp 508,500.00
pah dan Bahan Rp 1,265,588.89
Rp 1,265,588.89 Rp 7,593,533.33
Rp 1,265,588.89 Rp 6,391,223.89
Rp 445,933.00
Rp 151,751.06
Rp 312,822.30
Jumlah Bahan Rp 910,506.36
Rp 200,750.00
Rp 22,630.00
Rp 97,200.00
Rp 23,725.00
Jumlah Upah Rp 344,305.00
pah dan Bahan Rp 1,254,811.36
Rp 76,885.00
Rp 285,000.00
Rp 260,685.25
Jumlah Bahan Rp 622,570.25
Rp 143,000.00
Rp 16,120.00
Rp 47,700.00
Rp 3,900.00
Jumlah Upah Rp 210,720.00
pah dan Bahan Rp 833,290.25
Rp 430,556.00
Rp 140,855.10
Rp 273,719.51
Jumlah Bahan Rp 845,130.62
Rp 200,750.00
Rp 22,630.00
Rp 97,200.00
Rp 23,725.00
Jumlah Upah Rp 344,305.00
pah dan Bahan Rp 1,189,435.62
Rp 430,556.00
Rp 140,855.10
Rp 559,823.04
Jumlah Bahan Rp 1,131,234.14
Rp 200,750.00
Rp 22,630.00
Rp 97,200.00
Rp 23,725.00
Jumlah Upah Rp 344,305.00
pah dan Bahan Rp 1,475,539.14
Rp 399,802.00
Rp 116,776.02
Rp 184,078.08
Jumlah Bahan Rp 700,656.10
Rp 181,500.00
Rp 20,460.00
Rp 85,500.00
Rp 21,450.00
Jumlah Upah Rp 308,910.00
pah dan Bahan Rp 1,009,566.10
Rp 369,048.00
Rp 106,534.59
Rp 163,624.96
Jumlah Bahan Rp 639,207.55
Rp 176,000.00
Rp 19,840.00
Rp 81,000.00
Rp 20,800.00
Jumlah Upah Rp 297,640.00
pah dan Bahan Rp 936,847.55
Rp 307,540.00
Rp 86,051.74
Rp 122,718.72
Jumlah Bahan Rp 516,310.46
Rp 165,000.00
Rp 18,600.00
Rp 76,500.00
Rp 19,500.00
Jumlah Upah Rp 279,600.00
pah dan Bahan Rp 795,910.46
Rp 215,278.00
Rp 55,327.47
Rp 61,359.36
Jumlah Bahan Rp 331,964.83
Rp 154,000.00
Rp 17,360.00
Rp 72,000.00
Rp 18,200.00
Jumlah Upah Rp 261,560.00
pah dan Bahan Rp 593,524.83
Rp 299,851.50
Rp 94,231.79
Rp 171,307.45
Jumlah Bahan Rp 565,390.74
Rp 165,000.00
Rp 18,600.00
Rp 90,000.00
Rp 19,500.00
Jumlah Upah Rp 293,100.00
pah dan Bahan Rp 858,490.74
Rp 261,409.00
Rp 86,543.29
Rp 171,307.45
Jumlah Bahan Rp 519,259.74
Rp 165,000.00
Rp 18,600.00
Rp 90,000.00
Rp 19,500.00
Jumlah Upah Rp 293,100.00
pah dan Bahan Rp 812,359.74
Rp 123,016.00
Rp 372,407.50
Jumlah Bahan Rp 495,423.50
Rp 214,500.00
Rp 24,180.00
Rp 71,550.00
Rp 5,850.00
Jumlah Upah Rp 316,080.00
pah dan Bahan Rp 811,503.50
Rp 610,000.00
Rp 223,444.50
Jumlah Bahan Rp 833,444.50
