DAFTAR KUANTITAS DAN HARGA
PEKERJAAN : REHAB PUSKESMAS BINEH KRUENG
LOKASI : PUSKESMAS BINEH KRUENG
KECAMATAN : TANGAN-TANGAN
KABUPATEN : ACEH BARAT DAYA
PROVINSI : ACEH
TAHUN ANGGARAN : 2016
HARGA
NO. URAIAN PEKERJAAN VOLUME SAT ANALISA SATUAN
(Rp)
1 2 3 4 5 6
A PEKERJAAN PERSIAPAN
1 Pembongkaran dan Pembersihan Lapangan 1.00 Ls Taksir 15,000,000.00
2 Pengukuran dan Pemasangan Bowplank 1.00 Ls Taksir 1,000,000.00
3 Papan Nama Proyek 1.00 Ls Taksir 350,000.00
4 Administrasi dan Dokumentasi 1.00 Ls Taksir 2,000,000.00
Jumlah
B PEKERJAAN REHAB GEDUNG PUSKESMAS
I PEKERJAAN TANAH DAN PONDASI
1 Galian Tanah Pondasi m³ AHSP PU A.2.3.1.1 61,443.75
2 Urugan Kembali bekas Galian m³ AHSP PU A.2.3.1.9 26,834.68
3 Urugan Pasir bawah Pondasi m³ AHSP PU A.2.3.1.11 139,837.50
4 Urugan Pasir bawah Lantai m³ AHSP PU A.2.3.1.11 139,837.50
5 Timbunan Bawah Lantai m³ AHSP PU A.2.3.1.11.a 119,497.50
Jumlah
II PEKERJAAN PASANGAN
1 Pas. Batu Kosong m³ AHSP PU A.3.2.1.9 349,780.20
2 Pas. Pondasi Batu Kali 1 : 4 m³ AHSP PU A.3.2.1.2 734,754.25
3 Pasangan 1/2 Bata 1: 2 m² AHSP PU A.4.4.1.7.a 143,251.51
4 Plesteran 1 : 2 m² AHSP PU A.4.4.2.2 59,164.54
5 Pasangan 1/2 Bata 1: 4 m² AHSP PU A.4.4.1.9.a 132,410.58
6 Plesteran 1 : 4 m² AHSP PU A.4.4.2.4 53,562.00
Jumlah
III PEKERJAAN BETON
1 Pondasi Sumuran
- Cincin Sumuran Dia. 1 m Bh Taksir 125,000.00
- Beton m³ AHSP PU A.4.1.1.5 884,620.86
- Besi tulangan (Polos) kg AHSP PU A.4.1.1.17 12,032.81
2 Tapak 120 x 120 cm
- Beton m³ AHSP PU A.4.1.1.5 884,620.86
- Besi tulangan (Polos) kg AHSP PU A.4.1.1.17 12,032.81
3 Kolom Tapak 30/30
- Beton m³ AHSP PU A.4.1.1.5 884,620.86
- Besi tulangan (Polos) kg AHSP PU A.4.1.1.17 12,032.81
- Bekisting m² AHSP PU A.4.1.1.22 152,868.28
4 Sloof 45/30
- Beton m³ AHSP PU A.4.1.1.5 884,620.86
- Besi tulangan (Polos) kg AHSP PU A.4.1.1.17 12,032.81
- Bekisting m² AHSP PU A.4.1.1.21 121,156.72
5 Kolom 30/30
- Beton m³ AHSP PU A.4.1.1.5 884,620.86
- Besi tulangan (Polos) kg AHSP PU A.4.1.1.17 12,032.81
- Besi tulangan (Ulir) kg AHSP PU A.4.1.1.17.a 16,422.86
- Bekisting m² AHSP PU A.4.1.1.22 152,868.28
6 Kolom Praktis 13/13
- Beton m³ AHSP PU A.4.1.1.5 884,620.86
- Besi tulangan (Polos) kg AHSP PU A.4.1.1.17 12,032.81
- Bekisting m² AHSP PU A.4.1.1.22 152,868.28
7 Balok Lateue 13/13
- Beton m³ AHSP PU A.4.1.1.5 884,620.86
- Besi tulangan (Polos) kg AHSP PU A.4.1.1.17 12,032.81
- Bekisting m² AHSP PU A.4.1.1.23 152,868.28
8 Balok Lantai 40/25
- Beton m³ AHSP PU A.4.1.1.5 884,620.86
- Besi tulangan (Polos) kg AHSP PU A.4.1.1.17 12,032.81
- Besi tulangan (Ulir) kg AHSP PU A.4.1.1.17.a 16,422.86
- Bekisting m² AHSP PU A.4.1.1.23 152,868.28
9 Cor Plat Beton T = 12 cm
- Beton m³ AHSP PU A.4.1.1.5 884,620.86
- Besi tulangan (Polos) kg AHSP PU A.4.1.1.17 12,032.81
- Bekisting m² AHSP PU A.4.1.1.24 264,872.00
10 Cor Kanopi Plat Beton T = 5 cm
- Beton m³ AHSP PU A.4.1.1.5 884,620.86
