PERHITUNGAN KUANTITAS PEKERJAAN

3.1(1a) Galian Biasa

PAKET : PEMBANGUNAN JALAN KAYU ARA - BATU RAYA


KONTRAKTOR : ……………………………
KONSULTAN : ………………………………………..

Gambar Sketsa

Luas Galian Luas Timbunan

NO STATION L/R Volume


Panjang Area Rata2 Area Rata2
(M 2) (M 2) (M )
3
(M 2) (M 2)
PERHITUNGAN KUANTITAS PEKERJAAN
3.1(1a) Galian Biasa

PAKET : PEMBANGUNAN JALAN KAYU ARA - BATU RAYA


KONTRAKTOR : ……………………………
KONSULTAN : ………………………………………..

Gambar Sketsa

Luas Galian Luas Timbunan

NO STATION L/R Volume


Panjang Area Rata2 Area Rata2
(M 2) (M 2) (M )
3
(M 2) (M 2)
1 00+000 Full - -
25.00 9.097 227.424 -
2 00+025 Full 18.194 -
25.00 17.799 444.973 -
3 00+050 Full 17.404 -
25.00 11.656 291.410 -
4 00+075 Full 5.909 -
25.00 8.159 203.986 -
5 00+100 Full 10.410 -
25.00 5.956 148.910 -
6 00+125 Full 1.503 -
25.00 1.518 37.958 -
7 00+150 Full 1.534 -
25.00 1.549 38.733 -
8 00+175 Full 1.565 -
25.00 1.540 38.500 -
9 00+200 Full 1.515 -
25.00 1.520 37.996 -
10 00+225 Full 1.524 -
25.00 5.099 127.480 -
11 00+250 Full 8.674 -
25.00 5.455 136.366 -
12 00+275 Full 2.235 -
25.00 3.619 90.486 -
13 00+300 Full 5.003 -
25.00 5.723 143.088 -
14 00+325 Full 6.443 -
25.00 6.644 166.088 -
15 00+350 Full 6.844 -
25.00 7.044 176.088 -
16 00+375 Full 7.244 -
25.00 6.204 155.088 -
17 00+400 Full 5.164 -
25.00 9.044 226.088 -
18 00+425 Full 12.924 -
25.00 14.084 352.088 -
19 00+450 Full 15.244 -
25.00 14.124 353.088 -
PERHITUNGAN KUANTITAS PEKERJAAN
3.1(1a) Galian Biasa

PAKET : PEMBANGUNAN JALAN KAYU ARA - BATU RAYA


KONTRAKTOR : ……………………………
KONSULTAN : ………………………………………..

Gambar Sketsa

Luas Galian Luas Timbunan

NO STATION L/R Volume


Panjang Area Rata2 Area Rata2
(M 2) (M 2) (M )
3
(M 2) (M 2)
25.00 14.124 353.088 -
20 00+475 Full 13.004 -
25.00 17.053 426.331 -
21 00+500 Full 21.103 -
25.00 21.023 525.575 -
22 00+525 Full 20.943 -
25.00 17.023 425.575 -
23 00+550 Full 13.103 -
25.00 14.653 366.334 -
24 00+575 Full 16.204 -
25.00 16.590 414.753 -
25 00+600 Full 16.977 -
25.00 13.852 346.288 -
26 00+625 Full 10.727 -
25.00 8.560 214.000 -
27 00+650 Full 6.394 -
25.00 3.950 98.743 -
28 00+675 Full 1.506 -
25.00 1.600 39.999 -
29 00+700 Full 1.694 -
25.00 2.429 60.723 -
30 00+725 Full 3.164 -
25.00 13.242 331.054 -
31 00+750 Full 23.321 -
25.00 20.308 507.706 -
32 00+775 Full 17.296 -
25.00 10.917 272.924 -
33 00+800 Full 4.538 -
25.00 3.639 90.974 -
34 00+825 Full 2.740 -
25.00 4.490 112.250 -
35 00+850 Full 6.240 -
25.00 4.140 103.500 -
36 00+875 Full 2.040 -
25.00 4.490 112.250 -
37 00+900 Full 6.940 -
25.00 4.233 105.828 -
38 00+925 Full 1.526 -
25.00 1.421 35.516 -
PERHITUNGAN KUANTITAS PEKERJAAN
3.1(1a) Galian Biasa

PAKET : PEMBANGUNAN JALAN KAYU ARA - BATU RAYA


KONTRAKTOR : ……………………………
KONSULTAN : ………………………………………..

Gambar Sketsa

Luas Galian Luas Timbunan

NO STATION L/R Volume


Panjang Area Rata2 Area Rata2
(M 2) (M 2) (M )
3
(M 2) (M 2)
25.00 1.421 35.516 -
39 00+950 Full 1.315 -
25.00 1.548 38.688 -
40 00+975 Full 1.780 -
25.00 5.864 146.609 -
41 01+000 Full 9.949 -
SUB JUMLAH 01 8,171.452
TOTAL 8,171.452

BINA MARGA KONSULTA

………………………………. HERI SURIANA


Pelaksana Lapangan / Chief Inspec
Koordinator Pengawas Lapangan
N KUANTITAS PEKERJAAN
1(1a) Galian Biasa

Gambar Sketsa

Volume Volume

Utk Galian
Volume Keterangan
Timbunan Diakui

(M 3 ) (M 3)
N KUANTITAS PEKERJAAN
1(1a) Galian Biasa

Gambar Sketsa

Volume Volume

Utk Galian
Volume Keterangan
Timbunan Diakui

(M 3 ) (M 3)

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
N KUANTITAS PEKERJAAN
1(1a) Galian Biasa

Gambar Sketsa

Volume Volume

Utk Galian
Volume Keterangan
Timbunan Diakui

(M 3 ) (M 3)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
N KUANTITAS PEKERJAAN
1(1a) Galian Biasa

Gambar Sketsa

Volume Volume

Utk Galian
Volume Keterangan
Timbunan Diakui

(M 3 ) (M 3)
-
-
-

-
-

KONSULTAN KONTRAKTOR

HERI SURIANA, ST MUROD AHMAD, Amd


Chief Inspector Quantity Engineer
PERHITUNGAN KUANTITAS PEKERJAAN
3.1(1a) Galian Biasa

PAKET : PEMBANGUNAN JALAN KAYU ARA - BATU RAYA


KONTRAKTOR : ……………………………
KONSULTAN : ………………………………………..

Gambar Sketsa

Luas Luas Timbunan

NO STATION L/R Volume


Panjang Area Rata2 Area Rata2
(M 2) (M 2) (M )
3
(M 2) (M 2)
PERHITUNGAN KUANTITAS PEKERJAAN
3.1(1a) Galian Biasa

PAKET : PEMBANGUNAN JALAN KAYU ARA - BATU RAYA


KONTRAKTOR : ……………………………
KONSULTAN : ………………………………………..

Gambar Sketsa

Luas Luas Timbunan

NO STATION L/R Volume


Panjang Area Rata2 Area Rata2
(M 2) (M 2) (M )
3
(M 2) (M 2)
1 01+000 Full 9.949 -
25.00 8.713 217.813 -
2 01+025 Full 7.476 -
25.00 6.884 172.094 -
3 01+050 Full 6.291 -
25.00 5.979 149.469 -
4 01+075 Full 5.666 -
25.00 6.604 165.094 -
5 01+100 Full 7.541 -
25.00 6.916 172.906 -
6 01+125 Full 6.291 -
25.00 4.954 123.859 -
7 01+150 Full 3.617 -
25.00 5.579 139.484 -
8 01+175 Full 7.541 -
25.00 10.041 251.031 -
9 01+200 Full 12.541 -
25.00 15.416 385.406 -
10 01+225 Full 18.291 -
25.00 15.166 379.156 -
11 01+250 Full 12.041 -
25.00 16.666 416.656 -
12 01+275 Full 21.291 -
25.00 25.979 649.469 -
13 01+300 Full 30.666 -
25.00 32.229 805.719 -
14 01+325 Full 33.791 -
25.00 32.854 821.344 -
15 01+350 Full 31.916 -
25.00 17.599 439.975 -
16 01+375 Full 3.282 -
25.00 3.321 83.031 -
17 01+400 Full 3.361 -
25.00 2.714 67.841 -
18 01+425 Full 2.067 -
25.00 2.240 55.998 -
19 01+450 Full 2.413 -
25.00 2.573 64.331 -
PERHITUNGAN KUANTITAS PEKERJAAN
3.1(1a) Galian Biasa

PAKET : PEMBANGUNAN JALAN KAYU ARA - BATU RAYA


KONTRAKTOR : ……………………………
KONSULTAN : ………………………………………..