Rp 143,000.00
Rp 16,120.00
Rp 47,700.00
Rp 3,900.00
Jumlah Upah Rp 210,720.00
pah dan Bahan Rp 1,044,164.50
Rp 76,885.00
Rp 327,600.00
Jumlah Bahan Rp 404,485.00
Rp 143,000.00
Rp 16,120.00
Rp 47,700.00
Rp 3,900.00
Jumlah Upah Rp 210,720.00
pah dan Bahan Rp 615,205.00
Rp 600,000.00
Rp 186,203.75
Jumlah Bahan Rp 786,203.75
Rp 143,000.00
Rp 16,120.00
Rp 47,700.00
Rp 3,900.00
Jumlah Upah Rp 210,720.00
pah dan Bahan Rp 996,923.75
Rp 184,524.00
Rp 45,086.05
Rp 40,906.24
Jumlah Bahan Rp 270,516.29
Rp 101,750.00
Rp 6,200.00
Rp 81,000.00
Rp 5,525.00
Jumlah Upah Rp 194,475.00
pah dan Bahan Rp 464,991.29
Rp 169,147.00
Rp 40,987.99
Rp 35,792.96
Jumlah Bahan Rp 245,927.95
Rp 100,100.00
Rp 5,580.00
Rp 76,500.00
Rp 5,525.00
Jumlah Upah Rp 187,705.00
pah dan Bahan Rp 433,632.95
Rp 153,770.00
Rp 36,889.94
Rp 30,679.68
Jumlah Bahan Rp 221,339.62
Rp 99,000.00
Rp 4,960.00
Rp 67,500.00
Rp 5,525.00
Jumlah Upah Rp 176,985.00
pah dan Bahan Rp 398,324.62
Err:509
Err:509
Jumlah Bahan Err:509
Rp 66,550.00
Rp 16,120.00
Rp 22,500.00
Rp 3,900.00
Jumlah Upah Rp 109,070.00
pah dan Bahan Err:509
1 unit
Rp 1,374,439.50
Rp 100,000.00
Rp 1,875,000.00
Jumlah Bahan Rp 3,349,439.50
Rp 110,000.00
Rp 18,600.00
Rp 49,500.00
Rp 5,200.00
Jumlah Upah Rp 183,300.00
pah dan Bahan Rp 3,532,739.50
#REF!
#REF!
#REF!
Jumlah Bahan #REF!
#REF!
#REF!
#REF!
#REF!
Jumlah Bahan #REF!
#REF!
#REF!
#REF!
#REF!
Jumlah Bahan #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Jumlah Bahan #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Jumlah Bahan #REF!
#REF!
Rp 7,593,533.33
Rp 263,977.88
#REF!
Rp 2,012,871.49
Jumlah Bahan #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Jumlah Bahan #REF!
#REF!
#REF!
#REF!
Jumlah Bahan #REF!
#REF!
Rp 299,851.50
Rp 812,359.74
Jumlah Bahan Rp 1,112,211.24
Rp 1,112,211.24
#REF!
#REF!
#REF!
#REF!
Jumlah Bahan #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Jumlah Bahan #REF!
#REF!
#REF!
#REF!
Jumlah Bahan #REF!
#REF!
#REF!
#REF!
Jumlah Bahan #REF!
#REF!
#REF!
#REF!
Jumlah Bahan #REF!
#REF!
#REF!
#REF!
Jumlah Bahan #REF!
#REF!
#REF!
#REF!
Jumlah Bahan #REF!
#REF!
