Rab Rumah Tunggu Puskesmas
Rab Rumah Tunggu Puskesmas
Kebutuhan Hok
Tukang kayu 0.100 x
Pekerja 0.100 x
Kepala tukang 0.010 x
Mandor 0.005 x
2 Pekerjaan Pondasi 2.2.1 Perhtungan Volume Galian
Panjang Pondasi/ Galian p = 30.50 m
Lebar Galian b = 0.80 m Kebutuhan Hok
Tinggi Galian h = 0.60 m Pekerja 0.400 x
Volume V = p * b*h 14.64 m Mandor
3
0.040 x
Kebutuhan Hok
Pekerja 1.500 x
Tukang batu 0.600 x
Kepala tukang 0.060 x
Mandor 0.075 x
1. SLOF
3 Pekerjaan Beton 3.1.1 Perhitungan Volume Sloof Beton * PENGECORAN BETON
3.1 Sloof Campuran 1pc:2psr:3krkl Kebutuhan Bahan
Campuran 1pc:2psr:3krkl Panjang L = 30.50 m Semen portland 8.400 x
Lebar B = 0.15 m Pasir beton 0.540 x
Tinggi H = 0.20 m Koral beton/batu pecah 2/3 0.810 x
Volume V = B*H*L 0.92 m Air kerja
3
0.200 x
papan Begisting 0.250 x
3.1.2 Perhitungan Pembesian Paku 7cm 0.300 x
- Sengkang Besi ɸ6 - 15mm
Panjang Sloof L = 30.50 m Kebutuhan Hok
Lebar Sengkang Bs = 0.10 m Pekerja 2.000 x
Tinggi Sengkang Hs = 0.15 m Tukang batu 0.350 x
Jarak Sengkang Js = 0.15 m Kepala tukang 0.035 x
Panjang 1 Sengkang L1s = (Bs*2)+(Hs*2)+(0.02 0.55 m Mandor 1.000 x
Jumlah Sengkang Ns = (L/Js)+1 204.33 bh
Panjang Total Sengkang Ls = L1s*Ns 112.38 m *PEMBESIAN
*Jumlah Kebutuhan Besi 6P N = Ls/12 9.00 btg Kebutuhan Bahan
Berat Besi 6P w = 0.22 kg/m Besi ɸ6 mm 1.100 x
Berat besi 6P Total wt = w*Ls 24.72 kg Besi ɸ12 mm 1.100 x
Kawat Ikat 2.000 x
- Tulangan Pokok 4 ɸ 12 mm
Panjang Sloof L = 30.50 m Kebutuhan Hok
Jumlah Besi Nb = 3.00 bh Pekerja 3.900 x
Panjang Total Tul. Pokok 12P Lt = L*Nb 91.50 m Tukang batu 1.050 x
*Jumlah Kebutuhan Besi 12P N = Lt/12 8.00 btg Kepala tukang 0.105 x
Mandor 0.053 x
Berat Besi 12P w = 0.89 kg/m
Berat besi 12P Total wt = w*Lt 81.16 kg
3.2 Kolom Praktis 3.2.1 Perhitungan Volume Kolom 2. KOLOM PRAKTIS
Campuran 1pc:2psr:3krkl Campuran 1pc:2psr:3krkl * PENGECORAN BETON
Jumlah Kolom Nk = 11.00 m Kebutuhan Bahan
Tinggi Tiang HT = 1.20 m Semen portland 8.400 X
Lebar l = 0.12 m Pasir beton 0.540 X
Panjang p = 0.12 m Koral beton/batu pecah 2/3 0.810 X
Volume V = p*l*Nk*HT 0.19 m3 Air kerja 0.200 X
3.2.2 Perhitungan Pembesian Kebutuhan Hok
- Sengkang Besi ɸ6 - 15mm Pekerja 2.000 X
Jumlah Kolom Nk = 11.00 Tukang batu 0.350 X
Tinggi Tiang HT = 1.20 Kepala tukang 0.035 X
Lebar Sengkang Bs = 0.07 Mandor 1.000 X
Tinggi Sengkang Hs = 0.07
Jarak Sengkang Js = 0.15 *PEMBESIAN
Panjang 1 Sengkang L1s = (Bs*2)+(Hs*2)+(0.02 0.33 m Kebutuhan Bahan
Jumlah Sengkang Ns = (HT/Js)+1 9.00 bh Besi ɸ6 mm 1.100 x
Panjang Total Sengkang Ls = L1s*Ns*NK 32.67 m Besi ɸ12 mm 1.100 x
*Jumlah Kebutuhan Besi 6P N = Ls/12 3.00 btg Kawat Ikat 2.000 x
Kebutuhan Bahan
Pasir Pasang 1.2 x
Kebutuhan Hok
Pekerja 0.300 x
Mandor 0.015 x
9 PEKERJAAAN ATAP9.1 Perhitungan Volume Atap 9. PEKERJAAN PENUTUP ATAP SENG BJLS 0.20
* Bidang Atap REKAP KEBUTUHAN PEKERJAAN PENU
Panjang (Panjang Bubungan) pb = 8.00 m Kebutuhan Bahan
