Anda di halaman 1dari 2

STANDART MATERIAL PELAKSANA PDKB SUTT/SUTET

TRANSMISI JAWA BAGIAN TIMUR DAN BALI

Pengambilan Benda Pengambilan Benda


No Uraian Satuan Material Asing Tower 70 Kv Asing Tower 150 Kv
Volume Jumlah Volume
I MATERIAL :
1 Sakapen tube 462,000
2 Lap Majun kg 22,000
3 Minyak penetran ( Non Flammable ) tube 325,000
4 Mobile grease/Vet kg 60,000
5 Batere AA 1,5 buah 6,500 5 32500 5
6 Buku SP3B lot
7 Isolasi rol 25,000 0.25 6250 0.25
8 Silicon cloth buah 350,000 0.25 87500 0.25
9 Aseton liter 60,000 0.25 15000 0.25
10 Sarung tangan pasang 180,000 3 540000 3
11 DVD RW keping
12 Sikat Kawat Baja buah 20,000
13 Sikat Kawat Kuningan buah 30,000
14 Contact Grease tube 900,000
15 Amplas lembar 5,000
16 Contact Cleaner tube
17 Soft Detergen liter 50,000
18 BBM Genset liter 6,500
19 Minyak Hidrolik liter
20 Oli Mesin liter 75,000

Jumlah 681250 681250

Pengambilan Benda Pengambilan Benda


No Uraian Satuan Material Asing Tower 70 Kv Asing Tower 150 Kv
Volume Jumlah Volume
II Material Penunjang
1 Material Penunjang ( Dalam Kota ) h/o 50,000 10 500000 10

III JASA
1 PHL h/o 125,000 3 375000 3
Jumlah 875000 875000

Jumlah Total 1556250 1556250


UTET

Pengambilan Benda Pengambilan Benda


Asing Tower 150 Kv Asing Tower 500 Kv
Jumlah Volume Jumlah

32500 5 32500

6250 0.25 6250


87500 0.25 87500
15000 0.25 15000
540000 5 900000

681250 1041250

Pengambilan Benda Pengambilan Benda


Asing Tower 150 Kv Asing Tower 500 Kv
Jumlah Volume Jumlah

500000 12 600000

375000 5 625000
875000 1225000

1556250 2266250

Anda mungkin juga menyukai