Anggaran Dana Desa (DD) Tahun 2020

Kab. : Bungo Kegiatan : Pemb. WC Warga


Kec. : Tanahh Sepenggal Linta Take Of Sheet Lokasi : Kp. ………….
Dusun : Sungai Puri Volume : 1 Unit

IX. PEK. SEPTICKTANK


a. Galian tanah septiktank Panjang = 1.50 M
Lebar = 1.50 M
Tinggi = 1.70 M
Volume = 1.50 x 1.50 x 1.70 = 3.83 M3

b Pas. Bata 1 : 2 Panjang = 6.00 M


Tinggi = 1.70 M
Volume = 6.00 x 1.70 = 10.20 M2

c Urugan Pasir Panjang = 1.50 Meter


Lebar = 1.50 Meter
Tebal = 0.05 Meter
Volume = 1.50 x 1.50 x 0.05 = 0.11 M3

e. Plesteran 1 : 2 Panjang = 6.00 M


Tinggi = 1.70 M
Volume = 6.00 x 1.70 = 10.20 M2

f. Cor Beton Bertulang Panjang = 1.50 M


Lebar = 1.50 M
Tebal = 0.10 M
Volume = 1.50 x 1.50 x 0.10 = 0.23 M3
g. Pek. Pembesian
Besi Lantai Septictank memanjang
Panjang Besi = 1.50 Meter
Jumlah Besi = 1.5 / 0.15 + 1 = 11 Bh
1.7
Kebutuhan = 1.50 x 11 = 16.5 / 12 = 1.375 Btg

Besi Lantai Septictank melintang


Panjang Besi = 1.50 Meter
Jumlah Besi = 1.5 / 0.15 + 1 = 11 Bh
Kebutuhan = 1.50 x 11 = 16.5 / 12 = 1.375 Btg

Total Kebutuhan Besi Berdasarkan Batang = 2.75 Jadi 3.00 Btg


Total Kebutuhan Besi Berdasarkan Berat = 14.22 Kg/Btg

Tanggal Survei : Di Setujui oleh Dibuat oleh :


Rio Dusun Sungai Puri Perencana Kegiatan

………………… SYAMSUWIR,ST
Anggaran Dana Desa (DD) Tahun 2020

PERHITUNGAN ANALISA BAHAN, ALAT DAN UPAH


Berdasarkan SNI

Kabupaten : Bungo Jenis Prasarana : Pemb. WC Warga


Kecamatan : Tanahh Sepenggal Lintas Volume : 1 Unit
Dusun : Sungai Puri

Volume Volume
No. Uraian Pekerjaan Sat. Indeks Bahan & Pembulatan Keterangan
Pekerjaan
Upah
I. PEK. TANAH
SNI 2835 - 2008
1 Menggali 1 M3 tanah biasa sedalam 1 Meter
Upah :
Pekerja HOK 0.7500 3.83 2.87 3.00

2 Mengurug 1 M3 pasir urug


Bahan :
Pasir urug M3 1.2000 0.11 0.14 1.00
Upah :
Pekerja HOK 0.3000 0.11 0.03

II. PEK. DINDING


SNI DT 91 - 0009 - 2007
1 M2 Memasang dinding bata merah (5 x 11 x 22) tebal 1/2 bata 1 Pc : 4 Pp
Bahan :
Bata merah Bh 70.0000 10.20 714 714
Semen Zak 0.2300 10.20 2.35 3.00
Pasir pasang M3 0.0430 10.20 0.44 0.50
Upah :
Pekerja HOK 0.3000 10.20 3.06 3.00
Tukang HOK 0.1000 10.20 1.02 1.00

III. PEK. PLESTERAN


SNI DT 91 - 0010 - 2007
1 M2 Plesteran 1 Pc : 4 Pp tebal 15 mm
Bahan :
Semen Zak 0.1248 10.20 1.27 1.00
Pasir pasang M3 0.0240 10.20 0.24 0.50
Upah :
Pekerja HOK 0.3000 10.20 3.06 3.00
Tukang HOK 0.1500 10.20 1.53 2.00