- Besi tulangan (Polos) kg AHSP PU A.4.1.1.17 12,032.81
- Bekisting m² AHSP PU A.4.1.1.24 264,872.00
Jumlah
IV PEKERJAAN LANTAI
1 Rabat Beton Lantai, t = 5 cm m3 AHSP PU A.4.1.1.5 884,620.86
2 Lantai Keramik 20 x 20 cm m2 AHSP PU A.4.4.3.36 #N/A
3 Lantai Keramik 30 x 30 cm m2 AHSP PU A.4.4.3.35. 252,500.76
4 Lantai Keramik 40 x 40 cm m2 AHSP PU A.4.4.3.35.c 231,747.18
5 Lantai Granit 60 x 60 cm m2 AHSP PU A.4.4.3.35.d #N/A
6 Keramik Dinding 20 x 40 cm m2 AHSP PU A.4.4.3.54.b 317,262.76
7 Cor Dinding dan Lantai Saluran m3 AHSP PU A.4.1.1.5 884,620.86
Jumlah
V PEKERJAAN KUSEN, DAUN PINTU DAN VENTILASI
1 Kosen + Daun Pintu dan Jendela Type I Panel uPVC Tebal 5 Cm + m² Taksir 1,300,000.00
Kaca Polos 5 mm + Ongkos+ Accesoris Lengkap Terpasang
2 Kosen + Daun Jendela Type II Panel uPVC Tebal 5 Cm + m² Taksir 1,300,000.00
Kaca Polos 5 mm + Ongkos+ Accesoris Lengkap Terpasang
3 Kosen + Daun Jendela dan Ventilasi Type I Panel uPVC Tebal 5 Cm m² Taksir 1,300,000.00
+ Kaca Polos 5 mm + Ongkos+ Accesoris Lengkap Terpasang
4 Kosen + Daun Jendela Type II Panel uPVC Tebal 5 Cm + m² Taksir 1,300,000.00
Kaca Polos 5 mm + Ongkos+ Accesoris Lengkap Terpasang
5 Ventilasi uPVC Tebal 5 Cm + Kaca Polos 5 mm + m² Taksir 1,300,000.00
Kaca Polos 5 mm + Ongkos+ Accesoris Lengkap Terpasang
Jumlah
VI PEKERJAAN PLAFOND
1 Plafond PVC + List Profil + Sambungan + Rangka (Terpasang) m² Taksir 250,000.00
2 Plafond Gypsum Board 9 mm + Rangka m2 AHSP PU A.4.5.1.7 81,466.22
3 Rangka Langit - Langit Kayu Kls II m2 AHSP PU A.4.5.1.5a 158,674.60
4 List Profil Plafond Gypsum m' AHSP PU A.4.5.1.9a 24,504.05
Jumlah
VII PEKERJAAN ATAP
1 Rangka Kuda - Kuda Baja Ringan m² AHSP PU A.4.5.2.32 189,947.35
2 Atap Seng Genteng Metal m² AHSP PU A.4.5.2.33 122,716.87
3 Listplank Kayu, Uk. 2 x 20 m' AHSP PU A.4.6.1.21 64,878.95
4 Talang Patahan Atap m' Taksir 70,000.00
5 Rabung Seng Genteng Metal m' AHSP PU A.4.5.2.36 69,808.58
Jumlah
VIII PEK. INSTALASI LISTRIK
1 Penambahan Arus Listrik 1x 35 Ampere + Bahan + Pkt Taksir 19,800,000.00
Ongkos+ Accesoris Lengkap Terpasang
2 Pemasukkan Arus Listrik 8 Amphere Pkt Taksir 3,500,000.00
2 Instalasi Titik Penerangan, Instalasi termasuk kabel Ttk Taksir 165,000.00
NYA 2,5 mm dalam Pipa PVC, Fitting dan
Kelengkapan Instalasi Terpasang
3 Instalasi Titik Api Kontak, Instalasi termasuk kabel Ttk Taksir 165,000.00
NYA 2,5 mm dalam Pipa PVC dan Kelengkapan
Instalasi Terpasang
4 Instalasi AC, Instalasi termasuk stop kontak, kabel Ttk Taksir 165,000.00
dan Kelengkapan Instalasi Terpasang
5 MCB (Terpasang) Bh Taksir 140,000.00
6 Lampu LED 5 Watt Bh Taksir 80,000.00
7 Down Light + Lampu LED 8 Watt Bh Taksir 125,000.00
8 Lampu HE 32 Watt Bh Taksir 55,000.00
9 Lampu HE 28 Watt Bh Taksir 42,000.00
10 Down Light Lampu, Uk. 5 Inch Bh Taksir 100,000.00
11 Mangkok + Penutup Bh Taksir 15,000.00
12 Stop Kontak Bh Taksir 28,000.00