Gambar Sketsa

Luas Luas Timbunan

NO STATION L/R Volume


Panjang Area Rata2 Area Rata2
(M 2) (M 2) (M )
3
(M 2) (M 2)
25.00 2.573 64.331 -
20 01+475 Full 2.733 -
25.00 2.681 67.025 -
21 01+500 Full 2.629 -
25.00 3.010 75.256 -
22 01+525 Full 3.392 -
25.00 3.313 82.825 -
23 01+550 Full 3.234 -
25.00 3.085 77.116 -
24 01+575 Full 2.935
25.00 3.544 88.604 -
25 01+600 Full 4.153
25.00 4.153 103.831 -
26 01+625 Full 4.153
25.00 3.874 96.860 -
27 01+650 Full 3.596
25.00 5.968 149.212 -
28 01+675 Full 8.341
25.00 4.920 123.006 -
29 01+700 Full 1.499
25.00 1.494 37.360 -
30 01+725 Full 1.490
25.00 1.287 32.181 -
31 01+750 Full 1.085
25.00 1.199 29.981 -
32 01+775 Full 1.314
25.00 1.350 33.756 -
33 01+800 Full 1.387 -
25.00 1.428 35.706 -
34 01+825 Full 1.470 -
25.00 1.511 37.781 -
35 01+850 Full 1.553 -
25.00 1.594 39.856 -
36 01+875 Full 1.636 -
25.00 1.677 41.931 -
37 01+900 Full 1.719 -
25.00 1.736 43.391 -
38 01+925 Full 1.753 -
25.00 1.765 44.113 -
PERHITUNGAN KUANTITAS PEKERJAAN
3.1(1a) Galian Biasa

PAKET : PEMBANGUNAN JALAN KAYU ARA - BATU RAYA


KONTRAKTOR : ……………………………
KONSULTAN : ………………………………………..

Gambar Sketsa

Luas Luas Timbunan

NO STATION L/R Volume


Panjang Area Rata2 Area Rata2
(M 2) (M 2) (M )
3
(M 2) (M 2)
25.00 1.765 44.113 -
39 01+950 Full 1.777 -
25.00 3.401 85.034 -
40 01+975 Full 5.026 -
25.00 4.851 121.281 -
41 02+000 Full 4.676 -
SUB JUMLAH 02 7,006.784
TOTAL 15,178.236

BINA MARGA KONSULTAN

KUSNATA, st HERI SURIANA


Pelaksana Lapangan / Chief Inspecto
Koordinator Pengawas Lapangan
AN KUANTITAS PEKERJAAN
.1(1a) Galian Biasa

Gambar Sketsa

Volume Volume

Utk Galian
Volume Keterangan
Timbunan Diakui

(M 3) (M 3)
AN KUANTITAS PEKERJAAN
.1(1a) Galian Biasa

Gambar Sketsa

Volume Volume

Utk Galian
Volume Keterangan
Timbunan Diakui

(M 3) (M 3)

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
AN KUANTITAS PEKERJAAN
.1(1a) Galian Biasa

Gambar Sketsa

Volume Volume

Utk Galian
Volume Keterangan
Timbunan Diakui

(M 3) (M 3)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
AN KUANTITAS PEKERJAAN
.1(1a) Galian Biasa

Gambar Sketsa

Volume Volume

Utk Galian
Volume Keterangan
Timbunan Diakui

(M 3) (M 3)
-
-
-

-
-

KONSULTAN KONTRAKTOR

HERI SURIANA, ST MUROD AHMAD, Amd


Chief Inspector Quantity Engineer
PERHITUNGAN KUANTITAS PEKERJAAN
3.1(1a) Galian Biasa

PAKET : PEMBANGUNAN JALAN KAYU ARA - BATU RAYA


KONTRAKTOR : ……………………………
KONSULTAN : ………………………………………..

Gambar Sketsa

Luas Luas Timbunan

NO STATION L/R Volume


Panjang Area Rata2 Area Rata2
(M 2) (M 2) (M )
3
(M 2) (M 2)
PERHITUNGAN KUANTITAS PEKERJAAN
3.1(1a) Galian Biasa

PAKET : PEMBANGUNAN JALAN KAYU ARA - BATU RAYA


KONTRAKTOR : ……………………………
KONSULTAN : ………………………………………..

Gambar Sketsa

Luas Luas Timbunan

NO STATION L/R Volume


Panjang Area Rata2 Area Rata2
(M 2) (M 2) (M )
3
(M 2) (M 2)
1 02+000 Full 4.676 -
25.00 5.124 128.091 -
2 02+025 Full 5.571 -
25.00 4.232 105.797 -
3 02+050 Full 2.893 -
25.00 5.278 131.956 -
4 02+075 Full 7.664 -
25.00 8.714 217.844 -
5 02+100 Full 9.764 -
25.00 6.898 172.453 -
6 02+125 Full 4.033 -
25.00 4.133 103.313 -
7 02+150 Full 4.233 -
25.00 4.174 104.344 -
8 02+175 Full 4.115 -
25.00 3.999 99.969 -
9 02+200 Full 3.883 -
25.00 4.093 102.328 -
10 02+225 Full 4.304 -
25.00 4.234 105.844 -
11 02+250 Full 4.164 -
25.00 3.814 95.344 -
12 02+275 Full 3.464 -
25.00 4.514 112.844 -
13 02+300 Full 5.564 -
25.00 5.214 130.344 -
14 02+325 Full 4.864 -
25.00 3.866 96.653 -
15 02+350 Full 2.868 -
25.00 3.881 97.025 -
16 02+375 Full 4.893 -
25.00 4.450 111.238 -
17 02+400 Full 4.006 -
25.00 3.900 97.497 -
18 02+425 Full 3.794 -
25.00 4.058 101.444 -
19 02+450 Full 4.321 -
25.00 3.409 85.219 -
PERHITUNGAN KUANTITAS PEKERJAAN
3.1(1a) Galian Biasa

PAKET : PEMBANGUNAN JALAN KAYU ARA - BATU RAYA


KONTRAKTOR : ……………………………
KONSULTAN : ………………………………………..

Gambar Sketsa

Luas Luas Timbunan

NO STATION L/R Volume


Panjang Area Rata2 Area Rata2
(M 2) (M 2) (M )
3
(M 2) (M 2)
25.00 3.409 85.219 -
20 02+475 Full 2.496 -
25.00 2.984 74.594 -
21 02+500 Full 3.471 -
25.00 4.218 105.453 -
22 02+525 Full 4.965 -
25.00 5.439 135.969 -
23 02+550 Full 5.913 -
25.00 5.033 125.813 -
24 02+575 Full 4.153 -
25.00 4.434 110.844 -
25 02+600 Full 4.715 -
25.00 6.390 159.750 -
26 02+625 Full 8.065 -
25.00 8.660 216.500 -
27 02+650 Full 9.255 -
25.00 6.543 163.563 -
28 02+675 Full 3.830 -
25.00 3.176 79.406 -
29 02+700 Full 2.523 -
25.00 2.618 65.453 -
30 02+725 Full 2.714 -
25.00 2.772 69.297 -
31 02+750 Full 2.830 -
15.00 2.665 39.975 -
32 02+765 Full 2.500
PERHITUNGAN KUANTITAS PEKERJAAN
3.1(1a) Galian Biasa

PAKET : PEMBANGUNAN JALAN KAYU ARA - BATU RAYA


KONTRAKTOR : ……………………………
KONSULTAN : ………………………………………..

Gambar Sketsa

Luas Luas Timbunan

NO STATION L/R Volume


Panjang Area Rata2 Area Rata2
(M 2) (M 2) (M )
3
(M 2) (M 2)

SUB JUMLAH 03 3,546.159


TOTAL 18,724.395

BINA MARGA KONSULTAN

KUSNATA, st HERI SURIANA


Pelaksana Lapangan / Chief Inspecto
AN KUANTITAS PEKERJAAN
.1(1a) Galian Biasa

Gambar Sketsa

Volume Volume

Utk Galian
Volume Keterangan
Timbunan Diakui

(M 3) (M 3)
AN KUANTITAS PEKERJAAN
.1(1a) Galian Biasa

Gambar Sketsa

Volume Volume

Utk Galian
Volume Keterangan
Timbunan Diakui

(M 3) (M 3)

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
AN KUANTITAS PEKERJAAN
.1(1a) Galian Biasa

Gambar Sketsa

Volume Volume

Utk Galian
Volume Keterangan
Timbunan Diakui

(M 3) (M 3)
-
-
-
-
-
-
-
-
-
-
-
-
-
AN KUANTITAS PEKERJAAN
.1(1a) Galian Biasa

Gambar Sketsa

Volume Volume

Utk Galian
Volume Keterangan
Timbunan Diakui

(M 3) (M 3)

-
-

KONSULTAN KONTRAKTOR

HERI SURIANA, ST MUROD AHMAD, Amd


Chief Inspector Quantity Engineer
PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -4.00 -4.00 -2.00 0.00 2.00 3.00 3.50
EXISTING
ELEVASI (m) 120.005 119.995 119.895 119.795 119.695 119.595 119.405
00+825
JARAK (m) -4.00 -3.50 -2.00 0.00 2.00 3.50 3.50
ABD
ELEVASI (m) 120.005 119.405 119.410 119.415 119.410 119.405 119.405

-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -4.00 -4.00 -2.00 0.00 2.00 3.00 3.50
EXISTING
ELEVASI (m) 119.803 119.793 119.693 119.593 119.493 119.393 118.703
00+850
JARAK (m) -4.00 -3.50 -2.00 0.00 2.00 3.50 3.50
ABD
ELEVASI (m) 119.803 118.703 118.708 118.713 118.708 118.703 118.703