IV. PEK. LANTAI BETON BERTULAN


Membuat 1 M3 Lantai beton bertulang
Bahan :
Semen @ 50 Kg Zak 7.4200 0.23 1.67 2.00
Pasir beton M3 0.6980 0.23 0.16 0.50
Kerikil M3 1.0470 0.23 0.24 0.50
Upah :
Pekerja HOK 1.6500 0.23 0.37 1.00
Tukang Kayu HOK 0.2750 0.23 0.06

Dibuat oleh :
Perencana Kegiatan

SYAMSUWIR,ST
Anggaran Dana Desa (DD) Tahun 2020

REKAPITULASI BAHAN & UPAH RENCANA ANGGARAN BIAYA

Kabupaten : Bungo Program : DD


Kecamatan : Tanahh Sepenggal Lintas Jenis Kegiatan : Pemb. WC Warga
Desa : Sungai Puri Ukuran/ Dimensi : 1 Unit
Volume Harga Julah
Jumlah DD
Dari Sat. Satuan Swadaya
No. URAIAN Total Dari DD Rp.
Swadaya Rp. Rp.

a b c=a-b d f g = b x f h = c x f
I. BAHAN
1 Semen PCC @ 50 Kg 6.00 6.00 Zak 72,000 - 432,000
2 Pasir 2.50 2.50 M3 130,000 - 325,000
3 Kerikil 0.50 0.5 M3 150,000 - 75,000
4 Batu Bata 714 714 Bh 600 - 428,400
5 Besi Beton Ø 8 mm KS TY 3.00 3.00 Btg 70,000 - 210,000
6 Kawat Beton 1.00 1.00 Kg 25,000 - 25,000
7 Paku 2.00 2.00 Kg 20,000 - 40,000
8 Kayu Kelas III 0.25 0.25 M3 1,800,000 - 450,000
9 Pipa PVC 3/4" 1.00 1.00 Btg 55,000 - 55,000
10 Pipa PVC 3" 2.00 2.00 Btg 140,000 - 280,000
11 Kloset Jongkok 1.00 1.00 Bh 350,000 - 350,000
12 Sambungan Dan Asesoris Pipa 1.00 1.00 Ls 50,000 - 50,000

Sub Total (1) - 2,720,400


II. ALAT
1 Ember cor 3.00 3.00 Bh 10,000 - 30,000
2 Benang tukang 1.00 1.00 Bh 9,600 - 9,600
3
Sub Total (2) - 39,600
III. UPAH
1 Pekerja 10.00 10.00 Hok 80,000 - 800,000
2 Tukang 3.00 3.00 Hok 100,000 - 300,000
- 1,100,000
Jumlah (1) + (2) + (3) + (4) - 3,860,000
Total Biaya DD + Swadaya 3,860,000

Sungai Puri, …………………....2020

Disetujui oleh : Dibuat oleh:


RIO Dusun Sungai Puri Perencana Kegiatan

…………. SYAMSUWIR,ST
Anggaran Dana Desa (DD) Tahun 2020

REKAPITULASI RENCANA ANGGARAN BIAYA (R-RAB)


Jenis Prasarana : Pembangunan WC Warga

Propinsi : Jambi Kecamatan : Tanahh Sepenggal Lintas


Kabupaten : Bungo Dusun : Sungai Puri

Jenis Kegiatan : Pemb. WC Warga


Ukuran Dimensi : 1 Unit
Jumlah Total Bobot %
No. URAIAN Jumlah : 1 Unit
Lokasi : Kp. ………….
DD Swadaya DD Swadaya