13 Saklar Bh Taksir 15,000.00
Jumlah
IX PEKERJAAN PENGECATAN
1 Pekekerjaan Cat Plafond m² AHSP PU A.4.7.1.10 16,282.17
2 Pekerjaan Cat Dinding m² AHSP PU A.4.7.1.10 16,282.17
3 Pekerjaan Cat Kayu/Minyak m² AHSP PU A.4.7.1.4 #N/A
Jumlah
X PEKERJAAN SANITASI
1 Bak Air PVC + Penutup Samping Bh Taksir 400,000.00
2 Kran Air Bh AHSP PU A.4.5.1.19 62,291.25
3 Kloset Jongkok Porselin (Setara TOTO) Unit AHSP PU A.5.1.1.2 652,349.00
4 Floor Drain Bh AHSP PU A.4.5.1.1.14 48,731.25
5 Zink Cuci Piring Steinless (2 Lubang) Bh Taksir 800,000.00
6 Septictank + Resapan Unit Taksir 5,000,000.00
7 Mesin Pompa Air Listrik (Jetpump) + Rangka Besi Pengaman Unit Taksir 1,000,000.00
8 Instalasi Pemipaan Air Bersih + Bahan + Aksesories (Terpasang) Pkt Taksir 800,000.00
9 Instalasi Pemipaan Air Kotor + Bahan + Aksesories (Terpasang) Pkt Taksir 800,000.00
Jumlah
XI PEKERJAAN LAIN-LAIN
1 Wallpaper Dinding (Terpasang) m² Taksir 90,000.00
2 Batu Alam (Terpasang) m² Taksir 335,000.00
3 Cat Fernish Batu Alam m² Taksir 35,000.00
4 Rangka Besi Pagar Hollow (Terpasang) m² Taksir 650,000.00
5
Jumlah
15,000,000.00
1,000,000.00
350,000.00
2,000,000.00
18,350,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#N/A
0.00
0.00
#N/A
0.00
0.00
#N/A
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#N/A
#N/A
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#N/A
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pasangan 1 M3 Pondasi Cyclopen 60% Camp 1Pc:2PB:3Kr 40% Batu Belah
Satuan / Unit : M3
Analisa : AHSP PU A.3.2.1.10
Jenis Pekerjaan : Membuat Beton Mutu F'c = 7,4 Mpa (K 100), Slump (12 ± 2) cm, W/c = 0,87
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.1
Jenis Pekerjaan : Membuat Beton Mutu F'c = 9,8 Mpa (K 125), Slump (12 ± 2) cm, W/c = 0,78
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.2
Jenis Pekerjaan : Beton Mutu F'c = 14,5 Mpa (K 175), Slump (12 ± 2) cm, W/c = 0,66
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.5
Jenis Pekerjaan : Beton Mutu F'c = 16,9 Mpa (K 200), Slump (12 ± 2) cm, W/c = 0,61
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.6
Jenis Pekerjaan : Beton Mutu F'c = 19,3 Mpa (K 225), Slump (12 ± 2) cm, W/c = 0,58
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.7
Jenis Pekerjaan : Beton Mutu F'c = 21,7 Mpa (K 250), Slump (12 ± 2) cm, W/c = 0,56
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.8
Jenis Pekerjaan : Beton Mutu F'c = 24,0 Mpa (K 275), Slump (12 ± 2) cm, W/c = 0,53
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.8
Jenis Pekerjaan : Beton Mutu F'c = 26,4 Mpa (K 300), Slump (12 ± 2) cm, W/c = 0,52
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.8
Jenis Pekerjaan : Pasangan Dinding Bata ( 5 x 11 x 22 ) cm Tebal 1 Bata Camp. 1Pc : 2 PP.
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.1
Jenis Pekerjaan : Pasangan Dinding Bata ( 4 x 10 x 20 ) cm Tebal 1 Bata Camp. 1Pc : 2 PP.