SNI 2-6.1
Rp 919.54
Rp 1,758.62
Rp 5,948.28
Jumlah Bahan Rp 8,626.44
Rp 14,482.76
Rp 5,229.89
Rp 3,793.10
Rp 18,344.83
Rp 4,988.51
Jumlah Upah Rp 46,839.08
pah dan Bahan Rp 55,465.52
Rp 17,480.00
Rp 1,100.00
Jumlah Bahan Rp 18,580.00
Rp 2,250.00
Rp 325.00
Rp 2,850.00
Rp 310.00
Jumlah Upah Rp 5,735.00
pah dan Bahan Rp 24,315.00
Rp 47,450.00
Rp 996.00
Jumlah Bahan Rp 48,446.00
Rp 5,400.00
Rp 390.00
Rp 3,420.00
Rp 372.00
Jumlah Upah Rp 9,582.00
pah dan Bahan Rp 58,028.00
Rp 3,000.00
Rp 7,800.00
Rp 2,700.00
Jumlah Upah Rp 13,500.00
Rp 3,465.00
Rp 390.60
Rp 900.00
Rp 162.50
Jumlah Upah Rp 4,918.10
pah dan Bahan Rp 18,418.10
+ Profit 10% Rp 20,259.91
Rp 10,000.00
Rp 26,000.00
Rp 2,700.00
Jumlah Upah Rp 38,700.00
Rp 2,310.00
Rp 260.40
Rp 1,260.00
Rp 162.50
Jumlah Upah Rp 3,992.90
pah dan Bahan Rp 42,692.90
Rp 7,400.00
Rp 19,240.00
Jumlah Upah Rp 26,640.00
Rp 2,310.00
Rp 260.40
Rp 1,260.00
Rp 162.50
Jumlah Upah Rp 3,992.90
pah dan Bahan Rp 30,632.90
Rp 3,600.00
Rp 5,400.00
Jumlah Upah Rp 9,000.00
Rp 3,465.00
Rp 390.60
Rp 900.00
Rp 162.50
Jumlah Upah Rp 4,918.10
pah dan Bahan Rp 13,918.10
Rp 5,600.00
Rp 22,252.50
Rp 3,277.50
Jumlah Bahan Rp 31,130.00
Rp 3,150.00
Rp 162.50
Rp 495.00
Rp 372.00
Jumlah Upah Rp 4,179.50
pah dan Bahan Rp 35,309.50
Rp 9,031.25
Rp 983.25
Rp 400.00
Jumlah Bahan Rp 10,414.50
Rp 4,725.00
Rp 243.75
Rp 742.50
Rp 558.00
Jumlah Upah Rp 6,269.25
pah dan Bahan Rp 16,683.75
Rp 25,950.00
Rp 7,568.75
Jumlah Bahan Rp 33,518.75
Rp 2,430.00
Rp 175.50
Rp 5,130.00
Rp 558.00
Jumlah Upah Rp 8,293.50
pah dan Bahan Rp 41,812.25
Rp 21,625.00
Jumlah Bahan Rp 21,625.00
Rp 450.00
Rp 65.00
Rp 570.00
Rp 62.00
Jumlah Upah Rp 1,147.00
pah dan Bahan Rp 22,772.00
+ Profit 10% Rp 25,049.20
Rp 84,510.00
Rp 2,511.25
Jumlah Bahan Rp 87,021.25
Rp 3,645.00
Rp 266.50
Rp 7,695.00
Rp 8,370.00
Jumlah Upah Rp 19,976.50
pah dan Bahan Rp 106,997.75
Rp 51,030.00
Rp 2,511.25
Jumlah Bahan Rp 53,541.25
Rp 3,645.00
Rp 266.50
Rp 7,695.00
Rp 837.00
Jumlah Upah Rp 12,443.50
pah dan Bahan Rp 65,984.75
Rp 185,384.89
Rp 250,000.00
Rp 210,000.00
Rp 24,360.00
Rp 49,162.50
Rp 900,000.00
Jumlah Bahan Rp 1,618,907.39
Rp 180,000.00
Rp 65,000.00
Rp 228,000.00
Rp 124,000.00