Lebar (Panjang Kaki Kuda - kuda) lk = 3.53 m Seng Gelombang BJLS 0.30 0.90 x
Jumlah n = 2.00 sisi Paku Seng 0.120 x
Luas Bidang Atap L = pb*lk*n 56.48 m2 Seng Plat (Bubungan)
Kebutuhan Hok
Pekerja 0.140 x
Tukang 0.067 x
Kepala tukang 0.007 x
Mandor 0.007 x
### PEKERJAAN LISPLANG10.1 Perhitungan Luas Lisplang
* Panjang Lisplang 10. PEKERJAAN LISPLANG 2.5/30 CM
Panjang 1 P1 = 8.00 m x 2 sisi 16.00 m REKAP KEBUTUHAN PEKERJAAN
Panjang 2 (Miring kaki kuda - kuda) P2 = 3.53 m x 4 sisi 14.12 m Kebutuhan Bahan
Panjang total papan ΣP = 30.12 m Papan kayu Kls I (2.5cm / 24 0.006 x
Papan kayu Kls I (2.5cm / 18 0.005 x
* Ukuran lisplang sisi luar Paku 5 s.d 7 cm 0.100 x
Panjang p = 30.12 m Kebutuhan Hok
Lebar h1 = 0.24 m Pekerja 0.100 x
Tebal t = 0.025 m Tukang kayu 0.050 x
Luas Lisplang sisi luar L = p*h1 7.23 m Kepala tukang
2
0.020 x
Volume Lisplang sisi luar V = L*t 0.181 m3 Mandor 0.005 x
### PEKERJAAN PLAFON 11.1 Perhitungan Luas Plafon 11. PEKERJAAAN PLAFON 5/7CM
Bangunan Utama REKAP KEBUTUHAN PEKERJAAN
Panjang p = 8.00 Kebutuhan Bahan
Lebar (kaki kuda - kuda) l = 5.50 Kaso 5/7 cm 0.021 x
Luas L = p*l 44.00 m2 Tripleks 3 mm 0.370 x
Tripleks 9 mm untuk list 0.050 x
Paku 7 s.d 10 cm 0.080 x
Paku 1 s.d 2 cm 0.030 x
Kebutuhan Hok
Pekerja 0.234 x
Tukang kayu 0.338 x
Kepala tukang 0.034 x
Mandor 0.008 x
*Pengecatan Seng
Kebutuhan Bahan
Menie Seng 5 kg 0.10 x
Tiner 0.05 x
Kwas 3 " 0.01 x
Kebutuhan Hok
Pekerja 0.06 x
Tukang kayu 0.04 x
Kepala tukang 0.002 x
Mandor 0.001 x
Kebutuhan Hok
Pekerja
Tukang kayu
Kepala tukang
Mandor
Pelaksanaan Pembangunan
Pembangunan Rumah Tunggu
4x 6 m
Puskesmas Maubasa
PEKERJAAN PONDASI
= 0.12 0.10 m3
= 0.48 0.50 kg
= 0.17 0.20 m3
= 6.69 7.00 m3
= 4.39 4.00 m3
= 10.57 11.00 m3
= 32.67 33.00 Zak
= 1.92 2.00 Tgki
= 15.84 16.00 m3
= 4.98 5.00 m3
= 19.36 19.00 Zak
= 31.26 31.00 Dos
= 6.13 6.00 kg
= 0.43 1.00 Tgki
= 1.46 1.00 m3
= 1.87 2.00 m3
1/2 BATA
PEKERJAAN GORDING
NG BJLS 0.20
RJAAN PENUTUP ATAP SENG
56.48 = 50.83 51.00 Lmbr
56.48 = 6.78 7.00 kg
= 9.00 9.00 m
CM
PEKERJAAN LISPLANG
N PEKERJAAN PLAFON
aun Puntu
EKERJAAN PENGECATAN
= 18.752 19.00 kg
= 32.96 33.00 kg
= 5.81 6.00 kg
= 1.17 1.00 bh
= 23.44 23.00 lmbr
= 7.58 8.00 lmbr
= 4.22 4.00 kg
= 2.10 2.00 kg
= 5.05 5.00 kg
= 3.79 4.00 liter
= 1.84 2.00 bh
HARGA/BIAYA BAHAN
Kateg
No URAIAN Satuan ori Harga di Quarry Buruh Angkutan
Biaya
(RP) (Rp) ( Rp )
1 2 3 4 5 6
1 BAHAN
1 Batu Kali /belah ukr. 15/20 atau Variasi m3 I-a 90,000.00 25,000.00 75,000.00
2 Batu Kali/belah ukr. 10/15 kg I-a 90,000.00 50,000.00 80,000.00
3 Kerikil 2/3 cm m3 I-a 275,000.00 37,500.00 87,500.00
4 Kerikil 3/5 cm m3 I-a 235,000.00 37,500.00 87,500.00
5 Pasir Pasang m3 I-a 75,000.00 25,000.00 75,000.00
6 Pasir Beton m3 I-a 75,000.00 25,000.00 75,000.00
7 Bata merah 5 x 10 x 20 cm bh I-a 800.00 100.00 100.00
8 Batu Angin (Loupster) 20 x 25 cm bh I-a 7,500.00
9 Tanah Urug m3 I-a 50,000.00 30,000.00 40,000.00