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.1.a
Jenis Pekerjaan : Pasangan Dinding Bata ( 5x11x22) cm Tebal 1 Bata Camp. 1Pc : 4 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.3
Jenis Pekerjaan : Pasangan Dinding Bata ( 4x10x20) cm Tebal 1 Bata Camp. 1Pc : 4 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.3.a
Jenis Pekerjaan : Pasangan Dinding Bata ( 5x11x22) cm Tebal 1/2 Bata Camp. 1Pc : 2 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.7
Jenis Pekerjaan : Pasangan Dinding Bata ( 4x10x20) cm Tebal 1/2 Bata Camp. 1Pc : 2 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.7.a
Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1/2 Bata Camp. 1Pc : 3 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.8
Jenis Pekerjaan : Pasangan Dinding Bata ( 5 x 11 x 22 ) cmTebal 1/2 Bata Camp. 1Pc : 4 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.9
Jenis Pekerjaan : Pasangan Dinding Bata ( 4 x 10 x 20 ) cm Tebal 1/2 Bata Camp. 1Pc : 4 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.9.a
Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1/2 Bata Camp. 1Pc : 5 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.10
Jenis Pekerjaan : Memasang Langit-Langit Tripleks Ukuran (120 x 240) cm, tebal 6 mm
Satuan / Unit : M2
Analisa : AHSP PU A.4.5.1.5
Jenis Pekerjaan : Membuat dan Memasang Kusen pintu dan Kusen Jendela, Kayu Kelas I
Satuan / Unit : M3
Analisa : AHSP PU A.4.6.1.1
Jenis Pekerjaan : Membuat dan Memasang Daun Pintu Panel Kayu Kelas II
Satuan / Unit : M2
Analisa : AHSP PU A.4.6.1.5
Jenis Pekerjaan : Pengecatan Bidang Kayu Baru (1 x plamir, 1 x cat dasar,2 x cat penutup)
Satuan / Unit : M2
Analisa : AHSP PU A.4.7.1.4
Jenis Pekerjaan : Pengecatan Tembok Baru (1 x plamir, 1 x cat dasar, 2 x cat penutup)
Satuan / Unit : M2
Analisa : AHSP PU A.4.7.1.10
HASRIZAL, A.Md
Wakil Direktur
NO URAIAN PEKERJAAN ANALISA HARGA SATUAN
A PEKERJAAN PERSIAPAN
1 Pengukuran dan Pemasangan 1 M Bouwplank AHSP PU A.2.2.1.4 82,292.25
2 Pembersihan 1 M2 Lapangan dan Perataan AHSP PU A.2.2.1.9 12,147.50
B PEKERJAAN TANAH
1 Galian Tanah Biasa Sedalam 1 Meter AHSP PU A.2.3.1.1 61,443.75
2 Galian Tanah Biasa Sedalam 2 Meter AHSP PU A.2.3.1.2 75,003.75
3 Galian Tanah Biasa Sedalam 3 Meter AHSP PU A.2.3.1.3 88,733.25
4 Mengurug Kembali Galian AHSP PU A.2.3.1.9 26,834.68
5 Memadatkan tanah (per 20 cm) AHSP PU A.2.3.1.10 43,787.50
6 Timbunan Tanah didatangkan Termasuk Perataan dan Pemadatan AHSP PU - T.14 E 147,747.50
7 Urugan Pasir AHSP PU A.2.3.1.11 139,837.50
8 Timbunan Tanah AHSP PU A.2.3.1.11.a 119,497.50
9 Pengurugan 1 M3 Sirtu AHSP PU A.2.3.1.14 137,153.75
C PEKERJAAN PASANGAN
1 Pondasi Batu Belah / Kali Campuran 1 : 4 AHSP PU A.3.2.1.2 734,754.25
2 Pasangan Batu Kosong ( Anstamping ) AHSP PU A.3.2.1.9 349,780.20
3 Pasangan 1 M3 Pondasi Cyclopen 60% Camp 1Pc:2PB:3Kr 40% Batu Belah AHSP PU A.3.2.1.10 867,642.25