-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0


PERHITUNGAN VOLUME GALIAN
-5.0 -4.0 -3.0 -2.0 PEMBANGUNAN
-1.0 JALAN KAYU
0.0 ARA - BATU RAYA 1.0

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -4.00 -4.00 -2.00 0.00 2.00 3.00 3.50
EXISTING
ELEVASI (m) 119.028 119.018 118.918 118.818 118.718 118.618 118.528
00+875
JARAK (m) -4.00 -3.50 -2.00 0.00 2.00 3.50 3.50
ABD
ELEVASI (m) 119.028 118.528 118.533 118.538 118.533 118.528 118.528

-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0


PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -4.00 -4.00 -2.00 0.00 2.00 3.00 3.50
EXISTING
ELEVASI (m) 122.246 122.236 122.136 122.036 121.936 121.836 121.046
00+900
JARAK (m) -4.00 -3.50 -2.00 0.00 2.00 3.50 3.50
ABD
ELEVASI (m) 122.246 121.046 121.051 121.056 121.051 121.046 121.046

-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0


PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -3.50 -3.00 -2.00 0.00 2.00 4.00 4.00
EXISTING
ELEVASI (m) 122.911 123.061 123.111 123.161 123.211 123.231 123.241
00+925
JARAK (m) -3.50 -3.50 -2.00 0.00 2.00 3.50 4.00
ABD
ELEVASI (m) 122.911 122.911 122.941 122.951 122.946 122.941 123.241

-4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -4.00 -3.00 -2.00 0.00 2.00 4.00 4.50
EXISTING
ELEVASI (m) 123.897 123.997 124.047 124.097 124.147 124.167 124.177
00+950
JARAK (m) -4.00 -4.00 -2.00 0.00 2.00 4.00 4.50
ABD
ELEVASI (m) 123.897 123.897 123.927 123.937 123.932 123.927 124.177

-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0


PERHITUNGAN VOLUME GALIAN
-5.0 -4.0 -3.0 -2.0 PEMBANGUNAN
-1.0 JALAN
0.0 KAYU ARA - 1.0
BATU RAYA 2.0
PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -4.00 -3.00 -2.00 0.00 2.00 4.00 4.50
EXISTING
ELEVASI (m) 125.685 125.845 125.895 125.945 125.995 126.015 126.025
00+975
JARAK (m) -4.00 -4.00 -2.00 0.00 2.00 4.00 4.50
ABD
ELEVASI (m) 125.685 125.685 125.715 125.725 125.720 125.715 126.025

-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -3.50 -2.50 -2.00 0.00 2.00 4.00 4.50
EXISTING
ELEVASI (m) 126.451 127.801 127.851 127.901 127.951 127.971 127.981
01+000
JARAK (m) -3.50 -3.50 -2.00 0.00 2.00 3.50 4.50
ABD
ELEVASI (m) 126.451 126.451 126.481 126.491 126.486 126.481 127.981

-4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0


PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA
-4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -3.00 -2.50 -2.00 0.00 2.00 2.50 3.50
EXISTING
ELEVASI (m) 126.870 127.995 128.095 128.195 128.245 128.265 128.270
01+025
JARAK (m) -3.00 -2.50 -2.00 0.00 2.00 2.50 3.50
ABD
ELEVASI (m) 126.870 126.870 126.875 126.880 126.875 126.870 128.270

-4.0 -3.0 -2.0 -1.0 0.0 1.0


PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -3.00 -2.50 -2.00 0.00 2.00 3.00 4.00
EXISTING
ELEVASI (m) 128.886 129.711 129.811 129.911 129.961 129.981 129.986
01+050
JARAK (m) -3.00 -3.00 -2.00 0.00 2.00 3.00 4.00
ABD
ELEVASI (m) 128.886 128.886 128.891 128.896 128.891 128.886 129.986

-4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0


PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -3.00 -2.50 -2.00 0.00 2.00 3.00 4.00
EXISTING
ELEVASI (m) 129.830 130.555 130.655 130.755 130.805 130.825 130.830
01+075
JARAK (m) -3.00 -3.00 -2.00 0.00 2.00 3.00 4.00
ABD
ELEVASI (m) 129.830 129.830 129.835 129.840 129.835 129.830 130.830

-4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -3.00 -2.50 -2.00 0.00 2.00 3.00 4.00
EXISTING
ELEVASI (m) 130.996 132.021 132.121 132.221 132.271 132.291 132.296
01+100
JARAK (m) -3.00 -3.00 -2.00 0.00 2.00 3.00 4.00
ABD
ELEVASI (m) 130.996 130.996 131.001 131.006 131.001 130.996 132.296
PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

-4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0


PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -3.00 -2.50 -2.00 0.00 2.00 3.00 4.00
EXISTING
ELEVASI (m) 131.895 132.720 132.820 132.920 132.970 132.990 132.995
01+125
JARAK (m) -3.00 -3.00 -2.00 0.00 2.00 3.00 4.00
ABD
ELEVASI (m) 131.895 131.895 131.900 131.905 131.900 131.895 132.995

-4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -3.00 -2.50 -2.00 0.00 2.00 3.00 3.50
EXISTING
ELEVASI (m) 130.335 130.760 130.860 130.960 131.010 131.030 131.035
01+150
JARAK (m) -3.00 -3.00 -2.00 0.00 2.00 3.00 3.50
ABD
ELEVASI (m) 130.335 130.335 130.340 130.345 130.340 130.335 131.035

-4.0 -3.0 -2.0 -1.0 0.0 1.0


PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA
-4.0 -3.0 -2.0 -1.0 0.0 1.0
PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -3.00 -2.50 -2.00 0.00 2.00 3.00 4.00
EXISTING
ELEVASI (m) 128.707 129.732 129.832 129.932 129.982 130.002 130.007
01+175
JARAK (m) -3.00 -3.00 -2.00 0.00 2.00 3.00 4.00
ABD
ELEVASI (m) 128.707 128.707 128.712 128.717 128.712 128.707 130.007

-4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -3.00 -2.50 -2.00 0.00 2.00 3.00 4.00
EXISTING
ELEVASI (m) 129.314 131.139 131.239 131.339 131.389 131.409 131.414
01+200
JARAK (m) -3.00 -3.00 -2.00 0.00 2.00 3.00 4.00
ABD
ELEVASI (m) 129.314 129.314 129.319 129.324 129.319 129.314 131.414

-4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0


PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA
-4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0
PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -3.00 -2.50 -2.00 0.00 2.00 3.00 4.00
EXISTING
ELEVASI (m) 128.828 131.573 131.673 131.773 131.823 131.843 131.848
01+225
JARAK (m) -3.00 -3.00 -2.00 0.00 2.00 3.00 4.00
ABD
ELEVASI (m) 128.828 128.828 128.833 128.838 128.833 128.828 131.848

-4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -3.00 -2.50 -2.00 0.00 2.00 3.00 4.00
EXISTING
ELEVASI (m) 126.859 128.604 128.704 128.804 128.854 128.874 128.879
01+250
JARAK (m) -3.00 -3.00 -2.00 0.00 2.00 3.00 4.00
ABD
ELEVASI (m) 126.859 126.859 126.864 126.869 126.864 126.859 128.879

-4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0


PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA
-4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -3.00 -2.50 -2.00 0.00 2.00 3.00 4.00
EXISTING
ELEVASI (m) 125.510 128.735 128.835 128.935 128.985 129.005 129.010
01+275
JARAK (m) -3.00 -3.00 -2.00 0.00 2.00 3.00 4.00
ABD
ELEVASI (m) 125.510 125.510 125.515 125.520 125.515 125.510 129.010

-4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0


PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -3.00 -2.50 -2.00 0.00 2.00 3.00 4.00
EXISTING
ELEVASI (m) 125.118 129.843 129.943 130.043 130.093 130.113 130.118
01+300
JARAK (m) -3.00 -3.00 -2.00 0.00 2.00 3.00 4.00
ABD
ELEVASI (m) 125.118 125.118 125.123 125.128 125.123 125.118 130.118

-4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0


PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -3.00 -2.50 -2.00 0.00 2.00 3.00 4.00
EXISTING
ELEVASI (m) 123.967 129.192 129.292 129.392 129.442 129.462 129.467
01+325
JARAK (m) -3.00 -3.00 -2.00 0.00 2.00 3.00 4.00
ABD
ELEVASI (m) 123.967 123.967 123.972 123.977 123.972 123.967 129.467

-4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -3.00 -2.50 -2.00 0.00 2.00 3.00 4.00
EXISTING
ELEVASI (m) 123.097 128.022 128.122 128.222 128.272 128.292 128.297
01+350
JARAK (m) -3.00 -3.00 -2.00 0.00 2.00 3.00 4.00
ABD
ELEVASI (m) 123.097 123.097 123.102 123.107 123.102 123.097 128.297

-4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0


PERHITUNGAN VOLUME GALIAN
-4.0 -3.0 -2.0 -1.0 PEMBANGUNAN
0.0 JALAN KAYU
1.0 ARA - BATU RAYA 2.0
PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -4.00 -3.50 -2.00 0.00 2.00 4.00 4.30
EXISTING
ELEVASI (m) 121.213 121.388 121.588 121.688 121.698 121.708 121.713
01+375
JARAK (m) -4.00 -3.50 -2.00 0.00 2.00 4.00 4.30
ABD
ELEVASI (m) 121.213 121.213 121.218 121.223 121.218 121.213 121.713