10 Balok kayu kls. II uk. 6/12 cm m3 4,025,000.00
11 Kayu Papan kls. II uk. 4/12 cm m3 4,025,000.00
12 Usuk 4/6 kayu kls. II m3 3,850,000.00
13 Kaso 5/7 cm kayu kls. II m3 3,850,000.00
14 Papan Kayu kls. III Bowplang m3 2,300,000.00
15 Papan Kayu kls. II (2,5/24 cm) m3 3,000,000.00
16 Papan Kayu kls. II (2,5/18 cm) m3 3,000,000.00
17 Papan kayu Begesting kls.II m3 3,000,000.00
18 Tripleks 3 mm lbr 66,000.00
19 Tripleks 9 mm lbr 156,000.00
20 Multipleks 14 mm lbr 200,000.00
21 Minyak begesting ltr 20,000.00
22 Beghel U Plat bh I-b 25,000.00
23 Beghel U Bulat bh I-b 25,000.00
24 Plat Strip 40 cm, 3mm (3 lubang) bh I-b 20,000.00
25 Angkur bh I-b 30,000.00
26 Mur Baut Panjang 25 cm + Ring set I-b 20,000.00
27 Mur Baut Panjang 10 cm + Ring set I-b 20,000.00
28 Semen Tonasa 40 kg zak I-b 54,000.00 6,000.00 10,000.00
29 Semen Warna kg I-b 25,000.00
30 Besi ɸ 6 mm btg I-b 35,000.00
31 Besi ɸ 8 mm btg I-b 56,000.00
32 Besi ɸ 10 mm btg I-b 87,000.00
33 Besi ɸ 12 mm btg I-b 121,000.00
34 Kawat Beton kg I-b 20,000.00
35 Seng Gelombang BJLS 0.20 lbr I-b 48,000.00
36 Seng Gelombang BJLS 0.30 lbr I-b 61,000.00
37 Seng Plat 0.60 m (bubungan) m I-b 25,000.00
38 Keramik ukr. 30 x 30 cm dos I-b 82,000.00
39 Keramik dinding 20 x 25 biru (k. mandi dos I-b 78,000.00
40 Keramik Lantai 20 x 20 biru (k. mandi) dos I-b 82,000.00
41 Pintu Kamar Mandi (Fiber) unit I-b 600,000.00
42 Sekrup (Fisher) dos I-b 15,000.00
43 Plamir Tembok kg I-b 17,500.00
44 Cat Tembok Altex kg I-b 25,500.00
45 Menie Kayu dasar kg I-b 71,000.00
46 Menie Seng kg I-b 47,000.00
47 Ijuk kg 55,000.00
48 Weber I-b 25,000.00
49 Plamir kayu kg I-b 36,000.00
50 Vernis Boyo kg I-b 21,000.00
51 Kasium kg I-b 12,500.00
52 Dempul kayu kg I-b 40,000.00
53 Cat Kayu Mengkilat kg I-b 75,000.00
54 Minyak Cat (Tiner) ltr I-b 59,000.00
55 Residu Kuda - Kuda dan Gording (oli ko ltr I-b 15,000.00
56 Paku 15 cm kg I-b 20,000.00
57 Paku 10 s.d 12 cm kg I-b 20,000.00
58 Paku 7 s.d 10 cm kg I-b 20,000.00
59 Paku 5 s.d 7 cm kg I-b 20,000.00
60 Paku 1 s.d 2 cm untuk Tripleks kg I-b 22,500.00
61 Paku Seng kg I-b 25,000.00
62 Kunci Yale 2 x slaag bh I-b 280,000.00
63 Engsel Jendela psg I-b 21,000.00
64 Engsel Pintu merk. King (besi) psg I-b 25,000.00
65 Gerendel Jendela (Kuningan) bh I-b 14,000.00
66 Gerendel Pintu (Kuningan) bh I-b 14,000.00
67 Hak Angin (Kuningan) bh I-b 10,000.00
68 Closed Jongkok merk. INA bh I-b 290,000.00
69 Wastafel 1 set merk. INA bh I-b 120,000.00
70 Pipa PE rol I-b 250,000.00
71 Pipa PVC diameter 4" btg I-b 86,000.00
72 Elbow PVC diameter 4" bh I-b 12,500.00
73 Soket PVC diameter 4" bh I-b 30,000.00
74 Pipa GIP diameter 1/2" btg I-b 168,000.00
75 Tee GIP diameter 2" - 1 1/2" bh I-b 12,500.00
76 Knie GIP 1/2" bh I-b 14,000.00
77 Soket GIP 1/2" bh I-b 12,500.00
78 Kran Air 1/2" bh I-b 59,000.00
79 Dop GIP 1/2" bh I-b 9,000.00
80 Pipa Ventilasi Hawa bh I-b 56,000.00
81 Flour Drain bh I-b 20,000.00