Jumlah Upah Rp 597,000.00
pah dan Bahan Rp 2,215,907.39
Rp 8,610.00
Rp 2,511.25
Jumlah Bahan Rp 11,121.25
Rp 1,620.00
Rp 117.00
Rp 342.00
Rp 372.00
Jumlah Upah Rp 2,451.00
pah dan Bahan Rp 13,572.25
Rp 11,760.00
Rp 3,430.00
Jumlah Bahan Rp 15,190.00
Rp 1,620.00
Rp 117.00
Rp 3,420.00
Rp 372.00
Jumlah Upah Rp 5,529.00
pah dan Bahan Rp 20,719.00
Rp 35,700.00
Jumlah Bahan Rp 35,700.00
Rp 11,000.00
Rp 930.00
Rp 900.00
Rp 260.00
Jumlah Upah Rp 13,090.00
pah dan Bahan Rp 48,790.00
Rp 2,460,000.00
Rp 147,600.00
Jumlah Bahan Rp 2,607,600.00
Rp 60,500.00
Rp 62.00
Rp 148,500.00
Rp 10,400.00
Jumlah Upah Rp 219,462.00
pah dan Bahan Rp 2,827,062.00
Rp 47,040.00
Rp 179,400.00
Rp 63,000.00
Rp 182,400.00
Rp 51,000.00
Jumlah Bahan Rp 522,840.00
Rp 330,000.00
Rp 18,600.00
Rp 135,000.00
Rp 19,500.00
Jumlah Upah Rp 503,100.00
pah dan Bahan Rp 1,025,940.00
Rp 23,520.00
Rp 89,700.00
Rp 31,500.00
Rp 54,096.00
Rp 25,500.00
Jumlah Bahan Rp 224,316.00
Rp 165,000.00
Rp 9,300.00
Rp 67,500.00
Rp 9,750.00
Jumlah Upah Rp 251,550.00
pah dan Bahan Rp 475,866.00
Rp 1,800,000.00
Rp 8,625.00
Rp 142.50
Rp 8,970.00
Rp 24,600.00
Jumlah Bahan Rp 1,842,337.50
Rp 55,000.00
Rp 6,200.00
Rp 45,000.00
Rp 6,500.00
Jumlah Upah Rp 112,700.00
pah dan Bahan Rp 1,955,037.50
Rp 459,000.00
Rp 8,970.00
Rp 24,600.00
Jumlah Bahan Rp 492,570.00
Rp 82,500.00
Rp 9,300.00
Rp 45,000.00
Rp 10,400.00
Jumlah Upah Rp 147,200.00
pah dan Bahan Rp 639,770.00
Rp 400,000.00
Rp 150,000.00
Rp 8,625.00
Rp 142.50
Rp 8,970.00
Rp 24,600.00
Jumlah Bahan Rp 592,337.50
Rp 79,750.00
Rp 9,300.00
Rp 54,000.00
Rp 6,500.00
Jumlah Upah Rp 149,550.00
pah dan Bahan Rp 741,887.50
Rp 77,259.15
Rp 230,264.28
Rp 129,140.10
Rp 52,405.50
Rp 17,000.00
Jumlah Bahan Rp 506,069.03
Rp 165,000.00
Rp 18,600.00
Rp 157,500.00
Rp 22,750.00
Jumlah Upah Rp 363,850.00
pah dan Bahan Rp 869,919.03
Rp 83,091.06
Rp 72,752.01
Rp 112,700.00
Rp 17,000.00
Jumlah Bahan Rp 285,543.07
Rp 110,000.00
Rp 12,400.00
Rp 45,000.00
Rp 6,500.00
Jumlah Upah Rp 173,900.00
pah dan Bahan Rp 459,443.07
Rp 166,182.12
Rp 129,336.91
Rp 33,750.00
Jumlah Bahan Rp 329,269.03
Rp 110,000.00
Rp 12,400.00
Rp 45,000.00
Rp 6,500.00
Jumlah Upah Rp 173,900.00
pah dan Bahan Rp 503,169.03
Rp 28,000.00