-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -4.00 -3.50 -2.00 0.00 2.00 4.00 4.30
EXISTING
ELEVASI (m) 120.399 120.584 120.784 120.884 120.894 120.904 120.909
01+400
JARAK (m) -4.00 -3.50 -2.00 0.00 2.00 4.00 4.30
ABD
ELEVASI (m) 120.399 120.399 120.404 120.409 120.404 120.399 120.909

-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0


PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -3.30 -3.30 -2.00 0.00 2.00 3.00 3.30
EXISTING
ELEVASI (m) 122.913 122.913 122.813 122.697 122.700 122.710 122.715
01+425
JARAK (m) -3.30 -3.00 -2.00 0.00 2.00 3.00 3.30
ABD
ELEVASI (m) 122.913 122.413 122.418 122.423 122.418 122.413 122.715

-4.0 -3.0 -2.0 -1.0 0.0 1.0


PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -3.30 -3.30 -2.00 0.00 2.00 3.00 3.30
EXISTING
ELEVASI (m) 123.726 123.726 123.626 123.616 123.566 123.511 123.516
01+450
JARAK (m) -3.30 -3.00 -2.00 0.00 2.00 3.00 3.30
ABD
ELEVASI (m) 123.726 123.216 123.221 123.226 123.221 123.216 123.516

-4.0 -3.0 -2.0 -1.0 0.0 1.0


PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA
PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -3.30 -3.30 -2.00 0.00 2.00 3.00 3.30
EXISTING
ELEVASI (m) 122.444 122.444 122.344 122.334 122.444 122.449 122.454
01+475
JARAK (m) -3.30 -3.00 -2.00 0.00 2.00 3.00 3.30
ABD
ELEVASI (m) 122.444 121.944 121.949 121.954 121.949 121.944 122.454

-4.0 -3.0 -2.0 -1.0 0.0 1.0


N VOLUME GALIAN
LAN KAYU ARA - BATU RAYA

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

449.4963
2.74
446.7563

0.0 1.0 2.0 3.0 4.0


121.00

Existing

120.00 rencana

119.00

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

449.4888
6.24
443.2488

0.0 1.0 2.0 3.0 4.0


120.00
N VOLUME GALIAN
LAN KAYU
0.0 ARA - BATU RAYA 1.0 2.0 3.0 4.0
120.00

Existing

119.00 rencana

118.00

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

445.6825
2.04
443.6425

0.0 1.0 2.0 3.0 4.0


120.00

Existing

119.00 rencana
N VOLUME GALIAN
LAN KAYU ARA - BATU RAYA
Existing

119.00 rencana

118.00

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

458.8000
6.94
451.8600

0.0 1.0 2.0 3.0 4.0


123.00

122.00

Existing

rencana

121.00

120.00
N VOLUME GALIAN
LAN KAYU ARA - BATU RAYA

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

462.0888
1.53
460.5625

1.0 2.0 3.0 4.0 5.0


124.00

Existing

123.00 rencana

122.00

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

527.5648
1.32
526.2498

0 1.0 2.0 3.0 4.0 5.0


125.00
N VOLUME GALIAN
0LAN KAYU ARA - 1.0
BATU RAYA 2.0 3.0 4.0 5.0
125.00

Existing

124.00 rencana

123.00
N VOLUME GALIAN
LAN KAYU ARA - BATU RAYA

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

535.5088
1.78
533.7288

0 1.0 2.0 3.0 4.0 5.0


127.00

Existing

126.00 rencana

125.00

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

513.3065
9.95
503.3578

1.0 2.0 3.0 4.0 5.0


129.00
N VOLUME GALIAN
LAN KAYU ARA - BATU RAYA
1.0 2.0 3.0 4.0 5.0
129.00

128.00

Existing

127.00 rencana

126.00

125.00

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

418.086
7.48
410.610

0 1.0 2.0 3.0 4.0


129.00

128.00

Existing

rencana
N VOLUME GALIAN 128.00
LAN KAYU ARA - BATU RAYA
Existing

rencana

127.00

126.00

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

455.7773
6.29
449.4860

1.0 2.0 3.0 4.0 5.0


131.00

130.00

Existing

rencana

129.00
rencana

129.00
N VOLUME GALIAN
LAN KAYU ARA - BATU RAYA

128.00

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

458.6063
5.67
452.9400

1.0 2.0 3.0 4.0 5.0


131.00

Existing

130.00 rencana

129.00

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

464.1123
7.54
456.5710
N VOLUME GALIAN
LAN KAYU ARA - BATU RAYA

1.0 2.0 3.0 4.0 5.0


133.00

132.00

Existing

rencana

131.00

130.00
N VOLUME GALIAN
LAN KAYU ARA - BATU RAYA

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

466.3088
6.29
460.0175

1.0 2.0 3.0 4.0 5.0


134.00

133.00

Existing

rencana

132.00

131.00

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

426.1913
3.62
422.5738

0 1.0 2.0 3.0 4.0


132.00
N VOLUME GALIAN
LAN KAYU ARA - BATU RAYA
0 1.0 2.0 3.0 4.0
132.00

131.00

Existing

rencana

130.00

129.00
N VOLUME GALIAN
LAN KAYU ARA - BATU RAYA

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

456.1008
7.54
448.5595

1.0 2.0 3.0 4.0 5.0


131.00

130.00

Existing

rencana

129.00

128.00

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

462.0253
12.54
449.4840

1.0 2.0 3.0 4.0 5.0


132.00
N VOLUME GALIAN
LAN KAYU ARA - BATU RAYA
1.0 2.0 3.0 4.0 5.0
132.00

131.00

Existing

130.00 rencana

129.00

128.00
N VOLUME GALIAN
LAN KAYU ARA - BATU RAYA

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

464.6943
18.29
446.4030

1.0 2.0 3.0 4.0 5.0


133.00

132.00

131.00

Existing

130.00 rencana

129.00

128.00

127.00

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

453.0528
12.04
441.0115

1.0 2.0 3.0 4.0 5.0


130.00
N VOLUME GALIAN
LAN KAYU ARA - BATU RAYA
1.0 2.0 3.0 4.0 5.0
130.00

129.00

128.00
Existing

rencana

127.00

126.00

125.00

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

455.3613
21.29
434.0700

1.0 2.0 3.0 4.0 5.0


130.00

129.00

128.00

127.00 Existing

rencana

126.00
129.00

128.00
N VOLUME GALIAN
LAN KAYU ARA - BATU RAYA 127.00 Existing

rencana

126.00

125.00

124.00

123.00

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

461.1143
30.67
430.4480

1.0 2.0 3.0 4.0 5.0


131.00

130.00

129.00

128.00

127.00 Existing

rencana

126.00

125.00

124.00

123.00

122.00
N VOLUME GALIAN
LAN KAYU ARA - BATU RAYA

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

459.4608
33.79
425.6695

1.0 2.0 3.0 4.0 5.0


130.00

129.00

128.00

127.00

126.00 Existing

rencana

125.00

124.00

123.00

122.00

121.00

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

454.9908
31.92
423.0745

1.0 2.0 3.0 4.0 5.0


129.00

128.00
N VOLUME GALIAN
LAN KAYU
1.0 ARA - BATU RAYA 2.0 3.0 4.0 5.0
129.00

128.00

127.00

126.00

125.00 Existing

rencana

124.00

123.00

122.00

121.00

120.00
N VOLUME GALIAN
LAN KAYU ARA - BATU RAYA

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

505.3545
3.28
502.0727

0 1.0 2.0 3.0 4.0 5.0


122.00

Existing

121.00 rencana

120.00

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

502.0354
3.36
498.6746

0 1.0 2.0 3.0 4.0 5.0


121.00
N VOLUME GALIAN
LAN KAYU ARA - BATU RAYA

0 1.0 2.0 3.0 4.0 5.0


121.00

Existing

rencana

120.00

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

404.8615
2.07
402.7949

0 1.0 2.0 3.0 4.0


123.00

Existing

rencana
123.00

N VOLUME GALIAN
LAN KAYU ARA - BATU RAYA
Existing

rencana

122.00

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

407.8461
2.41
405.4328

0 1.0 2.0 3.0 4.0


124.00

Existing

123.00 rencana

122.00
N VOLUME GALIAN
LAN KAYU ARA - BATU RAYA
122.00
N VOLUME GALIAN
LAN KAYU ARA - BATU RAYA

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

403.6685
2.73
400.9352

0 1.0 2.0 3.0 4.0


123.00

Existing

122.00 rencana

121.00
PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -3.30 -3.30 -2.00 0.00 2.00 3.00 3.30
EXISTING
ELEVASI (m) 120.132 120.132 120.032 120.022 120.142 120.147 120.152
01+500
JARAK (m) -3.30 -3.00 -2.00 0.00 2.00 3.00 3.30
ABD
ELEVASI (m) 120.132 119.652 119.657 119.662 119.657 119.652 120.152