4 Membuat Beton Mutu F'c = 7,4 Mpa (K 100), Slump (12 ± 2) cm, W/c = 0,87 AHSP PU A.4.1.1.1 770,047.38
5 Membuat Beton Mutu F'c = 9,8 Mpa (K 125), Slump (12 ± 2) cm, W/c = 0,78 AHSP PU A.4.1.1.2 812,218.65
6 Beton Mutu F'c = 14,5 Mpa (K 175), Slump (12 ± 2) cm, W/c = 0,66 AHSP PU A.4.1.1.5 884,620.86
7 Beton Mutu F'c = 16,9 Mpa (K 200), Slump (12 ± 2) cm, W/c = 0,61 AHSP PU A.4.1.1.6 884,620.86
8 Beton Mutu F'c = 19,3 Mpa (K 225), Slump (12 ± 2) cm, W/c = 0,58 AHSP PU A.4.1.1.7 949,992.70
9 Beton Mutu F'c = 21,7 Mpa (K 250), Slump (12 ± 2) cm, W/c = 0,56 AHSP PU A.4.1.1.8 968,691.36
10 Beton Mutu F'c = 24,0 Mpa (K 275), Slump (12 ± 2) cm, W/c = 0,53 AHSP PU A.4.1.1.8 1,000,619.84
11 Beton Mutu F'c = 26,4 Mpa (K 300), Slump (12 ± 2) cm, W/c = 0,52 AHSP PU A.4.1.1.8 1,010,637.23
D PEKERJAAN PEMBESIAN
1 Pembesian 1 Kg Dengan Besi Polos AHSP PU A.4.1.1.17 12,032.81
2 Pembesian 1 Kg Dengan Besi Ulir AHSP PU A.4.1.1.17.a 16,422.86
3 Memasang 1 Kg Jaring Kawat Baja / Wire Mesh AHSP PU A.4.1.1.19 15,486.65
E PEKERJAAN BEKISTING
1 Memasang Bekisting Untuk Pondasi AHSP PU A.4.1.1.20 63,046.47
2 Memasang Bekisting Untuk Sloof AHSP PU A.4.1.1.21 121,156.72
3 Memasang Bekisting Untuk Kolom AHSP PU A.4.1.1.22 152,868.28
4 Memasang Bekisting Untuk Balok AHSP PU A.4.1.1.23 152,868.28
5 Memasang Bekisting Untuk Plat Lantai AHSP PU A.4.1.1.24 264,872.00
6 Memasang Bekisting Untuk Dinding AHSP PU A.4.1.1.25 263,742.00
7 Memasang Bekisting Untuk Tangga AHSP PU A.4.1.1.26 145,996.00
8 Memasang Bekisting Untuk Jembatan Pengecoran AHSP PU A.4.1.1.27 109,610.00
G PEKERJAAN ALUMINIUM
1 Pemasangan Kusen Pintu Aluminum AHSP PU A.4.2.1.11 #N/A
2 Pemasangan Rangka besi Hollow 40 x 40 x 2 mm AHSP PU A.4.2.1.20 173,568.00
I PEKERJAAN LANTAI
1 Memasang Lantai Keramik Uk 40 x 40 cm AHSP PU A.4.4.3.34 210,472.95
2 Memasang Lantai Keramik Uk 20 x 20 cm AHSP PU A.4.4.3.36 196,821.14
3 Pasangan Keramik Lantai Uk. 33 x 33 cm AHSP PU A.4.4.3.34. #N/A
4 Pasangan Keramik Lantai Uk. 30 x 30 cm Pholished AHSP PU A.4.4.3.35. 252,500.76
5 Pasangan Keramik Lantai Uk. 30 x 30 cm UnPholished AHSP PU A.4.4.3.35.a #N/A
6 Pasangan Keramik Lantai Uk. 40 x 40 cm Pholished AHSP PU A.4.4.3.35.b 214,248.00
7 Pasangan Keramik Lantai Uk. 40 x 40 cm Pholished AHSP PU A.4.4.3.35.c 231,747.18
8 Pasangan Lantai Granit Tile Uk. 60 x 60 cm Pholished AHSP PU A.4.4.3.35.d #N/A
9 Pasangan Lantai Granit Tile Uk. 60 x 60 cm UnPholished AHSP PU A.4.4.3.35.e #N/A
10 Pasangan Keramik Lantai Uk. 20 x 20 cm UnPholished AHSP PU A.4.4.3.36 #N/A
11 Pasangan Keramik Lantai Uk. 25 x 25 cm UnPholished AHSP PU A.4.4.3.36.a 215,000.02
12 Pasangan Plint Keramik Uk. 10 x 20 cm AHSP PU A.4.4.3.39 31,151.28
13 Pasangan Plint Keramik Uk. 8 x 25 cm AHSP PU A.4.4.3.39.a #N/A
14 Pasangan Dinding Keramik Uk. 20 x 25 cm AHSP PU A.4.4.3.54 243,586.76
15 Pasangan Dinding Keramik Uk. 20 x 45 cm AHSP PU A.4.4.3.54.a #N/A