82 Sealtape bh I-b 5,000.00
83 Air Tangki 5000 ltr tangki 90,000.00
84 Kosen Pintu (P1) unit 450,000.00
85 Kosen Pintu (P2) unit 450,000.00
86 Kosen Jendela 1 lubang (J) unit 260,000.00
87 Daun Pintu (P1) unit 800,000.00
88 Daun Pintu (P2) unit 800,000.00
89 Daun Jendela Kaca 5mm 1 Lubang (J) unit 450,000.00
90 Bovev (BV) unit 250,000.00
91 Meja 1/2 Biro bh 1,000,000.00
92 Kursi Plastik (merk napoli) bh 80,000.00
92 Tempat Tidur ukr. 1.60 m unit 1,600,000.00
93 Karpet Permadani lbr 650,000.00
2 ALAT
1 Pikwel bh II-a 72,000.00 1,000.00 2,000.00
2 Linggis bh II-a 77,000.00 1,000.00 2,000.00
3 Skop bh II-a 72,000.00 1,000.00 2,000.00
4 Ember cor bh II-a 12,000.00
5 Ember Sedang bh II-a 15,000.00
6 Terpal uk 5 x 7 cm bh II-a 385,000.00 5,000.00 10,000.00
7 Selang d-1/2" roll II-a 150,000.00
8 Tali Tukang roll II-a 10,000.00
9 Gerobak dorong Roda 3 bh II-a 475,000.00 5,000.00 10,000.00
10 Kawat Ayak bh II-a 11,000.00
11 Waterpas Selang m II-a 15,000.00
12 Pisau Dumpul bh II-a 7,500.00
13 Kuas biasa 3" bh II-a 20,000.00
14 Amplas Tembok bh II-a 6,000.00
15 Amplas kayu bh II-a 6,000.00
16 Kuas Roll / Rool Cat bh II-a 25,000.00
17 Kwas 3" bh II-a 17,500.00
18 Kertas pasir lmbr II-a 6,000.00
19 Gayung Air bh II-a 10,000.00
20 Sewa Molen hr II-a 150,000.00
3 UPAH
1 Pekerja hok III-a 45,000.00
2 Tukang hok III-a 75,000.00
3 Kepala Tukang hok III-a 95,000.00
4 Mandor hok III-a 65,000.00
4 BIAYA LAIN - LAIN
1 Jasa Desain & RAB Ls 1,170,000.00
2 Biaya Sertifikasi 80% & 100% Ls 250,000.00
3 Papan Proyek Ls 150,000.00
4 HonorTransportasi Pelaksana Ls 2,700,000.00
5 ATK dan Dokumentasi Ls 230,000.00
Kategori Biaya
I-a Pembelian bahan hasil tenaga manusia
I-b Pembelian bahan hasil industri
II-a Pembelian alat tangan
II-b
' Pembelian / penyewaan alat mesin
III-a Pembayaran tenaga kerja untuk konstruksi
III-b Pembayaran tenaga untuk pengumpulan bahan
: 2.2 Pelaksanaan Pembangunan
HARGA/BIAYA BAHAN
Jumlah Harga
( Rp )
190,000.00
220,000.00
400,000.00
360,000.00
175,000.00
175,000.00
1,000.00
7,500.00
120,000.00
4,025,000.00
4,025,000.00
3,850,000.00
3,850,000.00
2,300,000.00
3,000,000.00
3,000,000.00
3,000,000.00
66,000.00
156,000.00
200,000.00
20,000.00
25,000.00
25,000.00
20,000.00
30,000.00
20,000.00
20,000.00
70,000.00
25,000.00
35,000.00
56,000.00
87,000.00
121,000.00
15,000.00
48,000.00
61,000.00
25,000.00
82,000.00
78,000.00
82,000.00
600,000.00
15,000.00
17,500.00
25,500.00
71,000.00
47,000.00
55,000.00
25,000.00
36,000.00
21,000.00
12,500.00
40,000.00
75,000.00
59,000.00
15,000.00
20,000.00
20,000.00
20,000.00
20,000.00
22,500.00
25,000.00
280,000.00
21,000.00
25,000.00
14,000.00
14,000.00
10,000.00
290,000.00
120,000.00
250,000.00
86,000.00
12,500.00
30,000.00
168,000.00
12,500.00
14,000.00
12,500.00
59,000.00
9,000.00
56,000.00
20,000.00
5,000.00
90,000.00
450,000.00
450,000.00
260,000.00
800,000.00
800,000.00
450,000.00
250,000.00