-4.0 -3.0 -2.0 -1.0 0.0 1.0 2

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -4.30 -4.30 -2.00 0.00 2.00 4.00 4.30
EXISTING
ELEVASI (m) 119.965 119.965 119.865 119.855 120.005 120.010 120.015
01+525
JARAK (m) -4.30 -4.00 -2.00 0.00 2.00 4.00 4.30
ABD
ELEVASI (m) 119.965 119.515 119.520 119.525 119.520 119.515 120.015

-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0


PERHITUNGAN VOLUME GALIAN
-5.0 -4.0 -3.0 -2.0 PEMBANGUNAN0.0
-1.0 JALAN KAYU ARA1.0
- BATU RAYA 2.0
PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -4.30 -4.30 -2.00 0.00 2.00 4.00 4.30
EXISTING
ELEVASI (m) 119.788 119.788 119.688 119.678 119.778 119.783 119.788
01+550
JARAK (m) -4.30 -4.00 -2.00 0.00 2.00 4.00 4.30
ABD
ELEVASI (m) 119.788 119.338 119.343 119.348 119.343 119.338 119.788

-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -4.30 -4.30 -2.00 0.00 2.00 4.00 4.30
EXISTING
ELEVASI (m) 117.190 117.190 117.090 117.080 116.948 116.953 116.958
01+575
JARAK (m) -4.30 -4.00 -2.00 0.00 2.00 4.00 4.30
ABD
ELEVASI (m) 117.190 116.688 116.693 116.698 116.693 116.688 116.958

-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0


PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA
-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -4.30 -4.30 -2.00 0.00 2.00 4.00 4.30
EXISTING
ELEVASI (m) 116.363 116.363 116.291 116.391 116.401 116.406 116.411
01+600
JARAK (m) -4.30 -4.00 -2.00 0.00 2.00 4.00 4.30
ABD
ELEVASI (m) 116.363 115.861 115.866 115.871 115.866 115.861 116.411

-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0


PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -4.30 -4.30 -2.00 0.00 2.00 4.00 4.30
EXISTING
ELEVASI (m) 115.963 115.963 115.891 115.991 116.001 116.006 116.011
01+625
JARAK (m) -4.30 -4.00 -2.00 0.00 2.00 4.00 4.30
ABD
ELEVASI (m) 115.963 115.461 115.466 115.471 115.466 115.461 116.011

-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0


PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -4.30 -4.30 -2.00 0.00 2.00 4.00 4.30
EXISTING
ELEVASI (m) 112.859 112.859 112.938 113.038 113.048 113.053 113.058
01+650
JARAK (m) -4.30 -4.00 -2.00 0.00 2.00 4.00 4.30
ABD
ELEVASI (m) 112.859 112.557 112.562 112.567 112.562 112.557 113.058

-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -4.30 -4.30 -2.00 0.00 2.00 3.50 4.00
EXISTING
ELEVASI (m) 112.702 112.700 112.500 112.300 112.100 111.900 111.202
01+675
JARAK (m) -4.30 -3.50 -2.00 0.00 2.00 3.50 4.00
ABD
ELEVASI (m) 112.702 111.202 111.207 111.212 111.207 111.202 111.202

-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0


PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA
-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0
PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -4.30 -4.30 -2.00 0.00 2.00 4.00 4.30
EXISTING
ELEVASI (m) 110.490 110.490 110.459 110.469 110.479 110.484 110.489
01+700
JARAK (m) -4.30 -4.00 -2.00 0.00 2.00 4.00 4.30
ABD
ELEVASI (m) 110.490 110.288 110.293 110.298 110.293 110.288 110.489

-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -4.30 -4.30 -2.00 0.00 2.00 4.00 4.30
EXISTING
ELEVASI (m) 109.535 109.535 109.505 109.515 109.525 109.530 109.535
01+725
JARAK (m) -4.30 -4.00 -2.00 0.00 2.00 4.00 4.30
ABD
ELEVASI (m) 109.535 109.335 109.340 109.345 109.340 109.335 109.535

-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0


PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA
-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0
PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -4.30 -4.30 -2.00 0.00 2.00 4.00 4.30
EXISTING
ELEVASI (m) 109.382 109.382 109.342 109.352 109.362 109.367 109.372
01+750
JARAK (m) -4.30 -4.00 -2.00 0.00 2.00 4.00 4.30
ABD
ELEVASI (m) 109.382 109.222 109.227 109.232 109.227 109.222 109.372

-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -4.30 -4.30 -2.00 0.00 2.00 4.00 4.30
EXISTING
ELEVASI (m) 109.618 109.618 109.598 109.608 109.618 109.623 109.628
01+775
JARAK (m) -4.30 -4.00 -2.00 0.00 2.00 4.00 4.30
ABD
ELEVASI (m) 109.618 109.448 109.453 109.458 109.453 109.448 109.628

-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0


PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA
-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0
PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -4.30 -4.30 -2.00 0.00 2.00 4.00 4.30
EXISTING
ELEVASI (m) 108.875 108.875 108.865 108.875 108.885 108.890 108.895
01+800
JARAK (m) -4.30 -4.00 -2.00 0.00 2.00 4.00 4.30
ABD
ELEVASI (m) 108.875 108.705 108.710 108.715 108.710 108.705 108.895

-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -4.30 -4.30 -2.00 0.00 2.00 4.00 4.30
EXISTING
ELEVASI (m) 109.096 109.096 109.086 109.096 109.106 109.111 109.116
01+825
JARAK (m) -4.30 -4.00 -2.00 0.00 2.00 4.00 4.30
ABD
ELEVASI (m) 109.096 108.916 108.921 108.926 108.921 108.916 109.116

-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0


PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA
-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0
PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -4.30 -4.30 -2.00 0.00 2.00 4.00 4.30
EXISTING
ELEVASI (m) 106.692 106.692 106.682 106.692 106.702 106.707 106.712
01+850
JARAK (m) -4.30 -4.00 -2.00 0.00 2.00 4.00 4.30
ABD
ELEVASI (m) 106.692 106.502 106.507 106.512 106.507 106.502 106.712

-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -4.30 -4.30 -2.00 0.00 2.00 4.00 4.30
EXISTING
ELEVASI (m) 103.909 103.909 103.899 103.909 103.919 103.924 103.929
01+875
JARAK (m) -4.30 -4.00 -2.00 0.00 2.00 4.00 4.30
ABD
ELEVASI (m) 103.909 103.709 103.714 103.719 103.714 103.709 103.929

-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0


PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA
-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0
PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -4.30 -4.30 -2.00 0.00 2.00 4.00 4.30
EXISTING
ELEVASI (m) 103.923 103.923 103.913 103.923 103.933 103.938 103.943
01+900
JARAK (m) -4.30 -4.00 -2.00 0.00 2.00 4.00 4.30
ABD
ELEVASI (m) 103.923 103.713 103.718 103.723 103.718 103.713 103.943

-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -4.00 -3.50 -2.00 0.00 2.00 4.00 4.50
EXISTING
ELEVASI (m) 105.584 105.734 105.784 105.834 105.884 105.904 105.914
01+925
JARAK (m) -4.00 -4.00 -2.00 0.00 2.00 4.00 4.50
ABD
ELEVASI (m) 105.584 105.584 105.614 105.624 105.619 105.614 105.914

-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0


PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA
-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0
PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -4.00 -3.50 -2.00 0.00 2.00 4.00 4.50
EXISTING
ELEVASI (m) 105.709 105.862 105.912 105.962 106.012 106.032 106.042
01+950
JARAK (m) -4.00 -4.00 -2.00 0.00 2.00 4.00 4.50
ABD
ELEVASI (m) 105.709 105.709 105.739 105.749 105.744 105.739 106.042

-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -3.50 -3.00 -2.00 0.00 2.00 4.00 4.00
EXISTING
ELEVASI (m) 110.767 111.417 111.467 111.517 111.567 111.587 111.597
01+975
JARAK (m) -3.50 -3.50 -2.00 0.00 2.00 3.50 4.00
ABD
ELEVASI (m) 110.767 110.767 110.797 110.807 110.802 110.797 111.597

-4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0


PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA
-4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0
PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -3.50 -3.00 -2.00 0.00 2.00 4.00 4.00
EXISTING
ELEVASI (m) 108.774 109.374 109.424 109.474 109.524 109.544 109.554
02+000
JARAK (m) -3.50 -3.50 -2.00 0.00 2.00 3.50 4.00
ABD
ELEVASI (m) 108.774 108.774 108.804 108.814 108.809 108.804 109.554

-4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -3.30 -3.30 -2.00 0.00 2.00 3.00 3.30
EXISTING
ELEVASI (m) 104.635 104.635 104.830 105.130 105.430 105.530 105.535
02+025
JARAK (m) -3.30 -3.00 -2.00 0.00 2.00 3.00 3.30
ABD
ELEVASI (m) 104.635 104.235 104.240 104.245 104.240 104.235 105.535

-4.0 -3.0 -2.0 -1.0 0.0 1.0 2


PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA
-4.0 -3.0 -2.0 -1.0 0.0 1.0 2
PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -3.30 -3.30 -2.00 0.00 2.00 3.00 3.30
EXISTING
ELEVASI (m) 106.130 106.130 106.140 106.145 106.150 106.155 106.160
02+050
JARAK (m) -3.30 -3.00 -2.00 0.00 2.00 3.00 3.30
ABD
ELEVASI (m) 106.130 105.680 105.685 105.690 105.685 105.680 106.160