16 Pasangan Dinding Keramik Uk. 20 x 40 cm AHSP PU A.4.4.3.54.b 317,262.76
17 Pasangan Dinding Batu tempel Hitam AHSP PU A.4.4.3.58 #N/A
18 Pasangan Dinding Batu Alam AHSP PU A.4.4.3.58.a #N/A
19 Memasang Dinding Keramik Uk 20 x 20 cm AHSP PU A.4.4.3.54 219,630.76
20 Memasang Dinding Keramik Uk 20 x 40 cm AHSP PU A.4.4.3.54a 290,368.76
K PEKERJAAN KAYU
1 Membuat dan Memasang Kusen pintu dan Kusen Jendela, Kayu Kelas I AHSP PU A.4.6.1.1 8,760,890.00
2 Membuat dan Memasang Daun Pintu Panel Kayu Kelas II AHSP PU A.4.6.1.5 536,467.50
3 Membuat dan Memasang Daun Jendela Kayu Kelas II AHSP PU A.4.6.1.6 399,907.00
4 Memasang Jalusi Kusen, Kayu Kelas I AHSP PU A.4.6.1.10 #N/A
5 Memasang Konstruksi Kuda-Kuda, Kayu Kelas I AHSP PU A.4.6.1.14 9,496,378.75
6 Memasang Konstruksi Gordeng, Kayu Kelas II AHSP PU A.4.6.1.15 4,740,463.00
7 Memasang Rangka Langit-Langit Kayu Kelas II AHSP PU A.4.6.1.20 103,722.70
8 Memasang Listplank Uk. 3 x 20 Cm Kayu Kelas I atau Klas II AHSP PU A.4.6.1.21 64,878.95
9 Memasang Kuda - Kuda Kayu Kelas I atau Klas II AHSP PU A.4.6.1.13 5,678,928.00
10 Memasang Gording Kayu Kelas I atau Klas II AHSP PU A.4.6.1.15 6,397,127.75
11 Memasang Listplank Uk. 2 x 20 Cm Kayu Kelas I atau Klas II AHSP PU A.4.6.1.21 64,878.95
12 Memasang Listplank Uk. 2 x 30 Cm Kayu Kelas I atau Klas II AHSP PU A.4.6.1.22 64,551.25
M PEKERJAAN SANITASI
1 Memasang Kloset Duduk/Monoblock AHSP PU A.5.1.1.1 2,531,256.50
2 Memasang Kloset Jongkok Porselen AHSP PU A.5.1.1.2 652,349.00
3 Memasang 1 Buah Urinoir AHSP PU A.5.1.1.4 2,545,325.00
4 Pemasangan 1 Bh Wastafel AHSP PU A.5.1.1.5 1,587,943.80
5 Memasang Floor Drain AHSP PU A.4.5.1.1.14 48,731.25
6 Pemasangan 1 Buah Bak Kontrol Bata 30x30 tinggi 35 cm AHSP PU A.5.1.1.15 372,923.73
7 Pemasangan 1 Buah Bak Kontrol Bata 45x45 cm tinggi 50 cm AHSP PU A.5.1.1.16 575,001.63
8 Pemasangan 1 Buah Bak Kontrol Bata 60x60 cm tinggi 65 cm AHSP PU A.5.1.1.17 692,472.19
9 Memasang Kran Air dia. 1/2" atau 3/4" AHSP PU A.4.5.1.19 62,291.25
N PEKERJAAN KACA
1 Memasang 1 m2 Kaca tebal 5 mm AHSP PU A.4.6.2.17 165,754.05
O PEKERJAAN PENGECATAN
1 Pengecatan Bidang Kayu lama AHSP PU A.4.7.1.4a 21,475.65
2 Pengecatan Bidang Kayu Baru (1 x plamir, 1 x cat dasar,2 x cat penutup) AHSP PU A.4.7.1.4 #N/A
3 Pengecatan Tembok Baru (1 x plamir, 1 x cat dasar, 2 x cat penutup) AHSP PU A.4.7.1.10 16,282.17
4 Pengecatan Tembok lama (1 x cat dasar, 2 x cat penutup) AHSP PU A.4.7.1.11 21,502.21
1
1
1
2
2
2
3
3
3
4
4
4
5
5
6
6
7
7
8
8
9
9
10
10
11
11
12
12
13
13
14
14
15
15
16
16
17
17
18
18
19
19
20
20
21
21
22
22
23
23
24
24
25
25
26
26
27
27
28
28
29
29
30
30
31
31
32
32
33
33
34
34
35
35
36
39
40
36
37
37
38
38
39
40
41
41
42
42
43
43
44
48
49
62
44
45
45
46
46
47
47
48
49
50
50
51
51
52
52
52
53
53
54
54
55
55
56
56
57
57
58
58
59
59
60
60
61
61
61
62
63
DAFTAR HARGA BAHAN DAN UPAH
B. HARGA BAHAN
1 Air 85.00 / Liter
2 Atap Genteng Metal 0.30 78,700.00 / lbr