1,000,000.00
80,000.00
1,600,000.00
650,000.00
75,000.00
80,000.00
75,000.00
12,000.00
15,000.00
400,000.00
150,000.00
10,000.00
490,000.00
11,000.00
15,000.00
7,500.00
20,000.00
6,000.00
6,000.00
25,000.00
17,500.00
6,000.00
10,000.00
150,000.00
45,000.00
75,000.00
95,000.00
65,000.00
1,170,000.00
250,000.00
150,000.00
2,700,000.00
230,000.00
RENCANA ANGGARAN BIAYA (RAB)
Desa : ……………………
Kecamatan : Kelimutu
Kabupaten : Ende
Provinsi : NTT
Volume
Uraian
No Total Swadaya APBDes
a b c d = (b-c)
1 BELANJA MODAL
1 Kayu usuk 4/6 0.10 - 0.10
2 Paku biasa 5 s.d 7 cm 4.50 - 4.50
3 Kayu papan 3/20 (Bowplank) 0.20 - 0.20
4 Pasir Pasang 16.00 - 16.00
5 Batu Ukuran 10/15 4.00 - 4.00
6 Batu belah 15/20 cm (Variasi) 11.00 - 11.00
7 Semen porland 89.00 - 89.00
8 Pasir beton 2.00 - 2.00
9 Koral beton/batu pecah 2/3 4.00 - 4.00
10 papan Begisting 0.23 - 0.23
11 Besi ɸ6 mm 24.00 - 24.00
12 Besi ɸ12 mm 28.00 - 28.00
13 Kawat Ikat 5.00 - 5.00
14 Tanah Urug 16.00 - 16.00
15 Keramik 30 x 30 cm 31.00 - 31.00
16 Semen warna 6.00 - 6.00
17 Bata merah 5 x 10 x 20 cm 2,083.00 2,083.00
18 - - -
19 Balok 6/12 cm 0.80 0.80
20 Kayu 4/12 cm 0.48 0.48
21 Paku 15 cm 7.00 7.00
22 Beghel U Plat 2.00 2.00
23 Beghel U Bulat 4.00 4.00
24 Plat Strip 40 cm 3 lubang 16.00 16.00
25 Angkur 4.00 4.00
26 Mur Baut Panjang 25 cm + Ring 8.00 8.00
27 Mur Baut Panjang 10 cm + Ring 32.00 32.00
28 Oli Kotor 10.00 10.00
29 Seng Gelombang BJLS 0.30 51.00 51.00
30 Paku Seng 7.00 7.00
31 Seng Plat 0.60m (Bubungan) 9.00 9.00
32 Papan kayu Kls I (2.5cm / 24 cm) 0.20 0.20
33 Papan kayu Kls I (2.5cm / 18 cm) 0.10 0.10
34 Kaso 5/7 cm 0.92 0.92
35 Tripleks 3 mm 16.00 16.00
36 Tripleks 9 mm untuk list 2.00 2.00
37 Paku 7 s.d 10 cm 4.00 4.00
38 Paku 1 s.d 2 cm 1.00 1.00
39 Plamir Tembok 19.00 19.00
40 Cat Tembok Altex 33.00 33.00
41 Menie Seng 6.00 6.00
42 Meny Kayu 4.00 4.00
43 Dempul Kayu 2.00 2.00
44 Cat Kayu 5.00 - 5.00
45 Minyak Cat Kayu (Tiner) 4.00 - 4.00
46 Kosen Pintu (P1) 3.00 - 3.00
47 Kosen Pintu (P2) 1.00 - 1.00
48 Kosen Jendela 1 lubang (J) 7.00 - 7.00
49 Daun Pintu Panel (P1) 3.00 - 3.00
50 Daun Pintu Panel (P2) 1.00 - 1.00
51 Daun Jendela Kaca 5mm 1 Lubang (J) 5.00 - 5.00
52 Kunci Yale 2 x slaag 4.00 - 4.00
53 Engsel Jendela 7.00 - 7.00
54 Engsel Pintu merk. King (besi) 3.00 - 3.00
55 Gerendel Jendela (Kuningan) 7.00 - 7.00
56 Gerendel Pintu (Kuningan) 1.00 - 1.00
57 Hak Angin (Kuningan) 14.00 - 14.00
58 Tempat Tidur Kayu uk. 160cm 2.00 - 2.00
59 Kursi Kayu 10.00 - 10.00
S
2 BELANJA BARANG DAN JASA
Pikwel 2.00 - 2.00
Tali Tukang 2.00 - 2.00
Linggis 2.00 - 2.00
Skop 4.00 - 4.00
Gerobak dorong Roda 3 1.00 - 1.00
Waterpas Selang 10.00 - 10.00
Selang d-1/2" 1.00 - 1.00
Ember cor 10.00 - 10.00
Ember Sedang 2.00 - 2.00
Amplas Tembok 23.00 - 23.00
Amplas Kayu 8.00 - 8.00
Rool Cat 1.00 - 1.00
Kwas 3" 2.00 - 2.00
Mengetahui, Woloara,…
Kepala Desa …………….. Tim Peny
(……………………………..) (………..