Rp 431.25
Jumlah Bahan Rp 28,431.25
Rp 5,500.00
Rp 620.00
Rp 450.00
Rp 325.00
Jumlah Upah Rp 6,895.00
pah dan Bahan Rp 35,326.25
Rp 55,000.00
Jumlah Bahan Rp 55,000.00
Rp 5,500.00
Rp 620.00
Rp 450.00
Rp 325.00
Jumlah Upah Rp 6,895.00
pah dan Bahan Rp 61,895.00
Rp 26,013.00
Rp 44,882.20
Rp 18,000.00
Rp 78,039.00
Rp 104,052.00
Rp 65,032.50
Rp 24,712.35
Rp 96,000.00
Rp 82,425.00
Rp 30,000.00
Rp 6,090.00
Jumlah Bahan Rp 575,246.05
Rp 18,000.00
Rp 2,600.00
Rp 2,750.00
Rp 3,420.00
Rp 37,050.00
Rp 3,100.00
Jumlah Upah Rp 66,920.00
pah dan Bahan Rp 642,166.05
Rp 32,250.00
Rp 790.60
Rp 11,700.00
Rp 520.00
Rp 660.00
Rp -
Jumlah Upah Rp 12,880.00
pah dan Bahan Rp 45,920.60
Rp 15,750.00
Rp 790.60
Rp 10,350.00
Rp 520.00
Rp 600.00
Rp -
Jumlah Upah Rp 11,470.00
pah dan Bahan Rp 28,010.60
Rp 11,500.00
Rp 7,200.00
Rp 5,200.00
Rp 2,700.00
Rp 787.50
Rp 73,625.00
Rp 7,500.00
Rp 60,000.00
Rp 2,950.00
Rp 600.00
Rp 750.00
Jumlah Alat Rp 4,300.00
Rp 13,500.00
Rp 2,600.00
Rp 1,200.00
Rp 1,100.00
Jumlah Upah Rp 18,400.00
pah dan Bahan Rp 191,212.50
Rp 5,720.00
Rp 3,240.00
Rp 6,750.00
Rp 50,000.00
Rp 7,500.00
Rp 24,000.00
Rp 4,425.00
Rp 600.00
Rp 952.50
Jumlah Alat Rp 5,977.50
Rp 15,750.00
Rp 2,925.00
Rp 1,500.00
Rp 1,100.00
Jumlah Upah Rp 21,275.00
pah dan Bahan Rp 124,462.50
Rp 1,428.00
Rp 2,184.00
Rp 2,833.33
Jumlah Alat Rp 6,445.33
Rp 648.00
Rp 156.00
Rp 235.20
Rp 785.40
Jumlah Upah Rp 1,824.60
pah dan Bahan Rp 8,269.93
Rp 11,200.00
Rp 12,750.00
Jumlah Alat Rp 23,950.00
Rp 990.00
Rp 260.00
Rp 180.00
Rp 1,155.00
Jumlah Upah Rp 2,585.00
pah dan Bahan Rp 26,535.00
Jumlah
( Rp.)
2,592,000.00
660,000.00
1,966,450.00
0.00
3,571,425.00
0.00
0.00
0.00
0.00
0.00
19,048,000.00
26,875,000.00
38,000,000.00
0.00
0.00
92,712,875.00
92,712,875.00
9,271.29
9,270.00
K 341
Jumlah
( Rp.)
79,200.00
852.50
1,100.00
375.00
3,000.00
25,000.00
109,527.50
109,527.50
1,095.28
1,100.00
Jumlah
( Rp.)
414.00
110.00
250.00
0.00
75.00
0.00
15,000.00
1,500.00
0.00
0.00
3,102.00
2,002.00
1,180.00
0.00
23,633.00
23,633.00
23,630.00
Jumlah
( Rp.)
414.00
110.00
300.00
0.00
100.00
0.00
32,400.00
1,500.00
0.00
0.00
0.00
3,102.00
2,497.00
1,475.00
0.00
41,898.00
41,898.00
41,898.00
Jumlah
( Rp.)