3 Bak Air PVC + Penutup Samping 400,000.00 / Unt
4 Batu Alam 335,000.00 / m2
5 Batu bata (Uk. 20 x 10 x 5 cm) 850.00 / bh
6 Batu bata (Uk. 18 x 10 x 3.5 cm) 760.00 / bh
7 Batu gunung/batu kali 150,000.00 / m3
8 Baut Reng 500.00 / bh
9 Baut Truss 500.00 / bh
10 Baja Profil 21,000.00 / kg
11 Besi beton polos 8,500.00 / kg
12 Besi beton ulir 12,200.00 / kg
13 Besi strip 5 mm 15,700.00 / kg
14 Besi Hollow 4 x 40 x 40 25,000.00 / m'
15 Besi Siku 40 x 40 x 4 28,833.33 / m'
16 Besi Baja IWF 11,000.00 / kg
17 Bon bon keramik 18,000.00 / m'
18 Cat dasar 14,000.00 / kg
19 Cat menie 43,000.00 / kg
20 Cat minyak 70,000.00 / kg
21 Cat plafond 22,000.00 / kg
22 Cat tembok 22,000.00 / kg
23 Dempul Kayu 15,000.00 / kg
24 Dolken Kayu ø 8-10/4 m 20,000.00 / btg
25 Downlight lampu 4 inch 68,000.00 / bh
26 Downlight lampu 5 inch 87,000.00 / bh
27 Engsel pintu 33,000.00 / bh
28 Engsel jendela 22,500.00 / bh
29 Floor Penutup Lantai 33,000.00 / bh
30 Furring Plafond 45,000.00 / Btg
31 Gebalan Rumput 20,000.00 / m2
32 Gypsum 9 mm 156,000.00 / lbr
33 Grendel pintu/jendela 18,500.00 / lbr
34 Hak angin 24,000.00 / bh
35 Kain Kasa 32,500.00 / Rol
36 Kawat beton 20,000.00 / kg
37 Kayu Seumantok 4,800,000.00 / m3
38 Kayu meuranti (Klas II) 2,800,000.00 / m3
39 Kayu klas III 2,500,000.00 / m3
40 Kaca bening 5 mm 120,000.00 / m2
41 Kaca reyband 5 mm 150,000.00 / m2
42 Kalsiboard 4.5 mm 70,000.00 / lbr
43 Kalsiboard 6 mm 75,000.00 / lbr
44 Kawat duri 4,500.00 /m
45 Kerikil 130,000.00 / m3
46 Kerikil 88.89 / kg
47 Keramik Lantai 60x60cm (polished) 135,000.00 / m2
48 Keramik Lantai 60x60cm (polished) 48,600.00 / bh
49 Keramik Lantai 40x40cm (polished) 75,000.00 / m2
50 Keramik Lantai 40x40cm (polished) 12,000.00 / bh
51 Keramik Lantai 40x40cm (unpolished) 89,500.00 / m2
52 Keramik Lantai 40x40cm (unpolished) 14,320.00 / bh
53 Keramik Lantai 30x30cm (polished) 60,000.00 / m2
54 Keramik Lantai 40x40cm (unpolished) 9,600.00 / bh
55 Keramik Lantai 25x25 (unpolished) 75,000.00 / m2
56 Keramik Lantai 25x25 (unpolished) 4,687.50 / bh
57 Keramik Lantai 20x20 (polished) 60,000.00 / m2
58 Keramik Lantai 20x20 (polished) 2,400.00 / bh
59 Keramik dinding 30x60 cm 26,500.00 / bh
60 Keramik dinding 20x40 cm 120,000.00 / m2
61 Keramik dinding 20x40 cm 12,000.00 / bh
62 Keramik dinding 20x25 cm 80,000.00 / m2
63 Keramik dinding 20x25 cm 4,000.00 / bh
64 Keramik dinding 10x20 cm 1,500.00 / bh
65 Kusen uPVC, t=5 cm + Daun Pintu/Jendela + Aksesories + Terpasang 1,300,000.00 / m2
66 Granit Lantai 60x60 cm 87,000.00 / bh
67 Granit Lantai 80x80 cm 280,000.00 / m2
68 Kloset jongkok keramik (setara KIA) 350,000.00 / bh
69 Kloset duduk keramik (setara KIA) 1,800,000.00 / bh
70 Koral Beton 125,000.00 / m3
71 Kunci tanam 2 slaag 160,000.00 / bh
72 Kran air 3/4" 45,000.00 / bh
73 Kertas Amplas 4,500.00 / lbr
74 Lampu HE 23 Watt 35,000.00 / bh
75 Lampu HE 28 Watt 42,000.00 / bh