ALAT DAN UPAH
No.Rab : 01/RAB-RTP/DD/2017
Bidang : Pelaksanaan Pembangunan
Kegiatan : Pemb. Rumah Tunggu
Jenis Keg. : Rekap RAB
Ukuran : 4m x 6m (1 Unit)
Lokasi : Puskesmas Kelimutu
Harga Satuan Jumlah Harga
Satuan
(Rp) Rp
e f g = (d x f)
m3 3,850,000.00 385,000.00
kg 20,000.00 90,000.00
m3 2,300,000.00 460,000.00
m3 175,000.00 2,800,000.00
m3 220,000.00 880,000.00
m3 190,000.00 2,090,000.00
sak 70,000.00 6,230,000.00
m3 175,000.00 350,000.00
m3 400,000.00 1,600,000.00
m3 3,000,000.00 690,000.00
btg 35,000.00 840,000.00
btg 121,000.00 3,388,000.00
kg 15,000.00 75,000.00
m3 120,000.00 1,920,000.00
dos 82,000.00 2,542,000.00
kg 25,000.00 150,000.00
bh 1,000.00 2,083,000.00
bh - -
m3 4,025,000.00 3,220,000.00
m3 4,025,000.00 1,932,000.00
kg 20,000.00 140,000.00
bh 25,000.00 50,000.00
bh 25,000.00 100,000.00
bh 20,000.00 320,000.00
bh 30,000.00 120,000.00
set 20,000.00 160,000.00
set 20,000.00 640,000.00
ltr 15,000.00 150,000.00
lbr 48,000.00 2,448,000.00
kg 25,000.00 175,000.00
m 25,000.00 225,000.00
m3 3,000,000.00 600,000.00
m3 3,000,000.00 300,000.00
m3 3,850,000.00 3,542,000.00
lbr 66,000.00 1,056,000.00
lbr 156,000.00 312,000.00
kg 20,000.00 80,000.00
kg 22,500.00 22,500.00
kg 17,500.00 332,500.00
kg 25,500.00 841,500.00
kg 47,000.00 282,000.00
kg 71,000.00 284,000.00
kg 40,000.00 80,000.00
kg 75,000.00 375,000.00
ltr 59,000.00 236,000.00
unit 450,000.00 1,350,000.00
unit 450,000.00 450,000.00
unit 260,000.00 1,820,000.00
unit 800,000.00 2,400,000.00
unit 800,000.00 800,000.00
unit 450,000.00 2,250,000.00
unit 280,000.00 1,120,000.00
psg 21,000.00 147,000.00
psg 25,000.00 75,000.00
bh 14,000.00 98,000.00
bh 14,000.00 14,000.00
bh 10,000.00 140,000.00
bh 1,600,000.00 3,200,000.00
bh 80,000.00 800,000.00
Sub Total (1).a 59,260,500.00
bh 150,000.00 300,000.00
roll 25,000.00 50,000.00
bh 10,000.00 20,000.00
bh 10,000.00 40,000.00
bh 490,000.00 490,000.00
m 15,000.00 150,000.00
roll 150,000.00 150,000.00
bh 12,000.00 120,000.00
bh 15,000.00 30,000.00
lbr 6,000.00 138,000.00
lbr 6,000.00 48,000.00
bh 25,000.00 25,000.00
bh 17,500.00 35,000.00
Sub Total (2) 1,596,000.00
Ls 1,170,000.00 1,170,000.00
Ls 250,000.00 250,000.00
Unit 150,000.00 150,000.00
Ls 2,700,000.00 2,700,000.00
Ls 230,000.00 230,000.00
Sub Total (4) 4,500,000.00
Total 78,273,250.00
Woloara,……..Maret 2017
Tim Penyusun RKPDes
(………..………………)
REKAPITULASI PAJAK PPN (10%) & PPh (1.5%)
Desa : ……………No.Rab
Kecamatan : Kelimutu Bidang : Pelaksanaan Pembangunan
Kabupaten : Ende Kegiatan : Pemb. Rumah Tunggu
Provinsi : NTT Jenis Keg.: Rekap RAB
Ukuran : 4m x 6m (1 Unit)
Lokasi : Puskesmas MAUBASA
Volume Harga Satuan Jumlah Harga