1,800.00
275.00
2,500.00
500.00
1,250.00
0.00
72,000.00
1,500.00
0.00
0.00
0.00
3,008.00
1,589.00
1,475.00
0.00
85,897.00
85,897.00
85,897.00
ur (bahan sirtu)
K 225
Jumlah
( Rp.)
12,006.00
5,000.00
1,842.50
72,000.00
210.00
0.00
0.00
0.00
8,000.00
0.00
99,058.50
99,058.50
99,059.00
Jumlah
( Rp.)
5,400.00
275.00
0.00
0.00
0.00
0.00
48,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
53,675.00
53,675.00
53,680.00
K 408'
Jumlah
( Rp.)
900.00
357.50
300.00
0.00
0.00
0.00
1,200.00
2,916.67
1,120.00
500.00
7,294.17
7,294.17
7,290.00
Jumlah
( Rp.)
396.00
110.00
150.00
0.00
525.00
0.00
750.00
0.00
0.00
0.00
0.00
3,784.00
5,677.20
0.00
0.00
11,392.20
11,392.20
11,390.00
Jumlah
( Rp.)
576.00
165.00
200.00
0.00
525.00
0.00
750.00
0.00
0.00
5,418.00
5,700.00
13,334.00
13,334.00
13,330.00
an Buangan
Jumlah
( Rp.)
702.00
220.00
250.00
0.00
525.00
0.00
750.00
0.00
6,776.80
8,907.20
18,131.00
18,131.00
18,130.00
ras / berbatu
Jumlah
( Rp.)
720.00
220.00
300.00
0.00
900.00
0.00
750.00
0.00
7,224.00
9,500.00
19,614.00
19,614.00
19,610.00
ng setempat ( manual )
K 224
Jumlah
( Rp.)
13,500.00
0.00
687.50
720.00
0.00
14,907.50
14,907.50
14,910.00
Jumlah
( Rp.)
9,216.00
6,400.00
1,512.50
1,200.00
0.00
12,768.00
20,736.00
29,029.00
80,861.50
80,861.50
80,860.00
Jumlah
( Rp.)
6,912.00
4,800.00
1,210.00
950.00
950.00
10,214.40
14,745.00
23,226.00
63,007.40
63,007.40
63,010.00
Jumlah
( Rp.)
558.00
137.50
500.00
0.00
375.00
0.00
89,856.00
25,920.00
0.00
0.00
0.00
3,279.40
950.00
1,870.00
2,706.00
4,858.00
131,009.90
131,009.90
131,010.00
Jumlah
( Rp.)
558.00
137.50
500.00
0.00
375.00
0.00
82,836.00
29,520.00
0.00
0.00
0.00
3,279.40
950.00
1,870.00
2,706.00
4,858.00
127,589.90
127,589.90
127,590.00
A ( lebar = 1.00 m )
Jumlah
( Rp.)
558.00
137.50
600.00
0.00
375.00
0.00
89,856.00
25,920.00
3,279.40
950.00
2,057.00
5,280.00
4,858.00
133,870.90
133,870.90
133,870.00
B ( lebar = 1.00 m )
Jumlah
( Rp.)
558.00
137.50
500.00
0.00
375.00
0.00
82,836.00
29,520.00
0.00
0.00
0.00
3,279.40
950.00
2,057.00
5,280.00
4,858.00
130,350.90
130,350.90
130,350.00
engan Buruh )
K 511
Jumlah
( Rp.)
13,500.00
907.50
600.00
0.00
300.00
0.00
89,856.00
25,920.00
0.00
5,833.33
4,166.67
141,083.50
141,083.50
141,080.00
engan Buruh )
K 511
Jumlah
( Rp.)
13,500.00
907.50
600.00
0.00
300.00
0.00
82,836.00
29,520.00
0.00
5,833.33
4,166.67
137,663.50
137,663.50
137,660.00
130,350.00
Jumlah
( Rp.)