I BAHAN 2,720,400 - 2,720,400 1.70

II PERALATAN 39,600 39,600 0.02

IV UPAH 1,100,000 1,100,000 0.69

JUMLAH 3,860,000 - 3,860,000 - 2


JUMLAH WC UMUM 40 buah 154,400,000
3,000,000
V JASA DISAIN DAN RAB 2,300,000 1.44

JUMLAH TOTAL 159,700,000 4

Jumlah Biaya Upah 1,100,000 -


Jumlah HOK Konstruksi 13.00 HOK

Sungai Puri, ………………. 2020


Rio Dusu Sungai Puri
Perencana Kegiatan

………………… SYAMSUWIR,ST
Program Daerah Pemberdayaan Masyarakat Form 2.8

HASIL SURVEI HARGA BAHAN / ALAT


Kabupaten : Bungo Kecamatan : Tanah Tumbuh Dusun : Rambah
Nama dan Alamat Suplier
Harga
No. Jenis Bahan / Alat Satuan TUNAS BARU SEMOGA Toko BARU PPN PPh Galian C Jumlah Pembulatan
Tanah BAROQAH Tanah Terendah (Rp.)
Tumbuh Candi Tumbuh
BAHAN
1 Semen PCC @ 50 Kg 65,000 65,000 67,000 63,000 5,727 859 69,586 70,000
2 Pasir 125,000 125,000 125,000 125,000 7,000 132,000 132,000
3 Kerikil 125,000 125,000 125,000 125,000 9,000 134,000 134,000
4 Tanah Urug 87,500 87,500 87,500 87,500 2,500 90,000 90,000
5 Batu Gunung 187,500 187,500 187,500 187,500 16,500 204,000 204,000
7 Batu Bata 500 500 500 550
8 Tripleks Tebal 4 mm 75,000 85,000 80,000 75,000 6,818 1,023 82,841 83,000
9 List Plafond Siku2 25,000 25,000 25,000 25,000 2,273 341 27,614 28,000
10 Kawat Bendrat 20,000 23,000 22,000 20,000 1,818 273 22,091 22,000
11 Besi Ø 6 mm 25,000 27,000 27,000 25,000 2,273 341 27,614 28,000
12 Besi Ø 8 mm SNI Jawa 42,000 45,000 45,000 42,000 3,818 573 46,391 46,000
13 Besi Ø 10 mm SNI 63,000 66,000 65,000 63,000 5,727 859 69,586 69,500
14 Besi Ø 12 mm SNI 100,000 105,000 104,000 100,000 9,091 1,364 110,455 110,000
15 Paku 15,000 14,000 15,000 14,000 1,273 191 15,464 15,500
16 Paku Atap 30,000 30,000 31,000 30,000 2,727 409 33,136 33,000
17 Paku Tripleks 20,000 21,000 20,000 20,000 1,818 273 22,091 22,000
18 Kayu Cor 1,750,000 1,750,000 1,750,000 1,750,000 159,091 23,864 1,932,955 1,933,000
19 Papan Mal 1,750,000 1,750,000 1,750,000 1,750,000 159,091 23,864 1,932,955 1,933,000
20 Seng BJLS 20 Gelombang 11 46,500 50,000 47,500 46,500 4,227 634 51,361 51,000
21 Seng Perabung 12,000 13,000 12,000 12,000 1,091 164 13,255 13,000
22 Seng Plat 20,000 22,000 22,000 20,000 1,818 273 22,091 22,000
23 Kunci Pintu tanam 2 Slag 140,000 150,000 150,000 140,000 12,727 1,909 154,636 155,000
24 Grendel Pintu 30,000 33,000 33,000 30,000 2,727 409 33,136 33,000
25 Grendel Jendela 7,000 8,000 8,000 7,000 636 95 7,732 8,000
26 Engsel pintu Kuningan 4" 15,000 18,000 18,000 15,000 1,364 205 16,568 16,500
27 Engsel jendela Sedang 9,000 10,000 10,000 9,000 818 123 9,941 10,000
28 Hak angin 12,000 12,000 15,000 12,000 1,091 164 13,255 13,000
29 Handel Jendela 7,000 8,000 8,000 7,000 636 95 7,732 8,000
30 Cat Tembok Metrolitte/ Sejenis 20,000 20,000 22,000 20,000 1,818 273 22,091 22,000
31 Cat Minyak Avian/ Sejenis 60,000 62,000 62,000 60,000 5,455 818 66,273 66,000
32 Cat Meni Kayu 10,000 10,000 12,000 10,000 909 136 11,045 11,000
33 Amplas 5,000 6,000 6,000 5,000 455 68 5,523 6,000
34 Thinner 13,000 15,000 15,000 13,000 1,182 177 14,359 14,000
35 Dempul Kayu 20,000 22,000 20,000 20,000 1,818 273 22,091 22,000
36 Kloset Jongkok 130,000 135,000 140,000 130,000 11,818 1,773 143,591 144,000
37 Ter/ Residu 10,000 10,000 12,000 10,000 909 136 11,045 11,000
38 Plamour 10,000 10,000 12,000 10,000 909 136 11,045 11,000
39 Pipa Hawa 1,5 m 45,000 50,000 50,000 45,000 4,091 614 49,705 50,000
40 Pipa PVC 3" 60,000 62,000 62,000 60,000 5,455 818 66,273 66,000
41 Pipa PVC 2,5" 55,000 60,000 60,000 55,000 5,000 750 60,750 61,000
42 Katrol 30,000 32,000 35,000 30,000 2,727 409 33,136 33,000
43 Mesin Pompa Air 400,000 430,000 450,000 400,000 36,364 5,455 441,818 442,000
44 Pipa 3/4" 15,000 17,000 15,000 15,000 1,364 205 16,568 16,000
45 Elbow 3/4" 3,000 4,000 4,000 3,000 273 41 3,314 3,000
46 Sockdrat 1/2" 3,000 4,000 5,000 3,000 273 41 3,314 3,000
47 Kran 1/2" 10,000 10,000 12,000 10,000 909 136 11,045 11,000
48 Lem Paralon 5,000 5,000 6,000 5,000 455 68 5,523 5,000
Bak Fiber 300,000 300,000 350,000 300,000 27,273 4,091 331,364 330,000
Tedmond 1000 Ltr 1,200,000 1,250,000 1,300,000 1,200,000 109,091 16,364 1,325,455 1,325,000
Tedmond 500 Ltr 750,000 800,000 780,000 750,000 68,182 10,227 828,409 828,000
- - -
- - -