Uraian Satuan
No Total (Rp) Rp
a b e f g = (d x f)
1 BELANJA MODAL
1 Kayu usuk 4/6 0.10 m3 3,850,000.00 385,000.00
2 Paku biasa 5 s.d 7 cm 4.50 kg 20,000.00 90,000.00
3 Kayu papan 3/20 (Bowplank) 0.20 m3 2,300,000.00 460,000.00
4 Pasir Pasang 16.00 m3 175,000.00 2,800,000.00
5 Batu Ukuran 10/15 4.00 m3 220,000.00 880,000.00
6 Batu belah 15/20 cm (Variasi) 11.00 m3 190,000.00 2,090,000.00
7 Semen porland 89.00 sak 70,000.00 6,230,000.00
8 Pasir beton 2.00 m3 175,000.00 350,000.00
9 Koral beton/batu pecah 2/3 4.00 m3 400,000.00 1,600,000.00
10 papan Begisting 0.23 m3 3,000,000.00 690,000.00
11 Besi ɸ6 mm 24.00 btg 35,000.00 840,000.00
12 Besi ɸ12 mm 28.00 btg 121,000.00 3,388,000.00
13 Kawat Ikat 5.00 kg 15,000.00 75,000.00
14 Tanah Urug 16.00 m3 120,000.00 1,920,000.00
15 Keramik 30 x 30 cm 31.00 dos 82,000.00 2,542,000.00
16 Semen warna 6.00 kg 25,000.00 150,000.00
17 Bata merah 5 x 10 x 20 cm 2,083.00 bh 1,000.00 2,083,000.00
18 - - bh - -
19 Balok 6/12 cm 0.80 m3 4,025,000.00 3,220,000.00
20 Kayu 4/12 cm 0.48 m3 4,025,000.00 1,932,000.00
21 Paku 15 cm 7.00 kg 20,000.00 140,000.00
22 Beghel U Plat 2.00 bh 25,000.00 50,000.00
23 Beghel U Bulat 4.00 bh 25,000.00 100,000.00
24 Plat Strip 40 cm 3 lubang 16.00 bh 20,000.00 320,000.00
25 Angkur 4.00 bh 30,000.00 120,000.00
26 Mur Baut Panjang 25 cm + Ring 8.00 set 20,000.00 160,000.00
27 Mur Baut Panjang 10 cm + Ring 32.00 set 20,000.00 640,000.00
28 Oli Kotor 10.00 ltr 15,000.00 150,000.00
29 Seng Gelombang BJLS 0.30 51.00 lbr 48,000.00 2,448,000.00
30 Paku Seng 7.00 kg 25,000.00 175,000.00
31 Seng Plat 0.60m (Bubungan) 9.00 m 25,000.00 225,000.00
32 Papan kayu Kls I (2.5cm / 24 cm) 0.20 m3 3,000,000.00 600,000.00
33 Papan kayu Kls I (2.5cm / 18 cm) 0.10 m3 3,000,000.00 300,000.00
34 Kaso 5/7 cm 0.92 m3 3,850,000.00 3,542,000.00
35 Tripleks 3 mm 16.00 lbr 66,000.00 1,056,000.00
36 Tripleks 9 mm untuk list 2.00 lbr 156,000.00 312,000.00
37 Paku 7 s.d 10 cm 4.00 kg 20,000.00 80,000.00
38 Paku 1 s.d 2 cm 1.00 kg 22,500.00 22,500.00
39 Plamir Tembok 19.00 kg 17,500.00 332,500.00
40 Cat Tembok Altex 33.00 kg 25,500.00 841,500.00
41 Menie Seng 6.00 kg 47,000.00 282,000.00
42 Meny Kayu 4.00 kg 71,000.00 284,000.00
43 Dempul Kayu 2.00 kg 40,000.00 80,000.00
44 Cat Kayu 5.00 kg 75,000.00 375,000.00
45 Minyak Cat Kayu (Tiner) 4.00 ltr 59,000.00 236,000.00
46 Kosen Pintu (P1) 3.00 unit 450,000.00 1,350,000.00
47 Kosen Pintu (P2) 1.00 unit 450,000.00 450,000.00
48 Kosen Jendela 1 lubang (J) 7.00 unit 260,000.00 1,820,000.00
49 Daun Pintu Panel (P1) 3.00 unit 800,000.00 2,400,000.00
50 Daun Pintu Panel (P2) 1.00 unit 800,000.00 800,000.00