-4.0 -3.0 -2.0 -1.0 0.0 1.0 2

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -3.50 -3.00 -2.00 0.00 2.00 4.00 4.00
EXISTING
ELEVASI (m) 108.968 109.888 109.988 110.088 110.188 110.288 110.298
02+075
JARAK (m) -3.50 -3.50 -2.00 0.00 2.00 3.50 4.00
ABD
ELEVASI (m) 108.968 108.968 108.998 109.008 109.003 108.998 110.298

-4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0


PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA
-4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0
PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -3.50 -3.00 -2.00 0.00 2.00 4.00 4.00
EXISTING
ELEVASI (m) 110.786 112.006 112.106 112.206 112.306 112.406 112.416
02+100
JARAK (m) -3.50 -3.50 -2.00 0.00 2.00 3.50 4.00
ABD
ELEVASI (m) 110.786 110.786 110.816 110.826 110.821 110.816 112.416

-4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -3.50 -3.50 -2.00 0.00 2.00 3.00 3.50
EXISTING
ELEVASI (m) 115.832 115.832 115.827 115.717 115.722 115.727 115.732
02+125
JARAK (m) -3.50 -3.00 -2.00 0.00 2.00 3.00 3.50
ABD
ELEVASI (m) 115.832 115.132 115.137 115.142 115.137 115.132 115.732

-4.0 -3.0 -2.0 -1.0 0.0 1.0 2


PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

-4.0 -3.0 -2.0 -1.0 0.0 1.0 2


PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -3.50 -3.50 -2.00 0.00 2.00 3.00 3.50
EXISTING
ELEVASI (m) 118.022 118.022 118.017 118.107 118.112 118.117 118.122
02+150
JARAK (m) -3.50 -3.00 -2.00 0.00 2.00 3.00 3.50
ABD
ELEVASI (m) 118.022 117.422 117.427 117.432 117.427 117.422 118.122

-4.0 -3.0 -2.0 -1.0 0.0 1.0 2

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -3.50 -3.50 -2.00 0.00 2.00 3.00 3.50
EXISTING
ELEVASI (m) 123.119 123.119 123.304 123.404 123.409 123.414 123.419
02+175
JARAK (m) -3.50 -3.00 -2.00 0.00 2.00 3.00 3.50
ABD
ELEVASI (m) 123.119 122.719 122.724 122.729 122.724 122.719 123.419

-4.0 -3.0 -2.0 -1.0 0.0 1.0 2


PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

-4.0 -3.0 -2.0 -1.0 0.0 1.0 2

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -4.00 -3.00 -2.00 0.00 2.00 4.00 4.50
EXISTING
ELEVASI (m) 126.052 126.372 126.472 126.572 126.672 126.772 126.782
02+200
JARAK (m) -4.00 -4.00 -2.00 0.00 2.00 4.00 4.50
ABD
ELEVASI (m) 126.052 126.052 126.082 126.092 126.087 126.082 126.782

-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0


-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0

PERHITUNGAN VOLUME GALIAN


PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -3.50 -3.00 -2.00 0.00 2.00 4.00 4.00
EXISTING
ELEVASI (m) 127.415 127.855 127.955 128.055 128.155 128.255 128.265
02+225
JARAK (m) -3.50 -3.50 -2.00 0.00 2.00 3.50 4.00
ABD
ELEVASI (m) 127.415 127.415 127.445 127.455 127.450 127.445 128.265

-4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0


PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA
PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -3.50 -3.00 -2.00 0.00 2.00 4.00 4.00
EXISTING
ELEVASI (m) 129.205 129.625 129.725 129.825 129.925 130.025 130.035
02+250
JARAK (m) -3.50 -3.50 -2.00 0.00 2.00 3.50 4.00
ABD
ELEVASI (m) 129.205 129.205 129.235 129.245 129.240 129.235 130.035

-4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -3.50 -3.00 -2.00 0.00 2.00 4.00 4.00
EXISTING
ELEVASI (m) 130.000 130.320 130.420 130.520 130.620 130.720 130.730
02+275
JARAK (m) -3.50 -3.50 -2.00 0.00 2.00 3.50 4.00
ABD
ELEVASI (m) 130.000 130.000 130.030 130.040 130.035 130.030 130.730

-4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0


PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA
-4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0
PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3
JARAK (m) -3.50 -3.00 -2.00 0.00 2.00 4.00 4.00
EXISTING
ELEVASI (m) 130.116 130.736 130.836 130.936 131.036 131.136 131.146
02+300
JARAK (m) -3.50 -3.50 -2.00 0.00 2.00 3.50 4.00
ABD
ELEVASI (m) 130.116 130.116 130.146 130.156 130.151 130.146 131.146