Mengetahui : Dibuat oleh :


Ketua TPK Sekretaris TPK

YAHYA. J MARIAM
Semen PCC @ 50 Kg
Batu Kali
Pasir
Kerikil
Batu Bata
Tanah Urug
Besi Beton Ø 10 mm KS TY
Besi Beton Ø 8 mm KS TY
Besi Beton Ø 6 mm Jawa P= 12 M
Kawat Beton
Paku
Paku Tripleks
Tripleks Tebal 4 mm
Seng Gelombang 11 SNI 6 kaki
Seng Plat
Paku Atap
Keramik 40 x 40 cm
Semen warna
List kayu profil
Cat tembok warna
Cat tembok utk plapond
Cat minyak
Cat dasar tembok
Cat dasar kayu glotek
Plamier
Minyak cat
Amplas
Kuzen pintu
Kuzen jendela
Daun pintu Panil
Daun jendela + kaca
Kunci Pintu tanam 2 Slag
Engsel pintu Kuningan 4"
Engsel jendela Sedang
Hak angin
Tarikan jendela
Grendel jendela
Balok 8/12
Balok 6/12
Balok 5/10
Papan 3/25
Papan 3/10
Papan Kayu Klas II utk Bubungan
Papan Kayu Klas II Penutup tepi atap
Kayu Klas III (papan cor 2/20)
Balok kayu klas II (5/7)
Dolken kayu gelam Ø 8 - 4 M

Anda mungkin juga menyukai