51 Daun Jendela Kaca 5mm 1 Lubang 5.00 unit 450,000.00 2,250,000.00
52 Kunci Yale 2 x slaag 4.00 unit 280,000.00 1,120,000.00
53 Engsel Jendela 7.00 psg 21,000.00 147,000.00
54 Engsel Pintu merk. King (besi) 3.00 psg 25,000.00 75,000.00
55 Gerendel Jendela (Kuningan) 7.00 bh 14,000.00 98,000.00
56 Gerendel Pintu (Kuningan) 1.00 bh 14,000.00 14,000.00
57 Hak Angin (Kuningan) 14.00 bh 10,000.00 140,000.00
58 Tempat Tidur Kayu uk. 160cm 2.00 bh 1,600,000.00 3,200,000.00
59 Kursi Kayu 10.00 bh 80,000.00 800,000.00
a. Total (1) 59,260,500.00
b. DPP 100/110*a 53,873,182.00
c. PPN 10% *b 5,387,318.00
d. PPh 1.5%*b 808,098.00
Sub Total 1 =(a+c+d) 65,455,916.00
2 BELANJA BARANG DAN JASA
Pikwel 2.00 bh 150,000.00 300,000.00
Tali Tukang 2.00 roll 25,000.00 50,000.00
Linggis 2.00 bh 10,000.00 20,000.00
Skop 4.00 bh 10,000.00 40,000.00
Gerobak dorong Roda 3 1.00 bh 490,000.00 490,000.00
Waterpas Selang 10.00 m 15,000.00 150,000.00
Selang d-1/2" 1.00 roll 150,000.00 150,000.00
Ember cor 10.00 bh 12,000.00 120,000.00
Ember Sedang 2.00 bh 15,000.00 30,000.00
Amplas Tembok 23.00 lbr 6,000.00 138,000.00
Amplas Kayu 8.00 lbr 6,000.00 48,000.00
Rool Cat 1.00 bh 25,000.00 25,000.00
Kwas 3" 2.00 bh 17,500.00 35,000.00
a. Total (2) 1,596,000.00
b. DPP 100/110*a 1,450,909.00
c. PPN 10% *b 145,091.00
d. PPh 1.5%*b 21,764.00
Sub Total 2=(a+c+d) 1,762,855.00
3 UPAH KERJA MASYARAKAT
1 Pekerja 107.00 hok 45,000.00 4,815,000.00
2 Tukang 84.00 hok 75,000.00 6,300,000.00
3 Kepala tukang 11.20 hok 95,000.00 1,064,000.00
4 Mandor 11.35 hok 65,000.00 737,750.00
Sub Total (3) 12,916,750.00
Bahan Peralatan
No
(Rp.) (Rp.)
1 Pekerjaan Persiapan - .00 410,000.00
2 Pekerjaaan Pondasi 7,360,000.00 856,000.00
3 Pekerjaan Beton 7,108,000.00 84,000.00
4 Pekerjaaan Lantai 7,792,000.00 - .00
5 Pekerjaan Dinding Tembok 3,063,000.00 - .00
Pekerjaan Dinding Triplek 12,502,500.00
6 Pekerjaan Plesteran + Acian 1,190,000.00 - .00
7 Pekerjaan Kuda - Kuda 5,348,500.00 - .00
8 Pekerjaan Gording 1,483,500.00 - .00
9 Pekerjaan Penutup Atap Seng BJLS 0.20 2,848,000.00 - .00
10 Pekerjaan Lisplang 960,000.00 - .00
11 Pekerjaan Plafon 5,012,500.00 - .00
12 Pekerjaan Pengecatan 2,431,000.00 246,000.00
13 Pekerjaan Pintu dan Jendela 10,664,000.00 - .00
14 Pekerjaan Meubeler 4,000,000.00 - .00
JUMLAH 71,763,000.00 1,596,000.00
ANGGARAN BIAYA PRASARANA
N RUMAH TUNGGU
AS MAUBASA
t
Ke
(Rp) I II III IV I II III IV I II III IV I II III IV
1 Rapat persiapan
2 Pembersihan Lokasi
3 Pendropingan Material
4 Pembentukan badan jalan
5 Pemasangan bt Pinggir
6 Pekerjaan Telford
7 Pengecoran Rabat Beton
8 Pembersihan Akhir
9 Laporan Akir
0.00
0.00
0.00
0.00
0.00
0.00
0.00