-4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0


AN VOLUME GALIAN
ALAN KAYU ARA - BATU RAYA

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

396.0454
2.63
393.4166

1.0 2.0 3.0 4.0


121.00

Existing

120.00 rencana

119.00

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

515.4463
3.39
512.0545

1.0 2.0 3.0 4.0 5.0


121.00
AN VOLUME GALIAN
ALAN KAYU ARA1.0
- BATU RAYA 2.0 3.0 4.0 5.0
121.00

120.00 Existing

rencana

119.00
AN VOLUME GALIAN
ALAN KAYU ARA - BATU RAYA

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

514.6277
3.23
511.3934

1.0 2.0 3.0 4.0 5.0


120.00

Existing

rencana

119.00

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

503.1895
2.94
500.2544

1.0 2.0 3.0 4.0 5.0


118.00
AN VOLUME GALIAN
ALAN KAYU ARA - BATU RAYA
1.0 2.0 3.0 4.0 5.0
118.00

117.00 Existing

rencana

116.00

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

500.2916
4.15
496.1383

0.0 1.0 2.0 3.0 4.0 5.0


117.00

Existing

116.00 rencana
AN VOLUME GALIAN
ALAN KAYU ARA - BATU RAYA
Existing

116.00 rencana

115.00

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

498.5716
4.15
494.4183

1.0 2.0 3.0 4.0 5.0


117.00

116.00 Existing

rencana

115.00
AN VOLUME GALIAN
ALAN KAYU ARA - BATU RAYA

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

486.0247
3.60
482.4291

1.0 2.0 3.0 4.0 5.0


114.00

Existing

113.00 rencana

112.00

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

467.2422
8.34
458.9008

1.0 2.0 3.0 4.0 5.0


113.00
AN VOLUME GALIAN
ALAN KAYU ARA - BATU RAYA
1.0 2.0 3.0 4.0 5.0
113.00

112.00

Existing

rencana

111.00

110.00
AN VOLUME GALIAN
ALAN KAYU ARA - BATU RAYA

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

474.9715
1.50
473.4724

1.0 2.0 3.0 4.0 5.0


111.00

Existing

rencana

110.00

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

470.8703
1.49
469.3805

1.0 2.0 3.0 4.0 5.0


110.00
AN VOLUME GALIAN
ALAN KAYU ARA - BATU RAYA
1.0 2.0 3.0 4.0 5.0
110.00

Existing

rencana

109.00
AN VOLUME GALIAN
ALAN KAYU ARA - BATU RAYA

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

470.1594
1.08
469.0746

1.0 2.0 3.0 4.0 5.0


110.00

Existing

rencana

109.00

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

471.2802
1.31
469.9664

1.0 2.0 3.0 4.0 5.0


110.00
AN VOLUME GALIAN
ALAN KAYU ARA - BATU RAYA
1.0 2.0 3.0 4.0 5.0
110.00

Existing

rencana

109.00
AN VOLUME GALIAN
ALAN KAYU ARA - BATU RAYA

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

468.1383
1.39
466.7515

0 1.0 2.0 3.0 4.0 5.0


109.00

Existing

rencana

108.00

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

469.0886
1.47
467.6188

1.0 2.0 3.0 4.0 5.0


110.00
AN VOLUME GALIAN
ALAN KAYU ARA - BATU RAYA
1.0 2.0 3.0 4.0 5.0
110.00

109.00 Existing

rencana

108.00
AN VOLUME GALIAN
ALAN KAYU ARA - BATU RAYA

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

458.7514
1.55
457.1986

1.0 2.0 3.0 4.0 5.0


107.00

Existing

rencana

106.00

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

446.7845
1.64
445.1487

1.0 2.0 3.0 4.0 5.0


104.00
AN VOLUME GALIAN
ALAN KAYU ARA - BATU RAYA
1.0 2.0 3.0 4.0 5.0
104.00

Existing

rencana

103.00
AN VOLUME GALIAN
ALAN KAYU ARA - BATU RAYA

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

446.8447
1.72
445.1259

1.0 2.0 3.0 4.0 5.0


104.00

Existing

rencana

103.00

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

450.0720
1.75
448.3195

1.0 2.0 3.0 4.0 5.0


106.00
AN VOLUME GALIAN
ALAN KAYU ARA - BATU RAYA
1.0 2.0 3.0 4.0 5.0
106.00

Existing

rencana

105.00
AN VOLUME GALIAN
ALAN KAYU ARA - BATU RAYA

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

450.6213
1.78
448.8448

1.0 2.0 3.0 4.0 5.0


107.00

Existing

106.00 rencana

105.00

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

419.1738
5.03
414.1475

1.0 2.0 3.0 4.0 5.0


112.00
AN VOLUME GALIAN
ALAN KAYU ARA - BATU RAYA
1.0 2.0 3.0 4.0 5.0
112.00

111.00 Existing

rencana

110.00
AN VOLUME GALIAN
ALAN KAYU ARA - BATU RAYA

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

411.4375
4.68
406.7613

1.0 2.0 3.0 4.0 5.0


110.00

Existing

109.00 rencana

108.00

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

347.0315
5.57
341.4605

1.0 2.0 3.0 4.0


106.00
AN VOLUME GALIAN
ALAN KAYU ARA - BATU RAYA
1.0 2.0 3.0 4.0
106.00

105.00

Existing

rencana

104.00

103.00
AN VOLUME GALIAN
ALAN KAYU ARA - BATU RAYA

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

350.2768
2.89
347.3840

1.0 2.0 3.0 4.0


107.00

Existing

106.00 rencana

105.00

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

414.1900
7.66
406.5263

1.0 2.0 3.0 4.0 5.0


111.00
AN VOLUME GALIAN
ALAN KAYU ARA - BATU RAYA
1.0 2.0 3.0 4.0 5.0
111.00

110.00

Existing

rencana

109.00

108.00
AN VOLUME GALIAN
ALAN KAYU ARA - BATU RAYA

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

422.5825
9.76
412.8188

1.0 2.0 3.0 4.0 5.0


113.00

112.00

Existing

111.00 rencana

110.00

109.00

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

405.0795
4.03
401.0470

1.0 2.0 3.0 4.0


116.00
AN VOLUME GALIAN
ALAN KAYU ARA - BATU RAYA

1.0 2.0 3.0 4.0


116.00

115.00 Existing

rencana

114.00
AN VOLUME GALIAN
ALAN KAYU ARA - BATU RAYA

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

413.2945
4.23
409.0620

1.0 2.0 3.0 4.0


119.00

Existing

118.00 rencana

117.00

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

432.0165
4.12
427.9015

1.0 2.0 3.0 4.0


124.00
AN VOLUME GALIAN
ALAN KAYU ARA - BATU RAYA

1.0 2.0 3.0 4.0


124.00

123.00 Existing

rencana

122.00

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

538.3910
3.88
534.5085

1.0 2.0 3.0 4.0 5.0


127.00
1.0 2.0 3.0 4.0 5.0
127.00

AN VOLUME GALIAN
ALAN KAYU ARA - BATU RAYA

Existing

126.00 rencana

125.00

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

480.8463
4.30
476.5425

1.0 2.0 3.0 4.0 5.0


129.00

128.00

Existing

rencana

127.00

126.00
rencana

127.00

AN VOLUME GALIAN
ALAN KAYU ARA - BATU RAYA
126.00
AN VOLUME GALIAN
ALAN KAYU ARA - BATU RAYA

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

487.4538
4.16
483.2900

1.0 2.0 3.0 4.0 5.0


131.00

130.00

Existing

rencana

129.00

128.00

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

489.9100
3.46
486.4463

1.0 2.0 3.0 4.0 5.0


131.00
AN VOLUME GALIAN
ALAN KAYU ARA - BATU RAYA
1.0 2.0 3.0 4.0 5.0
131.00

130.00 Existing

rencana

129.00
AN VOLUME GALIAN
ALAN KAYU ARA - BATU RAYA

4 5 6 7 8 9 10 LUAS (M2) LUAS AREA (M2)

491.9200
5.56
486.3563

1.0 2.0 3.0 4.0 5.0


132.00

131.00

Existing

rencana

130.00

129.00
PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3 4
JARAK (m) -3.50 -3.00 -2.00 0.00 2.00 4.00 4.00
EXISTING
ELEVASI (m) 129.436 129.956 130.056 130.156 130.256 130.356 130.366
02+325
JARAK (m) -3.50 -3.50 -2.00 0.00 2.00 3.50 4.00
ABD
ELEVASI (m) 129.436 129.436 129.466 129.476 129.471 129.466 130.366

-4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0 3.0

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3 4
JARAK (m) -4.00 -4.00 -2.00 0.00 2.00 4.00 4.00
EXISTING
ELEVASI (m) 126.306 126.306 126.402 126.403 126.404 126.405 126.406
02+350
JARAK (m) -4.00 -3.50 -2.00 0.00 2.00 3.50 4.00
ABD
ELEVASI (m) 126.306 126.006 126.011 126.016 126.011 126.006 126.406
PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0 3.0


PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3 4
JARAK (m) -4.00 -4.00 -2.00 0.00 2.00 4.00 4.00
EXISTING
ELEVASI (m) 120.056 120.056 119.952 119.953 119.954 119.955 119.956
02+375
JARAK (m) -4.00 -3.50 -2.00 0.00 2.00 3.50 4.00
ABD
ELEVASI (m) 120.056 119.306 119.311 119.316 119.311 119.306 119.956

-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0 3.0

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3 4
JARAK (m) -4.00 -4.00 -2.00 0.00 2.00 4.00 4.00
EXISTING
ELEVASI (m) 116.479 116.479 116.628 116.678 116.728 116.778 116.779
02+400
JARAK (m) -4.00 -3.50 -2.00 0.00 2.00 3.50 4.00
ABD
ELEVASI (m) 116.479 116.129 116.134 116.139 116.134 116.129 116.779
PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0 3.0


PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3 4
JARAK (m) -4.50 -4.50 -2.00 0.00 2.00 4.00 4.50
EXISTING
ELEVASI (m) 115.561 115.561 115.511 115.461 115.510 115.560 115.561
02+425
JARAK (m) -4.50 -4.00 -2.00 0.00 2.00 4.00 4.50
ABD
ELEVASI (m) 115.561 115.061 115.066 115.071 115.066 115.061 115.561

-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0 3.0

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3 4
JARAK (m) -4.50 -4.50 -2.00 0.00 2.00 4.00 4.50
EXISTING
ELEVASI (m) 117.983 117.983 117.933 117.883 117.833 117.882 117.883
02+450
JARAK (m) -4.50 -4.00 -2.00 0.00 2.00 4.00 4.50
ABD
ELEVASI (m) 117.983 117.383 117.388 117.393 117.388 117.383 117.883
PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0 3.0


PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3 4
JARAK (m) -4.50 -4.50 -2.00 0.00 2.00 4.00 4.50
EXISTING
ELEVASI (m) 120.716 120.716 120.666 120.616 120.566 120.515 120.516
02+475
JARAK (m) -4.50 -4.00 -2.00 0.00 2.00 4.00 4.50
ABD
ELEVASI (m) 120.716 120.316 120.321 120.326 120.321 120.316 120.516

-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0 3.0

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3 4
JARAK (m) -4.50 -4.50 -2.00 0.00 2.00 4.00 4.50
EXISTING
ELEVASI (m) 120.186 120.186 120.136 120.086 120.036 120.085 120.086
02+500
JARAK (m) -4.50 -4.00 -2.00 0.00 2.00 4.00 4.50
ABD
ELEVASI (m) 120.186 119.686 119.691 119.696 119.691 119.686 120.086
PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0 3.0


PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3 4
JARAK (m) -4.50 -4.50 -2.00 0.00 2.00 4.00 4.50
EXISTING
ELEVASI (m) 119.806 119.806 119.955 120.005 120.055 120.105 120.106
02+525
JARAK (m) -4.50 -4.00 -2.00 0.00 2.00 4.00 4.50
ABD
ELEVASI (m) 119.806 119.406 119.411 119.416 119.411 119.406 120.106

-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0 3.0

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3 4
JARAK (m) -4.00 -3.50 -2.00 0.00 2.00 4.00 4.50
EXISTING
ELEVASI (m) 118.686 119.356 119.406 119.456 119.506 119.526 119.536
02+550
JARAK (m) -4.00 -4.00 -2.00 0.00 2.00 4.00 4.50
ABD
ELEVASI (m) 118.686 118.686 118.716 118.726 118.721 118.716 119.536
PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0 3.0


PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3 4
JARAK (m) -4.00 -3.50 -2.00 0.00 2.00 4.00 4.50
EXISTING
ELEVASI (m) 115.747 116.197 116.247 116.297 116.347 116.367 116.377
02+575
JARAK (m) -4.00 -4.00 -2.00 0.00 2.00 4.00 4.50
ABD
ELEVASI (m) 115.747 115.747 115.777 115.787 115.782 115.777 116.377

-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0 3.0

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3 4
JARAK (m) -4.50 -4.50 -2.00 0.00 2.00 4.00 4.50
EXISTING
ELEVASI (m) 111.813 111.813 111.793 111.773 111.753 111.733 111.613
02+600
JARAK (m) -4.50 -4.00 -2.00 0.00 2.00 4.00 4.50
ABD
ELEVASI (m) 111.813 111.213 111.218 111.223 111.218 111.213 111.613
PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0 3.0


PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3 4
JARAK (m) -4.50 -4.50 -2.00 0.00 2.00 4.00 4.50
EXISTING
ELEVASI (m) 107.488 107.488 107.468 107.448 107.428 107.368 107.388
02+625
JARAK (m) -4.50 -4.00 -2.00 0.00 2.00 4.00 4.50
ABD
ELEVASI (m) 107.488 106.488 106.493 106.498 106.493 106.488 107.388