275.00
550.00
0.00
0.00
0.00
6,300.00
0.00
14,400.00
3,240.00
3,000.00
480.00
2,100.00
210.00
30,555.00
30,555.00
30,560.00
Jumlah
( Rp.)
2,365.00
1,550.00
0.00
775.00
0.00
47,574.00
2,150.00
87,400.00
28,548.00
26,680.00
10,296.00
306,720.00
5,964.00
3,690.00
14,980.00
6,420.00
12,840.00
557,952.00
557,952.00
557,950.00
K618
Jumlah
( Rp.)
110.00
100.00
0.00
50.00
0.00
2,538.00
100.00
3,300.00
1,872.00
1,740.00
725.00
15,840.00
321.00
180.00
535.71
321.43
642.86
28,376.00
28,376.00
567,520.00
567,520.00
Jumlah
( Rp.)
3,330.00
715.00
2,500.00
0.00
1,225.00
0.00
97,440.00
459,000.00
101,935.00
38,448.00
15,000.00
16,800.00
115,080.00
6,174.00
8,340.00
3,535.00
2,800.00
10,803.40
883,125.40
883,125.40
883,130.00
383,970.00
: 10 m2
Jumlah
( Rp.)
2,286.00
440.00
100.00
0.00
675.00
0.00
33,600.00
187,000.00
46,150.00
10,440.00
3,750.00
6,720.00
45,960.00
3,710.00
5,000.00
2,121.00
1,120.00
6,437.20
355,509.20
355,509.20
35,550.92
35,550.00
36,510.00
: 10 m2
Jumlah
( Rp.)
2,286.00
440.00
950.00
0.00
525.00
0.00
33,600.00
180,200.00
15,600.00
16,560.00
3,750.00
5,040.00
34,560.00
3,710.00
3,760.00
1,589.00
840.00
4,829.80
308,239.80
308,239.80
30,823.98
30,820.00
Jumlah
( Rp.)
180.00
50.00
55.00
50.00
2,182.80
489.00
105.00
0.00
0.00
60.00
357.00
357.00
0.00
3,885.80
3,885.80
3,890.00
Jumlah
( Rp.)
180.00
50.00
55.00
50.00
3,019.20
254.00
105.00
0.00
0.00
93.00
357.00
357.00
0.00
4,520.20
4,520.20
4,520.00
) ( lebar = 1.00 m )
Jumlah
( Rp.)
3,330.00
715.00
2,800.00
0.00
1,225.00
0.00
97,440.00
459,000.00
101,935.00
38,448.00
15,000.00
16,800.00
115,080.00
9,716.00
11,840.00
3,535.00
2,800.00
10,803.40
890,467.40
890,467.40
890,470.00
REKAPITULASI RENCANA ANGGARAN BIAYA
Tugas : Semester 6; Kelas B (Struktur)
Lokasi : SURAKARTA
JUMLAH HARGA
NO URAIAN PEKERJAAN
(RP)
I Pekerjaan Persiapan Rp 7,800,408.00
II Pekerjaan Pondasi Rp 54,227,504.12
III Pekerjaan Lantai Rp 24,080,244.37
IV Pekerjaan Dinding Rp 82,759,412.39
V Pekerjaan Beton Rp 116,542,317.03
VI Pekerjaan Kayu Rp 40,903,722.14
VII Pekerjaan Kunci dan Kaca Rp 6,874,749.06
VIII Pekerjaan Atap Rp 230,442,479.65
IX Pekerjaan Langit - Langit Rp 16,478,904.75
X Pekerjaan Kelistrikan Rp 3,878,600.00
XI Pekerjaan Sanitasi Rp 8,673,866.01
XII Pekerjaan Pengecatan Rp 21,415,871.75
Jumlah Rp 614,078,079.28
Ditambah keuntungan 10% Rp 675,485,887.20
Dibulatkan Rp 655,500,000.00
Terbilang : Enam Ratus Lima Puluh Lima Juta Lima Ratus Ribu Rupiah