NTS
GAMBAR RENCANA
PEMBANGUNAN
U
RUMAH WALET
OUT LOKASI ( 3 UNIT )
KABUPATEN
KUTAI KARTANEGARA
KECAMATAN
TABANG
DESA
MUARA SALUNG
JENIS PRASARANA
BANGUNAN
LOKASI
RT 1 Desa Muara Salung
JUDUL GAMBAR
LAY OUT LOKASI
Digambar Oleh
Kader Teknik
……………………
..................................
B Pek. Pemancangan
Kedalaman seluruh = Kedalaman Pancangan x Jumlah Tiang Pancang
Pancangan = 0.5 m x 20 m
= 10 m = 10 m
RINI ASTUTI
DAFTAR HARGA SATUAN UPAH DAN BAHAN
B BAHAN MATERIAL
1 Balok Ulin (10/10) P. 4 m Batang 150,000.00 4,500.00 154,500.00
2 Balok Ulin (5/10) P. 4 m Batang 80,000.00 2,400.00 82,400.00
3 Papan Ulin (2/20) P. 5 m Lembar 100,000.00 3,000.00 103,000.00
4 Baut 12" P. 25 + Mur Buah 15,000.00 450.00 15,450.00
5 Paku Ulin 2" Kg 24,000.00 720.00 24,720.00
7 Tandon 1200 Lter Unit 1,200,000.00 36,000.00 1,236,000.00
8 Pipa PVC 1/2" Batang 60,000.00 1,800.00 61,800.00
9 Stop Kran 1/2" Pcs 35,000.00 1,050.00 36,050.00
10 Drat Valve 1/2" Pcs 15,000.00 450.00 15,450.00
11 El Valve 1/2" Pcs 15,000.00 450.00 15,450.00
12 Sealtape Rol 5,000.00 150.00 5,150.00
13 Lem Pipa Kaleng 50,000.00 1,500.00 51,500.00
14 Papan Kegiatan Unit 500,000 15,000.00 515,000
RINI ASTUTI
RENCANA ANGGARAN BIAYA (RAB)
KAMPUNG MUARA GUSIK KECAMATAN BONGAN
TAHUN ANGGARAN 2019