76 Lampu HE 32 Watt 55,000.00 / bh
77 Lampu LED 5 Watt 80,000.00 / bh
78 Down Light + Lampu HE 35 Watt 95,000.00 / bh
79 Down Light + Lampu LED 8 Watt 125,000.00 / bh
80 Downlight lampu 4 inch 80,000.00 / bh
81 Downlight lampu 5 inch 100,000.00 / bh
82 List Profil Kayu 15,000.00 / m1
83 List Profil Gypsum 12,500.00 / m1
84 Lem kayu 35,000.00 / kg
85 Minyak Bekesting 4,000.00 / ltr
86 Mangkok Listrik + Penutup 15,000.00 / bh
87 Thiner 21,000.00 / ltr
88 Pacok Jendela 22,000.00 / bh
89 Paku seng 26,000.00 / kg
90 Paku GRC/kalsiboard 33,000.00 / kg
91 Paku kayu 17,000.00 / kg
92 Paku sekrup 31,000.00 / kg
93 Paku Triplek 17,000.00 / kg
94 Pasir urug 85,000.00 / m3
95 Pasir pasang 130,000.00 / m3
96 Pasir pasang 92.86 / kg
97 Pasir beton 130,000.00 / m3
98 Pasir beton 92.86 / kg
99 Papan Meranti 2,800,000.00 / m3
100 Paving Blok 3,700.00 / bh
101 Pegangan jendela 17,000.00 / bh
102 Pegangan Pintu Double 135,000.00 / bh
103 Pipa PVC Dim. 1/2 Inch 33,000.00 / btg
104 Pipa PVC Dim. 3/4 Inch 42,000.00 / btg
105 Pipa PVC Dim. 1 Inch 63,000.00 / btg
106 Pipa PVC Dim. 1.5 Inch 87,000.00 / btg
107 Pipa PVC Dim. 2 Inch 95,000.00 / btg
108 Pipa PVC Dim. 2.5 Inch 110,000.00 / btg
109 Pipa PVC Dim. 3 Inch 125,000.00 / btg
110 Pipa PVC Dim. 4 Inch 335,000.00 / btg
111 Plafond PVC + List Profil + Sambungan + Rangka (Terpasang) 250,000.00 / m2
112 Plywood 4 mm (122 x 244) cm 102,000.00 / Lbr
113 Plywood 4 mm (90 x 220) cm 80,000.00 / Lbr
114 Plamir 25,000.00 / kg
115 Profil C.75.100 13,500.00 /m
116 Rabung genteng metal 0.30 27,000.00 / bh
117 Rabung Seng 0.30 110,000.00 / lbr
118 Reng U.45 9,500.00 /m
119 Residu/Minyak bekisting 4,300.00 / ltr
120 Saklar (setara Broco) 18,000.00 / bh
121 Saklar (setara Panasonic) 15,000.00 / bh
122 Saklar lampu 3 Seri (setara Broco) 29,000.00 / bh
123 Screw 550.00 / bh
124 Semen portlant 55,000.00 / zak
125 Semen warna (50 kg) 220,000.00 / zak
126 Seng gelombang BJLS 0.30 65,000.00 / Lbr
127 Seng gelombang Warna 0.30 100,000.00 / Lbr
128 Seng Zincalum Warna 0.30 70,455.00 / Lbr
129 Seng plat BJLS 0.30 130,000.00 / Lbr
130 Stop Kontak (setara Broco) 28,000.00 / bh
131 Stop Kontak (setara Panasonic) 14,000.00 / bh
132 Stop Kontak Tanam (setara Broco) 32,500.00 / bh
133 Tanah Urug 70,000.00 / m3
134 Timbunan Sirtu 85,000.00 / m3
135 Tarikan Jendela 23,000.00 / bh
136 Titik Lampu + Instalasi 165,000.00 / Ttk
137 Triplek 2 mm 62,000.00 / Lbr
138 Triplek 3 mm 68,000.00 / Lbr
139 Triplek 4 mm 75,000.00 / Lbr
140 Triplek 5 mm 105,000.00 / Lbr
141 Triplek 9 mm 143,000.00 / Lbr
142 Seal teap 11,000.00 / bh
143 Urinoir keramik 1,599,000.00 / bh
144 Wastafel + Kaca 890,500.00 / bh
145 Wiresmesh 37,500.00 / m2
HASRIZAL, A.Md
Wakil Direktur
Pekerjaan : REHAB PUSKESMAS BINEH KRUENG
Instansi :
Perencana :
Tahun Anggaran :
Dihitung Oleh :
BACK UP DATA
NO SKET GAMBAR PERHITUNGAN VOLUME
Ls
Ls
Ls
Ls
m3
m3
m3
m3
m3
m3
m3
m3
m3