-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0 3.0

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3 4
JARAK (m) -4.50 -4.50 -2.00 0.00 2.00 3.00 4.00
EXISTING
ELEVASI (m) 101.141 101.131 101.031 100.931 100.831 100.731 99.741
02+650
JARAK (m) -4.50 -4.00 -2.00 0.00 2.00 4.00 4.00
ABD
ELEVASI (m) 101.141 99.741 99.746 99.751 99.746 99.741 99.741
PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0 3.0


PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3 4
JARAK (m) -4.50 -4.50 -2.00 0.00 2.00 3.00 4.00
EXISTING
ELEVASI (m) 97.655 97.645 97.545 97.445 97.345 97.245 96.955
02+675
JARAK (m) -4.50 -4.00 -2.00 0.00 2.00 4.00 4.00
ABD
ELEVASI (m) 97.655 96.955 96.960 96.965 96.960 96.955 96.955

-5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0 3.0

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3 4
JARAK (m) -5.50 -5.50 -2.00 0.00 2.00 4.00 5.50
EXISTING
ELEVASI (m) 92.261 92.261 92.241 92.221 92.201 92.251 92.271
02+700
JARAK (m) -5.50 -5.00 -2.00 0.00 2.00 5.00 5.50
ABD
ELEVASI (m) 92.261 91.991 91.996 92.001 91.996 91.991 92.271
PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

-7.0 -6.0 -5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0 3.0 4.0 5
PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3 4
JARAK (m) -5.50 -5.50 -2.00 0.00 2.00 4.00 5.50
EXISTING
ELEVASI (m) 92.486 92.486 92.466 92.446 92.426 92.477 92.497
02+725
JARAK (m) -5.50 -5.00 -2.00 0.00 2.00 5.00 5.50
ABD
ELEVASI (m) 92.486 92.198 92.203 92.208 92.203 92.198 92.497

-7.0 -6.0 -5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0 3.0 4.0 5

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3 4
JARAK (m) -5.50 -5.50 -2.00 0.00 2.00 4.00 5.50
EXISTING
ELEVASI (m) 90.312 90.312 90.292 90.272 90.252 90.294 90.314
02+750
JARAK (m) -5.50 -5.00 -2.00 0.00 2.00 5.00 5.50
ABD
ELEVASI (m) 90.312 90.011 90.016 90.021 90.016 90.011 90.314
PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

-7.0 -6.0 -5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0 3.0 4.0 5
PERHITUNGAN VOLUME GALIAN
PEMBANGUNAN JALAN KAYU ARA - BATU RAYA

STA KOORDINAT 10 9 8 7 6 5 4 3 2 1 CL 1 2 3 4
JARAK (m) -5.50 -5.50 -2.00 0.00 2.00 4.00 5.50
EXISTING
ELEVASI (m) 90.611 90.611 90.591 90.571 90.611 90.631 90.651
02+765
JARAK (m) -5.50 -5.00 -2.00 0.00 2.00 5.00 5.50
ABD
ELEVASI (m) 90.611 90.361 90.366 90.371 90.366 90.361 90.651

-7.0 -6.0 -5.0 -4.0 -3.0 -2.0 -1.0 0.0 1.0 2.0 3.0 4.0 5
GAN VOLUME GALIAN
ALAN KAYU ARA - BATU RAYA

LUAS AREA
5 6 7 8 9 10 LUAS (M2)
(M2)

488.8450
4.86
483.9813

1.0 2.0 3.0 4.0 5.0


131.00

130.00

Existing

rencana

129.00

128.00

LUAS AREA
5 6 7 8 9 10 LUAS (M2)
(M2)

505.7050
2.87
502.8365
GAN VOLUME GALIAN
ALAN KAYU ARA - BATU RAYA

0.0 1.0 2.0 3.0 4.0 5.0


127.00

126.00 Existing

rencana

125.00
GAN VOLUME GALIAN
ALAN KAYU ARA - BATU RAYA

LUAS AREA
5 6 7 8 9 10 LUAS (M2)
(M2)

479.7050
4.89
474.8115

.0 1.0 2.0 3.0 4.0 5.0


121.00

120.00

Existing

rencana

119.00

118.00

LUAS AREA
5 6 7 8 9 10 LUAS (M2)
(M2)

466.8090
4.01
462.8035
GAN VOLUME GALIAN
ALAN KAYU ARA - BATU RAYA

.0 1.0 2.0 3.0 4.0 5.0


117.00

116.00 Existing

rencana

115.00
GAN VOLUME GALIAN
ALAN KAYU ARA - BATU RAYA

LUAS AREA
5 6 7 8 9 10 LUAS (M2)
(M2)

519.6088
3.79
515.8145

0.0 1.0 2.0 3.0 4.0 5.0


116.00

Existing

115.00 rencana

114.00

LUAS AREA
5 6 7 8 9 10 LUAS (M2)
(M2)

530.3848
4.32
526.0635
GAN VOLUME GALIAN
ALAN KAYU ARA - BATU RAYA

.0 1.0 2.0 3.0 4.0 5.0


119.00

118.00 Existing

rencana

117.00
GAN VOLUME GALIAN
ALAN KAYU ARA - BATU RAYA

LUAS AREA
5 6 7 8 9 10 LUAS (M2)
(M2)

542.7583
2.50
540.2620

.0 1.0 2.0 3.0 4.0 5.0


121.00

Existing

rencana

120.00

LUAS AREA
5 6 7 8 9 10 LUAS (M2)
(M2)

540.2983
3.47
536.8270
GAN VOLUME GALIAN
ALAN KAYU ARA - BATU RAYA

.0 1.0 2.0 3.0 4.0 5.0


121.00

120.00 Existing

rencana

119.00
GAN VOLUME GALIAN
ALAN KAYU ARA - BATU RAYA

LUAS AREA
5 6 7 8 9 10 LUAS (M2)
(M2)

540.1320
4.97
535.1670

.0 1.0 2.0 3.0 4.0 5.0


121.00

Existing

120.00 rencana

119.00

LUAS AREA
5 6 7 8 9 10 LUAS (M2)
(M2)

508.8755
5.91
502.9630
GAN VOLUME GALIAN
ALAN KAYU ARA - BATU RAYA

.0 1.0 2.0 3.0 4.0 5.0


120.00

119.00 Existing

rencana

118.00
GAN VOLUME GALIAN
ALAN KAYU ARA - BATU RAYA

LUAS AREA
5 6 7 8 9 10 LUAS (M2)
(M2)

495.0648
4.15
490.9123

0.0 1.0 2.0 3.0 4.0 5.0


117.00

Existing

116.00 rencana

115.00

LUAS AREA
5 6 7 8 9 10 LUAS (M2)
(M2)

503.2135
4.72
498.4985
GAN VOLUME GALIAN
ALAN KAYU ARA - BATU RAYA

0.0 1.0 2.0 3.0 4.0 5.0


112.00

111.00 Existing

rencana

110.00
GAN VOLUME GALIAN
ALAN KAYU ARA - BATU RAYA

LUAS AREA
5 6 7 8 9 10 LUAS (M2)
(M2)

483.5010
8.07
475.4360

0.0 1.0 2.0 3.0 4.0 5.0


108.00

107.00

Existing

rencana

106.00

105.00

LUAS AREA
5 6 7 8 9 10 LUAS (M2)
(M2)

430.3943
9.26
421.1393
GAN VOLUME GALIAN
ALAN KAYU ARA - BATU RAYA

1.0 2.0 3.0 4.0 5.0


102.00

101.00

Existing

rencana

100.00

99.00
GAN VOLUME GALIAN
ALAN KAYU ARA - BATU RAYA

LUAS AREA
5 6 7 8 9 10 LUAS (M2)
(M2)

414.5288
3.83
410.6988

1.0 2.0 3.0 4.0 5.0


98.00

Existing

97.00 rencana

96.00

LUAS AREA
5 6 7 8 9 10 LUAS (M2)
(M2)

507.1430
2.52
504.6205
GAN VOLUME GALIAN
ALAN KAYU ARA - BATU RAYA

1.0 2.0 3.0 4.0 5.0 6.0 7.0


93.00

92.00 Existing

rencana

91.00
GAN VOLUME GALIAN
ALAN KAYU ARA - BATU RAYA

LUAS AREA
5 6 7 8 9 10 LUAS (M2)
(M2)

508.3803
2.71
505.6665

1.0 2.0 3.0 4.0 5.0 6.0 7.0


93.00

Existing

rencana

92.00

LUAS AREA
5 6 7 8 9 10 LUAS (M2)
(M2)

496.4255
2.83
493.5955
GAN VOLUME GALIAN
ALAN KAYU ARA - BATU RAYA

1.0 2.0 3.0 4.0 5.0 6.0 7.0


91.00

90.00 Existing

rencana

89.00
GAN VOLUME GALIAN
ALAN KAYU ARA - BATU RAYA

LUAS AREA
5 6 7 8 9 10 LUAS (M2)
(M2)

498.1805
2.50
495.6805

1.0 2.0 3.0 4.0 5.0 6.0 7.0


91.00

Existing

rencana